CA2147492A1 - Drilling and cementing a well - Google Patents

Drilling and cementing a well

Info

Publication number
CA2147492A1
CA2147492A1 CA 2147492 CA2147492A CA2147492A1 CA 2147492 A1 CA2147492 A1 CA 2147492A1 CA 2147492 CA2147492 CA 2147492 CA 2147492 A CA2147492 A CA 2147492A CA 2147492 A1 CA2147492 A1 CA 2147492A1
Authority
CA
Canada
Prior art keywords
drilling
blast furnace
drilling fluid
furnace slag
borehole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
CA 2147492
Other languages
French (fr)
Inventor
Kenneth Michael Cowan
Arthur Herman Hale
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shell Canada Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Publication of CA2147492A1 publication Critical patent/CA2147492A1/en
Abandoned legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C09DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
    • C09KMATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE
    • C09K8/00Compositions for drilling of boreholes or wells; Compositions for treating boreholes or wells, e.g. for completion or for remedial operations
    • C09K8/02Well-drilling compositions
    • C09K8/04Aqueous well-drilling compositions
    • C09K8/14Clay-containing compositions
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23QDETAILS, COMPONENTS, OR ACCESSORIES FOR MACHINE TOOLS, e.g. ARRANGEMENTS FOR COPYING OR CONTROLLING; MACHINE TOOLS IN GENERAL CHARACTERISED BY THE CONSTRUCTION OF PARTICULAR DETAILS OR COMPONENTS; COMBINATIONS OR ASSOCIATIONS OF METAL-WORKING MACHINES, NOT DIRECTED TO A PARTICULAR RESULT
    • B23Q17/00Arrangements for observing, indicating or measuring on machine tools
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23QDETAILS, COMPONENTS, OR ACCESSORIES FOR MACHINE TOOLS, e.g. ARRANGEMENTS FOR COPYING OR CONTROLLING; MACHINE TOOLS IN GENERAL CHARACTERISED BY THE CONSTRUCTION OF PARTICULAR DETAILS OR COMPONENTS; COMBINATIONS OR ASSOCIATIONS OF METAL-WORKING MACHINES, NOT DIRECTED TO A PARTICULAR RESULT
    • B23Q41/00Combinations or associations of metal-working machines not directed to a particular result according to classes B21, B23, or B24
    • B23Q41/08Features relating to maintenance of efficient operation
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B30PRESSES
    • B30BPRESSES IN GENERAL
    • B30B15/00Details of, or accessories for, presses; Auxiliary measures in connection with pressing
    • B30B15/26Programme control arrangements
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B28/00Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements
    • C04B28/02Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements containing hydraulic cements other than calcium sulfates
    • C04B28/08Slag cements
    • CCHEMISTRY; METALLURGY
    • C09DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
    • C09KMATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE
    • C09K8/00Compositions for drilling of boreholes or wells; Compositions for treating boreholes or wells, e.g. for completion or for remedial operations
    • C09K8/42Compositions for cementing, e.g. for cementing casings into boreholes; Compositions for plugging, e.g. for killing wells
    • C09K8/46Compositions for cementing, e.g. for cementing casings into boreholes; Compositions for plugging, e.g. for killing wells containing inorganic binders, e.g. Portland cement
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/13Methods or devices for cementing, for plugging holes, crevices, or the like
    • E21B33/14Methods or devices for cementing, for plugging holes, crevices, or the like for cementing casings into boreholes
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/18Numerical control [NC], i.e. automatically operating machines, in particular machine tools, e.g. in a manufacturing environment, so as to execute positioning, movement or co-ordinated operations by means of programme data in numerical form
    • G05B19/406Numerical control [NC], i.e. automatically operating machines, in particular machine tools, e.g. in a manufacturing environment, so as to execute positioning, movement or co-ordinated operations by means of programme data in numerical form characterised by monitoring or safety
    • G05B19/4063Monitoring general control system
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B23/00Testing or monitoring of control systems or parts thereof
    • G05B23/02Electric testing or monitoring
    • G05B23/0205Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults
    • G05B23/0218Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults characterised by the fault detection method dealing with either existing or incipient faults
    • G05B23/0224Process history based detection method, e.g. whereby history implies the availability of large amounts of data
    • G05B23/0227Qualitative history assessment, whereby the type of data acted upon, e.g. waveforms, images or patterns, is not relevant, e.g. rule based assessment; if-then decisions
    • G05B23/0235Qualitative history assessment, whereby the type of data acted upon, e.g. waveforms, images or patterns, is not relevant, e.g. rule based assessment; if-then decisions based on a comparison with predetermined threshold or range, e.g. "classical methods", carried out during normal operation; threshold adaptation or choice; when or how to compare with the threshold
    • GPHYSICS
    • G07CHECKING-DEVICES
    • G07CTIME OR ATTENDANCE REGISTERS; REGISTERING OR INDICATING THE WORKING OF MACHINES; GENERATING RANDOM NUMBERS; VOTING OR LOTTERY APPARATUS; ARRANGEMENTS, SYSTEMS OR APPARATUS FOR CHECKING NOT PROVIDED FOR ELSEWHERE
    • G07C3/00Registering or indicating the condition or the working of machines or other apparatus, other than vehicles
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/30Nc systems
    • G05B2219/33Director till display
    • G05B2219/33284Remote diagnostic
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/30Nc systems
    • G05B2219/45Nc applications
    • G05B2219/45143Press-brake, bending machine
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2223/00Indexing scheme associated with group G05B23/00
    • G05B2223/06Remote monitoring
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/80Management or planning
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/50Reuse, recycling or recovery technologies
    • Y02W30/91Use of waste materials as fillers for mortars or concrete

Abstract

A slim hole well is drilled using a drilling fluid comprising blast furnace slag and water which drilling fluid is circulated during the drilling to lay down a filter cake. Thereafter, an activator is added and generally, an alkaline material and additional blast furnace slag, to produce a cementitious slurry which is passed down a casing and up into an annulus to effect primary ce-menting.

Description

~ 0 94/092~2 214 7 ~ 9 2 PC~r/EP93/02932 -DRILLING AND CEMENTING A WELL

This invention relates to drilling and cementing a well.
A borehole for an oil well or gas well is normally drilled with an initial diameter of about 50 cm. It has long been known to drill smaller diameter holes, known as slim holes, for exploratory wells. These wells generally have a borehole of no more than 13-15 cm initial diameter. It would be desirable to drill slim hole production wells in some instances.
As with the drilling of conventional boreholes, the slim hole process is generally carried out using a rotary drilling process.
The rotary drilling of a borehole is accomplished using a rotary drilling assembly comprising a by rotating a drill bit attached to the lower end of a drill string. Weight is applied to the drill bit while rotating to create a borehole into the earth.
The drill string is hollow and pipe sections are added to the drill string to increase its length as the borehole is deepened. In rotary drilling the drill bit can be rotated by rotating the drill string and/or by driving a downhole motor arranged at the lower end of the drill string.
This rotary drilling process creates significant amounts of friction which produces heat along with fragments of the strata being penetrated. The fragments of the strata must be removed from the borehole and the drill bit must be cooled to extend its useful life. Both of these necessities are accomplished by the circulation of a fluid down through the drill string and up to the surface between the drill string and the wall of the borehole.
Once the borehole has been drilled to the desired depth, it may be desirable to isolate the separate areas, zones or formations traversed by the borehole. For extraction of fluids from formations, a conduit (casing) must be inserted into the borehole extending from the surface downward, and liners may be hung inside the casing.

21~7492 .
At this point it becomes necessary to fill the annulus between the casing and the borehole wall or between the liner and casing with a material which will seal the annulus and provide structural support for the casing or liner. This is commonly referred to as primary cementing.
Slim hole drilling creates two problems. First, it is more difficult to remove the fluid in the annulus between the borehole and casing because the annulus is smaller. Second, it is more difficult to remove the filter cake on the side of the borehole wall, again because the annulus i5 SO narrow. This latter problem is significant because the filter cake is generally incompatible with the cement. This can result in channelling of fluids used to wash out the drilling fluid and~or channelling of the cement leaving significant areas of unremoved and incompatible drilling ~luid in 1~ the annulus. This results in voids in the final cementing job.
USA patent specification No. 3 557 876 discloses a method for drilling and cementing a well comprising:
drilling a borehole with a rotary drilling assembly comprising a drill string and a drill bit utilizing a drilling fluid comprising water and a cementitious material;
circulating the drilling fluid down the drill string and up an annulus between the drill string and wall of the borehole, thus laying down a filter cake on the wall of the borehole during the drilling;
withdrawing the drilling assembly and inserting a casing;
adding an activator to the drilling fluid to produce a cementitious-slurry; and circulating the cementitious slurry do~n the casing and up into the annulus It is an object of this invention to cement a slim hole well.
It is a further object of this invention to avo;d the formation of voids in a cementing job in a slim hole well.
It is a further object of this invention to avoid the problems of incompatibility between filter cake and cement in the annulus of a slim hole well.

~7ED S'~I~ET

~ 21~7~92 To this end the method for drilling and cementing a well according to the present invention is characterized in that the drilling fluid comprising blast furnace slag and water, and in that the casing has such an outer diam~ter that the width of the annulus between the outer surface of the casing and the inner surface of the borehole is between 0.2 and 4 cm.
It has been discovered that by utilizing blast furnace slag in the drilling fluid, a compatible filter cake is laid down on the borehole wall and thus the filter cake turns into an asset rather than a liability. In addition, as will be discussed in detail hereinbelow, undisplaced drilling fluid in the narrow annulus is converted into a strong, hard, sealing material.
The term 'slim hole drilling' is intended to encompass those techniques where the initial borehole diameter is 7 to 23 cm, more lS generally 10 to 15 cm. In such wells the width of the annulus between a casing or a liner and the wall of the borehole is only between 0.2 and 4 cm; generally between 0.6 and 3 cm, more generally between 1 and 2 cm. Reference to the dimension of the annulus means the difference between the radius to the inner surface of the borehole and the radius to the outer surface of the casing.
The term 'drilling fluid' as used herein means water or oil based fluids which contain water, blast furnace slag and at least one other additive such as viscosifiers, thinners, dissolved salts, solids from the drilled formations, solid weighting agents to increase the fluid density, formation stabilizers to inhibit deleterious interaction between the drilling fluid and geologic formations, and additives to improve the l.ubricity of the drilling fluid.
Reference is made to USA patent specification No. 5 058 679.
This publication relates to converting a drilling fluid in-situ to a cement by adding blast furnace slag for cementing. In this case the cement-containing drilling fluid i5 not used for drilling and subse~uent cementing, nor does this publication relates to the specific problems associated with cementing casings in slim hole T~iu~Lj S'~I~ET

21~7~92 - 3a -production wells. Therefore this publication is not relevant to the present invention.
In preferred embodiments wherein the drilling fluid is activated by additional blast furnace slag and accelerators, as will be discussed hereinbelow, the rheological properties of both the drilling fluid and the cement can be optimized. ~inally, the drilling fluid and cement produced in accoLdance with this invention is tolerant, indeed is benefited by, the presence of brine. Since a major area where slim hole wells are utilized is in offshore drilling where brine is inevitably present this is of special significance. Since drilling fluid used in accordance with ~ 0 94/09252 214 7 4 9 2 PCT/EP93/02932 this invention becomes a part of the final cement, the fluid can be referred to as a universal fluid, i.e., is useful in the drilling and cementing.
Generally, the initial drilling fluid will be any one of the known types of drilling fluids which has been combined with blast furnace slag. Suitable drilling fluids include those known in the art as water-based muds, fresh water mud, sea water mud, salt mud, brine mud, lime mud, gypsum mud, polyalcohol mud and oil-in-water emulsions. One group of suitable drilling fluids is disclosed in USA patent specification No. 5 058 679. Also, oil-cont~ining muds which also contain water can be utilized such as low water content oil-base mud and invert oil-emulsion mud. In all cases the mud will also have blast furnace slag which will generally be present in an amount between 2.8 and 285 kg/m of final drilling fluid, preferably between 28 and 228 kg/m , most preferably between 57 and 143 kg/m .
A typical drilling fluid formulation to which cementitious material may be added to form a universal drilling fluid is as follows: 10-20 wt~ salt, 23-28 kg/m bentonite, 11-17 kg/m carboxymethyl starch (fluid loss preventor), sold under the trade name "BIOLOSE" by Milpark Drilling Fluids, 1-3 kg/m partially hydrolyzed polyacrylamide (PHPA) which is a shale stabilizer, sold under the trade name "NEWDRIL" by Milpark Drilling Fluids, 3-4 kg/m CMC sold under the trade name "MILPAC" by Milpark Drilling Fluids, 85-200 kg/m drill solids, and 0-715 kg/m barite.
Because the drilling fluid becomes a part of the final cementitious slurry, the amount of used drilling fluid which must be disposed of is greatly ~irinished.
In another embodiment of this invention, most or all of the components of the drilling fluid are chosen such that they have a function in the cementitious material also. The following Tables 1 and 2 illustrates the uniqueness of such drilling fluid formulations and cementitious slurry formulations.

O 94/09252 ~ P ~ /EP93/02932 Table 1. Information on functions of additives in a drilling fluid.
Primary function Secondary function Additive SyntheticFluid loss polymerl control Starch Fluid loss Viscosity control control BiopolymerViscosity Silicate Viscosity Shale stabilizer CarbohydrateDeflocculant polymer Barite Density BentoniteFluid loss control Clay/Quartz -- --dust7 Slag Cuttings --stabilizer Lime Shale Alkalinity stabilizer PECP10 Cuttings/Well- Fluid loss bore stabilizer NaCl Shale stabilizer Oil Lubricant Anti-balling W 0 94/09252 ~7492 6 - PC~r/EP93/02932 Table 2. Information on functions of additives in a cementitious slurry.
Primary function Secondary function Additive Synthetic Fluid loss Retarder polymerl control Starch2 Fluid loss Retarder control Biopolymer ViscosityRetarder Silicate Accelerator --Carbohydrate Retarder Deflocculant polymer4 Barite5 DensitySolids concentration Bentonite6 Fluid loss Solids controlconcentr.
Clay/Quartz Solids dust7 concentration Slag Cementitious Solids concentration Lime9 AcceleratorSolids concentration PECP10 RetarderRheological control NaCl _ _ Oil -- --lA synthetic polymer manufactured by SKW Chemicals Inc. under trade name "POLYDRILL", for instance.
Starch made by Milpark Inc. under the trade name "PERMALOSE", for instance.
3"BIOZAN", a biopolymer made by Kelco Oil Field Group, Inc., for instance.
A water-soluble carbohydrate polymer manufactured by Grain Processing Co. under the trade name "MOR-REX", for instance.

~ O 94/09252 21 ~ 7 4 ~ 2 P ~ /EP93/02932 Barite is BaS04, a drilling fluid weighting agent.
6Bentonite is clay or colloidal clay thickening agent.
A clay/quartz solid dust manufactured by MilWhite Corp. under the trade name "REVDUST", for instance.
Blast furnace slag manufactured by Blue Circle Cement Co. under the trade name "NEWCEM" is suitable.
CaO.
Polycyclicpolyetherpolyol, as described in USA patent specification No. 5 058 679.
By 'blast furnace slag' is meant the hydraulic refuse from the melting of metals or reduction of ores in a furnace as disclosed in USA patent specification No. 5 058 679, the disclosure of which is incorporated herein by reference. By 'phosphorus salt' is meant a phosphonate, a phosphate or a polyphosphate as is described in detail hereinafter.
The preferred blast furnace slag used in this invention is a high glass content slag produced by quickly quenching a molten stream of slag at a temperature of between 1400 C and 1600 C
through intimate contact with large volumes of water. Quenching converts the stream into a material in a glassy state having hydraulic properties. At this stage it is generally a granular material that can be easily ground to the desired degree of fineness. Silicon dioxides, aluminium oxides, iron oxides, calcium oxide, magnesium oxide, sodium oxide, potassium oxide, and sulphur are some of the chemical components in slags. Preferably, the blast furnace slag used in this invention has a particle size such that it exhibits a specific surface area between 2 000 cm /g and 15 000 cm /g and more preferably, between 3 000 cm /g and 15 000 cm /g, even more preferably, between 4 000 cm /g and 9 000 cm /g, most preferably between 4 000 cm /g and 8 500 cm /g. In each instance the specific surface area or surface area is the Blaine specific surface area. An available blast furnace slag which fulfils these requirements is marketed under the trade name "NEWCEM" by the Blue Circle Cement Company. This slag is obtained from the Bethlehem Steel Corporation blast furnace at Sparrows Point, Maryland.

W 0 94/09252 P ~ /EP93/02932 ~
2~7492 A usual blast furnace slag composition range in weight percent is: SiO2, 30-40; A1203, 8-18; CaO, 35-50; MgO, 0-15; iron oxides, 0-1; S, 0-2 and manganese oxides, 0-2. A typical specific example is: SiO2, 36.4; A1203, 16.0; CaO, 43.3; MgO, 3.5; iron oxides, 0.3;
S, 0.5; and ~ng~n~se oxides, < 0.1.
Blast furnace slag having relatively small particle size is frequently desirable because of the greater strength it imparts in many instances to a final cement. Characterized in terms of particle size the term "fine" can be used to describe particles with a specific surface area between 4 000 and 7 000 cm2/g, corresponding to 16 to 31 micrometer in size; "microfine" can be used to describe those particles with a specific surface area between 7 000 and 10 000 cm /g that correspond to particles of 1 5.5-16 micrometer in size and "ultrafine" can be used to describe particles with a specific surface area over 10 000 cm2/g that correspond to particles 5.5 micrometer and smaller in size. Small particle size blast furnace slags are available from Blue Circle Cement Co., Koch Industries, Tulsa, Oklahoma, under the trade name "WELL-CEM", and from Geochem under the trade name "MICROFINE
MC100".
However, it is very time consuming to grind blast furnace slag to these particles sizes. It is not possible to grind blast furnace slag in a manner where particles are entirely one size. Thus, any grinding operation will give a polydispersed particle size distribution. A plot of particle size versus percent of particles having that size would thus give a curve showing the particle size distribution.
In accordance with a preferred embodiment of this invention a blast furnace slag having a polydispersed particle size distribution exhibiting at least two nodes on a plot of particle size versus percent of particles in that size is utilized. It has been found that if only a portion of the particles are in the ultrafine category, the re~ining, indeed the majority, of the slag can be ground more coarsely and still give essentially the same result as is obtained from the more expensive grinding of all of ~ 0 94/09252 21~ 7 19 2 PC~r/EP93/02932 g the blast furnace slag to an ultrafine state. Thus, a grinding process which will give at least 5~ of its particles are between 1.9 and 5.5 micrometer offers a particular advantage in economy and effectiveness. More preferably, 6 to 25wt% would be between 1.9 and 5.5 micrometer. The most strai~htforward way of obtaining such a composition is simply to grind a minor portion of the blast furnace slag to an ultrafine condition and mix the resulting powder with slag ground under less severe conditions. Even with the less severe conditions there would be some particles in the fine, microfine or ultrafine range. Thus, only a minority, i.e., as little as 4wt% of the slag, would need to be ground to the ultrafine particle size.
Generally, 5 to 25wt%, more preferably 5 to 10wt~ can be ground to the ultrafine particle size and the re~in~er ground in a normal way thus giving particles generally in a size range of greater than 11 micrometer, the majority being in the 11 to 31 micrometer range.
Another feature of this invention is the ability to tailor the rheology of both the drilling fluid and the final cement to the conditions of a particular borehole. This results from the fact that the use of slag as the hydraulic material gives a final cementitious slurry which is not weakened in the manner that would be the case with Portland cement if the slurry is more dilute. On the other hand, additional slag does not impart extremely high viscosity to the slurry and thus a higher concentration of hydraulic material can be used if desired.
However, in the preferred method of this invention, the drilling fluid is utilized and thereafter diluted prior to or during the addition of additional blast furnace slag. The dilution fluid can be the same as the liquid used to make the drilling fluid or it can be different. Generally, it will be brine, especially if the drilling fluid was made using brine. It can also be a more concentrated brine. In many instances, it is preferred that both the dilution fluid and the original liquid used to produce the initial drilling fluid be seawater. This is especially beneficial in offshore drilling applications where fresh water is not readily available and seawater is.

W O 94/09252 ~ 2 PC~r/EP93/02932 ~

Suitably the drilling fluid contains between 57 and 143 kg/m3 of the blast furnace slag and wherein the additional blast furnace slag is added in forming the cementitious slurry in an amount sufficient to give a total amount of cementitious material in the 5 cementitious slurry between 285 and 1 430 kg/m3.
Thus, a significant improvement in the operating procedure is provided. This is because the density of the drilling fluid can be chosen in the first place to be sufficient to avoid inflow into the borehole because of formation pressure but insufficient to rupture the borehole wall and force fluid out into the formation. By utilizing the dilution and thereafter the addition of additional blast furnace slag, the cementitious slurry can also have the density tailored to the particular operation the same as the drilling fluid.
The dilution can be carried out in either of two ways. First, a vessel cont~ining drilling fluid can simply be isolated and the desired amount of water or other diluent added thereto. In a preferred embodiment, however, the drilling fluid is passed to a r;~jng zone as a flowing stream and the dilution fluid added "on the fly" to the flowing stream. Thereafter, the additional blast furnace slag is added. This avoids highly viscous cementitious slurry compositions and allows all of the pumping to be done with piping and pumps associated with the well rig without the need for pumps designed for pumping cement. This is of particular value in the areas to which this invention is of special utility, offshore drilling rigs where the transportation of additional pumping equipment is particularly inconvenient. Thus, it is possible to tailor the final density of the cementitious slurry, if desired, to a ~alue between 30% less and 70% more than the original density of the drilling fluid, preferably between 15~ less and 50% more, most preferably essentially the same, i.e., varying by no more than +5 weight percent.
The total amount of cementitious material present in the cementitious slurry is generally between about 57 and about 1 712 kg/m , preferably between 285 and 1 430 kg/m , most preferably ~ 0 94/09252 214 7 ~ 9 2 PC~r/EP93/02932 between 428 and 1 000 kg/m . In a most preferred embodiment the hydraulic material is made up entirely, or essentially entirely, of blast furnace slag, no other hydraulic material being added.
In yet another related embodiment of this invention, universal fluid is utilized in a drilling operation and thereafter additional slag snd/or additives are gradually added so as to gradually transition from a drilling fluid to a cementitious slurry.
This invention can even be used to drill extended reach slim hole wells which, themselves, present some of the same problems as slim hole wells generally because of uneven casing placement in the borehole.
The term 'drilling extended reach wells' is intended to encompass those techniques sometimes referred to as deviated drilling, horizontal drilling or directional drilling. The invention is applicable to those deviated wells where the deviation from vertical is as little as one percent since even this small deviation over the course of a borehole causes difficulty in centering the casings. The other extreme would be a truly horizontal well which would be quite rare. The invention is of particular value in those wells having a deviation from the vertical of between 1 and 90 degrees, preferably between 10 and 90 degrees, most preferably between 30 and 80 degrees.
In some instances, it is desirable to sequence the incorporation of ingredients. For instance, the slag may be introduced into the drilling fluid after the addition of thinners and/or retarders. This is particularly true if mixed metal hydroxides are used in the drilling fluid to impart thixotropic properties. In such instances, a thinner such as a lignosulphonate is preferably added before adding slag.
The mixed metal hydroxides provide better solids suspension.
This, in combination with the settable filter cake provided in the technique of this invention, greatly enhances the cementing in a restricted annulus. The mixed metal hydroxides are particularly effective in muds contAining clay such as sodium bentonite.
Preferred systems thickened in this way contain from 3-57 kg/m3 of W O 94/09252 2~ 4~ ~9 2 P ~ /EP93/02932 ~

clay such as bentonite, preferably 6 to 43 kg/m , most-preferably 20 to 34 kg/m . The mixed metal hydroxides are generally present in an amount between 0.3 and 6 kg/m of total drilling fluid, preferably between 0.3 and 4 kg/m , most preferably between 2 and 4 kg/m . Mixed metal hydroxides are known in the art and are trivalent metal hydroxide-containing compositions such as MgAl(OH)4 7Clo 3. They conform essentially to the formula LimDdT(OH)(m+2d+3+na)A a where m represents the number of Li ions present; the amount being between 0 and about 1;
D represents divalent metals ions; with d representing the amount of D ions between 0 and about 4;
T represents trivalent metal ions;
A represents monovalent or polyvalent anions of valence n, other than OH , with a being the amount of A anions; and where (m+2d+3+na) is equal to or greater than 3.
A more detailed description can be found in USA patent specification No. 4 664 843.
The mixed metal hydroxides in the drilling fluid in combination with blast furnace slag tend to set to a cement having considerable strength in a comparatively short time, i.e., about one-half hour at temperatures as low as 38 C. This can be a major asset in some applications.
Suitable fluid loss additives found in drilling fluids include bentonite clay, carboxymethylated starches, starches, carboxymethyl cellulose, synthetic resins such as "POLYDRILL" by SKW Chemicals, sulphonated lignite, lignites, lignin, or tannin compounds. Weight materials include barite, calcium carbonate, hematite and MgO, for example. Shale stabilizers that are used in drilling fluids include hydrolyzed polyacrylonitrile, partially hydrolyzed polyacrylamide, salts including NaCl, KCl, sodium or potassium formate, sodium or potassium acetate, polyethers and polycyclic and/or polyalcohols.
Viscosifying additives can be used such as biopolymers, starches, attapulgite and sepiolite. Additives are also used to reduce ~ 0 94/09252 214 7 4 9 2 PC~r/EP93/02932 torque. Suitable thinners such as chrome and chrome free lignosulphonates, sulphonated styrene maleic-anhydride and polyacrylate may also be used depending upon the mud type and mud weight. Lubricating additives include nonionic detergents and oil (diesel, mineral oil, vegetable oil, synthetic oil), for instance.
Alkalinity control can be obtained with KOH, NaOH or CaO, for instance. In addition, other additives such as corrosion inhibitors, nut hulls etc. may be found in a typical drilling flu$d. Of course, drill solids including such minerals as quartz and clay minerals (smectite, illite, chlorite, kaolinite, etc.) may be found in a typical mud.
After the completion of the drilling, the drilling fluid is activated. This can be done by adding activators as discussed in detail hereinbelow, by adding additional blast furnace slag, or both. Preferably, the activation is done by adding additional blast furnace slag and an accelerator. It is also in the scope of the invention for the cementitious slurry to comprise hydraulic materials other than blast furnace slag, for instance, pozzolans and other hydraulic materials can be present. By 'hydraulic material' is meant a material which, on contact with water and/or activators, hardens or sets into a solidified composition.
The activator or activators can be added either with any other ingredients that are added before the additional blast furnace slag, with the additional blast furnace slag, or after the addition of the additional blast furnace slag.
In some instances, it may be desirable to use a material which functions as a retarder along with the activator because of the need for other effects brought about by the retarder. For instance, a chromium lignosulphonate may be used as a thinner along with the activator even though it also functions as a retarder.
As noted hereinabove, the activator can be nothing more than additional blast furnace slag in a concentration high enough to form a cementitious slurry. Blast furnace slag will eventually hydrolyze and form cement particularly if it is in a heated W O 94/09252 P ~ /EPg3/02932 ~
21~7 492 environment or if heat is applied to the borehole to speed up the setting.
However, it is greatly preferred to utilize a combination of slag in an amount which represents the majority of the total slag in the cementitious composition (i.e., a majority of the total of the slag in the drilling fluid and the slag added to form the cementitious slurry) and a chemical activator. Suitable chemical activators include sodium silicate, sodium fluoride, sodium silicofluoride, magnesium silicofluoride, zinc silicofluoride, sodium carbonate, potassium carbonate, sodium hydroxide, potassium hydroxide, calcium hydroxide, sodium sulphate and mixtures thereof.
A mixture of caustic soda (sodium hydroxide) and soda ash (sodium carbonate) is preferred because of the effectiveness and ready availability. When mixtures of alkaline agents such as caustic soda and soda ash are used the ratio can vary rather widely since each will function as an accelerator alone. Preferably, about 2.8 to 57 kg/m3 of caustic soda, more preferably 5 to 17 kg/m of caustic soda are used in conjunction with from 5 to 143 kg/m , preferably 5 to 57 kg/~3 of soda ash. The references to "kg/m " means kg per m3 of final cementitious slurry.
In yet another embodiment of this invention the drilling process is carried out as described hereinabove with a universal fluid to produce a borehole through a plurality of strata, thus laying down a filter cake. Prior to the cementing operation, an activator is passed into contact with the filter cake, for instance by circulating the activator down the drill string and up the annulus between the drill string and the filter cake, or else the drill string is removed and the casing inserted and the activator circulated down the casing and up the annulus. As used herein 'down' as it relates to a drill string or casing means in a direction toward the farthest reach of the borehole even though in rare instances the borehole can be disposed in a horizontal position. Similarly, 'up' means back toward the be~i~nin~ of the borehole. Preferably, the circulation is carried out by using the drill string, this being the benefit of this embodiment of the 2147~92 invention whereby the filter cake can be "set" to shut off gas zones, water loss, or to shut off lost circulation in order to keep drilllng without having to remove the drill string and set another string of casing. This can also be used to stabilize zones which may S be easily washed-out (salt zones wherein the salt is soluble in water, for instance) or other unstable zones. After the drilling is complete the drilling fluid is then diluted, the drill string removed, and the cementing carried out as described hereinabove.
This can be accomplished by circulating a separate fluid containing the activator or by adding an activator such as an alkali as described hereinabove to the drilling fluid.
The present invention further relates to a method for drilling and cementing a well, wherein the drilling fluid comprises water and between 47 and 143 kg/m3 of blast furnace slag, clay, starch, I~ partially hydrolyzed polyacrylamide, and barite, wherein the casing has such an outer diameter that the width of the annulus between the outer surface of the casing and the inner surface of the borehole is between 0.2 and 4 cm, wherein the activator composition comprises blast furnace slag, a lignosulphonate thinner, and an activator comprising a mixture of caustic soda and soda ash, and wherein the total amount of blast furnace slag in the cementitious slurry is between 285 and 1 430 kg/m3.
Conventional spacers may be used in the above described sequence. Also, any leftover fluid having activators therein may be displaced out of the borehole by the next fluid and/or spacer fluid and stored for subsequent use or disposal.

MVM8/T8628~CT

W O 94/09252 P ~ /EP93/02932 2 ~ ~ 7 ~ 9 2 - 16 -In this embodiment where the filter cake is "set", the activator can be any of the alkaline activators referred to hereinabove such as a mixture of sodium hydroxide and sodium carbonate.
The invention will now be described in more detail by way of example with reference to the below test.
A 1 665 kg/m universal fluid was prepared using a 1 617 kg/m drilling fluid having the following composition: 20 wt% salt (140 000 mg/l), 23-28 kg/m bentonite, 11-17 kg/m carboxymethyl starch, sold under the trade name "BIOLOSE" by Milpark, 1.4-2.8 kg/m3 partially hydrolyzed polyacrylamide (PHPA), sold under the trade name "NEWDRIL", by Milpark, 2.8-3.6 kg/m CMC, sold under the trade name "MILPAC" by Milpark, 86-200 kg/m drill solids, 0-700 kg/m3 barite, and 114 kg/m of blast furnace slag sold under the trade name "NEWCEM" by Blue Circle Cement Company.
The universal fluid was designed to be a drilling fluid at temperatures 49 C through 71 C and to provide a settable filter cake for better zonal isolation and for protection of the formation. A full-scale horizontal borehole model was used to test the hardening of this universal fluid. This universal fluid was tested to show that it and its filter cake would set up under downhole conditions.
The 1 665 kg/m universal fluid was circulated through the model and a filter cake was formed. A portion of the universal fluid was then converted into a 1 845 kg/m cementitious slurry by the addition of slag and activators as described hereinafter and was used to displace the universal fluid in the borehole model. The borehole model was heat aged at 93 C for three weeks. The most important objective of this test was to deposit the universal fluid in slmulated washed-out sections and to show that undisplaced universal fluid pockets can be set up in the worst possible physical conditions.
Test objectives were: 1) to demonstrate that undisplaced pockets of the 1 665 kg/m universal fluid can set up under downhole conditions in order to eliminate unset fluids and filter ~ O 94/09252 21 4 7 4 9 2 P ~ /EP93/02932 cakes in the test model, 2) to demonstrate that the 1 665 kg/m3 universal fluid could be converted into a cementitious slurry with satisfactory slurry and set cement properties, and 3) to demonstrate that a universal fluid/cementitious slurry job can improve zonal isolation (improved shear and hydraulic bond in the model) and provide lateral casing support.
Test conditions: three washed-out sections (2.54, 5.08 and 15.24 cm wide) were specially built by modifying a synthetic borehole model. The displacement test on the modified model was based on the following field conditions:
Universal fluid Condition - Drilling a deviated hole with a diameter of 27 cm at borehole circulating temperature (BHCT) of 49 C to 71 C.
Cement slurry condition - Borehole static temperature (BHST) of 93 C (5 486 m) Displacement Model: A 12.7-cm outside diameter (OD), 4.6-m long steel casing in a 16.5-cm inside diameter (ID) synthetic core, simulating a formation with the 3 washed-out sections, was used in a horizontal position using the following test conditions: 1) slow displacement rates (159 l/min) in order not to wash away the deposited filter cake and to preserve undisplaced universal fluid in the washed-out sections, 2) 100% casing standoff (centralized).
The synthetic core (formation) was a 4.45-cm thick layer of a permeable sand-epoxy mix on the inner circumference of the model (27.3-cm OD and 25.4-cm ID steel casing). Three washed out sections (sharp edged with no transition zones) were made by removing portions of the simulated sand-epoxy formation before welding the sections of the 4.57 m total length steel casing together. The tops of the three wash-outs (2.54, 5.08 and 15.24 cm wide) were placed at 1.5 m, 2.1 m, and 3 m respectively from the bottom of the borehole model. As mentioned earlier, the 12.7-cm OD steel casing was centralized inside the borehole model leaving a theoretical annular clearance of 1.9 cm except in the wash-outs where it was 6.35 cm wide.

W O 94/09252 ~ 2 P ~ /EP93/02932 The 1.9 cm annular clearance simulates the narrow annulus in a slim hole well.
Deposition of filter cake: The above-described 1 665 kg/m3 universal fluid was circulated for 2 hours through the water-saturated borehole model at 447-636 l/min. The borehole model was shut in, electrically heated to 60 C and pressurized. Filtrate was collected at a pressure differential of 0.~69 MPa to build a filter cake approximately 0.32 cm thick on the core.
Displacement: after the overnight filtering period at 60 C, the universal fluid was circulated through the borehole model at 159 l/min for 20 minutes while collecting additional filtrate.
During the time of circulation, a 795 1 batch of universal fluid was isolated from the universal fluid and converted it into a 570 kg/m3 cementitious slurry by adding additional 457 kg/m NEWCEM
brand slag, activators and a retarder. The cementitious slurry was then dyed by adding 7 kg/m red iron oxide. The activator system was made up of 11 kg/m caustic soda, 40 kg/m soda ash and 17 kg/m "SPERSENE CF" (chrome free lignosulphonate manufactured by MI
Drilling Fluids). The universal fluid was displaced out of the borehole model with the dyed cementitious slurry at 159-318 l/min until the initial portion of uncontaminated cementitious slurry was noted at the discharge. The slow displacement was employed in order to leave substantial amounts of undisplaced universal fluid in the model. The cementitious slurry was then circulated through the borehole model for an additional 20 minutes at 159-318 l/min.
Evaluation of the core: after a three-week aging period at 93 C, the borehole model was allowed to cool to room temperature.
The model was then disassembled and sawed into three sections.
These sections were again sawed into smaller sections for further shear and hydraulic bond tests.
All the available cross sections were photographed for estimating displacement efficiency. As planned, the displacement efficiency was about 55%. The normally poor displacement efficiency of the model was clearly represented by the high angle of the borehole model. Although the casing was centralized, a perfect ~ 0 94/09252 21 4 7 ~ 9 2 P ~ /EP93/02932 centralization was not obtained. Much of the universal' fluid was not displaced out of the annulus in the narrow side of the annulus.
By 'displacement efficiency' is meant the volume of mud removed `~ divided by the volume of the annulus times 100 to convert to percent.
Thus, this example demonstrates the value of the invention in a narrow annulus such as is found in a slim hole well.
The presence of undisplaced universal fluid was evident all the way from one end to the other end, especially on the bottom side. Even so, the universal fluid filter cakes and undisplaced universal fluid pockets were found to be very hard. A test with a hand held penetrometer indicates that the universal fluid filter cakes and cementitious slurry had compressive strengths in excess of 5.1 MPa (maximum reading). In essence, an excellent cement job was obtained in spite of the slow pumping rates, high angle (90) of the hole and presence of the three wash-outs. The cement job would have been very poor with a displacement efficiency of 55% if the universal fluid/cement slurry had not been used.
Blocks containing the washed-out portions of the model were sawed and further evaluated. Lengthwise diamond saw cuts were made to produce parallel faced slices about 3 to 4 cm thick. These slices exposed the newly cut cross sections of the formation, the annulus, the wash-outs and the hardened universal fluid, universal fluid filter cake, and the cementitious slurry.
Hardened universal fluid and universal fluid filter cake were found in the 2.54 cm wash-out, at the base of the 5.08 cm wash-out, and at the base corners of the 15.24 cm wash-out. The increased hardness near the permeable formation faces in the wash-outs is caused by the concentration of the universal fluid by fluid loss.
The hardened universal fluids showed a compressive strength between about 3.4 10.5 MPa. Although there were various lamination in the samples, the annulus and washed-out sections were completely cemented and the overall zonal isolation was excellent.
Additionally, 8 slag cementitious slurry samples were taken during the displacement and cured in 5 cm cube moulds at 93 C for W O 94/09252 P ~ /EP93/02932 ~
~4~ 492 20 -one week. An average compressive strength of 13 MPa with a standard deviation of 1 MPa was obtained.
Hydraulic Bond Test Results: the top section (1.4 m long) was cut into two smaller sections. In-situ hydraulic bond tests were conducted on these cores (0.7 m long) using a fluorescent dyed water. Two taps (front and back) were drilled to the casing on the core and nipples were installed using epoxy resin. Dyed water was pumped through the nipples using an hydraulic pump and breakdown pressures were recorded as hydraulic bond strength. The test results were as follows:

Core/Pressure Tap Hydraulic Bond, MPa H-1, Front 12.4 H-l, Back 2.7 H-2, Front 3.8 H-2, Back 5.2 Shear Bond Test Results: The two bottom sections of the model (1.4 m long) were cut into 5 pieces for shear bond tests. The sections containing the wash-outs were excluded from the shear bond tests. Shear bond was measured by pressing out the casing on a hydraulic press. The test results were as follows:

Sample Pipe Length (cm) Force (kN) Shear Bond (MPa) S-l 25 18 0.18 S-2 23 86 0.93 S-3 22 7.6 0.88 S-4 27 45 0.42 S-5 27 24 0.22 S-6 27 22 0.22 S-7 27 7.0 0.06 S-8 22 8.9 0.10 Specimens appeared damaged during sawing the core.

~vo 94/09252 214 7 4 9 2 P ~ /EP93/02932 In addition, 4 slag cementitious slurry samples were taken during the displacement and cured in laboratory shear bond moulds with a steel pipe having a dimension of 10 cm length and 3.8 OD at , 93 C for one week. An average shear bond was 0.32 MPa.
From the above the following is concluded. The undisplaced pockets of the universal fluid were set hard with a compressive strength between 3.4 and 10 MPa. Excellent hydraulic bond data were obtained. Although varied, shear bond data are very good. It is demonstrated that (1) a blast furnace slag universal fluid can achieve a 100% displacement efficiency by eliminating unset pockets of drilling fluid even in a narrow annulus, (2) a blast furnace slag universal fluid can improve a lateral support of casing by eliminating unset materials and providing additional strength through solidification of those portions which otherwise would be unset, (3) a blast furnace slag universal fluid can improve zonal isolation through improving shear and hydraulic bonds, and (4) a high density blast furnace slag universal fluid can be formulated and utilized at elevated temperatures.

Claims (17)

C L A I M S
1. A method for drilling and cementing a well comprising:
drilling a borehole with a rotary drilling assembly comprising a drill string and a drill bit utilizing a drilling fluid comprising water and a cementitious material;
circulating the drilling fluid down the drill string and up an annulus between the drill string and wall of the borehole, thus laying down a filter cake on the wall of the borehole during the drilling;
withdrawing the drilling assembly and inserting a casing;
adding an activator to the drilling fluid to produce a cementitious slurry; and circulating the cementitious slurry down the casing and up into the annulus, characterized in that the drilling fluid comprising blast furnace slag and water, and in that the casing has such an outer diameter that the width of the annulus between the outer surface of the casing and the inner surface of the borehole is between 0.2 and 4 cm.
2. The method according to claim 1, wherein the activator is additional blast furnace slag and alkaline agent.
3. The method according to claim 2, wherein the alkaline agent is a mixture of caustic soda and soda ash.
4. The method according to claim 3, wherein the drilling fluid comprises, in addition, a lignosulphonate thinner.
5. The method according to claim 2, wherein the drilling fluid contains between 57 and 143 kg/m3 of the blast furnace slag and wherein the additional blast furnace slag is added in forming the cementitious slurry in an amount sufficient to give a total amount of cementitious material in the cementitious slurry between 285 and 1 430 kg/m3.
6. The method according to claim 5, wherein the blast furnace slag represents the only hydraulic component in the cementitious slurry.
7. The method according to claim 2, wherein the slag of the drilling fluid and the slag of the activator each are made up of a mixture of between 5 and 25 wt% ultrafine ground slag and between 80 and 95 wt% of fine or microfine ground slag.
8. The method according to claim 1, wherein the water contains dissolved salts.
9. The method according to claim 8, wherein the dissolved salts comprise sodium chloride.
10. The method according to claim 9, wherein the sodium chloride is present in an amount between 0.2 and 5 wt%.
11. The method according to claim 8, wherein the water comprises sea water.
12. The method according to claim 1, wherein the drilling fluid contains, in addition, a polycyclicpolyetherpolyol.
13. The method according to claim 1, wherein the borehole has a diameter between 10 and 15 cm and the annulus has a width between 0.4 and 3 cm.
14. The method according to claim 1, wherein the drilling fluid contains clay and a mixed metal hydroxide thixotropic agent.
15. The method according to claim 14, wherein the clay is bentonite and the mixed metal hydroxide is MgAl(OH)4, 7Cl0.3, wherein a lignosulphonate thinning agent is added prior to adding the activator, and wherein the activator comprises additional blast furnace slag and an alkaline agent.
16. The method according to claim 1, wherein:
prior to the withdrawing the drilling assembly, an activator is passed down the drill string and up into contact with the filter cake, thus causing setting of the filter cake; and thereafter additional drilling is carried out.
17. The method according to claim 1, wherein the drilling fluid comprises water and between 47 and 143 kg/m3 of blast furnace slag, clay, starch, partially hydrolyzed polyacrylamide, and barite, wherein the casing has such an outer diameter that the width of the annulus between the outer surface of the casing and the inner surface of the borehole is between 0.2 and 4 cm, wherein the activator composition comprises blast furnace slag, a lignosulphonate thinner, and an activator comprising a mixture of caustic soda and soda ash, and wherein the total amount of blast furnace slag in the cementitious slurry is between 285 and 1 430 kg/m3.
CA 2147492 1992-10-22 1993-10-21 Drilling and cementing a well Abandoned CA2147492A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US964,991 1992-10-22
US07/964,991 US5343951A (en) 1992-10-22 1992-10-22 Drilling and cementing slim hole wells

Publications (1)

Publication Number Publication Date
CA2147492A1 true CA2147492A1 (en) 1994-04-28

Family

ID=25509281

Family Applications (1)

Application Number Title Priority Date Filing Date
CA 2147492 Abandoned CA2147492A1 (en) 1992-10-22 1993-10-21 Drilling and cementing a well

Country Status (11)

Country Link
US (1) US5343951A (en)
EP (1) EP0667930B1 (en)
CN (1) CN1058316C (en)
AU (1) AU672842B2 (en)
BR (2) BR9307297A (en)
CA (1) CA2147492A1 (en)
MY (1) MY110354A (en)
NO (1) NO951504L (en)
NZ (1) NZ257122A (en)
OA (1) OA10012A (en)
WO (1) WO1994009252A1 (en)

Families Citing this family (30)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5447197A (en) * 1994-01-25 1995-09-05 Bj Services Company Storable liquid cementitious slurries for cementing oil and gas wells
US5499677A (en) * 1994-12-23 1996-03-19 Shell Oil Company Emulsion in blast furnace slag mud solidification
US6536520B1 (en) 2000-04-17 2003-03-25 Weatherford/Lamb, Inc. Top drive casing system
CN1059648C (en) * 1998-08-15 2000-12-20 刘兴才 Mining filling and blocking low water-bearing cementing powder
CN1346422A (en) 1999-04-09 2002-04-24 国际壳牌研究有限公司 Method for annalar sealing
US6258160B1 (en) * 1999-09-07 2001-07-10 Halliburton Energy Services, Inc. Methods and compositions for grouting heat exchange pipe
FR2801049B1 (en) * 1999-11-16 2002-01-04 Ciments D Obourg Sa DAIRY-BASED ULTRA-HIGH PERFORMANCE CONCRETE COMPOSITION
GC0000398A (en) 2001-07-18 2007-03-31 Shell Int Research Method of activating a downhole system
US20050009710A1 (en) * 2002-01-31 2005-01-13 Halliburton Energy Services Reactive sealing compositions for sealing hydrocarbon containing subterranean formations and methods
US6899186B2 (en) * 2002-12-13 2005-05-31 Weatherford/Lamb, Inc. Apparatus and method of drilling with casing
US7730965B2 (en) 2002-12-13 2010-06-08 Weatherford/Lamb, Inc. Retractable joint and cementing shoe for use in completing a wellbore
USRE42877E1 (en) 2003-02-07 2011-11-01 Weatherford/Lamb, Inc. Methods and apparatus for wellbore construction and completion
US7650944B1 (en) 2003-07-11 2010-01-26 Weatherford/Lamb, Inc. Vessel for well intervention
US7059408B2 (en) * 2004-07-08 2006-06-13 Halliburton Energy Services, Inc. Methods of reducing the impact of a formate-based drilling fluid comprising an alkaline buffering agent on a cement slurry
US7303014B2 (en) * 2004-10-26 2007-12-04 Halliburton Energy Services, Inc. Casing strings and methods of using such strings in subterranean cementing operations
US7303008B2 (en) * 2004-10-26 2007-12-04 Halliburton Energy Services, Inc. Methods and systems for reverse-circulation cementing in subterranean formations
US7284608B2 (en) * 2004-10-26 2007-10-23 Halliburton Energy Services, Inc. Casing strings and methods of using such strings in subterranean cementing operations
GB2424432B (en) 2005-02-28 2010-03-17 Weatherford Lamb Deep water drilling with casing
WO2007134255A2 (en) 2006-05-12 2007-11-22 Weatherford/Lamb, Inc. Stage cementing methods used in casing while drilling
US8276689B2 (en) 2006-05-22 2012-10-02 Weatherford/Lamb, Inc. Methods and apparatus for drilling with casing
US20110180256A1 (en) * 2008-10-13 2011-07-28 M-I L.L.C. Chrome free water-based wellbore fluid
US9102861B2 (en) * 2012-09-27 2015-08-11 Halliburton Energy Services, Inc. Cement compositions for cementing in confined locales and methods for use thereof
CN103032050A (en) * 2012-12-14 2013-04-10 湖北双环科技股份有限公司 Unstable formation treatment technique for rock salt well construction
US20140262268A1 (en) * 2013-03-15 2014-09-18 Halliburton Energy Services, Inc. ("HESI") Drilling and Completion Applications of Magnetorheological Fluid Barrier Pills
CN103627375B (en) * 2013-12-02 2017-01-04 中国石油集团西部钻探工程有限公司 Fine slag powder cementing fluid and preparation method thereof
NO341732B1 (en) * 2014-02-18 2018-01-15 Neodrill As Device and method for stabilizing a wellhead
CN105866339B (en) * 2016-05-05 2018-01-05 西南石油大学 The evaluation mud cake and preparation method of a kind of shale water-base drilling fluid sealing characteristics
CN106285566A (en) * 2016-08-01 2017-01-04 中嵘能源科技集团有限公司 A kind of air injection anticorrosion completion method and the inhibition acid solution wherein used
CN111946297A (en) * 2020-08-19 2020-11-17 新地能源工程技术有限公司 Filling and curing slurry and horizontal directional drilling grouting collapse prevention process
CN115895624B (en) * 2022-11-11 2024-03-22 荆州嘉华科技有限公司 Epoxy-based flushing fluid and preparation method and application thereof

Family Cites Families (70)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2899329A (en) * 1959-08-11 Certificate of correction
US2336723A (en) * 1941-03-11 1943-12-14 John V Drummond Concrete, cement, and the like, and the process of making the same
US2649160A (en) * 1952-03-15 1953-08-18 Atlantic Refining Co Method of cementing casings in oil wells
US2822873A (en) * 1954-11-12 1958-02-11 Shell Dev Cement composition
US2880096A (en) * 1954-12-06 1959-03-31 Phillips Petroleum Co Cement compositions and process of cementing wells
US2938353A (en) * 1954-12-27 1960-05-31 Shell Oil Co Submersible drilling barge
US3021680A (en) * 1954-12-29 1962-02-20 John T Hayward Submergible drilling barge with hull protective devices
US2895301A (en) * 1955-02-08 1959-07-21 California Research Corp Stabilization of submarine raft foundations
US2961044A (en) * 1957-06-17 1960-11-22 Phillips Petroleum Co Cement compositions and process of cementing wells
FR1237311A (en) * 1959-06-19 1960-07-29 Soletanche New clay grout injection process and product used for the implementation of said process
US3168139A (en) * 1961-05-08 1965-02-02 Great Lakes Carbon Corp Converting drilling muds to slurries suitable for cementing oil and gas wells
US3077740A (en) * 1962-01-02 1963-02-19 Dow Chemical Co Stabilization of clay soils and aggregates-so4-po4
US3412564A (en) * 1967-02-21 1968-11-26 Pike Corp Of America Sub-sea working and drilling apparatus
US3499491A (en) * 1968-06-28 1970-03-10 Dresser Ind Method and composition for cementing oil well casing
US3557876A (en) * 1969-04-10 1971-01-26 Western Co Of North America Method and composition for drilling and cementing of wells
US3695355A (en) * 1970-01-16 1972-10-03 Exxon Production Research Co Gravel pack method
US3670832A (en) * 1970-08-19 1972-06-20 Atlantic Richfield Co Slim hole drilling method
US3724562A (en) * 1970-08-19 1973-04-03 Atlantic Richfield Co Slim hole drilling electric power unit
US3675728A (en) * 1970-09-18 1972-07-11 Atlantic Richfield Co Slim hole drilling
US3820611A (en) * 1970-11-11 1974-06-28 Atlantic Richfield Co Well drilling method and apparatus
US3712393A (en) * 1971-01-20 1973-01-23 Atlantic Richfield Co Method of drilling
US3835939A (en) * 1972-09-18 1974-09-17 Atlantic Richfield Co Well drilling
US4057116A (en) * 1972-11-17 1977-11-08 Atlantic Richfield Company Slim hold drilling
IE40156B1 (en) * 1973-07-20 1979-03-28 Redpath Dorman Long North Sea Improvements in or relating to the stabilisation of marititime structures
US3887009A (en) * 1974-04-25 1975-06-03 Oil Base Drilling mud-cement compositions for well cementing operations
US3964921A (en) * 1975-02-27 1976-06-22 Calgon Corporation Well cementing composition having improved flow properties, containing phosphonobutane tricarboxylic acid, and method of use
US4037424A (en) * 1975-10-03 1977-07-26 Anders Edward O Offshore drilling structure
US4014174A (en) * 1975-10-28 1977-03-29 N L Industries, Inc. Method of simultaneously strengthening the surface of a borehole and bonding cement thereto and method of forming cementitious pilings
US4215952A (en) * 1978-03-15 1980-08-05 Chevron Research Company Offshore structure for use in waters containing large moving ice masses
US4252471A (en) * 1978-11-01 1981-02-24 Straub Erik K Device for protecting piles
SU833704A1 (en) * 1979-04-06 1981-05-30 Новокузнецкое Отделение Уральскогонаучно-Исследовательского И Проектногоинститута Строительных Материалов Complex additive to slag-concrete mix
DE2930602A1 (en) * 1979-07-27 1981-02-19 Muenster L Graf Zu Handel METHOD FOR BINDING WASTEWATER AND SLUDGE
US4335980A (en) * 1980-04-28 1982-06-22 Chevron Research Company Hull heating system for an arctic offshore production structure
US4425055A (en) * 1982-02-02 1984-01-10 Shell Oil Company Two-section arctic drilling structure
US4427320A (en) * 1982-02-19 1984-01-24 Shell Oil Company Arctic offshore platform
JPS58144069A (en) * 1982-02-23 1983-08-27 Futaba Bobin Kk Manufacture of bobbins
US4460292A (en) * 1982-07-15 1984-07-17 Agritec, Inc. Process for containment of liquids as solids or semisolids
US4760882A (en) * 1983-02-02 1988-08-02 Exxon Production Research Company Method for primary cementing a well with a drilling mud which may be converted to cement using chemical initiators with or without additional irradiation
US4450009A (en) * 1983-04-29 1984-05-22 Halliburton Company Method of preparing a light weight cement composition from sea water
US4518508A (en) * 1983-06-30 1985-05-21 Solidtek Systems, Inc. Method for treating wastes by solidification
JPS60230418A (en) * 1984-04-28 1985-11-15 Takenaka Komuten Co Ltd Offshore unit structure
JPS60242219A (en) * 1984-05-14 1985-12-02 Takenaka Komuten Co Ltd Formation of offshore seabed mound
US4668128A (en) * 1984-07-05 1987-05-26 Soli-Tech, Inc. Rigidification of semi-solid agglomerations
JPS6148454A (en) * 1984-08-13 1986-03-10 日本磁力選鉱株式会社 Use of steel slag
NO850836L (en) * 1985-03-01 1986-09-02 Norske Stats Oljeselskap DEVELOPMENT AND DEVELOPMENT SYSTEM FOR OIL OIL AND / OR GAS FIELDS.
JPS61250085A (en) * 1985-04-30 1986-11-07 Lion Corp Method for treating soil
US4664843A (en) * 1985-07-05 1987-05-12 The Dow Chemical Company Mixed metal layered hydroxide-clay adducts as thickeners for water and other hydrophylic fluids
US4720214A (en) * 1986-05-21 1988-01-19 Shell Offshore Inc. Mudmat design
US4674574A (en) * 1986-09-26 1987-06-23 Diamond Shamrock Chemicals Company Fluid loss agents for oil well cementing composition
US4761183A (en) * 1987-01-20 1988-08-02 Geochemical Corporation Grouting composition comprising slag
US4897119A (en) * 1988-01-11 1990-01-30 Geochemical Corporation Aqueous dispersion of ground slag
US4880468A (en) * 1988-09-29 1989-11-14 Halliburton Services Waste solidification composition and methods
US5026215A (en) * 1988-12-02 1991-06-25 Geochemical Corporation Method of grouting formations and composition useful therefor
US5106423A (en) * 1988-12-02 1992-04-21 Geochemical Corporation Formation grouting method and composition useful therefor
US4913585A (en) * 1988-12-21 1990-04-03 Tricor Envirobonds, Ltd. Method of treating solids containing waste fluid
US4991668A (en) * 1989-02-06 1991-02-12 Maurer Engineering, Inc. Controlled directional drilling system and method
US5016711A (en) * 1989-02-24 1991-05-21 Shell Oil Company Cement sealing
US5082499A (en) * 1989-02-28 1992-01-21 Union Oil Company Of California Well preflush fluid
US4942929A (en) * 1989-03-13 1990-07-24 Atlantic Richfield Company Disposal and reclamation of drilling wastes
US5020598A (en) * 1989-06-08 1991-06-04 Shell Oil Company Process for cementing a well
US5058679A (en) * 1991-01-16 1991-10-22 Shell Oil Company Solidification of water based muds
US5133806A (en) * 1990-06-05 1992-07-28 Fujita Corporation Softy mud solidifying agent
US5105885A (en) * 1990-11-20 1992-04-21 Bj Services Company Well cementing method using a dispersant and fluid loss intensifier
US5147565A (en) * 1990-12-12 1992-09-15 Halliburton Company Foamed well cementing compositions and methods
US5123487A (en) * 1991-01-08 1992-06-23 Halliburton Services Repairing leaks in casings
US5127473A (en) * 1991-01-08 1992-07-07 Halliburton Services Repair of microannuli and cement sheath
US5121795A (en) * 1991-01-08 1992-06-16 Halliburton Company Squeeze cementing
US5125455A (en) * 1991-01-08 1992-06-30 Halliburton Services Primary cementing
US5086850A (en) * 1991-01-08 1992-02-11 Halliburton Company Well bore drilling direction changing method
US5213160A (en) * 1991-04-26 1993-05-25 Shell Oil Company Method for conversion of oil-base mud to oil mud-cement

Also Published As

Publication number Publication date
CN1086575A (en) 1994-05-11
CN1058316C (en) 2000-11-08
BR9800343A (en) 1999-06-29
AU5337194A (en) 1994-05-09
EP0667930B1 (en) 1997-03-12
NZ257122A (en) 1995-10-26
MY110354A (en) 1998-04-30
BR9307297A (en) 1999-06-01
AU672842B2 (en) 1996-10-17
NO951504L (en) 1995-06-21
NO951504D0 (en) 1995-04-20
OA10012A (en) 1996-03-29
EP0667930A1 (en) 1995-08-23
WO1994009252A1 (en) 1994-04-28
US5343951A (en) 1994-09-06

Similar Documents

Publication Publication Date Title
AU671169B2 (en) Method for drilling and cementing a well
EP0667930B1 (en) Drilling and cementing a well
EP0664848B1 (en) Method for drilling and cementing a well
US5351759A (en) Slag-cement displacement by direct fluid contact
US9957434B2 (en) Cementitious compositions comprising a non-aqueous fluid and an alkali-activated material
US5325922A (en) Restoring lost circulation
US5361842A (en) Drilling and cementing with blast furnace slag/silicate fluid
US5439056A (en) Coal slag solidification of drilling fluid
US5301752A (en) Drilling and cementing with phosphate-blast furnace slag
US5379840A (en) High temperature well cementing with low grade blast furnace slag
US5311945A (en) Drilling and cementing with phosphate
US5307877A (en) Wellbore sealing with two-component ionomeric system
US5332040A (en) Process to cement a casing in a wellbore
US5301754A (en) Wellbore cementing with ionomer-blast furnace slag system
EP2004569B1 (en) Settable drilling fluids comprising cement kiln dust and methods of using them
US5379843A (en) Side-tracking cement plug
US5343947A (en) Anchor plug for open hole test tools

Legal Events

Date Code Title Description
EEER Examination request
FZDE Discontinued