CA2560062A1 - Method and apparatus and program storage device adapted for visualization of qualitative and quantitative risk assessment based on technical wellbore design and earth properties - Google Patents

Method and apparatus and program storage device adapted for visualization of qualitative and quantitative risk assessment based on technical wellbore design and earth properties Download PDF

Info

Publication number
CA2560062A1
CA2560062A1 CA002560062A CA2560062A CA2560062A1 CA 2560062 A1 CA2560062 A1 CA 2560062A1 CA 002560062 A CA002560062 A CA 002560062A CA 2560062 A CA2560062 A CA 2560062A CA 2560062 A1 CA2560062 A1 CA 2560062A1
Authority
CA
Canada
Prior art keywords
risk
severity
risks
input data
ranked
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
CA002560062A
Other languages
French (fr)
Inventor
Daan Veeningen
Kris Givens
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Schlumberger Canada Ltd
Original Assignee
Schlumberger Canada Limited
Daan Veeningen
Kris Givens
Schlumberger Technology Corporation
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Schlumberger Canada Limited, Daan Veeningen, Kris Givens, Schlumberger Technology Corporation filed Critical Schlumberger Canada Limited
Priority claimed from PCT/US2005/009033 external-priority patent/WO2005091196A1/en
Publication of CA2560062A1 publication Critical patent/CA2560062A1/en
Abandoned legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q40/00Finance; Insurance; Tax strategies; Processing of corporate or income taxes
    • G06Q40/08Insurance
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0635Risk analysis of enterprise or organisation activities
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q40/00Finance; Insurance; Tax strategies; Processing of corporate or income taxes
    • G06Q40/03Credit; Loans; Processing thereof

Abstract

A method is disclosed for determining and displaying risk information in response to a plurality of input data, the input data including a plurality of input data calculation results, comprising the steps of: comparing each calculation result of the plurality of input data calculation results of the input data with each logical expression of a plurality of logical expressions;
ranking by the logical expression the calculation result; and generating a plurality of ranked individual risks in response to the ranking step, each of the plurality of ranked individual risks representing an input data calculation result that has been ranked by the logical expression as having either a high risk severity or a medium risk severity or a low risk severity;
generating the risk information in response to the plurality of ranked individual risks; and displaying the risk information, the displaying step including displaying the risk information on a risk information display.

Description

Method and Apparatus and Program Storage Device adapted for Visualization of Qualitative and Quantitative Risk Assessment Based on Technical Wellbore Design and Earth Properties BACKGROUND OF THE INVENTION

[0011 The subject matter of the present invention relates to a software system adapted to be stored in a computer system, such as a personal computer, for providing a a two-dimensional or a three-dimensional visualization of a qualitative and quantitative risk assessment based on technical welibore design and Earth properties.
[002] Minimizing wellbore costs and associated risks requires wellbore construction planning techniques that account for the interdependencies involved in the wellbore design.
The inherent difficulty is that most design processes and systems exist as independent tools used for individual tasks by the various disciplines involved in the planning process. In an environment where increasingly difficult wells of higher value are being drilled with fewer resources, there is now, more than ever, a need for a rapid well-planning, cost, and risk assessment tool.
[003] This specification discloses a software system representing an automated process adapted for integrating both a weilbore construction planning workflow and accounting for process interdependencies. The automated process is based on a drilling simulator, the process representing a highly interactive process which is encompassed in a software system that: (1) allows well construction practices to be tightly linked to geological and geomechanical models, (2) enables asset teams to plan realistic well trajectories by automatically generating cost estimates with a risk assessment, thereby allowing quick screening and economic evaluation of prospects, (3) enables asset teams to quantify the value of additional information by providing insight into the business impact of project uncertainties, (4) reduces the time required for drilling engineers to assess risks and create probabilistic time and cost estimates faithful to an engineered well design, (5) permits drilling engineers to immediately assess the business impact and associated risks of applying new technologies, new procedures, or different approaches to a well design.
Discussion of these points illustrate the application of the workflow and verify the value, speed, and accuracy of this integrated well planning and decision-support tool.
[004] Identifying the risks associated with drilling a well is probably the most subjective process in well planning today. This is based on a person recognizing part of a technical well design that is out of place relative to the earth properties or mechanical equipment to be used to drill the well. The identification of any risks is brought about by integrating all of the well, earth, and equipment information in the mind of a person and mentally sifting through all of the information, mapping the interdependencies, and based solely on personal experience extracting which parts of the project pose what potential risks to the overall success of that project. This is tremendously sensitive to human bias, the individual's ability to remember and integrate all of the data in their mind, and the individuals experience to enable them to recognize the conditions that trigger each drilling risk. Most people are not equipped to do this and those that do are very inconsistent unless strict process and checklists are followed.
There are some drilling risk software systems in existence today, but they all require the same human process to identify and assess the likelihood of each individual risks and the consequences. They are simply a computer system for manually recording the results of the risk identification process.
[005] The Risk Assessment sub-task associated with the 'Automatic Well Planning Software System' of the present invention is a system that will automatically assess risks associated with the technical well design decisions in relation to the earth's geology and geomechanical properties and in relation to the mechanical limitations of the equipment specified or recommended for use.
[006] When users are lucky enough to have identified and captured drilling risks for drilling a given well, there are no prescribed standard visualization techniques that truly add value to the risk information already created. There are some techniques for locating an individual risk event at a specified measured depth or depth interval. This is usually done using some type of symbol or shape and pattern combination in a 3D space. There is no way of nicely displaying risks that overlap or are interdependent and no way of looking at generalized risk level for the well at each depth. It is also very difficult to see risk categories and individual risks individually or simultaneously in 2D or 3D. All of these problems lead to the need for improved risk visualization techniques.

SUMMARY OF THE INVENTION
[007] One aspect of the present invention involves a method of determining and displaying risk information in response to a plurality of input data, the input data including a plurality of input data calculation results, comprising the steps of: comparing each calculation result of the plurality of input data calculation results of the input data with each logical expression of a plurality of logical expressions; ranking by the logical expression the calculation result; and generating a plurality of ranked individual risks in response to the ranking step, each of the plurality of ranked individual risks representing an input data calculation result that has been ranked by the logical expression as having either a high risk severity or a medium risk severity or a low risk severity; generating the risk information in response to the plurality of ranked individual risks; and displaying the risk information, the displaying step including displaying the risk information on a risk information display, the risk information display including a display of the plurality of ranked individual risks as a function of depth in a wellbore.
[008] Another aspect of the present invention involves a method of determining and displaying risk information in response to a plurality of input data, the input data including a plurality of input data calculation results, comprising the steps of:
comparing each calculation result of the plurality of input data calculation results of the input data with each logical expression of a plurality of logical expressions; ranking, by the logical expression, each the calculation result; and generating a plurality of ranked individual risks in response to the ranking step, each of the plurality of ranked individual risks representing an input data calculation result that has been ranked by the logical expression as having either a high risk severity or a medium risk severity or a low risk severity; generating a plurality of design tasks in response to the ranked individual risks; and displaying the risk information in response to the plurality of design tasks, the displaying step including displaying a risk information display, the risk information display including a display of each of the design tasks.
[009] Another aspect of the present invention involves a method of determining and displaying risk information in response to a plurality of input data, the input data including a plurality of input data calculation results, comprising the steps of:
comparing each calculation result of the plurality of input data calculation results of the input data with each logical expression of a plurality of logical expressions; ranking, by the logical expression, each the input data calculation result; and generating a plurality of ranked individual risks in response to the ranking step, each of the plurality of ranked individual risks representing an input data calculation result that has been ranked by the logical expression as having either a high risk severity or a medium risk severity or a low risk severity; generating the risk information in response to the plurality of ranked individual risks; and displaying the risk information, the displaying step including displaying a risk information display, the risk information display including a display of the plurality of the ranked individual risks extending along a length of a wellbore.
[0010] Another aspect of the present invention involves a program storage device readable by a machine tangibly embodying a program of instructions executable by the machine to perform method steps for determining and displaying risk information in response to a plurality of input data, the input data including a plurality of input data calculation results, the method steps comprising: comparing each calculation result of the plurality of input data calculation results of the input data with each logical expression of a plurality of logical expressions; ranking by the logical expression the calculation result; and generating a plurality of ranked individual risks in response to the ranking step, each of the plurality of ranked individual risks representing an input data calculation result that has been ranked by the logical expression as having either a high risk severity or a medium risk severity or a low risk severity; generating the risk information in response to the plurality of ranked individual risks; and displaying the risk information, the displaying step including displaying the risk information on a risk information display, the risk information display including a display of the plurality of ranked individual risks as a function of depth in a wellbore.
[0011] Another aspect of the present invention involves a program storage device readable by a machine tangibly embodying a program of instructions executable by the machine to perform method steps for determining and displaying risk information in response to a plurality of input data, the input data including a plurality of input data calculation results, the method steps comprising: comparing each calculation result of the plurality of input data calculation results of the input data with each logical expression of a plurality of logical expressions; ranking, by the logical expression, each the calculation result;
and generating a plurality of ranked individual risks in response to the ranking step, each of the plurality of ranked individual risks representing an input data calculation result that has been ranked by the logical expression as having either a high risk severity or a medium risk severity or a low risk severity; generating a plurality of design tasks in response to the ranked individual risks;
and displaying the risk information in response to the plurality of design tasks, the displaying step including displaying a risk information display, the risk information display including a display of each of the design tasks.
[0012] Another aspect of the present invention involves a program storage device readable by a machine tangibly embodying a program of instructions executable by the machine to perform method steps for determining and displaying risk information in response to a plurality of input data, the input data including a plurality of input data calculation results, the method steps comprising: comparing each calculation result of the plurality of input data calculation results of the input data with each logical expression of a plurality of logical expressions; ranking, by the logical expression, each the input data calculation result; and generating a plurality of ranked individual risks in response to the ranking step, each of the plurality of ranked individual risks representing an input data calculation result that has been ranked by the logical expression as having either a high risk severity or a medium risk severity or a low risk severity; generating the risk information in response to the plurality of ranked individual risks; and displaying the risk information, the displaying step including displaying a risk information display, the risk information display including a display of the plurality of the ranked individual risks extending along a length of a wellbore.
[0013] Further scope of applicability of the present invention will become apparent from the detailed description presented hereinafter. It should be understood, however, that the detailed description and the specific examples, while representing a preferred embodiment of the present invention, are given by way of illustration only, since various changes and modifications within the spirit and scope of the invention will become obvious to one skilled in the art from a reading of the following detailed description.

BRIEF DESCRIPTION OF THE DRAWINGS
[0014] A full understanding of the present invention will be obtained from the detailed description of the preferred embodiment presented hereinbelow, and the accompanying drawings, which are given by way of illustration only and are not intended to be limitative of the present invention, and wherein:
[0015] figure 1 illustrates a software architecture schematic indicating a modular nature to support custom workflows;
[0016] figure 2 including figures 2A, 2B, 2C, and 2D illustrate a typical task view consisting of workflow, help and data canvases;
[0017] figure 3 including figures 3A, 3B, 3C, and 3D illustrate wellbore stability, mud weights, and casing points;
[0018] figure 4 including figures 4A, 4B, 4C, and 4D illustrate risk assessment;
[0019] figure 5 including figures 5A, 5B, 5C, and 5D illustrate a Monte Carlo time and cost distribution;
[0020] figure 6 including figures 6A, 6B, 6C, and 6D illustrate a probabilistic time and cost vs. depth;
[0021] figure 7 including figures 7A, 7B, 7C, and 7D illustrate a summary montage;
[0022] figure 8 illustrates a workflow in an 'Automatic Well Planning Software System' of the present invention;
[0023] figure 9A illustrates a computer system storing an Automatic Well Planning Risk Assessment Software of the present invention;
[0024] figure 9B illustrates a display as shown on a Recorder or Display device of the Computer System of figure 9A;
[0025] figure 10 illustrates a detailed construction of the Automatic Well Planning Risk Assessment Software stored in the Computer System of figure 9A;
[0026] figure 11 illustrates a block diagram which is used during a functional description of the operation of the present invention;
[0027] figure 12 including figures 12A, 12B, 12C, and 12D illustrates one example of the risk assessment output data 18b1 being recorded or displayed on the recorder or display device 18b in figure 9B in accordance with one aspect of the present invention, figure 12 illustrating a screen shot of a two-dimensional risk representation as a function of depth in a wellbore;
[0028] figure 13 including figures 13A, 13B, 13C, and 13D illustrates another example of the risk assessment output data 18b1 being recorded or displayed on the recorder or display device 18b in figure 9B in accordance with another aspect of the present invention, figure 13 illustrating a screen shot of a two dimensional risk representation as a function of a particular design task;
[0029] figure 14 illustrates another example of the risk assessment output data 18b1 being recorded or displayed on the recorder or display device 18b in figure 9B in accordance with another aspect of the present invention, figure 14 illustrating an example of a data output of a risk assessment quantification per risk category as a function of depth in the wellbore;
[0030] figures 15 illustrates another example of the risk assessment output data 18b I being recorded or displayed on the recorder or display device 18b in figure 9B in accordance with another aspect of the present invention, figure 15 illustrating an example of the risk categories displayed in three dimensions in a visualization environment; and
[0031] figures 16 and 17 represent another construction of the example of the risk categories displayed in three dimensions in a visualization environment which is illustrated in figure 15.

DETAILED DESCRIPTION
[0032] An 'Automatic Well Planning Software System' in accordance with the present invention is disclosed in this specification. The 'Automatic Well Planning Software System' is a "smart" tool for rapid creation of a detailed drilling operational plan that provides economics and risk analysis. The user inputs trajectory and earth properties parameters; the system uses this data and various catalogs to calculate and deliver an optimum well design thereby generating a plurality of outputs, such as drill string design, casing seats, mud weights, bit selection and use, hydraulics, and the other essential factors for the drilling task.
System tasks are arranged in a single workflow in which the output of one task is included as input to the next. The user can modify most outputs, which permits fine-tuning of the input values for the next task. The 'Automatic Well Planning Software System' has two primary user groups: (1) Geoscientist: Works with trajectory and earth properties data; the 'Automatic Well Planning Software System' provides the necessary drilling engineering calculations; this allows the user to scope drilling candidates rapidly in terms of time, costs, and risks; and (2) Drilling engineer: Works with wellbore geometry and drilling parameter outputs to achieve optimum activity plan and risk assessment; Geoscientists typically provide the trajectory and earth properties data. The scenario, which consists of the entire process and its output, can be exported for sharing with other users for peer review or as a communication tool to facilitate project management between office and field. Variations on a scenario can be created for use in business decisions. The 'Automatic Well Planning Software System' can also be used as a training tool for geoscientists and drilling engineers.
[0033] The 'Automatic Well Planning Software System' will enable the entire well construction workflow to be run through quickly. In addition, the 'Automatic Well Planning Software System' can ultimately be updated and re-run in a time-frame that supports operational decision making. The entire replanning process must be fast enough to allow users to rapidly iterate to refine well plans through a series of what-if scenarios.
[0034] The decision support algorithms provided by the 'Automatic Well Planning Software System' disclosed in this specification would link geological and geomechanical data with the drilling process (casing points, casing design, cemer3t, mud, bits, hydraulics, etc) to produce estimates and a breakdown of the well time, costs, axid risks. This will allow interpretation variations, changes, and updates of the Earth Model to be quickly propogated through the well planning process.
[0035] The software associated with the aforementioned 'Automatic Well Planning Software System' accelerates the prospect selection, screening, ranking, and well construction workflows. The target audiences are two fold: those who generate drilling prospects, and those who plan and drill those prospects. More specifically, the target audiences include:
Asset Managers, Asset Teams (Geologists, Geophysicists, Reservoir Engineers, and Production Engineers), Drilling Managers, and Drilling Engineers.
[0036] Asset Teams will use the software associated with the 'Automatic Well Planning Software System' as a scoping tool for cost estimates, and assessing mechanical feasibility, so that target selection and well placement decisions can be made more knowledgeably, and more efficiently. This process will encourage improved subsurface evaluation and provide a better appreciation of risk and target accessibility. Since the system can be configured to adhere to company or local design standards, guidelines, and operational practices, users will be confident that well plans are technically sound.
[0037] Drilling Engineers will use the software associated with the 'Automatic Well Planning Software System' disclosed in this specification for rapid scenario planning, risk identification, and well plan optimization. It will also be used for training, in planning centers, universities, and for looking at the drilling oà specific wells, electronically drilling the well, scenario modeling and 'what-if exercises, pred iction and diagnosis of events, post-drilling review and knowledge transfer.
[0038] The software associated with the 'Automatic Well Planning Software System' will enable specialists and vendors to demonstrate differentiation amongst new or competing technologies. It will allow operators to quantify the risk and business impact of the application of these new technologies or procedures.
[0039] Therefore, the 'Automatic Well Planning Software System' disclosed in this specification, in accordance with the present invention, will: (1) dramatically improve the efficiency of the well planning and drilling processes by incorporating all available data and well engineering processes in a single predictive well construction model, (2) integrate predictive models and analytical solutions for wellbore stability, mud weights & casing seat selection, tubular & hole size selection, tubular design, cementing, drilling fluids, bit selection, rate of penetration, BHA design, drillstring design, hydraulics, risk identification, operations planning, and probabilistic time and cost estimation, all within the framework of a mechanical earth model, (3) easily and interactively manipulate variables and intermediate results within individual scenarios to produce sensitivity analyses. As a result, when the 'Automatic Well Planning Software System' of the present invention is utilized, the following results will be achieved: (1) more accurate results, (2) more effective use of engineering resources, (3) increased awareness, (4) reduced risks while drilling, (5) decreased well costs, and (6) a standard methodology or process for optimization through iteration in planning and execution. As a result, during the implementation of the 'Automatic Well Planning Software System' of the present invention, the emphasis was placed on architecture and usability.
[0040] In connection with the implementation of the 'Automatic Well Planning Software System', the software development effort was driven by the requirements of a flexible architecture which must permit the integration of existing algorithms and technologies with commercial-off-the-shelf (COTS) tools for data visualization. Additionally, the workflow demanded that the product be portable, lightweight and fast, and require a very small learning curve for users. Another key requirement was the ability to customize the workflow and configuration based on proposed usage, user profile and equipment availability.
[0041] The software associated with the 'Automatic Well Planning Software System' was developed using the 'Ocean' framework owned by Schlumberger Technology Corporation of Houston, Texas. This framework uses Microsoft's .NET technologies to provide a software development platform which allows for easy integration of COTS soflware tools with a flexible architecture that was specifically designed to support custom workflows based on existing drilling algorithms and technologies.
[0042] Referring to figure 1, a software architecture schematic is illuEstrated indicating the 'modular nature' for supporting custom workflows. Figure 1 schematically shows the modular architecture that was developed to support custom workflow s. This provides the ability to configure the application based on the desired usage. For a quick estimation of the time, cost and risk associated with the well, a workflow consisting of lookup tables and simple algorithms can be selected. For a more detailed analysis, complex algorithms can be included in the workflow.
[0043] In addition to customizing the workflow, the software associated with the 'Automatic Well Planning Software System' of the present invention was designe;d to use user-specified equipment catalogs for its analysis. This ensures that any results produced by the software are always based on local best practices and available equipment at the project site. From a usability perspective, application user interfaces were designed to all(>w the user to navigate through the workflow with ease.
[0044] Referring to figure 2, a typical task view consisting of workflow, help and data canvases is illustrated. Figure 2 shows a typical task view with its associated user canvases.
A typical task view consists of a workflow task bar, a dynamically updating help canvas, and a combination of data canvases based on COTS tools like log graphics, Data Grids, Wellbore Schematic and charting tools. In any task, the user has the option to n3odify data through any of the canvases; the application then automatically synchronizes the data in the other canvases based on these user modifications.
[0045] The modular nature of the software architecture associated with the 'Automatic Well Planning Software System' also allows the setting-up of a non-graphical workflow, which is key to implementing advanced functionality, such as batch processing of an entire field, and sensitivity analysis based on key parameters, etc.
[0046] Basic information for a scenario, typical of well header information for the well and wellsite, is captured in the first task. The trajectory (measured depth, inclination, and azimuth) is loaded and the other directional parameters like true vertical depth and dogleg severity are calculated automatically and graphically presented to the user.
[0047] The 'Automatic Well Planning Software System' disclosed in this specification requires the loading of either geomechanical earth properties extracted from an earth model, or, at a minimum, pore pressure, fracture gradient, and unconfined compressive strength.
From this input data, the 'Automatic Well Planning Software System' automatically selects the most appropriate rig and associated properties, costs, and mecllanical capabilities. The rig properties include parameters like derrick rating to evaluate risks -when running heavy casing strings, pump characteristics for the hydraulics, size of the BOP, which influences the sizes of the casings, and very importantly the daily rig rate and spread rate: - The user can select a different rig than what the 'Automatic Well Planning Software System' proposed and can modify any of the technical specifications suggested by the software.
[0048] Other wellbore stability algorithms (which are offered by Schlumberger Technology Corporation, or Houston, Texas) calculate the predicted shear failure and the fracture pressure as a function of depth and display these values with the pore pressure. The 'Automatic Well Planning Software System' then proposes automatically the casing seats and maximum mud weight per hole section using customizable logic and rules. The rules include safety margins to the pore pressure and fracture gradient, minimum and maximurn lengths for hole sections and limits for maximum overbalance of the drilling fluid to the poFre pressure before a setting an additional casing point. The 'Automatic Well Planning Soflwax:-e System' evaluates the casing seat selection from top-to-bottom and from bottom-to-top a.nd determines the most economic variant. The user can change, insert, or delete casing poi<nts at any time, which will reflect in the risk, time, and cost for the well.
[0049] Referring to figure 3, a display showing wellbore stability, mud weights, and casing points is illustrated.
[0050] The wellbore sizes are driven primarily by the production tubing size.
The preceding casing and hole sizes are determined using clearance factors. The wellbore sizes can be restricted by additional constraints, such as logging requirements or platform slot size. Casing weights, grades, and connection types are automatically calculated using traditional biaxial design algorithms and simple load cases for burst, collapse and tension. The most cost effective solution is chosen when multiple suitable pipes are found in the extensive tubular catalog. Non-compliance with the minimum required design factors are highlighted to the user, pointing out that a manual change of the proposed design may be in order. The 'Automatic Well Planning Software System' allows full strings to be replaced with liners, in which case, the liner overlap and hanger cost are automatically suggested while all strings are redesigned as necessary to account for changes in load cases. The cement slurries and placement are automatically proposed by the 'Automatic Well Planning Software System'.
The lead and tail cement tops, volumes, and densities are suggested. The cementing hydrostatic pressures are validated against fracture pressures, while allowing the user to modify the slurry interval tops, lengths, and densities. The cost is derived from the volume of the cement job and length of time required to place the cement.
[0051] The 'Automatic Well Planning Software System' proposes the proper drilling fluid type including rheology properties that are required for hydraulic calculations. A sophisticated scoring system ranks the appropriate fluid systems, based on operating environment, discharge legislation, temperature, fluid density, wellbore stability, wellbore friction and cost.
The system is proposing not more than 3 different fluid systems for a well, although the user can easily override the proposed fluid systems.
[0052] A new and novel algorithm used by the 'Automatic Well Planning Software System' selects appropriate bit types that are best suited to the anticipated rock strengths, hole sizes, and drilled intervals. For each bit candidate, the footage and bit life is determined by comparing the work required to drill the rock interval with the statistical work potential for that bit. The most economic bit is selected from all candidates by evaluating the cost per foot which takes into account the rig rate, bit cost, tripping time and drilling performance (ROP).
Drilling parameters like string surface revolutions and weight on bit are proposed based on statistical or historical data.
[0053] In the 'Automatic Well Planning Software System', the bottom hole assembly (BHA) and drillstring is designed based on the required maximum weight on bit, inclination, directional trajectory and formation evaluation requirements in the hole section. The well trajectory influences the relative weight distribution between drill collars and heavy weight drill pipe. The BHA components are automatically selected based on the hole size, the internal diameter of the preceding casings, and bending stress ratios are calculated for each component size transition. Final kick tolerances for each hole section are also calculated as part of the risk analysis.
[0054] The minimum flow rate for hole cleaning is calculated using Luo's2 and Moore's3 criteria considering the wellbore geometry, BHA configuration, fluid density and rheology, rock density, and ROP. The bit nozzles total flow area (TFA) are sized to maximize the standpipe pressure within the liner operating pressure envelopes. Pump liner sizes are selected based on the flow requirements for hole cleaning and corresponding circulating pressures.
The Power Law rheology model is used to calculate the pressure drops through the circulating system, including the equivalent circulating density (ECD).
[0055] Referring to figure 4, a display showing 'Risk Assessment' is illustrated.
[0056] In figure 4, in the 'Automatic Well Planning Software System', drilling event 'risks' are quantified in a total of 54 risk categories of which the user can customize the risk thresholds. The risk categories are plotted as a function of depth and color coded to aid a quick visual interpretation of potential trouble spots. Further risk assessment is achieved by grouping these categories in the following categories: 'gains', 'losses', 'stuck pipe', and 'mechanical problems'. The total risk log curve can be displayed along the trajectory to correlate drilling risks with geological markers. Additional risk analysis views display the "actual risk" as a portion of the "potential risk" for each design task.
[0057] In the 'Automatic Well Planning Software System', a detailed operational activity plan is automatically assembled from customizable templates. The duration for each activity is calculated based on the engineered results of the previous tasks and Non-Productive Time (NPT) can be included. The activity plan specifies a range (minimum, average, and maximum) of time and cost for each activity and lists the operations sequentially as a function of depth and hole section. This information is graphically presented in the time vs depth and cost vs depth graphs.
[0058] Referring to figure 5, a display showing Monte Carlo time and cost distributions is illustrated. In figure 5, the 'Automatic Well Planning Software System' uses Monte Carlo simulation to reconcile all of the range of time and cost data to produce probabilistic time and cost distributions. [0059] Referring to figure 6, a display showing Probabilistic time and cost vs. depth is illustrated. In figure 6, this probabilistic analysis, used by the 'Automatic Well Planning Software System' of the present invention, allows quantifying the P10, P50 and probabilities for time and cost.

[0060] Referring to figure 7, a display showing a summary montage is illustrated. In figure 7, a comprehensive summary report and a montage display, utilized by the 'Automatic Well Planning Software System', can be printed or plotted in large scale and are also available as a standard result output.

[0061] Using its expert system and logic, the 'Automatic Well Planning Software System' disclosed in this specification automatically proposes sound technical solutions and provides a smooth path through the well planning workflow. Graphical interaction with the results of each task allows the user to efficiently fine-tune the results. In just minutes, asset teams, geoscientists, and drilling engineers can evaluate drilling projects and economics using probabilistic cost estimates based on solid engineering fandamentals instead of traditional, less rigorous estimation methods. The testing program combined with feedback received from other users of the program during the development of the software package made it possible to draw the following conclusions: (1) The 'Automatic Well Planning Software System' can be installed and used by inexperienced users with a minimum amount of training and by referencing the documentation provided, (2) The need for good earth property data enhances the link to geological and geomechanical models and encourages improved subsurface interpretation; it can also be used to quanitfy the value of acquiring additional information to reduce uncertainty, (3) With a minimum amount of input data, the 'Automatic Well Planning Software System' can create reasonable probabilistic time and cost estimates faithful to an engineered well design; based on the field test results, if the number of casing points and rig rates are accurate, the results will be within 20% of a fully engineered well design and AFE, (4) With additional customization and localization, predicted results compare to within 10% of a fully engineered well design AFE, (5) Once the 'Automatic Well Planning Software System' has been localized, the ability to quickly run new scenarios and assess the business impact and associated risks of applying new technologies, procedures or approaches to well designs is readily possible, (6) The speed of the 'Automatic Well Planning Software System' allows quick iteration and refinement of well plans and creation of different 'what if scenarios for sensitivity analysis, (7) The 'Automatic Well Planning Software System' provides consistent and transparent well cost estimates to a process that has historically been arbitrary, inconsistent, and opaque; streamlining the workflow and eliminating human bias provides drilling staff the confidence to delegate and empower non-drilling staff to do their own scoping estimates, (8) The 'Automatic Well Planning Software System' provides unique understanding of drilling risk and uncertainty enabling more realistic economic modeling and improved decision making, (9) The risk assessment accurately identifies the type and location of risk in the wellbore enabling drilling engineers to focus their detailed engineering efforts most effectively, (10) It was possible to integrate and automate the well construction planning workflow based on an earth model and produce technically sound usable results, (11) The project was able to extensively use COTS
technology to accelerate development of the software, and (12) The well engineering workflow interdependencies were able to be mapped and managed by the software.

[0062] The following nomenclature was used in this specification:

RT = Real-Time, usually used in the context of real-time data (while drilling).
G&G = Geological and Geophysical SEM = Shared Earth Model MEM = Mechanical Earth Model NPT = Non Productive Time, when operations are not planned, or due to operational difficulties, the progress of the well has be delayed, also often referred to as Trouble Time.
NOT = Non Optimum Time, when operations take longer than they should for various reasons.
WOB = Weight on bit ROP = Rate of penetration RPM = Revolutions per minute BHA = Bottom hole assembly SMR = Software Modification Request BOD = Basis of Design, document specifying the requirements for a well to be drilled.
AFE = Authorization for Expenditure [0064] References (1) Booth, J., Bradford, I.D.R., Cook, J.M., Dowell, J.D., Ritchie, G., Tuddenham, I.:
'Meeting Future Drilling Planning and Decision Support Requirements: A New Drilling Simulator', IADC/SPE 67816 presented at the 2001 IADC/SPE Drilling Conference, Amsterdam, The Netherlands, 27 February - 1 March.

(2) Luo, Y., Bern, P.A. and Chambers, B.D.: 'Flow-Rate Predictions for Cleaning Deviated Wells', paper IADC/SPE 23884 presented at the 1992 IADC/SPE Drilling Conference, New Orleans, Louisiana, February 18-21.

(3) Moore and Chien theory is published in 'Applied Drilling Engineering', Bourgoyne, A.T.,Jr, et al., SPE Textbook Series Vo12.

[0065] A functional specification associated with the overall 'Automatic Well Planning Software System' of the present invention (termed a'use case') will be set forth in the following paragraphs. This functional specification relates to the overall 'Automatic Well Planning Software System'.

[0066] The following defines information that pertains to this particular 'use case'. Each piece of information is important in understanding the purpose behind the 'use Case'.

Goal In Context: Describe the full workflow for the low level user Scope: N/A
Level: Low Level Pre-Condition: Geological targets pre-defined Success End Condition: Probability based time estimate with cost and risk Failed End Condition: Failure in calculations due to assumptions or if distribution of results is too large Prirnary Actor: Well Engineer Trigger Event: N/A

[0067] Main Success Scenario -- This Scenario describes the steps that are taken from trigger event to goal completion when everything works without failure. It also describes any required cleanup that is done after the goal has been reached. The steps are listed below:

l. User opens program, and system prompts user whether to open an old file or create a new one. User creates new model and system prompts user for well information (well name, field, country, coordinates). System prompts user to insert -earth model.
Window with different options appears and user selects data level. Secondary window appears where file is loaded or data inserted manually. System displays 3D
view of earth model with key horizons, targets, anti-targets, markers, seismic, etc.
2. System prompts user for a well trajectory. The user either loads from a file or creates one in Caviar for Swordfish. System generates 3D view of trajectory in the earth model and 2D views, both plan and vertical section. User prompted to verify trajectory and modify if needed via direct interaction with 3D window.
3. The system will extract mechanical earth properties (PP, FG, WBS, lithology, density, strength, min/max horizontal stress, etc.) for every point along the trajectory and store it. These properties will either come from a populated mechanical earth model, from interpreted logs applied to this trajectory, or manually entered.
4. The system will prompt the user for the rig constraints. Rig specification options will be offered and the user will choose either the type of rig and basic configurations or insert data manually for a specific drilling unit.
5. The system will prompt the user to enter pore pressure data, if applicable, otherwise taken from the mechanical earth model previously inserted and a MW window will be generated using PP, FG, and WBS curves. The MW window will be displayed and allow interactive modification.
6. The system will automatically divide the well into hole/casing sections based on kick tolerance and trajectory sections and then propose a mud weight schedule.
These will be displayed on the MW window and allow the user to interactively modify their values. The casing points can also be interactively modified on the 2D and 3D
trajectory displays 7. The system will prompt the user for casing size constraints (tubing size, surface slot size, evaluation requirements), and based on the number of sections generate the appropriate hole size - casing size combinations. The hole/casing circle chart will be used, again allowing for interaction from the user to modify the hole/casing size progression.
8. The system will successively calculate casing grades, weights/wall thickness and connections based on the sizes selected and the depths. User will be able to interact and define availability of types of casing.
9. The system will generate a basic cementing program, with simple slurry designs and corresponding volumes..
10. The system will display the wellbore schematic based on the calculations previously performed and this interface will be fully interactive, allowing the user to click and drag hole & casing sizes, top & bottom setting depths, and recalculating based on these selections. System will flag user if the selection is not feasible.
11. The system will generate the appropriate mud types, corresponding rheology, and composition based on the lithology, previous calculations, and the users selection.
12. The system will successively split the well sections into bit runs, and based on the rock properties will select drilling bits for each section with ROP and drilling parameters.
13. The system will generate a basic BHA configuration, based on the bit section runs, trajectory and rock properties.

Items 14, 15, and 16 represent one task: Hydraulics.

14. The system will run a hole cleaning calculation, based on trajectory, wellbore geometry, BHA composition and MW characteristics.
15. The system will do an initial hydraulics/ECD calculation using statistical ROP data.
This data will be either selected or user defined by the system based on smart table lookup.
16. Using the data generated on the first hydraulics calculation, the system will perform an ROP simulation based on drilling bit characteristics and rock properties.
17. The system will run a successive hydraulics/ECD calculation using the ROP
simulation data. System will flag user if parameters are not feasible.
18. The system will calculate the drilling parameters and display them on a multi display panel. This display will be exportable, portable, and printable.
19. The system will generate an activity planning sequence using default activity sequences for similar hole sections and end conditions. This sequence will be fully modifiable by the user, permitting modification in sequence order and duration of the event. This sequence will be in the same standard as the Well Operations or Drilling Reporting software and will be interchangeable with the Well Operations or Drilling Reporting software. The durations of activities will be populated from tables containing default "best practice" data or from historical data (DIMS, Snapper...).
20. The system will generate time vs. depth curve based on the activity planning details.
The system will create a best, mean, and worst set of time curves using combinations of default and historical data. These curves will be exportable to other documents and printable.
21. The system will prompt the user to select probability points such as P10, P50, P90 and then run a Monte Carlo simulation to generate a probability distribution curve for the scenario highlighting the user selected reference points and corresponding values of time. The system will provide this as frequency data or cumulative probability curves.
These curves will be again exportable and printable.
22. The system will generate a cost plan using default cost templates that are pre-configured by users and can be modified at this point. Many of the costs will reference durations of the entire well, hole sections, or specific activities to calculate the applied cost. The system will generate P10, P50, and P90 cost vs. depth curves.

23. The system will generate a summary of the well plan, in word format, along with the main display graphs. The user will select all that should be exported via a check box interface. The system will generate a large one-page summary of the whole process.
This document will be as per a standard Well Operations Program template.

[0068] Referring to figure 8, as can be seen on the left side of the displays illustrated in figures 2 through 6, the 'Automatic Well Planning Software System' of the present invention includes a plurality of tasks. Each of those tasks are illustrated in figure 8. In figure 8, those plurality of tasks are divided into four groups: (1) Input task 10, where input data is provided, (2) Wellbore Geometry task 12 and Drilling Parameters task 14, where calculations are performed, and (3) a Results task 16, where a set of results are calculated and presented to a user. The Input task 10 includes the following sub-tasks: (1) scenario information, (2) trajectory, (3) Earth properties, (4) Rig selection, (5) Resample Data. The Wellbore Geometry task 12 includes the following sub-tasks: (1) Wellbore stability, (2) Mud weights and casing points, (3) Wellbore sizes, (4) Casing design, (5) Cement design, (6) Wellbore geometry. The Drilling Parameters task 14 includes the following sub-tasks:
(1) Drilling fluids, (2) Bit selection, (3) Drillstring design, (4) Hydraulics. The Results task 16 includes the following sub-tasks: (1) Risk Assessment 16a, (2) Risk Matrix, (3) Time and cost data, (4) Time and cost chart, (5) Monte Carlo, (6) Monte Carlo graph, (7) Summary report, and (8) montage.

[0069] Recalling that the Results task 16 of figure 8 includes a'Risk Assessment' sub-task 16a, the 'Risk Assessment' sub-task 16a will be discussed in detail in the following paragraphs with reference to figures 9A, 9B, and 10.

Automatic Well Planning Software System - Risk Assessment sub-task 16a -Software [0070] Identifying the risks associated with drilling a well is probably the most subjective process in well planning today. This is based on a person recognizing part of a technical well design that is out of place relative to the earth properties or mechanical equipment to be used to drill the well. The identification of any risks is brought about by integrating all of the well, earth, and equipment information in the mind of a person and mentally sifting through all of the information, mapping the interdependencies, and based solely on personal experience extracting which parts of the project pose what potential risks to the overall success of that project. This is tremendously sensitive to human bias, the individual's ability to remember and integrate all of the data in their mind, and the individuals experience to enable them to recognize the conditions that trigger each drilling risk. Most people are not equipped to do this and those that do are very inconsistent unless strict process and checklists are followed.
There are some drilling risk software systems in existence today, but they all require the same human process to identify and assess the likelihood of each individual risks and the consequences. They are simply a computer system for manually recording the results of the risk identification process.

[0071] The Risk Assessment sub-task 16a associated with the 'Automatic Well Planning Software System' of the present invention is a system that will automatically assess risks associated with the technical well design decisions in relation to the earth's geology and geomechanical properties and in relation to the mechanical limitations of the equipment specified or recommended for use.

[0072] Risks are calculated in four ways: (1) by 'Individual Risk Parameters', (2) by 'Risk Categories', (3) by 'Total Risk', and (4) the calculation of 'Qualitative Risk Indices' for each.
[0073] Individual Risk Parameters are calculated along the measured depth of the well and color coded into high, medium, or low risk for display to the user. Each risk will identify to the user: an explanation of exactly what is the risk violation, and the value and the task in the workflow controlling the risk. These risks are calculated consistently and transparently allowing users to see and understand all of the known risks and how they are identified.
These risks also tell the users which aspects of the well justify further engineering effort to investigate in more detail.

[0074] Group/category risks are calculated by incorporating all of the individual risks in specific combinations. Each individual risk is a member of one or more Risk Categories.

Four principal Risk Categories are defined as follows: (1) Gains, (2) Losses, (3) Stuck, and (4) Mechanical; since these four Rick Categories are the most common and costly groups of troublesome events in drilling worldwide.

[0075] The Total Risk for a scenario is calculated based on the cumulative results of all of the group/category risks along both the risk and depth axes.

[0076] Risk indexing - Each individual risk parameter is used to produce an individual risk index which is a relative indicator of the likelihood that a particular risk will occur. This is purely qualitative, but allows for comparison of the relative likelihood of one risk to another -this is especially indicative when looked at from a percentage change. Each Risk Category is used to produce a category risk index also indicating the likelihood of occurrence and useful for identifying the most likely types of trouble events to expect. Finally, a single risk index is produced for the scenario that is specifically useful for comparing the relative risk of one scenario to another.

[0077] The 'Automatic Well Planning Software System' of the present invention is capable of delivering a comprehensive technical risk assessment, and it can do this automatically.
Lacking an integrated model of the technical well design to relate design decisions to associated risks, the 'Automatic Well Planning Software System' can attribute the risks to specific design decisions and it can direct users to the appropriate place to modify a design choice in efforts to modify the risk profile of the well.

[0078] Referring to figure 9A, a Computer System 18 is illustrated. The Computer System 18 includes a Processor 18a connected to a system bus, a Recorder or Display Device 18b connected to the system bus, and a Memory or Program Storage Device 18c connected to the system bus. The Recorder or Display Device 18b is adapted to display 'Risk Assessment Output Data' 18b1. The Memory or Program Storage Device 18c is adapted to store an 'Automatic Well Planning Risk Assessment Software' 18c1. The 'Automatic Well Planning Risk Assessment Software' 18c1 is originally stored on another 'program storage device', such as a hard disk; however, the hard disk was inserted into the Computer System 18 and the 'Automatic Well Planning Risk Assessment Software' 18c1 was loaded from the hard disk into the Memory or Program Storage Device 18c of the Computer System 18 of figure 9A. In addition, a Storage Medium 20 containing a plurality of 'Input Data' 20a is adapted to be connected to the system bus of the Computer System 18, the 'Input Data' 20a being accessible to the Processor 18a of the Computer System 18 when the Storage Medium 20 is connected to the system bus of the Computer System 18. In operation, the Processor 18a of the Computer System 18 will execute the Automatic Well Planning Risk Assessment Software 18c1 stored in the Memory or Program Storage Device 180 of the Computer System 18 while, simultaneously, using the 'Input Data' 20a stored in the Storage Medium 20 during that execution. When the Processor 18a completes the execution of the Automatic Well Planning Risk Assessment Software 18c1 stored in the Memory or Program Storage Device 18c (while using the 'Input Data' 20a), the Recorder or Display Device 18b will record or display the 'Risk Assessment Output Data' 18b1, as shown in figure 9A. For example the 'Risk Assessment Output Data' 18b 1 can be displayed on a display screen of the Computer System 18, or the 'Risk Assessment Output Data' 18b1 can be recorded on a printout which is generated by the Computer System 18. The Computer System 18 of figure 9A may be a personal computer (PC). The Memory or Program Storage Device 1 8c is a computer readable medium or a program storage device which is readable by a machine, such as the processor 18a. The processor 18a may be, for example, a microprocessor, microcontroller, or a mainframe or workstation processor. The Memory or Program Storage Device 18c, which stores the 'Automatic Well Planning Risk Assessment Software' 180 1, may be, for example, a hard disk, ROM, CD-ROM, DRAM, or other RAM, flash memory, magnetic storage, optical storage, registers, or other volatile and/or non-volatile memory.

[0079] Referring to figure 9B, a larger view of the Recorder or Display Device 18b of figure 9A is illustrated. In figure 9B, the 'Risk Assessment Output Data' 18b1 includes:
(1) a plurality or Risk Categories, (2) a plurality of Subcategory Risks (each of which have been ranked as either a High Risk or a Medium Risk or a Low Risk), and (3) a plurality of Individual Risks (each of which have been ranked as either a High Risk or a Medium Risk or a Low Risk). The Recorder or Display Device 18b of figure 9B will display or record the 'Risk Assessment Output Data' 18b1 including the Risk Categories, the Subcategory Risks, and the Individual Risks.

[0080] Referring to figure 10, a detailed construction of the 'Automatic Well Planning Risk Assessment Software' 1 Scl of figure 9A is illustrated. In figure 10, the 'Automatic Well Planning Risk Assessment Software' 18c1 includes a first block which stores the Input Data 20a, a second block 22 which stores a plurality of Risk Assessment Logical Expressions 22; a third block 24 which stores a plurality of Risk Assessment Algorithms 24, a fourth block 26 which stores a plurality of Risk Assessment Constants 26, and a fifth block 28 which stores a plurality of Risk Assessrnent Catalogs 28. The Risk Assessment Constants 26 include values which are used as input for the Risk Assessment Algorithms 24 and the Risk Assessment Logical Expressions 22. The Risk Assessment Catalogs 28 include look-up values -which are used as input by the Risk Assessment Algorithms 24 and the Risk Assessment Logical Expressions 22. The 'Input Data' 20a includes values which are used as input for the Risk Assessment Algorithms 24 and the Risk Assessment Logical Expressions 22. The 'Risk Assessment Output Data' 18b 1 includes values which are computed by the Risk Assessment Algorithms 24 and which result from the Risk Assessment Logical Expressions 22. In operation, referring to figures 9 and 10, the Processor 18a of the Computer System 18 of figure 9A executes the Automatic Well Planning Risk Assessment Software 18c1 by executing the Risk Assessment Logical Expressions 22 and the Risk Assessment Algorithms 24 of the Risk Assessment Software 18c1 while, simultaneously, using the 'Input Data' 20a, the Risk Assessment Constants 26, and the values stored in the Risk Assessment Catalogs 28 as 'input data' for the Risk Assessment Logical Expressions 22 and the Risk Assessrnent Algorithms 24 during that execution. When that execution by the Processor 18a of the Risk Assessment Logical Expressions 22 and the Risk Assessment Algorithms 24 (while using the 'Input Data' 20a, Constants 26, and Catalogs 28) is completed, the 'Risk Assessment Output Data' 18b1 will be generated as a'result'. That 'Risk Assessment Output Data' 18b I is recorded or displayed on -the Recorder or Display Device 18b of the Computer Systern 18 of figure 9A. In addition, that 'Risk Assessment Output Data' 18b1 can be manually input, by an operator, to the Risk Assessment Logical Expressions block 22 and the Risk Assessment Algorithms block 24 via a'Manual Input' block 30 shown in figure 10.

Input Data 20a [0081] The following paragraphs will set forth the 'Input Data' 20a which is used by the 'Risk Assessment Logical Expressions' 22 and the 'Risk Assessment Algorithms' 24. Values of the Input Data 20a that are used as input for the Risk Assessment Algorithms 24 and the Risk Assessment Logical Expressions 22 are as follows:

(1) Casing Point Depth (2) Measured Depth (3) True Vertical Depth (4) Mud Weight (5) Measured Depth (6) ROP
(7) Pore Pressure (8) Static Temperature (9) Pump Rate (10) Dog Leg Severity (11) ECD
(12) Inclination (13) Hole Size (14) Casing Size (15) Easting-westing (16) Northing-Southing (17) Water Depth (18) Maximum Water Depth (19) Maximum well Depth (20) Kick Tolerance (21) Drill Collar 1 Weight (22) Drill Collar 2Weight (23) Drill Pipe Weight (24) Heavy Weight Weight (25) Drill Pipe Tensile Rating (26) Upper Wellbore Stability Limit (27) Lower Wellbore Stability Limit (28) Unconfined Compressive Strength (29) Bit Size (30) Mechanical drilling energy (UCS integrated over distance drilled by the bit) (31) Ratio of footage drilled compared to statistical footage (32) Cumulative UCS
(33) Cumulative Excess UCS
(34) Cumulative UCS Ratio (35) Average UCS of rock in section (36) Bit Average UCS of rock in section (37) Statistical Bit Hours (38) Statistical Drilled Footage for the bit (39) RPM
(40) On Bottom Hours (41) Calculated Total Bit Revolutions (42) Time to Trip (43) Critical Flow Rate (44) Maximum Flow Rate in hole section (45) Minimum Flow Rate in hole section (46) Flow Rate (47) Total Nozzle Flow Area of bit (48) Top Of Cement (49) Top of Tail slurry (50) Length of Lead slurry (51) Length of Tail slurry (52) Cement Density Of Lead (53) CementDensity Of Tail slurry (54) Casing Weight per foot (55) Casing Burst Pressure (56) Casing Collapse Pressure (57) Casing Type Name (58) Hydrostatic Pressure of Cement column
(59) Start Depth
(60) End Depth
(61) Conductor
(62) Hole Section Begin Depth
(63) Openhole Or Cased hole completion
(64) Casing Internal Diameter
(65) Casing Outer Diameter
(66) Mud Type
(67) Pore Pressure without Safety Margin
(68) Tubular Burst Design Factor
(69) Casing Collapse Pressure Design Factor
(70) Tubular Tension Design Factor
(71) Derrick Load Rating
(72) Drawworks Rating
(73) Motion Compensator Rating
(74) Tubular Tension rating
(75) Statistical Bit ROP
(76) Statistical Bit RPM
(77) Well Type
(78) Maximum Pressure
(79) Maximum Liner Pressure Rating
(80) Circulating Pressure
(81) Maximum UCS of bit
(82) Air Gap
(83) Casing Point Depth
(84) Presence of H2S
(85) Presence of C02
(86) Offshore Well
(87) Flow Rate Maximum Limit Risk Assessment Constants 26 [0082] The following paragraphs will set forth the 'Risk Assessment Constants' 26 which are used by the 'Risk Assessment Logical Expressions' 22 and the 'Risk Assessment Algorithms' 24. Values of the Constants 26 that are used as input data for Risk Assessment Algorithms 24 and the Risk Assessment Logical Expressions 22 are as foll ows:

(1) Maximum Mud Weight Overbalance to Pore Pressure (2) Minimum Required Collapse Design Factor (3) Minimum Required Tension Design Factor (4) Minimum Required Burst Design Factor (5) Rock density (6) Seawater density Risk Assessment Catalogs 28 [0083] The following paragraphs will set forth the 'Risk Assessment Catalogs' 28 which are used by the 'Risk Assessment Logical Expressions' 22 and the 'Risk Assessment Algorithms' 24. Values of the Catalogs 28 that are used as input data for Risk Assessment Algorithms 24 and the Risk Assessment Logical Expressions 22 include the following:

(1) Risk Matrix Catalog (2) Risk Calculation Catalog (3) Drilistring component catalog (4) Drill Bit Catalog (5) Clearance Factor Catalog (6) Drill Collar Catalog (7) Drill Pipes Catalog (8) Minimum and maximum flow rate catalog (9) Pump catalog (10) Rig Catalog (11) Constants and variables Settings catalog (12) Tubular Catalog Risk Assessment Output Data 18b1 [0084] The following paragraphs will set forth the 'Risk Assessment Output Data' 18b1 which are generated by the 'Risk Assessment Algorithms' 24. The 'Risk Assessment Output Data' 18b1, which is generated by the 'Risk Assessment Algorithms' 24, includes the following types of output data: (1) Risk Categories, (2) Subcategory Risks, and (3) Individual Risks. The 'Risk Categories', 'Subcategory Risks', and 'Individual Risks' included within the 'Risk Assessment Output Data' 18b1 comprise the following:

The following 'Risk Categories' are calculated:
(1) Individual Risk (2) Average Individual Risk (3) Subcategory Risk (4) Average Subcategory Risk (5) Total risk (6) Average total risk (7) Potential risk for each design task (8) Actual risk for each design task The following 'Subcategory Risks' are calculated (1) Gains risks (2) Losses risks (3) Stuck Pipe risks (4) Mechanical risks The following 'Individual Risks' are calculated (1) H2S and CO2, (2) Hydrates, (3) Well water depth, (4) Tortuosity, (5) Dogleg severity, (6) Directional Drilling Index, (7) Inclination, (8) Horizontal displacement, (9) Casing Wear, (10) High pore pressure, (11) Low pore pressure, (12) Hard rock, (13) Soft Rock, (14) High temperature, (15) Water-depth to rig rating, (16) Well depth to rig rating, (17) mud weight to kick, (18) mud weight to losses, (19) mud weight to fracture, (20) mud weight window, (21) Wellbore stability window, (22) wellbore stability, (23) Hole section length, (24) Casing design factor, (25) Hole to casing clearance, (26) casing to casing clearance, (27) casing to bit clearance, (28) casing linear weight, (29) Casing maximum overpull, (30) Low top of cement, (31) Cement to kick, (32) cement to losses, (33) cement to fracture, (34) Bit excess work, (35) Bit work, (36) Bit footage, (37) bit hours, (38) Bit revolutions, (39) Bit ROP, (40) Drillstring maximum overputt, (41) Bit compressive strength, (42) Kick tolerance, (43) Critical flow rate, (44) Maximum flow rate, (45) Small nozzle area, (46) Standpipe pressure, (47) ECD to fracture, (48) ECD to losses, (49) Subsea BOP, (50) Large Hole, (51) Small Hole, (52) Number of casing strings, (53) Drillstring parting, (54) Cuttings.

Risk Assessment Logical 22 [0085] The following paragraphs will set forth the 'Risk Assessment Logical Expressions' 22. The 'Risk Assessment Logical Expressions' 22 will: (1) receive the 'Input Data 20a' including a'plurality of Input Data calculation results' that has been generated by the 'Input Data 20a'; (2) determine whether each of the 'plurality of Input Data calculation results' represent a high risk, a medium risk, or a low risk; and (3) generate a'plurality of Risk Values' (also known as a'plurality of Individual Risks), in response thereto, each of the plurality of Risk Values/plurality of Individual Risks representing a'an Input Data calculation result' that has been 'ranked' as either a'high risk', a'medium risk', or a'low risk'.

The Risk Assessment Logical Expressions 22 include the following:
Task: Scenario Description: H2S and C02 present for scenario indicated by user (per well) Short Name: 1-12S_C02 Data Name: H2S
Calculation: H2S and C02 check boxes checked yes Calculation Name: CalculateH2S_CO2 High: Both selected Medium: Either one selected Low: Neither selected Unit: unitless Task: Scenario Description: Hydrate development (per well) Short Name: Hydrates Data Name: Water Depth Calculation: = Water Depth Calculation Name: CalculateHydrates High: >= 3000 Medium: >= 2000 Low: < 2000 Unit: ft Task: Scenario Description: Hydrate development (per well) Short Name: Well WD

Data Name: Water Depth Calculation: = WaterDepth Calculation Name: CalculateHydrates High: >= 5000 Medium: >=1000 Low: < 1000 Unit: ft Task: Trajectory Description: Dogleg severity (per depth) Short Name: DLS
Data Name: Dog Leg Severity Calculation: NA
Calculation Name: CalculateRisk High: >= 6 Medium: >= 4 Low: < 4 Unit: deg/100ft Task: Trajectory Description: Tortuosity (per depth) Short Name: TORT
Data Name: Dog Leg Severity Calculation: Summation of DLS
Calculation Name: CalculateTort High: >= 90 Medium: >= 60 Low: < 60 Unit: deg Task: Trajectory Description: Inclination (per depth) Short Name: INC
Data Name: Inclination Calculation: NA
Calculation Name: CalculateRisk High: >= 65 Medium: >= 40 Low: < 40 Unit: deg Task: Trajectory Description: Well inclinations with difficult cuttings transport conditions (per depth) Short Name: Cutting Data Name: Inclination Calculation: NA

Calculation Name: CalculateCutting High: >= 45 Medium: > 65 Low: < 45 Unit: deg Task: Trajectory Description: Horizontal to vertical ratio (per depth) Short Name: Hor_Disp Data Name: Inclination Calculation: = Horizontal Displacement /True Vertical Depth Calculation Name: CalculateHor Disp High: >= 1.0 Medium: >= 0.5 Low: < 0.5 Unit: Ratio Task: Trajectory Description: Directional Drillability Index (per depth) Fake Threshold Short Name: DDI
Data Name: Inclination Calculation: = Calculate DDI using Resample data Calculation Name: CalculateDDI
High: > 6.8 Medium: >= 6.0 Low: < 6.0 Unit: unitless Task: EarthModel Description: High or supernormal Pore Pressure (per depth) Short Name: PP_High Data Name: Pore Pressure without Safety Margin Calculation: = PP
Calculation Name: CalculateRisk High: >= 16 Medium: >= 12 Low: < 12 Unit: ppg Task: EarthModel Description: Depleted or subnormal Pore Pressure (per depth) Short Name: PP_Low Data Name: Pore Pressure without Safety Margin Calculation: = Pore Pressure without Safety Margin Calculation Name: CalculateRisk High: <= 8.33 Medium: <= 8.65 Low: > 8.65 Unit: ppg Task: EarthModel Description: Superhard rock (per depth) Short Name: RockHard Data Name: Unconfined Compressive Strength Calculation: = Unconfined Compressive Strength Calculation Name: CalculateRisk High: >= 25 Medium: >= 16 Low: < 16 Unit: kpsi Task: EarthModel Description: Gumbo (per depth) Short Name: RockSoft Data Name: Unconfined Compressive Strength Calculation: = Unconfined Compressive Strength Calculation Name: CalculateRisk High: <= 2 Medium: <= 4 Low: > 4 Unit: kpsi Task: EarthModel Description: High Geothermal Temperature (per depth) Short Name: TempHigh Data Name: StaticTemperature Calculation: = Temp Calculation Name: CalculateRisk High: >= 280 Medium: >= 220 Low: < 220 Unit: degF

Task: RigConstraint Description: Water depth as a ratio to the maximum water depth rating of the rig (per depth) Short Name: Rig_WD
Data Name:
Calculation: = WD , Rig WD rating Calculation Name: CalculateRig_WD
High: >= 0.75 Medium: >= 0.5 Low: < 0.5 Unit: Ratio Task: RigConstraint Description: Total measured depth as a ratio to the maximum depth rating of the rig (per depth) Short Name: Rig_MD
Data Name:
Calculation: = MD /Rig MD rating Calculation Name: CalculateRig_MD
High: >= 0.75 Medium: >= 0.5 Low: < 0.5 Unit: Ratio Task: RigConstraint "Description: Subsea BOP or wellhead (per well), not quite sure how to compute it"
Short Name: SS_BOP
Data Name: Water Depth Calculation: =
Calculation Name: CalculateHydrates High: >= 3000 Medium: >= 1000 Low: < 1000 Unit: $

Task: MudWindow Description: Kick potential where Mud Weight is too low relative to Pore Pressure (per depth) Short Name: MW_Kick Data Name:
Calculation: = Mud Weight - Pore Pressure Calculation Name: CalculateMW_Kick High: <= 0.3 Medium: <= 0.5 Low: > 0.5 Unit: ppg Task: MudWindow Description: Loss potential where Hydrostatic Pressure is too high relative to Pore Pressure (per depth) Short Name: MW_Loss Data Name: .
Calculation: = Hydrostatic Pressure - Pore Pressure Calculation Name: CalculateMWLoss "PreCondition: =Mud Type (HP-WBM, ND-WBM, D-WBM)"
High: >= 2500 Medium: >= 2000 Low: < 2000 Unit: psi Task: MudWindow Description: Loss potential where Hydrostatic Pressure is too high relative to Pore Pressure (per depth) Short Name: MW_Loss Data Name:
Calculation: = Hydrostatic Pressure - Pore Pressure Calculation Method: CalculateMWLoss "PreCondition: =Mud Type (OBM, MOBM, SOBM)"
High: >= 2000 Medium: >=1500 Low: < 1500 Unit: psi Task: MudWindow Description: Loss potential where Mud Weight is too high relative to Fracture Gradient (per depth) Short Name: MW_Frac Data Name:
Calculation: = Upper Bound - Mud Weight Calculation Method: CalculateMW_Frac High: <= 0.2 Medium: <= 0.5 Low: > 0.5 Unit: ppg Task: MudWindow Description: Narrow mud weight window (per depth) Short Name: MWW
Data Name:
Calculation: = Upper Wellbore Stability Limit - Pore Pressure without Safety Margin Calculation Method: CalculateMWW
High: <= 0.5 Medium: <= 1.0 Low: > 1.0 Unit: ppg Task: MudWindow Description: Narrow wellbore stability window (per depth) Short Name: WBSW
Data Name:
Calculation: = Upper Bound - Lower Bound Calculation Method: CalculateWBSW

"PreCondition: =Mud Type (OBM, MOBM, SOBM)"
High: <= 0.3 Medium: <= 0.6 Low: > 0.6 Unit: ppg Task: MudWindow Description: Narrow wellbore stability window (per depth) Short Name: WBSW
Data Name:
Calculation: = Upper Bound - Lower Bound Calculation Method: CalculateWBSW
"PreCondition: =Mud Type (HP-WBM, ND-WBM, D-WBM)"
High: <= 0.4 Medium: <= 0.8 Low: > 0.8 Unit: ppg Task: MudWindow Description: Wellbore Stability (per depth) Short Name: WBS
Data Name: Pore Pressure without Safety Margin Calculation: = Pore Pressure without Safety Margin Calculation Method: CalculateWBS
High: LB >= MW >= PP
Medium: MW >= LB >= PP
Low: MW >= PP >= LB
Unit: unitless Task: MudWindow Description: Hole section length (per hole section) Short Name: HSLength Data Name:
Calculation: = HoleEnd - HoleStart Calculation Method: CalculateHSLength High: >= 8000 Medium: >= 7001 Low: < 7001 Unit: ft Task: MudWindow Description: Dogleg severity at Casing points for casing wear (per hole section) Short Name: Csg_Wear Data Name: Dog Leg Severity Calculation: = Hole diameter Calculation Method: CalculateCsg_Wear High: >= 4 Medium: >= 3 Low: < 3 Unit: deg/100ft Task: MudWindow Description: Number of Casing strings (per hole section) Short Name: Csg_Count Data Name: Casing Point Depth Calculation: = Number of Casing strings Calculation Method: CalculateCsg_Count High: >= 6 Medium: >= 4 Low: < 4 Unit: unitless Task: WellboreSizes Description: Large Hole size (per hole section) Short Name: Hole_Big Data Name: Hole Size Calculation: = Hole diameter Calculation Method: CalculateHoleSectionRisk High: >= 24 Medium: >= 18.625 Low: < 18.625 Unit: in Task: WellboreSizes Description: Small Hole size (per hole section) Short Name: Hole_Sm Data Name: Hole Size Calculation: = Hole diameter Calculation Method: CalculateHole_Sm PreCondition: Onshore High: <= 4.75 Medium: <= 6.5 Low: > 6.5 Unit: in Task: WellboreSizes Description: Small Hole size (per hole section) Short Name: Hole_Sm Data Name: Hole Size Calculation: = Hole diameter Calculation Method: CalculateHole_Sm PreCondition: Offshore High: <= 6.5 Medium: <= 7.875 Low: > 7.875 Unit: in Task: TubularDesign "Description: Casing Design Factors for Burst, Collapse, & Tension (per hole section), DFb,c,t <= 1.0 for High, DFb,c,t <= 1.1 for Medium, DFb,c,t > 1.1 for Low"
Short Name: CsgDF
Data Name:
Calculation: = DF/Design Factor Calculation Method: CalculateCsg_DF
High: <= 1.0 Medium: <= 1.1 Low: > 1.1 Unit: unitless Task: TubularDesign Description: Casing string weight relative to rig lifting capabilities (per casing string) Short Name: Csg_Wt Data Name:
Calculation: = CasingWeight/RigMinRating Calculation Method: CalculateCsg_Wt High: >= 0.95 Medium: < 0.95 Low: < 0.8 Unit: Ratio Task: TubularDesign Description: Casing string allowable Margin of Overpull (per casing string) Short Name: Csg_MOP
Data Name:
Calculation: = Tubular Tension rating-CasingWeight Calculation Method: CalculateCsg_MOP
High: <= 50 Medium: <= 100 Low: > 100 Unit: klbs Task: WellboreSizes Description: Clearance between hole size and casing max OD (per hole section) Short Name: Hole_Csg Data Name:
Calculation: = Area of hole size , Area of casing size (max OD) Calculation Method: CalculateHole_Csg High: <= 1.1 Medium: <=1.25 Low: > 1.25 Unit: Ratio Task: WellboreSizes Description:
Short Name: Csg_Csg Data Name:
Calculation: = CainsgID/NextMaxCasingSize Calculation Method: CalculateCsgCsg High: <= 1.05 Medium: <= 1.1 Low: > 1.1 Unit: Ratio Task: WellboreSizes Description: Clearance between casing inside diameter and subsequent bit size (per bit run) Short Name: Csg-Bit Data Name:
Calculation: = CainsgID/NextBit Size Calculation Method: CalculateCsg_Bit High: <= 1.05 Medium: <= 1.1 Low: > 1.1 Unit: Ratio Task: CementDesign Description: Cement height relative to design guidelines for each string type (per hole section) Short Name: TOC_Low Data Name:
Calculation: = CasingBottomDepth - TopDepthOfCement Calculation Method: CalculateTOC_Low High: <= 0.75 Medium: <=1.0 Low: > 1.0 Unit: Ratio Task: CementDesign Description: Kick potential where Hydrostatic Pressure is too low relative to Pore Pressure (per depth) Short Name: Cmt_Kick Data Name:
Calculation: Cementing Hydrostatic Pressure - Pore Pressure)/TVD
Calculation Method: CalculateCmt_Kick High: <= 0.3 Medium: <= 0.5 Low: > 0.5 Unit: ppg Task: CementDesign Description: Loss potential where Hydrostatic Pressure is too high relative to Pore Pressure (per depth) Short Name: Cmt_Loss Data Name:
Calculation: = Cementing Hydrostatic Pressure - Pore Pressure Calculation Method: CalculateCmt_Loss High: >= 2500 Medium: >= 2000 Low: <2000 Unit: psi Task: CementDesign Description: Loss potential where Hydrostatic Pressure is too high relative to Fracture Gradient (per depth) Short Name: Cmt_Frac Data Name:
Calculation: UpperBound - Cementing Hydrostatic Pressure)/TVD
Calculation Method: CalculateCmt_Frac High: <= 0.2 Medium: <= 0.5 Low: > 0.5 Unit: ppg Task: BitsSelection Description: Excess bit work as a ratio to the Cumulative Mechanical drilling energy (UCS
integrated over distance drilled by the bit) Short Name: BitWkXS
Data Name: CumExcessCumulative UCSRatio Calculation: = CumExcess/Cumulative UCS
Calculation Method: CalculateBitSectionRisk High: >= 0.2 Medium: >= 0.1 Low: < 0.1 Unit: Ratio Task: BitsSelection Description: Cumulative bit work as a ratio to the bit catalog average Mechanical drilling energy (UCS integrated over distance drilled by the bit) Short Name: Bit_Wk Data Name:

Calculation: = Cumulative UCS/ Mechanical drilling energy (UCS integrated over distance drilled by the bit) Calculation Method: CalculateBit_Wk High: >= 1.5 Medium: >= 1.25 Low: < 1.25 Unit: Ratio Task: BitsSelection Description: Cumulative bit footage as a ratio to the bit catalog average footage (drilled length) (per depth) Short Name: Bit_Ftg Data Name: Ratio of footage drilled compared to statistical footage Calculation: = Ratio of footage drilled compared to statistical footage Calculation Method: CalculateBitSectionRisk High: >= 2 Medium: >= 1.5 Low: < 1.5 Unit: Ratio Task: BitsSelection Description: Cumulative bit hours as a ratio to the bit catalog average hours (on bottom rotating time) (per depth) Short Name: Bit_Hrs Data Name: Bit_Ftg Calculation: = On Bottom Hours/Statistical Bit Hours Calculation Method: CalculateBit_Hrs High: >= 2 Medium: >= 1.5 Low: < 1.5 Unit: Ratio Task: BitsSelection Description: Cumulative bit Krevs as a ratio to the bit catalog average Krevs (RPM*hours) (per depth) Short Name: Bit_Krev Data Name:
Calculation: = Cumulative Krevs , Bit average Krevs Calculation Method: CalculateBit_Krev High: >= 2 Medium: >= 1.5 Low: < 1.5 Unit: Ratio Task: BitsSelection Description: Bit ROP as a ratio to the bit catalog average ROP (per bit run) Short Name: Bit_ROP
Data Name:
Calculation: = ROP/Statistical Bit ROP
Calculation Method: CalculateBit_ROP
High: >= 1.5 Medium: >= 1.25 Low: < 1.25 Unit: Ratio Task: BitsSelection Description: UCS relative to Bit UCS and Max Bit UCS (per depth) Short Name: Bit_UCS
Data Name:
Calculation: = UCS
Calculation Method: CalculateBitUCS
High: UCS >= Max Bit UCS >= Bit UCS
Medium: Max Bit UCS >= UCS >= Bit UCS
Low: Max Bit UCS >= Bit UCS >= UCS
Unit: Ratio Task: DrillstringDesign Description: Drillstring allowable Margin of Overpull (per bit run) Short Name: DS_MOP
Data Name:
Calculation: = MOP
Calculation Method: CalculateDS_MOP
High: <= 50 Medium: <= 100 Low: > 100 Unit: klbs Task: DrillstringDesign "Description: Potential parting of the drillstrings where required tension approaches mechanical tension limits of drill pipe, heavy weight, drill pipe, drill collars, or connections (per bit run) "
Short Name: DS_Part Data Name:
Calculation: = Required Tension (including MOP)/Tension limit of drilling component (DP) Calculation Method: CalculateDS_Part High: >= 0.9 Medium: >= 0.8 Low: > 0.8 Unit: ratio Task: DrillstringDesign Description: Kick Tolerance (per hole section) Short Name: Kick_Tol Data Name: BitUCS
"Calculation: NA (already calculated), Exploration/Development"
Calculation Method: CalculateKick_Tol PreCondition: Exporation High: <= 50 Medium: <= 100 Low: > 100 Unit: bbl Task: DrillstringDesign Description: Kick Tolerance (per hole section) Short Name: Kick_Tol Data Name: BitUCS
"Calculation: NA (already calculated), Exploration/Development"
Calculation Method: CalculateKick_Tol PreCondition: Development High: <= 25 Medium: <= 50 Low: > 50 Unit: bbl Task: Hydraulics Description: Flow rate for hole cleaning (per depth) Short Name: Q_Crit "Data Name: Flow Rate, Critical Flow Rate"
Calculation: = Flow Rate/Critical Flow Rate Calculation Method: CalculateQ_Crit High: <= 1.0 Medium: <= 1.1 Low: > 1.1 Unit: Ratio Task: Hydraulics Description: Flow rate relative to pump capabilities(per depth) Short Name: Q_Max Data Name: BitUCS
Calculation: = Q/Qmax Calculation Method: CalculateQ_Max High: >= 1.0 Medium: >= 0.9 Low: < 0.9 Unit: Ratio Task: Hydraulics "Description: TFA size relative to minimum TFA (per bit run), 0.2301 = 3 of 10/32 inch, 0.3313 = 3 of 12/32inch"
Short Name: TFA_Low Data Name: BitUCS
Calculation: TFA
Calculation Method: CalculateTFA_Low High: <= 0.2301 Medium: <= 0.3313 Low: > 0.3313 Unit: inch Task: Hydraulics Description: Circulating pressure relative to rig and pump maximum pressure (per depth) Short Name: P_Max Data Name: BitUCS
Calculation: P_Max Calculation Method: CalculateP_Max High: >= 1.0 Medium: >= 0.9 Low: < 0.9 Unit: Ratio Task: Hydraulics Description: Loss potential where ECD is too high relative to Fracture Gradient (per depth) Short Name: ECD_Frac Data Name: BitUCS
Calculation: UpperBound-ECD
Calculation Method: CalculateECD_Frac High: <= 0.0 Medium: <= 0.2 Low: > 0.2 Unit: ppg Task: Hydraulics Description: Loss potential where ECD is too high relative to Pore Pressure (per depth) Short Name: ECD_Loss Data Name: BitUCS
Calculation: = ECD - Pore Pressure Calculation Method: CalculateECD_Loss "PreCondition: Mud Type (HP-WBM, ND-WBM, D-WBM)"
High: >= 2500 Medium: >= 2000 Low: < 2000 Unit: psi Task: Hydraulics Description: Loss potential where ECD is too high relative to Pore Pressure (per depth) Short Name: ECDLoss Data Name: BitUCS
Calculation: = ECD - Pore Pressure Calculation Method: CalculateECDLoss "PreCondition: Mud Type (OBM, MOBM, SOBM)"
High: >= 2000 Medium: >= 1500 Low: < 1500 Unit: psi Risk Assessment Algorithms 24 [0086] Recall that the 'Risk Assessment Logical Expressions' 22 will: (1) receive the 'Input Data 20a' including a'plurality of Input Data calculation results' that has been generated by the 'Input Data 20a'; (2) determine whether each of the 'plurality of Input Data calculation results' represent a high risk, a medium risk, or a low risk; and (3) generate a plurality of Risk Values/plurality of Individual Risks in response thereto, where each of the plurality of Risk Values/plurality of Individual Risks represents a'an Input Data calculation result' that has been 'ranked' as having either a'high risk' severity, or a'medium risk' severity, or a'low risk' severity. For example, recall the following task:

Task: Hydraulics Description: Loss potential where ECD is too high relative to Pore Pressure (per depth) Short Name: ECD_Loss Data Name: BitUCS
Calculation: = ECD - Pore Pressure Calculation Method: CalculateECDLoss "PreCondition: Mud Type (OBM, MOBM, SOBM)"
High: >= 2000 Medium: >= 1500 Low: < 1500 Unit: psi [0087] When the Calculation 'ECD- Pore Pressure' associated with the above referenced Hydraulics task is >= 2000, a'high' rank is assigned to that calculation; but if the Calculation 'ECD - Pore Pressure' is >=1500, a'medium' rank is assigned to that calculation, but if the Calculation 'ECD - Pore Pressure' is < 1500, a'low' rank is assigned to that calculation.
[0088] Therefore, the 'Risk Assessment Logical Expressions' 22 will rank each of the 'Input Data calculation results' as either a'high risk' or a'medium risk' or a'low risk' thereby generating a'plurality of ranked Risk Values', also known as a'plurality of ranked Individual Risks'. In response to the 'plurality of ranked Individual Risks' received from the Logical Expressions 22, the 'Risk Assessment Logical Algorithms' 24 will then assign a'value' and a 'color' to each of the plurality of ranked Individual Risks received from the Logical Expressions 22, where the 'value' and the 'color' depends upon the particular ranking (i.e., the 'high risk' rank, or the 'medium risk' rank, or the 'low risk' rank) that is associated with each of the plurality of ranked Individual Risks. The 'value' and the 'color' is assigned, by the 'Risk Assessment Algorithms' 24, to each of the plurality of Individual Risks received from the Logical Expressions 22 in the following manner:

Risk Calculation #1 - Individual Risk Calculation:
[0089] Referring to the 'Risk Assessment Output Data' 18b1 set forth above, there are fifty-four (54) 'Individual Risks' currently specified. For an 'Individual Risk':

a High risk = 90, a Medium risk = 70, and a Low risk = 10 High risk color code = Red Medium risk color code = Yellow Low risk color code = Green
[0090] If the 'Risk Assessment Logical Expressions' 22 assigns a'high risk' rank to a particular 'Input Data calculation result', the 'Risk Assessment Algorithms' 24 will then assign a value '90' to that 'Input Data calculation result' and a color 'red' to that 'Input Data calculation result'.
[0091] If the 'Risk Assessment Logical Expressions' 22 assigns a'medium risk' rank to a particular 'Input Data calculation result', the 'Risk Assessment Algorithms' 24 will then assign a value '70' to that 'Input Data calculation result' and a color 'yellow' to that 'Input Data calculation result'.
[0092] If the 'Risk Assessment Logical Expressions' 22 assigns a'low risk' rank to a particular 'Input Data calculation result', the 'Risk Assessment Algorithms' 24 will then assign a value '10' to that 'Input Data calculation result' and a color 'green' to that 'Input Data calculation result'.
[0093] Therefore, in response to the 'Ranked Individual Risks' from the Logical Expressions 22, the Risk Assessment Algorithms 24 will assign to each of the 'Ranked Individual Risks' a value of 90 and a color 'red' for a high risk, a value of 70 and a color 'yellow' for the medium risk, and a value of 10 and a color 'green' for the low risk. However, in addition, in response to the 'Ranked Individual Risks' from the Logical Expressions 22, the Risk Assessment Algorithms 24 will also generate a plurality of ranked 'Risk Categories' and a plurality of ranked 'Subcategory Risks'
[0094] Referring to the 'Risk Assessment Output Data' 18b1 set forth above, the 'Risk Assessment Output Data' 18b1 includes: (1) eight 'Risk Categories', (2) four 'Subcategory Risks', and (3) fifty-four (54) 'Individual Risks' [ that is, 54 individual risks plus 2'gains' plus 2'losses' plus 2'stuck' plus 2'mechanical' plus 1'total' = 63 risks].
[0095] The eight 'Risk Categories' include the following: (1) an Individual Risk, (2) an Average Individual Risk, (3) a Risk Subcategory (or Subcategory Risk), (4) an Average Subcategory Risk, (5) a Risk Total (or Total Risk), (6) an Average Total Risk, (7) a potential Risk for each design task, and (8) an Actual Risk for each design task.
[0096] Recalling that the 'Risk Assessment Algorithms' 24 have already established and generated the above referenced 'Risk Category (1)' [i.e., the plurality of ranked Individual Risks'] by assigning a value of 90 and a color 'red' to a high risk 'Input Data calculation result', a value of 70 and a color 'yellow' to a medium risk 'Input Data calculation result', and a value of 10 and a color 'green' to a low risk 'Input Data calculation result', the 'Risk Assessment Algorithms' 24 will now calculate and establish and generate the above referenced 'Risk Categories (2) through (8)' in response to the plurality of Risk Values/plurality of Individual Risks received from the 'Risk Assessment Logical Expressions' 22 in the following manner:

Risk Calculation #2 - Average Individual Risk:
[0097] The average of all of the 'Risk Values' is calculated as follows:
E,." Riskvalue;
Average individual risk =
n
[0098] In order to determine the 'Average Individual Risk', sum the above referenced 'Risk Values' and then divide by the number of such 'Risk Values', where i = number of sample points. The value for the 'Average Individual Risk' is displayed at the bottom of the colored individual risk track.

Risk Calculation #3 - Risk subcategory
[0099] Referring to the 'Risk Assessment Output Data' 18b1 set forth above, the followir3g 'Subcategory Risks' are defined: (a) gains, (b) losses, (c) stuck and (d) mechanical, where a 'Subcategory Risk' (or 'Risk Subcategory') is defined as follows:

E ~ (Riskvaluej x severityj x Nj) Risk Subcategoiy =
Ej (severity Jx Nj) j = number of individual risks, 0_ Severity S 5, and N j = either I or 0 depending on whether the Risk Valuej contributes to the sub category Severity j = from the risk matrix catalog.

Red risk display for Risk Subcategory >_ 40 Yellow risk display for 20 <_ Risk Subcategor y< 40 Green risk display for Risk Subcategory < 20 Risk Calculation #4 - Average subcategory risk:

E '' (Risk Subcategory; x risk multiplier; ) Average subcategory risk n riskmultiplier n = number of sample points.
The value for the average subcategory risk is displayed at the bottom of the colored subcategory risk track.

Risk Multiplier = 3 for Risk Subcategory >_ 40, Risk Multiplier = 2 for 20 <_ Risk Subcategor y< 40 Risk Multiplier = 1 for Risk Subcategory < 20 Risk Calculation #5 - Total Risk The total risk calculation is based on the following categories: (a) gains, (b) losses, (c) stuck, and (d) mechanical.

Risk subcategoryk Risk Total = 4 where k = number of subcategories Red risk display for Risk total > 40 Yellow risk display for 20 <_ Risk Total < 40 Green risk display for Risk Total < 20 Risk Calculation #6 - Average Total Risk Average total risk ; (Risk Subcategory; x risk nzultiplier; ) =
risknaultiplier n = number of sample points.

Risk Multiplier = 3 for Risk Subcategory >_ 40, Risk Multiplier = 2 for 20 <_ Risk Subcategor y< 40 Risk Multiplier = I for Risk Subcategory < 20 The value for the average total risk is displayed at the bottom of the colored total risk track.
Risk calculation #7 - Risks per design task:

The following 14 design tasks have been defined: Scenario, Trajectory, Mechanical Earth Model, Rig, Wellbore stability, Mud weight and casing points, Wellbore Sizes, Casing, Cement, Mud, Bit, Drillstring, Hydraulics, and Time design. There are currently 54 individual risks specified.

Risk calculation #7A - Potential maximum risk per design task Potential Risk (90 x Severityk,i x N~.,i ) k- EJ-1 ss (Severityk,.i x Nk,i ) k = index of design tasks, there are 14 design tasks, Nj = either 0 or 1 depending on whether the Risk Valuej contributes to the design task.
0 <_ Severity < 5 Risk calculation #7B - Actual risk per design task ~5, (Average Individual Riskj x Severity ~ x Nk, f) Actual Riskk = 55 lj_, (Severity f x Nk j ) k = index of design tasks, there are 14 design tasks Nk>.i E [0,..., hf ]
0 < Severityj _< 5 The 'Severity' in the above equations are defined as follows:
Risk Severity H2S_CO2 2.67 Hydrates 3.33 Well_WD 3.67 TORT .. 3 Well_MD 4.33 Hor Disp 4.67 DDI 4.33 PP_High 4.33 PP_Low 2.67 RockHard 2 RockSoft 1.33 TempHigh . 3 Rig_WD . 5 Rig_MD 5 SS_BOP 3.67 MW_Kick 4 MW_Loss 3 MW_Frac 3.33 MWW 3.33 WBSW 3.33 HSLength 3 Hole_Big 2 Hole_Sm 2.67 Hole_Csg 2.67 Csg_Csg 2.33 Csg_Bit 1.67 Csg_DF 4 Csg Wt 3 Csg_MOP 2.67 Csg_Wear 1.33 Csg_Count 4.33 TOC_Low 1.67 Cmt_Kick 3.33 Cmt_Loss 2.33 Cmt_Frac 3.33 Bit_Wk 2.33 Bit WkXS 2.33 Bit Ftg 2.33 Bit_Hrs 2 Bit_Krev 2 BitROP 2 BitUCS 3 DS_MOP 3.67 DS_Part 3 Kick_Tol 4.33 Q_Crit 2.67 Q_Max 3.33 Cutting 3.33 P_Max 4 TFA_Low 1.33 ECD_Frac 4 ECD Loss 3.33
[00100] Refer now to figure 11 which will be used during the following functional description of the operation of the present invention.

[00101 ] A functional description of the operation of the 'Automatic Well Planning Risk Assessment Software' 18c1 will be set forth in the following paragraphs with reference to figures 1 through 11 of the drawings.

[00102] The Input Data 20a shown in figure 9A will be introduced as 'input data' to the Computer System 18 of figure 9A. The Processor 18a will execute the Automatic Well Planning Risk Assessment Software 18c1, while using the Input Data 20a, and, responsive thereto, the Processor 18a will generate the Risk Assessment Output Data 18b1, the Risk Assessment Output Data 18b 1 being recorded or displayed on the Recorder or Display Device 18b in the manner illustrated in figure 9B. The Risk Assessment Output Data 18b 1 includes the 'Risk Categories', the 'Subcategory Risks', and the 'Individual Risks'.
When the Automatic Well Planning Risk Assessment Software 18c1 is executed by the Processor 18a of figure 9A, referring to figures 10 and 11, the Input Data 20a (and the Risk Assessment Constants 26 and the Risk Assessment Catalogs 28) are collectively provided as 'input data' to the Risk Assessment Logical Expressions 22. Recall that the Input Data 20a includes a 'plurality of Input Data Calculation results'. As a result, as denoted by element numeral 32 in figure 11, the 'plurality of Input Data Calculation results' associated with the Input Data 20a will be provided directly to the Logical Expressions block 22 in figure 11. During that execution of the Logical Expressions 22 by the Processor 18a, each of the 'plurality of Input Data Calculation results' from the Input Data 20a will be compared with each of the 'logical expressions' in the Risk Assessment Logical Expressions block 22 in figure 11.
When a match is found between an 'Input Data Calculation result' from the Input Data 20a and an 'expression' in the Logical Expressions block 22, a'Risk Value' or 'Individual Risk' 34 will be generated (by the Processor 18a) from the Logical Expressions block 22 in figure 11. As a result, since a'plurality of Input Data Calculation results' 32 from the Input Data 20a have been compared with a'plurality of expressions' in the Logical Expressions' block 22 in figure 11, the Logical Expressions block 22 will generate a plurality of Risk Values/plurality of Individual Risks 34 in figure 11, where each of the plurality of Risk Values/plurality of Individual Risks on line 34 in figure 11 that are generated by the Logical Expressions block 22 will represent an 'Input Data Calculation result' from the Input Data 20a that has been ranked as either a'High Risk', or a'Medium Risk', or a'Low Risk' by the Logical Expressions block 22. Therefore, a'Risk Value' or 'Individual Risk' is defined as an 'Input Data Calculation result' from the Input Data 20a that has been matched with one of the 'expressions' in the Logical Expressions 22 and ranked, by the Logical Expressions block 22, as either a'High Risk', or a'Medium Risk', or a'Low Risk'. For example, consider the following 'expression' in the Logical Expressions' 22:

Task: MudWindow Description: Hole section length (per hole section) Short Name: HSLength Data Name:
Calculation: = HoleEnd - HoleStart Calculation Method: CalculateHSLength High: >= 8000 Medium: >= 7001 Low: < 7001 [00103] The 'Hole End - HoleStart' calculation is an 'Input Data Calculation result' from the Input Data 20a. The Processor 18a will find a match between the 'Hole End -HoleStart Input Data Calculation result' originating from the Input Data 20a and the above identified 'expression' in the Logical Expressions 22. As a result, the Logical Expressions block 22 will 'rank' the 'Hole End - HoleStart Input Data Calculation result' as either a'High Risk', or a'Medium Risk', or a'Low Risk' depending upon the value of the 'Hole End -HoleStart Input Data Calculation result'.

[00104] When the 'Risk Assessment Logical Expressions' 22 ranks the 'Input Data calculation result' as either a'high risk' or a'medium risk' or a'low risk' thereby generating a plurality of ranked Risk Values/plurality of ranked Individual Risks, the 'Risk Assessment Logical Algorithms' 24 will then assign a'value' and a'color' to that ranked 'Risk Value' or ranked 'Individual Risk', where the 'value' and the 'color' depends upon the particular ranking (i.e_, the 'high risk' rank, or the 'medium risk' rank, or the 'low risk' rank) that is associated with that 'Risk Value' or 'Individual Risk'. The 'value' and the 'color' is assigned, by the 'Risk Assessment Logical Algorithms' 24, to the ranked 'Risk Values' or ranked 'Individual Risks' in the following manner:

a High risk = 90, a Medium risk = 70, and aLowrisk= 10 High risk color code = Red Medium risk color code = Yellow Low risk color code = Green [00105] If the 'Risk Assessment Logical Expressions' 22 assigns a'high risk' rank to the 'Input Data calculation result' thereby generating a ranked 'Individual Risk', the 'Risk Assessment Logical Algorithms' 24 assigns a value '90' to that ranked 'Risk Value' or ranked 'Individual Risk' and a color 'red' to that ranked 'Risk Value' or that ranked 'Individual Risk'. If the 'Risk Assessment Logical Expressions' 22 assigns a'medium risk' rank to the 'Input Data calculation result' thereby generating a ranked 'Individual Risk', the 'Risk Assessment Logical Algorithms' 24 assigns a value '70' to that ranked 'Risk Value' or ranked 'Individual Risk' and a color 'yellow' to that ranked 'Risk Value' or that ranked 'Individual Risk'. If the 'Risk Assessment Logical Expressions' 22 assigns a'low risk' rank to the 'Input Data calculation result' thereby generating a ranked 'Individual Risk', the 'Risk Assessment Logical Algorithms' 24 assigns a value '10' to that ranked 'Risk Value' or ranked 'Individual Risk' and a color 'green' to that ranked 'Risk Value' or that ranked 'Individual Risk'.

[00106] Therefore, in figure 11, a plurality of ranked Individual Risks (or ranked Risk Values) is generated, along line 34, by the Logical Expressions block 22, the plurality of ranked Individual Risks (which forms a part of the 'Risk Assessment Output Data' 18b1) being provided directly to the 'Risk Assessment Algorithms' block 24. The 'Risk Assessment Algorithms' block 24 will receive the plurality of ranked Individual Risks' from line 34 and, responsive thereto, the 'Risk Assessment Algorithms' 24 will: (1) generate the 'Ranked Individual Risks' including the 'values' and 'colors' associated therewith in the manner described above, and, in addition, (2) calculate and generate the 'Ranked Risk Categories' 40 and the 'Ranked Subcategory Risks' 40 associated with the 'Risk Assessment Output Data' 18b1. The 'Ranked Risk Categories' 40 and the 'Ranked Subcategory Risks' 40 and the 'Ranked Individual Risks' 40 can now be recorded or displayed on the Recorder or Display device 18b. Recall that the 'Ranked Risk Categories' 40 include: an Average Individual Risk, an Average Subcategory Risk, a Risk Total (or Total Risk), an Average Total Risk, a potential Risk for each design task, and an Actual Risk for each design task.
Recall that the 'Ranked Subcategory Risks' 40 include: a Risk Subcategory (or Subcategory Risk).

[00107] As a result, recalling that the 'Risk Assessment Output Data' 18b1 includes 'one or more Risk Categories' and 'one or more Subcategory Risks' and 'one or more Individual Risks', the 'Risk Assessment Output Data' 18b1, which includes the Risk Categories 40 and the Subcategory Risks 40 and the Individual Risks 40, can now be recorded or displayed on the Recorder or Display Device 18b of the Computer System 18 shown in figure 9A.

[00108] As noted earlier, the 'Risk Assessment Algorithms' 24 will receive the 'Ranked Individual Risks' from the Logical Expressions 22 along line 34 in figure 11;
and, responsive thereto, the 'Risk Assessment Algorithms' 24 will (1) assign the 'values' and the 'colors' to the 'Ranked Individual Risks' in the manner described above, and, in addition, (2) calculate and generate the 'one or more Risk Categories' 40 and the 'one or more Subcategory Risks' 40 by using the following equations (set forth above).

The average Individual Risk is calculated from the 'Risk Values' as follows:
Y ; Riskvalue;
Average individual risk =
n The Subcategory Risk, or Risk Subcategory, is calculated from the 'Risk Values' and the 'Severity', as defined above, as follows:

Risk Subcategory "(Riskvalue J x severityj x N1) =
Ej (severityj x Nj) The Average Subcategory Risk is calculated from the Risk Subcategory in the following manner, as follows:

~ ."
Average subcategory risk = (Risk Subcategory; x risk multiplier, ) n risk multiplier 1 !

The Risk Total is calculated from the Risk Subcategory in the following manner, as follows:
E i Risk subcategoryk Risk Total =

The Average Total Risk is calculated from the Risk Subcategory in the following manner, as follows:

Average total risk (Risk Subcategory; x risk multiplier,) =
n risk rnultiplier The Potential Risk is calculated from the Severity, as defined above, as follow:
J5, (90 x Severityk ~ x Nk,j) Potential Riskk =
E j_i ss(Severityk,ix Nk,j) The Actual Risk is calculated from the Average Individual Risk and the Severity (defined above) as follows:

Actual Riskk -~J5' (Average Individual Risk; x Severity j x Nk,j) 1 =1 (Severityjx Nk,i) [00109] Recall that the Logical Expressions block 22 will generate a'plurality of Risk Values/Ranked Individual Risks' along line 34 in figure 11, where each of the 'plurality of Risk Values/Ranked Individual Risks' generated along line 34 represents a received 'Input Data Calculation result' from the Input Data 20a that has been 'ranked' as either a'High Risk', or a'Medium Risk', or a'Low Risk' by the Logical Expressions 22. A'High Risk' will be assigned a'Red' color, and a'Medium Risk' will be assigned a'Yellow' color, and a 'Low Risk' will be assigned a'Green' color. Therefore, noting the word 'rank' in the following, the Logical Expressions block 22 will generate (along line 34 in figure 11) a 'plurality of ranked Risk Values/ranked Individual Risks'.

[00110] In addition, in figure 11, recall that the 'Risk Assessment Algorithms' block 24 will receive (from line 34) the 'plurality of ranked Risk Values/ranked Individual Risks' from the Logical Expressions block 22. In response thereto, noting the word 'rank' in the following, the 'Risk Assessment Algorithms' block 24 will generate: (1) the 'one or more Individual Risks having 'values' and 'colors' assigned thereto, (2) the 'one or more ranked Risk Categories' 40, and (3) the 'one or more ranked Subcategory Risks' 40. Since the 'Risk Categories' and the 'Subcategory Risks' are each 'ranked', a'High Risk' (associated with a Risk Category 40 or a Subcategory Risk 40) will be assigned a'Red' color, and a'Medium Risk' will be assigned a'Yellow' color, and a'Low Risk' will be assigned a'Green' color.
In view of the above 'rankings' and the colors associated therewith, the 'Risk Assessment Output Data' 18b 1, including the 'ranked' Risk Categories 40 and the 'ranked' Subcategory Risks 40 and the 'ranked' Individual Risks 38, will be recorded or displayed on the Recorder or Display Device 18b of the Computer System 18 shown in figure 9A in the manner illustrated in figure 9B.

Automatic Well Planning Software System - Risk Assessment sub-task 16a -Visualization [00111] In accordance with one aspect of the present invention, the above described risk categories and subcategory risks and individual risks are visualized in two-dimensions (2D) [or three-dimensions (3D)] along a depth in a wellbore by displaying a total 'ranked risk category', a'ranked subcategory risk', and a'ranked individual risk'. The 2D
view of the risks is displayed in two ways: the first way is by risk parameter, risk category, and risk summary vs. depth; and the second way is total risk vs. workflow task identifying the relative risk contribution of each technical design task in the workflow.

[00112] As a result of the nature by which the risks are calculated, an array of risk values are produced that can be visualized as a log. Logs are such a standard way of visualizing data in the oil and gas industry that it is a natural visualization technique for risk as well. These logs can be plotted in 2D or 3D. 2D logs have any number of methods of display allowing for infinite flexibility, however 3D offers something unique. Displaying the risk data in 3D in the "lathe" view with or without color scaling is also very useful for creating visual risk volumes along the trajectory.

[00113] These risk visualization techniques of the present invention will be used to visualize risks in the 3D earth model and identify coincidence of risk levels and geological features.
This enables users to draw correlations from the positional coincidence of risk and geophysical attributes, geological features, reservoir simulation results (like streamlines), mechanical stresses, and positional uncertainty of trajectory. Based on any discovery of correlation or other relationship, users can assess the benefts and drawbacks of modifying the position or design of the well to reduce the cost and/or risks associated with the well.
[00114] Referring to figure 12, one example of the risk assessment output data 18b1, that is recorded or displayed on the recorder or display device 18b of figure 9B, is illustrated, figure 12 illustrating a screen shot of a two-dimensional risk representation as a function of depth in a wellbore. Figure 12 represents a screenshot of the current two-dimensional risk representation as a function of depth. From left to right the following risk tracks are displayed: Total risk in color track 48, Total risk in log track 49, Subcategory Risks 46 including a Gains risk in color track, a Losses risk in color track, a Stuck Pipe risk in color track, and a Mechanical risk in color track, and Individual risks 42 in color track (there are 54 Individual Risks). The risks are graphically presented using the colors red, yellow and green that correspond with a high risk, a medium risk, and a low risk, respectively.
The individual risks 42 are quantified with a numerical value at the bottom of each color track. The subcategories (gains, losses, stuck and mechanical) are presented using the same color scheme including the numeric [00115] In figure 12, when the risk assessment output data 18b1 is displayed on the Recorder or Display device 18b of figure 9A, a'first type of display' 41 illustrated in figure 12 includes: the fifty-four (54) 'Individual Risks' 42 plotted as a funetion of depth 44 in a wellbore, the four (4) Subcategory Risks (or 'Risk Subcategory') 46 plotted as a function of depth 44 in the wellbore, the Total Risk (or 'Risk Total') 48 plotted as a function of depth 44 in the wellbore, and a log 49 which is a'log representation' of the Total Risk 48, the 'log representation' being 'Total Risk 48 amplitude as a function of depth' in the wellbore. Recall that the 54 'ranked Individual Risks' 42 in figure 12 are generated by the Logical Expressions 22 in figure 11 and are received (from line 34) by the Risk Assessment Algorithms 24 in figure 11, and that the 54 'ranked Individual Risks' 42 (at each sample interval along the depth dimension 44 in the wellbore) are each given a'value' and a'color' by the Algorithms 24 depending upon the 'rank' of the risk (i.e., high, medium or low). Recall that the Subcategory Risks 46 (at each sample interval along the depth dimension 44 in the wellbore) are each calculated by the following equation:

Risk Subcategory '(Riskvalue J x severity J x Nj) =
jj(severity,x N,) where the 'Risk value' is the value of the Individual Risk and the severity is provided above.
Recall that the Total Risk 48 (at each sample interval along the depth dimension 44 in the wellbore) is calculated by the following equation:

E ; Risk subcategoryk Risk Total =

[00116] In figure 12, the 'depth in the welibore' dimension 44 (or 'depth dimension' 44) in figure 12 includes a plurality of sample intervals 50 which''extend along the depth dimension 44 of the 'first type of display' of figure 12. At each sample interval 50 of the plurality of sample intervals 50 which extend along the depth dimension 44 of the 'first type of display' in figure 12, each of the fifty-four (54) 'Individual Risks' 42 at that sample interval have already been 'ranked' (by the Logical Expressions 22) as having either a'high risk' or a 'medium risk' or a'low risk', and, in addition, each of the four (4) Subcategory Risks 46 have also been 'ranked' (by the Algorithms 24) as having either a'high risk' or a'medium risk' or a'low risk', and, in addition, the Total Risk 48 has also been 'ranked' (by the Algorithms 24) as having either a'high risk' or a'medium risk' or a'low risk'. If a'high risk' is the rank of either the Individual Risks 42 or the Subcategory Risks 46 or the Total Risk 48 at a particular sample interval 50, a red color is assigned to the risk at that sample interval; and if a'medium risk' is the rank of either the Individual Risks 42 or the Subcategory Risks 46 or the Total Risk 48 at a particular sample interva150, a yellow color is assigned to the risk at that sample interval; and if a'low risk' is the rank of either the Individual Risks 42 or the Subcategory Risks 46 or the Total Risk 48 at a particular sample interva150, a green color is assigned to the risk at that sample interval. Therefore, at each sample interva150, a plurality of colors may be seen on the 'first type of display' in figure 12 associated with the Total Risk 48 and the four Subcategory Risks 46 and the fifl.y-four Individual Risks 42. At each sample interval 50, if the risk is ranked as a'high risk', a red color is assigned to that risk and a value of 90 is assigned to that risk; and if the risk is ranked as a'medium risk', a yellow color is assigned to that risk and a value of 70 is assigned to that risk; and if the risk is ranked as a'low risk', a green color is assigned to that risk and a value of 10 is assigned to that risk.

[00117] In figure 12, the Subcategory Risks 46 include: gains, losses, stuck, and mechanical. A'gain' subcategory risk 46 means that a positive flow of wellbore fluid exists at that sample interval 50 in the wellbore (i.e., the wellbore fluid is flowing uphole to a surface of the wellbore). A'loss' subcategory risk 46 means that a negative flow of welibore fluid exists at that sample interva150 in the welibore (i.e., the welibore fluid is flowing from the wellbore and into the Earth formation - not uphole to the surface).
A'stuck' subcategory risk 46 means that, at that sample interval 50, the tubing equipment or drill pipe is 'stuck' in the wellbore. A'mechanical' subcategory risk 46 means that, at that sample interval 50, a mechanical problem exists with respect to the tubing equipment or drill pipe in the wellbore.
At a particular sample interva150 along the depth dimension 44 of the 'first type of display' shown in figure 12, at least some of the 54 Individual Risks 42 may include:
(1) a'gain' type of subcategory risk 46 (wellbore fluid is flowing uphole at that point), (2) a'loss' type of subcategory risk 46 (wellbore fluid is flowing into the formation at that point), (3) a'stuck' type of subcategory risk 46 (a piece of equipment downhole is 'stuck' in the wellbore at that point), and (4) a'mechanical' type of subcategory risk 46 (a piece of equipment downhole has a mechanical problem at that point). The Individual Risks 42 which are 'gains' at 'that sample interval' 50 are grouped together and are reflected under the 'gains' subcategory risk 46 column in figure 12; and the Individual Risks 42 which are 'losses' at that sample interval 50 are grouped together and are reflected under the 'losses' subcategory risk 46 column in figure 12; and the Individual Risks 42 which represent 'stuck equipment' at that sarnple interval 50 are grouped together and are reflected under the 'stuck' subcategory risk 46 column in figure 12, and the Individual Risks 42 which represent 'mechanical problems' at that sample interval 50 are grouped together and reflected under the 'mechanical' subcategory risk 46 column in figure 12. A'Risk Total' 48 at 'that sample interval' 50 is calculated from:

(1) the 'gains' subcategory risks 46 at 'that sample interval' 50, (2) and the 'losses' subcategory risks 46 at 'that sample interval' 50, (3) and the 'stuck' subcategory risks 46 at 'that sample interval' 50, (4) and the 'mechanical' subcategory risks 46 at 'that sample interval' 50, the 'Risk total' 48 being displayed at 'that sample interval' 50 under column 48 in figure 12. In figure 12, a plurality of 'Individual Risks' 42 are associated, respectively, with a plurality of columns in the 'first type of display' shown in figure 12;
and, in addition, a plurality of 'Average Individual Risks' 52 are associated, respectively, with the plurality of columns in the 'first type of display' and the plurality of 'Individual Risks' 42 in figure 12.
For example, an 'Individual Risk' 42a in figure 12 is displayed above a particular column of the 'first type of display' in figure 12, and an 'Average Individual Risk' 52a is displayed below that particular column associated with that 'Individual Risk' 42a.
Recall that the 'Average Individual Risk' 52a is ca.lculated by using the following equation:

~ ," Riskvalue;
Average individual risk =
n [00118] In figure 12, a plurality of 'Subcategory Risks' 46 (i.e., gains, losses, stuck, and mechanical) are associated, respectiively, with a plurality of columns in the 'first type of display' shown in figure 12; and, in addition, a plurality of 'Average Subcategory Risks' 54 are associated, respectively, with the plurality of columns in the 'first type of display' and the plurality of 'Subcategory Risks' 46 in figure 12. For example, a'gains Subcategory Risk' 46a in figure 12 is displayed above a particular column of the 'first type of display' in figure 12, and an 'Average Subcategory Risk' 54a is displayed below that particular column associated with that 'gains Subcategory Risk' 46a. Recall that the 'Average Subcategory Risk' 54a is calculated by using the following equation:

," (Risk Subcategory, x risk multiplier; ) Average subcategory risk =
n riskrnultiplier [00119] In figure 12, a'Total Risk' 48 is associated with a first column in the 'first type of display' shown in figure 12; and, in addition, an 'Average Total Risk' 56 is associated with that first column in the 'first type of display' and the 'Total Risk' 48 in figure 12. For example, a'Total Risk' 48 in figure 12 is displayed above the first column of the 'first type of display' in figure 12, and an 'Average Total Risk' 56 is displayed below that first column associated with that 'Total Risk' 48. Recall that the 'Average Total Risk' 56 is calculated by using the following equation:

~ ."
Average total risk (Risk Subcategory; x risk multiplier) n risk multiplier [00120] In figure 12, referring to Individual Risk 42a and Average Individual Risk 52a, the column in figure 12 associated with the Individual Risk 42a and the Average Individual Risk 52a includes a'plurality of colors' that are associated, respectively, with the plurality of sample intervals 50 which extend along the depth dimension 44 of the 'first type of display' in figure 12. The aforementioned 'plurality of colors' includes a corresponding 'plurality of values', there being a'value' associated with each 'color'. The 'colors' will be either red, or yellow, or green, and the 'value' includes: a value of 90 representing a'high risk' which is associated with a red color, a value of 70 representing a'medium risk' which is associated with a yellow color, and a value of 10 representing a low risk which is associated with a green color.

[00121] Referring to figure 13, another example of the risk assessment output data 18b1, that is recorded or displayed on the recorder or display device 18b of figure 9B, is illustrated, figure 13 illustrating a screen shot of a two dimensional risk representation as a function of a particular design task. Figure 13 represents a screenshot of the current two-dimensional risk representation as a function of the particular design task. From top to bottom the following risks or 'design tasks' are displayed: Scenario, Trajectory, Mechanical Earth Model, Rig, Wellbore stability, Mud weight and casing points, Wellbore Sizes, Casing, Cement, Mud, Bit, Drillstring, Hydraulics, and Time design. Figure 13 illustrates a display of the 'Risk for each Design Task'. Figure 13 includes two parts: (1) a'first part', and (2) a'second part'. The 'first part' of figure 13 presents a bar graph of the potential risk (in a-white color) and the actual risk as calculated by the Automatic Well Planning Risk Assessment Software 18c1 (in a dark color). The Automatic Well Planning Risk Assessment Softwa.re 18c1 also calculates the ratio of the actual versus the potential risk as a percentage. The 'second part' of figure 13 presents the actual and potential risk in a cross plot. This display is siinilar to the Boston Consultancy Group plot. The potential risk is presented on the horizo3ntal axis while the actual risk is presented on the vertical axis. Graphically, one can distinguish different quadrants.
The quadrants in the left top presents a high actual risk with a low potential risk. This plotting allows a quick graphic interpretation of the risks. In addition, the design tasks with the highest actual risks are color coded with "wann" colors, while the low actual risk design tasks have "colder" colors.

[00122] In figure 13, when the risk assessment output data 18b1 is displayed on the Recorder or Display device 18b of figure 9A, a'second type of display' 58 illustrated in figure 13 includes: a first part 58a and a second part 58b.

[00123] In figure 13, the first part 58a of the 'second type of displa.y' 58 of figure 13 is a bar-graph of Potential Risk relative to Actual Risk wherein a plurality of design tasks 60 appear on a vertical axis and a Potential Risk 62 appears on a horizorn-tal axis. The design tasks 60 have been discussed above, in this specification, and include the following 14 design tasks: Scenario, Mechanical Earth Model (MEM), Wellbore Sizes (Vi7B Sizes), Mud weight and casing points (MW & CSG Pnt), Wellbore Stability (WBS), Hydraulics, Bit, Trajectory, Rig, Cement (CMT), Casing (CSG), Time, Bottom Hole Assembly (BHA), and Mud.
The Potential Risk 62 represents a scale of Potential Risk extending from zero (0) to one-hundred (100). A'design task', such as 'Scenario', is a grouping of Individual Risks 42. For example, the 'Scenario' design task 60a represents a'first grouping of Individual Risks' 42 and the 'Mechanical Earth Model (MEM)' design task 60b represents a'second grouping of Individual Risks 42. Taking the 'Scenario' design task 60a as an exarnple, the white portion 60a1 represents the 'Potential Risk' and the darkened portion 60a2 represents the 'Actual Risk'. Taking the 'Mechanical Earth Model (MEM)' design task 60b as another example, the white portion 60b1 represents the 'Potential Risk' and the darkened portion 60b2 represents the 'Actual Risk'. Therefore, in connection with each of the fourteen (14) above referenced design tasks 60 in figure 13, the white portion of each bar-graph in the first section 58a represents the 'Potential Risk' and the darkened portion of each bar-graph represents the 'Actual Risk'.

[00124] The Potential Risk 60a1 and the Actual Risk 60a2 can be defined as follows: the 'Potential Risk' represents the risk taken in connection with the 'most difficult well having the most difficult trajectory', and the 'Actual Risk' is the risk taken in connection with another 'wellbore being drilled'. The Potential Risk can be measured by the following 'potential risk values': maximum depth of the well, dogleg severity, Tortuosity (Tort), inclination, horizontal displacement, and Directional Drilling Index (DDI).
If, for a 'particular well', all of the above mentioned 'potential risk values' have reached their maximum values, a maximum 'potential risk' has been achieved in connection with that 'particular well', and, as a result, that 'particular well' represents the 'most difficult well having the most difficult trajectory'. On the other hand, 'any other wellbore being drilled' would be measured with reference to that 'particular well' because that 'particular well' represents the maximum 'Potential Risk'. Having defined the 'Potential Risk', the risk being taken in connection with 'any other wellbore being drilled' would be an 'Actual Risk'. The 'Actual Risk' taken in connection with 'any other wellbore being drilled' is usually less than the 'Potential Risk' in connection with the 'particular well' because the above referenced 'potential risk values' are always less for 'any other wellbore being drilled' relative to the 'potential risk values' for the 'particular well' which represents the maxinium 'Potential Risk'.

[00125] In figure 13, the second part 58b of the 'second type of display' 58 of figure 13 is a'Boston Consultancy' plot 5 8b. In figure 13, the 'Boston Consultancy' plot 5 8b includes a vertical axis and a horizontal axis. The Actual Risk appears on the vertical axis and the Potential Risk appears on the horizontal axis. The fourteen (14) design tasks 60 identified above (i.e., Scenario, Mechanical Earth Model (MEM), Wellbore Sizes (WB
Sizes), Mud weight and casing points (MW & CSG Pnt), Wellbore Stability (WBS), Hydraulics, Bit, Trajectory, Rig, Cement (CMT), Casing (CSG), Time, Bottom Hole Assembly (BHA), and Mud) appear on the right side of the 'Boston Consultancy' plot 58b of figure 13, each design task 60 having a'dot' 62 which uniquely identifies that particular design task 60. The Boston Consultancy plot 58b of figure 13 is divided into a plurality of blocks 64 which represent a particular Potential Risk and a particular Actual Risk. A plurality of 'dots' 66 appear in the blocks 64 of the 'Boston Consultancy' plot 58b, each of the 'dots' 66 in the blocks 64 of the plot 58b being one of the 'dots' 62 which represent a particular design task 60. In operation, referring to the 'Boston Consultancy' plot 5 8b in figure 13, a first 'dot' 68 in one of the blocks 64 of the plot 58b has a relatively low Potential Risk and a relatively low Actual Risk.
Therefore, a first design task associated with 'dot' 68 on plot 58b has a relatively low Potential Risk and a relatively low Actual Risk. However, a second 'dot' 70 in another one of the blocks 64 of the plot 58b has a relatively high Potential Risk and a relatively high Actual Risk. Therefore, a second design task associated with 'dot' 70 on plot 58b has a relatively high Potential Risk and a relatively high Actual Risk.

[00126] Referring to figure 14, another example of the risk assessment output data 18b1, that is recorded or displayed on the recorder or display device 18b of figure 9B, is illustrated, figure 14 illustrating an example of a data output of a risk assessment quantification per risk category as a function of depth in the wellbore. Figure 14 represents an example of the ascii data output of the risk quantification per risk category as a function of depth. These arrays of risk values can be displayed as logs in standard oilfield visualization applications.

[00127] In figure 14, when the risk assessment output data 18b1 is displayed on the Recorder or Display device 18b of figure 9A, a'third type of display' 72 illustrated in figure 14 includes the same columns which appear in figure 12, namely, the Individual Risks 42, the Subcategory Risks 46, and the Total Risk 48, each of which is measured at each sample interva150 as a function depth 44 (where 'MD' is 'measured depth') in a wellbore. In order to simplify the discussion of the 'third type of display' 72 in figure 14, the Individual Risks 42 in figure 14 include only a portion (i.e., 9) of all of the 54 Individual Risks 42 which appear in figure 12; however, the 'third type of display' 72 will include all of the fifty-four (54) Individual Risks 42 which also appear as Individual Risks 42 in figure 12. In figure 14, at a particular sample interval 50 (which could be, for example, one foot to 3 meters in length) at a particular measured depth (MD) of 391.21, for example, the total risk has a 'value' of 36.81; the 'gains' subcategory risk' 46 has a'value' of 35.48; ,,,;
the H2S C02 Individual Risk 42 has a'value' of 10; ...; and the Directional Drilling Index (DDI) Individual Risk 42 has a'value' of 10.

[00128] Recall that these 'values' were taken from the following:
a High risk = 90, a Medium risk = 70, and a Low risk = 10 High risk color code = Red Medium risk color code = Yellow Low risk color code = Green [00129] In figure 11, recall that the 'Input Data calculation results' on line 32 were each matched with one of the Logical Expressions 22 and, as a result, that 'Input Data calculation result' was 'ranked' as either a'high risk' or a'medium risk' or a'low risk', thereby generating 'Ranked Individual Risks' which are generated on line 34 in figure 11. If a 'Ranked Individual Risk' has a'high risk' ranking, a value of '90' is assigned to that 'Ranked Individual Risk' and a color of 'Red' is also assigned to that 'Ranked Individual Risk'. If a 'Ranked Individual Risk' has a'medium risk' ranking, a value of '70' is assigned to that 'Ranked Individual Risk' and a color of 'Yellow' is also assigned to that 'Ranked Individual Risk'. If a'Ranked Individual Risk' has a'low risk' ranking, a value of '10' is assigned to that 'Ranked Individual Risk' and a color of 'Green' is also assigned to that 'Ranked Individual Risk'. In figure 11, the Risk Assessment Algorithms 24 will then receive the 'Ranked Individual Risks' and calculate and generate 'Ranked Subcategory Risks' (e.g., 'gains', 'losses', 'stuck', and 'mechanical' 46 in figures 12 and 14) and 'Ranked Risk Categories' (e.g., Average Individual Risk, Total Risk, and Average Total Risk, Potential Risk, and Actual Risk). The 'Ranked Individual Risks' and the 'Ranked Subcategory Risks' and the 'Ranked Risk Categories' are displayed on the Recorder or Display device 18b in figure 9A.

[00130] In figure 14, therefore, one of the above referenced 'values' (i.e., one of the values of '10' or '70' or '90') are assigned to each of the 'Ranked Individual Risks' 42 at each 'measured depth (MD)' 44 in a wellbore; however, in figure 12, one of the 'colors' (i.e., 'red' or 'yellow' or 'green') are assigned to each of the 'Ranked Individual Risks' 42 at each 'measured depth (MD)' 44 in the wellbore. In figure 14, however, some of the Individual Risks 42 at each 'measured depth (MD)' 44 represent a'gain' (wellbore fluid is flowing uphole); and some of the Individual Risks 42 at each 'measured depth' 44 represent a'loss' (wellbore fluid is flowing into the formation); and some of the Individual Risks 42 at each 'measured depth' 44 represent a'stuck' problem (the tubing equipment at that MD 44 is 'stuck' in the wellbore); and some of the Individual Risks 42 at each 'measured depth' 44 represent a'mechanical' problem (the equipment disposed downhole at that MD 44 has a 'mechanical' problem). Therefore, at that MD 44, all of the 'gains' Individual Risks 42 are collectively represented and displayed under the 'gains' Subcategory Risk 46 column; and, at that MD 44, all of the 'losses' Individual Risks 42 are collectively represented and displayed under the 'losses' Subcategory Risk 46 column; and, at that MD 44, all of the 'stuck' Individual Risks 42 are collectively represented and displayed under the 'stuck' Subcategory Risk 46 column; and, at that MD 44, all of the 'mechanical' Individual Risks 42 are collectively represented and displayed under the 'mechanical' Subcategory Risk 46 column.
In figure 14, the 'gains' Subcategory Risks at that MD 44 are also assigned a'value'; and the 'losses' Subcategory Risks at that MD 44 are also assigned a'value'; and the 'stuck' Subcategory Risks at that MD 44 are also assigned a'value'; and the 'mechanical' Subcategory Risks at that MD 44 are also assigned a'value'; however, in figure 12, the 'gains' Subcategory Risks at that MD 44 are also assigned a'color' (i.e., 'red' or 'yellow' or 'green') corresponding to the 'value'; and the 'losses' Subcategory Risks at that MD 44 are also assigned a'color' corresponding to the 'value'; and the 'stuck' Subcategory Risks at that MD 44 are also assigned a'color' corresponding to the 'value'; and the 'mechanical' Subcategory Risks at that MD 44 are also assigned a'color' corresponding to the 'value'.
Recall that each of the 'gains' and 'losses' and 'stuck' and 'mechanical' Subcategory Risks are calculated from the Individual Risks by using the following equation:

Risk Subcategory "(Riskvaluej x severityj x Nj) =
Ej(severityjx Nj) where the 'Risk Value' is the 'Input Data calculation result' which generated the 'Ranked Individual Risk'.

[00131] In figure 14, at that MD 44, the 'gains' and 'losses' and 'stuck' and 'mechanical' Subcategory Risks 46 are used to calculate the 'Total Risk' 48, which, in figure 14, is labeled a'Risk Index' 48. In figure 14, at that MD 44, the 'Total Risk' 48 has a'value'; however, in figure 12, at that MD 44, the 'Total Risk' 48 has a'color' (i.e., 'red' or 'yellow' or 'green') which corresponds to the 'value'. In figure 14, the Total Risk 48 / Risk Index 48 is calculated from the Subcategory Risks 46 by using the following equation, as set forth above:
Risk Total = E ; Risk subcategoryk [00132] In figure 14, the 'values', which are assigned to each of the Individual Risks 42 and to each of the Subcategory Risks 46 and to the Total Risk 48 at each 'measured depth (MD)' 44 in a wellbore, represent either a'high risk' or a'medium risk' or a'low risk' depending upon the magnitude of the 'value'; however, in figure 12, the 'colors', which are assigned to each of the Individual Risks 42 and to each of the Subcategory Risks 46 and to the Total Risk 48 at each 'measured depth (MD)' 44 in the wellbore, represent either a'high risk' or a'medium risk' or a'low risk' depending upon the 'color' (i.e., depending upon whether the 'color' is the 'red' color, or the 'yellow' color, or the 'green' color).

[00133] Referring to figures 15, 16, and 17, another example of the risk assessment output data 18b1, that is recorded or displayed on the recorder or display device 18b of figure 9B, is illustrated, figure 15 illustrating an example of the risk categories displayed in three dimensions in a visualization environment. Figure 15 represents an example of the risk categories displayed in 3D in a visualization environment called 'Inside Reality'. Cylinders with different colors along the trajectory present different risk categories, while the cylinder diameter presents the severity of the risk. This presentation provides means to quickly correlate drilling risks with the geology.

[00134] In figures 15, 16, and 17, referring initially to figure 15, when the risk assessment output data 18b 1 is displayed on the Recorder or Display device 18b of figure 9A, a'fourth type of display' 74 illustrated in figure 15 includes a three-dimensional illustration of a wellbore 76 penetrating an Earth formation 78. The wellbore 76 is illustrated again in figure 16. In figure 16, the wellbore 76 includes a plurality of cylinders 80, 82, ..., and 84. The cylinder 80 represents 'risk #1' of the 54 Individual Risks 42 shown in figures 12 and 14, cylinder 82 represents 'risk #2' of the 54 Individual Risks 42, ..., and cylinder 84 represents 'risk # 54' of the 54 Individual Risks 42 shown in figures 12 and 14. The severity (i.e., a 'high risk' severity or a'medium risk' severity or a'low risk' severity) of each of the Individual Risks 42 associated with each of the cylinders 80, 82, ..., and 84 is illustrated by either the 'color' of the cylinder or the 'size' of the cylinder. For example, in the event that the severity of each of the Individual Risks 42 associated with each of the cylinders 80, 82;
..., and 84 is illustrated by 'color', if cylinder 80 is 'red' in color, the Individual Risk associated with that cylinder 80 has a'high risk' severity. If cylinder 82 is 'yellow' in color, the Individual Risk associated with that cylinder 82 has a'medium risk' severity. If cylinder 84 is 'green' in color, the Individual Risk associated with that cylinder 84 has a'low risk' severity. In figure 17, each of the cylinders 80, 82,..., 84 in figure 16 can have different diameters. For example, in figure 17, the cylinders 86, 88, and 90 can have a first inner diameter D1, a second intermediate diameter D2, and a third outer diameter D3.
In figure 16, in the event that the severity (i.e., a'high risk' severity, a'medium risk' severity, or a'low risk' severity) of each of the Individual Risks 42 associated with each of the cylinders 80, 82, ..., and 84 is illustrated by 'size', if cylinder 80 in figure 16 has a diameter D1, a'low risk' severity would be associated with the Individual Risk 42 corresponding to that cylinder 80. If cylinder 82 in figure 16 has a diameter D2, a'medium risk' severity would be associated with the Individual Risk 42 corresponding to that cylinder 82. If cylinder 84 in figure 16 has a diameter D3, a'high risk' severity would be associated with the Individual Risk 42 corresponding to that cylinder 84.

[00135] A functional specification associated with the Automatic Well Planning Risk Assessment Software 18c1 stored in the memory or program storage device 18c of figure 9A
is set forth in the following paragraphs.

Generate Risks Characteristic Information Goal In Context: This use case describes the risk assessment process, methodology, and calculations as well as how to display by depth and by task.
Scope: Automatically generate qualitative risks from specified risk calculations and designs vs. business rules. Risks will be assessed by depth or hole section/bit run for each business rule and results displayed in 2 ways, by depth and task.
Risks will be assigned values and combined into indices that will be used to compare scenarios against each other.
Level: Task Pre-Condition: The user has completed prior use cases and has data for all tasks available for producing the risks.
Success End Condition: The system confirms to the user that the risks have been successfully generated.
Failed End Condition: The system indicated to the user that the risk assessment is not generated successfully.
Primary Actor: The User Trigger Event: The user completed the Cost Estimate Main Success Scenario Step Actor Action System Response 1 The system performs all of the risk calculations and-comparing to risk thresholds and highlight all depths individually or by interval (well, hole section, or bit section) as applicable.
2 Risks will be displayed 2 ways, organized by depth (RiskMap) and by task (TaskRisk).
= Depth based (refer to RiskMap example) -by scenario, by group (gains, losses, stuck, mechanical), by risk track, by tasks, by individual risks, composite risk log/color scale.
= Task based (refer to TaskRisk example) -per scenario, all risks based on a given task are grouped together and plotted as task groups.
**Casing points and Bit end depths should both be user optional displays over the risks.
3 Compute risk indices for both methods of display and for all groupings using weighted average of risk x length with values of risk as per the following....
= High risk = 90%, red color = Med risk = 70%, yellow or amber color = Low risk = 10%, no color 4 User reviews risk displays System shows user a pop-up display (like tool-tip) and risk indices and of the threshold violations and tasks controlling the selects risk track. selected risk.
User navigates to System updates risk calculations and displays (if controlling task and necessary).
modifies results to modify risk assessment and navigates back to the risk task.

6 The user accepts the The use case ends successfully.
answers and navigates to the reports task.
Scenario Extensions Step Condition Action Description 1 a The system fails to get The system informs the user of the failure and its threshold values. reasons.
The user makes the appropriate correction.
The system re-joins Step 1.
lb The system fails to get The system informs the user of the failure and its threshold values. reasons.
The user makes no correction.
The user stops the process. The use case ends unsuccessfully.
3a The system is unable to The system informs the user of the failure and its calculate risk indices. reasons.
The user makes necessary corrections.
The system rejoins Step 3.

Scenario Variations Step Variable Possible Variations 1 a The system While user is working in a specific task - any risks that produces displays are calculated from results of that task are displayed in risks per task the task UI (view). This would be an optional setting to while working in aid users in identifying risks as they work rather than the task for on the exclusively at the end of the workflow.
fly risk assessment and risk mitigation work by the user.
This is in addition to the normal risk assessment task.
4a User reviews risk System will allow overlaying or other visual and displays and risk numerical comparison methods for risk displays and risk indices and wants values for 2 or more scenarios.
to compare risks of 2 or more scenarios.
5a User double clicks System navigates the user back to the task that is risk track or controlling the selected risk.
interval. The user modifies the task results to modify the risk assessment and navigates back to the risk task.
System rejoins at step 5.
5b User double clicks System navigates the user back to the task that is risk track or controlling the selected risk and displays a graphics track interval. containing all risks derived from this specific tasks result within the task view.
The user modifies the task results to modify the risk assessment and navigates back to the risk task.
System rejoins at step 5.

Business Rules All Risk Thresholds should be editable by the user in the configuration file although long term we may need to lock these values down separately from the rest of the configuration values.

Scenario Information H2S and C02 present for scenario indicated by user (per well) Short Name: 142S C02 Category: Mechanical Calculation: H2S and C02 check boxes checked yes...
= High: Both selected = Medium: Either one selected = Low: Neither selected Hydrate development (per well) Short Name: Hydrates Category: Mechanical, Stuck Calculation: Water depth = High: _ 3000' = Medium: >_ 2000' = Low: < 2000' Water Depth (per well) Short Name: Well WD
Category: Mechanical Calculation: Water depth = High: _5000' = Medium: _ 1000' = Low: < 1000' Trajectory Total Well Depth (per well) Short Name: Well MD
Category: Mechanical Calculation: Total Measured depth = High: >_ 20000' = Medium: _ 12000' = Low: < 12000' Trajectory shape J or S curve (per well) Short Name: JSCurve Category: Mechanical Calculation: Total Measured depth = High: >_ = Medium: >_ = Low: <

Dogleg severity (per depthl Short Name: DLS
Category: Stuck, Mechanical Calculation: NA
= High: _6 /100' = Medium: > 4 /100' = Low: < 4 /100' Tortuosity (per depth) Short Name: TORT
Category: Stuck, Mechanical Calculation: TORT = EDLS;

= High: > 90 = Medium: >_ 60 = Low: < 60 Inclination (per depth) Short Name: INC
Category: Mechanical, Stuck Calculation: NA
= High: _ 65 = Medium: _40 = Low: < 40 Well inclinations with difficult cuttin s transport conditions (per depth) Short Name: Cuttings Category: Mechanical, Stuck Calculation: NA
= High: 45 >_ Inc_65 = Medium: > 65 = Low: < 45 Horizontal to vertical ratio (per depth) Short Name: Hor_Disp Category: Stuck, Mechanical Calculation: = Horizontal Displacement = True Vertical Depth = High: _ 1.0 = Medium: _ 0.5 = Low: < 0.5 Directional Drillabili Index (per depth) Short Name: DDI
Category: Stuck, Mechanical Calculation: Calculate the DDI using the "Resample data"

Note: The DDI is calculated for the entire well. Therefore, the DDI is not displayed as a risk track, but displayed in the risk summary overview.

DDI - LOG,o rMDxAHDxTORTZIOSITY
L TVD J
NID, TVD in meters (or feet???) Tortuosity : TOR DLS;

AHD = Along hole displacement. In Swordfish, the AHD will be calculated using the Pythagorean principle (using the resample data) AHD = [J(x,~, - xõ )2 + (Yõ+I - Yõ Y
= High: DDI > 6.8 = Medium DDI < 6.8 and > 6 = Low: DDI < 6 Earth Properties High or supernormal Pore Pressure (per depth) Short Name: PP_High Category: Gains Calculation: = PP
= High: _ l6ppg = Medium: >_ 12ppg = Low: < 12ppg Depleted or subnormal Pore Pressure (per depth) Short Name: PP_Low Category: Losses, Stuck Calculation: = PP
= High: 5 8.33 ppg = Medium: 5 8.65 ppg = Low: > 8.65 ppg Superhard rock (per depth) Short Name: RockHard Category: Mechanical Calculation: = UCS
= High: _ 25 kpsi = Medium: _ 16 kpsi = Low: < 16 kpsi Gumbo (per depth) Short Name: RockSoft Category: Stuck, Mechanical Calculation: = UCS
= High: < 2 kpsi = Medium: 5 4 kpsi = Low: > 4 kpsi Geothermal Temperature High Geothermal Temperature (per depth) Short Name: TempHigh Category: Mechanical Calculation: = Temperature = High: _ 280 F
= Medium: _ 220 F
= Low: < 220 F

Low Geothermal Temperature (per depth) Short Name: TempLow Category: Mechanical, Losses Calculation: = Temperature = High: <_ 50 F

= Medium: _< 60 F
= Low: > 60 F
Rig Selection Water depth as a ratio to the maximum water depth rating of the rig(per depth) Short Name: Rig_WD
Category: Mechanical Calculation: = WD = Rig WD rating = High: _ 0.75 = Medium: _ 0.5 = Low: < 0.5 Total measured denth as a ratio to the maximum depth rating of the rig (per depth) Short Name: Rig_MD
Category: Mechanical Calculation: = MD = Rig MD rating = High: _ 0.75 = Medium: _ 0.5 = Low: < 0.5 Subsea BOP or wellhead (per well) Short Name: SS_BOP
Category: Mechanical Calculation: = Water Depth = High: WD _ 3000' = Medium: WD _> 1000' = Low: WD < 1000' Mud Weight Window Kick potential where Mud Weight is too low relative to Pore Pressure (per depth) Short Name: MW Kick Category: Gains ' Calculation: = Mud Weight - Pore Pressure = High: 5 0.3 ppg = Medium: S 0.5 ppg = Low: > 0.5 ppg Loss potential where Hydrostatic Pressure is too high relative to Pore Pressure (per depth) Short Name: MW_Loss Category: Losses, Stuck Calculation: = Hydrostatic Pressure - Pore Pressure Water based muds (HP-WBM, ND-WBM, D-WBM) = High: - 2500 psi = Medium: - 2000 psi = Low: < 2000 psi Oil based muds (OBM, MOBM, SOBM) = High: - 2000 psi = Medium: _ 1500 psi = Low: < 1500 psi Loss potential where Mud Weight is too high relative to Fracture Gradient (per depth) Short Name: MW_Frac Category: Losses, Stuck Calculation: = Upper Bound - Mud Weight = High: - 0.2 ppg = Medium: S 0.5 ppg = Low: > 0.5 ppg Narrow mud weight window (per depth) Short Name: MWW
Category: Gains, Losses, Stuck Calculation: = Upper Bound - Pore Pressure = High: < 0.5 ppg = Medium: S 1.0 ppg = Low: > 1.0 ppg Wellbore Stability(per depth) Short Name: WBS
Category: Stuck Calculation: PP, LB, MW
= High: LB _ MW ? PP
= Medium MW _ LB _ PP
= Low: MW - PP > LB

Narrow wellbore stability window (per depth) Short Name: WBSW

Category: Stuck Calculation: = Upper Bound - Lower Bound = OBM/WBM values = High: _ 0.3/0.4 ppg = Medium: <_ 0.6/0.8 ppg = Low: > 0.6/0.8 ppg Ballooning(per hole section) Short Name: Balloon Category: Losses, Gains Calculation: Mud Weight, Tensile Failure, Fracture Gradient (i.e. Min Principal Stress) = High: Tensile Failure <_ Mud Weight <_ Fracture Gradient = Medium: Mud Weight _ Tensile Failure <_ Fracture Gradient = Low: Mud Weight <_ Fracture Gradient <_ Tensile Failure Hole section length (per hole section) Short Name: HSLength Category: Stuck, Mechanical Calculation: NA
= High: _> 8000 ft = Medium: _ 7001 ft = Low: < 7001 ft Dogleg severity at Casing points for casing wear (per hole section) Short Name: Csg_Wear Category: Mechanical Calculation: = DLS
= High: >_ 4 /100' = Medium: _ 3 /100' = Low: < 3 /100' Number of Casing strings (per hole section2 Short Name: CsgCount Category: Mechanical Calculation: En , CsgS'trings = High: >_ 6 = Medium: >_ 4 = Low: < 4 Wellbore Sizes Large Hole sizes (per hole section) Short Name: Hole_Big Category: Kick, Stuck, Mechanical Calculation: = Hole diameter = High: _ 24"
= Medium: _ 18.625"
= Low: < 18.625"

Small Hole sizes (per hole section) Short Name: Hole_Sm Category: Losses, Stuck Calculation: = Hole diameter (Onshore/Offshore) = High: 5 4.75"/6.5"
= Medium: <_ 6.5"/7.875"
= Low: > 6.5"/7.875"

Clearance between hole size and casing max OD (per hole section) Short Name: Hole_Csg Category: Losses, Stuck Calculation: = Area of hole size = Area of casing size (max OD) = High: < 1.1 = Medium: <_ 1.25 = Low: > 1.25 Clearance between casing inside diameter and subsequent casing max OD (per hole section) Short Name: Csg_Csg Category: Losses, Stuck Calculation: = Area of casing ID = Area of casing max OD
= High: <_ 1.05 = Medium: < 1.1 = Low: > 1.1 Clearance between casing inside diameter and subsequent bit size (per bit run) Short Name: Csg_Bit Category: Losses, Stuck Calculation: = Area of nominal casing size (ID) = Area of nominal bit size (OD) next hole section = High: <_ 1.05 = Medium: _ 1.1 = Low: > 1.1 Casing Design Casing Design Factors for Burst, Collapse, & Tension (per hole section) Short Name: Csg_DF
Category: Mechanical Calculation: DFb,c,t = Minimum (DFb, DFc, DFt) DFb = Calculated Burst Design Factor = Required Burst Design Factor DFc = Calculated Collapse Design Factor = Required Collapse Design Factor DFt = Calculated Tension Design Factor = Required Tension Design Factor = High: DFb,c,t <_ 1.0 = Medium: DFb,c,t _ 1.1 = Low: DFb,c,t > 1.1 Casing string weight relative to rig lifting capabilities (per casing string) Short Name: Csg_Wt Category: Mechanical Calculation: = Casing string weight (bouyed) I Minimum (Derrick, Drawworks, Motion Compensator) = High: - 0.95 = Medium: < 0.95 = Low: < 0.8 Casing string allowable Margin of Overpull (per casing string) Short Name: Csg MOP
Category: Mechanical, Stuck Calculation: = Casing string tensile rating - Casing string weight (bouyed) = High: < 50 klbs = Medium: <_ 100 klbs = Low: > 100 klbs Cement Design Cement height relative to design guidelines for each stringtype (per hole section) Short Name: TOC Low Category: Mechanical Calculation: = Cement height / String type cementing height rule = High: < 0.75 = Medium: <- 1.0 = Low: > 1.0 Cement density lower than standard slurry: hydrostatic pressure / losses risk:
Short Name:
Category:
Calculation:
= High: _<
= Medium: <-= Low: >

Kick potential where Hydrostatic Pressure is too low relative to Pore Pressure (per depth) Short Name: Cmt_Kick Category: Gains Calculation: = Cementing Hydrostatic Pressure - Pore Pressure = High: < 0.3 ppg = Medium: <_ 0.5 ppg = Low: > 0.5 ppg Loss potential where Hydrostatic Pressure is too high relative to Pore Pressure (per depth) Short Name: Cmt_Loss Category: Losses Calculation: = Cementing Hydrostatic Pressure - Pore Pressure = High: _ 2500 psi = Medium: >_ 2000 psi = Low: < 2000 psi Loss potential where Hydrostatic Pressure is too high relative to Fracture Gradient (per depth) Short Name: CmtFrac Category: Losses Calculation: = Upper Bound - Cementing Hydrostatic Pressure = High: _ 0.2 ppg = Medium: 5 0.5 ppg = Low: > 0.5 ppg Bit Selection Excess bit work as a ratio to the Cumulative KPSIFT (UCS x Length) (per depth) Short Name: BitVJkXS
Category: Mechanical Calculation: = Excess KPSIFT = Cumulative KPSIFT
= High: _ 0.2 = Medium: _ 0.1 = Low: < 0.1 Cumulative bit work as a ratio to the bit catalog average KPSIFT (UCS x Length) (per depth) Short Name: Bit_Wk Category: Mechanical Calculation: = Cumulative KPSIFT = Bit average KPSIFT
= High: _1.5 = Medium: >_ 1.25 = Low: < 1.25 Cumulative bit footage as a ratio to the bit catalog avera eg footage (drilled length) (per depth) Short Name: Bit_Ftg Category: Mechanical Calculation: = Cumulative length = Bit average length = High: _ 2 = Medium: _ 1.5 = Low: < 1.5 Cumulative bit hours as a ratio to the bit catalog average hours (on bottom rotating time2(per de th Short Name: Bit_Hrs Category: Mechanical Calculation: = Cumulative hours = Bit average hours = High: >_ 2 = Medium: _ 1.5 = Low: < 1.5 Cumulative bit Krevs as a ratio to the bit catalog average Krevs (RPM*hours) (per depth) Short Name: Bit Krev Category: Mechanical Calculation: = Cumulative Krevs = Bit average Krevs = High: >_ 2 = Medium: _ 1.5 = Low: < 1.5 Bit ROP as a ratio to the bit catalog average ROP (per bit run) Short Name: BitROP
Category: Mechanical Calculation: = Planned ROP = Bit catalog average ROP
= High: _1.5 = Medium: _ 1.25 = Low: < 1.25 UCS relative to Bit UCS and Max Bit UCS (per depth~
Short Name: BitUCS
Category: Mechanical Calculation: NA
= High: UCS _ Max Bit UCS _ Bit UCS
= Medium: Max Bit UCS > UCS >_ Bit UCS
= Low: Max Bit UCS _ Bit UCS UCS
Drillstring Design BHA Tensile Risk (per bit run) Short Name:
Category:
Calculation:
= High: <_ = Medium: <_ = Low: >

Drillstring weight (per bit run) Short Name:
Category: Mechanical Calculation:
Drillstring allowable Margin of Over,pull (per bit run) Short Name: DS_MOP
Category: Mechanical, Stuck Calculation: = MOP
= High: <_ 50 klbs = Medium: - 100 klbs = Low: > 100 klbs Drillstring buckling - Neutral Point (NPZposition in drillstring(ner bit run) Short Name: DSBuckle Category: Mechanical, Stuck Calculation:
= High: NP in drill pipe = Medium: NP in heavy weight drill pipe = Low: NP in drill collars Kick Tolerance (per hole section) Short Name: KickTol Category: Losses, Stuck, Gains Calculation: NA (already calculated), Exploration/Development = High: _ 50/25 bbl = Medium: 5 100/50 bbl = Low: > 100/50 bbl Potential twistoff where required drilling torque approaches mechanical torsional limits of drill pipe, Hea weight drill pipe, drill collars, or connections (per bit run) Short Name: DSTwist Category: Mechanical Calculation: = Required Torque = Torsional limit of drillstring component (DC, HWDP, or DP) or connection = High: _ 0.9 = Medium: - 0.8 = Low: < 0.8 Potential parting of the drillstrings where required tension approaches mechanical tension limits of drill pipe, Heavy weight drill pipe, drill collars, or connections (per bit run) Short Name: DS_Part Category: Mechanical Calculation: = Required Tension (including MOP) = Tension limit of drillstring component (DC, H)VDP, or DP) or connection = High: _ 0.9 = Medium: _ 0.8 = Low: < 0.8 Hydraulics Flow rate for hole cleaning (per depth) Short Name: QCrit Category: Stuck, Losses Calculation: = Q/Qcr = High: _ 1.0 = Medium: 51.1 = Low: > 1.1 Flow rate relative to pump capabilities (per depth) Short Name: Q_Max Category: Mechanical Calculation: = Q/Qmax : Flowrate / Maximum Liner Flowrate = High: >_ 1.0 = Medium: _ 0.9 = Low: < 0.9 TFA size relative to minimum TFA (per bit run) Short Name: TFA Low Category: Mechanical Calculation: TFA
= High: <_ 0.2301 (3@10/32aa) = Medium: <_ 0.3313 (3@12/32") = Low: > 0.3313 (3@12/32") Circulating pressure relative to rig and pump maximum pressure ( en r depth) Short Name: P_Max Category: Mechanical Calculation: = Ratio: Pressure Circulating / Maximum Liner Pressure = High: _ 1.0 = Medium: _ 0.9 = Low: < 0.9 Loss potential where ECD is too high relative to Fracture Gradient (per depth) Short Name: ECDFrac Category: Losses, Stuck Calculation: = Upper Bound - ECD
= High: - 0.0 ppg = Medium: <- 0.2 ppg = Low: > 0.2 ppg Loss potential where ECD is too hiah relative to Pore Pressure (per depth) Short Name: ECD_Loss Category: Losses, Stuck Calculation: = ECD - Pore Pressure Water based muds (HP-WBM, ND-WBM, D-WBM) = High: _ 2500 psi = Medium: >_ 2000 psi = Low: < 2000 psi Oil based muds (OBM, MOBM, SOBM) = High: - 2000 psi = Medium: > 1500 psi = Low: < 1500 psi Risks (unorganized) = Kick Tolerance below design thresholds = Wellbore stability risk assessed same way as used by fluid selection algorithm - 10 of hole section where LL>PP translated? - Stuck = Mud weight overbalance risk (MW-PP) - Gains, Losses, Differential Sticking = Mud weight underbalance risk (FG-MW) - Losses, differential sticking = Drillstring tensile risk as a function of MOP (Margin of Overpull or Max OverPull) = Drillstring torsional risk based on torque and drag results (after T&D
implemented) = Trajectory risk from drillability index = Clearance risks - casing/casing, casing/hole, bit/casing - Mechanical, losses, gains, stuck Cement hydrostatic overbalance risk Depth related risks Maximum overbalance Ratio of maximum mud weight to the pore pressure (per hole section) High > 2500 psi Medium = [1500 - 2500] ppg Low<1500psi Minimum overbalance High<lppg Medium = [2 - 3] ppg Low > 3 ppg Hole cleaning Ratio of circulation rate to the critical flow rate (at zero ROP) Low > 1.2 Medium = [1.0 - 1.2]
High < 1.0 RiskMap Mockup (Risk vs. Depth) Risk wei hting Each risk has a weighting or severity factor ranging from 1 to 5, listed in the second column.
Then the risk occurrence is indicated for each category in the matrix below.
One (1) indicates the risk is included in the category, and zero (0) means exclusion. The risk is calculated by:
Risk category weighting (1- 5) X Risk (10% - 70% - 90 lo) X Interval X Risk occurrence.
The invention being thus described, it will be obvious that the same may be varied in many ways. Such variations are not to be regarded as a departure from the spirit and scope of the invention, and all such modifications as would be obvious to one skilled in the art are intended to be included within the scope of the following claims.

Claims (43)

1. A method of determining and displaying risk information in response to a plurality of input data, said input data including a plurality of input data calculation results, comprising the steps of:

comparing each calculation result of said plurality of input data calculation results of said input data with each logical expression of a plurality of logical expressions;

ranking by said logical expression said calculation result; and generating a plurality of ranked individual risks in response to the ranking step, each of said plurality of ranked individual risks representing an input data calculation result that has been ranked by said logical expression as having either a high risk severity or a medium risk severity or a low risk severity;

generating said risk information in response to said plurality of ranked individual risks; and displaying said risk information, the displaying step including displaying said risk information on a risk information display, said risk information display including a display of said plurality of ranked individual risks as a function of depth in a wellbore.
2. The method of claim 1, wherein each of said plurality of ranked individual risks displayed on said risk information display as a function of depth in said wellbore include a severity, said severity including either said high risk severity or said medium risk severity or said low risk severity, a color representing each said severity.
3. The method of claim 1, wherein each of said plurality of ranked individual risks displayed on said risk information display as a function of depth in said wellbore include a severity, said severity including either said high risk severity or said medium risk severity or said low risk severity, a numerical value representing each said severity.
4. The method of claim 1, wherein said risk information displayed on said risk information display comprises one or more ranked subcategory risks.
5. The method of claim 4, wherein said risk information displayed on said risk information display includes said one or more ranked subcategory risks as a function of depth in said wellbore.
6. The method of claim 5, wherein each of said one or more ranked subcategory risks displayed on said risk information display as a function of depth in said wellbore includes a severity, said severity including said high risk severity or said medium risk severity or said low risk severity, said severity being represented on said risk information display as a color.
7. The method of claim 5, wherein each of said one or more ranked subcategory risks displayed on said risk information display as a function of depth in said wellbore includes a severity, said severity including said high risk severity or said medium risk severity or said low risk severity, said severity being represented on said risk information display as a numerical value.
8. The method of claim 5, wherein said subcategory risks is selected from a group consisting of: gains risks, losses risks, stuck pipe risks, and mechanical risks.
9. The method of claim 1, wherein said risk information displayed on said risk information display comprises one or more risk categories.
10. The method of claim 9, wherein said one or more risk categories includes a total risk, said risk information display including said total risk displayed on said risk information display as a function of depth in said wellbore.
11. The method of claim 9, wherein said risk categories are selected from a group consisting of: an average individual risk, a subcategory risk, an average subcategory risk, a total risk, an average total risk, a potential risk for each design task, and an actual risk for each design task.
12. The method of claim 11, wherein said risk information displayed on said risk information display includes said total risk as a function of depth in said wellbore.
13. The method of claim 12, wherein each said total risk displayed on said risk information display includes a severity, said severity including said high risk severity or said medium risk severity or said low risk severity, each said severity being represented on said risk information display as a color.
14. The method of claim 12, wherein each said total risk displayed on said risk information display includes a severity, said severity including said high risk severity or said medium risk severity or said low risk severity, each said severity being represented on said risk information display as a numerical value.
15. The method of claim 1, wherein said individual risk values are selected from a group consisting of: H2S and CO2, Hydrates, Well water depth, Tortuosity, Dogleg severity, Directional Drilling Index, Inclination, Horizontal displacement, Casing Wear, High pore pressure, Low pore pressure, Hard rock, Soft Rock, High temperature, Water-depth to rig rating, Well depth to rig rating, mud weight to kick, mud weight to losses, mud weight to fracture, mud weight window, Wellbore stability window, wellbore stability, Hole section length, Casing design factor, Hole to casing clearance, casing to casing clearance, casing to bit clearance, casing linear weight, Casing maximum overpull, Low top of cement, Cement to kick, cement to losses, cement to fracture, Bit excess work, Bit work, Bit footage, bit hours, Bit revolutions, Bit Rate of Penetration, Drillstring maximum overputt, Bit compressive strength, Kick tolerance, Critical flow rate, Maximum flow rate, Small nozzle area, Standpipe pressure, ECD to fracture, ECD to losses, Gains, Gains Average, Losses, Losses average, Stuck, Stuck average, Mechanical, Mechanical average, Risk Average, Subsea BOP, Large Hole, Small Hole, Number of casing strings, Drillstring parting, and Cuttings.
16. A method of determining and displaying risk information in response to a plurality of input data, said input data including a plurality of input data calculation results, comprising the steps of:

comparing each calculation result of said plurality of input data calculation results of said input data with each logical expression of a plurality of logical expressions;

ranking, by said logical expression, each said calculation result; and generating a plurality of ranked individual risks in response to the ranking step, each of said plurality of ranked individual risks representing an input data calculation result that has been ranked by said logical expression as having either a high risk severity or a medium risk severity or a low risk severity;

generating a plurality of design tasks in response to said ranked individual risks; and displaying said risk information in response to said plurality of design tasks, the displaying step including displaying a risk information display, said risk information display including a display of each of said design tasks.
17. The method of claim 16, wherein each of said design tasks include an actual risk and a potential risk, and wherein said display of each of said design tasks on said risk information display includes a display of said actual risk associated with each of said design tasks and a display of said potential risk associated with each of said design tasks.
18. The method of claim 17, wherein said display of each of said design tasks on said risk information display further includes a plot comprising said actual risk on one axis and said potential risk on another axis and a display of each said design task on said plot.
19. A method of determining and displaying risk information in response to a plurality of input data, said input data including a plurality of input data calculation results, comprising the steps of:

comparing each calculation result of said plurality of input data calculation results of said input data with each logical expression of a plurality of logical expressions;

ranking, by said logical expression, each said input data calculation result;
and generating a plurality of ranked individual risks in response to the ranking step, each of said plurality of ranked individual risks representing an input data calculation result that has been ranked by said logical expression as having either a high risk severity or a medium risk severity or a low risk severity;

generating said risk information in response to said plurality of ranked individual risks; and displaying said risk information, the displaying step including displaying a risk information display, said risk information display including a display of said plurality of said ranked individual risks extending along a length of a wellbore.
20. The method of claim 19, wherein said display of said plurality of ranked individual risks extending along a length of a wellbore includes a three-dimensional display of a corresponding plurality of cylinders extending along a length of said wellbore, each of said cylinders representing one of said plurality of ranked individual risks.
21. The method of claim 20, wherein each of said cylinders which represent one of said ranked individual risks has a color, said color representing a severity of said one of said ranked individual risks.
22. The method of claim 20, wherein each of said cylinders which represent one of said ranked individual risks has a size, said size representing a severity of said one of said ranked individual risks.
23. A program storage device readable by a machine tangibly embodying a program of instructions executable by the machine to perform method steps for determining and displaying risk information in response to a plurality of input data, said input data including a plurality of input data calculation results, said method steps comprising:

comparing each calculation result of said plurality of input data calculation results of said input data with each logical expression of a plurality of logical expressions;

ranking by said logical expression said calculation result; and generating a plurality of ranked individual risks in response to the ranking step, each of said plurality of ranked individual risks representing an input data calculation result that has been ranked by said logical expression as having either a high risk severity or a medium risk severity or a low risk severity;

generating said risk information in response to said plurality of ranked individual risks; and displaying said risk information, the displaying step including displaying said risk information on a risk information display, said risk information display including a display of said plurality of ranked individual risks as a function of depth in a wellbore.
24. The program storage device of claim 23, wherein each of said plurality of ranked individual risks displayed on said risk information display as a function of depth in said wellbore include a severity, said severity including either said high risk severity or said medium risk severity or said low risk severity, a color representing each said severity.
25. The program storage device of claim 23, wherein each of said plurality of ranked individual risks displayed on said risk information display as a function of depth in said wellbore include a severity, said severity including either said high risk severity or said medium risk severity or said low risk severity, a numerical value representing each said severity.
26. The program storage device of claim 23, wherein said risk information displayed on said risk information display comprises one or more ranked subcategory risks.
27. The program storage device of claim 26, wherein said risk information displayed on said risk information display includes said one or more ranked subcategory risks as a function of depth in said wellbore.
28. The program storage device of claim 27, wherein each of said one or more ranked subcategory risks displayed on said risk information display as a function of depth in said wellbore includes a severity, said severity including said high risk severity or said medium risk severity or said low risk severity, said severity being represented on said risk information display as a color.
29. The program storage device of claim 27, wherein each of said one or more ranked subcategory risks displayed on said risk information display as a function of depth in said wellbore includes a severity, said severity including said high risk severity or said medium risk severity or said low risk severity, said severity being represented on said risk information display as a numerical value.
30. The program storage device of claim 27, wherein said subcategory risks is selected from a group consisting of: gains risks, losses risks, stuck pipe risks, and mechanical risks.
31. The program storage device of claim 23, wherein said risk information displayed on said risk information display comprises one or more risk categories.
32. The program storage device of claim 31, wherein said one or more risk categories includes a total risk, said risk information display including said total risk displayed on said risk information display as a function of depth in said wellbore.
33. The program storage device of claim 31, wherein said risk categories are selected from a group consisting of: an average individual risk, a subcategory risk, an average subcategory risk, a total risk, an average total risk, a potential risk for each design task, and an actual risk for each design task.
34. The program storage device of claim 33, wherein said risk information displayed on said risk information display includes said total risk as a function of depth in said wellbore.
35. The program storage device of claim 34, wherein each said total risk displayed on said risk information display includes a severity, said severity including said high risk severity or said medium risk severity or said low risk severity, each said severity being represented on said risk information display as a color.
36. The program storage device of claim 34, wherein each said total risk displayed on said risk information display includes a severity, said severity including said high risk severity or said medium risk severity or said low risk severity, each said severity being represented on said risk information display as a numerical value.
37. The program storage device of claim 23, wherein said individual risk values are selected from a group consisting of: H2S and CO2, Hydrates, Well water depth, Tortuosity, Dogleg severity, Directional Drilling Index, Inclination, Horizontal displacement, Casing Wear, High pore pressure, Low pore pressure, Hard rock, Soft Rock, High temperature, Water-depth to rig rating, Well depth to rig rating, mud weight to kick, mud weight to losses, mud weight to fracture, mud weight window, Wellbore stability window, wellbore stability, Hole section length, Casing design factor, Hole to casing clearance, casing to casing clearance, casing to bit clearance, casing linear weight, Casing maximum overpull, Low top of cement, Cement to kick, cement to losses, cement to fracture, Bit excess work, Bit work, Bit footage, bit hours, Bit revolutions, Bit Rate of Penetration, Drillstring maximum overputt, Bit compressive strength, Kick tolerance, Critical flow rate, Maximum flow rate, Small nozzle area, Standpipe pressure, ECD to fracture, ECD to losses, Gains, Gains Average, Losses, Losses average, Stuck, Stuck average, Mechanical, Mechanical average, Risk Average, Subsea BOP, Large Hole, Small Hole, Number of casing strings, Drillstring parting, and Cuttings.

37. A program storage device readable by a machine tangibly embodying a program of instructions executable by the machine to perform method steps for determining and displaying risk information in response to a plurality of input data, said input data including a plurality of input data calculation results, said method steps comprising:

comparing each calculation result of said plurality of input data calculation results of said input data with each logical expression of a plurality of logical expressions;

ranking, by said logical expression, each said calculation result; and generating a plurality of ranked individual risks in response to the ranking step, each of said plurality of ranked individual risks representing an input data calculation result that has been ranked by said logical expression as having either a high risk severity or a medium risk severity or a low risk severity;

generating a plurality of design tasks in response to said ranked individual risks; and displaying said risk information in response to said plurality of design tasks, the displaying step including displaying a risk information display, said risk information display including a display of each of said design tasks.
38. The program storage device of claim 37, wherein each of said design tasks include an actual risk and a potential risk, and wherein the display of each of said design tasks on said risk information display includes a display of said actual risk associated with each of said design tasks and a display of said potential risk associated with each of said design tasks.
39. The program storage device of claim 38, wherein said display of each of said design tasks on said risk information display further includes a plot comprising said actual risk on one axis and said potential risk on another axis and a display of each said design task on said plot.
40. A program storage device readable by a machine tangibly embodying a program of instructions executable by the machine to perform method steps for determining and displaying risk information in response to a plurality of input data, said input data including a plurality of input data calculation results, said method steps comprising:

comparing each calculation result of said plurality of input data calculation results of said input data with each logical expression of a plurality of logical expressions;

ranking, by said logical expression, each said input data calculation result;
and generating a plurality of ranked individual risks in response to the ranking step, each of said plurality of ranked individual risks representing an input data calculation result that has been ranked by said logical expression as having either a high risk severity or a medium risk severity or a low risk severity;

generating said risk information in response to said plurality of ranked individual risks; and displaying said risk information, the displaying step including displaying a risk information display, said risk information display including a display of said plurality of said ranked individual risks extending along a length of a wellbore.
41. The program storage device of claim 40, wherein said display of said plurality of ranked individual risks extending along a length of a wellbore includes a three-dimensional display of a corresponding plurality of cylinders extending along a length of said wellbore, each of said cylinders representing one of said plurality of ranked individual risks.
42. The program storage device of claim 41, wherein each of said cylinders which represent one of said ranked individual risks has a color, said color representing a severity of said one of said ranked individual risks.
43. The program storage device of claim 41, wherein each of said cylinders which represent one of said ranked individual risks has a size, said size representing a severity of said one of said ranked individual risks.
CA002560062A 2004-03-17 2005-03-17 Method and apparatus and program storage device adapted for visualization of qualitative and quantitative risk assessment based on technical wellbore design and earth properties Abandoned CA2560062A1 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
US10/802,524 US7653563B2 (en) 2004-03-17 2004-03-17 Method and apparatus and program storage device adapted for automatic qualitative and quantitative risk assessment based on technical wellbore design and earth properties
US10/802,524 2004-03-17
PCT/US2005/009033 WO2005091196A1 (en) 2004-03-17 2005-03-17 Method and apparatus and program storage device adapted for visualization of qualitative and quantitative risk assessment based on technical wellbore design and earth properties

Publications (1)

Publication Number Publication Date
CA2560062A1 true CA2560062A1 (en) 2005-09-29

Family

ID=35061849

Family Applications (1)

Application Number Title Priority Date Filing Date
CA002560062A Abandoned CA2560062A1 (en) 2004-03-17 2005-03-17 Method and apparatus and program storage device adapted for visualization of qualitative and quantitative risk assessment based on technical wellbore design and earth properties

Country Status (7)

Country Link
US (1) US7653563B2 (en)
EP (1) EP1725980A1 (en)
AR (1) AR048506A1 (en)
CA (1) CA2560062A1 (en)
EA (1) EA010708B1 (en)
NO (1) NO20064179L (en)
TW (1) TWI315499B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3678072A4 (en) * 2017-12-15 2020-07-15 Alibaba Group Holding Limited Model integration method and device
CN112712284A (en) * 2021-01-15 2021-04-27 福州大学 Urban gas pipeline risk evaluation system and method based on AHP-entropy weight method

Families Citing this family (93)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050273304A1 (en) * 2000-03-13 2005-12-08 Smith International, Inc. Methods for evaluating and improving drilling operations
US9482055B2 (en) 2000-10-11 2016-11-01 Smith International, Inc. Methods for modeling, designing, and optimizing the performance of drilling tool assemblies
US20100175877A1 (en) * 2006-01-24 2010-07-15 Parris Michael D Method of designing and executing a well treatment
US7784544B2 (en) * 2006-01-24 2010-08-31 Schlumberger Technology Corporation Method of treating a subterranean formation using a rheology model for fluid optimization
US8812334B2 (en) * 2006-02-27 2014-08-19 Schlumberger Technology Corporation Well planning system and method
US8744893B2 (en) * 2006-04-11 2014-06-03 Siemens Aktiengesellschaft Method for analyzing risks in a technical project
US7857046B2 (en) * 2006-05-31 2010-12-28 Schlumberger Technology Corporation Methods for obtaining a wellbore schematic and using same for wellbore servicing
US7606666B2 (en) * 2007-01-29 2009-10-20 Schlumberger Technology Corporation System and method for performing oilfield drilling operations using visualization techniques
WO2008112929A1 (en) * 2007-03-13 2008-09-18 Schlumberger Canada Limited Method and system for managing information
US8014987B2 (en) * 2007-04-13 2011-09-06 Schlumberger Technology Corp. Modeling the transient behavior of BHA/drill string while drilling
US8688487B2 (en) * 2007-04-18 2014-04-01 Schlumberger Technology Corporation Method and system for measuring technology maturity
US7814989B2 (en) * 2007-05-21 2010-10-19 Schlumberger Technology Corporation System and method for performing a drilling operation in an oilfield
US8332194B2 (en) * 2007-07-30 2012-12-11 Schlumberger Technology Corporation Method and system to obtain a compositional model of produced fluids using separator discharge data analysis
US8073800B2 (en) * 2007-07-31 2011-12-06 Schlumberger Technology Corporation Valuing future information under uncertainty
US7878268B2 (en) * 2007-12-17 2011-02-01 Schlumberger Technology Corporation Oilfield well planning and operation
US8135862B2 (en) * 2008-01-14 2012-03-13 Schlumberger Technology Corporation Real-time, bi-directional data management
US8285532B2 (en) * 2008-03-14 2012-10-09 Schlumberger Technology Corporation Providing a simplified subterranean model
US9488044B2 (en) 2008-06-23 2016-11-08 Schlumberger Technology Corporation Valuing future well test under uncertainty
CN102473232A (en) * 2009-08-12 2012-05-23 埃克森美孚上游研究公司 Optimizing well management policy
US8265874B2 (en) 2010-04-21 2012-09-11 Saudi Arabian Oil Company Expert system for selecting fit-for-purpose technologies and wells for reservoir saturation monitoring
WO2012031165A2 (en) * 2010-09-02 2012-03-08 Zaretsky, Howard System and method of cost oriented software profiling
WO2012106348A2 (en) * 2011-01-31 2012-08-09 M-I Llc Method of minimizing wellbore instability
US9291019B2 (en) 2011-12-20 2016-03-22 Exxonmobil Upstream Research Company Systems and methods to inhibit packoff formation during drilling assembly removal from a wellbore
US8596385B2 (en) 2011-12-22 2013-12-03 Hunt Advanced Drilling Technologies, L.L.C. System and method for determining incremental progression between survey points while drilling
US9404356B2 (en) 2011-12-22 2016-08-02 Motive Drilling Technologies, Inc. System and method for remotely controlled surface steerable drilling
US8210283B1 (en) 2011-12-22 2012-07-03 Hunt Energy Enterprises, L.L.C. System and method for surface steerable drilling
US11085283B2 (en) 2011-12-22 2021-08-10 Motive Drilling Technologies, Inc. System and method for surface steerable drilling using tactical tracking
US9297205B2 (en) 2011-12-22 2016-03-29 Hunt Advanced Drilling Technologies, LLC System and method for controlling a drilling path based on drift estimates
US9157309B1 (en) 2011-12-22 2015-10-13 Hunt Advanced Drilling Technologies, LLC System and method for remotely controlled surface steerable drilling
US9982532B2 (en) 2012-05-09 2018-05-29 Hunt Energy Enterprises, L.L.C. System and method for controlling linear movement using a tapered MR valve
US9057258B2 (en) 2012-05-09 2015-06-16 Hunt Advanced Drilling Technologies, LLC System and method for using controlled vibrations for borehole communications
US8517093B1 (en) 2012-05-09 2013-08-27 Hunt Advanced Drilling Technologies, L.L.C. System and method for drilling hammer communication, formation evaluation and drilling optimization
AU2013306402B2 (en) 2012-08-23 2015-12-10 Landmark Graphics Corporation Well planning workflow system, method and computer-program product
US20140076632A1 (en) 2012-09-20 2014-03-20 Baker Hughes Incoroporated Method to predict overpressure uncertainty from normal compaction trendline uncertainty
US10190403B2 (en) * 2013-01-03 2019-01-29 Landmark Graphics Corporation System and method for predicting and visualizing drilling events
US20140214476A1 (en) * 2013-01-31 2014-07-31 Halliburton Energy Services, Inc. Data initialization for a subterranean operation
US10223327B2 (en) * 2013-03-14 2019-03-05 Fisher-Rosemount Systems, Inc. Collecting and delivering data to a big data machine in a process control system
US10678225B2 (en) 2013-03-04 2020-06-09 Fisher-Rosemount Systems, Inc. Data analytic services for distributed industrial performance monitoring
US10649424B2 (en) 2013-03-04 2020-05-12 Fisher-Rosemount Systems, Inc. Distributed industrial performance monitoring and analytics
US10649449B2 (en) 2013-03-04 2020-05-12 Fisher-Rosemount Systems, Inc. Distributed industrial performance monitoring and analytics
US9804588B2 (en) 2014-03-14 2017-10-31 Fisher-Rosemount Systems, Inc. Determining associations and alignments of process elements and measurements in a process
US9397836B2 (en) 2014-08-11 2016-07-19 Fisher-Rosemount Systems, Inc. Securing devices to process control systems
US10909137B2 (en) 2014-10-06 2021-02-02 Fisher-Rosemount Systems, Inc. Streaming data for analytics in process control systems
US10386827B2 (en) 2013-03-04 2019-08-20 Fisher-Rosemount Systems, Inc. Distributed industrial performance monitoring and analytics platform
US9665088B2 (en) 2014-01-31 2017-05-30 Fisher-Rosemount Systems, Inc. Managing big data in process control systems
US10866952B2 (en) 2013-03-04 2020-12-15 Fisher-Rosemount Systems, Inc. Source-independent queries in distributed industrial system
US9558220B2 (en) 2013-03-04 2017-01-31 Fisher-Rosemount Systems, Inc. Big data in process control systems
US9823626B2 (en) 2014-10-06 2017-11-21 Fisher-Rosemount Systems, Inc. Regional big data in process control systems
US10282676B2 (en) 2014-10-06 2019-05-07 Fisher-Rosemount Systems, Inc. Automatic signal processing-based learning in a process plant
US10152031B2 (en) 2013-03-15 2018-12-11 Fisher-Rosemount Systems, Inc. Generating checklists in a process control environment
US10296668B2 (en) 2013-03-15 2019-05-21 Fisher-Rosemount Systems, Inc. Data modeling studio
US8818729B1 (en) 2013-06-24 2014-08-26 Hunt Advanced Drilling Technologies, LLC System and method for formation detection and evaluation
US10920576B2 (en) 2013-06-24 2021-02-16 Motive Drilling Technologies, Inc. System and method for determining BHA position during lateral drilling
US8996396B2 (en) 2013-06-26 2015-03-31 Hunt Advanced Drilling Technologies, LLC System and method for defining a drilling path based on cost
US9317349B2 (en) * 2013-09-11 2016-04-19 Dell Products, Lp SAN vulnerability assessment tool
US9396200B2 (en) 2013-09-11 2016-07-19 Dell Products, Lp Auto-snapshot manager analysis tool
US9720758B2 (en) 2013-09-11 2017-08-01 Dell Products, Lp Diagnostic analysis tool for disk storage engineering and technical support
US9454423B2 (en) 2013-09-11 2016-09-27 Dell Products, Lp SAN performance analysis tool
US10223230B2 (en) 2013-09-11 2019-03-05 Dell Products, Lp Method and system for predicting storage device failures
US10329896B2 (en) 2014-02-21 2019-06-25 Gyrodata, Incorporated System and method for analyzing wellbore survey data to determine tortuosity of the wellbore using tortuosity parameter values
US10577918B2 (en) 2014-02-21 2020-03-03 Gyrodata, Incorporated Determining directional data for device within wellbore using contact points
US10316639B2 (en) 2014-02-21 2019-06-11 Gyrodata, Incorporated System and method for analyzing wellbore survey data to determine tortuosity of the wellbore using displacements of the wellbore path from reference lines
US9428961B2 (en) * 2014-06-25 2016-08-30 Motive Drilling Technologies, Inc. Surface steerable drilling system for use with rotary steerable system
US11106185B2 (en) 2014-06-25 2021-08-31 Motive Drilling Technologies, Inc. System and method for surface steerable drilling to provide formation mechanical analysis
US10168691B2 (en) 2014-10-06 2019-01-01 Fisher-Rosemount Systems, Inc. Data pipeline for process control system analytics
US9890633B2 (en) 2014-10-20 2018-02-13 Hunt Energy Enterprises, Llc System and method for dual telemetry acoustic noise reduction
EP3265647B1 (en) * 2015-03-06 2021-02-24 Hartford Steam Boiler Inspection and Insurance Company Risk assessment for drilling and well completion operations
CN106257463B (en) * 2015-06-16 2019-11-01 中石化石油工程技术服务有限公司 A kind of bit performance evaluation method and system
US10503483B2 (en) 2016-02-12 2019-12-10 Fisher-Rosemount Systems, Inc. Rule builder in a process control network
WO2017206182A1 (en) * 2016-06-03 2017-12-07 Schlumberger Technology Corporation Detecting events in well reports
US11933158B2 (en) 2016-09-02 2024-03-19 Motive Drilling Technologies, Inc. System and method for mag ranging drilling control
US10872183B2 (en) * 2016-10-21 2020-12-22 Baker Hughes, A Ge Company, Llc Geomechanical risk and hazard assessment and mitigation
TWI629657B (en) * 2016-11-21 2018-07-11 永智顧問有限公司 Carbon asset risk management approach
WO2018160494A1 (en) * 2017-02-28 2018-09-07 Gas Technology Institute System and method for automated and intelligent quantitative risk assessment of infrastructure systems
WO2018231256A1 (en) 2017-06-16 2018-12-20 Landmark Graphics Corporation Optimized visualization of loads and resistances for wellbore tubular design
EP3659101A4 (en) 2017-07-27 2020-12-09 Hartford Steam Boiler Inspection and Insurance Company Manage equipment based risk on asset-specific energy data usage utilizing sensor-driven dynamically adjustable feedback loops
US10830033B2 (en) 2017-08-10 2020-11-10 Motive Drilling Technologies, Inc. Apparatus and methods for uninterrupted drilling
WO2019033039A1 (en) 2017-08-10 2019-02-14 Motive Drilling Technologies, Inc. Apparatus and methods for automated slide drilling
EP3740643A4 (en) 2018-01-19 2021-10-20 Motive Drilling Technologies, Inc. System and method for analysis and control of drilling mud and additives
US11346215B2 (en) 2018-01-23 2022-05-31 Baker Hughes Holdings Llc Methods of evaluating drilling performance, methods of improving drilling performance, and related systems for drilling using such methods
CN108346002A (en) * 2018-02-12 2018-07-31 深圳云图智联技术有限公司 Front end for substation's Analysis of Risk Control shows method and its system
US10579231B1 (en) * 2018-11-01 2020-03-03 Nabors Drilling Technologies Usa, Inc. Contextual drilling interface and recommendation system and methods
US10808517B2 (en) 2018-12-17 2020-10-20 Baker Hughes Holdings Llc Earth-boring systems and methods for controlling earth-boring systems
CN111598366A (en) * 2019-02-20 2020-08-28 中国石油化工股份有限公司 Real-time drilling auxiliary decision-making method and system
US11466556B2 (en) 2019-05-17 2022-10-11 Helmerich & Payne, Inc. Stall detection and recovery for mud motors
CN110163442A (en) * 2019-05-27 2019-08-23 华北理工大学 A kind of gas well plug-ging prediction technique based on integrated study
US11200093B2 (en) * 2019-07-15 2021-12-14 Baker Hughes Oilfield Operations Llc Management of a geomechanical workflow of a geomechanics application in a computer system
US11180982B2 (en) 2020-04-21 2021-11-23 Saudi Arabian Oil Company Systems and methods to safeguard well integrity from hydraulic fracturing
CN111444637B (en) * 2020-05-28 2023-04-25 洲际海峡能源科技有限公司 Shale gas long-section horizontal well casing running safety evaluation method and system
CN111652501B (en) * 2020-05-29 2023-05-05 泰康保险集团股份有限公司 Financial product evaluation device and method, electronic equipment and storage medium
US11818205B2 (en) 2021-03-12 2023-11-14 Bank Of America Corporation System for identity-based exposure detection in peer-to-peer platforms
US11885212B2 (en) 2021-07-16 2024-01-30 Helmerich & Payne Technologies, Llc Apparatus and methods for controlling drilling
CN116128309B (en) * 2023-04-11 2023-07-21 青岛科技大学 Petroleum engineering well site operation maintenance management system based on Internet of things

Family Cites Families (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
IE910209A1 (en) 1990-02-28 1991-09-11 Union Oil Co Drag analysis method
US5611052A (en) * 1993-11-01 1997-03-11 The Golden 1 Credit Union Lender direct credit evaluation and loan processing system
US5696907A (en) * 1995-02-27 1997-12-09 General Electric Company System and method for performing risk and credit analysis of financial service applications
US7032689B2 (en) * 1996-03-25 2006-04-25 Halliburton Energy Services, Inc. Method and system for predicting performance of a drilling system of a given formation
US6408953B1 (en) * 1996-03-25 2002-06-25 Halliburton Energy Services, Inc. Method and system for predicting performance of a drilling system for a given formation
US6612382B2 (en) * 1996-03-25 2003-09-02 Halliburton Energy Services, Inc. Iterative drilling simulation process for enhanced economic decision making
US6109368A (en) * 1996-03-25 2000-08-29 Dresser Industries, Inc. Method and system for predicting performance of a drilling system for a given formation
US6223143B1 (en) * 1998-08-31 2001-04-24 The United States Government As Represented By The Administrator Of The National Aeronautics And Space Administration Quantitative risk assessment system (QRAS)
US7127407B1 (en) * 1999-04-29 2006-10-24 3M Innovative Properties Company Method of grouping and analyzing clinical risks, and system therefor
US7006992B1 (en) * 2000-04-06 2006-02-28 Union State Bank Risk assessment and management system
US20020099586A1 (en) * 2000-11-22 2002-07-25 National Britannia Group Ltd. Method, system, and computer program product for risk assessment and risk management
US7003439B2 (en) * 2001-01-30 2006-02-21 Schlumberger Technology Corporation Interactive method for real-time displaying, querying and forecasting drilling event and hazard information
US20030125997A1 (en) * 2001-12-20 2003-07-03 Allison Stoltz System and method for risk assessment
US7441197B2 (en) * 2002-02-26 2008-10-21 Global Asset Protection Services, Llc Risk management information interface system and associated methods
US7124054B2 (en) * 2002-06-28 2006-10-17 Microsoft Corporation System and method for mining model accuracy display
JP2007500915A (en) * 2003-06-09 2007-01-18 グリーンライン・システムズ・インコーポレーテッド System and method for risk detection, reporting and infrastructure
US7698148B2 (en) * 2003-09-12 2010-04-13 Raytheon Company Web-based risk management tool and method
US7243735B2 (en) * 2005-01-26 2007-07-17 Varco I/P, Inc. Wellbore operations monitoring and control systems and methods

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3678072A4 (en) * 2017-12-15 2020-07-15 Alibaba Group Holding Limited Model integration method and device
US11132624B2 (en) 2017-12-15 2021-09-28 Advanced New Technologies Co., Ltd. Model integration method and device
CN112712284A (en) * 2021-01-15 2021-04-27 福州大学 Urban gas pipeline risk evaluation system and method based on AHP-entropy weight method

Also Published As

Publication number Publication date
EA010708B1 (en) 2008-10-30
TWI315499B (en) 2009-10-01
AR048506A1 (en) 2006-05-03
US7653563B2 (en) 2010-01-26
EA200601711A1 (en) 2007-06-29
US20050228905A1 (en) 2005-10-13
NO20064179L (en) 2006-12-18
TW200601114A (en) 2006-01-01
EP1725980A1 (en) 2006-11-29

Similar Documents

Publication Publication Date Title
US7630914B2 (en) Method and apparatus and program storage device adapted for visualization of qualitative and quantitative risk assessment based on technical wellbore design and earth properties
US7653563B2 (en) Method and apparatus and program storage device adapted for automatic qualitative and quantitative risk assessment based on technical wellbore design and earth properties
US7258175B2 (en) Method and apparatus and program storage device adapted for automatic drill bit selection based on earth properties and wellbore geometry
CA2560275C (en) Method and system for automatic well planning
US7546884B2 (en) Method and apparatus and program storage device adapted for automatic drill string design based on wellbore geometry and trajectory requirements
US7548873B2 (en) Method system and program storage device for automatically calculating and displaying time and cost data in a well planning system using a Monte Carlo simulation software
US8812334B2 (en) Well planning system and method
EP1644800B1 (en) Method and apparatus and program storage device including an integrated well planning workflow control system with process dependencies
WO2005091196A1 (en) Method and apparatus and program storage device adapted for visualization of qualitative and quantitative risk assessment based on technical wellbore design and earth properties