CA2792184A1 - Method and system for accessing subterranean deposits from the surface - Google Patents
Method and system for accessing subterranean deposits from the surface Download PDFInfo
- Publication number
- CA2792184A1 CA2792184A1 CA2792184A CA2792184A CA2792184A1 CA 2792184 A1 CA2792184 A1 CA 2792184A1 CA 2792184 A CA2792184 A CA 2792184A CA 2792184 A CA2792184 A CA 2792184A CA 2792184 A1 CA2792184 A1 CA 2792184A1
- Authority
- CA
- Canada
- Prior art keywords
- well bore
- forming
- well
- lateral
- bores
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 238000000034 method Methods 0.000 title claims description 66
- 239000003245 coal Substances 0.000 claims description 91
- 238000005553 drilling Methods 0.000 claims description 63
- 239000012530 fluid Substances 0.000 claims description 45
- 238000005520 cutting process Methods 0.000 claims description 15
- 230000002706 hydrostatic effect Effects 0.000 claims description 10
- 238000005086 pumping Methods 0.000 claims description 8
- 230000007423 decrease Effects 0.000 claims 4
- 230000003247 decreasing effect Effects 0.000 claims 3
- VNWKTOKETHGBQD-UHFFFAOYSA-N methane Chemical compound C VNWKTOKETHGBQD-UHFFFAOYSA-N 0.000 description 28
- 238000005065 mining Methods 0.000 description 25
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 19
- 238000004519 manufacturing process Methods 0.000 description 18
- 230000015572 biosynthetic process Effects 0.000 description 17
- 238000005755 formation reaction Methods 0.000 description 17
- 238000010586 diagram Methods 0.000 description 11
- 230000007704 transition Effects 0.000 description 4
- 239000006260 foam Substances 0.000 description 3
- 238000005259 measurement Methods 0.000 description 3
- 238000005273 aeration Methods 0.000 description 2
- 238000007872 degassing Methods 0.000 description 2
- 230000005251 gamma ray Effects 0.000 description 2
- 229930195733 hydrocarbon Natural products 0.000 description 2
- 150000002430 hydrocarbons Chemical class 0.000 description 2
- 239000011148 porous material Substances 0.000 description 2
- 239000000654 additive Substances 0.000 description 1
- 230000002411 adverse Effects 0.000 description 1
- 238000011109 contamination Methods 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 239000010779 crude oil Substances 0.000 description 1
- 230000001934 delay Effects 0.000 description 1
- 230000003111 delayed effect Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000009977 dual effect Effects 0.000 description 1
- 239000000428 dust Substances 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000000605 extraction Methods 0.000 description 1
- 210000003746 feather Anatomy 0.000 description 1
- 239000008398 formation water Substances 0.000 description 1
- 239000000446 fuel Substances 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 230000000977 initiatory effect Effects 0.000 description 1
- 229910052500 inorganic mineral Inorganic materials 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000013508 migration Methods 0.000 description 1
- 230000005012 migration Effects 0.000 description 1
- 239000011707 mineral Substances 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 238000011084 recovery Methods 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
- 238000012876 topography Methods 0.000 description 1
- 210000003462 vein Anatomy 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/09—Locating or determining the position of objects in boreholes or wells, e.g. the position of an extending arm; Identifying the free or blocked portions of pipes
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/006—Production of coal-bed methane
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/12—Methods or apparatus for controlling the flow of the obtained fluid to or in wells
- E21B43/121—Lifting well fluids
- E21B43/13—Lifting well fluids specially adapted to dewatering of wells of gas producing reservoirs, e.g. methane producing coal beds
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/30—Specific pattern of wells, e.g. optimizing the spacing of wells
- E21B43/305—Specific pattern of wells, e.g. optimizing the spacing of wells comprising at least one inclined or horizontal well
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/04—Directional drilling
- E21B7/046—Directional drilling horizontal drilling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F7/00—Methods or devices for drawing- off gases with or without subsequent use of the gas for any purpose
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Physics & Mathematics (AREA)
- Fluid Mechanics (AREA)
- Environmental & Geological Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- General Chemical & Material Sciences (AREA)
- Oil, Petroleum & Natural Gas (AREA)
- Mechanical Engineering (AREA)
- Geophysics (AREA)
- Earth Drilling (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
- Sink And Installation For Waste Water (AREA)
- Filling Or Discharging Of Gas Storage Vessels (AREA)
- Cleaning In General (AREA)
- Geophysics And Detection Of Objects (AREA)
- Threshing Machine Elements (AREA)
- Constituent Portions Of Griding Lathes, Driving, Sensing And Control (AREA)
- Automatic Assembly (AREA)
- Blow-Moulding Or Thermoforming Of Plastics Or The Like (AREA)
- Piles And Underground Anchors (AREA)
- Analysing Materials By The Use Of Radiation (AREA)
- Jigs For Machine Tools (AREA)
- Magnetic Bearings And Hydrostatic Bearings (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Length Measuring Devices With Unspecified Measuring Means (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
Accessing a subterranean zone from a surface includes forming a plurality of well bore patterns each extending in a different direction from a surface well bore extending from the surface to the subterranean zone.
Description
METHOD AND SYSTEM FOR ACCESSING SUBTERRANEAN
DEPOSITS FROM THE SURFACE
This application is a division of co-pending Canadian Patent Application Serial No. 2,661,725.
TECHNICAL FIELD OF THE INVENTION
The present invention relates generally to the recovery of subterranean deposits, and more particularly to a method and system for accessing subterranean deposits from the surface.
BACKGROUND OF THE INVENTION
Subterranean deposits of coal contain substantial quantities of entrained methane gas limited in production in use of methane gas from coal deposits has occurred for many years. Substantial obstacles, however, have frustrated more extensive development and use of methane gas deposits in coal seams. The foremost problem in producing methane gas from coal seams is that while coal seams may extend over large areas of up to several thousand acres, the coal seams are fairly shallow in depth, varying from a few inches to several meters. Thus, while the coal-seams are often relatively near the surface, vertical wells drilled into the coal deposits for obtaining methane gas can only drain a fairly small radius around the coal deposits. Further, coal deposits are not amendable to pressure fracturing and other methods often used for increasing methane gas production from rock formations. As a result, once the gas easily drained from a vertical well bore in a coal seam is produced, further production is limited in volume.
Additionally, coal seams are often associated with subterranean water, which must be drained from the coal seam in order to produce the methane.
Horizontal drilling patterns have been tried in order to extend the amount of coal seams exposed to a drill bore for gas extraction. Such horizontal drilling techniques, however, require the use of a radiused well bore which presents difficulties in removing the entrained water from the coal seam. The most efficient method for pumping water from a subterranean well, a sucker rod pump, does not work well in horizontal or radiused bores.
A further problem for surface production of gas from coal seams is the difficulty presented by under balanced drilling conditions caused by the porousness of the coal seam. During both vertical and horizontal surface drilling operations, drilling fluid is used to remove cuttings from the well bore to the surface.
The drilling fluid exerts a hydrostatic pressure on the formation which, if it exceeds the hydrostatic pressure of the formation, can result in a loss of drilling fluid into the formation. This results in entrainment of drilling finds in the formation, which tends to plug the pores, cracks, and fractures that are needed to produce the gas.
DEPOSITS FROM THE SURFACE
This application is a division of co-pending Canadian Patent Application Serial No. 2,661,725.
TECHNICAL FIELD OF THE INVENTION
The present invention relates generally to the recovery of subterranean deposits, and more particularly to a method and system for accessing subterranean deposits from the surface.
BACKGROUND OF THE INVENTION
Subterranean deposits of coal contain substantial quantities of entrained methane gas limited in production in use of methane gas from coal deposits has occurred for many years. Substantial obstacles, however, have frustrated more extensive development and use of methane gas deposits in coal seams. The foremost problem in producing methane gas from coal seams is that while coal seams may extend over large areas of up to several thousand acres, the coal seams are fairly shallow in depth, varying from a few inches to several meters. Thus, while the coal-seams are often relatively near the surface, vertical wells drilled into the coal deposits for obtaining methane gas can only drain a fairly small radius around the coal deposits. Further, coal deposits are not amendable to pressure fracturing and other methods often used for increasing methane gas production from rock formations. As a result, once the gas easily drained from a vertical well bore in a coal seam is produced, further production is limited in volume.
Additionally, coal seams are often associated with subterranean water, which must be drained from the coal seam in order to produce the methane.
Horizontal drilling patterns have been tried in order to extend the amount of coal seams exposed to a drill bore for gas extraction. Such horizontal drilling techniques, however, require the use of a radiused well bore which presents difficulties in removing the entrained water from the coal seam. The most efficient method for pumping water from a subterranean well, a sucker rod pump, does not work well in horizontal or radiused bores.
A further problem for surface production of gas from coal seams is the difficulty presented by under balanced drilling conditions caused by the porousness of the coal seam. During both vertical and horizontal surface drilling operations, drilling fluid is used to remove cuttings from the well bore to the surface.
The drilling fluid exerts a hydrostatic pressure on the formation which, if it exceeds the hydrostatic pressure of the formation, can result in a loss of drilling fluid into the formation. This results in entrainment of drilling finds in the formation, which tends to plug the pores, cracks, and fractures that are needed to produce the gas.
As a result of these difficulties in surface production of methane gas from coal deposits, the methane gas which must be removed from a coal seam prior to mining, has been removed from coal seams through the use of subterranean methods. While the use of subterranean methods allows water to be easily removed from a coal seam and eliminates under balanced drilling conditions, they can only access a limited amount of the coal seams exposed by current mining operations. Where longwall mining is practiced, for example, underground drilling rigs are used to drill horizontal holes from a panel currently being mined into an adjacent panel that will later be mined. The limitations of underground rigs limit the reach of such horizontal holes and thus the area that can be effectively drained. In addition, the degasification of a next panel during mining of a current panel limits the time for degasification. As a result, many horizontal bores must be drilled to remove the gas in a limited period of time. Furthermore, in conditions of high gas content or migration of gas through a coal seam, mining may need to be halted or delayed until a next panel can be adequately degasified. These production delays add to the expense associated with degasifying a coal seam.
SUMMARY OF THE INVENTION
In accordance with one aspect of the present invention there is provided method for accessing a subterranean zone from a surface, comprising: forming a first well bore extending from the surface to the subterranean zone; forming a second well bore extending from the surface to the subterranean zone, the second well bore intersecting the first well bore at a junction proximate to the subterranean zone; and forming, through the second well bore, a well bore pattern from the junction into the subterranean zone, wherein forming the well bore pattern comprises:
forming the well bore pattern using an articulated drill string extending through the second well bore and the junction; supplying drilling fluid through the articulated drill string to remove cuttings generated by the drill string; and pumping the drilling fluid with the cuttings to the surface through the first well bore to minimize hydrostatic pressure on the subterranean zone during drilling of the drainage pattern.
In accordance with another aspect of the present invention there is provided a system for accessing a subterranean zone from a surface, comprising: a first well bore pattern extending from a surface well bore, the first well bore pattern forming a first substantially quadrilateral area; and a second well bore pattern extending from the surface well bore, the second well bore pattern forming a second substantially quadrilateral area, and wherein a first side of the first quadrilateral area is disposed substantially in common with a first side of the second quadrilateral area.
In accordance with yet another aspect of the present invention there is provided a method for accessing a subterranean zone from a surface, comprising: forming a first well bore pattern in the form of a first substantially quadrilateral area, the first well bore pattern extending from a surface well bore; and forming a second well bore pattern in the form of a second substantially quadrilateral area, the second well bore pattern extending from the surface 5 well bore, and wherein a first side of the first quadrilateral area is disposed substantially in common with a first side of the second quadrilateral area.
In accordance with still yet another aspect of the present invention there is provided a system for accessing a subterranean zone from a surface, comprising: a surface well bore extending from the surface to the subterranean zone; and a plurality of well bore patterns disposed within the subterranean zone each extending in a different direction from the surface well bore, the plurality of well bore patterns symmetrically disposed about the surface well bore.
In accordance with still yet another aspect of the present invention there is provided a method for accessing a subterranean zone from a surface, comprising: forming a surface well bore extending from the surface to the subterranean zone; and forming a plurality of well bore patterns disposed within the subterranean zone each extending in a different direction from the surface well bore, the plurality of well bore patterns symmetrically disposed about the surface well bore.
In accordance with still yet another aspect of the present invention there is provided a system for accessing a subterranean zone from a surface, comprising: a first well bore pattern disposed within the subterranean zone extending from a first surface well bore; and a second well bore pattern disposed within the subterranean zone extending from a second surface well bore, the first and second well bore patterns configured to nest adjacent each other within the subterranean zone.
In accordance with still yet another aspect of the present invention there is provided a method for accessing a subterranean zone from a surface, comprising: forming a first well bore pattern extending from a first surface well bore and disposed within the subterranean zone; and forming a second well bore pattern extending from a second surface well bore and disposed within the subterranean zone, the first and second well bore patterns arranged to nest adjacent each other within the subterranean zone.
In accordance with still yet another aspect of the present invention there is provided a method for accessing a subterranean zone from a surface, comprising: forming a first well bore extending from the surface to the subterranean zone; forming a second well bore extending from the surface to the subterranean zone, the second well bore intersecting the first well bore at a junction proximate the subterranean zone; forming a well bore pattern within the subterranean zone extending from the junction using a drill string extending downwardly through the second well bore; supplying drilling fluid downwardly through the drill string to remove cuttings generated by the drill string; and minimizing down-hole pressure within the subterranean zone by pumping the drilling fluid and the cuttings to the surface through the first well bore.
SUMMARY OF THE INVENTION
In accordance with one aspect of the present invention there is provided method for accessing a subterranean zone from a surface, comprising: forming a first well bore extending from the surface to the subterranean zone; forming a second well bore extending from the surface to the subterranean zone, the second well bore intersecting the first well bore at a junction proximate to the subterranean zone; and forming, through the second well bore, a well bore pattern from the junction into the subterranean zone, wherein forming the well bore pattern comprises:
forming the well bore pattern using an articulated drill string extending through the second well bore and the junction; supplying drilling fluid through the articulated drill string to remove cuttings generated by the drill string; and pumping the drilling fluid with the cuttings to the surface through the first well bore to minimize hydrostatic pressure on the subterranean zone during drilling of the drainage pattern.
In accordance with another aspect of the present invention there is provided a system for accessing a subterranean zone from a surface, comprising: a first well bore pattern extending from a surface well bore, the first well bore pattern forming a first substantially quadrilateral area; and a second well bore pattern extending from the surface well bore, the second well bore pattern forming a second substantially quadrilateral area, and wherein a first side of the first quadrilateral area is disposed substantially in common with a first side of the second quadrilateral area.
In accordance with yet another aspect of the present invention there is provided a method for accessing a subterranean zone from a surface, comprising: forming a first well bore pattern in the form of a first substantially quadrilateral area, the first well bore pattern extending from a surface well bore; and forming a second well bore pattern in the form of a second substantially quadrilateral area, the second well bore pattern extending from the surface 5 well bore, and wherein a first side of the first quadrilateral area is disposed substantially in common with a first side of the second quadrilateral area.
In accordance with still yet another aspect of the present invention there is provided a system for accessing a subterranean zone from a surface, comprising: a surface well bore extending from the surface to the subterranean zone; and a plurality of well bore patterns disposed within the subterranean zone each extending in a different direction from the surface well bore, the plurality of well bore patterns symmetrically disposed about the surface well bore.
In accordance with still yet another aspect of the present invention there is provided a method for accessing a subterranean zone from a surface, comprising: forming a surface well bore extending from the surface to the subterranean zone; and forming a plurality of well bore patterns disposed within the subterranean zone each extending in a different direction from the surface well bore, the plurality of well bore patterns symmetrically disposed about the surface well bore.
In accordance with still yet another aspect of the present invention there is provided a system for accessing a subterranean zone from a surface, comprising: a first well bore pattern disposed within the subterranean zone extending from a first surface well bore; and a second well bore pattern disposed within the subterranean zone extending from a second surface well bore, the first and second well bore patterns configured to nest adjacent each other within the subterranean zone.
In accordance with still yet another aspect of the present invention there is provided a method for accessing a subterranean zone from a surface, comprising: forming a first well bore pattern extending from a first surface well bore and disposed within the subterranean zone; and forming a second well bore pattern extending from a second surface well bore and disposed within the subterranean zone, the first and second well bore patterns arranged to nest adjacent each other within the subterranean zone.
In accordance with still yet another aspect of the present invention there is provided a method for accessing a subterranean zone from a surface, comprising: forming a first well bore extending from the surface to the subterranean zone; forming a second well bore extending from the surface to the subterranean zone, the second well bore intersecting the first well bore at a junction proximate the subterranean zone; forming a well bore pattern within the subterranean zone extending from the junction using a drill string extending downwardly through the second well bore; supplying drilling fluid downwardly through the drill string to remove cuttings generated by the drill string; and minimizing down-hole pressure within the subterranean zone by pumping the drilling fluid and the cuttings to the surface through the first well bore.
Other technical advantages of the present invention will be readily apparent to one skilled in the art from the following figures, description, and claims.
BRIEF DESCRIPTION OF THE DRAWINGS
For a more complete understanding of the present invention and its advantages, reference is now made to the following description taken in conjunction with the accompanying drawings, wherein like numerals represent like parts, in which:
FIGURE 1 is a cross-sectional diagram illustrating formation of a horizontal drainage pattern in a subterranean zone through an articulated surface well intersecting a vertical cavity well in accordance with one embodiment of the present invention;
FIGURE 2 is a cross-sectional diagram illustrating formation of the horizontal drainage pattern in the subterranean zone through the articulated surface well intersecting the vertical cavity well in accordance with another embodiment of the present invention;
FIGURE 3 is a cross-sectional diagram illustrating production of fluids from a horizontal draining pattern in a subterranean zone through a vertical well bore in accordance with one embodiment of the present invention;
FIGURE 4 is a top plan diagram illustrating a pinnate drainage pattern for accessing deposits in a subterranean zone in accordance with one embodiment of the- present invention;
FIGURE 5 is a top plan diagram illustrating a pinnate drainage pattern for accessing deposits in a subterranean zone in accordance with another embodiment of the present invention;
BRIEF DESCRIPTION OF THE DRAWINGS
For a more complete understanding of the present invention and its advantages, reference is now made to the following description taken in conjunction with the accompanying drawings, wherein like numerals represent like parts, in which:
FIGURE 1 is a cross-sectional diagram illustrating formation of a horizontal drainage pattern in a subterranean zone through an articulated surface well intersecting a vertical cavity well in accordance with one embodiment of the present invention;
FIGURE 2 is a cross-sectional diagram illustrating formation of the horizontal drainage pattern in the subterranean zone through the articulated surface well intersecting the vertical cavity well in accordance with another embodiment of the present invention;
FIGURE 3 is a cross-sectional diagram illustrating production of fluids from a horizontal draining pattern in a subterranean zone through a vertical well bore in accordance with one embodiment of the present invention;
FIGURE 4 is a top plan diagram illustrating a pinnate drainage pattern for accessing deposits in a subterranean zone in accordance with one embodiment of the- present invention;
FIGURE 5 is a top plan diagram illustrating a pinnate drainage pattern for accessing deposits in a subterranean zone in accordance with another embodiment of the present invention;
FIGURE 6 is a top plan diagram illustrating a quadrilateral pinnate drainage pattern for accessing deposits in a subterranean zone in accordance with still another embodiment of the present invention;
FIGURE 7 is a top plan diagram illustrating the alignment of pinnate drainage patterns within panels of a coal seam for degasifying and preparing the coal seam for mining operations in accordance with one embodiment of the present invention;
FIGURE 8 is a flow diagram illustrating a method for preparing a coal seam for mining operations in accordance with one embodiment of the present invention;
FIGURES 9A-C are cross-sectional diagrams illustrating a cavity well positioning tool in accordance with one embodiment of the present invention.
DETAILED DESCRIPTION OF THE INVENTION
FIGURE 1 illustrates a cavity and articulated well combination for accessing a subterranean zone from the surface in accordance with one embodiment of the present invention. In this embodiment, the subterranean zone is a coal seam. It will be understood that other low pressure, ultra-low pressure, and low porosity subterranean zones can -be similarly accessed using the dual well system of the present invention to remove and/or produce water, hydrocarbons and other fluids in the zone and to treat minerals in the zone prior to mining operations.
Referring to FIGURE 1, a substantially vertical well bore 12 extends from the surface 14 to a target coal seam 15. The substantially vertical well bore 12 intersects, penetrates and continues below the coal seam 15. The substantially vertical well bore is lined with a suitable well casing 16 that terminates at or above the level of the coal seam 15.
The substantially vertical well bore 12 is logged either during or after drilling in order to locate the exact vertical depth of the coal seam 15. As a result, the coal seam is not missed in subsequent drilling operations and techniques used to locate the seam 15 while drilling need not be employed. An enlarged diameter cavity 20 is formed in the substantially vertical well bore 12 at the level of the coal seam 15. As described in more detail below, the enlarged diameter cavity 20 provides a junction for intersection of the substantially vertical well bore by articulated well bore used to form a substantially horizontal drainage pattern in the coal seam 15. The enlarged diameter cavity 20 also provides a collection point for fluids drained from the coal seam 15 during production operations.
In one embodiment, the enlarged diameter cavity 20 has a radius of approximately eight feet and a vertical dimension which equals or exceeds the vertical dimension of the coal seam 15. The enlarged diameter cavity 20 is formed using suitable under-reaming techniques and equipment. A vertical portion of the substantially vertical well bore 12 continues below the enlarged diameter cavity 20 to form a sump 22 for the cavity 20.
An articulated well bore 30 extends from the surface 14 to the enlarged diameter cavity 20 of the substantially vertical well bore 12. The articulated well bore 30 includes a substantially vertical portion 32, a substantially horizontal portion 34, and a curved or radiused portion 36 interconnecting the vertical and horizontal portions 32 and 34. The horizontal portion 34 lies substantially in the horizontal plane of the coal seam and intersects the large diameter cavity 20 of the substantially vertical well bore 12.
The articulated well bore 30 is offset a sufficient distance from the substantially vertical well bore 12 at 5 the surface 14 to permit the large radius curved section 36 and any desired horizontal section 34 to be drilled before intersecting the enlarged diameter cavity 20. To provide the curved portion 36 with a radius of 100-150 feet, the articulated well bore 30 is offset a distance of about 300 10 feet from the substantially vertical well bore 12. This spacing minimizes the angle of the curved portion 36 to reduce friction in the bore 30 during drilling operations.
As a result, reach of the articulated drill string drilled through the articulated well bore 30 is maximized.
15 The articulated well bore 30 is drilled using articulated drill string 40 that includes a suitable down-hole motor and bit 42. A measurement while drilling (MWD) device 44 is included in the articulated drill string 40 for controlling the orientation and direction of the well bore drilled by the motor and bit 42. The substantially vertical portion 32 of the articulated well bore 30 is lined with a suitable casing 38.
After the enlarged diameter cavity 20 has been successfully intersected by the articulated well bore 30, drilling is continued through the cavity 20 using the articulated drill string 40 and appropriate horizontal drilling apparatus to provide a substantially horizontal drainage pattern 50 in the coal seam 15. The substantially horizontal drainage pattern 50 and other such well bores include sloped, undulating, or other inclinations of the coal seam 15 or other subterranean zone. During this operation, gamma ray logging tools and conventional measurement while drilling devices may be employed to control and direct the orientation of the drill bit to retain the drainage pattern 50 within the confines of the coal seam 15 and to provide substantially uniform coverage of a desired area within the coal seam 15. Further information regarding the drainage pattern is described in more detail below in connection with FIGURES 4-7.
During the process of drilling the drainage pattern 50, drilling fluid or "mud" is pumped down the articulated drill string 40 and circulated out of the drill string 40 in the vicinity of the bit 42, where it is used to scour the formation and to remove formation cuttings. The cuttings are then entrained in the drilling fluid which circulates up through the annulus between the drill string 40 and the well bore walls until it reaches the surface 14, where the cuttings are removed from the drilling fluid and the fluid is then recirculated. This conventional drilling operation produces a standard column of drilling fluid having a vertical height equal to the depth of the well bore 30 and produces a hydrostatic pressure on the well bore corresponding to the well bore depth. Because coal seams tend to be porous and fractured, they may be unable to sustain such hydrostatic pressure, even if formation water is also present in the coal seam 15. Accordingly, if the full hydrostatic pressure is allowed to act on the coal seam 15, the result may be loss of drilling fluid and entrained cuttings into the formation. Such a circumstance is referred to as an "over balanced" drilling operation in which the hydrostatic fluid pressure in the well bore exceeds the ability of the formation to withstand the pressure. Loss of drilling fluids in cuttings into the formation not only is expensive in terms of the lost drilling fluids, which must be made up, but it tends to plug the pores in the coal seam 15, which are needed to drain the coal seam of gas and water.
To prevent over balance drilling conditions during formation of the drainage pattern 50, air compressors 60 are provided to circulate compressed air down the substantially vertical well bore 12 and back up through the articulated well bore 30. The circulated air will admix with the drilling fluids in the annulus around the articulated drill string 40 and create bubbles throughout the column of drilling fluid. This has the effective of lightening the hydrostatic pressure of the drilling fluid and reducing the down-hole pressure sufficiently that drilling conditions do not become over balanced. Aeration of the drilling fluid reduces down-hole pressure to approximately 150-200 pounds per square inch (psi).
Accordingly, low pressure coal seams and other subterranean zones can be drilling without substantial loss of drilling fluid and contamination of the zone by the drilling fluid.
Foam, which may be compressed air mixed with water, may also be circulated down through the articulated drill string 40 along with the drilling mud in order to aerate the drilling fluid in the annulus as the articulated well bore 30 is being drilled and, if desired, as the drainage pattern 50 is being drilled. Drilling of the drainage pattern 50 with the use of an air hammer bit or an air-powered down-hole motor will also supply compressed air or foam to the drilling fluid. In this case, the compressed air or foam which is used to power the bit or down-hole motor exits the vicinity of the drill bit 42. However, the larger volume of air which can be circulated down- the substantially vertical well bore 12, permits greater aeration of the drilling fluid than generally is possible by air supplied through the articulated drill string 40.
FIGURE 7 is a top plan diagram illustrating the alignment of pinnate drainage patterns within panels of a coal seam for degasifying and preparing the coal seam for mining operations in accordance with one embodiment of the present invention;
FIGURE 8 is a flow diagram illustrating a method for preparing a coal seam for mining operations in accordance with one embodiment of the present invention;
FIGURES 9A-C are cross-sectional diagrams illustrating a cavity well positioning tool in accordance with one embodiment of the present invention.
DETAILED DESCRIPTION OF THE INVENTION
FIGURE 1 illustrates a cavity and articulated well combination for accessing a subterranean zone from the surface in accordance with one embodiment of the present invention. In this embodiment, the subterranean zone is a coal seam. It will be understood that other low pressure, ultra-low pressure, and low porosity subterranean zones can -be similarly accessed using the dual well system of the present invention to remove and/or produce water, hydrocarbons and other fluids in the zone and to treat minerals in the zone prior to mining operations.
Referring to FIGURE 1, a substantially vertical well bore 12 extends from the surface 14 to a target coal seam 15. The substantially vertical well bore 12 intersects, penetrates and continues below the coal seam 15. The substantially vertical well bore is lined with a suitable well casing 16 that terminates at or above the level of the coal seam 15.
The substantially vertical well bore 12 is logged either during or after drilling in order to locate the exact vertical depth of the coal seam 15. As a result, the coal seam is not missed in subsequent drilling operations and techniques used to locate the seam 15 while drilling need not be employed. An enlarged diameter cavity 20 is formed in the substantially vertical well bore 12 at the level of the coal seam 15. As described in more detail below, the enlarged diameter cavity 20 provides a junction for intersection of the substantially vertical well bore by articulated well bore used to form a substantially horizontal drainage pattern in the coal seam 15. The enlarged diameter cavity 20 also provides a collection point for fluids drained from the coal seam 15 during production operations.
In one embodiment, the enlarged diameter cavity 20 has a radius of approximately eight feet and a vertical dimension which equals or exceeds the vertical dimension of the coal seam 15. The enlarged diameter cavity 20 is formed using suitable under-reaming techniques and equipment. A vertical portion of the substantially vertical well bore 12 continues below the enlarged diameter cavity 20 to form a sump 22 for the cavity 20.
An articulated well bore 30 extends from the surface 14 to the enlarged diameter cavity 20 of the substantially vertical well bore 12. The articulated well bore 30 includes a substantially vertical portion 32, a substantially horizontal portion 34, and a curved or radiused portion 36 interconnecting the vertical and horizontal portions 32 and 34. The horizontal portion 34 lies substantially in the horizontal plane of the coal seam and intersects the large diameter cavity 20 of the substantially vertical well bore 12.
The articulated well bore 30 is offset a sufficient distance from the substantially vertical well bore 12 at 5 the surface 14 to permit the large radius curved section 36 and any desired horizontal section 34 to be drilled before intersecting the enlarged diameter cavity 20. To provide the curved portion 36 with a radius of 100-150 feet, the articulated well bore 30 is offset a distance of about 300 10 feet from the substantially vertical well bore 12. This spacing minimizes the angle of the curved portion 36 to reduce friction in the bore 30 during drilling operations.
As a result, reach of the articulated drill string drilled through the articulated well bore 30 is maximized.
15 The articulated well bore 30 is drilled using articulated drill string 40 that includes a suitable down-hole motor and bit 42. A measurement while drilling (MWD) device 44 is included in the articulated drill string 40 for controlling the orientation and direction of the well bore drilled by the motor and bit 42. The substantially vertical portion 32 of the articulated well bore 30 is lined with a suitable casing 38.
After the enlarged diameter cavity 20 has been successfully intersected by the articulated well bore 30, drilling is continued through the cavity 20 using the articulated drill string 40 and appropriate horizontal drilling apparatus to provide a substantially horizontal drainage pattern 50 in the coal seam 15. The substantially horizontal drainage pattern 50 and other such well bores include sloped, undulating, or other inclinations of the coal seam 15 or other subterranean zone. During this operation, gamma ray logging tools and conventional measurement while drilling devices may be employed to control and direct the orientation of the drill bit to retain the drainage pattern 50 within the confines of the coal seam 15 and to provide substantially uniform coverage of a desired area within the coal seam 15. Further information regarding the drainage pattern is described in more detail below in connection with FIGURES 4-7.
During the process of drilling the drainage pattern 50, drilling fluid or "mud" is pumped down the articulated drill string 40 and circulated out of the drill string 40 in the vicinity of the bit 42, where it is used to scour the formation and to remove formation cuttings. The cuttings are then entrained in the drilling fluid which circulates up through the annulus between the drill string 40 and the well bore walls until it reaches the surface 14, where the cuttings are removed from the drilling fluid and the fluid is then recirculated. This conventional drilling operation produces a standard column of drilling fluid having a vertical height equal to the depth of the well bore 30 and produces a hydrostatic pressure on the well bore corresponding to the well bore depth. Because coal seams tend to be porous and fractured, they may be unable to sustain such hydrostatic pressure, even if formation water is also present in the coal seam 15. Accordingly, if the full hydrostatic pressure is allowed to act on the coal seam 15, the result may be loss of drilling fluid and entrained cuttings into the formation. Such a circumstance is referred to as an "over balanced" drilling operation in which the hydrostatic fluid pressure in the well bore exceeds the ability of the formation to withstand the pressure. Loss of drilling fluids in cuttings into the formation not only is expensive in terms of the lost drilling fluids, which must be made up, but it tends to plug the pores in the coal seam 15, which are needed to drain the coal seam of gas and water.
To prevent over balance drilling conditions during formation of the drainage pattern 50, air compressors 60 are provided to circulate compressed air down the substantially vertical well bore 12 and back up through the articulated well bore 30. The circulated air will admix with the drilling fluids in the annulus around the articulated drill string 40 and create bubbles throughout the column of drilling fluid. This has the effective of lightening the hydrostatic pressure of the drilling fluid and reducing the down-hole pressure sufficiently that drilling conditions do not become over balanced. Aeration of the drilling fluid reduces down-hole pressure to approximately 150-200 pounds per square inch (psi).
Accordingly, low pressure coal seams and other subterranean zones can be drilling without substantial loss of drilling fluid and contamination of the zone by the drilling fluid.
Foam, which may be compressed air mixed with water, may also be circulated down through the articulated drill string 40 along with the drilling mud in order to aerate the drilling fluid in the annulus as the articulated well bore 30 is being drilled and, if desired, as the drainage pattern 50 is being drilled. Drilling of the drainage pattern 50 with the use of an air hammer bit or an air-powered down-hole motor will also supply compressed air or foam to the drilling fluid. In this case, the compressed air or foam which is used to power the bit or down-hole motor exits the vicinity of the drill bit 42. However, the larger volume of air which can be circulated down- the substantially vertical well bore 12, permits greater aeration of the drilling fluid than generally is possible by air supplied through the articulated drill string 40.
FIGURE 2 illustrates method and system for drilling the drainage pattern 50 in the coal seam 15 in accordance with another embodiment of the present invention. In this embodiment, the substantially vertical well bore 12, enlarged diameter cavity 20 and articulated well bore 32 are positioned and formed as previously described in connection with the FIGURE 1.
Referring to FIGURE 2, after intersection of the enlarged diameter cavity 20 by the articulated well bore 30 a pump 52 is installed in the enlarged diameter cavity 20 to pump drilling fluid and cuttings to the surface 14 through the substantially vertical well bore 12. This eliminates the friction of air and fluid returning up the articulated well bore 30 and reduces down-hole pressure to nearly zero. Accordingly, coal seams and other subterranean zones having ultra low pressures below 150 psi can be accessed from the surface. Additionally, the risk of combining air and methane in the well is eliminated.
FIGURE 3 illustrates production of fluids from the horizontal drainage pattern 50 in the coal seam 15 in accordance with one embodiment of the present invention.
In this embodiment, after the substantially vertical and articulated well bores 12 and 30 as well as desired drainage pattern 50 have been drilled, the articulated drill string 40 is removed from the articulated well bore and the articulated well bore is capped. For multiple pinnate structure described below, the articulated well 30 may be plugged in the substantially horizontal portion 34.
Otherwise, the articulated well 30 may be left unplugged.
30 Referring to FIGURE 3, a down hole pump 80 is disposed in the substantially vertical well bore 12 in the enlarged diameter cavity 20. The enlarged cavity 20 provides a reservoir for accumulated fluids allowing intermittent pumping. without adverse effects of a hydrostatic head caused by accumulated fluids in the well bore.
The down hole pump 80 is connected to the surface 14 via a tubing string 82 and may be powered by sucker rods 84 extending down through the well bore 12 of the tubing. The sucker rods 84 are reciprocated by a suitable surface mounted apparatus, such as a powered walking beam 86 to operate the down hole pump 80. The down hole pump 80 is used to remove water and entrained coal fines from the coal seam 15 via the drainage pattern 50. Once the water is removed to the surface, it may be treated for separation of methane which may be dissolved in the water and for removal of entrained fines. After sufficient water has been removed from the coal seam 15, pure coal seam gas may be allowed to flow to the surface 14 through the annulus of the substantially vertical well bore 12 around the tubing string 82 and removed via piping attached to a wellhead apparatus. At the surface, the methane is treated, compressed and pumped through a pipeline for use as a fuel in a conventional manner. The down hole pump 80 may be operated continuously or as needed to remove water drained from the coal seam 15 into the enlarged diameter cavity 20.
FIGURES 4-7 illustrate substantially horizontal drainage patterns 50 for accessing the coal seam 15 or other subterranean zone in accordance with one embodiment of the present invention. In this embodiment, the drainage patterns comprise pinnate patterns that have a central diagonal with generally symmetrically arranged and appropriately spaced laterals extending from each side of the diagonal. The pinnate pattern approximates the pattern of veins in a leaf or the design of a feather in that it has similar, substantially parallel, auxiliary drainage bores arranged in substantially equal and parallel spacing or opposite sides of an axis. The pinnate drainage pattern with its central bore and generally symmetrically arranged and appropriately spaced auxiliary drainage bores on each side provides a uniform pattern for draining fluids from a 5 coal seam or other subterranean formation. As described in more detail below, the pinnate pattern provides substantially uniform coverage of a square, other quadrilateral, or grid area and may be aligned with longwall mining panels for preparing the coal seam 15 for 10 mining operations. It will be understood that other suitable drainage patterns may be used in accordance with the present invention.
The pinnate and other suitable drainage patterns drilled from the surface provide surface access to 15 subterranean formations. The drainage pattern may be used to uniformly remove and/or insert fluids or otherwise manipulate a subterranean deposit. In non coal applications, the drainage pattern may be used initiating in-situ burns, "huff-puff" steam operations for heavy crude oil, and the removal of hydrocarbons from low porosity reservoirs.
FIGURE 4 illustrates a pinnate drainage pattern 100 in accordance with one embodiment of the present invention.
In this embodiment, the pinnate drainage pattern 100 provides access to a substantially square area 102 of a subterranean zone. A number of the pinnate patterns 100 may be used together to provide uniform access to a large subterranean region.
Referring to FIGURE 4, the enlarged diameter cavity 20 defines a first corner of the area 102. The pinnate pattern 100 includes a substantially horizontal main well bore 104 extending diagonally across the area 102 to a distant corner 106 of the area 102. Preferably, the substantially vert.ical and articulated well bores 12 and 30 are positioned over the area 102 such that the diagonal bore 104 is drilled up the slope of the coal seam 15. This will facilitate collection of water, gas from the area 102.
The diagonal bore 104 is drilled using the articulated drill string 40 and extends from the enlarged cavity 20 in alignment with the articulated well bore 30.
A plurality of lateral well bores 110 extend from the opposites sides of diagonal bore 104 to a periphery 112 of the area 102. The lateral bores 110 may mirror each other on opposite sides of the diagonal bore 104 or may be offset from each other along the diagonal bore 104. Each of the lateral bores 110 includes a radius curving portion 114 coming off of the diagonal bore 104 and an elongated portion 116 formed after the curved portion 114 has reached a desired orientation. For uniform coverage of the square area 102, pairs of lateral bores 110 are substantially evenly spaced on each side of the diagonal bore 104 and extend from the diagonal 104 at an angle of approximately 45 degrees. The lateral bores 110 shorten in length based on progression away from the enlarged diameter cavity 20 in order to facilitate drilling of the lateral bores 110.
The pinnate drainage pattern 100 using a single diagonal bore 104 and five pairs of lateral bores 110 may drain a coal seam area of approximately 150 acres in size.
Where a smaller area is to be drained, or where the coal seam has a different shape, such as a long, narrow shape or due to surface or subterranean topography, alternate pinnate drainage patterns may be employed by varying the angle of the lateral bores 110 to the diagonal bore 104 and the orientation of the lateral bores 110. Alternatively, lateral bores 110 can be drilled from only one side of the diagonal bore 104 to form a one-half pinnate pattern.
Referring to FIGURE 2, after intersection of the enlarged diameter cavity 20 by the articulated well bore 30 a pump 52 is installed in the enlarged diameter cavity 20 to pump drilling fluid and cuttings to the surface 14 through the substantially vertical well bore 12. This eliminates the friction of air and fluid returning up the articulated well bore 30 and reduces down-hole pressure to nearly zero. Accordingly, coal seams and other subterranean zones having ultra low pressures below 150 psi can be accessed from the surface. Additionally, the risk of combining air and methane in the well is eliminated.
FIGURE 3 illustrates production of fluids from the horizontal drainage pattern 50 in the coal seam 15 in accordance with one embodiment of the present invention.
In this embodiment, after the substantially vertical and articulated well bores 12 and 30 as well as desired drainage pattern 50 have been drilled, the articulated drill string 40 is removed from the articulated well bore and the articulated well bore is capped. For multiple pinnate structure described below, the articulated well 30 may be plugged in the substantially horizontal portion 34.
Otherwise, the articulated well 30 may be left unplugged.
30 Referring to FIGURE 3, a down hole pump 80 is disposed in the substantially vertical well bore 12 in the enlarged diameter cavity 20. The enlarged cavity 20 provides a reservoir for accumulated fluids allowing intermittent pumping. without adverse effects of a hydrostatic head caused by accumulated fluids in the well bore.
The down hole pump 80 is connected to the surface 14 via a tubing string 82 and may be powered by sucker rods 84 extending down through the well bore 12 of the tubing. The sucker rods 84 are reciprocated by a suitable surface mounted apparatus, such as a powered walking beam 86 to operate the down hole pump 80. The down hole pump 80 is used to remove water and entrained coal fines from the coal seam 15 via the drainage pattern 50. Once the water is removed to the surface, it may be treated for separation of methane which may be dissolved in the water and for removal of entrained fines. After sufficient water has been removed from the coal seam 15, pure coal seam gas may be allowed to flow to the surface 14 through the annulus of the substantially vertical well bore 12 around the tubing string 82 and removed via piping attached to a wellhead apparatus. At the surface, the methane is treated, compressed and pumped through a pipeline for use as a fuel in a conventional manner. The down hole pump 80 may be operated continuously or as needed to remove water drained from the coal seam 15 into the enlarged diameter cavity 20.
FIGURES 4-7 illustrate substantially horizontal drainage patterns 50 for accessing the coal seam 15 or other subterranean zone in accordance with one embodiment of the present invention. In this embodiment, the drainage patterns comprise pinnate patterns that have a central diagonal with generally symmetrically arranged and appropriately spaced laterals extending from each side of the diagonal. The pinnate pattern approximates the pattern of veins in a leaf or the design of a feather in that it has similar, substantially parallel, auxiliary drainage bores arranged in substantially equal and parallel spacing or opposite sides of an axis. The pinnate drainage pattern with its central bore and generally symmetrically arranged and appropriately spaced auxiliary drainage bores on each side provides a uniform pattern for draining fluids from a 5 coal seam or other subterranean formation. As described in more detail below, the pinnate pattern provides substantially uniform coverage of a square, other quadrilateral, or grid area and may be aligned with longwall mining panels for preparing the coal seam 15 for 10 mining operations. It will be understood that other suitable drainage patterns may be used in accordance with the present invention.
The pinnate and other suitable drainage patterns drilled from the surface provide surface access to 15 subterranean formations. The drainage pattern may be used to uniformly remove and/or insert fluids or otherwise manipulate a subterranean deposit. In non coal applications, the drainage pattern may be used initiating in-situ burns, "huff-puff" steam operations for heavy crude oil, and the removal of hydrocarbons from low porosity reservoirs.
FIGURE 4 illustrates a pinnate drainage pattern 100 in accordance with one embodiment of the present invention.
In this embodiment, the pinnate drainage pattern 100 provides access to a substantially square area 102 of a subterranean zone. A number of the pinnate patterns 100 may be used together to provide uniform access to a large subterranean region.
Referring to FIGURE 4, the enlarged diameter cavity 20 defines a first corner of the area 102. The pinnate pattern 100 includes a substantially horizontal main well bore 104 extending diagonally across the area 102 to a distant corner 106 of the area 102. Preferably, the substantially vert.ical and articulated well bores 12 and 30 are positioned over the area 102 such that the diagonal bore 104 is drilled up the slope of the coal seam 15. This will facilitate collection of water, gas from the area 102.
The diagonal bore 104 is drilled using the articulated drill string 40 and extends from the enlarged cavity 20 in alignment with the articulated well bore 30.
A plurality of lateral well bores 110 extend from the opposites sides of diagonal bore 104 to a periphery 112 of the area 102. The lateral bores 110 may mirror each other on opposite sides of the diagonal bore 104 or may be offset from each other along the diagonal bore 104. Each of the lateral bores 110 includes a radius curving portion 114 coming off of the diagonal bore 104 and an elongated portion 116 formed after the curved portion 114 has reached a desired orientation. For uniform coverage of the square area 102, pairs of lateral bores 110 are substantially evenly spaced on each side of the diagonal bore 104 and extend from the diagonal 104 at an angle of approximately 45 degrees. The lateral bores 110 shorten in length based on progression away from the enlarged diameter cavity 20 in order to facilitate drilling of the lateral bores 110.
The pinnate drainage pattern 100 using a single diagonal bore 104 and five pairs of lateral bores 110 may drain a coal seam area of approximately 150 acres in size.
Where a smaller area is to be drained, or where the coal seam has a different shape, such as a long, narrow shape or due to surface or subterranean topography, alternate pinnate drainage patterns may be employed by varying the angle of the lateral bores 110 to the diagonal bore 104 and the orientation of the lateral bores 110. Alternatively, lateral bores 110 can be drilled from only one side of the diagonal bore 104 to form a one-half pinnate pattern.
The diagonal bore 104 and the lateral bores 110 are formed by drilling through the enlarged diameter cavity 20 using the articulated drill string 40 and appropriate horizontal drilling apparatus. During this operation, gamma ray logging tools and conventional measurement while drilling technologies may be employed to control the direction and orientation of the drill bit so as to retain the drainage pattern within the confines of the coal seam and to maintain proper spacing and orientation of the 10 diagonal and lateral bores 104 and 110.
In a particular embodiment, the diagonal bore 104 is drilled with an incline at each of a plurality of lateral kick-off points 108. After the diagonal 104 is complete, the articulated drill string 40 is backed up to, each 15 successive lateral point 108 from which a lateral bore 110 is drilled on each side of the diagonal 104. It will be understood that the pinnate drainage pattern 100 may be otherwise suitably formed in accordance with the present invention.
FIGURE 5 illustrates a pinnate drainage pattern 120 in accordance with another embodiment of the present invention. In this embodiment, the pinnate drainage pattern 120 drains a substantially rectangular area 122 of the coal seam 15. The pinnate drainage pattern 120 includes a main diagonal bore 124 and a plurality of lateral bores 126 that are formed as described in connection with diagonal and lateral bores 104 and 110 of FIGURE 4. For the substantially rectangular area 122, however, the lateral bores 126 on a first side of the diagonal 124 include a shallow angle while the lateral bores 126 on the opposite side of the diagonal 124 include a steeper angle to together provide uniform coverage of the area 12.
In a particular embodiment, the diagonal bore 104 is drilled with an incline at each of a plurality of lateral kick-off points 108. After the diagonal 104 is complete, the articulated drill string 40 is backed up to, each 15 successive lateral point 108 from which a lateral bore 110 is drilled on each side of the diagonal 104. It will be understood that the pinnate drainage pattern 100 may be otherwise suitably formed in accordance with the present invention.
FIGURE 5 illustrates a pinnate drainage pattern 120 in accordance with another embodiment of the present invention. In this embodiment, the pinnate drainage pattern 120 drains a substantially rectangular area 122 of the coal seam 15. The pinnate drainage pattern 120 includes a main diagonal bore 124 and a plurality of lateral bores 126 that are formed as described in connection with diagonal and lateral bores 104 and 110 of FIGURE 4. For the substantially rectangular area 122, however, the lateral bores 126 on a first side of the diagonal 124 include a shallow angle while the lateral bores 126 on the opposite side of the diagonal 124 include a steeper angle to together provide uniform coverage of the area 12.
FIGURE 6 illustrates a quadrilateral pinnate drainage pattern 140 in accordance with another embodiment of the present invention. The quadrilateral drainage pattern 140 includes four discrete pinnate drainage patterns 100 each draining a quadrant of a region 142 covered by the pinnate drainage pattern 100.
Each of the pinnate drainage patterns 100 includes a diagonal well bore 104 and a plurality of lateral well bores 110 extending from the diagonal well bore 104. In the quadrilateral embodiment, each of the diagonal and lateral bores 104 and 110 are drilled from a common articulated well bore 146. This allows tighter spacing of the surface production equipment, wider coverage of a drainage pattern and reduces drilling equipment and operations.
FIGURE 7 illustrates the alignment of pinnate drainage patterns 100 with subterranean structures of a coal seam for degasifying and preparing the coal seam for mining operations in accordance with one embodiment of the present invention. In this embodiment, the coal seam 15 is mined using a longwall process. It will be understood that the present invention can be used to degassify coal seams for other types of mining operations.
Referring to FIGURE 7, coal panels 150 extend longitudinally from a longwall 152. In accordance with longwall mining practices, each panel 150 is subsequently mined from a distant end toward the longwall 152 and the mine roof allowed to cave and fracture into the opening behind the mining process. Prior to mining of the panels 150, the pinnate drainage patterns 100 are drilled into the panels 150 from the surface to degasify the panels 150 well ahead of mining operations. Each of the pinnate drainage patterns 100 is aligned with the longwall 152 and panel 150 grid and covers portions of one or. more panels 150. In this way, a region of a mine can be degasified from the surface based on subterranean structures and constraints.
FIGURE 8 is a flow diagram illustrating a method for preparing the coal seam 15 for mining operations in accordance with one embodiment of the present invention.
In this embodiment, the method begins at step 160 in which areas to be drained and drainage patterns 100 for the areas are identified. Preferably, the areas are aligned with the grid of a mining plan for the region. Pinnate structures 100, 120 and 140 may be used to provide optimized coverage for the region. It will be understood that other suitable patterns may be used to degasify the coal seam 15.
Proceeding to step 162, the substantially vertical well 12 is drilled from the surface 14 through the coal seam 15. Next, at step 164, down hole logging equipment is utilized to exactly identify the location of the coal seam in the well bore 12. At step 166, the enlarged diameter cavity 20 is formed in the substantially vertical well bore 12 at the location of the coal seam 15. As previously discussed, the enlarged diameter cavity 20 may be formed by under reaming and other conventional techniques.
Next, at step 168, the articulated well bore 30 is drilled to intersect the enlarged diameter cavity 20. At step 170, the main diagonal bore 104 for the pinnate drainage pattern 100 is drilled through the articulated well bore 30 into the coal seam 15. After formation of the main diagonal 104, lateral bores 110 for the pinnate drainage pattern 100 are drilled at step 172. As previously described, lateral kick-off points may be formed in the diagonal bore 104 during its formation to facilitate drilling of the lateral bores 110.
At step 174, the articulated well bore 30 is capped.
Next, at step 176, the enlarged diagonal cavity 20 is cleaned in preparation for installation of downhole production equipment. The enlarged diameter cavity 20 may 5 be cleaned by pumping compressed air down the substantially vertical well bore 12 or other suitable techniques. At step 178, production equipment is installed in the substantially vertical well bore 12. The production equipment includes a sucker rod pump extending down into 10 the cavity 20 for removing water from the coal seam 15.
The removal of water will drop the pressure of the coal seam and allow methane gas to diffuse and be produced up the annulus of the substantially vertical well bore 12.
Proceeding to step 180, water that drains from the 15 drainage pattern 100 into the cavity 20 is pumped to the surface with the rod pumping unit. Water may be continuously or intermittently be pumped as needed to remove it from the cavity 20. At step 182, methane gas diffused from the coal seam 15 is continuously collected at 20 the surface 14. Next, at decisional step 184 it is determined whether the production of gas from the coal seam 15 is complete. In one embodiment, the production of gas may be complete after the cost of the collecting the gas exceeds the revenue generated by the well. In another embodiment, gas may continue to be produced from the well until a remaining level of gas in the coal seam 15 is below required levels for mining operations. If production of the gas is not complete, the No branch of decisional step 184 returns to steps 180 and 182 in which water and gas continue to be removed from the coal seam 15. Upon completion of production, the Yes branch of decisional step 184 leads to step 186 in which the production equipment is removed.
Each of the pinnate drainage patterns 100 includes a diagonal well bore 104 and a plurality of lateral well bores 110 extending from the diagonal well bore 104. In the quadrilateral embodiment, each of the diagonal and lateral bores 104 and 110 are drilled from a common articulated well bore 146. This allows tighter spacing of the surface production equipment, wider coverage of a drainage pattern and reduces drilling equipment and operations.
FIGURE 7 illustrates the alignment of pinnate drainage patterns 100 with subterranean structures of a coal seam for degasifying and preparing the coal seam for mining operations in accordance with one embodiment of the present invention. In this embodiment, the coal seam 15 is mined using a longwall process. It will be understood that the present invention can be used to degassify coal seams for other types of mining operations.
Referring to FIGURE 7, coal panels 150 extend longitudinally from a longwall 152. In accordance with longwall mining practices, each panel 150 is subsequently mined from a distant end toward the longwall 152 and the mine roof allowed to cave and fracture into the opening behind the mining process. Prior to mining of the panels 150, the pinnate drainage patterns 100 are drilled into the panels 150 from the surface to degasify the panels 150 well ahead of mining operations. Each of the pinnate drainage patterns 100 is aligned with the longwall 152 and panel 150 grid and covers portions of one or. more panels 150. In this way, a region of a mine can be degasified from the surface based on subterranean structures and constraints.
FIGURE 8 is a flow diagram illustrating a method for preparing the coal seam 15 for mining operations in accordance with one embodiment of the present invention.
In this embodiment, the method begins at step 160 in which areas to be drained and drainage patterns 100 for the areas are identified. Preferably, the areas are aligned with the grid of a mining plan for the region. Pinnate structures 100, 120 and 140 may be used to provide optimized coverage for the region. It will be understood that other suitable patterns may be used to degasify the coal seam 15.
Proceeding to step 162, the substantially vertical well 12 is drilled from the surface 14 through the coal seam 15. Next, at step 164, down hole logging equipment is utilized to exactly identify the location of the coal seam in the well bore 12. At step 166, the enlarged diameter cavity 20 is formed in the substantially vertical well bore 12 at the location of the coal seam 15. As previously discussed, the enlarged diameter cavity 20 may be formed by under reaming and other conventional techniques.
Next, at step 168, the articulated well bore 30 is drilled to intersect the enlarged diameter cavity 20. At step 170, the main diagonal bore 104 for the pinnate drainage pattern 100 is drilled through the articulated well bore 30 into the coal seam 15. After formation of the main diagonal 104, lateral bores 110 for the pinnate drainage pattern 100 are drilled at step 172. As previously described, lateral kick-off points may be formed in the diagonal bore 104 during its formation to facilitate drilling of the lateral bores 110.
At step 174, the articulated well bore 30 is capped.
Next, at step 176, the enlarged diagonal cavity 20 is cleaned in preparation for installation of downhole production equipment. The enlarged diameter cavity 20 may 5 be cleaned by pumping compressed air down the substantially vertical well bore 12 or other suitable techniques. At step 178, production equipment is installed in the substantially vertical well bore 12. The production equipment includes a sucker rod pump extending down into 10 the cavity 20 for removing water from the coal seam 15.
The removal of water will drop the pressure of the coal seam and allow methane gas to diffuse and be produced up the annulus of the substantially vertical well bore 12.
Proceeding to step 180, water that drains from the 15 drainage pattern 100 into the cavity 20 is pumped to the surface with the rod pumping unit. Water may be continuously or intermittently be pumped as needed to remove it from the cavity 20. At step 182, methane gas diffused from the coal seam 15 is continuously collected at 20 the surface 14. Next, at decisional step 184 it is determined whether the production of gas from the coal seam 15 is complete. In one embodiment, the production of gas may be complete after the cost of the collecting the gas exceeds the revenue generated by the well. In another embodiment, gas may continue to be produced from the well until a remaining level of gas in the coal seam 15 is below required levels for mining operations. If production of the gas is not complete, the No branch of decisional step 184 returns to steps 180 and 182 in which water and gas continue to be removed from the coal seam 15. Upon completion of production, the Yes branch of decisional step 184 leads to step 186 in which the production equipment is removed.
Next, at decisional step 188, it is determined whether the coal seam 15 is to be further prepared for mining operations. If the coal seam 15 is to be further prepared for mining operations, the Yes branch of decisional step 188 leads to step 190 in which water and other additives may be injected back into the coal seam 15 to rehydrate the coal seam in order to minimize dust, to improve the efficiency of mining, and to improve the mined product.
Step 190 and the No branch of decisional step 188 lead to step 192 in which the coal seam 15 is mined. The removal of the coal from the seam causes the mined roof to cave and fracture into the opening behind the mining process. The collapsed roof creates gob gas which may be collected at step 194 through the substantially vertical well bore 12. Accordingly, additional drilling operations are not required to recover gob gas from a mined coal seam.
Step 194 leads to the end of the process by which a coal seam is efficiently degasified from the surface. The method provides a symbiotic relationship with the mine to remove unwanted gas prior to mining and to rehydrate the coal prior to the mining process.
FIGURES 9A through 9C are diagrams illustrating deployment of a well cavity pump 200 in accordance with an embodiment of the present invention. Referring to FIGURE
9A, well cavity pump 200 comprises a well bore portion 202 and a cavity positioning device 204. Well bore portion 202 comprises an inlet 206 for drawing and transferring well fluid contained within cavity 20 to a surface of vertical well bore 12.
In this embodiment, cavity positioning device 204 is rotatably coupled to well bore portion 202 to provide rotational movement of cavity positioning device 204 relative to well bore portion 202. For example, a pin, shaft, or other suitable method or device (not explicitly shown) may be used to rotatably couple cavity position device 204 to well bore portion 202, to provide pivotal movement of cavity positioning device 204 about an axis 208 relative to well bore portion 202. Thus, cavity positioning device 204 may be coupled to well bore portion 202 between an end 210 and an end 212 of cavity positioning device 204 such that both ends 210 and 212 may be rotatably manipulated relative to well bore portion 202.
Cavity positioning device 204 also comprises a counter balance portion 214 to control a position of ends 210 and 212 relative to well bore portion 202 in a generally unsupported condition. For example, cavity positioning device 204 is generally cantilevered about axis 208 relative to well bore portion 202. Counter balance portion 214 is disposed along cavity positioning device 204 between axis 208 and end 210 such that a weight or mass of counter balance portion 214 counter balances cavity positioning device 204 during deployment and withdrawal of well cavity pump 200 relative to vertical well bore 12 and cavity 20.
In operation, cavity positioning device 204 is deployed into vertical well bore 12 having end 210 and counter balance portion 214 positioned in a generally retracted condition, thereby disposing end 210 and counter balance portion 214 adjacent well bore portion 202. As well cavity pump 200 travels downwardly within vertical well bore 12 in the direction indicated generally by arrow 216, a length of cavity positioning device 204 generally prevents rotational movement of cavity positioning device 204 relative to well bore portion 202. For example, the mass of counter balance portion 214 may cause counter balance portion 214 and end 212 to be generally supported by contact with a vertical wall 218 of vertical well bore 12 as well cavity pump 200 travels downwardly within vertical well bore 12.
Referring to FIGURE 9B, as well cavity pump 200 travels downwardly within vertical well bore 12, counter balance portion 214 causes rotational or pivotal movement of cavity positioning device 204 relative to well bore portion 202 as cavity positioning device 204 transitions from vertical well bore 12 to cavity 20. For example, as cavity positioning device 204 transitions from vertical well bore 12 to cavity 20, counter balance portion 214 and end 212 become generally unsupported by vertical wall 218 of vertical well bore 12. As counter balance portion 214 and end 212 become generally unsupported, counter balance portion 214 automatically causes rotational movement of cavity positioning device 204 relative to well bore portion 202. For example, counter balance portion 214 generally causes end 210 to rotate or extend outwardly relative to vertical well bore 12 in the direction indicated generally by arrow 220. Additionally, end 212 of cavity positioning device 204 extends or rotates outwardly relative to vertical well bore 12 in the direction indicated generally by arrow 222.
The length of cavity positioning device 204 is configured such that ends 210 and 212 of cavity positioning device 204 become generally unsupported by vertical well bore 12 as cavity positioning device 204 transitions from vertical well bore 12 into cavity 20, thereby allowing counter balance portion 214 to cause rotational movement of end 212 outwardly relative to well bore portion 202 and beyond an annulus portion 224 of sump 22. Thus, in operation, as cavity positioning device 204 transitions from vertical well bore 12 to cavity 20, counter balance portion 214 causes end 212 to rotate or extend outwardly in the direction indicated generally by arrow 222 such that continued downward travel of well cavity pump 200 results in contact of end 212 with a horizontal wall 226 of cavity 20.
Referring to FIGURE 9C, as downwardly travel of well cavity pump 200 continues, the contact of end 212 with horizontal wall 226 of cavity 20 causes further rotational movement of cavity positioning device 204 relative to well bore portion 202. For example, contact between end 212 and horizontal 226 combined with downward travel of well cavity pump 200 causes end 210 to extend or rotate outwardly relative to vertical well bore 12 in the direction indicated generally by arrow 228 until counter balance portion 214 contacts a horizontal wall 230 of cavity20.
Once counter balance portion 214 and end 212 of cavity positioning device 204 become generally supported by horizontal walls 226 and 230 of cavity 20, continued downward travel of well cavity pump 200 is substantially prevented, thereby positioning inlet 206 at a predefined location within cavity 20.
Thus, inlet 206 may be located at various positions along well bore portion 202 such that inlet 206 is disposed at the predefined location within cavity 20 as cavity positioning device 204 bottoms out within cavity 20.
Therefore, inlet 206 may be accurately positioned within cavity 20 to substantially prevent drawing in debris or other material disposed within sump or rat hole 22 and to prevent gas interference caused by placement of the inlet 20 in the narrow well bore. Additionally, inlet 206 may be positioned within cavity 20 to maximize fluid withdrawal from cavity 20.
In reverse operation, upward travel of well cavity pump 200 generally results in releasing contact between counter balance portion 214 and end 212 with horizontal walls 230 and 226, respectively. As cavity positioning device 204 becomes generally unsupported within cavity 20, the mass of cavity positioning device 204 disposed between 5 end 212 and axis 208 generally causes cavity positioning device 204 to rotate in directions opposite the directions indicated generally by arrows 220 and 222 as illustrated FIGURE 9B. Additionally, counter balance portion 214 cooperates with the mass of cavity positioning device 204 10 disposed between end 212 and axis 208 to generally align cavity positioning device 204 with vertical well bore 12.
Thus, cavity positioning device 204 automatically becomes aligned with vertical well bore 12 as well cavity pump 200 is withdrawn from cavity 20. Additional upward travel of 15 well cavity pump 200 then may be used to remove cavity positioning device 204 from cavity 20 and vertical well bore 12.
Therefore, the present invention provides greater reliability than prior systems and methods by positively 20 locating inlet 206 of well cavity pump 200 at a predefined location within cavity 20. Additionally, well cavity pump 200 may be efficiently removed from cavity 20 without requiring additional unlocking or alignment tools to facilitate the withdrawal of well cavity pump 200 from 25 cavity 20 and vertical well bore 12.
Step 190 and the No branch of decisional step 188 lead to step 192 in which the coal seam 15 is mined. The removal of the coal from the seam causes the mined roof to cave and fracture into the opening behind the mining process. The collapsed roof creates gob gas which may be collected at step 194 through the substantially vertical well bore 12. Accordingly, additional drilling operations are not required to recover gob gas from a mined coal seam.
Step 194 leads to the end of the process by which a coal seam is efficiently degasified from the surface. The method provides a symbiotic relationship with the mine to remove unwanted gas prior to mining and to rehydrate the coal prior to the mining process.
FIGURES 9A through 9C are diagrams illustrating deployment of a well cavity pump 200 in accordance with an embodiment of the present invention. Referring to FIGURE
9A, well cavity pump 200 comprises a well bore portion 202 and a cavity positioning device 204. Well bore portion 202 comprises an inlet 206 for drawing and transferring well fluid contained within cavity 20 to a surface of vertical well bore 12.
In this embodiment, cavity positioning device 204 is rotatably coupled to well bore portion 202 to provide rotational movement of cavity positioning device 204 relative to well bore portion 202. For example, a pin, shaft, or other suitable method or device (not explicitly shown) may be used to rotatably couple cavity position device 204 to well bore portion 202, to provide pivotal movement of cavity positioning device 204 about an axis 208 relative to well bore portion 202. Thus, cavity positioning device 204 may be coupled to well bore portion 202 between an end 210 and an end 212 of cavity positioning device 204 such that both ends 210 and 212 may be rotatably manipulated relative to well bore portion 202.
Cavity positioning device 204 also comprises a counter balance portion 214 to control a position of ends 210 and 212 relative to well bore portion 202 in a generally unsupported condition. For example, cavity positioning device 204 is generally cantilevered about axis 208 relative to well bore portion 202. Counter balance portion 214 is disposed along cavity positioning device 204 between axis 208 and end 210 such that a weight or mass of counter balance portion 214 counter balances cavity positioning device 204 during deployment and withdrawal of well cavity pump 200 relative to vertical well bore 12 and cavity 20.
In operation, cavity positioning device 204 is deployed into vertical well bore 12 having end 210 and counter balance portion 214 positioned in a generally retracted condition, thereby disposing end 210 and counter balance portion 214 adjacent well bore portion 202. As well cavity pump 200 travels downwardly within vertical well bore 12 in the direction indicated generally by arrow 216, a length of cavity positioning device 204 generally prevents rotational movement of cavity positioning device 204 relative to well bore portion 202. For example, the mass of counter balance portion 214 may cause counter balance portion 214 and end 212 to be generally supported by contact with a vertical wall 218 of vertical well bore 12 as well cavity pump 200 travels downwardly within vertical well bore 12.
Referring to FIGURE 9B, as well cavity pump 200 travels downwardly within vertical well bore 12, counter balance portion 214 causes rotational or pivotal movement of cavity positioning device 204 relative to well bore portion 202 as cavity positioning device 204 transitions from vertical well bore 12 to cavity 20. For example, as cavity positioning device 204 transitions from vertical well bore 12 to cavity 20, counter balance portion 214 and end 212 become generally unsupported by vertical wall 218 of vertical well bore 12. As counter balance portion 214 and end 212 become generally unsupported, counter balance portion 214 automatically causes rotational movement of cavity positioning device 204 relative to well bore portion 202. For example, counter balance portion 214 generally causes end 210 to rotate or extend outwardly relative to vertical well bore 12 in the direction indicated generally by arrow 220. Additionally, end 212 of cavity positioning device 204 extends or rotates outwardly relative to vertical well bore 12 in the direction indicated generally by arrow 222.
The length of cavity positioning device 204 is configured such that ends 210 and 212 of cavity positioning device 204 become generally unsupported by vertical well bore 12 as cavity positioning device 204 transitions from vertical well bore 12 into cavity 20, thereby allowing counter balance portion 214 to cause rotational movement of end 212 outwardly relative to well bore portion 202 and beyond an annulus portion 224 of sump 22. Thus, in operation, as cavity positioning device 204 transitions from vertical well bore 12 to cavity 20, counter balance portion 214 causes end 212 to rotate or extend outwardly in the direction indicated generally by arrow 222 such that continued downward travel of well cavity pump 200 results in contact of end 212 with a horizontal wall 226 of cavity 20.
Referring to FIGURE 9C, as downwardly travel of well cavity pump 200 continues, the contact of end 212 with horizontal wall 226 of cavity 20 causes further rotational movement of cavity positioning device 204 relative to well bore portion 202. For example, contact between end 212 and horizontal 226 combined with downward travel of well cavity pump 200 causes end 210 to extend or rotate outwardly relative to vertical well bore 12 in the direction indicated generally by arrow 228 until counter balance portion 214 contacts a horizontal wall 230 of cavity20.
Once counter balance portion 214 and end 212 of cavity positioning device 204 become generally supported by horizontal walls 226 and 230 of cavity 20, continued downward travel of well cavity pump 200 is substantially prevented, thereby positioning inlet 206 at a predefined location within cavity 20.
Thus, inlet 206 may be located at various positions along well bore portion 202 such that inlet 206 is disposed at the predefined location within cavity 20 as cavity positioning device 204 bottoms out within cavity 20.
Therefore, inlet 206 may be accurately positioned within cavity 20 to substantially prevent drawing in debris or other material disposed within sump or rat hole 22 and to prevent gas interference caused by placement of the inlet 20 in the narrow well bore. Additionally, inlet 206 may be positioned within cavity 20 to maximize fluid withdrawal from cavity 20.
In reverse operation, upward travel of well cavity pump 200 generally results in releasing contact between counter balance portion 214 and end 212 with horizontal walls 230 and 226, respectively. As cavity positioning device 204 becomes generally unsupported within cavity 20, the mass of cavity positioning device 204 disposed between 5 end 212 and axis 208 generally causes cavity positioning device 204 to rotate in directions opposite the directions indicated generally by arrows 220 and 222 as illustrated FIGURE 9B. Additionally, counter balance portion 214 cooperates with the mass of cavity positioning device 204 10 disposed between end 212 and axis 208 to generally align cavity positioning device 204 with vertical well bore 12.
Thus, cavity positioning device 204 automatically becomes aligned with vertical well bore 12 as well cavity pump 200 is withdrawn from cavity 20. Additional upward travel of 15 well cavity pump 200 then may be used to remove cavity positioning device 204 from cavity 20 and vertical well bore 12.
Therefore, the present invention provides greater reliability than prior systems and methods by positively 20 locating inlet 206 of well cavity pump 200 at a predefined location within cavity 20. Additionally, well cavity pump 200 may be efficiently removed from cavity 20 without requiring additional unlocking or alignment tools to facilitate the withdrawal of well cavity pump 200 from 25 cavity 20 and vertical well bore 12.
Claims (58)
1. A method for accessing a subterranean zone from a surface, comprising:
forming a first well bore extending from the surface to the subterranean zone;
forming a second well bore extending from the surface to the subterranean zone, the second well bore intersecting the first well bore at a junction proximate to the subterranean zone; and forming, through the second well bore, a well bore pattern from the junction into the subterranean zone, wherein forming the well bore pattern comprises:
forming the well bore pattern using an articulated drill string extending through the second well bore and the junction;
supplying drilling fluid through the articulated drill string to remove cuttings generated by the drill string; and pumping the drilling fluid with the cuttings to the surface through the first well bore to minimize hydrostatic pressure on the subterranean zone during drilling of the drainage pattern.
forming a first well bore extending from the surface to the subterranean zone;
forming a second well bore extending from the surface to the subterranean zone, the second well bore intersecting the first well bore at a junction proximate to the subterranean zone; and forming, through the second well bore, a well bore pattern from the junction into the subterranean zone, wherein forming the well bore pattern comprises:
forming the well bore pattern using an articulated drill string extending through the second well bore and the junction;
supplying drilling fluid through the articulated drill string to remove cuttings generated by the drill string; and pumping the drilling fluid with the cuttings to the surface through the first well bore to minimize hydrostatic pressure on the subterranean zone during drilling of the drainage pattern.
2. The method of claim 1, wherein the subterranean zone comprises a low pressure reservoir having a pressure below 250 pounds per square inch (psi).
3. The method of claim 1, further comprising:
forming an enlarged cavity in the first well bore proximate to the subterranean zone;
drilling the second well bore to intersect the large cavity of the first well bore; and drilling, through the second well bore, the well bore pattern from the enlarged cavity into the subterranean zone.
forming an enlarged cavity in the first well bore proximate to the subterranean zone;
drilling the second well bore to intersect the large cavity of the first well bore; and drilling, through the second well bore, the well bore pattern from the enlarged cavity into the subterranean zone.
4. The method of claim 3, further comprising:
collecting fluid from the well bore pattern in the enlarged cavity; and producing the fluid from the enlarged cavity through the first well bore.
collecting fluid from the well bore pattern in the enlarged cavity; and producing the fluid from the enlarged cavity through the first well bore.
5. The method of claim 1, wherein the subterranean zone comprises a coal seam.
6. The method of claim 1, wherein the subterranean zone comprises an oil reservoir.
7. The method of claim 1, further comprising:
producing fluid from the subterranean zone through the well bore pattern; and producing the fluid from the well bore pattern through first well bore.
producing fluid from the subterranean zone through the well bore pattern; and producing the fluid from the well bore pattern through first well bore.
8. A system for accessing a subterranean zone from a surface, comprising:
a first well bore pattern extending from a surface well bore, the first well bore pattern forming a first substantially quadrilateral area;
and a second well bore pattern extending from the surface well bore, the second well bore pattern forming a second substantially quadrilateral area, and wherein a first side of the first quadrilateral area is disposed substantially in common with a first side of the second quadrilateral area.
a first well bore pattern extending from a surface well bore, the first well bore pattern forming a first substantially quadrilateral area;
and a second well bore pattern extending from the surface well bore, the second well bore pattern forming a second substantially quadrilateral area, and wherein a first side of the first quadrilateral area is disposed substantially in common with a first side of the second quadrilateral area.
9. The system of Claim 8, wherein each of the first and second well bore patterns comprises:
a first well bore extending from the surface well bore, the first well bore extending from a first end to a distant end of a respective quadrilateral area; and a plurality of lateral well bores extending outwardly from the first well bore.
a first well bore extending from the surface well bore, the first well bore extending from a first end to a distant end of a respective quadrilateral area; and a plurality of lateral well bores extending outwardly from the first well bore.
10. The system of Claim 9, wherein a distance from an end of a lateral well bore to the surface well bore is substantially equal for each of the lateral well bores.
11. The system of Claim 8, wherein each of the first and second well bore patterns comprises:
a first well bore extending from the surface well bore, the first well bore extending from a first end to a distant end of a respective quadrilateral area;
a first set of lateral well bores extending outwardly from the first well bore; and a second set of lateral well bores extending outwardly from the first set of lateral well bores.
a first well bore extending from the surface well bore, the first well bore extending from a first end to a distant end of a respective quadrilateral area;
a first set of lateral well bores extending outwardly from the first well bore; and a second set of lateral well bores extending outwardly from the first set of lateral well bores.
12. The system of Claim 8, wherein each of the first and second well bore patterns comprise:
a first well bore extending from the surface well bore, the first well bore extending from a first end to a distant end of a respective quadrilateral area; and a plurality of lateral well bores extending outwardly from the first well bore, each of the plurality of lateral well bores substantially equally spaced apart from each other.
a first well bore extending from the surface well bore, the first well bore extending from a first end to a distant end of a respective quadrilateral area; and a plurality of lateral well bores extending outwardly from the first well bore, each of the plurality of lateral well bores substantially equally spaced apart from each other.
13. The system of Claim 8, further comprising a third well bore pattern extending from the surface well bore, the third well bore pattern forming a third substantially quadrilateral area, and wherein a first side of the third quadrilateral area is disposed substantially in common with a second side of the first quadrilateral area.
14. The system of Claim 8, wherein each of the first and second well bore patterns comprise:
a first well bore extending from the surface well bore, the first well bore extending from a first end to a distant end of a respective quadrilateral area; and a plurality of lateral well bores extending outwardly from the first well bore, a length of each of the lateral well bores decreasing as a distance from a respective lateral well bore and the surface well bore increases.
a first well bore extending from the surface well bore, the first well bore extending from a first end to a distant end of a respective quadrilateral area; and a plurality of lateral well bores extending outwardly from the first well bore, a length of each of the lateral well bores decreasing as a distance from a respective lateral well bore and the surface well bore increases.
15. A method for accessing a subterranean zone from a surface, comprising:
forming a first well bore pattern in the form of a first substantially quadrilateral area, the first well bore pattern extending from a surface well bore; and forming a second well bore pattern in the form of a second substantially quadrilateral area, the second well bore pattern extending from the surface well bore, and wherein a first side of the first quadrilateral area is disposed substantially in common with a first side of the second quadrilateral area.
forming a first well bore pattern in the form of a first substantially quadrilateral area, the first well bore pattern extending from a surface well bore; and forming a second well bore pattern in the form of a second substantially quadrilateral area, the second well bore pattern extending from the surface well bore, and wherein a first side of the first quadrilateral area is disposed substantially in common with a first side of the second quadrilateral area.
16. The method of Claim 15, wherein each of the first and second well bore patterns comprise:
a first well bore extending from the surface well bore, the first well bore extending from a first end to a distant end of a respective quadrilateral area; and a plurality of lateral well bores extending outwardly from the first well bore.
a first well bore extending from the surface well bore, the first well bore extending from a first end to a distant end of a respective quadrilateral area; and a plurality of lateral well bores extending outwardly from the first well bore.
17. The method of Claim 15, wherein forming the plurality of lateral well bores comprises forming the lateral well bores such that a distance from an end of a lateral well bore to the surface well bore is substantially equal for each of the lateral well bores.
18. The method of Claim 15, wherein forming each of the first and second well bore patterns comprises:
forming a first well bore extending from the surface well bore, the first well bore extending from a first end to a distant end of a respective quadrilateral area;
forming a first set of lateral well bores extending outwardly from the first well bore; and forming a second set of lateral well bores extending outwardly from the first set of lateral well bores.
forming a first well bore extending from the surface well bore, the first well bore extending from a first end to a distant end of a respective quadrilateral area;
forming a first set of lateral well bores extending outwardly from the first well bore; and forming a second set of lateral well bores extending outwardly from the first set of lateral well bores.
19. The method of Claim 15, wherein forming each of the first and second well bore patterns comprises:
forming a first well bore extending from the surface well bore, the first well bore extending from a first end to a distant end of a respective quadrilateral area; and forming a plurality of lateral well bores extending outwardly from the first well bore, each of the plurality of lateral well bores substantially equally spaced apart from each other.
forming a first well bore extending from the surface well bore, the first well bore extending from a first end to a distant end of a respective quadrilateral area; and forming a plurality of lateral well bores extending outwardly from the first well bore, each of the plurality of lateral well bores substantially equally spaced apart from each other.
20. The method of Claim 15, further comprising forming a third well bore pattern in the form of a third substantially quadrilateral area, the third well bore pattern extending from the surface well bore, and wherein a first side of the third quadrilateral area is disposed substantially in common with a second side of the first quadrilateral area.
21. The method of Claim 15, wherein forming each of the first and second well bore patterns comprises:
forming a first well bore extending from the surface well bore, the first well bore extending from a first end to a distant end of a respective quadrilateral area; and forming a plurality of lateral well bores extending outwardly from the first well bore, a length of each of the lateral well bores decreasing as a distance from a respective lateral well bore and the surface well bore increases.
forming a first well bore extending from the surface well bore, the first well bore extending from a first end to a distant end of a respective quadrilateral area; and forming a plurality of lateral well bores extending outwardly from the first well bore, a length of each of the lateral well bores decreasing as a distance from a respective lateral well bore and the surface well bore increases.
22. A system for accessing a subterranean zone from a surface, comprising:
a surface well bore extending from the surface to the subterranean zone; and a plurality of well bore patterns disposed within the subterranean zone each extending in a different direction from the surface well bore, the plurality of well bore patterns symmetrically disposed about the surface well bore.
a surface well bore extending from the surface to the subterranean zone; and a plurality of well bore patterns disposed within the subterranean zone each extending in a different direction from the surface well bore, the plurality of well bore patterns symmetrically disposed about the surface well bore.
23. The system of Claim 22, wherein each of the plurality of well bore patterns comprises:
a first well bore extending outwardly from the surface well bore; and a plurality of lateral well bores extending outwardly from the first well bore.
a first well bore extending outwardly from the surface well bore; and a plurality of lateral well bores extending outwardly from the first well bore.
24. The system of Claim 23, wherein the lateral well bores are disposed substantially evenly spaced apart from each other.
25. The system of Claim 23, wherein a length of a respective lateral well bore decreases as a distance from the respective lateral well bore to the surface well bore increases.
26. The system of Claim 23, wherein a distance from each of the lateral well bores to the surface well bore is substantially equal.
27. The system of Claim 22, wherein each of the plurality of well bore patterns forms a substantially quadrilateral shape.
28. The system of Claim 22, wherein each of the well bore patterns comprises:
a first well bore extending from the surface well bore;
a first set of lateral well bores extending outwardly from a first side of the first well bore;
and a second set of lateral well bores extending outwardly from a second side of the first well bore.
a first well bore extending from the surface well bore;
a first set of lateral well bores extending outwardly from a first side of the first well bore;
and a second set of lateral well bores extending outwardly from a second side of the first well bore.
29. The system of Claim 28, wherein each of the first set of lateral well bores is disposed opposite a corresponding one of the second set of lateral well bores.
30. A method for accessing a subterranean zone from a surface, comprising:
forming a surface well bore extending from the surface to the subterranean zone; and forming a plurality of well bore patterns disposed within the subterranean zone each extending in a different direction from the surface well bore, the plurality of well bore patterns symmetrically disposed about the surface well bore.
forming a surface well bore extending from the surface to the subterranean zone; and forming a plurality of well bore patterns disposed within the subterranean zone each extending in a different direction from the surface well bore, the plurality of well bore patterns symmetrically disposed about the surface well bore.
31. The method of Claim 30, wherein forming each of the plurality of well bore patterns comprises:
forming a first well bore extending outwardly from the surface well bore; and forming a plurality of lateral well bores extending outwardly from the first well bore.
forming a first well bore extending outwardly from the surface well bore; and forming a plurality of lateral well bores extending outwardly from the first well bore.
32. The method of Claim 31, wherein forming the lateral well bores comprises disposing each of the lateral well bores substantially evenly spaced apart from each other.
33. The method of Claim 31, wherein forming the lateral well bores comprises forming each lateral well bore such that a length of the lateral well bore decreases as a distance from the respective lateral well bore to the surface well bore increases.
34. The method of Claim 31, wherein forming the lateral well bores comprises forming each of the lateral well bores such that a distance from each of the lateral well bores to the surface well bore is substantially equal.
35. The method of Claim 30, wherein forming each of the plurality of well bore patterns comprises forming each of the plurality of well bore patterns having a substantially quadrilateral shape.
36. The method of Claim 30, wherein forming each of the well bore patterns comprises:
forming a first well bore extending from the surface well bore;
forming a first set of lateral well bores extending outwardly from a first side of the first well bore; and forming a second set of lateral well bores extending outwardly from a second side of the first well bore.
forming a first well bore extending from the surface well bore;
forming a first set of lateral well bores extending outwardly from a first side of the first well bore; and forming a second set of lateral well bores extending outwardly from a second side of the first well bore.
37. The method of Claim 36, wherein forming the first and second sets of lateral well bores comprises forming each of the first set of lateral well bores opposite a corresponding one of the second set of lateral well bores.
38. A system for accessing a subterranean zone from a surface, comprising:
a first well bore pattern disposed within the subterranean zone extending from a first surface well bore; and a second well bore pattern disposed within the subterranean zone extending from a second surface well bore, the first and second well bore patterns configured to nest adjacent each other within the subterranean zone.
a first well bore pattern disposed within the subterranean zone extending from a first surface well bore; and a second well bore pattern disposed within the subterranean zone extending from a second surface well bore, the first and second well bore patterns configured to nest adjacent each other within the subterranean zone.
39. The method of Claim 38, wherein each of the first and second well bore patterns comprises:
a first well bore extending from a respective surface well bore; and a plurality of lateral well bores extending outwardly from the first well bore.
a first well bore extending from a respective surface well bore; and a plurality of lateral well bores extending outwardly from the first well bore.
40. The system of Claim 38, wherein each of the first and second well bore patterns comprises:
a plurality of main well bores extending outwardly from a respective surface well bore; and a plurality of lateral well bores extending outwardly from each of the plurality of main well bores.
a plurality of main well bores extending outwardly from a respective surface well bore; and a plurality of lateral well bores extending outwardly from each of the plurality of main well bores.
41. The system of Claim 40, wherein the plurality of main well bores are symmetrically disposed about the respective surface well bore.
42. The system of Claim 40, wherein a length of each of the lateral well bores decreases as a distance between the respective lateral well bore and a respective surface well bore increases.
43. The system of Claim 40, wherein each of the first and second well bore patterns comprises:
a plurality of main well bores extending outwardly from a respective surface well bore;
a first set of lateral well bores extending outwardly from a first side of each of the plurality of main well bores; and a second set of lateral well bores extending outwardly from a second side of each of the main well bores.
a plurality of main well bores extending outwardly from a respective surface well bore;
a first set of lateral well bores extending outwardly from a first side of each of the plurality of main well bores; and a second set of lateral well bores extending outwardly from a second side of each of the main well bores.
44. The system of Claim 43, wherein each of the first set of lateral well bores is disposed opposite a corresponding one of the second set of lateral well bores.
45. A method for accessing a subterranean zone from a surface, comprising:
forming a first well bore pattern extending from a first surface well bore and disposed within the subterranean zone; and forming a second well bore pattern extending from a second surface well bore and disposed within the subterranean zone, the first and second well bore patterns arranged to nest adjacent each other within the subterranean zone.
forming a first well bore pattern extending from a first surface well bore and disposed within the subterranean zone; and forming a second well bore pattern extending from a second surface well bore and disposed within the subterranean zone, the first and second well bore patterns arranged to nest adjacent each other within the subterranean zone.
46. The method of Claim 45, wherein forming each of the first and second well bore patterns comprises:
forming a first well bore extending from a respective surface well bore; and forming a plurality of lateral well bores extending outwardly from the first well bore.
forming a first well bore extending from a respective surface well bore; and forming a plurality of lateral well bores extending outwardly from the first well bore.
47. The method of Claim 45, wherein forming each of the first and second well bore patterns comprises:
forming a plurality of main well bores extending outwardly from a respective surface well bore; and forming a plurality of lateral well bores extending outwardly from each of the plurality of main well bores.
forming a plurality of main well bores extending outwardly from a respective surface well bore; and forming a plurality of lateral well bores extending outwardly from each of the plurality of main well bores.
48. The method of Claim 47, wherein forming the plurality of main well bores comprises forming the plurality of main well bores symmetrically disposed about the respective surface well bore.
49. The method of Claim 47, wherein forming the lateral well bores comprises forming each of the lateral well bores having a length that decreases as a distance between the respective lateral well bore and a respective surface well bore increases.
50. The method of Claim 45, wherein forming each of the first and second well bore patterns comprises:
forming a plurality of main well bores extending outwardly from a respective surface well bore;
forming a first set of lateral well bores extending outwardly from a first side of each of the plurality of main well bores; and forming a second set of lateral well bores extending outwardly from a second side of each of the main well bores.
forming a plurality of main well bores extending outwardly from a respective surface well bore;
forming a first set of lateral well bores extending outwardly from a first side of each of the plurality of main well bores; and forming a second set of lateral well bores extending outwardly from a second side of each of the main well bores.
51. The method of Claim 50, wherein forming each of the first set of lateral well bores comprises forming each of the first set of lateral well bores opposite a corresponding one of the second set of lateral well bores.
52. A method for accessing a subterranean zone from a surface, comprising:
forming a first well bore extending from the surface to the subterranean zone;
forming a second well bore extending from the surface to the subterranean zone, the second well bore intersecting the first well bore at a junction proximate the subterranean zone;
forming a well bore pattern within the subterranean zone extending from the junction using a drill string extending downwardly through the second well bore;
supplying drilling fluid downwardly through the drill string to remove cuttings generated by the drill string; and minimizing down-hole pressure within the subterranean zone by pumping the drilling fluid and the cuttings to the surface through the first well bore.
forming a first well bore extending from the surface to the subterranean zone;
forming a second well bore extending from the surface to the subterranean zone, the second well bore intersecting the first well bore at a junction proximate the subterranean zone;
forming a well bore pattern within the subterranean zone extending from the junction using a drill string extending downwardly through the second well bore;
supplying drilling fluid downwardly through the drill string to remove cuttings generated by the drill string; and minimizing down-hole pressure within the subterranean zone by pumping the drilling fluid and the cuttings to the surface through the first well bore.
53. The method of Claim 52, wherein forming the second well bore comprises forming the second well bore offset from the first well bore at the surface.
54. The method of Claim 52, wherein forming the second well bore comprises forming the second well bore extending from the first well bore at a location between the surface and the subterranean zone.
55. The method of Claim 52, wherein forming the well bore pattern comprises:
forming a main well bore extending from the junction; and forming a plurality of lateral well bores extending outwardly from the main well bore.
forming a main well bore extending from the junction; and forming a plurality of lateral well bores extending outwardly from the main well bore.
56. The method of Claim 52, wherein forming the well bore pattern comprises:
forming a main well bore extending from the junction;
forming a first plurality of lateral well bores extending outwardly from the main well bore; and forming a second plurality of lateral well bores extending from the first plurality of lateral well bores.
forming a main well bore extending from the junction;
forming a first plurality of lateral well bores extending outwardly from the main well bore; and forming a second plurality of lateral well bores extending from the first plurality of lateral well bores.
57. The method of Claim 52, wherein forming the well bore pattern comprises:
forming a main well bore extending from the junction; and forming a plurality of lateral well bores extending outwardly from the main well bore, a length of each of the lateral well bores decreasing as a distance from the respective lateral well bore and the junction increases.
forming a main well bore extending from the junction; and forming a plurality of lateral well bores extending outwardly from the main well bore, a length of each of the lateral well bores decreasing as a distance from the respective lateral well bore and the junction increases.
58. The method of Claim 52, further comprising forming an enlarged cavity at the junction of the first and second well bores.
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US09/197,687 US6280000B1 (en) | 1998-11-20 | 1998-11-20 | Method for production of gas from a coal seam using intersecting well bores |
US09/197,687 | 1998-11-20 | ||
CA2661725A CA2661725C (en) | 1998-11-20 | 1999-11-19 | Method and system for accessing subterranean deposits from the surface |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CA2661725A Division CA2661725C (en) | 1998-11-20 | 1999-11-19 | Method and system for accessing subterranean deposits from the surface |
Publications (1)
Publication Number | Publication Date |
---|---|
CA2792184A1 true CA2792184A1 (en) | 2000-06-02 |
Family
ID=22730357
Family Applications (9)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CA002589332A Expired - Fee Related CA2589332C (en) | 1998-11-20 | 1999-11-19 | Method and system for accessing subterranean deposits from the surface |
CA2792184A Abandoned CA2792184A1 (en) | 1998-11-20 | 1999-11-19 | Method and system for accessing subterranean deposits from the surface |
CA002441672A Expired - Fee Related CA2441672C (en) | 1998-11-20 | 1999-11-19 | Method and system for accessing subterranean deposits from the surface |
CA2661725A Expired - Fee Related CA2661725C (en) | 1998-11-20 | 1999-11-19 | Method and system for accessing subterranean deposits from the surface |
CA002441667A Expired - Fee Related CA2441667C (en) | 1998-11-20 | 1999-11-19 | Method and system for accessing subterranean deposits from the surface |
CA002447254A Expired - Fee Related CA2447254C (en) | 1998-11-20 | 1999-11-19 | Well cavity positioning method |
CA002483023A Expired - Fee Related CA2483023C (en) | 1998-11-20 | 1999-11-19 | Method and system for accessing subterranean deposits from the surface |
CA002441671A Expired - Fee Related CA2441671C (en) | 1998-11-20 | 1999-11-19 | Method and system for accessing subterranean deposits from the surface |
CA002350504A Expired - Fee Related CA2350504C (en) | 1998-11-20 | 1999-11-19 | Method and system for accessing subterranean deposits from the surface |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CA002589332A Expired - Fee Related CA2589332C (en) | 1998-11-20 | 1999-11-19 | Method and system for accessing subterranean deposits from the surface |
Family Applications After (7)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CA002441672A Expired - Fee Related CA2441672C (en) | 1998-11-20 | 1999-11-19 | Method and system for accessing subterranean deposits from the surface |
CA2661725A Expired - Fee Related CA2661725C (en) | 1998-11-20 | 1999-11-19 | Method and system for accessing subterranean deposits from the surface |
CA002441667A Expired - Fee Related CA2441667C (en) | 1998-11-20 | 1999-11-19 | Method and system for accessing subterranean deposits from the surface |
CA002447254A Expired - Fee Related CA2447254C (en) | 1998-11-20 | 1999-11-19 | Well cavity positioning method |
CA002483023A Expired - Fee Related CA2483023C (en) | 1998-11-20 | 1999-11-19 | Method and system for accessing subterranean deposits from the surface |
CA002441671A Expired - Fee Related CA2441671C (en) | 1998-11-20 | 1999-11-19 | Method and system for accessing subterranean deposits from the surface |
CA002350504A Expired - Fee Related CA2350504C (en) | 1998-11-20 | 1999-11-19 | Method and system for accessing subterranean deposits from the surface |
Country Status (15)
Country | Link |
---|---|
US (12) | US6280000B1 (en) |
EP (4) | EP1316673B1 (en) |
CN (5) | CN101328791A (en) |
AT (4) | ATE334297T1 (en) |
AU (9) | AU760896B2 (en) |
CA (9) | CA2589332C (en) |
CZ (1) | CZ20011757A3 (en) |
DE (4) | DE69932546T2 (en) |
ES (3) | ES2297582T3 (en) |
ID (1) | ID30391A (en) |
NZ (3) | NZ512303A (en) |
PL (9) | PL193562B1 (en) |
RU (6) | RU2246602C2 (en) |
WO (1) | WO2000031376A2 (en) |
ZA (1) | ZA200103917B (en) |
Families Citing this family (227)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6729394B1 (en) * | 1997-05-01 | 2004-05-04 | Bp Corporation North America Inc. | Method of producing a communicating horizontal well network |
US8376052B2 (en) | 1998-11-20 | 2013-02-19 | Vitruvian Exploration, Llc | Method and system for surface production of gas from a subterranean zone |
US7048049B2 (en) * | 2001-10-30 | 2006-05-23 | Cdx Gas, Llc | Slant entry well system and method |
US6662870B1 (en) * | 2001-01-30 | 2003-12-16 | Cdx Gas, L.L.C. | Method and system for accessing subterranean deposits from a limited surface area |
US6679322B1 (en) * | 1998-11-20 | 2004-01-20 | Cdx Gas, Llc | Method and system for accessing subterranean deposits from the surface |
US6708764B2 (en) * | 2002-07-12 | 2004-03-23 | Cdx Gas, L.L.C. | Undulating well bore |
US20040035582A1 (en) * | 2002-08-22 | 2004-02-26 | Zupanick Joseph A. | System and method for subterranean access |
US6425448B1 (en) | 2001-01-30 | 2002-07-30 | Cdx Gas, L.L.P. | Method and system for accessing subterranean zones from a limited surface area |
US7073595B2 (en) * | 2002-09-12 | 2006-07-11 | Cdx Gas, Llc | Method and system for controlling pressure in a dual well system |
US6280000B1 (en) | 1998-11-20 | 2001-08-28 | Joseph A. Zupanick | Method for production of gas from a coal seam using intersecting well bores |
US6681855B2 (en) | 2001-10-19 | 2004-01-27 | Cdx Gas, L.L.C. | Method and system for management of by-products from subterranean zones |
US7025154B2 (en) * | 1998-11-20 | 2006-04-11 | Cdx Gas, Llc | Method and system for circulating fluid in a well system |
US8297377B2 (en) | 1998-11-20 | 2012-10-30 | Vitruvian Exploration, Llc | Method and system for accessing subterranean deposits from the surface and tools therefor |
US6988548B2 (en) * | 2002-10-03 | 2006-01-24 | Cdx Gas, Llc | Method and system for removing fluid from a subterranean zone using an enlarged cavity |
US6598686B1 (en) * | 1998-11-20 | 2003-07-29 | Cdx Gas, Llc | Method and system for enhanced access to a subterranean zone |
RO117724B1 (en) * | 2000-10-02 | 2002-06-28 | Pompiliu Gheorghe Dincă | Process for developing an oil field using subsurface drains |
US6923275B2 (en) * | 2001-01-29 | 2005-08-02 | Robert Gardes | Multi seam coal bed/methane dewatering and depressurizing production system |
US7243738B2 (en) * | 2001-01-29 | 2007-07-17 | Robert Gardes | Multi seam coal bed/methane dewatering and depressurizing production system |
US6591903B2 (en) * | 2001-12-06 | 2003-07-15 | Eog Resources Inc. | Method of recovery of hydrocarbons from low pressure formations |
US6679326B2 (en) * | 2002-01-15 | 2004-01-20 | Bohdan Zakiewicz | Pro-ecological mining system |
US6968893B2 (en) * | 2002-04-03 | 2005-11-29 | Target Drilling Inc. | Method and system for production of gas and water from a gas bearing strata during drilling and after drilling completion |
US6810960B2 (en) * | 2002-04-22 | 2004-11-02 | Weatherford/Lamb, Inc. | Methods for increasing production from a wellbore |
US7360595B2 (en) * | 2002-05-08 | 2008-04-22 | Cdx Gas, Llc | Method and system for underground treatment of materials |
US6725922B2 (en) | 2002-07-12 | 2004-04-27 | Cdx Gas, Llc | Ramping well bores |
US6991048B2 (en) * | 2002-07-12 | 2006-01-31 | Cdx Gas, Llc | Wellbore plug system and method |
US6991047B2 (en) * | 2002-07-12 | 2006-01-31 | Cdx Gas, Llc | Wellbore sealing system and method |
US7025137B2 (en) * | 2002-09-12 | 2006-04-11 | Cdx Gas, Llc | Three-dimensional well system for accessing subterranean zones |
US8333245B2 (en) | 2002-09-17 | 2012-12-18 | Vitruvian Exploration, Llc | Accelerated production of gas from a subterranean zone |
US7094811B2 (en) | 2002-10-03 | 2006-08-22 | Bayer Corporation | Energy absorbing flexible foams produced in part with a double metal cyanide catalyzed polyol |
US6953088B2 (en) * | 2002-12-23 | 2005-10-11 | Cdx Gas, Llc | Method and system for controlling the production rate of fluid from a subterranean zone to maintain production bore stability in the zone |
US7264048B2 (en) * | 2003-04-21 | 2007-09-04 | Cdx Gas, Llc | Slot cavity |
DE10320401B4 (en) * | 2003-05-06 | 2015-04-23 | Udo Adam | Process for mine gas production |
US6932168B2 (en) * | 2003-05-15 | 2005-08-23 | Cnx Gas Company, Llc | Method for making a well for removing fluid from a desired subterranean formation |
US7134494B2 (en) * | 2003-06-05 | 2006-11-14 | Cdx Gas, Llc | Method and system for recirculating fluid in a well system |
US7513304B2 (en) * | 2003-06-09 | 2009-04-07 | Precision Energy Services Ltd. | Method for drilling with improved fluid collection pattern |
WO2005003509A1 (en) * | 2003-06-30 | 2005-01-13 | Petroleo Brasileiro S A-Petrobras | Method for, and the construction of, a long-distance well for the production, transport, storage and exploitation of mineral layers and fluids |
US7073577B2 (en) * | 2003-08-29 | 2006-07-11 | Applied Geotech, Inc. | Array of wells with connected permeable zones for hydrocarbon recovery |
US7051809B2 (en) * | 2003-09-05 | 2006-05-30 | Conocophillips Company | Burn assisted fracturing of underground coal bed |
US7100687B2 (en) * | 2003-11-17 | 2006-09-05 | Cdx Gas, Llc | Multi-purpose well bores and method for accessing a subterranean zone from the surface |
US7163063B2 (en) * | 2003-11-26 | 2007-01-16 | Cdx Gas, Llc | Method and system for extraction of resources from a subterranean well bore |
US20060201715A1 (en) * | 2003-11-26 | 2006-09-14 | Seams Douglas P | Drilling normally to sub-normally pressured formations |
US7419223B2 (en) * | 2003-11-26 | 2008-09-02 | Cdx Gas, Llc | System and method for enhancing permeability of a subterranean zone at a horizontal well bore |
US20060201714A1 (en) * | 2003-11-26 | 2006-09-14 | Seams Douglas P | Well bore cleaning |
US7445045B2 (en) * | 2003-12-04 | 2008-11-04 | Halliburton Energy Services, Inc. | Method of optimizing production of gas from vertical wells in coal seams |
US7104320B2 (en) * | 2003-12-04 | 2006-09-12 | Halliburton Energy Services, Inc. | Method of optimizing production of gas from subterranean formations |
US7207395B2 (en) * | 2004-01-30 | 2007-04-24 | Cdx Gas, Llc | Method and system for testing a partially formed hydrocarbon well for evaluation and well planning refinement |
US7207390B1 (en) * | 2004-02-05 | 2007-04-24 | Cdx Gas, Llc | Method and system for lining multilateral wells |
US7222670B2 (en) * | 2004-02-27 | 2007-05-29 | Cdx Gas, Llc | System and method for multiple wells from a common surface location |
US20050241834A1 (en) * | 2004-05-03 | 2005-11-03 | Mcglothen Jody R | Tubing/casing connection for U-tube wells |
US7278497B2 (en) * | 2004-07-09 | 2007-10-09 | Weatherford/Lamb | Method for extracting coal bed methane with source fluid injection |
CN101010512A (en) * | 2004-08-24 | 2007-08-01 | 克劳斯科技管理公司 | Pump jack apparatus and pumping method |
US20050051326A1 (en) * | 2004-09-29 | 2005-03-10 | Toothman Richard L. | Method for making wells for removing fluid from a desired subterranean |
US7581592B1 (en) | 2004-11-24 | 2009-09-01 | Bush Ronald R | System and method for the manufacture of fuel, fuelstock or fuel additives |
US7353877B2 (en) * | 2004-12-21 | 2008-04-08 | Cdx Gas, Llc | Accessing subterranean resources by formation collapse |
US7225872B2 (en) * | 2004-12-21 | 2007-06-05 | Cdx Gas, Llc | Perforating tubulars |
US7311150B2 (en) * | 2004-12-21 | 2007-12-25 | Cdx Gas, Llc | Method and system for cleaning a well bore |
US7299864B2 (en) * | 2004-12-22 | 2007-11-27 | Cdx Gas, Llc | Adjustable window liner |
WO2006076547A2 (en) * | 2005-01-14 | 2006-07-20 | Halliburton Energy Services, Inc. | System and method for producing fluids from a subterranean formation |
CN1317483C (en) * | 2005-03-25 | 2007-05-23 | 北京奥瑞安能源技术开发有限公司 | Method of entering target geologic body and system |
CN100392209C (en) * | 2005-04-20 | 2008-06-04 | 太原理工大学 | Rock salt deposit horizontal chamber type oil-gas depot and its building method |
CN100420824C (en) * | 2005-04-21 | 2008-09-24 | 新奥气化采煤有限公司 | Underground coal gasification |
US7571771B2 (en) * | 2005-05-31 | 2009-08-11 | Cdx Gas, Llc | Cavity well system |
US20060175061A1 (en) * | 2005-08-30 | 2006-08-10 | Crichlow Henry B | Method for Recovering Hydrocarbons from Subterranean Formations |
US7493951B1 (en) | 2005-11-14 | 2009-02-24 | Target Drilling, Inc. | Under-balanced directional drilling system |
CN100455769C (en) * | 2005-12-22 | 2009-01-28 | 中国石油大学(华东) | Method for extracting hydrate on bottom of sea by deep earth heart water circulation |
US7647967B2 (en) * | 2006-01-12 | 2010-01-19 | Jimni Development LLC | Drilling and opening reservoir using an oriented fissure to enhance hydrocarbon flow and method of making |
US8261820B2 (en) * | 2006-01-12 | 2012-09-11 | Jimni Development LLC | Drilling and opening reservoirs using an oriented fissure |
US7648348B2 (en) * | 2006-06-28 | 2010-01-19 | Scallen Richard E | Dewatering apparatus |
US20080016768A1 (en) | 2006-07-18 | 2008-01-24 | Togna Keith A | Chemically-modified mixed fuels, methods of production and used thereof |
US8622608B2 (en) * | 2006-08-23 | 2014-01-07 | M-I L.L.C. | Process for mixing wellbore fluids |
US8044819B1 (en) | 2006-10-23 | 2011-10-25 | Scientific Drilling International | Coal boundary detection using an electric-field borehole telemetry apparatus |
US7812647B2 (en) * | 2007-05-21 | 2010-10-12 | Advanced Analogic Technologies, Inc. | MOSFET gate drive with reduced power loss |
US7789157B2 (en) | 2007-08-03 | 2010-09-07 | Pine Tree Gas, Llc | System and method for controlling liquid removal operations in a gas-producing well |
US7832468B2 (en) * | 2007-10-03 | 2010-11-16 | Pine Tree Gas, Llc | System and method for controlling solids in a down-hole fluid pumping system |
US8272456B2 (en) * | 2008-01-02 | 2012-09-25 | Pine Trees Gas, LLC | Slim-hole parasite string |
GB2459082B (en) * | 2008-02-19 | 2010-04-21 | Phillip Raymond Michael Denne | Improvements in artificial lift mechanisms |
US8137779B2 (en) * | 2008-02-29 | 2012-03-20 | Ykk Corporation Of America | Line of sight hose cover |
US8276673B2 (en) | 2008-03-13 | 2012-10-02 | Pine Tree Gas, Llc | Gas lift system |
US8162405B2 (en) | 2008-04-18 | 2012-04-24 | Shell Oil Company | Using tunnels for treating subsurface hydrocarbon containing formations |
US8740310B2 (en) * | 2008-06-20 | 2014-06-03 | Solvay Chemicals, Inc. | Mining method for co-extraction of non-combustible ore and mine methane |
EP2321497B1 (en) | 2008-08-01 | 2017-06-14 | Solvay Chemicals, Inc. | Traveling undercut solution mining systems and methods |
WO2010016767A2 (en) * | 2008-08-08 | 2010-02-11 | Ziebel As | Subsurface reservoir drainage system |
RU2518700C2 (en) | 2008-10-13 | 2014-06-10 | Шелл Интернэшнл Рисерч Маатсхаппий Б.В. | Using self-regulating nuclear reactors in treating subsurface formation |
RU2389909C1 (en) * | 2009-01-30 | 2010-05-20 | Борис Анатольевич ДУДНИЧЕНКО | Well jet pumping unit for degassing of coal beds |
US20110005762A1 (en) * | 2009-07-09 | 2011-01-13 | James Michael Poole | Forming Multiple Deviated Wellbores |
CN101603431B (en) * | 2009-07-14 | 2011-05-11 | 中国矿业大学 | Method for reinforcing outburst-prone coal seam cross-cut coal uncovering |
US8229488B2 (en) * | 2009-07-30 | 2012-07-24 | Sony Ericsson Mobile Communications Ab | Methods, apparatuses and computer programs for media content distribution |
CN101649740B (en) * | 2009-09-03 | 2011-08-31 | 周福宝 | Ground bored well body structure for gas extraction |
CN101699033B (en) * | 2009-10-27 | 2011-12-21 | 山西焦煤集团有限责任公司 | Device for pumping and draining water from downward hole of coal bed |
CN102053249B (en) * | 2009-10-30 | 2013-04-03 | 吴立新 | Underground space high-precision positioning method based on laser scanning and sequence encoded graphics |
ES2371429B1 (en) * | 2009-11-24 | 2012-08-30 | Antonio Francisco Soler Terol | PERFECTED SYSTEM OF ACCESS TO UNDERGROUND VERTICAL DUCTS. |
EA201290503A1 (en) * | 2009-12-15 | 2012-12-28 | Шеврон Ю.Эс.Эй. Инк. | SYSTEM, METHOD AND CONFIGURATION FOR MAINTENANCE AND OPERATION OF BOTTLES |
CN101732929B (en) * | 2010-02-11 | 2012-05-30 | 常熟理工学院 | Blade lattice streaming gravity buoyancy device |
US8701768B2 (en) | 2010-04-09 | 2014-04-22 | Shell Oil Company | Methods for treating hydrocarbon formations |
WO2011127292A1 (en) * | 2010-04-09 | 2011-10-13 | Shell Oil Company | Methods for heating with slots in hydrocarbon formations |
CN101806207A (en) * | 2010-04-26 | 2010-08-18 | 徐萍 | Horizontal well three-dimensional intersection well pattern structure |
CN101818620B (en) * | 2010-04-26 | 2013-04-10 | 徐萍 | Mining method for maximum reservoir contact well |
CN101936155B (en) * | 2010-08-04 | 2014-06-04 | 北京奥瑞安能源技术开发有限公司 | Distributed structure of horizontal section of multi-branch horizontal coal bed methane well |
CN101915072B (en) * | 2010-08-04 | 2014-03-26 | 中煤科工集团重庆研究院 | Method for extracting coal bed gas in stable mining region by ground well drilling |
CN101936142B (en) * | 2010-08-05 | 2012-11-28 | 北京奥瑞安能源技术开发有限公司 | Aerated underbalanced drilling method for coal-bed gas |
CA2808408C (en) | 2010-08-23 | 2015-05-26 | Wentworth Patent Holdings Inc. | Method and apparatus for creating a planar cavern |
US8646846B2 (en) | 2010-08-23 | 2014-02-11 | Steven W. Wentworth | Method and apparatus for creating a planar cavern |
US9359876B2 (en) | 2010-08-27 | 2016-06-07 | Well Control Technologies, Inc. | Methods and apparatus for removing liquid from a gas producing well |
EP2609287B1 (en) | 2010-08-27 | 2018-08-15 | CNX Gas Company LLC | A method and apparatus for removing liquid from a gas producing well |
CN101967974B (en) * | 2010-09-13 | 2012-07-25 | 灵宝金源矿业股份有限公司 | Method for crossed operation of vertical shaft backward-excavation deepening and exploitation projects |
CN101975055B (en) * | 2010-09-17 | 2013-03-06 | 北京奥瑞安能源技术开发有限公司 | Method for remediating trouble well of coal bed gas multi-branch horizontal well |
CN101949284A (en) * | 2010-09-25 | 2011-01-19 | 北京奥瑞安能源技术开发有限公司 | Coalbed methane horizontal well system and construction method thereof |
CN102080568B (en) * | 2010-11-19 | 2012-10-31 | 河北联合大学 | Method for reducing water pressure of covering layer of mine transferred from opencast mine to underground mine |
CN102086774A (en) * | 2011-01-17 | 2011-06-08 | 中联煤层气国家工程研究中心有限责任公司 | Drainage method of gas in coal bed |
CN102146797B (en) * | 2011-01-21 | 2012-12-12 | 中国矿业大学 | Short-section temporary gob-side entry retaining method |
CN102116167B (en) * | 2011-01-25 | 2012-03-21 | 煤炭科学研究总院西安研究院 | Ground and underground three-dimensional extraction system of coal seam gas |
CN102121364A (en) * | 2011-02-14 | 2011-07-13 | 中国矿业大学 | Well structure of pressure-releasing coal bed gas ground extraction well and arrangement method thereof |
HU229944B1 (en) * | 2011-05-30 | 2015-03-02 | Sld Enhanced Recovery, Inc | Method for ensuring of admission material into a bore hole |
CN102213090B (en) * | 2011-06-03 | 2014-08-06 | 中国科学院广州能源研究所 | Method and device for exploiting natural gas hydrate in permafrost region |
CN102852546B (en) * | 2011-06-30 | 2015-04-29 | 河南煤业化工集团研究院有限责任公司 | Method for pre-pumping coal roadway stripe gas of single soft protruded coal seam of unexploited area |
CN102352774A (en) * | 2011-07-27 | 2012-02-15 | 焦作矿区计量检测中心 | Method for controlling efficiency of drainage system by using flow rate of pipelines |
RU2499142C2 (en) * | 2011-09-02 | 2013-11-20 | Михаил Владимирович Попов | Method of degassing of unrelieved formations in underground mines |
CN102400664B (en) * | 2011-09-03 | 2012-12-26 | 中煤科工集团西安研究院 | Well completion process method for increasing gas production of ground horizontally butted well of soft coal stratum |
CN102383830B (en) * | 2011-09-30 | 2014-12-24 | 中煤科工集团重庆研究院有限公司 | Comprehensive outburst prevention method for outburst coal seam region |
CN102392678A (en) * | 2011-10-21 | 2012-03-28 | 河南煤业化工集团研究院有限责任公司 | Gas drainage method combining surface and underground fracturing and permeability improvement |
CN102352769A (en) * | 2011-10-21 | 2012-02-15 | 河南煤业化工集团研究院有限责任公司 | Integrated mining method for commonly mining coal and gas of high mine |
CN103161439A (en) * | 2011-12-09 | 2013-06-19 | 卫国 | Horizontal segment updip well group |
RU2485297C1 (en) * | 2011-12-22 | 2013-06-20 | Открытое акционерное общество "Татнефть" имени В.Д. Шашина | Development method of oil deposits by means of well interconnected through productive formation |
CN102425397A (en) * | 2011-12-29 | 2012-04-25 | 郑州大学 | Method for exploiting coal-bed methane by utilizing water force of horizontal pinnate well of double well-shaft to scour, drill and relieve pressure |
CN102518411A (en) * | 2011-12-29 | 2012-06-27 | 郑州大学 | Method for mining coal bed gas by hydraulic washout of butted well in manner of pressure relief |
RU2499134C2 (en) * | 2012-01-13 | 2013-11-20 | Открытое акционерное общество "Татнефть" имени В.Д. Шашина | Method of development of oil pool located above gas pool and separated therefrom by impermeable parting |
CN102587981B (en) * | 2012-03-12 | 2012-12-05 | 中国石油大学(华东) | Underground salt cavern gas storage and building method thereof |
RU2503799C2 (en) * | 2012-03-12 | 2014-01-10 | Открытое Акционерное Общество "Газпром Промгаз" | Method for shale gas production |
CN102704908B (en) * | 2012-05-14 | 2015-06-03 | 西南石油大学 | Split-flow automatic control system of coal bed methane horizontal branch well and process thereof |
EP2877668B1 (en) | 2012-07-03 | 2016-09-28 | Halliburton Energy Services, Inc. | Method of intersecting a first well bore by a second well bore |
CN102852490A (en) * | 2012-09-07 | 2013-01-02 | 北京九尊能源技术股份有限公司 | High gas suction and discharge process method for complex well |
CN103711457A (en) * | 2012-09-29 | 2014-04-09 | 中国石油化工股份有限公司 | Design method of six-spud-in wellbore structure |
US9388668B2 (en) * | 2012-11-23 | 2016-07-12 | Robert Francis McAnally | Subterranean channel for transporting a hydrocarbon for prevention of hydrates and provision of a relief well |
CN103161440A (en) * | 2013-02-27 | 2013-06-19 | 中联煤层气国家工程研究中心有限责任公司 | Single-well coalbed methane horizontal well system and finishing method thereof |
US9320989B2 (en) | 2013-03-15 | 2016-04-26 | Haven Technology Solutions, LLC. | Apparatus and method for gas-liquid separation |
CN104141481B (en) * | 2013-05-06 | 2016-09-07 | 中国石油天然气股份有限公司 | A kind of ultra-low penetration compact oil reservoir horizontal well well-arranging procedure |
CN103243777A (en) * | 2013-05-17 | 2013-08-14 | 贵州能发高山矿业有限公司 | Karst region mine water-exploring water-taking method and device |
CN103291307B (en) * | 2013-05-22 | 2015-08-05 | 中南大学 | A kind of rich water rockhole Dewatering by leading level method |
CN103711473B (en) * | 2013-12-30 | 2016-01-20 | 中国石油集团渤海钻探工程有限公司 | Two-way Cycle relay-type coal seam compound well bores completion method |
CN103670271B (en) * | 2013-12-30 | 2016-03-09 | 中国石油集团渤海钻探工程有限公司 | Two-way Cycle relay-type coal seam drilling method |
CN103742188B (en) * | 2014-01-07 | 2016-08-17 | 中国神华能源股份有限公司 | Colliery drawing-off gas well and boring method |
CN103821554B (en) * | 2014-03-07 | 2016-03-30 | 重庆大学 | Based on the boring method for arranging without coal pillar mining Y type ventilation goaf |
AU2015246646B2 (en) * | 2014-04-14 | 2018-12-06 | Peabody Energy Australia Pty Ltd | A multi purpose drilling system and method |
RU2546704C1 (en) * | 2014-04-15 | 2015-04-10 | Открытое акционерное общество "Татнефть" имени В.Д. Шашина | Less explored oil deposit development method |
CN103967472B (en) * | 2014-05-26 | 2016-08-31 | 中煤科工集团西安研究院有限公司 | A kind of coal bed gas staged fracturing horizontal well enhanced gas extraction method |
CN103993827B (en) * | 2014-06-12 | 2016-07-06 | 北京奥瑞安能源技术开发有限公司 | Under balance pressure drilling method and system for coal bed gas |
CN104131831B (en) * | 2014-06-12 | 2016-10-12 | 中国矿业大学 | A kind of coal bed gas well three-dimensional associating pumping method up and down |
US20170226840A1 (en) * | 2014-08-04 | 2017-08-10 | Christopher James CONNELL | A well system |
CN104329113B (en) * | 2014-09-03 | 2016-10-05 | 安徽理工大学 | A kind of method of surface drilling standing seat earth release mash gas extraction |
CN104453832B (en) * | 2014-10-30 | 2018-04-06 | 北京奥瑞安能源技术开发有限公司 | A kind of multi-lateral horizontal well system and its construction method |
CN104790951B (en) * | 2015-03-12 | 2017-09-26 | 大同煤矿集团有限责任公司 | Weaken the method and device away from the high-order tight roofs of 100 ~ 350m of coal seam |
CN104806217B (en) * | 2015-03-20 | 2017-03-22 | 河南理工大学 | Combined separated layer fracturing, grouping and layer-combining mining method for coal bed well group |
CN104695912A (en) * | 2015-03-24 | 2015-06-10 | 山东齐天石油技术有限公司 | Novel coal-bed methane mining equipment |
CN104847263A (en) * | 2015-04-30 | 2015-08-19 | 中煤科工集团西安研究院有限公司 | Coal bed methane far-end butt joint horizontal well drilling method |
US10036210B2 (en) * | 2015-05-01 | 2018-07-31 | Zilift Holdings, Ltd. | Method and system for deploying an electrical submersible pump in a wellbore |
CN104948108A (en) * | 2015-05-30 | 2015-09-30 | 山西晋城无烟煤矿业集团有限责任公司 | Hole drilling and poking technology of kilometer drilling machine for coal seam gas hole drilling |
CN105003293A (en) * | 2015-07-01 | 2015-10-28 | 西南石油大学 | Gas drainage system for high-gas-content coal mine |
CN104989330A (en) * | 2015-08-03 | 2015-10-21 | 中国神华能源股份有限公司 | Coalbed gas recovery method |
CN105041370B (en) * | 2015-08-24 | 2017-07-07 | 安徽理工大学 | A kind of concordant hole pumping and mining coal-bed gas two-dimensional flow field method of testing |
CN105156089A (en) * | 2015-08-28 | 2015-12-16 | 中国神华能源股份有限公司 | U-shaped well system and well drilling method thereof |
CN105134213B (en) * | 2015-09-10 | 2017-05-03 | 西南石油大学 | Regional drilling and coal mining process method |
CN105317456A (en) * | 2015-11-16 | 2016-02-10 | 中国矿业大学 | Gas extraction pipeline and method capable of preventing water accumulation and slag deposition |
CN105649531B (en) * | 2015-12-21 | 2017-12-05 | 中国石油天然气集团公司 | One kind is without rig drilling equipment |
CN105715227B (en) * | 2016-01-26 | 2018-01-09 | 中国矿业大学 | Self-sealing hydraulic pressure for up pressure measuring drill hole removes device and application method certainly |
CN105888723B (en) * | 2016-06-24 | 2018-04-10 | 安徽理工大学 | Drainage arrangement from gas pressure measurement to layer-through drilling and method during a kind of lower |
CN105937393B (en) * | 2016-06-27 | 2022-11-04 | 中国石油天然气股份有限公司 | Horizontal well dragging type liquid production profile testing pipe column and testing method thereof |
CN106351687B (en) * | 2016-10-31 | 2018-06-26 | 张培 | A kind of convertible deslagging water drainage device of gas drainage pipeline |
CN106555609B (en) * | 2016-11-21 | 2017-08-08 | 西安科技大学 | A kind of coal mine gob water, which is visited, puts method |
CN106545296A (en) * | 2016-12-02 | 2017-03-29 | 淮北矿业股份有限公司 | A kind of surface drilling grouting treatment method of deep mining coal seam base plate limestone water damage |
CN106677746A (en) * | 2017-01-05 | 2017-05-17 | 中国神华能源股份有限公司 | Method for coal bed gas exploitation of full working face through down-hole system |
CN106869875B (en) * | 2017-01-05 | 2019-06-07 | 中国神华能源股份有限公司 | The method for exploiting two layers of coal bed gas |
US10184297B2 (en) | 2017-02-13 | 2019-01-22 | Saudi Arabian Oil Company | Drilling and operating sigmoid-shaped wells |
CN107044270B (en) * | 2017-04-05 | 2019-09-13 | 李卫忠 | Coal mine leting speeper casing water-stopping method and sealing casing |
CN106930733A (en) * | 2017-05-10 | 2017-07-07 | 中国神华能源股份有限公司 | Coal bed gas group wells extraction system and method for construction |
CN107152261A (en) * | 2017-05-10 | 2017-09-12 | 中国神华能源股份有限公司 | Coal bed gas extraction system and method for construction |
CN107313716B (en) * | 2017-07-18 | 2023-05-09 | 山西晋城无烟煤矿业集团有限责任公司 | Drilling method for coal-bed gas well crossing goaf by composite plugging broken rock at hole bottom |
US11136875B2 (en) * | 2017-07-27 | 2021-10-05 | Saudi Arabian Oil Company | Systems, apparatuses, and methods for downhole water separation |
CN107288546B (en) * | 2017-08-16 | 2019-05-03 | 北京奥瑞安能源技术开发有限公司 | A kind of completion method and horizontal well of horizontal well |
CN108590738A (en) * | 2018-03-01 | 2018-09-28 | 王宇曜 | Down-hole gas sucking releasing shaft construction method |
CN108222890A (en) * | 2018-03-09 | 2018-06-29 | 中国石油大学(华东) | A kind of preset tubing string pneumatic type drainage gas production tool |
CN110242209A (en) * | 2018-03-09 | 2019-09-17 | 中国石油天然气股份有限公司 | The boring method of producing well |
CN108468566B (en) * | 2018-03-26 | 2019-11-26 | 中煤科工集团西安研究院有限公司 | Empty crystal really visits and puts method mine based on underground pencil directional drilling always |
CN108798630B (en) * | 2018-04-28 | 2021-09-28 | 中国矿业大学 | Cave pressure relief mining simulation test system for tectonic coal in-situ coal bed gas horizontal well |
CN108915766B (en) * | 2018-07-10 | 2020-09-29 | 河北煤炭科学研究院 | Method for exploring deep hidden water guide channel of working surface |
CN109057768A (en) * | 2018-08-02 | 2018-12-21 | 四川盐业地质钻井大队 | Recovery method suitable for thin interbed native soda deposit |
CN109139011A (en) * | 2018-08-02 | 2019-01-04 | 缪协兴 | A kind of coal seam is the waterproof coal-mining method of Main aquifer |
CN109578058B (en) * | 2018-12-10 | 2021-05-14 | 中国矿业大学 | Method for improving gas extraction concentration of extraction borehole through auxiliary drilling |
US10478753B1 (en) | 2018-12-20 | 2019-11-19 | CH International Equipment Ltd. | Apparatus and method for treatment of hydraulic fracturing fluid during hydraulic fracturing |
CA3125549A1 (en) | 2018-12-20 | 2020-06-25 | Haven Technology Solutions Llc | Apparatus and method for gas-liquid separation of multi-phase fluid |
CN109403955B (en) * | 2018-12-21 | 2022-03-22 | 中国电建集团贵阳勘测设计研究院有限公司 | Device and method for measuring maximum horizontal stress direction in drill hole |
RU2709263C1 (en) * | 2019-04-30 | 2019-12-17 | Публичное акционерное общество «Татнефть» имени В.Д. Шашина | Method of drilling and development of offshoots from horizontal well |
RU2708743C1 (en) * | 2019-04-30 | 2019-12-11 | Публичное акционерное общество «Татнефть» имени В.Д. Шашина | Method of drilling offshoots from an openhole well horizontal part |
CN110206099A (en) * | 2019-06-14 | 2019-09-06 | 国家能源投资集团有限责任公司 | Underground water system |
CN110185418B (en) * | 2019-06-20 | 2022-04-19 | 中联煤层气有限责任公司 | Coal bed gas mining method for coal bed group |
CN110107263B (en) * | 2019-06-20 | 2021-09-03 | 中联煤层气有限责任公司 | Method for exploiting coal bed gas from tectonic coal reservoir |
CN110306934B (en) * | 2019-07-02 | 2021-03-19 | 中煤科工集团西安研究院有限公司 | Construction method for large-diameter high-position directional long drill hole of double-branch top plate |
CN110439463A (en) * | 2019-07-31 | 2019-11-12 | 江河水利水电咨询中心 | Mined-out Area control injected hole pore-creating technique |
RU2709262C1 (en) * | 2019-08-30 | 2019-12-17 | Публичное акционерное общество «Татнефть» имени В.Д. Шашина | Method of drilling and development of offshoot from horizontal well (versions) |
CN110700878B (en) * | 2019-10-24 | 2020-10-27 | 中煤科工集团西安研究院有限公司 | Pumping screw pump drilling tool system for accumulated water in underground drilling hole of coal mine and construction method thereof |
RU2730688C1 (en) * | 2019-12-09 | 2020-08-25 | Федеральное государственное бюджетное учреждение науки Институт горного дела им. Н.А. Чинакала Сибирского отделения Российской академии наук | Method of directed hydraulic fracturing of coal bed |
CN111058891B (en) * | 2019-12-11 | 2021-06-04 | 煤炭科学技术研究院有限公司 | Method for replacing and extracting coal seam gas in underground and aboveground modes |
CN111236891A (en) * | 2020-02-25 | 2020-06-05 | 神华神东煤炭集团有限责任公司 | Coal bed gas extraction method |
CN112240165B (en) * | 2020-06-09 | 2022-10-25 | 冀中能源峰峰集团有限公司 | Target layer position tracking method for exploration and treatment of water damage area of coal mine |
CN111810084A (en) * | 2020-06-12 | 2020-10-23 | 煤科集团沈阳研究院有限公司 | Coal bed mesh gas extraction drilling construction method of water jet drilling machine |
CN111810085A (en) * | 2020-06-12 | 2020-10-23 | 煤科集团沈阳研究院有限公司 | Water jet drilling machine and coal seam feathery gas extraction drilling construction method |
CN111894672B (en) * | 2020-08-14 | 2021-11-23 | 山东科技大学 | Method for advanced treatment of roof separation water damage of stope by adopting ground drainage drilling |
CN112196611B (en) * | 2020-10-12 | 2022-07-12 | 重庆工程职业技术学院 | Gas drainage water-vapor separation device |
CN112211595B (en) * | 2020-10-20 | 2022-05-06 | 吕梁学院 | Construction method of coal-bed gas well at critical position |
CN112211644B (en) * | 2020-10-20 | 2022-04-05 | 吕梁学院 | Method for guaranteeing coal roadway driving of soft coal seam containing gas coal roadway strip |
CN112593911B (en) * | 2020-12-14 | 2022-05-17 | 山西晋城无烟煤矿业集团有限责任公司 | Coal mining and diameter expanding method by sectional power of horizontal well on coal mine ground |
CN112593912B (en) * | 2020-12-14 | 2022-05-17 | 山西晋城无烟煤矿业集团有限责任公司 | Coal bed gas horizontal well power expanding, pressure relief and permeability increase extraction method |
CN112832675A (en) * | 2021-01-08 | 2021-05-25 | 南方科技大学台州研究院 | Method for drilling small-aperture underground water monitoring well in gravel layer |
CN112727542A (en) * | 2021-01-12 | 2021-04-30 | 中国铁路设计集团有限公司 | Underground water comprehensive utilization system for tunnel in water-rich area and use method |
CN112796824B (en) * | 2021-03-08 | 2022-05-17 | 吕梁学院 | Slag discharging and water draining device for gas pipeline |
CN113464121B (en) * | 2021-05-12 | 2023-08-25 | 中煤科工集团西安研究院有限公司 | Method for determining gamma geosteering drilling track of azimuth while drilling |
CN113107591B (en) * | 2021-05-15 | 2022-11-29 | 枣庄矿业集团新安煤业有限公司 | Auxiliary drainage device for preventing and treating water in coal mine construction and drainage method thereof |
CN113279687B (en) * | 2021-06-07 | 2022-03-29 | 中国矿业大学 | Water damage detection and treatment integrated treatment method for old goaf of riverside coal mine |
WO2022261011A1 (en) * | 2021-06-08 | 2022-12-15 | Southwest Irrigation Llc | Systems, methods and apparatus for mine slope extraction |
RU2771371C1 (en) * | 2021-08-23 | 2022-05-04 | Публичное акционерное общество «Татнефть» имени В.Д. Шашина | Set of assemblies for increasing the filtration area of the bottomhole zone of an open horizontal well |
WO2023028336A1 (en) | 2021-08-26 | 2023-03-02 | Colorado School Of Mines | System and method for harvesting geothermal energy from a subterranean formation |
CN113623005B (en) * | 2021-09-06 | 2024-03-26 | 中煤科工集团沈阳研究院有限公司 | Mixed gas recognition method for coal seam group exploitation |
CN114320290B (en) * | 2021-11-24 | 2023-08-11 | 中煤科工集团西安研究院有限公司 | Full-hydraulic control system and control method for automatic rod-adding drilling machine for coal mine |
CN114198141B (en) * | 2022-02-16 | 2022-06-07 | 中煤昔阳能源有限责任公司白羊岭煤矿 | Fully-mechanized coal mining face short borehole rapid pressure relief extraction method |
CN114562331B (en) * | 2022-03-03 | 2023-04-11 | 中煤科工集团西安研究院有限公司 | Method for preventing and controlling old open water of integrated mine from being damaged by small kiln in same thick coal seam |
CN114737928B (en) * | 2022-06-13 | 2022-09-06 | 中煤科工集团西安研究院有限公司 | Nuclear learning-based coalbed methane intelligent drainage and mining method and system |
CN115450693B (en) * | 2022-08-17 | 2023-07-14 | 中煤科工西安研究院(集团)有限公司 | Large-drop deep-discharging method and system for steeply inclined aquifer |
CN116104567B (en) * | 2022-12-14 | 2023-07-18 | 中国矿业大学 | Comprehensive treatment method for underground coal mine mud-carrying sand water burst |
Family Cites Families (437)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US274740A (en) | 1883-03-27 | douglass | ||
US54144A (en) | 1866-04-24 | Improved mode of boring artesian wells | ||
FR964503A (en) | 1950-08-18 | |||
US526708A (en) | 1894-10-02 | Well-drilling apparatus | ||
US639036A (en) | 1899-08-21 | 1899-12-12 | Abner R Heald | Expansion-drill. |
US1189560A (en) | 1914-10-21 | 1916-07-04 | Georg Gondos | Rotary drill. |
US1285347A (en) | 1918-02-09 | 1918-11-19 | Albert Otto | Reamer for oil and gas bearing sand. |
US1485615A (en) | 1920-12-08 | 1924-03-04 | Arthur S Jones | Oil-well reamer |
US1467480A (en) | 1921-12-19 | 1923-09-11 | Petroleum Recovery Corp | Well reamer |
US1488106A (en) | 1923-02-05 | 1924-03-25 | Eagle Mfg Ass | Intake for oil-well pumps |
US1520737A (en) | 1924-04-26 | 1924-12-30 | Robert L Wright | Method of increasing oil extraction from oil-bearing strata |
US1777961A (en) | 1927-04-04 | 1930-10-07 | Capeliuschnicoff M Alcunovitch | Bore-hole apparatus |
US1674392A (en) | 1927-08-06 | 1928-06-19 | Flansburg Harold | Apparatus for excavating postholes |
GB442008A (en) | 1934-07-23 | 1936-01-23 | Leo Ranney | Method of and apparatus for recovering water from or supplying water to subterraneanformations |
GB444484A (en) | 1934-09-17 | 1936-03-17 | Leo Ranney | Process of removing gas from coal and other carbonaceous materials in situ |
US2018285A (en) | 1934-11-27 | 1935-10-22 | Schweitzer Reuben Richard | Method of well development |
US2069482A (en) | 1935-04-18 | 1937-02-02 | James I Seay | Well reamer |
US2150228A (en) | 1936-08-31 | 1939-03-14 | Luther F Lamb | Packer |
US2169718A (en) | 1937-04-01 | 1939-08-15 | Sprengund Tauchgesellschaft M | Hydraulic earth-boring apparatus |
US2335085A (en) | 1941-03-18 | 1943-11-23 | Colonnade Company | Valve construction |
US2490350A (en) | 1943-12-15 | 1949-12-06 | Claude C Taylor | Means for centralizing casing and the like in a well |
US2452654A (en) | 1944-06-09 | 1948-11-02 | Texaco Development Corp | Method of graveling wells |
US2450223A (en) | 1944-11-25 | 1948-09-28 | William R Barbour | Well reaming apparatus |
GB651468A (en) | 1947-08-07 | 1951-04-04 | Ranney Method Water Supplies I | Improvements in and relating to the abstraction of water from water bearing strata |
US2679903A (en) | 1949-11-23 | 1954-06-01 | Sid W Richardson Inc | Means for installing and removing flow valves or the like |
US2726847A (en) | 1952-03-31 | 1955-12-13 | Oilwell Drain Hole Drilling Co | Drain hole drilling equipment |
US2726063A (en) | 1952-05-10 | 1955-12-06 | Exxon Research Engineering Co | Method of drilling wells |
US2723063A (en) * | 1952-06-03 | 1955-11-08 | Carr Stanly | Garment hanger |
US2847189A (en) | 1953-01-08 | 1958-08-12 | Texas Co | Apparatus for reaming holes drilled in the earth |
US2780018A (en) | 1953-03-11 | 1957-02-05 | James R Bauserman | Vehicle license tag and tab construction |
US2797893A (en) | 1954-09-13 | 1957-07-02 | Oilwell Drain Hole Drilling Co | Drilling and lining of drain holes |
US2783018A (en) | 1955-02-11 | 1957-02-26 | Vac U Lift Company | Valve means for suction lifting devices |
US2934904A (en) | 1955-09-01 | 1960-05-03 | Phillips Petroleum Co | Dual storage caverns |
US2911008A (en) | 1956-04-09 | 1959-11-03 | Manning Maxwell & Moore Inc | Fluid flow control device |
US2868202A (en) * | 1956-09-24 | 1959-01-13 | Abe Okrend | Infant feeding device |
US2980142A (en) | 1958-09-08 | 1961-04-18 | Turak Anthony | Plural dispensing valve |
GB893869A (en) | 1960-09-21 | 1962-04-18 | Ranney Method International In | Improvements in or relating to wells |
US3208537A (en) | 1960-12-08 | 1965-09-28 | Reed Roller Bit Co | Method of drilling |
US3163211A (en) | 1961-06-05 | 1964-12-29 | Pan American Petroleum Corp | Method of conducting reservoir pilot tests with a single well |
US3135293A (en) | 1962-08-28 | 1964-06-02 | Robert L Erwin | Rotary control valve |
US3385382A (en) | 1964-07-08 | 1968-05-28 | Otis Eng Co | Method and apparatus for transporting fluids |
US3347595A (en) | 1965-05-03 | 1967-10-17 | Pittsburgh Plate Glass Co | Establishing communication between bore holes in solution mining |
US3406766A (en) * | 1966-07-07 | 1968-10-22 | Henderson John Keller | Method and devices for interconnecting subterranean boreholes |
FR1533221A (en) | 1967-01-06 | 1968-07-19 | Dba Sa | Digitally Controlled Flow Valve |
US3362475A (en) | 1967-01-11 | 1968-01-09 | Gulf Research Development Co | Method of gravel packing a well and product formed thereby |
US3443648A (en) | 1967-09-13 | 1969-05-13 | Fenix & Scisson Inc | Earth formation underreamer |
US3534822A (en) | 1967-10-02 | 1970-10-20 | Walker Neer Mfg Co | Well circulating device |
US3809519A (en) | 1967-12-15 | 1974-05-07 | Ici Ltd | Injection moulding machines |
US3578077A (en) | 1968-05-27 | 1971-05-11 | Mobil Oil Corp | Flow control system and method |
US3503377A (en) | 1968-07-30 | 1970-03-31 | Gen Motors Corp | Control valve |
US3528516A (en) | 1968-08-21 | 1970-09-15 | Cicero C Brown | Expansible underreamer for drilling large diameter earth bores |
US3530675A (en) | 1968-08-26 | 1970-09-29 | Lee A Turzillo | Method and means for stabilizing structural layer overlying earth materials in situ |
US3582138A (en) | 1969-04-24 | 1971-06-01 | Robert L Loofbourow | Toroid excavation system |
US3647230A (en) * | 1969-07-24 | 1972-03-07 | William L Smedley | Well pipe seal |
US3587743A (en) | 1970-03-17 | 1971-06-28 | Pan American Petroleum Corp | Explosively fracturing formations in wells |
USRE32623E (en) * | 1970-09-08 | 1988-03-15 | Shell Oil Company | Curved offshore well conductors |
US3687204A (en) | 1970-09-08 | 1972-08-29 | Shell Oil Co | Curved offshore well conductors |
US3684041A (en) | 1970-11-16 | 1972-08-15 | Baker Oil Tools Inc | Expansible rotary drill bit |
US3692041A (en) | 1971-01-04 | 1972-09-19 | Gen Electric | Variable flow distributor |
US3681011A (en) | 1971-01-19 | 1972-08-01 | Us Army | Cryo-coprecipitation method for production of ultrafine mixed metallic-oxide particles |
FI46651C (en) | 1971-01-22 | 1973-05-08 | Rinta | Ways to drive water-soluble liquids and gases to a small extent. |
US3744565A (en) | 1971-01-22 | 1973-07-10 | Cities Service Oil Co | Apparatus and process for the solution and heating of sulfur containing natural gas |
US3757876A (en) | 1971-09-01 | 1973-09-11 | Smith International | Drilling and belling apparatus |
US3859328A (en) * | 1971-11-03 | 1975-01-07 | Pfizer | 18 beta-glycyrrhetinic acid amides |
US3757877A (en) | 1971-12-30 | 1973-09-11 | Grant Oil Tool Co | Large diameter hole opener for earth boring |
US3759328A (en) | 1972-05-11 | 1973-09-18 | Shell Oil Co | Laterally expanding oil shale permeabilization |
US3828867A (en) | 1972-05-15 | 1974-08-13 | A Elwood | Low frequency drill bit apparatus and method of locating the position of the drill head below the surface of the earth |
US3902322A (en) | 1972-08-29 | 1975-09-02 | Hikoitsu Watanabe | Drain pipes for preventing landslides and method for driving the same |
US3800830A (en) | 1973-01-11 | 1974-04-02 | B Etter | Metering valve |
US3825081A (en) | 1973-03-08 | 1974-07-23 | H Mcmahon | Apparatus for slant hole directional drilling |
US3874413A (en) | 1973-04-09 | 1975-04-01 | Vals Construction | Multiported valve |
US3907045A (en) | 1973-11-30 | 1975-09-23 | Continental Oil Co | Guidance system for a horizontal drilling apparatus |
US3887008A (en) | 1974-03-21 | 1975-06-03 | Charles L Canfield | Downhole gas compression technique |
US4022279A (en) * | 1974-07-09 | 1977-05-10 | Driver W B | Formation conditioning process and system |
US3934649A (en) * | 1974-07-25 | 1976-01-27 | The United States Of America As Represented By The United States Energy Research And Development Administration | Method for removal of methane from coalbeds |
US3957082A (en) | 1974-09-26 | 1976-05-18 | Arbrook, Inc. | Six-way stopcock |
US3961824A (en) | 1974-10-21 | 1976-06-08 | Wouter Hugo Van Eek | Method and system for winning minerals |
SE386500B (en) | 1974-11-25 | 1976-08-09 | Sjumek Sjukvardsmek Hb | GAS MIXTURE VALVE |
US3952802A (en) * | 1974-12-11 | 1976-04-27 | In Situ Technology, Inc. | Method and apparatus for in situ gasification of coal and the commercial products derived therefrom |
SU750108A1 (en) * | 1975-06-26 | 1980-07-23 | Донецкий Ордена Трудового Красного Знамени Политехнический Институт | Method of degassing coal bed satellites |
US4037658A (en) | 1975-10-30 | 1977-07-26 | Chevron Research Company | Method of recovering viscous petroleum from an underground formation |
US4037351A (en) | 1975-12-15 | 1977-07-26 | Springer Charles H | Apparatus for attracting and electrocuting flies |
US4020901A (en) | 1976-01-19 | 1977-05-03 | Chevron Research Company | Arrangement for recovering viscous petroleum from thick tar sand |
US4030310A (en) | 1976-03-04 | 1977-06-21 | Sea-Log Corporation | Monopod drilling platform with directional drilling |
US4137975A (en) * | 1976-05-13 | 1979-02-06 | The British Petroleum Company Limited | Drilling method |
US4073351A (en) | 1976-06-10 | 1978-02-14 | Pei, Inc. | Burners for flame jet drill |
US4060130A (en) | 1976-06-28 | 1977-11-29 | Texaco Trinidad, Inc. | Cleanout procedure for well with low bottom hole pressure |
US4077481A (en) * | 1976-07-12 | 1978-03-07 | Fmc Corporation | Subterranean mining apparatus |
JPS5358105A (en) | 1976-11-08 | 1978-05-25 | Nippon Concrete Ind Co Ltd | Method of generating supporting force for middle excavation system |
US4089374A (en) | 1976-12-16 | 1978-05-16 | In Situ Technology, Inc. | Producing methane from coal in situ |
US4136996A (en) | 1977-05-23 | 1979-01-30 | Texaco Development Corporation | Directional drilling marine structure |
US4134463A (en) | 1977-06-22 | 1979-01-16 | Smith International, Inc. | Air lift system for large diameter borehole drilling |
US4169510A (en) | 1977-08-16 | 1979-10-02 | Phillips Petroleum Company | Drilling and belling apparatus |
US4151880A (en) | 1977-10-17 | 1979-05-01 | Peabody Vann | Vent assembly |
NL7713455A (en) | 1977-12-06 | 1979-06-08 | Stamicarbon | PROCEDURE FOR EXTRACTING CABBAGE IN SITU. |
US4160510A (en) | 1978-01-30 | 1979-07-10 | Rca Corporation | CRT with tension band adapted for pusher-type tensioning and method for producing same |
US4156437A (en) | 1978-02-21 | 1979-05-29 | The Perkin-Elmer Corporation | Computer controllable multi-port valve |
US4182423A (en) | 1978-03-02 | 1980-01-08 | Burton/Hawks Inc. | Whipstock and method for directional well drilling |
US4226475A (en) | 1978-04-19 | 1980-10-07 | Frosch Robert A | Underground mineral extraction |
NL7806559A (en) | 1978-06-19 | 1979-12-21 | Stamicarbon | DEVICE FOR MINERAL EXTRACTION THROUGH A BOREHOLE. |
US4221433A (en) | 1978-07-20 | 1980-09-09 | Occidental Minerals Corporation | Retrogressively in-situ ore body chemical mining system and method |
US4257650A (en) * | 1978-09-07 | 1981-03-24 | Barber Heavy Oil Process, Inc. | Method for recovering subsurface earth substances |
US4189184A (en) | 1978-10-13 | 1980-02-19 | Green Harold F | Rotary drilling and extracting process |
US4224989A (en) | 1978-10-30 | 1980-09-30 | Mobil Oil Corporation | Method of dynamically killing a well blowout |
FR2445483A1 (en) | 1978-12-28 | 1980-07-25 | Geostock | SAFETY METHOD AND DEVICE FOR UNDERGROUND LIQUEFIED GAS STORAGE |
US4366988A (en) | 1979-02-16 | 1983-01-04 | Bodine Albert G | Sonic apparatus and method for slurry well bore mining and production |
FR2452590A1 (en) | 1979-03-27 | 1980-10-24 | Snecma | REMOVABLE SEAL FOR TURBOMACHINE DISPENSER SEGMENT |
US4283088A (en) | 1979-05-14 | 1981-08-11 | Tabakov Vladimir P | Thermal--mining method of oil production |
US4296785A (en) | 1979-07-09 | 1981-10-27 | Mallinckrodt, Inc. | System for generating and containerizing radioisotopes |
US4222611A (en) | 1979-08-16 | 1980-09-16 | United States Of America As Represented By The Secretary Of The Interior | In-situ leach mining method using branched single well for input and output |
US4312377A (en) | 1979-08-29 | 1982-01-26 | Teledyne Adams, A Division Of Teledyne Isotopes, Inc. | Tubular valve device and method of assembly |
CA1140457A (en) | 1979-10-19 | 1983-02-01 | Noval Technologies Ltd. | Method for recovering methane from coal seams |
US4333539A (en) | 1979-12-31 | 1982-06-08 | Lyons William C | Method for extended straight line drilling from a curved borehole |
US4386665A (en) | 1980-01-14 | 1983-06-07 | Mobil Oil Corporation | Drilling technique for providing multiple-pass penetration of a mineral-bearing formation |
US4299295A (en) | 1980-02-08 | 1981-11-10 | Kerr-Mcgee Coal Corporation | Process for degasification of subterranean mineral deposits |
US4303127A (en) | 1980-02-11 | 1981-12-01 | Gulf Research & Development Company | Multistage clean-up of product gas from underground coal gasification |
SU876968A1 (en) | 1980-02-18 | 1981-10-30 | Всесоюзный Научно-Исследовательский Институт Использования Газов В Народном Хозяйстве И Подземного Хранения Нефти, Нефтепродуктов И Сжиженных Газов | Method of communicating wells in formations of soluble rock |
US4317492A (en) | 1980-02-26 | 1982-03-02 | The Curators Of The University Of Missouri | Method and apparatus for drilling horizontal holes in geological structures from a vertical bore |
US4296969A (en) | 1980-04-11 | 1981-10-27 | Exxon Production Research Company | Thermal recovery of viscous hydrocarbons using arrays of radially spaced horizontal wells |
US4328577A (en) | 1980-06-03 | 1982-05-04 | Rockwell International Corporation | Muldem automatically adjusting to system expansion and contraction |
US4372398A (en) | 1980-11-04 | 1983-02-08 | Cornell Research Foundation, Inc. | Method of determining the location of a deep-well casing by magnetic field sensing |
CH653741A5 (en) | 1980-11-10 | 1986-01-15 | Elektra Energy Ag | Method of extracting crude oil from oil shale or oil sand |
US4356866A (en) | 1980-12-31 | 1982-11-02 | Mobil Oil Corporation | Process of underground coal gasification |
JPS627747Y2 (en) | 1981-03-17 | 1987-02-23 | ||
US4390067A (en) | 1981-04-06 | 1983-06-28 | Exxon Production Research Co. | Method of treating reservoirs containing very viscous crude oil or bitumen |
US4396076A (en) | 1981-04-27 | 1983-08-02 | Hachiro Inoue | Under-reaming pile bore excavator |
US4396075A (en) | 1981-06-23 | 1983-08-02 | Wood Edward T | Multiple branch completion with common drilling and casing template |
US4397360A (en) | 1981-07-06 | 1983-08-09 | Atlantic Richfield Company | Method for forming drain holes from a cased well |
US4415205A (en) | 1981-07-10 | 1983-11-15 | Rehm William A | Triple branch completion with separate drilling and completion templates |
US4437706A (en) | 1981-08-03 | 1984-03-20 | Gulf Canada Limited | Hydraulic mining of tar sands with submerged jet erosion |
US4401171A (en) | 1981-12-10 | 1983-08-30 | Dresser Industries, Inc. | Underreamer with debris flushing flow path |
US4422505A (en) * | 1982-01-07 | 1983-12-27 | Atlantic Richfield Company | Method for gasifying subterranean coal deposits |
US4444896A (en) | 1982-05-05 | 1984-04-24 | Exxon Research And Engineering Co. | Reactivation of iridium-containing catalysts by halide pretreat and oxygen redispersion |
US4442896A (en) | 1982-07-21 | 1984-04-17 | Reale Lucio V | Treatment of underground beds |
US4527639A (en) | 1982-07-26 | 1985-07-09 | Bechtel National Corp. | Hydraulic piston-effect method and apparatus for forming a bore hole |
US4494010A (en) | 1982-08-09 | 1985-01-15 | Standum Controls, Inc. | Programmable power control apparatus responsive to load variations |
US4463988A (en) | 1982-09-07 | 1984-08-07 | Cities Service Co. | Horizontal heated plane process |
US4558744A (en) | 1982-09-14 | 1985-12-17 | Canocean Resources Ltd. | Subsea caisson and method of installing same |
US4452489A (en) * | 1982-09-20 | 1984-06-05 | Methane Drainage Ventures | Multiple level methane drainage shaft method |
US4458767A (en) | 1982-09-28 | 1984-07-10 | Mobil Oil Corporation | Method for directionally drilling a first well to intersect a second well |
US4715400A (en) | 1983-03-09 | 1987-12-29 | Xomox Corporation | Valve and method of making same |
JPS6058307A (en) | 1983-03-18 | 1985-04-04 | 株式会社太洋商会 | Molding automatic packing method of hanging section and device thereof |
FR2545006B1 (en) | 1983-04-27 | 1985-08-16 | Mancel Patrick | DEVICE FOR SPRAYING PRODUCTS, ESPECIALLY PAINTS |
US4532986A (en) | 1983-05-05 | 1985-08-06 | Texaco Inc. | Bitumen production and substrate stimulation with flow diverter means |
US4502733A (en) * | 1983-06-08 | 1985-03-05 | Tetra Systems, Inc. | Oil mining configuration |
US4512422A (en) | 1983-06-28 | 1985-04-23 | Rondel Knisley | Apparatus for drilling oil and gas wells and a torque arrestor associated therewith |
US4494616A (en) | 1983-07-18 | 1985-01-22 | Mckee George B | Apparatus and methods for the aeration of cesspools |
CA1210992A (en) | 1983-07-28 | 1986-09-09 | Quentin Siebold | Off-vertical pumping unit |
FR2551491B1 (en) * | 1983-08-31 | 1986-02-28 | Elf Aquitaine | MULTIDRAIN OIL DRILLING AND PRODUCTION DEVICE |
FR2557195B1 (en) | 1983-12-23 | 1986-05-02 | Inst Francais Du Petrole | METHOD FOR FORMING A FLUID BARRIER USING INCLINED DRAINS, ESPECIALLY IN AN OIL DEPOSIT |
US5168042A (en) | 1984-01-10 | 1992-12-01 | Ly Uy Vu | Instrumentless quantitative analysis system |
US4544037A (en) | 1984-02-21 | 1985-10-01 | In Situ Technology, Inc. | Initiating production of methane from wet coal beds |
US4565252A (en) | 1984-03-08 | 1986-01-21 | Lor, Inc. | Borehole operating tool with fluid circulation through arms |
US4519463A (en) * | 1984-03-19 | 1985-05-28 | Atlantic Richfield Company | Drainhole drilling |
US4605067A (en) * | 1984-03-26 | 1986-08-12 | Rejane M. Burton | Method and apparatus for completing well |
US4600061A (en) * | 1984-06-08 | 1986-07-15 | Methane Drainage Ventures | In-shaft drilling method for recovery of gas from subterranean formations |
US4536035A (en) | 1984-06-15 | 1985-08-20 | The United States Of America As Represented By The United States Department Of Energy | Hydraulic mining method |
US4605076A (en) * | 1984-08-03 | 1986-08-12 | Hydril Company | Method for forming boreholes |
US4646836A (en) * | 1984-08-03 | 1987-03-03 | Hydril Company | Tertiary recovery method using inverted deviated holes |
US4533182A (en) | 1984-08-03 | 1985-08-06 | Methane Drainage Ventures | Process for production of oil and gas through horizontal drainholes from underground workings |
US4753485A (en) * | 1984-08-03 | 1988-06-28 | Hydril Company | Solution mining |
US4618009A (en) | 1984-08-08 | 1986-10-21 | Homco International Inc. | Reaming tool |
US4773488A (en) | 1984-08-08 | 1988-09-27 | Atlantic Richfield Company | Development well drilling |
US4599172A (en) | 1984-12-24 | 1986-07-08 | Gardes Robert A | Flow line filter apparatus |
BE901892A (en) | 1985-03-07 | 1985-07-01 | Institution Pour Le Dev De La | NEW PROCESS FOR CONTROLLED RETRACTION OF THE GAS-INJECTING INJECTION POINT IN SUBTERRANEAN COAL GASIFICATION SITES. |
US4674579A (en) | 1985-03-07 | 1987-06-23 | Flowmole Corporation | Method and apparatus for installment of underground utilities |
AU580813B2 (en) * | 1985-05-17 | 1989-02-02 | Methtec Incorporated. | A method of mining coal and removing methane gas from an underground formation |
GB2178088B (en) | 1985-07-25 | 1988-11-09 | Gearhart Tesel Ltd | Improvements in downhole tools |
US4676313A (en) | 1985-10-30 | 1987-06-30 | Rinaldi Roger E | Controlled reservoir production |
US4763734A (en) | 1985-12-23 | 1988-08-16 | Ben W. O. Dickinson | Earth drilling method and apparatus using multiple hydraulic forces |
US4702314A (en) | 1986-03-03 | 1987-10-27 | Texaco Inc. | Patterns of horizontal and vertical wells for improving oil recovery efficiency |
US4651836A (en) * | 1986-04-01 | 1987-03-24 | Methane Drainage Ventures | Process for recovering methane gas from subterranean coalseams |
FR2596803B1 (en) | 1986-04-02 | 1988-06-24 | Elf Aquitaine | SIMULTANEOUS DRILLING AND TUBING DEVICE |
US4754808A (en) | 1986-06-20 | 1988-07-05 | Conoco Inc. | Methods for obtaining well-to-well flow communication |
US4662440A (en) | 1986-06-20 | 1987-05-05 | Conoco Inc. | Methods for obtaining well-to-well flow communication |
EP0251881B1 (en) | 1986-06-26 | 1992-04-29 | Institut Français du Pétrole | Enhanced recovery method to continually produce a fluid contained in a geological formation |
US4727937A (en) * | 1986-10-02 | 1988-03-01 | Texaco Inc. | Steamflood process employing horizontal and vertical wells |
US4718485A (en) * | 1986-10-02 | 1988-01-12 | Texaco Inc. | Patterns having horizontal and vertical wells |
US4754819A (en) | 1987-03-11 | 1988-07-05 | Mobil Oil Corporation | Method for improving cuttings transport during the rotary drilling of a wellbore |
SU1448078A1 (en) * | 1987-03-25 | 1988-12-30 | Московский Горный Институт | Method of degassing a coal-rock mass portion |
US4889186A (en) | 1988-04-25 | 1989-12-26 | Comdisco Resources, Inc. | Overlapping horizontal fracture formation and flooding process |
US4756367A (en) | 1987-04-28 | 1988-07-12 | Amoco Corporation | Method for producing natural gas from a coal seam |
US4889199A (en) | 1987-05-27 | 1989-12-26 | Lee Paul B | Downhole valve for use when drilling an oil or gas well |
US4776638A (en) * | 1987-07-13 | 1988-10-11 | University Of Kentucky Research Foundation | Method and apparatus for conversion of coal in situ |
US4842061A (en) | 1988-02-05 | 1989-06-27 | Vetco Gray Inc. | Casing hanger packoff with C-shaped metal seal |
US4830105A (en) | 1988-02-08 | 1989-05-16 | Atlantic Richfield Company | Centralizer for wellbore apparatus |
JPH01238236A (en) | 1988-03-18 | 1989-09-22 | Hitachi Ltd | Optical subscriber transmitting system |
US4852666A (en) | 1988-04-07 | 1989-08-01 | Brunet Charles G | Apparatus for and a method of drilling offset wells for producing hydrocarbons |
US4836611A (en) | 1988-05-09 | 1989-06-06 | Consolidation Coal Company | Method and apparatus for drilling and separating |
FR2632350B1 (en) | 1988-06-03 | 1990-09-14 | Inst Francais Du Petrole | ASSISTED RECOVERY OF HEAVY HYDROCARBONS FROM A SUBTERRANEAN WELLBORE FORMATION HAVING A PORTION WITH SUBSTANTIALLY HORIZONTAL AREA |
US4844182A (en) | 1988-06-07 | 1989-07-04 | Mobil Oil Corporation | Method for improving drill cuttings transport from a wellbore |
NO169399C (en) | 1988-06-27 | 1992-06-17 | Noco As | DEVICE FOR DRILLING HOLES IN GROUND GROUPS |
US4832122A (en) | 1988-08-25 | 1989-05-23 | The United States Of America As Represented By The United States Department Of Energy | In-situ remediation system and method for contaminated groundwater |
US5185133A (en) * | 1988-08-23 | 1993-02-09 | Gte Products Corporation | Method for producing fine size yellow molybdenum trioxide powder |
US4883122A (en) | 1988-09-27 | 1989-11-28 | Amoco Corporation | Method of coalbed methane production |
US4947935A (en) * | 1989-07-14 | 1990-08-14 | Marathon Oil Company | Kill fluid for oil field operations |
US5201617A (en) | 1989-10-04 | 1993-04-13 | Societe Nationale D'etude Et De Construction De Moteurs D'aviation S.N.E.C.M.A. | Apparatus for supporting a machine tool on a robot arm |
US4978172A (en) | 1989-10-26 | 1990-12-18 | Resource Enterprises, Inc. | Gob methane drainage system |
JP2692316B2 (en) | 1989-11-20 | 1997-12-17 | 日本電気株式会社 | Wavelength division optical switch |
CA2009782A1 (en) | 1990-02-12 | 1991-08-12 | Anoosh I. Kiamanesh | In-situ tuned microwave oil extraction process |
US5035605A (en) | 1990-02-16 | 1991-07-30 | Cincinnati Milacron Inc. | Nozzle shut-off valve for an injection molding machine |
GB9003758D0 (en) | 1990-02-20 | 1990-04-18 | Shell Int Research | Method and well system for producing hydrocarbons |
NL9000426A (en) * | 1990-02-22 | 1991-09-16 | Maria Johanna Francien Voskamp | METHOD AND SYSTEM FOR UNDERGROUND GASIFICATION OF STONE OR BROWN. |
US5106710A (en) | 1990-03-01 | 1992-04-21 | Minnesota Mining And Manufacturing Company | Receptor sheet for a toner developed electrostatic imaging process |
JP2819042B2 (en) | 1990-03-08 | 1998-10-30 | 株式会社小松製作所 | Underground excavator position detector |
SU1709076A1 (en) | 1990-03-22 | 1992-01-30 | Всесоюзный научно-исследовательский институт гидрогеологии и инженерной геологии | Method of filtration well completion |
US5033550A (en) | 1990-04-16 | 1991-07-23 | Otis Engineering Corporation | Well production method |
US5135058A (en) | 1990-04-26 | 1992-08-04 | Millgard Environmental Corporation | Crane-mounted drill and method for in-situ treatment of contaminated soil |
US5148877A (en) | 1990-05-09 | 1992-09-22 | Macgregor Donald C | Apparatus for lateral drain hole drilling in oil and gas wells |
US5194859A (en) | 1990-06-15 | 1993-03-16 | Amoco Corporation | Apparatus and method for positioning a tool in a deviated section of a borehole |
US5074366A (en) | 1990-06-21 | 1991-12-24 | Baker Hughes Incorporated | Method and apparatus for horizontal drilling |
US5040601A (en) * | 1990-06-21 | 1991-08-20 | Baker Hughes Incorporated | Horizontal well bore system |
US5148875A (en) | 1990-06-21 | 1992-09-22 | Baker Hughes Incorporated | Method and apparatus for horizontal drilling |
US5036921A (en) | 1990-06-28 | 1991-08-06 | Slimdril International, Inc. | Underreamer with sequentially expandable cutter blades |
US5074360A (en) | 1990-07-10 | 1991-12-24 | Guinn Jerry H | Method for repoducing hydrocarbons from low-pressure reservoirs |
US5074365A (en) | 1990-09-14 | 1991-12-24 | Vector Magnetics, Inc. | Borehole guidance system having target wireline |
US5115872A (en) | 1990-10-19 | 1992-05-26 | Anglo Suisse, Inc. | Directional drilling system and method for drilling precise offset wellbores from a main wellbore |
US5217076A (en) * | 1990-12-04 | 1993-06-08 | Masek John A | Method and apparatus for improved recovery of oil from porous, subsurface deposits (targevcir oricess) |
CA2066912C (en) | 1991-04-24 | 1997-04-01 | Ketankumar K. Sheth | Submersible well pump gas separator |
US5197783A (en) | 1991-04-29 | 1993-03-30 | Esso Resources Canada Ltd. | Extendable/erectable arm assembly and method of borehole mining |
US5165491A (en) | 1991-04-29 | 1992-11-24 | Prideco, Inc. | Method of horizontal drilling |
US5664911A (en) | 1991-05-03 | 1997-09-09 | Iit Research Institute | Method and apparatus for in situ decontamination of a site contaminated with a volatile material |
US5246273A (en) | 1991-05-13 | 1993-09-21 | Rosar Edward C | Method and apparatus for solution mining |
US5193620A (en) | 1991-08-05 | 1993-03-16 | Tiw Corporation | Whipstock setting method and apparatus |
US5197553A (en) | 1991-08-14 | 1993-03-30 | Atlantic Richfield Company | Drilling with casing and retrievable drill bit |
US5271472A (en) | 1991-08-14 | 1993-12-21 | Atlantic Richfield Company | Drilling with casing and retrievable drill bit |
US5174374A (en) | 1991-10-17 | 1992-12-29 | Hailey Charles D | Clean-out tool cutting blade |
US5199496A (en) | 1991-10-18 | 1993-04-06 | Texaco, Inc. | Subsea pumping device incorporating a wellhead aspirator |
US5168942A (en) | 1991-10-21 | 1992-12-08 | Atlantic Richfield Company | Resistivity measurement system for drilling with casing |
US5207271A (en) | 1991-10-30 | 1993-05-04 | Mobil Oil Corporation | Foam/steam injection into a horizontal wellbore for multiple fracture creation |
US5255741A (en) | 1991-12-11 | 1993-10-26 | Mobil Oil Corporation | Process and apparatus for completing a well in an unconsolidated formation |
US5201817A (en) | 1991-12-27 | 1993-04-13 | Hailey Charles D | Downhole cutting tool |
US5242017A (en) | 1991-12-27 | 1993-09-07 | Hailey Charles D | Cutter blades for rotary tubing tools |
US5226495A (en) | 1992-05-18 | 1993-07-13 | Mobil Oil Corporation | Fines control in deviated wells |
US5289888A (en) * | 1992-05-26 | 1994-03-01 | Rrkt Company | Water well completion method |
FR2692315B1 (en) | 1992-06-12 | 1994-09-02 | Inst Francais Du Petrole | System and method for drilling and equipping a lateral well, application to the exploitation of oil fields. |
US5242025A (en) | 1992-06-30 | 1993-09-07 | Union Oil Company Of California | Guided oscillatory well path drilling by seismic imaging |
US5477923A (en) | 1992-08-07 | 1995-12-26 | Baker Hughes Incorporated | Wellbore completion using measurement-while-drilling techniques |
US5474131A (en) | 1992-08-07 | 1995-12-12 | Baker Hughes Incorporated | Method for completing multi-lateral wells and maintaining selective re-entry into laterals |
GB2297988B (en) | 1992-08-07 | 1997-01-22 | Baker Hughes Inc | Method & apparatus for locating & re-entering one or more horizontal wells using whipstocks |
US5655602A (en) * | 1992-08-28 | 1997-08-12 | Marathon Oil Company | Apparatus and process for drilling and completing multiple wells |
US5301760C1 (en) | 1992-09-10 | 2002-06-11 | Natural Reserve Group Inc | Completing horizontal drain holes from a vertical well |
US5343965A (en) | 1992-10-19 | 1994-09-06 | Talley Robert R | Apparatus and methods for horizontal completion of a water well |
US5355967A (en) * | 1992-10-30 | 1994-10-18 | Union Oil Company Of California | Underbalance jet pump drilling method |
US5485089A (en) | 1992-11-06 | 1996-01-16 | Vector Magnetics, Inc. | Method and apparatus for measuring distance and direction by movable magnetic field source |
US5462120A (en) | 1993-01-04 | 1995-10-31 | S-Cal Research Corp. | Downhole equipment, tools and assembly procedures for the drilling, tie-in and completion of vertical cased oil wells connected to liner-equipped multiple drainholes |
US5469155A (en) | 1993-01-27 | 1995-11-21 | Mclaughlin Manufacturing Company, Inc. | Wireless remote boring apparatus guidance system |
CA2158637A1 (en) * | 1993-03-17 | 1994-09-29 | John North | Improvements in or relating to drilling and the extraction of fluids |
FR2703407B1 (en) | 1993-03-29 | 1995-05-12 | Inst Francais Du Petrole | Pumping device and method comprising two suction inlets applied to a subhorizontal drain. |
US5402851A (en) | 1993-05-03 | 1995-04-04 | Baiton; Nick | Horizontal drilling method for hydrocarbon recovery |
US5450902A (en) | 1993-05-14 | 1995-09-19 | Matthews; Cameron M. | Method and apparatus for producing and drilling a well |
US5394950A (en) | 1993-05-21 | 1995-03-07 | Gardes; Robert A. | Method of drilling multiple radial wells using multiple string downhole orientation |
DE4323580C1 (en) * | 1993-07-14 | 1995-03-23 | Elias Lebessis | Tear tool |
US5411088A (en) | 1993-08-06 | 1995-05-02 | Baker Hughes Incorporated | Filter with gas separator for electric setting tool |
US5727629A (en) | 1996-01-24 | 1998-03-17 | Weatherford/Lamb, Inc. | Wellbore milling guide and method |
US6209636B1 (en) * | 1993-09-10 | 2001-04-03 | Weatherford/Lamb, Inc. | Wellbore primary barrier and related systems |
US5363927A (en) | 1993-09-27 | 1994-11-15 | Frank Robert C | Apparatus and method for hydraulic drilling |
US5853056A (en) | 1993-10-01 | 1998-12-29 | Landers; Carl W. | Method of and apparatus for horizontal well drilling |
US5385205A (en) | 1993-10-04 | 1995-01-31 | Hailey; Charles D. | Dual mode rotary cutting tool |
US5431482A (en) * | 1993-10-13 | 1995-07-11 | Sandia Corporation | Horizontal natural gas storage caverns and methods for producing same |
US5501173A (en) | 1993-10-18 | 1996-03-26 | Westinghouse Electric Corporation | Method for epitaxially growing α-silicon carbide on a-axis α-silicon carbide substrates |
US5411085A (en) | 1993-11-01 | 1995-05-02 | Camco International Inc. | Spoolable coiled tubing completion system |
US5411082A (en) | 1994-01-26 | 1995-05-02 | Baker Hughes Incorporated | Scoophead running tool |
US5411104A (en) | 1994-02-16 | 1995-05-02 | Conoco Inc. | Coalbed methane drilling |
US5454410A (en) | 1994-03-15 | 1995-10-03 | Edfors; John E. | Apparatus for rough-splitting planks |
US5431220A (en) | 1994-03-24 | 1995-07-11 | Smith International, Inc. | Whipstock starter mill assembly |
US5658347A (en) | 1994-04-25 | 1997-08-19 | Sarkisian; James S. | Acetabular cup with keel |
US5494121A (en) | 1994-04-28 | 1996-02-27 | Nackerud; Alan L. | Cavern well completion method and apparatus |
US5435400B1 (en) * | 1994-05-25 | 1999-06-01 | Atlantic Richfield Co | Lateral well drilling |
ZA954157B (en) | 1994-05-27 | 1996-04-15 | Seec Inc | Method for recycling carbon dioxide for enhancing plant growth |
US5411105A (en) | 1994-06-14 | 1995-05-02 | Kidco Resources Ltd. | Drilling a well gas supply in the drilling liquid |
US5733067A (en) | 1994-07-11 | 1998-03-31 | Foremost Solutions, Inc | Method and system for bioremediation of contaminated soil using inoculated support spheres |
US5564503A (en) | 1994-08-26 | 1996-10-15 | Halliburton Company | Methods and systems for subterranean multilateral well drilling and completion |
US5454419A (en) | 1994-09-19 | 1995-10-03 | Polybore, Inc. | Method for lining a casing |
US5501273A (en) | 1994-10-04 | 1996-03-26 | Amoco Corporation | Method for determining the reservoir properties of a solid carbonaceous subterranean formation |
US5540282A (en) | 1994-10-21 | 1996-07-30 | Dallas; L. Murray | Apparatus and method for completing/recompleting production wells |
US5462116A (en) * | 1994-10-26 | 1995-10-31 | Carroll; Walter D. | Method of producing methane gas from a coal seam |
ATE181137T1 (en) | 1994-10-31 | 1999-06-15 | Red Baron Oil Tools Rental | TWO-STAGE ROOM |
US5659347A (en) | 1994-11-14 | 1997-08-19 | Xerox Corporation | Ink supply apparatus |
US5613242A (en) * | 1994-12-06 | 1997-03-18 | Oddo; John E. | Method and system for disposing of radioactive solid waste |
US5586609A (en) * | 1994-12-15 | 1996-12-24 | Telejet Technologies, Inc. | Method and apparatus for drilling with high-pressure, reduced solid content liquid |
US5852505A (en) | 1994-12-28 | 1998-12-22 | Lucent Technologies Inc. | Dense waveguide division multiplexers implemented using a first stage fourier filter |
US5501279A (en) | 1995-01-12 | 1996-03-26 | Amoco Corporation | Apparatus and method for removing production-inhibiting liquid from a wellbore |
US5732776A (en) * | 1995-02-09 | 1998-03-31 | Baker Hughes Incorporated | Downhole production well control system and method |
GB9505652D0 (en) | 1995-03-21 | 1995-05-10 | Radiodetection Ltd | Locating objects |
US5868210A (en) * | 1995-03-27 | 1999-02-09 | Baker Hughes Incorporated | Multi-lateral wellbore systems and methods for forming same |
US6581455B1 (en) | 1995-03-31 | 2003-06-24 | Baker Hughes Incorporated | Modified formation testing apparatus with borehole grippers and method of formation testing |
US5653286A (en) | 1995-05-12 | 1997-08-05 | Mccoy; James N. | Downhole gas separator |
CN1062330C (en) * | 1995-05-25 | 2001-02-21 | 中国矿业大学 | Propulsion air-feeding type coal underground gasifying furnace |
US5584605A (en) | 1995-06-29 | 1996-12-17 | Beard; Barry C. | Enhanced in situ hydrocarbon removal from soil and groundwater |
CN2248254Y (en) | 1995-08-09 | 1997-02-26 | 封长旺 | Soft-axis deep well pump |
US5706871A (en) | 1995-08-15 | 1998-01-13 | Dresser Industries, Inc. | Fluid control apparatus and method |
BR9610373A (en) | 1995-08-22 | 1999-12-21 | Western Well Toll Inc | Traction-thrust hole tool |
US5785133A (en) | 1995-08-29 | 1998-07-28 | Tiw Corporation | Multiple lateral hydrocarbon recovery system and method |
US5697445A (en) | 1995-09-27 | 1997-12-16 | Natural Reserves Group, Inc. | Method and apparatus for selective horizontal well re-entry using retrievable diverter oriented by logging means |
JPH09116492A (en) | 1995-10-18 | 1997-05-02 | Nec Corp | Wavelength multiplex light amplifying/repeating method/ device |
AUPN703195A0 (en) * | 1995-12-08 | 1996-01-04 | Bhp Australia Coal Pty Ltd | Fluid drilling system |
US5680901A (en) | 1995-12-14 | 1997-10-28 | Gardes; Robert | Radial tie back assembly for directional drilling |
US5914798A (en) | 1995-12-29 | 1999-06-22 | Mci Communications Corporation | Restoration systems for an optical telecommunications network |
US5941308A (en) | 1996-01-26 | 1999-08-24 | Schlumberger Technology Corporation | Flow segregator for multi-drain well completion |
US5669444A (en) | 1996-01-31 | 1997-09-23 | Vastar Resources, Inc. | Chemically induced stimulation of coal cleat formation |
US6065550A (en) | 1996-02-01 | 2000-05-23 | Gardes; Robert | Method and system for drilling and completing underbalanced multilateral wells utilizing a dual string technique in a live well |
US5720356A (en) | 1996-02-01 | 1998-02-24 | Gardes; Robert | Method and system for drilling underbalanced radial wells utilizing a dual string technique in a live well |
US7185718B2 (en) | 1996-02-01 | 2007-03-06 | Robert Gardes | Method and system for hydraulic friction controlled drilling and completing geopressured wells utilizing concentric drill strings |
US6457540B2 (en) * | 1996-02-01 | 2002-10-01 | Robert Gardes | Method and system for hydraulic friction controlled drilling and completing geopressured wells utilizing concentric drill strings |
US5944107A (en) | 1996-03-11 | 1999-08-31 | Schlumberger Technology Corporation | Method and apparatus for establishing branch wells at a node of a parent well |
US6283216B1 (en) | 1996-03-11 | 2001-09-04 | Schlumberger Technology Corporation | Apparatus and method for establishing branch wells from a parent well |
US6056059A (en) | 1996-03-11 | 2000-05-02 | Schlumberger Technology Corporation | Apparatus and method for establishing branch wells from a parent well |
US6564867B2 (en) | 1996-03-13 | 2003-05-20 | Schlumberger Technology Corporation | Method and apparatus for cementing branch wells from a parent well |
US5775433A (en) | 1996-04-03 | 1998-07-07 | Halliburton Company | Coiled tubing pulling tool |
US5690390A (en) | 1996-04-19 | 1997-11-25 | Fmc Corporation | Process for solution mining underground evaporite ore formations such as trona |
GB2347159B (en) | 1996-05-01 | 2000-11-22 | Baker Hughes Inc | Methods of recovering hydrocarbons from a producing zone |
US6547006B1 (en) * | 1996-05-02 | 2003-04-15 | Weatherford/Lamb, Inc. | Wellbore liner system |
US5676207A (en) | 1996-05-20 | 1997-10-14 | Simon; Philip B. | Soil vapor extraction system |
US5771976A (en) | 1996-06-19 | 1998-06-30 | Talley; Robert R. | Enhanced production rate water well system |
FR2751374B1 (en) * | 1996-07-19 | 1998-10-16 | Gaz De France | PROCESS FOR EXCAVATING A CAVITY IN A LOW-THICKNESS SALT MINE |
US5957539A (en) | 1996-07-19 | 1999-09-28 | Gaz De France (G.D.F.) Service National | Process for excavating a cavity in a thin salt layer |
US6015012A (en) * | 1996-08-30 | 2000-01-18 | Camco International Inc. | In-situ polymerization method and apparatus to seal a junction between a lateral and a main wellbore |
WO1998015712A2 (en) | 1996-10-08 | 1998-04-16 | Baker Hughes Incorporated | Method of forming wellbores from a main wellbore |
US6012520A (en) | 1996-10-11 | 2000-01-11 | Yu; Andrew | Hydrocarbon recovery methods by creating high-permeability webs |
US5775443A (en) | 1996-10-15 | 1998-07-07 | Nozzle Technology, Inc. | Jet pump drilling apparatus and method |
US5879057A (en) | 1996-11-12 | 1999-03-09 | Amvest Corporation | Horizontal remote mining system, and method |
US6089322A (en) | 1996-12-02 | 2000-07-18 | Kelley & Sons Group International, Inc. | Method and apparatus for increasing fluid recovery from a subterranean formation |
US5867289A (en) | 1996-12-24 | 1999-02-02 | International Business Machines Corporation | Fault detection for all-optical add-drop multiplexer |
RU2097536C1 (en) | 1997-01-05 | 1997-11-27 | Открытое акционерное общество "Удмуртнефть" | Method of developing irregular multiple-zone oil deposit |
US5853224A (en) | 1997-01-22 | 1998-12-29 | Vastar Resources, Inc. | Method for completing a well in a coal formation |
US5863283A (en) | 1997-02-10 | 1999-01-26 | Gardes; Robert | System and process for disposing of nuclear and other hazardous wastes in boreholes |
US5871260A (en) | 1997-02-11 | 1999-02-16 | Delli-Gatti, Jr.; Frank A. | Mining ultra thin coal seams |
US5845710A (en) | 1997-02-13 | 1998-12-08 | Halliburton Energy Services, Inc. | Methods of completing a subterranean well |
US5884704A (en) | 1997-02-13 | 1999-03-23 | Halliburton Energy Services, Inc. | Methods of completing a subterranean well and associated apparatus |
US5938004A (en) | 1997-02-14 | 1999-08-17 | Consol, Inc. | Method of providing temporary support for an extended conveyor belt |
US6019173A (en) * | 1997-04-04 | 2000-02-01 | Dresser Industries, Inc. | Multilateral whipstock and tools for installing and retrieving |
EP0875661A1 (en) * | 1997-04-28 | 1998-11-04 | Shell Internationale Researchmaatschappij B.V. | Method for moving equipment in a well system |
US6030048A (en) * | 1997-05-07 | 2000-02-29 | Tarim Associates For Scientific Mineral And Oil Exploration Ag. | In-situ chemical reactor for recovery of metals or purification of salts |
US20020043404A1 (en) * | 1997-06-06 | 2002-04-18 | Robert Trueman | Erectable arm assembly for use in boreholes |
US5832958A (en) | 1997-09-04 | 1998-11-10 | Cheng; Tsan-Hsiung | Faucet |
TW411471B (en) | 1997-09-17 | 2000-11-11 | Siemens Ag | Memory-cell device |
US5868202A (en) | 1997-09-22 | 1999-02-09 | Tarim Associates For Scientific Mineral And Oil Exploration Ag | Hydrologic cells for recovery of hydrocarbons or thermal energy from coal, oil-shale, tar-sands and oil-bearing formations |
US6244340B1 (en) | 1997-09-24 | 2001-06-12 | Halliburton Energy Services, Inc. | Self-locating reentry system for downhole well completions |
US6050335A (en) | 1997-10-31 | 2000-04-18 | Shell Oil Company | In-situ production of bitumen |
US5988278A (en) | 1997-12-02 | 1999-11-23 | Atlantic Richfield Company | Using a horizontal circular wellbore to improve oil recovery |
US5934390A (en) | 1997-12-23 | 1999-08-10 | Uthe; Michael | Horizontal drilling for oil recovery |
US6062306A (en) | 1998-01-27 | 2000-05-16 | Halliburton Energy Services, Inc. | Sealed lateral wellbore junction assembled downhole |
US6119771A (en) | 1998-01-27 | 2000-09-19 | Halliburton Energy Services, Inc. | Sealed lateral wellbore junction assembled downhole |
US6119776A (en) | 1998-02-12 | 2000-09-19 | Halliburton Energy Services, Inc. | Methods of stimulating and producing multiple stratified reservoirs |
US6024171A (en) * | 1998-03-12 | 2000-02-15 | Vastar Resources, Inc. | Method for stimulating a wellbore penetrating a solid carbonaceous subterranean formation |
EP0952300B1 (en) * | 1998-03-27 | 2006-10-25 | Cooper Cameron Corporation | Method and apparatus for drilling a plurality of offshore underwater wells |
US6065551A (en) | 1998-04-17 | 2000-05-23 | G & G Gas, Inc. | Method and apparatus for rotary mining |
US6263965B1 (en) | 1998-05-27 | 2001-07-24 | Tecmark International | Multiple drain method for recovering oil from tar sand |
US6135208A (en) | 1998-05-28 | 2000-10-24 | Halliburton Energy Services, Inc. | Expandable wellbore junction |
US6244338B1 (en) | 1998-06-23 | 2001-06-12 | The University Of Wyoming Research Corp., | System for improving coalbed gas production |
US6179054B1 (en) * | 1998-07-31 | 2001-01-30 | Robert G Stewart | Down hole gas separator |
RU2136566C1 (en) | 1998-08-07 | 1999-09-10 | Предприятие "Кубаньгазпром" | Method of building and operation of underground gas storage in sandwich-type nonuniform low penetration slightly cemented terrigenous reservoirs with underlaying water-bearing stratum |
GB2342670B (en) * | 1998-09-28 | 2003-03-26 | Camco Int | High gas/liquid ratio electric submergible pumping system utilizing a jet pump |
US6892816B2 (en) | 1998-11-17 | 2005-05-17 | Schlumberger Technology Corporation | Method and apparatus for selective injection or flow control with through-tubing operation capacity |
US6454000B1 (en) | 1999-11-19 | 2002-09-24 | Cdx Gas, Llc | Cavity well positioning system and method |
US6681855B2 (en) * | 2001-10-19 | 2004-01-27 | Cdx Gas, L.L.C. | Method and system for management of by-products from subterranean zones |
US20040035582A1 (en) * | 2002-08-22 | 2004-02-26 | Zupanick Joseph A. | System and method for subterranean access |
US8376052B2 (en) | 1998-11-20 | 2013-02-19 | Vitruvian Exploration, Llc | Method and system for surface production of gas from a subterranean zone |
US6708764B2 (en) * | 2002-07-12 | 2004-03-23 | Cdx Gas, L.L.C. | Undulating well bore |
US7073595B2 (en) | 2002-09-12 | 2006-07-11 | Cdx Gas, Llc | Method and system for controlling pressure in a dual well system |
US7025154B2 (en) * | 1998-11-20 | 2006-04-11 | Cdx Gas, Llc | Method and system for circulating fluid in a well system |
US8297377B2 (en) | 1998-11-20 | 2012-10-30 | Vitruvian Exploration, Llc | Method and system for accessing subterranean deposits from the surface and tools therefor |
US6280000B1 (en) * | 1998-11-20 | 2001-08-28 | Joseph A. Zupanick | Method for production of gas from a coal seam using intersecting well bores |
US6679322B1 (en) | 1998-11-20 | 2004-01-20 | Cdx Gas, Llc | Method and system for accessing subterranean deposits from the surface |
US7048049B2 (en) | 2001-10-30 | 2006-05-23 | Cdx Gas, Llc | Slant entry well system and method |
US6425448B1 (en) | 2001-01-30 | 2002-07-30 | Cdx Gas, L.L.P. | Method and system for accessing subterranean zones from a limited surface area |
US6988548B2 (en) * | 2002-10-03 | 2006-01-24 | Cdx Gas, Llc | Method and system for removing fluid from a subterranean zone using an enlarged cavity |
US6662870B1 (en) * | 2001-01-30 | 2003-12-16 | Cdx Gas, L.L.C. | Method and system for accessing subterranean deposits from a limited surface area |
US6598686B1 (en) | 1998-11-20 | 2003-07-29 | Cdx Gas, Llc | Method and system for enhanced access to a subterranean zone |
US6250391B1 (en) | 1999-01-29 | 2001-06-26 | Glenn C. Proudfoot | Producing hydrocarbons from well with underground reservoir |
MY120832A (en) | 1999-02-01 | 2005-11-30 | Shell Int Research | Multilateral well and electrical transmission system |
RU2176311C2 (en) | 1999-08-16 | 2001-11-27 | ОАО "Томскгазпром" | Method of development of gas condensate-oil deposit |
DE19939262C1 (en) | 1999-08-19 | 2000-11-09 | Becfield Drilling Services Gmb | Borehole measuring device uses stator and cooperating rotor for providing coded pressure pulses for transmission of measured values to surface via borehole rinsing fluid |
US6199633B1 (en) * | 1999-08-27 | 2001-03-13 | James R. Longbottom | Method and apparatus for intersecting downhole wellbore casings |
US6223839B1 (en) * | 1999-08-30 | 2001-05-01 | Phillips Petroleum Company | Hydraulic underreamer and sections for use therein |
US7096976B2 (en) | 1999-11-05 | 2006-08-29 | Halliburton Energy Services, Inc. | Drilling formation tester, apparatus and methods of testing and monitoring status of tester |
CA2393406C (en) | 1999-12-14 | 2008-11-25 | Shell Canada Limited | System for producing de-watered oil |
UA37720A (en) | 2000-04-07 | 2001-05-15 | Інститут геотехнічної механіки НАН України | Method for degassing extraction section of mine |
NO312312B1 (en) * | 2000-05-03 | 2002-04-22 | Psl Pipeline Process Excavatio | Device by well pump |
CA2415278A1 (en) | 2000-05-16 | 2001-11-22 | Omega Oil Company | Method and apparatus for hydrocarbon subterranean recovery |
RU2179234C1 (en) | 2000-05-19 | 2002-02-10 | Открытое акционерное общество "Татнефть" Татарский научно-исследовательский и проектный институт нефти "ТатНИПИнефть" | Method of developing water-flooded oil pool |
US6590202B2 (en) | 2000-05-26 | 2003-07-08 | Precision Drilling Technology Services Group Inc. | Standoff compensation for nuclear measurements |
US6566649B1 (en) | 2000-05-26 | 2003-05-20 | Precision Drilling Technology Services Group Inc. | Standoff compensation for nuclear measurements |
US20020023754A1 (en) | 2000-08-28 | 2002-02-28 | Buytaert Jean P. | Method for drilling multilateral wells and related device |
US6561277B2 (en) | 2000-10-13 | 2003-05-13 | Schlumberger Technology Corporation | Flow control in multilateral wells |
WO2002034931A2 (en) * | 2000-10-26 | 2002-05-02 | Guyer Joe E | Method of generating and recovering gas from subsurface formations of coal, carbonaceous shale and organic-rich shales |
US6457525B1 (en) | 2000-12-15 | 2002-10-01 | Exxonmobil Oil Corporation | Method and apparatus for completing multiple production zones from a single wellbore |
US7243738B2 (en) | 2001-01-29 | 2007-07-17 | Robert Gardes | Multi seam coal bed/methane dewatering and depressurizing production system |
US6923275B2 (en) * | 2001-01-29 | 2005-08-02 | Robert Gardes | Multi seam coal bed/methane dewatering and depressurizing production system |
US6639210B2 (en) | 2001-03-14 | 2003-10-28 | Computalog U.S.A., Inc. | Geometrically optimized fast neutron detector |
CA2344627C (en) | 2001-04-18 | 2007-08-07 | Northland Energy Corporation | Method of dynamically controlling bottom hole circulating pressure in a wellbore |
GB2379508B (en) | 2001-04-23 | 2005-06-08 | Computalog Usa Inc | Electrical measurement apparatus and method |
US6604910B1 (en) | 2001-04-24 | 2003-08-12 | Cdx Gas, Llc | Fluid controlled pumping system and method |
US6497556B2 (en) | 2001-04-24 | 2002-12-24 | Cdx Gas, Llc | Fluid level control for a downhole well pumping system |
US6571888B2 (en) | 2001-05-14 | 2003-06-03 | Precision Drilling Technology Services Group, Inc. | Apparatus and method for directional drilling with coiled tubing |
US6575255B1 (en) | 2001-08-13 | 2003-06-10 | Cdx Gas, Llc | Pantograph underreamer |
US6644422B1 (en) | 2001-08-13 | 2003-11-11 | Cdx Gas, L.L.C. | Pantograph underreamer |
US6591922B1 (en) | 2001-08-13 | 2003-07-15 | Cdx Gas, Llc | Pantograph underreamer and method for forming a well bore cavity |
US6595301B1 (en) | 2001-08-17 | 2003-07-22 | Cdx Gas, Llc | Single-blade underreamer |
US6595302B1 (en) | 2001-08-17 | 2003-07-22 | Cdx Gas, Llc | Multi-blade underreamer |
RU2205935C1 (en) | 2001-09-20 | 2003-06-10 | Общество с ограниченной ответственностью "ТюменНИИгипрогаз" | Method of multiple hole construction |
US6581685B2 (en) | 2001-09-25 | 2003-06-24 | Schlumberger Technology Corporation | Method for determining formation characteristics in a perforated wellbore |
US6962030B2 (en) * | 2001-10-04 | 2005-11-08 | Pd International Services, Inc. | Method and apparatus for interconnected, rolling rig and oilfield building(s) |
US6585061B2 (en) | 2001-10-15 | 2003-07-01 | Precision Drilling Technology Services Group, Inc. | Calculating directional drilling tool face offsets |
US6591903B2 (en) | 2001-12-06 | 2003-07-15 | Eog Resources Inc. | Method of recovery of hydrocarbons from low pressure formations |
US6577129B1 (en) | 2002-01-19 | 2003-06-10 | Precision Drilling Technology Services Group Inc. | Well logging system for determining directional resistivity using multiple transmitter-receiver groups focused with magnetic reluctance material |
US6646441B2 (en) | 2002-01-19 | 2003-11-11 | Precision Drilling Technology Services Group Inc. | Well logging system for determining resistivity using multiple transmitter-receiver groups operating at three frequencies |
US6722452B1 (en) * | 2002-02-19 | 2004-04-20 | Cdx Gas, Llc | Pantograph underreamer |
US6968893B2 (en) * | 2002-04-03 | 2005-11-29 | Target Drilling Inc. | Method and system for production of gas and water from a gas bearing strata during drilling and after drilling completion |
US7360595B2 (en) | 2002-05-08 | 2008-04-22 | Cdx Gas, Llc | Method and system for underground treatment of materials |
US6991048B2 (en) * | 2002-07-12 | 2006-01-31 | Cdx Gas, Llc | Wellbore plug system and method |
US6725922B2 (en) | 2002-07-12 | 2004-04-27 | Cdx Gas, Llc | Ramping well bores |
US6991047B2 (en) * | 2002-07-12 | 2006-01-31 | Cdx Gas, Llc | Wellbore sealing system and method |
US6976547B2 (en) * | 2002-07-16 | 2005-12-20 | Cdx Gas, Llc | Actuator underreamer |
US6851479B1 (en) * | 2002-07-17 | 2005-02-08 | Cdx Gas, Llc | Cavity positioning tool and method |
US7025137B2 (en) | 2002-09-12 | 2006-04-11 | Cdx Gas, Llc | Three-dimensional well system for accessing subterranean zones |
US8333245B2 (en) * | 2002-09-17 | 2012-12-18 | Vitruvian Exploration, Llc | Accelerated production of gas from a subterranean zone |
US6860147B2 (en) * | 2002-09-30 | 2005-03-01 | Alberta Research Council Inc. | Process for predicting porosity and permeability of a coal bed |
US6964308B1 (en) | 2002-10-08 | 2005-11-15 | Cdx Gas, Llc | Method of drilling lateral wellbores from a slant well without utilizing a whipstock |
AU2002952176A0 (en) | 2002-10-18 | 2002-10-31 | Cmte Development Limited | Drill head steering |
US6953088B2 (en) | 2002-12-23 | 2005-10-11 | Cdx Gas, Llc | Method and system for controlling the production rate of fluid from a subterranean zone to maintain production bore stability in the zone |
US7264048B2 (en) | 2003-04-21 | 2007-09-04 | Cdx Gas, Llc | Slot cavity |
US6932168B2 (en) | 2003-05-15 | 2005-08-23 | Cnx Gas Company, Llc | Method for making a well for removing fluid from a desired subterranean formation |
US7134494B2 (en) | 2003-06-05 | 2006-11-14 | Cdx Gas, Llc | Method and system for recirculating fluid in a well system |
WO2005003509A1 (en) | 2003-06-30 | 2005-01-13 | Petroleo Brasileiro S A-Petrobras | Method for, and the construction of, a long-distance well for the production, transport, storage and exploitation of mineral layers and fluids |
US7100687B2 (en) | 2003-11-17 | 2006-09-05 | Cdx Gas, Llc | Multi-purpose well bores and method for accessing a subterranean zone from the surface |
US7163063B2 (en) | 2003-11-26 | 2007-01-16 | Cdx Gas, Llc | Method and system for extraction of resources from a subterranean well bore |
US7207395B2 (en) | 2004-01-30 | 2007-04-24 | Cdx Gas, Llc | Method and system for testing a partially formed hydrocarbon well for evaluation and well planning refinement |
US7222670B2 (en) | 2004-02-27 | 2007-05-29 | Cdx Gas, Llc | System and method for multiple wells from a common surface location |
US7178611B2 (en) | 2004-03-25 | 2007-02-20 | Cdx Gas, Llc | System and method for directional drilling utilizing clutch assembly |
US7370701B2 (en) | 2004-06-30 | 2008-05-13 | Halliburton Energy Services, Inc. | Wellbore completion design to naturally separate water and solids from oil and gas |
US7387165B2 (en) | 2004-12-14 | 2008-06-17 | Schlumberger Technology Corporation | System for completing multiple well intervals |
US7571771B2 (en) | 2005-05-31 | 2009-08-11 | Cdx Gas, Llc | Cavity well system |
US7543648B2 (en) | 2006-11-02 | 2009-06-09 | Schlumberger Technology Corporation | System and method utilizing a compliant well screen |
US20080149349A1 (en) | 2006-12-20 | 2008-06-26 | Stephane Hiron | Integrated flow control device and isolation element |
US7673676B2 (en) | 2007-04-04 | 2010-03-09 | Schlumberger Technology Corporation | Electric submersible pumping system with gas vent |
-
1998
- 1998-11-20 US US09/197,687 patent/US6280000B1/en not_active Expired - Lifetime
-
1999
- 1999-11-19 CA CA002589332A patent/CA2589332C/en not_active Expired - Fee Related
- 1999-11-19 CA CA2792184A patent/CA2792184A1/en not_active Abandoned
- 1999-11-19 CA CA002441672A patent/CA2441672C/en not_active Expired - Fee Related
- 1999-11-19 CA CA2661725A patent/CA2661725C/en not_active Expired - Fee Related
- 1999-11-19 CN CN200810133404.2A patent/CN101328791A/en active Pending
- 1999-11-19 NZ NZ512303A patent/NZ512303A/en not_active IP Right Cessation
- 1999-11-19 CA CA002441667A patent/CA2441667C/en not_active Expired - Fee Related
- 1999-11-19 ES ES05020737T patent/ES2297582T3/en not_active Expired - Lifetime
- 1999-11-19 RU RU2001117069/03A patent/RU2246602C2/en not_active IP Right Cessation
- 1999-11-19 PL PL99375239A patent/PL193562B1/en unknown
- 1999-11-19 AT AT03003550T patent/ATE334297T1/en not_active IP Right Cessation
- 1999-11-19 CZ CZ20011757A patent/CZ20011757A3/en unknown
- 1999-11-19 NZ NZ528538A patent/NZ528538A/en not_active IP Right Cessation
- 1999-11-19 DE DE69932546T patent/DE69932546T2/en not_active Expired - Lifetime
- 1999-11-19 NZ NZ527146A patent/NZ527146A/en not_active IP Right Cessation
- 1999-11-19 PL PL99348705A patent/PL190694B1/en unknown
- 1999-11-19 EP EP03003550A patent/EP1316673B1/en not_active Expired - Lifetime
- 1999-11-19 RU RU2008143916/03A patent/RU2505657C2/en not_active IP Right Cessation
- 1999-11-19 CA CA002447254A patent/CA2447254C/en not_active Expired - Fee Related
- 1999-11-19 AU AU31018/00A patent/AU760896B2/en not_active Expired
- 1999-11-19 ES ES03003550T patent/ES2271398T3/en not_active Expired - Lifetime
- 1999-11-19 PL PL99375240A patent/PL193557B1/en unknown
- 1999-11-19 EP EP07021409A patent/EP1975369B1/en not_active Expired - Lifetime
- 1999-11-19 ES ES99965010T patent/ES2251254T3/en not_active Expired - Lifetime
- 1999-11-19 CA CA002483023A patent/CA2483023C/en not_active Expired - Fee Related
- 1999-11-19 CN CN200510096639.5A patent/CN1727636B/en not_active Expired - Fee Related
- 1999-11-19 PL PL99375236A patent/PL193560B1/en unknown
- 1999-11-19 PL PL99375242A patent/PL193559B1/en unknown
- 1999-11-19 AT AT99965010T patent/ATE309449T1/en not_active IP Right Cessation
- 1999-11-19 AT AT05020737T patent/ATE383495T1/en not_active IP Right Cessation
- 1999-11-19 CN CN200710152916.9A patent/CN101158267B/en not_active Expired - Fee Related
- 1999-11-19 CA CA002441671A patent/CA2441671C/en not_active Expired - Fee Related
- 1999-11-19 DE DE69937976T patent/DE69937976T2/en not_active Expired - Lifetime
- 1999-11-19 ID IDW00200101332A patent/ID30391A/en unknown
- 1999-11-19 EP EP05020737A patent/EP1619352B1/en not_active Expired - Lifetime
- 1999-11-19 PL PL99375243A patent/PL193555B1/en unknown
- 1999-11-19 PL PL99375241A patent/PL193558B1/en unknown
- 1999-11-19 CN CN200510096640.8A patent/CN1776196B/en not_active Expired - Fee Related
- 1999-11-19 CN CNB998155705A patent/CN100400794C/en not_active Expired - Fee Related
- 1999-11-19 EP EP99965010A patent/EP1131535B1/en not_active Expired - Lifetime
- 1999-11-19 WO PCT/US1999/027494 patent/WO2000031376A2/en active IP Right Grant
- 1999-11-19 DE DE69928280T patent/DE69928280T2/en not_active Expired - Lifetime
- 1999-11-19 CA CA002350504A patent/CA2350504C/en not_active Expired - Fee Related
- 1999-11-19 US US09/444,029 patent/US6357523B1/en not_active Expired - Lifetime
- 1999-11-19 PL PL375238A patent/PL192352B1/en unknown
- 1999-11-19 DE DE69942756T patent/DE69942756D1/en not_active Expired - Lifetime
- 1999-11-19 PL PL99375237A patent/PL193561B1/en unknown
- 1999-11-19 AT AT07021409T patent/ATE480694T1/en not_active IP Right Cessation
-
2001
- 2001-02-20 US US09/788,897 patent/US6732792B2/en not_active Expired - Fee Related
- 2001-02-20 US US09/791,033 patent/US6439320B2/en not_active Expired - Lifetime
- 2001-02-20 US US09/789,956 patent/US6478085B2/en not_active Expired - Lifetime
- 2001-05-15 ZA ZA200103917A patent/ZA200103917B/en unknown
- 2001-06-20 US US09/885,219 patent/US6561288B2/en not_active Expired - Lifetime
-
2002
- 2002-06-07 US US10/165,627 patent/US6668918B2/en not_active Expired - Fee Related
- 2002-06-07 US US10/165,625 patent/US6688388B2/en not_active Expired - Fee Related
- 2002-12-27 RU RU2002135347/03A patent/RU2259480C2/en not_active IP Right Cessation
-
2003
- 2003-01-22 AU AU2003200203A patent/AU2003200203B2/en not_active Expired
- 2003-08-15 US US10/641,856 patent/US6976533B2/en not_active Expired - Fee Related
-
2005
- 2005-06-09 AU AU2005202498A patent/AU2005202498B2/en not_active Expired
- 2005-08-11 RU RU2005125568/03A patent/RU2293833C1/en not_active IP Right Cessation
- 2005-12-20 US US11/312,041 patent/US20060096755A1/en not_active Abandoned
-
2006
- 2006-09-29 AU AU2006222767A patent/AU2006222767B2/en not_active Expired
- 2006-12-15 RU RU2006144731/03A patent/RU2338863C2/en not_active IP Right Cessation
-
2007
- 2007-08-24 AU AU2007211918A patent/AU2007211918B2/en not_active Expired
- 2007-08-24 AU AU2007211917A patent/AU2007211917B2/en not_active Expired
- 2007-08-24 AU AU2007211916A patent/AU2007211916B2/en not_active Expired
- 2007-09-14 AU AU2007216777A patent/AU2007216777B2/en not_active Expired
- 2007-10-31 US US11/981,939 patent/US8511372B2/en not_active Expired - Fee Related
- 2007-10-31 US US11/982,232 patent/US8297350B2/en not_active Expired - Fee Related
-
2011
- 2011-01-28 AU AU2011200364A patent/AU2011200364B2/en not_active Expired
-
2013
- 2013-11-06 RU RU2013149294/03A patent/RU2013149294A/en not_active Application Discontinuation
Also Published As
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CA2661725C (en) | Method and system for accessing subterranean deposits from the surface | |
US6679322B1 (en) | Method and system for accessing subterranean deposits from the surface | |
AU2016206350A1 (en) | Method and system for accessing subterranean deposits from the surface | |
AU2013213679A1 (en) | Method and system for accessing subterranean deposits from the surface |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
EEER | Examination request | ||
FZDE | Discontinued |
Effective date: 20150922 |