CN101629993B - Electric meter simulation test method - Google Patents

Electric meter simulation test method Download PDF

Info

Publication number
CN101629993B
CN101629993B CN2009103052844A CN200910305284A CN101629993B CN 101629993 B CN101629993 B CN 101629993B CN 2009103052844 A CN2009103052844 A CN 2009103052844A CN 200910305284 A CN200910305284 A CN 200910305284A CN 101629993 B CN101629993 B CN 101629993B
Authority
CN
China
Prior art keywords
meter
ammeter
data
data item
simulation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009103052844A
Other languages
Chinese (zh)
Other versions
CN101629993A (en
Inventor
张军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Clou Electronics Co Ltd
Original Assignee
Shenzhen Clou Electronics Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Clou Electronics Co Ltd filed Critical Shenzhen Clou Electronics Co Ltd
Priority to CN2009103052844A priority Critical patent/CN101629993B/en
Publication of CN101629993A publication Critical patent/CN101629993A/en
Application granted granted Critical
Publication of CN101629993B publication Critical patent/CN101629993B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention provides an electric meter simulation test method which comprises the following steps: A. configuring an electric meter to be used for simulating an electric meter in reality; B. setting a route, configuring route information according to electric meter configuration in the step A and forming a route path according to the configured route information; C. establishing connection to be used for connecting a simulation meter and a concentrator; D. transmitting a meter reading command by the concentrator, judging whether a target meter can be read or not by the simulation meter according to comparison between a received frame and locally configured route information, inquiring a value of a relevant data item of the target meter and judging whether the concrete data of a terminal is replied or not according to the reading rate set by the simulation meter; and E. forming a test report.

Description

Electric meter simulation test method
Technical field
The present invention relates to a kind of ammeter field, particularly about a kind of electric meter simulation test method.
Background technology
In the existing power system; Aspect low-voltage collecting meter reading his-and-hers watches to copy passband undesirable always; Before concentrator dispatches from the factory, the test of the performance of checking meter of concentrator needed thousands of table; And the table of various different models, build this environment very consumes resources and cost, can't satisfy the needs in the practical application.
Summary of the invention
In order to overcome the deficiency of above-mentioned prior art, the present invention provides a kind of can be difficult to dispose the electric meter simulation test method that is difficult to build with test environment by existing big electrometer.
The technical solution adopted for the present invention to solve the technical problems is: a kind of electric meter simulation test method is provided, and it may further comprise the steps: A disposes the ammeter that is used for simulating reality to ammeter;
The B route is provided with, and is configured into walking along the street by information configuration according to the ammeter in the steps A, according to the routing iinformation formation routed path of configuration;
C connects, and is used for the simulation table is connected with concentrator;
The D concentrator sends the order of checking meter; The simulation table compares according to frame of receiving and local configuration routing iinformation; Can judge through this route and copy logical purpose table, the search purposes epiphase closes the value of data item again, judges whether to reply the concrete data in terminal according to the passband of copying of simulation table setting;
E forms test report.
The scheme of the further technical solution problem of the present invention is: the content that disposes in the described steps A comprises allocation list, configuration data items, and the occurrence that every ammeter data item is set.
The scheme of the further technical solution problem of the present invention is: the ammeter configuration comprises ammeter numbering, ammeter title, ammeter type, ammeter address and copies logical success ratio.
The scheme of the further technical solution problem of the present invention is: the configuration of the data item of ammeter comprises the data item that the basic parameter of ammeter, of that month electric flux, last month electric flux, the month before last electric flux, maximum demand time of origin Data Identification coding schedule, variable data identification code table, parameter Data Identification coding schedule, electric energy data identification code table, maximum demand Data Identification coding schedule etc. are comprised, according to the project actual needs can this system newly-increased, revise, data item that deletion is concrete.Each data item comprises data item title, data item coding, data layout, data length, data initial value.
The scheme of the further technical solution problem of the present invention is: the occurrence that every ammeter data item is set is the value of the data item of the ammeter that reads according to project needs configuration needs.Through interface, other system can be revised the occurrence of the corresponding data item of certain piece ammeter.
The scheme of the further technical solution problem of the present invention is: among the described step B; Concentrator copy reading piece ammeter can pass to the purpose table to copy reading information through near carrier wave meter as relaying through power carrier signal; The purpose table receives that copy reading information advanced the relaying carrier wave meter to relevant table information through line of electric force and give concentrator data transfer; The situation of simulation table simulation be the relaying carrier wave meter as wherein certain grade of route, in routing configuration, dispose many routing iinformations as required.
The scheme of the further technical solution problem of the present invention is: among the said step C, described simulation table connects through serial ports and concentrator.
The scheme of the further technical solution problem of the present invention is: among the said step D; The order of checking meter according to the concentrator transmission; The check meter routing condition of order of analysis; Whether there is this route according to routing condition inquiry judging in the route information table,, whether has the data item of needs inquiry again in the search purposes table if there is this route; If exist this data item just to obtain the value that the purpose epiphase closes data item, determine whether to reply the data message of the ammeter that obtains again according to the logical probability of copying of the purpose table that is provided with.
The scheme of the further technical solution problem of the present invention is: in the said step e: the data that produce in the above-mentioned steps are formed document; And said document managed; Document content comprises the command frame of checking meter that concentrator sends, and command analysis forms the routed path of checking meter, meter reading data item to checking meter; The simulation table returns frame information, and time of origin.
Compared to prior art, the advantage of electric meter simulation test method of the present invention is: through simulating a large amount of tables, avoided the test concentrator of traditional approach to copy the situation that passband needs several thousand tables; Traditional approach is installed several thousand table test concentrators and is copied passband cost height, and the environment difficulty is built, and can simulate the situation in the reality through the simulation table; This mode allocation list is convenient, and it is simple that route is set, and is convenient and quick; Can write down simultaneously the data message in the test process again; For later data analysis provides convenience, not only improved testing efficiency, reduced cost of labor again.
Description of drawings
Fig. 1 is the schematic flow sheet of electric meter simulation test method provided by the invention.
Fig. 2 is the simulation table of electric meter simulation test method provided by the invention and the structural representation of concentrator.
Fig. 3 is the frame format structural representation of the order of checking meter of electric meter simulation test method provided by the invention.
Fig. 4 is the frame format structural representation of the data message of the ammeter that obtains of the answer of electric meter simulation test method provided by the invention.
Embodiment
Following content is to combine concrete preferred implementation to the further explain that the present invention did, and can not assert that practical implementation of the present invention is confined to these explanations.For the those of ordinary skill of technical field under the present invention, under the prerequisite that does not break away from the present invention's design, can also make some simple deduction or replace, all should be regarded as belonging to protection scope of the present invention.
The invention provides a kind of electric meter simulation test method, it may further comprise the steps:
A disposes the ammeter that is used for simulating reality to ammeter, and the content of configuration comprises allocation list, configuration data items, and the occurrence that every ammeter data item is set;
The B route is provided with, and is configured into walking along the street by information configuration according to the ammeter in the steps A, according to the routing iinformation formation routed path of configuration;
C connects, and is used for the simulation table is connected with concentrator;
The D concentrator sends the order of checking meter; The simulation table compares according to frame of receiving and local configuration routing iinformation; Can judge through this route and copy logical purpose table, the search purposes epiphase closes the value of data item again, judges whether to reply the concrete data in terminal according to the passband of copying of simulation table setting;
E forms test report.
In the above-mentioned steps A, the ammeter configuration comprises ammeter numbering, ammeter title, ammeter type, ammeter address and copies logical success ratio.
The configuration of the data item of ammeter comprises the data item that the basic parameter of ammeter, of that month electric flux, last month electric flux, the month before last electric flux, maximum demand time of origin Data Identification coding schedule, variable data identification code table, parameter Data Identification coding schedule, electric energy data identification code table, maximum demand Data Identification coding schedule etc. are comprised, according to the project actual needs can this system newly-increased, revise, data item that deletion is concrete.Each data item comprises data item title, data item coding, data layout, data length, data initial value.
The occurrence of every ammeter data item is set, the value of the data item of the ammeter that reads according to project needs configuration needs.Through interface, other system can be revised the occurrence of the corresponding data item of certain piece ammeter.
Concentrator copy reading piece ammeter can pass to the purpose table to copy reading information through near carrier wave meter as relaying through power carrier signal, and the purpose table is given concentrator relevant table information data transfer through line of electric force through the relaying carrier wave meter after receiving copy reading information.The situation of simulation table simulation be the relaying carrier wave meter as wherein certain grade of route, in routing configuration, dispose many routing iinformations as required.
Described simulation table connects through serial ports and concentrator.
The order of checking meter according to the concentrator transmission; The check meter routing condition of order of analysis; Whether there is this route according to routing condition inquiry judging in the route information table,, whether has the data item of needs inquiry again in the search purposes table if there is this route; If exist this data item just to obtain the value that the purpose epiphase closes data item, determine whether to reply the data message of the ammeter that obtains again according to the logical probability of copying of the purpose table that is provided with.
The address field of relaying transmitted frame is one-level relay station address, and the size of transistroute table is by the relaying grade encoding decision of control code, and transistroute table maximum is seven station addresses.For one-level relaying transmitted frame, the transistroute table only has one of address, point of destination, the order of checking meter that concentrator sends, and the frame format of the order of checking meter is as shown in Figure 3.
Address field is one-level transistroute address.The D5-D7 of control code representes the transistroute rank, and the maximum transistroute degree of depth is 7 grades, and D0-D4 is a function code.If direct copy reading piece table, then transistroute table information is empty, and the Senior Three position of control code is 0.
The simulation table is received the check meter routing condition of order of the order post analysis of checking meter of concentrator; Whether there is this route according to routing condition inquiry judging in the route information table; Just obtain the value that the purpose epiphase closes data item if there is this route; Determine whether to reply the data message of the ammeter that obtains again according to the logical probability of copying of the purpose table that is provided with, its frame format is as shown in Figure 4.
In the said step e: the data that produce in the above-mentioned steps are formed document, and said document is managed.Document content comprises the command frame of checking meter that concentrator sends, and the command analysis of checking meter is formed the routed path of checking meter, the meter reading data item, and the simulation table returns frame information, and time of origin.
The present invention adopts receiving thread to handle the frame that concentrator sends, after the simulation table is received and is concentrated the frame that sends over, and through frame is analyzed, the routing iinformation that obtains being correlated with according to the situation after analyzing and the data item of needs copy reading.The simulation table inquires about whether there is this routed path according to routing iinformation in the system configuration table; If exist and just whether have the data item that needs copy reading in the search purposes table; If exist this data item just from allocation list, to take out this value of this table, form associated frame according to agreement again and send through sending thread.
The invention has the beneficial effects as follows: through simulating a large amount of tables, avoided the test concentrator of traditional approach to copy the situation that passband needs several thousand tables, traditional approach is installed several thousand table test concentrators and is copied passband cost height; The environment difficulty is built, and can simulate the situation in the reality through the simulation table, and this mode allocation list is convenient; It is simple that route is set; Convenient and quick, can write down the data message in the test process again simultaneously, for later data analysis provides convenience; Not only improve testing efficiency, reduced cost of labor again.

Claims (7)

1. electric meter simulation test method, it may further comprise the steps:
A disposes the ammeter that is used for simulating reality to ammeter, and the content of configuration comprises allocation list, configuration data items, and the occurrence that every ammeter data item is set;
The B route is provided with, and is configured into walking along the street by information configuration according to the ammeter in the steps A, according to the routing iinformation formation routed path of configuration;
C connects, and is used for the simulation table is connected with concentrator;
The D concentrator sends the order of checking meter; The simulation table compares according to frame of receiving and local configuration routing iinformation; Can judge through this route and copy logical purpose table, the search purposes epiphase closes the value of data item again, judges whether to reply the concrete data in terminal according to the passband of copying of simulation table setting;
E forms test report.
2. electric meter simulation test method according to claim 1 is characterized in that: the ammeter configuration comprises ammeter numbering, ammeter title, ammeter type, ammeter address and copies logical success ratio.
3. electric meter simulation test method according to claim 1; It is characterized in that: the configuration of the data item of ammeter comprises the data item that the basic parameter of ammeter, of that month electric flux, last month electric flux, the month before last electric flux, maximum demand time of origin Data Identification coding schedule, variable data identification code table, parameter Data Identification coding schedule, electric energy data identification code table, maximum demand Data Identification coding schedule are comprised; According to the project actual needs can this system newly-increased, revise, data item that deletion is concrete, each data item comprises data item title, data item coding, data layout, data length, data initial value.
4. electric meter simulation test method according to claim 1; It is characterized in that: among the described step B; Concentrator copy reading piece ammeter can pass to the purpose table to copy reading information through near carrier wave meter as relaying through power carrier signal; The purpose table receives that copy reading information gives concentrator relevant table information data transfer through line of electric force through the relaying carrier wave meter; The situation of simulation table simulation be the relaying carrier wave meter as wherein certain grade of route, in routing configuration, dispose many routing iinformations as required.
5. electric meter simulation test method according to claim 1 is characterized in that: among the said step C, described simulation table connects through serial ports and concentrator.
6. electric meter simulation test method according to claim 1; It is characterized in that: among the said step D; According to the order of checking meter that concentrator sends, analyze the routing condition of the order of checking meter, whether there is this route according to routing condition inquiry judging in the route information table; If there is this route; Whether there is the data item of needs inquiry again in the search purposes table,, determines whether to reply the data message of the ammeter that obtains again according to the logical probability of copying of the purpose table that is provided with if exist this data item just to obtain the value that the purpose epiphase closes data item.
7. electric meter simulation test method according to claim 1; It is characterized in that: in the said step e: the data that produce in the above-mentioned steps are formed document, and said document is managed, document content comprises the command frame of checking meter that concentrator sends; Command analysis forms the routed path of checking meter to checking meter; The meter reading data item, the simulation table returns frame information, and time of origin.
CN2009103052844A 2009-08-06 2009-08-06 Electric meter simulation test method Expired - Fee Related CN101629993B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009103052844A CN101629993B (en) 2009-08-06 2009-08-06 Electric meter simulation test method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009103052844A CN101629993B (en) 2009-08-06 2009-08-06 Electric meter simulation test method

Publications (2)

Publication Number Publication Date
CN101629993A CN101629993A (en) 2010-01-20
CN101629993B true CN101629993B (en) 2012-07-25

Family

ID=41575168

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009103052844A Expired - Fee Related CN101629993B (en) 2009-08-06 2009-08-06 Electric meter simulation test method

Country Status (1)

Country Link
CN (1) CN101629993B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102175983A (en) * 2011-03-04 2011-09-07 河北省电力研究院 Method for testing multifunctional watt-hour meter reading time of electric quantity collector for watt-hour meter
CN103699401A (en) * 2013-11-14 2014-04-02 深圳市航天泰瑞捷电子有限公司 Method for automatically setting recording parameters at multiple serial ports of intelligent electric meter
CN105702012A (en) * 2014-11-24 2016-06-22 国网辽宁省电力有限公司锦州供电公司 Meter reading system PLC intelligent communicator, and communication method thereof
CN107395391A (en) * 2017-06-06 2017-11-24 中国电力科学研究院 A kind of low-voltage power line bandwidth carrier system for testing unification of communication protocol and method
CN107576926B (en) * 2017-08-09 2019-08-16 宁波三星医疗电气股份有限公司 A method of generating simulation ammeter returned data

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1994029825A1 (en) * 1993-06-04 1994-12-22 M & Fc Holding Company, Inc. Duplex bi-directional multi-mode remote instrument reading and telemetry system
US6333975B1 (en) * 1998-03-03 2001-12-25 Itron, Inc. Method and system for reading intelligent utility meters
US20060066455A1 (en) * 2003-07-18 2006-03-30 Hancock Martin A Grouping mesh clusters

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1994029825A1 (en) * 1993-06-04 1994-12-22 M & Fc Holding Company, Inc. Duplex bi-directional multi-mode remote instrument reading and telemetry system
US6333975B1 (en) * 1998-03-03 2001-12-25 Itron, Inc. Method and system for reading intelligent utility meters
US20060066455A1 (en) * 2003-07-18 2006-03-30 Hancock Martin A Grouping mesh clusters
CN101194294A (en) * 2005-05-04 2008-06-04 功率测量有限公司 Grouping mesh clusters

Also Published As

Publication number Publication date
CN101629993A (en) 2010-01-20

Similar Documents

Publication Publication Date Title
CN101629993B (en) Electric meter simulation test method
US8346209B2 (en) Remote meter reading using the existing mobile network
CN103490958A (en) Method for testing local communication unit interchangeability of acquisition terminal
CN102468984A (en) Method and system for testing electricity consumption information acquisition system, and master station
CN102915636A (en) Traffic signal instrument control strategy comprehensive performance validity test system and method
CN104580117A (en) Authentication method, device and system
CN107359698B (en) A kind of distribution web area intelligent terminal
CN111447227A (en) Protocol analysis method and device of Internet of things equipment
CN109035741A (en) Bimodulus electric energy meter communication system and method
CN102752166A (en) Debugging method, chip, single board and system
CN102946616A (en) Internet of things middleware performance testing system and testing method
CN102157057A (en) Wi-Fi (Wireless Fidelity)-based wireless meter reading device
CN102800033A (en) Distribution production and marketing business integration system
CN102143523A (en) Service delivery platform and application testing method based on service delivery platform
CN103795680A (en) Communication method supporting multiple communication protocols, and electric energy meter
CN101459977A (en) Remote wireless meter reading system
CN102468986A (en) Test method and system for electricity consumption information collection system, and main station
CN105471982A (en) Interaction method and system for internet-of-things gateway and cloud platform
CN102313880A (en) Method and system for testing local communication equipment of power utilization information acquisition system, and master station
CN101309178B (en) Parsing method and apparatus for automatic exchanging optical network systematic log information
CN104408903A (en) Micro-power wireless meter reading method
CN110932406B (en) Remote signaling information checking method and device for intelligent substation scheduling master station
CN105577785A (en) Interregional network communication system and implementation method thereof
CN103217597B (en) A kind of construction method of general test template of digital relay protective device
CN103188235B (en) The method and system of group information synchronization between a kind of client and service end

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20100120

Assignee: NANCHANG KELU SMART GRID TECHNOLOGY CO.,LTD.

Assignor: SHENZHEN CLOU ELECTRONICS Co.,Ltd.

Contract record no.: 2014440020482

Denomination of invention: Electric meter simulation test method

Granted publication date: 20120725

License type: Exclusive License

Record date: 20141230

LICC Enforcement, change and cancellation of record of contracts on the licence for exploitation of a patent or utility model
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120725

Termination date: 20210806