CN101825327A - Method for acquiring optimum air-conditioning system operation parameters based on weather forecast - Google Patents

Method for acquiring optimum air-conditioning system operation parameters based on weather forecast Download PDF

Info

Publication number
CN101825327A
CN101825327A CN 201010185956 CN201010185956A CN101825327A CN 101825327 A CN101825327 A CN 101825327A CN 201010185956 CN201010185956 CN 201010185956 CN 201010185956 A CN201010185956 A CN 201010185956A CN 101825327 A CN101825327 A CN 101825327A
Authority
CN
China
Prior art keywords
air
conditioning
clock
value
regulate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201010185956
Other languages
Chinese (zh)
Other versions
CN101825327B (en
Inventor
倪龙
牛福新
姚杨
姜益强
马最良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Harbin Institute of Technology
Original Assignee
Harbin Institute of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Harbin Institute of Technology filed Critical Harbin Institute of Technology
Priority to CN2010101859565A priority Critical patent/CN101825327B/en
Publication of CN101825327A publication Critical patent/CN101825327A/en
Application granted granted Critical
Publication of CN101825327B publication Critical patent/CN101825327B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention relates to a method for acquiring the optimum air-conditioning system operation parameters based on the weather forecast, solving the problems of poor temperature regulating quality in the buildings because of inaccurate operation parameters of the existing air-conditioning systems and difficult implementation and grave energy waste because of higher requirements of the existing automatic air-conditioning regulating devices for the existing air-conditioners. The method is characterized by computing the hourly meteorological parameters of the next N-numbered hours according to the weather forecast in combination with the historical meteorological data; later, computing the hourly air-conditioning load according to the characteristic parameters of the buildings in combination with the hourly meteorological parameters and comparing the hourly air-conditioning load with the designed air-conditioning load to determine the hourly load coefficients; then carrying out heat balance analysis on all the operation modes and the hourly load coefficient of the air-conditioners to be regulated to screen out the feasible operation modes; and selecting the feasible operation mode characterized by minimum energy consumption as the optimum operation mode and outputting the parameters of the optimum operation mode. The method is applicable to operation control of large air-conditioners.

Description

Method for acquiring optimum air-conditioning system operation parameters based on weather forecast
Technical field
The present invention relates to a kind of preparation method of air-conditioning system operational factor.
Background technology
In the most existing air-conditioning system, owing to construction time, design, initial cost, managerial reason, the operational factor of air-conditioning is by manual metering mode and calculating acquisition in addition, operational factor is inaccurate, and operating personnel regulate to satisfy the demand of Building Heat comfort level air-conditioning by this data.Air-conditioning system is under this operation control, and the cold that handpiece Water Chilling Units provides is difficult to adapt to the variation of building loading, and thermal comfort is second-rate in the building.
And existing air-conditioning self-checking device, as direct digital control system (DDC system), realize adjustment though can reach air-conditioning system according to variation of temperature in the building, but this system need transform significantly to existing air-conditioning, is difficult to realize for the existing air-conditioning system of major part; Simultaneously, it is with high costs, and energy waste is also bigger.
Summary of the invention
The present invention causes in the building adjustment of poor quality for the operational factor that solves existing air-conditioning system is inaccurate, and existing air-conditioning self-checking device is to the problem that having relatively high expectations of existing air-conditioning causes being difficult to carry out, energy waste is serious, thereby a kind of method for acquiring optimum air-conditioning system operation parameters based on weather forecast is provided.
Based on the method for acquiring optimum air-conditioning system operation parameters of weather forecast, it is realized by following steps:
Step 1, inquiry wait to regulate following N hour weather forecast of air-conditioning location, obtain this area following N hour temperature maximum and temperature minimum of a value;
Step 2, following N hour the temperature maximum in this area that obtains according to step 1 and temperature minimum of a value obtain following N hour of this area by the time air themperature value;
Step 3, with same month in following N hour described place month on corresponding date of this area described in the step 2 in the history meteorological data, search and the maximum temperature value on this date and immediate historical date of minimum temperature value, and with the solar radiation value on the described historical date solar radiation value as this date;
Step 4, the solar radiation value that obtains with step 3 are radix, determine following N hour of this area by the time intensity of solar radiation value;
Following N hour of step 5, this area that obtains according to step 2 by the time following N hour of air themperature value, the step 4 this area that determines by the time intensity of solar radiation value and wait to regulate air-conditioning place building characterisitic parameter, adopt the air conditioner load theory of computation obtain to wait to regulate following N hour of air-conditioning by the time air-conditioning load value;
Step 6, with step 5 obtain to wait to regulate following N hour of air-conditioning by the time air-conditioning load value regulate the Air-conditioner design load value divided by waiting, determine to wait to regulate air-conditioning by the time air-conditioning load coefficient;
Step 7, will wait to regulate the handpiece Water Chilling Units quantity of air-conditioning and the regulative mode of handpiece Water Chilling Units carries out permutation and combination, obtain all operational modes of waiting to regulate air-conditioning;
Step 8, all operational modes and the step 6 of waiting of obtaining of step 7 being regulated air-conditioning determine to wait to regulate air-conditioning by the time air-conditioning load coefficient carry out thermal equilibrium analysis, and filter out and satisfy the feasible operational mode of waiting to regulate the wet requirement of air-conditioning heat;
Step 9, satisfiedly wait to regulate the wet feasible operational mode that requires of air-conditioning heat and carry out operation energy consumption and calculate what filter out in the step 8, and the energy consumption result is compared, the feasible operational mode of selecting the energy consumption minimum for use is as the optimized operation pattern;
Parameter output in step 10, the optimized operation pattern that step 9 is obtained, the optimized operation parameter of waiting to regulate air-conditioning system that the result of described output is;
Described N is for more than or equal to 1 and be less than or equal to 24 integer.
Following N hour temperature maximum in this area that obtains according to step 1 described in the step 2 and temperature minimum of a value obtain following N hour of this area by the time air themperature value
Figure 819774DEST_PATH_IMAGE001
For:
Figure 828181DEST_PATH_IMAGE002
In the formula, t MaxBe the temperature maximum; t MinBe the temperature minimum of a value;
Figure 881588DEST_PATH_IMAGE001
For by the time air themperature value; Parameter βBe corresponding coefficient constantly, this coefficient with corresponding relation constantly is: 1 o'clock, β=-0.337; 2 o'clock, β=-0.365; 3 o'clock, β=-0.404; 4 o'clock, β=-0.433; 5 o'clock, β=-0.452; 6 o'clock, β=-0.394; 7 o'clock, β=-0.269; 8 o'clock, β=-0.115; 9 o'clock, β=0.029; 10 o'clock, β=0.154; 11 o'clock, β=0.279; 12 o'clock, β=0.385; 13 o'clock, β=0.462; 14 o'clock, β=0.500; 15 o'clock, β=0.490; 16 o'clock, β=0.413; 17 o'clock, β=0.375; 18 o'clock, β=0.269; 19 o'clock, β=0.135; 20 o'clock, β=0.000; 21 o'clock, β=-0.096; 22 o'clock, β=-0.163; 23 o'clock, β=-0.221; 24 o'clock, β=-0.250.
The described solar radiation value that obtains with step 3 of step 4 is a radix, determine following N hour of this area by the time intensity of solar radiation value For:
Figure 887514DEST_PATH_IMAGE004
In the formula:
Figure 117638DEST_PATH_IMAGE005
Be this day solar radiation value; Parameter γBe coefficient, its value standard is: when weather information when being fine, γ=1; When weather information is the moon, γ=0.5; When weather information is shower, γ=0.6; When weather information is light rain, γ=0.4; When weather information is moderate rain, γ=0.3; When weather information for when raining heavyly, γ=0.2; Other weather informations, γ=0.0.
The characterisitic parameter of building described in the step 5 comprises: wait to regulate the size of air-conditioning place building, the construction material of waiting to regulate air-conditioning place building and the interior of building personnel rule of working and resting.
Step 5 obtain to wait to regulate following N hour of air-conditioning by the time air-conditioning load value revise by waiting the historical data of regulating air-conditioning.
Parameter comprises in the step 10 optimized operation pattern: the handpiece Water Chilling Units of waiting to regulate air-conditioning by the time platform number and the running time and the corresponding method of operation thereof of opening.
Beneficial effect: method of the present invention can realize that according to weather forecast and historical meteorological data the air-conditioning system operational factor of acquisition is accurate, can make the interior adjustment quality of building reach optimum efficiency; And do not need existing air-conditioning is transformed, save the consumption of the energy in a large number.Adopt the operational factor of the air-conditioning system of the present invention's acquisition, air-conditioning system is controlled automatically, can realize the operatorless automatic control of air-conditioning system.Method of the present invention is applicable to the control to the air-conditioning system of existing building.
Description of drawings
Fig. 1 is the schematic flow sheet of the inventive method.
The specific embodiment
The specific embodiment one, based on the method for acquiring optimum air-conditioning system operation parameters of weather forecast, it is realized by following steps:
Step 1, inquiry wait to regulate following N hour weather forecast of air-conditioning location, obtain this area following N hour temperature maximum and temperature minimum of a value;
Step 2, following N hour the temperature maximum in this area that obtains according to step 1 and temperature minimum of a value obtain following N hour of this area by the time air themperature value;
Step 3, with same month in following N hour described place month on corresponding date of this area described in the step 2 in the history meteorological data, search and the maximum temperature value on this date and immediate historical date of minimum temperature value, and with the solar radiation value on the described historical date solar radiation value as this date;
Step 4, the solar radiation value that obtains with step 3 are radix, determine following N hour of this area by the time intensity of solar radiation value;
Following N hour of step 5, this area that obtains according to step 2 by the time following N hour of air themperature value, the step 4 this area that determines by the time intensity of solar radiation value and wait to regulate air-conditioning place building characterisitic parameter, adopt the air conditioner load theory of computation obtain to wait to regulate following N hour of air-conditioning by the time air-conditioning load value;
Step 6, with step 5 obtain to wait to regulate following N hour of air-conditioning by the time air-conditioning load value regulate the Air-conditioner design load value divided by waiting, determine to wait to regulate air-conditioning by the time air-conditioning load coefficient;
Step 7, will wait to regulate the handpiece Water Chilling Units quantity of air-conditioning and the regulative mode of handpiece Water Chilling Units carries out permutation and combination, obtain all operational modes of waiting to regulate air-conditioning;
Step 8, all operational modes and the step 6 of waiting of obtaining of step 7 being regulated air-conditioning determine to wait to regulate air-conditioning by the time air-conditioning load coefficient carry out thermal equilibrium analysis, and filter out and satisfy the feasible operational mode of waiting to regulate the wet requirement of air-conditioning heat;
Step 9, satisfiedly wait to regulate the wet feasible operational mode that requires of air-conditioning heat and carry out operation energy consumption and calculate what filter out in the step 8, and the energy consumption result is compared, the feasible operational mode of selecting the energy consumption minimum for use is as the optimized operation pattern;
Parameter output in step 10, the optimized operation pattern that step 9 is obtained, the optimized operation parameter of waiting to regulate air-conditioning system that the result of described output is;
Described N is for more than or equal to 1 and be less than or equal to 24 integer.
Following N hour temperature maximum in this area that obtains according to step 1 described in the step 2 and temperature minimum of a value obtain following N hour of this area by the time air themperature value
Figure 161686DEST_PATH_IMAGE001
For:
Figure 855972DEST_PATH_IMAGE002
In the formula, t MaxBe the temperature maximum; t MinBe the temperature minimum of a value; For by the time air themperature value; Parameter βBe corresponding coefficient constantly, this coefficient with corresponding relation constantly is: 1 o'clock, β=-0.337; 2 o'clock, β=-0.365; 3 o'clock, β=-0.404; 4 o'clock, β=-0.433; 5 o'clock, β=-0.452; 6 o'clock, β=-0.394; 7 o'clock, β=-0.269; 8 o'clock, β=-0.115; 9 o'clock, β=0.029; 10 o'clock, β=0.154; 11 o'clock, β=0.279; 12 o'clock, β=0.385; 13 o'clock, β=0.462; 14 o'clock, β=0.500; 15 o'clock, β=0.490; 16 o'clock, β=0.413; 17 o'clock, β=0.375; 18 o'clock, β=0.269; 19 o'clock, β=0.135; 20 o'clock, β=0.000; 21 o'clock, β=-0.096; 22 o'clock, β=-0.163; 23 o'clock, β=-0.221; 24 o'clock, β=-0.250.
The described solar radiation value that obtains with step 3 of step 4 is a radix, determine following N hour of this area by the time intensity of solar radiation value
Figure 490533DEST_PATH_IMAGE003
For:
Figure 574158DEST_PATH_IMAGE004
In the formula: Be this day solar radiation value; Parameter γBe coefficient, its value standard is: when weather information when being fine, γ=1; When weather information is the moon, γ=0.5; When weather information is shower, γ=0.6; When weather information is light rain, γ=0.4; When weather information is moderate rain, γ=0.3; When weather information for when raining heavyly, γ=0.2; Other weather informations, γ=0.0.
The characterisitic parameter of building described in the step 5 comprises: wait to regulate the size of air-conditioning place building, the construction material of waiting to regulate air-conditioning place building and the interior of building personnel rule of working and resting.
Step 5 obtain to wait to regulate following N hour of air-conditioning by the time air-conditioning load value revise by waiting the historical data of regulating air-conditioning.
Parameter comprises in the step 10 optimized operation pattern: the handpiece Water Chilling Units of waiting to regulate air-conditioning by the time platform number and the running time and the corresponding method of operation thereof of opening.
Determine in the present embodiment step 1 to wait that following N hour weather forecast regulating the air-conditioning location can determine according to medium such as meteorological observatory or website, TVs.
The historical meteorological data in following N hour described corresponding place month on date of this area described in the step 3 can obtain by meteorological observatory or website.
The intensity of solar radiation value had determined personnel in the building, equipment, new wind load and light load jointly when the personnel of interior of building described in the step 5 worked and rested pursuing of rule and step 4 acquisition; Step 4 obtain by the time intensity of solar radiation value and the common decision of size of waiting to regulate air-conditioning place building described in the step 5 wait that the transparent building enclosure of regulating air-conditioning place building loads; Wait to regulate the size of air-conditioning place building described in the step 5 and wait to regulate the construction material of air-conditioning place building and step 1 described by the time temperature the difference of maximum and temperature minimum of a value determined jointly to wait that the nontransparent building enclosure of regulating air-conditioning place building loads.
Wait described in the step 6 to regulate air-conditioning theoretical by the time load value can be by waiting to regulate air-conditioning place initial design air-conditioning department or control department obtains.
In the step 9 feasible operational mode is carried out operation energy consumption and calculate, comprise all energy consumptions with energy equipment are added up.
The optimized operation parameter of exporting in the step 10 can form form, the operation of air conditioner personnel move air-conditioning according to described form, and feed back the wet parameter of heat of each air conditioning area, if do not meet the requirements, the operations staff can carry out ratio and revise, and deposits amended result in historical data base.
 

Claims (6)

1. based on the method for acquiring optimum air-conditioning system operation parameters of weather forecast, it is characterized in that: it is realized by following steps:
Step 1, inquiry wait to regulate following N hour weather forecast of air-conditioning location, obtain this area following N hour temperature maximum and temperature minimum of a value;
Step 2, following N hour the temperature maximum in this area that obtains according to step 1 and temperature minimum of a value obtain following N hour of this area by the time air themperature value;
Step 3, with same month in following N hour described place month on corresponding date of this area described in the step 2 in the history meteorological data, search and the maximum temperature value on this date and immediate historical date of minimum temperature value, and with the solar radiation value on the described historical date solar radiation value as this date;
Step 4, the solar radiation value that obtains with step 3 are radix, determine following N hour of this area by the time intensity of solar radiation value;
Following N hour of step 5, this area that obtains according to step 2 by the time following N hour of air themperature value, the step 4 this area that determines by the time intensity of solar radiation value and wait to regulate air-conditioning place building characterisitic parameter, adopt the air conditioner load theory of computation obtain to wait to regulate following N hour of air-conditioning by the time air-conditioning load value;
Step 6, with step 5 obtain to wait to regulate following N hour of air-conditioning by the time air-conditioning load value regulate the Air-conditioner design load value divided by waiting, determine to wait to regulate air-conditioning by the time air-conditioning load coefficient;
Step 7, will wait to regulate the handpiece Water Chilling Units quantity of air-conditioning and the regulative mode of handpiece Water Chilling Units carries out permutation and combination, obtain all operational modes of waiting to regulate air-conditioning;
Step 8, all operational modes and the step 6 of waiting of obtaining of step 7 being regulated air-conditioning determine to wait to regulate air-conditioning by the time air-conditioning load coefficient carry out thermal equilibrium analysis, and filter out and satisfy the feasible operational mode of waiting to regulate the wet requirement of air-conditioning heat;
Step 9, satisfiedly wait to regulate the wet feasible operational mode that requires of air-conditioning heat and carry out operation energy consumption and calculate what filter out in the step 8, and the energy consumption result is compared, the feasible operational mode of selecting the energy consumption minimum for use is as the optimized operation pattern;
Parameter output in step 10, the optimized operation pattern that step 9 is obtained, the optimized operation parameter of waiting to regulate air-conditioning system that the result of described output is;
Described N is for more than or equal to 1 and be less than or equal to 24 integer.
2. the method for acquiring optimum air-conditioning system operation parameters based on weather forecast according to claim 1, it is characterized in that described in the step 2 following N hour the temperature maximum in this area that obtains according to step 1 and temperature minimum of a value obtain following N hour of this area by the time air themperature value
Figure 2010101859565100001DEST_PATH_IMAGE001
For:
Figure 535214DEST_PATH_IMAGE002
In the formula, t MaxBe the temperature maximum; t MinBe the temperature minimum of a value;
Figure 75523DEST_PATH_IMAGE001
For by the time air themperature value; Parameter βBe corresponding coefficient constantly, this coefficient with corresponding relation constantly is: 1 o'clock, β=-0.337; 2 o'clock, β=-0.365; 3 o'clock, β=-0.404; 4 o'clock, β=-0.433; 5 o'clock, β=-0.452; 6 o'clock, β=-0.394; 7 o'clock, β=-0.269; 8 o'clock, β=-0.115; 9 o'clock, β=0.029; 10 o'clock, β=0.154; 11 o'clock, β=0.279; 12 o'clock, β=0.385; 13 o'clock, β=0.462; 14 o'clock, β=0.500; 15 o'clock, β=0.490; 16 o'clock, β=0.413; 17 o'clock, β=0.375; 18 o'clock, β=0.269; 19 o'clock, β=0.135; 20 o'clock, β=0.000; 21 o'clock, β=-0.096; 22 o'clock, β=-0.163; 23 o'clock, β=-0.221; 24 o'clock, β=-0.250.
3. the method for acquiring optimum air-conditioning system operation parameters based on weather forecast according to claim 1 is characterized in that the described solar radiation value that obtains with step 3 of step 4 is a radix, determine following N hour of this area by the time intensity of solar radiation value
Figure 2010101859565100001DEST_PATH_IMAGE003
For:
In the formula:
Figure 2010101859565100001DEST_PATH_IMAGE005
Be this day solar radiation value; Parameter γBe coefficient, its value standard is: when weather information when being fine, γ=1; When weather information is the moon, γ=0.5; When weather information is shower, γ=0.6; When weather information is light rain, γ=0.4; When weather information is moderate rain, γ=0.3; When weather information for when raining heavyly, γ=0.2; Other weather informations, γ=0.0.
4. the method for acquiring optimum air-conditioning system operation parameters based on weather forecast according to claim 1 is characterized in that the characterisitic parameter of building described in the step 5 comprises: wait to regulate the size of air-conditioning place building, the construction material of waiting to regulate air-conditioning place building and the interior of building personnel rule of working and resting.
5. the method for acquiring optimum air-conditioning system operation parameters based on weather forecast according to claim 1, it is characterized in that step 5 obtain to wait to regulate following N hour of air-conditioning by the time air-conditioning load value revise by waiting the historical data of regulating air-conditioning.
6. the method for acquiring optimum air-conditioning system operation parameters based on weather forecast according to claim 1 is characterized in that parameter comprises in the step 10 optimized operation pattern: the handpiece Water Chilling Units of waiting to regulate air-conditioning by the time platform number and the running time and the corresponding method of operation thereof of opening.
CN2010101859565A 2010-05-28 2010-05-28 Method for acquiring optimum air-conditioning system operation parameters based on weather forecast Expired - Fee Related CN101825327B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010101859565A CN101825327B (en) 2010-05-28 2010-05-28 Method for acquiring optimum air-conditioning system operation parameters based on weather forecast

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010101859565A CN101825327B (en) 2010-05-28 2010-05-28 Method for acquiring optimum air-conditioning system operation parameters based on weather forecast

Publications (2)

Publication Number Publication Date
CN101825327A true CN101825327A (en) 2010-09-08
CN101825327B CN101825327B (en) 2012-03-07

Family

ID=42689394

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010101859565A Expired - Fee Related CN101825327B (en) 2010-05-28 2010-05-28 Method for acquiring optimum air-conditioning system operation parameters based on weather forecast

Country Status (1)

Country Link
CN (1) CN101825327B (en)

Cited By (37)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103017297A (en) * 2012-12-27 2013-04-03 李克豪 Air-conditioning system operation method based on weather change
CN103234254A (en) * 2013-04-12 2013-08-07 惠州Tcl家电集团有限公司 Server-based method for optimizing performance parameters of air conditioner, air conditioner and server
CN103629781A (en) * 2013-11-11 2014-03-12 四川长虹电器股份有限公司 Method and system for performing air treatment based on weather data
CN104303125A (en) * 2012-01-23 2015-01-21 地球网络股份有限公司 Optimizing and controlling the energy consumption of a building
CN104596035A (en) * 2015-01-06 2015-05-06 广东美的制冷设备有限公司 Air conditioner controller matching method and system as well as mobile terminal based on geographical position
CN104950707A (en) * 2015-05-29 2015-09-30 小米科技有限责任公司 Control method and device for wind discharge equipment
CN105222286A (en) * 2015-11-10 2016-01-06 苏州海而仕信息科技有限公司 The constant-temperature control method of water-cooled central air-conditioning
CN105371357A (en) * 2015-12-07 2016-03-02 中国建筑科学研究院 Heat supply pipe network regulation and control method and system
CN105387565A (en) * 2015-11-24 2016-03-09 深圳市酷开网络科技有限公司 Temperature adjusting method and device
CN105444336A (en) * 2014-08-22 2016-03-30 广东美的制冷设备有限公司 Air conditioner control method and air conditioner
CN105511423A (en) * 2014-10-10 2016-04-20 Lg电子株式会社 Central control apparatus, facility control system and method
CN105757894A (en) * 2016-03-24 2016-07-13 珠海格力电器股份有限公司 Control method and device for air conditioner
CN106225172A (en) * 2016-08-17 2016-12-14 珠海格力电器股份有限公司 Air conditioning control device, method and system
CN106529167A (en) * 2016-10-28 2017-03-22 深圳市云科设计咨询服务有限公司 Analysis method for comprehensive energy consumption of air conditioning system in non-heating season
CN106705342A (en) * 2015-07-31 2017-05-24 广东美的制冷设备有限公司 Method and system for synthesizing new air conditioner operation mode and intelligent terminal
CN106951630A (en) * 2017-03-17 2017-07-14 深圳市云科设计咨询服务有限公司 A kind of refrigeration host computer device selection method being applied in air-conditioning system
CN107192098A (en) * 2017-06-09 2017-09-22 重庆科技学院 Hospital ventilation regulates and controls method and regulator control system
CN107300278A (en) * 2016-04-14 2017-10-27 施耐德电气It公司 The system and method used for the compressor minimized in HVAC system
CN107726555A (en) * 2017-09-21 2018-02-23 新智能源系统控制有限责任公司 A kind of building air conditioning model predictive control method and device
CN107743569A (en) * 2015-06-08 2018-02-27 开利公司 HVAC system startup/stopping control
CN107781947A (en) * 2017-09-21 2018-03-09 新智能源系统控制有限责任公司 A kind of air conditioning system Cooling and Heat Source forecast Control Algorithm and device
CN107861404A (en) * 2017-10-27 2018-03-30 北京戴纳实验科技有限公司 A kind of control method for Design of Laboratory Management System
CN108110749A (en) * 2016-11-24 2018-06-01 国网江苏省电力公司镇江供电公司 A kind of adjusting method and device of flexible load resource
US9996091B2 (en) 2013-05-30 2018-06-12 Honeywell International Inc. Comfort controller with user feedback
CN108954715A (en) * 2018-07-27 2018-12-07 宁波奥克斯电气股份有限公司 A kind of optimized operation parameter determination method, intelligent expansion module and air conditioner
CN109028480A (en) * 2018-06-08 2018-12-18 杭州古北电子科技有限公司 A kind of thermostatic constant wet control system and its method
CN109612044A (en) * 2018-12-25 2019-04-12 珠海格力电器股份有限公司 Air conditioning control method, air-conditioning in conjunction with meteorologic parameter
CN109765797A (en) * 2018-12-20 2019-05-17 广东美的暖通设备有限公司 A kind of air conditioner energy saving analogue system
US10354345B2 (en) 2012-01-23 2019-07-16 Whisker Labs, Inc. Optimizing and controlling the energy consumption of a building
CN110296497A (en) * 2018-03-21 2019-10-01 开利公司 The system and method for connecting the HVAC health monitoring of family
WO2019196492A1 (en) * 2018-04-09 2019-10-17 珠海格力电器股份有限公司 Air conditioner and control method therefor, device, storage medium and server
CN111043731A (en) * 2019-12-31 2020-04-21 中维通(北京)科技有限公司 Air conditioning system adjusting method based on weather forecast
WO2020177084A1 (en) * 2019-03-05 2020-09-10 亿可能源科技(上海)有限公司 Management and control method for air conditioning system, and system and storage medium
CN112013521A (en) * 2020-09-09 2020-12-01 中维通(北京)科技有限公司 Air conditioning system adjusting method and system based on weather forecast
CN112539512A (en) * 2020-12-09 2021-03-23 广东电网有限责任公司佛山供电局 Transformer substation's thing networking atmospheric control system
CN113294902A (en) * 2021-05-31 2021-08-24 厦门科灿信息技术有限公司 Energy-saving control method and device for air conditioner and air conditioner control terminal
CN115183390A (en) * 2022-08-18 2022-10-14 合肥美的暖通设备有限公司 Control method of air conditioner, air conditioner and storage medium

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9416987B2 (en) 2013-07-26 2016-08-16 Honeywell International Inc. HVAC controller having economy and comfort operating modes

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03195849A (en) * 1989-12-26 1991-08-27 Mitsubishi Heavy Ind Ltd Load estimating device for air-conditioner
JPH0821650A (en) * 1994-07-06 1996-01-23 Toshiba Corp Building controller
US6098893A (en) * 1998-10-22 2000-08-08 Honeywell Inc. Comfort control system incorporating weather forecast data and a method for operating such a system
EP1134508A2 (en) * 2000-03-17 2001-09-19 Markus Werner Air-conditioning control method for a weather dependent building or installation area
CN1884934A (en) * 2005-06-23 2006-12-27 株式会社东芝 Air conditioner control device
CN101251289A (en) * 2008-04-07 2008-08-27 俞天平 Novel technique for tracing conditioned space dynamic thermal load

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03195849A (en) * 1989-12-26 1991-08-27 Mitsubishi Heavy Ind Ltd Load estimating device for air-conditioner
JPH0821650A (en) * 1994-07-06 1996-01-23 Toshiba Corp Building controller
US6098893A (en) * 1998-10-22 2000-08-08 Honeywell Inc. Comfort control system incorporating weather forecast data and a method for operating such a system
EP1134508A2 (en) * 2000-03-17 2001-09-19 Markus Werner Air-conditioning control method for a weather dependent building or installation area
CN1884934A (en) * 2005-06-23 2006-12-27 株式会社东芝 Air conditioner control device
CN101251289A (en) * 2008-04-07 2008-08-27 俞天平 Novel technique for tracing conditioned space dynamic thermal load

Cited By (59)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10354345B2 (en) 2012-01-23 2019-07-16 Whisker Labs, Inc. Optimizing and controlling the energy consumption of a building
CN104303125B (en) * 2012-01-23 2019-08-20 地球网络股份有限公司 The energy consumption of optimization and control building
CN104303125A (en) * 2012-01-23 2015-01-21 地球网络股份有限公司 Optimizing and controlling the energy consumption of a building
CN103017297A (en) * 2012-12-27 2013-04-03 李克豪 Air-conditioning system operation method based on weather change
CN103234254B (en) * 2013-04-12 2016-08-10 惠州Tcl家电集团有限公司 Method, air-conditioning and the server of heat pump performance parameter optimization based on server
CN103234254A (en) * 2013-04-12 2013-08-07 惠州Tcl家电集团有限公司 Server-based method for optimizing performance parameters of air conditioner, air conditioner and server
US9996091B2 (en) 2013-05-30 2018-06-12 Honeywell International Inc. Comfort controller with user feedback
US11934214B2 (en) 2013-05-30 2024-03-19 Ademco Inc. Comfort controller with user feedback
US11054848B2 (en) 2013-05-30 2021-07-06 Ademco Inc. Comfort controller with user feedback
CN103629781A (en) * 2013-11-11 2014-03-12 四川长虹电器股份有限公司 Method and system for performing air treatment based on weather data
CN103629781B (en) * 2013-11-11 2016-09-07 四川长虹电器股份有限公司 The system of air-treatment is carried out based on weather data
CN105444336B (en) * 2014-08-22 2018-11-20 广东美的制冷设备有限公司 The control method and air conditioner of air conditioner
CN105444336A (en) * 2014-08-22 2016-03-30 广东美的制冷设备有限公司 Air conditioner control method and air conditioner
CN105511423A (en) * 2014-10-10 2016-04-20 Lg电子株式会社 Central control apparatus, facility control system and method
CN104596035A (en) * 2015-01-06 2015-05-06 广东美的制冷设备有限公司 Air conditioner controller matching method and system as well as mobile terminal based on geographical position
CN104596035B (en) * 2015-01-06 2017-06-20 广东美的制冷设备有限公司 Air-conditioner controller matching process and system and mobile terminal based on geographical position
CN104950707B (en) * 2015-05-29 2018-02-23 小米科技有限责任公司 air outlet device control method and device
CN104950707A (en) * 2015-05-29 2015-09-30 小米科技有限责任公司 Control method and device for wind discharge equipment
CN107743569A (en) * 2015-06-08 2018-02-27 开利公司 HVAC system startup/stopping control
CN106705342A (en) * 2015-07-31 2017-05-24 广东美的制冷设备有限公司 Method and system for synthesizing new air conditioner operation mode and intelligent terminal
CN106705342B (en) * 2015-07-31 2019-08-23 广东美的制冷设备有限公司 It is a kind of for synthesizing the method, system and intelligent terminal of new air conditioning operating mode
CN105222286A (en) * 2015-11-10 2016-01-06 苏州海而仕信息科技有限公司 The constant-temperature control method of water-cooled central air-conditioning
CN105387565B (en) * 2015-11-24 2018-03-30 深圳市酷开网络科技有限公司 The method and apparatus for adjusting temperature
CN105387565A (en) * 2015-11-24 2016-03-09 深圳市酷开网络科技有限公司 Temperature adjusting method and device
CN105371357B (en) * 2015-12-07 2017-10-10 中国建筑科学研究院 Heat supply pipe network regulation and control method and system
CN105371357A (en) * 2015-12-07 2016-03-02 中国建筑科学研究院 Heat supply pipe network regulation and control method and system
CN105757894A (en) * 2016-03-24 2016-07-13 珠海格力电器股份有限公司 Control method and device for air conditioner
CN105757894B (en) * 2016-03-24 2018-09-25 珠海格力电器股份有限公司 The control method and device of air conditioner
CN107300278A (en) * 2016-04-14 2017-10-27 施耐德电气It公司 The system and method used for the compressor minimized in HVAC system
CN107300278B (en) * 2016-04-14 2020-03-03 施耐德电气It公司 System and method for minimizing compressor usage in an HVAC system
CN106225172A (en) * 2016-08-17 2016-12-14 珠海格力电器股份有限公司 Air conditioning control device, method and system
CN106529167A (en) * 2016-10-28 2017-03-22 深圳市云科设计咨询服务有限公司 Analysis method for comprehensive energy consumption of air conditioning system in non-heating season
CN108110749A (en) * 2016-11-24 2018-06-01 国网江苏省电力公司镇江供电公司 A kind of adjusting method and device of flexible load resource
CN108110749B (en) * 2016-11-24 2020-02-21 国网江苏省电力公司镇江供电公司 Flexible load resource adjusting method and device
CN106951630A (en) * 2017-03-17 2017-07-14 深圳市云科设计咨询服务有限公司 A kind of refrigeration host computer device selection method being applied in air-conditioning system
CN107192098B (en) * 2017-06-09 2019-10-08 重庆科技学院 Hospital ventilation regulates and controls method and regulator control system
CN107192098A (en) * 2017-06-09 2017-09-22 重庆科技学院 Hospital ventilation regulates and controls method and regulator control system
CN107726555A (en) * 2017-09-21 2018-02-23 新智能源系统控制有限责任公司 A kind of building air conditioning model predictive control method and device
CN107781947B (en) * 2017-09-21 2020-03-31 新智能源系统控制有限责任公司 Cold and heat source prediction control method and device for building air conditioning system
CN107781947A (en) * 2017-09-21 2018-03-09 新智能源系统控制有限责任公司 A kind of air conditioning system Cooling and Heat Source forecast Control Algorithm and device
CN107861404A (en) * 2017-10-27 2018-03-30 北京戴纳实验科技有限公司 A kind of control method for Design of Laboratory Management System
CN110296497B (en) * 2018-03-21 2022-10-11 开利公司 System and method for linking home HVAC health monitoring
CN110296497A (en) * 2018-03-21 2019-10-01 开利公司 The system and method for connecting the HVAC health monitoring of family
WO2019196492A1 (en) * 2018-04-09 2019-10-17 珠海格力电器股份有限公司 Air conditioner and control method therefor, device, storage medium and server
CN109028480A (en) * 2018-06-08 2018-12-18 杭州古北电子科技有限公司 A kind of thermostatic constant wet control system and its method
CN109028480B (en) * 2018-06-08 2021-08-20 杭州博联智能科技股份有限公司 Constant temperature and humidity control system and method thereof
CN108954715A (en) * 2018-07-27 2018-12-07 宁波奥克斯电气股份有限公司 A kind of optimized operation parameter determination method, intelligent expansion module and air conditioner
CN109765797A (en) * 2018-12-20 2019-05-17 广东美的暖通设备有限公司 A kind of air conditioner energy saving analogue system
CN109612044A (en) * 2018-12-25 2019-04-12 珠海格力电器股份有限公司 Air conditioning control method, air-conditioning in conjunction with meteorologic parameter
WO2020177084A1 (en) * 2019-03-05 2020-09-10 亿可能源科技(上海)有限公司 Management and control method for air conditioning system, and system and storage medium
CN111043731A (en) * 2019-12-31 2020-04-21 中维通(北京)科技有限公司 Air conditioning system adjusting method based on weather forecast
CN113108432A (en) * 2020-09-09 2021-07-13 中维通(北京)科技有限公司 Air conditioning system adjusting method and system based on weather forecast
CN112013521B (en) * 2020-09-09 2021-06-01 中维通(北京)科技有限公司 Air conditioning system adjusting method and system based on weather forecast
CN113108432B (en) * 2020-09-09 2022-04-15 中维通(北京)科技有限公司 Air conditioning system adjusting method and system based on weather forecast
CN112013521A (en) * 2020-09-09 2020-12-01 中维通(北京)科技有限公司 Air conditioning system adjusting method and system based on weather forecast
CN112539512A (en) * 2020-12-09 2021-03-23 广东电网有限责任公司佛山供电局 Transformer substation's thing networking atmospheric control system
CN113294902A (en) * 2021-05-31 2021-08-24 厦门科灿信息技术有限公司 Energy-saving control method and device for air conditioner and air conditioner control terminal
CN115183390A (en) * 2022-08-18 2022-10-14 合肥美的暖通设备有限公司 Control method of air conditioner, air conditioner and storage medium
CN115183390B (en) * 2022-08-18 2024-02-23 合肥美的暖通设备有限公司 Air conditioner control method, air conditioner and storage medium

Also Published As

Publication number Publication date
CN101825327B (en) 2012-03-07

Similar Documents

Publication Publication Date Title
CN101825327B (en) Method for acquiring optimum air-conditioning system operation parameters based on weather forecast
US8620476B2 (en) Method and apparatus for smart climate control
CN107169606A (en) A kind of Forecasting Methodology of office building refrigeration duty
US20130304269A1 (en) Continuous Optimization Energy Reduction Process in Commercial Buildings
CN107781947A (en) A kind of air conditioning system Cooling and Heat Source forecast Control Algorithm and device
CN106681964A (en) Public building energy consumption auditing statistics splitting method
US20120130924A1 (en) System and method for analyzing energy use
Volkov et al. Energy performance and energy saving of life-support systems in educational institutions
CN108426354A (en) Air-conditioning Load Prediction system based on radiated time sequence method
CN107576015A (en) A kind of building air conditioning model predictive control method and device for realizing Demand Side Response
JP2005257113A (en) Schedule transmitting device, apparatus operation setting device, schedule distributing method, and apparatus operation setting method
Thyer et al. Optimising energy use in an existing commercial building: a case study of Australia’s Reef HQ Aquarium
KR102028601B1 (en) Method andapparatus for forcatsting energy consumptuion of a facalty
CN208567008U (en) Air-conditioning Load Prediction system based on radiated time sequence method
Chen et al. Effects of weather forecasting on indoor comfort and energy savings in office buildings
EP2065655B1 (en) Method for energy saving by scheduling of the energy supplied for air-conditioning, according to the previous and/or expected power consumption and the knowledge in advance of weather data
JP2015061395A (en) Energy utilization support system, method of supporting the same and support program
Pachano et al. Enhancing self-consumption for decarbonization: An optimization strategy based on a calibrated building energy model
Xiaonuan et al. Existing buildings' operation and maintenance: renovation project of Chow Yei Ching Building at the University of Hong Kong
Zafaranchi et al. Comparing energy profiles of different building types by determining their sensitivities
Ma et al. Study on the effect of photovoltaic louver shading and lighting control system on building energy consumption and daylighting
US20220187773A1 (en) Managing energy using artificial intelligence
Tang et al. Matching of air conditioning power and PV panel output power based on dynamic controlling of air conditioning air supply volume
Del Regno et al. Energy efficiency in hospitals: comparative analysis of different HVAC configurations
CN101876448A (en) Meteorological power-saving method model

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120307

Termination date: 20140528