CN102535807A - Modular wall tile pre-bonding structure and construction method thereof - Google Patents

Modular wall tile pre-bonding structure and construction method thereof Download PDF

Info

Publication number
CN102535807A
CN102535807A CN2012100350468A CN201210035046A CN102535807A CN 102535807 A CN102535807 A CN 102535807A CN 2012100350468 A CN2012100350468 A CN 2012100350468A CN 201210035046 A CN201210035046 A CN 201210035046A CN 102535807 A CN102535807 A CN 102535807A
Authority
CN
China
Prior art keywords
profile
preparatory
wall
cementing agent
walltile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012100350468A
Other languages
Chinese (zh)
Other versions
CN102535807B (en
Inventor
晏绪飞
汤永明
郑宜坤
张志山
刘锡俊
郑春
姚曙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Third Bureau Decoration Co Ltd
Original Assignee
China Construction Third Bureau Decoration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Third Bureau Decoration Co Ltd filed Critical China Construction Third Bureau Decoration Co Ltd
Priority to CN201210035046.8A priority Critical patent/CN102535807B/en
Publication of CN102535807A publication Critical patent/CN102535807A/en
Application granted granted Critical
Publication of CN102535807B publication Critical patent/CN102535807B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention relates to a modular wall tile pre-bonding structure and a construction method thereof, which are particularly suitable for paving and constructing wall tiles on a wall surface in fine interior decoration. The flatness, verticality and tile joint consistency of the wall surface can be better controlled during construction. The structure comprises the wall tiles, a bonding agent, a base course plate, screws and a fixing buckle strip, wherein the wall tiles or veneers are bonded to the base course plate through the bonding agent; and the base course plate is connected with a base course wall through the fixing buckle strip. The structural form is changed and optimized on the basis of the conventional wall tile paving, so that a novel wall tile paving system which can meet the requirements of quick paving and quality control is formed.

Description

Preparatory sticking structure of a kind of modular wall face brick and job practices thereof
Technical field
The present invention relates to the building finishing field, particularly relate to fine fitment metope wall brick paving construction technology.
Background technology
At present; Innovation along with the ceramic tile technology; The kind of various walltiles, decorative pattern, quality, pattern have been obtained the development of advancing by leaps and bounds, and can satisfy various architectural decoration functional requirements, and the increasing decorating building wall of China has all adopted ceramic tile to carry out Decoration Design.To the finishing stage in later stage, particularly large-scale office premises public domain metope, ground, kitchen, washroom, the ground of most real estate building design all adopt ceramic tile to decorate in a large number.As press the traditional approach construction, and after the ceramic tile paving was accomplished, skill was uneven because the deviation of civil engineering metope and workman construct, and it also is uneven usually causing the face brick quality.The tradition paving is also very high for the requirement of temperature, humidity, neither be convenient especially in the winter rainy season construction.
Therefore how to invent a kind of new paving system that improves; Can avoid the civil engineering body of wall influence, improve construction quality, weaken climatic effect, speed up the work; Make full use of existing material and equipment; The cost minimum with the shortest time carries out paving, satisfies the needs of new various building functions, just becomes a new problem.This problem still occurs in the decorative engineering at home for the first time, but does not have experience for reference.Since to consider whole paving unity, decorate the problem that planeness, levelness, the verticality of back metope all reach code requirement and can avoid various environmental factors, material factor to cause; And do not destroy the quality of former civil engineering structure and waterproofing course, so this technological innovation also has certain degree of difficulty.
Summary of the invention
The purpose of this invention is to provide preparatory sticking structure of a kind of modular wall face brick and job practices thereof; The bonding combined system that but this structure is a repeated removal that a cover is connected with the basic unit metope to be made up; And to walltile and with it the ornament materials of associated carry out modularization; Described connection combined system can make traditional walltile paving, dismounting, displacement, combination become easy, and fast original material that utilizes is removed and installed easily.
Technical scheme of the present invention: the preparatory sticking structure of a kind of modular wall face brick, comprise walltile, cementing agent, basal plate, screw, fixing profile, walltile is bonded on the basal plate through cementing agent, and basal plate is connected with the basic unit wall through fixing profile.
Said basal plate is fixedly connected with the fixing profile bull of profile through cementing agent and screw, and fixedly the profile parent part of profile passes through cementing agent and screw and is fixedly connected with the basic unit wall, and profile bull and profile parent part engage and articulate.
The connecting portion of said profile bull and basic unit's wall is provided with pad.
The whole cutting of said walltile, installation in advance form module.
Said cementing agent is an AB glue.
Said walltile replaces with the facing plate.
The job practices of the preparatory sticking structure of above-mentioned modular wall face brick is following:
1) unified cutting apart, cuts out the basal plate of corresponding size according to the concrete metope size in scene.
2) unwrapping wire is located, and on basic unit's wall, installs and fixes the profile parent part of profile, and the profile parent part is fixed on the wall with cementing agent and screw.
3) on basal plate, walltile is bondd firmly on request with cementing agent.
4) profile bull and basal plate are fixed with cementing agent and screw at the back side of basal plate.
When 5) installing, basal plate is articulated to the profile bull on the profile parent part that is fixed on basic unit's wall, inserts pad according to actual needs between profile bull and the basic unit's wall, profile is tightened.
Can unify the chamfering of cutting edge to walltile according to actual needs in the practice of construction.Further, said cementing agent is an AB glue, and said walltile replaces with the facing plate.
Beneficial effect of the present invention: can make conventional walltile paving, fractionation and combination become easy, the unified cutting of big machinery has guaranteed the walltile geometrical factor always, and edging, chamfering are attractive in appearance, and it is straight, always to bump the angle.Workshop semiproduct cooked mode will improve construction speed greatly, reduce material transport, site operation number simultaneously, be convenient to project quality, progress, safety construction management.It is smooth that layered manner is pasted the height that guarantees the walltile finished surface, reduces consumption of materials.
Description of drawings
To be the preparatory sticking structure of modular wall face brick of the present invention be connected sketch map with the basic unit wall to Fig. 1.
Fig. 2 is a fixedly profile profile parent part scheme of installation of the present invention.
Fig. 3 is that walltile of the present invention is pasted sketch map.
Fig. 4 is an external corner scheme of installation of the present invention.
Among the figure: 1-profile parent part, 2-cementing agent, 3-screw, 4-basic unit wall, 5-pad, 6-profile bull, 7-basal plate, 8-walltile.
The specific embodiment
Below in conjunction with the practical implementation case the present invention is specified as follows: be connected sketch map as the preparatory sticking structure of modular wall face brick of one embodiment of the present of invention with the basic unit wall, as shown in Figure 1, it comprises walltile 8; Cementing agent 3, basal plate 7, screw 3; Fixing profile; Walltile 8 is bonded on the basal plate 7 through cementing agent 2, and basal plate 7 is connected with basic unit wall 4 through fixing profile, and wherein basal plate 7 passes through cementing agent 2 and screw 3 and is fixedly connected with the fixing profile bull 6 of profile; Fixedly the profile parent part 1 of profile is fixedly connected with basic unit wall 4 through cementing agent 2 and screw 3; 1 engaging articulates profile bull 6 with the profile parent part, can profile be tightened at the connecting portion insertion pad 5 of profile bull 6 with basic unit's wall 4 according to actual needs.All walltiles 8 adopt the unified cutting of processing factory, guarantee the modulus zero deflection how much, unified bevelling, angle lap.Can select cementing agent 2 to be AB glue according to actual requirement of engineering, also can carry out the construction of building wall surfacing materials commonly used such as facing plate.
The job practices of the preparatory sticking structure of modular wall face brick comprises the steps:
As shown in Figure 2, unified cutting apart, cut out the basal plate 7 of corresponding size according to the concrete metope size in scene; The unwrapping wire location; And on basic unit's wall 4, install and fix the profile parent part 1 of profile; Profile parent part 1 usefulness cementing agent 2 is fixed on the wall with screw 3; With adaptive system to the degree of plainness for wall surface requirement, through early stage unwrapping wire can pass through native system levelling metope, guarantee the planeness and the verticality of metope after the walltile paving; As shown in Figure 3, on basal plate 7, walltile 8 is bondd firmly on request with cementing agent; The back side at basal plate 7 is fixing with basal plate 7 with profile bull 6 with cementing agent and screw 3; During installation, basal plate 7 usefulness profile bulls 6 are articulated on the profile parent part 1 that is fixed on basic unit's metope, according to actual needs, insert pad 5 between profile bull 6 and the basic unit's wall 4; With the profile chucking, can be through above-mentioned construction according to the metope size, through the unwrapping wire in early stage; In advance walltile 8 is pasted on basal plate 7, it is convenient to paste, and quality is controlled easily; Directly monoblock basal plate 7 is sticked on basic unit's wall 4 during installation, easy for installation, fixing is high.And can unify the chamfering of cutting edge to walltile according to actual needs.As shown in Figure 4; At the external corner position; Corresponding surface layer walltile 4 or face brick are unified cutting; Owing to the modularization of basal plate, greatly reduce the generation of the situation such as external corner stickup dislocation that cause owing to factors such as basic unit's temperature difference, the preparatory sticking structure external corner of this modular wall face brick is installed and also can be satisfied quick paving and control quality requirement.

Claims (10)

1. preparatory sticking structure of modular wall face brick; It is characterized in that: comprise walltile (8), cementing agent (2), basal plate (7); Screw (3); Fixing profile, walltile (8) is bonded on the basal plate (7) through cementing agent (2), and basal plate (7) is connected with basic unit's wall (4) through fixing profile.
2. the preparatory sticking structure of a kind of modular wall face brick according to claim 1; It is characterized in that: said basal plate (7) is fixedly connected with the fixing profile bull (6) of profile through cementing agent (2) and screw (3); Fixedly the profile parent part (1) of profile is fixedly connected with basic unit's wall (4) through cementing agent (2) and screw (3), and profile bull (6) and profile parent part (1) engaging articulate.
3. the preparatory sticking structure of a kind of modular wall face brick according to claim 1 and 2 is characterized in that: said profile bull (6) is provided with pad (5) with the connecting portion of basic unit's wall (4).
4. the preparatory sticking structure of a kind of modular wall face brick according to claim 1 and 2 is characterized in that: the whole cutting of said walltile (8), installation in advance form module.
5. the preparatory sticking structure of a kind of modular wall face brick according to claim 1 and 2 is characterized in that: said cementing agent (2) is an AB glue.
6. the preparatory sticking structure of a kind of modular wall face brick according to claim 1 and 2, it is characterized in that: said walltile replaces with the facing plate.
7. the job practices of the preparatory sticking structure of modular wall face brick according to claim 1 and 2 is characterized in that:
1) unified cutting apart, cuts out the basal plate (7) of corresponding size according to the concrete metope size in scene;
2) unwrapping wire is located, and on basic unit's wall (4), installs and fixes the profile parent part (1) of profile, and profile parent part (1) is fixed on the wall with cementing agent (2) and screw (3);
3) upward walltile (8) is bondd firmly on request at basal plate (7) with cementing agent;
4) profile bull (6) and basal plate (7) is fixing at the back side of basal plate (7) with cementing agent (2) and screw (3);
When 5) installing, basal plate (7) is articulated to profile bull (6) on the profile parent part (1) that is fixed on basic unit's wall, inserts pad (5) according to actual needs between profile bull (6) and the basic unit's wall (4), profile is tightened.
8. the job practices of the preparatory sticking structure of modular wall face brick according to claim 7 is characterized in that: according to actual needs walltile is unified the chamfering of cutting edge.
9. according to the job practices of claim 7 or the preparatory sticking structure of 8 described modular wall face bricks, it is characterized in that: said cementing agent (2) is an AB glue.
10. according to claim 7 or the preparatory sticking structure of 8 described a kind of modular wall face bricks, it is characterized in that: said walltile replaces with the facing plate.
CN201210035046.8A 2012-02-16 2012-02-16 Modular wall tile pre-bonding structure and construction method thereof Expired - Fee Related CN102535807B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210035046.8A CN102535807B (en) 2012-02-16 2012-02-16 Modular wall tile pre-bonding structure and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210035046.8A CN102535807B (en) 2012-02-16 2012-02-16 Modular wall tile pre-bonding structure and construction method thereof

Publications (2)

Publication Number Publication Date
CN102535807A true CN102535807A (en) 2012-07-04
CN102535807B CN102535807B (en) 2014-07-09

Family

ID=46343701

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210035046.8A Expired - Fee Related CN102535807B (en) 2012-02-16 2012-02-16 Modular wall tile pre-bonding structure and construction method thereof

Country Status (1)

Country Link
CN (1) CN102535807B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104234365A (en) * 2013-06-06 2014-12-24 上海超杰环境保护有限公司 Fastener tile and installation method thereof
CN109403641A (en) * 2018-11-27 2019-03-01 上海聚通装饰集团有限公司 A kind of anti-loosening technique for fixing of skirting bonding installation
CN111576771A (en) * 2020-05-09 2020-08-25 绍兴市亮戈装饰设计工程有限公司 Modular wall tile pre-pasting structure and construction method thereof
CN112049352A (en) * 2020-08-25 2020-12-08 成都建工装饰装修有限公司 Modular wall tile pre-pasting structure and construction method thereof
CN112267635A (en) * 2020-10-27 2021-01-26 北京华邑建设集团有限公司 Construction process for block pre-sticking wall tile

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1055215A (en) * 1990-03-29 1991-10-09 株式会社大理石工艺社 The hookup mechanism of structures such as stone material
JPH03244737A (en) * 1990-02-21 1991-10-31 Kunishiro Taika Kogyosho:Kk Tile outer wall structure and construction method thereof
JPH10252242A (en) * 1997-03-14 1998-09-22 Touyoko Kikaku Kk Surface decorative structure and construction method
CN2303888Y (en) * 1997-03-03 1999-01-13 许鸿泉 Dry construction ceramic tile
US6609342B2 (en) * 2000-08-10 2003-08-26 Nichiha Co., Ltd. Sealing member and siding boards attachment structure
CN2612753Y (en) * 2003-01-30 2004-04-21 海尔集团公司 Monolithic ceramic tile wall/floor
CN101384779A (en) * 2006-02-08 2009-03-11 弗伦斯通风设备公司 Device for fixing thin elements to facades
CN201649498U (en) * 2010-01-12 2010-11-24 王云飞 Hanging fastener component for stone ceramic plates
CN102094480A (en) * 2011-03-15 2011-06-15 王云飞 Stone ceramic plate hanging buckle component and mounting process thereof

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3244737B2 (en) * 1991-12-24 2002-01-07 松下電工株式会社 Battery life notification device

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03244737A (en) * 1990-02-21 1991-10-31 Kunishiro Taika Kogyosho:Kk Tile outer wall structure and construction method thereof
CN1055215A (en) * 1990-03-29 1991-10-09 株式会社大理石工艺社 The hookup mechanism of structures such as stone material
CN2303888Y (en) * 1997-03-03 1999-01-13 许鸿泉 Dry construction ceramic tile
JPH10252242A (en) * 1997-03-14 1998-09-22 Touyoko Kikaku Kk Surface decorative structure and construction method
US6609342B2 (en) * 2000-08-10 2003-08-26 Nichiha Co., Ltd. Sealing member and siding boards attachment structure
CN2612753Y (en) * 2003-01-30 2004-04-21 海尔集团公司 Monolithic ceramic tile wall/floor
CN101384779A (en) * 2006-02-08 2009-03-11 弗伦斯通风设备公司 Device for fixing thin elements to facades
CN201649498U (en) * 2010-01-12 2010-11-24 王云飞 Hanging fastener component for stone ceramic plates
CN102094480A (en) * 2011-03-15 2011-06-15 王云飞 Stone ceramic plate hanging buckle component and mounting process thereof

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104234365A (en) * 2013-06-06 2014-12-24 上海超杰环境保护有限公司 Fastener tile and installation method thereof
CN109403641A (en) * 2018-11-27 2019-03-01 上海聚通装饰集团有限公司 A kind of anti-loosening technique for fixing of skirting bonding installation
CN111576771A (en) * 2020-05-09 2020-08-25 绍兴市亮戈装饰设计工程有限公司 Modular wall tile pre-pasting structure and construction method thereof
CN111576771B (en) * 2020-05-09 2021-09-21 绍兴市亮戈装饰设计工程有限公司 Modular wall tile pre-pasting structure and construction method thereof
CN112049352A (en) * 2020-08-25 2020-12-08 成都建工装饰装修有限公司 Modular wall tile pre-pasting structure and construction method thereof
CN112267635A (en) * 2020-10-27 2021-01-26 北京华邑建设集团有限公司 Construction process for block pre-sticking wall tile

Also Published As

Publication number Publication date
CN102535807B (en) 2014-07-09

Similar Documents

Publication Publication Date Title
US5208086A (en) Laminated tile product, method for producing the same and method for installing the same
US5314554A (en) Method for producing a laminated tile product
CN208105573U (en) A kind of walling system
CN102535807B (en) Modular wall tile pre-bonding structure and construction method thereof
US5062913A (en) Laminated tile product and method for producing the same
WO2017190449A1 (en) Quickly installable building surface decorative material
CN103790334B (en) Combined splicing floor tile and laying technology of combined splicing floor tile
CN104499614A (en) Wall heat-preservation integration point hanging system and mounting method thereof
CN201250496Y (en) A plastic floor
CN103556804A (en) Wall and floor decoration module and mounting method thereof
CN203729547U (en) Composite splicing floor tile
CN105604284A (en) Production method for flexible tile module and prefabricated members
CN103556799B (en) The preparation method of honeycomb aluminum wall floor decoration module
CN102888970B (en) Large-area solid wood composite block floor as well as production method and installation method thereof
CN2923888Y (en) Positive corner closing-in strip
CN207144321U (en) Parapet abnormity bears down on one insulation and decoration component
CN103556798B (en) The preparation method of aluminum Concha Arcae wall floor decoration module
CN211369445U (en) Compound ceramic tile spreads fast and pastes structure
CN206554331U (en) A kind of sound insulation cracking resistance decorates prefabricated indoor partition panel
CN208533945U (en) A kind of flexible assembly floor tile
CN106193497A (en) The body of wall of a kind of teniogranite ornamental surface heat insulation and construction method thereof
CN206829561U (en) Big stringcourse insulation and decoration component
CN109868955A (en) The construction method of wall is used for after various plane materiels and cellular board are compound
CN108978851A (en) A kind of improvement room finishing system and decoration method
CN110453882A (en) A kind of paving structure of assembled SPC compound tile

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140709

Termination date: 20190216

CF01 Termination of patent right due to non-payment of annual fee