CN103353954A - Dynamic capacity allocation system and method - Google Patents

Dynamic capacity allocation system and method Download PDF

Info

Publication number
CN103353954A
CN103353954A CN2013102204827A CN201310220482A CN103353954A CN 103353954 A CN103353954 A CN 103353954A CN 2013102204827 A CN2013102204827 A CN 2013102204827A CN 201310220482 A CN201310220482 A CN 201310220482A CN 103353954 A CN103353954 A CN 103353954A
Authority
CN
China
Prior art keywords
production capacity
production
data
information
productivity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013102204827A
Other languages
Chinese (zh)
Inventor
李臻
王辰阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Huali Microelectronics Corp
Original Assignee
Shanghai Huali Microelectronics Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Huali Microelectronics Corp filed Critical Shanghai Huali Microelectronics Corp
Priority to CN2013102204827A priority Critical patent/CN103353954A/en
Publication of CN103353954A publication Critical patent/CN103353954A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • General Factory Administration (AREA)

Abstract

The invention discloses a dynamic capacity allocation system. The system comprises: a host which comprises a storage device, an information maintenance device, a real-time automatic updating device, a capacity allocation device, a capacity demand calculating and judging device, a capacity fine-tuning device and an automatic dispatching device. The invention also discloses a dynamic capacity allocation method. The method comprises: an information maintenance step, a real-time automatic updating step, a capacity allocation step, a capacity demand calculating and judging step, a capacity fine-tuning step and an automatic dispatching step. The beneficial effects are that: the dynamic capacity allocation is targeted for a production line; capacity is automatically calculated according to shipment schedules per month and a capacity allocation plan is formed, so that the automatic dispatching device is notified immediately to adjust goods-running strategies of the production line; the method and system are flexible and highly-efficient; computational accuracy is high; data updating is rapid and timely; limitations can be found in time, so that preparation is well made to prevent delay of shipment.

Description

Dynamic Productivity Calculation distribution system and method
Technical field
The present invention relates to a kind of Productivity Allocation system, belong to computing machine and microelectronics technology, relate in particular to a kind of Dynamic Productivity Calculation distribution system and method.
Background technology
Day by day complicated along with the development of technology in the integrated circuit manufacturing process and production line work, manufacturing department will guarantee delivery just-in-time, just must accomplish very accurate, careful to the Productivity Allocation of board.Because the board enormous amount on the production line, product category is many, and board production is all different in the frequency of product of the same race and different product use, and is so the Productivity Allocation system also must be flexible, convenient to tackle the complicated condition of production.
Be with PPT(Power Point basically, Microsoft's PowerPoint program), excel(electrical form) etc. in the present circumstance, mode is recorded the related data of each board, the expansion situation of cavity board.Be used for to calculate the WPH(Wafer Per Hour of production capacity, wafer quantum of output hourly) and the Flow(flow process of each product), also all be the mode with manual maintenance, gather at last the production capacity data that calculate a static state, efficient is low, and computational accuracy is poor, and Data Update is also untimely.
The work of production line one line is very numerous and diverse, it is the centrostigma of whole corporate directive, the many production decisions of manufacturing department are all closely bound up with board production capacity situation, use at present the mode of manual maintenance production capacity, Data Update is untimely, and accuracy can not guarantee, the most important thing is a lot of complicated calculating, can't calculate fast the result by manpower, can not in time provide accurately important referential data for decision-making level.
Summary of the invention
For the problem of above-mentioned existence, the present invention discloses a kind of Dynamic Productivity Calculation distribution system and method, to overcome the deficiency of using manual maintenance production capacity mode in the prior art.
To achieve these goals, the present invention adopts following technical scheme:
A kind of Dynamic Productivity Calculation distribution system comprises a main frame, and described main frame comprises a storer, and wherein, described system also comprises: the maintenance of information device is used for production information is imported to described storer; The real time automatic update device is used for the information that imports to described storer is carried out real time automatic update, and the data after the output renewal; The Productivity Allocation device, when being used for the data after receiving renewal, the frequency of utilization of equipment when producing according to product of the same race or multiple product, statistics Productivity Allocation ratio, and output Productivity Allocation ratio data; The production capacity demand is calculated and judgment means, be used for when receiving the Productivity Allocation ratio data, the maximum production capacity of computing equipment, production capacity load estimation situation and bottleneck equipment, whether the production capacity of judging result of calculation satisfies Production requirement, if "Yes", then directly with calculation result data output, if "No" then sends mail to the keeper by described main frame with calculation result data automatically; The production capacity micromatic setting, be used for after described production capacity demand calculating and judgment means are judged as "No", the keeper receives that described main frame automatically sends when comprising the mail of calculation result data, the keeper finely tunes Productivity Allocation ratio data and bottleneck device data by described main frame, obtain the production capacity maximum data, and output production capacity maximum data; The automatic job distribution device, be used for when receiving the calculation result data of exporting after described production capacity demand calculating and judgment means are judged as "Yes", automatically sending the worker, perhaps when receiving the production capacity maximum data of described production capacity micromatic setting output, automatically adjust the worker's scheme of sending according to the Productivity Allocation of production capacity maximum data, and automatic job distribution, to guarantee the finishing production shipment on time.
A kind of Dynamic Productivity Calculation distribution method of in host computer system, using, described host computer system comprises a storer, wherein, described method comprises: the maintenance of information step imports to production information in the described storer; The real time automatic update step is carried out real time automatic update to the information that imports in the described storer, and the data after the output renewal; When Productivity Allocation step, data after receiving renewal, the frequency of utilization of equipment when producing according to product of the same race or multiple product, statistics Productivity Allocation ratio, and output Productivity Allocation ratio data; The production capacity demand is calculated and determining step, when receiving the Productivity Allocation ratio data, the maximum production capacity of computing equipment, production capacity load estimation situation and bottleneck equipment, whether the production capacity of judging result of calculation satisfies Production requirement, if "Yes", then directly with calculation result data output, if "No" then sends mail to the keeper by described main frame with calculation result data automatically; The production capacity trim step, when described production capacity demand is calculated and after determining step is judged as "No", the keeper receives that described main frame automatically sends when comprising the mail of calculation result data, the keeper finely tunes Productivity Allocation ratio data and bottleneck device data by described main frame, obtain the production capacity maximum data, and output production capacity maximum data; The automatic job distribution step, when receiving the calculation result data of exporting after described production capacity demand calculating and determining step are judged as "Yes", automatically send the worker, perhaps when receiving the production capacity maximum data of described production capacity trim step output, automatically adjust the worker's scheme of sending according to the Productivity Allocation of production capacity maximum data, and automatic job distribution, to guarantee the finishing production shipment on time.
Above-mentioned Dynamic Productivity Calculation distribution method, wherein, in described maintenance of information step, described production information comprises production schedule information, product information and facility information.
Above-mentioned Dynamic Productivity Calculation distribution method, wherein, described production schedule information comprises each product shipment plan per month of being set by production schedule section.
Above-mentioned Dynamic Productivity Calculation distribution method, wherein, described product information comprises Production Version and the flow process version number that produces product.
Above-mentioned Dynamic Productivity Calculation distribution method, wherein, described facility information comprises device number, the processing procedure information under the equipment, equipment selecteed information whether in predetermined processing procedure, the WPH information of processing procedure production capacity under equipment affiliated area information and the equipment.
Above-mentioned Dynamic Productivity Calculation distribution method, wherein, in described Productivity Allocation step, carry out Productivity Allocation for product of the same race: the frequency of utilization during according to the production information of product of the same race and same device fabrication product of the same race in different production capacity scheduled units, add up the Productivity Allocation ratio that each production capacity scheduled unit is assigned to; Perhaps carry out Productivity Allocation for multiple product: according to the production information of different product and the frequency of utilization of producing the equipment of different product, add up every equipment per month to the Productivity Allocation ratio of different product.
The present invention has following advantage or beneficial effect:
1, carry out Dynamic Productivity Calculation for production line and distribute, automatically calculate the production capacity situation according to shipment plan per month, and the Productivity Allocation scheme, and immediately notify the automatic job distribution device, in time adjust production line and run the goods strategy;
2, host computer system obtains dynamic production capacity data, and flexible and efficient, computational accuracy is high, and Data Update is in time quick, and the Productivity Allocation project setting is convenient;
3, comprise these two kinds of Productivity Allocation situations of product of the same race and different product, but simultaneously also the people can in time find bottleneck for finely tuning, ready, avoid the shipment of delaying.
Concrete description of drawings
Fig. 1 is the structural representation of Dynamic Productivity Calculation distribution system of the present invention.
Fig. 2 is the schematic flow sheet of Dynamic Productivity Calculation distribution method of the present invention.
Embodiment
The present invention is further illustrated below in conjunction with accompanying drawing and specific embodiment, but not as limiting to the invention.
Dynamic Productivity Calculation distribution system of the present invention referring to Fig. 1, comprises a main frame, and main frame comprises a storer, and this system also comprises:
The maintenance of information device, be used for production information is imported to storer, wherein, production information comprises production schedule MPS(Master Production Schedule) information, product information and facility information, MPS information comprises each product shipment plan per month of being set by production schedule section, according to product and month with in the shipment plan boot memory, product information comprises Production Version and flow process (FLOW) version number that produces product, facility information comprises device number, processing procedure (capability) information under the equipment (is that same equipment can be served as respectively different production boards in the different processing procedures under same flow process, that is to say that the production effect that same equipment plays is different with the role who serves as), equipment in predetermined processing procedure whether selecteed information (namely for a certain concrete equipment, whether it selected in a certain or predetermined processing procedure that certain several needs is used to, be put to the information in the middle of producing), the WPH information of processing procedure production capacity under equipment affiliated area information and the equipment.
The real time automatic update device is used for the information that imports to storer is carried out real time automatic update, and the data after the output renewal.
The Productivity Allocation device, when being used for the data after receiving renewal, the frequency of utilization of equipment when producing according to product of the same race or multiple product, statistics Productivity Allocation ratio, and output Productivity Allocation ratio data.
The production capacity demand is calculated and judgment means, be used for when receiving the Productivity Allocation ratio data, the maximum production capacity of computing equipment, production capacity load estimation situation and bottleneck equipment, whether the production capacity of judging result of calculation satisfies Production requirement, if "Yes", then directly with calculation result data output, if "No" then sends mail to the keeper by described main frame with calculation result data automatically.
The production capacity micromatic setting, be used for after described production capacity demand calculating and judgment means are judged as "No", the keeper receives that described main frame automatically sends when comprising the mail of calculation result data, the keeper finely tunes Productivity Allocation ratio data and bottleneck device data by described main frame, obtain the production capacity maximum data, and output production capacity maximum data.
The automatic job distribution device, be used for when receiving the calculation result data of exporting after described production capacity demand calculating and judgment means are judged as "Yes", automatically sending the worker, perhaps when receiving the production capacity maximum data of described production capacity micromatic setting output, automatically adjust the worker's scheme of sending according to the Productivity Allocation of production capacity maximum data, and automatic job distribution, to guarantee the finishing production shipment on time.
The Dynamic Productivity Calculation distribution method of in host computer system, using of the present invention, as shown in Figure 2, host computer system comprises a storer, the method comprises:
The maintenance of information step, production information is imported in the storer, wherein, production information comprises production schedule MPS information, product information and facility information, MPS information comprises each product shipment plan per month of being set by production schedule section, according to product and month with in the shipment plan boot memory, product information comprises Production Version and flow process (FLOW) version number that produces product, facility information comprises device number, processing procedure (capability) information under the equipment (is that same equipment can be served as respectively different production boards in the different processing procedures under same flow process, that is to say that the production effect that same equipment plays is different with the role who serves as), equipment in predetermined processing procedure whether selecteed information (namely for a certain concrete equipment, whether it selected in a certain or predetermined processing procedure that certain several needs is used to, be put to the information in the middle of producing), the WPH information of processing procedure production capacity under equipment affiliated area information and the equipment.
The real time automatic update step is carried out real time automatic update to the information that imports in the storer, and the data after the output renewal.
When Productivity Allocation step, data after receiving renewal, the frequency of utilization of equipment when producing according to product of the same race or multiple product, statistics Productivity Allocation ratio, and output Productivity Allocation ratio data.
The production capacity demand is calculated and determining step, when receiving the Productivity Allocation ratio data, the maximum production capacity of computing equipment, production capacity load estimation situation and bottleneck equipment, whether the production capacity of judging result of calculation satisfies Production requirement, if "Yes", then directly with calculation result data output, if "No" then sends mail to the keeper by described main frame with calculation result data automatically.
The production capacity trim step, when described production capacity demand is calculated and after determining step is judged as "No", the keeper receives that described main frame automatically sends when comprising the mail of calculation result data, the keeper finely tunes Productivity Allocation ratio data and bottleneck device data by described main frame, obtain the production capacity maximum data, and output production capacity maximum data.
The automatic job distribution step, when receiving the calculation result data of exporting after described production capacity demand calculating and determining step are judged as "Yes", automatically send the worker, perhaps when receiving the production capacity maximum data of described production capacity trim step output, automatically adjust the worker's scheme of sending according to the Productivity Allocation of production capacity maximum data, and the special circumstances Productivity Allocation adjusted the worker's scheme of sending automatically, and automatic job distribution, guaranteeing the finishing production shipment on time, and in time adjust production line and run the goods strategy.
In the Productivity Allocation step, carry out Productivity Allocation for product of the same race: the frequency of utilization during according to the production information of product of the same race and same device fabrication product of the same race in different production capacity scheduled units, add up the Productivity Allocation ratio that each production capacity scheduled unit is assigned to; Perhaps carry out Productivity Allocation for different product: according to the production information of different product and the frequency of utilization of producing the equipment of different product, add up every equipment per month to the Productivity Allocation ratio of different product.
Production capacity keeper's periodic maintenance production information, comprise the MPS maintenance of information, product information is safeguarded, the important secretary such as device-dependent message, and real time automatic update is in storer, then use Dynamic Productivity Calculation distribution system of the present invention calculate the every day/the per month maximum production capacity of each equipment, production capacity load estimation situation, if production capacity satisfies all Production requirements, then notifications automatic job distribution device is sent the worker according to current each product that calculates to the demand of equipment; As finding to have the inadequate equipment of production capacity or bottleneck equipment, production capacity keeper uses main frame that production capacity is finely tuned, and calculate and adjust the result, find out preferred plan, and notify the automatic job distribution device to make corresponding adjustment, in time adjust production line and run the goods strategy, and send the worker, the last ready disposing task of the device-dependent personnel of automatic mail notification is avoided the shipment of delaying.
It should be appreciated by those skilled in the art that those skilled in the art realizing described variation example in conjunction with prior art and above-described embodiment, do not do at this and give unnecessary details.Such variation example does not affect flesh and blood of the present invention, does not repeat them here.
Above preferred embodiment of the present invention is described.It will be appreciated that, the present invention is not limited to above-mentioned specific implementations, and the equipment of wherein not describing in detail to the greatest extent and structure are construed as with the common mode in this area to be implemented; Any those of ordinary skill in the art, do not breaking away from the technical solution of the present invention scope situation, all can utilize method and the technology contents of above-mentioned announcement that technical solution of the present invention is made many possible changes and modification, or being revised as the equivalent embodiment of equivalent variations, this does not affect flesh and blood of the present invention.Therefore, every content that does not break away from technical solution of the present invention according to any simple modification, equivalent variations and the modification that technical spirit of the present invention is done above embodiment, all still belongs in the scope of technical solution of the present invention protection.

Claims (7)

1. a Dynamic Productivity Calculation distribution system comprises a main frame, and described main frame comprises a storer, it is characterized in that described system also comprises:
The maintenance of information device is used for production information is imported to described storer;
The real time automatic update device is used for the information that imports to described storer is carried out real time automatic update, and the data after the output renewal;
The Productivity Allocation device, when being used for the data after receiving renewal, the frequency of utilization of equipment when producing according to product of the same race or multiple product, statistics Productivity Allocation ratio, and output Productivity Allocation ratio data;
The production capacity demand is calculated and judgment means, be used for when receiving the Productivity Allocation ratio data, the maximum production capacity of computing equipment, production capacity load estimation situation and bottleneck equipment, whether the production capacity of judging result of calculation satisfies Production requirement, if "Yes", then directly with calculation result data output, if "No" then sends mail to the keeper by described main frame with calculation result data automatically;
The production capacity micromatic setting, be used for after described production capacity demand calculating and judgment means are judged as "No", the keeper receives that described main frame automatically sends when comprising the mail of calculation result data, the keeper finely tunes Productivity Allocation ratio data and bottleneck device data by described main frame, obtain the production capacity maximum data, and output production capacity maximum data;
The automatic job distribution device, be used for when receiving the calculation result data of exporting after described production capacity demand calculating and judgment means are judged as "Yes", automatically sending the worker, perhaps when receiving the production capacity maximum data of described production capacity micromatic setting output, automatically adjust the worker's scheme of sending according to the Productivity Allocation of production capacity maximum data, and automatic job distribution, to guarantee the finishing production shipment on time.
2. Dynamic Productivity Calculation distribution method of in host computer system, using, described host computer system comprises a storer, it is characterized in that described method comprises:
The maintenance of information step imports to production information in the described storer;
The real time automatic update step is carried out real time automatic update to the information that imports in the described storer, and the data after the output renewal;
When Productivity Allocation step, data after receiving renewal, the frequency of utilization of equipment when producing according to product of the same race or multiple product, statistics Productivity Allocation ratio, and output Productivity Allocation ratio data;
The production capacity demand is calculated and determining step, when receiving the Productivity Allocation ratio data, the maximum production capacity of computing equipment, production capacity load estimation situation and bottleneck equipment, whether the production capacity of judging result of calculation satisfies Production requirement, if "Yes", then directly with calculation result data output, if "No" then sends mail to the keeper by described main frame with calculation result data automatically;
The production capacity trim step, when described production capacity demand is calculated and after determining step is judged as "No", the keeper receives that described main frame automatically sends when comprising the mail of calculation result data, the keeper finely tunes Productivity Allocation ratio data and bottleneck device data by described main frame, obtain the production capacity maximum data, and output production capacity maximum data;
The automatic job distribution step, when receiving the calculation result data of exporting after described production capacity demand calculating and determining step are judged as "Yes", automatically send the worker, perhaps when receiving the production capacity maximum data of described production capacity trim step output, automatically adjust the worker's scheme of sending according to the Productivity Allocation of production capacity maximum data, and automatic job distribution, to guarantee the finishing production shipment on time.
3. Dynamic Productivity Calculation distribution method as claimed in claim 2 is characterized in that, in described maintenance of information step, described production information comprises production schedule information, product information and facility information.
4. Dynamic Productivity Calculation distribution method as claimed in claim 3 is characterized in that, described production schedule information comprises each product shipment plan per month of being set by production schedule section.
5. Dynamic Productivity Calculation distribution method as claimed in claim 3 is characterized in that, described product information comprises Production Version and the flow process version number that produces product.
6. Dynamic Productivity Calculation distribution method as claimed in claim 3, it is characterized in that, described facility information comprises device number, the processing procedure information under the equipment, equipment selecteed information whether in predetermined processing procedure, the WPH information of processing procedure production capacity under equipment affiliated area information and the equipment.
7. Dynamic Productivity Calculation distribution method as claimed in claim 2, it is characterized in that, in described Productivity Allocation step, carry out Productivity Allocation for product of the same race: the frequency of utilization during according to the production information of product of the same race and same device fabrication product of the same race in different production capacity scheduled units, add up the Productivity Allocation ratio that each production capacity scheduled unit is assigned to; Perhaps
Carry out Productivity Allocation for multiple product: according to the production information of different product and the frequency of utilization of producing the equipment of different product, add up every equipment per month to the Productivity Allocation ratio of different product.
CN2013102204827A 2013-06-04 2013-06-04 Dynamic capacity allocation system and method Pending CN103353954A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013102204827A CN103353954A (en) 2013-06-04 2013-06-04 Dynamic capacity allocation system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013102204827A CN103353954A (en) 2013-06-04 2013-06-04 Dynamic capacity allocation system and method

Publications (1)

Publication Number Publication Date
CN103353954A true CN103353954A (en) 2013-10-16

Family

ID=49310320

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013102204827A Pending CN103353954A (en) 2013-06-04 2013-06-04 Dynamic capacity allocation system and method

Country Status (1)

Country Link
CN (1) CN103353954A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105184500A (en) * 2015-09-21 2015-12-23 歌尔声学股份有限公司 Production line equipment allotting method and system
CN110580579A (en) * 2019-08-28 2019-12-17 上汽通用五菱汽车股份有限公司 Internet-based automobile part supplier capacity management method and system
CN112365181A (en) * 2020-11-24 2021-02-12 上海华力集成电路制造有限公司 Qtime WIP control method of dynamic process flow
CN113780892A (en) * 2021-09-29 2021-12-10 上海华力微电子有限公司 Method for making product production plan based on integer programming

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1704947A (en) * 2004-05-29 2005-12-07 鸿富锦精密工业(深圳)有限公司 Mold processing productivity load disposal system and method
CN101128786A (en) * 2005-02-28 2008-02-20 先进微装置公司 Automated throughput control system and method of operating the same
US7379782B1 (en) * 2007-03-26 2008-05-27 Activplant Corporation System and method of monitoring and quantifying performance of an automated manufacturing facility

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1704947A (en) * 2004-05-29 2005-12-07 鸿富锦精密工业(深圳)有限公司 Mold processing productivity load disposal system and method
CN101128786A (en) * 2005-02-28 2008-02-20 先进微装置公司 Automated throughput control system and method of operating the same
US7379782B1 (en) * 2007-03-26 2008-05-27 Activplant Corporation System and method of monitoring and quantifying performance of an automated manufacturing facility

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105184500A (en) * 2015-09-21 2015-12-23 歌尔声学股份有限公司 Production line equipment allotting method and system
CN110580579A (en) * 2019-08-28 2019-12-17 上汽通用五菱汽车股份有限公司 Internet-based automobile part supplier capacity management method and system
CN110580579B (en) * 2019-08-28 2023-05-30 上汽通用五菱汽车股份有限公司 Internet-based automobile part provider capacity management method and system
CN112365181A (en) * 2020-11-24 2021-02-12 上海华力集成电路制造有限公司 Qtime WIP control method of dynamic process flow
CN113780892A (en) * 2021-09-29 2021-12-10 上海华力微电子有限公司 Method for making product production plan based on integer programming

Similar Documents

Publication Publication Date Title
CN103235835B (en) For the inquiry implementation method and device of data-base cluster
US10921791B2 (en) Production plan generation device, production plan generation method, and production plan
CN106817408B (en) Distributed server cluster scheduling method and device
CN103353954A (en) Dynamic capacity allocation system and method
CN104182279A (en) Task scheduling method, device and system
CN111353690B (en) Block chain enabled production scheduling edge calculation method
CN113393092B (en) Production scheduling method, equipment, device and storage medium
CN107483981B (en) Resource Calculation monitoring distribution method, storage medium, electronic equipment and system is broadcast live
CN104423331A (en) Wafer fabrication scheduling method and wafer fabrication scheduling system for semiconductor integrated circuit production
CN103414792A (en) Additive manufacturing resource dispatching system based on cloud computing and corresponding method
CN102638457B (en) Method and system for automatically allocating server resource
CN106161485A (en) Resource regulating method, device and the system of a kind of infrastructure service cluster
CN103440545A (en) System and method for management of product batch grades
CN110297944A (en) Distributed XML data processing method and system
CN112241405A (en) Flight plan automatic generation method and device, storage medium and electronic equipment
CN109242269A (en) Job instruction generation method, device, system, electronic equipment and storage medium
CN111443720A (en) Robot scheduling method and device
CN111612293A (en) Scheduling method and equipment based on MES system
CN107577211B (en) Internet of things technology-based pulling control system and method for material in process
CN114049011A (en) Production scheduling method and device
CN107578191A (en) The automatic method for carrying out PMC burdening calculations
CN105357317A (en) Data uploading method and system based on multi-client polling queuing
CN104850923A (en) Semiconductor production simulation system
CN114546096A (en) Base band chip, task scheduling method and terminal equipment
CN114707874A (en) Scheduling method, equipment and storage medium applied to aluminum alloy production

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20131016