CN104412707B - The method of operating of operation equipment and operation equipment for light-emitting device - Google Patents

The method of operating of operation equipment and operation equipment for light-emitting device Download PDF

Info

Publication number
CN104412707B
CN104412707B CN201380019677.3A CN201380019677A CN104412707B CN 104412707 B CN104412707 B CN 104412707B CN 201380019677 A CN201380019677 A CN 201380019677A CN 104412707 B CN104412707 B CN 104412707B
Authority
CN
China
Prior art keywords
converter
voltage
operation equipment
circuit
control device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201380019677.3A
Other languages
Chinese (zh)
Other versions
CN104412707A (en
Inventor
H·奥尔
C·瓦纳切
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tridonicatco GmbH and Co KG
Original Assignee
Tridonicatco GmbH and Co KG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tridonicatco GmbH and Co KG filed Critical Tridonicatco GmbH and Co KG
Publication of CN104412707A publication Critical patent/CN104412707A/en
Application granted granted Critical
Publication of CN104412707B publication Critical patent/CN104412707B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H05ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
    • H05BELECTRIC HEATING; ELECTRIC LIGHT SOURCES NOT OTHERWISE PROVIDED FOR; CIRCUIT ARRANGEMENTS FOR ELECTRIC LIGHT SOURCES, IN GENERAL
    • H05B45/00Circuit arrangements for operating light-emitting diodes [LED]
    • H05B45/10Controlling the intensity of the light
    • H05B45/14Controlling the intensity of the light using electrical feedback from LEDs or from LED modules
    • HELECTRICITY
    • H05ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
    • H05BELECTRIC HEATING; ELECTRIC LIGHT SOURCES NOT OTHERWISE PROVIDED FOR; CIRCUIT ARRANGEMENTS FOR ELECTRIC LIGHT SOURCES, IN GENERAL
    • H05B45/00Circuit arrangements for operating light-emitting diodes [LED]
    • H05B45/50Circuit arrangements for operating light-emitting diodes [LED] responsive to malfunctions or undesirable behaviour of LEDs; responsive to LED life; Protective circuits
    • H05B45/59Circuit arrangements for operating light-emitting diodes [LED] responsive to malfunctions or undesirable behaviour of LEDs; responsive to LED life; Protective circuits for reducing or suppressing flicker or glow effects

Abstract

A kind of operation equipment (2) for light-emitting device (3) includes:Circuit of power factor correction (20);Converter (30), the converter are connected with the circuit of power factor correction (20) and with the output end (41) that powers for light-emitting device (3);And control device (14), the control device has input (51), and the input is used for the voltage (Vbus) that sensing is supplied to the converter (30) by the circuit of power factor correction (20).Control device (14) are configured to execute the assessment to the ripple voltage (64) in the voltage (Vbus), and are determined and the output end (41) connected load (3) of the converter (30) and/or the power output of the converter (30) according to the assessment.

Description

The method of operating of operation equipment and operation equipment for light-emitting device
The present invention relates to a kind of operation equipment for light-emitting device.The invention particularly relates to this kind of with power factor school The operation equipment of positive circuit.
Avoided using PFC (" PFC " PFC) or at least reduce and occur in input current Harmonic current.Harmonic current may be particularly occurred in non-linear customer, the rectification for example in the supply with continuous filtering In device, because in the case of such customer, although input voltage is sinusoidal form, but the phase place of input current occurs partially Move and occur the distortion of non-sine form.The high-frequency harmonic vibration for now occurring can be by connection in front of each device Circuit of power factor correction that be activated or clock control is resisting.Circuit of power factor correction can be also used for flare-aircraft The operation equipment of structure, the such as electric ballast of fluorescent illumination mechanism or LED converter.This circuit is for operating illumination The device of mechanism is meaningful, this is because specification limit is sent back to and allows harmonic wave in supply network.
It is generally desirable to operation equipment and can be used for different light-emitting devices, the LED mould being for example used for varying number LED Block.Desirably, the operation equipment for being capable of automatic detection load connected with the output end of converter is provided.This causes necessity When make operation equipment control or adjustment with load be adapted.Can be automatically true by information by measurement process for this operation equipment It is set to a measured value and running parameter is adjusted according to the measured value.
Document EP1881745A1 achieves the detection to lamp type using spiral resistive measurement.Parameter of igniting is corresponded to should The type detection of lamp is setting, and starts lamp.Derived power and derived in school again by the power by ignitor supply The parameter of the circuit of power factor correction arranged for the power in positive lamp type detection process.
International Publication file WO2009/146934A2 describes method and apparatus, wherein adopts from a parameter The turn-on time of the PFC switch that APFC (" PFC ") is especially measured, and using operation equipment extremely A few running parameter.
Therefore when operation equipment is so-called SELV (" single ELV " or " SELV ") equipment, right The detection of the load of operation equipment output end enables in particular to express a requirement.In such devices for security reasons in tool Have between the SELV side of low-voltage and non-SELV side and there is potential isolation, the non-SELV side is electrically isolated out with SELV side.? For requiring in the operation equipment of light-emitting component that such electric current separates or potential isolation is in order at security consideration, will pass through So-called potential barrier or SELV potential barrier make ELV (special low pressure) area and the area with higher supply voltage and especially line voltage Domain separation.
Detection converter output end is conventionally used to, i.e. the method for the attribute of the load of the output end of SELV side is included in SELV Side obtains the process of measured value.But corresponding assessment and control are needed in SELV side using corresponding logical block or return Measured value via SELV potential barrier.Two processes are all related to additional circuit engineering cost
Task is to provide apparatus and method and provides improvement project about the problem.Task is, provides device And method, wherein the load of operation equipment output end and/or power output can be detected.
Task is, provides apparatus and method, need not be load inspection wherein in the operation equipment with potential barrier Survey and obtain measured value on the secondary side.
According to the present invention, provide a kind of be given in the independent claim feature, for light-emitting device and side The operation equipment of method.It is favourable and preferred embodiment that dependent claims limit the present invention.
In the method and apparatus according to embodiment, operation equipment has the power factor school for providing voltage to converter Positive circuit.The converter can be insulation or nonisulated formula resonance converter, e.g. LLC resonance converter.The conversion The output end (being also used as the output end of operation equipment) of device operationally provides electric energy to light-emitting device.PFC The control device of circuit can be carried out and be arranged so which according to assessment ripple voltage, especially circuit of power factor correction The ripple voltage of the peak-peak voltage in the voltage provided to converter is determining load connected with the output end of converter And/or the power output of converter.
Allowed according to ripple voltage, especially to by circuit of power factor correction according to the method and apparatus of embodiment Load and/or the power output assessed to detect converter of the ripple voltage of the peak-peak voltage of offer.Assessment for The measured value of remained capacity will be obtained in primary side.It is not necessarily to for load detecting process and on the SELV side of operation equipment Obtain measured value.
For example in order to different loads will be detected, control device can be arranged for detecting multiple LED, these LED Powered by the output end of converter.According to the amplitude of the ripple voltage in the voltage provided by circuit of power factor correction, In the case of the measured value about SELV potential barrier need not be returned, this or other load detecting processes are feasible.
The control device for example can be determined in the case of using indicatrix by way of form inquiry.The control Device processed can be using the load for so determining according to another characteristic curve, such as to be determined by another form inquiry For operating the parameter of converter, the form inquiry should be used for the load for detecting.The control device can be according to detecting Load and/or power output control the operation to operation equipment in a different manner.
In one embodiment, the control device is configured to the luminous intensity of light-emitting device according to the load that detects It is adjusted to rated value.As an alternative or supplement, the control device can be configured to suppress color shift according to the load for detecting. As an alternative or supplement, the control device can be configured to suppress flicker according to the load for detecting.
The control device can act in a different manner the operation of operation equipment so as to according to the load that detects come Control the operation.The control device can select the Working mould for circuit of power factor correction according to the load for detecting Formula.The control device can be selected according to the load for detecting, if should when DCM (" discontinuous conduction mode ") works or Person continuous and by the continuous current of inductor, i.e.,:In BCM (" critical conduction mode " or " border conduction mode ") work Operation power factor correcting circuit when making.The control device also can be selected according to the load for detecting for power factor school The running parameter of positive circuit.For example, the power factor that the control device can be according to the adjustment of load for detecting when BCM works The turn-on time (" Ton " time) of the power switch 24 of correcting circuit 20.As an alternative or supplement, the control device being capable of basis The load for detecting is adjusting the stand-by period or most before the power switch connection of the circuit of power factor correction when DCM work The short stand-by period.
The control device also can select the mode of operation for converter according to the load for detecting.The control device energy Enough select according to the load for detecting, should be operated with pulsed operation state converter (wherein cut off converter half-bridge or Full-bridge certain period of time), converter still should be operated with continuous duty, for example, dim for amplitude.The control dress Put and running parameter for converter can be automatically determined according to the load for detecting, the half-bridge of such as converter or full-bridge The connection frequency of switch.
The operation equipment can be implemented as the form of LED converter.The operation equipment can also be implemented as constant electricity The form of potential source.The operation equipment can be implemented as so that realizing the adjustment to operation equipment output voltage.
The control device can be implemented as the form of integrated circuit, and (ASIC is " specially to be especially implemented as special particular electrical circuit With integrated circuit ").
According to the method for different embodiments and the effect for therefore each reaching with according to the operation equipment of embodiment Embodiment is corresponding.
Hereinafter with reference to accompanying drawing and with reference to preferred embodiment in detail the present invention is described in detail.
Fig. 1 shows the illuminator with circuit of power factor correction according to an embodiment.
Fig. 2 shows the circuit diagram of the operation equipment according to an embodiment.
Fig. 3 has been depicted the load detecting process of the peak-peak voltage of the ripple voltage based on bus voltage, the peak Value-crest voltage is by according to the use of the control device of an embodiment operation equipment.
Fig. 4 has been depicted the process of the peak-peak voltage for knowing ripple voltage, and the peak-peak voltage is by according to one The control device of the operation equipment of individual embodiment is used.
Fig. 5 is the block diagram of the control device of the operation equipment according to an embodiment.
Fig. 1 is shown including for lighting device 3, being such as used for the block diagram of the illuminator 1 of the operation equipment 2 of LED.Behaviour Make equipment 2 to be connected with bus 4 or wireless connection system, to receive dimming commands and/or status report.
Operation equipment 2 for example can be embodied as gas-discharge lamp, luminescent material lamp or another fluorescent illuminating device Or it is embodied as LED converter.Operation equipment 2 carries out rectification with rectifier 10 to supply voltage, for example to supply voltage. Operation circuit 2 is with circuit of power factor correction 11.Operation circuit 2 is with control device 14.Circuit of power factor correction 11 is carried For a voltage Vbus, also referred to as bus voltage, for the downstream components of operation equipment 2.Can be reached by converter 12 To another voltage conversion and/or dimming function, the converter can be implemented as resonance converter.Converter 12 can be with transformation Device or other commutators are to realize electric isolution between the SELV side of operation equipment and non-SELV side.
Rectifier 10 can be connected to alternating voltage via a high frequency filter as far as possible, especially be connected to power supply electricity Pressure.The alternating voltage of the rectification that circuit of power factor correction 11 can be received from rectifier 10 is using as input voltage. Circuit of power factor correction 11 achieves the function of filtering and produces a DC voltage Vbus to be supplied to converter 12.So And the voltage of the supply voltage as converter 12 produced by circuit of power factor correction 11 also has ripple voltage, i.e.,:Tool There is a ripple.
Operation equipment 2 and the especially feature of control device 14 will be described by detail by referring to Fig. 2 to Fig. 6.Logical For often, control device 14 can according to the load 3 of the output end of converter 12 and/or according to the power output of operation equipment come Control circuit of power factor correction and/or converter 12.Control device 14 is configured to according to assessment especially voltage Vbus Detecting load 3, the peak-peak voltage is provided by circuit of power factor correction 11 to the peak-peak voltage of ripple voltage To converter 12.Control device 14 can control the operation to operation equipment according to the load for detecting.For example in order to want Detection is loaded multiple for automatic detection LED or the attribute of another aspect automatic detection light-emitting device 3.
Fig. 2 is the circuit diagram of the operation equipment according to an embodiment.Operation equipment 2 generally has PFC Circuit 20, the converter 30 located at 20 downstream of circuit of power factor correction and control device 14.Converter 30 especially can be real It is now resonance converter.The alternating voltage of rectification can be conveyed to circuit of power factor correction 20 as input voltage vin Input 19.The input voltage of operation equipment 2 is not necessarily the alternating voltage of rectification.For example rectifier 10 can be arranged as follows, Make which to source voltage commutation and circuit of power factor correction 20 is supplied to as input voltage vin.
The circuit of power factor correction can be with booster converter topographical arrangement.
The alternating voltage Vin of rectification is transported to inductor or winding 21.By inductor 21 and circuit of power factor correction 20 Input interface and output end between diode 22 be connected in series.By the output end of circuit of power factor correction 20 and converter 30 input is connected and the voltage Vbus produced by circuit of power factor correction 20 is supplied to conversion as supply voltage Device 30.
Circuit of power factor correction 20 has the charging capacitor 23 in its output end.Will be configured to power switch and can To be for example configured to field-effect transistor (FET), especially the controllable electrical switches 24 of MOSFET are connected to inductor 21 and diode Line between 22.Switch 24 can pass through (unshowned) current divider resistance eutral grounding.To be opened by the control device 14 of operation equipment 2 Close 24 and be switched on state and dissengaged positions.Control device 14 is borrowed with corresponding output end 52 to control PFC control signal Help the output end for example can be with the grid voltage of controlling switch 24.
In the state of switch 24 is connected, inductor 21 is grounded by switch 24, wherein blocking diode 22 so that for electricity Sensor 21 charges, and by electrical power storage in inductor 21.On the contrary, in roof-cut resistence 24, that is, when switching off, two poles Pipe 22 is energized so that inductor 21 can discharge to charging capacitor 23 self by diode 22 and will be stored in inductor Electric energy in 21 is transferred in charging capacitor 23.
By may be embodied as integrated circuit, especially the control device 14 of ASIC carrys out controlling switch 24.Will be by connecing repeatedly Leading to and PFC process being realized with roof-cut resistence 24, the connection frequency of its breaker in middle 24 is much larger than rectified AC voltage The frequency of Vin.
Converter 30 receives the supply voltage Vbus provided by circuit of power factor correction 20 in its output end.Converter 30 Electrolyte can be included, to realize the electric isolution between the non-SELV side of operation equipment 2 and the SELV side of operation equipment 2.Accordingly Potential barrier 49 or SELV potential barrier 49 the non-SELV side of operation equipment 2 is isolated from the SELV side of operation equipment 2.
Converter 30 has with armature winding 34 and the transformer of secondary windings 36.Converter 30 can be real using slab bridge control It is the LLC resonance converter comprising LLC resonance circuit to apply.The armature winding 34 of the transformer can also play LLC resonance circuit Inductor effect.The LLC resonance circuit includes another inductor 33 and capacitor 35.With inductor 33,34 and electricity The LLC resonance circuit of container 35 may be embodied as series resonant circuit.The less inductor 33 of the LLC resonance circuit also can quilt It is integrated in transformer and can be, for example, the leakage inductance of armature winding 34.
Converter 30 operationally, primary side by half-bridge switch 31,32 clock switch controlling.Switch 31,32 Field-effect transistor (FETs) can be implemented as, be especially embodied as MOSFET.Control device 14 can result in the alternating of switch 31,32 Clock mode connect.Control to switch is realized as follows, i.e., always at most conducting switchs one in 31,32.Control dress Put 14 and can control half-bridge under different working modes using switch 31,32.In the first operation mode, thus it is possible to vary switch 31st, 32 with respect to the resonant frequency of LLC resonance circuit connection frequency in case realize amplitude light modulation.In the second operation mode may be used To control half-bridge as follows, i.e.,:Converter 30 is caused to operate in a pulsed fashion.Wherein two can be opened in certain duration Close 31,32 and switch to off-state.Control device 14 can according to the load 3 detected at output end 41 and/or according to The power output detected at the output end 41 of operation equipment 2 is automatically using corresponding mode of operation and/or running parameter.Such as will As more detailed description, detection process is for example realized according to the peak-peak voltage of ripple voltage.Control device 14 is set It is set to for producing control signal, the control signal can be via the first output end 53 coupled with first switch 31 and with second Switch 32 the second output ends 54 for coupling to control.
Converter 30 has the primary side with transformer secondary output winding 36.The primary side can have band diode 37,38 Rectifier and the capacitor 39 positioned at rectifier output end.In addition can be in the 41 upstream grafting inductance of output end of converter 30 Device 40.The inductor 40 for example can be removed when converter 30 is manipulated into constant voltage source.
Load can be coupled with the output end 41 of converter, especially be switched on connection.Load 3 can include multiple luminous Diode (LED).Load 3 as light-emitting device can include inorganic and/or organic LED.These LED can be as in figure Connection in parallel as schematically showing in 2.But these LED of connection that can also connect, or can using series circuit and The combination of parallel circuit.
Control device 14 is configured to automatic detection load 3 or the power output exported via output end 41.Now will be right The time dependent voltage Vbus provided from circuit of power factor correction 20 to converter 30 as supply voltage is commented Estimate, as will be described in more detail with reference to Fig. 3 to Fig. 6.Control device 14 can come automatically according to the load for detecting so that The work of circuit of power factor correction 20 and/converter 30 is adapted with different working modes and/or running parameter.
Now a measured value will be conveyed to control device 14, control device 14 can obtain voltage using the measured value Vbus.Control device 14 for example can obtain voltage by way of the divider with resistance 26,27 is with time resolution Vbus, the voltage are supplied to converter 30 by circuit of power factor correction 20 as supply voltage.Can be by respective measurement values A/D conversion is realized before the input for being transported to control device 14.
Waviness and ripple voltage in the voltage Vbus provided by circuit of power factor correction 20 can be expressed as:
I (t) herein be fill a capacitor with the electricity that the charging current of time oscillation and C are the charging capacitor Hold.The ripple voltage that is drawn by the Section 1 on the right side of equation (1) has peak-peak voltage, equally when output end 41 and survey When amount point is electrically isolated from, obtained at the voltage Vbus for control device 14 according to the load 3 at 30 output end 41 of converter The peak-peak voltage.According to
P=VI=I2R=V2/R (2)
Power output at output end 41 is depending on load R.Correspondingly, the reduction of such as output current can for example cause electricity The reduction of the peak-peak voltage of pressure ripple.
Fig. 3 is that the dependence of peak-peak voltage and load that the circuit described in Fig. 2 has been explicitly shown ripple voltage is closed System.It is supported on more than ten times of change in described dependence.Such load change is, for example, the change of LED quantity, these LED is powered by operation equipment.The change of LED quantity is also appeared in the course of work, such as due to the interruption of LED.
The change of load by the peak value of the ripple voltage in the voltage Vbus for causing to be provided by circuit of power factor correction 20- The change of crest voltage.Peak-peak voltage described in Fig. 3 70 can for example as voltage in one cycle maximum Difference between minimum of a value, i.e., obtain as voltage difference.
This load dependency relation of the peak-peak voltage 70 of the ripple voltage in voltage Vbus cause to load and/ The detection of power output depends on the assessment to ripple voltage, particularly depends between minimum of a value and the maximum of voltage Vbus Voltage difference.
Control device 14 can use for example in figure 3 as described in the detection load of indicatrix, the feature is bent Line represents the peak-peak voltage relationship of load and ripple voltage.Now can be for example using corresponding indicatrix.
Fig. 4 shows the process of the peak-peak voltage for determining ripple voltage.The alternating voltage 61 of rectification is fed to work( Rate factor correcting circuit 20.The a cycle of non-rectified AC voltage is adapted to two cycles 62 of rectified AC voltage 61.When During the time window in the cycle 62 for being equal to or more than rectified AC voltage in its length, circuit of power factor correction 20 is provided Voltage Vbus is collected.The summation of collection value 65,66,67,68 can be assessed so as to determine ripple voltage 64 peak value- Crest voltage 70.
Different evaluation processes can be adopted.In one embodiment, control device 14 determines and occurs in the cycle 62 The maximum 68 of collection value and a minimum of a value 67.Difference between maximum 68 and the minimum of a value 67 is used as The standard of the peak-peak voltage of ripple voltage.
Complete treatment technology is feasible.For example control device can by sine curve fitting to collection value 65,66, 67th, 68, to determine the amplitude as in two adaptation parameters.
The example below has been explicitly shown effect of the control device 14 during load detecting.One expression voltage Vbus's Measured value will be received in input by control device 14 or be obtained in measurement point.Can be in the way of being changed using A/D.According to Collection value, can execute amplitude detection automatically.Wherein the amplitude of ripple voltage will be determined.Can using determined by amplitude examining Survey load.The load for example can be determined by way of form inquiry.Can be using indicatrix according to the amplitude come really Fixed load and/or power output.Alternatively, it is also feasible to replace form and for example assess the process of determination by algorithm. Assessment determine or form inquiry during it is also contemplated that aging compensation about operation equipment 2.Can be, for example, The operation equipment 2 of different degree of agings arranges different table value, and which is according to the aging using of operation equipment 2.Alternatively, Can be in view of the compensation factor changed according to the aging of operation equipment 2 in assessment.When operation equipment 2 is aging, for example The electric capacity that charging capacitor 23 changes can work, and wherein the change can be compensated for.
The control device 14 of operation equipment 2 can realize other functions.The control device of operation equipment 2 enables in particular to root According to the load for detecting, i.e., PFC is automatically determined according to the peak-peak voltage of the bus voltage Vbus for determining The mode of operation of circuit 20, the running parameter of circuit of power factor correction 20, the mode of operation of converter 30 and/or converter 30 Running parameter.
Fig. 5 shows the function of the control device 14 according to an embodiment in the way of functional block diagram.
Control device 14 can determine the voltage Vbus provided by circuit of power factor correction 20 with logical block 81 In ripple voltage peak-peak voltage.The logical block 81 can determine load using indicatrix.According to converter The load of output end can adapt to different functions.
Control device 14 can select the mode of operation of circuit of power factor correction with function 82.Function 82 can root The mode of operation of circuit of power factor correction is automatically selected according to the load for detecting.Function 82 can be according to the load choosing for detecting Selecting should be with DCM (" discontinuous conduction mode ") work or continuously and by the continuous current of inductor, i.e., (" to be faced with BCM Boundary's conduction mode " or " border conduction mode ") work and carry out operation power factor correcting circuit.If circuit of power factor correction 20 other mode of operations are feasible, then function 82 correspondingly selects one of mode of operation, such as CCM (" continuous conduction mould Formula ") mode of operation.
Function 82 can also select the running parameter of circuit of power factor correction according to the load for detecting.For example, control Device processed can adjust the power switch 24 of the circuit of power factor correction 20 when working with BCM according to the load for detecting Turn-on time (" Ton " time).As an alternative or supplement, control device can be adjusted according to the load for detecting with DCM work Stand-by period or most short stand-by period before the power switch 24 of circuit of power factor correction 20 is connected when making.
Control device 14 can carry out half-bridge control with function 85 to converter 30.Function 85 can be according to detecting Load come select to operate with pulsed mode converter 30 (wherein the half-bridge of cut-out converter or full-bridge certain Time period) converter 30, such as amplitude light modulation still should be operated with continuously-running duty.Function 85 can be according to detecting Load determine running parameter, the connection frequency of the such as half-bridge switch of converter 30 for converter automatically.
Control device 14 can have other functions, be for example used for suppressing the function 83 of the aberration related to load and/or Function 84, strength control or intensity for adjusting the light sent by light-emitting device 3 according to load are adjusted.Other can be realized For according to load control and/or the function of adjustment circuit of power factor correction 20 and/or converter 30.
Control device 14 can be implemented as the operation according to the different functions of indicatrix adaptation by operation equipment It is matched with the load and/or power output for detecting.It can be, for example, now the operation setting further feature song of operation equipment 2 Line, mode of operation and/or running parameter are provided as the function of loading.By the peak-peak voltage of ripple voltage and load This feature curve for connecting and the indicatrix for connecting load with running parameter can also be combined.
The transfer process in other embodiment can be realized in the embodiment with reference to described by above-mentioned accompanying drawing.In example The operation equipment can also be embodied as during the operation equipment provided as constant current source is such as provided in detail constant Voltage source.
When the process of peak-peak voltage of detection voltage ripple is described by disparity map, it would however also be possible to employ other Technology, such as via adaptation or by assessing the amplitude of voltage or ripple voltage by the peak-peak voltage of ripple voltage Determine into adaptation parameter.
As the replacement using indicatrix or supplement, can be by the peak-peak voltage of ripple voltage also by letter Number carries out calculating assessment to determine load and/or power output.
The inductor and capacitor of circuit of power factor correction and/or converter can be implemented as single inductance element Or capacity cell.The lucky less inductor and capacitor of circuit of power factor correction and/or converter can also be embodied as Parasitic inductor and capacitor parasitics.
Method and apparatus according to embodiment is can be used in the operation equipment for light-emitting device, is used for example in electronics Ballast device is used in LED converter.

Claims (14)

1. for the operation equipment (2) of light-emitting device (3), which includes one kind
Circuit of power factor correction (20),
Converter (30), its are connected with the circuit of power factor correction (20), and are had for described light-emitting device (3) power supply Output end (41), and
Control device (14), the control device have input (51), and the input is used for obtaining by the PFC Circuit (20) is supplied to the voltage (Vbus) of the converter (30), wherein described control device (14) be configured to execute to institute The assessment of the ripple voltage (64) of voltage (Vbus) is stated, and described with the converter (30) to determine according to the assessment The load of output end (41) connected light-emitting device (3) and/or the power output of the converter (30),
Wherein, described control device (14) with function (82) with according to the load of the light-emitting device (3) to select The mode of operation of circuit of power factor correction (20) is stated, and the mode of operation is discontinuous conduction mode, critical conduction mould Formula or continuous conduction mode.
2. according to claim 1 to operation equipment (2),
Wherein described control device (14) be provided in the time period (62) during determine the collection value of the voltage (Vbus) (65、66、67、68).
3. according to claim 2 to operation equipment (2), which includes
Rectifier (10), the rectifier couple and are arranged for rectification alternating current with the circuit of power factor correction (20) Pressure, wherein described time period include at least one cycle of the alternating voltage.
4. operation equipment (2) according to Claims 2 or 3,
Wherein described control device (14) the maximum collection value being configured so that according to acquisition in the time period (62) (68) the peak-peak voltage (70) between the minimum collection value (67) for and obtaining in the time period (62) is described to determine Assessment.
5. according to claim 4 to operation equipment (2),
Wherein described control device (14) be configured to by form inquiry determined according to peak-peak voltage (70) with described The load of the output end (41) connected light-emitting device (3) of converter (30).
6. according to claim 5 to operation equipment (2),
Wherein described control device (14) be configured to determine by the form inquiry described with the converter (30) The quantity of the connected light emitting diode of output end (41).
7. according to claim 1 to operation equipment (2),
Wherein described converter (30) output end (41) is electrically insulated with the input of the converter (30), the conversion The input of device (30) is connected to the circuit of power factor correction (20).
8. according to claim 7 to operation equipment (2),
Wherein described converter (30) it is implemented as LLC resonance converter.
9. according to claim 8 to operation equipment (2),
Wherein described control device (14) the half-bridge control for being arranged for the LLC resonance converter,
Wherein described control device (14) load and/or the converter being configured to according to the light-emitting device (3) (30) the power output come adjust the half-bridge control.
10. according to claim 1 to operation equipment (2),
Wherein described control device (14) be configured to according to determined by the load of light-emitting device (3) and/or institute State the power output of converter (30) to control the circuit of power factor correction (20) and/or the converter (30), so as to The luminous intensity sent from the light-emitting device (3) is adjusted to rated value.
11. operation equipment (2) according to claim 1, the equipment are implemented as LED converter.
12. operation equipment (2) according to claim 1,
The operation equipment is implemented as the ballast equipment for discharge lamp.
The method of operating of 13. operation equipments (2) for being used for light-emitting device (3), wherein described operation equipment (2) including power factor Correcting circuit (20) and converter (30), it is described that the converter is connected with the circuit of power factor correction (20) and has The output end (41) that light-emitting device (3) is powered, wherein methods described includes:
The voltage (Vbus) provided to the converter (30) from the circuit of power factor correction (20) is provided,
The ripple voltage (64) of the voltage (Vbus) is assessed, and
According to connected described with the output end (41) of the converter (30) to determine to the assessment of the ripple voltage The load of light-emitting device (3) and/or the power output of the converter (30),
Wherein, the Working mould of the circuit of power factor correction (20) is selected according to the load of the light-emitting device (3) Formula, and the mode of operation is discontinuous conduction mode, critical conduction mode or continuous conduction mode.
14. methods according to claim 13,
The method is implemented by the operation equipment (2) any one of claim 1 to 12.
CN201380019677.3A 2012-04-13 2013-04-15 The method of operating of operation equipment and operation equipment for light-emitting device Expired - Fee Related CN104412707B (en)

Applications Claiming Priority (5)

Application Number Priority Date Filing Date Title
DE102012007453.0 2012-04-13
DE102012007453 2012-04-13
DE102012014308A DE102012014308A1 (en) 2012-04-13 2012-07-19 Operating device for a lamp and method for operating a control gear
DE102012014308.7 2012-07-19
PCT/AT2013/000071 WO2013152373A1 (en) 2012-04-13 2013-04-15 Operating device for an illuminant and method for operating an operating device

Publications (2)

Publication Number Publication Date
CN104412707A CN104412707A (en) 2015-03-11
CN104412707B true CN104412707B (en) 2017-03-08

Family

ID=49232029

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201380019677.3A Expired - Fee Related CN104412707B (en) 2012-04-13 2013-04-15 The method of operating of operation equipment and operation equipment for light-emitting device

Country Status (4)

Country Link
EP (1) EP2837261B1 (en)
CN (1) CN104412707B (en)
DE (1) DE102012014308A1 (en)
WO (1) WO2013152373A1 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102013222892A1 (en) * 2013-11-11 2015-05-13 Tridonic Gmbh & Co Kg LED converter and method for controlling a converter circuit of an LED converter
DE102015207433A1 (en) * 2015-04-23 2016-11-10 Tridonic Gmbh & Co Kg Operating circuit, luminaire and method for detecting a control signal
WO2020082324A1 (en) * 2018-10-26 2020-04-30 Tridonic Gmbh & Co Kg Method and apparatus of adjusting parameter for electrical device

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6700335B2 (en) * 2001-09-28 2004-03-02 Osram Sylavania, Inc. Method and circuit for regulating power in a high pressure discharge lamp
US7759881B1 (en) * 2008-03-31 2010-07-20 Cirrus Logic, Inc. LED lighting system with a multiple mode current control dimming strategy
CN201533427U (en) * 2009-11-24 2010-07-21 浙江摩根电子科技有限公司 LLC self-excited half-bridge resonant LED driver
CN201557292U (en) * 2009-10-01 2010-08-18 英飞特电子(杭州)有限公司 High efficiency constant current LED driver
CN101932175A (en) * 2010-08-31 2010-12-29 电子科技大学 LED constant current driving circuit capable of dimming automatically
CN201789664U (en) * 2010-08-20 2011-04-06 深圳市雅玛西电子有限公司 Half-bridge LLC resonance LED power supply
CN102067734A (en) * 2008-06-06 2011-05-18 赤多尼科两合股份有限公司 Lamp type detection by means of power factor correction circuit
DE102010031239A1 (en) * 2010-03-19 2011-09-22 Tridonic Ag LED control with clocked constant current source

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1881745B1 (en) 2006-07-20 2010-04-14 STMicroelectronics Srl Process for recognizing the supply power of discharge lamps and related device
DE102010031247A1 (en) * 2010-03-19 2011-09-22 Tridonic Ag Low voltage power supply for a LED lighting system

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6700335B2 (en) * 2001-09-28 2004-03-02 Osram Sylavania, Inc. Method and circuit for regulating power in a high pressure discharge lamp
US7759881B1 (en) * 2008-03-31 2010-07-20 Cirrus Logic, Inc. LED lighting system with a multiple mode current control dimming strategy
CN102067734A (en) * 2008-06-06 2011-05-18 赤多尼科两合股份有限公司 Lamp type detection by means of power factor correction circuit
CN201557292U (en) * 2009-10-01 2010-08-18 英飞特电子(杭州)有限公司 High efficiency constant current LED driver
CN201533427U (en) * 2009-11-24 2010-07-21 浙江摩根电子科技有限公司 LLC self-excited half-bridge resonant LED driver
DE102010031239A1 (en) * 2010-03-19 2011-09-22 Tridonic Ag LED control with clocked constant current source
CN201789664U (en) * 2010-08-20 2011-04-06 深圳市雅玛西电子有限公司 Half-bridge LLC resonance LED power supply
CN101932175A (en) * 2010-08-31 2010-12-29 电子科技大学 LED constant current driving circuit capable of dimming automatically

Also Published As

Publication number Publication date
DE102012014308A1 (en) 2013-10-17
EP2837261A1 (en) 2015-02-18
WO2013152373A1 (en) 2013-10-17
EP2837261B1 (en) 2018-10-10
CN104412707A (en) 2015-03-11

Similar Documents

Publication Publication Date Title
US9220159B2 (en) Electronic ballast
US9839077B2 (en) LED lighting device using ballast
KR101248807B1 (en) Isolation-type flyback converter for light emitting diode driver
CN104221473B (en) The operation device of the control method of circuit of power factor correction, circuit of power factor correction and lighting mechanism
US9398650B2 (en) LED lighting device using ballast
JP3945681B2 (en) Lighting device
CN104247563B (en) For the converter of light-emitting component, LED converter and converter operation method
US8994286B2 (en) Operating device for a lamp having a power correction circuit
US8344628B2 (en) Dimming electronic ballast with lamp end of life detection
TW201230861A (en) LED retrofit lamp
CN102238780B (en) Control circuit of light-emitting element
CN110121229B (en) LED lighting system
CN103026798A (en) Dimmable LED lamp
CN105684553A (en) Circuit assembly for operating at least a first and a second cascade of leds
CN101652012A (en) High pressure discharge lamp lighting device and luminaire
CN104412707B (en) The method of operating of operation equipment and operation equipment for light-emitting device
EP3871471B1 (en) Led lamp arrangement with controlled power
JP5300501B2 (en) Lighting device and lighting apparatus
KR101452059B1 (en) Power suuplying apparatus and power supplying apparatus
CN1937876A (en) High voltage discharge lamp lighting device and illumination apparatus
EP3008978A1 (en) Led lighting converter
JP5069573B2 (en) High pressure discharge lamp lighting device, lighting fixture
Ng et al. High frequency AC distributed power system for fluorescent lighting
JP5163892B2 (en) Discharge lamp lighting device
KR200228628Y1 (en) Electronic Stabilizer For Each Dimming Control

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170308