CN105093939A - Building control system design and debugging apparatus and method - Google Patents
Building control system design and debugging apparatus and method Download PDFInfo
- Publication number
- CN105093939A CN105093939A CN201510110618.8A CN201510110618A CN105093939A CN 105093939 A CN105093939 A CN 105093939A CN 201510110618 A CN201510110618 A CN 201510110618A CN 105093939 A CN105093939 A CN 105093939A
- Authority
- CN
- China
- Prior art keywords
- design
- control system
- building control
- data
- debugging
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
Abstract
The invention provides a building control system design and debugging apparatus and method. The apparatus includes a design and inspection unit and a debugging auxiliary unit, the design and inspection unit can automatically generate design and system configuration documents and cabinet wiring diagrams based on the imported design data to perform the subsequent deployment and debugging of a building control system, and the debugging auxiliary unit can auxiliarily execute the on-site debugging of the designed building control system after the building control system is deployed based on the design and system configuration documents and cabinet wiring diagrams. The building control system design and debugging apparatus and method is less error-prone in design process, guarantees the integral consistency of the system, and can improve the on-site debugging efficiency of the system.
Description
Technical field
The present invention relates to system and commissioning device and method, more specifically, relate to building control system design and commissioning device and method.
Background technology
At present, along with the scale of building control system and complicacy improve day by day, effectively design and debug large buildings control system and become more and more important.
In existing technical scheme, the designer of building control system completes the design of building control system usually as follows: the architectural composition figure obtaining target building according to demand, select the field controller for each building equipment based on this architectural composition figure artificially thereupon, and determine according to selected field controller artificially or write corresponding application program and logic and design the wiring diagram of each bin, the installment and debugging of field apparatus is carried out subsequently, such as, technical scheme described in patent documentation US20050119767A1 based on this wiring diagram.
But there are the following problems for above-mentioned existing technical scheme: (1) organizes field apparatus and design wiring diagram according to specific architectural composition figure artificially due to needs, therefore design process is easy to make mistakes and is difficult to the global consistency of guarantee system; (2) due to needs total man building-site debugging unit equipment and system configuration, therefore the efficiency of system debug is lower.
Therefore, there is following demand: provide and design process can be made not easily to make mistakes and the global consistency of system can be ensured and building control system design and commissioning device and the method for fielded system debugging efficiency can be improved.
Summary of the invention
In order to solve the problem existing for above-mentioned prior art, the present invention proposes and design process can be made not easily to make mistakes and the global consistency of system can be ensured and building control system design and commissioning device and the method for fielded system debugging efficiency can be improved.
The object of the invention is to be achieved through the following technical solutions:
A kind of building control system design and commissioning device, described building control system design and commissioning device comprise:
Design and inspection unit, described design and inspection unit can based on the design data imported automatically generative approach and system configuration document and bin wiring diagram to implement deployment and the debugging of follow-up building control system;
Debugging auxiliary unit, described debugging auxiliary unit can after disposing described building control system according to described design and system configuration document and bin wiring diagram the auxiliary field adjustable performed for designed building control system.
In scheme disclosed above, preferably, direct the second design data of importing of the mode of input data on the first design data of importing of the described design data mode comprised by filling in design parameter template and/or the user interface that provided in described design and inspection unit 1 by user.
In scheme disclosed above, preferably, described design parameter template can carry out real-time inspection based on the first predetermined rule to the rationality of the design data that user inserts and logical validity, thus point out and guarantee that user inputs the design data meeting described first rule, wherein, described reasonalbeness check comprises the inspection of data layout to inputted data and data content.
In scheme disclosed above, preferably, described design and inspection unit can analyze described design data, and follow-up for anomaly is carried out to analysis result data, and automatically generates described design and system configuration document and bin wiring diagram based on the analysis result data after follow-up for anomaly thereupon.
In scheme disclosed above, preferably, described design and inspection unit analyze described design data as follows: according to preset and described design data is classified by the data field category index stored, and according to the rule preset, basic operations is carried out to each Data classification, to obtain the analysis result data through classification and computing.
In scheme disclosed above, preferably, described design and inspection unit carry out follow-up for anomaly to analysis result data as follows: carry out real-time inspection based on predetermined Second Rule to the rationality of the analysis result data produced by the first design data imported and logical validity, and when noting abnormalities to user report abnormal information; For the analysis result data that described second design data directly inputted by user produces, converge when it is transfused to and imported or already present whole design data in real time rationality and logical validity inspection are carried out to it based on predetermined described Second Rule, and momentarily point out abnormal information to user when noting abnormalities.
In scheme disclosed above, preferably, described Second Rule contains described first rule, and described abnormal information is classified as first kind abnormal information and Equations of The Second Kind abnormal information two class, described first kind abnormal information instruction does not allow the data of being correlated with to use in design process subsequently, although the data that described Equations of The Second Kind abnormal information instruction is relevant are unconventional and are allowed to be used by continuation in design process subsequently, may have problems.
In scheme disclosed above, preferably, described design and inspection unit automatically generative approach and system configuration document and bin wiring diagram as follows: converge the analysis result data on inspection that the analysis result data on inspection produced by the first design data imported and described second design data directly inputted by user produce, from database, select suitable field unit device controller and applied logic associated with it with generative approach and system configuration document based on predetermined design matched rule, and automatically generate bin wiring diagram based on selected field unit device controller thereupon, wherein, when noting abnormalities in the process at generative approach and system configuration document and bin wiring diagram to user report abnormal information.
In scheme disclosed above, preferably, after described design and system configuration document and bin wiring diagram are generated, described design and system configuration document are deployed on fielded system control station so that user disposes according to described bin wiring diagram and debugs described building control system by described design and inspection unit.
In scheme disclosed above, preferably, in deployment with when debugging described building control system, described debugging auxiliary unit is initiated and is performed assisted modulation operation, described assisted modulation operation comprises: initiate and the detection operation of the type performed for described fielded system control station and legitimacy, if the type of described fielded system control station and legitimacy and different design, then point out user exceptions, described abnormal information comprises abnormal cause.
In scheme disclosed above, preferably, in deployment with when debugging described building control system, described debugging auxiliary unit is initiated and is performed assisted modulation operation, and described assisted modulation operation comprises further: (1) checks the correctness of field wiring based on described bin wiring diagram; (2) check the consistance of field apparatus mount message and system configuration information and design documentation, and present inconsistent information to user, described inconsistent information comprises the information of inconsistent field unit device controller and the information of inconsistent equipment.
In scheme disclosed above, preferably, described debugging auxiliary unit checks the consistance of field apparatus mount message and system configuration information and offline design document as follows: generate the offline design list of elements based on described design documentation, and the described offline design list of elements comprises basic key element and element to be compared; Based on installing from Site Detection and the equipment collected and configuration information generation field deployment element information table, its form is identical with the described offline design list of elements; With basic key element for index by the element to be compared in the described offline design list of elements and described field deployment element information table according to priority comparison one by one, with formed consistance comparison report.
In scheme disclosed above, preferably, described assisted modulation operation comprises further: if determine that field apparatus mount message and system configuration information and design documentation are inconsistent, then the described design documentation of online corrigendum or the on-the-spot corrigendum equipment of prompting user are installed and configuration, to make both consistent.
In scheme disclosed above, preferably, after building control system is disposed and debugging completes, described debugging auxiliary unit can the running status of monitoring field equipment in real time.
Object of the present invention also can be achieved through the following technical solutions:
A kind of building control system design and adjustment method, described building control system design and adjustment method comprise the following steps:
(A1) based on the design data imported automatically generative approach and system configuration document and bin wiring diagram to implement deployment and the debugging of follow-up building control system;
(A2) dispose described building control system according to described design and system configuration document and bin wiring diagram, and perform the field adjustable for designed building control system based on described design and system configuration document and bin wiring diagram auxiliary field commissioning staff.
Building control system disclosed in this invention design and commissioning device and method have the following advantages: (1) owing to not needing to organize field apparatus and design wiring diagram according to specific architectural composition figure artificially, therefore makes design process more accurately and convenient and be easy to the global consistency of guarantee system; (2) due to more effectively field adjustable can be carried out by auxiliary unit, therefore the efficiency of system debug can be improved significantly, thus the cost reducing system installation and dispose.
Accompanying drawing explanation
By reference to the accompanying drawings, technical characteristic of the present invention and advantage will be understood better by those skilled in the art, wherein:
Fig. 1 is the schematic diagram of building control system design and commissioning device according to an embodiment of the invention;
Fig. 2 is the process flow diagram of building control system design and adjustment method according to an embodiment of the invention.
Embodiment
Fig. 1 is the schematic diagram of building control system design and commissioning device according to an embodiment of the invention.As shown in Figure 1, building control system design disclosed in this invention and commissioning device comprise design and inspection unit 1 and debug auxiliary unit 2.Described design and inspection unit 1 can based on the design data imported automatically generative approach and system configuration document and bin wiring diagram to implement deployment and the debugging of follow-up building control system.Described debugging auxiliary unit 2 can after disposing described building control system according to described design and system configuration document and bin wiring diagram the auxiliary field adjustable performed for designed building control system.
Preferably, in building control system disclosed in this invention design and commissioning device, described design data comprises the first design data that the mode by filling in design parameter template (such as with the some table of excel form) imports and/or direct the second design data of importing of the mode of input data on the user interface that provided in described design and inspection unit 1 by user.
Preferably, in building control system design disclosed in this invention and commissioning device, described design parameter template can based on the first predetermined rule to the rationality of the design data that user inserts and logical validity (such as, article one, network can not cross over multiple building, building control system can not comprise equipment point more than 2200 etc.) carry out real-time inspection, thus point out and guarantee that user inputs the design data meeting described first rule, wherein, described reasonalbeness check comprises to the inspection of the data layout of inputted data and data content (such as, the scope of some cell data must at 0-50, some cell must be numeral etc.).Exemplarily, described first rule realizes with the form of embedded grand application,
Preferably, in building control system design disclosed in this invention and commissioning device, design and inspection unit 1 can analyze described design data, and follow-up for anomaly is carried out to analysis result data, and automatically generates described design and system configuration document and bin wiring diagram based on the analysis result data after follow-up for anomaly thereupon.
Preferably, in building control system design disclosed in this invention and commissioning device, described design and inspection unit 1 analyze described design data as follows: according to preset and described design data carries out classifying (such as by the data field category index stored, its each row are split in each data class with the form of a unit by certain a line in a table), and according to the rule preset, basic operations is carried out (such as to each Data classification, calculate the AO(analog output on each unit) quantity), to obtain the analysis result data through classification and computing.
Preferably, in building control system design disclosed in this invention and commissioning device, described design and inspection unit 1 carry out follow-up for anomaly to analysis result data as follows: carry out real-time inspection based on predetermined Second Rule to the rationality of the analysis result data produced by the first design data imported and logical validity, and when noting abnormalities to user report abnormal information; For the analysis result data that described second design data directly inputted by user produces, converge when it is transfused to and imported or already present whole design data in real time rationality and logical validity inspection are carried out to it based on predetermined described Second Rule, and momentarily point out abnormal information to user when noting abnormalities.
Preferably, in building control system design disclosed in this invention and commissioning device, described Second Rule contains described first rule (can guarantee the double safety that rationality and logical validity check thus), and described abnormal information is classified as first kind abnormal information and Equations of The Second Kind abnormal information two class, described first kind abnormal information instruction does not allow the data of being correlated with to use in design process subsequently, although the data that described Equations of The Second Kind abnormal information instruction is relevant are unconventional and are allowed to be used by continuation in design process subsequently, but may have problems.
Preferably, in building control system design disclosed in this invention and commissioning device, described design and inspection unit 1 automatically generative approach and system configuration document and bin wiring diagram as follows: converge the analysis result data on inspection that the analysis result data on inspection produced by the first design data imported and described second design data directly inputted by user produce, from database, select suitable field unit device controller (comprising model and the port numbers of field unit device controller) and applied logic associated with it with generative approach and system configuration document based on predetermined design matched rule, and automatically generate bin wiring diagram based on selected field unit device controller thereupon, wherein, when noting abnormalities in the process at generative approach and system configuration document and bin wiring diagram to user report abnormal information.
Preferably, in building control system design disclosed in this invention and commissioning device, after described design and system configuration document and bin wiring diagram are generated, described design and system configuration document are deployed on fielded system control station so that user (such as field engineer) disposes according to described bin wiring diagram and debugs described building control system by described design and inspection unit 1.
Preferably, in building control system design disclosed in this invention and commissioning device, in deployment with when debugging described building control system, described debugging auxiliary unit 2 is initiated and is performed assisted modulation operation, described assisted modulation operation comprises: initiate and the detection operation of the type (such as its model) performed for described fielded system control station and legitimacy (such as whether effectively being authorized), if the type of described fielded system control station and legitimacy and different design, then point out user exceptions, described abnormal information comprises abnormal cause.
Preferably, in building control system design disclosed in this invention and commissioning device, in deployment with when debugging described building control system, described debugging auxiliary unit 2 is initiated and is performed assisted modulation operation, and described assisted modulation operation comprises further: (1) checks the correctness of field wiring based on described bin wiring diagram; (2) consistance of field apparatus mount message and system configuration information and design documentation is checked, and present inconsistent information (such as to user, field unit device controller is linked into wrong network, input point type configuration mistake etc.), described inconsistent information comprises the information of inconsistent field unit device controller and the information of inconsistent equipment.
Preferably, in building control system design disclosed in this invention and commissioning device, described debugging auxiliary unit 2 checks the consistance of field apparatus mount message and system configuration information and offline design document as follows: generate the offline design list of elements based on described design documentation, and the described offline design list of elements comprises basic key element and element to be compared; Based on installing from Site Detection and the equipment collected and configuration information generation field deployment element information table, its form is identical with the described offline design list of elements; With basic key element (such as the identifier of field unit device controller) for index by the element to be compared in the described offline design list of elements and described field deployment element information table according to priority comparison one by one, with formed consistance comparison report.
Preferably, in building control system design disclosed in this invention and commissioning device, described assisted modulation operation comprises further: if determine that field apparatus mount message and system configuration information and design documentation are inconsistent, then the described design documentation of online corrigendum or the on-the-spot corrigendum equipment of prompting user are installed and configuration, to make both consistent.
Preferably, in building control system disclosed in this invention design and commissioning device, after building control system is disposed and debugging completes, described debugging auxiliary unit 2 can the running status of monitoring field equipment in real time.
Therefore, building control system disclosed in this invention design and commissioning device have following advantages: (1) owing to not needing to organize field apparatus and design wiring diagram according to specific architectural composition figure artificially, therefore makes design process more accurately and convenient and be easy to the global consistency of guarantee system; (2) due to more effectively field adjustable can be carried out by debugging auxiliary unit, therefore the efficiency of system debug can be improved significantly, thus the cost reducing system installation and dispose.
Fig. 2 is the process flow diagram of building control system design and adjustment method according to an embodiment of the invention.As shown in Figure 2, building control system disclosed in this invention design and adjustment method comprise the following steps: (A1) based on the design data imported automatically generative approach and system configuration document and bin wiring diagram to implement deployment and the debugging of follow-up building control system; (A2) dispose described building control system according to described design and system configuration document and bin wiring diagram, and perform the field adjustable for designed building control system based on described design and system configuration document and bin wiring diagram auxiliary field commissioning staff.
Preferably, in building control system disclosed in this invention design and adjustment method, described design data comprises the first design data that the mode by filling in design parameter template (such as with the some table of excel form) imports and/or direct the second design data of importing of the mode of input data on the user interface that provided in described design and inspection unit 1 by user.
Preferably, in building control system design disclosed in this invention and adjustment method, described design parameter template can based on the first predetermined rule to the rationality of the design data that user inserts and logical validity (such as, article one, network can not cross over multiple building, building control system can not comprise equipment point more than 2200 etc.) carry out real-time inspection, thus point out and guarantee that user inputs the design data meeting described first rule, wherein, described reasonalbeness check comprises to the inspection of the data layout of inputted data and data content (such as, the scope of some cell data must at 0-50, some cell must be numeral etc.).Exemplarily, described first rule realizes with the form of embedded grand application,
Preferably, in building control system design disclosed in this invention and adjustment method, described step (A1) comprises further: analyze described design data, and follow-up for anomaly is carried out to analysis result data, and automatically generates described design and system configuration document and bin wiring diagram based on the analysis result data after follow-up for anomaly thereupon.
Preferably, in building control system design disclosed in this invention and adjustment method, described step (A1) comprises further analyzes described design data as follows: according to preset and described design data carries out classifying (such as by the data field category index stored, its each row are split in each data class with the form of a unit by certain a line in a table), and according to the rule preset, basic operations is carried out (such as to each Data classification, calculate the AO(analog output on each unit) quantity), to obtain the analysis result data through classification and computing.
Preferably, in building control system design disclosed in this invention and adjustment method, described step (A1) comprises further carries out follow-up for anomaly to analysis result data as follows: carry out real-time inspection based on predetermined Second Rule to the rationality of the analysis result data produced by the first design data imported and logical validity, and when noting abnormalities to user report abnormal information; For the analysis result data that described second design data directly inputted by user produces, converge when it is transfused to and imported or already present whole design data in real time rationality and logical validity inspection are carried out to it based on predetermined described Second Rule, and momentarily point out abnormal information to user when noting abnormalities.
Preferably, in building control system design disclosed in this invention and adjustment method, described Second Rule contains described first rule (can guarantee the double safety that rationality and logical validity check thus), and described abnormal information is classified as first kind abnormal information and Equations of The Second Kind abnormal information two class, described first kind abnormal information instruction does not allow the data of being correlated with to use in design process subsequently, although the data that described Equations of The Second Kind abnormal information instruction is relevant are unconventional and are allowed to be used by continuation in design process subsequently, but may have problems.
Preferably, in building control system design disclosed in this invention and adjustment method, described step (A1) comprises as follows automatically generative approach and system configuration document and bin wiring diagram further: converge the analysis result data on inspection that the analysis result data on inspection produced by the first design data imported and described second design data directly inputted by user produce, from database, select suitable field unit device controller (comprising model and the port numbers of field unit device controller) and applied logic associated with it with generative approach and system configuration document based on predetermined design matched rule, and automatically generate bin wiring diagram based on selected field unit device controller thereupon, wherein, when noting abnormalities in the process at generative approach and system configuration document and bin wiring diagram to user report abnormal information.
Preferably, in building control system design disclosed in this invention and adjustment method, described step (A1) comprises further: after described design and system configuration document and bin wiring diagram are generated, and described design and system configuration document is deployed on fielded system control station so that user (such as field engineer) disposes according to described bin wiring diagram and debugs described building control system.
Preferably, in building control system design disclosed in this invention and adjustment method, described step (A2) comprises further: in deployment with when debugging described building control system, initiate and perform assisted modulation operation, described assisted modulation operation comprises: initiate and the detection operation of the type (such as its model) performed for described fielded system control station and legitimacy (such as whether effectively being authorized), if the type of described fielded system control station and legitimacy and different design, then point out user exceptions, described abnormal information comprises abnormal cause.
Preferably, in building control system design disclosed in this invention and adjustment method, described step (A2) comprises further: in deployment with when debugging described building control system, initiate and perform assisted modulation operation, described assisted modulation operation comprises further: (1) checks the correctness of field wiring based on described bin wiring diagram; (2) consistance of field apparatus mount message and system configuration information and design documentation is checked, and present inconsistent information (such as to user, field unit device controller is linked into wrong network, input point type configuration mistake etc.), described inconsistent information comprises the information of inconsistent field unit device controller and the information of inconsistent equipment.
Preferably, in building control system design disclosed in this invention and adjustment method, described step (A2) comprises the consistance checking field apparatus mount message and system configuration information and offline design document as follows further: generate the offline design list of elements based on described design documentation, the described offline design list of elements comprises basic key element and element to be compared; Based on installing from Site Detection and the equipment collected and configuration information generation field deployment element information table, its form is identical with the described offline design list of elements; With basic key element (such as the identifier of field unit device controller) for index by the element to be compared in the described offline design list of elements and described field deployment element information table according to priority comparison one by one, with formed consistance comparison report.
Preferably, in building control system design disclosed in this invention and adjustment method, described assisted modulation operation comprises further: if determine that field apparatus mount message and system configuration information and design documentation are inconsistent, then the described design documentation of online corrigendum or the on-the-spot corrigendum equipment of prompting user are installed and configuration, to make both consistent.
Preferably, in building control system disclosed in this invention design and adjustment method, described step (A2) comprises further: dispose and the running status of monitoring field equipment in real time after having debugged at building control system.
Therefore, building control system disclosed in this invention design and adjustment method have following advantages: (1) owing to not needing to organize field apparatus and design wiring diagram according to specific architectural composition figure artificially, therefore makes design process more accurately and convenient and be easy to the global consistency of guarantee system; (2) due to more effectively field adjustable can be carried out by auxiliary unit, therefore the efficiency of system debug can be improved significantly, thus the cost reducing system installation and dispose.
Although the present invention is described by above-mentioned preferred implementation, its way of realization is not limited to above-mentioned embodiment.Should be realized that: when not departing from purport of the present invention and scope, those skilled in the art can make different changes and amendment to the present invention.
Claims (15)
1. building control system design and a commissioning device, described building control system design and commissioning device comprise:
Design and inspection unit, described design and inspection unit can based on the design data imported automatically generative approach and system configuration document and bin wiring diagram to implement deployment and the debugging of follow-up building control system;
Debugging auxiliary unit, described debugging auxiliary unit can after disposing described building control system according to described design and system configuration document and bin wiring diagram the auxiliary field adjustable performed for designed building control system.
2. building control system design according to claim 1 and commissioning device, it is characterized in that, direct the second design data of importing of the mode of input data on the first design data that the described design data mode comprised by filling in design parameter template imports and/or the user interface that provided in described design and inspection unit 1 by user.
3. building control system design according to claim 2 and commissioning device, it is characterized in that, described design parameter template can carry out real-time inspection based on the first predetermined rule to the rationality of the design data that user inserts and logical validity, thus point out and guarantee that user inputs the design data meeting described first rule, wherein, described reasonalbeness check comprises the inspection of data layout to inputted data and data content.
4. building control system design according to claim 3 and commissioning device, it is characterized in that, described design and inspection unit can analyze described design data, and follow-up for anomaly is carried out to analysis result data, and automatically generates described design and system configuration document and bin wiring diagram based on the analysis result data after follow-up for anomaly thereupon.
5. building control system design according to claim 4 and commissioning device, it is characterized in that, described design and inspection unit analyze described design data as follows: according to preset and described design data is classified by the data field category index stored, and according to the rule preset, basic operations is carried out to each Data classification, to obtain the analysis result data through classification and computing.
6. building control system design according to claim 5 and commissioning device, it is characterized in that, described design and inspection unit carry out follow-up for anomaly to analysis result data as follows: carry out real-time inspection based on predetermined Second Rule to the rationality of the analysis result data produced by the first design data imported and logical validity, and when noting abnormalities to user report abnormal information; For the analysis result data that described second design data directly inputted by user produces, converge when it is transfused to and imported or already present whole design data in real time rationality and logical validity inspection are carried out to it based on predetermined described Second Rule, and momentarily point out abnormal information to user when noting abnormalities.
7. building control system design according to claim 6 and commissioning device, it is characterized in that, described Second Rule contains described first rule, and described abnormal information is classified as first kind abnormal information and Equations of The Second Kind abnormal information two class, described first kind abnormal information instruction does not allow the data of being correlated with to use in design process subsequently, although the data that described Equations of The Second Kind abnormal information instruction is relevant are unconventional and are allowed to be used by continuation in design process subsequently, may have problems.
8. building control system design according to claim 7 and commissioning device, it is characterized in that, described design and inspection unit automatically generative approach and system configuration document and bin wiring diagram as follows: converge the analysis result data on inspection that the analysis result data on inspection produced by the first design data imported and described second design data directly inputted by user produce, from database, select suitable field unit device controller and applied logic associated with it with generative approach and system configuration document based on predetermined design matched rule, and automatically generate bin wiring diagram based on selected field unit device controller thereupon, wherein, when noting abnormalities in the process at generative approach and system configuration document and bin wiring diagram to user report abnormal information.
9. building control system design according to claim 8 and commissioning device, it is characterized in that, after described design and system configuration document and bin wiring diagram are generated, described design and system configuration document are deployed on fielded system control station so that user disposes according to described bin wiring diagram and debugs described building control system by described design and inspection unit.
10. building control system design according to claim 9 and commissioning device, it is characterized in that, in deployment with when debugging described building control system, described debugging auxiliary unit is initiated and is performed assisted modulation operation, described assisted modulation operation comprises: initiate and the detection operation of the type performed for described fielded system control station and legitimacy, if the type of described fielded system control station and legitimacy and different design, then point out user exceptions, described abnormal information comprises abnormal cause.
11. building control system design according to claim 10 and commissioning devices, it is characterized in that, in deployment with when debugging described building control system, described debugging auxiliary unit is initiated and is performed assisted modulation operation, and described assisted modulation operation comprises further: (1) checks the correctness of field wiring based on described bin wiring diagram; (2) check the consistance of field apparatus mount message and system configuration information and design documentation, and present inconsistent information to user.
12. building control system design according to claim 11 and commissioning devices, it is characterized in that, described debugging auxiliary unit checks the consistance of field apparatus mount message and system configuration information and offline design document as follows: generate the offline design list of elements based on described design documentation, and the described offline design list of elements comprises basic key element and element to be compared; Based on installing from Site Detection and the equipment collected and configuration information generation field deployment element information table, its form is identical with the described offline design list of elements; With basic key element for index by the element to be compared in the described offline design list of elements and described field deployment element information table according to priority comparison one by one, with formed consistance comparison report.
13. building control system design according to claim 12 and commissioning devices, it is characterized in that, described assisted modulation operation comprises further: if determine that field apparatus mount message and system configuration information and design documentation are inconsistent, then the described design documentation of online corrigendum or the on-the-spot corrigendum equipment of prompting user are installed and configuration, to make both consistent.
14. building control systems according to claim 13 design and commissioning devices, is characterized in that, after building control system is disposed and debugging completes, described debugging auxiliary unit can the running status of monitoring field equipment in real time.
15. 1 kinds of building control system designs and adjustment method, described building control system design and adjustment method comprise the following steps:
(A1) based on the design data imported automatically generative approach and system configuration document and bin wiring diagram to implement deployment and the debugging of follow-up building control system;
(A2) dispose described building control system according to described design and system configuration document and bin wiring diagram, and perform the field adjustable for designed building control system based on described design and system configuration document and bin wiring diagram auxiliary field commissioning staff.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510110618.8A CN105093939B (en) | 2015-03-13 | 2015-03-13 | Building control system design and commissioning device and method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510110618.8A CN105093939B (en) | 2015-03-13 | 2015-03-13 | Building control system design and commissioning device and method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105093939A true CN105093939A (en) | 2015-11-25 |
CN105093939B CN105093939B (en) | 2018-12-14 |
Family
ID=54574645
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510110618.8A Active CN105093939B (en) | 2015-03-13 | 2015-03-13 | Building control system design and commissioning device and method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105093939B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111831494A (en) * | 2020-06-08 | 2020-10-27 | 珠海格力电器股份有限公司 | Debugging system of building equipment |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4885694A (en) * | 1987-04-29 | 1989-12-05 | Honeywell Inc. | Automated building control design system |
US20050119767A1 (en) * | 2003-12-01 | 2005-06-02 | Gary Kiwimagi | Configuration application for building automation |
WO2007123774A2 (en) * | 2006-03-30 | 2007-11-01 | Siemens Building Technologies, Inc. | Service tool for wireless automation systems |
CN101311864A (en) * | 2007-05-18 | 2008-11-26 | 西门子建筑技术公司 | Arrangement and method for accessing data of a building automation system component |
CN101460928A (en) * | 2006-04-11 | 2009-06-17 | 因文西斯系统公司 | Method and supporting configuration user interfaces for streamlining installing replacement field devices |
CN102782689A (en) * | 2009-12-23 | 2012-11-14 | Aea集成公司 | System and method for automated building services design |
CN103048959A (en) * | 2011-10-13 | 2013-04-17 | Abb股份公司 | Method for configuring a control device |
CN104081298A (en) * | 2012-02-10 | 2014-10-01 | Abb技术有限公司 | System and method for automated handling of a workflow in an automation and/or electrical engineering project |
-
2015
- 2015-03-13 CN CN201510110618.8A patent/CN105093939B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4885694A (en) * | 1987-04-29 | 1989-12-05 | Honeywell Inc. | Automated building control design system |
US20050119767A1 (en) * | 2003-12-01 | 2005-06-02 | Gary Kiwimagi | Configuration application for building automation |
WO2007123774A2 (en) * | 2006-03-30 | 2007-11-01 | Siemens Building Technologies, Inc. | Service tool for wireless automation systems |
CN101460928A (en) * | 2006-04-11 | 2009-06-17 | 因文西斯系统公司 | Method and supporting configuration user interfaces for streamlining installing replacement field devices |
CN101311864A (en) * | 2007-05-18 | 2008-11-26 | 西门子建筑技术公司 | Arrangement and method for accessing data of a building automation system component |
CN102782689A (en) * | 2009-12-23 | 2012-11-14 | Aea集成公司 | System and method for automated building services design |
CN103048959A (en) * | 2011-10-13 | 2013-04-17 | Abb股份公司 | Method for configuring a control device |
CN104081298A (en) * | 2012-02-10 | 2014-10-01 | Abb技术有限公司 | System and method for automated handling of a workflow in an automation and/or electrical engineering project |
Non-Patent Citations (1)
Title |
---|
刘志京: "基于Lonworks技术的楼宇控制系统设计", 《北京印刷学院学报》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111831494A (en) * | 2020-06-08 | 2020-10-27 | 珠海格力电器股份有限公司 | Debugging system of building equipment |
Also Published As
Publication number | Publication date |
---|---|
CN105093939B (en) | 2018-12-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108255649B (en) | Diagnosis strategy design method based on modeling simulation cooperative analysis | |
US20170236234A1 (en) | Risk management method and system for a land transporation system | |
CN102750301B (en) | Blueprint generating method for integrated avionic system model aiming at architecture analysis and design language (AADL) description | |
CN105426300B (en) | Standard conformance test system and method for CIM/E model of power system | |
CN104483842A (en) | Regulation and control integrated automatic master station comparison method | |
CN107368955A (en) | The implementation method of power grid risk, equipment Risk and operating risk integration linkage | |
CN105808880A (en) | Relay protection setting method and system based on graphical power distribution network | |
CN105718432A (en) | Information mining and data quality verification method for power grid operation equipment | |
CN105069587A (en) | Mobile Internet-based relay protection verification device | |
CN102142108A (en) | Information processing method of corresponding relationship among materials and equipment suitable for power system | |
CN104615928A (en) | Metrological verification method and system and server | |
US6941261B1 (en) | Cause and effect logic application implementation | |
CN103777092A (en) | Cloud technology based relay protection test system and method | |
CN111241660A (en) | Civil engineering experiment detection system and method based on cloud computing technology | |
CN107194658A (en) | The project iteration branch management method of micro services system | |
CN107808020A (en) | Based on the computer interlocking software exploitation of formalized model exploitation with realizing system | |
CN105321126A (en) | SCD-based method for checking intelligent substation device | |
CN105093939A (en) | Building control system design and debugging apparatus and method | |
CN104573366A (en) | Method for verifying electric quantity data based on calculation of electric power load integrals | |
CN104598375A (en) | Failure prediction method for software development | |
CN104216986A (en) | Device and method for improving data query efficiency through pre-operation according to data update period | |
CN105137776A (en) | Metering automation terminal control assistant system | |
CN115146942A (en) | Electronic operation ticket system of hydraulic power plant and operation method | |
Thomas et al. | An innovative and automated solution for NERC PRC-027-1 compliance | |
CN113541126A (en) | Power distribution network simulation system suitable for verifying advanced algorithm and algorithm verification method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |