CN105095634A - Migration velocity model building method based on geological mass - Google Patents

Migration velocity model building method based on geological mass Download PDF

Info

Publication number
CN105095634A
CN105095634A CN201410221882.4A CN201410221882A CN105095634A CN 105095634 A CN105095634 A CN 105095634A CN 201410221882 A CN201410221882 A CN 201410221882A CN 105095634 A CN105095634 A CN 105095634A
Authority
CN
China
Prior art keywords
migration
speed
geological mass
velocity model
imaging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410221882.4A
Other languages
Chinese (zh)
Other versions
CN105095634B (en
Inventor
郭恺
杨瑞娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Chemical Corp
Sinopec Geophysical Research Institute
Original Assignee
China Petroleum and Chemical Corp
Sinopec Geophysical Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Chemical Corp, Sinopec Geophysical Research Institute filed Critical China Petroleum and Chemical Corp
Priority to CN201410221882.4A priority Critical patent/CN105095634B/en
Publication of CN105095634A publication Critical patent/CN105095634A/en
Application granted granted Critical
Publication of CN105095634B publication Critical patent/CN105095634B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The present invention provides a migration velocity model building method based on a geological mass, and belongs to the field of oil, gas and earthquake exploration. According to the present invention, on the basis that an initial velocity model is used for performing migration imaging, the quality of the migration imaging is analyzed, a position with inadequate imaging is found, a reason of the inadequate imaging is determined, and a region of speed modification is determined; the region that needs the speed modification is divided into small blocks, and small block data is used for building a new speed field, and migration processing on different velocity values is performed, and an appropriate velocity of imaging is determined according to a migration result; and repetitive cycle iterations are performed until velocity model accuracy that meets the requirements is obtained.

Description

A kind of Migration velocity model method for building up based on geological mass
Technical field
The invention belongs to oil-gas seismic exploration field, be specifically related to a kind of Migration velocity model method for building up based on geological mass.
Background technology
In the migration processing of oil seismic exploration three-dimensional data, migration velocity is the key parameter determining imaging processing effect, it not only requires that the size of velocity amplitude makes diffracted wave restrain, and requires that the variation tendency of speed is the correct response of underground geologic bodies transitivity change.The establishment of Migration velocity model, majority adopts stack velocity by after the conversion of Dix formula, then carry out horizontal level and smooth, as initial migration velocity field model.Conventional main method has:
1, iterative scans method: utilize three-dimensional overlay velocity field, by the migration velocity field that Dix formula conversion acquisition one is initial, data-bias imaging is carried out in increasing or the reduction of carrying out speed on this basis again, depending on the rationality of its architectonic imaging effect determination speed, finally determine migration velocity field through loop iteration repeatedly.Shortcoming is that workload is large, computing time is long, human factor is many, for tectonic relief change greatly or the region of shatter belt be difficult to acquisition velocity field more exactly.
2, synthem method: utilize stack velocity data, in conjunction with explanation tectonic structure layer, by the t of layer 0time sets up the interval velocity of each layer, after the process such as smothing filtering, obtains the average velocity of each layer by accumulative, then for skew after demarcating with drilling data.Shortcoming is that workload is large, complicated operation, is difficult to effectively apply in complex structural area.
3, time slice method: with three-dimensional overlay speed data, three-dimensional bin coordinate data, data based on well-shooting data, stack velocity to be changed by Dix formula and well data is demarcated and determined interval velocity, after velocity correction is level and smooth, determine interval velocity again, interval velocity is replaced and calculates between two time slices.The method and synthem method similar, but relatively simpler than synthem method, do not need meticulous synthem to explain, reduce interpretation errors.Shortcoming cannot effectively apply for the area without well data.
Oil seismic exploration needs high-precision migrated seismic section, when pre-stack time migration process, set up one accurately rate pattern be very crucial.The method for building up of rate pattern has multiple, but all needs, through correction repeatedly and perfect, just can reach rate pattern demand more accurately.Usual employing stack velocity sets up initial rate pattern, and this model often exists some errors with true geology image taking speed.Need the speed correction carrying out the later stage.
Summary of the invention
The object of the invention is to solve the difficult problem existed in above-mentioned prior art, a kind of Migration velocity model method for building up based on geological mass is provided, convenient and swiftly set up the higher Migration velocity model of precision exactly, improve the precision of seismic migration imaging, reduce calculations of offset amount, save computing time, speed is determined accurately, effectively set up Migration velocity model more accurately efficiently, thus obtain the migrated seismic section of degree of precision.
The present invention is achieved by the following technical solutions:
Based on a Migration velocity model method for building up for geological mass, utilizing initial velocity model to carry out on the basis of migration imaging, analyzing the quality of migration imaging, find out the position of imaging deficiency, be specified to the reason that picture is not enough, determine the region that speed is revised;
To needing the Region dividing carrying out speed amendment to become fritter, small block data being set up a new velocity field, and carrying out the migration processing of friction speed value, be specified to as rational speed according to migration result;
Through repetitive cycling iteration, until obtain the rate pattern precision met the demands.
Described method comprises:
(1) input seismic processing data, set up initial velocity model;
(2) overall geology block designs;
(3) determine speed modification region, form geological mass;
(4) scope of geological mass is designed;
(5) erection rate of described geological mass is determined: by changing speed percentage value, different rate patterns is set up to each geological mass;
(6) geological mass migration imaging: to each geological mass use step (5) to set up to the different rate pattern of geological mass should carrying out migration processing and obtain migration imaging result;
(7) the migration imaging result that obtains of step display (6);
(8) effect analysis: the described migration imaging result analyzing each geological mass, interpretive analysis judges whether rationally the position adjusted is playbacked, whether accurately to playback, whether met geologic rule, if met, then effect reaches requirement, if do not met, then effect does not reach requirement;
(9) judge whether effect reaches requirement, in this way, then enter step (10), as no, then return step (5);
(10) output speed aggregate speed field;
(11) the bulk velocity field merged and offset data is exported.
Described step (1) is achieved in that
Utilize the speed analyzed during stacking image, velocity amplitude excessive or too small is individually adjusted to circumferential speed close;
In the region that stack velocity fluctuations is larger, after smoothing process, produce an initial velocity model.
Described step (2) is achieved in that
The crossline direction of initial velocity model (i.e. three-dimensional entirety data) is designed to x direction, and in-line direction is designed to y direction, and time orientation is designed to z direction.A three-dimensional system of coordinate is formed like this by x, y and z;
The design of x direction is spaced apart the integral multiple of CDP number;
The design of y direction is spaced apart the integral multiple of trace spacing;
Z direction: the time, the time interval was 100 milliseconds from 0 millisecond.
The design of x direction is spaced apart 10 CDP numbers; The design of y direction is spaced apart 10 earthquake number of channels.
Described step (3) is achieved in that
Find out migration imaging data position playback unreasonable, playback inaccurate regional extent, determine the scope of three coordinates of each regional extent, i.e. speed modification region, gets into data block, i.e. a geological mass by tectonic structure corresponding for the data area of this speed modification region.
Described step (4) is achieved in that
According to the geologic structure at test data place and the feature of geologic horizon, suitably expand the scope of described geological mass, specific as follows:
When tectonic position is dipping bed, the direction that dips down expands, the migration aperture scope needed when expanding skew to;
When tectonic position is flat bed, expand to surrounding, expand 3-5 km;
When tectonic position is tomography, expand to tomography downdip direction, the migration aperture scope needed when expanding skew to;
When tectonic position is projection, expand to protruding below, the migration aperture scope needed when expanding skew to;
The most described geological mass expands as cubical data.
Compared with prior art, the invention has the beneficial effects as follows: because initial velocity exists the error with actual imaging speed, during skew, geologic horizon playback is inaccurate, causes tectonic structure to produce error.Adopt this method conveniently can go out the seismic imaging speed more close with actual imaging speed by Realization analysis, earthquake information can be made to playback rational position when imaging, make the imaging and focusing of big cross section, fractured subterranean formation reflection is clear, upper and lower interface imaging is reasonable, constructs clear, and resolution characteristic improves, stratum reflection strong or weak relation and wave group feature are obviously given prominence to, and are easy to geologic structure interpretation and carry out integrated geological interpretation etc.
Accompanying drawing explanation
Fig. 1 is geological mass global design schematic diagram.
Fig. 2-1 is that the first choosing in schematic diagram of geological mass chooses schematic diagram.
Fig. 2-2 is that the second that geological mass is chosen in schematic diagram chooses schematic diagram.
Fig. 2-3 be geological mass choose in schematic diagram the third choose schematic diagram.
Fig. 3-1 is the data block input range schematic diagram of tilted strata.
Fig. 3-2 is data block input range schematic diagram of acline.
Fig. 3-3 is data block input range schematic diagram of cross-section structure.
Fig. 3-4 is data block input range schematic diagram that protruding (complexity) constructs.
Fig. 4 is the step block diagram of the inventive method.
Fig. 5-1 is the initial velocity model migrated section of major fault.
Fig. 5-2 is the migrated sections of the major fault utilizing this method to obtain.
Fig. 6-1 is the initial velocity model migrated section at position, deep layer buried hill.
Fig. 6-2 is the migrated sections at the position, deep layer buried hill utilizing this method to obtain.
Fig. 7-1 is the initial velocity model migrated section at first position in embodiment 1.
Fig. 7-2 is the migrated sections at first position in the embodiment 1 utilizing this method to obtain.
Fig. 8-1 is the initial velocity model migrated section at second position in embodiment 1.
Fig. 8-2 is the migrated sections at second position in the embodiment 1 utilizing this method to obtain.
Fig. 9 is the initial velocity model migrated section in example 2.
Figure 10 is the migrated section in the example 2 utilizing this method to obtain.
Embodiment
Below in conjunction with accompanying drawing, the present invention is described in further detail:
The Migration velocity model that the present invention is based on geological mass analyzes the advantage that method for building up has uniqueness, and can make up the deficiency of above-mentioned existing method and additive method, the Migration velocity model precision of acquisition is high.
Utilizing initial velocity model to carry out on the basis of migration imaging, analyzing the quality of migration imaging, find out the position of imaging deficiency, be specified to the reason that picture is not enough, determine the region that speed is revised.To needing the Region dividing carrying out speed amendment to become fritter, small block data set up a new velocity field, and carry out the migration processing of friction speed value, be specified to as rational speed according to migration result.This process need through repetitive cycling iteration several times, until meet the requirements of rate pattern precision.
Specific implementation process is as follows:
The foundation of 1 basal rate model
The first step of migration velocity analysis sets up initial rate pattern.Utilize the speed analyzed during stacking image, carry out simple speed correction according to tectonic characteristics and (velocity amplitude excessive or too small is individually adjusted to circumferential speed close.), and carry out necessary zonal smoothing processing (in the region that stack velocity fluctuations is larger, need smoothing process) produce an initial rate pattern afterwards and (utilize stack velocity by root-mean-square velocity conversion formula, produce a rate pattern after conversion, be initial velocity model.)。Process is below exactly utilize this model to carry out careful speed correction and iteration, determines that establishing final migration velocity field offsets for final geology according to geology migration imaging precision.
The design of 2 geological mass
The crossline direction of three-dimensional entirety data is designed to x direction, and in-line direction is designed to y direction, and time orientation is designed to z direction.A three-dimensional system of coordinate is formed like this, as shown in Figure 1 by x, y and z.
The specific design of actual three dimensional seismic data:
X direction: the minimum unit in this direction according to the setting of CDP line-spacing, as CDP be 25 meters time, can be a cell cube by 10 CDP, namely 250 meters.
Y direction: as trace spacing be 25 meters time, designing 250 meters is a cell cube;
Z direction: the time, design time was spaced apart 100 milliseconds from 0 millisecond, as writing time be 6000 milliseconds time, be divided into 60 cell cubes the time.
Design cell body spread pattern is: x 1, x 2, x 3..., x n, y 1, y 2, y 3..., y m, z 1, z 2, z 3..., z 60, wherein, n is the space-number of x coordinate direction, and m is the space-number of y coordinate direction.
Choosing of 3 geological mass
(refer to that the position playback of migration imaging data (as high-dip structure, major fault, stratum, inclination angle etc.) is unreasonable, playback inaccurate regional extent by needing to carry out speed adjustment.) tectonic structure corresponding to data area get into a data block, be called " geological mass ", and this data area is generally associated with tectonic structure.Then this " geological mass " is carried out to adjustment analysis and the migration imaging of speed.
The method chosen: according to the migrated section of process, to the data position needing to revise, determines the scope of three coordinates, as chosen: 1. x 50, y 60, z 10, 2. x 50, y 60, y 61, z 10, z 11, 3. x 100, x 101, y 90, y 91, y 92, z 100, z 101, z 102, z 103, respectively as shown in Fig. 2-1 to Fig. 2-3.
The determination principle of 4 block sizes
Determine need carry out the data scope of testing after, according to the geologic structure at test data place and the feature (as: flat bed, tiltedly layer, complex structure body and section etc.) of geologic horizon, suitably expand the scope (data volume of input) of input operational data body to meet the demand of structural offset playback.Specific Principles is: a, when tectonic position is dipping bed, and the input data direction that will dip down expands, the migration aperture scope needed when expanding skew to; B, when tectonic position is flat bed, input data will expand to surrounding, general expand 3-5 km; C, when tectonic position is tomography, input data to expand to tomography downdip direction, the migration aperture scope needed when expanding skew to; D, when tectonic position is projection, input data will expand to protruding below, the migration aperture scope needed when expanding skew to.As shown in Fig. 3-1 to Fig. 3-4.The last data that these expand are all cubical data.
5 realization flows
On the basis of initial velocity, carry out the migration imaging of initial velocity, the speed modification region of analyzing is gone forward side by side line speed adjustment and skew, determines final migration velocity field according to geology imaging results.The process of specific implementation is: to the geological data through utilizing initial velocity model migration processing, carrying out the distribution design of overall geological mass, forming a data block met in xyz coordinate system; To the inaccurate regional extent of data analysis determination speed and block number, in the scope needing speed correction, choose corresponding sub-geological mass, small block data body is carried out the local offset of real-time friction speed, according to interpretation of result determination velocity amplitude; Aforesaid operations is carried out to the region of all Water demand, aggregate speed field (all speed is merged by connection, interpolating method) after all blocks operation complete, after obtaining final speed correction model, this final speed model is utilized to carry out final migration imagery process to overall data, the flow process of specific implementation as shown in Figure 4, comprising:
(1) seismic processing data are inputted;
(2) overall geology block designs;
(3) speed modification region is determined;
(4) design section block scope;
(5) a point geological mass erection rate is determined: by changing speed percentage value, set up several different rate pattern;
(6) geological mass migration imaging is divided: the model of the friction speed using previous step to set up carries out migration processing);
(7) display analysis migration imaging result;
(8) effect analysis: analyze the data after migration imaging, interpretive analysis judges whether rationally the position (as high-dip structure, major fault, stratum, inclination angle etc.) adjusted is playbacked, whether accurately to playback, whether met geologic rule;
(9) judge whether effect reaches requirement, in this way, then enter step (10), as no, then return step (5);
(10) output speed aggregate speed field: the speed of first output modifications, merges after all speed being determined together again;
(11) overall offset data are exported.
Fig. 5-1 and Fig. 5-2 is positions of a major fault, and Fig. 5-1 is initial velocity model migrated section, and Fig. 5-2 is the migrated sections adopting this method to obtain, and can find out that the imaging and focusing of big cross section is better, the reflection of fractured subterranean formation upper abdomen stratum is clear.
Fig. 6-1 and Fig. 6-2 is positions, a deep layer buried hill, Fig. 6-1 is initial velocity model migrated section, Fig. 6-2 is the migrated sections adopting this method, can find out that buried hill end face imaging is clear, inside story reflection have also been obtained improvement, the stratum catoptric imaging wave group feature at top, buried hill is clear, and unitary construction is rationally obvious, is easy to stratum and follows the trail of and explain.
Example 1: adopt this method to carry out application process at the HY block in certain oily district, achieve effect preferably.Fig. 7-1 to Fig. 8-2 is 2 different parts of same seismic data, and Fig. 7-1 is the imaging processing effect adopting initial velocity, and Fig. 7-2 is the imaging processing effects after adopting this method.Fig. 7-2 section 2 step tomography is clear, and the stratum reflectance signature between tomography is obvious; Fig. 8-1 is the section of original place reason, and Fig. 8-2 is the processing profiles after adopting this method to improve.The tomography of Fig. 8-2 is clear, and the imaging of section lower abdomen geological interface is clear, is easy to structure elucidation and later stage geological research.
Example 2: certain oily district BD block data.Fig. 9 is the section of original place reason, and Figure 10 is the processing profiles after adopting this method to improve.Speed correction has been carried out at 2 positions when this data process in emphasis dialogue chromosphere, obviously find out that the section wave group feature after improvement is obvious, stratum catoptric imaging is reasonable, constructs clear, resolution characteristic improves, and is easy to geologic structure interpretation and carries out integrated geological interpretation.
The present invention convenient and swiftly can set up the higher migration velocity of precision exactly, utilizing initial velocity model to carry out on the basis of migration imaging, analyzing the quality of migration imaging, find out the position of imaging deficiency, be specified to the reason that picture is not enough, determine the region that speed is revised.To needing the Region dividing carrying out speed amendment to become fritter, small block data set up a new velocity field, and carry out the migration processing of friction speed value, be specified to as rational speed according to migration result.After obtaining accurate rate pattern, skew diffraction can Complete Convergence, and inclination lineups can better playback, and obtain high-quality imaging section, is easy to structure elucidation and later stage research thereof.
Technique scheme is one embodiment of the present invention, for those skilled in the art, on the basis that the invention discloses application process and principle, be easy to make various types of improvement or distortion, and the method be not limited only to described by the above-mentioned embodiment of the present invention, therefore previously described mode is just preferred, and does not have restrictive meaning.

Claims (7)

1. the Migration velocity model method for building up based on geological mass, it is characterized in that: described method is carried out on the basis of migration imaging utilizing initial velocity model, analyze the quality of migration imaging, find out the position of imaging deficiency, be specified to the reason that picture is not enough, determine the region that speed is revised;
To needing the Region dividing carrying out speed amendment to become fritter, small block data being set up a new velocity field, and carrying out the migration processing of friction speed value, be specified to as rational speed according to migration result;
Through repetitive cycling iteration, until obtain the rate pattern precision met the demands.
2. the Migration velocity model method for building up based on geological mass according to claim 1, is characterized in that: described method comprises:
(1) input seismic processing data, set up initial velocity model;
(2) overall geology block designs;
(3) determine speed modification region, form geological mass;
(4) scope of geological mass is designed;
(5) erection rate of described geological mass is determined: by changing speed percentage value, different rate patterns is set up to each geological mass;
(6) geological mass migration imaging: to each geological mass use step (5) to set up to the different rate pattern of geological mass should carrying out migration processing and obtain migration imaging result;
(7) the migration imaging result that obtains of step display (6);
(8) effect analysis: the described migration imaging result analyzing each geological mass, interpretive analysis judges whether rationally the position adjusted is playbacked, whether accurately to playback, whether met geologic rule, if met, then effect reaches requirement, if do not met, then effect does not reach requirement;
(9) judge whether effect reaches requirement, in this way, then enter step (10), as no, then return step (5);
(10) output speed aggregate speed field;
(11) the bulk velocity field merged and offset data is exported.
3. the Migration velocity model method for building up based on geological mass according to claim 2, is characterized in that: described step (1) is achieved in that
Utilize the speed analyzed during stacking image, velocity amplitude excessive or too small is individually adjusted to circumferential speed close;
In the region that stack velocity fluctuations is larger, after smoothing process, produce an initial velocity model.
4. the Migration velocity model method for building up based on geological mass according to claim 2, is characterized in that: described step (2) is achieved in that
The crossline direction of initial velocity model is designed to x direction, and in-line direction is designed to y direction, and time orientation is designed to z direction.A three-dimensional system of coordinate is formed like this by x, y and z;
The design of x direction is spaced apart the integral multiple of CDP number;
The design of y direction is spaced apart the integral multiple of trace spacing;
Z direction: the time, the time interval was 100 milliseconds from 0 millisecond.
5. the Migration velocity model method for building up based on geological mass according to claim 4, is characterized in that: the design of x direction is spaced apart 10 CDP numbers; The design of y direction is spaced apart 10 earthquake number of channels.
6. the Migration velocity model method for building up based on geological mass according to claim 2, is characterized in that: described step (3) is achieved in that
Find out migration imaging data position playback unreasonable, playback inaccurate regional extent, determine the scope of three coordinates of each regional extent, i.e. speed modification region, gets into data block, i.e. a geological mass by tectonic structure corresponding for the data area of this speed modification region.
7. the Migration velocity model method for building up based on geological mass according to claim 2, is characterized in that: described step (4) is achieved in that
According to the geologic structure at test data place and the feature of geologic horizon, suitably expand the scope of described geological mass, specific as follows:
When tectonic position is dipping bed, the direction that dips down expands, the migration aperture scope needed when expanding skew to;
When tectonic position is flat bed, expand to surrounding, expand 3-5 km;
When tectonic position is tomography, expand to tomography downdip direction, the migration aperture scope needed when expanding skew to;
When tectonic position is projection, expand to protruding below, the migration aperture scope needed when expanding skew to;
The most described geological mass expands as cubical data.
CN201410221882.4A 2014-05-23 2014-05-23 A kind of Migration velocity model method for building up based on geological mass Active CN105095634B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410221882.4A CN105095634B (en) 2014-05-23 2014-05-23 A kind of Migration velocity model method for building up based on geological mass

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410221882.4A CN105095634B (en) 2014-05-23 2014-05-23 A kind of Migration velocity model method for building up based on geological mass

Publications (2)

Publication Number Publication Date
CN105095634A true CN105095634A (en) 2015-11-25
CN105095634B CN105095634B (en) 2018-06-01

Family

ID=54576055

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410221882.4A Active CN105095634B (en) 2014-05-23 2014-05-23 A kind of Migration velocity model method for building up based on geological mass

Country Status (1)

Country Link
CN (1) CN105095634B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106054246A (en) * 2016-05-19 2016-10-26 中国石油集团川庆钻探工程有限公司地球物理勘探公司 Pre-stack depth migration speed model establishing method based on percentage speed scanning
CN113866827A (en) * 2021-09-29 2021-12-31 中国石油大学(华东) Method, system, medium and device for explanatory velocity modeling seismic imaging

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1404018A (en) * 2002-09-29 2003-03-19 西安交通大学 Intelligent scene drawing system and drawing & processing method in computer network environment
WO2003060754A1 (en) * 2001-12-31 2003-07-24 The Board Of Regents Of The University And Community College System, On Behalf Of The University Of Nevada, Reno Multiphase physical transport modeling method and modeling system
US20040122646A1 (en) * 2002-12-18 2004-06-24 International Business Machines Corporation System and method for automatically building an OLAP model in a relational database
CN1956009A (en) * 2005-10-26 2007-05-02 北京航空航天大学 Presenting method of large scale three-D data set
CN102944894A (en) * 2012-11-26 2013-02-27 中国科学院地质与地球物理研究所 Earthquake prestack migration imaging method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2003060754A1 (en) * 2001-12-31 2003-07-24 The Board Of Regents Of The University And Community College System, On Behalf Of The University Of Nevada, Reno Multiphase physical transport modeling method and modeling system
CN1404018A (en) * 2002-09-29 2003-03-19 西安交通大学 Intelligent scene drawing system and drawing & processing method in computer network environment
US20040122646A1 (en) * 2002-12-18 2004-06-24 International Business Machines Corporation System and method for automatically building an OLAP model in a relational database
CN1956009A (en) * 2005-10-26 2007-05-02 北京航空航天大学 Presenting method of large scale three-D data set
CN102944894A (en) * 2012-11-26 2013-02-27 中国科学院地质与地球物理研究所 Earthquake prestack migration imaging method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张猛 等: ""积分法叠前深度偏移技术在BS6地区的应用"", 《勘探地球物理进展》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106054246A (en) * 2016-05-19 2016-10-26 中国石油集团川庆钻探工程有限公司地球物理勘探公司 Pre-stack depth migration speed model establishing method based on percentage speed scanning
CN106054246B (en) * 2016-05-19 2018-01-16 中国石油集团川庆钻探工程有限公司地球物理勘探公司 Pre-stack depth migration velocity model building method based on percent speed scanning
CN113866827A (en) * 2021-09-29 2021-12-31 中国石油大学(华东) Method, system, medium and device for explanatory velocity modeling seismic imaging
CN113866827B (en) * 2021-09-29 2023-05-09 中国石油大学(华东) Interpretation velocity modeling seismic imaging method, system, medium and equipment

Also Published As

Publication number Publication date
CN105095634B (en) 2018-06-01

Similar Documents

Publication Publication Date Title
CN102967882B (en) The modeling method of the interval velocity model on stratum
Zhang et al. Double-difference tomography: The method and its application to the Hayward fault, California
CN103472483B (en) Velocity modeling method based on true earth's surface or floating datum
CN104459782B (en) Horizon chromatography inversion earthquake speed modeling method with thin layers used and modeling unit
CN107966732B (en) Seismic properties change rate acquiring method based on space structure guiding
CN107817526B (en) Prestack seismic gather segmented amplitude energy compensation method and system
CN103454686A (en) Reservoir prediction method and system based on small-scale sedimentary facies of stratal slice
CN102944896A (en) Model method static correction method for surface survey data
CN109188520A (en) Thin reservoir thickness prediction method and device
CN108897041B (en) Prediction method and device for uranium ore enrichment area
CN105259581B (en) Seismic data time-depth conversion method
CN102230974B (en) Three-dimensional high-precision bin fractionation processing and evaluation technology for seismic data
CN104678440A (en) Well-constrained two-dimensional seismic variable velocity field nonlinear error correction method
CN105549084A (en) Method and system for building three-dimensional high-precision velocity model
CN106772587A (en) Seismic elastic parameter Facies Control Modeling method based on same position multiphase collocating kriging
CN104849762A (en) Method for correcting oil reservoir top surface micro structure by using information of horizontal well stratum penetrating point
CN108121009A (en) Development late stage complex fault block velocity-variant depth mapping method
CN109946742A (en) The pure rolling land qP shakes digital simulation method in a kind of TTI medium
CN106199694A (en) Synthetic record method based on deep varitron ripple
CN105093318B (en) A kind of adaptive wave equation wave field extrapolation static correcting method
CN107942379A (en) A kind of method for improving complex fault block rate pattern precision
CN105095634A (en) Migration velocity model building method based on geological mass
CN104570112A (en) Time-depth conversion method and device for two-dimensional geologic model
CN107340537A (en) A kind of method of P-SV converted waves prestack reverse-time depth migration
CN105204064A (en) Mixed domain Fourier finite difference migration method based on coefficient optimization

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant