CN105133571B - A kind of deep hole tilts curtain and vertical curtain plugging type connection method - Google Patents

A kind of deep hole tilts curtain and vertical curtain plugging type connection method Download PDF

Info

Publication number
CN105133571B
CN105133571B CN201510475277.4A CN201510475277A CN105133571B CN 105133571 B CN105133571 B CN 105133571B CN 201510475277 A CN201510475277 A CN 201510475277A CN 105133571 B CN105133571 B CN 105133571B
Authority
CN
China
Prior art keywords
curtain
adit
grouting
vertical
lower floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510475277.4A
Other languages
Chinese (zh)
Other versions
CN105133571A (en
Inventor
樊鹏
李法海
薛凯
韩兴
王宁
陈曦
卢亚涛
汪海
孙国兴
张鹏
胡晓霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 5 Co Ltd
Original Assignee
Sinohydro Bureau 5 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 5 Co Ltd filed Critical Sinohydro Bureau 5 Co Ltd
Priority to CN201510475277.4A priority Critical patent/CN105133571B/en
Publication of CN105133571A publication Critical patent/CN105133571A/en
Application granted granted Critical
Publication of CN105133571B publication Critical patent/CN105133571B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

Curtain and vertical curtain plugging type connection method are tilted the invention discloses a kind of deep hole, is comprised the following steps:Choose lower floor's grouting adit(2)Section is come directly towards as connection block section(4), be in the milk adit to lower floor(2)Overlap joint curtain(7)It is in the milk;From upper strata grouting adit(1)Do connection block section(4)Inclination curtain;Be in the milk adit to lower floor(2)Connection block section(4)Concrete closure is carried out, rockfill grouting is carried out after the completion of closure;In connection block section(4), from upper strata grouting adit(1)Vertical curtain is made to lower floor's grouting adit(2), it is in the milk the curtain lap segment that the vertical grout curtain of deep hole of adit formed between levels grouting adit with lower floor.Present invention reduces difficulty of construction, linkage section grouting quality is improved, makes constructing operation more convenient and quicker.

Description

A kind of deep hole tilts curtain and vertical curtain plugging type connection method
Technical field
The present invention relates to grout curtain field, more particularly to a kind of deep hole tilts curtain and vertical curtain plugging type connection side Method.
Background technology
With the development of construction technique of earth and rock dam, more and more large-scale hugeization of earth-rock works with design planning is being built. The quantity of grouting adit is incrementally increased, and length is progressively lengthened, and the discrepancy in elevation between grouting adit is also progressively increased.Traditional grouting adit Connection between the vertical curtain of deep hole and oblique curtain generally uses this connection method of varied angle deep hole grout curtain, however, by In the increase of grout curtain hole hole depth, it is necessary to which the deep hole grout curtain connection method of traditional varied angle is at controlled grouting hole deviation angle Degree precision aspect has higher requirements, and this has resulted in the increase of conventional construction method difficulty of construction, can not meet what is progressively developed Engineering construction demand.
The content of the invention
The technical problems to be solved by the invention are to provide a kind of deep hole and tilt curtain and vertical curtain plugging type connection side Method, reduces difficulty of construction, improves linkage section grouting quality, makes constructing operation more convenient and quicker.
In order to solve the above technical problems, the technical solution adopted by the present invention is:
A kind of deep hole tilts curtain and vertical curtain plugging type connection method, comprises the following steps:
Lower floor's grouting adit top section is chosen as connection block section, the overlap joint curtain for the adit that is in the milk to lower floor is filled Slurry;
The inclination curtain of connection block section is made from upper strata grouting adit, the inclination curtain is upper strata grouting adit and lower floor Curtain between grouting adit;
Concrete closure is carried out to the connection block section of lower floor's grouting adit, rockfill grouting is carried out after the completion of closure;
In connection block section, do vertical curtain to lower floor from upper strata grouting adit and be in the milk adit, be in the milk adit with lower floor The curtain lap segment that the vertical grout curtain of deep hole is formed between levels grouting adit.
It is additionally included in increase in the middle of the inclination curtain of connection block section and vertical curtain and determines angle inclination curtain.
The angle of inclination for determining angle inclination curtain is 2.5 °.
Lower floor's grouting adit top section is 8 ~ 10m.
The inclination curtain is 60m, and the overlap joint curtain is 8 ~ 10m.
Compared with prior art, the beneficial effects of the invention are as follows:1)Without continuous varied angle deep hole, difficulty of construction greatly drops It is low, it is easy to operate, it is convenient and swift;2)Linkage section overlaps curtain without spacial multi-angle hole position, it is easy to construct;3)Grouting adit is taken Connect the laggard horizontal high voltage inclination grout curtain of section closure to be combined with the overlap joint grout curtain of spacial multi-angle hole position, be more beneficial for ensureing Lap segment construction quality.
Brief description of the drawings
Fig. 1 is a kind of plugging type connection method of the invention along grouting adit length direction schematic diagram.
Fig. 2 is that a kind of plugging type connection method of the invention is vertically in the milk adit length direction schematic diagram.
Fig. 3 is a kind of grout hole position plane schematic diagram of the plugging type connection method of the invention in overlapping regions.
In figure:The vertical curtains of 0-, oblique curtain lap segment;Be in the milk adit on 1- upper stratas;2- lower floors grouting adit;3- connections are blocked Oblique curtain, the vertical curtain of section;4- connections block section;5- upper stratas grout curtain bottom line;6- grout curtain bottom lines;7- overlaps curtain Curtain;8- lower floors grouting adit connection block section;9- connections 5 ° of angling holes of block section grout curtain, that is, tilt curtain;10- connections are sealed Stifled section 2.5 ° of angling holes of increased grout curtain;The vertical hole of 11- connection block section grout curtains;Be in the milk the oblique curtain of adit on 12- upper stratas Curtain hole;The 13- upper stratas grouting adit connection vertical curtain hole in block section;14- upper stratas 2.5 ° of grout curtain holes of grouting adit linkage section; The 15- upper stratas grouting vertical curtain hole position of adit;The oblique grout curtain areas of 16-;The vertical grout curtain areas of 17-.
Embodiment
With reference to embodiment, the present invention is further illustrated, and a kind of deep hole of the invention tilts curtain and lead Straight curtain plugging type connection method is specially:
1st, lower floor's grouting adit 2 top section is chosen as connection block section 4, and the overlap joint curtain 7 for the adit 2 that is in the milk to lower floor enters Row grouting.
2nd, the inclination curtain 9 of connection block section 4 is made from upper strata grouting adit 1, the inclination curtain 9 is upper strata grouting adit Curtain between 1 and lower floor's grouting adit 2.
3rd, after overlap joint curtain and oblique grout curtain have been checked, the connection block section 4 for the adit 2 that is in the milk to lower floor carries out coagulation Grave is blocked up, and rockfill grouting is carried out after the completion of closure.
4th, in connection block section 4, vertical curtain is made to lower floor's grouting adit 2 from upper strata grouting adit 1, is in the milk with lower floor The curtain lap segment that the vertical grout curtain of deep hole of adit is formed between levels grouting adit.
Further, to ensure to tilt the grouting effect between the row of curtain two, it is additionally included in the inclination curtain of connection block section 4 Curtain determines angle with increase in the middle of vertical curtain and tilts curtain.Specifically, the angle of inclination for determining angle inclination curtain is 2.5 °. Lower floor's grouting adit 2 top section is 8 ~ 10m.The inclination curtain is 60m, and the overlap joint curtain 7 is 8 ~ 10m.Tilt curtain Curtain grouting pressure overlaps grout curtain pressure much larger than varied angle, is more beneficial for ensureing the construction quality of linkage section.Connection closure The vertical grout curtain of deep hole outside block section 4 is attached after the completion of the construction of section 4, directly grouting adit 1 does vertical from upper strata Curtain forms continuous curtain curtain wall and carries out antiseepage to the curtain bottom line of lower floor's grouting adit 2.
Engineering application example
In the long sill may power station built, each 5 grouting adit of left and right banks, the elevation grouting adit lining cutting of right bank lower floor 1460 is Complete and the oblique grout curtain of deep hole has also been completed, wherein the lower floor of right bank 1460 grouting adit right bank termination coordinate is vertical 0+436.2. Original design is angle grout curtain overlapping regions in vertical 0+427.10 ~ vertical 0+447.10.Overlapping regions right bank is the 1520m of design The downward vertical curtain hole of elevation, overlapping regions left bank is 5 ° of downward inclination curtain holes of 1520m elevations.Overlapping regions use by 5 ° of oblique curtains of deep hole fade to vertical curtain from left to right, and by being connected with lower floor's grouting adit varied angle overlap joint curtain hole Connect, it is ensured that space overlaps quality.In traditional connection method, the grouting of right bank 1520 is flat in angle grout curtain overlapping regions Upstream row oblique curtain in hole arranges 4 ° of inclination curtains(Totally 7 holes), remaining 3 hole is changed to 3 °, 2 °, 1 ° of curtain hole, curtain in order Bottom line is EL.1454.In the range of angle overlap joint, 1520 grouting adit upstream row curtain holes since vertical 0+429.10 in order For 4 °, 3 °, 2 °, 1 ° of curtain hole, curtain bottom line elevation is EL.1467, and remaining 6 hole is changed to vertical curtain hole, and curtain bottom line is high Journey is 1460 grouting adit curtain bottom lines.In angle overlapping regions(Vertical 0+427.10 ~ vertical 0+447.10), 1520 grouting adits Upstream and downstream row curtain centerline hole at increase row's curtain hole, since vertical 0+427.10 curtain orifice angle be followed successively by 5 °, 4 °, 3 °, 2 °, 1 °, curtain bottom line elevation is EL.1467, and carries out the overlap joint grout curtain of multi-angle in lower floor's grouting adit(It is maximum Grouting pressure 1.5MPa)Remaining 6 hole is changed to vertical curtain hole, and curtain bottom line elevation is 1460 grouting adit curtain bottom lines.This Varied angle is taken in connection method(5°→4°→3°→2°→1°→0°)Overlap joint, curtain hole depth is more than 60m, and needs to carry out accordingly Porous lower layer grouting adit varied angle space overlap joint curtain hole, construction precision requires high, and difficulty of construction is very big.
After plugging type connection method of the present invention, by setting the grouting adit block section of 8m length, section grouting is flat Enter line tilt grout curtain to the grouting bottom line of lower floor's grouting adit, levels grouting adit in upper strata grouting adit after the closure of hole Between form grout curtain overlapping regions, and by seeing the low-angle of progress in former tiltedly curtain and the vertical curtain that is carried out after closure (2.5°)Oblique curtain so that vertical curtain is effectively connected with tilting curtain.

Claims (5)

1. a kind of deep hole tilts curtain and vertical curtain plugging type connection method, it is characterised in that comprise the following steps:
Choose lower floor's grouting adit(2)Section is come directly towards as connection block section(4), be in the milk adit to lower floor(2)Overlap joint curtain(7) It is in the milk;
From upper strata grouting adit(1)Do connection block section(4)Inclination curtain(9), the inclination curtain(9)It is upper strata grouting Adit(1)With lower floor's grouting adit(2)Between curtain;
Be in the milk adit to lower floor(2)Connection block section(4)Concrete closure is carried out, rockfill grouting is carried out after the completion of closure;
In connection block section(4), from upper strata grouting adit(1)Vertical curtain is made to lower floor's grouting adit(2), it is in the milk flat with lower floor Hole(2)Vertical grout curtain formed levels grouting adit between curtain lap segment.
2. a kind of deep hole as claimed in claim 1 tilts curtain and vertical curtain plugging type connection method, it is characterised in that also It is included in connection block section(4)Inclination curtain and vertical curtain in the middle of increase determine angle inclination curtain.
3. a kind of deep hole as claimed in claim 2 tilts curtain and vertical curtain plugging type connection method, it is characterised in that institute State determine angle tilt curtain angle of inclination be 2.5 °.
4. a kind of deep hole as claimed in claim 1 tilts curtain and vertical curtain plugging type connection method, it is characterised in that institute State lower floor's grouting adit(2)Top section is 8 ~ 10m.
5. a kind of deep hole as claimed in claim 1 tilts curtain and vertical curtain plugging type connection method, it is characterised in that institute It is 60m, the overlap joint curtain to state inclination curtain(7)For 8 ~ 10m.
CN201510475277.4A 2015-08-06 2015-08-06 A kind of deep hole tilts curtain and vertical curtain plugging type connection method Active CN105133571B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510475277.4A CN105133571B (en) 2015-08-06 2015-08-06 A kind of deep hole tilts curtain and vertical curtain plugging type connection method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510475277.4A CN105133571B (en) 2015-08-06 2015-08-06 A kind of deep hole tilts curtain and vertical curtain plugging type connection method

Publications (2)

Publication Number Publication Date
CN105133571A CN105133571A (en) 2015-12-09
CN105133571B true CN105133571B (en) 2017-07-25

Family

ID=54719119

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510475277.4A Active CN105133571B (en) 2015-08-06 2015-08-06 A kind of deep hole tilts curtain and vertical curtain plugging type connection method

Country Status (1)

Country Link
CN (1) CN105133571B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105966797B (en) * 2016-05-25 2019-03-22 清华大学 Design method for the double-curtain type system for preventing oil-gas depot from revealing
CN106894390B (en) * 2017-03-06 2019-05-03 中国电建集团中南勘测设计研究院有限公司 A kind of grout curtain method suitable for dam two sides
CN107989044A (en) * 2017-11-27 2018-05-04 云南建投第十建设有限公司 The selection of special geology Percussion Piles dado structure material and control method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5026215A (en) * 1988-12-02 1991-06-25 Geochemical Corporation Method of grouting formations and composition useful therefor
JPH1018281A (en) * 1996-07-03 1998-01-20 Maeda Corp Curtain grouting method
CN102505701A (en) * 2011-09-28 2012-06-20 中国水利水电第七工程局成都水电建设工程有限公司 Self-compaction mortar and deep hole curtain pouring construction method
CN102864786A (en) * 2012-09-28 2013-01-09 葛洲坝集团基础工程有限公司 Hole deviation control method for drilling in deep hole curtain grouting

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202954377U (en) * 2012-12-13 2013-05-29 中国水电顾问集团成都勘测设计研究院 Cover-plate dam foundation triangle-region curtain structure
CN203080558U (en) * 2013-02-06 2013-07-24 中国水电顾问集团北京勘测设计研究院 Direct-type high-pressure grout curtain connection structure in thin lining-grouting cave
CN204212168U (en) * 2014-10-31 2015-03-18 中国电建集团贵阳勘测设计研究院有限公司 A kind of dam water-retaining structure utilizing solution cavity to combine to build a dam
CN104358270A (en) * 2014-12-03 2015-02-18 中国电建集团成都勘测设计研究院有限公司 High core wall rock-fill dam foundation seepage prevention structure on deep overburden layer

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5026215A (en) * 1988-12-02 1991-06-25 Geochemical Corporation Method of grouting formations and composition useful therefor
JPH1018281A (en) * 1996-07-03 1998-01-20 Maeda Corp Curtain grouting method
CN102505701A (en) * 2011-09-28 2012-06-20 中国水利水电第七工程局成都水电建设工程有限公司 Self-compaction mortar and deep hole curtain pouring construction method
CN102864786A (en) * 2012-09-28 2013-01-09 葛洲坝集团基础工程有限公司 Hole deviation control method for drilling in deep hole curtain grouting

Also Published As

Publication number Publication date
CN105133571A (en) 2015-12-09

Similar Documents

Publication Publication Date Title
CN105133571B (en) A kind of deep hole tilts curtain and vertical curtain plugging type connection method
CN106481360A (en) Salt cave Tank Process quickly built by a kind of asymmetric halogen of adopting of twin-well
CN109899089A (en) Goaf grouting method based on pinniform horizontal branch directional drilling technique
CN201627180U (en) Reinforced structure of large fault of dam foundation of gravity dam
CN204552783U (en) A kind of loess tunnel vertical deformation control structure
CN105351001B (en) A kind of method based on gob side entry retaining region reinforcement gas pumping
CN105868472B (en) A kind of goaf air leaking flow field dynamic numeric simulation method based on deformation geometry
CN104481541B (en) One-inclined multi-vertical cascaded well group salt mine mining method
CN103775095A (en) Ridge soft-foundation tunnel advance double guide tunnel and construction method thereof
CN109854297A (en) A kind of coalfield mined-out Areas grouting method based on directional drilling technique
CN106545313A (en) Grouting curtain hole structure and its construction technology
CN209260738U (en) A kind of band opening blade foot has bottom steel boxed cofferdam
CN103742162B (en) Shield tail top is provided with shield machine and the synchronous grouting device of synchronous grouting device
CN102678119A (en) High-efficiency filling mining method for controlling rock mass movement
CN106677791B (en) A kind of construction method of shallow embedding shield driven tunnel crossing highway
CN106121645B (en) The method that coal column group is left in a kind of residual exploiting field of step construction filling second mining
CN105155472B (en) Dam foundation anti-seepage structure of deep overlying layer earth-rock dam and construction method of dam foundation anti-seepage structure
CN103422813A (en) Single-well coal bed gas multi-branch horizontal well system and well drilling method
CN108331558B (en) Horizontal well for gas layer and drilling and fracturing method of horizontal well
CN109505578A (en) The old well of extra-low permeability oil reservoirs realizes the refracturing method of the lateral Tapping Residual Oil in crack
CN109268063A (en) The method for constructing gob side entry retaining shield lane wall using drift-sand filling net cage
CN206052653U (en) A kind of rock stone-filled structure based on concrete-pile
CN106150502B (en) A kind of method that coal column group is left in residual exploiting field of multistage ladder type construction filling second mining
CN105239566B (en) Multi-head stirring type large-diameter cast-in-situ pipe pile device and application thereof
CN203716985U (en) Advanced dual guide hole of mountain ridge soft foundation tunnel

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant