DE3823925A1 - Arrangement for testing peripheral connection modules of a communications system - Google Patents

Arrangement for testing peripheral connection modules of a communications system

Info

Publication number
DE3823925A1
DE3823925A1 DE19883823925 DE3823925A DE3823925A1 DE 3823925 A1 DE3823925 A1 DE 3823925A1 DE 19883823925 DE19883823925 DE 19883823925 DE 3823925 A DE3823925 A DE 3823925A DE 3823925 A1 DE3823925 A1 DE 3823925A1
Authority
DE
Germany
Prior art keywords
connection
switching
modules
control
computer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
DE19883823925
Other languages
German (de)
Other versions
DE3823925C2 (en
Inventor
Raf Lievens
Fernand Ghyselinck
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Siemens AG
Original Assignee
Siemens AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Siemens AG filed Critical Siemens AG
Priority to DE19883823925 priority Critical patent/DE3823925A1/en
Publication of DE3823925A1 publication Critical patent/DE3823925A1/en
Application granted granted Critical
Publication of DE3823925C2 publication Critical patent/DE3823925C2/de
Granted legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/22Detection or location of defective computer hardware by testing during standby operation or during idle time, e.g. start-up testing
    • G06F11/26Functional testing
    • G06F11/261Functional testing by simulating additional hardware, e.g. fault simulation
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04MTELEPHONIC COMMUNICATION
    • H04M3/00Automatic or semi-automatic exchanges
    • H04M3/22Arrangements for supervision, monitoring or testing
    • H04M3/26Arrangements for supervision, monitoring or testing with means for applying test signals or for measuring
    • H04M3/28Automatic routine testing ; Fault testing; Installation testing; Test methods, test equipment or test arrangements therefor
    • H04M3/30Automatic routine testing ; Fault testing; Installation testing; Test methods, test equipment or test arrangements therefor for subscriber's lines, for the local loop
    • H04M3/302Automatic routine testing ; Fault testing; Installation testing; Test methods, test equipment or test arrangements therefor for subscriber's lines, for the local loop using modulation techniques for copper pairs
    • H04M3/303Automatic routine testing ; Fault testing; Installation testing; Test methods, test equipment or test arrangements therefor for subscriber's lines, for the local loop using modulation techniques for copper pairs and using PCM multiplexers, e.g. pair gain systems
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04MTELEPHONIC COMMUNICATION
    • H04M3/00Automatic or semi-automatic exchanges
    • H04M3/22Arrangements for supervision, monitoring or testing
    • H04M3/26Arrangements for supervision, monitoring or testing with means for applying test signals or for measuring
    • H04M3/28Automatic routine testing ; Fault testing; Installation testing; Test methods, test equipment or test arrangements therefor
    • H04M3/32Automatic routine testing ; Fault testing; Installation testing; Test methods, test equipment or test arrangements therefor for lines between exchanges
    • H04M3/323Automatic routine testing ; Fault testing; Installation testing; Test methods, test equipment or test arrangements therefor for lines between exchanges for the arrangements providing the connection (test connection, test call, call simulation)

Abstract

A testing device in each case has a simulation device which simulates characteristics of connectable terminals, a switching network to connect the same to the peripheral connection modules and a switching control device which serves to control the simulation device and the switching network and which, for testing purposes, is connected along with a central processor controller of the communications system via an interface to a peripheral computer. <IMAGE>

Description

Zeitgemäße Kommunikationssysteme ermöglichen im allgemeinen den Anschluß analoger und auch digitaler Endgeräte, die auch unter­ schiedlichen Kommunikationsdiensten zugeordnet sein können. Ne­ ben einer zentralen Prozessorsteuerung, die über eine System- Datenbasis verfügt, weisen diese Kommunikationssysteme periphe­ re Anschlußbaugruppen auf, die an Art und Funktion der anzu­ schließenden Einheiten angepaßt sind. Man unterscheidet bei­ spielsweise Anschlußbaugruppen für analoge Fernsprechendgeräte, digitale Fernsprechendgeräte, digitale Datengeräte und Anschluß­ baugruppen für Amtsleitungen und für Querverbindungsleitungen.Modern communication systems generally enable the Connection of analog and also digital end devices, which also under can be assigned to different communication services. No ben a central processor control that over a system Database, these communication systems are peripheral re connection modules based on the type and function of the closing units are adapted. One differentiates at for example connection modules for analogue telephone devices, digital telephone devices, digital data devices and connection assemblies for trunk lines and for cross-connection lines.

Für die Prüfung der einwandfreien Funktion der peripheren An­ schlußbaugruppen werden entsprechende Endgeräte an die Anschluß­ baugruppen angeschaltet und dann die einzelnen Ports der An­ schlußbaugruppen gegenüber den anderen Ports sowohl derselben Anschlußbaugruppe als auch anderer Anschlußbaugruppen überprüft.For checking the proper functioning of the peripheral an final modules are corresponding terminals to the connection modules switched on and then the individual ports of the An end modules compared to the other ports both the same Connection module and other connection modules checked.

Die der Erfindung zugrundeliegende Aufgabe besteht darin, eine Prüfanordnung zu schaffen, bei der auf das Anschalten mehrerer Endgeräte an die Anschlußbaugruppen verzichtet werden kann und die eine unaufwendige flexible Anpassung an die unterschiedli­ chen Ausstattungen solcher Kommunikationssysteme ermöglicht. Dies wird erfindungsgemäß erreicht durch eine Anordnung zum Prüfen peripherer (Anschluß-) Baugruppen zum Anschließen ana­ loger bzw. digitaler Endgeräte bzw. von Verbindungsleitungen eines mit einem digitalen Koppelfeld und mit einer über eine System-Datenbasis verfügenden zentralen Prozessorsteuerung aus­ gestatteten Kommunikationssystems mittels einer Prüfeinrichtung, die eine Eigenschaften der analogen bzw. digitalen Endgeräte nachbildende Simulationseinrichtung, ein Koppelnetzwerk zum Anschalten der Simulationseinrichtung an die peripheren Bau­ gruppen bzw. zum Verbinden der den analogen Endgeräten zuge­ ordneten Baugruppen untereinander und/oder mit den den Verbin­ dungsleitungen zugeordneten Anschlußbaugruppen und eine der Steuerung der Simulationseinrichtung und des Koppelnetzwerkes dienende Schalt-Steuereinrichtung aufweist, die gemäß einem Steuerprogramm eines über jeweils eine Schnittstelle an die Schalt-Steuereinrichtung und an die zentrale Prozessorsteue­ rung angeschlossenen Computers gesteuert wird.The object underlying the invention is a To create a test arrangement when switching on several End devices to the connection modules can be dispensed with and which is an uncomplicated, flexible adaptation to the differ Chen equipment of such communication systems. This is achieved according to the invention by an arrangement for Check peripheral (connection) modules for connection ana loger or digital devices or connecting lines one with a digital switching matrix and one with one System database have central processor control  permitted communication system by means of a test device, one of the properties of analog or digital devices simulating simulation device, a coupling network to Switch on the simulation device to the peripheral building groups or for connecting the analogue terminals arranged assemblies with each other and / or with the connection cable lines assigned connector assemblies and one of the Control of the simulation device and the coupling network serving switching control device, which according to a Control program one via an interface to each Switch control device and to the central processor control connected computer is controlled.

In der im Rahmen der erfindungsgemäßen Anordnung vorgesehenen Prüfeinrichtung werden typische Signale und Zustände von Endge­ räten mit einer Simulationseinrichtung zur Verfügung gestellt und entsprechend dem vom Computer an die Prüfeinrichtung abge­ gebenen Prüfprogramm aktiviert. So kann beispielsweise ein in der Prüfeinrichtung vorgesehener Ruftongenerator angeschaltet werden oder eine Umschaltung der Frequenz eines Generators er­ folgen. Weitere Aktivierungen in der Simulationseinrichtung schalten Leitungswiderstände simulierende Abschlußwiderstände wirksam. Die Zuordnung der einzelnen Simulationen, d.h. von Signalen oder Pegeln, erfolgt mittels des Koppelnetzwerkes, das zugleich dem Anschalten der einzelnen Ports der Anschlußbau­ gruppen an die Simulationseinrichtung dient. Diese Anschaltung erfolgt vorzugsweise über zwei Leitungsadern, an die demgemäß sowohl die Simulationseinrichtung als auch die einzelnen Ports der Anschlußbaugruppen anschaltbar sind.In the arrangement provided within the scope of the arrangement according to the invention Test equipment are typical signals and states of Endge advised with a simulation facility and according to that from the computer to the test facility test program activated. For example, an in the test device provided ring tone generator switched on be or switching the frequency of a generator he consequences. Further activations in the simulation facility switch line resistances simulating terminating resistors effective. The assignment of the individual simulations, i.e. from Signals or levels, takes place via the coupling network, the at the same time the connection of the individual ports groups to the simulation facility. This connection is preferably carried out via two line wires to which accordingly both the simulation device and the individual ports the connection modules can be connected.

Ein weiterer wesentlicher Vorteil der erfindungsgemäßen Anord­ nung besteht in der Steuerung der Prüfeinrichtung durch den ex­ ternen Computer, dessen Resourcen in üblicher Weise genutzt werden können. Durch die zusätzliche Ankopplung des Computers an den zentralen Prozessor bzw. an dessen System-Datenbasis können für Einzelprüfungen notwendige zusätzliche Kriterien aus der zu prüfenden Kommunikationsanlage in den Prüfvorgang einbe­ zogen werden. In diesem Zusammenhang ist als vorteilhaft anzu­ sehen, daß die jeweiligen Prüfergebnisse, die aufgrund der Struktur und Arbeitsweise des zu prüfenden Kommunikationssy­ stems zu in der System-Datenbasis registrierten Ergebnissen führen, als entsprechende Prüfergebnisse von der System-Daten­ basis an den Computer übergeben werden können. Eine weitere vorteilhafte Ausgestaltung der Erfindung berücksichtigt System­ gegebenheiten dadurch, daß eine dem Kommunikationssystem imma­ nente Systemsicherheits-Steuerung während der Prüfphase unwirk­ sam geschaltet ist. Damit wird erreicht, daß automatische Feh­ lerunterdrückungsmechanismen, wie z.B. die Sperrung bestimm­ ter abgehender Leitungsanschlüsse, unterbunden werden.Another significant advantage of the arrangement according to the invention The control of the test facility by the ex remote computer, whose resources are used in the usual way can be. Through the additional connection of the computer to the central processor or its system database  can select additional criteria necessary for individual exams the communication system to be tested in the test process be drawn. In this context it should be considered advantageous see that the respective test results, which are due to the Structure and mode of operation of the communication system to be checked stems on results registered in the system database lead as corresponding test results from the system data base can be transferred to the computer. Another advantageous embodiment of the invention takes into account the system conditions in that the communication system imma System security control during the test phase ineffective sam is switched. This ensures that automatic mis suppression mechanisms, e.g. determine the blocking outgoing line connections are prevented.

Die weitestgehende Verlagerung der eigentlichen logischen Steu­ eroperationen in den externen Computer ermöglicht eine einfache Ausgestaltung der Prüfeinrichtung, insbesondere derart, daß le­ diglich passive Schaltelemente und keine Prozessorsteuerungen verwendet werden. In diesem Zusammenhang ist vorgesehen, daß die Schalt-Steuereinrichtung eine Einstellsteuerung aufweist, die Steuerinformationen des Computers in Einstellinformationen für Schaltelemente des Koppelnetzwerkes und der Simulationsein­ richtungen umsetzt. Diese Schaltelemente können beispielsweise durch Relais realisiert sein.The most extensive shift of the actual logical tax Operations in the external computer allows easy Design of the test device, in particular such that le only passive switching elements and no processor controls be used. In this context it is provided that the switching control device has a setting control, the control information of the computer in setting information for switching elements of the coupling network and the simulation implemented directions. These switching elements can, for example be realized by relays.

Eine übersichtliche Strukturierung des Koppelnetzwerkes und insbesondere eine Erhöhung der Arbeitsgeschwindigkeit der Prüf­ einrichtung, die im wesentlichen von den Schaltzeiten des Kop­ pelnetzwerkes abhängt, wird dadurch erreicht, daß das Koppel­ netzwerk derart zweigeteilt ist, daß das eine Netzwerkteil dem Anschluß der Ports der den digitalen Endgeräten zugeordneten Anschlußbaugruppen und das andere Netzwerkteil dem Anschluß der Ports der den analogen Endgeräten zugeordneten Anschlußbaugrup­ pen dient. A clear structuring of the coupling network and in particular an increase in the speed of work of the test device, which essentially depends on the switching times of the cop pelnetzwerkes depends on the coupling network is divided in two such that the one network part Connection of the ports assigned to the digital devices Connection modules and the other network part connecting the Ports of the connection module assigned to the analog terminals pen serves.  

Eine Beschleunigung der Prüfabläufe ist insbesondere auch da­ durch möglich, daß jeweils ein Port einer Anschlußbaugruppe gegen alle Ports einer anderen Anschlußbaugruppe in derselben Schaltlage des Koppelnetzwerkes geprüft wird.There is also an acceleration of the test procedures through possible that a port of a connection module against all ports of another connection module in the same Switching position of the coupling network is checked.

Die Erfindung wird im folgenden anhand eines in zwei Figuren dargestellten Ausführungsbeispiels erläutert. Dabei zeigen:The invention is described below with reference to one in two figures illustrated embodiment explained. Show:

Fig. 1 ein Übersichtsschema der wesentlichen Bestandteile der Prüfanordnung und Fig. 1 is an overview diagram of the essential components of the test arrangement and

Fig. 2 den prinzipiellen Aufbau der in der Prüfanordnung ein­ gesetzten Prüfeinrichtung. Fig. 2 shows the basic structure of the test device set in the test arrangement.

Die in der Fig. 1 dargestellte Prüfanordnung umfaßt als wesent­ liche Bestandteile ein den eigentlichen Prüfling darstellendes Kommunikationssystem KS, eine Prüfeinrichtung PE und einen Com­ puter PC. Das Kommunikationssystem KS ist modular aufgebaut, wobei die zentralen Funktionen zugeordneten Module im unteren Bereich und die Module mit peripheren Anschlußbaugruppen im oberen Modulbereich des Kommunikationssystems KS angeordnet sind. Zu den Modulen, die zentralen Funktionen zugeordnet sind, zählen neben einem Netzteil NT ein zentraler Steuerprozessor DP mit der zugehörigen System-Datenbasis, ein Modul mit wenigstens einem Input/Output-Prozessor zur Verbindungssteuerung zwischen dem zentralen Prozessor DP und Anschlußbaugruppen, ein digitales Koppelfeldmodul MTS und eine zentrale Ton- und Signalisierungs­ erkennungs- und -erzeugungseinrichtung SIU. Im dargestellten Ausführungsbeispiel enthält das Kommunikationssystem KS jeweils einige gleichartige periphere Anschlußmodule, die dem Anschluß analoger Fernsprechendgeräte - SLMA - dem Anschluß digitaler Fernsprechendgeräte - SLMB - oder dem Anschluß von Amtsleitun­ gen - TMB - dienen. The test arrangement shown in FIG. 1 comprises, as an essential component, a communication system KS which represents the actual test object, a test device PE and a computer PC . The communication system KS has a modular structure, the modules assigned to central functions being arranged in the lower area and the modules with peripheral connection modules in the upper module area of the communication system KS . In addition to a power supply unit NT, the modules that are assigned to central functions include a central control processor DP with the associated system database, a module with at least one input / output processor for connection control between the central processor DP and connection modules, and a digital switching matrix module MTS and a central sound and signaling detection and generation device SIU . In the illustrated embodiment, the communication system KS includes certain similar each peripheral port modules that the terminal analog telephone terminals - SLMA - the connecting digital telephone terminals - SLMB - or the terminal of Amtsleitun gen - TMB - serve.

Die Prüfeinrichtung PE enthält als wesentliche Bestandteile ne­ ben einer Stromversorgung SV ein Koppelnetzwerk KN, eine Simu­ lationseinrichtung SIM und eine sowohl das Koppelnetzwerk KN als auch die Simulationseinrichtung SIM steuernde Schalt-Steuer­ einrichtung CONT.The test device PE contains as essential components ne ben a power supply PS, a coupling network CN, a simu lationseinrichtung SIM and both the coupling network CN as the simulation means SIM also controlled switching control device CONT.

Das Kommunikationssystem KS und die Prüfeinrichtung PE werden über ein oder mehrere Verbindungskabel mit Adern AL 1 . . . ALn mit den einzelnen Ports der peripheren Anschlußbaugruppen TMB, SLMA, SLMB verbunden.The communication system KS and the test device PE are connected via one or more connecting cables with wires AL 1 . . . ALn connected to the individual ports of the peripheral connection modules TMB , SLMA , SLMB .

Der mit der eigentlichen Prüfsoftware SW geladene Computer PC steht über eine Datenschnittstelle - DS - mit dem Kommunika­ tionssystem KS, d.h. mit dem zentralen Prozessor DP desselben in Verbindung. Eine weitere Datenverbindung besteht über eine Datenschnittstelle SS mit der Schalt-Steuereinrichtung CONT der Prüfeinrichtung PE. Über die letztere Schnittstelle SS werden entsprechend der Prüfsoftware SW Einstellbefehle suk­ zessive an die Prüfeinrichtung PE abgegeben. Als Ergebnis der Prüfung liegen Zustandsänderungen in der dem zentralen Prozessor DP zugeordneten Systemdatenbasis vor und werden über die Datenschnittstelle SS an den Computer PC übergeben. Zur Anzeige und zum Registrieren von Prüf- und Fehlermeldungen ist der Computer PC mit einem Monitor MO und einem Drucker DR verbunden.The loaded with the actual test software SW computer PC is connected via a data interface - DS - with the communication system KS , ie with the central processor DP . Another data connection exists via a data interface SS with the switching control device CONT of the test device PE . Adjustment commands are successively issued to the test device PE via the latter interface SS in accordance with the test software SW . As a result of the check, there are state changes in the system database assigned to the central processor DP and are transferred to the computer PC via the data interface SS . To display and register test and error messages, the computer PC is connected to a monitor MO and a printer DR .

Der in der Fig. 2 dargestellte Ausschnitt der Prüfeinrichtung PE der Fig. 1 umfaßt im wesentlichen die Schalt-Steuereinrich­ tung sowie die Simulationseinrichtung und das Koppelnetzwerk. Die Schalt-Steuereinrichtung umfaßt eine Steuereinrichtung SE, die über einen 8-Bit-Eingangsbus E 1 . . . E 8 vom Computer - PC, Fig. 1 - gesteuert wird. Die Steuereinrichtung SE setzt die Eingangsinformationen in Ansteueradressen um, die über einen Ausgangsbus A 0 . . . A 6 an zwei Schalteinrichtungen SE 1, SE 2 sowie an die Simulationseinrichtung SIM, SIM-S, SIM-E übertragen wer­ den. Weitere Einstelleitungen E, F, R dienen dem Schalten oder Abschalten - Leitung E - von mittels der Schalteinrichtungen SE 1, SE 2 markierten Relais. Über die Leitung R wird die Prüf­ einrichtung in den Leerlaufzustand - Idle State - versetzt, wäh­ rend über die Leitung F die Freigabe - Release - des Systems er­ folgt.The section of the test device PE shown in FIG. 2 of FIG. 1 essentially comprises the Schalt-Steuereinrich device as well as the simulation device and the coupling network. The switching control device comprises a control device SE , which is connected via an 8-bit input bus E 1 . . . E 8 is controlled by the computer - PC , Fig. 1. The control device SE converts the input information into control addresses which are transmitted via an output bus A 0 . . . A 6 to two switching devices SE 1 , SE 2 and to the simulation device SIM , SIM-S , SIM-E transmitted who. Further setting lines E , F , R are used for switching or switching off - line E - of relays marked by switching devices SE 1 , SE 2 . Via the line R the test is device in the idle state - Idle State - offset currency rend over the line F release - release - the system he follows.

Die Simulationseinrichtung SIM umfaßt im vorliegenden Ausfüh­ rungsbeispiel eine Simulations-Steuereinrichtung SIM-S und eine Simulations-Schalteinrichtung SIM-E, wodurch insgesamt 16 Simu­ lationen mit dem Koppelnetzwerk verbunden werden können.In the present exemplary embodiment, the simulation device SIM comprises a simulation control device SIM-S and a simulation switching device SIM-E , whereby a total of 16 simulations can be connected to the coupling network.

Mittels eines Relais S 0 wird beispielsweise ein einen integra­ len Bestandteil der Prüfeinrichtung darstellender Tongenerator über einen Kontakt s 0 an einen Simulationsanschluß Ring/Tip an­ geschaltet.By means of a relay S 0 , for example, a tone generator representing an integral part of the test device is connected via a contact s 0 to a simulation connection ring / tip.

Mittels eines Relais S 1 wird ein 12-kHz/16-kHz-Generator ge­ schaltet. Mittels eines Relais S 2 erfolgt die Umschaltung die­ ses Generators von 16 kHz auf 12 kHz.A 12 kHz / 16 kHz generator is switched by means of a relay S 1 . The Ses generator is switched from 16 kHz to 12 kHz by means of a relay S 2 .

Mit Relais S 3 . . . S 8 werden Abschlußwiderstände und Erdpotential auf den Simulationsanschluß Ring/Tip geschaltet.With relay S 3 . . . S 8 , terminating resistors and earth potential are connected to the simulation connection ring / tip.

Die Schalteinrichtung SE 1 dient im wesentlichen der Anschaltung von Teilnehmeranschlußbaugruppen SLMB für digitale Endgeräte an ein erstes Koppelnetzwerkteil KN 1 bzw. an den Simulationsan­ schluß Ring/Tip. Mit Hilfe von Relais D 0 . . . D 63 werden die ein­ zelnen Ports von insgesamt acht Teilnehmeranschlußbaugruppen SLMB an den Simulationsanschluß Ring/Tip angeschlossen.The switching device SE 1 essentially serves to connect subscriber line modules SLMB for digital terminals to a first coupling network part KN 1 or to the simulation ring / tip. With the help of relay D 0 . . . D 63 the individual ports of a total of eight subscriber line modules SLMB are connected to the simulation connection ring / tip.

Ein zweites Koppelnetzwerkteil KN 2 dient dem Anschluß der Teil­ nehmeranschlußbaugruppen SLMA für analoge Endgeräte und der Leitungsanschlußbaugruppen TMB. Die zugeordnete Schalteinrich­ tung SE 2 steuert Relais U 0 . . . U 15, mit denen eine Umschaltung von dem Ring-Anschluß auf den Tip-Anschluß des Simulationsan­ schlusses und in umgekehrter Richtung durchgeführt wird. Re­ lais T 0 . . . T 15 dienen dem Anschluß der Leitungsanschlußbaugrup­ pen TMB, während Relais R 0 . . . R 63 dem Anschluß der Ports der Teilnehmeranschlußbaugruppen SLMA dienen. Relais N 0 . . . N 15 die­ nen dem Anschluß einzelner Simulationen an das Koppelnetzwerk­ teil KN 2.A second coupling network part KN 2 is used to connect the subscriber line modules SLMA for analog terminals and the line line modules TMB . The assigned switching device SE 2 controls relay U 0 . . . U 15 , with which a switch from the ring connection to the tip connection of the simulation connection is carried out and in the opposite direction. Relay T 0 . . . T 15 are used to connect the TMB line connection modules , while relay R 0 . . . R 63 serve to connect the ports of the subscriber line modules SLMA . Relay N 0 . . . N 15, the connection of individual simulations to the coupling network part KN 2 .

Die jeweils momentanen Einstellungen werden von der Steuerein­ richtung SE an einem Display DIS angezeigt.The respective current settings are shown by the control device SE on a display DIS .

Claims (5)

1. Anordnung zum Prüfen peripherer (Anschluß-) Baugruppen (SLMA, SLMB, TMB) zum Anschließen analoger bzw. digitaler End­ geräte bzw. von Verbindungsleitungen eines mit einem digitalen Koppelfeld (MTS) und einer über eine System-Datenbasis verfügen­ den zentralen Prozessorsteuerung (DP) ausgestatteten Kommuni­ kationssystems (KS) mittels einer Prüfeinrichtung (PE), die ei­ ne Eigenschaften der analogen bzw. digitalen Endgeräte nach­ bildende Simulationseinrichtung (SIM), ein Koppelnetzwerk (KN) zum Anschalten der Simulationseinrichtung (SIM) an die periphe­ ren Anschlußbaugruppen (SLMA, SLMB, TMB) bzw. zum Verbinden der den analogen Endgeräten zugeordneten Anschlußbaugruppen (SLMA) untereinander und/oder mit den den Verbindungsleitungen zuge­ ordneten Anschlußbaugruppen (TMB) und eine der Steuerung der Simulationseinrichtung (SIM) und des Koppelnetzwerkes (KN) die­ nende Schalt-Steuereinrichtung (CONT) aufweist, die gemäß ei­ nem Steuerprogramm (SW) eines über jeweils eine Schnittstelle (DS, SS) an die Schalt-Steuereinrichtung (CONT) und an die zen­ trale Prozessorsteuerung (DP) des Kommunikationssystems (KS) angeschlossenen Computers (PC) gesteuert wird.1. Arrangement for testing peripheral (connection) modules ( SLMA , SLMB , TMB ) for connecting analog or digital end devices or connecting lines with a digital switching matrix ( MTS ) and a system database have the central processor control ( DP ) equipped communication system ( KS ) by means of a test device ( PE ), the ei ne properties of the analog or digital devices after simulating device ( SIM ), a coupling network ( KN ) for switching on the simulation device ( SIM ) to the peripheral connection modules ( SLMA, SLMB, TMB ) or for connecting the connection modules ( SLMA ) assigned to the analog terminals to one another and / or to the connection modules ( TMB ) assigned to the connecting lines and one of the controls for the simulation device ( SIM ) and the coupling network ( KN ) Switching control device ( CONT ), which according to a control program ( SW ) one via an interface ( DS, SS ) to the switching control device ( CONT ) and to the central processor controller ( DP ) of the communication system ( KS ) connected computer ( PC ) is controlled. 2. Anordnung nach Anspruch 1, dadurch gekennzeichnet, daß die Schalt-Steuereinrichtung (CONT) eine Einstellsteuerung (SE) aufweist, die Steuerinformationen des Computers (PC) in Einstellinformationen für Schaltelemente des Koppelnetzwerkes (KN 1, KN 2) und der Simulationseinrichtung (SIM) umsetzt.2. Arrangement according to claim 1, characterized in that the switching control device ( CONT ) has a setting control ( SE ), the control information of the computer ( PC ) in setting information for switching elements of the coupling network ( KN 1 , KN 2 ) and the simulation device ( SIM ) implements. 3. Anordnung nach Anspruch 1 oder 2, dadurch gekennzeichnet, daß das Koppelnetzwerk (KN) derart zweigeteilt ist, daß das ei­ ne Netzwerkteil (KN 1) dem Anschluß der Ports der den digitalen Endgeräten zugeordneten Anschlußbaugruppen (SLMB) und das an­ dere Netzwerkteil (KN 2) dem Anschluß der Ports der den analogen Endgeräten zugeordneten Anschlußbaugruppen (SLMA) dient.3. Arrangement according to claim 1 or 2, characterized in that the coupling network ( KN ) is divided in two such that the egg ne network part ( KN 1 ) the connection of the ports of the connection devices assigned to the digital terminals ( SLMB ) and the other network part ( KN 2 ) serves to connect the ports of the connection modules ( SLMA ) assigned to the analog terminals. 4. Verfahren zum Betreiben der Anordnung nach einem der An­ sprüche 1 bis 3, dadurch gekennzeichnet, daß Steuerprogrammdaten vom Computer (PC) sowohl an die zen­ trale Prozessorsteuerung (DP) als auch an die Schalt-Steuerein­ richtung (CONT) abgegeben werden und die jeweiligen Prüfergeb­ nisse von der System-Datenbasis an den Computer (PC) übergeben werden.4. A method for operating the arrangement according to one of claims 1 to 3, characterized in that control program data from the computer ( PC ) both to the central processor controller ( DP ) and to the switching control device ( CONT ) are delivered and the the respective test results are transferred from the system database to the computer ( PC ). 5. Verfahren nach Anspruch 4, dadurch gekennzeichnet, daß eine dem Kommunikationssystem (KS) immanente Systemsicher­ heits-Steuerung während der Prüfphase unwirksam geschaltet ist.5. The method according to claim 4, characterized in that a system security control inherent in the communication system ( KS ) is deactivated during the test phase.
DE19883823925 1988-07-14 1988-07-14 Arrangement for testing peripheral connection modules of a communications system Granted DE3823925A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE19883823925 DE3823925A1 (en) 1988-07-14 1988-07-14 Arrangement for testing peripheral connection modules of a communications system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19883823925 DE3823925A1 (en) 1988-07-14 1988-07-14 Arrangement for testing peripheral connection modules of a communications system

Publications (2)

Publication Number Publication Date
DE3823925A1 true DE3823925A1 (en) 1990-01-18
DE3823925C2 DE3823925C2 (en) 1992-10-15

Family

ID=6358692

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19883823925 Granted DE3823925A1 (en) 1988-07-14 1988-07-14 Arrangement for testing peripheral connection modules of a communications system

Country Status (1)

Country Link
DE (1) DE3823925A1 (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1992004794A3 (en) * 1990-09-04 1992-06-25 Raychem Corp Alarm and test system for a digital main line
WO1993009628A1 (en) * 1991-11-08 1993-05-13 Siemens Aktiengesellschaft Function testing system for a communications installation
US5427547A (en) * 1990-09-17 1995-06-27 Raychem Corporation Gel filled modular electrical connecting block
US5562491A (en) * 1990-09-17 1996-10-08 Raychem Corporation Gel filled electrical connector
US5598455A (en) * 1990-09-17 1997-01-28 Raychem Corporation Alarm and test system for a digital added main line
WO1997019392A2 (en) * 1995-11-23 1997-05-29 Siemens Aktiengesellschaft Simulator unit for simulating a peripheral unit of a modular programmable controller
WO2002056574A2 (en) * 2001-01-10 2002-07-18 Adc Telecommunications Israel Ltd. Emulating exchange for multiple servers
DE10246347A1 (en) * 2002-10-04 2004-04-15 Siemens Ag Test circuit arrangement for testing terminal connection e.g. of telecommunication network, includes test/control unit for authorizing simulation of signalling functions in cooperation with access unit during positive test result
RU2474861C1 (en) * 2011-09-27 2013-02-10 Общество с ограниченной ответственностью "Опытно-конструкторское бюро "Авиаавтоматика" (ООО ОКБ "Авиаавтоматика") Automated test and control equipment

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3428071A1 (en) * 1984-07-30 1986-01-30 Siemens AG, 1000 Berlin und 8000 München Switching arrangement
DE3623850A1 (en) * 1986-07-15 1988-01-28 Siemens Ag Message for requesting operating data and maintaining a communication system
DE3632569A1 (en) * 1986-09-25 1988-04-07 Bosch Gmbh Robert TESTING METHOD FOR CHECKING ELECTRICAL CIRCUITS AND TESTING DEVICE THEREOF
DE3639242A1 (en) * 1986-11-17 1988-05-19 Horst Dipl Ing Hartenstein Device for testing electronic modules

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3428071A1 (en) * 1984-07-30 1986-01-30 Siemens AG, 1000 Berlin und 8000 München Switching arrangement
DE3623850A1 (en) * 1986-07-15 1988-01-28 Siemens Ag Message for requesting operating data and maintaining a communication system
DE3632569A1 (en) * 1986-09-25 1988-04-07 Bosch Gmbh Robert TESTING METHOD FOR CHECKING ELECTRICAL CIRCUITS AND TESTING DEVICE THEREOF
DE3639242A1 (en) * 1986-11-17 1988-05-19 Horst Dipl Ing Hartenstein Device for testing electronic modules

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0682435A2 (en) * 1990-09-04 1995-11-15 RAYCHEM CORPORATION (a Delaware corporation) Alarm and test system with improved coupling circuit for a digital added main line
WO1992004794A3 (en) * 1990-09-04 1992-06-25 Raychem Corp Alarm and test system for a digital main line
AU658828B2 (en) * 1990-09-04 1995-05-04 Raychem Corporation Alarm and test system for a digital main line
EP0682435A3 (en) * 1990-09-04 1996-07-17 Raychem Corp Alarm and test system with improved coupling circuit for a digital added main line.
US5601460A (en) * 1990-09-17 1997-02-11 Raychem Corporation Gel filled modular electrical connecting block
US5427547A (en) * 1990-09-17 1995-06-27 Raychem Corporation Gel filled modular electrical connecting block
US5562491A (en) * 1990-09-17 1996-10-08 Raychem Corporation Gel filled electrical connector
US5598455A (en) * 1990-09-17 1997-01-28 Raychem Corporation Alarm and test system for a digital added main line
WO1993009628A1 (en) * 1991-11-08 1993-05-13 Siemens Aktiengesellschaft Function testing system for a communications installation
WO1997019392A2 (en) * 1995-11-23 1997-05-29 Siemens Aktiengesellschaft Simulator unit for simulating a peripheral unit of a modular programmable controller
WO1997019392A3 (en) * 1995-11-23 1997-07-17 Siemens Ag Simulator unit for simulating a peripheral unit of a modular programmable controller
WO2002056574A2 (en) * 2001-01-10 2002-07-18 Adc Telecommunications Israel Ltd. Emulating exchange for multiple servers
WO2002056574A3 (en) * 2001-01-10 2003-05-01 Adc Telecomm Israel Ltd Emulating exchange for multiple servers
DE10246347A1 (en) * 2002-10-04 2004-04-15 Siemens Ag Test circuit arrangement for testing terminal connection e.g. of telecommunication network, includes test/control unit for authorizing simulation of signalling functions in cooperation with access unit during positive test result
DE10246347B4 (en) * 2002-10-04 2004-12-09 Siemens Ag Test circuit arrangement, test system and method for testing a terminal connection
RU2474861C1 (en) * 2011-09-27 2013-02-10 Общество с ограниченной ответственностью "Опытно-конструкторское бюро "Авиаавтоматика" (ООО ОКБ "Авиаавтоматика") Automated test and control equipment

Also Published As

Publication number Publication date
DE3823925C2 (en) 1992-10-15

Similar Documents

Publication Publication Date Title
EP1427086B2 (en) Electrical apparatus and method for operating it
DE3824250C2 (en)
DE3823925C2 (en)
EP0580893B1 (en) Test method for testing a subscriber connection
DE3215672C1 (en) Arrangement for automatic testing of telephone systems, in particular telephone PABX systems
EP0603692B1 (en) Method for automatic testing of switching and transmission procedures in a telecommunication network and a responder for implementing this method
DE3424124A1 (en) Circuit arrangement for checking the functions of telecommunications switching systems, in particular telephone switching systems
DE2826063A1 (en) INDIRECTLY CONTROLLED SWITCHING SYSTEM WITH TIME CHANNEL LINKS, IN PARTICULAR TELEPHONE SWITCHING SYSTEM
DE3215663C1 (en) Arrangement for automatic testing of telephone systems, in particular telephone PABX systems
DE3502564A1 (en) Test configuration for testing the operation of activated and non-activated facilities of processor-controlled communications switching systems
DE10137219C1 (en) Electronic dialing system and method for prequalifying subscriber lines
DE19627937C2 (en) Free configuration of a subscriber circuit
EP0211261B1 (en) Method for automatically testing a communication system, especially a private branch exchange
DE3116374C2 (en) Circuit arrangement for setting a signal level monitoring device without measuring instruments
DE19931237C2 (en) Method and test arrangement for testing performance features of communication systems
DE3241175C2 (en)
DE1803002C3 (en) Centrally controlled switching system, in particular telephone switching system, each with at least one program and / or status memory Siemens AG, 1000 Berlin and 8000 Munich
DE19731527C2 (en) Teletext input system
EP0280895B1 (en) Digital interface between at least two subscriber terminal units and a processing unit
DE2845101A1 (en) ARRANGEMENT FOR TESTING CONNECTING LINES
EP1932332B1 (en) Method and device for testing the function for inverting the polarity on a subscriber connection line comprising several wires
DE3215651C1 (en) Arrangement for automatic creation of different system-specific test data collations for the purposes of testing telephone systems, in particular telephone PABX systems
DE2850376C2 (en) Procedure for checking the connections of a telecommunications network
DE2029762C3 (en) Method for determining the simultaneous occupancy of two or more of several assemblies
DE3215663C2 (en)

Legal Events

Date Code Title Description
8110 Request for examination paragraph 44
D2 Grant after examination
8364 No opposition during term of opposition
8339 Ceased/non-payment of the annual fee