US20030171981A1 - Computer implemented vehicle repair analysis system - Google Patents

Computer implemented vehicle repair analysis system Download PDF

Info

Publication number
US20030171981A1
US20030171981A1 US10/386,051 US38605103A US2003171981A1 US 20030171981 A1 US20030171981 A1 US 20030171981A1 US 38605103 A US38605103 A US 38605103A US 2003171981 A1 US2003171981 A1 US 2003171981A1
Authority
US
United States
Prior art keywords
business
vehicle
delay
data structure
reason
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
US10/386,051
Other versions
US6990461B2 (en
Inventor
Guy Bargnes
John Howe
Charles Kelly
Jean-Claude Pierre
Chris Lavington
Antonio Torres
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to US10/386,051 priority Critical patent/US6990461B2/en
Publication of US20030171981A1 publication Critical patent/US20030171981A1/en
Application granted granted Critical
Publication of US6990461B2 publication Critical patent/US6990461B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • G06Q10/063116Schedule adjustment for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06312Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06314Calendaring for a resource
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06315Needs-based resource requirements planning or analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/02Marketing; Price estimation or determination; Fundraising
    • G06Q30/0201Market modelling; Market analysis; Collecting market data
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/02Marketing; Price estimation or determination; Fundraising
    • G06Q30/0201Market modelling; Market analysis; Collecting market data
    • G06Q30/0203Market surveys; Market polls

Definitions

  • the present invention relates generally to a computer-implemented vehicle processing facility analysis system, more particularly, to a networked and distributed computer-implemented vehicle repair facility analysis system.
  • Vehicle repair shops handle a large volume of vehicles. Vehicles remain many days within the shops since the repair process has many time consuming steps. For example in a typical collision repair process, vehicles undergo a vehicle disassembly step, frame repair step, metal repair step, preparation step, painting step, reassembly step, and testing step. Delays invariably arise from a number of sources. Exemplary delay sources include the incorrect parts being delivered or an insurance company not quickly processing a vehicle collision claim.
  • a computer-implemented method and apparatus for tracking a vehicle during a vehicle-related multi-step process.
  • a vehicle identifier is received for uniquely identifying a vehicle.
  • a delay reason is received for why the vehicle was delayed during at least one of the multi-step processes.
  • An association is stored among the delay reason, the step at which the vehicle delay occurred, and the vehicle identifier. The stored association is used to identify at least one delay reason for the vehicle.
  • a computer-implemented method and apparatus are provided for analyzing a vehicle facility processing business.
  • a business performance data structure is stored in the memory of at least one computer that is used to summarize business performance data related to the business.
  • a business priority data structure is stored in the computer memory in order to summarize business priorities related to the business.
  • a business projection data structure is stored in the computer memory in order to summarize business projections data related to the business.
  • a production workforce shift profile data structure is stored in the memory in order to summarize production workforce shifts related to the business.
  • a business summary report is generated using the business performance data structure, the business priorities data structure, the business projection data structure, and the workforce shift data structure.
  • FIG. 1 is a system block diagram depicting the computer-implemented vehicle facility repair analysis system
  • FIG. 2 is a software module data flow diagram depicting the data flow among software modules of the present invention utilized to generate business analysis data
  • FIG. 3 is a structure chart depicting the web site structure of the present invention.
  • FIG. 4 is a computer screen display depicting a succinct recap of business performance, priorities, projections, and production workforce shift report that was generated in accordance with the teachings of the present invention
  • FIG. 5 is a computer screen display depicting a vehicle tracking and cycle time assessment data processing screen
  • FIG. 6 is a computer screen display depicting the display of data associated with sales and marketing data
  • FIG. 7 is a computer screen display depicting the entry and display of detailed data associated with sales and marketing data of FIG. 6;
  • FIG. 8 is a computer screen display displaying the result of entering data via the computer screen display of FIG. 7;
  • FIG. 9 is a computer screen display depicting the display of data that was provided via the computer screen of FIG. 7;
  • FIGS. 10 a and 10 b are a computer screen display depicting the entry and display of company financial data, owner's priority data, personnel & facility data, and technician workshift data;
  • FIG. 11 depicts a computer screen showing how an user's shop compares to other shops in selected measures.
  • FIG. 1 depicts a collision repair facility 30 being connected to a business analysis and transaction computer server 34 via a network such as the Internet 38 .
  • Collision repair facility 30 uses computer server 34 to analyze the collision repair facility's performance, priorities, business projections and workforce shifts.
  • computer 42 provides an interface 46 for an user to facility 30 to communicate with computer server 34 .
  • computer 42 is situated within facility 30 so that the status of a vehicle can be efficiently tracked as it is being repaired in facility 30 .
  • the present invention is not limited to the user being only situated within the collision repair facility 30 , but also includes an user physically remote from facility 30 but has knowledge of the vehicle's status in facility 30 wherein the process a vehicle is.
  • User 50 provides financial and other facility-related data so that business analysis module 60 that resides on computer server 34 can analyze the user-provided data.
  • Business analysis module 60 examines user-provided financial, facility, personnel information, and priority assessment data to provide to the user an assessment of the collision repair facility's strengths, weaknesses, areas of opportunities, and business projections.
  • business analysis module 60 can indicate to user 50 that based upon the user-provided input data, facility 30 has an opportunity for growth relative to industry guidelines. Module 60 can also indicate to the user how well facility 30 is doing relative to the top 25% of all other collision repair facility shops.
  • business analysis module 60 receives from computer 42 vehicle repair processing cycle time data.
  • the cycle time data includes not only at what step a vehicle is within the vehicle repair process, but also includes delay reasons and delay time amounts for any delays that have occurred at a step in the repair process.
  • Business analysis module 60 uses the data to identify whether facility 30 has as one of its strengths a relatively fast time to process a vehicle repair.
  • Business analysis module 60 also can indicate what equipment the facility 30 can use to actualize opportunities or to overcome weaknesses in one or more areas.
  • Business transaction module 64 interacts with business analysis module 60 and user 50 to automate the process of buying for user 50 the equipment that would improve the operations of facility 30 . For example, if the business analysis module 60 had identified that facility 30 has a chronic problem of a shortage of movable carts. Business transaction module 64 is used to identify for the user sellers of movable carts. In this manner, the purchase of needed items is automated for the user by the present invention.
  • a paint supply company provides the present invention to the owner of a collision repair shop. Through use by the owner of module 64 to purchase items, the present invention can recommend products and services offered by the paint supply company, or products and services offered by companies that have co-branded with the paint supply company. The paint supply company providing the present invention also increases loyalty of the owner to the paint supply company even if no non-paint items are ordered.
  • multiple collision facilities 56 can use computer server 34 to analyze and to transact business.
  • the present invention can also be given to users on a computer storage medium (such as a CD-ROM). The user uses the software to analyze and transact business.
  • FIG. 2 depicts data input and processing performed by business analysis module 60 .
  • An user provides customer financial data 80 , customer, facility and personnel information 84 , customer assessment of priorities 88 , and production shift information 89 in order for business analysis module 60 to identify best practices 92 , analytical worksheets 96 , and forms and policies of the business 100 .
  • customer financial data 80 includes refinish labor sales and other data items depicted in FIGS. 10 a and 10 b shown by reference numeral 80 .
  • Customer, facility and personnel information 84 includes number of metal stall including frame and other data items depicted in FIGS. 10 a and 10 b shown by reference numeral 84 .
  • Customer assessment of priorities 88 includes prioritizing financial measures and other items depicted in FIGS. 10 a and 10 b shown by reference numeral 88 .
  • Production shift information 89 includes number of day shift technicians and other data items depicted in FIGS. 10 a and 10 b shown by reference numeral 89 .
  • the present invention associates many best practices with the correct form to use.
  • An example of such an association between best practice and the correct form is the efficient capability to track vehicle and cycle time (for example, see FIG. 5).
  • the shop owner By clicking on the form to include it in the shop owner's personal inventory, the shop owner can create a customized Operations Manual.
  • a website is provided to the user as depicted in FIG. 3.
  • a 2020 recap web page 120 that provides a succinct presentation of key performance indicators (KPIs), business owner's priorities, financial projections, and the production workforce shift profile associated with the facility.
  • KPIs key performance indicators
  • various data input web pages are provided, such as the categories web pages 124 and the update my personal reports web page 128 .
  • the category web pages 124 allow the user to enter data into the present invention (see, for example, FIGS. 6 - 9 ).
  • the update web pages 128 allow the user to customize reports to better fit the particular needs of the user.
  • Data entry web page 135 allows the user to provide data specifically for the 2020 recap results summary web page 120 .
  • An example of data entry web page 135 is FIGS. 10 a and 10 b.
  • FIG. 4 depicts a 2020 recap which is a succinct presentation by the present invention of how well the collision repair facility is doing.
  • a performance summary 200 a priority summary 204 , a projection summary 208 , and a production workforce shift profile summary 212 .
  • Performance summary 200 is generated using a performance data structure with the structure depicted within region 216 .
  • the business performance data structure includes selected key performance indicators, facility/shop data, industry guidelines, a top 25% indicator, and whether opportunities exist to improve the business.
  • a key performance indicator within data structure 216 includes a production efficiency amount for the facility, industry guidelines, and top 25% indicator.
  • total gross profit percent is provided for the shop, industry guides, and top 25%.
  • An opportunity in this example has been identified by the present invention that the user's shop has a total gross profit percent of 38.5% which is below the 40.0% industry guideline and well below the top 25% value of 43.5%.
  • An opportunity indicator 220 is generated by the present invention for the user to explicitly show that the user's shop can grow in this area in order to be more competitive relative to other shops.
  • Specific aspects of the shop, such as paint can be studied and analyzed by the present invention. For example, monthly paint gallons of waste per paint technician is provided as an indicator for the user to review.
  • opportunity indicator 222 is generated by the present invention for the user to explicitly show that based upon the shop's monthly sales and number of staff employees the user's shop can most likely generate additional profits without adding staff.
  • performance data structure 216 includes the following indicators: annualized total sales amount, total gross profit percent, production proficiency, production staffing density (main shift), monthly sales per administrative employee, monthly sales per estimator, paint cost per paint hour billed, monthly gallons waste per paint technician, overall customer satisfaction index, and gross profit dollar amount per technician clock hour.
  • FIG. 11 depicts a computer screen showing how an user's shop compares to other shops, and not just how the user's shop compares with the top 25% of all shops.
  • column 237 on FIG. 11 depicts that the user's shop is above average for technician production efficiency relative to other shops as shown by reference numeral 241 .
  • Column 239 depicts that the user's shop is below average for stalls per technician (main shift only) as shown by reference numeral 243 .
  • a business priorities data structure is depicted within region 240 in order to store and to display business priority information relevant to the user's shop.
  • the business priorities data structure 240 includes business areas and indicators as to how strong the shop is within the areas. For example, a priority as selected by the user is the financial performance of the shop. Based upon the user's financial input data in this example, the financial performance of the shop is indicated as being relatively weak by the owner as shown by the strength indicator 244 . If the user wanted to see the data and the calculation methods by which key performance indicators 200 were generated, the user clicks upon tab 248 to obtain greater detail about the data used to generate the performance indicators 200 .
  • owner priorities data structure 240 includes financial measures, financial performance, sales and marketing, customer satisfaction index, and insurance relations including cycle time, administration (general), administration (parts), production (general), production (refinish), facility (capacity, equipment, layout), and personnel including pay plans and incentives.
  • Projections summary 208 uses data structure 250 to handle the projections data associated with the shop.
  • the data structure 250 includes performance factors, sales, gross profit, the additional amount of gross profit that would be generated given a certain level of improvement. Projections data structure 250 allows the user to pose “what if” scenarios for assessing how much improvement the user shop would experience given different situations.
  • the second performance factor in projections data structure 250 is directed to posing a “what if” scenario of what would be the increase in profits with a 10% improvement in production proficiency. Based upon the user's supplied input data, the projections module determines that with the a 10% improvement in production proficiency, the gross profit of the shop would be improved by $24,000 with sales of $1,470,000 and a gross profit of $540,000.
  • projections data structure 250 includes the following performance factors: current performance (annualized), “with 10% improvement in production efficiency” “performance with one additional technician” “with 10% improvement in parts:labor ratio”, “with 2% improvement in labor gross profit”, “with 2% improvement in parts gross profit” “with 2% improvement in materials gross profit” and “with cumulative impact of all improvements”.
  • the production workforce shift profile summary 212 is generated using a production workforce data structure 260 that includes main shift only data, main shift plus overtime or Saturday data, main shift and second shift data, and main shift/second shift and Saturday data.
  • a production workforce data structure 260 that includes main shift only data, main shift plus overtime or Saturday data, main shift and second shift data, and main shift/second shift and Saturday data.
  • the dark portions 264 that the shop has a main shift plus an overtime shift, while the lighter portions 268 indicate that there is not a second shift nor a Saturday operations shift.
  • the present invention utilizes within data structure 260 a breakout of the main shift from the other shifts, such as the second shift. In this manner, the present invention is better able to assess facility utilization and potential for greater facility utilization.
  • the shop owner can not only obtain a better perspective of the utilization of the facility, but also have a more practical evaluation of actual stalls per technician for the primary shift.
  • the user If the user wanted to see how the data was generated or to input new data into the business analysis module, the user identifies within priority summary section 204 which priority detail needs examination. As an example, if the user wanted to enter in data for the first time relative to “insurance relations including cycle time”, which is the fifth priority within summary section 204 , the user clicks upon tab button 272 . Upon clicking tab button 272 , the user is directed to the insurance and cycle time area which would include the computer screen of FIG. 5.
  • FIG. 5 depicts a data entry and data display computer screen related to vehicle tracking and cycle time measurements and assessments.
  • the present invention uses data structure 304 with the attributes listed in row 300 or equivalents thereof.
  • Cycle time data structure 304 includes a vehicle identifier to uniquely identify a vehicle that is undergoing a repair process.
  • the vehicle can be identified by an unique repair number supplied by the shop, a customer name, vehicle brand, vehicle year, and beginning date of the repair.
  • Data structure 304 also includes the steps which the vehicle is to undergo for repair. If the repair is due to a vehicle accident which would include a vehicle frame reconstruction and repainting, then typical repair steps include the vehicle disassembly step, frame repair step, metal repair step, preparation step, painting step, reassembly step, and testing step. Data structure 304 not only tracks what step a vehicle is presently at but also includes whether a vehicle remains at a step for time greater than a predetermined amount. In the preferred embodiment, codes as shown in region 308 are placed at a step where a delay has occurred. For example, a “PI” code is used to indicate that the reason for delay was that there was a delay in delivery of the parts.
  • a number preceding the code indicates the amount of time associated with the delay.
  • the number indicates the additional days of delay, such as, for example, “2P2” indicates that there was a two day delay at a particular step due to incorrect parts being delivered. Accordingly, if for a vehicle at the frame repair step the code “2P2” appears, this indicates that there was a delay for two days for a vehicle where the frame could not be operated upon due to incorrect parts being delivered.
  • the present invention also includes the source category of the parts, such as whether the parts category is an OEM (original equipment manufacturer) parts category, or an after market parts category, or a salvage parts category, or other types of parts category.
  • the source category of the parts such as whether the parts category is an OEM (original equipment manufacturer) parts category, or an after market parts category, or a salvage parts category, or other types of parts category.
  • Another embodiment includes using additional attributes to store the source category of the parts.
  • Data structure 304 includes the date upon which the vehicle's repair was completed as well as the final total amount expended to perform the repair.
  • data structure 304 not only tracks the vehicle through a multi-step process, but also performs cycle time measurement by noting the amount of time of delay.
  • the present invention performs cycle time analysis by providing the reason for the delay.
  • a symbol such as a “-- --” is entered in data structure 304 .
  • data structure 304 Each day, all vehicles in the vehicle repair facility are reviewed. If a vehicle has been worked upon for at least five hours, then nothing additionally is noted for the vehicle in data structure 304 . However, if less than five hours has been expended for working upon a car, then the reason for the delay as well as the current delay time amount is entered into the appropriate step in data structure 304 .
  • Data structure 304 also includes target analysis where desired target time repair values are compared against the actual time expended to repair a vehicle.
  • the target analysis includes the number of labor hours sold, the labor hours divided by five hours, actual business days expended to repair the vehicle, and a cycle time efficiency metric. For example, if the number of labor hours sold to complete a vehicle repair process was 30 hours, the labor hours divided by 5 value would be 6. If the actual days expended was 7 instead of the targeted six days, then the cycle time efficiency would indicate that 1 day had been lost.
  • Data structure 304 includes the insurance company being associated with a vehicle repair in order to capture delays associated with an insurance company. For example, if an inordinate number of “I1” insurance approval delay codes have been entered in data structure 304 for a particular insurance company, then the owner of the vehicle can be told that the reason for the delay was not the repair shop, but rather the insurance company that the vehicle's owner presently uses and that this insurance company is chronically late inspecting damaged vehicles.
  • FIG. 6 provides an example of an user entering and viewing the detailed information used to generate sales and marketing summary information.
  • FIG. 6 is associated with the selling and sources of the business.
  • the present invention provides multiple areas in this category for the user to provide information about their business.
  • the present invention asks for information related to a customer's first impression of the user's facility.
  • a pointing device such as a computer mouse
  • FIG. 7 more detailed questions are asked about the user's facility. For example, regarding the customer's first impression of the facility, more detailed information is gathered via region 380 . Questions include but are not limited to the user ranking overall impression of the shop from the street as being nonapplicable, weak, average or strong. Even more detailed questions may be asked regarding the overall impression by focusing the user upon the shop's signage, general appearance of the building and whether the shop has a clear and wide entrance. If the user deems necessary, such as if the user upon reflection believes that one or more of these questions indicate a weakness, the user can select to add this particular question to a 90-day business plan of the facility or add it to a one-year business plan of the facility. It should be understood that the present invention also includes the present invention allowing the user to bypass FIG. 6 and proceed directly to the detailed questions of FIG. 7.
  • FIG. 8 provides an example of the present invention generating results after the user has provided information to the questions presented in FIG. 7.
  • the signage question produced a weak response
  • the general appearance of the building produced a relatively strong response
  • the clear and wide entrance question produced a very weak response.
  • These responses as well as the other responses associated with the questions of region 380 contributed to a customer's first impression of the facility as being weak as shown by reference numeral 384 .
  • FIG. 9 shows the same computer screen as FIG. 7, however populated with information supplied by the user.
  • the results of the responses supplied by the user on FIG. 9 shows the strength indicator relative to the customer's first impression of your facility by reference numeral 384 .
  • the user has supplied other information that the present invention is used to generate the strength indicators for the remaining business aspects in FIG. 9.
  • FIGS. 10 a and 10 b show another example of the present invention acquiring data in order to provide business analysis to the user.
  • the computer screen depicted in FIGS. 10 a and 10 b shows a customer data entry form for providing detailed information about the user as well as sales information and how many technicians work, on which days, for how many hours, and for which shift. This information is aggregated by the present invention and shown to the user in the succinct format depicted in FIG. 4.
  • the present invention is not limited to vehicle collision repair shops, but extends to other multi-process vehicle operations or multi-process non-vehicle operations, such as but not limited to vehicle sales operations.
  • a vehicle sales operation shop uses the present invention to analyze its business relative to performance, priorities, projections, and production workforce shift profiles.

Abstract

A computer-implemented method and apparatus is provided for tracking a vehicle during a vehicle-related multi-step process. A vehicle identifier is received for uniquely identifying a vehicle. A delay reason is received for why the vehicle was delayed during at least one of the multi-step processes. An association is stored among the delay reason, the step at which the vehicle delay occurred, and the vehicle identifier. The stored association is used to identify at least one delay reason for the vehicle. The method and apparatus also analyze business aspects of the vehicle-related multi-step process and succinctly summarize the business analysis with respect to performance, priorities, projections, and production workforce shift profiles.

Description

    CROSS-REFERENCE TO RELATED APPLICATION
  • The present application is a divisional application of U.S. Ser. No. 09/602,922, filed Jun. 23, 2000, which is incorporated herein by reference.[0001]
  • BACKGROUND OF THE INVENTION
  • 1. Field of the Invention [0002]
  • The present invention relates generally to a computer-implemented vehicle processing facility analysis system, more particularly, to a networked and distributed computer-implemented vehicle repair facility analysis system. [0003]
  • 2. Background and Summary of the Invention [0004]
  • Vehicle repair shops handle a large volume of vehicles. Vehicles remain many days within the shops since the repair process has many time consuming steps. For example in a typical collision repair process, vehicles undergo a vehicle disassembly step, frame repair step, metal repair step, preparation step, painting step, reassembly step, and testing step. Delays invariably arise from a number of sources. Exemplary delay sources include the incorrect parts being delivered or an insurance company not quickly processing a vehicle collision claim. [0005]
  • Due to the large volume that repair shops handle, repair shop managers find it difficult to correctly diagnose what delays occur enough times to warrant correction. The delays that occur most frequently might be able to be diagnosed. However, delays that occur less frequently escape detection and correction. [0006]
  • Not only is the diagnosis of vehicle delays problematic, but it is difficult for a shop owner to obtain in a relatively straightforward way a comprehensive view of how the owner's shop is performing in terms of facility potential, profit potential and other factors relative to other shops, let alone know how it is performing relative to the top vehicle repair shops. Business analysis software packages exist, but are typically not directed to as many specifics (e.g., cycle time analysis, facility shift, and other factors) of a vehicle repair shop, and therefore are less complete. A non-limiting specific example includes the amount of paint used by technicians in the repair process. Typical business analysis software packages are not directed to analyzing the usage of paint and how such usage compares with other shops. [0007]
  • The present invention overcomes the aforementioned disadvantages as well as other disadvantages. In accordance with the teachings of the present invention, a computer-implemented method and apparatus is provided for tracking a vehicle during a vehicle-related multi-step process. A vehicle identifier is received for uniquely identifying a vehicle. A delay reason is received for why the vehicle was delayed during at least one of the multi-step processes. An association is stored among the delay reason, the step at which the vehicle delay occurred, and the vehicle identifier. The stored association is used to identify at least one delay reason for the vehicle. [0008]
  • In another embodiment of the present invention, a computer-implemented method and apparatus are provided for analyzing a vehicle facility processing business. A business performance data structure is stored in the memory of at least one computer that is used to summarize business performance data related to the business. A business priority data structure is stored in the computer memory in order to summarize business priorities related to the business. A business projection data structure is stored in the computer memory in order to summarize business projections data related to the business. A production workforce shift profile data structure is stored in the memory in order to summarize production workforce shifts related to the business. A business summary report is generated using the business performance data structure, the business priorities data structure, the business projection data structure, and the workforce shift data structure. [0009]
  • Further areas of applicability of the present invention will become apparent from the detailed description provided hereinafter. It should be understood, however, that the detailed description and specific examples, while indicating preferred embodiments of the invention, are intended for purposes of illustration only, since various changes and modifications within the spirit and scope of the invention will become apparent to those skilled in the art from this detailed description.[0010]
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • The present invention will become more fully understood from the detailed description and the accompanying drawings, wherein: [0011]
  • FIG. 1 is a system block diagram depicting the computer-implemented vehicle facility repair analysis system; [0012]
  • FIG. 2 is a software module data flow diagram depicting the data flow among software modules of the present invention utilized to generate business analysis data; [0013]
  • FIG. 3 is a structure chart depicting the web site structure of the present invention; [0014]
  • FIG. 4 is a computer screen display depicting a succinct recap of business performance, priorities, projections, and production workforce shift report that was generated in accordance with the teachings of the present invention; [0015]
  • FIG. 5 is a computer screen display depicting a vehicle tracking and cycle time assessment data processing screen; [0016]
  • FIG. 6 is a computer screen display depicting the display of data associated with sales and marketing data; [0017]
  • FIG. 7 is a computer screen display depicting the entry and display of detailed data associated with sales and marketing data of FIG. 6; [0018]
  • FIG. 8 is a computer screen display displaying the result of entering data via the computer screen display of FIG. 7; [0019]
  • FIG. 9 is a computer screen display depicting the display of data that was provided via the computer screen of FIG. 7; [0020]
  • FIGS. 10[0021] a and 10 b are a computer screen display depicting the entry and display of company financial data, owner's priority data, personnel & facility data, and technician workshift data; and
  • FIG. 11 depicts a computer screen showing how an user's shop compares to other shops in selected measures.[0022]
  • DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENT
  • FIG. 1 depicts a [0023] collision repair facility 30 being connected to a business analysis and transaction computer server 34 via a network such as the Internet 38. Collision repair facility 30 uses computer server 34 to analyze the collision repair facility's performance, priorities, business projections and workforce shifts.
  • At [0024] collision repair facility 30, computer 42 provides an interface 46 for an user to facility 30 to communicate with computer server 34. In the preferred embodiment, computer 42 is situated within facility 30 so that the status of a vehicle can be efficiently tracked as it is being repaired in facility 30. However, it is to be understood that the present invention is not limited to the user being only situated within the collision repair facility 30, but also includes an user physically remote from facility 30 but has knowledge of the vehicle's status in facility 30 wherein the process a vehicle is.
  • [0025] User 50 provides financial and other facility-related data so that business analysis module 60 that resides on computer server 34 can analyze the user-provided data. Business analysis module 60 examines user-provided financial, facility, personnel information, and priority assessment data to provide to the user an assessment of the collision repair facility's strengths, weaknesses, areas of opportunities, and business projections. For example, business analysis module 60 can indicate to user 50 that based upon the user-provided input data, facility 30 has an opportunity for growth relative to industry guidelines. Module 60 can also indicate to the user how well facility 30 is doing relative to the top 25% of all other collision repair facility shops.
  • As another non-limiting example, [0026] business analysis module 60 receives from computer 42 vehicle repair processing cycle time data. The cycle time data includes not only at what step a vehicle is within the vehicle repair process, but also includes delay reasons and delay time amounts for any delays that have occurred at a step in the repair process. Business analysis module 60 uses the data to identify whether facility 30 has as one of its strengths a relatively fast time to process a vehicle repair.
  • [0027] Business analysis module 60 also can indicate what equipment the facility 30 can use to actualize opportunities or to overcome weaknesses in one or more areas. Business transaction module 64 interacts with business analysis module 60 and user 50 to automate the process of buying for user 50 the equipment that would improve the operations of facility 30. For example, if the business analysis module 60 had identified that facility 30 has a chronic problem of a shortage of movable carts. Business transaction module 64 is used to identify for the user sellers of movable carts. In this manner, the purchase of needed items is automated for the user by the present invention.
  • In the preferred embodiment of the present invention, a paint supply company provides the present invention to the owner of a collision repair shop. Through use by the owner of [0028] module 64 to purchase items, the present invention can recommend products and services offered by the paint supply company, or products and services offered by companies that have co-branded with the paint supply company. The paint supply company providing the present invention also increases loyalty of the owner to the paint supply company even if no non-paint items are ordered.
  • Due to the networked environment in the preferred embodiment of the present invention, [0029] multiple collision facilities 56 can use computer server 34 to analyze and to transact business. However, it should be understood that the present invention can also be given to users on a computer storage medium (such as a CD-ROM). The user uses the software to analyze and transact business.
  • FIG. 2 depicts data input and processing performed by [0030] business analysis module 60. An user provides customer financial data 80, customer, facility and personnel information 84, customer assessment of priorities 88, and production shift information 89 in order for business analysis module 60 to identify best practices 92, analytical worksheets 96, and forms and policies of the business 100. For example, customer financial data 80 includes refinish labor sales and other data items depicted in FIGS. 10a and 10 b shown by reference numeral 80. Customer, facility and personnel information 84 includes number of metal stall including frame and other data items depicted in FIGS. 10a and 10 b shown by reference numeral 84. Customer assessment of priorities 88 includes prioritizing financial measures and other items depicted in FIGS. 10a and 10 b shown by reference numeral 88. Production shift information 89 includes number of day shift technicians and other data items depicted in FIGS. 10a and 10 b shown by reference numeral 89.
  • The present invention associates many best practices with the correct form to use. An example of such an association between best practice and the correct form is the efficient capability to track vehicle and cycle time (for example, see FIG. 5). By clicking on the form to include it in the shop owner's personal inventory, the shop owner can create a customized Operations Manual. [0031]
  • In order to most efficiently and effectively acquire and generate the desired information, a website is provided to the user as depicted in FIG. 3. At the top of the structure, is a 2020 [0032] recap web page 120 that provides a succinct presentation of key performance indicators (KPIs), business owner's priorities, financial projections, and the production workforce shift profile associated with the facility. In order to provide the data needed to generate the succinct business presentation, various data input web pages are provided, such as the categories web pages 124 and the update my personal reports web page 128. The category web pages 124 allow the user to enter data into the present invention (see, for example, FIGS. 6-9). The update web pages 128 allow the user to customize reports to better fit the particular needs of the user.
  • “What if? scenarios” [0033] web pages 133 allow the user to examine the effect of changing certain parameters, such as financial parameters, upon the user's facility. Data entry web page 135 allows the user to provide data specifically for the 2020 recap results summary web page 120. An example of data entry web page 135 is FIGS. 10a and 10 b.
  • FIG. 4 depicts a 2020 recap which is a succinct presentation by the present invention of how well the collision repair facility is doing. Within the preferred embodiment of the present invention, the following areas or their equivalent are provided: a [0034] performance summary 200, a priority summary 204, a projection summary 208, and a production workforce shift profile summary 212.
  • [0035] Performance summary 200 is generated using a performance data structure with the structure depicted within region 216. The business performance data structure includes selected key performance indicators, facility/shop data, industry guidelines, a top 25% indicator, and whether opportunities exist to improve the business. For example, a key performance indicator within data structure 216 includes a production efficiency amount for the facility, industry guidelines, and top 25% indicator. As another example, total gross profit percent is provided for the shop, industry guides, and top 25%. An opportunity in this example has been identified by the present invention that the user's shop has a total gross profit percent of 38.5% which is below the 40.0% industry guideline and well below the top 25% value of 43.5%. An opportunity indicator 220 is generated by the present invention for the user to explicitly show that the user's shop can grow in this area in order to be more competitive relative to other shops. Specific aspects of the shop, such as paint, can be studied and analyzed by the present invention. For example, monthly paint gallons of waste per paint technician is provided as an indicator for the user to review.
  • As another example, [0036] opportunity indicator 222 is generated by the present invention for the user to explicitly show that based upon the shop's monthly sales and number of staff employees the user's shop can most likely generate additional profits without adding staff.
  • In the preferred embodiment, [0037] performance data structure 216 includes the following indicators: annualized total sales amount, total gross profit percent, production proficiency, production staffing density (main shift), monthly sales per administrative employee, monthly sales per estimator, paint cost per paint hour billed, monthly gallons waste per paint technician, overall customer satisfaction index, and gross profit dollar amount per technician clock hour.
  • With selected performance indicators such as efficiency and staffing density, the user sees a spectrum of actual values and the shop's position on the spectrum. The user is neither intimidated by group averages that are high nor stifled by a low target. The user will find the performances of real shops at the shop owner's current performance and at any level of performance considered. [0038]
  • For example, FIG. 11 depicts a computer screen showing how an user's shop compares to other shops, and not just how the user's shop compares with the top 25% of all shops. In this example, [0039] column 237 on FIG. 11 depicts that the user's shop is above average for technician production efficiency relative to other shops as shown by reference numeral 241. Column 239 depicts that the user's shop is below average for stalls per technician (main shift only) as shown by reference numeral 243.
  • With reference back to FIG. 4, a business priorities data structure is depicted within [0040] region 240 in order to store and to display business priority information relevant to the user's shop. The business priorities data structure 240 includes business areas and indicators as to how strong the shop is within the areas. For example, a priority as selected by the user is the financial performance of the shop. Based upon the user's financial input data in this example, the financial performance of the shop is indicated as being relatively weak by the owner as shown by the strength indicator 244. If the user wanted to see the data and the calculation methods by which key performance indicators 200 were generated, the user clicks upon tab 248 to obtain greater detail about the data used to generate the performance indicators 200. In the preferred embodiment, owner priorities data structure 240 includes financial measures, financial performance, sales and marketing, customer satisfaction index, and insurance relations including cycle time, administration (general), administration (parts), production (general), production (refinish), facility (capacity, equipment, layout), and personnel including pay plans and incentives.
  • [0041] Projections summary 208 uses data structure 250 to handle the projections data associated with the shop. The data structure 250 includes performance factors, sales, gross profit, the additional amount of gross profit that would be generated given a certain level of improvement. Projections data structure 250 allows the user to pose “what if” scenarios for assessing how much improvement the user shop would experience given different situations.
  • For example, the second performance factor in [0042] projections data structure 250 is directed to posing a “what if” scenario of what would be the increase in profits with a 10% improvement in production proficiency. Based upon the user's supplied input data, the projections module determines that with the a 10% improvement in production proficiency, the gross profit of the shop would be improved by $24,000 with sales of $1,470,000 and a gross profit of $540,000.
  • In the preferred embodiment, [0043] projections data structure 250 includes the following performance factors: current performance (annualized), “with 10% improvement in production efficiency” “performance with one additional technician” “with 10% improvement in parts:labor ratio”, “with 2% improvement in labor gross profit”, “with 2% improvement in parts gross profit” “with 2% improvement in materials gross profit” and “with cumulative impact of all improvements”.
  • The production workforce [0044] shift profile summary 212 is generated using a production workforce data structure 260 that includes main shift only data, main shift plus overtime or Saturday data, main shift and second shift data, and main shift/second shift and Saturday data. Within summary 212, the dark portions 264 that the shop has a main shift plus an overtime shift, while the lighter portions 268 indicate that there is not a second shift nor a Saturday operations shift. The present invention utilizes within data structure 260 a breakout of the main shift from the other shifts, such as the second shift. In this manner, the present invention is better able to assess facility utilization and potential for greater facility utilization. By the present invention's identifying main shift employees separately from second shift employees, the shop owner can not only obtain a better perspective of the utilization of the facility, but also have a more practical evaluation of actual stalls per technician for the primary shift.
  • If the user wanted to see how the data was generated or to input new data into the business analysis module, the user identifies within [0045] priority summary section 204 which priority detail needs examination. As an example, if the user wanted to enter in data for the first time relative to “insurance relations including cycle time”, which is the fifth priority within summary section 204, the user clicks upon tab button 272. Upon clicking tab button 272, the user is directed to the insurance and cycle time area which would include the computer screen of FIG. 5.
  • FIG. 5 depicts a data entry and data display computer screen related to vehicle tracking and cycle time measurements and assessments. The present invention uses data structure [0046] 304 with the attributes listed in row 300 or equivalents thereof.
  • Cycle time data structure [0047] 304 includes a vehicle identifier to uniquely identify a vehicle that is undergoing a repair process. For example, the vehicle can be identified by an unique repair number supplied by the shop, a customer name, vehicle brand, vehicle year, and beginning date of the repair.
  • Data structure [0048] 304 also includes the steps which the vehicle is to undergo for repair. If the repair is due to a vehicle accident which would include a vehicle frame reconstruction and repainting, then typical repair steps include the vehicle disassembly step, frame repair step, metal repair step, preparation step, painting step, reassembly step, and testing step. Data structure 304 not only tracks what step a vehicle is presently at but also includes whether a vehicle remains at a step for time greater than a predetermined amount. In the preferred embodiment, codes as shown in region 308 are placed at a step where a delay has occurred. For example, a “PI” code is used to indicate that the reason for delay was that there was a delay in delivery of the parts. A number preceding the code indicates the amount of time associated with the delay. In the preferred embodiment, the number indicates the additional days of delay, such as, for example, “2P2” indicates that there was a two day delay at a particular step due to incorrect parts being delivered. Accordingly, if for a vehicle at the frame repair step the code “2P2” appears, this indicates that there was a delay for two days for a vehicle where the frame could not be operated upon due to incorrect parts being delivered.
  • If a particular shop receives an inordinate amount of code “P2's”, then this would indicate that there is a chronic problem of incorrect parts being delivered, possibly for example from a single source for a single brand of vehicle. This delay would adversely affect the strength indicator for cycle time and would also indicate that the problem could be addressed such as by possibly ordering parts from another supply shop for vehicles of that brand. [0049]
  • In the preferred embodiment, the present invention also includes the source category of the parts, such as whether the parts category is an OEM (original equipment manufacturer) parts category, or an after market parts category, or a salvage parts category, or other types of parts category. Another embodiment includes using additional attributes to store the source category of the parts. [0050]
  • Data structure [0051] 304 includes the date upon which the vehicle's repair was completed as well as the final total amount expended to perform the repair. Thus, data structure 304 not only tracks the vehicle through a multi-step process, but also performs cycle time measurement by noting the amount of time of delay. The present invention performs cycle time analysis by providing the reason for the delay.
  • In the preferred embodiment, when a car enters each step, a symbol such as a “-- --” is entered in data structure [0052] 304. Each day, all vehicles in the vehicle repair facility are reviewed. If a vehicle has been worked upon for at least five hours, then nothing additionally is noted for the vehicle in data structure 304. However, if less than five hours has been expended for working upon a car, then the reason for the delay as well as the current delay time amount is entered into the appropriate step in data structure 304.
  • Data structure [0053] 304 also includes target analysis where desired target time repair values are compared against the actual time expended to repair a vehicle. In the preferred embodiment, the target analysis includes the number of labor hours sold, the labor hours divided by five hours, actual business days expended to repair the vehicle, and a cycle time efficiency metric. For example, if the number of labor hours sold to complete a vehicle repair process was 30 hours, the labor hours divided by 5 value would be 6. If the actual days expended was 7 instead of the targeted six days, then the cycle time efficiency would indicate that 1 day had been lost.
  • Data structure [0054] 304 includes the insurance company being associated with a vehicle repair in order to capture delays associated with an insurance company. For example, if an inordinate number of “I1” insurance approval delay codes have been entered in data structure 304 for a particular insurance company, then the owner of the vehicle can be told that the reason for the delay was not the repair shop, but rather the insurance company that the vehicle's owner presently uses and that this insurance company is chronically late inspecting damaged vehicles.
  • FIG. 6 provides an example of an user entering and viewing the detailed information used to generate sales and marketing summary information. In particular, FIG. 6 is associated with the selling and sources of the business. The present invention provides multiple areas in this category for the user to provide information about their business. For example, the present invention asks for information related to a customer's first impression of the user's facility. A user clicks upon [0055] button 350 via a pointing device (such as a computer mouse) to see more detailed questions asked by the present invention as well as have access to an action planner for adding particular checklist items to the user's business plan. Upon clicking button 350, the user in this example is taken to the computer screen depicted in FIG. 7.
  • With respect to FIG. 7, more detailed questions are asked about the user's facility. For example, regarding the customer's first impression of the facility, more detailed information is gathered via [0056] region 380. Questions include but are not limited to the user ranking overall impression of the shop from the street as being nonapplicable, weak, average or strong. Even more detailed questions may be asked regarding the overall impression by focusing the user upon the shop's signage, general appearance of the building and whether the shop has a clear and wide entrance. If the user deems necessary, such as if the user upon reflection believes that one or more of these questions indicate a weakness, the user can select to add this particular question to a 90-day business plan of the facility or add it to a one-year business plan of the facility. It should be understood that the present invention also includes the present invention allowing the user to bypass FIG. 6 and proceed directly to the detailed questions of FIG. 7.
  • FIG. 8 provides an example of the present invention generating results after the user has provided information to the questions presented in FIG. 7. For example, the signage question produced a weak response, the general appearance of the building produced a relatively strong response, while the clear and wide entrance question produced a very weak response. These responses as well as the other responses associated with the questions of [0057] region 380 contributed to a customer's first impression of the facility as being weak as shown by reference numeral 384. The user selected both the signage as well as clear and wide entrance questions to be added to the 90-day business plan.
  • FIG. 9 shows the same computer screen as FIG. 7, however populated with information supplied by the user. The results of the responses supplied by the user on FIG. 9 shows the strength indicator relative to the customer's first impression of your facility by [0058] reference numeral 384. In this example, the user has supplied other information that the present invention is used to generate the strength indicators for the remaining business aspects in FIG. 9.
  • FIGS. 10[0059] a and 10 b show another example of the present invention acquiring data in order to provide business analysis to the user. The computer screen depicted in FIGS. 10a and 10 b shows a customer data entry form for providing detailed information about the user as well as sales information and how many technicians work, on which days, for how many hours, and for which shift. This information is aggregated by the present invention and shown to the user in the succinct format depicted in FIG. 4.
  • The invention being thus described, it will be obvious that the same may be varied in many ways. Such variations are not to be regarded as a departure from the spirit and scope of the invention and all such modifications that would be obvious to one skilled in the art are intended to be included within the scope of the following claims. For example, the present invention is not limited to vehicle collision repair shops, but extends to other multi-process vehicle operations or multi-process non-vehicle operations, such as but not limited to vehicle sales operations. For example, a vehicle sales operation shop uses the present invention to analyze its business relative to performance, priorities, projections, and production workforce shift profiles. [0060]

Claims (34)

What is claimed is:
1. A computer-implemented method for tracking a vehicle during a vehicle-related collision repair multi-step process, comprising the steps of:
receiving a vehicle identifier for uniquely identifying a vehicle;
receiving a delay reason for why the vehicle was delayed during at least one step of the multi-step collision repair process;
storing an association among the delay reason, the step at which vehicle delay occurred, and the vehicle identifier; and
using the stored association to identify at least one delay reason for the vehicle.
2. The method of claim 1 further comprising the steps of:
receiving amount of delay time associated with the delay reason; and
storing an association between the delay reason and the received amount of delay time; and
using the stored time delay amount association to identify for the vehicle at least one delay reason and the amount of time delay associated with the delay reason.
3. The method of claim 2 further comprising the steps of:
using codes to identify the delay reason and the amount of delay time associated with the delay reason;
using the codes in storing the association between the delay reason and the received amount of delay time; and
using the stored time delay amount association to identify for the vehicle at least one delay reason and the amount of time delay associated with the delay reason.
4. The method of claim 3 wherein the delay reason is selected from the group consisting of parts delayed reason, parts incorrect delay reason, parts damaged delay reason, parts fit delay reason, insurance approval delay reason, insurance supplemental approval delay reason, customer delay reason, frame department delay reason, metal department delay reason, paint department delay reason, employee out delay reason, sublet delay reason, and combinations thereof; said codes including a source category identifier.
5. The method of claim 2 further comprising the steps of:
receiving multiple delay reasons for why the vehicle was delayed during at least one step of the multi-step process;
storing an association among the delay reasons, the respective steps at which vehicle delays occurred, and the vehicle identifier; and
using the stored association to identify delay reasons for the vehicle.
6. The method of claim 3 further comprising the steps of:
storing amount of delay time the vehicle expends during a step of the multi-step process; and
conducting vehicle processing time delay analysis using the stored amount of delay time the vehicle expends during a step of the multi-step process.
7. The method of claim 3 further comprising the step of:
receiving a delay reason upon the vehicle being at a step not worked upon for a preselected daily target amount of time.
8. The method of claim 2 further comprising the steps of:
storing vehicle processing time target data and actual vehicle processing time data; and
conducting vehicle processing time delay analysis using the stored amount of delay time the vehicle expends during a step of the multi-step process.
9. The method of claim 1 wherein the multi-step process includes steps related to a vehicle collision repair process.
10. The method of claim 9 wherein the multi-step process includes at least one step selected from the group consisting of disassembly step, frame step, metal step, preparation step, paint step, reassembly step, testing step, detailing step, and combinations thereof.
11. The method of claim 1 wherein the vehicle identifier includes vehicle brand data, vehicle year data, and customer identifying data.
12. The method of claim 1 further comprising the steps of:
storing in a database the association among the delay reason, the step at which vehicle delay occurred, and the vehicle identifier.
13. The method of claim 1 further comprising the steps of:
storing in a relational database the association among the delay reason, the step at which vehicle delay occurred, and the vehicle identifier.
14. The method of claim 1 further comprising the steps of:
receiving the vehicle identifier over a network;
receiving the delay reason over the network;
retrieving the stored association from a database; and
sending over the network the stored association in order to use the stored association to identify at least one delay reason for the vehicle.
15. The method of claim 14 wherein the network is a global communications network connected by common protocols.
16. The method of claim 15 wherein the network is Internet.
17. A computer-implemented method for analyzing a vehicle-related business, comprising the steps of:
storing a business performance data structure stored in memory of at least one computer in order to summarize business performance data related to the business;
storing a business priorities performance data structure stored in the memory in order to summarize business priorities performance related to the business;
storing a business projections data structure stored in the memory in order to summarize business projections data related to the business;
storing a production workforce shift profile data structure in the memory in order to summarize product workforce shifts related to the business; and
generating a business summary report using the business performance data structure, the business priorities performance data structure, the business projections data structure, and the production workforce shift profile data structure.
18. The method of claim 17 wherein the business priorities performance data structure stores business performance-related categories, said method further comprising the step of:
indicating within the business summary report whether an improvement opportunity is present for at least one category within the business priorities performance data structure.
19. The method of claim 17 wherein the business priorities data structure stores business priorities-related categories, said method further comprising the step of:
displaying within the business summary report for at least one of the categories included within the business priorities data structure a strength indicator.
20. The method of claim 17 wherein the business projections data structure stores business projections-related categories, said method further comprising the step of:
generating within the business summary report for at least one of the categories sales, profit and profit improvement metrics.
21. The method of claim 17 wherein the business performance data structure stores categories selected from the group consisting of total sales, total gross profit percent, production productivity, production staffing density, monthly sales per administrative employee, monthly sales per estimator, paint cost per paint hour billed, monthly gallons waste per paint technician, overall customer satisfaction index, gross profit amount per technician clock hour, and combinations thereof.
22. The method of claim 21 further comprising the step of:
indicating within the business summary report whether an improvement opportunity is present for at least one of the categories within the business performance data structure.
23. The method of claim 22 wherein the business priorities data structure stores categories selected from the group consisting of financial measures, financial performance, sales and marketing, customer satisfaction index, insurance relations including cycle time, administration general, administration parts, production general, production refinish, facility, personnel including pay plans and incentives, and combinations thereof.
24. The method of claim 23 further comprising the step of:
generating within the business summary report for at least one of the categories included within the business priorities data structure a strength indicator.
25. The method of claim 24 wherein the business projections data structure stores categories selected from the group consisting of production proficiency improvement, additional technicians, parts to labor ratio improvement, labor gross profits improvement, parts gross profit improvement, materials gross profit improvement, cumulative impact of all improvements, and combinations thereof.
26. The method of claim 25 wherein the business projections data structure include categories, said method further comprising the step of:
generating within the business summary report for at least one of the categories sales, profit and profit improvement metrics.
27. The method of claim 26 wherein the business includes a facility to perform at least one step of the multi-step process, said method further comprising the step of:
storing a production workforce shift profile in the memory in order to summarize product workforce shifts related to perform better utilization of the facility for the business.
28. The method of claim 17 wherein the business priorities data structure stores business priorities-related categories, said method further comprising the steps of:
generating a strength indicator on a computer screen within the business summary report for at least one of the categories; and
providing a link on the computer screen to enable viewing of detailed information, forms, and data related to the strength indicator.
29. The method of claim 28 wherein the detailed information includes management best practices for producing the strength indicator.
30. The method of claim 28 further comprising the step of:
providing links to forms, policies, procedures, pay plans in order to generate a customized operational manual for the business.
31. The method of claim 28 further comprising the step of:
providing a web page to enable ordering of items via Internet based upon the business summary report.
32. The method of claim 17 further comprising the steps of:
sending the business performance data structure, the business priorities performance data structure and the business projections data structure over a network to the memory of the computer.
33. The method of claim 32 wherein the network is a global communications network connected by common protocols.
34. The method of claim 33 wherein the network is Internet.
US10/386,051 2000-06-23 2003-03-11 Computer implemented vehicle repair analysis system Expired - Fee Related US6990461B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US10/386,051 US6990461B2 (en) 2000-06-23 2003-03-11 Computer implemented vehicle repair analysis system

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US09/602,922 US7020620B1 (en) 2000-06-23 2000-06-23 Computer-implemented vehicle repair analysis system
US10/386,051 US6990461B2 (en) 2000-06-23 2003-03-11 Computer implemented vehicle repair analysis system

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
US09/602,922 Division US7020620B1 (en) 2000-06-23 2000-06-23 Computer-implemented vehicle repair analysis system

Publications (2)

Publication Number Publication Date
US20030171981A1 true US20030171981A1 (en) 2003-09-11
US6990461B2 US6990461B2 (en) 2006-01-24

Family

ID=24413310

Family Applications (3)

Application Number Title Priority Date Filing Date
US09/602,922 Expired - Fee Related US7020620B1 (en) 2000-06-23 2000-06-23 Computer-implemented vehicle repair analysis system
US10/386,051 Expired - Fee Related US6990461B2 (en) 2000-06-23 2003-03-11 Computer implemented vehicle repair analysis system
US10/705,359 Abandoned US20040162754A1 (en) 2000-06-23 2003-11-10 Method of determining an efficiency of a repair process

Family Applications Before (1)

Application Number Title Priority Date Filing Date
US09/602,922 Expired - Fee Related US7020620B1 (en) 2000-06-23 2000-06-23 Computer-implemented vehicle repair analysis system

Family Applications After (1)

Application Number Title Priority Date Filing Date
US10/705,359 Abandoned US20040162754A1 (en) 2000-06-23 2003-11-10 Method of determining an efficiency of a repair process

Country Status (3)

Country Link
US (3) US7020620B1 (en)
AU (1) AU2001265226A1 (en)
WO (1) WO2002001453A2 (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020072941A1 (en) * 2000-12-07 2002-06-13 Ibm Corporation Method and apparatus for processing electronic records for physical transactions
US20030009373A1 (en) * 2001-06-27 2003-01-09 Maritz Inc. System and method for addressing a performance improvement cycle of a business
US20030111525A1 (en) * 2001-12-18 2003-06-19 Georgina Sweeney Method and system of determining status of automobile undergoing repair
US20050216326A1 (en) * 2001-06-13 2005-09-29 Honda Giken Kogyo Kabushiki Kaisha Mechanic skill control system
WO2006047595A2 (en) * 2004-10-25 2006-05-04 Whydata, Inc. Apparatus and method for measuring service performance
US20080059279A1 (en) * 2000-11-17 2008-03-06 Goldschneider James D Network-based business process for improving performance of businesses
US7389276B1 (en) * 2003-09-18 2008-06-17 Profit Boost, Llc Method of determining pricing to ensure profitability
US20090157535A1 (en) * 2007-10-11 2009-06-18 Choiniere Michael A System and method for standardizing accounting of consumables
US20100057479A1 (en) * 2008-08-26 2010-03-04 Gm Global Technology Operations, Inc. System and method to compute vehicle health index from aggregate data
US8108250B1 (en) * 2007-01-05 2012-01-31 Intelligent Business Tools Method and apparatus for providing a business tool
US20150120441A1 (en) * 2013-10-29 2015-04-30 Yoshinori Matsumoto Advertisement distribution program, advertisement distribution method for executing advertisement distribution program and advertisement control device
US20180032942A1 (en) * 2016-07-26 2018-02-01 Mitchell Repair Information Company, Llc Methods and Systems for Tracking Labor Efficiency

Families Citing this family (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7899690B1 (en) 2000-08-18 2011-03-01 The Crawford Group, Inc. Extended web enabled business to business computer system for rental vehicle services
US8600783B2 (en) 2000-08-18 2013-12-03 The Crawford Group, Inc. Business to business computer system for communicating and processing rental car reservations using web services
US20020194329A1 (en) * 2001-05-02 2002-12-19 Shipley Company, L.L.C. Method and system for facilitating multi-enterprise benchmarking activities and performance analysis
US20030050830A1 (en) * 2001-09-13 2003-03-13 William Troyer Method and apparatus for evaluating relative performance of a business in an association of the same or similar businesses
US20080027769A1 (en) * 2002-09-09 2008-01-31 Jeff Scott Eder Knowledge based performance management system
US7379922B2 (en) * 2002-04-29 2008-05-27 Avanous, Inc. Pricing model system and method
US7613627B2 (en) * 2004-02-02 2009-11-03 Ford Motor Company Computer-implemented method and system for collecting and communicating inspection information for a mechanism
US20070282943A1 (en) * 2006-05-30 2007-12-06 Rincones Lena C Relocation services via a shared service center
US20070294052A1 (en) * 2006-06-16 2007-12-20 Sikorsky Aircraft Corporation Supplier teardown & analysis reporting system
CA2664941C (en) * 2006-10-06 2017-09-12 The Crawford Group, Inc. Method and system for communicating vehicle repair information to a business-to-business rental vehicle reservation management computer system
US8160906B2 (en) * 2006-12-12 2012-04-17 The Crawford Group, Inc. System and method for improved rental vehicle reservation management
CA2695131A1 (en) 2007-07-25 2009-01-29 The Crawford Group, Inc. System and method for allocating replacement vehicle rental costs using a virtual bank of repair facility credits
US20090286559A1 (en) * 2008-05-15 2009-11-19 W8Ter, L.L.C. Method and system for communicating status in a service queue
US10453013B1 (en) * 2011-08-31 2019-10-22 Inherent Leverage, Inc. Method for processing vehicle repair
US20140358631A1 (en) * 2013-06-03 2014-12-04 24/7 Customer, Inc. Method and apparatus for generating frequently asked questions
US9336244B2 (en) 2013-08-09 2016-05-10 Snap-On Incorporated Methods and systems for generating baselines regarding vehicle service request data
US9201930B1 (en) * 2014-05-06 2015-12-01 Snap-On Incorporated Methods and systems for providing an auto-generated repair-hint to a vehicle repair tool
US9639995B2 (en) 2015-02-25 2017-05-02 Snap-On Incorporated Methods and systems for generating and outputting test drive scripts for vehicles
US20190080341A1 (en) * 2017-09-08 2019-03-14 Akzo Nobel Coatings International B.V. Method and System for Computer-Assisted Paint Selection

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4392119A (en) * 1981-06-15 1983-07-05 U.S. Computer Systems, Inc. Apparatus and method for monitoring the arrival and duration of stay of a vehicle at a drive-in window
US5128861A (en) * 1988-12-07 1992-07-07 Hitachi, Ltd. Inventory control method and system
US5717595A (en) * 1995-01-12 1998-02-10 Cherrington; John K. Integrated automated vehicle analysis
US5946662A (en) * 1996-03-29 1999-08-31 International Business Machines Corporation Method for providing inventory optimization
US5962829A (en) * 1994-03-10 1999-10-05 Fujitsu Limited Customer management terminal equipment, customer managing method, and media for customer management
US6556974B1 (en) * 1998-12-30 2003-04-29 D'alessandro Alex F. Method for evaluating current business performance

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4404639A (en) * 1980-12-02 1983-09-13 Chevron Research Company Automotive diagnostic system
US5377098A (en) * 1988-02-26 1994-12-27 Nissan Motor Co., Ltd. Method and apparatus for compiling data relating to damage extent, panel and chassis member rectification work, painting work and costs
EP0404541A3 (en) * 1989-06-20 1992-07-01 Max Tunbridge Method of cost assessing damaged vehicles
US5432904A (en) * 1991-02-19 1995-07-11 Ccc Information Services Inc. Auto repair estimate, text and graphic system
US5317503A (en) * 1992-03-27 1994-05-31 Isao Inoue Apparatus for calculating a repair cost of a damaged car
EP0587290B1 (en) * 1992-07-30 2000-01-26 Teknekron Infoswitch Corporation Method and system for monitoring and/or controlling the performance of an organization
US5657233A (en) * 1995-01-12 1997-08-12 Cherrington; John K. Integrated automated vehicle analysis
US6263322B1 (en) * 1998-07-07 2001-07-17 Hunter Engineering Company Integrated automotive service system and method
US6330499B1 (en) * 1999-07-21 2001-12-11 International Business Machines Corporation System and method for vehicle diagnostics and health monitoring
US6575365B1 (en) 1999-10-22 2003-06-10 Robert D. Bourne Method for doing business with collision centers
WO2001082136A2 (en) * 2000-04-20 2001-11-01 General Electric Company Method and system for graphically identifying replacement parts for generally complex equipment
US20020007237A1 (en) * 2000-06-14 2002-01-17 Phung Tam A. Method and system for the diagnosis of vehicles

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4392119A (en) * 1981-06-15 1983-07-05 U.S. Computer Systems, Inc. Apparatus and method for monitoring the arrival and duration of stay of a vehicle at a drive-in window
US5128861A (en) * 1988-12-07 1992-07-07 Hitachi, Ltd. Inventory control method and system
US5962829A (en) * 1994-03-10 1999-10-05 Fujitsu Limited Customer management terminal equipment, customer managing method, and media for customer management
US5717595A (en) * 1995-01-12 1998-02-10 Cherrington; John K. Integrated automated vehicle analysis
US5946662A (en) * 1996-03-29 1999-08-31 International Business Machines Corporation Method for providing inventory optimization
US6556974B1 (en) * 1998-12-30 2003-04-29 D'alessandro Alex F. Method for evaluating current business performance

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080059279A1 (en) * 2000-11-17 2008-03-06 Goldschneider James D Network-based business process for improving performance of businesses
US20050198041A1 (en) * 2000-12-07 2005-09-08 Lewandowski Robert P. Method and apparatus for processing electronic records for physical transactions
US20020072941A1 (en) * 2000-12-07 2002-06-13 Ibm Corporation Method and apparatus for processing electronic records for physical transactions
US20050192856A1 (en) * 2000-12-07 2005-09-01 Lewandowski Robert P. Method and apparatus for processing electronic records for physical transactions
US7113892B2 (en) * 2001-06-13 2006-09-26 Honda Giken Kogyo Kabushiki Kaisha Mechanic skill control system
US20050216326A1 (en) * 2001-06-13 2005-09-29 Honda Giken Kogyo Kabushiki Kaisha Mechanic skill control system
US20030009373A1 (en) * 2001-06-27 2003-01-09 Maritz Inc. System and method for addressing a performance improvement cycle of a business
US20030111525A1 (en) * 2001-12-18 2003-06-19 Georgina Sweeney Method and system of determining status of automobile undergoing repair
US7389276B1 (en) * 2003-09-18 2008-06-17 Profit Boost, Llc Method of determining pricing to ensure profitability
WO2006047595A2 (en) * 2004-10-25 2006-05-04 Whydata, Inc. Apparatus and method for measuring service performance
WO2006047595A3 (en) * 2004-10-25 2006-08-03 Whydata Inc Apparatus and method for measuring service performance
US8108250B1 (en) * 2007-01-05 2012-01-31 Intelligent Business Tools Method and apparatus for providing a business tool
US20090157535A1 (en) * 2007-10-11 2009-06-18 Choiniere Michael A System and method for standardizing accounting of consumables
US8364563B2 (en) * 2007-10-11 2013-01-29 Car Parts, Inc. Color Systems System and method for standardizing accounting of consumables
US20100057479A1 (en) * 2008-08-26 2010-03-04 Gm Global Technology Operations, Inc. System and method to compute vehicle health index from aggregate data
US20150120441A1 (en) * 2013-10-29 2015-04-30 Yoshinori Matsumoto Advertisement distribution program, advertisement distribution method for executing advertisement distribution program and advertisement control device
US10438236B2 (en) * 2013-10-29 2019-10-08 Yoshinori Matsumoto Advertisement distribution program, advertisement distribution method for executing advertisement distribution program and advertisement control device
US20180032942A1 (en) * 2016-07-26 2018-02-01 Mitchell Repair Information Company, Llc Methods and Systems for Tracking Labor Efficiency
US10692035B2 (en) * 2016-07-26 2020-06-23 Mitchell Repair Information Company, Llc Methods and systems for tracking labor efficiency

Also Published As

Publication number Publication date
US6990461B2 (en) 2006-01-24
AU2001265226A1 (en) 2002-01-08
US7020620B1 (en) 2006-03-28
US20040162754A1 (en) 2004-08-19
WO2002001453A2 (en) 2002-01-03

Similar Documents

Publication Publication Date Title
US7020620B1 (en) Computer-implemented vehicle repair analysis system
Raval et al. Benchmarking the Lean Six Sigma performance measures: a balanced score card approach
Muralidharan Six Sigma for organizational excellence
Devlin et al. Service quality from the customers' perspective
US20070250377A1 (en) Performance analysis support system
US20030050830A1 (en) Method and apparatus for evaluating relative performance of a business in an association of the same or similar businesses
US20030018503A1 (en) Computer-based system and method for monitoring the profitability of a manufacturing plant
Johnson The development of measures of the cost of quality for anengineering unit
US20050033628A1 (en) Contractor certification system
US20110231214A1 (en) Aerospace and defense program analysis tool
US20040236587A1 (en) Lifecycle profitability tool for leasable assets
US20080059279A1 (en) Network-based business process for improving performance of businesses
US20090006018A1 (en) Quality management system
Turgunov et al. Principles of assessment and management of quality systems in industrial enterprises
Ebert Technical controlling and software process improvement
Wibowo Impact of procurement professionalization on the efficiency of public procurement
JP2003524222A (en) System and method for developing and managing financial services products
Kurien et al. Supply chain performance measurement practices of Indian industries
Siadat et al. Reengineering purchase request process of tam Iran Khodro Company using best practices
Teixeira et al. A methodology for quality problems diagnosis in SMEs
US20080065458A1 (en) Method and system for reducing total transactional lead time and enhancing quality of a process within a healthcare environment
Chen et al. Continuous SPA: Continuous assessing and monitoring software process
MELAKU THE EFFECT OF AFTER-SALES SERVICES ON CUSTOMER SATISFACTION IN THE CASE OF ELECTROCOMMERCIAL SC SUZUKI CAR
Ebert Technical controlling in software development
Hines et al. A framework for extending lean accounting into a supply chain

Legal Events

Date Code Title Description
FPAY Fee payment

Year of fee payment: 4

REMI Maintenance fee reminder mailed
LAPS Lapse for failure to pay maintenance fees
LAPS Lapse for failure to pay maintenance fees

Free format text: PATENT EXPIRED FOR FAILURE TO PAY MAINTENANCE FEES (ORIGINAL EVENT CODE: EXP.)

FP Lapsed due to failure to pay maintenance fee

Effective date: 20140124

STCH Information on status: patent discontinuation

Free format text: PATENT EXPIRED DUE TO NONPAYMENT OF MAINTENANCE FEES UNDER 37 CFR 1.362