US20040060705A1 - Method and apparatus for increasing fluid recovery from a subterranean formation - Google Patents

Method and apparatus for increasing fluid recovery from a subterranean formation Download PDF

Info

Publication number
US20040060705A1
US20040060705A1 US10/664,784 US66478403A US2004060705A1 US 20040060705 A1 US20040060705 A1 US 20040060705A1 US 66478403 A US66478403 A US 66478403A US 2004060705 A1 US2004060705 A1 US 2004060705A1
Authority
US
United States
Prior art keywords
gas
pressure
formation
liquid
production
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US10/664,784
Inventor
Terry Kelley
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to US10/664,784 priority Critical patent/US20040060705A1/en
Publication of US20040060705A1 publication Critical patent/US20040060705A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/34Arrangements for separating materials produced by the well
    • E21B43/38Arrangements for separating materials produced by the well in the well
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/12Methods or apparatus for controlling the flow of the obtained fluid to or in wells
    • E21B43/121Lifting well fluids

Definitions

  • the present invention relates to a liquid/gas separator for positioning in the lower part of a well intended for the production of fluids, such as hydrocarbons.
  • the separator prevents the entry of gas into the production tubing string, but allows the entry of fluid in liquid form.
  • the invention also relates to a method for improving the primary, secondary or tertiary recovery of reservoir hydrocarbons and to improved systems involving downhole liquid/gas separators for various hydrocarbon recovery applications.
  • Hydrocarbon recovery operations commonly allow reservoir gas within the formation to flow into the wellbore and to the surface with the liquid hydrocarbons.
  • This practice initially drives high volumes of hydrocarbons into the well and up through the production tubing.
  • Conventional hydrocarbon producing methods thus allow, and in many cases rely upon, the pressurized reservoir gases to directly assist in lifting the production fluids to the surface.
  • This practice thus utilizes the pressure and liquid-driving capabilities of the reservoir gas to improve early well production recovery. While prevalent, this practice significantly reduces the ultimate recovery of liquid hydrocarbon reserves from the formation.
  • Liquid/gas separators have been used downhole in producing oil and gas wells to allow the entry of reservoir fluids which are in the liquid state into the tubular string that conveys the liquid fluids to the surface, and to prevent the entry of fluids in the gaseous state into the producing tubular string.
  • One type of separation device which remains immersed in the surrounding downhole fluid, includes a float and a valve arrangement. When this separation device is full of liquid, an open conduit is provided from the reservoir to the producing tubular. When the liquid is displaced by gas in the separation device, the float rises due to its increased buoyancy and a valve closes to prevent the entry of fluids into the producing tubular,
  • This separator thus includes a float activated valving system which opens when the separator is full of liquid and closes when that liquid is displaced by gas.
  • the flotation system within this separator is configured to operate in the vertical or substantially vertical orientation.
  • the separator allows liquid to be transmitted by pressure energy within the producing formation upward through the tubular string which is positioned above a standing or check valve, and then to be lifted to the surface by a conventional pump powered by a reciprocating or rotating (progressive cavity) rod string.
  • Other types of available downhole pumps such as electrical submersible pumps or hydraulic (jet-type) pumps, may also be used to lift the liquid to the surface once it is entrapped above the liquid gas separator and within the production tubing string.
  • the downhole separator does little to cause or accelerate the separation of liquid and gas. Rather, the device senses the presence of a gas or a liquid within the device by the float, and allows only liquid entry into the production tubing string.
  • the separator thus operates within a downhole well in a manner similar to a float operated valve controller which detects the liquid/gas. interface within a surface vessel.
  • One type of separation device marketed as the Korkele downhole separator has proven effective in many installations.
  • the separator may be placed and operated within a cased wellbore with a conventional diameter casing therein or may also be operated in an open hole. In either case, the separator may be suspended in the well from production tubing.
  • the basic advantage of the Korkele downhole separator is that it improves performance of the well and the well-reservoir production system by allowing for the production of liquids only, i.e., it prevents the entry of gas from the reservoir into the production tubular string.
  • the downhole separator as discussed above is more fully described in a July 1972 article in World Oil, pages 37-42.
  • U.S. Pat. Nos. 1,507,454 and 1,757,267 discloses an automatic pump control system with an upright stem connected to a diaphragm to operate a standing valve.
  • the '267 patent discloses a gas/oil separator having a separating chamber located within the tubing and a mechanism for diverting the path of oil over an enlarged contact surface to separate free oil from gas.
  • U.S. Patents naming Kork Kelly as an inventor or co-inventor include U.S. Pat. Nos. 2,291,902; 3,410,217; 3,324,803; 3,363,581; and 3,451,477.
  • the '902 patent discloses a gas anchor having a float connected to a valve stem which operates a valve head.
  • the '217 patent discloses a separator for liquid control in gas wells.
  • the '803 patent discloses a device having a floating bucket connected by a rod for liquid/gas wells. A valve member is disclosed below and in close proximity to a check ball.
  • the '581 patent discloses a pressure balanced and full-opening gas lift valve.
  • the '477 patent relates to an improved method for effecting gas control in oil wells.
  • the device includes a flotation bucket with an open top and a valve string including a valve member connected to the top of a rod, with the bottom of the rod connected to the bottom bucket.
  • the '740 patent discloses both methods and apparatus for effecting gas control in oil wells utilizing a flotation bucket with an open top and a valve string including a valve member connected to the top of a rod.
  • U.S. Pat. No. 3,971,213 discloses an improved pneumatic beam pumping unit.
  • U.S. Pat. No. 3,408,949 discloses a bottom hole gas/liquid separator having a float tube encircling the lower end of a production tubing and adapted to move vertically within a housing.
  • a production valve is disposed on the upper end of a spacer bar such that the float ad spacer bar form a sand trap.
  • U.S. Pat. No. 3,483,827 discloses a well producing which utilizes a gas separator in a tubing string to separate liquid from gas prior to nto a downhole pump.
  • 3,724,486 discloses a liquid and gas separation for a downhole well wherein a valve member is moveable and resiliently mounted on table liquid container designed so that liquid will accumulate within the bore hole above ition where gas enters to decrease or prohibit the entry of gas into the bore hole.
  • U.S. Pat. No. 3,993,129 discloses a fluid injection valve for use in well tubing for controlling the low of fluid between the outside of the production tubing and the inside of the tubing.
  • 5,456,318 discloses a fluid pumping device having a fluid inlet valve disposed at its lower end for fluid flow into the body of the device, a plunger assembly disposed in the interior of the body for reciprocating movement, a seal which cooperates with the plunger assembly to divide the body into isolated upper and lower chambers and to divide the body from the production tube, and fluid flow control valves.
  • U.S. Pat. No. 5,653,286 discloses a downhole gas separator connected to the lower end of a tubing string designed such that primary liquid fluid flows into a chamber within the separator.
  • U.S. Pat. No. 5,655,604 discloses a downhole production pump and circulating system which utilizes valves wherein the valve balls are attached to projector stems.
  • U.S. Pat. No. 5,664,628 discloses an improved filter medium for use in subterranean wells.
  • An improved separation device a method of operating a separation device, an improved overall hydrocarbon recovery system, and improved techniques for recovering hydrocarbons are hereinafter disclosed.
  • the present invention discloses an improved downhole liquid injector and improved techniques utilizing an injector for recovering hydrocarbons from producing reservoirs.
  • Several basic concepts influence the benefits of utilizing the liquid injector of the present invention in various existing and planned well and/or reservoir producing systems.
  • positive prevention of gas into the producing tubular improves the efficiency of an artificial lift pumping system by allowing the lift system to handle primarily liquids rather than a combination of liquids and gases.
  • the artificial lift pumping system is efficiently pumping only primarily liquids.
  • Conventional artificial lift systems which utilize a rod string to power a downhole pump thus operate more efficiently with liquid only flowing through the production tubing string.
  • Preventing gas lock in downhole positive displacement and electrical submersible pumps is a major problem for the oil well operator with existing technology. Since the injector of the present invention substantially reduces or eliminates unwanted gas to the production tubing string, gas lock is avoided and the life and efficiency of positive displacement aid submersible pumps is increased.
  • the present invention By preventing gas entry downhole into the production tubing string, the present invention also reduces the possibility of gas blowout through the surface production system.
  • the present invention also reduces sucker rod stuffing box drying and wear to reduce leakage of fluids from the wellhead and minimize environmental problems associated with producing hydrocarbons.
  • the system of the present invention may significantly benefit from the concept of preventing gas production from the reservoir and thereby retaining the gas within the reservoir where it will continue to supply energy in the form of pressure to drive well fluids into the producing wellbore.
  • the present invention By keeping gas within the reservoir, the present invention also creates a more effective liquid drainage pattern within the reservoir by reducing gas coning around the well and improving the maintenance of an effective gas cap drive to develop an enhanced liquid gravity drainage system.
  • the system of the present invention thus acts to oppose the release of gas from the formation into the wellbore and minimize undesirable coning of a gas cap, while also promoting the generation and maintenance of a more effective gas cap drive.
  • the flow of desired liquid hydrocarbons into the wellbore is also assisted by retaining gas in solution within the crude oil to maintain a lower fluid viscosity, thereby lowering the resistance to flow of the crude oil through the reservoir.
  • reservoir rock has a lower relative permeability to liquids than to gas, particularly when the crude loses its lighter components and becomes heavy, minimizing gas inflow and maintaining reservoir pressure keeps the crude more gas saturated and less viscous so that it is mobile and may more freely flow toward the wellbore area.
  • the injector of the present invention may also be used to significantly improve the efficiency of a downhole system designed to remove liquids, typically water, from the wellbore which impede the production of natural gas from a gas reservoir.
  • a downhole system designed to remove liquids, typically water, from the wellbore which impede the production of natural gas from a gas reservoir.
  • the efficiency of a gas recovery system may be significantly enhanced.
  • Systems with a positive downhole gas shutoff for removing liquid accumulations will also be safer to operate since gas flow to the surface through the tubing string may be automatically and positively controlled if surface control is lost.
  • the techniques of the present invention may be used to improve long-term productivity and increase the recovery of hydrocarbon reserves from many existing oilfields.
  • new oilfields particularly those in which it is desirable to prevent or limit the wasteful production or uneconomical recovery of natural gas which lowers ultimate crude recovery
  • the present invention offers a valuable completion option.
  • Such new fields are continually being discovered and developed in isolated offshore locations, and in many countries which are just now developing their petroleum reserves.
  • the downhole separation device of the present invention which is more properly termed a liquid injector, is a float-operated device that permits producing reservoir fluids to flow into a production tubing string but positively shuts off the entry of gas.
  • the injector prevents entry of fine-grain sand into the interior of the injector tool by utilizing an improved screening device to provide significantly increased protection from sand entry and minimize filling and plugging by the fine-grained sand particles.
  • the sand particle sizes excluded by the screening device do not significantly impede fluid flow.
  • the screening device also provides advantages relating to the breakup of foams in the wellbore to enhance the flow of liquid rather than gas into the interior of the injector.
  • the flow shutoff valve is located at a high position within or above the intake tube and close to the standing or check valve. This positioning of the shutoff valve causes liquids in the intake tube to remain under wellbore pressure while the shutoff valve is closed, thus preventing the release of solution gas in response to pressure reduction caused by the pumping action, thus reducing problems associated with pump gas lock. Raising the shutoff valve also keeps the shutoff valve out of the lower area of the float in which sand may settle during the time the valve is closed, thus further minimizing the possibility of sand plugging.
  • An improved method is provided for creating a liquid reservoir within a well pumping or producing system.
  • liquid does not flow directly into the pump intake, and instead the wellbore formation fluid is first diverted into a vertical reservoir created in an annulus between the tubing and the casing by addition of a packer.
  • the downhole pump may then draw from this reservoir. Should the injector shutoff valve close, the pump would continue to draw liquid until the working fluid level drops to the pump intake.
  • An additional benefit from this concept occurs as a result of further solution gas breakout and separation within the vertical reservoir.
  • the gas from the producing formation below the packer may be vented through a vent tube containing a pressure regulation system to ensure wellbore pressure sufficient to lift liquid to a working level above a pump. This system may also benefit from the use of various back pressure controls and fluid entry and reversal mechanisms.
  • the injector of the present invention may also be combined with an improved beam.
  • pumping unit as described in U.S. Pat. No. 3,971,213.
  • This integrated system uses power derived from the pressure of natural gas produced in the annulus in the previously described liquid reservoir. After pressure reduction at the surface, the produced gas may be routed into a flow line for sale. No waste or burning of produced gas is required, and instead a selfcontained operation is achieved.
  • the techniques of the present invention minimize the production of gas which, in many applications, is wasted and flared.
  • a gas lift system in a flowing well may be configured with double packers to create a chamber above the producing formation.
  • a tubing regulator device controls the pressure of entrapped gas from the wellbore which is relieved into the chamber, which in turn provides a desired pressure differential across the formation and to the wellbore.
  • Gas in the chamber may further act as a first lifting stage for slugs of liquid entering the tubing.
  • the techniques of the present invention may also be used to increase productivity in horizontal wells, as discussed further below.
  • the techniques of the present invention may thus be used to increase liquid hydrocarbon recovery by conserving and utilizing natural gas as a reservoir driving mechanism so that a gas cap pushes the liquid downward to a lower horizontal bore hole or lateral.
  • the present invention may function to retain a pressurized gas reservoir downhole and thereby improve recovery of liquid hydrocarbons, and may also be used to remove liquids which block the effective recovery of gaseous hydrocarbons.
  • the improved method of producing hydrocarbons from a well serves to more efficiently retain and utilize the inherent energy of natural gas within the reservoir.
  • a properly designed system according to the present invention may create a reservoir producing mechanism that minimizes production problems and recovers significantly greater volumes of liquid hydrocarbon reserves.
  • the techniques described herein may be used for maintaining a downhole reservoir so that the liquid injector may operate independent of an artificial lift system for the well.
  • the methods of the present invention may also utilize a liquid injector below an annular seal or packer between the tubing and casing to provide for and control the relief of wellbore gas pressure buildup above the liquid in the wellbore and thereby optimize reservoir inflow performance.
  • the liquid injector may also be incorporated with a gas lift system to achieve a design with enhanced wellbore to reservoir pressure drawdown and inflow patterns.
  • the techniques of the present invention may be used to enhance hydrocarbon recovery from highly deviated or horizontal wellbores, and may also be used in directional well drilling and completion techniques.
  • the injector provides benefits from improved control by preventing formation gas production with the production of liquids.
  • the injector incorporates an improved sand filter and may utilize a liquid reservoir above a packer, and optionally employs a shutoff valve located closer to the pump.
  • the techniques of the present invention may be used to minimize and prevent gas locking in pumped wells, and also minimize the likelihood of gas blowout to surface by allowing the injector to act as a downhole gas shutoff device.
  • the techniques of the present invention further result in improved lubrication for the polished rod to minimize leakage of hydrocarbons through the stuffing box.
  • the present invention may be used to effectively de-water gas wells by removing liquids that prevent optimum gas production. In wells in which liquid hydrocarbons are produced, gas waste is minimized and conservation of gas enhances gas drive capabilities.
  • a significant feature of the present invention is the improved long-term productivity and increased recovery of hydrocarbon reserves of existing oilfields.
  • the systems of the present invention provide an effective completion option over existing technology. By retaining a high percentage of natural gas within the reservoir and producing the oil by gravity drainage, more oil is recovered.
  • An advantage of the present invention is that highly sophisticated equipment and techniques are not required to significantly improve the production of hydrocarbons.
  • Another significant advantage of the invention is the relatively low cost of the equipment and operating techniques as described herein compared to the significant advantages realized by the well operator.
  • the useful life of other hydrocarbon production equipment, such as downhole positive displacement pumps and wellhead stuffing boxes, is improved by the system provided by this invention.
  • FIG. 1 is a simplified pictorial view of an injector according to the present invention suspended from a tubing string within the interior in a casing of a wellbore.
  • the downhole float and valve mechanisms are simplistically depicted for easy understanding of the injector.
  • FIG. 2 is a simplified pictorial view of one embodiment of a liquid injector according to the present invention, including an improved sand screen.
  • FIG. 3 illustrates an injector according to the present invention incorporating a packer below a liquid reservoir and a gas vent tube and a spring loaded check valve positioned above the working liquid level.
  • FIG. 4 illustrates schematically the improved hydrocarbon recovery performance provided by the liquid injector of the present invention.
  • FIG. 5 illustrates the use of an injector in an application for improving recovery of hydrocarbons from substantially depleted zones.
  • FIG. 6 illustrates schematically improvements in gravity drainage provided by the liquid injector of the present invention and a liquid reservoir above a packer.
  • FIG. 7 illustrates an application of a liquid injector used in a flowing well with gas lift.
  • FIG. 8 illustrates an application wherein a liquid injector is used in combination with chamber gas lift with a bleed-off control.
  • FIG. 9 illustrates the use of an injector according to the present invention in a free flowing well.
  • FIG. 10 illustrates an injector used for gas control in a horizontal well application.
  • FIG. 11 illustrates the use of an injector in an alternate arrangement in a horizontal well application.
  • FIG. 12 illustrates another application wherein a liquid injector is used with horizontal bore hole technology for enhanced hydrocarbon recovery.
  • FIG. 1 simplistically illustrates the primary components of a liquid injector 10 according to the present invention suspended in a tubing string TS within a downhole well passing through a hydrocarbon-bearing formation F.
  • Injector 10 is thus positioned within the lower end of a casing C which is perforated to allow formation fluids to flow into the interior of the casing C and thus surround the injector 10 .
  • a downhole pump P which may be powered by surface equipment such as a pump jack (not shown), with the power being transmitted from the surface to the pump via a sucker rod R positioned within the production tubing string TS.
  • the pump P includes a lower pump traveling valve TV which allows fluids to pass upward from the liquid injector 10 and into the pump, and then be transmitted through the production tubing TS to the surface.
  • a liquid level LL within the casing C is ideally maintained by the injector 10 to allow liquid hydrocarbons to be transmitted to the pump P and then to the surface via the tubing string TS, while the annulus A between the tubing string TS and the casing C above the liquid level is occupied by pressurized gas.
  • the liquid injector 10 as shown in FIG. 1 includes an outer housing 12 with a plurality of intake perforations 14 which allow liquid within the interior of the casing C to flow into the interior of the housing 12 and then into float 22 to surround vertical tube 16 which is in fluid communication with the lower end of the tubing string TS.
  • An injector intake or shutoff valve 19 includes a valve member 18 that cooperates with shutoff seat 20 at the lower end of the tube 16 , and the valve member 18 in turn moves with the float 22 which surrounds the tubing 16 to control the flow of liquid into the tube 16 .
  • the downhole float 22 thus operates in response to the liquids which surround it within housing 12 .
  • Valve member 18 thus lowers with respect to the housing 12 when the float 22 is filled with liquid, thereby opening the shutoff valve 19 and allowing liquids to flow upward into the tubing string past a standing or check valve 24 and enter the pump P.
  • the standing valve is part of the pump P and is immediately below the traveling valve TV.
  • gas in the annulus A displaces the liquid so that the liquid no longer flows through ports 14 into the float 22 , the float 22 rises to close the valve 19 and prevent gas from entering the interior of the tubing string TS.
  • the basic operation of the injector 10 is thus relatively simple, and the injector itself is inexpensive and reliable.
  • the standing or check valve 24 thus prevents fluids which pass upward past this valve from returning by gravity back to the injector.
  • the float 22 may have various configurations, and that other arrangements may be used so that the shutoff valve 19 is automatically responsive to the operation of the float.
  • FIG. 2 illustrates a modified liquid injector 26 according to the present invention which may similarly be suspended from a tubing string TS as shown in FIG. 1.
  • the liquid injector 26 includes components previously described and, although the configuration of the components may be altered, the same reference numbers are used herein for functionally similar components.
  • the injector 26 thus includes a float 22 moveable within a housing 12 .
  • a bull plug 28 is removable for threading a closed lower pipe which serves as a sand reservoir to the injector.
  • valve member 19 has been replaced by a combination of an elongate moveable valve stem 30 and a valve body 32 positioned closely adjacent seat 20 .
  • valve stem 30 is secured to the float 22 as previously described, although it is apparent that the intake or shutoff valve 19 for the injector 26 has been substantially raised compared to the previously described embodiment. Also, fluid flowing up to the shutoff valve 19 travels upward through a smaller diameter flow tube 16 , where it may continue upward to a pump P as previously described. Immediately above the shutoff valve 19 is the standing valve 24 for the pump, as previously described. As with the operation of the previously described injector, the float lowers and raises the valve stem 30 to open and close the valve 19 using valve body 32 . The valve body 32 opens to relieve the pressure differential when the float drops, and the valve closes when gas displaces the liquid. The valve body 32 has a relief port therein, as more fully described in U.S. Pat.
  • the float 22 may have a three inch outer diameter and a length of approximately 30 feet, and may be fabricated from 16 gauge metal.
  • the outer housing or jacket 12 of the injector 26 may have approximately a four inch outer diameter.
  • FIG. 2 also shows an injector head 34 for structurally interconnecting the tube with the lower end of the production tubing PT. Also, it should be understood that the shutoff valve 19 as shown in FIG. 2 may be used in the lower part of the injector as shown in FIG. 1.
  • the housing 12 as shown in FIG. 2 does not include intake openings 14 and instead a sleeve-shaped sand screen 36 is provided. Fluids must thus pass through the sleeve-shaped screen 36 and into the interior of the housing or jacket 12 .
  • the operation of the separator may be inhibited by formation sand which may build up in the float and restrict operation of the separator.
  • the injector 26 as shown in FIG. 2 minimizes this problem by providing a sand filtering screen 36 across the primary fluid intake to the float.
  • Various commercial screens 36 may be used, such as the Johnson (US Filter) prepacked screen or the Pall Corporation multilayer wire mesh screen.
  • Screen 36 thus fits across or replaces a portion of the outer housing or shell of the injector to minimize sand plugging problems, while also not unduly restricting the flow of liquids into the injector.
  • Preferred screen 36 may also assist in recovery of hydrocarbons by reducing foaming and separating liquids from gases.
  • a preferred screen 36 according to the present invention preferably is adapted for blocking at least 90% of sand which has a particle size from 10 microns to 30 microns or larger from entering the interior of the injector, while allowing those few particles smaller than that size to pass through the screen and thus not unduly restrict fluid flow or cause screen plugging.
  • the screen 36 may have threaded upper and lower ends for mating engagement with the housing 12 and with the head 34 which connects the screen 36 with the tubing string TS.
  • the selection of the screen and its particle size blocking features will depend to a large extent upon the formation conditions and the downhole operations, and the characteristics of the desired screen may be altered with experience.
  • the injector 26 as shown in FIG. 2 has its intake or shutoff valve 19 for the injector positioned vertically upward relative to a lowermost end of the float 22 .
  • pressure in the 30 foot line between these components was lowered to a vacuum by the action of the pump P, which in some instances caused the liquid hydrocarbons in this 30 foot line to vaporize.
  • the pumping systems could become gas locked,
  • the improvement to the injector as shown in FIG. 2 relocates the shutoff valve significantly upward in the injector housing, and ideally immediately below the standing valve 24 .
  • the vertical space between the shutoff valve 19 and the standing valve 24 is essentially eliminated and is now ideally less than ten times the outer nominal diameter of the housing 12 , and preferably is less than about three times the outer nominal diameter of the housing 12 .
  • the shutoff valve is thus operated by long slender rod 30 affixed to the bottom of the float 22 , with the rod extending upward toward the shutoff seat 20 .
  • the volume between these valves is reduced to allow immediate entry of liquid under wellbore pressure when the shutoff valve opens.
  • the design as shown in FIG. 2 thus solves two problems with prior art separation devices.
  • First liquids in the long intake tube 16 do not remain under wellbore pressure when the shutoff valve is closed, which reduces the problem of pump gas lock as described above.
  • Second, by raising the shutoff valve 19 it is kept out of the lower area of the float in which, sand which passes through the filter 36 would likely settle during the time the valve is closed, thus minimizing the possibility of sand plugging.
  • the filter 36 as described above provides an improved screening device which significantly increases protection to the entry of very fine grain sand within the injector and minimizes a likelihood of plugging, while also serving to break up foams in the wellbore to enhance the flow of liquids into the injector.
  • the combination of the filter screen 36 and the repositioning of the injector shutoff valve 19 as shown in FIG. 2 thus significantly improves the operation of the injector.
  • FIG. 3 depicts another arrangement of a liquid injector 54 according to the present invention.
  • the components of the injector 54 are not being depicted in FIG. 3 since it may be understood that those components may conform to the previously described embodiments.
  • the outer housing 12 of the injector 54 includes a plurality of openings 14 which allow fluids to enter the interior of the injector from the annulus radially outward of the injector.
  • the basic operation of the injector 54 is as previously described.
  • a downhole packer 44 is provided between the injector 54 and the casing C.
  • a gas vent tube 46 sealingly passes through the packer 44 and extends upward to above the working level of the liquid LL within the casing C, as shown in FIG. 3.
  • a spring loaded check valve 48 is provided at the upper end of the gas vent tube 46 and within the gaseous portion of the annulus. The spring loaded check valve 48 ensures that the pressure in the wellbore remains adequate to lift liquid in the annulus A well above tubing inlet ports 40 .
  • This gas vent system thus provides a gas venting and production system and maintains an adequate lift for the working fluid level to prevent the pump P from operating against a closed valve as more fully explained below.
  • the system as shown in FIG. 3 prevents pumping against a closed shutoff valve by providing a packer 44 to seal the annulus between the tubing string TS and the casing C above the liquid injector, and providing openings 40 from the annulus between the tubing and the casing above the packer but below the pump intake. Liquids from the formation thus flow into the interior of the injector housing and upward past the packer 44 , and then through a check valve 25 . This annular liquid chamber LC thus forms a vertical reservoir from which the pump P may draw fluid. As shown in FIG.
  • the injector 54 in the improved embodiment eliminates the above-described problems for prior art separators by providing a reservoir of liquid such that the pump intake is not directly supplied only by fluid passing at that moment through the injector shutoff valve, but also by liquid in the reservoir which flows through the annulus openings 40 .
  • the injector 54 and the pump P may thus operate independently in response to the liquid reservoir, and may operate continuously or intermittently as dictated by the producing formation and the injector and pump interaction.
  • the pump P thus preferably will operate as dictated by the level of liquid in this vertical reservoir.
  • a significant advantage of this concept is that the pump operation may be monitored and controlled from the surface such that it need not be operated when it does not have a sufficient liquid supply to the pump intake.
  • the vertical liquid reservoir as shown in FIG. 3 is thus created in the annulus between the tubing and casing and above the packer or other seal 44 .
  • the packer 44 in turn is positioned above the injector shutoff valve.
  • the openings 40 above the packer 44 establish communication between (a) the interior chamber axially positioned between the standing valve 24 and the packer 44 , and (b) the surrounding annular vertical reservoir axially between the packer 44 and the liquid level LL. These openings 40 thus allow fluid access between the reservoir to both the standing valve and the pump intake. As long as liquid production from the producing formation equals or exceeds the volume of the pump output to the surface, the system as shown in FIG. 3 operates at maximum efficiency.
  • the liquid level within the annular reservoir would rise. This fluid level rise would continue until the hydrostatic pressure of the liquid at the injector valve level equaled the producing formation pressure available to move the liquid out of the injector.
  • the liquid reservoir above the packer thus lets formation pressure move liquid independently of pump output so that the pump may be stopped when liquid level drops while the formation keeps producing.
  • the system as shown in FIG. 3 permits two controls from the surface to more efficiently control the downhole fluid producing system.
  • the downhole pump may be stopped when it does not have liquid to supply its intake.
  • a suitable control mechanism for stopping the pump may be a flow/no-flow detector in the surface flow line, or other conventional detectors which monitor pump load electronically. Once the pump is stopped, it may be programmed to restart automatically after a specified time period, during which liquid is again building in the annular reservoir.
  • the system as shown in FIG. 3 assures optimum hydrocarbon production by adjusting the pump speed to maintain the working fluid level above the pump intake.
  • a suitable pump-off control permits longer term pump operation and, most importantly, production from the reservoir through the wellbore continues when the pump shuts off. As with conventional artificial lift operations, it would be a desirable design for the pump capacity to closely match formation liquid production.
  • the second surface control is obtained by monitoring and controlling the gas pressure in the annulus A. If no gas is bled from the annulus at the surface, no gas may be produced by the system described herein.
  • the formation to wellbore pressure differential necessary to move liquid through the formation may thus be achieved solely by liquid removal via the wellbore.
  • some gas may be bled off at the surface to optimize production or to relieve the buildup. This may be achieved by using available back pressure control devices which may bleed the desired volume of gas into a well surface flow line or into a surface located liquid/gas separator unit.
  • the vent tube 46 as shown in FIG.
  • the tube 46 functions to convey gas through the annular liquid reservoir so that it does not bubble up through the liquid and thus become entrapped or go into solution in the crude and enter the suction of a pump.
  • a method of passing gas from the below the packer 44 to the upper portion of the annulus is desirably obtained without gas contacting the liquid in the annular reservoir.
  • the length of the tube 46 would thus be designed so that it extends above the expected height of the liquid in the annulus at its maximum working level.
  • the check valve 48 prevents liquid from reentering the tube 46 and flowing to the formation.
  • the back-pressure control mechanism described above may be simplistically obtained by providing a spring 50 for holding the valve 48 closed.
  • Valve 48 thus effectively acts as a back-pressure device to ensure that there will always be a higher level of gas pressure in the formation to drive liquid to the injector and upward through the annular reservoir, independent of the pressure of gas in the annulus. For example, if the chosen spring loading on the valve 48 required 200 psi differential to open, even if the annulus pressure were bled to atmosphere at the surface, a 200 psi formation pressure would be available to lift liquid to the annular reservoir. Should a surface valve in communication with the annulus be closed, the valve 48 . would still maintain formation pressure at a higher level and liquid would be transferred upward until the liquid level build up equaled reservoir pressure in the wellbore.
  • the system as shown in FIG. 3 thus provides a method of creating a reservoir of liquid to more efficiently supply the pump P. Liquid may be continuously transferred from the injector to the liquid reservoir and from the liquid reservoir to the pump by the appropriate openings 40 . This method also assures that a pressure differential is available to provide formation energy to lift liquid into the annular reservoir. By providing the back-pressure feature as discussed above, the optimum pressure differential around the wellbore may be obtained for maximum formation fluid movement and hydrocarbon recovery. This system achieves these objectives while eliminating or minimizing the production of natural gas and maintaining its valuable contribution as an energy source to efficiently deplete the oil zone within the downhole formation.
  • the system of the present invention allows for the production of oil while avoiding these flaring problems and also maximizes the production of liquid hydrocarbons from the formation.
  • the injector according to the present invention may also be used with an improved gas pumping power unit, such as that disclosed in U.S. Pat. No. 3,971,213 hereby incorporated by reference.
  • the pumping unit as disclosed in the '213 patent describes a sucker rod pumping unit that may be powered by natural gas drawn from the annulus between the tubing and the casing of a well. This gas pressure, which need only be a minimal amount of gas above a flow-line pressure, may be used to power a piston which in turn actuates the beam of a pumping unit.
  • the advantages obtained by this system include operation of the pump with a low incremental pressure while allowing the return of used gas to a sales line, and also counterbalancing of the system with pressure energy stored in the hollow substructure of the unit.
  • the pumping unit as described in the '213 patent may thus be used in conjunction with the downhole injector as disclosed herein to create a producing system that may operate at minimum cost, and without the expense and maintenance of an electrical gas powered motor drive unit at the surface.
  • FIG. 3 Another modification to the system shown in FIG. 3 will be to provide another check valve 25 above the packer 44 , and one or more tubes 52 , open to the tubing TS directly below a disk or plug in the tubing below ports 40 , which provide fluid communication from above the check valve to the annulus above the packer. Any gas in solution which does enter the interior of the injector may thus pass through the check valve 25 and then the discharge tube 52 to move upward to the working fluid level rather than passing through the standing valve and to the pump. Gas is then discharged into the chamber below the liquid level LL but above the ports 40 , so that the gas migrates upward to the liquid level LL and into the gaseous annulus above that level. Liquid, on the other hand, enters the pump P from the annulus at a position below the discharge from the one or more tubes 52 , so that little if any gas flows from the annulus into the pump during its operation.
  • the check valve 25 may be located below injector head 34 within a short sub essentially having the diameter of tubing TS. This sub with check valve 25 would be directly connected to tube 16 . Above head 34 , another tubing sub of a length of at least 6 to 10 feet would contain a vertical divider which creates two flow passages: one closed at the top to the production tubing string and ported to the annulus at its topmost location and open at the bottom to the flow from injector 54 , and the other closed at the bottom to the flow from the injector 54 and having ports open to the annulus at the bottom and open at the top to standing valve 24 .
  • Tube 46 through the packer 44 as shown in FIG. 3 extends to above the expected liquid level LL to allow for gas flow.
  • the check valve 48 at the top of the tube 46 prevents liquid reentry below the packer.
  • a lower annulus pressure above the liquid may be maintained to create a pressure differential for the desired liquid level and fluid flow, as well as a controlled relief of reservoir gas from formation F and below the packer 44 to above the liquid level LL and to the annulus A between the tubing and the casing.
  • Various other fluid reentry and reversal mechanisms may also be used in conjunction with the vent tube 46 .
  • the system as shown in FIG. 3 may be used in dewatering applications for gas wells.
  • providing a reservoir above packer 44 lets formation pressure move liquid independently of pump output.
  • the pump P may thus be stopped when liquid level drops, while the formation keeps producing.
  • This particular configuration also provides a method of desirably pumping liquid accumulations off of a gas well and thus increase gas production.
  • the liquid may be condensate (a liquid gas), or may be condensate combined with water.
  • condensate accumulation the liquid reservoir provides a superior method of pumping compared to prior art techniques.
  • vaporization leads directly to gas locking problems for the pumping operation (both in oil wells and gas wells with condensate and/or oil).
  • the technique of this invention desirably avoids vaporization and reduces pumping inefficiency.
  • water may accumulate in the vertical reservoir above the packers 44 and be efficiently pumped off rather than build up around the perforations of the gas producing formation where the water may cause an undesirable spray-type disturbance in the well annulus.
  • the injector as shown in FIG. 3 may also be used in conjunction with horizontal wells as described subsequently to obtain and enhance recovery and improve reservoir performance.
  • the system of this invention is also more accommodating to gravel packed wells since it reduces fluid inflow velocity and wellbore damage.
  • a packer 44 is provided in the annulus between the casing C and the production tubing string TS.
  • the casing above the formation F, including the gas zone, is also perforated.
  • Gas in the wellbore below the packer 44 and above the liquid level LL returns to aid the gas cap, and is kept out of the tubing string TS by the injector 54 .
  • gas is refused entry into the wellbore due to the operation of the injector 54 (which may have the features of the injectors previously described), and thus gas may stay within the reservoir.
  • This scenario forces the reservoir to maintain a substantially horizontal interface between the liquid hydrocarbons in the formation F and the gas cap GC, which acts on the liquid from the top down and tends to aid gravity drainage of the liquid down and then laterally into the wellbore.
  • a pressure differential from the wellbore to the formation may be created in the upper part of the gas column within the wellbore by the rising liquid column which builds after the injector closes to shut in the gas. That pressure differential will try to displace gas back to the formation, although that pressure differential is typically quite small and, except for applications with thick reservoirs of several hundred feet or more, the formation may not be sufficiently permeable for gas to go back into the reservoir. A small pressure differential may thus not effectively prevent continued gas build up in the wellbore.
  • the liquid/gas interface may thus move relatively quickly downward to the injector intake, while the interface would likely rise very slowly to cause only intermittent opening of the injector.
  • the concepts of the present invention may also be extended to applicable reservoir situations for secondary and tertiary recovery by maintaining gas in the reservoir according to the present invention and then adding gas with a conventional secondary or tertiary injection operation.
  • gas such as carbon dioxide, nitrogen, natural gas or steam
  • Applicable gas driving mechanism may thus be initiated or enhanced in older reservoirs in which the natural gas has been substantially depleted.
  • the injector of the present invention will, of course, also tend to maintain any injected gas in the formation rather than recovering the ejected gas to the surface and then again reinjecting the gas.
  • FIG. 5 depicts a secondary or tertiary recovery operation with an injector 54 in the lower part of a wellbore.
  • a gas injection string 56 extends from the surface downhole through the packer 44 to supply pressurized gas to the gas cap GC.
  • a check valve 57 optionally may be provided at the lower end of the injection line 56 , and possibly within the packer 44 , to prevent fluid from flowing upward past the packer through the injection line 56 .
  • Conventional compressors would typically be provided at the surface for this gas injection operation.
  • FIG. 5 thus depicts gas supplying the cap GC both from the lower part of the wellbore where gas is prohibited from entering the tubing string TS by the injector 54 , and from the gas above the liquid level LL which is input to the wellbore and to the gas cap GC by injection string 56 .
  • gas injection could also occur through a separate well as is the case in many gas reinjection, re-pressuring projects, or gas storage reservoirs.
  • the pump P as previously described is not shown in FIGS. 4 and 5, but in many applications a downwhole pump will be provided above the injector 54 for pumping fluids to the surface through the production tubing string TS.
  • Liquid hydrocarbons may thus be recovered according to the present invention from an underground formation without producing natural gas with the liquid hydrocarbons.
  • the injector By positioning the injector as described above downhole in the wellbore adjacent to the producing formation, the pressure energy of the gas will be maintained to flow the liquid hydrocarbons into a producing tubular string and then to the surface.
  • Such a system may have sufficient gas pressure to lift or flow a column of liquid to the surface without the use of an artificial lift system, so that the system comprises only a production tubing string and a downhole injector.
  • the injector may be open to the producing formation and operated within the casing string for retaining gas in the formation. The entire annular area between the tubing and the casing may thus be exposed to formation fluids at essentially formation pressure.
  • the flowing bottom hole pressure of gas and liquid at the intake to the injector may thus be the energy sufficient to move liquids through the injector and through the production tubing string to the surface.
  • Flowing oil wells are commonly assisted by the incorporation of gas in the liquid column, either as slugs from the formation or as gas breakout through pressure production as the liquid rises within the tubing.
  • gas incorporation reduces the average density of the flowing fluid and thereby requires less fluid pressure energy to lift the hydrocarbons to the surface.
  • Separating gas at the bottom of the wellbore by the injector according to this invention may thus increase the average density of the flowing fluid and may thus require a higher pressure to lift the fluid.
  • the injector may separate liquid from gas within the wellbore and flow liquids to the surface while also providing gas formation pressure exceeding the hydrostatic head of the fluid column, plus the flow line back pressure.
  • Such configuration is not common because it is generally not desired to expose the annulus and thus expose the casing itself to higher formation pressures.
  • wells with formation pressures high enough to flow, and particularly deeper wells are generally equipped with a packer or sealing device located at the bottom of the tubing string to seal the annulus between the casing and the tubing and thereby isolate formation pressure from below the packer and within the tubing string.
  • the annular volume in deep, high pressure wells may be substantially filled with brine or another heavier-than-water liquid containing a corrosion inhibitor.
  • FIG. 4 thus illustrates this concept, with the injector located below the packer.
  • the vent tube 46 as discussed above need not be provided for the embodiment shown in FIG. 4.
  • the gas energy may still be used to flow the liquid hydrocarbons to the surface.
  • the injector of the present invention may thus be used adjacent to a producing formation and in a flowing well to avoid producing natural gas.
  • the injector 54 below a packer 44 in high pressure wells, the annulus between the tubing and the casing may be sealed from formation pressure.
  • the injector 54 below the packer may also be used in a well produced by an artificial lift system, wherein the artificial lift method is a closed loop gas lift operated with minimum need for supplemental gas from the formation.
  • the injector of the present invention may thus be used in numerous applications where gas production is undesired, wasteful, or prohibited.
  • FIG. 6 illustrates another application using the injector 54 of this invention.
  • a thick reservoir includes a lower oil bearing formation F and an upper gas cap GC.
  • the injector 52 is suspended in the well from a production tubing string TS.
  • a packer 44 is provided to seal the annulus between the tubing string TS and the casing C at a position above the gas cap GC.
  • the injector 54 prevents entry of gas into the tubing string so that gas moves upward in the annulus to rise above the liquid level LL and reenters the formation.
  • the gas cap moves downward from the interface shown in dashed lines to the interface shown in solid lines, and thereby moves the liquid down and toward the well without coning.
  • Crossover ports 88 in the tubing string TS above the packer 44 allow communication back to the annulus.
  • Standing valve 24 is provided above the crossover ports 88 , and the pump P powered by rod string R is then provided above the standing valve.
  • the annulus above the packer 44 thus obtains a working flow level for efficient operation of the pump P, as previously described.
  • the above-described systems, in conjunction with the injector 54 allow the formation to produce sufficiently without gas breakthrough or coning, yet utilizes formation gas to assist in the flowing and/or artificial lift at the well,
  • This downhole system may allow for the bleed off of a controlled amount of formation gas entrapped by the producing system to allow the efficient production of liquids from the formation, as will be described.
  • the downhole system may also maintain an optimum predetermined pressure differential between the wellbore and the formation.
  • a packer may be used in many applications, but need not always be provided. Formation gas may thus be effectively utilized to help lift liquids from the well in a manner which uses the advantages of producing a well with a downhole injector but permits only liquid production through the injector.
  • a variation of the above described embodiment incorporates gas lift with a packer 44 in the annulus between the tubing and the casing, as shown in FIG. 7.
  • This system utilizes gas lift valves LV positioned along the tubing string TS and above the packer to help produce liquid from the liquid injector to the surface.
  • the surface equipment depicted in FIG. 7 includes a surface liquid/gas separator unit 66 with a liquid hydrocarbon flowline 68 extending therefrom. Gas from the separator 66 may flow via line 70 to compressor 72 , which in turn is powered by gas engine 74 . The pressurized gas is then circulated in a direct loop, and may be discharged back into the well to act on the lift valves LV and help bring the liquid hydrocarbon to the surface.
  • a further explanation of the lift valves LV is discussed below.
  • the system as shown in FIG. 8 uses a lower packer 44 and an upper packer 78 to create a chamber 80 in the annulus between the tubing and the casing.
  • This chamber may be fluidly connected to the wellbore below the lower packer 44 , which is open to the formation F, by a vent line 82 .
  • the lower packer 44 thus incorporates a tube 82 with a check valve 84 at its upper end.
  • This tube 82 allows the release of formation gas to the chamber 80 , so that gas pressure builds up above the lower packer 44 .
  • the check valve 84 prevents communication from the chamber 80 back to the formation and closes the chamber 80 so that a gas charge may be built up for the gas lift process.
  • one or more lift valves LV may sense and maintain pressure in the chamber 80 at a level sufficient to create the desired differential from the reservoir to the wellbore. Accordingly, when pressure builds above this level, formation gas is discharged from the chamber 80 to the tubing and thus to the surface. Additional lift valves in the chamber may sense the level of liquids rising in the tubing and open to lift the liquid upward to an upper gas lift valve.
  • a significant advantage of the system as shown in FIG. 8 is that gas production may be controlled and utilized for lifting purposes, but no free gas is allowed to flow into the open tubular through the injector 54 .
  • the gas lift valves LV allow for such pressure control in the lower chamber 80 and sensing of fluid slugs S in the tubing string TS.
  • Conventional gas lift technology is thus combined with the injector 54 of the present invention to permit only the flow of liquids from the reservoir and retain gas cap pressure to enhance gravity flow.
  • the system as shown in FIG. 8 provides for the controlled bleed off of gas pressure under the lower packer 44 within the wellbore and directly utilizes that bled off gas to help the lift valves 86 to produce the desired liquid from the tubing string.
  • the upper valve which is commonly known as a casing pressure operated valve, will typically be set by internal bellows precharging to a known pressure and will thus act as a regulator. This will ensure that pressure in the chamber 80 and the corresponding wellbore pressure will never exceed the desired wellbore pressure limit selected by the productivity index analysis for optimum reservoir fluid inflow.
  • This upper regulator valve will thus open and discharge gas into the tubing when chamber pressure exceeds its predetermined setting. Gas discharged into the tubing will aid in lifting any liquid within the tubing to the surface.
  • the lower lift valve which is the tubing pressure controlled valve, is designed to open at a preselected internal tubing pressure reached by the increasing column of liquid above this valve.
  • the lower gas lift valve opens, then gas buildup in the chamber 80 suddenly flows under the liquid slug, lifting the liquid farther up the tubing string.
  • These gas lift valves are also commonly referred to as intermitting valves.
  • the combination of injector and gas lift valves as described above may also be incorporated into an artificial lift system in which the primary lift mechanism is the closed system operating with gas lift valves above the upper packer.
  • the primary lift mechanism is the closed system operating with gas lift valves above the upper packer.
  • liquid slugs may be partially lifted by the relief formation gas coming from the lower chamber to be picked up by the main gas lift system 86 above the upper packer 78 , so that the liquid slug is carried to the surface.
  • the formation F and chamber 80 may be maintained at a pressure of, e.g., 1,000 psi, or approximately 500 psi below shut-in reservoir pressure. This 1,000 psi will be available to the lower chamber valve to assist in lifting liquid slugs when it is activated to do so.
  • the main lift valves 86 may be responsive to annulus pressure above the upper packer 78 , required to assist in driving the liquid slugs S to the well head W.
  • Conventional liquid/gas separation, processing, and decompression mechanisms provided at the surface may extract the desired liquids and recycle the gas through the artificial lift system.
  • the system components 66 , 68 , 70 , 72 and 74 were previously described. Excess gas introduced from the formation and input to the tubing string from the lower relief chamber 80 may be partially utilized as fuel for the compressor prime mover 74 , which reduces the gas produced by the well system. Reservoir and facility engineering calculations may be used to determine the estimated amount of formation gas to be utilized to achieve the desired well productivity.
  • the system of the present invention may be designed to maintain a desired pressure differential between the interior of the wellbore and the formation to create the desired reservoir fluid inflow.
  • the liquid injector of the present invention may be used in artificial lifted wells. By obtaining the significant advantages of retaining in situ gas within the reservoir, however, the liquid injector may contribute to liquid hydrocarbon recovery from a high pressure flowing well which will have sufficient bottom-hole pressure to lift a column of reasonably light fluid to the surface. In an isolated recovery location, systems for handling produced gas would thus not be necessary, thereby retaining the reservoir in an ideal condition.
  • a high pressure well may have the annulus between the tubing and casing open to the reservoir.
  • the downhole packer 44 as shown in FIG. 4 may be placed in the annulus between the tubing and the casing. If desired, the annulus above the packer 44 may be filled with a protective fluid, such as a drilling mud or a completion fluid.
  • FIG. 9 depicts high pressure gas acting downward on the formation liquid through the gas cap GC and forcing the formation liquid into the injector 54 .
  • the system as shown in FIG. 9 has a high pressure in the formation to result in a free flowing well. Liquid hydrocarbons thus pass upward in the tubing string to the wellhead W at the subsurface without artificial lift. The system may thus be operated without a packer between the tubing and the casing, as shown in FIG. 9, for assisting in recovery from a flowing well which does not utilize artificial lift. Liquid hydrocarbons may thus flow out the line 58 from the wellhead W. Gas in the annulus A between the tubing string TS and the casing C may be maintained at a desired pressure by regulator 64 at the surface. This pressure may be monitored by gauge 62 , and is ideally maintained at a safe yet sufficiently high level to maintain the well in a free flowing condition. Excess gas may be economically recovered through regulator 64 .
  • a horizontal wellbore is generally parallel to the formation and may thus be drilled and completed so as to be open to a producing formation over a relatively long distance.
  • the horizontal wellbore or lateral thus has a much greater opportunity to collect reservoir fluids for production to the surface, and productivity for horizontal bore holes accordingly may be substantially increased over conventional vertical wells.
  • Horizontal wellbore technology thus may recover a greater percentage of the oil and gas from reserves compared to conventional vertical wellbore technology.
  • the vertical well with the injector therein should be large enough to accommodate sufficiently sized tools of the present invention and match the anticipated fluid production.
  • FIGS. 1-10 Various types of artificial lift systems may be used in conjunction with the injector and the horizontal wellbore technology. Pressure within the annulus of the well may be controlled from the surface, as explained above, to control the producing bottom hole pressure in each of the one or more wellbores positioned within the producing zone.
  • a packer may be used above the producing zone to isolate the annulus between the tubing and the casing for producing fluid, with the injector then being provided below the packer.
  • a system with an injector may thus be reliably used for high pressure flow in horizontal well applications.
  • the injector as described above utilizes a float concept such that the injector may be installed and operated in a near-vertical position. This limitation does not limit the use of this technology in horizontal well applications, however, as shown in FIGS.
  • a modified float system or a density sensor could be provided downhole for sensing the presence of liquids or gas, and the shutoff valve could be electrically, hydraulically or mechanically actuated in response to this modified float system or density sensor so that the injector operation need not be limited to a vertical or near-vertical orientation in the wellbore.
  • the liquid injector according to the present invention thus may be below or above the horizontal laterals and within the vertical portion of the well.
  • the horizontal configuration of the producing wells as described above may be used to improve recovery by gravity drainage as previously described, and there are distinct advantages achieved by retaining gas energy within the formation in horizontal well applications.
  • the horizontal well intersects the vertical well above the injector 54 .
  • the gas cap GC forces the oil downward for collection by the horizontal bore hole.
  • Packer 44 serves its previously described purpose of preventing the gas from moving up in the well annulus, and thus assists in maintaining the desired gas cap GC. Accordingly, the casing C may be perforated in the zone of the gas cap GC and above the liquid level LL.
  • Pump P drives the oil to the surface and, for this application, is preferably a high volume electric submersible pump P to pump large flow rates of oil through the tubing string TS.
  • Conventional electric submersible pump configurations would require the addition of ports 40 and 88 as shown in FIGS. 3 and 6 to allow fluid flow past the pump motor for cooling.
  • one or more horizontal laterals may be drilled from a substantially vertical wellbore within a single substantially horizontal plane.
  • One or more horizontal laterals may thus each be initiated from a vertical hole by a pilot hole utilized to start the horizontal bore hole.
  • a pilot bit may be used to cut a hole in the casing and start the horizontal lateral.
  • the pilot bit may then be retrieved and a conventional drilling tool used to result in the horizontal bore hole.
  • a retrievable whipstock may be used so that the kick off tools do not interfere with the subsequent placement of the injector in the bore hole. If a cement plug is positioned on the vertical portion of the bore hole, the plug may be drilled out after the horizontal bore holes are completed.
  • FIG. 11 illustrates a horizontal bore hole drilled in formation F below a gas cap GC as a continuation of the vertical boreholes.
  • the oil enters through a screened liner SL, typically operating within a gravel-packed borehole.
  • a variety of horizontal drilling technologies may be used with the concepts of the present invention. Both horizontal and highly angled holes extending from the existing wellbore may be used to increase the area of drainage. Conduits commonly referred to as drain holes may be configured as a variety of jet drilled perforations or larger boreholes, or short-radius drilled holes may also be used in conjunction with the injector of the present invention.
  • the injector 54 may then be located within or above the producing formation and in the vertical portion of the wellbore. As shown in FIG. 11, the non-vertical wellbore lateral is provided below the injector 54 and will thus be open to the producing fluids. This configuration allows for the drilling and completion of the horizontal wellbore below the vertical section of the well.
  • the wellbore may be completely cased or cemented down to at least the producing formation, thereby positively containing fluid within the formation.
  • the injector and the intake to the pump P may be located at a level sufficiently low relative to the producing formation such that the available reservoir pressure in the formation may lift liquids to at least the level of the pump.
  • the reservoir characteristics would thus determine the relative height at which the injector and pump would be set, which in turn would determine the horizontal drilling and completion characteristics.
  • To locate injector 54 as close to the producing zone as possible will require use of existing shorter-radius horizontal drilling and completion techniques.
  • the annulus A above the pump may be pressure controlled at the surface to monitor the desired liquid level LL. Liquid hydrocarbons from the pump P are thus produced to the surface through the production tubing string TS.
  • FIG. 12 Another example of horizontal well technology is shown in FIG. 12, wherein a second layer of horizontal wellbores or laterals extend from the vertical wellbore which contains the injector 54 .
  • the upper wellbore lateral may be located within a gas zone and above the relatively thick liquid bearing formation F.
  • the injector 54 acts to circulate separated gas back to the reservoir and return energy to the reservoir for driving oil from the formation rock.
  • expensive equipment and techniques involving the recovery of the gas energy and the subsequent reinjection of the gas back into the formation are thus avoided.
  • more than one wellbore may be extended laterally from the vertical-wellbore in both the gas cap and the producing formation and in different directions to encompass a larger drainage area. This technique is commonly referred to as using multi-laterals.
  • the productivity from the well may be substantially enhanced.
  • the injector may be used to freely transmit liquids into the production tubing string while preventing the entry of gas to the surface.
  • liquid production from one or more horizontal bore holes may significantly increase and free gas is provided back through the producing formation, optionally to one or more separate horizontal bores or conduits at a level higher within the formation.
  • FIG. 12 illustrates how the injector 54 may be used in a vertical section of the well which has one or more horizontal bores each drilled from different levels.
  • Combining an injector of the present invention with high productivity from lateral wells while also retaining the reservoir gas energy downhole is an effective approach to maximize hydrocarbon recovery.
  • Various types of pumps such as an electric submersible pump may be used in combination with an injector to create an efficient and high-volume producing well.
  • a horizontal bore hole through an upper section may be used to convey injected gas deep into the reservoir for a more effective drive mechanism to the horizontal producing wellbore.
  • This system with upper and lower horizontal wellbores would circulate and retain gas which is prevented from moving into the tubing string by the injector and thus is maintained in the downhole formation.
  • the gas pressure below the packer 44 may maintain a desired liquid level LL in the annulus above the packer, with the crossover ports 88 above the packer serving the purpose previously described.
  • a system similar to that shown in FIG. 12 provides for strongly enhanced recovery using secondary or tertiary recovery methods through which pressure depleted reservoirs could be made to produce at higher levels.
  • the injection line 56 thus extends from the surface through the downhole packer 44 to assist in maintaining an effective gas cap GC.
  • Check valve 57 optionally may be provided along line 56 to limit gas flow along line 56 to the downward direction.
  • the concepts of the present invention may also be applicable to a version of “huff and puff” recovery technology in which gas is injected for a period of time then suspended while liquid buildup is produced.
  • the gas zone for pressurizing could be injected from an offset well, preferably located structurally close to the recovery well.
  • the tubing regulator mechanism may be used to control and trap gas relief from the wellbore into the chamber between the packers and thus provide the desired pressure differential from formation to wellbore, while the injector prevents free gas production. Gas in the chamber between the packers may further act as the first lifting stage for slugs of liquid entering the tubing.
  • the injector of the present invention may thus substantially assist the productivity of horizontal wells by utilizing the free gas prevented from going into the tubing string by the injector to enhance liquid production.
  • a packer is positioned in the wellbore between the upper gas injector laterals and the lower fluid recovery laterals.
  • the entire reservoir may be open to the wellbore, and the formation isolated only below the packer. Only liquid may be produced through the liquid injector and gas recirculated back to the gas zone. The gas may also be injected through the packer to replenish gas energy as previously described. Gas re-entry into the gas zone is facilitated by the use of horizontal lateral boreholes connected with the wellbore below the packer.
  • the liquid injector of the present invention may thus be incorporated into existing or planned field gas injection programs to help control gas breakthrough.
  • a significant feature of the injector and packer configuration according to this invention is the reduced risk of a well blowout. Gas is not free to escape from a pump assisted well which includes the injector as disclosed herein. Only the small amount of gas above the packer, the oil above the pump and solution gas in liquids that do pass through the injector would be available fuel for any blowout. Accordingly, a well including the injector and the technology of this invention may be more easily controlled if a blowout does occur.
  • While the concepts of the present invention may work in various types of wells, retaining gas within the reservoir and recovering a high percentage of oils by gravity drainage is most effective for use in thicker reservoirs in which a cap gas or solution gas breakout is otherwise used as a mechanism to enhance early production to the detriment of a longer, but more productive oil recovery.
  • a cap gas or solution gas breakout is otherwise used as a mechanism to enhance early production to the detriment of a longer, but more productive oil recovery.
  • gas were produced to create the optimum drawdown pressure in the annulus, then the gas may be re-injected back into the reservoir for conservation, and inefficient coning in the producing well still controlled.
  • the effectiveness of the system with nitrogen, carbon dioxide and other injected gases is also practical.

Abstract

A downhole injector (10), (26), (38) and (54) is provided at the lower end of the production tubing string (TS) for passing liquids from a downhole hydrocarbon formation (F) into the tubing string while preventing gases from passing through the injector. The present invention uses the injector with an optimum wellbore annulus (A) back pressure using a regulator (64) and a pressure gauge (62) to enhance total gaseous and liquid hydrocarbon recovery. In wells requiring artificial lift, a downhole pump (P) may be used to efficiently pump formation fluids to the surface or alternatively one or more gas lift valves (LV) for raising slugs of liquid to the surface. The present invention may also be used with multi horizontal borehole technology for increasing hydrocarbon recovery by retaining gases in the formation to act upon liquid hydrocarbons by maintaining an over head pressure for driving the liquids from the formation through the injector for maximum ultimate recovery and hydrocarbon reserve value.

Description

    FIELD OF THE INVENTION
  • The present invention relates to a liquid/gas separator for positioning in the lower part of a well intended for the production of fluids, such as hydrocarbons. The separator prevents the entry of gas into the production tubing string, but allows the entry of fluid in liquid form. The invention also relates to a method for improving the primary, secondary or tertiary recovery of reservoir hydrocarbons and to improved systems involving downhole liquid/gas separators for various hydrocarbon recovery applications. [0001]
  • BACKGROUND OF THE INVENTION
  • Hydrocarbon recovery operations commonly allow reservoir gas within the formation to flow into the wellbore and to the surface with the liquid hydrocarbons. This practice initially drives high volumes of hydrocarbons into the well and up through the production tubing. Conventional hydrocarbon producing methods thus allow, and in many cases rely upon, the pressurized reservoir gases to directly assist in lifting the production fluids to the surface. This practice thus utilizes the pressure and liquid-driving capabilities of the reservoir gas to improve early well production recovery. While prevalent, this practice significantly reduces the ultimate recovery of liquid hydrocarbon reserves from the formation. [0002]
  • Liquid/gas separators have been used downhole in producing oil and gas wells to allow the entry of reservoir fluids which are in the liquid state into the tubular string that conveys the liquid fluids to the surface, and to prevent the entry of fluids in the gaseous state into the producing tubular string. One type of separation device, which remains immersed in the surrounding downhole fluid, includes a float and a valve arrangement. When this separation device is full of liquid, an open conduit is provided from the reservoir to the producing tubular. When the liquid is displaced by gas in the separation device, the float rises due to its increased buoyancy and a valve closes to prevent the entry of fluids into the producing tubular, [0003]
  • This separator thus includes a float activated valving system which opens when the separator is full of liquid and closes when that liquid is displaced by gas. The flotation system within this separator is configured to operate in the vertical or substantially vertical orientation. When the liquid/gas separator is open, the separator allows liquid to be transmitted by pressure energy within the producing formation upward through the tubular string which is positioned above a standing or check valve, and then to be lifted to the surface by a conventional pump powered by a reciprocating or rotating (progressive cavity) rod string. Other types of available downhole pumps, such as electrical submersible pumps or hydraulic (jet-type) pumps, may also be used to lift the liquid to the surface once it is entrapped above the liquid gas separator and within the production tubing string. [0004]
  • In practice, the downhole separator does little to cause or accelerate the separation of liquid and gas. Rather, the device senses the presence of a gas or a liquid within the device by the float, and allows only liquid entry into the production tubing string. The separator thus operates within a downhole well in a manner similar to a float operated valve controller which detects the liquid/gas. interface within a surface vessel. One type of separation device marketed as the Korkele downhole separator has proven effective in many installations. [0005]
  • The separator may be placed and operated within a cased wellbore with a conventional diameter casing therein or may also be operated in an open hole. In either case, the separator may be suspended in the well from production tubing. The basic advantage of the Korkele downhole separator is that it improves performance of the well and the well-reservoir production system by allowing for the production of liquids only, i.e., it prevents the entry of gas from the reservoir into the production tubular string. The downhole separator as discussed above is more fully described in a July 1972 article in World Oil, pages 37-42. [0006]
  • Further details with respect to this separator are disclosed in U.S. Pat. No. 3,643,740 granted to Kork E. Kelley and hereby incorporated by reference. [0007]
  • Other prior art includes U.S. Pat. Nos. 1,507,454 and 1,757,267. The '454 patent discloses an automatic pump control system with an upright stem connected to a diaphragm to operate a standing valve. The '267 patent discloses a gas/oil separator having a separating chamber located within the tubing and a mechanism for diverting the path of oil over an enlarged contact surface to separate free oil from gas. [0008]
  • U.S. Patents naming Kork Kelly as an inventor or co-inventor include U.S. Pat. Nos. 2,291,902; 3,410,217; 3,324,803; 3,363,581; and 3,451,477. The '902 patent discloses a gas anchor having a float connected to a valve stem which operates a valve head. The '217 patent discloses a separator for liquid control in gas wells. The '803 patent discloses a device having a floating bucket connected by a rod for liquid/gas wells. A valve member is disclosed below and in close proximity to a check ball. The '581 patent discloses a pressure balanced and full-opening gas lift valve. The '477 patent relates to an improved method for effecting gas control in oil wells. The device includes a flotation bucket with an open top and a valve string including a valve member connected to the top of a rod, with the bottom of the rod connected to the bottom bucket. The '740 patent discloses both methods and apparatus for effecting gas control in oil wells utilizing a flotation bucket with an open top and a valve string including a valve member connected to the top of a rod. U.S. Pat. No. 3,971,213 discloses an improved pneumatic beam pumping unit. [0009]
  • U.S. Pat. No. 3,408,949 discloses a bottom hole gas/liquid separator having a float tube encircling the lower end of a production tubing and adapted to move vertically within a housing. A production valve is disposed on the upper end of a spacer bar such that the float [0010]
    Figure US20040060705A1-20040401-P00999
    ad spacer bar form a sand trap. U.S. Pat. No. 3,483,827 discloses a well producing
    Figure US20040060705A1-20040401-P00999
    which utilizes a gas separator in a tubing string to separate liquid from gas prior to
    Figure US20040060705A1-20040401-P00999
    nto a downhole pump. U.S. Pat. No. 3,724,486 discloses a liquid and gas separation
    Figure US20040060705A1-20040401-P00999
    for a downhole well wherein a valve member is moveable and resiliently mounted on
    Figure US20040060705A1-20040401-P00999
    table liquid container designed so that liquid will accumulate within the bore hole above
    Figure US20040060705A1-20040401-P00999
    ition where gas enters to decrease or prohibit the entry of gas into the bore hole. U.S. Pat. No. 3,993,129 discloses a fluid injection valve for use in well tubing for controlling the low of fluid between the outside of the production tubing and the inside of the tubing.
  • More recently issued patents include U.S. Pat. Nos. 4,474,234 and 4,570,718. The '234 patent discloses a hydrocarbon production well having a safety valve removably mounted in the production tubing beneath a pump. The '718 patent relates to an oil level sensor system and method for operating an oil well whereby upper and lower oil well sensors control pumping of the well. U.S. Pat. No. 5,456,318 discloses a fluid pumping device having a fluid inlet valve disposed at its lower end for fluid flow into the body of the device, a plunger assembly disposed in the interior of the body for reciprocating movement, a seal which cooperates with the plunger assembly to divide the body into isolated upper and lower chambers and to divide the body from the production tube, and fluid flow control valves. [0011]
  • U.S. Pat. No. 5,653,286 discloses a downhole gas separator connected to the lower end of a tubing string designed such that primary liquid fluid flows into a chamber within the separator. U.S. Pat. No. 5,655,604 discloses a downhole production pump and circulating system which utilizes valves wherein the valve balls are attached to projector stems. U.S. Pat. No. 5,664,628 discloses an improved filter medium for use in subterranean wells. [0012]
  • None of the prior art discussed above fully benefits from the capability of an effective downhole liquid/gas separator. Further improvements are required to obtain the significant advantages realized by retaining within the downhole producing formation the inherent energy, i.e. the compressed gas, which drives the desired hydrocarbon products from the reservoir rock and into the wellbore so that they may be more efficiently produced. By preventing the formation gas at bottom of the well from entering the production tubing string and permitting only the entry of liquids into the tubing string, the retained potential energy and expansive properties of the gas may be effectively utilized to produce a higher percentage of liquid reserves than would otherwise be recovered by conventional technology. Alternatively, improved procedures for pumping liquid accumulations off gas wells are necessary to improve the performance of gas wells. Moreover, further improvements in a separation device, in methods of using a separation device, and in the configuration and operation of the overall hydrocarbon recovery system in which a separation device is employed are required to benefit from the numerous applications in which such a device may be effectively used to enhance recovery of hydrocarbons. [0013]
  • The disadvantages of the prior art are overcome by the present invention. An improved separation device, a method of operating a separation device, an improved overall hydrocarbon recovery system, and improved techniques for recovering hydrocarbons are hereinafter disclosed. [0014]
  • SUMMARY OF THE INVENTION
  • The present invention discloses an improved downhole liquid injector and improved techniques utilizing an injector for recovering hydrocarbons from producing reservoirs. Several basic concepts influence the benefits of utilizing the liquid injector of the present invention in various existing and planned well and/or reservoir producing systems. First, positive prevention of gas into the producing tubular improves the efficiency of an artificial lift pumping system by allowing the lift system to handle primarily liquids rather than a combination of liquids and gases. By providing for the positive prevention of gas into the production tubing, the artificial lift pumping system is efficiently pumping only primarily liquids. Conventional artificial lift systems, which utilize a rod string to power a downhole pump thus operate more efficiently with liquid only flowing through the production tubing string. Preventing gas lock in downhole positive displacement and electrical submersible pumps is a major problem for the oil well operator with existing technology. Since the injector of the present invention substantially reduces or eliminates unwanted gas to the production tubing string, gas lock is avoided and the life and efficiency of positive displacement aid submersible pumps is increased. [0015]
  • By preventing gas entry downhole into the production tubing string, the present invention also reduces the possibility of gas blowout through the surface production system. The present invention also reduces sucker rod stuffing box drying and wear to reduce leakage of fluids from the wellhead and minimize environmental problems associated with producing hydrocarbons. [0016]
  • The system of the present invention may significantly benefit from the concept of preventing gas production from the reservoir and thereby retaining the gas within the reservoir where it will continue to supply energy in the form of pressure to drive well fluids into the producing wellbore. By permitting only the inflow of reservoir liquids into the production tubing string and maintaining gases on the top of a liquid column in the well, a high percentage of natural gas remains in the reservoir where it provides the pressure to drive liquids toward the wellbore and creates a more efficient drainage mechanism to best utilize the principles of gravity separation. [0017]
  • By keeping gas within the reservoir, the present invention also creates a more effective liquid drainage pattern within the reservoir by reducing gas coning around the well and improving the maintenance of an effective gas cap drive to develop an enhanced liquid gravity drainage system. The system of the present invention thus acts to oppose the release of gas from the formation into the wellbore and minimize undesirable coning of a gas cap, while also promoting the generation and maintenance of a more effective gas cap drive. [0018]
  • By retaining the gas in the reservoir, the flow of desired liquid hydrocarbons into the wellbore is also assisted by retaining gas in solution within the crude oil to maintain a lower fluid viscosity, thereby lowering the resistance to flow of the crude oil through the reservoir. Since reservoir rock has a lower relative permeability to liquids than to gas, particularly when the crude loses its lighter components and becomes heavy, minimizing gas inflow and maintaining reservoir pressure keeps the crude more gas saturated and less viscous so that it is mobile and may more freely flow toward the wellbore area. [0019]
  • The injector of the present invention may also be used to significantly improve the efficiency of a downhole system designed to remove liquids, typically water, from the wellbore which impede the production of natural gas from a gas reservoir. By providing for the efficient removal of problem liquids which impede the production of gases from primarily gas reserve reservoirs, the efficiency of a gas recovery system may be significantly enhanced. Systems with a positive downhole gas shutoff for removing liquid accumulations will also be safer to operate since gas flow to the surface through the tubing string may be automatically and positively controlled if surface control is lost. [0020]
  • The techniques of the present invention may be used to improve long-term productivity and increase the recovery of hydrocarbon reserves from many existing oilfields. In new oilfields, particularly those in which it is desirable to prevent or limit the wasteful production or uneconomical recovery of natural gas which lowers ultimate crude recovery, the present invention offers a valuable completion option. Such new fields are continually being discovered and developed in isolated offshore locations, and in many countries which are just now developing their petroleum reserves. [0021]
  • The downhole separation device of the present invention, which is more properly termed a liquid injector, is a float-operated device that permits producing reservoir fluids to flow into a production tubing string but positively shuts off the entry of gas. In a preferred embodiment, the injector prevents entry of fine-grain sand into the interior of the injector tool by utilizing an improved screening device to provide significantly increased protection from sand entry and minimize filling and plugging by the fine-grained sand particles. The sand particle sizes excluded by the screening device do not significantly impede fluid flow. The screening device also provides advantages relating to the breakup of foams in the wellbore to enhance the flow of liquid rather than gas into the interior of the injector. In one embodiment of the injector, the flow shutoff valve is located at a high position within or above the intake tube and close to the standing or check valve. This positioning of the shutoff valve causes liquids in the intake tube to remain under wellbore pressure while the shutoff valve is closed, thus preventing the release of solution gas in response to pressure reduction caused by the pumping action, thus reducing problems associated with pump gas lock. Raising the shutoff valve also keeps the shutoff valve out of the lower area of the float in which sand may settle during the time the valve is closed, thus further minimizing the possibility of sand plugging. [0022]
  • An improved method is provided for creating a liquid reservoir within a well pumping or producing system. According to one technique, liquid does not flow directly into the pump intake, and instead the wellbore formation fluid is first diverted into a vertical reservoir created in an annulus between the tubing and the casing by addition of a packer. The downhole pump may then draw from this reservoir. Should the injector shutoff valve close, the pump would continue to draw liquid until the working fluid level drops to the pump intake. An additional benefit from this concept occurs as a result of further solution gas breakout and separation within the vertical reservoir. The gas from the producing formation below the packer may be vented through a vent tube containing a pressure regulation system to ensure wellbore pressure sufficient to lift liquid to a working level above a pump. This system may also benefit from the use of various back pressure controls and fluid entry and reversal mechanisms. [0023]
  • The injector of the present invention may also be combined with an improved beam. pumping unit as described in U.S. Pat. No. 3,971,213. This integrated system uses power derived from the pressure of natural gas produced in the annulus in the previously described liquid reservoir. After pressure reduction at the surface, the produced gas may be routed into a flow line for sale. No waste or burning of produced gas is required, and instead a selfcontained operation is achieved. [0024]
  • The techniques of the present invention minimize the production of gas which, in many applications, is wasted and flared. By providing a controlled back pressure relief in a gas lifted well, a gas lift system in a flowing well may be configured with double packers to create a chamber above the producing formation. A tubing regulator device controls the pressure of entrapped gas from the wellbore which is relieved into the chamber, which in turn provides a desired pressure differential across the formation and to the wellbore. Gas in the chamber may further act as a first lifting stage for slugs of liquid entering the tubing. Various modifications to this technique are more fully discussed below. The techniques of the present invention may also be used to increase productivity in horizontal wells, as discussed further below. The techniques of the present invention may thus be used to increase liquid hydrocarbon recovery by conserving and utilizing natural gas as a reservoir driving mechanism so that a gas cap pushes the liquid downward to a lower horizontal bore hole or lateral. [0025]
  • It is an object of the present invention to provide improved equipment and methods for recovering hydrocarbons from subterranean formations. More particularly, the present invention may function to retain a pressurized gas reservoir downhole and thereby improve recovery of liquid hydrocarbons, and may also be used to remove liquids which block the effective recovery of gaseous hydrocarbons. The improved method of producing hydrocarbons from a well serves to more efficiently retain and utilize the inherent energy of natural gas within the reservoir. A properly designed system according to the present invention may create a reservoir producing mechanism that minimizes production problems and recovers significantly greater volumes of liquid hydrocarbon reserves. [0026]
  • It is a feature of the present invention that the techniques described herein may be used for maintaining a downhole reservoir so that the liquid injector may operate independent of an artificial lift system for the well. The methods of the present invention may also utilize a liquid injector below an annular seal or packer between the tubing and casing to provide for and control the relief of wellbore gas pressure buildup above the liquid in the wellbore and thereby optimize reservoir inflow performance. The liquid injector may also be incorporated with a gas lift system to achieve a design with enhanced wellbore to reservoir pressure drawdown and inflow patterns. The techniques of the present invention may be used to enhance hydrocarbon recovery from highly deviated or horizontal wellbores, and may also be used in directional well drilling and completion techniques. [0027]
  • One feature of the present system is that the injector provides benefits from improved control by preventing formation gas production with the production of liquids. The injector incorporates an improved sand filter and may utilize a liquid reservoir above a packer, and optionally employs a shutoff valve located closer to the pump. The techniques of the present invention may be used to minimize and prevent gas locking in pumped wells, and also minimize the likelihood of gas blowout to surface by allowing the injector to act as a downhole gas shutoff device. The techniques of the present invention further result in improved lubrication for the polished rod to minimize leakage of hydrocarbons through the stuffing box. The present invention may be used to effectively de-water gas wells by removing liquids that prevent optimum gas production. In wells in which liquid hydrocarbons are produced, gas waste is minimized and conservation of gas enhances gas drive capabilities. [0028]
  • A significant feature of the present invention is the improved long-term productivity and increased recovery of hydrocarbon reserves of existing oilfields. In new fields, the systems of the present invention provide an effective completion option over existing technology. By retaining a high percentage of natural gas within the reservoir and producing the oil by gravity drainage, more oil is recovered. [0029]
  • An advantage of the present invention is that highly sophisticated equipment and techniques are not required to significantly improve the production of hydrocarbons. Another significant advantage of the invention is the relatively low cost of the equipment and operating techniques as described herein compared to the significant advantages realized by the well operator. Moreover, the useful life of other hydrocarbon production equipment, such as downhole positive displacement pumps and wellhead stuffing boxes, is improved by the system provided by this invention. [0030]
  • These and further objects, features, and advantages of this invention will become apparent from the following detailed description, wherein reference is made to the figures in the accompanying drawings. [0031]
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • FIG. 1 is a simplified pictorial view of an injector according to the present invention suspended from a tubing string within the interior in a casing of a wellbore. The downhole float and valve mechanisms are simplistically depicted for easy understanding of the injector. [0032]
  • FIG. 2 is a simplified pictorial view of one embodiment of a liquid injector according to the present invention, including an improved sand screen. [0033]
  • FIG. 3 illustrates an injector according to the present invention incorporating a packer below a liquid reservoir and a gas vent tube and a spring loaded check valve positioned above the working liquid level. [0034]
  • FIG. 4 illustrates schematically the improved hydrocarbon recovery performance provided by the liquid injector of the present invention. [0035]
  • FIG. 5 illustrates the use of an injector in an application for improving recovery of hydrocarbons from substantially depleted zones. [0036]
  • FIG. 6 illustrates schematically improvements in gravity drainage provided by the liquid injector of the present invention and a liquid reservoir above a packer. [0037]
  • FIG. 7 illustrates an application of a liquid injector used in a flowing well with gas lift. [0038]
  • FIG. 8 illustrates an application wherein a liquid injector is used in combination with chamber gas lift with a bleed-off control. [0039]
  • FIG. 9 illustrates the use of an injector according to the present invention in a free flowing well. [0040]
  • FIG. 10 illustrates an injector used for gas control in a horizontal well application. [0041]
  • FIG. 11 illustrates the use of an injector in an alternate arrangement in a horizontal well application. [0042]
  • FIG. 12 illustrates another application wherein a liquid injector is used with horizontal bore hole technology for enhanced hydrocarbon recovery. [0043]
  • DETAILED DESCRIPTION OF PREFERRED EMBODIMENTS Injector Features and Operation
  • FIG. 1 simplistically illustrates the primary components of a [0044] liquid injector 10 according to the present invention suspended in a tubing string TS within a downhole well passing through a hydrocarbon-bearing formation F. Injector 10 is thus positioned within the lower end of a casing C which is perforated to allow formation fluids to flow into the interior of the casing C and thus surround the injector 10. Also simplistically shown in FIG. 1 is a downhole pump P which may be powered by surface equipment such as a pump jack (not shown), with the power being transmitted from the surface to the pump via a sucker rod R positioned within the production tubing string TS. The pump P includes a lower pump traveling valve TV which allows fluids to pass upward from the liquid injector 10 and into the pump, and then be transmitted through the production tubing TS to the surface. As explained further below, a liquid level LL within the casing C is ideally maintained by the injector 10 to allow liquid hydrocarbons to be transmitted to the pump P and then to the surface via the tubing string TS, while the annulus A between the tubing string TS and the casing C above the liquid level is occupied by pressurized gas.
  • The [0045] liquid injector 10 as shown in FIG. 1 includes an outer housing 12 with a plurality of intake perforations 14 which allow liquid within the interior of the casing C to flow into the interior of the housing 12 and then into float 22 to surround vertical tube 16 which is in fluid communication with the lower end of the tubing string TS. An injector intake or shutoff valve 19 includes a valve member 18 that cooperates with shutoff seat 20 at the lower end of the tube 16, and the valve member 18 in turn moves with the float 22 which surrounds the tubing 16 to control the flow of liquid into the tube 16. The downhole float 22 thus operates in response to the liquids which surround it within housing 12. Valve member 18 thus lowers with respect to the housing 12 when the float 22 is filled with liquid, thereby opening the shutoff valve 19 and allowing liquids to flow upward into the tubing string past a standing or check valve 24 and enter the pump P. For most operations in which a pump P is used, the standing valve is part of the pump P and is immediately below the traveling valve TV, When gas in the annulus A displaces the liquid so that the liquid no longer flows through ports 14 into the float 22, the float 22 rises to close the valve 19 and prevent gas from entering the interior of the tubing string TS. The basic operation of the injector 10 is thus relatively simple, and the injector itself is inexpensive and reliable. The standing or check valve 24 thus prevents fluids which pass upward past this valve from returning by gravity back to the injector. Those skilled in the art will appreciate that the float 22 may have various configurations, and that other arrangements may be used so that the shutoff valve 19 is automatically responsive to the operation of the float.
  • FIG. 2 illustrates a modified [0046] liquid injector 26 according to the present invention which may similarly be suspended from a tubing string TS as shown in FIG. 1. The liquid injector 26 includes components previously described and, although the configuration of the components may be altered, the same reference numbers are used herein for functionally similar components. The injector 26 thus includes a float 22 moveable within a housing 12. At the lower end of the housing 12, a bull plug 28 is removable for threading a closed lower pipe which serves as a sand reservoir to the injector. For the embodiment shown in FIG. 2, valve member 19 has been replaced by a combination of an elongate moveable valve stem 30 and a valve body 32 positioned closely adjacent seat 20. The valve stem 30 is secured to the float 22 as previously described, although it is apparent that the intake or shutoff valve 19 for the injector 26 has been substantially raised compared to the previously described embodiment. Also, fluid flowing up to the shutoff valve 19 travels upward through a smaller diameter flow tube 16, where it may continue upward to a pump P as previously described. Immediately above the shutoff valve 19 is the standing valve 24 for the pump, as previously described. As with the operation of the previously described injector, the float lowers and raises the valve stem 30 to open and close the valve 19 using valve body 32. The valve body 32 opens to relieve the pressure differential when the float drops, and the valve closes when gas displaces the liquid. The valve body 32 has a relief port therein, as more fully described in U.S. Pat. No. 3,451,477. In a suitable application, the float 22 may have a three inch outer diameter and a length of approximately 30 feet, and may be fabricated from 16 gauge metal. The outer housing or jacket 12 of the injector 26 may have approximately a four inch outer diameter. FIG. 2 also shows an injector head 34 for structurally interconnecting the tube with the lower end of the production tubing PT. Also, it should be understood that the shutoff valve 19 as shown in FIG. 2 may be used in the lower part of the injector as shown in FIG. 1.
  • The [0047] housing 12 as shown in FIG. 2 does not include intake openings 14 and instead a sleeve-shaped sand screen 36 is provided. Fluids must thus pass through the sleeve-shaped screen 36 and into the interior of the housing or jacket 12. In prior art liquid/gas separators, the operation of the separator may be inhibited by formation sand which may build up in the float and restrict operation of the separator. The injector 26 as shown in FIG. 2 minimizes this problem by providing a sand filtering screen 36 across the primary fluid intake to the float. Various commercial screens 36 may be used, such as the Johnson (US Filter) prepacked screen or the Pall Corporation multilayer wire mesh screen. Screen 36 thus fits across or replaces a portion of the outer housing or shell of the injector to minimize sand plugging problems, while also not unduly restricting the flow of liquids into the injector. Preferred screen 36 may also assist in recovery of hydrocarbons by reducing foaming and separating liquids from gases. A preferred screen 36 according to the present invention preferably is adapted for blocking at least 90% of sand which has a particle size from 10 microns to 30 microns or larger from entering the interior of the injector, while allowing those few particles smaller than that size to pass through the screen and thus not unduly restrict fluid flow or cause screen plugging. The screen 36 may have threaded upper and lower ends for mating engagement with the housing 12 and with the head 34 which connects the screen 36 with the tubing string TS. The selection of the screen and its particle size blocking features will depend to a large extent upon the formation conditions and the downhole operations, and the characteristics of the desired screen may be altered with experience.
  • The [0048] injector 26 as shown in FIG. 2 has its intake or shutoff valve 19 for the injector positioned vertically upward relative to a lowermost end of the float 22. In prior art liquid/gas separators, there was conventionally a vertical spacing of approximately 30 feet or more between the intake or shutoff valve and any standing valve 24. When the lower shutoff valve closed, pressure in the 30 foot line between these components was lowered to a vacuum by the action of the pump P, which in some instances caused the liquid hydrocarbons in this 30 foot line to vaporize. When the lower shutoff valve then opened, the pumping systems could become gas locked, The improvement to the injector as shown in FIG. 2 relocates the shutoff valve significantly upward in the injector housing, and ideally immediately below the standing valve 24. More particularly, the vertical space between the shutoff valve 19 and the standing valve 24 is essentially eliminated and is now ideally less than ten times the outer nominal diameter of the housing 12, and preferably is less than about three times the outer nominal diameter of the housing 12. The shutoff valve is thus operated by long slender rod 30 affixed to the bottom of the float 22, with the rod extending upward toward the shutoff seat 20. By providing the shutoff valve closely adjacent the standing valve 24, the volume between these valves is reduced to allow immediate entry of liquid under wellbore pressure when the shutoff valve opens.
  • The design as shown in FIG. 2 thus solves two problems with prior art separation devices. First liquids in the [0049] long intake tube 16 do not remain under wellbore pressure when the shutoff valve is closed, which reduces the problem of pump gas lock as described above. Secondly, by raising the shutoff valve 19, it is kept out of the lower area of the float in which, sand which passes through the filter 36 would likely settle during the time the valve is closed, thus minimizing the possibility of sand plugging. The filter 36 as described above provides an improved screening device which significantly increases protection to the entry of very fine grain sand within the injector and minimizes a likelihood of plugging, while also serving to break up foams in the wellbore to enhance the flow of liquids into the injector. The combination of the filter screen 36 and the repositioning of the injector shutoff valve 19 as shown in FIG. 2 thus significantly improves the operation of the injector.
  • Liquid Reservoir Above Packer
  • FIG. 3 depicts another arrangement of a [0050] liquid injector 54 according to the present invention. The components of the injector 54 are not being depicted in FIG. 3 since it may be understood that those components may conform to the previously described embodiments. The outer housing 12 of the injector 54 includes a plurality of openings 14 which allow fluids to enter the interior of the injector from the annulus radially outward of the injector. The basic operation of the injector 54 is as previously described.
  • For the embodiment as shown in FIG. 3, a [0051] downhole packer 44 is provided between the injector 54 and the casing C. A gas vent tube 46 sealingly passes through the packer 44 and extends upward to above the working level of the liquid LL within the casing C, as shown in FIG. 3. It should be understood that the annulus A between the tubular string TS and the casing C above the liquid level LL is occupied by gas, while the annulus below the liquid level LL as shown in FIG. 3 is filled with liquid. A spring loaded check valve 48 is provided at the upper end of the gas vent tube 46 and within the gaseous portion of the annulus. The spring loaded check valve 48 ensures that the pressure in the wellbore remains adequate to lift liquid in the annulus A well above tubing inlet ports 40. This gas vent system thus provides a gas venting and production system and maintains an adequate lift for the working fluid level to prevent the pump P from operating against a closed valve as more fully explained below.
  • In an artificial lift system utilizing a downhole pump P and an [0052] injector 54, the intake to the pump P is positively closed when the float shutoff valve closes. Unless the pump is programmed by downhole detection or surface energy output measuring devices to shut off, the pump operation will continue against the closed valve and thus waste energy. Also when the shutoff valve opens, liquid is forced into the depressurized flow tube 16 and this jetting action may induce vaporization. Operating against the closed injector valve, the pumping system inefficiently raises and lowers the entire volume of fluid within the tubing on each pump upstroke and downstroke. Moreover, each upstroke produces a vacuum below the standing valve which adds an additional pump load. When the separator shutoff valve opens while the volume below the standing valve is at a reduced pressure, liquid would be jetted through the separator shutoff valve and may be depressurized such that gas in solution with the crude oil may expand to flash and separate. Such a flashing could cause several undesirable consequences, including cooling and thus the creation of paraffins or solids participation, or the creation of a gas volume within the pump chamber which would prevent 100% liquid fill up and thus reduce the efficiency of the pump. These same problems would occur with other types of artificial lift pumping systems, such as electric submersible pumps or hydraulic positive displacement pumps.
  • The system as shown in FIG. 3 prevents pumping against a closed shutoff valve by providing a [0053] packer 44 to seal the annulus between the tubing string TS and the casing C above the liquid injector, and providing openings 40 from the annulus between the tubing and the casing above the packer but below the pump intake. Liquids from the formation thus flow into the interior of the injector housing and upward past the packer 44, and then through a check valve 25. This annular liquid chamber LC thus forms a vertical reservoir from which the pump P may draw fluid. As shown in FIG. 3, the injector 54 in the improved embodiment eliminates the above-described problems for prior art separators by providing a reservoir of liquid such that the pump intake is not directly supplied only by fluid passing at that moment through the injector shutoff valve, but also by liquid in the reservoir which flows through the annulus openings 40. The injector 54 and the pump P may thus operate independently in response to the liquid reservoir, and may operate continuously or intermittently as dictated by the producing formation and the injector and pump interaction. The pump P thus preferably will operate as dictated by the level of liquid in this vertical reservoir. A significant advantage of this concept is that the pump operation may be monitored and controlled from the surface such that it need not be operated when it does not have a sufficient liquid supply to the pump intake. Nevertheless, while the pump is inactive, the formation may continue to produce from the reservoir and through the injector. Any formation liquids produced from the reservoir are thus captured and easily recovered when the pump is subsequently activated. By adjusting the pump speed to maintain a working liquid level LL above the pump intake, optimum gas production is assured while short shut-in periods and repeated actuation of the injector valves are smoothed out. Longer term loss of fluid intake may be handled by timed or sensed pump-off controls while production would continue into the reservoir while the pump was shut off.
  • The vertical liquid reservoir as shown in FIG. 3 is thus created in the annulus between the tubing and casing and above the packer or [0054] other seal 44. The packer 44 in turn is positioned above the injector shutoff valve. The openings 40 above the packer 44 establish communication between (a) the interior chamber axially positioned between the standing valve 24 and the packer 44, and (b) the surrounding annular vertical reservoir axially between the packer 44 and the liquid level LL. These openings 40 thus allow fluid access between the reservoir to both the standing valve and the pump intake. As long as liquid production from the producing formation equals or exceeds the volume of the pump output to the surface, the system as shown in FIG. 3 operates at maximum efficiency. Should the injector liquid output exceed the pump output, the liquid level within the annular reservoir would rise. This fluid level rise would continue until the hydrostatic pressure of the liquid at the injector valve level equaled the producing formation pressure available to move the liquid out of the injector. In effect, the liquid reservoir above the packer thus lets formation pressure move liquid independently of pump output so that the pump may be stopped when liquid level drops while the formation keeps producing.
  • It should be understood that the system as shown in FIG. 3 permits two controls from the surface to more efficiently control the downhole fluid producing system. Because the annular reservoir above the [0055] packer 44 allows continual liquid production from the formation independent of the pump, the downhole pump may be stopped when it does not have liquid to supply its intake. A suitable control mechanism for stopping the pump may be a flow/no-flow detector in the surface flow line, or other conventional detectors which monitor pump load electronically. Once the pump is stopped, it may be programmed to restart automatically after a specified time period, during which liquid is again building in the annular reservoir. The system as shown in FIG. 3 assures optimum hydrocarbon production by adjusting the pump speed to maintain the working fluid level above the pump intake. A suitable pump-off control permits longer term pump operation and, most importantly, production from the reservoir through the wellbore continues when the pump shuts off. As with conventional artificial lift operations, it would be a desirable design for the pump capacity to closely match formation liquid production.
  • The second surface control is obtained by monitoring and controlling the gas pressure in the annulus A. If no gas is bled from the annulus at the surface, no gas may be produced by the system described herein. The formation to wellbore pressure differential necessary to move liquid through the formation may thus be achieved solely by liquid removal via the wellbore. Depending on particular formation and fluid properties and the producing fluid drive mechanism in effect within the producing formation, however, some gas may be bled off at the surface to optimize production or to relieve the buildup. This may be achieved by using available back pressure control devices which may bleed the desired volume of gas into a well surface flow line or into a surface located liquid/gas separator unit. The [0056] vent tube 46 as shown in FIG. 3 thus allows gas to move from the formation into an annulus between the tubing and the casing. The tube 46 functions to convey gas through the annular liquid reservoir so that it does not bubble up through the liquid and thus become entrapped or go into solution in the crude and enter the suction of a pump. A method of passing gas from the below the packer 44 to the upper portion of the annulus is desirably obtained without gas contacting the liquid in the annular reservoir. The length of the tube 46 would thus be designed so that it extends above the expected height of the liquid in the annulus at its maximum working level. The check valve 48 prevents liquid from reentering the tube 46 and flowing to the formation. The back-pressure control mechanism described above may be simplistically obtained by providing a spring 50 for holding the valve 48 closed. Valve 48 thus effectively acts as a back-pressure device to ensure that there will always be a higher level of gas pressure in the formation to drive liquid to the injector and upward through the annular reservoir, independent of the pressure of gas in the annulus. For example, if the chosen spring loading on the valve 48 required 200 psi differential to open, even if the annulus pressure were bled to atmosphere at the surface, a 200 psi formation pressure would be available to lift liquid to the annular reservoir. Should a surface valve in communication with the annulus be closed, the valve 48. would still maintain formation pressure at a higher level and liquid would be transferred upward until the liquid level build up equaled reservoir pressure in the wellbore.
  • The system as shown in FIG. 3 thus provides a method of creating a reservoir of liquid to more efficiently supply the pump P. Liquid may be continuously transferred from the injector to the liquid reservoir and from the liquid reservoir to the pump by the [0057] appropriate openings 40. This method also assures that a pressure differential is available to provide formation energy to lift liquid into the annular reservoir. By providing the back-pressure feature as discussed above, the optimum pressure differential around the wellbore may be obtained for maximum formation fluid movement and hydrocarbon recovery. This system achieves these objectives while eliminating or minimizing the production of natural gas and maintaining its valuable contribution as an energy source to efficiently deplete the oil zone within the downhole formation. In many isolated locations where liquid hydrocarbons are produced but wherein a gas pipeline is not accessible, gas would otherwise have to be flared and thus wasted. The system of the present invention allows for the production of oil while avoiding these flaring problems and also maximizes the production of liquid hydrocarbons from the formation.
  • The injector according to the present invention may also be used with an improved gas pumping power unit, such as that disclosed in U.S. Pat. No. 3,971,213 hereby incorporated by reference. The pumping unit as disclosed in the '213 patent describes a sucker rod pumping unit that may be powered by natural gas drawn from the annulus between the tubing and the casing of a well. This gas pressure, which need only be a minimal amount of gas above a flow-line pressure, may be used to power a piston which in turn actuates the beam of a pumping unit. The advantages obtained by this system include operation of the pump with a low incremental pressure while allowing the return of used gas to a sales line, and also counterbalancing of the system with pressure energy stored in the hollow substructure of the unit. The pumping unit as described in the '213 patent may thus be used in conjunction with the downhole injector as disclosed herein to create a producing system that may operate at minimum cost, and without the expense and maintenance of an electrical gas powered motor drive unit at the surface. [0058]
  • Another modification to the system shown in FIG. 3 will be to provide another [0059] check valve 25 above the packer 44, and one or more tubes 52, open to the tubing TS directly below a disk or plug in the tubing below ports 40, which provide fluid communication from above the check valve to the annulus above the packer. Any gas in solution which does enter the interior of the injector may thus pass through the check valve 25 and then the discharge tube 52 to move upward to the working fluid level rather than passing through the standing valve and to the pump. Gas is then discharged into the chamber below the liquid level LL but above the ports 40, so that the gas migrates upward to the liquid level LL and into the gaseous annulus above that level. Liquid, on the other hand, enters the pump P from the annulus at a position below the discharge from the one or more tubes 52, so that little if any gas flows from the annulus into the pump during its operation.
  • In another embodiment of this fluid reversal concept and which serves the purpose of [0060] tubes 52, the check valve 25 may be located below injector head 34 within a short sub essentially having the diameter of tubing TS. This sub with check valve 25 would be directly connected to tube 16. Above head 34, another tubing sub of a length of at least 6 to 10 feet would contain a vertical divider which creates two flow passages: one closed at the top to the production tubing string and ported to the annulus at its topmost location and open at the bottom to the flow from injector 54, and the other closed at the bottom to the flow from the injector 54 and having ports open to the annulus at the bottom and open at the top to standing valve 24.
  • Efficient Gas Production
  • It should also be understood that gas production from the reservoir may also be allowed according to this invention. [0061] Tube 46 through the packer 44 as shown in FIG. 3 extends to above the expected liquid level LL to allow for gas flow. The check valve 48 at the top of the tube 46 prevents liquid reentry below the packer. By applying back pressure control on the vent tube 46 via a spring mechanism 50, a lower annulus pressure above the liquid may be maintained to create a pressure differential for the desired liquid level and fluid flow, as well as a controlled relief of reservoir gas from formation F and below the packer 44 to above the liquid level LL and to the annulus A between the tubing and the casing. Various other fluid reentry and reversal mechanisms not shown in FIG. 3 may also be used in conjunction with the vent tube 46.
  • Moreover, the system as shown in FIG. 3 may be used in dewatering applications for gas wells. As previously noted, providing a reservoir above [0062] packer 44 lets formation pressure move liquid independently of pump output. The pump P may thus be stopped when liquid level drops, while the formation keeps producing. This particular configuration also provides a method of desirably pumping liquid accumulations off of a gas well and thus increase gas production. The liquid may be condensate (a liquid gas), or may be condensate combined with water. In the case of condensate accumulation, the liquid reservoir provides a superior method of pumping compared to prior art techniques. As discussed above, vaporization leads directly to gas locking problems for the pumping operation (both in oil wells and gas wells with condensate and/or oil). The technique of this invention desirably avoids vaporization and reduces pumping inefficiency. As for water accumulation, water may accumulate in the vertical reservoir above the packers 44 and be efficiently pumped off rather than build up around the perforations of the gas producing formation where the water may cause an undesirable spray-type disturbance in the well annulus. The injector as shown in FIG. 3 may also be used in conjunction with horizontal wells as described subsequently to obtain and enhance recovery and improve reservoir performance. The system of this invention is also more accommodating to gravel packed wells since it reduces fluid inflow velocity and wellbore damage.
  • Improved Reservoir Performance
  • By improving the features and operation of the injector as described above, significant benefits may be obtained by retaining in situ formation natural gas or injected gas within the reservoir to effect increased recovery of liquid hydrocarbons. Rather than use the natural gas energy to immediately produce high quantities of hydrocarbons and thus deplete the formation, the concept of the present invention retains the energy of the natural gas as a driving fluid to achieve desirable initial liquid hydrocarbon flow rates and significantly higher long-term liquid hydrocarbon flow rates compared to prior art techniques, without damaging the reservoir. The basic concept of the method according to the present invention may be shown with respect to FIG. 4, which depicts an idealized vertically thick reservoir with the oil bearing formation F having a good continuous vertical permeability, and with either initial gas cap GC or highly saturated crude above the formation that forms a secondary gas cap with pressure reduction. According to conventional practice, the lower part of the formation would be open to the reservoir and hydrocarbons would be produced at the highest rate possible along with the gas. This action would quickly deplete the near wellbore liquid zone as the gas would tend to cone towards the pressure depleted zone, driving oil into the well. This conventional coning would result in a gas to liquid interface as shown in dashed lines in FIG. 4. This coning is highly undesirable since it significantly reduces the ultimate oil recovery and prematurely depletes the gas reserve. Coning is thus avoided or at least minimized according to the techniques of the present invention. [0063]
  • As shown in FIG. 4, a [0064] packer 44 is provided in the annulus between the casing C and the production tubing string TS. The casing above the formation F, including the gas zone, is also perforated. Gas in the wellbore below the packer 44 and above the liquid level LL returns to aid the gas cap, and is kept out of the tubing string TS by the injector 54. According to the present invention, gas is refused entry into the wellbore due to the operation of the injector 54 (which may have the features of the injectors previously described), and thus gas may stay within the reservoir. This scenario forces the reservoir to maintain a substantially horizontal interface between the liquid hydrocarbons in the formation F and the gas cap GC, which acts on the liquid from the top down and tends to aid gravity drainage of the liquid down and then laterally into the wellbore.
  • It should be apparent to those skilled in the art that not all reservoirs will respond to this forced gas drive mechanism as described above. Liquid producing rates would likely be lower initially as the gas drive acceleration and natural gas lift is eliminated. By forcing the return of gas from the top of the wellbore back into the gas cap within the same well, optimum resistance-free completions and pressure differentials adequate to drive the gas back into the formation will be required. This desired pressure differential may be generated by pressure below the [0065] packer 44 and in the gas zone GC reflecting the higher pressure at the bottom of a liquid column in and near the injector 54, wherein said higher pressure results from the hydrostatic head of liquid in a relatively thick formation. It will be described later how the return of produced gas in the wellbore may be accomplished or aided by other mechanical means.
  • A pressure differential from the wellbore to the formation may be created in the upper part of the gas column within the wellbore by the rising liquid column which builds after the injector closes to shut in the gas. That pressure differential will try to displace gas back to the formation, although that pressure differential is typically quite small and, except for applications with thick reservoirs of several hundred feet or more, the formation may not be sufficiently permeable for gas to go back into the reservoir. A small pressure differential may thus not effectively prevent continued gas build up in the wellbore. The liquid/gas interface may thus move relatively quickly downward to the injector intake, while the interface would likely rise very slowly to cause only intermittent opening of the injector. Reservoir studies may be necessary in some applications to define the requirements and physical characteristics of reservoirs that will be conducive to the improved performance according to the present invention, and to analyze the relative economics of the present invention compared to conventional hydrocarbon exploration and recovery techniques. Many reservoirs should, however, benefit from the concepts of the present invention and will result in significantly improved performance. [0066]
  • The concepts of the present invention may also be extended to applicable reservoir situations for secondary and tertiary recovery by maintaining gas in the reservoir according to the present invention and then adding gas with a conventional secondary or tertiary injection operation. Thus the concepts of the present invention and the maintenance of the formation gases when combined with injected gases, such as carbon dioxide, nitrogen, natural gas or steam, may further assist in recovery of hydrocarbons. Applicable gas driving mechanism may thus be initiated or enhanced in older reservoirs in which the natural gas has been substantially depleted. The injector of the present invention will, of course, also tend to maintain any injected gas in the formation rather than recovering the ejected gas to the surface and then again reinjecting the gas. FIG. 5 depicts a secondary or tertiary recovery operation with an [0067] injector 54 in the lower part of a wellbore. A gas injection string 56 extends from the surface downhole through the packer 44 to supply pressurized gas to the gas cap GC. A check valve 57 optionally may be provided at the lower end of the injection line 56, and possibly within the packer 44, to prevent fluid from flowing upward past the packer through the injection line 56. Conventional compressors (if needed) would typically be provided at the surface for this gas injection operation. FIG. 5 thus depicts gas supplying the cap GC both from the lower part of the wellbore where gas is prohibited from entering the tubing string TS by the injector 54, and from the gas above the liquid level LL which is input to the wellbore and to the gas cap GC by injection string 56. It should be understood that such gas injection could also occur through a separate well as is the case in many gas reinjection, re-pressuring projects, or gas storage reservoirs. The pump P as previously described is not shown in FIGS. 4 and 5, but in many applications a downwhole pump will be provided above the injector 54 for pumping fluids to the surface through the production tubing string TS.
  • Liquid hydrocarbons may thus be recovered according to the present invention from an underground formation without producing natural gas with the liquid hydrocarbons. By positioning the injector as described above downhole in the wellbore adjacent to the producing formation, the pressure energy of the gas will be maintained to flow the liquid hydrocarbons into a producing tubular string and then to the surface. Such a system may have sufficient gas pressure to lift or flow a column of liquid to the surface without the use of an artificial lift system, so that the system comprises only a production tubing string and a downhole injector. The injector may be open to the producing formation and operated within the casing string for retaining gas in the formation. The entire annular area between the tubing and the casing may thus be exposed to formation fluids at essentially formation pressure. The flowing bottom hole pressure of gas and liquid at the intake to the injector may thus be the energy sufficient to move liquids through the injector and through the production tubing string to the surface. [0068]
  • Flowing oil wells are commonly assisted by the incorporation of gas in the liquid column, either as slugs from the formation or as gas breakout through pressure production as the liquid rises within the tubing. Such gas incorporation reduces the average density of the flowing fluid and thereby requires less fluid pressure energy to lift the hydrocarbons to the surface. Separating gas at the bottom of the wellbore by the injector according to this invention may thus increase the average density of the flowing fluid and may thus require a higher pressure to lift the fluid. [0069]
  • In open annulus wells as described above, the injector may separate liquid from gas within the wellbore and flow liquids to the surface while also providing gas formation pressure exceeding the hydrostatic head of the fluid column, plus the flow line back pressure. Such configuration is not common because it is generally not desired to expose the annulus and thus expose the casing itself to higher formation pressures. Thus wells with formation pressures high enough to flow, and particularly deeper wells, are generally equipped with a packer or sealing device located at the bottom of the tubing string to seal the annulus between the casing and the tubing and thereby isolate formation pressure from below the packer and within the tubing string. The annular volume in deep, high pressure wells may be substantially filled with brine or another heavier-than-water liquid containing a corrosion inhibitor. Such fluids and attended monitoring schemes assure that high pressure does not leak into the annulus. In wells with a packer which seals with the annulus, the injector according to the present invention may still be used to separate liquid and gas and thus conserve the gas and its associated energy within the casing. FIG. 4 thus illustrates this concept, with the injector located below the packer. The [0070] vent tube 46 as discussed above need not be provided for the embodiment shown in FIG. 4. The gas energy may still be used to flow the liquid hydrocarbons to the surface.
  • The injector of the present invention may thus be used adjacent to a producing formation and in a flowing well to avoid producing natural gas. By providing the [0071] injector 54 below a packer 44 in high pressure wells, the annulus between the tubing and the casing may be sealed from formation pressure. The injector 54 below the packer may also be used in a well produced by an artificial lift system, wherein the artificial lift method is a closed loop gas lift operated with minimum need for supplemental gas from the formation. The injector of the present invention may thus be used in numerous applications where gas production is undesired, wasteful, or prohibited.
  • FIG. 6 illustrates another application using the [0072] injector 54 of this invention. In this application, a thick reservoir includes a lower oil bearing formation F and an upper gas cap GC. The injector 52 is suspended in the well from a production tubing string TS. A packer 44 is provided to seal the annulus between the tubing string TS and the casing C at a position above the gas cap GC. The injector 54 prevents entry of gas into the tubing string so that gas moves upward in the annulus to rise above the liquid level LL and reenters the formation. The gas cap moves downward from the interface shown in dashed lines to the interface shown in solid lines, and thereby moves the liquid down and toward the well without coning. Crossover ports 88 in the tubing string TS above the packer 44 allow communication back to the annulus. Standing valve 24 is provided above the crossover ports 88, and the pump P powered by rod string R is then provided above the standing valve. The annulus above the packer 44 thus obtains a working flow level for efficient operation of the pump P, as previously described.
  • The above-described systems, in conjunction with the [0073] injector 54, allow the formation to produce sufficiently without gas breakthrough or coning, yet utilizes formation gas to assist in the flowing and/or artificial lift at the well, This downhole system may allow for the bleed off of a controlled amount of formation gas entrapped by the producing system to allow the efficient production of liquids from the formation, as will be described. The downhole system may also maintain an optimum predetermined pressure differential between the wellbore and the formation. As noted above, a packer may be used in many applications, but need not always be provided. Formation gas may thus be effectively utilized to help lift liquids from the well in a manner which uses the advantages of producing a well with a downhole injector but permits only liquid production through the injector.
  • A variation of the above described embodiment incorporates gas lift with a [0074] packer 44 in the annulus between the tubing and the casing, as shown in FIG. 7. This system utilizes gas lift valves LV positioned along the tubing string TS and above the packer to help produce liquid from the liquid injector to the surface. The surface equipment depicted in FIG. 7 includes a surface liquid/gas separator unit 66 with a liquid hydrocarbon flowline 68 extending therefrom. Gas from the separator 66 may flow via line 70 to compressor 72, which in turn is powered by gas engine 74. The pressurized gas is then circulated in a direct loop, and may be discharged back into the well to act on the lift valves LV and help bring the liquid hydrocarbon to the surface. A further explanation of the lift valves LV is discussed below.
  • The system as shown in FIG. 8 uses a [0075] lower packer 44 and an upper packer 78 to create a chamber 80 in the annulus between the tubing and the casing. This chamber may be fluidly connected to the wellbore below the lower packer 44, which is open to the formation F, by a vent line 82. As shown in FIG. 8, the lower packer 44 thus incorporates a tube 82 with a check valve 84 at its upper end. This tube 82 allows the release of formation gas to the chamber 80, so that gas pressure builds up above the lower packer 44. The check valve 84 prevents communication from the chamber 80 back to the formation and closes the chamber 80 so that a gas charge may be built up for the gas lift process. Within the chamber 80, one or more lift valves LV may sense and maintain pressure in the chamber 80 at a level sufficient to create the desired differential from the reservoir to the wellbore. Accordingly, when pressure builds above this level, formation gas is discharged from the chamber 80 to the tubing and thus to the surface. Additional lift valves in the chamber may sense the level of liquids rising in the tubing and open to lift the liquid upward to an upper gas lift valve.
  • A significant advantage of the system as shown in FIG. 8 is that gas production may be controlled and utilized for lifting purposes, but no free gas is allowed to flow into the open tubular through the [0076] injector 54. The gas lift valves LV allow for such pressure control in the lower chamber 80 and sensing of fluid slugs S in the tubing string TS. Conventional gas lift technology is thus combined with the injector 54 of the present invention to permit only the flow of liquids from the reservoir and retain gas cap pressure to enhance gravity flow. Moreover, the system as shown in FIG. 8 provides for the controlled bleed off of gas pressure under the lower packer 44 within the wellbore and directly utilizes that bled off gas to help the lift valves 86 to produce the desired liquid from the tubing string.
  • Two gas lift valves are shown within the [0077] chamber 80, but those skilled in the art will realize that additional gas valves may be desired or necessary for additional volume. The upper valve, which is commonly known as a casing pressure operated valve, will typically be set by internal bellows precharging to a known pressure and will thus act as a regulator. This will ensure that pressure in the chamber 80 and the corresponding wellbore pressure will never exceed the desired wellbore pressure limit selected by the productivity index analysis for optimum reservoir fluid inflow. This upper regulator valve will thus open and discharge gas into the tubing when chamber pressure exceeds its predetermined setting. Gas discharged into the tubing will aid in lifting any liquid within the tubing to the surface. The lower lift valve, which is the tubing pressure controlled valve, is designed to open at a preselected internal tubing pressure reached by the increasing column of liquid above this valve. When the injector allows sufficient inflow, the lower gas lift valve opens, then gas buildup in the chamber 80 suddenly flows under the liquid slug, lifting the liquid farther up the tubing string. These gas lift valves are also commonly referred to as intermitting valves.
  • The combination of injector and gas lift valves as described above may also be incorporated into an artificial lift system in which the primary lift mechanism is the closed system operating with gas lift valves above the upper packer. In operation, liquid slugs may be partially lifted by the relief formation gas coming from the lower chamber to be picked up by the main [0078] gas lift system 86 above the upper packer 78, so that the liquid slug is carried to the surface. Accordingly, the formation F and chamber 80 may be maintained at a pressure of, e.g., 1,000 psi, or approximately 500 psi below shut-in reservoir pressure. This 1,000 psi will be available to the lower chamber valve to assist in lifting liquid slugs when it is activated to do so. The main lift valves 86 may be responsive to annulus pressure above the upper packer 78, required to assist in driving the liquid slugs S to the well head W. Conventional liquid/gas separation, processing, and decompression mechanisms provided at the surface may extract the desired liquids and recycle the gas through the artificial lift system. The system components 66, 68, 70, 72 and 74 were previously described. Excess gas introduced from the formation and input to the tubing string from the lower relief chamber 80 may be partially utilized as fuel for the compressor prime mover 74, which reduces the gas produced by the well system. Reservoir and facility engineering calculations may be used to determine the estimated amount of formation gas to be utilized to achieve the desired well productivity. Site specific conditions will influence the design to properly utilize any excess produced gas, whether for sales line, minimal flaring or reinjection into another zone or well. By using known reservoir and gas lift engineering techniques, the system of the present invention may be designed to maintain a desired pressure differential between the interior of the wellbore and the formation to create the desired reservoir fluid inflow.
  • Flowing Well Applications
  • As previously noted, the liquid injector of the present invention may be used in artificial lifted wells. By obtaining the significant advantages of retaining in situ gas within the reservoir, however, the liquid injector may contribute to liquid hydrocarbon recovery from a high pressure flowing well which will have sufficient bottom-hole pressure to lift a column of reasonably light fluid to the surface. In an isolated recovery location, systems for handling produced gas would thus not be necessary, thereby retaining the reservoir in an ideal condition. In one application, a high pressure well may have the annulus between the tubing and casing open to the reservoir. In another application, the [0079] downhole packer 44 as shown in FIG. 4 may be placed in the annulus between the tubing and the casing. If desired, the annulus above the packer 44 may be filled with a protective fluid, such as a drilling mud or a completion fluid.
  • FIG. 9 depicts high pressure gas acting downward on the formation liquid through the gas cap GC and forcing the formation liquid into the [0080] injector 54. The system as shown in FIG. 9 has a high pressure in the formation to result in a free flowing well. Liquid hydrocarbons thus pass upward in the tubing string to the wellhead W at the subsurface without artificial lift. The system may thus be operated without a packer between the tubing and the casing, as shown in FIG. 9, for assisting in recovery from a flowing well which does not utilize artificial lift. Liquid hydrocarbons may thus flow out the line 58 from the wellhead W. Gas in the annulus A between the tubing string TS and the casing C may be maintained at a desired pressure by regulator 64 at the surface. This pressure may be monitored by gauge 62, and is ideally maintained at a safe yet sufficiently high level to maintain the well in a free flowing condition. Excess gas may be economically recovered through regulator 64.
  • Horizontal Well Applications
  • The techniques of the present invention are also applicable to horizontal wellbore technology, wherein one or more horizontal bore holes or laterals are drilled from and connected to a substantially vertical well. Horizontal well technology may provide a variety of downhole hydrocarbon recovery configurations. This technology has the significant advantage of creating a longer and more effective drainage system through the reservoir than conventional vertical well technology. The injector of the present invention may be applied in many of these applications to offer substantial advantages over conventional vertical well hydrocarbon recovery techniques. [0081]
  • A horizontal wellbore is generally parallel to the formation and may thus be drilled and completed so as to be open to a producing formation over a relatively long distance. The horizontal wellbore or lateral thus has a much greater opportunity to collect reservoir fluids for production to the surface, and productivity for horizontal bore holes accordingly may be substantially increased over conventional vertical wells. Horizontal wellbore technology thus may recover a greater percentage of the oil and gas from reserves compared to conventional vertical wellbore technology. To accommodate the high volumes of fluid that may be produced by the horizontal bore holes or laterals, the vertical well with the injector therein should be large enough to accommodate sufficiently sized tools of the present invention and match the anticipated fluid production. [0082]
  • Various types of artificial lift systems may be used in conjunction with the injector and the horizontal wellbore technology. Pressure within the annulus of the well may be controlled from the surface, as explained above, to control the producing bottom hole pressure in each of the one or more wellbores positioned within the producing zone. As previously noted, a packer may be used above the producing zone to isolate the annulus between the tubing and the casing for producing fluid, with the injector then being provided below the packer. A system with an injector may thus be reliably used for high pressure flow in horizontal well applications. The injector as described above utilizes a float concept such that the injector may be installed and operated in a near-vertical position. This limitation does not limit the use of this technology in horizontal well applications, however, as shown in FIGS. 10, 11 and [0083] 12. Moreover, a modified float system or a density sensor could be provided downhole for sensing the presence of liquids or gas, and the shutoff valve could be electrically, hydraulically or mechanically actuated in response to this modified float system or density sensor so that the injector operation need not be limited to a vertical or near-vertical orientation in the wellbore.
  • The liquid injector according to the present invention thus may be below or above the horizontal laterals and within the vertical portion of the well. The horizontal configuration of the producing wells as described above may be used to improve recovery by gravity drainage as previously described, and there are distinct advantages achieved by retaining gas energy within the formation in horizontal well applications. In FIG. 10, the horizontal well intersects the vertical well above the [0084] injector 54. The gas cap GC forces the oil downward for collection by the horizontal bore hole. Packer 44 serves its previously described purpose of preventing the gas from moving up in the well annulus, and thus assists in maintaining the desired gas cap GC. Accordingly, the casing C may be perforated in the zone of the gas cap GC and above the liquid level LL. Pump P drives the oil to the surface and, for this application, is preferably a high volume electric submersible pump P to pump large flow rates of oil through the tubing string TS. Conventional electric submersible pump configurations would require the addition of ports 40 and 88 as shown in FIGS. 3 and 6 to allow fluid flow past the pump motor for cooling.
  • As shown in FIG. 10, one or more horizontal laterals may be drilled from a substantially vertical wellbore within a single substantially horizontal plane. One or more horizontal laterals may thus each be initiated from a vertical hole by a pilot hole utilized to start the horizontal bore hole. A pilot bit may be used to cut a hole in the casing and start the horizontal lateral. The pilot bit may then be retrieved and a conventional drilling tool used to result in the horizontal bore hole. A retrievable whipstock may be used so that the kick off tools do not interfere with the subsequent placement of the injector in the bore hole. If a cement plug is positioned on the vertical portion of the bore hole, the plug may be drilled out after the horizontal bore holes are completed. [0085]
  • FIG. 11 illustrates a horizontal bore hole drilled in formation F below a gas cap GC as a continuation of the vertical boreholes. The oil enters through a screened liner SL, typically operating within a gravel-packed borehole. A variety of horizontal drilling technologies may be used with the concepts of the present invention. Both horizontal and highly angled holes extending from the existing wellbore may be used to increase the area of drainage. Conduits commonly referred to as drain holes may be configured as a variety of jet drilled perforations or larger boreholes, or short-radius drilled holes may also be used in conjunction with the injector of the present invention. [0086]
  • After drilling the laterals, the [0087] injector 54 may then be located within or above the producing formation and in the vertical portion of the wellbore. As shown in FIG. 11, the non-vertical wellbore lateral is provided below the injector 54 and will thus be open to the producing fluids. This configuration allows for the drilling and completion of the horizontal wellbore below the vertical section of the well. The wellbore may be completely cased or cemented down to at least the producing formation, thereby positively containing fluid within the formation. In wells requiring artificial lift, the injector and the intake to the pump P may be located at a level sufficiently low relative to the producing formation such that the available reservoir pressure in the formation may lift liquids to at least the level of the pump. The reservoir characteristics would thus determine the relative height at which the injector and pump would be set, which in turn would determine the horizontal drilling and completion characteristics. To locate injector 54 as close to the producing zone as possible will require use of existing shorter-radius horizontal drilling and completion techniques. The annulus A above the pump may be pressure controlled at the surface to monitor the desired liquid level LL. Liquid hydrocarbons from the pump P are thus produced to the surface through the production tubing string TS.
  • Another example of horizontal well technology is shown in FIG. 12, wherein a second layer of horizontal wellbores or laterals extend from the vertical wellbore which contains the [0088] injector 54. The upper wellbore lateral may be located within a gas zone and above the relatively thick liquid bearing formation F. The injector 54 acts to circulate separated gas back to the reservoir and return energy to the reservoir for driving oil from the formation rock. By retaining the gas in the formation and separating the gas downhole, expensive equipment and techniques involving the recovery of the gas energy and the subsequent reinjection of the gas back into the formation are thus avoided. It is understood that more than one wellbore may be extended laterally from the vertical-wellbore in both the gas cap and the producing formation and in different directions to encompass a larger drainage area. This technique is commonly referred to as using multi-laterals.
  • By using the liquid injector of the present invention in conjunction with one or more laterals or otherwise substantially horizontal wellbore fluid conduits which extend a long distance into producing formation, the productivity from the well may be substantially enhanced. The injector may be used to freely transmit liquids into the production tubing string while preventing the entry of gas to the surface. By providing the injector at or near the level of the producing formation and within the essentially vertical bore hole which is open to one or more horizontal laterals, liquid production from one or more horizontal bore holes may significantly increase and free gas is provided back through the producing formation, optionally to one or more separate horizontal bores or conduits at a level higher within the formation. FIG. 12 thus discloses another possible advantage of using the horizontal well completion technology with a second bore hole positioned in the gas cap to facilitate gravity drainage by enhanced gas pressure in the gas cap. The enhanced gas cap maintained by the upper lateral in the upper part of the reservoir thus contributes to the production of the liquids from the lower lateral. By providing a packer in the well as shown in FIGS. 10 and 12, the techniques of the present invention may be self-sustaining by the forced return of gas to upper zones. [0089]
  • FIG. 12 illustrates how the [0090] injector 54 may be used in a vertical section of the well which has one or more horizontal bores each drilled from different levels. Combining an injector of the present invention with high productivity from lateral wells while also retaining the reservoir gas energy downhole is an effective approach to maximize hydrocarbon recovery. Various types of pumps such as an electric submersible pump may be used in combination with an injector to create an efficient and high-volume producing well. As shown in FIG. 12, a horizontal bore hole through an upper section may be used to convey injected gas deep into the reservoir for a more effective drive mechanism to the horizontal producing wellbore. This system with upper and lower horizontal wellbores would circulate and retain gas which is prevented from moving into the tubing string by the injector and thus is maintained in the downhole formation. As previously disclosed, the gas pressure below the packer 44 may maintain a desired liquid level LL in the annulus above the packer, with the crossover ports 88 above the packer serving the purpose previously described.
  • A system similar to that shown in FIG. 12 provides for strongly enhanced recovery using secondary or tertiary recovery methods through which pressure depleted reservoirs could be made to produce at higher levels. Using two horizontal bore holes from different vertical wells,.gas from the surface may also be used to assist the driving concept. The [0091] injection line 56 thus extends from the surface through the downhole packer 44 to assist in maintaining an effective gas cap GC. Check valve 57 optionally may be provided along line 56 to limit gas flow along line 56 to the downward direction. The concepts of the present invention may also be applicable to a version of “huff and puff” recovery technology in which gas is injected for a period of time then suspended while liquid buildup is produced. The gas zone for pressurizing could be injected from an offset well, preferably located structurally close to the recovery well.
  • In a dual packer embodiment used with horizontal technology, the tubing regulator mechanism may be used to control and trap gas relief from the wellbore into the chamber between the packers and thus provide the desired pressure differential from formation to wellbore, while the injector prevents free gas production. Gas in the chamber between the packers may further act as the first lifting stage for slugs of liquid entering the tubing. The injector of the present invention may thus substantially assist the productivity of horizontal wells by utilizing the free gas prevented from going into the tubing string by the injector to enhance liquid production. In an alternate embodiment, a packer is positioned in the wellbore between the upper gas injector laterals and the lower fluid recovery laterals. [0092]
  • Various other embodiments may be possible utilizing the injector of the present invention. The entire reservoir may be open to the wellbore, and the formation isolated only below the packer. Only liquid may be produced through the liquid injector and gas recirculated back to the gas zone. The gas may also be injected through the packer to replenish gas energy as previously described. Gas re-entry into the gas zone is facilitated by the use of horizontal lateral boreholes connected with the wellbore below the packer. The liquid injector of the present invention may thus be incorporated into existing or planned field gas injection programs to help control gas breakthrough. [0093]
  • A significant feature of the injector and packer configuration according to this invention, which is mentioned briefly above, is the reduced risk of a well blowout. Gas is not free to escape from a pump assisted well which includes the injector as disclosed herein. Only the small amount of gas above the packer, the oil above the pump and solution gas in liquids that do pass through the injector would be available fuel for any blowout. Accordingly, a well including the injector and the technology of this invention may be more easily controlled if a blowout does occur. [0094]
  • While the concepts of the present invention may work in various types of wells, retaining gas within the reservoir and recovering a high percentage of oils by gravity drainage is most effective for use in thicker reservoirs in which a cap gas or solution gas breakout is otherwise used as a mechanism to enhance early production to the detriment of a longer, but more productive oil recovery. By using the benefits of the injector and the downhole gas shutoff as described herein, the proper reservoir conditions may be identified and the recovery from the reservoir optimized. Ideally, the reservoir is relatively thick and has good vertical permeability. This provides a good mechanism for returning gas to the gas cap and enhancing the gravity drainage system. If gas were produced to create the optimum drawdown pressure in the annulus, then the gas may be re-injected back into the reservoir for conservation, and inefficient coning in the producing well still controlled. The effectiveness of the system with nitrogen, carbon dioxide and other injected gases is also practical. [0095]
  • The foregoing disclosure and description of the invention are thus explanatory thereof. It will be appreciated by those skilled in the art that various changes in the size, shape and materials, as well in the details of the illustrated construction and systems, combination of features, and methods as discussed herein may be made without departing from this invention. Although the invention has thus been described in detail for various embodiments, it should be understood that this explanation is for illustration, and the invention is not limited to these embodiments. Modifications to the system and methods described herein will be apparent to those skilled in the art in view of this disclosure. Such modifications will be made without departing from the invention, which is defined by the claims. [0096]

Claims (71)

What is claimed is:
1. A system for producing and recovering liquids at the surface of a well in fluid communication with a downhole gaseous and liquid hydrocarbon formation, the liquids being produced and recovered through a production tubing string within a wellbore, the system comprising:
the wellbore being perforated for fluid communication with the downhole hydrocarbon formation both above and bellow a gas-fluid interface separating hydrocarbon fluids from a gas cap above the fluids;
a surface gas flow pressure regulator and a surface pressure gauge on the casing well head annulus exit port for respectively controlling gas flow and pressure and measuring pressure while maintaining a predetermined flow pressure on the wellbore annulus;
a downhole injector for passing formation fluids by pressure differential through the injector and into the production tubing string while preventing gases from passing through the injector;
a downhole pump positioned within the production tubing string above the injector for pumping liquids to the surface;
the downhole pump for efficiently pumping liquid inflow through the production tubing string to the surface of the well; and
the wellbore with maintained direct fluid communication between the well and a formation gas zone and between the well and a formation hydrocarbon liquid zone beneath the gas zone, such that such gas pressure acts as a cap on the formation liquids to force the liquids out of the formation and through the injector toward the surface.
2. The system as defined in claim 1, further comprising:
the downhole injector being positioned relative to the downhole opened hydrocarbon formation so that all incoming liquid hydrocarbons are efficiently and completely removed from the wellbore into the lower pressure production tubing string on to the surface for increased gaseous and liquid hydrocarbon recovery.
3. The system as defined in claim 1, further comprising:
wherein the well has a surface gas flow meter for continually and comparatively measuring and monitoring the formation gas flow production, pressure and recovery for the most effective optimum gas flow pressure at the surface and periodically making and observing fluid level and gas-oil ratio test, while continually and comparatively measuring and monitoring the production and recovery of formation liquids through a surface metering facility for a combined total maximum gaseous and liquid hydrocarbon production and ultimate recovery, throughout the reservoir's formations total gaseous and liquid hydrocarbon recovery life for maximum hydrocarbon reserve value.
4. The system as defined in claim 1, further comprising:
the surface gas flow pressure regulator and the surface pressure gauge for continually and controllably and comparatively regulating flowing formation gas production and pressure at a controlled flow pressure to retain a predetermined optimum formation gas pressure in an annulus about the production tubing string, and thereby on and within the downhole opened hydrocarbon formation, such that the gas pressure prevents solution gas within the liquid hydrocarbon in its formation and the wellbore from breaking out of solution, whereby maintaining its expulsive force, high mobility and low viscosity, and acts as a driving force to pass pressured higher pressure hydrostatic head liquids out of the formation and through the injector by pressure differential up into the lower pressure production tubing string to recover formation liquids at the surface, wherein total in place liquid hydrocarbons are maintained highly fluid and recoverable, thereby increasing related liquid hydrocarbon reserve value.
5. The system as defined in claim 1, further comprising:
the wellbore annulus with a maintained predetermined formation gas pressure such that gas pressure acts as a driving force on all liquids to pass them through the injector by pressure differential up into the lower pressure production tubing string for formation fluid recovery at the surface, so that a liquid level is maintained in the wellbore at the injector liquid in take level for maximum free gas and pressurized fluid flow from all opened hydrocarbon formations for maximum gaseous and liquid hydrocarbon recovery, whereby total gaseous and liquid hydrocarbon reserve recoverability and related value is increased.
6. The system as defined in claim 1, further comprising:
the wellbore with maintained gas pressure in the annulus above the downhole injector intake liquid level as a driving force to maintain a predetermined liquid level in the lower pressure production tubing string for maximum artificial lift efficiency of incoming liquids on to the surface.
7. The system as defined in claim 1, further comprising:
one or more gas lift valves as an alternative means for lifting liquids positioned along the production tubing string above the downhole injector for selectively, at a predetermined pressure, passing annulus gases through the production tubing string to raise incoming liquids in cycles as slugs of liquid to the surface through the production tubing string.
8. The system as defined in claim 1, further comprising:
the wellbore opened with one or more horizontal and alternatively highly angled boreholes in a gas zone for maximum zone exposure and increased gas flow and recovery.
9. The system as defined in claim 1, further comprising:
the wellbore opened with one or more horizontal and alternatively highly angled boreholes in a liquid hydrocarbon zone for maximum zone exposure and increased liquid hydrocarbon flow and recovery.
10. The system as defined in claim 1, further comprising:
a check valve in the tubing string above the top of the injector; and the injector including an injector housing having a nominal outer diameter, a fluid responsive float open at the top and closed at the bottom and moveable with respect to the injector housing as a function of fluid density surrounding the float, and a shut off valve member moveably responsive to the float for engagement with a shut off valve seat, the shut off valve member being spaced vertically below inside the injector housing from the check valve.
11. The system as defined in claim 1, wherein the injector includes a sleeveshaped filter screen for restricting at least 90% of solid particles of 30 microns or greater from passing through the filter screen.
12. The system as defined in claim 1, further comprising:
the well head surface gas flow pressure regulator for closing off the release of gas flow and pressure from the opened gas formation of an opened hydrocarbon reservoir with a considerably high percentage of liquid hydrocarbons, in an annulus of the vertical wellbore and connecting horizontal and deviated wellbore annuluses, and the surface pressure gauge for measuring the surface wellbore annulus pressure, while simultaneously producing and recovering and monitoring at the surface production tubing string discharge all incoming liquid hydrocarbons entering the wellbore, so that previously incoming formation gas above the incoming liquids in the wellbore is maintained in the open gas zone, whereby conserving in place gas volume and pressure by the incoming liquid's greater hydrostatic head pressure which drives it through the downhole injector by pressure differential and into the lower pressure production tubing string on toward the surface for maximum liquid hydrocarbon production and ultimate recovery from a hydrocarbon formation.
13. The system as defined in claim 12, further comprising:
the surface gas flow pressure regulator for closing off the wellbore annulus at the well head exit port such that all gases which are prevented from flowing and from entering the production tubing string by the injector are retained downhole within the opened upper gas zone for storing gases there for future production by the incoming higher pressure formation liquids in transit through the wellbore into the injector to be produced and recovered through the lower pressure production tubing string on to the surface, whereby maintained formation gas pressure assist by overhead pressure for the maximum production and ultimate recovery of hydrocarbon formation fluids from the opened lower liquid hydrocarbon formation, wherein total in place gaseous and liquid hydrocarbon reserve recoverability and related value is notably increased.
14. The system as defined in claim 13, further comprising:
the surface gas flow pressure regulator for closing off the wellbore annulus at the well head exit port throughout the complete production and total recovery of all in place liquid hydrocarbons until said production and recovery considerably declines, at such time converting over to total gas production by releasing the surface gas flow pressure to a full opened gas flow pressure at the surface gas flow regulator to efficiently produce and recover natural gas, whereby total in place liquid hydrocarbons have been recovered, leaving only the small quantities that stick to the formation rock pores as a thin film, and that are isolated in any formation structural traps, wherein in place gas is free to flow to the surface for total in place natural gas production and ultimate recovery, thereby recovering total in place liquid and gaseous hydrocarbons maintained and converted by this recovery process to be ultimately recoverable.
15. The system as defined in claim 1, further comprising:
the surface gas flow pressure regulator for completely closing a wellbore annulus at the well head exit port in a well that has no surface gas sales line such as to prevent surface gas flaring, so that all gases which are prevented from flowing and from entering the production tubing string by the injector are retained downhole within the opened upper gas zone by incoming higher pressure liquids in transit through the wellbore for storing gases there for future production, such that the upper gas zone is assisted by maintained overhead pressure for the production and recovery of all incoming liquid hydrocarbons which enter the wellbore by their greater hydrostatic head pressure driving them through the downhole injector by pressure differential on up into the lower pressure production tubing string toward the surface for maximum production and ultimate recovery of hydrocarbon fluids from the opened liquid hydrocarbon formation, whereby early total in place liquid hydrocarbon recovery is economically realized at low cost, wherein total in place gaseous and liquid hydrocarbon reserve value is significantly increased by becoming recoverable.
16. The system as defined in claim 15, further comprising:
the surface gas flow pressure regulator for controlling the wellbore annulus gas flow pressure at the wellhead exit port to produce and recover natural gas in a well that has installed a gas sales line during the complete production and total recovery of all in place liquid hydrocarbons, recovering said liquids by a predetermined gas flow pressure, such that gas is retained in solution within the recovering liquid hydrocarbons, so that said liquids are always maintained recoverable, until liquid hydrocarbon production and recovery considerably decline, at such time converting over to total gas production by releasing the surface gas flow pressure to a fully opened gas flow pressure at the surface gas flow regulator to efficiently produce and recover natural gas, whereby total in place liquid hydrocarbons have been recovered, leaving only the small quantities that stick to the formation rock pores as a thin film, and that are isolated in any formation structural traps, wherein in place gas is free to flow to the surface for total in place natural gas production and ultimately recovery, thereby recovering total in place liquid and gaseous hydrocarbons maintained and converted by this recovery process to be ultimately recoverable.
17. The system as defined in claim 1, further comprising:
the surface gas flow pressure regulator for controlling the wellbore annulus gas flow pressure at the wellhead exit port during the complete production and total recovery of all in place liquid hydrocarbons, recovering said liquids by a predetermined gas flow pressure, such that gas is retained in solution within the recovering liquid hydrocarbons, so that said liquids are always maintained recoverable, until liquid hydrocarbon production and recovery considerably decline, at such time converting over to total gas production by releasing the surface gas flow pressure to a fully opened gas flow pressure at the surface gas flow regulator to efficiently produce and recover natural gas, whereby total in place liquid hydrocarbons have been recovered, leaving only the small quantities that stick to the formation rock pores as a thin film, and that are isolated in any formation structural traps, wherein in place gas is free to flow to the surface for total in place natural gas production and ultimate recovery, thereby recovering total in place liquid and gaseous hydrocarbons maintained and converted by this recovery process to be ultimately recoverable.
18. A method of producing and recovering liquids at the surface of a well in fluid communication with a downhole gaseous and liquid hydrocarbon formation, the liquids being produced and recovered through a production tubing string within a wellbore, the method comprising:
providing a surface gas flow pressure regulator and a surface pressure gauge on the casing well head annulus exit port for respectively controlling gas flow and pressure and measuring pressure while maintaining a predetermined flow pressure on the wellbore annulus;
providing perforations in the wellbore for fluid communication with the downhole hydrocarbon formation both above and bellow a gas-fluid interface separating fluids from a gas cap above the fluids;
providing a downhole injector for passing formation fluids by pressure differential through the injector and into the production tubing string while preventing gases from passing through the injector;
positioning a downhole pump within the production tubing string above the injector for pumping liquids to the surface;
pumping liquid inflow efficiently through the production tubing string to the surface of the well; and
maintaining direct fluid communication between the well and a formation gas zone and between the well and a formation hydrocarbon liquid zone beneath the gas zone, such that such gas pressure acts as a cap on the formation liquids to force the liquids out of the formation and through the injector toward the surface.
19. The method as defined in claim 18, further comprising:
wherein the downhole injector is positioned relative to the downhole opened hydrocarbon formation in the wellbore so that all incoming liquid hydrocarbons are efficiently and completely removed from the wellbore into the lower pressure production tubing string on to the surface thereby increasing gaseous and liquid hydrocarbon production and ultimate recovery.
20. The method as defined in claim 18, further comprising:
continually and comparatively measuring and monitoring the formation gas flow production, pressure and related recovery for the most effective optimum gas flow pressure at the wells surface gas flow meter, and periodically making and observing fluid level and gas oil ratio test, while continually and comparatively measuring and monitoring production and recovery of formation liquids through a surface metering facility for a combined total maximum gaseous and liquid hydrocarbon production and ultimate recovery, throughout the reservoirs formations total gaseous and liquid hydrocarbon recovery life for maximum hydrocarbon reserve value.
21. The method as defined in claim 18, further comprising:
while recovering formation liquids at the surface production tubing string discharge, simultaneously flowing formation gas production and pressure at a regulated and controlled gas flow pressure at the surface gas flow pressure regulator with the surface pressure gauge to retain a predetermined optimum formation gas pressure in an annulus about the production tubing string, and thereby on and within the downhole opened hydrocarbon formation, such that the gas pressure prevents solution gas within the liquid hydrocarbon in its formation and the wellbore from breaking out of solution, maintaining its expulsive force, high mobility and low viscosity, and acts as a driving force to pass pressured higher pressure hydrostatic head liquids out of the formation and through the injector by pressure differential on up into the lower pressure production tubing string to recover formation liquids at the surface, wherein total in place liquid hydrocarbons are maintained highly fluid and recoverable, thereby increasing related liquid hydrocarbon reserve value.
22. The method as defined in claim 18, further comprising:
maintaining a predetermined optimum formation gas flow pressure in the wellbore annulus such that gas pressure acts as a driving force on all liquids to pass them though the injector by pressure differential up into the lower pressure production tubing string for formation fluid recovery at the surface so that a liquid level is maintained in the wellbore at the injector liquid in take level for maximum free gas and pressurized fluid flow from all opened hydrocarbon formations for maximum gaseous and liquid hydrocarbon recovery, whereby total gaseous and liquid hydrocarbon reserve recoverability and related value is increased.
23. The method as defined in claim 18, further comprising:
maintaining a wellbore gas pressure in the annulus above the downhole injector intake liquid level as a driving force to maintain a.predetermined liquid level in the lower pressure production tubing string for maximum artificial lift efficiency of incoming liquids on to the surface.
24. The method as defined in claim 18, further comprising:
continually measuring and controllably regulating the release of gas flow and pressure at the surface gas flow pressure regulator for the most effective optimum flow pressure in an annulus about the production tubing string throughout the reservoirs formations total gaseous and liquid hydrocarbon recovery life for maximum recoverability of all in place hydrocarbons to increase hydrocarbon reserve value.
25. The method as defined in claim 18, further comprising:
providing one or more gas lift valves as an alternative means for lifting liquids positioned along the production tubing string above the downhole injector for selectively, at a predetermined pressure, passing annulus gases through the production tubing string to raise incoming liquids in cycles as slugs of liquid to the surface through the production tubing string.
26. The method as defined in claim 18, further comprising:
opening a wellbore with one or more horizontal and alternatively highly angled boreholes in a gas zone for maximum zone exposure and increased gas flow and recovery.
27. The method as defined in claim 18, further comprising:
opening a wellbore with one or more horizontal and alternatively highly angled boreholes in a liquid hydrocarbon zone for maximum zone exposure and increased liquid hydrocarbon flow and recovery.
28. The method as defined in claim 18, further comprising:
positioning a check valve within a production tubing string above the top of the injector for preventing fluids which pass by the check valve from returning to the injector; and
the injector housing having a nominal outer diameter, a fluid responsive float open at the top and closed at the bottom and moveable with respect to the injector housing as a function of fluid density surrounding the float, and a shut off valve member moveably responsive to the float for engagement with a shut off valve seat, the shut off valve member being spaced vertically below inside the injector housing from the check valve.
29. The method as defined in claim 18, further comprising:
providing a sleeve-shaped filter screen across an inlet flow port of the injector for restricting at least 90% of solid particles 30 microns or greater from passing through the filter screen.
30. The method as defined in claim 18, further comprising:
providing the well head surface gas flow pressure regulator for closing off the release of gas flow and pressure from the opened gas formation of an opened hydrocarbon reservoir with a considerably high percentage of liquid hydrocarbons in an annulus of the vertical wellbore and connecting horizontal and deviated wellbore annuluses, and the surface pressure gauge for measuring the surface wellbore annulus pressure, while simultaneously producing and recovering and monitoring at the surface production tubing string discharge all incoming liquid hydrocarbons entering the wellbore, so that previously incoming formation gas in the wellbore above the incoming liquids is maintained in the opened gas zone, thereby conserving in place gas volume and pressure by the incoming liquid's greater hydrostatic head pressure which drives it through the pressure drop in the downhole injector and through the lower pressure production tubing string on to the surface for maximum liquid hydrocarbon production and ultimate recovery from a hydrocarbon formation.
31. The method as defined in claim 30, further comprising:
providing the surface gas flow pressure regulator for closing off the wellbore annulus at the well head exit port such that all gases which are prevented form flowing and from entering the production tubing string by the injector are retained downhole within the opened upper gas zone for storing gases there for future production by the incoming higher pressure formation liquids in transit through the wellbore into the injector to be produced and recovered through the lower pressure production tubing string at the surface, whereby maintained formation gas pressure assist by overhead pressure for the maximum production and ultimate recovery of hydrocarbon formation fluids from the opened lower liquid hydrocarbon formation, wherein total in place gaseous and liquid hydrocarbon reserve recoverability and related value is notably increased.
32. The method as defined in claim 31, further comprising:
providing the surface gas flow pressure regulator for closing off the wellbore annulus at the well head exit port throughout the complete production and total recovery of all in place liquid hydrocarbons until said production and recovery considerably decline, at such time converting over to total gas production by releasing the surface gas flow pressure to a full opened gas flow pressure at the surface gas flow regulator to efficiently produce and recover natural gas, whereby total in place liquid hydrocarbons have been recovered, leaving only the small quantities that stick to the formation rock pores as a thin film and that are isolated in any formation structural traps, wherein total in place gas is free to flow to the surface for total in place natural gas production and ultimate recovery, thereby recovering total in place liquid and gaseous hydrocarbons maintained and converted by this recovery process to be ultimately recoverable.
33. The method as defined in claim 18, further comprising:
providing the surface gas flow pressure regulator for completely closing a wellbore annulus at the well head exit port in a well that has no surface gas sales line, such as to prevent surface gas flaring, so that all gases which are prevented from flowing and from entering the production tubing string by the injector are retained downhole within the opened upper gas zone for storing gases there for future production by incoming higher pressure liquids in transit through the wellbore, such that the upper gas zone assist by overhead pressure for the production and recovery of all incoming liquid hydrocarbons entering the wellbore by their greater hydrostatic head pressure driving them through the downhole injector by pressure differential on up into the lower pressure production tubing string toward the surface for maximum production and ultimate recovery of hydrocarbon fluids from the opened liquid hydrocarbon formation, whereby early total in place liquid hydrocarbon recovery is economically realized at low cost, wherein total in place gaseous and liquid hydrocarbon reserve value is significantly increased by becoming recoverable.
34. The method as defined in claim 33, further comprising:
providing the surface gas flow pressure regulator for controlling the wellbore annulus gas flow pressure at the wellhead exit port to produce and recover natural gas in a well that has installed a gas sale line during the complete production and total recovery of all in place liquid hydrocarbons, recovering said liquids by a predetermined gas flow pressure, such that gas is retained in solution within the recovering liquid hydrocarbons, so that said liquids are always maintained recoverable, until liquid hydrocarbon production and recovery considerably decline, at such time converting over to total gas production by releasing the surface gas flow pressure to a fully opened gas flow pressure at the surface gas flow regulator to efficiently produce and recover natural gas, whereby total in place liquid hydrocarbons have been recovered, leaving only the small quantities that stick to the formation rock pores as a thin film, and that are isolated in any formation structural traps, wherein in place gas is free to flow to the surface for total in place natural gas production and ultimate recovery, thereby recovering total in place liquid and gaseous hydrocarbons maintained and converted by this recovery process to be ultimately recoverable.
35. The method as defined in claim 18, further comprising:
maintaining a predetermined optimum flow pressure to produce both natural gas and liquid hydrocarbons under a state of equilibrium, thereby providing a more efficient drainage mechanism such that gas remains on top of liquid hydrocarbons within the reservoir's formations, utilizing gas energy and the principles of gravity separation to eliminate undesirable coning and loss of free gas and solution gas through the liquid hydrocarbon formation into the wellbore, whereby liquid and gaseous hydrocarbons are maintained pressured and as recoverable flowing fluids with a more effective overhead gas cap pressure drive, wherein total in place gaseous and liquid hydrocarbon reserve recoverability and related value is notably increased.
36. The method as defined in claim 18, further comprising:
providing the surface gas flow pressure regulator for controlling the wellbore annulus gas flow pressure at the wellhead exit port during the complete production and total recovery of all in place liquid hydrocarbons, recovering said liquids by a predetermined gas flow pressure, such that gas is retained in solution within the recovering liquid hydrocarbons, so that said liquids are always maintained recoverable, until liquid hydrocarbon production and recovery considerably decline, at such time converting over to total gas production by releasing the surface gas flow pressure to a fully opened gas flow pressure at the surface gas flow regulator to efficiently produce and recover natural gas, whereby total in place liquid hydrocarbons have been recovered, leaving only the small quantities that stick to the formation rock pores as a thin film, and that are isolated in any formation structural traps, wherein in place gas is free to flow to the surface for total in place natural gas production and ultimate recovery, thereby recovering total in place liquid and gaseous hydrocarbons maintained and converted by this recovery process to be ultimately recoverable.
37. A system for increasing production and ultimate recovery of gaseous and liquid hydrocarbons from one or more downhole natural gas baring formations and through a production tubing string within a wellbore by complete removal of liquids from the wellbore and utilizing gas pressure drive of the natural gas baring formation, the system comprising:
the wellbore being perforated for fluid communication with one or more downhole gas baring formations both above and bellow a gas-fluid interface;
a surface gas flow pressure regulator and a surface pressure gauge provided on the casing well head annulus exit port for regulating gas flow and pressure and to maintain a predetermined flow pressure on the wellbore annulus;
a downhole injector positioned at the bottom of the production tubing string relative to the lowest opened formation;
the downhole injector for passing formation liquids by pressure differential through the production tubing string toward the surface while preventing formation gases from entering the production tubing string;
a downhole pump positioned within a production tubing string above the injector for pumping liquids to the surface;
the downhole pump for efficiently pumping liquid inflow through the production tubing string to the surface of the well; and
the wellbore with maintained direct fluid communication with one or more opened gas baring formations and liquids entering from the lower part of the formations, such that such gas pressure acts as a cap on the formation fluids in the opened formation to force the fluids out of the formation into the wellbore through the injector and toward the surface.
38. The system as defined in claim 37, further comprising:
the downhole injector being positioned relative to the lowest downhole opened gas baring formation so that all incoming liquid hydrocarbons and invading waters are efficiently and completely removed from the wellbore into the production tubing string on to the surface for increased gaseous and liquid hydrocarbon recovery.
39. The system as defined in claim 37, further comprising:
wherein the well has a surface gas flow meter for continually and comparatively measuring and monitoring the formation gas flow production, pressure and recovery for the most effective optimum gas flow pressure at the surface, and periodically making and observing fluid level test, while continually and comparatively measuring and monitoring the production and recovery of formation liquids through a surface metering facility for a combined total maximum gaseous and liquid hydrocarbon production and ultimate recovery, throughout the reservoir's formations total gaseous and liquid hydrocarbon recovery life for maximum hydrocarbon reserve value.
40. The system as defined in claim 37, further comprising:
the surface gas flow pressure regulator and the surface pressure gauge for continually and controllably and comparatively regulating flowing formation gas production and pressure at a controlled flow pressure to retain a predetermined optimum formation gas pressure in an annulus about the production tubing string, and thereby on and within all opened hydrocarbon formations, such that the gas pressure prevents solution gas within the liquid hydrocarbon in its formation and the wellbore from breaking out of solution, whereby maintaining its expulsive force, high mobility and low viscosity, and acts as a driving force to pass pressured higher pressure hydrostatic head liquids out of the formation and through the injector by pressure differential up into the lower pressure production tubing string to recover formation liquids at the surface, wherein total in place liquid hydrocarbons are maintained highly fluid and recoverable, thereby increasing related liquid hydrocarbon reserve value.
41. The system as defined in claim 37, further comprising:
the wellbore annulus with a maintained predetermined formation gas pressure such that gas pressure acts as a driving force on all liquid hydrocarbons and any invading waters to pass them through the injector by pressure differential up into the lower pressure production tubing string for formation fluid recovery at the surface, so that a liquid level is maintained in the wellbore at the injector liquid intake level for maximum free gas and pressurized fluid flow from all opened hydrocarbon formations for maximum gaseous and liquid hydrocarbon recovery, whereby total gaseous and liquid hydrocarbon reserve recoverability and related value is increased.
42. The system as defined in claim 37, further comprising:
the wellbore with maintained gas pressure in the annulus above the downhole injector intake liquid level as a driving force to maintain a predetermined liquid level in the lower pressure production tubing string for maximum artificial lift efficiency of incoming liquids on to the surface.
43. The system as defined in claim 37, further comprising:
one or more gas lift valves as an alternative means for lifting liquids positioned along the production tubing string above the downhole injector for selectively passing annulus gases through the production tubing string to raise incoming liquids as slugs of liquid to the surface through the production tubing string.
44. The system as defined in claim 37, further comprising:
the wellbore opened with one or more horizontal and alternatively highly angled boreholes in a gas zone for maximum zone exposure and increased gas flow and recovery.
45. The system as described in claim 37, further comprising:
the wellbore opened with one or more horizontal and alternatively highly angled boreholes in a liquid hydrocarbon zone for maximum zone exposure and increased liquid hydrocarbon flow and recovery.
46. The system as defined in claim 37, further comprising:
a check valve in the tubing string above the top of the injector; and the injector including an injector housing having a nominal outer diameter, a fluid responsive float open at the top and closed at the bottom and moveable with respect to the injector housing as a function of fluid density surrounding the float, and a shut off valve member moveably responsive to the float for engagement with a shut off valve seat, the shut off valve member being spaced vertically below inside the injector housing from the check valve.
47. The system as defined in claim 37, wherein the injector includes a sleeve shaped filter screen for restricting at least 90% of solid particles of 30 microns or greater from passing through the filter screen.
48. The system as defined in claim 37, further comprising:
the well head surface gas flow pressure regulator for closing off the release of gas flow and pressure in an opened hydrocarbon reservoir with a considerable high volume of liquid hydrocarbons in one or more opened gas baring formations and one or more opened liquid hydrocarbon formations in an annulus of the vertical wellbore and connecting horizontal and deviated wellbore annuluses, and the surface pressure gauge for measuring the surface wellbore annulus pressure, while simultaneously producing and recovering and monitoring at the surface production tubing string discharge all incoming liquid hydrocarbons and invading waters entering the wellbore, so that previously incoming formation gas above the liquids in the wellbore is maintained in the open gas zone, whereby conserving in place gas volume and pressure by the incoming liquid's greater hydrostatic head pressure which drives it through the downhole injector by pressure differential and into the lower pressure production tubing string on toward the surface for maximum liquid hydrocarbon production and ultimate recovery and ultimately total gaseous hydrocarbon recovery from a hydrocarbon formation.
49. The system as defined in claim 48, further comprising:
the surface gas flow pressure regulator for closing off the wellbore annulus at the well head exit port such that all gases which are prevented from flowing and from entering the production tubing string by the injector are retained downhole within the opened upper gas zone for storing gases there for future production by the incoming higher pressure formation liquids in transit through the wellbore into the injector to be produced and recovered through the lower pressure production tubing string on to the surface, whereby maintained formation gas pressure assist by overhead pressure for the maximum production and ultimate recovery of hydrocarbon formation fluids from the opened lower liquid hydrocarbon formation, wherein total in place gaseous and liquid hydrocarbon reserve recoverability and related value are notably increased.
50. The system as defined in claim 49, further comprising:
the surface gas flow pressure regulator for closing off the wellbore annulus at the well head exit port throughout the complete production and total recovery of all in place liquid hydrocarbons until said production and recovery considerably decline, at such time converting over to total gas production by releasing the surface gas flow pressure to a lower optimum flow pressure at the surface gas flow regulator to efficiently produce and recover natural gas, while efficiently removing any incoming invading waters in the wellbore, whereby total in place liquid hydrocarbons have been recovered, leaving only the small quantities that stick to the formation rock pores as a thin film, and that are isolated in any formation structural traps, wherein total in place gas is free to flow to the surface for total in place natural gas production and ultimate recovery, thereby recovering total in place liquid and gaseous hydrocarbons maintained and converted by this recovery process to be ultimately recoverable.
51. The system as defined in claim 37, further comprising:
the surface gas flow pressure regulator for completely closing a wellbore annulus at the wellhead exit port in one or more opened gas baring formations and in one or more opened liquid hydrocarbon formations in a well that has no surface gas sales line, such as to prevent surface gas flaring, so that all gases which are prevented from flowing and from entering the production tubing string by the injector are retained downhole within all opened upper gas zones by incoming higher pressure liquids in transit through the wellbore for storing gases there for future production, such that the upper gas zone is assisted by maintained overhead pressure for the production and recovery of all incoming liquid hydrocarbons and invading waters which enter the wellbore by their greater hydrostatic head pressure driving them through the downhole injector by pressure differential on up into the lower pressure production tubing string toward the surface for maximum production and ultimate recovery of hydrocarbon fluids from all opened liquid hydrocarbon formations, whereby early total in place liquid hydrocarbon recovery is economically realized at low cost, wherein total in place gaseous and liquid hydrocarbon reserve value is considerably increased by becoming recoverable.
52. The system as defined in claim 51, further comprising:
the surface gas flow pressure regulator for controlling the wellbore annulus flow pressure at the wellhead exit port to produce and recover natural gas in a well that has installed a gas sales line during the complete production and total recovery of all in place liquid hydrocarbons, recovering said liquids by a predetermined gas flow pressure, such that gas is retained in solution within the recovering liquid hydrocarbons, so that said liquids are always maintained recoverable, until liquid hydrocarbon production and recovery considerably decline, at such time converting over to total gas production by releasing the surface gas flow pressure to a lower optimum gas flow pressure at the surface gas flow regulator to efficiently produce and recover natural gas while removing any incoming invading waters, whereby total in place liquid hydrocarbons have been recovered, leaving only the small quantities that stick to the formation rock pores as a thin film, and that are isolated in any formation structural traps, wherein in place gas is free to flow to the surface for total in place natural gas production and ultimate recovery, thereby recovering total in place liquid and gaseous hydrocarbons maintained and converted by this recovery process to be ultimately recoverable.
53. The system as defined in claim 37, further comprising:
the surface gas flow pressure regulator for controlling the wellbore annulus flow pressure at the wellhead exit port during the complete production and total recovery of all in place liquid hydrocarbons, recovering said liquids by a predetermined gas flow pressure, such that gas is retained in solution within the recovering liquid hydrocarbons, so that said liquids are always maintained recoverable, until liquid hydrocarbon production and recovery considerably decline, at such time converting over to total gas production by releasing the surface gas flow pressure to a lower optimum gas flow pressure at the surface gas flow regulator to efficiently produce and recover natural gas while removing any incoming invading waters, whereby total in place liquid hydrocarbons have been recovered, leaving only the small quantities that stick to the formation rock pores as a thin film, and that are isolated in any formation structural traps, wherein in place gas is free to flow to the surface for total in place natural gas production and ultimate recovery, thereby recovering total in place liquid and gaseous hydrocarbons maintained and converted by this recovery process to be ultimately recoverable.
54. A method of increasing production and ultimate recovery of gaseous and liquid hydrocarbons from one or more downhole natural gas baring formations and through a production tubing string within a wellbore by complete removal of liquids from the wellbore and utilizing gas pressure drive of a natural gas baring formation, the method comprising:
the wellbore being perforated for fluid communication with one or more downhole hydrocarbon formations both above and bellow a gas-fluid interface;
providing a surface gas flow pressure regulator and a surface pressure gauge on the casing well head annulus exit port for respectively regulating gas flow production and measuring pressure while maintaining a predetermined flow pressure on the wellbore annulus;
positioning a downhole injector at the bottom of a production tubing string relative to the lowest opened formation;
passing formation fluids through the downhole injector by pressure differential and through the production tubing string toward the surface while preventing formation gases from entering the production tubing string;
positioning a downhole pump within a production tubing string above the injector for pumping liquids to the surface;
pumping liquid inflow efficiently through the production tubing string to the surface of the well; and
maintaining direct fluid communication between the wellbore and one or more opened gas baring formations and liquids entering from the lower part of the formations, such that such gas pressure acts as a cap on the formation fluids in the opened formation to force the fluids out of the formation into the wellbore through the injector and toward the surface.
55. The method as defined in claim 54, further comprising:
wherein the downhole injector is positioned relative to the lowest downhole opened gas baring formation in the wellbore so that all incoming liquid hydrocarbons and invading waters are efficiently and completely removed from the wellbore into the lower pressure production tubing string on to the surface thereby increasing gaseous and liquid hydrocarbon recovery.
56. The method as defined in claim 54, further comprising:
continually and comparatively measuring and monitoring the formation gas flow production, pressure and related recovery for the most effective optimum gas flow pressure at the wells surface gas flow meter and periodically making and observing fluid level and gas-oil ratio test, while continually and comparatively measuring and monitoring the production and recovery of formation liquids through a surface metering facility for a combined total maximum gaseous and liquid hydrocarbon production and ultimate recovery throughout the reservoir's formations total gaseous and liquid hydrocarbon recovery life for maximum hydrocarbon reserve value.
57. The method as defined in claim 54, further comprising:
while recovering formation liquids at the surface production tubing string discharge, simultaneously flowing formation gas production and pressure at a regulated and controlled predetermined gas flow pressure at the surface gas flow pressure regulator with the surface gas pressure gauge to retain an optimum formation gas pressure in an annulus about the production tubing string, and thereby on and within all opened hydrocarbon formations, such that the gas pressure prevents solution gas within the liquid hydrocarbon in its formation and the wellbore from breaking out of solution, thereby maintaining its expulsive force, high mobility and low viscosity, and acts as a driving force to pass pressured higher pressure hydrostatic head liquids out of the formation and through the injector by pressure differential on up into the lower pressure production tubing string to recover formation liquids at the surface, wherein total in place liquid hydrocarbons are maintained highly fluid and recoverable, thereby increasing related liquid hydrocarbon reserve value.
58. The method as defined in claim 54, further comprising:
maintaining a predetermined optimum formation gas flow pressure in the wellbore annulus such that gas pressure acts as a driving force on all liquid hydrocarbons and invading waters to pass them through the injector by pressure differential into the lower pressure production tubing string for formation fluid recovery at the surface, so that a liquid level is maintained in the wellbore at the injector liquid in take level for maximum free gas and pressurized fluid flow from all opened hydrocarbon formations for maximum gaseous and liquid hydrocarbon recovery, whereby total gaseous and liquid hydrocarbon reserve recoverability and related value is increased.
59. The method as defined in claim 54, further comprising:
maintaining a wellbore gas pressure in the annulus above the downhole injector intake liquid level as a driving force to maintain a predetermined liquid level in the lower pressure production tubing string for maximum artificial lift efficiency of incoming liquids on to the surface.
60. The method as defined in claim 54, further comprising;
providing one or more gas lift valves as an alternative means for lifting liquids positioned along the production tubing string above the downhole injector for selectively, at a predetermined pressure, passing annulus gases through the production tubing string to raise incoming liquids as slugs of liquid to the surface through the production tubing string.
61. The method as defined in claim 54, further comprising:
opening the wellbore with one or more horizontal and alternatively highly angled boreholes in a gas zone for maximum zone exposure and increased gas flow and recovery.
62. The method as defined in claim 54, further comprising:
opening the wellbore with one or more horizontal and alternatively highly angled boreholes in a liquid hydrocarbon zone for maximum zone exposure and increased liquid hydrocarbon flow and recovery.
63. The method as defined in claim 54, further comprising:
positioning a check valve within a production tubing string above the top of the injector for preventing fluids which pass by the check valve from returning to the injector; and
the injector housing having a nominal outer diameter, a fluid responsive float open at the top and closed at the bottom and moveable with respect to the injector housing as a function of fluid density surrounding the float, and a shut off valve member moveably responsive to the float for engagement with a shut off valve seat, the shut off valve member being spaced vertically below inside the injector housing from the check valve.
64. The method as defined in claim 54, further comprising:
providing a sleeve-shaped filter screen across an inlet flow port of the injector for restricting at least 90% of solid particles 30 microns or greater from passing through the filter screen.
65. The method as defined in claim 54, further comprising:
providing the well head surface gas flow pressure regulator for closing off the release of gas flow and pressure in an opened hydrocarbon reservoir with a considerable high volume of liquid hydrocarbons in one or more opened gas baring formations with one or more opened liquid hydrocarbon formations in an annulus of the vertical wellbore and all connecting horizontal and deviated wellbore annuluses, and the surface pressure gauge for measuring the surface wellbore annulus pressure, while simultaneously producing and recovering and monitoring at the surface production tubing string discharge all incoming liquid hydrocarbons and invading waters entering the wellbore, so that previously incoming formation gas in the wellbore above the incoming liquids is maintained in all opened gas zones, whereby conserving in place gas volume and pressure by the incoming liquid's greater hydrostatic head pressure which drives it through the pressure drop in the downhole injector and through the lower pressure production tubing string on to the surface for maximum liquid hydrocarbon production and ultimate recovery and ultimately total gaseous hydrocarbon recovery from a hydrocarbon formation.
66. The method as defined in claim 65, further comprising:
providing the surface gas flow pressure regulator for closing off the wellbore annulus at the well head exit port such that all gases which are prevented form flowing and from entering the production tubing string by the injector are retained downhole within all opened upper gas zones for storing gases there, for future production by the incoming higher pressure formation liquids in transit through the wellbore into the injector to be produced and recovered through the lower pressure production tubing string at the surface, whereby maintained formation gas pressure assist by overhead pressure for the maximum production and ultimate recovery of hydrocarbon formation fluids from all opened liquid hydrocarbon formations, wherein total gaseous and liquid hydrocarbon reserve recoverability and related value is notably increased.
67. The method as defined in claim 66, further comprising:
providing the surface gas flow pressure regulator for closing off the wellbore annulus at the well head exit port throughout the complete production and total recovery of all in place liquid hydrocarbons until said production and recovery considerably declines, at such time converting over to total gas production by releasing the surface gas flow pressure to a lower predetermined optimum flow pressure at the surface gas flow regulator to efficiently produce and recover natural gas while efficiently removing any incoming invading waters in the wellbore, whereby total in place liquid hydrocarbons have been recovered, leaving only the small quantities that stick to the formation rock pores as a thin film, and that are isolated in any formation structural traps, wherein total in place gas is free to flow to the surface for total in place natural gas production and recovery, thereby recovering total in place liquid and gaseous hydrocarbons maintained and converted by this recovery process to be ultimately recoverable.
68. The method as defined in claim 54, further comprising:
providing the surface gas flow pressure regulator for completely closing a wellbore annulus at the wellhead exit port in one or more opened gas baring formations and in one or more opened liquid hydrocarbon formations in a well that has no surface gas sales line, such as to prevent surface gas flaring, so that all gases which are prevented from flowing and from entering the production tubing string by the injector are retained downhole by incoming higher pressure liquids in transit through the wellbore within the opened upper gas zone for storing gases there for future production, such that all upper gas zones assist by overhead pressure for the production and recovery of all incoming liquid hydrocarbons and invading waters entering the wellbore by their greater hydrostatic head pressure, driving them through the downhole injector by pressure differential on up into the lower pressure production tubing string toward the surface for maximum production and ultimate recovery of hydrocarbon fluids from all opened liquid hydrocarbon formations, whereby early total in place liquid hydrocarbon recovery is economically realized at low cost, wherein total in place gaseous and liquid hydrocarbon reserve value is considerably increased by becoming recoverable.
69. The method as defined in claim 68, further comprising:
providing the surface gas flow pressure regulator for controlling the wellbore annulus gas flow pressure at the wellhead exit port to produce and recover natural gas in a well that has installed a gas sales line during the complete production and total recovery of all in place liquid hydrocarbons, recovering said liquids by a predetermined gas flow pressure, such that gas is retained in solution within the recovering liquid hydrocarbons, so that said liquids are always maintained recoverable, until liquid hydrocarbon production and recovery considerably decline, at such time converting over to total gas production by releasing the surface gas flow pressure to a lower optimum gas flow pressure at the surface gas flow regulator to efficiently produce and recover natural gas while removing any and all incoming invading waters, whereby total in place liquid hydrocarbons have been recovered, leaving only the small quantities that stick to the formation rock pores as a thin film, and that are isolated in any formation structural traps, wherein in place gas is free to flow to the surface for total in place natural gas production and ultimate recovery, thereby recovering total in place liquid and gaseous hydrocarbons maintained and converted by this recovery process to be ultimately recoverable.
70. The method as defined in claim 54, further comprising:
maintaining a predetermined optimum flow pressure to produce both natural gas and liquid hydrocarbons under a state of equilibrium thereby providing a more efficient drainage mechanism such that gas remains on top of liquid hydrocarbons within all opened hydrocarbon reservoirs' formations utilizing gas energy and the principles of gravity separation to eliminate undesirable coning and loss of free gas and solution gas through all opened liquid hydrocarbon formations into the wellbore, whereby gaseous and liquid hydrocarbons are maintained pressured and as recoverable flowing fluids with a more effective overhead gas cap pressure drive, wherein total in place gaseous and liquid hydrocarbon reserve recoverability and related value is substantially increased.
71. The method as defined in claim 54, further comprising:
providing the surface gas flow pressure regulator for controlling the wellbore annulus gas flow pressure at the wellhead exit port during the complete production and total recovery of all in place liquid hydrocarbons, recovering said liquids by a predetermined gas flow pressure, such that gas is retained in solution within the recovering liquid hydrocarbons, so that said liquids are always maintained recoverable, until liquid hydrocarbon production and recovery considerably decline, at such time converting over to total gas production by releasing the surface gas flow pressure to a lower optimum gas flow pressure at the surface gas flow regulator to efficiently produce and recover natural gas while removing any incoming invading waters, whereby total in place liquid hydrocarbons have been recovered, leaving only the small quantities that stick to the formation rock pores as a thin film, and that are isolated in any formation structural traps, wherein in place gas is free to flow to the surface for total in place natural gas production and ultimate recovery, thereby recovering total in place liquid and gaseous hydrocarbons maintained and converted by this recovery process to be ultimately recoverable.
US10/664,784 1996-12-02 2003-09-17 Method and apparatus for increasing fluid recovery from a subterranean formation Abandoned US20040060705A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US10/664,784 US20040060705A1 (en) 1996-12-02 2003-09-17 Method and apparatus for increasing fluid recovery from a subterranean formation

Applications Claiming Priority (6)

Application Number Priority Date Filing Date Title
US3221896P 1996-12-02 1996-12-02
US08/978,702 US6089322A (en) 1996-12-02 1997-11-26 Method and apparatus for increasing fluid recovery from a subterranean formation
US09/590,152 US6237691B1 (en) 1996-12-02 2000-06-08 Method and apparatus for increasing fluid recovery from a subterranean formation
US09/589,854 US6325152B1 (en) 1996-12-02 2000-06-08 Method and apparatus for increasing fluid recovery from a subterranean formation
US10/001,383 US6622791B2 (en) 1996-12-02 2001-10-23 Method and apparatus for increasing fluid recovery from a subterranean formation
US10/664,784 US20040060705A1 (en) 1996-12-02 2003-09-17 Method and apparatus for increasing fluid recovery from a subterranean formation

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
US10/001,383 Division US6622791B2 (en) 1996-12-02 2001-10-23 Method and apparatus for increasing fluid recovery from a subterranean formation

Publications (1)

Publication Number Publication Date
US20040060705A1 true US20040060705A1 (en) 2004-04-01

Family

ID=26708139

Family Applications (5)

Application Number Title Priority Date Filing Date
US08/978,702 Expired - Fee Related US6089322A (en) 1996-12-02 1997-11-26 Method and apparatus for increasing fluid recovery from a subterranean formation
US09/590,152 Expired - Fee Related US6237691B1 (en) 1996-12-02 2000-06-08 Method and apparatus for increasing fluid recovery from a subterranean formation
US09/589,854 Expired - Fee Related US6325152B1 (en) 1996-12-02 2000-06-08 Method and apparatus for increasing fluid recovery from a subterranean formation
US10/001,383 Expired - Fee Related US6622791B2 (en) 1996-12-02 2001-10-23 Method and apparatus for increasing fluid recovery from a subterranean formation
US10/664,784 Abandoned US20040060705A1 (en) 1996-12-02 2003-09-17 Method and apparatus for increasing fluid recovery from a subterranean formation

Family Applications Before (4)

Application Number Title Priority Date Filing Date
US08/978,702 Expired - Fee Related US6089322A (en) 1996-12-02 1997-11-26 Method and apparatus for increasing fluid recovery from a subterranean formation
US09/590,152 Expired - Fee Related US6237691B1 (en) 1996-12-02 2000-06-08 Method and apparatus for increasing fluid recovery from a subterranean formation
US09/589,854 Expired - Fee Related US6325152B1 (en) 1996-12-02 2000-06-08 Method and apparatus for increasing fluid recovery from a subterranean formation
US10/001,383 Expired - Fee Related US6622791B2 (en) 1996-12-02 2001-10-23 Method and apparatus for increasing fluid recovery from a subterranean formation

Country Status (8)

Country Link
US (5) US6089322A (en)
AU (1) AU753037B2 (en)
BR (1) BR9715041A (en)
CA (1) CA2310043C (en)
GB (1) GB2348909B (en)
NO (1) NO20002725L (en)
RU (1) RU2196892C2 (en)
WO (1) WO1998025005A1 (en)

Cited By (49)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070012442A1 (en) * 2005-07-13 2007-01-18 Weatherford/Lamb, Inc. Methods and apparatus for optimizing well production
US20090008101A1 (en) * 2007-07-06 2009-01-08 Coady Patrick T Method of Producing a Low Pressure Well
US20090032262A1 (en) * 2007-08-03 2009-02-05 Zupanick Joseph A Flow control system having an isolation device for preventing gas interference during downhole liquid removal operations
US20090101336A1 (en) * 2007-10-19 2009-04-23 Baker Hughes Incorporated Device and system for well completion and control and method for completing and controlling a well
US20090101335A1 (en) * 2007-10-19 2009-04-23 Baker Hughes Incorporated Device and system for well completion and control and method for completing and controlling a well
US20090101357A1 (en) * 2007-10-19 2009-04-23 Baker Hughes Incorporated Device and system for well completion and control and method for completing and controlling a well
US20090101330A1 (en) * 2007-10-19 2009-04-23 Baker Hughes Incorporated Device and system for well completion and control and method for completing and controlling a well
US20090101349A1 (en) * 2007-10-19 2009-04-23 Baker Hughes Incorporated Device and system for well completion and control and method for completing and controlling a well
US20090101360A1 (en) * 2007-10-19 2009-04-23 Baker Hughes Incorporated Device and system for well completion and control and method for completing and controlling a well
GB2459377A (en) * 2008-04-23 2009-10-28 Vetco Gray Inc Downhole water/oil gravity separator
US20090283270A1 (en) * 2008-05-13 2009-11-19 Baker Hughes Incoporated Plug protection system and method
US20090283271A1 (en) * 2008-05-13 2009-11-19 Baker Hughes, Incorporated Plug protection system and method
US20090283256A1 (en) * 2008-05-13 2009-11-19 Baker Hughes Incorporated Downhole tubular length compensating system and method
US20090288818A1 (en) * 2008-05-22 2009-11-26 Bak Passive gas separator for progressing cavity pumps
US20100065280A1 (en) * 2008-09-18 2010-03-18 Baker Hughes Inc. Gas restrictor for horizontally oriented pump
US20100206544A1 (en) * 2009-02-18 2010-08-19 Schlumberger Technology Corporation Integrated Cable Hanger Pick-Up System
US20100206549A1 (en) * 2009-02-18 2010-08-19 Schlumberger Technology Corporation Overpressure Protection in Gas Well Dewatering Systems
US20100211226A1 (en) * 2009-02-19 2010-08-19 Schlumberger Technology Corporation Monitoring and Control System for a Gas Well Dewatering Pump
US20100206568A1 (en) * 2009-02-18 2010-08-19 Schlumberger Technology Corporation Devices, Systems and Methods for Equalizing Pressure in a Gas Well
US20100209265A1 (en) * 2009-02-18 2010-08-19 Schlumberger Technology Corporation Gas Well Dewatering System
US20110038670A1 (en) * 2009-08-11 2011-02-17 Wilkinson John R Gaseous Sequestration Methods and Systems
US7891960B2 (en) 2006-03-13 2011-02-22 Lea Jr James F Reciprocal pump for gas and liquids
US7913755B2 (en) 2007-10-19 2011-03-29 Baker Hughes Incorporated Device and system for well completion and control and method for completing and controlling a well
US8056627B2 (en) 2009-06-02 2011-11-15 Baker Hughes Incorporated Permeability flow balancing within integral screen joints and method
US8113292B2 (en) 2008-05-13 2012-02-14 Baker Hughes Incorporated Strokable liner hanger and method
US8132624B2 (en) 2009-06-02 2012-03-13 Baker Hughes Incorporated Permeability flow balancing within integral screen joints and method
US8151881B2 (en) 2009-06-02 2012-04-10 Baker Hughes Incorporated Permeability flow balancing within integral screen joints
US8276673B2 (en) 2008-03-13 2012-10-02 Pine Tree Gas, Llc Gas lift system
US8555958B2 (en) 2008-05-13 2013-10-15 Baker Hughes Incorporated Pipeless steam assisted gravity drainage system and method
US20130277063A1 (en) * 2011-10-27 2013-10-24 Pumpwell Solutions, Ltd. System and method of improved fluid production from gaseous wells
CN103452531A (en) * 2013-09-22 2013-12-18 中国石油集团西部钻探工程有限公司 Method for underbalanced tubing descending, non-well-killing gas lifting, rotary pumping, pump maintaining and tubing maintaining
US8925637B2 (en) 2009-12-23 2015-01-06 Bp Corporation North America, Inc. Rigless low volume pump system
WO2018132536A1 (en) * 2017-01-11 2018-07-19 Summit Esp, Llc Electric submersible pump dual gas and sand separator
US10030490B2 (en) 2014-04-16 2018-07-24 Bp Corporation North America, Inc. Reciprocating pumps for downhole deliquification systems and fluid distribution systems for actuating reciprocating pumps
US10077642B2 (en) 2015-08-19 2018-09-18 Encline Artificial Lift Technologies LLC Gas compression system for wellbore injection, and method for optimizing gas injection
US10100825B2 (en) 2014-06-19 2018-10-16 Saudi Arabian Oil Company Downhole chemical injection method and system for use in ESP applications
WO2019232443A1 (en) * 2018-06-01 2019-12-05 Robert Bradley Cook Annular controlled safety valve system and method
RU2737628C1 (en) * 2020-05-25 2020-12-01 Управляющая компания общество с ограниченной ответственностью "ТМС групп" Production wells cleaning system with application of gravity filter
US10883354B2 (en) 2017-09-19 2021-01-05 Texas Tech University System Rod pump gas anchor and separator for horizontal wells and method of use
WO2021041178A1 (en) * 2019-08-23 2021-03-04 Baker Hughes Oilfield Operations Llc Method and apparatus for producing well with backup gas lift and an electrical submersible well pump
US11255171B2 (en) * 2016-10-21 2022-02-22 Weatherford Technology Holdings, Llc Method of pumping fluid from a wellbore by a subsurface pump having an interior flow passage in communication with a fluid chamber via a filter positioned in a side wall of a plunger
US11371326B2 (en) 2020-06-01 2022-06-28 Saudi Arabian Oil Company Downhole pump with switched reluctance motor
US11499563B2 (en) 2020-08-24 2022-11-15 Saudi Arabian Oil Company Self-balancing thrust disk
US11525348B2 (en) 2020-07-02 2022-12-13 Saudi Arabian Oil Company Downhole solids handling in wells
US11591899B2 (en) 2021-04-05 2023-02-28 Saudi Arabian Oil Company Wellbore density meter using a rotor and diffuser
RU2793784C1 (en) * 2022-09-14 2023-04-06 Общество с ограниченной ответственностью "Центр современных технологий" Method for operating a group of oil wells
US11644351B2 (en) 2021-03-19 2023-05-09 Saudi Arabian Oil Company Multiphase flow and salinity meter with dual opposite handed helical resonators
US11913464B2 (en) 2021-04-15 2024-02-27 Saudi Arabian Oil Company Lubricating an electric submersible pump
US11920469B2 (en) 2020-09-08 2024-03-05 Saudi Arabian Oil Company Determining fluid parameters

Families Citing this family (139)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6167960B1 (en) * 1998-08-17 2001-01-02 Emmanuel G. Moya Protection of downwell pumps from sand entrained in pumped fluids
US6280000B1 (en) 1998-11-20 2001-08-28 Joseph A. Zupanick Method for production of gas from a coal seam using intersecting well bores
US8376052B2 (en) * 1998-11-20 2013-02-19 Vitruvian Exploration, Llc Method and system for surface production of gas from a subterranean zone
US6662870B1 (en) * 2001-01-30 2003-12-16 Cdx Gas, L.L.C. Method and system for accessing subterranean deposits from a limited surface area
US6988548B2 (en) * 2002-10-03 2006-01-24 Cdx Gas, Llc Method and system for removing fluid from a subterranean zone using an enlarged cavity
US7048049B2 (en) 2001-10-30 2006-05-23 Cdx Gas, Llc Slant entry well system and method
US7025154B2 (en) 1998-11-20 2006-04-11 Cdx Gas, Llc Method and system for circulating fluid in a well system
US7073595B2 (en) * 2002-09-12 2006-07-11 Cdx Gas, Llc Method and system for controlling pressure in a dual well system
US8297377B2 (en) 1998-11-20 2012-10-30 Vitruvian Exploration, Llc Method and system for accessing subterranean deposits from the surface and tools therefor
CN1201063C (en) 1998-12-31 2005-05-11 国际壳牌研究有限公司 Method for removing condensables from natural gas stream, at wellhead, downstream of wellhead choke
NO992947D0 (en) * 1999-06-16 1999-06-16 Jon Kore Heggholmen Method and assembly of components for Õ extracting more oil and gas from oil / gas reservoirs
EP1103698A1 (en) * 1999-11-29 2001-05-30 Shell Internationale Researchmaatschappij B.V. Downhole gas/liquid separation system
US7017663B2 (en) 1999-12-14 2006-03-28 Shell Oil Company System for producing de-watered oil
OA12123A (en) * 1999-12-14 2006-05-05 Shell Int Research System for producing de-watered oil.
US20020036085A1 (en) * 2000-01-24 2002-03-28 Bass Ronald Marshall Toroidal choke inductor for wireless communication and control
US7259688B2 (en) * 2000-01-24 2007-08-21 Shell Oil Company Wireless reservoir production control
EG22420A (en) * 2000-03-02 2003-01-29 Shell Int Research Use of downhole high pressure gas in a gas - lift well
AU2001250184A1 (en) * 2000-12-13 2002-06-24 Valeriy Kushnirov Enhanced oil recovery method using downhole gas
US6626253B2 (en) * 2001-02-27 2003-09-30 Baker Hughes Incorporated Oscillating shear valve for mud pulse telemetry
US7322410B2 (en) * 2001-03-02 2008-01-29 Shell Oil Company Controllable production well packer
MY129058A (en) * 2001-10-01 2007-03-30 Shell Int Research Method and system for producing an oil and gas mixture through a well
WO2003033865A1 (en) * 2001-10-11 2003-04-24 Weatherford/Lamb, Inc. Combination well kick off and gas lift booster unit
US20030141073A1 (en) * 2002-01-09 2003-07-31 Kelley Terry Earl Advanced gas injection method and apparatus liquid hydrocarbon recovery complex
US7396216B2 (en) * 2002-04-23 2008-07-08 Halliburton Energy Services, Inc. Submersible pump assembly for removing a production inhibiting fluid from a well and method for use of same
CA2483202A1 (en) * 2002-04-24 2003-11-06 Shell Internationale Research Maatschappij B.V. Method of producing hydrocarbon gas
NZ536016A (en) * 2002-04-29 2006-03-31 Shell Int Research Cyclonic fluid separator equipped with adjustable vortex finder position
US7178592B2 (en) * 2002-07-10 2007-02-20 Weatherford/Lamb, Inc. Closed loop multiphase underbalanced drilling process
US6991047B2 (en) * 2002-07-12 2006-01-31 Cdx Gas, Llc Wellbore sealing system and method
US6877566B2 (en) * 2002-07-24 2005-04-12 Richard Selinger Method and apparatus for causing pressure variations in a wellbore
US7032674B2 (en) * 2002-07-31 2006-04-25 Nicholson A Kirby Process for increasing flow capacity of gas wells
MXPA05002165A (en) * 2002-09-02 2005-05-23 Shell Int Research Cyclonic fluid separator.
US8333245B2 (en) 2002-09-17 2012-12-18 Vitruvian Exploration, Llc Accelerated production of gas from a subterranean zone
US7048057B2 (en) * 2002-09-30 2006-05-23 Baker Hughes Incorporated Protection scheme and method for deployment of artificial lift devices in a wellbore
US6805199B2 (en) * 2002-10-17 2004-10-19 Halliburton Energy Services, Inc. Process and system for effective and accurate foam cement generation and placement
GB2396169B (en) * 2002-12-12 2005-03-16 Schlumberger Holdings Downhole separation of oil and water
US20040129428A1 (en) * 2002-12-20 2004-07-08 Kelley Terry Earl Plunger lift deliquefying system for increased recovery from oil and gas wells
US6923259B2 (en) * 2003-01-14 2005-08-02 Exxonmobil Upstream Research Company Multi-lateral well with downhole gravity separation
US7275590B2 (en) * 2004-05-27 2007-10-02 Mcclain Jim Submersible pump
WO2005001231A2 (en) * 2003-05-31 2005-01-06 Jim Mcclain Submersible pump
US7000694B2 (en) * 2003-06-04 2006-02-21 Crews Gregory A Oil anchor
US20070000841A1 (en) * 2003-09-11 2007-01-04 R3 Pump Technologies, Llc Directing fluid flow in remediation and other applications
US7104321B2 (en) * 2003-10-17 2006-09-12 Carruth Don V Downhole gas/liquid separator and method
US7296637B2 (en) * 2004-04-06 2007-11-20 Ed Gudac Oil drilling tool
RU2363718C2 (en) * 2004-04-13 2009-08-10 КОРИБА ТЕКНОЛОДЖИЗ, Эл.Эл.Си. Composition and method of increased oil yield
US7363983B2 (en) * 2004-04-14 2008-04-29 Baker Hughes Incorporated ESP/gas lift back-up
US7475731B2 (en) * 2004-04-15 2009-01-13 Production Control Services, Inc. Sand plunger
US7438125B2 (en) * 2004-04-20 2008-10-21 Production Control Services, Inc. Variable orifice bypass plunger
US7308952B2 (en) * 2004-06-04 2007-12-18 Strazhgorodskiy Semen Iosiphov Underbalanced drilling method and apparatus
US7628909B2 (en) * 2004-09-27 2009-12-08 Coriba Technologies, L.L.C. Composition and process for the extraction of bitumen from oil sands
US7537056B2 (en) * 2004-12-21 2009-05-26 Schlumberger Technology Corporation System and method for gas shut off in a subterranean well
US7311150B2 (en) * 2004-12-21 2007-12-25 Cdx Gas, Llc Method and system for cleaning a well bore
CN100346053C (en) * 2004-12-22 2007-10-31 西南石油学院 Automatic boosting oil production and liquid discharge gas producing device and method for underwell gas
US7861786B2 (en) 2004-12-22 2011-01-04 Bj Services Company, U.S.A. Method and apparatus for fluid bypass of a well tool
WO2006110451A2 (en) * 2005-04-08 2006-10-19 Board Of Supervisors Of Louisiana State University And Agricultural And Mechanical College Gas-assisted gravity drainage (gagd) process for improved oil recovery
US20060245958A1 (en) * 2005-04-29 2006-11-02 Carter Gregory J Bulk delivery system
US7513301B2 (en) * 2005-05-09 2009-04-07 Production Control Services, Inc. Liquid aeration plunger
US7678201B2 (en) * 2005-07-22 2010-03-16 Coriba Technologies, L.L.C. Composition and process for the removal and recovery of hydrocarbons from substrates
WO2008076147A2 (en) * 2006-06-19 2008-06-26 Zornes David A Building made of hexagonal layers
US7500525B2 (en) * 2007-01-04 2009-03-10 Altec, Inc. Gas well de-watering apparatus and method
US7878251B2 (en) * 2007-03-19 2011-02-01 Production Control Services, Inc. Multiple stage tool for use with plunger lift
US7952167B2 (en) * 2007-04-27 2011-05-31 Taiwan Semiconductor Manufacturing Company, Ltd. Scribe line layout design
ATE538285T1 (en) 2007-07-27 2012-01-15 Weatherford Lamb CONTINUOUS FLOW DRILLING SYSTEM AND METHODS
US7882896B2 (en) * 2007-07-30 2011-02-08 Baker Hughes Incorporated Gas eduction tube for seabed caisson pump assembly
WO2009135069A1 (en) * 2008-04-30 2009-11-05 Altarock Energy, Inc. Method and cooling system for electric submersible pumps/motors for use in geothermal wells
US7748443B2 (en) * 2008-05-08 2010-07-06 William C. Quinlan Dual packer for a horizontal well
US7971647B2 (en) * 2008-05-21 2011-07-05 Paal, L.L.C. Apparatus and method for raising a fluid in a well
RU2372530C1 (en) * 2008-06-25 2009-11-10 Зиновий Дмитриевич Хоминец Borehole jet system for logging and developing horizontal wells with abnormal low formation pressures
MX2011003125A (en) * 2008-10-10 2011-04-12 Bp Corp North America Inc Method for recovering heavy/viscous oils from a subterranean formation.
CN101493007B (en) * 2008-12-30 2013-07-17 中国科学院武汉岩土力学研究所 Natural gas separation and waste gas geological sequestration method based on mixed fluid self-separation
CN101463718B (en) * 2008-12-31 2012-05-23 中国石油化工股份有限公司胜利油田分公司采油工艺研究院 Same-well production technique column for low-permeation horizontal well
US7909092B2 (en) * 2009-01-15 2011-03-22 Sepaco Llc Downhole separator
RU2468196C2 (en) * 2009-04-07 2012-11-27 Агзамнур Мухаматгалиевич Шарифуллин Sand catcher in oil well
US8316942B2 (en) * 2009-07-31 2012-11-27 Baker Hughes Incorporated ESP for perforated sumps in horizontal well applications
US8657014B2 (en) * 2010-03-04 2014-02-25 Harbison-Fischer, Inc. Artificial lift system and method for well
RU2443854C1 (en) * 2010-09-14 2012-02-27 Открытое акционерное общество "Татнефть" имени В.Д. Шашина Development method of oil massive deposit and adjustable well valve
US20120067569A1 (en) * 2010-09-22 2012-03-22 Alan Keith Brown Well De-Liquefying System and Method
US8439999B2 (en) 2010-10-04 2013-05-14 David A. Simpson Device for capturing gas from a produced water stream
WO2012067638A1 (en) * 2010-11-20 2012-05-24 Dyer Richard J Ultra pump systems
US9556715B2 (en) * 2011-02-23 2017-01-31 Baker Hughes Incorporated Gas production using a pump and dip tube
JP5399436B2 (en) * 2011-03-30 2014-01-29 公益財団法人地球環境産業技術研究機構 Storage substance storage device and storage method
US9297247B2 (en) 2011-06-20 2016-03-29 James F. Lea, Jr. Plunger lift slug controller
WO2013010244A1 (en) * 2011-07-19 2013-01-24 Evan Koslow Apparatus and methods for producing natural gas using a gas recycle phase to remove liquid from a well
US9353587B2 (en) 2011-09-21 2016-05-31 Weatherford Technology Holdings, Llc Three-way flow sub for continuous circulation
US8597402B2 (en) 2011-09-23 2013-12-03 David A. Simpson and Janet K. Simpson Device for capturing gas from a produced water stream
WO2013089746A1 (en) 2011-12-15 2013-06-20 Halliburton Energy Services, Inc. Integrated opening subsystem for well closure system
WO2013089730A1 (en) * 2011-12-15 2013-06-20 Halliburton Energy Services, Inc. Dual closure system for well system
WO2013089753A1 (en) 2011-12-15 2013-06-20 Halliburton Energy Services, Inc. Subsurface safety valve deployable via electric submersible pump
CA2762480C (en) * 2011-12-16 2019-02-19 John Nenniger An inflow control valve for controlling the flow of fluids into a generally horizontal production well and method of using the same
RU2488686C1 (en) * 2012-01-10 2013-07-27 Открытое акционерное общество "Татнефть" имени В.Д. Шашина Method for separation and control of development of deposits drains with horizontal well, and device for its implementation
RU2516313C2 (en) * 2012-04-02 2014-05-20 Общество с ограниченной ответственностью "Газпром добыча Надым" (ООО "Газпром добыча Надым") Device for reservoir fluid removal from gas well
RU2501934C1 (en) * 2012-05-10 2013-12-20 Общество с ограниченной ответственностью Научно-производственная фирма "Пакер" Method for preventing fall of borehole equipment to horizontal or side well shaft, and device for its implementation
US9022106B1 (en) 2012-06-22 2015-05-05 James N. McCoy Downhole diverter gas separator
RU2501938C1 (en) * 2012-07-19 2013-12-20 ООО "РН-УфаНИПИнефть" Oil production method
US9366127B1 (en) 2013-02-14 2016-06-14 James N. McCoy Gas separator with integral pump seating nipple
US9528355B2 (en) * 2013-03-14 2016-12-27 Unico, Inc. Enhanced oil production using control of well casing gas pressure
CA2912671C (en) 2013-05-28 2018-02-27 Lifteck International Inc. Downhole pumping apparatus and method
US9388675B2 (en) * 2013-06-18 2016-07-12 Baker Hughes Incorporated Multi power launch system for pressure differential device
US9869164B2 (en) 2013-08-05 2018-01-16 Exxonmobil Upstream Research Company Inclined wellbore optimization for artificial lift applications
US10006262B2 (en) 2014-02-21 2018-06-26 Weatherford Technology Holdings, Llc Continuous flow system for drilling oil and gas wells
CN105089584A (en) * 2014-05-14 2015-11-25 中国石油化工股份有限公司 Method for improving recovery ratio of sealed small fault-block oil reservoir through alternate coupling injection and production of oil-water well
CN105089571A (en) * 2014-05-24 2015-11-25 天津大港油田钻采技术开发公司 Water injection string without surface flow and water injection technological method of water injection string
US9677388B2 (en) * 2014-05-29 2017-06-13 Baker Hughes Incorporated Multilateral sand management system and method
WO2016080982A1 (en) 2014-11-19 2016-05-26 Halliburton Energy Services, Inc. Assessment of pumpoff risk
RU2580862C1 (en) * 2015-01-12 2016-04-10 Общество с ограниченной ответственностью "ТюменНИИгипрогаз" Design of coastal multi-hole intelligent gas well for development of offshore deposit
US20160319654A1 (en) * 2015-04-29 2016-11-03 Schlumberger Technology Corporation System and methodology for pressure compensation
CA2984173C (en) * 2015-05-08 2023-10-03 Board Of Supervisors Of Louisiana State University And Agricultural And Mechanical College Single-well gas-assisted gravity draining process for oil recovery
RU2586349C1 (en) * 2015-06-10 2016-06-10 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Уфимский государственный нефтяной технический университет" Downhole pump unit
CN105156084A (en) * 2015-08-26 2015-12-16 中国石油天然气股份有限公司 Drainage device for accumulated liquid in annular space
US10443370B2 (en) * 2015-11-12 2019-10-15 Exxonmobil Upstream Research Company Horizontal well production apparatus and method for using the same
CN105649585B (en) * 2016-01-27 2018-05-04 新疆江汉油田技术服务有限公司 Flood suction integrated pipe column and its operating procedure
US11486243B2 (en) * 2016-08-04 2022-11-01 Baker Hughes Esp, Inc. ESP gas slug avoidance system
US10677030B2 (en) 2016-08-22 2020-06-09 Saudi Arabian Oil Company Click together electrical submersible pump
US10408032B2 (en) 2016-09-28 2019-09-10 Saudi Arabian Oil Company Wellbore system
US10865627B2 (en) * 2017-02-01 2020-12-15 Saudi Arabian Oil Company Shrouded electrical submersible pump
US10865635B2 (en) 2017-03-14 2020-12-15 Baker Hughes Oilfield Operations, Llc Method of controlling a gas vent system for horizontal wells
RU2693787C2 (en) * 2017-07-03 2019-07-04 Ооо "Нпф "Рэком" Multi-stage device for protection of bottom hole pump from seizures
US10815761B2 (en) 2017-07-05 2020-10-27 Cenovus Energy Inc. Process for producing hydrocarbons from a subterranean hydrocarbon-bearing reservoir
RU184576U1 (en) * 2017-09-05 2018-10-30 Публичное акционерное общество "Оренбургнефть" DEVICE FOR PREVENTING FALLING INLINE-EQUIPMENT EQUIPMENT IN THE WELL
US10557337B2 (en) * 2017-10-05 2020-02-11 Saudi Arabian Oil Company Downhole centrifugal separation and removal of sand from wells using progressing cavity pump
CN107795311B (en) * 2017-11-16 2023-06-27 中国地质大学(武汉) Gas well auxiliary liquid carrying system
US10415361B1 (en) 2018-03-21 2019-09-17 Saudi Arabian Oil Company Separating gas and liquid in a wellbore
EA035124B1 (en) * 2018-05-18 2020-04-29 Научно-Исследовательский И Проектный Институт Нефти И Газа (Нипинг) Oil well sand remover
US11274532B2 (en) 2018-06-22 2022-03-15 Dex-Pump, Llc Artificial lift system and method
CN109488265B (en) * 2018-09-14 2021-03-09 中国石油天然气股份有限公司 Oil extraction device and method for controlling oil layer pressure by double-layer oil pipe
CN109209347A (en) * 2018-10-10 2019-01-15 中国石油天然气股份有限公司 Oil well annular space gas-liquid interface measuring method and device
CN109296351B (en) * 2018-12-10 2021-09-17 胜利油田胜利泵业有限责任公司 Water-gas separation system for extraction and injection in same well by using electric submersible pump
WO2020150440A1 (en) * 2019-01-16 2020-07-23 Excelerate Energy Limited Partnership Floating gas lift system, apparatus and method
US11352864B2 (en) * 2019-05-13 2022-06-07 Halliburton Energy Services, Inc. ESP string protection apparatus
WO2021046633A1 (en) * 2019-09-12 2021-03-18 Morris John Rickey Wellbore production method and system using bailer
CN111472722B (en) * 2020-03-12 2022-02-01 中国石油天然气股份有限公司 Method and device for predicting layered gas production capacity of coal bed gas co-production well
US11629990B2 (en) 2020-05-21 2023-04-18 Saudi Arabian Oil Company System and method to measure mud level in a wellbore annulus
RU2741296C1 (en) * 2020-06-02 2021-01-25 Общество с ограниченной ответственностью "ЛУКОЙЛ-ПЕРМЬ" Unit set for cluster separation
CN111878042B (en) * 2020-08-24 2023-03-17 中国石油化工股份有限公司 Shale gas horizontal well full life cycle drainage and gas production integrated pipe column and construction method
US11480035B1 (en) 2020-09-04 2022-10-25 Oswaldo Jose Sanchez Torrealba Pressure assisted oil recovery system and apparatus
CN114412427B (en) * 2020-10-12 2023-11-14 北京星油科技有限公司 Gas lift and production integrated oil gas exploitation system
US11542797B1 (en) 2021-09-14 2023-01-03 Saudi Arabian Oil Company Tapered multistage plunger lift with bypass sleeve
CN113756757B (en) * 2021-10-27 2023-05-05 中联煤层气国家工程研究中心有限责任公司 Compound serial drainage device for coal-bed gas well
PE20231172A1 (en) * 2021-12-28 2023-07-26 Arlandis Juan Carlos Marie EXTRACTIVE PROVISION OF HYDROCARBONS IN OIL WELLS
CN115467644B (en) * 2022-11-02 2023-02-10 华运隆腾机械制造有限公司 Corrosion-resistant carbon dioxide gas production wellhead device

Citations (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1507454A (en) * 1923-04-30 1924-09-02 Blackburn Mcmaster Sylvester Automatic pump control
US1757267A (en) * 1926-12-23 1930-05-06 Kellogg M W Co Gas-oil separator
US2291902A (en) * 1940-04-08 1942-08-04 Kelley Kork Gas anchor
US3324803A (en) * 1965-04-27 1967-06-13 Kelley Kork Liquid control for gas wells
US3363581A (en) * 1966-05-16 1968-01-16 Kelley Kork Gas lift valve
US3408949A (en) * 1966-11-22 1968-11-05 Gulf Oil Corp Bottom hole gas-liquid separator
US3410217A (en) * 1967-04-25 1968-11-12 Kelley Kork Liquid control for gas wells
US3451477A (en) * 1967-06-30 1969-06-24 Kork Kelley Method and apparatus for effecting gas control in oil wells
US3483827A (en) * 1967-12-08 1969-12-16 Sun Oil Co Well producing apparatus
US3643740A (en) * 1969-04-28 1972-02-22 Kork Kelley Method and apparatus for effecting gas control in oil wells
US3724486A (en) * 1969-09-19 1973-04-03 Dresser Ind Liquid separation in a well
US3735815A (en) * 1971-07-19 1973-05-29 Dresser Ind Method and apparatus for producing multiple zone oil and gas wells
US3765483A (en) * 1971-08-09 1973-10-16 Dresser Ind Method and apparatus for producing dual zone oil and gas wells
US3971213A (en) * 1973-04-30 1976-07-27 Kelley Robert K Pneumatic beam pumping unit
US3993129A (en) * 1975-09-26 1976-11-23 Camco, Incorporated Fluid injection valve for wells
US4474234A (en) * 1981-12-02 1984-10-02 Compagnie Francaise Des Petroles Safety valve installed below an activation pump in a hydrocarbon production well
US4570718A (en) * 1984-12-21 1986-02-18 Adams Jr Harold P Oil level sensor system and method for oil wells
US4633954A (en) * 1983-12-05 1987-01-06 Otis Engineering Corporation Well production controller system
US5456318A (en) * 1992-11-12 1995-10-10 Fluid Masters Inc. Fluid pumping apparatus and method of pumping fluid
US5653286A (en) * 1995-05-12 1997-08-05 Mccoy; James N. Downhole gas separator
US5655604A (en) * 1994-05-04 1997-08-12 Newton Technologies, Inc. Down-hole, production pump and circulation system
US5664628A (en) * 1993-05-25 1997-09-09 Pall Corporation Filter for subterranean wells

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2434239A (en) * 1944-06-15 1948-01-06 John A Zublin Method of producing oil
US2810352A (en) * 1956-01-16 1957-10-22 Eugene D Tumlison Oil and gas separator for wells
US3653438A (en) * 1969-09-19 1972-04-04 Robert J Wagner Method for recovery of petroleum deposits
US4042029A (en) * 1975-04-25 1977-08-16 Shell Oil Company Carbon-dioxide-assisted production from extensively fractured reservoirs
US4345647A (en) * 1980-07-18 1982-08-24 Carmichael William C Apparatus to increase oil well flow
CA1212312A (en) * 1983-07-14 1986-10-07 Econolift Systems Ltd. Electronically controlled gas lift apparatus
US4589482A (en) * 1984-06-04 1986-05-20 Otis Engineering Corporation Well production system
US4643258A (en) * 1985-05-10 1987-02-17 Kime James A Pump apparatus
US5257665A (en) * 1992-08-27 1993-11-02 Camco International Inc. Method and system for recovering liquids and gas through a well
US5343945A (en) * 1993-02-19 1994-09-06 Atlantic Richfield Company Downholde gas/oil separation systems for wells
US5450901A (en) * 1993-12-17 1995-09-19 Marathon Oil Company Apparatus and process for producing and reinjecting gas
US5535825A (en) * 1994-04-25 1996-07-16 Hickerson; Russell D. Heat controlled oil production system and method

Patent Citations (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1507454A (en) * 1923-04-30 1924-09-02 Blackburn Mcmaster Sylvester Automatic pump control
US1757267A (en) * 1926-12-23 1930-05-06 Kellogg M W Co Gas-oil separator
US2291902A (en) * 1940-04-08 1942-08-04 Kelley Kork Gas anchor
US3324803A (en) * 1965-04-27 1967-06-13 Kelley Kork Liquid control for gas wells
US3363581A (en) * 1966-05-16 1968-01-16 Kelley Kork Gas lift valve
US3408949A (en) * 1966-11-22 1968-11-05 Gulf Oil Corp Bottom hole gas-liquid separator
US3410217A (en) * 1967-04-25 1968-11-12 Kelley Kork Liquid control for gas wells
US3451477A (en) * 1967-06-30 1969-06-24 Kork Kelley Method and apparatus for effecting gas control in oil wells
US3483827A (en) * 1967-12-08 1969-12-16 Sun Oil Co Well producing apparatus
US3643740A (en) * 1969-04-28 1972-02-22 Kork Kelley Method and apparatus for effecting gas control in oil wells
US3724486A (en) * 1969-09-19 1973-04-03 Dresser Ind Liquid separation in a well
US3735815A (en) * 1971-07-19 1973-05-29 Dresser Ind Method and apparatus for producing multiple zone oil and gas wells
US3765483A (en) * 1971-08-09 1973-10-16 Dresser Ind Method and apparatus for producing dual zone oil and gas wells
US3971213A (en) * 1973-04-30 1976-07-27 Kelley Robert K Pneumatic beam pumping unit
US3993129A (en) * 1975-09-26 1976-11-23 Camco, Incorporated Fluid injection valve for wells
US4474234A (en) * 1981-12-02 1984-10-02 Compagnie Francaise Des Petroles Safety valve installed below an activation pump in a hydrocarbon production well
US4633954A (en) * 1983-12-05 1987-01-06 Otis Engineering Corporation Well production controller system
US4570718A (en) * 1984-12-21 1986-02-18 Adams Jr Harold P Oil level sensor system and method for oil wells
US5456318A (en) * 1992-11-12 1995-10-10 Fluid Masters Inc. Fluid pumping apparatus and method of pumping fluid
US5664628A (en) * 1993-05-25 1997-09-09 Pall Corporation Filter for subterranean wells
US5655604A (en) * 1994-05-04 1997-08-12 Newton Technologies, Inc. Down-hole, production pump and circulation system
US5653286A (en) * 1995-05-12 1997-08-05 Mccoy; James N. Downhole gas separator

Cited By (107)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090200020A1 (en) * 2005-07-13 2009-08-13 William Hearn Methods and apparatus for optimizing well production
US20070012442A1 (en) * 2005-07-13 2007-01-18 Weatherford/Lamb, Inc. Methods and apparatus for optimizing well production
US7490675B2 (en) * 2005-07-13 2009-02-17 Weatherford/Lamb, Inc. Methods and apparatus for optimizing well production
US7806188B2 (en) 2005-07-13 2010-10-05 Weatherford/Lamb, Inc. Methods and apparatus for optimizing well production
US7891960B2 (en) 2006-03-13 2011-02-22 Lea Jr James F Reciprocal pump for gas and liquids
US20090008101A1 (en) * 2007-07-06 2009-01-08 Coady Patrick T Method of Producing a Low Pressure Well
US20100319908A1 (en) * 2007-08-03 2010-12-23 Zupanick Joseph A Flow control system having a downhole check valve selectively operable from a surface of a well
US20090032263A1 (en) * 2007-08-03 2009-02-05 Zupanick Joseph A Flow control system utilizing an isolation device positioned uphole of a liquid removal device
US8006767B2 (en) 2007-08-03 2011-08-30 Pine Tree Gas, Llc Flow control system having a downhole rotatable valve
US20090032262A1 (en) * 2007-08-03 2009-02-05 Zupanick Joseph A Flow control system having an isolation device for preventing gas interference during downhole liquid removal operations
US7971649B2 (en) 2007-08-03 2011-07-05 Pine Tree Gas, Llc Flow control system having an isolation device for preventing gas interference during downhole liquid removal operations
US7789158B2 (en) 2007-08-03 2010-09-07 Pine Tree Gas, Llc Flow control system having a downhole check valve selectively operable from a surface of a well
US20120199361A1 (en) * 2007-08-03 2012-08-09 Zupanick Joseph A System and method for controlling liquid removal operations in a gas-producing well
US20100319905A1 (en) * 2007-08-03 2010-12-23 Zupanick Joseph A System and method for controlling liquid removal operations in a gas-producing well
US20090050312A1 (en) * 2007-08-03 2009-02-26 Zupanick Joseph A Flow control system having a downhole check valve selectively operable from a surface of a well
US7789157B2 (en) 2007-08-03 2010-09-07 Pine Tree Gas, Llc System and method for controlling liquid removal operations in a gas-producing well
US7971648B2 (en) 2007-08-03 2011-07-05 Pine Tree Gas, Llc Flow control system utilizing an isolation device positioned uphole of a liquid removal device
US8162065B2 (en) 2007-08-03 2012-04-24 Pine Tree Gas, Llc System and method for controlling liquid removal operations in a gas-producing well
US8302694B2 (en) 2007-08-03 2012-11-06 Pine Tree Gas, Llc Flow control system having an isolation device for preventing gas interference during downhole liquid removal operations
US8528648B2 (en) 2007-08-03 2013-09-10 Pine Tree Gas, Llc Flow control system for removing liquid from a well
US7753115B2 (en) 2007-08-03 2010-07-13 Pine Tree Gas, Llc Flow control system having an isolation device for preventing gas interference during downhole liquid removal operations
US20090101349A1 (en) * 2007-10-19 2009-04-23 Baker Hughes Incorporated Device and system for well completion and control and method for completing and controlling a well
US7775271B2 (en) 2007-10-19 2010-08-17 Baker Hughes Incorporated Device and system for well completion and control and method for completing and controlling a well
US7784543B2 (en) 2007-10-19 2010-08-31 Baker Hughes Incorporated Device and system for well completion and control and method for completing and controlling a well
US7775277B2 (en) 2007-10-19 2010-08-17 Baker Hughes Incorporated Device and system for well completion and control and method for completing and controlling a well
US20090101360A1 (en) * 2007-10-19 2009-04-23 Baker Hughes Incorporated Device and system for well completion and control and method for completing and controlling a well
US7793714B2 (en) 2007-10-19 2010-09-14 Baker Hughes Incorporated Device and system for well completion and control and method for completing and controlling a well
US7789139B2 (en) 2007-10-19 2010-09-07 Baker Hughes Incorporated Device and system for well completion and control and method for completing and controlling a well
US8151875B2 (en) 2007-10-19 2012-04-10 Baker Hughes Incorporated Device and system for well completion and control and method for completing and controlling a well
US20090101336A1 (en) * 2007-10-19 2009-04-23 Baker Hughes Incorporated Device and system for well completion and control and method for completing and controlling a well
US20090101335A1 (en) * 2007-10-19 2009-04-23 Baker Hughes Incorporated Device and system for well completion and control and method for completing and controlling a well
US20090101330A1 (en) * 2007-10-19 2009-04-23 Baker Hughes Incorporated Device and system for well completion and control and method for completing and controlling a well
US20090101357A1 (en) * 2007-10-19 2009-04-23 Baker Hughes Incorporated Device and system for well completion and control and method for completing and controlling a well
US7913755B2 (en) 2007-10-19 2011-03-29 Baker Hughes Incorporated Device and system for well completion and control and method for completing and controlling a well
US8276673B2 (en) 2008-03-13 2012-10-02 Pine Tree Gas, Llc Gas lift system
GB2459377B (en) * 2008-04-23 2010-05-05 Vetco Gray Inc Downhole gravitational water separator
US8080157B2 (en) 2008-04-23 2011-12-20 Vetco Gray Inc. Downhole gravitational water separator
GB2459377A (en) * 2008-04-23 2009-10-28 Vetco Gray Inc Downhole water/oil gravity separator
US20090283264A1 (en) * 2008-05-13 2009-11-19 Baker Hughes Incorporated Systems, methods and apparatuses for monitoring and recovery of petroleum from earth formations
US7931081B2 (en) 2008-05-13 2011-04-26 Baker Hughes Incorporated Systems, methods and apparatuses for monitoring and recovery of petroleum from earth formations
US7789152B2 (en) 2008-05-13 2010-09-07 Baker Hughes Incorporated Plug protection system and method
US7814974B2 (en) * 2008-05-13 2010-10-19 Baker Hughes Incorporated Systems, methods and apparatuses for monitoring and recovery of petroleum from earth formations
US7819190B2 (en) 2008-05-13 2010-10-26 Baker Hughes Incorporated Systems, methods and apparatuses for monitoring and recovery of petroleum from earth formations
US20090283270A1 (en) * 2008-05-13 2009-11-19 Baker Hughes Incoporated Plug protection system and method
US20090283271A1 (en) * 2008-05-13 2009-11-19 Baker Hughes, Incorporated Plug protection system and method
US7789151B2 (en) 2008-05-13 2010-09-07 Baker Hughes Incorporated Plug protection system and method
US20090283255A1 (en) * 2008-05-13 2009-11-19 Baker Hughes Incorporated Strokable liner hanger
US20090283268A1 (en) * 2008-05-13 2009-11-19 Baker Hughes Incorporated Systems, methods and apparatuses for monitoring and recovery of petroleum from earth formations
US8113292B2 (en) 2008-05-13 2012-02-14 Baker Hughes Incorporated Strokable liner hanger and method
US9085953B2 (en) 2008-05-13 2015-07-21 Baker Hughes Incorporated Downhole flow control device and method
US8159226B2 (en) 2008-05-13 2012-04-17 Baker Hughes Incorporated Systems, methods and apparatuses for monitoring and recovery of petroleum from earth formations
US20090283256A1 (en) * 2008-05-13 2009-11-19 Baker Hughes Incorporated Downhole tubular length compensating system and method
US8555958B2 (en) 2008-05-13 2013-10-15 Baker Hughes Incorporated Pipeless steam assisted gravity drainage system and method
US8171999B2 (en) 2008-05-13 2012-05-08 Baker Huges Incorporated Downhole flow control device and method
US8069919B2 (en) 2008-05-13 2011-12-06 Baker Hughes Incorporated Systems, methods and apparatuses for monitoring and recovery of petroleum from earth formations
US8776881B2 (en) 2008-05-13 2014-07-15 Baker Hughes Incorporated Systems, methods and apparatuses for monitoring and recovery of petroleum from earth formations
US7798211B2 (en) 2008-05-22 2010-09-21 Baker Hughes Incorporated Passive gas separator for progressing cavity pumps
US20090288818A1 (en) * 2008-05-22 2009-11-26 Bak Passive gas separator for progressing cavity pumps
US20100065280A1 (en) * 2008-09-18 2010-03-18 Baker Hughes Inc. Gas restrictor for horizontally oriented pump
US7921908B2 (en) 2008-09-18 2011-04-12 Baker Hughes Incorporated Gas restrictor for horizontally oriented pump
US7980311B2 (en) 2009-02-18 2011-07-19 Schlumberger Technology Corporation Devices, systems and methods for equalizing pressure in a gas well
US20100209265A1 (en) * 2009-02-18 2010-08-19 Schlumberger Technology Corporation Gas Well Dewatering System
US20100206544A1 (en) * 2009-02-18 2010-08-19 Schlumberger Technology Corporation Integrated Cable Hanger Pick-Up System
US8127835B2 (en) 2009-02-18 2012-03-06 Schlumberger Technology Corporation Integrated cable hanger pick-up system
US20100206549A1 (en) * 2009-02-18 2010-08-19 Schlumberger Technology Corporation Overpressure Protection in Gas Well Dewatering Systems
US20100206568A1 (en) * 2009-02-18 2010-08-19 Schlumberger Technology Corporation Devices, Systems and Methods for Equalizing Pressure in a Gas Well
US7984756B2 (en) 2009-02-18 2011-07-26 Schlumberger Technology Corporation Overpressure protection in gas well dewatering systems
US8177526B2 (en) 2009-02-18 2012-05-15 Schlumberger Technology Corporation Gas well dewatering system
US20100211226A1 (en) * 2009-02-19 2010-08-19 Schlumberger Technology Corporation Monitoring and Control System for a Gas Well Dewatering Pump
WO2010096431A1 (en) * 2009-02-19 2010-08-26 Schlumberger Canada Limited Monitoring and control system for a gas well dewatering pump
US8082991B2 (en) 2009-02-19 2011-12-27 Schlumberger Technology Corporation Monitoring and control system for a gas well dewatering pump
US8151881B2 (en) 2009-06-02 2012-04-10 Baker Hughes Incorporated Permeability flow balancing within integral screen joints
US8056627B2 (en) 2009-06-02 2011-11-15 Baker Hughes Incorporated Permeability flow balancing within integral screen joints and method
US8132624B2 (en) 2009-06-02 2012-03-13 Baker Hughes Incorporated Permeability flow balancing within integral screen joints and method
US8454268B2 (en) 2009-08-11 2013-06-04 Exxonmobil Upstream Research Company Gaseous sequestration methods and systems
US20110038670A1 (en) * 2009-08-11 2011-02-17 Wilkinson John R Gaseous Sequestration Methods and Systems
US8925637B2 (en) 2009-12-23 2015-01-06 Bp Corporation North America, Inc. Rigless low volume pump system
US9127535B2 (en) 2009-12-23 2015-09-08 Bp Corporation North America Inc. Rigless low volume pump system
US20130277063A1 (en) * 2011-10-27 2013-10-24 Pumpwell Solutions, Ltd. System and method of improved fluid production from gaseous wells
US9500067B2 (en) * 2011-10-27 2016-11-22 Ambyint Inc. System and method of improved fluid production from gaseous wells
CN103452531A (en) * 2013-09-22 2013-12-18 中国石油集团西部钻探工程有限公司 Method for underbalanced tubing descending, non-well-killing gas lifting, rotary pumping, pump maintaining and tubing maintaining
US10030490B2 (en) 2014-04-16 2018-07-24 Bp Corporation North America, Inc. Reciprocating pumps for downhole deliquification systems and fluid distribution systems for actuating reciprocating pumps
US10480299B2 (en) 2014-06-19 2019-11-19 Saudi Arabian Oil Company Downhole chemical injection method and system for use in ESP applications
US10550678B2 (en) 2014-06-19 2020-02-04 Saudi Arabian Oil Company Downhole chemical injection method and system for use in ESP applications
US10100825B2 (en) 2014-06-19 2018-10-16 Saudi Arabian Oil Company Downhole chemical injection method and system for use in ESP applications
US10385664B2 (en) 2014-06-19 2019-08-20 Saudi Arabian Oil Company Downhole chemical injection method and system for use in ESP applications
US10077642B2 (en) 2015-08-19 2018-09-18 Encline Artificial Lift Technologies LLC Gas compression system for wellbore injection, and method for optimizing gas injection
US11255171B2 (en) * 2016-10-21 2022-02-22 Weatherford Technology Holdings, Llc Method of pumping fluid from a wellbore by a subsurface pump having an interior flow passage in communication with a fluid chamber via a filter positioned in a side wall of a plunger
WO2018132536A1 (en) * 2017-01-11 2018-07-19 Summit Esp, Llc Electric submersible pump dual gas and sand separator
US10883354B2 (en) 2017-09-19 2021-01-05 Texas Tech University System Rod pump gas anchor and separator for horizontal wells and method of use
GB2588029B (en) * 2018-06-01 2022-06-22 Bradley Cook Robert Annular controlled safety valve system and method
GB2588029A (en) * 2018-06-01 2021-04-14 Bradley Cook Robert Annular controlled safety valve system and method
US11041365B2 (en) 2018-06-01 2021-06-22 Robert Bradley Cook Annular controlled safety valve system and method
WO2019232443A1 (en) * 2018-06-01 2019-12-05 Robert Bradley Cook Annular controlled safety valve system and method
GB2601969B (en) * 2019-08-23 2023-05-10 Baker Hughes Oilfield Operations Llc Method and apparatus for producing well with backup gas lift and an electrical submersible well pump
US11242733B2 (en) 2019-08-23 2022-02-08 Baker Hughes Oilfield Operations Llc Method and apparatus for producing well with backup gas lift and an electrical submersible well pump
GB2601969A (en) * 2019-08-23 2022-06-15 Baker Hughes Oilfield Operations Llc Method and apparatus for producing well with backup gas lift and an electrical submersible well pump
WO2021041178A1 (en) * 2019-08-23 2021-03-04 Baker Hughes Oilfield Operations Llc Method and apparatus for producing well with backup gas lift and an electrical submersible well pump
RU2737628C1 (en) * 2020-05-25 2020-12-01 Управляющая компания общество с ограниченной ответственностью "ТМС групп" Production wells cleaning system with application of gravity filter
US11371326B2 (en) 2020-06-01 2022-06-28 Saudi Arabian Oil Company Downhole pump with switched reluctance motor
US11525348B2 (en) 2020-07-02 2022-12-13 Saudi Arabian Oil Company Downhole solids handling in wells
US11499563B2 (en) 2020-08-24 2022-11-15 Saudi Arabian Oil Company Self-balancing thrust disk
US11920469B2 (en) 2020-09-08 2024-03-05 Saudi Arabian Oil Company Determining fluid parameters
US11644351B2 (en) 2021-03-19 2023-05-09 Saudi Arabian Oil Company Multiphase flow and salinity meter with dual opposite handed helical resonators
US11591899B2 (en) 2021-04-05 2023-02-28 Saudi Arabian Oil Company Wellbore density meter using a rotor and diffuser
US11913464B2 (en) 2021-04-15 2024-02-27 Saudi Arabian Oil Company Lubricating an electric submersible pump
RU2793784C1 (en) * 2022-09-14 2023-04-06 Общество с ограниченной ответственностью "Центр современных технологий" Method for operating a group of oil wells

Also Published As

Publication number Publication date
CA2310043C (en) 2006-06-27
GB2348909A (en) 2000-10-18
BR9715041A (en) 2004-06-08
RU2196892C2 (en) 2003-01-20
US6089322A (en) 2000-07-18
NO20002725L (en) 2000-07-26
NO20002725D0 (en) 2000-05-26
US20020053426A1 (en) 2002-05-09
US6622791B2 (en) 2003-09-23
GB2348909B (en) 2002-09-11
US6237691B1 (en) 2001-05-29
GB0015626D0 (en) 2000-08-16
US6325152B1 (en) 2001-12-04
CA2310043A1 (en) 1998-06-11
AU5511798A (en) 1998-06-29
AU753037B2 (en) 2002-10-03
WO1998025005A1 (en) 1998-06-11

Similar Documents

Publication Publication Date Title
US6325152B1 (en) Method and apparatus for increasing fluid recovery from a subterranean formation
US5033550A (en) Well production method
US7506690B2 (en) Enhanced liquid hydrocarbon recovery by miscible gas injection water drive
US9322251B2 (en) System and method for production of reservoir fluids
US8122966B2 (en) Total in place hydrocarbon recovery by isolated liquid and gas production through expanded volumetric wellbore exposure +
US6367555B1 (en) Method and apparatus for producing an oil, water, and/or gas well
US6173768B1 (en) Method and apparatus for downhole oil/water separation during oil well pumping operations
CA2665035C (en) A method and apparatus for separating downhole oil and water and reinjecting separated water
US20030141073A1 (en) Advanced gas injection method and apparatus liquid hydrocarbon recovery complex
US20090145595A1 (en) Gas assisted downhole pump
US6854518B1 (en) Method and apparatus for enhancing production from an oil and/or gas well
US6131660A (en) Dual injection and lifting system using rod pump and an electric submersible pump (ESP)
US20060169458A1 (en) Pumping system and method for recovering fluid from a well
US20200256179A1 (en) Systems and apparatuses for downhole separation of gases from liquids
RU2364708C1 (en) Unit borehole rod pumping with double-acting pump
US7500525B2 (en) Gas well de-watering apparatus and method
RU2228433C2 (en) Method for oil extraction from watering wells and device realizing said method
EP0984134A2 (en) Method and apparatus for down-hole oil/water separation during oilwell pumping operations
US11773701B1 (en) Gas pump system
US11767740B1 (en) Life-of-well gas lift systems for producing a well and gas pump systems having pump control valves with belleville washers
US3476185A (en) Oil production by gas drive from adjacent strata
MXPA00005042A (en) Method and apparatus for increasing fluid recovery from a subterranean formation
US3482526A (en) Gas lift system
SU1350336A1 (en) Apparatus for recovering hydrocarbons from flooding well
US20180363429A1 (en) Plunger lift assembly

Legal Events

Date Code Title Description
STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION