US20040267408A1 - Method of distributing energy for a building, energy management system, system for satisfying the energy requirements of a building, and micro-cogeneration system - Google Patents

Method of distributing energy for a building, energy management system, system for satisfying the energy requirements of a building, and micro-cogeneration system Download PDF

Info

Publication number
US20040267408A1
US20040267408A1 US10/863,145 US86314504A US2004267408A1 US 20040267408 A1 US20040267408 A1 US 20040267408A1 US 86314504 A US86314504 A US 86314504A US 2004267408 A1 US2004267408 A1 US 2004267408A1
Authority
US
United States
Prior art keywords
energy
heat
building
thermal
cost
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US10/863,145
Inventor
Robert Kramer
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to US10/863,145 priority Critical patent/US20040267408A1/en
Publication of US20040267408A1 publication Critical patent/US20040267408A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/004Generation forecast, e.g. methods or systems for forecasting future energy generation
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/007Arrangements for selectively connecting the load or loads to one or several among a plurality of power lines or power sources
    • H02J3/0075Arrangements for selectively connecting the load or loads to one or several among a plurality of power lines or power sources for providing alternative feeding paths between load and source according to economic or energy efficiency considerations, e.g. economic dispatch
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2300/00Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
    • H02J2300/20The dispersed energy generation being of renewable origin
    • H02J2300/22The renewable source being solar energy
    • H02J2300/24The renewable source being solar energy of photovoltaic origin
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2310/00The network for supplying or distributing electric power characterised by its spatial reach or by the load
    • H02J2310/50The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads
    • H02J2310/56The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads characterised by the condition upon which the selective controlling is based
    • H02J2310/62The condition being non-electrical, e.g. temperature
    • H02J2310/64The condition being economic, e.g. tariff based load management
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/381Dispersed generators
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/46Controlling of the sharing of output between the generators, converters, or transformers
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B10/00Integration of renewable energy sources in buildings
    • Y02B10/10Photovoltaic [PV]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • Y02B70/3225Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy
    • Y02E10/56Power conversion systems, e.g. maximum power point trackers
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/222Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S50/00Market activities related to the operation of systems integrating technologies related to power network operation or related to communication or information technologies
    • Y04S50/10Energy trading, including energy flowing from end-user application to grid

Definitions

  • the disclosure relates generally to distributed generation energy systems and, more specifically, to a distributed generation energy system having an energy management system that optimizes and controls the generation and usage of energy to maintain a desired building environment at minimum cost.
  • Cogeneration processes have been developed in order to increase the overall efficiency of the power generation process.
  • cogeneration makes use of at least some of the waste heat, usually by extracting a portion of the waste heat from the low-temperature steam exhausted from the turbines.
  • the recovered heat may be used directly in the form of a hot air stream.
  • the recovered heat may be used to create additional steam, which is then used to generate still more electrical power.
  • an energy management system for managing the generation and distribution of energy from an energy source to a building.
  • the building has a desired building environment and a total energy profile including a thermal energy requirement and an electrical energy requirement.
  • the energy management system includes an energy generator arranged to convert energy from the energy source to thermal energy and electrical energy, a heat recovery unit arranged to recover byproduct heat from the energy generator, a cooling unit and/or a dessicant unit arranged to use a first portion of the thermal energy to provide cooling and/or dehumidification, a heating unit arranged to use a second portion of the thermal energy to drive a heating unit, a heat storage unit arranged to store excess heat, and an energy optimizing controller.
  • the energy optimizing controller includes a thermal flow controller and an electrical flow controller, with the thermal flow controller being arranged to distribute the thermal energy and the recovered byproduct heat to at least one of the cooling unit, the heating unit, and the heat storage unit.
  • the electrical flow controller is arranged to distribute electrical energy to at least one of a plurality of electrical components, with the energy optimizing controller being arranged to establish a target total energy cost, calculate an index of performance indicative of an actual energy cost based on an actual electrical load and an actual thermal load, compare the actual energy cost to the target total energy cost, and adjust the distribution of the thermal and electrical energy to thereby obtain a minimum total cost.
  • a thermally driven dessicant dehumidification system may be employed in order to reduce the humidity within the building, which thus lowers the amount of energy required for cooling purposes.
  • the electrical flow controller may be arranged to distribute electrical energy in the form of alternating current, direct current, or an optimized combination of alternating current and direct current.
  • FIG. 1 is a schematic diagram of an energy management system constructed in accordance with the teachings of the disclosure
  • FIG. 2 is a schematic diagram of an optimization scheme in accordance with the teachings of the disclosure for use with the energy management system of FIG. 1;
  • FIG. 3 is a fragmentary cross-sectional schematic view of a dessicant wheel disposed in a duct system
  • FIG. 4 is a schematic diagram of a preferred embodiment of the energy management system in accordance with the teachings of the disclosure.
  • FIG. 5 is a schematic diagram of another preferred embodiment of the energy management system in accordance with the teachings of the disclosure.
  • FIG. 6 is an exemplary fuzzy logic control surface
  • FIG. 7 is an exemplary fuzzy logic rule matrix used to construct the control surface of FIG. 6;
  • FIG. 8 is an exemplary interpolation map used in conjunction with the rule matrix of FIG. 7 to construct the control surface of FIG. 6;
  • FIG. 9 is an exemplary triangular membership function
  • FIG. 10 is another exemplary triangular membership function
  • FIG. 11 is another exemplary triangular membership function
  • FIG. 12 is another exemplary triangular membership function.
  • an energy management system in accordance with the teachings of the disclosure, includes one or more energy sources, such as, by way of example rather than limitation, a solar energy source 14 and a natural gas energy source 16 .
  • the energy management system 10 also includes a connection to an electric grid 18 .
  • the energy management system 10 along with the electric grid 18 , are configured to meet the heating, cooling, and electrical needs of a building 20 .
  • the solar energy source 14 includes solar cells 22 that produce thermal energy 24 and/or electrical energy 26 .
  • the solar energy source 14 may also include a solar heat assembly 28 that produces thermal energy 30 .
  • the thermal energy 24 and 30 are routed to heating and cooling equipment 32 .
  • the electrical energy 26 is routed to electric control/conversion equipment 34 .
  • the natural gas energy source 16 includes a micro turbine 36 (or a number of micro turbines 36 ) and/or a system of fuel cells 38 .
  • a suitable micro turbine 36 may be obtained from Capstone Turbine Corporation of Chatsworth, Calif. Both 30 kw and 60 kw micro turbines have been tested. Other sizes may be chosen based upon the overall power requirements of the building 20 .
  • one or more reciprocating engines may be used in place of the micro turbine 36 .
  • the micro turbines 36 produce thermal energy 40 that is routed to the heating and cooling equipment 32 , and electrical energy 42 that is routed to the electric control/conversion equipment 34 .
  • a conventional thermal heat producer, such as a gas furnace 44 may also be provided to produce a thermal energy stream 46 .
  • the fuel cells 38 produce thermal energy 48 and electrical energy 50 .
  • the thermal energy 48 from the fuel cells 38 is routed to the heating and cooling equipment 32
  • the electrical energy 50 from the fuel cells 38 is routed to the electric control/conversion equipment 34 .
  • the electric grid connection 18 supplies additional electrical energy 52 that is routed to or from the electric control/conversion equipment 34 .
  • the energy management system 10 includes an optimization system 54 , which optimizes the generation and usage of the electrical and/or thermal energy from all of the available sources.
  • the optimization system 54 optimizes the usage of electrical energy from the electric control/conversion equipment 34 , and optimizes the usage of the thermal energy from the heating and cooling equipment 32 , thus optimizing the overall energy usage. The optimization process is explained in greater detail below.
  • the excess electrical energy can be stored within a flywheel 56 .
  • excess electrical energy can be sold back to the electric grid 18 and/or stored in a conventional cell or battery.
  • the available thermal energy within the heating and cooling equipment 32 is then assessed and the total energy cost is optimized.
  • the thermal requirements for heating and/or cooling the building 20 for a desired building environment are then calculated based upon the occupancy and usage patterns of the building.
  • the difference between the thermal output (available thermal energy) and the thermal requirements for the desired building environment is then calculated. If the thermal output of the heating and cooling equipment 32 is in excess of the thermal requirements for the building 20 , the excess thermal energy may be stored in a heating and cooling storage unit 58 in a conventional manner.
  • the heating and cooling storage unit 58 may take a variety of forms.
  • the heating and cooling storage unit 58 may be a eutectic salt system which stores thermal energy as the eutectic salt changes phases between a liquid and a solid.
  • Other forms of thermal storage battery systems are known.
  • the optimization system 54 continually optimizes the usage of energy and byproduct heat from the various energy sources in order to maintain a desired building environment at a minimum cost. This is shown by an energy balance and comparison step at 56 .
  • the electric demand for the building is calculated at 58 .
  • Local electrical energy sources 60 such as the solar energy source 14 and the micro turbine 36 , provide an electric output 61 that is set to meet a calculated minimum cost of electric energy.
  • the electrical energy utilization is controlled by a subsystem that optimizes its value with respect to the local energy usage, the generation of electrical energy from the local electrical energy source 60 , and electrical energy from the electric grid 18 provided to the building.
  • This subsystem also provides a combination of alternating current and direct current 62 for various applications, as it may be advantageous to utilize at least a portion of the generated electrical energy in the form of direct current rather than converting to alternating current.
  • the subsystem may also optimize the portion of the electrical energy used as direct current.
  • the various heat sources 64 within the building are then considered, such as the thermal output from the micro turbine(s) 36 , fuel cells 38 , the thermal output of the solar energy source 14 , and/or any auxiliary furnaces that might be present in the building.
  • the thermal usage patterns of the building (which are typically based on occupancy patterns) are then observed at 66 , and a thermal requirement for heating and/or cooling of the building to maintain a desired building environment is calculated at 68 .
  • the difference between the thermal output of the heat sources 64 and the thermal requirement for the desired building environment 68 is then calculated. If there is excess thermal output, the excess thermal output is preferably allocated to fast response thermal storage at 70 , 72 .
  • heat may be dumped to the atmosphere at 74 through a bypass valve, the generation of heat may be decreased, or the heat may be cooled by means of an absorption cooling device 76 , thereby decreasing the need for electric air conditioning (shown at 78 ).
  • the heat may be routed to a dessicant dehumidification device 80 .
  • the dessicant dehumidification device 80 includes a dessicant wheel 80 a (shown in cross section in FIG. 3) which rotates about a central axis 80 b.
  • a lower duct 82 a routes warm, humid air past the lower portion of the dessicant wheel 80
  • an upper duct 82 b routes heated air, such as waste heat, past an upper portion of the dessicant wheel 80 .
  • the dessicant wheel 80 absorbs humidity in the lower duct 82 a, thus saturating that portion of the dessicant wheel 80 .
  • the dry air leaving the dessicant wheel 80 is returned to the building at A.
  • the saturated portion of the wheel travels to the upper duct 82 b, where the saturated portion is exposed to the hot air.
  • the hot air regenerates the dessicant, and the humid air is exhausted at B.
  • HVAC heating, ventilating, and air conditioning
  • heat is preferably extracted from the fast response thermal storage unit 70 , 72 or an auxiliary furnace (not shown), based upon a cost optimization of the value of the energy.
  • FIG. 4 illustrates a distributed generation system 100 assembled in accordance with the teachings of another disclosed embodiment.
  • a micro turbine 102 produces thermal energy, which is recovered by a heat recovery unit 104 , and also produces electrical energy.
  • a connection to an electric grid 106 provides additional electrical energy.
  • the amount of electrical energy needed for a building 108 is set to meet a minimum cost of energy at 110 .
  • An energy flow control and optimization unit 112 controls and optimizes the required amounts of electrical energy at 114 and the required amounts of thermal energy for the building 108 by monitoring the amounts of each form of energy that is used or needed.
  • a flow control device 116 then routes the thermal energy and/or electrical energy to various portions of the building 108 as needed based upon the occupancy and usage patterns of the building 108 .
  • thermal energy it can be stored in a heat storage unit 118 or, if the heat is not needed the heat may be dumped into the atmosphere, through a bypass valve 120 .
  • the excess thermal energy may take the form of a thermal stream exiting the micro turbine 102 . Should the excess thermal energy be needed (for example, in the form of hot air or to recharge a dessicant dehumidification system 122 ), the thermal energy can be routed to the appropriate component. If there is a sufficient amount of thermal energy that needs to be allocated to the building, the thermal energy can be converted into heat through use of a heat exchanger 124 .
  • the thermal energy might need to be converted into cooler air rather than heat.
  • the thermal energy can be sent to an absorption cooling unit 128 and a cooling heat exchanger 130 .
  • the resulting heated or cooled air is then directed to a building air handler 132 , which thereby directs the heated or cooled air to various portions of the building 108 .
  • FIG. 5 Another preferred embodiment is designated generally 150 in FIG. 5.
  • the system 150 optimizes the usage of energy and heat from various energy sources to maintain a desired building environment at minimum cost. This is shown by an energy balance and comparison step at 152 .
  • the electric demand for the building is calculated and an electric output 154 is set to meet a calculated minimum cost of electric energy.
  • Various heat sources 156 within the building are then assessed to determine the amount of thermal energy available.
  • the heat sources may include micro turbines, fuel cells, solar heating sources, and/or any auxiliary furnaces that might be present in the building.
  • the thermal usage patterns of the building are then observed at 158 , and a thermal requirement for heating and/or cooling of the building to maintain a desired building environment is calculated.
  • the difference between the thermal output of the heat sources 156 and the thermal requirement for the desired building environment is then calculated. If there is excess thermal output, the excess thermal output is preferably allocated to fast response thermal storage at 160 . If a maximum temperature is reached within the fast response thermal storage unit 160 , either heat is dumped to the atmosphere or the generation of heat is decreased based upon an optimal calculation of cost for either action. Additionally, or alternatively, heat may be stored in regions of the building. If the calculation for the difference between the thermal output of the heat sources 156 and the thermal requirement for the desired building environment results in an insufficient amount of heat to meet the thermal requirements for the desired building environment, heat is preferably extracted from the fast response thermal storage unit 160 or an auxiliary furnace (not shown), based upon a cost optimization of the value of the energy.
  • a stand alone power generation system provides electrical energy and thermal energy to a building.
  • the power generation system may generate electrical and thermal energy from a number of sources, including, for example, natural gas, waste gas such as refuse generated methane gas, solar energy, and other sources.
  • a distributed combined heat and power system the usage of the combined thermal and electrical energy from the variety of energy sources is controlled and optimized so as to achieve a minimum overall energy cost.
  • an entire building may be modeled as a system that can be controlled, regulated and interconnected with the external electric grid.
  • the system may have the capacity to generate electrical energy in a number of ways, including from sources such as solar energy assemblies, micro turbines, fuel cells, reciprocating engines, flywheels, or other electricity storage devices.
  • the system may also have the capacity to capture and use thermal energy form a variety of sources, including streams of recovered byproduct heat from micro turbines and fuel cell reformers.
  • the system may also obtain solar heat directly via active and passive solar heat assemblies and may extract heat from the surrounding atmosphere.
  • the system may also achieve additional efficiencies by optimizing the use of a building's inherent heat storage capacity, and/or by using a fast response thermal storage unit based upon eutectic salt or thermal mass storage technology. Thus, it is possible to reduce the total energy cost for the chosen building application while simultaneously increasing the reliability and quality of the supplied energy streams.
  • the inventive system may provide electricity and/or thermal energy of specifiable reliability and quality. Additional efficiencies may be gained by recovering a maximum amount of normally wasted heat energy. Further, by controlling the flow and usage of energy, both thermal and electrical, within the building, the overall efficiency of the energy usage is thus further increased, thus reducing the overall cost.
  • the system includes a series of subsystems that optimize the energy usage at the building location.
  • building considerations such as building electrical and thermal load patterns and other building energy demand considerations and variables as part of the overall energy usage profile
  • the system may achieve increased efficiency of between 75% to 80% compared to other systems.
  • many building systems such as HVAC systems and various electrical systems can be downsized, again reducing cost.
  • An integrated optimizing control system optimizes the usage of the energy sources and optimizes the usage of the generated energy (i.e., both thermal and electrical energy) within a building resulting in decreased net energy costs, increased reliability, and increased power quality.
  • the system evaluates the price of the electric grid, the price of locally generated electricity, and the cost and the value of heat from the various available sources. The system then continually adjusts the usage to achieve an optimal cost.
  • the system also provides an environmentally friendly solution for energy management because of the use of waste heat, and further provides the end user with the ability to customize the desired power quality and reliability options.
  • the system utilizes a building's inherent heat storage capacity and other available energy sources to reduce the total energy cost for the building while at the same time increasing the reliability and quality of the supplied energy streams.
  • Solar energy assemblies in the form of solar cells and/or active or passive solar heat assemblies may also be provided in order to provide electrical and thermal energy.
  • Passive solar energy may be configured into the basic design of the building such that there is an optimization of this thermal energy source as well as a consideration of the amount of heat storage within the building.
  • a fast response thermal storage system is employed, which allows for the rapid supply of thermal energy during changing environmental and economic conditions of the building.
  • a neural network is an information processing system that may include an array of highly interconnected processor nodes that have a similarity to living neurons. These artificial neurons are arranged in interconnected layers. The network is programmed, in the simplest case, by comparing actual output values with desired output values and adjusting the weighting of the interconnections between the layers to produce the desired output values for one or more sets of training input values.
  • Neural networks may be used for two purposes. First, the networks may be used as part of a feed forward predictive system. This system will allow for characterization of the building energy system and its subsequent optimization. Second, the networks may be used to predict building occupancy patterns based on regional energy usage, and may change the energy content of these regions by changing either the sensible or possibly a portion of the latent heat of the particular region.
  • the neural networks preferably divide the building into zones and define usage patterns of each of the zones within the building. Then, low usage portions of the building may be used to store heat for use by high usage portions of the building. These occupancy patterns shift throughout the day, and the system adapts dynamically to these patterns with the intent of minimizing the net thermal energy use of the building.
  • Such a predictive scheme will allow the building itself to become an energy storage system. Such energy storage will reduce the total energy costs by shifting energy from where it is not needed to regions of the building where it can be of most value. This will allow for optimization of the building energy system and will provide information for potential reductions in the HVAC capital expenditures anticipated for smaller buildings.
  • the fast response thermal storage option will greatly enhance the value of the waste heat and overall efficiency of the energy system.
  • Natural gas energy sources include distributed generation sources of heat or electricity such as micro turbines, reciprocating engines, fuel cells, and/or conventional HVAC components that are driven by natural gas.
  • electricity and heat may be produced by micro turbines, reciprocating engines, fuel cells, and/or other electricity producing devices.
  • the heat produced as a byproduct of the electric generation process may be recovered by means of a system that heats a flowing heat transfer medium, such as propylene glycol. Additional heat may also be recovered from passive solar heating assemblies in the building. This heat is then utilized for direct heating, cooling by means of absorption cooling devices, and/or stored for later use.
  • a flowing heat transfer medium such as propylene glycol. Additional heat may also be recovered from passive solar heating assemblies in the building. This heat is then utilized for direct heating, cooling by means of absorption cooling devices, and/or stored for later use.
  • Electricity and heat may be produced by one or more of a micro turbine(s), a reciprocating engine(s), and/or fuel cells.
  • Renewable resources including photoelectric generation, active solar heating and lighting, and passive solar heating and lighting may also provide energy.
  • the electrical energy utilization is controlled by a subsystem that optimizes its value with respect to the local energy usage as well as competitive electric energy sources such as energy from the electric grid of the building.
  • This subsystem may also provide a combination of alternating current and direct current for various applications contingent upon optimal usage profiles.
  • One of the benefits of the system described herein is the ability to use direct current (DC) electricity directly, rather than converting the electricity into alternating current (AC).
  • DC direct current
  • AC alternating current
  • This provides a savings in electricity because normally a loss results when direct current is converted into alternating current using a conventional inverter such as an oscillator or chopper followed by a step transformer.
  • efficiency is increased.
  • This also greatly enhances the reliability of the system since the inverter is typically a point of higher failure rate for those systems that contain standby or uninterruptible power supplies.
  • the direct use of direct current also provides a cost savings because DC to AC conversion equipment is not needed.
  • the optimization system optimizes the usage of the energy and byproduct heat from the various energy sources to maintain a desired building environment at minimum cost.
  • This optimization system first considers the electric demand for the building and sets an electric output to meet a calculated minimum cost of electric energy.
  • the various heat streams are considered, such as the thermal output from micro turbines and/or fuel cells, solar heating sources, or any auxiliary furnaces that might be present in the building.
  • the occupancy and usage patterns of the building are then observed, and a thermal requirement for heating and/or cooling of the building is calculated. This thermal requirement is based upon a model of the building at various weather conditions and the geographic orientation of the building.
  • the difference between the thermal output of the heat streams and the thermal requirement for the desired building environment is then calculated.
  • the excess thermal output is preferably allocated to fast response or other appropriate thermal storage until a maximum temperature is reached. If the maximum temperature is reached within the appropriate thermal storage unit, excess heat may be dumped to the atmosphere, or the generation of heat may be decreased based on an optimal calculation of cost for either action. If the calculation for the difference between the thermal output of the heat streams and the thermal requirement for the desired building environment results in an insufficient amount of heat to meet the heating requirements of the building, heat may be extracted from the fast response thermal storage or an auxiliary furnace, based upon a cost optimization of the value of the energy. The calculation of the difference between the thermal output of the heat streams and the thermal requirement for the desired building environment is crucial, because the thermal or time constant limits of the thermal storage cannot be exceeded.
  • the first approach establishes a dead band above and below the acceptable operating limits.
  • the second approach continually estimates the time constant associated with the particular operating point. Both approaches or methods may be used within the optimizing system described herein and can be selected by user or system preference dependent upon operating conditions.
  • the building itself is considered a thermal storage entity.
  • a feed forward, fuzzy logic, and or neural network system may be utilized to learn the occupancy and usage patterns of the building and allocate thermal energy in the building as part of the cost optimization system.
  • Various active building energy schemes such as physical space reconfiguration (movable walls, lighting schemes and water walls) may be included.
  • This level of optimization then may be included in an overall cost optimization system that considers external grid power as part of the optimization system.
  • the index of performance for this calculation is the total energy cost (e. g., the total fuel cost and the total electrical energy cost), divided by the amount of useable energy (e.g., kilowatts of thermal and electrical energy).
  • each energy source that provide the best economic and reliability value are preferably investigated.
  • Each of these individual aspects may then become a degree of freedom for formulation of a global index of performance.
  • This global index may then be optimized given the constraints within the physical and environmental aspects of the building.
  • the individual energy sources may be controlled in a manner that produces the maximum economic value within the constraints for the economics, reliability, power quality and environmental considerations.
  • the index of performance is defined as the cost per kilowatt of energy for a specific instant in time, where one kilowatt equals both electrical energy and thermal energy:
  • IP ( x 1+ x 2+ x 3+ x 4+ x 5)/ ⁇
  • x2 grid electric cost
  • x3 solar electric cost
  • x4 solar heat cost
  • x5 grid electric backup cost
  • x8 turbine/fuel cell heat recovery efficiency
  • x9 solar heating or cooling efficiency
  • x13 solar heat incident on building
  • x14 heat needed by building to maintain desired temperature
  • x15 desired building temperature for occupied regions
  • x16 electric usage (AC+DC);
  • x22 fraction of electric supplied by gas distributed generation
  • x25 fraction of gas generation waste heat used for building heating
  • x26 fraction of gas generation waste heat used for dessicant dehumidification
  • x27 fraction of gas generation waste heat used for absorption cooling
  • x28 temperature of heat storage
  • x29 heat storage capacity for unoccupied regions of building
  • x30 maximum ⁇ temperature of unoccupied region of building
  • the analysis for the optimization of the index of performance is done in the time domain.
  • Various frequency domain considerations and calculations may be performed during and/or after the optimization to supplement the optimization process.
  • a multi-dimensional control surface may be used. Illustrated in FIG. 6 is one potential three-dimensional control surface. The value for a particular output variable is calculated by determining the output variable's degree of membership in each fuzzy input variable and mapping the input variables on to the multi-dimensional control surface. The final dimension of the control surface (the height in this case) is the value of the output variable. In the example shown, there are two input variables and one output variable. However, it should be understood that any number of different input and output variables could be used.
  • control surface In practice, only a few points on the control surface are design coordinates that are stored in the system, with the remainder of the points on the control surface being determined via interpolation. In this example, nine design coordinates are used to define the three dimensional control surface, one for each combination of low, medium, and high of the two input variables. However, it should be understood that any number of design coordinates could be used to define the control surface, and that the control surface could have any number of dimensions.
  • FIG. 7 Illustrated in FIG. 7 are rules, depicted in matrix and textual forms, associated with the design coordinates used to construct the control surface of FIG. 6.
  • the “center” rule states that if input variable 1 is “high” and input variable 2 is “medium,” then set the output variable's value to 4.
  • the following three rules may be used to define a portion of an exemplary control surface: 1) If the temperature differential is a large positive, then the heat bypass is large; 2) If the temperature differential is a medium positive; and 3) if the temperature differential is a small positive, then the heat bypass is small.
  • a matrix may be considered a very coarse view of the control surface looking straight down from above.
  • the values of the design coordinates are the outputs of the rules.
  • the weight each of these rules carries can be adjusted by modifying the value of its output, thereby altering the shape of the control surface.
  • FIG. 8 Illustrated in FIG. 8 is another downward view of the control surface.
  • the rule numbers associated with the design coordinates are indicated in nine of the locations. A single rule governs the priority in these areas.
  • the arrows indicate regions of the control surface where more than one rule applies and interpolation is used.
  • Trapezoidal membership functions along the axes allegorize overlapping areas where more than one label of an input is partially true at the same time. The centroids of these trapezoids can be adjusted to alter the shape of the control surface.
  • shapes other than trapezoids could be used to describe the membership functions.
  • triangular membership functions are shown in FIGS. 9-12, which correspond to the exemplary rules given above.
  • each input axis is scaled to distribute the range of values.
  • any number of moving average and scaling functions could be used to adapt the control surface according to this method.
  • the weights of the rules and/or the centroids of the trapezoidal membership functions are adjusted (in effect the shape of the control surface is adjusted) in response to one or more performance metrics.
  • Performance metrics are any type of feedback the system receives.
  • the system adjusts one or more of the weights and/or centroids in a random direction. If the performance metric improves, the adjustment continues in the same direction. If the performance metric degrades, another random direction is chosen.
  • the system will converge on a small set of near optimal control surfaces (i.e., a circle of convergence). In a dynamic environment it will continue to chase the optimal control surface. Large adjustments will converge faster, but will also create a large circle of convergence. Of course, the size of the adjustment need not be constant. The system could use large adjustments when necessary to converge and then small adjustments to linger in a tight circle of convergence.
  • the modeled system is preferably continuous. Under various circumstances discrete models are used as appropriate to either enhance the calculation or decrease the time needed for calculations. Generally, a lumped parameter representation is used in the analysis in a well known manner. This allows for the use of standard differential equations as opposed to partial differential equations.
  • the initial optimization is done assuming the system is deterministic rather than stochastic. After the initial optimization is completed, a probabilistic optimization is done to account for uncertainties in data and forecasts.
  • the index of performance is based upon a generic system that is simulated using a computer simulation modeling system. Input and output from this simulation is done through an interface with a numeric computational computer program. System optimization is done through computer routines that utilize custom designed functions as well as those available in the numeric computational computer program. A building model is interfaced with the numeric computational computer program to provide building thermal requirements as a function of time.
  • MATHCAD® a general purpose modeling program
  • the standard program has been modified to account for various building requirements, including but not limited to thermal output, solar heating output, geographic orientation, and insulation.
  • This program then outputs to MATLAB® from Mathsoft, Inc., which is used for the numeric computational computer program.
  • MATLAB® from Mathsoft, Inc.
  • This is a broad modeling system that was programmed for the energy management package, which accounts for the various heat sources, the capability of heat storage, the maximum temperature within the heat storage, and what to do with excess heat once the maximum heat storage temperature is reached.
  • SIMULINK® also from Mathsoft, interfaces with MATLAB® and is used for the simulation. This program provides a prediction of the amount of BTUs produced within the system at any given time, depending on the amount of energy available.
  • OPTIMIZATION TOOLBOX® also from Mathsoft, is used for the optimization routines.
  • the global energy control system optimizes the sources of electrical and thermal energy so as to minimize the overall energy costs of the building to less than that provided by conventional energy source options.
  • This system continually regulates the balance between energy production and storage so as to minimize cost within the constraints of the energy reliability, quality and usage patterns of the building.
  • it is possible to run the combined heat and power system in a base loaded mode of operation rather than a peaking mode. This allows the system to run continuously because it is less weather dependent. This, in turn, greatly enhances the economic and environmental benefits of the system.

Abstract

An energy management system is provided for managing the generation and distribution of energy from an energy source to a building. The building has a desired building environment and a total energy profile including a thermal energy requirement and an electrical energy requirement. The energy management system comprises an energy generator arranged to convert energy from the energy source to thermal energy and electrical energy, a heat recovery unit arranged to recover byproduct heat from the energy generator, a cooling unit arranged to use a first portion of the thermal energy to drive a refrigeration unit, a heating unit arranged to use a second portion of the thermal energy to drive a heating unit, a heat storage unit arranged to store excess heat, and an energy optimizing controller. The energy optimizing controller includes a thermal flow controller and an electrical flow controller, with the thermal flow controller being arranged to distribute the thermal energy and the recovered byproduct heat to at least one of the cooling unit, the heating unit, and the heat storage unit. The electrical flow controller is arranged to distribute electrical energy to at least one of a plurality of electrical components, with the energy optimizing controller being arranged to establish a target total energy cost, calculate an index of performance indicative of an actual energy cost based on an actual electrical load and an actual thermal load, compare the actual energy cost to the target total energy cost, and adjust the distribution of the thermal and electrical energy to thereby obtain a minimum total cost.

Description

    CROSS REFERENCE TO RELATED APPLICATIONS
  • This is a division of U.S. patent application Ser. No. 09/928,040 filed Aug. 10, 2001, which claims the priority benefit of U.S. provisional application Ser. No. 60/224,606 filed Aug. 11, 2000, the respective disclosures of which are incorporated herein by reference in their entirety for all purposes.[0001]
  • TECHNICAL FIELD
  • The disclosure relates generally to distributed generation energy systems and, more specifically, to a distributed generation energy system having an energy management system that optimizes and controls the generation and usage of energy to maintain a desired building environment at minimum cost. [0002]
  • BACKGROUND
  • Conventional power generation is typically based on a process in which fuel is burned as a source of energy to turn a turbine. For example, in the case of a base load power plant, coal is burned to obtain heat, the heat is converted to steam, and steam pressure is used to turn one or more turbines. The turbines in turn generate electrical power. Unfortunately, conventional power generation is an inherently inefficient process, with much of the total energy value of the fuel source being lost in the form of wasted heat. Typically, only a small fraction of the total energy value of the fuel is extracted from the fuel and ultimately useable as electrical power. [0003]
  • Cogeneration processes have been developed in order to increase the overall efficiency of the power generation process. In contrast to conventional power generation, cogeneration makes use of at least some of the waste heat, usually by extracting a portion of the waste heat from the low-temperature steam exhausted from the turbines. The recovered heat may be used directly in the form of a hot air stream. Alternatively, the recovered heat may be used to create additional steam, which is then used to generate still more electrical power. [0004]
  • Other processes have been developed in the continuing attempts to maximize the overall efficiency of power generation and energy extraction. For example, natural gas is favored as a fuel source because it is clean burning with low emissions. Thus, gas-fired turbines are often used to generate electricity. In some cogeneration power plants, these clean-burning gas-fired turbines are coupled with heat exchangers which extract heat from the stream of hot exhaust gases. The exhaust gases are not released until a maximum amount of thermal energy has been recovered. These gas-fired power plants, which are often manufactured as independent, stand alone units, are therefore more efficient producers of electricity, hot water, or steam, and have the added benefit of producing negligible emissions. [0005]
  • Although cogeneration systems offer increased efficiency relative to more conventional power plants, further increases in overall energy efficiency are desirable. [0006]
  • SUMMARY
  • In accordance with an aspect of the disclosure, an energy management system is provided for managing the generation and distribution of energy from an energy source to a building. The building has a desired building environment and a total energy profile including a thermal energy requirement and an electrical energy requirement. The energy management system includes an energy generator arranged to convert energy from the energy source to thermal energy and electrical energy, a heat recovery unit arranged to recover byproduct heat from the energy generator, a cooling unit and/or a dessicant unit arranged to use a first portion of the thermal energy to provide cooling and/or dehumidification, a heating unit arranged to use a second portion of the thermal energy to drive a heating unit, a heat storage unit arranged to store excess heat, and an energy optimizing controller. The energy optimizing controller includes a thermal flow controller and an electrical flow controller, with the thermal flow controller being arranged to distribute the thermal energy and the recovered byproduct heat to at least one of the cooling unit, the heating unit, and the heat storage unit. The electrical flow controller is arranged to distribute electrical energy to at least one of a plurality of electrical components, with the energy optimizing controller being arranged to establish a target total energy cost, calculate an index of performance indicative of an actual energy cost based on an actual electrical load and an actual thermal load, compare the actual energy cost to the target total energy cost, and adjust the distribution of the thermal and electrical energy to thereby obtain a minimum total cost. [0007]
  • In further accordance with a preferred embodiment, a thermally driven dessicant dehumidification system may be employed in order to reduce the humidity within the building, which thus lowers the amount of energy required for cooling purposes. Further, the electrical flow controller may be arranged to distribute electrical energy in the form of alternating current, direct current, or an optimized combination of alternating current and direct current.[0008]
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • FIG. 1 is a schematic diagram of an energy management system constructed in accordance with the teachings of the disclosure; [0009]
  • FIG. 2 is a schematic diagram of an optimization scheme in accordance with the teachings of the disclosure for use with the energy management system of FIG. 1; [0010]
  • FIG. 3 is a fragmentary cross-sectional schematic view of a dessicant wheel disposed in a duct system; [0011]
  • FIG. 4 is a schematic diagram of a preferred embodiment of the energy management system in accordance with the teachings of the disclosure; [0012]
  • FIG. 5 is a schematic diagram of another preferred embodiment of the energy management system in accordance with the teachings of the disclosure; [0013]
  • FIG. 6 is an exemplary fuzzy logic control surface; [0014]
  • FIG. 7 is an exemplary fuzzy logic rule matrix used to construct the control surface of FIG. 6; [0015]
  • FIG. 8 is an exemplary interpolation map used in conjunction with the rule matrix of FIG. 7 to construct the control surface of FIG. 6; [0016]
  • FIG. 9 is an exemplary triangular membership function; [0017]
  • FIG. 10 is another exemplary triangular membership function; [0018]
  • FIG. 11 is another exemplary triangular membership function; and [0019]
  • FIG. 12 is another exemplary triangular membership function.[0020]
  • DETAILED DESCRIPTION
  • The following description of the disclosed embodiments is not intended to limit the scope of the invention to the precise form or forms detailed herein. Instead, the following description is intended to be illustrative of the principles of the invention so that others may follow its teachings. [0021]
  • Referring to FIG. 1, an energy management system, generally designated [0022] 10, in accordance with the teachings of the disclosure, includes one or more energy sources, such as, by way of example rather than limitation, a solar energy source 14 and a natural gas energy source 16. The energy management system 10 also includes a connection to an electric grid 18. The energy management system 10, along with the electric grid 18, are configured to meet the heating, cooling, and electrical needs of a building 20.
  • The [0023] solar energy source 14 includes solar cells 22 that produce thermal energy 24 and/or electrical energy 26. The solar energy source 14 may also include a solar heat assembly 28 that produces thermal energy 30. The thermal energy 24 and 30 are routed to heating and cooling equipment 32. The electrical energy 26 is routed to electric control/conversion equipment 34.
  • The natural [0024] gas energy source 16 includes a micro turbine 36 (or a number of micro turbines 36) and/or a system of fuel cells 38. A suitable micro turbine 36 may be obtained from Capstone Turbine Corporation of Chatsworth, Calif. Both 30 kw and 60 kw micro turbines have been tested. Other sizes may be chosen based upon the overall power requirements of the building 20. Alternatively, one or more reciprocating engines may be used in place of the micro turbine 36. The micro turbines 36 produce thermal energy 40 that is routed to the heating and cooling equipment 32, and electrical energy 42 that is routed to the electric control/conversion equipment 34. A conventional thermal heat producer, such as a gas furnace 44, may also be provided to produce a thermal energy stream 46. Further, the fuel cells 38 produce thermal energy 48 and electrical energy 50. The thermal energy 48 from the fuel cells 38 is routed to the heating and cooling equipment 32, while the electrical energy 50 from the fuel cells 38 is routed to the electric control/conversion equipment 34. The electric grid connection 18 supplies additional electrical energy 52 that is routed to or from the electric control/conversion equipment 34.
  • The [0025] energy management system 10 includes an optimization system 54, which optimizes the generation and usage of the electrical and/or thermal energy from all of the available sources. The optimization system 54 optimizes the usage of electrical energy from the electric control/conversion equipment 34, and optimizes the usage of the thermal energy from the heating and cooling equipment 32, thus optimizing the overall energy usage. The optimization process is explained in greater detail below.
  • In the event there is a surplus of available electrical energy, the excess electrical energy can be stored within a [0026] flywheel 56. As an alternative, excess electrical energy can be sold back to the electric grid 18 and/or stored in a conventional cell or battery. The available thermal energy within the heating and cooling equipment 32 is then assessed and the total energy cost is optimized. The thermal requirements for heating and/or cooling the building 20 for a desired building environment are then calculated based upon the occupancy and usage patterns of the building. The difference between the thermal output (available thermal energy) and the thermal requirements for the desired building environment is then calculated. If the thermal output of the heating and cooling equipment 32 is in excess of the thermal requirements for the building 20, the excess thermal energy may be stored in a heating and cooling storage unit 58 in a conventional manner. If there is insufficient thermal output from the heating and cooling equipment 32 to meet the thermal requirements of the building 20, additional thermal energy may extracted from the heating and cooling storage unit 58. The heating and cooling storage unit 58 may take a variety of forms. For example, the heating and cooling storage unit 58 may be a eutectic salt system which stores thermal energy as the eutectic salt changes phases between a liquid and a solid. Other forms of thermal storage battery systems are known.
  • Referring now to FIG. 2, the [0027] optimization system 54 from FIG. 1 is described in more detail. The optimization system 54 continually optimizes the usage of energy and byproduct heat from the various energy sources in order to maintain a desired building environment at a minimum cost. This is shown by an energy balance and comparison step at 56. The electric demand for the building is calculated at 58. Local electrical energy sources 60, such as the solar energy source 14 and the micro turbine 36, provide an electric output 61 that is set to meet a calculated minimum cost of electric energy. The electrical energy utilization is controlled by a subsystem that optimizes its value with respect to the local energy usage, the generation of electrical energy from the local electrical energy source 60, and electrical energy from the electric grid 18 provided to the building. This subsystem also provides a combination of alternating current and direct current 62 for various applications, as it may be advantageous to utilize at least a portion of the generated electrical energy in the form of direct current rather than converting to alternating current. The subsystem may also optimize the portion of the electrical energy used as direct current.
  • The [0028] various heat sources 64 within the building are then considered, such as the thermal output from the micro turbine(s) 36, fuel cells 38, the thermal output of the solar energy source 14, and/or any auxiliary furnaces that might be present in the building. The thermal usage patterns of the building (which are typically based on occupancy patterns) are then observed at 66, and a thermal requirement for heating and/or cooling of the building to maintain a desired building environment is calculated at 68. The difference between the thermal output of the heat sources 64 and the thermal requirement for the desired building environment 68 is then calculated. If there is excess thermal output, the excess thermal output is preferably allocated to fast response thermal storage at 70, 72. If a maximum temperature is reached within the fast response thermal storage unit 70, 72, heat may be dumped to the atmosphere at 74 through a bypass valve, the generation of heat may be decreased, or the heat may be cooled by means of an absorption cooling device 76, thereby decreasing the need for electric air conditioning (shown at 78). In addition, if the level of humidity within the building needs to be decreased, the heat may be routed to a dessicant dehumidification device 80.
  • As shown schematically in FIG. 3, the [0029] dessicant dehumidification device 80 includes a dessicant wheel 80 a (shown in cross section in FIG. 3) which rotates about a central axis 80 b. A lower duct 82 a routes warm, humid air past the lower portion of the dessicant wheel 80, while an upper duct 82 b routes heated air, such as waste heat, past an upper portion of the dessicant wheel 80. The dessicant wheel 80 absorbs humidity in the lower duct 82 a, thus saturating that portion of the dessicant wheel 80. The dry air leaving the dessicant wheel 80 is returned to the building at A. As the dessicant wheel 80 rotates about its axis 80 b, the saturated portion of the wheel travels to the upper duct 82 b, where the saturated portion is exposed to the hot air. The hot air regenerates the dessicant, and the humid air is exhausted at B.
  • Because approximately half or more of the air conditioning in a typical heating, ventilating, and air conditioning (HVAC) application is used for dehumidification, the use of a [0030] dessicant dehumidification system 80 thereby decreases the need for electric air conditioning (shown at 84 in FIG. 2). The choice is made based upon a calculation of the optimal cost based on a comparison between the cost of generating additional heat for use in the dehumidification system 80, and the cost of using additional electric air conditioning 84. If the calculation for the difference between the thermal output of the heat sources 64 and the thermal requirement for the desired building environment 68 results in an insufficient amount of heat to meet the thermal requirements for the desired building environment, heat is preferably extracted from the fast response thermal storage unit 70, 72 or an auxiliary furnace (not shown), based upon a cost optimization of the value of the energy.
  • FIG. 4 illustrates a distributed [0031] generation system 100 assembled in accordance with the teachings of another disclosed embodiment. A micro turbine 102 produces thermal energy, which is recovered by a heat recovery unit 104, and also produces electrical energy. A connection to an electric grid 106 provides additional electrical energy. The amount of electrical energy needed for a building 108 is set to meet a minimum cost of energy at 110. An energy flow control and optimization unit 112 controls and optimizes the required amounts of electrical energy at 114 and the required amounts of thermal energy for the building 108 by monitoring the amounts of each form of energy that is used or needed. A flow control device 116 then routes the thermal energy and/or electrical energy to various portions of the building 108 as needed based upon the occupancy and usage patterns of the building 108. If there is excess thermal energy, it can be stored in a heat storage unit 118 or, if the heat is not needed the heat may be dumped into the atmosphere, through a bypass valve 120. The excess thermal energy may take the form of a thermal stream exiting the micro turbine 102. Should the excess thermal energy be needed (for example, in the form of hot air or to recharge a dessicant dehumidification system 122), the thermal energy can be routed to the appropriate component. If there is a sufficient amount of thermal energy that needs to be allocated to the building, the thermal energy can be converted into heat through use of a heat exchanger 124.
  • Depending on the building temperature monitoring that occurs at [0032] 126, the thermal energy might need to be converted into cooler air rather than heat. In this case the thermal energy can be sent to an absorption cooling unit 128 and a cooling heat exchanger 130. The resulting heated or cooled air is then directed to a building air handler 132, which thereby directs the heated or cooled air to various portions of the building 108.
  • Another preferred embodiment is designated generally [0033] 150 in FIG. 5. The system 150 optimizes the usage of energy and heat from various energy sources to maintain a desired building environment at minimum cost. This is shown by an energy balance and comparison step at 152. The electric demand for the building is calculated and an electric output 154 is set to meet a calculated minimum cost of electric energy. Various heat sources 156 within the building are then assessed to determine the amount of thermal energy available. The heat sources may include micro turbines, fuel cells, solar heating sources, and/or any auxiliary furnaces that might be present in the building. The thermal usage patterns of the building are then observed at 158, and a thermal requirement for heating and/or cooling of the building to maintain a desired building environment is calculated. The difference between the thermal output of the heat sources 156 and the thermal requirement for the desired building environment is then calculated. If there is excess thermal output, the excess thermal output is preferably allocated to fast response thermal storage at 160. If a maximum temperature is reached within the fast response thermal storage unit 160, either heat is dumped to the atmosphere or the generation of heat is decreased based upon an optimal calculation of cost for either action. Additionally, or alternatively, heat may be stored in regions of the building. If the calculation for the difference between the thermal output of the heat sources 156 and the thermal requirement for the desired building environment results in an insufficient amount of heat to meet the thermal requirements for the desired building environment, heat is preferably extracted from the fast response thermal storage unit 160 or an auxiliary furnace (not shown), based upon a cost optimization of the value of the energy.
  • Distributed combined heat and power systems assembled in accordance with the disclosed embodiments offer further increases in overall fuel efficiency in conjunction with offering increased service reliability and lower costs to the consumer. In a distributed combined heat and power system, a stand alone power generation system provides electrical energy and thermal energy to a building. The power generation system may generate electrical and thermal energy from a number of sources, including, for example, natural gas, waste gas such as refuse generated methane gas, solar energy, and other sources. [0034]
  • In a distributed combined heat and power system, the usage of the combined thermal and electrical energy from the variety of energy sources is controlled and optimized so as to achieve a minimum overall energy cost. In an optimized distributed combined heat and power system, an entire building may be modeled as a system that can be controlled, regulated and interconnected with the external electric grid. The system may have the capacity to generate electrical energy in a number of ways, including from sources such as solar energy assemblies, micro turbines, fuel cells, reciprocating engines, flywheels, or other electricity storage devices. [0035]
  • The system may also have the capacity to capture and use thermal energy form a variety of sources, including streams of recovered byproduct heat from micro turbines and fuel cell reformers. The system may also obtain solar heat directly via active and passive solar heat assemblies and may extract heat from the surrounding atmosphere. The system may also achieve additional efficiencies by optimizing the use of a building's inherent heat storage capacity, and/or by using a fast response thermal storage unit based upon eutectic salt or thermal mass storage technology. Thus, it is possible to reduce the total energy cost for the chosen building application while simultaneously increasing the reliability and quality of the supplied energy streams. [0036]
  • By utilizing energy sources in a localized fashion, (i.e., at the building), which may be used in conjunction with the conventional electric grid, the inventive system may provide electricity and/or thermal energy of specifiable reliability and quality. Additional efficiencies may be gained by recovering a maximum amount of normally wasted heat energy. Further, by controlling the flow and usage of energy, both thermal and electrical, within the building, the overall efficiency of the energy usage is thus further increased, thus reducing the overall cost. [0037]
  • Preferably, the system includes a series of subsystems that optimize the energy usage at the building location. By including building considerations such as building electrical and thermal load patterns and other building energy demand considerations and variables as part of the overall energy usage profile, the system may achieve increased efficiency of between 75% to 80% compared to other systems. As a result, many building systems such as HVAC systems and various electrical systems can be downsized, again reducing cost. [0038]
  • Widespread implementation of such improved and more efficient distributed combined heat and power systems may save ratepayers great amounts in energy costs, and may on an annual basis, greatly reduce carbon dioxide, sulfur dioxide, and nitrogen oxide emissions. [0039]
  • An integrated optimizing control system optimizes the usage of the energy sources and optimizes the usage of the generated energy (i.e., both thermal and electrical energy) within a building resulting in decreased net energy costs, increased reliability, and increased power quality. On a continuous basis, the system evaluates the price of the electric grid, the price of locally generated electricity, and the cost and the value of heat from the various available sources. The system then continually adjusts the usage to achieve an optimal cost. The system also provides an environmentally friendly solution for energy management because of the use of waste heat, and further provides the end user with the ability to customize the desired power quality and reliability options. [0040]
  • The system utilizes a building's inherent heat storage capacity and other available energy sources to reduce the total energy cost for the building while at the same time increasing the reliability and quality of the supplied energy streams. [0041]
  • Solar energy assemblies in the form of solar cells and/or active or passive solar heat assemblies may also be provided in order to provide electrical and thermal energy. Passive solar energy may be configured into the basic design of the building such that there is an optimization of this thermal energy source as well as a consideration of the amount of heat storage within the building. Preferably, a fast response thermal storage system is employed, which allows for the rapid supply of thermal energy during changing environmental and economic conditions of the building. [0042]
  • Further, artificial intelligence systems based on fuzzy logic and neural networks may be used to further optimize and control the system. A neural network is an information processing system that may include an array of highly interconnected processor nodes that have a similarity to living neurons. These artificial neurons are arranged in interconnected layers. The network is programmed, in the simplest case, by comparing actual output values with desired output values and adjusting the weighting of the interconnections between the layers to produce the desired output values for one or more sets of training input values. [0043]
  • Neural networks may be used for two purposes. First, the networks may be used as part of a feed forward predictive system. This system will allow for characterization of the building energy system and its subsequent optimization. Second, the networks may be used to predict building occupancy patterns based on regional energy usage, and may change the energy content of these regions by changing either the sensible or possibly a portion of the latent heat of the particular region. [0044]
  • The neural networks preferably divide the building into zones and define usage patterns of each of the zones within the building. Then, low usage portions of the building may be used to store heat for use by high usage portions of the building. These occupancy patterns shift throughout the day, and the system adapts dynamically to these patterns with the intent of minimizing the net thermal energy use of the building. Such a predictive scheme will allow the building itself to become an energy storage system. Such energy storage will reduce the total energy costs by shifting energy from where it is not needed to regions of the building where it can be of most value. This will allow for optimization of the building energy system and will provide information for potential reductions in the HVAC capital expenditures anticipated for smaller buildings. The fast response thermal storage option will greatly enhance the value of the waste heat and overall efficiency of the energy system. [0045]
  • Natural gas energy sources include distributed generation sources of heat or electricity such as micro turbines, reciprocating engines, fuel cells, and/or conventional HVAC components that are driven by natural gas. For the distributed generation options, electricity and heat may be produced by micro turbines, reciprocating engines, fuel cells, and/or other electricity producing devices. [0046]
  • The heat produced as a byproduct of the electric generation process may be recovered by means of a system that heats a flowing heat transfer medium, such as propylene glycol. Additional heat may also be recovered from passive solar heating assemblies in the building. This heat is then utilized for direct heating, cooling by means of absorption cooling devices, and/or stored for later use. [0047]
  • Electricity and heat may be produced by one or more of a micro turbine(s), a reciprocating engine(s), and/or fuel cells. Renewable resources including photoelectric generation, active solar heating and lighting, and passive solar heating and lighting may also provide energy. By actively integrating the produced electricity with thermal energy sources and fast response thermal storage, it is possible to provide multiple levels of power quality and reliability as well as reduced overall energy costs. [0048]
  • The electrical energy utilization is controlled by a subsystem that optimizes its value with respect to the local energy usage as well as competitive electric energy sources such as energy from the electric grid of the building. This subsystem may also provide a combination of alternating current and direct current for various applications contingent upon optimal usage profiles. One of the benefits of the system described herein is the ability to use direct current (DC) electricity directly, rather than converting the electricity into alternating current (AC). This provides a savings in electricity because normally a loss results when direct current is converted into alternating current using a conventional inverter such as an oscillator or chopper followed by a step transformer. By using the direct current directly, efficiency is increased. This also greatly enhances the reliability of the system since the inverter is typically a point of higher failure rate for those systems that contain standby or uninterruptible power supplies. The direct use of direct current also provides a cost savings because DC to AC conversion equipment is not needed. [0049]
  • The optimization system optimizes the usage of the energy and byproduct heat from the various energy sources to maintain a desired building environment at minimum cost. This optimization system first considers the electric demand for the building and sets an electric output to meet a calculated minimum cost of electric energy. Next, the various heat streams are considered, such as the thermal output from micro turbines and/or fuel cells, solar heating sources, or any auxiliary furnaces that might be present in the building. The occupancy and usage patterns of the building are then observed, and a thermal requirement for heating and/or cooling of the building is calculated. This thermal requirement is based upon a model of the building at various weather conditions and the geographic orientation of the building. The difference between the thermal output of the heat streams and the thermal requirement for the desired building environment is then calculated. If there is an excess thermal output, the excess thermal output is preferably allocated to fast response or other appropriate thermal storage until a maximum temperature is reached. If the maximum temperature is reached within the appropriate thermal storage unit, excess heat may be dumped to the atmosphere, or the generation of heat may be decreased based on an optimal calculation of cost for either action. If the calculation for the difference between the thermal output of the heat streams and the thermal requirement for the desired building environment results in an insufficient amount of heat to meet the heating requirements of the building, heat may be extracted from the fast response thermal storage or an auxiliary furnace, based upon a cost optimization of the value of the energy. The calculation of the difference between the thermal output of the heat streams and the thermal requirement for the desired building environment is crucial, because the thermal or time constant limits of the thermal storage cannot be exceeded. [0050]
  • Two approaches to the time response of the thermal storage can be used. The first approach establishes a dead band above and below the acceptable operating limits. The second approach continually estimates the time constant associated with the particular operating point. Both approaches or methods may be used within the optimizing system described herein and can be selected by user or system preference dependent upon operating conditions. [0051]
  • At this level the building itself is considered a thermal storage entity. A feed forward, fuzzy logic, and or neural network system may be utilized to learn the occupancy and usage patterns of the building and allocate thermal energy in the building as part of the cost optimization system. Various active building energy schemes, such as physical space reconfiguration (movable walls, lighting schemes and water walls) may be included. This level of optimization then may be included in an overall cost optimization system that considers external grid power as part of the optimization system. The index of performance for this calculation is the total energy cost (e. g., the total fuel cost and the total electrical energy cost), divided by the amount of useable energy (e.g., kilowatts of thermal and electrical energy). [0052]
  • To allocate thermal energy to the building appropriately, the particular characteristics for each energy source that provide the best economic and reliability value are preferably investigated. Each of these individual aspects may then become a degree of freedom for formulation of a global index of performance. This global index may then be optimized given the constraints within the physical and environmental aspects of the building. By doing this, the individual energy sources may be controlled in a manner that produces the maximum economic value within the constraints for the economics, reliability, power quality and environmental considerations. [0053]
  • In the preferred embodiment, the index of performance is defined as the cost per kilowatt of energy for a specific instant in time, where one kilowatt equals both electrical energy and thermal energy:[0054]
  • IP=(x1+x2+x3+x4+x5)/ξ,
  • wherein ξ=kilowatts of energy (electric and heat); [0055]
  • wherein [0056]
  • x1=natural gas cost; [0057]
  • x2=grid electric cost; [0058]
  • x3=solar electric cost; [0059]
  • x4=solar heat cost; [0060]
  • x5=grid electric backup cost; [0061]
  • wherein x1+x2+x3+x4+x5≦non combined heat and power gas and electric energy cost. [0062]
  • There are also numerous variables that are considered in the calculations of the index of performance, and they are as follows: [0063]
  • x6=turbine efficiency; [0064]
  • x7=fuel cell efficiency; [0065]
  • x8=turbine/fuel cell heat recovery efficiency; [0066]
  • x9=solar heating or cooling efficiency; [0067]
  • x10=fast response heat storage cost; [0068]
  • x11=fast response heat storage size; [0069]
  • x12=fast response heat storage time constant; [0070]
  • x13=solar heat incident on building; [0071]
  • x14=heat needed by building to maintain desired temperature; [0072]
  • x15=desired building temperature for occupied regions; [0073]
  • x16=electric usage (AC+DC); [0074]
  • x17=reliability of electric service; [0075]
  • x18=reliability of thermal service; [0076]
  • x19=power quality service cost; [0077]
  • x20=building thermal usage; [0078]
  • x21=building electric usage; [0079]
  • x22=fraction of electric supplied by gas distributed generation; [0080]
  • x23=fraction of electric supplied by grid; [0081]
  • x24=fraction of electric supplied as direct current; [0082]
  • x25=fraction of gas generation waste heat used for building heating; [0083]
  • x26=fraction of gas generation waste heat used for dessicant dehumidification; [0084]
  • x27=fraction of gas generation waste heat used for absorption cooling; [0085]
  • x28=temperature of heat storage; [0086]
  • x29=heat storage capacity for unoccupied regions of building; [0087]
  • x30=maximum Δ temperature of unoccupied region of building; [0088]
  • wherein heat storage minimum temperature ≦x28≦heat storage maximum temperature; [0089]
  • wherein minimum temperature≦x31≦maximum temperature; [0090]
  • wherein [0091]
  • x24≦1, [0092]
  • x25≦1, [0093]
  • x26≦1, [0094]
  • x27≦1, [0095]
  • x30≦accepted level; [0096]
  • wherein minimum solar input ≦x13≦maximum solar input; and [0097]
  • wherein [0098]
  • x10≦direct heat production cost, [0099]
  • x11≦maximum allowable physical size, [0100]
  • x12≧minimum possible value. [0101]
  • Preferably, the analysis for the optimization of the index of performance is done in the time domain. Various frequency domain considerations and calculations may be performed during and/or after the optimization to supplement the optimization process. [0102]
  • To visualize the fuzzy control system, a multi-dimensional control surface may be used. Illustrated in FIG. 6 is one potential three-dimensional control surface. The value for a particular output variable is calculated by determining the output variable's degree of membership in each fuzzy input variable and mapping the input variables on to the multi-dimensional control surface. The final dimension of the control surface (the height in this case) is the value of the output variable. In the example shown, there are two input variables and one output variable. However, it should be understood that any number of different input and output variables could be used. [0103]
  • In practice, only a few points on the control surface are design coordinates that are stored in the system, with the remainder of the points on the control surface being determined via interpolation. In this example, nine design coordinates are used to define the three dimensional control surface, one for each combination of low, medium, and high of the two input variables. However, it should be understood that any number of design coordinates could be used to define the control surface, and that the control surface could have any number of dimensions. [0104]
  • Illustrated in FIG. 7 are rules, depicted in matrix and textual forms, associated with the design coordinates used to construct the control surface of FIG. 6. For example, the “center” rule states that if [0105] input variable 1 is “high” and input variable 2 is “medium,” then set the output variable's value to 4. In another example, the following three rules may be used to define a portion of an exemplary control surface: 1) If the temperature differential is a large positive, then the heat bypass is large; 2) If the temperature differential is a medium positive; and 3) if the temperature differential is a small positive, then the heat bypass is small. A matrix may be considered a very coarse view of the control surface looking straight down from above. The values of the design coordinates are the outputs of the rules. The weight each of these rules carries can be adjusted by modifying the value of its output, thereby altering the shape of the control surface.
  • Illustrated in FIG. 8 is another downward view of the control surface. The rule numbers associated with the design coordinates are indicated in nine of the locations. A single rule governs the priority in these areas. The arrows indicate regions of the control surface where more than one rule applies and interpolation is used. Trapezoidal membership functions along the axes allegorize overlapping areas where more than one label of an input is partially true at the same time. The centroids of these trapezoids can be adjusted to alter the shape of the control surface. Of course, shapes other than trapezoids could be used to describe the membership functions. For example, triangular membership functions are shown in FIGS. 9-12, which correspond to the exemplary rules given above. [0106]
  • Given the dynamic environment in which such a system is deployed, determining the best shape for the control surface is a moving target. Therefore, the control surface can be continually adjusted during operation to home in on the optimal shape and optimize the efficiency of the system. In a first embodiment, each input axis is scaled to distribute the range of values. Of course, any number of moving average and scaling functions could be used to adapt the control surface according to this method. [0107]
  • In a second embodiment, the weights of the rules and/or the centroids of the trapezoidal membership functions are adjusted (in effect the shape of the control surface is adjusted) in response to one or more performance metrics. Performance metrics are any type of feedback the system receives. In one embodiment, the system adjusts one or more of the weights and/or centroids in a random direction. If the performance metric improves, the adjustment continues in the same direction. If the performance metric degrades, another random direction is chosen. Eventually, in a stable environment, the system will converge on a small set of near optimal control surfaces (i.e., a circle of convergence). In a dynamic environment it will continue to chase the optimal control surface. Large adjustments will converge faster, but will also create a large circle of convergence. Of course, the size of the adjustment need not be constant. The system could use large adjustments when necessary to converge and then small adjustments to linger in a tight circle of convergence. [0108]
  • The modeled system is preferably continuous. Under various circumstances discrete models are used as appropriate to either enhance the calculation or decrease the time needed for calculations. Generally, a lumped parameter representation is used in the analysis in a well known manner. This allows for the use of standard differential equations as opposed to partial differential equations. The initial optimization is done assuming the system is deterministic rather than stochastic. After the initial optimization is completed, a probabilistic optimization is done to account for uncertainties in data and forecasts. [0109]
  • Preferably, the index of performance is based upon a generic system that is simulated using a computer simulation modeling system. Input and output from this simulation is done through an interface with a numeric computational computer program. System optimization is done through computer routines that utilize custom designed functions as well as those available in the numeric computational computer program. A building model is interfaced with the numeric computational computer program to provide building thermal requirements as a function of time. [0110]
  • This methodology is not specific to any particular computer product. In one embodiment, MATHCAD®, a general purpose modeling program, is used for the modeling of the building. The standard program has been modified to account for various building requirements, including but not limited to thermal output, solar heating output, geographic orientation, and insulation. This program then outputs to MATLAB® from Mathsoft, Inc., which is used for the numeric computational computer program. This is a broad modeling system that was programmed for the energy management package, which accounts for the various heat sources, the capability of heat storage, the maximum temperature within the heat storage, and what to do with excess heat once the maximum heat storage temperature is reached. SIMULINK®, also from Mathsoft, interfaces with MATLAB® and is used for the simulation. This program provides a prediction of the amount of BTUs produced within the system at any given time, depending on the amount of energy available. OPTIMIZATION TOOLBOX®, also from Mathsoft, is used for the optimization routines. [0111]
  • The net effect of this multi-dimensional optimization scheme is to choose the blend of energy sources that produces the desired energy configuration of the building and minimizes the total energy cost and any negative environmental impact of the building. [0112]
  • The global energy control system optimizes the sources of electrical and thermal energy so as to minimize the overall energy costs of the building to less than that provided by conventional energy source options. This system continually regulates the balance between energy production and storage so as to minimize cost within the constraints of the energy reliability, quality and usage patterns of the building. As a result of this optimization, it is possible to run the combined heat and power system in a base loaded mode of operation rather than a peaking mode. This allows the system to run continuously because it is less weather dependent. This, in turn, greatly enhances the economic and environmental benefits of the system. [0113]
  • The foregoing description is for the purpose of teaching those of ordinary skill in the art the best mode of carrying out the invention and is illustrative only. Modifications and alternative embodiments of the invention will be apparent to those skilled in the art in view of this detailed description of the exemplary embodiments. The details of the disclosed structure may be varied substantially without departing from the scope or spirit of the invention, and the exclusive use of all modifications within the scope of the appended claims is reserved. [0114]

Claims (25)

What is claimed:
1. A method of distributing energy for a building, the method comprising the steps of:
A. generating energy including electrical energy, generated heat, and byproduct heat from energy sources selected from the group consisting of natural gas, solar energy assemblies, and an electric grid;
B. recovering at least a portion of the byproduct heat;
C. modeling a total energy profile for the building, the total energy profile including a thermal energy requirement and an electrical energy requirement;
D. assessing a total available heat stream, the total available heat stream including a stream of the generated heat and a stream of the byproduct heat;
E. routing the electrical energy and the streams of generated heat and byproduct heat to the building for use;
F. establishing a target total energy cost for a discrete time interval;
G. calculating an index of performance indicative of an actual total energy cost for the discrete time interval; and
H. optimizing the usage of the electrical energy and the streams of generated heat and byproduct heat over the discrete time interval through an optimizing scheme to thereby maintain a desired building environment at a minimum total energy cost, wherein the optimizing scheme comprises the steps of:
a. calculating a minimum electrical energy requirement;
b. setting an electrical energy output to meet the calculated minimum electrical energy requirement;
c. comparing the total available heat stream to the thermal requirement for the building;
d. if the total available heat stream exceeds the thermal requirement for the building, then one of: i) storing an excess portion of the total available heat stream in a storage device; ii) dumping the excess portion to the atmosphere; or iii) decreasing the total available heat stream;
e. if the total available heat stream is less than the thermal requirement for the building, then at least one of: i) extracting the stored excess portion from the storage device; and ii) increasing the generated heat stream; and
f. optimizing the system by comparing the actual total energy cost to the target total energy cost and adjusting the usage of the electrical energy and the total available heat stream to thereby provide the minimum actual total energy cost.
2. The method of claim 1, wherein the index of performance is defined as a function of N independent variables within a given region of N space or dimension as follows:
IP=IP (x1, x2, . . . , xn), with the region being defined by ψ (x1, x2, . . . , xn)≦0, and wherein the index of performance is calculated by the following equation:
IP=(x1+x2+x3+x4+x5)/ξ,
wherein ξ=kilowatts of energy (electric and heat), and further wherein:
x1=an actual cost of natural gas over the discrete time interval;
x2=an actual cost of grid supplied electrical energy over the discrete time interval;
x3=an actual cost of solar energy assembly supplied electrical energy over the discrete time interval;
x4=an actual cost of solar energy supplied heat energy over the discrete time interval;
x5=an actual cost of grid supplied electrical backup energy; and wherein x1+x2+x3+x4+x5≦non-combined heat, power, gas and electrical energy cost.
3. The method of claim 2, wherein the energy is generated using at least one of a microturbine or a fuel cell assembly, and wherein the index of performance is further calculated by considering the following variables and constraints:
x6=turbine efficiency;
x7=fuel cell efficiency;
x8=turbine/fuel cell heat recovery efficiency;
x9=solar heating or cooling efficiency;
x10=heat storage cost;
x11=heat storage capacity;
x12=heat storage time constant;
x13=solar heat incident on building;
x14=heat needed by building to maintain desired temperature;
x15=desired building temperature for occupied regions;
x16=electrical energy usage, including alternating current usage and direct current usage;
x17=reliability of the grid-supplied electrical energy;
x18=reliability of the total available heat stream;
x19=power quality service cost,
x20=actual building thermal energy usage;
x21=actual building electrical usage;
x22=fraction of the electrical energy requirement supplied by the microturbine and the fuel cell;
x23=fraction of the electrical energy requirement supplied by the electric grid;
x24=fraction of the electrical energy requirement supplied in the form of direct current;
x25=fraction of byproduct heat used to satisfy a portion of the thermal energy requirement for heating the building;
x26=fraction of byproduct heat used for dehumidification of the heat storage device;
x27=fraction of byproduct heat used to satisfy a portion of the thermal energy requirement for cooling the building;
x28=temperature of the heat storage device;
x29=the heat storage capacity for a first set of designated regions of the building; and
x30=maximum Δ temperature of the first set of designated regions of the building;
wherein heat storage minimum temperature≦x28≦heat storage maximum temperature;
wherein minimum temperature≦x31≦maximum temperature, and further wherein:
x24≦1;
x25≦1;
x26≦1;
x27≦1;
x30≦a predetermined level; and wherein a minimum solar input≦x13≦a maximum solar input; and wherein
x10≦direct heat production cost,
x11≦maximum allowable physical size,
x12≧minimum possible value.
4. The method of claim 1, wherein the index of performance is defined as a function of N fuzzy variables within a given region of N space as follows:
IP=IP (x1, x2, . . . , xn), with the region being defined by ψ (x1, x2, . . . , xn)≦0, and wherein the index of performance is calculated by the following equation:
IP=(x1+x2+x3+x4+x5)/ξ,
wherein ξ=kilowatts of energy (electric and heat), and further wherein:
x1=an actual cost of natural gas over the discrete time interval;
x2=an actual cost of grid supplied electrical energy over the discrete time interval;
x3=an actual cost of solar energy assembly supplied electrical energy over the discrete time interval;
x4=an actual cost of solar energy supplied heat energy over the discrete time interval;
x5=an actual cost of grid supplied electrical backup energy;
wherein x1+x2+x3+x4+x5≦non-combined heat, power, gas and electrical energy cost; and
including the additional steps of:
determining a degree of membership in each of at least two of the fuzzy variables;
mapping the at least two degrees of membership onto a control surface adapted to optimize the energy usage; and
assigning a priority to at least one of the variables in response to the control surface mapping.
5. The method of claim 1, wherein the group of energy sources further includes at least one of refuse-generated methane gas and biomass-generated methane gas.
6. The method of claim 1, wherein the storage device is a fast response thermal storage unit.
7. The method of claim 1, wherein the electrical energy requirement includes a direct current requirement and an alternating current requirement, and calculating an optimal fraction of at least one of the direct or alternating current requirements relative to the electrical energy requirement.
8. The method of claim 1, wherein the step of modeling the total energy profile for the building includes the steps of assessing an occupancy pattern of the building and a usage pattern of the building.
9. The method of claim 1, wherein the step of modeling the total energy profile for the building includes the step of calculating the effect of environmental factors on the building.
10. The method of claim 1, including the step of using a dehumidification system to alter the total energy profile.
11. The method of claim 10, wherein the dehumidification system is a dessicant dehumidification system.
12. The method of claim 11, including the step of using a fractional portion of the byproduct heat to recondition the dessicant dehumidification system.
13. The method of claim 1, including routing the total available heat stream to the building using at least one of a heat exchanger or an absorption cooling device.
14. The method of claim 1, wherein the byproduct heat is recovered using a heat exchanger.
15. The method of claim 1, wherein the byproduct heat is dumped using a heat exchanger.
16. The method of claim 1, wherein the byproduct heat is dumped to the atmosphere using a bypass valve.
17. An energy management system for managing the generation and distribution of energy from an energy source to a building, the building having a desired building environment and a total energy profile including a thermal energy requirement and an electrical energy requirement, the energy management system comprising:
an energy generator arranged to convert energy from the energy source to thermal energy and electrical energy;
a heat recovery unit arranged to recover byproduct heat from the energy generator;
a cooling unit arranged to use a first portion of the thermal energy to drive a refrigeration unit;
a heating unit arranged to use a second portion of the thermal energy to drive a heating unit;
a heat storage unit arranged to store excess heat; and
an energy optimizing controller, the energy optimizing controller including a thermal flow controller and an electrical flow controller, the thermal flow controller being arranged to distribute the thermal energy and the recovered byproduct heat to at least one of the cooling unit, the heating unit, and the heat storage unit, the electrical flow controller being arranged to distribute electrical energy to at least one of a plurality of electrical components, the energy optimizing controller being arranged to establish a target total energy cost, calculate an index of performance indicative of an actual energy cost based on an actual electrical load and an actual thermal load, compare the actual energy cost to the target total energy cost, and adjust the distribution of the thermal and electrical energy to thereby obtain a minimum total cost.
18. The system of claim 17, including a dessicant dehumidification system to remove moisture from the building.
19. The system of claim 17, wherein the heating unit includes a heating heat exchanger.
20. The system of claim 17, wherein the cooling unit includes a cooling heat exchanger.
21. The system of claim 17, including a bypass valve to dump an excess portion of the thermal energy to the atmosphere.
22. The system of claim 17, wherein the energy generator can be selected from the group consisting of a micro turbine, a fuel cell, an electric grid, and solar cells.
23. The system of claim 17, including a power converter for converting a portion of the electrical energy to at least one of direct current or alternating current, and further wherein the energy optimizing controller also includes a converter controller for controlling the power converter.
24. A system for satisfying the energy requirements of a building comprising the steps of:
generating electrical energy and byproduct heat from one or more energy sources selected from the group consisting of natural gas, solar heating assemblies, and an electric grid;
determining the available amount of electrical energy;
determining the available amount of byproduct heat;
determining the energy requirements of the building, the energy requirements of the building including building heating requirements and building electrical energy requirements;
using the electrical energy and the byproduct heat to meet the energy requirements of the building; and
optimizing the using of the electrical energy and the byproduct heat through an optimizing scheme to minimize a total energy cost, wherein the optimizing scheme comprises the steps of:
establishing a target total energy cost;
calculating an index of performance indicative of an actual energy cost;
comparing the actual energy cost to the target total energy cost; and
adjusting the usage of the electrical energy and the byproduct heat.
25. A micro-cogeneration system comprising:
a gas fired micro-turbine for providing electrical and thermal energy;
means for recovering byproduct heat from the micro-turbine;
a heat exchanger system for converting a first portion of the thermal energy into useable heat;
an absorption cooler system for converting a second portion of the thermal energy into useable energy to drive a refrigeration cycle; and
means for distributing the electrical and thermal energy to a building for use.
US10/863,145 2000-08-11 2004-06-08 Method of distributing energy for a building, energy management system, system for satisfying the energy requirements of a building, and micro-cogeneration system Abandoned US20040267408A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US10/863,145 US20040267408A1 (en) 2000-08-11 2004-06-08 Method of distributing energy for a building, energy management system, system for satisfying the energy requirements of a building, and micro-cogeneration system

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
US22460600P 2000-08-11 2000-08-11
US09/928,040 US6757591B2 (en) 2000-08-11 2001-08-10 Energy management system and methods for the optimization of distributed generation
US10/863,145 US20040267408A1 (en) 2000-08-11 2004-06-08 Method of distributing energy for a building, energy management system, system for satisfying the energy requirements of a building, and micro-cogeneration system

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
US09/928,040 Division US6757591B2 (en) 2000-08-11 2001-08-10 Energy management system and methods for the optimization of distributed generation

Publications (1)

Publication Number Publication Date
US20040267408A1 true US20040267408A1 (en) 2004-12-30

Family

ID=22841382

Family Applications (2)

Application Number Title Priority Date Filing Date
US09/928,040 Expired - Fee Related US6757591B2 (en) 2000-08-11 2001-08-10 Energy management system and methods for the optimization of distributed generation
US10/863,145 Abandoned US20040267408A1 (en) 2000-08-11 2004-06-08 Method of distributing energy for a building, energy management system, system for satisfying the energy requirements of a building, and micro-cogeneration system

Family Applications Before (1)

Application Number Title Priority Date Filing Date
US09/928,040 Expired - Fee Related US6757591B2 (en) 2000-08-11 2001-08-10 Energy management system and methods for the optimization of distributed generation

Country Status (4)

Country Link
US (2) US6757591B2 (en)
AU (1) AU2001286433A1 (en)
TW (1) TW539932B (en)
WO (1) WO2002015365A2 (en)

Cited By (48)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070033951A1 (en) * 2005-07-19 2007-02-15 Visteon Global Technologies, Inc. Thermoelectric based heating and cooling system for a hybrid-electric vehicle
US20070239317A1 (en) * 2006-04-07 2007-10-11 Bogolea Bradley D Artificial-Intelligence-Based Energy Auditing, Monitoring and Control
US20080035195A1 (en) * 2001-02-09 2008-02-14 Bell Lon E Thermoelectric power generation systems
US20080271881A1 (en) * 2007-05-01 2008-11-06 Blecker Joseph G Automatic Switching Two Pipe Hydronic System
US20090038324A1 (en) * 2007-08-07 2009-02-12 Syracuse University Power and Refrigeration Cascade System
JP2009170405A (en) * 2008-01-15 2009-07-30 Nan Ya Printed Circuit Board Corp Energy management module and driving apparatus
US20100095996A1 (en) * 2005-06-28 2010-04-22 Bsst, Llc Thermoelectric power generator with intermediate loop
US20100110077A1 (en) * 2008-11-06 2010-05-06 Gary Grossman System and method for identifying power usage issues
AU2009236018A1 (en) * 2009-02-04 2010-08-19 Applied Hybrid Energy Pty Ltd An electrical power generation system
US20100326098A1 (en) * 2008-03-12 2010-12-30 Rog Lynn M Cooling, heating and power system with an integrated part-load, active, redundant chiller
US7870892B2 (en) 2004-05-10 2011-01-18 Bsst Llc Climate control method for hybrid vehicles using thermoelectric devices
US7870745B2 (en) 2006-03-16 2011-01-18 Bsst Llc Thermoelectric device efficiency enhancement using dynamic feedback
US20110067742A1 (en) * 2009-07-24 2011-03-24 Bell Lon E Thermoelectric-based power generation systems and methods
US20110088417A1 (en) * 2009-10-19 2011-04-21 Kayser Kenneth W Energy Recovery Ventilator And Dehumidifier
WO2011100427A2 (en) * 2010-02-12 2011-08-18 Enphase Energy, Inc. Method and apparatus for smart climate control
US20110231320A1 (en) * 2009-12-22 2011-09-22 Irving Gary W Energy management systems and methods
WO2012045027A1 (en) * 2010-09-30 2012-04-05 Robert Bosch Gmbh Adaptive load management system for incorporating customer electrical demand information for energy management
US20120089256A1 (en) * 2010-10-12 2012-04-12 Engineered Electric Company Portable cogeneration system incorporating renewable energy soures
US20120109704A1 (en) * 2010-10-27 2012-05-03 Ratnesh Kumar Sharma Managing utilization of biogas in an infrastructure
US20120150509A1 (en) * 2010-12-14 2012-06-14 Patrick Andrew Shiel Continuous optimization energy reduction process in commercial buildings
CN102510095A (en) * 2011-10-23 2012-06-20 西安交通大学 Combined cycle and straight condensing thermal power combined dispatching system and method
CN102510094A (en) * 2011-10-23 2012-06-20 西安交通大学 Combined cycle and pure condensed steam thermal power scheduling system and method
US20120173456A1 (en) * 2010-11-24 2012-07-05 Hirl Joseph P Decision support system for the management of energy use, contracting and capital investments for facilities
US8261868B2 (en) 2005-07-19 2012-09-11 Bsst Llc Energy management system for a hybrid-electric vehicle
US20120316687A1 (en) * 2011-06-07 2012-12-13 Fujitsu Limited System and Method for Managing Power Consumption
US20130024014A1 (en) * 2011-07-20 2013-01-24 Nec Laboratories America, Inc. Optimal energy management of a rural microgrid system using multi-objective optimization
US8409439B1 (en) 2009-04-28 2013-04-02 Nested Nozzle Mixers, Inc. Pressurized digester vessel
US8495884B2 (en) 2001-02-09 2013-07-30 Bsst, Llc Thermoelectric power generating systems utilizing segmented thermoelectric elements
WO2013130311A2 (en) * 2012-02-27 2013-09-06 Siemens Corporation System and method of total cost optimization for buildings with hybrid ventilation
US20130252120A1 (en) * 2008-03-18 2013-09-26 John S. Robertson Energy conversion system
US20130338835A1 (en) * 2012-06-14 2013-12-19 Christopher Mark Pepe Cogeneration System and Process for Determining Whether to Use Cogeneration
US8613200B2 (en) 2008-10-23 2013-12-24 Bsst Llc Heater-cooler with bithermal thermoelectric device
US20140129042A1 (en) * 2012-11-07 2014-05-08 Dorazio Enterprises, Inc. Community Based Energy Management System
WO2014138102A1 (en) * 2013-03-04 2014-09-12 Greensleeves, LLC Energy management systems and methods of use
US9006557B2 (en) 2011-06-06 2015-04-14 Gentherm Incorporated Systems and methods for reducing current and increasing voltage in thermoelectric systems
US9080789B2 (en) 2010-05-05 2015-07-14 Greensleeves, LLC Energy chassis and energy exchange device
US20160006066A1 (en) * 2008-03-18 2016-01-07 John S. Robertson Energy conversion system
US9293680B2 (en) 2011-06-06 2016-03-22 Gentherm Incorporated Cartridge-based thermoelectric systems
US9306143B2 (en) 2012-08-01 2016-04-05 Gentherm Incorporated High efficiency thermoelectric generation
US9310112B2 (en) 2007-05-25 2016-04-12 Gentherm Incorporated System and method for distributed thermoelectric heating and cooling
US9423140B2 (en) 2014-02-16 2016-08-23 Be Power Tech, Inc. Liquid desiccant regeneration system, systems including the same, and methods of operating the same
US20160301344A1 (en) * 2012-06-14 2016-10-13 Pac, Llc Cogeneration system configured to be installed into an existing boiler plant/ emergency generator installation and process for cogeneration
WO2017100768A1 (en) * 2015-12-12 2017-06-15 Micro-Utilities, Inc. Passive energy storage systems and related methods
WO2017205397A1 (en) * 2016-05-24 2017-11-30 Scuderi Group, Inc. Method of utilizing a combined heat and power system to produce electricity for a wholesale electricity market
US10205322B1 (en) 2015-03-09 2019-02-12 Cummins Power Generation Ip, Inc. Economically efficient operation of a power generator
US10387581B2 (en) 2013-09-05 2019-08-20 Greensleeves, LLC System for optimization of building heating and cooling systems
US11594770B2 (en) 2017-05-03 2023-02-28 Semiconductor Energy Laboratory Co., Ltd. Neural network, power storage system, vehicle, and electronic device
EP4131701A4 (en) * 2020-03-26 2024-01-03 Hitachi Ltd Thermal energy management system

Families Citing this family (146)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2386770A (en) * 2002-03-18 2003-09-24 Ecoct Gen Ltd Utility production and distribution system
US20030236593A1 (en) * 2002-06-21 2003-12-25 Schumacher Brett L. Method and apparatus for management of distributed heat and power generation
US20040019393A1 (en) * 2002-07-25 2004-01-29 Eileen Heider System and method for model base control
US7333880B2 (en) 2002-12-09 2008-02-19 Enernoc, Inc. Aggregation of distributed energy resources
US7142949B2 (en) 2002-12-09 2006-11-28 Enernoc, Inc. Aggregation of distributed generation resources
US7024258B2 (en) * 2003-03-17 2006-04-04 Siemens Building Technologies, Inc. System and method for model-based control of a building fluid distribution system
US20040253489A1 (en) * 2003-06-12 2004-12-16 Horgan Thomas J. Technique and apparatus to control a fuel cell system
EP1511108B1 (en) * 2003-08-29 2006-12-27 Matsushita Electric Industrial Co., Ltd. Cogeneration system, operation controller for cogeneration facility, and operation program for cogeneration facility
US20060068246A1 (en) * 2003-09-09 2006-03-30 Shiro Matsuo Energy stations
US7127327B1 (en) * 2003-09-11 2006-10-24 Dte Energy Technologies, Inc. System and method for managing energy generation equipment
US8234876B2 (en) * 2003-10-15 2012-08-07 Ice Energy, Inc. Utility managed virtual power plant utilizing aggregated thermal energy storage
US7502768B2 (en) * 2004-02-27 2009-03-10 Siemens Building Technologies, Inc. System and method for predicting building thermal loads
US7665670B2 (en) * 2004-03-25 2010-02-23 Siemens Industry, Inc. Method and apparatus for an integrated distributed MEMS based control system
US20060036675A1 (en) * 2004-04-26 2006-02-16 Crichlow Henry B Method and system for energy management and optimization.
US7412842B2 (en) 2004-04-27 2008-08-19 Emerson Climate Technologies, Inc. Compressor diagnostic and protection system
US7444189B1 (en) 2004-06-15 2008-10-28 John Joseph Marhoefer Method and apparatus for simultaneous optimization of distributed generation and hydrogen production
US8019445B2 (en) 2004-06-15 2011-09-13 Intelligent Generation Llc Method and apparatus for optimization of distributed generation
US7275377B2 (en) 2004-08-11 2007-10-02 Lawrence Kates Method and apparatus for monitoring refrigerant-cycle systems
US7424343B2 (en) 2004-08-11 2008-09-09 Lawrence Kates Method and apparatus for load reduction in an electric power system
AU2005277937A1 (en) * 2004-08-11 2006-03-02 Lawrence Kates Method and apparatus for monitoring refrigerant-cycle systems
US8940265B2 (en) * 2009-02-17 2015-01-27 Mcalister Technologies, Llc Sustainable economic development through integrated production of renewable energy, materials resources, and nutrient regimes
US7567859B2 (en) 2004-12-01 2009-07-28 Honeywell International Inc. Methods and apparatuses for control of building cooling, heating and power co-generation systems
US8099198B2 (en) * 2005-07-25 2012-01-17 Echogen Power Systems, Inc. Hybrid power generation and energy storage system
US8158286B2 (en) * 2005-08-17 2012-04-17 Honda Motor Co., Ltd. Energy stations
US20070042509A1 (en) * 2005-08-18 2007-02-22 Texas Instruments Inc. Detecting endpoint using luminescence in the fabrication of a microelectronics device
EP1764562A1 (en) * 2005-09-16 2007-03-21 RWE Fuel Cells GmbH Method for operating a fuel cell in a heating system
US9188363B2 (en) 2006-01-27 2015-11-17 Emerson Electric Co. Smart energy controlled water heater
US9151516B2 (en) * 2006-01-27 2015-10-06 Emerson Electric Co. Smart energy controlled water heater
US9310098B2 (en) 2006-01-27 2016-04-12 Emerson Electric Co. Water heater control using external temperature sensor
US8364327B2 (en) * 2006-06-23 2013-01-29 Saudi Arabian Oil Company Systems, program product, and methods for targeting optimal process conditions that render an optimal heat exchanger network design under varying conditions
US20080016768A1 (en) 2006-07-18 2008-01-24 Togna Keith A Chemically-modified mixed fuels, methods of production and used thereof
US8590325B2 (en) 2006-07-19 2013-11-26 Emerson Climate Technologies, Inc. Protection and diagnostic module for a refrigeration system
US20080216494A1 (en) 2006-09-07 2008-09-11 Pham Hung M Compressor data module
JP2010504733A (en) * 2006-09-25 2010-02-12 レクソース サーミオニクス,インコーポレイテッド Hybrid power generation and energy storage system
WO2008086617A1 (en) * 2007-01-17 2008-07-24 Groupe Enerstat Inc. Energy recuperation system
GB2448504B (en) * 2007-04-17 2012-07-25 Timothy Patrick Cooper A load management controller
US20090037142A1 (en) 2007-07-30 2009-02-05 Lawrence Kates Portable method and apparatus for monitoring refrigerant-cycle systems
US9140728B2 (en) 2007-11-02 2015-09-22 Emerson Climate Technologies, Inc. Compressor sensor module
US20090138305A1 (en) * 2007-11-27 2009-05-28 Shah Amip J Management of a service performing structure
US8041462B2 (en) * 2008-05-13 2011-10-18 Solarlogic, Llc System and method for controlling hydronic systems having multiple sources and multiple loads
US7848853B2 (en) * 2008-05-13 2010-12-07 Solarlogic, Llc System and method for controlling hydronic systems having multiple sources and multiple loads
GB0808930D0 (en) 2008-05-16 2008-06-25 Sunamp Ltd Energy Storage system
US9612635B2 (en) 2012-03-19 2017-04-04 Saudi Arabian Oil Company Systems and computer programs for simultaneous process and utility systems synthesis in partially and fully decentralized environments
US9760099B2 (en) 2008-06-06 2017-09-12 Saudi Arabian Oil Company Systems, program code, computer readable media for planning and retrofit of energy efficient eco-industrial parks through inter-time-inter-systems energy integration
US9360910B2 (en) * 2009-10-30 2016-06-07 Saudi Arabian Oil Company Systems, computer readable media, and computer programs for enhancing energy efficiency via systematic hybrid inter-processes integration
GB2461077B (en) * 2008-06-19 2010-07-14 Zenex Technologies Ltd Heating system
EP2163735A1 (en) * 2008-08-21 2010-03-17 C.R.F. Società Consortile per Azioni System and method for multi-objective management of the electrical and thermal energy gernerated by a co/trigeneration energy system in a multi-source energy plant
EP2159496A1 (en) * 2008-08-29 2010-03-03 Vito NV Controller for energy supply systems
GB0901880D0 (en) * 2009-02-05 2009-03-11 Blue Planet Buildings Ltd Modular assembly shelter
US8814983B2 (en) 2009-02-17 2014-08-26 Mcalister Technologies, Llc Delivery systems with in-line selective extraction devices and associated methods of operation
US9231267B2 (en) * 2009-02-17 2016-01-05 Mcalister Technologies, Llc Systems and methods for sustainable economic development through integrated full spectrum production of renewable energy
US9097152B2 (en) * 2009-02-17 2015-08-04 Mcalister Technologies, Llc Energy system for dwelling support
US8808529B2 (en) * 2009-02-17 2014-08-19 Mcalister Technologies, Llc Systems and methods for sustainable economic development through integrated full spectrum production of renewable material resources using solar thermal
US8616323B1 (en) 2009-03-11 2013-12-31 Echogen Power Systems Hybrid power systems
WO2010121255A1 (en) 2009-04-17 2010-10-21 Echogen Power Systems System and method for managing thermal issues in gas turbine engines
EP2425108A2 (en) * 2009-04-29 2012-03-07 Carrier Corporation Controller for combined heat and power system
CA2766637A1 (en) 2009-06-22 2010-12-29 Echogen Power Systems Inc. System and method for managing thermal issues in one or more industrial processes
WO2011017476A1 (en) 2009-08-04 2011-02-10 Echogen Power Systems Inc. Heat pump with integral solar collector
US8239178B2 (en) * 2009-09-16 2012-08-07 Schneider Electric USA, Inc. System and method of modeling and monitoring an energy load
US8794002B2 (en) 2009-09-17 2014-08-05 Echogen Power Systems Thermal energy conversion method
US8869531B2 (en) 2009-09-17 2014-10-28 Echogen Power Systems, Llc Heat engines with cascade cycles
US8813497B2 (en) 2009-09-17 2014-08-26 Echogen Power Systems, Llc Automated mass management control
US8613195B2 (en) 2009-09-17 2013-12-24 Echogen Power Systems, Llc Heat engine and heat to electricity systems and methods with working fluid mass management control
JP4980407B2 (en) * 2009-10-21 2012-07-18 三菱電機株式会社 Air conditioner control device, refrigeration device control device
US9159042B2 (en) 2009-10-23 2015-10-13 Viridity Energy, Inc. Facilitating revenue generation from data shifting by data centers
US9367825B2 (en) 2009-10-23 2016-06-14 Viridity Energy, Inc. Facilitating revenue generation from wholesale electricity markets based on a self-tuning energy asset model
US8892264B2 (en) 2009-10-23 2014-11-18 Viridity Energy, Inc. Methods, apparatus and systems for managing energy assets
US8457802B1 (en) 2009-10-23 2013-06-04 Viridity Energy, Inc. System and method for energy management
US9159108B2 (en) 2009-10-23 2015-10-13 Viridity Energy, Inc. Facilitating revenue generation from wholesale electricity markets
GB0919934D0 (en) * 2009-11-16 2009-12-30 Sunamp Ltd Energy storage systems
EP2336835A1 (en) * 2009-12-15 2011-06-22 Siemens Aktiengesellschaft Method and assembly for predictive controlling room temperatures in a building using cost information of different energy sources
KR101611301B1 (en) * 2010-04-21 2016-04-12 엘지전자 주식회사 A smart server and smart device
US8386086B2 (en) * 2010-04-26 2013-02-26 Accenture Global Services Limited Methods and systems for analyzing energy usage
CN102236349A (en) * 2010-04-30 2011-11-09 新奥科技发展有限公司 System energy efficiency controller, energy efficiency grain device and intelligent energy service system for energy utilization
JP2013545148A (en) * 2010-08-26 2013-12-19 テラフェロ ベーフェーベーアー Intelligent electronic interface for thermal energy storage module and stored thermal energy and method of buying and selling stored thermal energy capacity
DE102010043676A1 (en) 2010-11-10 2012-05-10 Robert Bosch Gmbh Method for controlling the energy cycles of an object
US8857186B2 (en) 2010-11-29 2014-10-14 Echogen Power Systems, L.L.C. Heat engine cycles for high ambient conditions
US8616001B2 (en) 2010-11-29 2013-12-31 Echogen Power Systems, Llc Driven starter pump and start sequence
US8783034B2 (en) 2011-11-07 2014-07-22 Echogen Power Systems, Llc Hot day cycle
WO2012089855A1 (en) 2010-12-27 2012-07-05 Fundacion Tecnalia Research & Innovation Method for economically optimizing the operation of micro-cogenerator apparatuses
WO2012161804A1 (en) * 2011-02-24 2012-11-29 Clean Urban Energy, Inc. Integration of commercial building operations with electric system operations and markets
WO2012118830A2 (en) 2011-02-28 2012-09-07 Arensmeier Jeffrey N Residential solutions hvac monitoring and diagnosis
US8768528B2 (en) * 2011-05-16 2014-07-01 Vcharge, Inc. Electrical thermal storage with edge-of-network tailored energy delivery systems and methods
DE102011107688A1 (en) * 2011-07-13 2013-01-17 Deutsches Zentrum für Luft- und Raumfahrt e.V. Data center has multiple servers in computer system, power supply system for main power supply to data center and cooling system for cooling computer system, where power supply system has direct-voltage generator
WO2013025653A2 (en) * 2011-08-12 2013-02-21 Mcalister Technologies, Llc Comprehensive cost modeling of sustainably autogenous systems and processes for the production of energy, material resources and nutrient regimes
US20130060719A1 (en) * 2011-09-02 2013-03-07 Hunt Energy Iq, Lp Load profile management and cost sensitivity analysis
EP2573474B1 (en) 2011-09-22 2019-05-15 Panasonic Intellectual Property Management Co., Ltd. Heat management algorithm for optimized CHP operation
US9062898B2 (en) 2011-10-03 2015-06-23 Echogen Power Systems, Llc Carbon dioxide refrigeration cycle
CN102510074B (en) * 2011-10-23 2014-06-04 西安交通大学 Cooling and power dispatching system and dispatching method of back-pressure type combined heat and power generation unit
US8964338B2 (en) 2012-01-11 2015-02-24 Emerson Climate Technologies, Inc. System and method for compressor motor protection
US10526970B2 (en) * 2012-01-23 2020-01-07 Siemens Aktiengesellschaft Combined heat and power plant and method for operation thereof
WO2013134455A1 (en) * 2012-03-07 2013-09-12 Siemens Corporation Online heurisitc algorithm for combined cooling heating and power plant optimization
US11050249B2 (en) 2012-03-23 2021-06-29 Concentric Power, Inc. Systems and methods for power cogeneration
US9388766B2 (en) 2012-03-23 2016-07-12 Concentric Power, Inc. Networks of cogeneration systems
EP2645532A1 (en) * 2012-03-28 2013-10-02 Terafero bvba An intelligent electronic control and communications interface module for a thermal or electrical energy storage module grid, and methods for stored thermal or electrical energy and thermal or electrical energy storage capacity trading.
WO2014031526A1 (en) 2012-08-20 2014-02-27 Echogen Power Systems, L.L.C. Supercritical working fluid circuit with a turbo pump and a start pump in series configuration
US9310439B2 (en) 2012-09-25 2016-04-12 Emerson Climate Technologies, Inc. Compressor having a control and diagnostic module
US9118226B2 (en) 2012-10-12 2015-08-25 Echogen Power Systems, Llc Heat engine system with a supercritical working fluid and processes thereof
US9341084B2 (en) 2012-10-12 2016-05-17 Echogen Power Systems, Llc Supercritical carbon dioxide power cycle for waste heat recovery
US9778627B2 (en) * 2012-11-16 2017-10-03 Siemens Aktiengesellschaft Method of controlling a power network
CA2899163C (en) 2013-01-28 2021-08-10 Echogen Power Systems, L.L.C. Process for controlling a power turbine throttle valve during a supercritical carbon dioxide rankine cycle
WO2014117068A1 (en) 2013-01-28 2014-07-31 Echogen Power Systems, L.L.C. Methods for reducing wear on components of a heat engine system at startup
CA2903784C (en) 2013-03-04 2021-03-16 Echogen Power Systems, L.L.C. Heat engine systems with high net power supercritical carbon dioxide circuits
US10418833B2 (en) 2015-10-08 2019-09-17 Con Edison Battery Storage, Llc Electrical energy storage system with cascaded frequency response optimization
US20140278709A1 (en) * 2013-03-14 2014-09-18 Combined Energies LLC Intelligent CCHP System
US9803902B2 (en) 2013-03-15 2017-10-31 Emerson Climate Technologies, Inc. System for refrigerant charge verification using two condenser coil temperatures
WO2014144446A1 (en) 2013-03-15 2014-09-18 Emerson Electric Co. Hvac system remote monitoring and diagnosis
US9551504B2 (en) 2013-03-15 2017-01-24 Emerson Electric Co. HVAC system remote monitoring and diagnosis
US9765979B2 (en) 2013-04-05 2017-09-19 Emerson Climate Technologies, Inc. Heat-pump system with refrigerant charge diagnostics
US9171276B2 (en) 2013-05-06 2015-10-27 Viridity Energy, Inc. Facilitating revenue generation from wholesale electricity markets using an engineering-based model
US9098876B2 (en) 2013-05-06 2015-08-04 Viridity Energy, Inc. Facilitating revenue generation from wholesale electricity markets based on a self-tuning energy asset model
US9470442B2 (en) 2013-06-25 2016-10-18 Mcogen, Inc. Power generation system and method
US10253993B2 (en) 2013-08-19 2019-04-09 Mcogen, Inc. Temperature modulated desiccant evaporative cooler and indirect and direct evaporative air conditioning systems, methods, and apparatus
US20150268650A1 (en) * 2014-03-24 2015-09-24 Nec Laboratories America, Inc. Power modeling based building demand management system
US10570777B2 (en) 2014-11-03 2020-02-25 Echogen Power Systems, Llc Active thrust management of a turbopump within a supercritical working fluid circuit in a heat engine system
US10621683B2 (en) 2014-11-05 2020-04-14 Yanmar Co., Ltd. Control device for optimizing local energy network
CN104766133A (en) * 2015-03-09 2015-07-08 山东大学 Comprehensive optimization method for small biomass methane combined supply system of cooling, heating and power
DE102015219199A1 (en) * 2015-10-05 2017-04-06 Bayerische Motoren Werke Aktiengesellschaft SOC forecast for thermal storage for runtime optimization of heat pumps
US10190793B2 (en) 2015-10-08 2019-01-29 Johnson Controls Technology Company Building management system with electrical energy storage optimization based on statistical estimates of IBDR event probabilities
US10418832B2 (en) 2015-10-08 2019-09-17 Con Edison Battery Storage, Llc Electrical energy storage system with constant state-of charge frequency response optimization
US10222083B2 (en) 2015-10-08 2019-03-05 Johnson Controls Technology Company Building control systems with optimization of equipment life cycle economic value while participating in IBDR and PBDR programs
US10700541B2 (en) 2015-10-08 2020-06-30 Con Edison Battery Storage, Llc Power control system with battery power setpoint optimization using one-step-ahead prediction
US10283968B2 (en) 2015-10-08 2019-05-07 Con Edison Battery Storage, Llc Power control system with power setpoint adjustment based on POI power limits
US10250039B2 (en) 2015-10-08 2019-04-02 Con Edison Battery Storage, Llc Energy storage controller with battery life model
US10197632B2 (en) 2015-10-08 2019-02-05 Taurus Des, Llc Electrical energy storage system with battery power setpoint optimization using predicted values of a frequency regulation signal
US10389136B2 (en) 2015-10-08 2019-08-20 Con Edison Battery Storage, Llc Photovoltaic energy system with value function optimization
US10564610B2 (en) 2015-10-08 2020-02-18 Con Edison Battery Storage, Llc Photovoltaic energy system with preemptive ramp rate control
US10222427B2 (en) 2015-10-08 2019-03-05 Con Edison Battery Storage, Llc Electrical energy storage system with battery power setpoint optimization based on battery degradation costs and expected frequency response revenue
US11210617B2 (en) 2015-10-08 2021-12-28 Johnson Controls Technology Company Building management system with electrical energy storage optimization based on benefits and costs of participating in PDBR and IBDR programs
US10554170B2 (en) 2015-10-08 2020-02-04 Con Edison Battery Storage, Llc Photovoltaic energy system with solar intensity prediction
US10742055B2 (en) 2015-10-08 2020-08-11 Con Edison Battery Storage, Llc Renewable energy system with simultaneous ramp rate control and frequency regulation
US10594153B2 (en) 2016-07-29 2020-03-17 Con Edison Battery Storage, Llc Frequency response optimization control system
US10778012B2 (en) 2016-07-29 2020-09-15 Con Edison Battery Storage, Llc Battery optimization control system with data fusion systems and methods
JP7377193B2 (en) * 2017-04-07 2023-11-09 アリューム エナジー ピーティーワイ リミテッド Behind-the-meter system and method for controlled distribution of solar energy in complex buildings
ES2698773B2 (en) * 2017-08-04 2020-01-20 Amorin Juan Jose Ortega LOCAL SYSTEM OF ENERGY PRODUCTION AND MANAGEMENT AND PROCEDURE FOR THE OPERATION OF THIS SYSTEM
US11187112B2 (en) 2018-06-27 2021-11-30 Echogen Power Systems Llc Systems and methods for generating electricity via a pumped thermal energy storage system
CN109241549B (en) * 2018-07-04 2022-11-29 国网浙江省电力有限公司电力科学研究院 Modeling method of energy distributor based on bus type structure
US11163271B2 (en) 2018-08-28 2021-11-02 Johnson Controls Technology Company Cloud based building energy optimization system with a dynamically trained load prediction model
US11159022B2 (en) 2018-08-28 2021-10-26 Johnson Controls Tyco IP Holdings LLP Building energy optimization system with a dynamically trained load prediction model
US11435120B2 (en) 2020-05-05 2022-09-06 Echogen Power Systems (Delaware), Inc. Split expansion heat pump cycle
FR3113313B1 (en) * 2020-08-05 2023-03-24 Accenta Method and installations for supplying energy, in particular thermal energy, in at least one building or the like, and system relating thereto
JP2024500375A (en) 2020-12-09 2024-01-09 スーパークリティカル ストレージ カンパニー,インコーポレイティド 3-reservoir electrical thermal energy storage system
CN113623710A (en) * 2021-08-18 2021-11-09 国网福建省电力有限公司经济技术研究院 Heat accumulating type electric heating optimal configuration method and device considering distribution network power and heating
CN113707965A (en) * 2021-08-27 2021-11-26 傲普(上海)新能源有限公司 Energy-saving method suitable for large-scale and intensive energy storage
CN114580122A (en) * 2022-01-17 2022-06-03 华南理工大学 Energy quality matching optimization method of building heating ventilation air-conditioning system based on exergy economy
CN117131982B (en) * 2023-08-21 2024-04-05 四川大学 User side energy optimization method for guaranteeing reliable load supply under extremely high temperature event

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4604714A (en) * 1983-11-08 1986-08-05 Westinghouse Electric Corp. Steam optimization and cogeneration system and method
US4686378A (en) * 1985-07-15 1987-08-11 Eta Thermal Systems Corporation Apparatus for generating heat and electricity
US5751604A (en) * 1992-02-03 1998-05-12 Terasaki Denki Sangyo Kabushiki Kaisha Cogeneration system
US5835383A (en) * 1996-02-26 1998-11-10 Sanyo Electric Co., Ltd. System-interconnected generator for converting solar energy to AC power
US20010025209A1 (en) * 1998-04-24 2001-09-27 Hitachi, Ltd. Electric power supply control system
US6311105B1 (en) * 1998-05-29 2001-10-30 Powerweb, Inc. Multi-utility energy control system
US6392386B2 (en) * 2000-03-16 2002-05-21 Cochlear Limited Device and process for operating a rechargeable storage for electrical energy
US6459171B1 (en) * 2000-07-21 2002-10-01 Arraycomm, Inc. Method and apparatus for sharing power
US6532454B1 (en) * 1998-09-24 2003-03-11 Paul J. Werbos Stable adaptive control using critic designs
US6542791B1 (en) * 1998-05-21 2003-04-01 The Research Foundation Of State University Of New York Load controller and method to enhance effective capacity of a photovotaic power supply using a dynamically determined expected peak loading

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19535752A1 (en) * 1995-09-26 1997-03-27 Peter Dipl Ing Mumm Control of independent power generation system
CA2250905A1 (en) * 1996-04-03 1997-10-16 Siemens Aktiengesellschaft Process and plant for operating a block-type thermal power station
DE19623874A1 (en) * 1996-06-15 1997-12-18 Brandenburger Erdwaermetechnik Procedure for using thermal energy contained in liquid or gaseous primary energy carrier, released by combustion
DE19740398C2 (en) * 1997-09-09 1999-12-02 Vng Verbundnetz Gas Ag Combined heat and power facility for energy supply
US6429785B1 (en) * 1999-01-08 2002-08-06 Siemens Power Transmission & Distribution Inc. Revenue meter having precision time clock
AUPP940899A0 (en) * 1999-03-23 1999-04-15 Time Developments Pty Ltd Interactive building module

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4604714A (en) * 1983-11-08 1986-08-05 Westinghouse Electric Corp. Steam optimization and cogeneration system and method
US4686378A (en) * 1985-07-15 1987-08-11 Eta Thermal Systems Corporation Apparatus for generating heat and electricity
US5751604A (en) * 1992-02-03 1998-05-12 Terasaki Denki Sangyo Kabushiki Kaisha Cogeneration system
US5835383A (en) * 1996-02-26 1998-11-10 Sanyo Electric Co., Ltd. System-interconnected generator for converting solar energy to AC power
US20010025209A1 (en) * 1998-04-24 2001-09-27 Hitachi, Ltd. Electric power supply control system
US6542791B1 (en) * 1998-05-21 2003-04-01 The Research Foundation Of State University Of New York Load controller and method to enhance effective capacity of a photovotaic power supply using a dynamically determined expected peak loading
US6311105B1 (en) * 1998-05-29 2001-10-30 Powerweb, Inc. Multi-utility energy control system
US6532454B1 (en) * 1998-09-24 2003-03-11 Paul J. Werbos Stable adaptive control using critic designs
US6392386B2 (en) * 2000-03-16 2002-05-21 Cochlear Limited Device and process for operating a rechargeable storage for electrical energy
US6459171B1 (en) * 2000-07-21 2002-10-01 Arraycomm, Inc. Method and apparatus for sharing power

Cited By (86)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080035195A1 (en) * 2001-02-09 2008-02-14 Bell Lon E Thermoelectric power generation systems
US8495884B2 (en) 2001-02-09 2013-07-30 Bsst, Llc Thermoelectric power generating systems utilizing segmented thermoelectric elements
US7870892B2 (en) 2004-05-10 2011-01-18 Bsst Llc Climate control method for hybrid vehicles using thermoelectric devices
US9006556B2 (en) 2005-06-28 2015-04-14 Genthem Incorporated Thermoelectric power generator for variable thermal power source
US8445772B2 (en) 2005-06-28 2013-05-21 Bsst, Llc Thermoelectric power generator with intermediate loop
US20100095996A1 (en) * 2005-06-28 2010-04-22 Bsst, Llc Thermoelectric power generator with intermediate loop
US7246496B2 (en) 2005-07-19 2007-07-24 Visteon Global Technologies, Inc. Thermoelectric based heating and cooling system for a hybrid-electric vehicle
US8261868B2 (en) 2005-07-19 2012-09-11 Bsst Llc Energy management system for a hybrid-electric vehicle
US20070033951A1 (en) * 2005-07-19 2007-02-15 Visteon Global Technologies, Inc. Thermoelectric based heating and cooling system for a hybrid-electric vehicle
US8783397B2 (en) 2005-07-19 2014-07-22 Bsst Llc Energy management system for a hybrid-electric vehicle
US7870745B2 (en) 2006-03-16 2011-01-18 Bsst Llc Thermoelectric device efficiency enhancement using dynamic feedback
US8424315B2 (en) 2006-03-16 2013-04-23 Bsst Llc Thermoelectric device efficiency enhancement using dynamic feedback
US20070239317A1 (en) * 2006-04-07 2007-10-11 Bogolea Bradley D Artificial-Intelligence-Based Energy Auditing, Monitoring and Control
US20080271881A1 (en) * 2007-05-01 2008-11-06 Blecker Joseph G Automatic Switching Two Pipe Hydronic System
US8141623B2 (en) 2007-05-01 2012-03-27 Blecker Joseph G Automatic switching two pipe hydronic system
US10464391B2 (en) 2007-05-25 2019-11-05 Gentherm Incorporated System and method for distributed thermoelectric heating and cooling
US9366461B2 (en) 2007-05-25 2016-06-14 Gentherm Incorporated System and method for climate control within a passenger compartment of a vehicle
US9310112B2 (en) 2007-05-25 2016-04-12 Gentherm Incorporated System and method for distributed thermoelectric heating and cooling
US20130312435A1 (en) * 2007-08-07 2013-11-28 Syracuse University Power and Refrigeration Cascade System
US10539348B2 (en) * 2007-08-07 2020-01-21 Syracuse University Power and refrigeration cascade system
US20090038324A1 (en) * 2007-08-07 2009-02-12 Syracuse University Power and Refrigeration Cascade System
JP2009170405A (en) * 2008-01-15 2009-07-30 Nan Ya Printed Circuit Board Corp Energy management module and driving apparatus
US20100326098A1 (en) * 2008-03-12 2010-12-30 Rog Lynn M Cooling, heating and power system with an integrated part-load, active, redundant chiller
US20160006066A1 (en) * 2008-03-18 2016-01-07 John S. Robertson Energy conversion system
US20130252120A1 (en) * 2008-03-18 2013-09-26 John S. Robertson Energy conversion system
US8613200B2 (en) 2008-10-23 2013-12-24 Bsst Llc Heater-cooler with bithermal thermoelectric device
US9542658B2 (en) 2008-11-06 2017-01-10 Silver Spring Networks, Inc. System and method for identifying power usage issues
US10255644B2 (en) 2008-11-06 2019-04-09 Itron Networked Solutions, Inc. System and method for identifying power usage issues
US20100110077A1 (en) * 2008-11-06 2010-05-06 Gary Grossman System and method for identifying power usage issues
AU2009236018A1 (en) * 2009-02-04 2010-08-19 Applied Hybrid Energy Pty Ltd An electrical power generation system
AU2009236018B2 (en) * 2009-02-04 2011-09-15 Applied Hybrid Energy Pty Ltd An electrical power generation system
US8409439B1 (en) 2009-04-28 2013-04-02 Nested Nozzle Mixers, Inc. Pressurized digester vessel
US8544827B1 (en) 2009-04-28 2013-10-01 Nested Nozzle Mixers, Inc. Nested nozzle mixer
US8656710B2 (en) 2009-07-24 2014-02-25 Bsst Llc Thermoelectric-based power generation systems and methods
US9276188B2 (en) 2009-07-24 2016-03-01 Gentherm Incorporated Thermoelectric-based power generation systems and methods
US20110067742A1 (en) * 2009-07-24 2011-03-24 Bell Lon E Thermoelectric-based power generation systems and methods
US20110088417A1 (en) * 2009-10-19 2011-04-21 Kayser Kenneth W Energy Recovery Ventilator And Dehumidifier
US20110231320A1 (en) * 2009-12-22 2011-09-22 Irving Gary W Energy management systems and methods
US8620476B2 (en) 2010-02-12 2013-12-31 Enphase Energy, Inc. Method and apparatus for smart climate control
WO2011100427A2 (en) * 2010-02-12 2011-08-18 Enphase Energy, Inc. Method and apparatus for smart climate control
US20110202181A1 (en) * 2010-02-12 2011-08-18 Enphase Energy, Inc. Method and apparatus for smart climate control
WO2011100427A3 (en) * 2010-02-12 2011-12-22 Enphase Energy, Inc. Method and apparatus for smart climate control
US10180268B2 (en) 2010-05-05 2019-01-15 Greensleeves, LLC Energy chassis and energy exchange device
US9080789B2 (en) 2010-05-05 2015-07-14 Greensleeves, LLC Energy chassis and energy exchange device
WO2012045027A1 (en) * 2010-09-30 2012-04-05 Robert Bosch Gmbh Adaptive load management system for incorporating customer electrical demand information for energy management
EP2980734A1 (en) * 2010-09-30 2016-02-03 Robert Bosch GmbH Adaptive load management system for incorporating customer electrical demand information for energy management
US10755295B2 (en) 2010-09-30 2020-08-25 Robert Bosch Gmbh Adaptive load management: a system for incorporating customer electrical demand information for demand and supply side energy management
US8812164B2 (en) * 2010-10-12 2014-08-19 Engineered Electric Company Portable cogeneration system incorporating renewable energy sources
US20120089256A1 (en) * 2010-10-12 2012-04-12 Engineered Electric Company Portable cogeneration system incorporating renewable energy soures
US20120109704A1 (en) * 2010-10-27 2012-05-03 Ratnesh Kumar Sharma Managing utilization of biogas in an infrastructure
US20120173456A1 (en) * 2010-11-24 2012-07-05 Hirl Joseph P Decision support system for the management of energy use, contracting and capital investments for facilities
US8583531B2 (en) * 2010-11-24 2013-11-12 Joseph P. Hirl Decision support system for the management of energy use, contracting and capital investments for facilities
US20120150509A1 (en) * 2010-12-14 2012-06-14 Patrick Andrew Shiel Continuous optimization energy reduction process in commercial buildings
US9293680B2 (en) 2011-06-06 2016-03-22 Gentherm Incorporated Cartridge-based thermoelectric systems
US9006557B2 (en) 2011-06-06 2015-04-14 Gentherm Incorporated Systems and methods for reducing current and increasing voltage in thermoelectric systems
US20120316687A1 (en) * 2011-06-07 2012-12-13 Fujitsu Limited System and Method for Managing Power Consumption
US8996186B2 (en) * 2011-06-07 2015-03-31 Fujitsu Limited System and method for managing power consumption
US20130166043A1 (en) * 2011-07-20 2013-06-27 Nec Laboratories America, Inc. Optimal energy management of a microgrid system using multi-objective optimization
US20150355618A1 (en) * 2011-07-20 2015-12-10 Nec Laboratories America, Inc. Optimal energy management of a rural microgrid system using multi-objective optimization
US20130024014A1 (en) * 2011-07-20 2013-01-24 Nec Laboratories America, Inc. Optimal energy management of a rural microgrid system using multi-objective optimization
US9201411B2 (en) * 2011-07-20 2015-12-01 Nec Laboratories America, Inc. Optimal energy management of a microgrid system using multi-objective optimization
US9146547B2 (en) * 2011-07-20 2015-09-29 Nec Laboratories America, Inc. Optimal energy management of a rural microgrid system using multi-objective optimization
US9811068B2 (en) * 2011-07-20 2017-11-07 Nec Corporation Optimal energy management of a rural microgrid system using multi-objective optimization
CN102510095A (en) * 2011-10-23 2012-06-20 西安交通大学 Combined cycle and straight condensing thermal power combined dispatching system and method
CN102510094A (en) * 2011-10-23 2012-06-20 西安交通大学 Combined cycle and pure condensed steam thermal power scheduling system and method
WO2013130311A2 (en) * 2012-02-27 2013-09-06 Siemens Corporation System and method of total cost optimization for buildings with hybrid ventilation
US9892472B2 (en) 2012-02-27 2018-02-13 Siemens Corporation Cost optimization for buildings with hybrid ventilation systems
WO2013130311A3 (en) * 2012-02-27 2013-10-31 Siemens Corporation Cost optimization for buildings with hybrid ventilation
US20130338835A1 (en) * 2012-06-14 2013-12-19 Christopher Mark Pepe Cogeneration System and Process for Determining Whether to Use Cogeneration
US20160301344A1 (en) * 2012-06-14 2016-10-13 Pac, Llc Cogeneration system configured to be installed into an existing boiler plant/ emergency generator installation and process for cogeneration
WO2013188440A1 (en) * 2012-06-14 2013-12-19 Pac, Llc Cogeneration system and process for determining whether to use cogeneration
US9285847B2 (en) * 2012-06-14 2016-03-15 Pac, Llc Cogeneration system and process for determining whether to use cogeneration
US10075115B2 (en) * 2012-06-14 2018-09-11 Pac, Llc Cogeneration system configured to be installed into an existing boiler plant/emergency generator installation and process for cogeneration
US9306143B2 (en) 2012-08-01 2016-04-05 Gentherm Incorporated High efficiency thermoelectric generation
US20140129042A1 (en) * 2012-11-07 2014-05-08 Dorazio Enterprises, Inc. Community Based Energy Management System
US20160018125A1 (en) * 2013-03-04 2016-01-21 Greensleeves, Llc. Energy management systems and methods of use
WO2014138102A1 (en) * 2013-03-04 2014-09-12 Greensleeves, LLC Energy management systems and methods of use
US10387581B2 (en) 2013-09-05 2019-08-20 Greensleeves, LLC System for optimization of building heating and cooling systems
US11092353B2 (en) 2013-09-05 2021-08-17 Greensleeves Technologies Corp. System for optimization of building heating and cooling systems
US9423140B2 (en) 2014-02-16 2016-08-23 Be Power Tech, Inc. Liquid desiccant regeneration system, systems including the same, and methods of operating the same
US10205322B1 (en) 2015-03-09 2019-02-12 Cummins Power Generation Ip, Inc. Economically efficient operation of a power generator
WO2017100768A1 (en) * 2015-12-12 2017-06-15 Micro-Utilities, Inc. Passive energy storage systems and related methods
WO2017205397A1 (en) * 2016-05-24 2017-11-30 Scuderi Group, Inc. Method of utilizing a combined heat and power system to produce electricity for a wholesale electricity market
US11594770B2 (en) 2017-05-03 2023-02-28 Semiconductor Energy Laboratory Co., Ltd. Neural network, power storage system, vehicle, and electronic device
US11955612B2 (en) 2017-05-03 2024-04-09 Semiconductor Energy Laboratory Co., Ltd. Neural network, power storage system, vehicle, and electronic device
EP4131701A4 (en) * 2020-03-26 2024-01-03 Hitachi Ltd Thermal energy management system

Also Published As

Publication number Publication date
WO2002015365A3 (en) 2002-09-06
WO2002015365A2 (en) 2002-02-21
US6757591B2 (en) 2004-06-29
US20020082747A1 (en) 2002-06-27
TW539932B (en) 2003-07-01
AU2001286433A1 (en) 2002-02-25

Similar Documents

Publication Publication Date Title
US6757591B2 (en) Energy management system and methods for the optimization of distributed generation
Huang et al. Optimal configuration planning of multi-energy systems considering distributed renewable energy
CN109919478B (en) Comprehensive energy microgrid planning method considering comprehensive energy supply reliability
CN105447599B (en) Heat-storage cogeneration unit and electric boiler-based abandoned wind elimination coordination scheduling model
CN109634119B (en) Energy internet optimization control method based on rolling optimization in day
CN111144620A (en) Electricity-hydrogen comprehensive energy system considering seasonal hydrogen storage and robust planning method thereof
CN111737884B (en) Multi-target random planning method for micro-energy network containing multiple clean energy sources
CN110361969B (en) Optimized operation method of cooling, heating and power comprehensive energy system
CN114330827B (en) Distributed robust self-scheduling optimization method for multi-energy flow virtual power plant and application thereof
CN105955931A (en) High-density distributed photovoltaic absorption-oriented regional energy network optimizing and scheduling method
Daneshvar et al. A novel transactive energy trading model for modernizing energy hubs in the coupled heat and electricity network
Yang et al. Interval method based optimal scheduling of regional multi-microgrids with uncertainties of renewable energy
CN105447586A (en) Micro-grid energy optimization method based on versatile flow model
CN116151565A (en) Urban intelligent energy system construction method and collaborative planning method based on multi-energy flow and multi-level
Yıldız et al. An innovative LFC scheme for multi-area microgrid incorporating with hydrogen-based demand response mechanism
Lingmin et al. A configuration optimization framework for renewable energy systems integrating with electric‐heating energy storage in an isolated tourist area
Reddy et al. Modeling and optimal control of micro-CSP and a building HVAC system to minimize electricity cost
CN110190630A (en) A kind of distribution prevention-emergency control method containing mostly micro- energy net
CN113239550B (en) Energy storage capacity configuration method for combined cooling heating and power system and combined cooling and power system
CN110472364B (en) Optimization method of off-grid type combined heat and power generation system considering renewable energy sources
CN113465221B (en) Low-carbon-emission combined cooling heating and power system and control method thereof
CN109376406A (en) Energy supplying system superstructure model, modeling method, computer equipment and storage medium
CN213783243U (en) Comprehensive energy system operation optimizing device for industrial park
CN113240178A (en) Multi-time scale optimization scheduling method and system for electric heating interconnection system
CN111756073A (en) Multi-energy complementary micro-grid layered control and operation optimization method

Legal Events

Date Code Title Description
STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION