US20060208737A1 - Calibration of xx, yy and zz induction tool measurements - Google Patents

Calibration of xx, yy and zz induction tool measurements Download PDF

Info

Publication number
US20060208737A1
US20060208737A1 US11/081,958 US8195805A US2006208737A1 US 20060208737 A1 US20060208737 A1 US 20060208737A1 US 8195805 A US8195805 A US 8195805A US 2006208737 A1 US2006208737 A1 US 2006208737A1
Authority
US
United States
Prior art keywords
measurements
multicomponent
transmitter
transmitters
medium
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US11/081,958
Inventor
Gulamabbas Merchant
Luis Pelegri
Vladimir Mogilatov
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Baker Hughes Holdings LLC
Original Assignee
Baker Hughes Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baker Hughes Inc filed Critical Baker Hughes Inc
Priority to US11/081,958 priority Critical patent/US20060208737A1/en
Assigned to BAKER HUGHES INCORPORATED reassignment BAKER HUGHES INCORPORATED ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: MOGILATOV, VLADIMIR S., PELEGRI, LUIS M., MERCHANT, GULAMABBAS
Priority to RU2007137982/28A priority patent/RU2007137982A/en
Priority to PCT/US2006/009333 priority patent/WO2006101899A2/en
Publication of US20060208737A1 publication Critical patent/US20060208737A1/en
Priority to US11/609,997 priority patent/US8305082B2/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01VGEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
    • G01V3/00Electric or magnetic prospecting or detecting; Measuring magnetic field characteristics of the earth, e.g. declination, deviation
    • G01V3/18Electric or magnetic prospecting or detecting; Measuring magnetic field characteristics of the earth, e.g. declination, deviation specially adapted for well-logging
    • G01V3/26Electric or magnetic prospecting or detecting; Measuring magnetic field characteristics of the earth, e.g. declination, deviation specially adapted for well-logging operating with magnetic or electric fields produced or modified either by the surrounding earth formation or by the detecting device
    • G01V3/28Electric or magnetic prospecting or detecting; Measuring magnetic field characteristics of the earth, e.g. declination, deviation specially adapted for well-logging operating with magnetic or electric fields produced or modified either by the surrounding earth formation or by the detecting device using induction coils
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01VGEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
    • G01V13/00Manufacturing, calibrating, cleaning, or repairing instruments or devices covered by groups G01V1/00 – G01V11/00

Definitions

  • the invention is related generally to the field of transverse electromagnetic induction measurements wherein the multicomponent measurements are made with antennas that may be transversely inclined to one another.
  • the method is applicable for both well logging operations and for airborne electromagnetic measurements.
  • Electromagnetic induction resistivity well logging instruments are well known in the art. Electromagnetic induction resistivity well logging instruments are used to determine the electrical conductivity, and its converse, resistivity, of earth formations penetrated by a borehole. Formation conductivity has been determined based on results of measuring the magnetic field of eddy currents that the instrument induces in the formation adjoining the borehole. The electrical conductivity is used for, among other reasons, inferring the fluid content of the earth formations. Typically, lower conductivity (higher resistivity) is associated with hydrocarbon-bearing earth formations.
  • the physical principles of electromagnetic induction well logging are well described, for example, in, J. H. Moran and K. S.
  • the conventional geophysical induction resistivity well logging tool is a probe suitable for lowering into the borehole and it comprises a sensor section containing a transmitter and receiver and other, primarily electrical, equipment for measuring data to infer the physical parameters that characterize the formation.
  • the sensor section, or mandrel comprises induction transmitters and receivers positioned along the instrument axis, arranged in the order according to particular instrument or tool specifications and oriented parallel with the borehole axis.
  • the electrical equipment generates an electrical voltage to be further applied to a transmitter induction coil, conditions signals coming from receiver induction coils, processes the acquired information, stores or by means of telemetry sending the data to the earth surface through a wire line cable used to lower the tool into the borehole.
  • Conventional induction well logging techniques employ coils wound on an insulating mandrel.
  • One or more transmitter coils are energized by an alternating current.
  • the oscillating magnetic field produced by this arrangement results in the induction of currents in the formations which are nearly proportional to the conductivity of the formations.
  • These currents contribute to the voltage induced in one or more receiver coils.
  • the basic transmitter coil and receiver coil has axes which are aligned with the longitudinal axis of the well logging device.
  • “uniaxial anisotropy” is characterized by a difference between the horizontal conductivity, in a plane parallel to the bedding plane, and the vertical conductivity, in a direction perpendicular to the bedding plane.
  • horizontal resistivity can be considered to be in the plane perpendicular to the bore hole, and the vertical resistivity in the direction parallel to the bore hole.
  • Conventional induction logging devices which tend to be sensitive only to the horizontal conductivity of the formations, do not provide a measure of vertical conductivity or of anisotropy. Techniques have been developed to determine formation anisotropy.
  • a conventional induction logging tool with transmitters and receivers (induction coils) oriented only along the borehole axis responds to the average horizontal conductivity that combines the conductivity of both sands and shales. These average readings are usually dominated by the relatively higher conductivity of the shale layers and exhibit reduced sensitivity to the lower conductivity sand layers where hydrocarbon reserves are produced.
  • loggers have turned to using transverse induction logging tools having magnetic transmitters and receivers (induction coils) oriented transversely with respect to the tool longitudinal axis.
  • the general hardware problem is typically associated with an unavoidable electrical field that is irradiated by the tool induction transmitter simultaneously with the desirable magnetic field, and it happens in agreement with Maxwell's equations for the time varying field.
  • the transmitter electrical field interacts with remaining modules of the induction logging tool and with the formation; however, this interaction does not produce any useful information. Indeed, due to the always-existing possibility for this field to be coupled directly into the receiver part of the sensor section through parasitic displacement currents, it introduces the noise. When this coupling occurs, the electrical field develops undesirable electrical potentials at the input of the receiver signal conditioning, primarily across the induction coil receiver, and this voltage becomes an additive noise component to the signal of interest introducing a systematic error to the measurements.
  • Multicomponent EM measurements are also now being used in airborne applications.
  • time-domain airborne electromagnetic (AEM) systems historically measure the inline horizontal (x) component.
  • New versions of the electromagnetic systems are designed to collect two additional components [the vertical (z) component and the lateral horizontal (y) component] to provide greater diagnostic information.
  • An example of such a system is shown in FIG. 3 .
  • This is illustrative of the GEOTEM® of Fugro Airborne Surveys Corp. Shown therein is a fixed wing aircraft 201 carrying a transmitter loop antenna 207 and a towed three component sensor 203 above the earth 205 .
  • Other configurations using helicopter borne sensors also exist.
  • measurements may be made with the transmitter in different source orientations.
  • the z-component response provides greater signal-to-noise, particularly at late delay times. This allows the conductivity to be determined to greater depth.
  • the symmetry implies that they component will be zero; hence a nonzero y component will indicate a lateral inhomogeneity.
  • the extent of contamination of the y component by the x and z components can be used to ascertain the strike direction and the lateral offset of the target, respectively. Having the z and y component data increases the total response when the profile line has not traversed the target. This increases the possibility of detecting a target located between adjacent flight lines or beyond a survey boundary.
  • One embodiment of the present invention is method of using a system having at least one transmitter and one or more receivers for making multicomponent induction measurements.
  • the system is positioned above the surface of the earth and oriented so that an axis of the at least one transmitter is substantially parallel to the surface and substantially collinear with an axis of at least one of the receivers.
  • Multicomponent measurements are obtained at one or more frequencies and one or more rotational angles of the system. Multifrequency focusing of the multicomponent measurements may be done.
  • the multicomponent measurements are analyzed to get a calibration error in at least one of the multicomponent measurements.
  • the multicomponent measurements are made by a system is adapted for use in a wellbore in an earth formation that includes three orthogonal transmitters.
  • the three transmitters may not be at the same spatial position.
  • the multicomponent measurements are made by a system is adapted for airborne use.
  • the multicomponent measurements may be selected from xx, xy, yy, and zz measurements.
  • the system includes one or more transmitters and one or more receivers for making multicomponent measurements at one or more frequencies at one or more rotational angles.
  • the system also includes a processor which determines from multicomponent measurements made at a substantially horizontal configuration of the system an indication of a calibration error in at least one of the multicomponent measurements.
  • the system may include three orthogonal transmitters that may not be co-located on a logging tool.
  • the transmitters and receivers may be conveyed on a fixed wing aircraft or a helicopter.
  • the multicomponent measurements may be selected from xx, xy, yy, and zz measurements.
  • the processor may be at a downhole location, a surface location, or a remote location.
  • Another embodiment of the invention is machine readable medium for use with a system having one or more transmitters and one or more receivers for making multicomponent induction measurements.
  • the medium includes instructions for positioning the system above the surface of the earth, instructions for orienting the system so that an axis of a transmitter is substantially parallel to the surface and substantially collinear with an axis f at least one of the plurality of receivers; instructions for obtaining multicomponent measurements at at least one frequency and at least one rotational angle of the system; and instructions for determining from the multicomponent measurements an indication of a calibration error in at least one of the multicomponent measurements.
  • the instructions may cover a system used in a wellbore or an airborne system.
  • the machine readable medium may include ROMs, EPROMs, EAROMs, Flash Memories and Optical disks.
  • FIG. 1 (Prior Art) shows an induction instrument disposed in a wellbore penetrating earth formations
  • FIG. 2 shows the arrangement of transmitter and receiver coils in the multicomponent induction logging tool marketed under the name 3DEXTM;
  • FIG. 3 illustrates equipment used for multicomponent airborne electromagnetic measurements
  • FIG. 4 shows a logging tool oriented horizontally above the earth as needed for calibration according to the method of the present invention.
  • FIG. 5 is a flow chart of the method of the present invention.
  • an electromagnetic induction well logging instrument 10 is shown disposed in a wellbore 2 drilled through earth formations.
  • the earth formations are shown generally at 4 .
  • the instrument 10 can be lowered into and withdrawn from the wellbore 2 by means of an armored electrical cable 6 or similar conveyance known in the art.
  • the instrument 10 can be assembled from three subsections: an auxiliary electronics unit 14 disposed at one end of the instrument 10 ; a coil mandrel unit 8 attached to the auxiliary electronics unit 14 ; and a receiver/signal processing/telemetry electronics unit 12 attached to the other end of the coil mandrel unit 8 , this unit 12 typically being attached to the cable 6 .
  • the coil mandrel unit 8 includes induction transmitter and receiver coils, as will be further explained, for inducing electromagnetic fields in the earth formations 4 and for receiving voltage signals induced by eddy currents flowing in the earth formations 4 as a result of the electromagnetic fields induced therein.
  • the auxiliary electronics unit 14 can include a signal generator and power amplifiers (not shown) to cause alternating currents of selected frequencies to flow through transmitter coils in the coil mandrel unit 8 .
  • the receiver/signal processing/telemetry electronics unit 12 can include receiver circuits (not shown) for detecting voltages induced in receiver coils in the coil mandrel unit 8 , and circuits for processing these received voltages (not shown) into signals representative of the conductivities of various layers, shown as 4 A through 4 F of the earth formations 4 .
  • the receiver/signal processing/telemetry electronics unit 12 can include signal telemetry to transmit the conductivity-related signals to the earth's surface along the cable 6 for further processing, or alternatively can store the conductivity related signals in an appropriate recording device (not shown) for processing after the instrument 10 is withdrawn from the wellbore 2 .
  • FIG. 2 the configuration of transmitter and receiver coils in a preferred embodiment of the 3DExplorerTM induction logging instrument of Baker Hughes is shown.
  • Three orthogonal transmitters 101 , 103 and 105 that are referred to as the T x , T z , and T y transmitters are shown (the z-axis is the longitudinal axis of the tool).
  • Corresponding to the transmitters 101 , 103 and 105 are associated receivers 107 , 109 and 111 , referred to as the R x , R z , and R y receivers, for measuring the corresponding magnetic fields.
  • the H xx , H yy , H zz , H xy , and H xz components are measured, though other components may also be used.
  • the method of the present invention is based upon measuring the different components of the induced magnetic field with the logging tool in a horizontal position over the surface of the earth.
  • this is requires some modification of the apparatus shown in FIG. 3 .
  • the body of the three-component sensor 203 would be provided with aerofoils that produce sufficient lift so that the receivers are at the same elevation as the transmitters.
  • FIG. 4 For a logging tool, this configuration is illustrated in FIG. 4 where the tool 225 is positioned horizontally in air over the earth.
  • the surface of the earth is denoted by 251 and boundaries of layers of the earth are indicated by 253 , 255 etc.
  • Also indicated are a three-component transmitter 261 and a three component receiver 263 with x, y and z coils as indicated.
  • the tool When the x-axis is vertical, certain relationships exist between the different components of a triaxial tool.
  • the tool is placed horizontal in air above the earth at a height of h s .
  • the earth is considered to be horizontally layered.
  • the conductivity of each layer can be arbitrary and there may be anisotropy present.
  • the figure shows only one tri-axial transmitter array and one tri-axial receiver array.
  • the distance h s is small enough so that there is influence of the earth.
  • the orientation of the array is such that the X-coils face towards the earth, the Y-coils and Z-coils are horizontal as shown in the figure.
  • the transmitter magnetic moments for the X, Y and Z transmitters be M x , M y and M z respectively.
  • ⁇ AIR ⁇ 0 ⁇ 0.
  • the magnetic field in the receivers X, Y and Z due to transmitter X, Y and Z respectively are H xx , H yy and H zz .
  • the response can be obtained as a solution to Maxwell's Equations.
  • H xx ⁇ 0 ⁇ ⁇ ⁇ 3 ⁇ ⁇ ( e - ⁇ ⁇ ⁇ z - z s ⁇ + R 0 ⁇ e - ⁇ ⁇ ( z 0 - z + h s ) ) ⁇ J 0 ⁇ ( ⁇ ⁇ ⁇ x ) ⁇ d ⁇ ( 1 )
  • R 0 is the reflection coefficient for the interface between air and layered earth
  • Z is the variable of integration
  • ⁇ 2 - k 0 2 ;
  • k o ⁇ ⁇ ⁇ o ⁇ ⁇ 0 ;
  • ⁇ 0 Conductivity of the layer in which the tool is located.
  • H xx ⁇ 0 ⁇ ⁇ ⁇ 2 ⁇ ( e - ⁇ ⁇ ⁇ z - z s ⁇ + R 0 ⁇ e - ⁇ ⁇ ⁇ ( z 0 - z + h s ) ) ⁇ J 0 ⁇ ( ⁇ ⁇ ⁇ x ) ⁇ d ⁇ .
  • H zz ⁇ 0 ⁇ ⁇ ⁇ 2 ⁇ ( - e - ⁇ ⁇ ⁇ z - z s ⁇ + R 0 ⁇ e - ⁇ ⁇ ( z 0 - z + h s ) ) ⁇ ( J 0 - J 1 ⁇ 2 ) ⁇ d ⁇ ( 3 )
  • H yy ⁇ 0 ⁇ ⁇ ( - e - ⁇ ⁇ ⁇ z - z s ⁇ + R 0 ⁇ e - ⁇ ⁇ ( z 0 - z + h s ) ) ⁇ J 1 ⁇ d ⁇ .
  • eqn. (17) is also approximately correct for multifrequency focused signals. Multifrequency focusing is discussed in U.S. Pat. No. 5,884,227 to Rabinovich et al., having the same assignee as the present invention and the contents of which are incorporated herein by reference.
  • the method includes extrapolating magnitudes of the receiver signals at a plurality of frequencies to a response which would be obtained at zero frequency.
  • at least one of eqns. (10) and (17) is used as a consistency check on the calibration achieved by the hardware such as that disclosed in Fanini.
  • Determination of the error in the zz measurements involves rotating the tool shown in FIG. 3 by 90° about the tool axis, thus interchanging the x- and y-axis (with a sign reversal).
  • P 1 + P 2 2 ⁇ zz . ( 21 )
  • the quantity given by eqn. (21) is zero, then the zz component is properly calibrated.
  • FIG. 5 a flow chart illustrating the method of the present invention is shown.
  • the z-axis is of the tool (or the transmitter on the aircraft) is oriented to horizontal 301 .
  • Multicomponent measurements are made at one or more frequencies 303 at at least one rotational angle.
  • frequencies 303 are sufficient.
  • mutlifrequency measurements may be made.
  • a multifrequency focusing (MFF) is applied to the measurements 305 .
  • calibration errors are determined 307 . As noted above, this is done using eqns. (1)-(7).
  • the operation of the transmitter and receivers may be controlled by one or more processors.
  • the downhole processor and/or the surface processor may be used. Part of the processing may be done at a remote location away from the wellbore. Implicit in the control and processing of the data is the use of a computer program implemented on a suitable machine readable medium that enables the processor to perform the control and processing.
  • the machine readable medium may include ROMs, EPROMs, EAROMs, Flash Memories and Optical disks.

Abstract

Measurements made with a multicomponent logging system oriented in a horizontal position above the surface of the earth must satisfy certain relationships. These relationships are used to establish calibration errors in the system.

Description

    BACKGROUND OF THE INVENTION
  • 1. Field of the Invention
  • The invention is related generally to the field of transverse electromagnetic induction measurements wherein the multicomponent measurements are made with antennas that may be transversely inclined to one another. The method is applicable for both well logging operations and for airborne electromagnetic measurements.
  • 2. Description of the Related Art
  • Electromagnetic induction resistivity well logging instruments are well known in the art. Electromagnetic induction resistivity well logging instruments are used to determine the electrical conductivity, and its converse, resistivity, of earth formations penetrated by a borehole. Formation conductivity has been determined based on results of measuring the magnetic field of eddy currents that the instrument induces in the formation adjoining the borehole. The electrical conductivity is used for, among other reasons, inferring the fluid content of the earth formations. Typically, lower conductivity (higher resistivity) is associated with hydrocarbon-bearing earth formations. The physical principles of electromagnetic induction well logging are well described, for example, in, J. H. Moran and K. S. Kunz, Basic Theory of Induction Logging and Application to Study of Two-Coil Sondes, Geophysics, vol. 27, No. 6, part 1, pp. 829-858, Society of Exploration Geophysicists, December 1962. Many improvements and modifications to electromagnetic induction resistivity instruments described in the Moran and Kunz reference, supra, have been devised, some of which are described, for example, in U.S. Pat. No. 4,837,517 issued to Barber, in U.S. Pat. No. 5,157,605 issued to Chandler et al and in U.S. Pat. No. 5,600,246 issued to Fanini et al.
  • The conventional geophysical induction resistivity well logging tool is a probe suitable for lowering into the borehole and it comprises a sensor section containing a transmitter and receiver and other, primarily electrical, equipment for measuring data to infer the physical parameters that characterize the formation. The sensor section, or mandrel, comprises induction transmitters and receivers positioned along the instrument axis, arranged in the order according to particular instrument or tool specifications and oriented parallel with the borehole axis. The electrical equipment generates an electrical voltage to be further applied to a transmitter induction coil, conditions signals coming from receiver induction coils, processes the acquired information, stores or by means of telemetry sending the data to the earth surface through a wire line cable used to lower the tool into the borehole.
  • Conventional induction well logging techniques employ coils wound on an insulating mandrel. One or more transmitter coils are energized by an alternating current. The oscillating magnetic field produced by this arrangement results in the induction of currents in the formations which are nearly proportional to the conductivity of the formations. These currents, in turn, contribute to the voltage induced in one or more receiver coils. By selecting only the voltage component which is in phase with the transmitter current, a signal is obtained that is approximately proportional to the formation conductivity. In conventional induction logging apparatus, the basic transmitter coil and receiver coil has axes which are aligned with the longitudinal axis of the well logging device. (For simplicity of explanation, it will be assumed that the borehole axis is aligned with the axis of the logging device, and that these are both in the vertical direction. Also single coils will subsequently be referred to without regard for focusing coils or the like.) This arrangement tends to induce secondary current loops in the formations that are concentric with the vertically oriented transmitting and receiving coils. The resultant conductivity measurements are indicative of the horizontal conductivity (or resistivity) of the surrounding formations. There are, however, various formations encountered in well logging which have a conductivity that is anisotropic. Anisotropy results from the manner in which formation beds were deposited by nature. For example, “uniaxial anisotropy” is characterized by a difference between the horizontal conductivity, in a plane parallel to the bedding plane, and the vertical conductivity, in a direction perpendicular to the bedding plane. When there is no bedding dip, horizontal resistivity can be considered to be in the plane perpendicular to the bore hole, and the vertical resistivity in the direction parallel to the bore hole. Conventional induction logging devices, which tend to be sensitive only to the horizontal conductivity of the formations, do not provide a measure of vertical conductivity or of anisotropy. Techniques have been developed to determine formation anisotropy.
  • Thus, in a vertical borehole, in a clastic sedimentary sequence, a conventional induction logging tool with transmitters and receivers (induction coils) oriented only along the borehole axis responds to the average horizontal conductivity that combines the conductivity of both sands and shales. These average readings are usually dominated by the relatively higher conductivity of the shale layers and exhibit reduced sensitivity to the lower conductivity sand layers where hydrocarbon reserves are produced. To address this problem, loggers have turned to using transverse induction logging tools having magnetic transmitters and receivers (induction coils) oriented transversely with respect to the tool longitudinal axis. Such instruments for transverse induction well logging has been described in PCT Patent publication WO 98/00733 of Beard et al. and U.S. Pat. No. 5,452,761 to Beard et al.; U.S. Pat. No. 5,999,883 to Gupta et al.; and U.S. Pat. No. 5,781,436 to Forgang et al.
  • One difficulty in interpreting the data acquired by a transversal induction logging tool is associated with vulnerability of its response to borehole conditions. Among these conditions is the presence of a conductive well fluid as well as wellbore fluid invasion effects. A known method for reducing these unwanted impacts on the transversal induction logging tool response was disclosed in L. A. Tabarovsky and M. I. Epov, Geometric and Frequency Focusing in Exploration of Anisotropic Seams, Nauka, USSR Academy of Science, Siberian Division, Novosibirsk, pp. 67-129 (1972) and L. A. Tabarovsky and M. I. Epov, Radial Characteristics Of Induction Focusing Probes With Transverse Detectors In An Anisotropic Medium, Soviet Geology And Geophysics, 20 (1979), pp. 81-90.
  • There are a few hardware margins and software limitations that impact a conventional transversal induction logging tool performance and result in errors appearing in the acquired data. The general hardware problem is typically associated with an unavoidable electrical field that is irradiated by the tool induction transmitter simultaneously with the desirable magnetic field, and it happens in agreement with Maxwell's equations for the time varying field. The transmitter electrical field interacts with remaining modules of the induction logging tool and with the formation; however, this interaction does not produce any useful information. Indeed, due to the always-existing possibility for this field to be coupled directly into the receiver part of the sensor section through parasitic displacement currents, it introduces the noise. When this coupling occurs, the electrical field develops undesirable electrical potentials at the input of the receiver signal conditioning, primarily across the induction coil receiver, and this voltage becomes an additive noise component to the signal of interest introducing a systematic error to the measurements.
  • Reduction of noise is of paramount importance, and a hardware solution to the problem is taught in U.S. Pat. No. 6,586,939 to Fanini et al, having the same assignee as the present invention and the contents of which are fully incorporated herein by reference. Proper correction is necessary in order to obtain meaningful interpretations of multicomponent induction logging data.
  • Multicomponent EM measurements are also now being used in airborne applications. As discussed in Smith et al., time-domain airborne electromagnetic (AEM) systems historically measure the inline horizontal (x) component. New versions of the electromagnetic systems are designed to collect two additional components [the vertical (z) component and the lateral horizontal (y) component] to provide greater diagnostic information. An example of such a system is shown in FIG. 3. This is illustrative of the GEOTEM® of Fugro Airborne Surveys Corp. Shown therein is a fixed wing aircraft 201 carrying a transmitter loop antenna 207 and a towed three component sensor 203 above the earth 205. Other configurations using helicopter borne sensors also exist. As discussed in Smith, measurements may be made with the transmitter in different source orientations.
  • In areas where the geology is near horizontal, the z-component response provides greater signal-to-noise, particularly at late delay times. This allows the conductivity to be determined to greater depth. In a layered environment, the symmetry implies that they component will be zero; hence a nonzero y component will indicate a lateral inhomogeneity. The extent of contamination of the y component by the x and z components can be used to ascertain the strike direction and the lateral offset of the target, respectively. Having the z and y component data increases the total response when the profile line has not traversed the target. This increases the possibility of detecting a target located between adjacent flight lines or beyond a survey boundary.
  • Hardware solutions of the type discussed by Fanini et al. are not practical for airborne systems where the transmitter and receiver are spatially separated. Even for transverse induction logging instruments such as the 3DEX™ of Baker Hughes Incorporated, it would be desirable to have an independent assessment of the calibration of the different components of multicomponent measurements. The present invention addresses this need.
  • SUMMARY OF THE INVENTION
  • One embodiment of the present invention is method of using a system having at least one transmitter and one or more receivers for making multicomponent induction measurements. The system is positioned above the surface of the earth and oriented so that an axis of the at least one transmitter is substantially parallel to the surface and substantially collinear with an axis of at least one of the receivers. Multicomponent measurements are obtained at one or more frequencies and one or more rotational angles of the system. Multifrequency focusing of the multicomponent measurements may be done. The multicomponent measurements are analyzed to get a calibration error in at least one of the multicomponent measurements.
  • In one embodiment of the invention, the multicomponent measurements are made by a system is adapted for use in a wellbore in an earth formation that includes three orthogonal transmitters. The three transmitters may not be at the same spatial position. In an alternate embodiment of the invention, the multicomponent measurements are made by a system is adapted for airborne use. The multicomponent measurements may be selected from xx, xy, yy, and zz measurements.
  • Another embodiment of the invention is a system for making multicomponent induction measurements. The system includes one or more transmitters and one or more receivers for making multicomponent measurements at one or more frequencies at one or more rotational angles. The system also includes a processor which determines from multicomponent measurements made at a substantially horizontal configuration of the system an indication of a calibration error in at least one of the multicomponent measurements. The system may include three orthogonal transmitters that may not be co-located on a logging tool. In another embodiment of the invention, the transmitters and receivers may be conveyed on a fixed wing aircraft or a helicopter. The multicomponent measurements may be selected from xx, xy, yy, and zz measurements. The processor may be at a downhole location, a surface location, or a remote location.
  • Another embodiment of the invention is machine readable medium for use with a system having one or more transmitters and one or more receivers for making multicomponent induction measurements. The medium includes instructions for positioning the system above the surface of the earth, instructions for orienting the system so that an axis of a transmitter is substantially parallel to the surface and substantially collinear with an axis f at least one of the plurality of receivers; instructions for obtaining multicomponent measurements at at least one frequency and at least one rotational angle of the system; and instructions for determining from the multicomponent measurements an indication of a calibration error in at least one of the multicomponent measurements. The instructions may cover a system used in a wellbore or an airborne system. The machine readable medium may include ROMs, EPROMs, EAROMs, Flash Memories and Optical disks.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • The invention is best understood by reference to the accompanying figures wherein like numbers refer to like components and in which:
  • FIG. 1 (Prior Art) shows an induction instrument disposed in a wellbore penetrating earth formations;
  • FIG. 2 (Prior Art) shows the arrangement of transmitter and receiver coils in the multicomponent induction logging tool marketed under the name 3DEX™;
  • FIG. 3 (prior art) illustrates equipment used for multicomponent airborne electromagnetic measurements;
  • FIG. 4 shows a logging tool oriented horizontally above the earth as needed for calibration according to the method of the present invention; and
  • FIG. 5 is a flow chart of the method of the present invention.
  • DETAILED DESCRIPTION OF THE INVENTION
  • Referring now to FIG. 1, an electromagnetic induction well logging instrument 10 is shown disposed in a wellbore 2 drilled through earth formations. The earth formations are shown generally at 4. The instrument 10 can be lowered into and withdrawn from the wellbore 2 by means of an armored electrical cable 6 or similar conveyance known in the art. The instrument 10 can be assembled from three subsections: an auxiliary electronics unit 14 disposed at one end of the instrument 10; a coil mandrel unit 8 attached to the auxiliary electronics unit 14; and a receiver/signal processing/telemetry electronics unit 12 attached to the other end of the coil mandrel unit 8, this unit 12 typically being attached to the cable 6.
  • The coil mandrel unit 8 includes induction transmitter and receiver coils, as will be further explained, for inducing electromagnetic fields in the earth formations 4 and for receiving voltage signals induced by eddy currents flowing in the earth formations 4 as a result of the electromagnetic fields induced therein.
  • The auxiliary electronics unit 14 can include a signal generator and power amplifiers (not shown) to cause alternating currents of selected frequencies to flow through transmitter coils in the coil mandrel unit 8.
  • The receiver/signal processing/telemetry electronics unit 12 can include receiver circuits (not shown) for detecting voltages induced in receiver coils in the coil mandrel unit 8, and circuits for processing these received voltages (not shown) into signals representative of the conductivities of various layers, shown as 4A through 4F of the earth formations 4. As a matter of convenience the receiver/signal processing/telemetry electronics unit 12 can include signal telemetry to transmit the conductivity-related signals to the earth's surface along the cable 6 for further processing, or alternatively can store the conductivity related signals in an appropriate recording device (not shown) for processing after the instrument 10 is withdrawn from the wellbore 2.
  • Referring to FIG. 2, the configuration of transmitter and receiver coils in a preferred embodiment of the 3DExplorer™ induction logging instrument of Baker Hughes is shown. Three orthogonal transmitters 101, 103 and 105 that are referred to as the Tx, Tz, and Ty transmitters are shown (the z-axis is the longitudinal axis of the tool). Corresponding to the transmitters 101, 103 and 105 are associated receivers 107, 109 and 111, referred to as the Rx, Rz, and Ry receivers, for measuring the corresponding magnetic fields. In one mode of operation of the tool, the Hxx, Hyy, Hzz, Hxy, and Hxz components are measured, though other components may also be used.
  • The method of the present invention is based upon measuring the different components of the induced magnetic field with the logging tool in a horizontal position over the surface of the earth. For the airborne EM system, this is requires some modification of the apparatus shown in FIG. 3. The body of the three-component sensor 203 would be provided with aerofoils that produce sufficient lift so that the receivers are at the same elevation as the transmitters. For a logging tool, this configuration is illustrated in FIG. 4 where the tool 225 is positioned horizontally in air over the earth. The surface of the earth is denoted by 251 and boundaries of layers of the earth are indicated by 253, 255 etc. Also indicated are a three-component transmitter 261 and a three component receiver 263 with x, y and z coils as indicated. The air has, for all practical purposes, a conductivity σ=0, while the earth layers have conductivity σ≠0.
  • When the x-axis is vertical, certain relationships exist between the different components of a triaxial tool. The tool is placed horizontal in air above the earth at a height of hs. The earth is considered to be horizontally layered. The conductivity of each layer can be arbitrary and there may be anisotropy present. The figure shows only one tri-axial transmitter array and one tri-axial receiver array. In a tool like 3DEX, there are two transmitter arrays at different spacing from the receiver and with moments such that the signal in air far from any objects or earth is zero. In the case considered here, the distance hs is small enough so that there is influence of the earth. The orientation of the array is such that the X-coils face towards the earth, the Y-coils and Z-coils are horizontal as shown in the figure.
  • Let the transmitter magnetic moments for the X, Y and Z transmitters be Mx, My and Mz respectively. Initially, let σAIR0≠0. Then, the magnetic field in the receivers X, Y and Z due to transmitter X, Y and Z respectively are Hxx, Hyy and Hzz. The response can be obtained as a solution to Maxwell's Equations. Assuming all the magnetic moments are equal to unity, the results can be expressed as the integrals: H xx = 0 ζ 3 β ( - β z - z s + R 0 - β ( z 0 - z + h s ) ) J 0 ( ζ x ) ζ ( 1 )
    where
    R0 is the reflection coefficient for the interface between air and layered earth;
    Z is the variable of integration; β = Ϛ 2 - k 0 2 ; k o = ω μ o σ 0 ;
    σ0=Conductivity of the layer in which the tool is located. For Air σ0=0;
    μ0=Magnetic Permeability of the layer in which the tool is located;
    ω=2 πf;
    f=transmitter frequency;
    z=Z location of receiver;
    zs=Z location of transmitter;
    hs=distance of receiver above layer boundary;
    z0=Z location of the layer boundary;
    J0=Bessel function of the first kind of order zero;
    J1=Bessel function of the first kind of order one;
  • Using σ0=0, k0=0, and β=ξ we can simplify Hxx to H xx = 0 ξ 2 ( - ξ z - z s + R 0 - ξ ( z 0 - z + h s ) ) J 0 ( ζ x ) ζ . ( 2 )
    Similarly H zz = 0 ζ 2 ( - - ξ z - z s + R 0 - ξ ( z 0 - z + h s ) ) ( J 0 - J 1 ξ 2 ) ζ ( 3 ) H yy = 0 ( - - ξ z - z s + R 0 - ξ ( z 0 - z + h s ) ) J 1 ζ . ( 4 )
    Hence H zz + H yy = 0 ζ 2 ( - - ξ z - z s + R 0 - ξ ( z 0 - z + h s ) ) J 0 ζ . ( 5 )
    Taking the difference of above sum with the expression for Hxx we get H xx - ( H zz + H yy ) = 2 0 ξ 2 - ξ z - z s J 0 ( ζ x ) ζ = 2 R 3 ( 2 - 3 x 2 R 2 ) . ( 6 )
    where x is the spacing between transmitter and receiver, R = x 2 + ( z - z s ) 2 .
    For a horizontal tool, x=L, and z=zs. Hence H xx - ( H zz + H yy ) = - 2 L 3 . ( 7 )
    As mentioned before, in a tri-axial tool, the measurement is done using a single transmitter with two receivers with their moments such that the magnetic field is canceled in air far from earth. Assuming the moments of the two receivers are M1 and M2 and the corresponding spacings are L1 and L2, the above expression becomes: H xx - ( H zz = H yy ) = - 2 ( M 1 L 1 3 - M 2 L 2 3 ) = 0. ( 8 )
  • The preceding expression is the result of the fact that the measurements in air cancel. If we have the situation that the measurements are made with a single receiver and two transmitters with their moments canceling the receiver magnetic field in air then by reciprocity, the above result is still valid. Hence,
    H xx =H zz +H yy.  (9)
    It should be noted that the above result is valid for collocated or equally spaced coils. The array is horizontal and the axis of the X coils is parallel to the normal to the earth surface. In terms of apparent conductivities, the above relation becomes:
    σxx=2σzzyy.  (10)
    The factor of 2 is due to the different tool constants used to convert the Z-component to conductivity as opposed the one used for X or Y component.
  • Various consequences of the eqn. (9) can also be derived. Consider the case when the tool is rotated around its axis. The corresponding measurements can be expressed in terms of the primary measurements at no rotation as follows:
    Ĥ xx=cos2(φ)H xx+sin2(φ)H yy  (11)
    Ĥ yy=sin2(φ)H xx+cos2(φ)H yy  (12)
    Ĥzz=Hzz.  (13)
    where φ is the angle of rotation of X-axis around Z-axis. When we compute an expression similar to eq. (8), we get: H ^ xx - ( H ^ zz + H ^ yy ) = cos 2 ( ϕ ) ( H xx - H zz - H yy ) + sin 2 ( ϕ ) ( H yy - H zz - H xx ) = - 2 sin 2 ( ϕ ) H zz ( 14 )
    The corresponding apparent conductive relation is:
    {circumflex over (σ)}xx−(2{circumflex over (σ)}zz+{circumflex over (σ)}yy)=−4 sin2(φ)σzz  (15).
    Similarly, for cross component measurement: H ^ xy = 1 2 sin ( 2 ϕ ) ( H yy - H xx ) = - 1 2 sin ( 2 ϕ ) H zz ( 16 )
    and
    {circumflex over (σ)}xy=−sin(2φ)σzz.  (17)
  • In reality, it is not practical to have the x-, y- and z-coils for the transmitter (and the receiver) co-located, i.e., at the same spatial position. For non-co-located coils, eqn. (17) is also approximately correct for multifrequency focused signals. Multifrequency focusing is discussed in U.S. Pat. No. 5,884,227 to Rabinovich et al., having the same assignee as the present invention and the contents of which are incorporated herein by reference. The method includes extrapolating magnitudes of the receiver signals at a plurality of frequencies to a response which would be obtained at zero frequency. In one embodiment of the invention, at least one of eqns. (10) and (17) is used as a consistency check on the calibration achieved by the hardware such as that disclosed in Fanini.
  • Additional relations exist that can be used for checking the consistency of the different components of measurements. With the tool in the orientation shown in FIG. 4, the measurements of the magnetic field components may be denoted by:
    {tilde over (H)} xx =H xxxx
    {tilde over (H)} yy =H yyyy
    {tilde over (H)} zz =H zzzz  (18),
    where δxx, δyy and δzz are the respective errors in the measurements made of the corresponding components. From eqn. (4) it follows that P 1 = H ~ zz + H ~ yy - H ~ xx = H zz + H yy - H xx + δ zz + δ yy + δ xx = δ zz + δ yy - δ xx . ( 19 )
  • Generally, it is easier to achieve calibration of the z-coils. Calibration of the z-coils is discussed, for example, in U.S. Pat. No. 5,293,128 to Zhou et al., having the same assignee as the present invention and the contents of which are fully incorporated herein by reference. If it is assumed that the zz measurements are properly calibrated, then eqn. (19) gives an indication of the relative error between the xx and yy measurements. If the zz measurements are not assumed to be properly calibrated, then it is possible to determine the calibration error in the zz measurements.
  • Determination of the error in the zz measurements involves rotating the tool shown in FIG. 3 by 90° about the tool axis, thus interchanging the x- and y-axis (with a sign reversal). We can then evaluate P 2 = H ~ zz + H ~ xx - H ~ yy = H zz + H xx - H yy + δ zz + δ xx + δ yy = δ zz + δ xx - δ yy . ( 20 )
    From eqns. (19) and (20), it follows that: P 1 + P 2 2 = δ zz . ( 21 )
    Thus, if the quantity given by eqn. (21) is zero, then the zz component is properly calibrated.
  • Turning now to FIG. 5, a flow chart illustrating the method of the present invention is shown. The z-axis is of the tool (or the transmitter on the aircraft) is oriented to horizontal 301. Multicomponent measurements are made at one or more frequencies 303 at at least one rotational angle. As noted above, for co-located transmitter (and receiver) coils, measurements at a single frequency are sufficient. For non co-located coils, mutlifrequency measurements may be made. As further noted above, at the very If the coils are not co-located, then a multifrequency focusing (MFF) is applied to the measurements 305. Next, calibration errors are determined 307. As noted above, this is done using eqns. (1)-(7). It is noted that even for an aeromagnetic system with only a single transmitter coil, some calibration information can be obtained using eqn. (3), so that the method of the invention can be practiced with a system having a single transmitter and a plurality of spaced-apart receivers.
  • The operation of the transmitter and receivers may be controlled by one or more processors. For wireline applications, the downhole processor and/or the surface processor may be used. Part of the processing may be done at a remote location away from the wellbore. Implicit in the control and processing of the data is the use of a computer program implemented on a suitable machine readable medium that enables the processor to perform the control and processing. The machine readable medium may include ROMs, EPROMs, EAROMs, Flash Memories and Optical disks.
  • While the foregoing disclosure is directed to the preferred embodiments of the invention, various modifications will be apparent to those skilled in the art. It is intended that all variations within the scope of the appended claims be embraced by the foregoing disclosure.

Claims (22)

1. A method of using a system having at least one transmitter and a plurality of receivers for making multicomponent induction measurements, the method comprising:
(a) positioning the system above the surface of the earth;
(b) orienting the system so that an axis of the at least one transmitter is substantially parallel to the surface and substantially collinear with an axis of at least one of the plurality of receivers;
(c) obtaining multicomponent measurements at at least one frequency and at least one rotational angle of the system; and
(d) determining from the multicomponent measurements an indication of a calibration error in at least one of the multicomponent measurements.
2. The method of claim 1 wherein:
(i) the system is adapted for use in a wellbore in the earth formation; and
(ii) the at least one transmitter comprises three transmitters orthogonal to each other.
3. The method of claim 2 wherein the three transmitters are not at substantially the same position (non co-located).
4. The method of claim 1 wherein the system is adapted for aerial use.
5. The method of claim 2 wherein the multicomponent measurements comprise xx, yy, and zz measurements, and wherein determining the indication of the calibration error comprises using a relation of the form:

H xx =H yy +H xx
where Hxx, Hyy and Hzz are magnetic field measurements in the xx, yy, and zz directions.
6. The method of claim 3 wherein:
(i) the multicomponent measurements comprise xy, and zz measurements;
(ii) the at least one rotation angle comprises an angle φ; and
(iii) determining the indication of the calibration error comprises using a relation of the form:

σxyzz sin 2φ
 where the σ's are apparent conductivity values at the angle φ.
7. The method of claim 5 wherein the at least one rotation angle comprises angles of 0° and 90°;
8. A system for making multicomponent induction measurements, the system comprising:
(a) at least one transmitter and a plurality of receivers that make multicomponent measurements at at least one frequency and at least one rotational angle;
(b) a processor which determines from the multicomponent measurements made at a substantially horizontal configuration of the system an indication of a calibration error in at least one of the multicomponent measurements.
9. The system of claim 8 wherein the at least one transmitter comprises three transmitters orthogonal to each other, the three transmitters disposed on a logging tool conveyed into a borehole in the earth formation.
10. The system of claim 9 wherein the three transmitters are not at substantially the same position (non co-located).
11. The system of claim 8 further comprising one of (i) a fixed wing aircraft, and, (ii) a helicopter, which maintains the at least one transmitter and the plurality of receivers in the substantially horizontal configuration.
12. The system of claim 9 wherein the multicomponent measurements comprise xx, yy, and zz measurements, and wherein the processor determines the indication of the calibration error comprises using a relation of the form:

H xx =H yy +H zz
where Hxx, Hyy and Hzz are magnetic field measurements in the xx, yy, and zz directions.
13. The system of claim 10 wherein:
(i) the multicomponent measurements comprise xy, and zz measurements;
(ii) the at least one rotation angle comprises an angle φ; and
(iii) the processor determines the indication of the calibration error comprises using a relation of the form:

σxyzz sin 2φ
 where the σ's are apparent conductivity values at the angle φ.
14. The system of claim 12 wherein the at least one rotation angle comprises angles of 0° and 90°;
15. The system of claim 9 wherein the processor is at one of (i) a downhole location, (ii) a surface location, and, (iii) a remote location.
16. A machine readable medium for use with a system having at least one transmitter and a plurality of receivers for making multicomponent induction measurements, the medium comprising instructions for:
(a) positioning the system above the surface of the earth;
(b) orienting the system so that an axis of the at least one transmitter is substantially parallel to the surface and substantially collinear with an axis of at least one of the plurality of receivers;
(c) obtaining multicomponent measurements at at least one frequency and at least one rotational angle of the system; and
(d) determining from the multicomponent measurements an indication of a calibration error in at least one of the multicomponent measurements.
17. The medium of claim 16 wherein:
(i) the system is adapted for use in a wellbore in the earth formation; and
(ii) the at least one transmitter comprises three transmitters orthogonal to each other.
18. The medium of claim 17 wherein the three transmitters are not at substantially the same position (non co-located).
19. The medium of claim 16 wherein the system is adapted for aerial use.
20. The medium of claim 17 wherein the multicomponent measurements comprise xx, yy, and zz measurements, and wherein the instructions further comprise a relation of the form:

H xx =H yy +H zz
where Hxx, Hyy, and Hzz are magnetic field measurements in the xx, yy, and zz directions.
21. The medium of claim 18 wherein:
(i) the multicomponent measurements comprise xy, and zz measurements;
(ii) the at least one rotation angle comprises an angle φ; and
wherein the instructions further comprise a relation of the form:

σxyzz sin 2φ
 where the σ's are apparent conductivity values at the angle φ.
22. The medium of claim 16 wherein the medium is selected from the group consisting of (i) a ROM, (ii) an EPROM, (iii) an EAROM, (iv) a Flash Memory, and, (v) an optical disk.
US11/081,958 2005-03-16 2005-03-16 Calibration of xx, yy and zz induction tool measurements Abandoned US20060208737A1 (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
US11/081,958 US20060208737A1 (en) 2005-03-16 2005-03-16 Calibration of xx, yy and zz induction tool measurements
RU2007137982/28A RU2007137982A (en) 2005-03-16 2006-03-15 CALIBRATION BY RESULTS OF MEASUREMENTS XX, YY AND ZZ OBTAINED BY AN INDUCTION INSTRUMENT
PCT/US2006/009333 WO2006101899A2 (en) 2005-03-16 2006-03-15 Calibration of xx, yy and zz induction tool measurements
US11/609,997 US8305082B2 (en) 2005-03-16 2006-12-13 Calibration of XX, YY and ZZ induction tool measurements

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US11/081,958 US20060208737A1 (en) 2005-03-16 2005-03-16 Calibration of xx, yy and zz induction tool measurements

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US11/609,997 Continuation-In-Part US8305082B2 (en) 2005-03-16 2006-12-13 Calibration of XX, YY and ZZ induction tool measurements

Publications (1)

Publication Number Publication Date
US20060208737A1 true US20060208737A1 (en) 2006-09-21

Family

ID=37009644

Family Applications (2)

Application Number Title Priority Date Filing Date
US11/081,958 Abandoned US20060208737A1 (en) 2005-03-16 2005-03-16 Calibration of xx, yy and zz induction tool measurements
US11/609,997 Active US8305082B2 (en) 2005-03-16 2006-12-13 Calibration of XX, YY and ZZ induction tool measurements

Family Applications After (1)

Application Number Title Priority Date Filing Date
US11/609,997 Active US8305082B2 (en) 2005-03-16 2006-12-13 Calibration of XX, YY and ZZ induction tool measurements

Country Status (3)

Country Link
US (2) US20060208737A1 (en)
RU (1) RU2007137982A (en)
WO (1) WO2006101899A2 (en)

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070108981A1 (en) * 2005-08-03 2007-05-17 Banning-Geertsma Erik J Method and system for determining an electromagnetic response from an earth formation and method of drilling a borehole
US7268555B1 (en) 2006-04-06 2007-09-11 Baker Hughes Incorporated Correction of cross-component induction measurements for misalignment using comparison of the XY formation response
US20070234787A1 (en) * 2006-04-07 2007-10-11 Baker Hughes Incorporated Processing of multi-component induction data in the presence of borehole abnormalities
US20070267192A1 (en) * 2006-04-26 2007-11-22 Baker Hughes Incorporated Method and Apparatus for Correcting Underestimation of Formation Anisotropy Ratio
US7333891B2 (en) 2006-04-06 2008-02-19 Baker Hughes Incorporated Correction of cross-component induction measurements for misalignment using comparison of the XY formation response
US7379818B2 (en) 2006-04-06 2008-05-27 Baker Hughes Incorporated Correction of cross-component induction measurements for misalignment using comparison of the XY formation response
US20080231283A1 (en) * 2007-03-21 2008-09-25 Baker Hughes Incorporated Multi-Frequency Cancellation of Dielectric Effect
US20080246486A1 (en) * 2007-04-04 2008-10-09 Baker Hughes Incorporated Mutual Shielding of Collocated Induction Coils in Multi-Component Induction Logging Instruments
US7652478B2 (en) 2004-05-07 2010-01-26 Baker Hughes Incorporated Cross-component alignment measurement and calibration
US20110006764A1 (en) * 2007-07-03 2011-01-13 Jeremiah Glen Pearce System and method for measuring a time-varying magnetic field and method for production of a hydrocarbon fluid
US8305082B2 (en) 2005-03-16 2012-11-06 Baker Hughes Incorporated Calibration of XX, YY and ZZ induction tool measurements
US8762107B2 (en) 2010-09-27 2014-06-24 Baker Hughes Incorporated Triaxial induction calibration without prior knowledge of the calibration area's ground conductivity
US10082593B2 (en) * 2016-03-01 2018-09-25 Gowell International, Llc Method and apparatus for synthetic magnetic sensor aperture using eddy current time transient measurement for downhole applications
US10890686B2 (en) * 2008-04-17 2021-01-12 Richard H. Hardman Methods for producing a log of material properties
US11112523B2 (en) 2017-12-01 2021-09-07 Schlumberger Technology Corporation Calibration of electromagnetic measurement tool
WO2022057070A1 (en) * 2020-09-15 2022-03-24 中国矿业大学 High-precision three-component electromagnetic field sensor and data transmission control system therefor

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2008021868A2 (en) * 2006-08-08 2008-02-21 Halliburton Energy Services, Inc. Resistivty logging with reduced dip artifacts
US9140817B2 (en) * 2009-10-08 2015-09-22 Precision Energy Services, Inc. Steerable magnetic dipole antenna for measurement-while-drilling applications
US8471563B2 (en) * 2009-10-08 2013-06-25 Precision Energy Services, Inc. Steerable magnetic dipole antenna for measurement while drilling applications
WO2014160724A1 (en) 2013-03-28 2014-10-02 Halliburton Energy Services, Inc. Calibration method for multi-component induction tools
US9612354B2 (en) 2014-02-06 2017-04-04 Cgg Services Sas Geophysical survey system using hybrid aircraft
US10830039B2 (en) * 2014-04-03 2020-11-10 Baker Hughes Holdings Llc Downhole tri-axial induction electromagnetic tool
US9921331B2 (en) 2014-12-17 2018-03-20 Cgg Services Sas Multi-sensor system for airborne geophysical prospecting and method
GB2578044B (en) * 2017-08-07 2022-05-25 Halliburton Energy Services Inc Component-based look-up table calibration for modularized resistivity tool

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4837517A (en) * 1987-07-16 1989-06-06 Schlumberger Technology Corporation Spatial frequency method and apparatus for investigating earth conductivity with high vertical resolution by induction techniques
US5157605A (en) * 1987-04-27 1992-10-20 Schlumberger Technology Corporation Induction logging method and apparatus including means for combining on-phase and quadrature components of signals received at varying frequencies and including use of multiple receiver means associated with a single transmitter
US5293128A (en) * 1992-07-02 1994-03-08 Western Atlas International, Inc. Method and apparatus for calibrating the output measurement of a logging tool as a function of earth formation parameters
US5452761A (en) * 1994-10-31 1995-09-26 Western Atlas International, Inc. Synchronized digital stacking method and application to induction logging tools
US5542761A (en) * 1995-09-20 1996-08-06 Dedoes Industries, Inc. Automatic paint stirring equipment with improved bushing
US5600246A (en) * 1995-11-28 1997-02-04 Western Atlas International, Inc. Method and apparatus for reducing signal-phase error in induction well logging instruments
US5781436A (en) * 1996-07-26 1998-07-14 Western Atlas International, Inc. Method and apparatus for transverse electromagnetic induction well logging
US5884227A (en) * 1997-04-01 1999-03-16 Western Atlas International, Inc. Method for interpreting induction logs in high resistivity contrast earth formations
US20030076107A1 (en) * 2001-08-03 2003-04-24 Baker Hughes Incorporated Method and apparatus for a multi-component induction instrument measuring system for geosteering and formation resistivity data interpretation in horizontal, vertical and deviated wells
US20040113609A1 (en) * 2002-07-30 2004-06-17 Homan Dean M. Electromagnetic logging tool calibration system
US7027923B2 (en) * 2003-12-12 2006-04-11 Schlumberger Technology Corporation Method for determining sonde error for an induction or propagation tool with transverse or triaxial arrays

Family Cites Families (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US658639A (en) * 1899-11-24 1900-09-25 Alexander Lutz Sanitary receiving-basin.
EA001862B1 (en) 1996-07-01 2001-10-22 Шелл Интернэшнл Рисерч Маатсхаппий Б.В. Electrical logging of a laminated earth formation
US6254863B1 (en) * 1998-08-12 2001-07-03 Loma Linda University Non-virulent Porphyromonas gingivalis mutant
US6586939B1 (en) 1999-12-24 2003-07-01 Baker Hughes Incorporated Method and apparatus for reducing the effects of parasitic and galvanic currents in a resistivity measuring tool
US6885947B2 (en) * 2001-03-08 2005-04-26 Baker Hughes Incorporated Method for joint interpretation of multi-array induction and multi-component induction measurements with joint dip angle estimation
US6584939B1 (en) * 2001-10-19 2003-07-01 Jessica M. Brezinski Animal coat
US7091877B2 (en) * 2003-10-27 2006-08-15 Schlumberger Technology Corporation Apparatus and methods for determining isotropic and anisotropic formation resistivity in the presence of invasion
CA2450837A1 (en) * 2003-11-25 2005-05-25 University Of New Brunswick Induction magnetometer
US7319331B2 (en) 2004-05-07 2008-01-15 Baker Hughes Incorporated Two loop calibrator
US7652478B2 (en) 2004-05-07 2010-01-26 Baker Hughes Incorporated Cross-component alignment measurement and calibration
US7205770B2 (en) 2004-05-07 2007-04-17 Baker Hughes Incorporated Borehole conductivity simulator verification and transverse coil balancing
US7501829B2 (en) 2005-02-28 2009-03-10 Schlumberger Technology Corporation Extra bucking coils as an alternative way to balance induction arrays
US20060208737A1 (en) 2005-03-16 2006-09-21 Baker Hughes Incorporated Calibration of xx, yy and zz induction tool measurements

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5157605A (en) * 1987-04-27 1992-10-20 Schlumberger Technology Corporation Induction logging method and apparatus including means for combining on-phase and quadrature components of signals received at varying frequencies and including use of multiple receiver means associated with a single transmitter
US4837517A (en) * 1987-07-16 1989-06-06 Schlumberger Technology Corporation Spatial frequency method and apparatus for investigating earth conductivity with high vertical resolution by induction techniques
US5293128A (en) * 1992-07-02 1994-03-08 Western Atlas International, Inc. Method and apparatus for calibrating the output measurement of a logging tool as a function of earth formation parameters
US5452761A (en) * 1994-10-31 1995-09-26 Western Atlas International, Inc. Synchronized digital stacking method and application to induction logging tools
US5542761A (en) * 1995-09-20 1996-08-06 Dedoes Industries, Inc. Automatic paint stirring equipment with improved bushing
US5600246A (en) * 1995-11-28 1997-02-04 Western Atlas International, Inc. Method and apparatus for reducing signal-phase error in induction well logging instruments
US5781436A (en) * 1996-07-26 1998-07-14 Western Atlas International, Inc. Method and apparatus for transverse electromagnetic induction well logging
US5999883A (en) * 1996-07-26 1999-12-07 Western Atlas International, Inc. Conductivity anisotropy estimation method for inversion processing of measurements made by a transverse electromagnetic induction logging instrument
US5884227A (en) * 1997-04-01 1999-03-16 Western Atlas International, Inc. Method for interpreting induction logs in high resistivity contrast earth formations
US20030076107A1 (en) * 2001-08-03 2003-04-24 Baker Hughes Incorporated Method and apparatus for a multi-component induction instrument measuring system for geosteering and formation resistivity data interpretation in horizontal, vertical and deviated wells
US20040113609A1 (en) * 2002-07-30 2004-06-17 Homan Dean M. Electromagnetic logging tool calibration system
US7027923B2 (en) * 2003-12-12 2006-04-11 Schlumberger Technology Corporation Method for determining sonde error for an induction or propagation tool with transverse or triaxial arrays

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7652478B2 (en) 2004-05-07 2010-01-26 Baker Hughes Incorporated Cross-component alignment measurement and calibration
US8305082B2 (en) 2005-03-16 2012-11-06 Baker Hughes Incorporated Calibration of XX, YY and ZZ induction tool measurements
US20070108981A1 (en) * 2005-08-03 2007-05-17 Banning-Geertsma Erik J Method and system for determining an electromagnetic response from an earth formation and method of drilling a borehole
US7268555B1 (en) 2006-04-06 2007-09-11 Baker Hughes Incorporated Correction of cross-component induction measurements for misalignment using comparison of the XY formation response
US7333891B2 (en) 2006-04-06 2008-02-19 Baker Hughes Incorporated Correction of cross-component induction measurements for misalignment using comparison of the XY formation response
US7379818B2 (en) 2006-04-06 2008-05-27 Baker Hughes Incorporated Correction of cross-component induction measurements for misalignment using comparison of the XY formation response
US20070234787A1 (en) * 2006-04-07 2007-10-11 Baker Hughes Incorporated Processing of multi-component induction data in the presence of borehole abnormalities
US8931335B2 (en) 2006-04-07 2015-01-13 Baker Hughes Incorporation Processing of multi-component induction data in the presence of borehole abnormalities
US20070267192A1 (en) * 2006-04-26 2007-11-22 Baker Hughes Incorporated Method and Apparatus for Correcting Underestimation of Formation Anisotropy Ratio
US7657375B2 (en) 2006-04-26 2010-02-02 Baker Hughes Incorporated Method and apparatus for correcting underestimation of formation anisotropy ratio
US7714585B2 (en) 2007-03-21 2010-05-11 Baker Hughes Incorporated Multi-frequency cancellation of dielectric effect
US20080231283A1 (en) * 2007-03-21 2008-09-25 Baker Hughes Incorporated Multi-Frequency Cancellation of Dielectric Effect
US7759940B2 (en) 2007-04-04 2010-07-20 Baker Hughes Incorporated Mutual shielding of collocated induction coils in multi-component induction logging instruments
US20080246486A1 (en) * 2007-04-04 2008-10-09 Baker Hughes Incorporated Mutual Shielding of Collocated Induction Coils in Multi-Component Induction Logging Instruments
US20110006764A1 (en) * 2007-07-03 2011-01-13 Jeremiah Glen Pearce System and method for measuring a time-varying magnetic field and method for production of a hydrocarbon fluid
US8258784B2 (en) 2007-07-03 2012-09-04 Shell Oil Company System and method for measuring a time-varying magnetic field and method for production of a hydrocarbon fluid
US10890686B2 (en) * 2008-04-17 2021-01-12 Richard H. Hardman Methods for producing a log of material properties
US8762107B2 (en) 2010-09-27 2014-06-24 Baker Hughes Incorporated Triaxial induction calibration without prior knowledge of the calibration area's ground conductivity
US10082593B2 (en) * 2016-03-01 2018-09-25 Gowell International, Llc Method and apparatus for synthetic magnetic sensor aperture using eddy current time transient measurement for downhole applications
US11112523B2 (en) 2017-12-01 2021-09-07 Schlumberger Technology Corporation Calibration of electromagnetic measurement tool
WO2022057070A1 (en) * 2020-09-15 2022-03-24 中国矿业大学 High-precision three-component electromagnetic field sensor and data transmission control system therefor
GB2613915A (en) * 2020-09-15 2023-06-21 Univ China Mining High-precision three-component electromagnetic field sensor and data transmission control system therefor

Also Published As

Publication number Publication date
US8305082B2 (en) 2012-11-06
WO2006101899A3 (en) 2007-03-08
US20070115000A1 (en) 2007-05-24
WO2006101899A2 (en) 2006-09-28
RU2007137982A (en) 2009-04-27

Similar Documents

Publication Publication Date Title
US8305082B2 (en) Calibration of XX, YY and ZZ induction tool measurements
US8841913B2 (en) Determining formation parameters using electromagnetic coupling components
US7778778B2 (en) Correction of multi-component measurements for tool eccentricity in deviated wells
US6643589B2 (en) Simultaneous determination of formation angles and anisotropic resistivity using multi-component induction logging data
US7629791B2 (en) Method and apparatus for making multi-component measurements in deviated wells
US6636045B2 (en) Method of determining formation anisotropy in deviated wells using separation of induction mode
US6502036B2 (en) 2-D inversion of multi-component induction logging data to resolve anisotropic resistivity structure
US8274289B2 (en) Antenna coupling component measurement tool having rotating antenna configuration
US6819111B2 (en) Method of determining vertical and horizontal resistivity, and relative dip in anisotropic earth formations having an arbitrary electro-magnetic antenna combination and orientation with additional rotation and position measurements
US7408355B1 (en) Borehole conductivity simulator verification and transverse coil balancing
US6925384B2 (en) Method for resistivity anisotropy determination in conductive borehole environments
US8931335B2 (en) Processing of multi-component induction data in the presence of borehole abnormalities
US7392137B2 (en) Determination of formation anistrophy, dip and azimuth
US7932723B2 (en) Borehole conductivity simulator verification and transverse coil balancing
US10481290B2 (en) Generalized directional measurements and using symmetrized and anti-symmetrized angles to indicate orientation of anisotropy and formation boundaries
US7952358B2 (en) Methods and apparatus for determination of a formation resistivity property using eccentered measurements
US7902827B2 (en) Method and apparatus for combined induction and imaging well logging
US8803527B2 (en) Use of electrodes and multi-frequency focusing to correct eccentricity and misalignment effects on transversal induction measurements
US7898260B2 (en) Method and apparatus for detecting borehole effects due to eccentricity of induction instruments
WO2008016638A2 (en) Correction of multi-component measurements for tool eccentricity in deviated wells

Legal Events

Date Code Title Description
AS Assignment

Owner name: BAKER HUGHES INCORPORATED, TEXAS

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:MERCHANT, GULAMABBAS;PELEGRI, LUIS M.;MOGILATOV, VLADIMIR S.;REEL/FRAME:016391/0487;SIGNING DATES FROM 20050307 TO 20050310

STCB Information on status: application discontinuation

Free format text: EXPRESSLY ABANDONED -- DURING EXAMINATION