US20070017704A1 - Single joint drilling system - Google Patents

Single joint drilling system Download PDF

Info

Publication number
US20070017704A1
US20070017704A1 US11/458,534 US45853406A US2007017704A1 US 20070017704 A1 US20070017704 A1 US 20070017704A1 US 45853406 A US45853406 A US 45853406A US 2007017704 A1 US2007017704 A1 US 2007017704A1
Authority
US
United States
Prior art keywords
pipe
erector
coupled
vertical support
handling system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US11/458,534
Inventor
Jaroslav Belik
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
National Oilwell Varco LP
Original Assignee
National Oilwell LP
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by National Oilwell LP filed Critical National Oilwell LP
Priority to US11/458,534 priority Critical patent/US20070017704A1/en
Assigned to NATIONAL-OILWELL, L.P. reassignment NATIONAL-OILWELL, L.P. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: BELIK, JAROSLAV
Publication of US20070017704A1 publication Critical patent/US20070017704A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B19/00Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
    • E21B19/14Racks, ramps, troughs or bins, for holding the lengths of rod singly or connected; Handling between storage place and borehole
    • E21B19/15Racking of rods in horizontal position; Handling between horizontal and vertical position
    • E21B19/155Handling between horizontal and vertical position

Definitions

  • the present invention relates generally to methods and apparatus for drilling wells More specifically, the present invention relates to systems for drilling wells utilizing single joints of pipe
  • tubular members such as drill pipe, drill collars, and casing
  • tubular members such as drill pipe, drill collars, and casing
  • the different tubular members are brought to the drill floor one at a time and added to the string.
  • Handling these tubular members has historically been a highly manual job using winches or other lifting appliances within the rig.
  • Automated systems for use in these “single joint” rigs must be able to safely handle a variety of tubular members while not slowing down drilling or tripping processes.
  • the embodiments of present invention comprise a combination of features and advantages that enable substantial enhancement of moving pipe and other tubular members to and from a drilling rig.
  • FIG. 1 is an elevation view of a drilling system designed in accordance with embodiments of the present invention
  • FIGS. 2-10 are views of the drilling system of FIG. 1 representing a sequence of events during a drilling or tripping operation
  • FIG. 11 is a side elevation view of a pipe erector system constructed in accordance with embodiments of the invention.
  • FIG. 12 is an end view of the pipe erector system of claim 11 shown in a closed position
  • FIG. 13 is an end view of the pipe erector system of claim 11 shown in an open position
  • FIG. 14 is a side elevation view of the pipe erector system of claim 11 shown in a first elevated position
  • FIG. 14 is a side elevation view of the pipe erector system of claim 11 shown in a second elevated position
  • FIG. 16 is a top view of an upper vertical pipe support constructed in accordance with embodiments of the invention.
  • FIG. 17 is a side view of the upper vertical pipe support of FIG. 16 ;
  • FIG. 18 is a front view of the upper vertical pipe support of FIG. 16 shown in a closed position
  • FIG. 19 is a side view of the upper vertical pipe support of FIG. 16 shown in an open position
  • FIG. 20 is a side view of the upper vertical pipe support of FIG. 16 shown engaged with a pipe member
  • FIGS. 21 and 22 shown drill floor equipment constructed in accordance with embodiments of the invention.
  • FIGS. 23 A-F illustrate the loading of pipe from a pipe handling system constructed in accordance with embodiments of the invention
  • FIGS. 24 A-F illustrate the loading of pipe onto the pipe handling system of FIGS. 23 A-F.
  • FIGS. 25 A-H illustrate the loading of pipe from a pipe handling system constructed in accordance with embodiments of the invention
  • FIGS. 26 A-H illustrate the loading of pipe onto the pipe handling system of FIGS. 25 A-H;
  • drilling system 10 comprises rig structure 12 , hoisting system 14 , pipe erecting system 16 , top drive system 18 , and drill floor equipment 20 .
  • Rig structure 12 comprises mast 22 , drill floor 24 , and sub-structure 26 .
  • Hoisting system 14 comprises drawworks 28 , crown block 30 , and traveling block 32 .
  • Top drive system 18 comprises top drive 34 , bails 36 , and elevator 38 .
  • Pipe handling system 16 comprises erector 40 , horizontal supports 42 , lower vertical support 44 , and upper vertical support 46 .
  • Drill floor equipment 20 comprises iron roughneck system 48 and slips 50 that are located on well center 52 .
  • FIGS. 2-10 illustrate the procedure used for drilling or running pipe into the hole.
  • top drive 34 is fully lowered toward drill floor 24 and a joint of pipe 54 needs to be added to the drill string 56 .
  • Erector 40 has raised pipe 54 to a substantially vertical position that is offset from well center 52 and an upper end of the pipe is above drill floor 24 .
  • Vertical supports 44 and 46 secure pipe 54 in the substantially vertical position so that erector 40 can be disengaged and pivoted back to horizontal, as shown in FIG. 3 .
  • top drive 34 can be detached from drill string 26 and raised, as shown in FIG. 4 .
  • elevator 38 and bails 34 are rotated to an extended position where the elevator is aligned with the offset position of pipe 54 . Elevator then engages pipe 54 , as shown in FIG. 5 .
  • top drive 34 is raised toward the top of mast 22 , carrying pipe 54 supported by elevator 38 .
  • Elevator 38 maintains pipe 54 in the position offset from well center 52 until the lower end of the pipe clears upper vertical support 44 and the upper end of drill string 56 . Once raised, elevator 38 is rotated back to its initial position so that pipe 54 is substantially on well center 52 .
  • top drive 34 is lowered and pipe 54 engaged with drill string 56 .
  • the engagement of pipe 54 with drill string 56 may be enabled by a stabbing system (not shown) or manual intervention.
  • FIG. 9 once pipe 54 is engaged with drill string 56 , roughneck system 48 is moved to well center 52 and makes-up the connection between pipe 54 and drill string 56 .
  • Top drive 34 can then engage the upper connection of pipe 54 and continue drilling or running the drill string into the well, as is shown in FIG. 10 . When top drive 34 nears drill floor 24 , the process repeats and another pipe joint is added to the drill string.
  • top drive 34 does not engage drill string 56 and the drill string is supported solely by elevator 38 .
  • Drill string is removed from the well by reversing the above procedure and using erector 40 to move pipe 54 back to a horizontal position.
  • Pipe handling system 16 comprises pipe erector 40 that moves a single joint of pipe at a time from a substantially horizontal storage position to a substantially vertical position where an upper end of the pipe is above an elevated drill floor and the pipe is offset from well center. It is understood that when in either the storage position or the substantially vertical position, the pipe is not required to be exactly horizontal or vertical and that some deviation from these orientations may be possible.
  • Erector 40 engages pipe 54 that has been disposed on horizontal supports 42 by a pipe handling system or other means.
  • Erector 40 comprises two pairs of capture arms 56 mounted to frame 58 , which is connected to base 60 at pivot 62 .
  • Frame 58 also comprises ledge 64 .
  • Hydraulic cylinder 66 is coupled to frame 58 and base 60 .
  • Hydraulic cylinder 68 is coupled to capture arm 56 and base 60 .
  • Erector 40 is in a horizontal position with capture arms open, as shown in FIG. 13 , as pipe 54 is placed on horizontal supports 52 Hydraulic cylinder 68 is extended so that capture arms 56 rotate to a closed position, as shown in FIG. 12 . Once capture arms 56 are closed, hydraulic cylinder 66 is retracted, rotating erector 40 about pivot 62 from horizontal to the vertical position shown in FIG. 14 . As erector 40 rotates, pipe 54 comes to rest on, and be vertically supported by ledge 64 . Once pipe 54 is vertical, lower vertical support 44 lifts the pipe off of ledge 64 , as shown in FIG. 15 . Lower vertical support 44 lifts pipe 54 by raising platform 70 via hydraulic cylinder 72 to engage and lift the bottom of the pipe.
  • ledge 64 is moveable relative to erector 40 and is used to lift pipe 54 onto lower vertical support 44 (which is stationary) and also to adjust the axial position of the pipe with the erector is in the horizontal position. Once, pipe 54 is lifted so that ledge 64 clears the bottom of the pipe, erector 40 is rotated back to the horizontal position.
  • FIG. 16 shows a top down view of upper vertical support 46 comprising swing aims 74 , hinge members 76 , actuation cylinder 78 , and linkages 80 .
  • FIG. 17 is a side view of upper vertical support 46 .
  • the operation of upper vertical support 46 is shown in FIGS. 18-20 , which show a front view of the support.
  • FIG. 18 shows swing arms 74 in a filly closed position and actuation cylinder 78 in an extended position.
  • Linkage 80 couples cylinder 78 to swing arms 74 .
  • drill floor equipment 20 comprising iron roughneck system 48 and slips 50 , is used to make and break pipe connections as pipe joints are added to, or removed from, the drill string
  • Iron roughneck system 48 comprises torque wrench 84 and spinner 86 mounted to swinging frame 88 and stabbing guide 90 mounted to mast 22 .
  • Swinging frame 88 forms a parallelogram-shaped support structure that allows rough-neck system 48 to be moved to and from well center as needed
  • iron roughneck system 48 may be removed from swinging frame 88 and replaced with casing tongs or other equipment for handling specific tubular members.
  • swinging frame 88 may allow for iron roughneck system 48 to be rotated to an elevated or other position that allows for the use of casing tongs or other equipment for handling specialized tubular members.
  • stabbing guide 90 aligns the pipe joint with drill string 94 , which is supported by slips 50 .
  • swinging frame 88 moves torque wrench 84 and spinner 86 toward the well center, as shown in FIG. 22 .
  • Spinner 86 engages pipe joint 92 and rotates the pipe so as to engage the threaded connection to drill string 94
  • Torque wrench 84 then applies the necessary torque to the threaded connection to secure the connection.
  • torque wrench 84 applies torque to break the connection and spinner 86 rotates the pipe joint to disengage the treaded connection
  • drilling system 10 and pipe erecting system 16 operates by taking pipe from a horizontal orientation and placing the pipe back in the horizontal orientation after use. Once horizontal, the pipe can be handled by a number of different pipe handling systems and methods. In certain embodiments, automated systems can be used to handle horizontal pipe without direct involvement of personnel.
  • One such pipe handling system is illustrated in FIGS. 23 A-F and 24 A-F.
  • pipe handling system 100 comprises rack 102 , frame 104 , tilting mechanism 106 , elevated stop 108 , and pipe unloading assembly 110 .
  • Unloading assembly 110 comprises lifting block 114 and rotating arm 116 .
  • tilting mechanism 106 raises the end of rack 102 so as to angle the rack toward erector 40 .
  • the movement of pipes 112 along rack 102 is limited by elevated stop 108 .
  • lifting block 114 is raised, pushing a single joint of pipe 112 upward
  • the pipe 112 moves over and past elevated stop 108 toward the end of rack 102 .
  • Lifting block 114 is then lowered so that the remainder of pipes 118 can move downward until contacting elevated stop 108 .
  • pipe 112 is stopped by arm 116 , which is disposed in a raised position.
  • Ann 116 is then rotated to lower pipe 112 onto erector 40 .
  • Arm 116 continues rotating downward so that is out of the way of erector 40 .
  • Erector 40 can then lift pipe 112 upward and away from pipe handling system 100 .
  • FIGS. 24 A-F illustrate pipe handling system 100 being used to store pipes being removed from a drill string.
  • tilting mechanism 106 lowers the end of rack 102 so as to angle the rack away from erector 40 .
  • Lifting block 114 and elevated stop 108 are retracted into rack 102 so as to provide a smooth surface along which pipe 112 can roll.
  • arm 116 rotates upward so as to lift the pipe from the erector.
  • Arm 116 continues to rotate until pipe 112 falls onto rack 102 where it will roll toward the far end of the rack.
  • Pipe handling system 200 comprises frame 202 that is pivotally mounted on base 204 .
  • the incline of frame 202 is controlled by piston 206 .
  • the loading and unloading of pipe into handling system 200 is done by pipe moving assembly 210 .
  • Pipe moving assembly 210 comprises extendable finger 214 , rotatable arm 216 , and drive motor 218 .
  • Assembly 210 is slidably mounted to a vertical member of frame 202 so that drive motor 218 engages gear rack 220 .
  • FIGS. 25 A-H The unloading of pipe from handling system 200 is illustrated in FIGS. 25 A-H.
  • Piston 206 inclines frame 202 so that pipe joints 212 tend to move toward pipe moving assembly 210 .
  • Finger 214 extends to separate a single joint of pipe from the row of pipes stored in frame 202 .
  • Assembly 210 the moves upward until pipe 212 clears frame 202 , as shown in FIG. 25B .
  • Pipe 212 will roll down assembly 210 until it contacts arm 216 , which is in an levated position. With pipe 212 resting against arm 216 , assembly 210 moves downward along flame 202 to the position shown in FIG. 25D .
  • Arm 216 then rotates so as to lower pipe 212 into erector 40 and continues rotating until reaching a lowered position as shown in FIG.
  • FIGS. 26 A-H The loading of pipe from erector 40 back into handling system 200 is illustrated in FIGS. 26 A-H.
  • Piston 206 inclines frame 202 so that pipe joints 212 tend to move away from moving assembly 210
  • Mover assembly 210 is disposed adjacent to erector 40 , once erector 40 lowers pipe 212 to a horizontal position. Once erector 40 disengages pipe 212 , arm 216 rotates to lift pipe 212 from erector 40 .
  • Mover assembly 210 then moves up frame 202 until pipe 212 clears the top of the frame. Once inside frame 202 , pipe 212 is restrained by extended finger 214 and bumper 215 .
  • Mover assembly 210 moves back down frame 202 until pipe 212 is at the row of pipe being loaded Finger 214 then retracts and pipe 212 will roll into position within frame 202 . Mover assembly 210 is then moved back to the proper elevation to receive pipe from erector 40 and arm 216 is rotated back to its lowered position.
  • an alternate pipe erecting system 300 comprises erector system 302 that moves a single joint of pipe at a time from a horizontal position to a vertical position where the pipe is restrained by vertical support system 304 .
  • Erector system 302 further comprises erector frame 306 , capture arms 308 , pivot 310 , elevating cylinder 312 , base frame 314 , support finger 316 , and finger cylinder 318
  • Vertical support system 304 comprises frame 320 , pipe rest 322 , lower funnel guide 324 , and upper funnel guide 326 .
  • erector 302 is in a horizontal position. Capture arms 308 secure pipe 54 to erector 302 . Once capture arms 308 are closed, elevating cylinder 312 operates to rotate erector 302 about pivot 310 from horizontal to the vertical position shown in FIG. 28 . As erector 302 rotates, pipe 54 comes to rest on, and be vertically supported by finger 316 . Once pipe 54 is vertical, finger cylinder 318 lowers finger 316 so that the pipe come to rest on pipe rest 322 . Referring to FIG. 28 , when pipe 54 is vertical it is also supported by upper funnel guide 324 and lower funnel guide 326 . Funnel guides 324 and 326 may be similar to vertical support 46 of FIGS. 17-20 . Once pipe 54 is fully supported by vertical support system 304 , capture arms 308 can be opened and erector 302 can then be rotated back to the horizontal position of FIG. 27 .
  • FIGS. 29-32 illustrate a pipe erector system 400 that incorporates a system for handling and installing blowout preventer 402 .
  • Pipe erector system 400 comprises base 404 , erector arm 406 , vertical support arm 408 , and blowout preventer handling arm 410 .
  • FIG. 29 shows pipe erector system 400 in a transport configuration emplaced adjacent to wellhead 412 .
  • Pipe erector system 400 is preferably configured so as to be transported with blowout preventer 402 via standard road trailers
  • Erector arm 406 is pivotally coupled to base 404 at pivot 414 .
  • Pin connection 418 couples handling arm 410 to support arm 408 , which is pivotally coupled to base 404 at pin connection 416 .
  • erector arm 406 , support arm 408 , and handling arm 410 are in a horizontal position.
  • erector arm 406 , support arm 408 , and handling arm 410 are pivoted about pivot 414 to an elevated, substantially vertical position as shown in FIG. 30 .
  • Arms 406 , 408 , and 410 may be pivoted by the hydraulic cylinder (not shown) that is used to operate erector arm 406 during normal operations.
  • erector arm 406 can be disconnected from support arm 408 and returned to its horizontal position as shown in FIG. 31 .
  • Handling arm 410 is then tilted outward from support arm 408 by extending actuator 420 and pivoting the handling arm about pin connection 418 Handling arm 410 is tilted outward until blowout preventer 402 is aligned with wellhead 412 ,
  • Lifting frame 422 and cable 424 which travels over pulley 426 and is coupled to actuator 428 , supports blowout preventer 402 .
  • Blowout preventer 402 is lowered by extending actuator 428 until the blowout preventer is supported by wellhead 412 , as is shown in FIG. 31 .
  • lifting frame 422 is disconnected from the blowout preventer and handling arm 410 is tilted back to vertical as shown in FIG. 32 .
  • pipe erector system 400 is ready for operation.

Abstract

A pipe handling system comprising a pipe erector operable to move a pipe from a horizontal storage position to a substantially vertical position wherein an upper end of the pipe is disposed above an elevated drill floor of a drilling rig and the pipe is offset from well center The pipe handling system also comprises an upper vertical support configured to support the pipe in the vertical position independently of said pipe erector

Description

    CROSS-REFERENCE TO RELATED APPLICATIONS
  • This application claims priority to U.S. Provisional Patent Application No. 60/700,624, filed on Jul. 19, 2005 and titled “Single Joint Drilling System,” which is hereby incorporated by reference herein,
  • STATEMENT REGARDING FEDERALLY SPONSORED RESEARCH OR DEVELOPMENT
  • Not Applicable.
  • BACKGROUND
  • The present invention relates generally to methods and apparatus for drilling wells More specifically, the present invention relates to systems for drilling wells utilizing single joints of pipe
  • Many smaller drilling rigs store tubular members, such as drill pipe, drill collars, and casing, in horizontal storage areas outside of the rig. As the different tubular members are needed, they are brought to the drill floor one at a time and added to the string. Handling these tubular members has historically been a highly manual job using winches or other lifting appliances within the rig. Automated systems for use in these “single joint” rigs must be able to safely handle a variety of tubular members while not slowing down drilling or tripping processes.
  • Thus, there remains a need to develop methods and apparatus for pipe handling and drilling systems, which overcome some of the foregoing difficulties while providing more advantageous overall results.
  • SUMMARY OF THE PREFERRED EMBODIMENTS
  • Embodiments of the present invention include a pipe handling system comprising a pipe erector operable to move a pipe from a horizontal storage position to a substantially vertical position wherein an upper end of the pipe is disposed above an elevated drill floor of a drilling rig and the pipe is offset from well center The pipe handling system also comprises an upper vertical support configured to support the pipe in the vertical position independently of said pipe erectors
  • Thus, the embodiments of present invention comprise a combination of features and advantages that enable substantial enhancement of moving pipe and other tubular members to and from a drilling rig. These and various other characteristics and advantages of the present invention will be readily apparent to those skilled in the art upon reading the following detailed description of the preferred embodiments of the invention and by referring to the accompanying drawings.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • For a more detailed description of the preferred embodiment of the present invention, reference will now be made to the accompanying drawings, wherein:
  • FIG. 1 is an elevation view of a drilling system designed in accordance with embodiments of the present invention;
  • FIGS. 2-10 are views of the drilling system of FIG. 1 representing a sequence of events during a drilling or tripping operation;
  • FIG. 11 is a side elevation view of a pipe erector system constructed in accordance with embodiments of the invention;
  • FIG. 12 is an end view of the pipe erector system of claim 11 shown in a closed position;
  • FIG. 13 is an end view of the pipe erector system of claim 11 shown in an open position;
  • FIG. 14 is a side elevation view of the pipe erector system of claim 11 shown in a first elevated position;
  • FIG. 14 is a side elevation view of the pipe erector system of claim 11 shown in a second elevated position;
  • FIG. 16 is a top view of an upper vertical pipe support constructed in accordance with embodiments of the invention;
  • FIG. 17 is a side view of the upper vertical pipe support of FIG. 16;
  • FIG. 18 is a front view of the upper vertical pipe support of FIG. 16 shown in a closed position;
  • FIG. 19 is a side view of the upper vertical pipe support of FIG. 16 shown in an open position;
  • FIG. 20 is a side view of the upper vertical pipe support of FIG. 16 shown engaged with a pipe member;
  • FIGS. 21 and 22 shown drill floor equipment constructed in accordance with embodiments of the invention;
  • FIGS. 23A-F illustrate the loading of pipe from a pipe handling system constructed in accordance with embodiments of the invention;
  • FIGS. 24A-F illustrate the loading of pipe onto the pipe handling system of FIGS. 23A-F.
  • FIGS. 25A-H illustrate the loading of pipe from a pipe handling system constructed in accordance with embodiments of the invention;
  • FIGS. 26A-H illustrate the loading of pipe onto the pipe handling system of FIGS. 25A-H;
  • DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
  • Referring now to FIG. 1, drilling system 10 comprises rig structure 12, hoisting system 14, pipe erecting system 16, top drive system 18, and drill floor equipment 20. Rig structure 12 comprises mast 22, drill floor 24, and sub-structure 26. Hoisting system 14 comprises drawworks 28, crown block 30, and traveling block 32. Top drive system 18 comprises top drive 34, bails 36, and elevator 38. Pipe handling system 16 comprises erector 40, horizontal supports 42, lower vertical support 44, and upper vertical support 46. Drill floor equipment 20 comprises iron roughneck system 48 and slips 50 that are located on well center 52.
  • FIGS. 2-10 illustrate the procedure used for drilling or running pipe into the hole. In FIG. 2, top drive 34 is fully lowered toward drill floor 24 and a joint of pipe 54 needs to be added to the drill string 56. Erector 40 has raised pipe 54 to a substantially vertical position that is offset from well center 52 and an upper end of the pipe is above drill floor 24. Vertical supports 44 and 46 secure pipe 54 in the substantially vertical position so that erector 40 can be disengaged and pivoted back to horizontal, as shown in FIG. 3.
  • To add pipe 54 to drill string 56, the drill string is first secured to drill floor 24 by slips 50 Once secured, top drive 34 can be detached from drill string 26 and raised, as shown in FIG. 4. Once clear of the top of drill string 56, elevator 38 and bails 34 are rotated to an extended position where the elevator is aligned with the offset position of pipe 54. Elevator then engages pipe 54, as shown in FIG. 5.
  • Referring now to FIGS. 6 and 7, top drive 34 is raised toward the top of mast 22, carrying pipe 54 supported by elevator 38. Elevator 38 maintains pipe 54 in the position offset from well center 52 until the lower end of the pipe clears upper vertical support 44 and the upper end of drill string 56. Once raised, elevator 38 is rotated back to its initial position so that pipe 54 is substantially on well center 52.
  • As shown in FIG. 8, once pipe 54 is aligned with well center 52, top drive 34 is lowered and pipe 54 engaged with drill string 56. The engagement of pipe 54 with drill string 56 may be enabled by a stabbing system (not shown) or manual intervention. As illustrated in FIG. 9, once pipe 54 is engaged with drill string 56, roughneck system 48 is moved to well center 52 and makes-up the connection between pipe 54 and drill string 56. Top drive 34 can then engage the upper connection of pipe 54 and continue drilling or running the drill string into the well, as is shown in FIG. 10. When top drive 34 nears drill floor 24, the process repeats and another pipe joint is added to the drill string. It is understood that, during tripping and other operations, top drive 34 does not engage drill string 56 and the drill string is supported solely by elevator 38. Drill string is removed from the well by reversing the above procedure and using erector 40 to move pipe 54 back to a horizontal position.
  • Pipe handling system 16 comprises pipe erector 40 that moves a single joint of pipe at a time from a substantially horizontal storage position to a substantially vertical position where an upper end of the pipe is above an elevated drill floor and the pipe is offset from well center. It is understood that when in either the storage position or the substantially vertical position, the pipe is not required to be exactly horizontal or vertical and that some deviation from these orientations may be possible.
  • Referring now to FIGS. 11-13, erector 40 engages pipe 54 that has been disposed on horizontal supports 42 by a pipe handling system or other means. Erector 40 comprises two pairs of capture arms 56 mounted to frame 58, which is connected to base 60 at pivot 62. Frame 58 also comprises ledge 64. Hydraulic cylinder 66 is coupled to frame 58 and base 60. Hydraulic cylinder 68 is coupled to capture arm 56 and base 60.
  • Erector 40 is in a horizontal position with capture arms open, as shown in FIG. 13, as pipe 54 is placed on horizontal supports 52 Hydraulic cylinder 68 is extended so that capture arms 56 rotate to a closed position, as shown in FIG. 12. Once capture arms 56 are closed, hydraulic cylinder 66 is retracted, rotating erector 40 about pivot 62 from horizontal to the vertical position shown in FIG. 14. As erector 40 rotates, pipe 54 comes to rest on, and be vertically supported by ledge 64. Once pipe 54 is vertical, lower vertical support 44 lifts the pipe off of ledge 64, as shown in FIG. 15. Lower vertical support 44 lifts pipe 54 by raising platform 70 via hydraulic cylinder 72 to engage and lift the bottom of the pipe. In certain embodiments, ledge 64 is moveable relative to erector 40 and is used to lift pipe 54 onto lower vertical support 44 (which is stationary) and also to adjust the axial position of the pipe with the erector is in the horizontal position. Once, pipe 54 is lifted so that ledge 64 clears the bottom of the pipe, erector 40 is rotated back to the horizontal position.
  • Referring back to FIG. 1, when pipe 54 is vertical it is also supported by upper vertical support 46, which captures the pipe at or near drill floor 24 On-e embodiment of an upper vertical support 46 is shown in FIGS. 16-20. FIG. 16 shows a top down view of upper vertical support 46 comprising swing aims 74, hinge members 76, actuation cylinder 78, and linkages 80. FIG. 17 is a side view of upper vertical support 46. The operation of upper vertical support 46 is shown in FIGS. 18-20, which show a front view of the support. FIG. 18 shows swing arms 74 in a filly closed position and actuation cylinder 78 in an extended position. Linkage 80 couples cylinder 78 to swing arms 74. Referring now to FIG. 19, as cylinder 48 is moved to a retracted position, linkage 80 moves downward and causes swing arms 74 to rotate outward about hinge members 76 and allow pipe 82 to pass between the swing arms. Cylinder 48 is then moved back toward the extended position, which causes swing arms 74 to rotate inward and engaged pipe 82, as shown in FIG. 20.
  • Referring back to FIG. 1, drill floor equipment 20, comprising iron roughneck system 48 and slips 50, is used to make and break pipe connections as pipe joints are added to, or removed from, the drill string The operation of drill floor equipment 20 is further shown in FIGS. 21 and 22 Iron roughneck system 48 comprises torque wrench 84 and spinner 86 mounted to swinging frame 88 and stabbing guide 90 mounted to mast 22. Swinging frame 88 forms a parallelogram-shaped support structure that allows rough-neck system 48 to be moved to and from well center as needed In certain embodiments, iron roughneck system 48 may be removed from swinging frame 88 and replaced with casing tongs or other equipment for handling specific tubular members. Alternatively, swinging frame 88 may allow for iron roughneck system 48 to be rotated to an elevated or other position that allows for the use of casing tongs or other equipment for handling specialized tubular members.
  • As pipe joint 92 is lowered, stabbing guide 90 aligns the pipe joint with drill string 94, which is supported by slips 50. As pipe joint 92 engages drill string 94, swinging frame 88 moves torque wrench 84 and spinner 86 toward the well center, as shown in FIG. 22. Spinner 86 engages pipe joint 92 and rotates the pipe so as to engage the threaded connection to drill string 94 Torque wrench 84 then applies the necessary torque to the threaded connection to secure the connection. When removing pipe joints from the drill string torque wrench 84 applies torque to break the connection and spinner 86 rotates the pipe joint to disengage the treaded connection
  • As described above, drilling system 10 and pipe erecting system 16 operates by taking pipe from a horizontal orientation and placing the pipe back in the horizontal orientation after use. Once horizontal, the pipe can be handled by a number of different pipe handling systems and methods. In certain embodiments, automated systems can be used to handle horizontal pipe without direct involvement of personnel. One such pipe handling system is illustrated in FIGS. 23A-F and 24A-F.
  • Referring now to FIG. 23A, pipe handling system 100 comprises rack 102, frame 104, tilting mechanism 106, elevated stop 108, and pipe unloading assembly 110. Unloading assembly 110 comprises lifting block 114 and rotating arm 116. When loading pipes 112 onto erector 40, tilting mechanism 106 raises the end of rack 102 so as to angle the rack toward erector 40. The movement of pipes 112 along rack 102 is limited by elevated stop 108.
  • Referring now to FIGS. 23B-23F, to load a single joint of pipe 112 onto erector 40, lifting block 114 is raised, pushing a single joint of pipe 112 upward The pipe 112 moves over and past elevated stop 108 toward the end of rack 102. Lifting block 114 is then lowered so that the remainder of pipes 118 can move downward until contacting elevated stop 108. At the end of rack 102, pipe 112 is stopped by arm 116, which is disposed in a raised position. Ann 116 is then rotated to lower pipe 112 onto erector 40. Arm 116 continues rotating downward so that is out of the way of erector 40. Erector 40 can then lift pipe 112 upward and away from pipe handling system 100.
  • FIGS. 24A-F illustrate pipe handling system 100 being used to store pipes being removed from a drill string. When moving pipes 112 from erector 40, tilting mechanism 106 lowers the end of rack 102 so as to angle the rack away from erector 40. Lifting block 114 and elevated stop 108 are retracted into rack 102 so as to provide a smooth surface along which pipe 112 can roll. Once pipe 112 is lowered and released by erector 40, arm 116 rotates upward so as to lift the pipe from the erector. Arm 116 continues to rotate until pipe 112 falls onto rack 102 where it will roll toward the far end of the rack.
  • Another pipe handling system is shown in FIGS. 25A-H and 26A-H. Pipe handling system 200 comprises frame 202 that is pivotally mounted on base 204. The incline of frame 202 is controlled by piston 206. The loading and unloading of pipe into handling system 200 is done by pipe moving assembly 210. Pipe moving assembly 210 comprises extendable finger 214, rotatable arm 216, and drive motor 218. Assembly 210 is slidably mounted to a vertical member of frame 202 so that drive motor 218 engages gear rack 220.
  • The unloading of pipe from handling system 200 is illustrated in FIGS. 25A-H. Piston 206 inclines frame 202 so that pipe joints 212 tend to move toward pipe moving assembly 210. Finger 214 extends to separate a single joint of pipe from the row of pipes stored in frame 202. Assembly 210 the moves upward until pipe 212 clears frame 202, as shown in FIG. 25B. Pipe 212 will roll down assembly 210 until it contacts arm 216, which is in an levated position. With pipe 212 resting against arm 216, assembly 210 moves downward along flame 202 to the position shown in FIG. 25D. Arm 216 then rotates so as to lower pipe 212 into erector 40 and continues rotating until reaching a lowered position as shown in FIG. 25E. With arm 216 in a lowered position, erector 40 can capture pipe 212 and move the pipe to the drill floor. Once erector 40 has moved out of the way, assembly 210 is moved back to uppermost row of pipes and arm 216 is rotated back to the elevated position
  • The loading of pipe from erector 40 back into handling system 200 is illustrated in FIGS. 26A-H. Piston 206 inclines frame 202 so that pipe joints 212 tend to move away from moving assembly 210 A Mover assembly 210 is disposed adjacent to erector 40, once erector 40 lowers pipe 212 to a horizontal position. Once erector 40 disengages pipe 212, arm 216 rotates to lift pipe 212 from erector 40. Mover assembly 210 then moves up frame 202 until pipe 212 clears the top of the frame. Once inside frame 202, pipe 212 is restrained by extended finger 214 and bumper 215. Mover assembly 210 moves back down frame 202 until pipe 212 is at the row of pipe being loaded Finger 214 then retracts and pipe 212 will roll into position within frame 202. Mover assembly 210 is then moved back to the proper elevation to receive pipe from erector 40 and arm 216 is rotated back to its lowered position.
  • Referring now to FIGS. 27 and 28, an alternate pipe erecting system 300 comprises erector system 302 that moves a single joint of pipe at a time from a horizontal position to a vertical position where the pipe is restrained by vertical support system 304. Erector system 302 further comprises erector frame 306, capture arms 308, pivot 310, elevating cylinder 312, base frame 314, support finger 316, and finger cylinder 318 Vertical support system 304 comprises frame 320, pipe rest 322, lower funnel guide 324, and upper funnel guide 326.
  • Referring to FIG. 27, erector 302 is in a horizontal position. Capture arms 308 secure pipe 54 to erector 302. Once capture arms 308 are closed, elevating cylinder 312 operates to rotate erector 302 about pivot 310 from horizontal to the vertical position shown in FIG. 28. As erector 302 rotates, pipe 54 comes to rest on, and be vertically supported by finger 316. Once pipe 54 is vertical, finger cylinder 318 lowers finger 316 so that the pipe come to rest on pipe rest 322. Referring to FIG. 28, when pipe 54 is vertical it is also supported by upper funnel guide 324 and lower funnel guide 326. Funnel guides 324 and 326 may be similar to vertical support 46 of FIGS. 17-20. Once pipe 54 is fully supported by vertical support system 304, capture arms 308 can be opened and erector 302 can then be rotated back to the horizontal position of FIG. 27.
  • FIGS. 29-32 illustrate a pipe erector system 400 that incorporates a system for handling and installing blowout preventer 402. Pipe erector system 400 comprises base 404, erector arm 406, vertical support arm 408, and blowout preventer handling arm 410. FIG. 29 shows pipe erector system 400 in a transport configuration emplaced adjacent to wellhead 412. Pipe erector system 400 is preferably configured so as to be transported with blowout preventer 402 via standard road trailers
  • Erector arm 406 is pivotally coupled to base 404 at pivot 414. Pin connection 418 couples handling arm 410 to support arm 408, which is pivotally coupled to base 404 at pin connection 416. When in the transport configuration of FIG. 29, erector arm 406, support arm 408, and handling arm 410 are in a horizontal position. Once pipe erector system 400 is emplaced adjacent to wellhead 412, erector arm 406, support arm 408, and handling arm 410 are pivoted about pivot 414 to an elevated, substantially vertical position as shown in FIG. 30. Arms 406, 408, and 410 may be pivoted by the hydraulic cylinder (not shown) that is used to operate erector arm 406 during normal operations.
  • Once elevated to the vertical position, erector arm 406 can be disconnected from support arm 408 and returned to its horizontal position as shown in FIG. 31. Handling arm 410 is then tilted outward from support arm 408 by extending actuator 420 and pivoting the handling arm about pin connection 418 Handling arm 410 is tilted outward until blowout preventer 402 is aligned with wellhead 412,
  • Lifting frame 422 and cable 424, which travels over pulley 426 and is coupled to actuator 428, supports blowout preventer 402. Blowout preventer 402 is lowered by extending actuator 428 until the blowout preventer is supported by wellhead 412, as is shown in FIG. 31. Once blowout preventer 402 is set on wellhead 412, lifting frame 422 is disconnected from the blowout preventer and handling arm 410 is tilted back to vertical as shown in FIG. 32. Once handling arm 410 is secured, pipe erector system 400 is ready for operation.
  • While preferred embodiments of this invention have been shown and described, modifications thereof can be made by one skilled in the art without departing from the scope or teaching of this invention. The embodiments described herein are exemplary only and are not limiting. Many variations and modifications of the system and apparatus are possible and are within the scope of the invention. Accordingly, the scope of protection is not limited to the embodiments described herein, but is only limited by the claims that follow, the scope of which shall include all equivalents of the subject matter of the claims.

Claims (20)

1. A pipe handling system comprising:
a pipe erector operable to move a pipe from a horizontal storage position to a substantially vertical position wherein an upper end of the pipe is disposed above an elevated drill floor of a drilling rig and the pipe is offset from well center; and
an upper vertical support configured to support the pipe in the vertical position independently of said pipe erector.
2. The pipe handling system of claim 1, further comprising a lower vertical support coupled to said pipe erector and configured to control the elevation of the pipe in the vertical position.
3. The pipe handling system of claim 1, wherein said upper vertical support comprises a pair of swing arms that are rotatable between an open position wherein the pipe call pass between said swing arms and a closed position where the pipe is engaged by both swing arms.
4. The pipe handling system of claim 1, further comprising a pair of capture arms coupled to said pipe erector, wherein said capture arms are rotatable between an open position that allows the pipe to be moved onto or off of said erector and a closed position wherein said capture arms secure the pipe to said erector.
5. The pipe handling system of claim 1, further comprising a ledge coupled to said pipe erector, wherein said ledge limits the axial movement of the pipe being supported by said pipe erector.
6. The pipe handling system of claim 1, further comprising:
a base pivotally coupled to said pipe erector; and
an actuator coupled to said base and said pipe erector, wherein said actuator is configured to move said pipe erector from a horizontal position to a vertical position.
7. The pipe handling system of claim 6 wherein said upper vertical support is coupled to said base.
8. The pipe handling system of claim 6 further comprising a blowout preventer handling arm coupled to said base.
9. A drilling system comprising:
a drilling rig having an elevated drill floor;
a pipe erector operable to move a pipe from a horizontal storage position to a substantially vertical position wherein an upper end of the pipe is disposed above the elevated drill floor and the pipe is offset from well center; and
an upper vertical support configured to support the pipe in the vertical position independently of said pipe erector.
10. The drilling system of claim 9, further comprising a lower vertical support coupled to said pipe erector and configured to control the elevation of the pipe in the vertical position.
11. The drilling system of claim 9, wherein said upper vertical support comprises a pair of swing arms that are rotatable between an open position wherein the pipe can pass between said swing aims and a closed position where the pipe is engaged by both swing arms.
12. The drilling system of claim 1, further comprising a pair of capture arms coupled to said pipe erector, wherein said capture arms are rotatable between an open position that allows the pipe to be moved onto or off of said erector and a closed position wherein said capture arms secure the pipe to said erector.
13. The drilling system of claim 1, further comprising a ledge coupled to said pipe erector, wherein said ledge limits the axial movement of the pipe being supported by said pipe erector.
14. The drilling system of claim 1, further comprising:
a base pivotally coupled to said pipe erector; and
an actuator coupled to said base and said pipe erector, wherein said actuator is configured to move said pipe erector from a horizontal position to a vertical position.
15. The drilling system of claim 14 wherein said upper vertical support is coupled to said base
16. The drilling system of claim 14 further comprising a blowout preventer handling arm coupled to said base.
17. A method for operating a drilling rig comprising:
loading a pipe onto a pipe erector disposed in a horizontal position;
moving the pipe erector to an elevated position wherein the pipe is in a substantially vertical position where an upper end of the pipe is disposed above an elevated drill floor of a drilling rig and the pipe is offset from well center;
engaging the pipe with an upper vertical support that maintains the substantially vertical position of the pipe;
disengaging the pipe from the pipe erector; and
moving the pipe erector to the horizontal position.
18. The method of claim 17 wherein the pipe is disengaged from the pipe erector by operating a lower vertical support to lift the pipe from a ledge disposed on the pipe erector and moving a pair of capture arms to an open position so that the pipe can be disengaged from the pipe erector.
19. The method of claim 17 further comprising:
engaging the upper end of the pipe with an elevator supported by the drilling rig;
releasing the pipe from the upper vertical support;
lifting the pipe above the elevated drill floor; and
moving the pipe to well center.
20. The method of claim 19 further comprising:
connecting the pipe to a drillstring supported at the drill floor;
loading a second pipe onto the pipe erector disposed in the horizontal position;
moving the pipe erector to the elevated position;
engaging the second pipe with the upper vertical support;
disengaging the second pipe from the pipe erector; and
moving the pipe erector to the horizontal position.
US11/458,534 2005-07-19 2006-07-19 Single joint drilling system Abandoned US20070017704A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US11/458,534 US20070017704A1 (en) 2005-07-19 2006-07-19 Single joint drilling system

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US70062405P 2005-07-19 2005-07-19
US11/458,534 US20070017704A1 (en) 2005-07-19 2006-07-19 Single joint drilling system

Publications (1)

Publication Number Publication Date
US20070017704A1 true US20070017704A1 (en) 2007-01-25

Family

ID=37238037

Family Applications (3)

Application Number Title Priority Date Filing Date
US11/458,534 Abandoned US20070017704A1 (en) 2005-07-19 2006-07-19 Single joint drilling system
US11/458,527 Active 2026-12-28 US7736119B2 (en) 2005-07-19 2006-07-19 Horizontal pipe handling system
US11/458,520 Active 2027-01-02 US7540338B2 (en) 2005-07-19 2006-07-19 Single joint drilling system with inclined pipe handling system

Family Applications After (2)

Application Number Title Priority Date Filing Date
US11/458,527 Active 2026-12-28 US7736119B2 (en) 2005-07-19 2006-07-19 Horizontal pipe handling system
US11/458,520 Active 2027-01-02 US7540338B2 (en) 2005-07-19 2006-07-19 Single joint drilling system with inclined pipe handling system

Country Status (5)

Country Link
US (3) US20070017704A1 (en)
EP (3) EP1746247A3 (en)
BR (3) BRPI0602681B1 (en)
CA (3) CA2551901C (en)
NO (3) NO20063339L (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080202812A1 (en) * 2007-02-23 2008-08-28 Atwood Oceanics, Inc. Simultaneous tubular handling system
US20090071720A1 (en) * 2007-09-19 2009-03-19 Cowan Mike D Mobile Land Drilling Rig and Method of Installation
US20090127001A1 (en) * 2007-11-16 2009-05-21 Rodger Lawrence Felt Pipehandler
US20110091304A1 (en) * 2009-10-16 2011-04-21 Friede & Goldman Marketing B.V. Cartridge tubular handling system
US20110174502A1 (en) * 2008-09-30 2011-07-21 National Oilwell Varco L.P. Pipe section guide system with flexible member
CN102877802A (en) * 2012-09-29 2013-01-16 济南光先数控机械有限公司 Numerical-control petroleum workover line
US20130330151A1 (en) * 2011-11-28 2013-12-12 T&T Engineering Services, Inc. Tubular Stand Building and Racking System
US8827008B2 (en) 2010-07-20 2014-09-09 National Oilwell Varco, L.P. Inflatable restraint system
US8935901B2 (en) * 2013-03-13 2015-01-20 Nabors Drilling International Limited Self-elevating mast employing draw works
US20180216405A1 (en) * 2015-06-18 2018-08-02 Itrec B.V. A drilling rig with a top drive system operable in a drilling mode and a tripping mode
US11346163B2 (en) 2018-04-27 2022-05-31 Canrig Robotic Technologies As System and method for conducting subterranean operations
US11377914B2 (en) * 2018-04-27 2022-07-05 Canrig Robotic Technologies As System and method for conducting subterranean operations

Families Citing this family (74)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7832974B2 (en) 2005-06-01 2010-11-16 Canrig Drilling Technology Ltd. Pipe-handling apparatus
US20070286708A1 (en) * 2006-06-09 2007-12-13 Columbia Trailer Co., Inc. Method and apparatus for handling pipe
US8690517B1 (en) 2008-09-11 2014-04-08 Mcelroy Manufacturing, Inc. Rack type pipe feeder for a pipe fusion machine
US9394106B2 (en) 2006-09-08 2016-07-19 Mcelroy Manufacturing, Inc. Rack type pipe feeder for a pipe fusion machine
US8113762B2 (en) * 2006-10-25 2012-02-14 National Oilwell Varco, L.P. Horizontal pipe storage and handling system
US7997166B2 (en) 2007-06-15 2011-08-16 Longyear Tm, Inc. Methods and apparatus for joint disassembly
US7997167B2 (en) * 2007-08-30 2011-08-16 Longyear Tm, Inc. Clamping and breaking device
KR100916667B1 (en) * 2007-12-06 2009-09-08 인석신 Excavator
US8033779B2 (en) 2008-01-31 2011-10-11 Canrig Drilling Technology Ltd. Pipe handling apparatus and methods
US8016536B2 (en) 2008-04-04 2011-09-13 Canrig Drilling Technology Ltd. Pipe-handling apparatus and methods
AU2009246461B2 (en) 2008-05-12 2011-12-15 Longyear Tm, Inc. Open-faced rod spinner
US7849929B2 (en) * 2008-05-12 2010-12-14 Longyear Tm, Inc. Drill rod spinner device
US7644894B1 (en) * 2009-03-19 2010-01-12 Moreau Darrell A Cable management and tie-off apparatus
GB0907199D0 (en) * 2009-04-27 2009-06-10 Derrick Services Uk Ltd An improvement to a derrick
US9038733B2 (en) * 2009-04-29 2015-05-26 Itrec B.V. Tubulars storage and handling system
US8317448B2 (en) * 2009-06-01 2012-11-27 National Oilwell Varco, L.P. Pipe stand transfer systems and methods
US8801356B2 (en) * 2009-07-29 2014-08-12 Markwater Handling Systems Ltd. Pipe kicker/indexer for pipe handling systems
WO2011011888A1 (en) * 2009-07-29 2011-02-03 Markwater International B.V. Apparatus and method for handling pipe
US8905160B1 (en) 2009-09-03 2014-12-09 Astec Industries, Inc. Drill pipe handling assembly
US8747045B2 (en) * 2009-11-03 2014-06-10 National Oilwell Varco, L.P. Pipe stabilizer for pipe section guide system
CN101718177B (en) * 2009-11-06 2012-01-18 宝鸡石油机械有限责任公司 Horizontal automatic tube-arranging device
DE102010013846A1 (en) 2010-04-01 2012-06-28 Herrenknecht Vertical Gmbh Method and device for feeding and discharging drill pipes to a drilling device
CN101832113B (en) * 2010-05-07 2013-01-02 贵州航天凯宏科技有限责任公司 Bilateral inlet-outlet pipe mechanism of oil field pipe transportation equipment
EP2635766B1 (en) 2010-11-02 2015-04-01 National Oilwell Varco Norway AS A drilling system and a device for assembling and disassembling pipe stands
US8839881B1 (en) * 2010-11-30 2014-09-23 Richard Baumler Tubular handling device
SE535586C2 (en) * 2010-12-30 2012-10-02 Atlas Copco Rocktech Ab Device and method for handling drill string components and drill rig
CN102305037B (en) * 2011-08-25 2013-08-28 成都科盛石油科技有限公司 Device for supporting long workpiece
US9080693B2 (en) 2011-11-21 2015-07-14 Yeti Pipeline Equipment, Llc Automated system for laying pipe
US9212526B1 (en) * 2012-01-17 2015-12-15 Canyon Oak Energy LLC Portable moveable horizontal to vertical pipe handler
DE102012100493A1 (en) 2012-01-23 2013-07-25 Bentec Gmbh Drilling & Oilfield Systems Device and method for handling linkage elements, ie pipes, rods and linkage trains for drilling rigs and drilling rigs
CN103244061B (en) * 2012-02-09 2015-04-01 上海振华重工(集团)股份有限公司 Automatic discharge pipe connecting pipe system and drill rod automatic rollover mechanism thereof
CN102654040B (en) * 2012-05-28 2014-03-12 东北石油大学 Automation device for storage of oil drilling string
CN102720447B (en) * 2012-06-14 2015-01-21 宝鸡石油机械有限责任公司 Motive power catwalk pipe wane and pipe loading method of motive power catwalk pipe wane
US9121234B2 (en) * 2012-06-21 2015-09-01 Superior Energy Services—North America Services, Inc. Rig carrier interconnection support and method
US9540878B2 (en) 2012-06-21 2017-01-10 Superior Energy Services—North America Services, Inc Method and apparatus for inspecting and tallying pipe
US9267328B2 (en) 2012-06-21 2016-02-23 Superior Energy Services-North America Services, Inc. Methods for real time control of a mobile rig
US20130343838A1 (en) * 2012-06-21 2013-12-26 Complete Production Services, Inc. Walkway with pipe moving elements mechanism and method
US9708860B2 (en) 2012-06-21 2017-07-18 Superior Energy Services-North America Services, Inc Ground level rig and method
US20130340572A1 (en) * 2012-06-21 2013-12-26 Complete Production Services, Inc. Long lateral completion system pipe tong and method of using the same
BR112015006161B1 (en) * 2012-10-22 2022-11-16 Quick Silver Drilling Technologies, Llc AUTOMATED TUBE FIRE DEVICE AND ITS USE METHODS
GB2508720B (en) 2012-10-23 2018-04-11 Nat Oilwell Varco Lp An Apparatus and a method for servicing pipes
WO2014078872A1 (en) 2012-11-19 2014-05-22 Key Energy Services, Llc Mechanized and automated catwalk system
CN103867142B (en) * 2012-12-13 2017-01-04 四川宏华石油设备有限公司 A kind of self-powered cat road
MX359943B (en) * 2013-03-01 2018-10-15 Itrec Bv Tubulars handling system and apparatus.
US9506302B2 (en) * 2013-03-13 2016-11-29 Forum Us, Inc. System for attaching a gullwing to a catwalk
ITUD20130038A1 (en) * 2013-03-20 2014-09-21 Fincantieri Cantieri Navali It "TUBULAR ELEMENT HANDLING SYSTEM"
US9863194B2 (en) 2013-05-03 2018-01-09 Canrig Drilling Technology Ltd. System for manipulating tubulars for subterranean operations
SE537457C2 (en) * 2013-08-02 2015-05-05 Atlas Copco Rocktech Ab Handling device for drill string components at a rock drill rig and rock drill rig
SE537328C2 (en) * 2013-08-02 2015-04-07 Atlas Copco Rocktech Ab Device for handling drill string components and rock drilling rig
EP3090121B1 (en) 2013-12-30 2021-05-19 Longyear TM, Inc. Drill rod handling system for moving drill rods to and from an operative position
MX2017010525A (en) * 2015-04-15 2017-11-13 Forum Us Inc Tubular handling system.
CN104895513B (en) * 2015-04-30 2017-03-01 常州大学 A kind of automatic cross conveyor of oil drilling tubing string
CN105064931B (en) * 2015-08-21 2017-07-21 中国地质大学(北京) Modularization drilling rod moving track
WO2017044139A1 (en) * 2015-09-09 2017-03-16 Thomson Licensing A fast group-wise technique for decomposing gsr signals across groups of individuals
CN105201425B (en) * 2015-09-21 2017-08-25 四川宏华石油设备有限公司 Marine drilling pipe conveying device
US20180274308A1 (en) 2015-09-23 2018-09-27 National Oilwell Varco, L.P. Impact Attenuating Media
CA3000512C (en) * 2015-11-16 2018-10-16 Schlumberger Canada Limited Lower stabilizing arm for a drilling rig
WO2017087216A1 (en) * 2015-11-19 2017-05-26 Schlumberger Technology Corporation Casing racking module
CA3006082A1 (en) 2015-12-22 2017-06-29 Bly Ip Inc. Drill rod clamping system and methods of using same
CN106429428A (en) * 2016-07-27 2017-02-22 胜利油田胜利动力机械集团有限公司石油机械分公司 Ground integrated conveyer
US10161202B2 (en) 2017-01-12 2018-12-25 Bauer Deep Drilling Gmbh Drill rod store, drilling rig and method for downward drilling
US10076988B1 (en) 2017-02-02 2018-09-18 Isco Industries, Inc. Automated system for laying pipe
SG11201908806WA (en) 2017-03-23 2019-10-30 Ensco Int Inc Vertical lift rotary table
US10808466B2 (en) 2018-01-26 2020-10-20 The Charles Machine Works, Inc. Pipe handling assembly
US11156039B2 (en) 2018-05-14 2021-10-26 The Charles Machine Works, Inc. Mechanical shuttle pipe gripper
CN109695427A (en) * 2018-10-31 2019-04-30 宝鸡市赛孚石油机械有限公司 A kind of lubricator vertical lifting system
US11952844B2 (en) 2019-01-31 2024-04-09 National Oilwell Varco, L.P. Tubular string building system and method
US11578541B2 (en) 2019-06-13 2023-02-14 The Charles Machine Works, Inc. Modular pipe loader assembly
CN113047788A (en) * 2020-01-07 2021-06-29 冯新 Automatic formula oil field drilling equipment that carries of pipe pole
KR102160590B1 (en) * 2020-05-11 2020-09-28 (주)씨앤에스아이 System and method for controlling hydra racker arm
CN111646365A (en) * 2020-06-16 2020-09-11 易门铜业有限公司 Unmanned overhead traveling crane control system
MX2022015756A (en) * 2020-07-16 2023-03-13 Gregg Drilling Llc Geotechnical rig systems and methods.
CN113338824B (en) * 2021-07-12 2022-06-07 新疆克拉玛依市荣昌有限责任公司 Active three drilling tool conveyors
GB2619308A (en) * 2022-05-31 2023-12-06 Tribe Tech Group Limited Rod handling system for a drilling rig

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3682259A (en) * 1970-01-09 1972-08-08 Bernard G Cintract Rod stacking and handling apparatus
US4759414A (en) * 1986-04-25 1988-07-26 W-N Apache Corporation Modular drilling machine and components thereof
US4834604A (en) * 1987-10-19 1989-05-30 Lee C. Moore Corporation Pipe moving apparatus and method
US20030155154A1 (en) * 2002-02-21 2003-08-21 Oser Michael S. System and method for transferring pipe
US20060096783A1 (en) * 2004-11-08 2006-05-11 Landry Harold W Method and apparatus for slant drilling

Family Cites Families (37)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US278022A (en) * 1883-05-22 Log-roller
US845152A (en) * 1903-07-25 1907-02-26 Robert Weir Log-roller.
US2631741A (en) * 1950-06-29 1953-03-17 Tucker Samuel Joseph Apparatus for handling drill pipes
US2710104A (en) * 1953-12-11 1955-06-07 United States Steel Corp Apparatus for charging billet heating furnaces and the like
US3182816A (en) * 1963-03-01 1965-05-11 Illo Joseph Bar unscrambling machine
US3559821A (en) * 1969-06-19 1971-02-02 Ralph Edward James Drill pipe handling apparatus
US4310283A (en) * 1970-01-23 1982-01-12 LeRoy LaSalle Method for handling pipe
US4099630A (en) * 1970-03-09 1978-07-11 Beck Don D Pipe handling apparatus
US3734210A (en) * 1970-06-15 1973-05-22 Kenting Drilling Ltd Carrier mounted drilling unit
US3706347A (en) * 1971-03-18 1972-12-19 Cicero C Brown Pipe handling system for use in well drilling
US3792783A (en) * 1971-03-18 1974-02-19 C Brown Pipe handling system
US3734208A (en) * 1971-08-19 1973-05-22 Bucyrus Erie Co Well drill transfer mechanism
US3795326A (en) * 1972-05-22 1974-03-05 Armco Steel Corp Apparatus for handling drill pipe
US3916500A (en) * 1972-05-24 1975-11-04 Cicero C Brown Pipe handling apparatus
US3985221A (en) * 1975-10-28 1975-10-28 General Motors Corporation Tube feeder with self-adjusting loader
US4024925A (en) * 1976-01-12 1977-05-24 Brown Joe R Equipment handling apparatus
US4051956A (en) * 1976-07-26 1977-10-04 Teague J T Horizontal pipe handling apparatus
US4403898A (en) * 1981-12-31 1983-09-13 Thompson Carroll R Pipe pick-up and laydown machine
US4494899A (en) * 1982-04-28 1985-01-22 Tri-Star Enterprises, Inc. Pipe trough for transporting pipe between upper and lower positions
US4533055A (en) * 1982-06-02 1985-08-06 Walker-Neer Manufacturing Co., Inc. Storage rack for drilling tubulars
US4642017A (en) * 1982-09-30 1987-02-10 Amca International Corporation Automated in-process pipe storage and retrieval system
US4604724A (en) * 1983-02-22 1986-08-05 Gomelskoe Spetsialnoe Konstruktorsko-Tekhnologicheskoe Bjuro Seismicheskoi Tekhniki S Opytnym Proizvodstvom Automated apparatus for handling elongated well elements such as pipes
US4547110A (en) * 1983-05-03 1985-10-15 Guy E. Lane Oil well drilling rig assembly and apparatus therefor
US4921386A (en) * 1988-06-06 1990-05-01 John Harrel Device for positioning and stabbing casing from a remote selectively variable location
US4643624A (en) * 1985-06-11 1987-02-17 Murphree Pat D Guide means for stabilizing pipe strings
CA1302390C (en) * 1988-06-09 1992-06-02 Allan Richardson Oil well rig with pipe handling apparatus
US5107940A (en) * 1990-12-14 1992-04-28 Hydratech Top drive torque restraint system
US5127790A (en) * 1991-01-22 1992-07-07 Teague J T Pipe and casing handling method
US5887816A (en) * 1997-07-28 1999-03-30 Accra-Wire Controls Inc. Dereeler for selectively feeding coiled stock into an associated fabricating machine
GB9803116D0 (en) * 1998-02-14 1998-04-08 Weatherford Lamb Apparatus for delivering a tubular to a wellbore
DE19837692C2 (en) * 1998-08-19 2003-04-03 Bentec Gmbh Drilling & Oilfield Systems Drilling device, drilling rig and method for drilling an exploration and production well
US6068066A (en) * 1998-08-20 2000-05-30 Byrt; Harry F. Hydraulic drilling rig
BR0107616A (en) * 2000-01-13 2002-11-12 Maritime Hydraulics As Horizontal tube handling device
ITBO20010028A1 (en) * 2001-01-23 2002-07-23 Iemca Giuliani Macchine Italia DEVICE FOR THE TRANSFER OF BARS FROM A WAREHOUSE IN THE GUIDE CHANNEL OF A LOADER FOR THE POWER SUPPLY OF A MACHINE TOOL
US6994505B2 (en) * 2004-01-09 2006-02-07 Frank's International Pick-up and lay-down system and method
CA2472387A1 (en) 2004-06-25 2005-12-25 Kerry Wells Oilfield pipe-handling apparatus
US7240742B2 (en) 2004-09-21 2007-07-10 The Charles Machine Works, Inc. Pipe handling system with a movable magazine

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3682259A (en) * 1970-01-09 1972-08-08 Bernard G Cintract Rod stacking and handling apparatus
US4759414A (en) * 1986-04-25 1988-07-26 W-N Apache Corporation Modular drilling machine and components thereof
US4834604A (en) * 1987-10-19 1989-05-30 Lee C. Moore Corporation Pipe moving apparatus and method
US20030155154A1 (en) * 2002-02-21 2003-08-21 Oser Michael S. System and method for transferring pipe
US20060096783A1 (en) * 2004-11-08 2006-05-11 Landry Harold W Method and apparatus for slant drilling

Cited By (28)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8584773B2 (en) 2007-02-23 2013-11-19 Atwood Oceanics, Inc. Simultaneous tubular handling system and method
US7802636B2 (en) * 2007-02-23 2010-09-28 Atwood Oceanics, Inc. Simultaneous tubular handling system and method
US10612323B2 (en) 2007-02-23 2020-04-07 Friede & Goldman United B.V. Simultaneous tubular handling system
US8186455B2 (en) 2007-02-23 2012-05-29 Atwood Oceanics, Inc. Simultaneous tubular handling system and method
US9410385B2 (en) 2007-02-23 2016-08-09 Friede Goldman United, Ltd. Simultaneous tubular handling system
US20080202812A1 (en) * 2007-02-23 2008-08-28 Atwood Oceanics, Inc. Simultaneous tubular handling system
US20090071720A1 (en) * 2007-09-19 2009-03-19 Cowan Mike D Mobile Land Drilling Rig and Method of Installation
US7819207B2 (en) * 2007-09-19 2010-10-26 Md Cowan, Inc. Mobile land drilling rig and method of installation
US20090127001A1 (en) * 2007-11-16 2009-05-21 Rodger Lawrence Felt Pipehandler
US7568533B2 (en) * 2007-11-16 2009-08-04 Rodger Lawrence Felt Pipehandler
US20110174502A1 (en) * 2008-09-30 2011-07-21 National Oilwell Varco L.P. Pipe section guide system with flexible member
US8109338B2 (en) 2008-09-30 2012-02-07 National Oilwell Varco, L.P. Pipe section guide system with flexible member
US8696289B2 (en) 2009-10-16 2014-04-15 Friede Goldman United, Ltd. Cartridge tubular handling system
US8215888B2 (en) 2009-10-16 2012-07-10 Friede Goldman United, Ltd. Cartridge tubular handling system
US20110091304A1 (en) * 2009-10-16 2011-04-21 Friede & Goldman Marketing B.V. Cartridge tubular handling system
US9476265B2 (en) 2009-10-16 2016-10-25 Friede Goldman United, Ltd. Trolley apparatus
US8827008B2 (en) 2010-07-20 2014-09-09 National Oilwell Varco, L.P. Inflatable restraint system
US9121235B2 (en) * 2011-11-28 2015-09-01 T&T Engineering Services, Inc. Tubular stand building and racking system
US20130330151A1 (en) * 2011-11-28 2013-12-12 T&T Engineering Services, Inc. Tubular Stand Building and Racking System
CN102877802A (en) * 2012-09-29 2013-01-16 济南光先数控机械有限公司 Numerical-control petroleum workover line
US9279267B2 (en) * 2013-03-13 2016-03-08 Nabors Drilling International Limited Self-elevating mast employing draw works
US20150107165A1 (en) * 2013-03-13 2015-04-23 Nabors Drilling International Limited Self-elevating mast employing draw works
US8935901B2 (en) * 2013-03-13 2015-01-20 Nabors Drilling International Limited Self-elevating mast employing draw works
US20180216405A1 (en) * 2015-06-18 2018-08-02 Itrec B.V. A drilling rig with a top drive system operable in a drilling mode and a tripping mode
US11512532B2 (en) * 2015-06-18 2022-11-29 Itrec B.V. Drilling rig with a top drive system operable in a drilling mode and a tripping mode
US20230048765A1 (en) * 2015-06-18 2023-02-16 Itrec B.V. Drilling rig with a top drive system operable in a drilling mode and a tripping mode
US11346163B2 (en) 2018-04-27 2022-05-31 Canrig Robotic Technologies As System and method for conducting subterranean operations
US11377914B2 (en) * 2018-04-27 2022-07-05 Canrig Robotic Technologies As System and method for conducting subterranean operations

Also Published As

Publication number Publication date
BRPI0602681A (en) 2007-07-17
CA2552173A1 (en) 2007-01-19
CA2551884C (en) 2009-12-15
NO20063338L (en) 2007-01-22
EP1748148A2 (en) 2007-01-31
CA2551884A1 (en) 2007-01-19
NO20063337L (en) 2007-01-22
US7736119B2 (en) 2010-06-15
CA2551901A1 (en) 2007-01-19
EP1746247A3 (en) 2015-10-14
CA2551901C (en) 2010-12-21
EP1748149A3 (en) 2015-09-02
US7540338B2 (en) 2009-06-02
BRPI0602681B1 (en) 2017-05-09
CA2552173C (en) 2010-09-28
NO20063339L (en) 2007-01-22
BRPI0603353A (en) 2007-04-03
US20070031215A1 (en) 2007-02-08
BRPI0602680A (en) 2007-03-13
US20070017703A1 (en) 2007-01-25
EP1746247A2 (en) 2007-01-24
EP1748149A2 (en) 2007-01-31
BRPI0602680B1 (en) 2017-03-28
EP1748148A3 (en) 2015-12-16

Similar Documents

Publication Publication Date Title
CA2552173C (en) Single joint drilling system
US10550650B2 (en) High trip rate drilling rig
US8506229B2 (en) Pipe handling apparatus and method
US7353880B2 (en) Method and apparatus for connecting tubulars using a top drive
US8550761B2 (en) Drill pipe handling and moving system
US7946795B2 (en) Telescoping jack for a gripper assembly
US10465455B2 (en) Automated tubular racking system
US7246983B2 (en) Pipe racking system
US8128332B2 (en) Header structure for a pipe handling apparatus
US7726929B1 (en) Pipe handling boom pretensioning apparatus
US8747045B2 (en) Pipe stabilizer for pipe section guide system
US8419335B1 (en) Pipe handling apparatus with stab frame stiffening
US10697255B2 (en) Tubular delivery arm for a drilling rig
US11118414B2 (en) Tubular delivery arm for a drilling rig
MXPA06008175A (en) Single joint drilling system
MXPA06008151A (en) Single joint drilling system
EP1792041A2 (en) Pipe racking system

Legal Events

Date Code Title Description
AS Assignment

Owner name: NATIONAL-OILWELL, L.P., TEXAS

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:BELIK, JAROSLAV;REEL/FRAME:018066/0739

Effective date: 20060718

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION