US20070125544A1 - Method and apparatus for providing pressure for well treatment operations - Google Patents

Method and apparatus for providing pressure for well treatment operations Download PDF

Info

Publication number
US20070125544A1
US20070125544A1 US11/396,918 US39691806A US2007125544A1 US 20070125544 A1 US20070125544 A1 US 20070125544A1 US 39691806 A US39691806 A US 39691806A US 2007125544 A1 US2007125544 A1 US 2007125544A1
Authority
US
United States
Prior art keywords
central
pumping
pumping units
well
providing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US11/396,918
Inventor
Lonnie Robinson
James Curry
Leonard Case
Lloyd McNeel
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Halliburton Energy Services Inc
Original Assignee
Halliburton Energy Services Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from US11/291,496 external-priority patent/US7841394B2/en
Application filed by Halliburton Energy Services Inc filed Critical Halliburton Energy Services Inc
Priority to US11/396,918 priority Critical patent/US20070125544A1/en
Assigned to HALLIBURTON ENERGY SERVICES, INC. reassignment HALLIBURTON ENERGY SERVICES, INC. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: MCNEEL, LLOYD, CURRY, JAMES, CASE, LEONARD, ROBINSON, LONNIE R.
Priority to CA002648265A priority patent/CA2648265A1/en
Priority to RU2008143351/03A priority patent/RU2008143351A/en
Priority to PCT/GB2007/001189 priority patent/WO2007113528A1/en
Publication of US20070125544A1 publication Critical patent/US20070125544A1/en
Priority to US11/873,160 priority patent/US7946340B2/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures
    • E21B43/2607Surface equipment specially adapted for fracturing operations
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/30Specific pattern of wells, e.g. optimizing the spacing of wells

Definitions

  • the present invention relates generally to well operations, and more particularly to methods and apparatuses for manufacturing well treatment fluid so as to conserve labor, infrastructure, and environmental impact.
  • Stimulation and treatment processes often involve mobile equipment that is set up and put in place at a pad and then moved by truck from pad to pad within short time periods. Only during non-stimulation activities, such as water flood operations, can some operations occur simultaneously.
  • This movement of equipment and personnel can involve complex logistics.
  • the servicing and stimulation of wells can require a series of coordinated operations that begin with the supply by truck of equipment, supplies, fuel, and chemicals to the wellhead.
  • the equipment is then set up and made ready with proppant and chemicals.
  • equipment After completion of the well services, equipment must be broken down and made ready for transport to the next pad for service. Often, the next pad will be less than 500 feet away from the previously treated pad.
  • additional trucks are often required to resupply and reequip an existing operation. This movement of equipment and supplies has environmental impacts, and the exposure of mobile equipment to adverse weather conditions can jeopardize well treatment operations and worker safety.
  • an apparatus for providing pressure for a well fracturing operation can include one or more docking areas for docking one or more pumping units to a pressure manifold wherein the one or more docking areas are operable to provide access between one or more pumping units, and a structure operable to enclose the one or more docking areas and pumping units.
  • the apparatus can also include a crane system, a central lubrication system connected to the one or more pumping units for providing lubrication fluid to the one or more pumping units, and a central power system connected to the one or more pumping units for starting the one or more pumping units.
  • the central power system can include a hydraulic power system.
  • the apparatus can include a central cooling system connected to the one or more pumping units for cooling the one or more pumping units.
  • the central cooling system can include a cooling tower.
  • the at least one of the one or more docking areas can extend outside of the structure.
  • the apparatus can include a ventilation system.
  • the apparatus can include a central fueling system connected to the one or more pumping units for supplying fuel to the one or more pumping units.
  • the central fueling system supplies one or more fuels from the group consisting of: diesel, gasoline, natural gas, or electricity.
  • the structure can include one or more structures from the group consisting of a supported fabric structure, a collapsible structure, a prefabricated structure, a retractable structure, a composite structure, a temporary structure, a prefabricated wall and roof structure, a deployable structure, a modular structure, a preformed structure, a mobile accommodation structure, and combinations thereof.
  • the one or more docking areas can include walkways.
  • the one or more docking areas can include one or more lubrication connections, coolant connections, fuel connections, power connections, and pressure connections.
  • the one or more pumping units can include heaters.
  • the apparatus can include one or more pumping units, a central fueling system connected to the one or more pumping units, a central power system connected to the one or more pumping units, a central lubrication system connected to the one or more pumping units, and a central cooling system connected to the one or more pumping units.
  • the central power system can include a hydraulic power system.
  • the central cooling system can include a cooling tower.
  • the apparatus can include a ventilation system.
  • the central fueling system can supply one or more fuels from the group consisting of: diesel, gasoline, natural gas, or electricity.
  • a method for operating one or more pumping units for a well fracturing operation from a central land based location includes providing fuel to the one or more pumping units from the central location, providing lubrication to the one or more pumping units from the central location, providing power to the one or more pumping units from the central location, and providing coolant to the one or more pumping units from the central location.
  • the power can be provided from a hydraulic power system.
  • the coolant can be provided from a cooling tower.
  • the method can include providing ventilation to the one or more pumping units.
  • the fuel can include of one or more fuels from the group consisting of: diesel, gasoline, natural gas, or electricity.
  • the method can also include enclosing the one or more pumping units in a structure.
  • FIG. 1 is a diagram of a centralized well treatment facility.
  • FIG. 2 is a flow diagram of a centralized well treatment facility.
  • FIG. 3 is a flow diagram of central manifold used to treat wells and recover production fluid.
  • FIG. 4 is a diagram of a multiple manifold well treatment system.
  • FIG. 5 is a schematic of a manifold apparatus for directing treatment fluid.
  • FIG. 6 is a schematic of a manifold apparatus for directing treatment fluid.
  • FIG. 7 is a schematic of a simultaneous fracturing method.
  • FIG. 8 is an aerial view of the pumping grid apparatus.
  • FIG. 9 is an aerial view of a structure that can enclose the pumping grid apparatus.
  • FIG. 10 is a side view of the pumping grid apparatus.
  • FIG. 11 is an aerial view of the fracturing operations factory and a remote pumping grid apparatus.
  • a well treatment operations factory 100 includes one or more of the following: a centralized power unit 103 ; a pumping grid 111 ; a central manifold 107 ; a proppant storage system 106 ; a chemical storage system 112 ; and a blending unit 105 .
  • the well treatment factory may be set upon a pad from which many other wellheads on other pads 110 may be serviced.
  • the well treatment operations factory may be connected via the central manifold 107 to at least a first pad 101 containing one or more wellheads via a first connection 108 and at least a second pad 102 containing one or more wellheads via a second connection 109 .
  • the connection may be a standard piping or tubing known to one of ordinary skill in the art.
  • the factory may be open, or it may be enclosed at its location in various combinations of structures including a supported fabric structure, a collapsible structure, a prefabricated structure, a retractable structure, a composite structure, a temporary building, a prefabricated wall and roof unit, a deployable structure, a modular structure, a preformed structure, or a mobile accommodation unit.
  • the factory may be circular and may incorporate alleyways for maintenance access and process fluid flow.
  • the factory, and any or all of its components can be climate controlled, air ventilated and filtered, and/or heated.
  • the heating can be accomplished with radiators, heat plumbing, natural gas heaters, electric heaters, diesel heaters, or other known equivalent devices.
  • the heating can be accomplished by convection, radiation, conduction, or other known equivalent methods.
  • the unit provides electrical power to all of the subunits within the well operations factory 100 via electrical connections.
  • the centralized power unit 103 can be powered by liquid fuel, natural gas, or other equivalent fuel and may optionally be a cogeneration power unit.
  • the unit may comprise a single trailer with subunits, each subunit with the ability to operate independently.
  • the unit may also be operable to extend power to one or more outlying wellheads.
  • the proppant storage system 106 is connected to the blending unit 105 and includes automatic valves and a set of tanks that contain proppant.
  • Each tank can be monitored for level, material weight, and the rate at which proppant is being consumed. This information can be transmitted to a controller or control area.
  • Each tank is capable of being filled pneumatically and can be emptied through a calibrated discharge chute by gravity. Gravity can be the substantial means of delivering proppant from the proppant tank.
  • the tanks may also be agitated in the event of clogging or unbalanced flow.
  • the proppant tanks can contain a controlled, calibrated orifice.
  • Each tank's level, material weight, and calibrated orifice can be used to monitor and control the amount of desired proppant delivered to the blending unit. For instance, each tank's orifice can be adjusted to release proppant at faster or slower rates depending upon the needs of the formation and to adjust for the flow rates measured by the change in weight of the tank.
  • Each proppant tank can contain its own air ventilation and filtering.
  • the tanks 106 can be arranged around each blending unit 105 within the enclosure, with each tank's discharge chute 803 located above the blending unit 105 .
  • the discharge chute can be connected to a surge hopper 804 .
  • proppant is released from the proppant storage unit 106 through a controllable gate in the unit.
  • the surge hopper contains a controlled, calibrated orifice or aperture 807 that releases proppant from the surge hopper at a desired rate.
  • the amount of proppant in the surge hopper is maintained at a substantially constant level.
  • Each tank can be connected to a pneumatic refill line 805 .
  • the tanks' weight can be measured by a measurement lattice 806 or by weight sensors or scales.
  • the weight of the tanks can be used to determine how much proppant is being used during a well stimulation operation, how much total proppant was used at the completion of a well stimulation operation, and how much proppant remains in the storage unit at any given time.
  • Tanks may be added to or removed from the storage system as needed. Empty storage tanks may be in the process of being filled by proppant at the same time full or partially full tanks are being used, allowing for continuous operation.
  • the tanks can be arranged around a calibrated v-belt conveyor.
  • a resin-coated proppant may be used by the addition of a mechanical proppant coating system.
  • the coating system may be a Muller System.
  • the chemical storage system 112 is connected to the blending unit and can include tanks for breakers, gel additives, crosslinkers, and liquid gel concentrate.
  • the tanks can have level control systems such as a wireless hydrostatic pressure system and may be insulated and heated. Pressurized tanks may be used to provide positive pressure displacement to move chemicals, and some tanks may be agitated and circulated.
  • the chemical storage system can continuously meter chemicals through the use of additive pumps which are able to meter chemical solutions to the blending unit 105 at specified rates as determined by the required final concentrations and the pump rates of the main treatment fluid from the blending unit.
  • the chemical storage tanks can include weight sensors that can continuously monitor the weight of the tanks and determine the quantity of chemicals used by mass or weight in real-time, as the chemicals are being used to manufacture well treatment fluid.
  • Chemical storage tanks can be pressurized using compressed air or nitrogen. They can also be pressurized using variable speed pumps using positive displacement to drive fluid flow.
  • the quantities and rates of chemicals added to the main fluid stream are controlled by valve-metering control systems.
  • the valve-metering can be magnetic mass or volumetric mass meters.
  • chemical additives could be added to the main treatment fluid via aspiration (Venturi Effect).
  • the rates that the chemical additives are aspirated into the main fluid stream can be controlled via adjustable, calibrated apertures located between the chemical storage tank and the main fluid stream.
  • the main fluid stream may be either the main fracture fluid being pumped or may be a slip stream off of a main fracture fluid stream.
  • the components of the chemical storage system are modularized allowing pumps, tanks, or blenders to be added or removed independently.
  • the blending unit 105 is connected to the chemical storage system 112 , the proppant storage system 106 , a water source 202 , and a pumping grid 111 and may prepare a fracturing fluid, complete with proppant and chemical additives or modifiers, by mixing and blending fluids and chemicals at continuous rates according to the needs of a well formation.
  • the blending unit 105 comprises a preblending unit 201 wherein water is fed from a water supply 202 and dry powder (guar) or liquid gel concentrate can be metered from a storage tank by way of a screw conveyor or pump into the preblender's fluid stream where it is mixed with water and blended with various chemical additives and modifiers provided by the chemical storage system 112 .
  • This mixture is fed into the blending unit's hydration device, which provides a first-in-first-out laminar flow.
  • This now near fully hydrated fluid stream is blended in the mixer 202 of the blending unit 105 with proppant from the proppant storage system to create the final fracturing fluid. This process can be accomplished at downhole pump rates.
  • the blending unit can modularized allowing its components to be easily replaced.
  • the mixing apparatus is a modified Halliburton Growler mixer modified to blend proppant and chemical additives to the base fluid without destroying the base fluid properties but still providing ample energy for the blending of proppant into a near fully hydrated fracturing fluid.
  • the final fluid can be directed to a pumping grid 111 and subsequently directed to a central manifold 107 , which can connect and direct the fluid via connection 109 , 204 , or 205 to multiple wells 110 simultaneously.
  • the fracturing operations factory can comprise one or more blending units each coupled to one or more of the control units, proppant storage system, the chemical storage system, the pre-gel blending unit, a water supply, the power unit, and the pumping grid. Each blending unit can be used substantially simultaneously with any other blending unit and can be blending well treatment fluid of the same or different composition than any other blending unit.
  • the blending unit does not comprise a pre-blending unit.
  • the fracturing operations factory contains a separate pre-gel blending unit.
  • the pre-gel blending unit is fed from a water supply and dry powder (guar) can be metered from a storage tank into the preblender's fluid stream where it is mixed with water and blended and can be subsequently transferred to the blending unit.
  • the pre-gel blending unit can be modular, can also be enclosed in the factory, and can be connected to the central control system.
  • the means for simultaneously flowing treatment fluid is a central manifold 107 .
  • the central manifold 107 is connected to the pumping grid 111 and is operable to flow stimulation fluid, for example, to multiple wells at different pads simultaneously.
  • the stimulation fluid can comprise proppant, gelling agents, friction reducers, reactive fluid such as hydrochloric acid, and can be aqueous or hydrocarbon based.
  • the manifold 107 is operable to treat simultaneously two separate wells, for example, as shown in FIG. 2 via connections 204 and 205 . In this example, multiple wells can be fractured simultaneously, or a treatment fluid can be flowed simultaneously to multiple wells.
  • the treatment fluid flowed can be of the same composition or different.
  • connection 109 between the central manifold 107 and a well location can be used in the opposite direction as shown in FIG. 2 to flow a production fluid, such as water or hydrocarbons, or return the well treatment fluid 301 from the well location to the manifold.
  • a production fluid such as water or hydrocarbons
  • the production fluid can be directed to a production system 303 where it can be stored or processed or, in the case of the returning well treatment fluid, to a reclamation system that can allow components of returning fluid to be reused.
  • the manifold is operable to receive production fluid or well treatment fluid from a first well location 101 while simultaneously flowing treatment fluid 302 using a second connection 108 to a second well location 102 .
  • the central manifold 107 is also operable to receive production fluid from both the first well location and the second well location simultaneously.
  • the first and second well locations can be at the same or different pads (as shown in FIG. 3 ).
  • the manifold is also operable to extend multiple connections to a single well location. In reference to FIG. 2 , in one embodiment, two connections are extended from the manifold to a single well location.
  • One connection 109 may be used to deliver well treatment fluid to the well location while the other connection 203 may be used to deliver production fluid or return well treatment fluid from the well location to the central manifold 107 .
  • the central manifold 107 can be connected to one or more additional manifolds 405 .
  • the additional manifolds are operable to connect to multiple well locations 401 - 404 and deliver well treatment fluids and receive production fluids via connections 406 - 409 , respectively, in the same way as the central manifold 107 described above in reference to FIGS. 2 and 3 .
  • the additional manifolds can be located at the well pads.
  • the central manifold has an input 501 that accepts pressurized stimulating fluid, fracturing fluid, or well treatment fluid from a pump truck or a pumping grid 111 .
  • the fluid flows into input 501 and through junctions 502 and 503 to lines 504 and 505 .
  • Line 504 contains a valve 506 , a pressure sensor 507 , and an additional valve 508 .
  • the line is connected to well head 101 .
  • Line 505 contains a valve 511 , a pressure sensor 512 , and an additional valve 513 .
  • These valves may be either plug valves or check valves and can be manually or electronically monitored and controlled.
  • the pressure sensor may be a pressure transducer and may also be manually or electronically monitored or controlled.
  • Line 504 is connected to well head 101 and line 505 is connected to well head 102 .
  • This configuration allows wells 101 and 102 to be stimulated individually and at a higher rate, by opening the valves along the line to the well to be treated while the valves along the other line are closed, or simultaneously at a lower rate, by opening the valves on both lines at the same time.
  • this architecture can be easily expanded to accommodate additional wells by the addition of junctions, lines, valves, and pressure sensors as illustrated. This architecture also allows monitoring the operations of the manifold and detecting leaks. By placing pressure sensors 507 and 512 between valves 506 and 508 and valves 511 and 513 respectively, the pressure of lines 504 and 505 can be readily determined during various phases of operation.
  • valves 511 and 513 are closed.
  • Pressure sensor 507 can detect the pressure within the active line 504
  • pressure sensor 512 can be used to detect if there is any leakage, as it would be expected that the pressure in line 505 in this configuration would be minimal.
  • only a single valve is used along each of lines 504 and 505 .
  • This embodiment can be used to stimulate wells simultaneously or singly as well.
  • the manifold of this embodiment can also work in reverse and transfer fluid from the wellhead back through the manifold and to the central location.
  • input 501 can be connected to a production system or reclamation system, for example, and the valves along the line connected to the wellhead in which it is desirable to recover fluid are open.
  • the valves along the other lines may be open or closed depending on whether it is desirable to recover fluids from the wellheads connected to those lines.
  • Production fluid or stimulation fluid can be returned from the wellhead to those systems respectively.
  • This manifold can be located at the central location or at a remote pad.
  • the central manifold contains two inputs 601 and 602 that accept pressurized stimulating fluid, fracturing fluid, or well treatment fluid from pump trucks or a pumping grid 111 .
  • Inputs 601 and 602 can accept fluid of different or the same compositions at similar or different pressures and rates.
  • the fluid pumped through input 602 travels through junctions 603 and 605 .
  • the junctions are further connected to lines 610 and 611 .
  • the fluid pumped through input 601 travels through junctions 604 and 615 .
  • the junctions are further connected to lines 609 and 612 .
  • Lines 609 , 610 , 611 , and 612 may each contain a valve 606 , a pressure sensor 607 , and an additional valve 608 , or may contain only a single valve. These valves may be either plug valves or check valves and can be manually or electronically monitored and controlled.
  • the pressure sensor may be a pressure transducer and may also be manually or electronically monitored or controlled.
  • valves on lines 609 and 610 are open and the valves on lines 611 and 612 are closed. Lines 609 and 610 are coupled to wellhead 101 through junction 616 .
  • the valves on lines 610 and 611 are both open. Fluid from input 601 can be delivered to well 101 and fluid from input 602 can be delivered to well 102 simultaneously by closing the valves on lines 610 and 612 and opening the valves on lines 611 and 609 .
  • the delivery of fluid to well 102 works analogously. As shown in FIG.
  • the manifold can be easily expanded to include additional wells through additional junctions, lines, and valves. Furthermore, as described in reference to FIG. 4 , the manifold of this embodiment can also work in reverse and transfer fluid from the wellhead back through the manifold and to the central location.
  • either or both inputs 601 and 602 can be connected to a production system or reclamation system, for example, and the valves along the line connected to the wellhead in which it is desirable to recover fluid are open.
  • the valves along the other lines may be open or closed depending on whether it is desirable to recover fluids from the wellheads connected to those lines.
  • Production fluid or stimulation fluid can be returned from the wellhead to those systems respectively.
  • This manifold can be located at the central location or at a remote pad.
  • multiple manifold trailers 701 and 702 may be used at the central location where the stimulation fluid is manufactured and pressurized.
  • the manifold trailers themselves are well known in the art.
  • Each manifold trailer is connected to pressurized stimulating fluid through pump trucks 703 or a pumping grid 111 .
  • a line from each manifold trailer can connect directly to a well head to stimulate it directly, or it can further be connected to the manifolds described that are further connected to well locations.
  • pumping modules can be hauled to the fracturing operation factory site by truck, and pinned or bolted or otherwise located together on the ground.
  • Pumping equipment grid modules can be added or taken away to accommodate the number of pumping units to be used on site.
  • the pressure manifold will interface with the pumping equipment grid modules and support a crane.
  • the grid system can be configured with various piping or electrical connections that each pumping unit may require for power, fuel, cooling, and lubrication.
  • the grid system would incorporate space to allow access to the pumping units' main components for easy maintenance.
  • the grid comprises one or more pumps 801 that can be electric, gas, diesel, or natural gas powered.
  • the grid can also contain spaces or docks 810 operable to receive equipment, such as pumps and other devices, modularized to fit within such spaces.
  • the pumping grid 111 can include walkways 807 that provide access to pumps or any other equipment docked in the grid spaces.
  • the grid's spaces or docks 810 can be prewired and preplumbed and can contain lube oil, fueling, power, and cooling capabilities and connections for the pumps 801 to manifold 107 (shown in FIG. 10 ).
  • the pumps 801 that connect to the grid 111 can be freestanding such as pumps 801 , or the pumps 809 can be attached to trucks 808 .
  • Pumps 809 can each contain its own fueling, cooling, lubrication, and power sources.
  • Pumps 801 can rely on centralized fuel, coolant, lubrication, and power sources.
  • the fuel for the pumps 801 can be supplied to the pumps 801 from a single central fueling system 803 through piping or tubing well known in the art.
  • the pumps 801 can include hydraulic starting mechanisms. Hydraulic power for the starting mechanisms can be supplied to the pumps 801 from a single central power system 804 using tubing or piping well known in the art. In the event electric pumps are used, the power system 804 can provide electricity to the pumps via wires.
  • the lubrication of the pumps 801 can also be centralized. Lubrication fluid can be supplied from a central lubrication system 805 to the pumps 801 using tubing or piping well known in the art.
  • Coolant for the pumps can be provided from a central source such as a coolant or water tower that can generate less noise than local fans.
  • the grid is operable to accept connections to proppant storage and metering systems, chemical storage and metering systems, and blending units.
  • the pumping grid can also have a crane 806 that can assist in the replacement or movement of pumps, manifolds, or other equipment.
  • the pumping grid 111 can be enclosed in a structure 901 .
  • the structure can be a supported fabric structure, a collapsible structure, a prefabricated structure, a retractable structure, a composite structure, a temporary structure, a prefabricated wall and roof structure, a deployable structure, a modular structure, a preformed structure, a mobile accommodation structure, and combinations thereof.
  • the pumping grid 111 can also be partially enclosed by structure 901 and partially exposed, as shown by pump trucks 808 , which are connected to the pumping grid outside of the structure 901 .
  • the pumping grid 111 can also include a ventilation system 902 that can release exhaust from the pumps and/or ventilate the inside of the structure 901 .
  • a central manifold 107 can accept connections to wells and can be connected to the pumping grid.
  • the central manifold and pumping grid are operable to simultaneously treat both a first well head connected via a first connection and a second well head connected via a second connection with the stimulation fluid manufactured by the factory and connected to the pumping grid.
  • the pumping grid can be located at a different pad miles away from the fracturing operations factory 100 .
  • An auxiliary pumping system 1102 which itself can include pumping trucks, manifold trailers 703 shown in FIG. 7 , or standalone pumps, can pump fracturing fluid from the fracturing operations factory 100 through connection 1101 to the pumping grid 111 .
  • the pumping grid 111 can next pump the fluid to production site 101 , for example. In this way, the operations of the fracturing factory 100 can be extended to remote pads through assembly and reassembly of the pumping grid 111 and connection 1101 .
  • the operations of the chemical storage system, proppant storage system, blending unit, pumping grid, power unit, and manifolds are controlled, coordinated, and monitored by a central control system.
  • the central control system can be an electronic computer system capable of receiving analog or digital signals from sensors and capable of driving digital, analog, or other variety of controls of the various components in the fracturing operations factory.
  • the control system can be located within the factory enclosure, if any, or it can be located at a remote location.
  • the central control system may use all of the sensor data from all units and the drive signals from their individual subcontrollers to determine subsystem trajectories.
  • control over the manufacture, pumping, gelling, blending, and resin coating of proppant by the control system can be driven by desired product properties such as density, rate, viscosity, etc.
  • Control can also be driven by external factors affecting the subunits such as dynamic or steady-state bottlenecks.
  • Control can be exercised substantially simultaneously with both the determination of a desired product property, or with altering external conditions. For instance, once it is determined that a well treatment fluid with a specific density is desired, a well treatment fluid of the specific density can be manufactured virtually simultaneously by entering the desired density into the control system.
  • the control system will substantially simultaneously cause the delivery of the proppant and chemical components comprising a well treatment fluid with the desired property to the blending unit where it can be immediately pumped to the desired well location.
  • Well treatment fluids of different compositions can also be manufactured substantially simultaneously with one another and substantially simultaneously with the determination of desired product properties through the use and control of multiple blending units each connected to the control unit, proppant storage system, chemical storage system, water source, and power unit.
  • the central control system can include such features as: (1) virtual inertia, whereby the rates of the subsystems (chemical, proppant, power, etc.) are coupled despite differing individual responses; (2) backward capacitance control, whereby the tub level controls cascade backward through the system; (3) volumetric observer, whereby sand rate errors are decoupled and proportional ration control is allowed without steady-state error.
  • the central control system can also be used to monitor equipment health and status.
  • the control system can report the quantity and rate usage of each component comprising the fluid. For instance, the rate or total amount of proppant, chemicals, water, or electricity consumed for a given well in an operation over any time period can be immediately reported both during and after the operation. This information can be coordinated with cost schedules or billing schedules to immediately compute and report incremental or total costs of operation.
  • the present invention can be used both for onshore and offshore operations using existing or specialized equipment or a combination of both. Such equipment can be modularized to expedite installation or replacement.
  • the present invention may be enclosed in a permanent, semipermanent, or mobile structure.
  • the present invention can be adapted for multiple uses.
  • multiple well sites may be treated, produced, or treated and produced sequentially or simultaneously from a single central location.
  • the invention is capable of considerable additional modification, alteration, and equivalents in form and function, as will occur to those ordinarily skilled in the art having the benefit of this disclosure.
  • the depicted and described embodiments of the invention are exemplary only, and are not exhaustive of the scope of the invention. Consequently, the invention is intended to be limited only by the spirit and scope of the appended claims.

Abstract

An apparatus for providing pressure for a well fracturing operation is disclosed. The apparatus includes one or more docking areas for docking one or more pumping units to a pressure manifold wherein the one or more docking areas are operable to provide access between one or more pumping units, and a structure operable to enclose the one or more docking areas and pumping units. An apparatus for providing pressure for a well fracturing operation is disclosed. The apparatus includes one or more pumping units, a central fueling system connected to the one or more pumping units, a central power system connected to the one or more pumping units, a central lubrication system connected to the one or more pumping units, and a central cooling system connected to the one or more pumping units.

Description

    CROSS-REFERENCE TO RELATED APPLICATIONS
  • This application is a continuation-in-part of application Ser. No. 11/291,496 filed Dec. 1, 2005.
  • FIELD OF THE INVENTION
  • The present invention relates generally to well operations, and more particularly to methods and apparatuses for manufacturing well treatment fluid so as to conserve labor, infrastructure, and environmental impact.
  • BACKGROUND
  • In the production of oil and gas in the field, it is often required to stimulate and treat several well locations within a designated amount of time. Stimulation and treatment processes often involve mobile equipment that is set up and put in place at a pad and then moved by truck from pad to pad within short time periods. Only during non-stimulation activities, such as water flood operations, can some operations occur simultaneously.
  • This movement of equipment and personnel can involve complex logistics. The servicing and stimulation of wells can require a series of coordinated operations that begin with the supply by truck of equipment, supplies, fuel, and chemicals to the wellhead. The equipment is then set up and made ready with proppant and chemicals. After completion of the well services, equipment must be broken down and made ready for transport to the next pad for service. Often, the next pad will be less than 500 feet away from the previously treated pad. In addition, due to the limited storage capacity of the moving equipment for chemicals and equipment, additional trucks are often required to resupply and reequip an existing operation. This movement of equipment and supplies has environmental impacts, and the exposure of mobile equipment to adverse weather conditions can jeopardize well treatment operations and worker safety.
  • SUMMARY
  • In general, an apparatus for providing pressure for a well fracturing operation is disclosed. The apparatus can include one or more docking areas for docking one or more pumping units to a pressure manifold wherein the one or more docking areas are operable to provide access between one or more pumping units, and a structure operable to enclose the one or more docking areas and pumping units. The apparatus can also include a crane system, a central lubrication system connected to the one or more pumping units for providing lubrication fluid to the one or more pumping units, and a central power system connected to the one or more pumping units for starting the one or more pumping units. The central power system can include a hydraulic power system. The apparatus can include a central cooling system connected to the one or more pumping units for cooling the one or more pumping units. The central cooling system can include a cooling tower. The at least one of the one or more docking areas can extend outside of the structure. The apparatus can include a ventilation system. The apparatus can include a central fueling system connected to the one or more pumping units for supplying fuel to the one or more pumping units. The central fueling system supplies one or more fuels from the group consisting of: diesel, gasoline, natural gas, or electricity. The structure can include one or more structures from the group consisting of a supported fabric structure, a collapsible structure, a prefabricated structure, a retractable structure, a composite structure, a temporary structure, a prefabricated wall and roof structure, a deployable structure, a modular structure, a preformed structure, a mobile accommodation structure, and combinations thereof. The one or more docking areas can include walkways. The one or more docking areas can include one or more lubrication connections, coolant connections, fuel connections, power connections, and pressure connections. The one or more pumping units can include heaters.
  • An apparatus for providing pressure for a well fracturing operation is disclosed. The apparatus can include one or more pumping units, a central fueling system connected to the one or more pumping units, a central power system connected to the one or more pumping units, a central lubrication system connected to the one or more pumping units, and a central cooling system connected to the one or more pumping units. The central power system can include a hydraulic power system. The central cooling system can include a cooling tower. The apparatus can include a ventilation system. The central fueling system can supply one or more fuels from the group consisting of: diesel, gasoline, natural gas, or electricity.
  • A method for operating one or more pumping units for a well fracturing operation from a central land based location is disclosed. The method includes providing fuel to the one or more pumping units from the central location, providing lubrication to the one or more pumping units from the central location, providing power to the one or more pumping units from the central location, and providing coolant to the one or more pumping units from the central location. The power can be provided from a hydraulic power system. The coolant can be provided from a cooling tower. The method can include providing ventilation to the one or more pumping units. The fuel can include of one or more fuels from the group consisting of: diesel, gasoline, natural gas, or electricity. The method can also include enclosing the one or more pumping units in a structure.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • A more complete understanding of the present disclosure and advantages thereof may be acquired by referring to the following description taken in conjunction with the accompanying drawings. The drawings illustrate only exemplary embodiments and are not intended to be limiting against the invention.
  • FIG. 1 is a diagram of a centralized well treatment facility.
  • FIG. 2 is a flow diagram of a centralized well treatment facility.
  • FIG. 3 is a flow diagram of central manifold used to treat wells and recover production fluid.
  • FIG. 4 is a diagram of a multiple manifold well treatment system.
  • FIG. 5 is a schematic of a manifold apparatus for directing treatment fluid.
  • FIG. 6 is a schematic of a manifold apparatus for directing treatment fluid.
  • FIG. 7 is a schematic of a simultaneous fracturing method.
  • FIG. 8 is an aerial view of the pumping grid apparatus.
  • FIG. 9 is an aerial view of a structure that can enclose the pumping grid apparatus.
  • FIG. 10 is a side view of the pumping grid apparatus.
  • FIG. 11 is an aerial view of the fracturing operations factory and a remote pumping grid apparatus.
  • DETAILED DESCRIPTION
  • The details of the methods and apparatuses according to the present invention will now be described with reference to the accompanying drawings.
  • In reference to FIG. 1, in one embodiment, a well treatment operations factory 100 includes one or more of the following: a centralized power unit 103; a pumping grid 111; a central manifold 107; a proppant storage system 106; a chemical storage system 112; and a blending unit 105. In this and other embodiments, the well treatment factory may be set upon a pad from which many other wellheads on other pads 110 may be serviced. The well treatment operations factory may be connected via the central manifold 107 to at least a first pad 101 containing one or more wellheads via a first connection 108 and at least a second pad 102 containing one or more wellheads via a second connection 109. The connection may be a standard piping or tubing known to one of ordinary skill in the art. The factory may be open, or it may be enclosed at its location in various combinations of structures including a supported fabric structure, a collapsible structure, a prefabricated structure, a retractable structure, a composite structure, a temporary building, a prefabricated wall and roof unit, a deployable structure, a modular structure, a preformed structure, or a mobile accommodation unit. The factory may be circular and may incorporate alleyways for maintenance access and process fluid flow. The factory, and any or all of its components can be climate controlled, air ventilated and filtered, and/or heated. The heating can be accomplished with radiators, heat plumbing, natural gas heaters, electric heaters, diesel heaters, or other known equivalent devices. The heating can be accomplished by convection, radiation, conduction, or other known equivalent methods.
  • In one embodiment of the centralized power unit 103, the unit provides electrical power to all of the subunits within the well operations factory 100 via electrical connections. The centralized power unit 103 can be powered by liquid fuel, natural gas, or other equivalent fuel and may optionally be a cogeneration power unit. The unit may comprise a single trailer with subunits, each subunit with the ability to operate independently. The unit may also be operable to extend power to one or more outlying wellheads.
  • In one embodiment, the proppant storage system 106 is connected to the blending unit 105 and includes automatic valves and a set of tanks that contain proppant. Each tank can be monitored for level, material weight, and the rate at which proppant is being consumed. This information can be transmitted to a controller or control area. Each tank is capable of being filled pneumatically and can be emptied through a calibrated discharge chute by gravity. Gravity can be the substantial means of delivering proppant from the proppant tank. The tanks may also be agitated in the event of clogging or unbalanced flow. The proppant tanks can contain a controlled, calibrated orifice. Each tank's level, material weight, and calibrated orifice can be used to monitor and control the amount of desired proppant delivered to the blending unit. For instance, each tank's orifice can be adjusted to release proppant at faster or slower rates depending upon the needs of the formation and to adjust for the flow rates measured by the change in weight of the tank. Each proppant tank can contain its own air ventilation and filtering. In reference to FIG. 8, the tanks 106 can be arranged around each blending unit 105 within the enclosure, with each tank's discharge chute 803 located above the blending unit 105. The discharge chute can be connected to a surge hopper 804. In one embodiment, proppant is released from the proppant storage unit 106 through a controllable gate in the unit. When the gate is open, proppant travels from the proppant storage unit into the discharge chute 803. The discharge chute releases the proppant into the surge hopper. In this embodiment, the surge hopper contains a controlled, calibrated orifice or aperture 807 that releases proppant from the surge hopper at a desired rate. The amount of proppant in the surge hopper is maintained at a substantially constant level. Each tank can be connected to a pneumatic refill line 805. The tanks' weight can be measured by a measurement lattice 806 or by weight sensors or scales. The weight of the tanks can be used to determine how much proppant is being used during a well stimulation operation, how much total proppant was used at the completion of a well stimulation operation, and how much proppant remains in the storage unit at any given time. Tanks may be added to or removed from the storage system as needed. Empty storage tanks may be in the process of being filled by proppant at the same time full or partially full tanks are being used, allowing for continuous operation. The tanks can be arranged around a calibrated v-belt conveyor. In addition, a resin-coated proppant may be used by the addition of a mechanical proppant coating system. The coating system may be a Muller System.
  • In one embodiment, the chemical storage system 112 is connected to the blending unit and can include tanks for breakers, gel additives, crosslinkers, and liquid gel concentrate. The tanks can have level control systems such as a wireless hydrostatic pressure system and may be insulated and heated. Pressurized tanks may be used to provide positive pressure displacement to move chemicals, and some tanks may be agitated and circulated. The chemical storage system can continuously meter chemicals through the use of additive pumps which are able to meter chemical solutions to the blending unit 105 at specified rates as determined by the required final concentrations and the pump rates of the main treatment fluid from the blending unit. The chemical storage tanks can include weight sensors that can continuously monitor the weight of the tanks and determine the quantity of chemicals used by mass or weight in real-time, as the chemicals are being used to manufacture well treatment fluid. Chemical storage tanks can be pressurized using compressed air or nitrogen. They can also be pressurized using variable speed pumps using positive displacement to drive fluid flow. The quantities and rates of chemicals added to the main fluid stream are controlled by valve-metering control systems. The valve-metering can be magnetic mass or volumetric mass meters. In addition, chemical additives could be added to the main treatment fluid via aspiration (Venturi Effect). The rates that the chemical additives are aspirated into the main fluid stream can be controlled via adjustable, calibrated apertures located between the chemical storage tank and the main fluid stream. In the case of fracturing operations, the main fluid stream may be either the main fracture fluid being pumped or may be a slip stream off of a main fracture fluid stream. In one embodiment, the components of the chemical storage system are modularized allowing pumps, tanks, or blenders to be added or removed independently.
  • In reference to FIG. 2, in one embodiment, the blending unit 105 is connected to the chemical storage system 112, the proppant storage system 106, a water source 202, and a pumping grid 111 and may prepare a fracturing fluid, complete with proppant and chemical additives or modifiers, by mixing and blending fluids and chemicals at continuous rates according to the needs of a well formation. The blending unit 105 comprises a preblending unit 201 wherein water is fed from a water supply 202 and dry powder (guar) or liquid gel concentrate can be metered from a storage tank by way of a screw conveyor or pump into the preblender's fluid stream where it is mixed with water and blended with various chemical additives and modifiers provided by the chemical storage system 112. These chemicals may include crosslinkers, gelling agents, viscosity altering chemicals, PH buffers, modifiers, surfactants, breakers, and stabilizers. This mixture is fed into the blending unit's hydration device, which provides a first-in-first-out laminar flow. This now near fully hydrated fluid stream is blended in the mixer 202 of the blending unit 105 with proppant from the proppant storage system to create the final fracturing fluid. This process can be accomplished at downhole pump rates. The blending unit can modularized allowing its components to be easily replaced. In one embodiment, the mixing apparatus is a modified Halliburton Growler mixer modified to blend proppant and chemical additives to the base fluid without destroying the base fluid properties but still providing ample energy for the blending of proppant into a near fully hydrated fracturing fluid. The final fluid can be directed to a pumping grid 111 and subsequently directed to a central manifold 107, which can connect and direct the fluid via connection 109, 204, or 205 to multiple wells 110 simultaneously. In one embodiment, the fracturing operations factory can comprise one or more blending units each coupled to one or more of the control units, proppant storage system, the chemical storage system, the pre-gel blending unit, a water supply, the power unit, and the pumping grid. Each blending unit can be used substantially simultaneously with any other blending unit and can be blending well treatment fluid of the same or different composition than any other blending unit.
  • In one embodiment, the blending unit does not comprise a pre-blending unit. Instead, the fracturing operations factory contains a separate pre-gel blending unit. The pre-gel blending unit is fed from a water supply and dry powder (guar) can be metered from a storage tank into the preblender's fluid stream where it is mixed with water and blended and can be subsequently transferred to the blending unit. The pre-gel blending unit can be modular, can also be enclosed in the factory, and can be connected to the central control system.
  • In one embodiment, the means for simultaneously flowing treatment fluid is a central manifold 107. The central manifold 107 is connected to the pumping grid 111 and is operable to flow stimulation fluid, for example, to multiple wells at different pads simultaneously. The stimulation fluid can comprise proppant, gelling agents, friction reducers, reactive fluid such as hydrochloric acid, and can be aqueous or hydrocarbon based. The manifold 107 is operable to treat simultaneously two separate wells, for example, as shown in FIG. 2 via connections 204 and 205. In this example, multiple wells can be fractured simultaneously, or a treatment fluid can be flowed simultaneously to multiple wells. The treatment fluid flowed can be of the same composition or different. These flows can be coordinated depending on a well's specific treatment needs. In addition, in reference to FIG. 3, the connection 109 between the central manifold 107 and a well location can be used in the opposite direction as shown in FIG. 2 to flow a production fluid, such as water or hydrocarbons, or return the well treatment fluid 301 from the well location to the manifold. From the central manifold 107, the production fluid can be directed to a production system 303 where it can be stored or processed or, in the case of the returning well treatment fluid, to a reclamation system that can allow components of returning fluid to be reused. The manifold is operable to receive production fluid or well treatment fluid from a first well location 101 while simultaneously flowing treatment fluid 302 using a second connection 108 to a second well location 102. The central manifold 107 is also operable to receive production fluid from both the first well location and the second well location simultaneously. In this embodiment, the first and second well locations can be at the same or different pads (as shown in FIG. 3). The manifold is also operable to extend multiple connections to a single well location. In reference to FIG. 2, in one embodiment, two connections are extended from the manifold to a single well location. One connection 109 may be used to deliver well treatment fluid to the well location while the other connection 203 may be used to deliver production fluid or return well treatment fluid from the well location to the central manifold 107.
  • In reference to FIG. 4, in one embodiment, the central manifold 107 can be connected to one or more additional manifolds 405. The additional manifolds are operable to connect to multiple well locations 401-404 and deliver well treatment fluids and receive production fluids via connections 406-409, respectively, in the same way as the central manifold 107 described above in reference to FIGS. 2 and 3. The additional manifolds can be located at the well pads.
  • In reference to FIG. 5, in one embodiment, the central manifold has an input 501 that accepts pressurized stimulating fluid, fracturing fluid, or well treatment fluid from a pump truck or a pumping grid 111. The fluid flows into input 501 and through junctions 502 and 503 to lines 504 and 505. Line 504 contains a valve 506, a pressure sensor 507, and an additional valve 508. The line is connected to well head 101. Line 505 contains a valve 511, a pressure sensor 512, and an additional valve 513. These valves may be either plug valves or check valves and can be manually or electronically monitored and controlled. The pressure sensor may be a pressure transducer and may also be manually or electronically monitored or controlled. Line 504 is connected to well head 101 and line 505 is connected to well head 102. This configuration allows wells 101 and 102 to be stimulated individually and at a higher rate, by opening the valves along the line to the well to be treated while the valves along the other line are closed, or simultaneously at a lower rate, by opening the valves on both lines at the same time. As shown in FIG. 5, this architecture can be easily expanded to accommodate additional wells by the addition of junctions, lines, valves, and pressure sensors as illustrated. This architecture also allows monitoring the operations of the manifold and detecting leaks. By placing pressure sensors 507 and 512 between valves 506 and 508 and valves 511 and 513 respectively, the pressure of lines 504 and 505 can be readily determined during various phases of operation. For instance, when the manifold is configured to stimulate only well 101, valves 511 and 513 are closed. Pressure sensor 507 can detect the pressure within the active line 504, and pressure sensor 512 can be used to detect if there is any leakage, as it would be expected that the pressure in line 505 in this configuration would be minimal. In another embodiment, only a single valve is used along each of lines 504 and 505. This embodiment can be used to stimulate wells simultaneously or singly as well. Furthermore, as described in reference to FIG. 4, the manifold of this embodiment can also work in reverse and transfer fluid from the wellhead back through the manifold and to the central location. In this configuration, input 501 can be connected to a production system or reclamation system, for example, and the valves along the line connected to the wellhead in which it is desirable to recover fluid are open. The valves along the other lines may be open or closed depending on whether it is desirable to recover fluids from the wellheads connected to those lines. Production fluid or stimulation fluid can be returned from the wellhead to those systems respectively. This manifold can be located at the central location or at a remote pad.
  • In reference to FIG. 6, in one embodiment, the central manifold contains two inputs 601 and 602 that accept pressurized stimulating fluid, fracturing fluid, or well treatment fluid from pump trucks or a pumping grid 111. Inputs 601 and 602 can accept fluid of different or the same compositions at similar or different pressures and rates. The fluid pumped through input 602 travels through junctions 603 and 605. The junctions are further connected to lines 610 and 611. The fluid pumped through input 601 travels through junctions 604 and 615. The junctions are further connected to lines 609 and 612. Lines 609, 610, 611, and 612 may each contain a valve 606, a pressure sensor 607, and an additional valve 608, or may contain only a single valve. These valves may be either plug valves or check valves and can be manually or electronically monitored and controlled. The pressure sensor may be a pressure transducer and may also be manually or electronically monitored or controlled. When, for example, the fluid from input 602 is desired to be delivered to well 101 only, the valves on line 610 are open and the valves on line 611 are closed. When the fluid from input 601 is desired to be delivered to well 101 only, the valves on line 609 are open and the valves on line 612 are closed. When it is desired that fluid from both inputs 601 and 602 are to be delivered to well 101 only, the valves on lines 609 and 610 are open and the valves on lines 611 and 612 are closed. Lines 609 and 610 are coupled to wellhead 101 through junction 616. When it is desired that fluid from input 602 be delivered to both wells 101 and 102 simultaneously, the valves on lines 610 and 611 are both open. Fluid from input 601 can be delivered to well 101 and fluid from input 602 can be delivered to well 102 simultaneously by closing the valves on lines 610 and 612 and opening the valves on lines 611 and 609. The delivery of fluid to well 102 works analogously. As shown in FIG. 6, the manifold can be easily expanded to include additional wells through additional junctions, lines, and valves. Furthermore, as described in reference to FIG. 4, the manifold of this embodiment can also work in reverse and transfer fluid from the wellhead back through the manifold and to the central location. In this configuration, either or both inputs 601 and 602 can be connected to a production system or reclamation system, for example, and the valves along the line connected to the wellhead in which it is desirable to recover fluid are open. The valves along the other lines may be open or closed depending on whether it is desirable to recover fluids from the wellheads connected to those lines. Production fluid or stimulation fluid can be returned from the wellhead to those systems respectively. This manifold can be located at the central location or at a remote pad.
  • In reference to FIG. 7, in one embodiment, multiple manifold trailers 701 and 702 may be used at the central location where the stimulation fluid is manufactured and pressurized. The manifold trailers themselves are well known in the art. Each manifold trailer is connected to pressurized stimulating fluid through pump trucks 703 or a pumping grid 111. A line from each manifold trailer can connect directly to a well head to stimulate it directly, or it can further be connected to the manifolds described that are further connected to well locations.
  • In one embodiment, of the pumping grid system 111, pumping modules can be hauled to the fracturing operation factory site by truck, and pinned or bolted or otherwise located together on the ground. Pumping equipment grid modules can be added or taken away to accommodate the number of pumping units to be used on site. The pressure manifold will interface with the pumping equipment grid modules and support a crane. The grid system can be configured with various piping or electrical connections that each pumping unit may require for power, fuel, cooling, and lubrication. The grid system would incorporate space to allow access to the pumping units' main components for easy maintenance. In reference to FIG. 8, in one embodiment of the pumping grid 111, the grid comprises one or more pumps 801 that can be electric, gas, diesel, or natural gas powered. The grid can also contain spaces or docks 810 operable to receive equipment, such as pumps and other devices, modularized to fit within such spaces. The pumping grid 111 can include walkways 807 that provide access to pumps or any other equipment docked in the grid spaces. The grid's spaces or docks 810 can be prewired and preplumbed and can contain lube oil, fueling, power, and cooling capabilities and connections for the pumps 801 to manifold 107 (shown in FIG. 10). The pumps 801 that connect to the grid 111 can be freestanding such as pumps 801, or the pumps 809 can be attached to trucks 808. Pumps 809 can each contain its own fueling, cooling, lubrication, and power sources. Pumps 801 can rely on centralized fuel, coolant, lubrication, and power sources. The fuel for the pumps 801 can be supplied to the pumps 801 from a single central fueling system 803 through piping or tubing well known in the art. The pumps 801 can include hydraulic starting mechanisms. Hydraulic power for the starting mechanisms can be supplied to the pumps 801 from a single central power system 804 using tubing or piping well known in the art. In the event electric pumps are used, the power system 804 can provide electricity to the pumps via wires. The lubrication of the pumps 801 can also be centralized. Lubrication fluid can be supplied from a central lubrication system 805 to the pumps 801 using tubing or piping well known in the art. Coolant for the pumps can be provided from a central source such as a coolant or water tower that can generate less noise than local fans. The grid is operable to accept connections to proppant storage and metering systems, chemical storage and metering systems, and blending units. The pumping grid can also have a crane 806 that can assist in the replacement or movement of pumps, manifolds, or other equipment. In reference to FIG. 9, the pumping grid 111 can be enclosed in a structure 901. The structure can be a supported fabric structure, a collapsible structure, a prefabricated structure, a retractable structure, a composite structure, a temporary structure, a prefabricated wall and roof structure, a deployable structure, a modular structure, a preformed structure, a mobile accommodation structure, and combinations thereof. The pumping grid 111 can also be partially enclosed by structure 901 and partially exposed, as shown by pump trucks 808, which are connected to the pumping grid outside of the structure 901. The pumping grid 111 can also include a ventilation system 902 that can release exhaust from the pumps and/or ventilate the inside of the structure 901. FIG. 10 shows the pumping grid 111, the crane 806, the pressure manifold 107, and the enclosing structure 901. A central manifold 107 can accept connections to wells and can be connected to the pumping grid. In one embodiment, the central manifold and pumping grid are operable to simultaneously treat both a first well head connected via a first connection and a second well head connected via a second connection with the stimulation fluid manufactured by the factory and connected to the pumping grid.
  • In reference to FIG. 11, in some embodiments, the pumping grid can be located at a different pad miles away from the fracturing operations factory 100. An auxiliary pumping system 1102, which itself can include pumping trucks, manifold trailers 703 shown in FIG. 7, or standalone pumps, can pump fracturing fluid from the fracturing operations factory 100 through connection 1101 to the pumping grid 111. The pumping grid 111 can next pump the fluid to production site 101, for example. In this way, the operations of the fracturing factory 100 can be extended to remote pads through assembly and reassembly of the pumping grid 111 and connection 1101.
  • In some embodiments, the operations of the chemical storage system, proppant storage system, blending unit, pumping grid, power unit, and manifolds are controlled, coordinated, and monitored by a central control system. The central control system can be an electronic computer system capable of receiving analog or digital signals from sensors and capable of driving digital, analog, or other variety of controls of the various components in the fracturing operations factory. The control system can be located within the factory enclosure, if any, or it can be located at a remote location. The central control system may use all of the sensor data from all units and the drive signals from their individual subcontrollers to determine subsystem trajectories. For example, control over the manufacture, pumping, gelling, blending, and resin coating of proppant by the control system can be driven by desired product properties such as density, rate, viscosity, etc. Control can also be driven by external factors affecting the subunits such as dynamic or steady-state bottlenecks. Control can be exercised substantially simultaneously with both the determination of a desired product property, or with altering external conditions. For instance, once it is determined that a well treatment fluid with a specific density is desired, a well treatment fluid of the specific density can be manufactured virtually simultaneously by entering the desired density into the control system. The control system will substantially simultaneously cause the delivery of the proppant and chemical components comprising a well treatment fluid with the desired property to the blending unit where it can be immediately pumped to the desired well location. Well treatment fluids of different compositions can also be manufactured substantially simultaneously with one another and substantially simultaneously with the determination of desired product properties through the use and control of multiple blending units each connected to the control unit, proppant storage system, chemical storage system, water source, and power unit. The central control system can include such features as: (1) virtual inertia, whereby the rates of the subsystems (chemical, proppant, power, etc.) are coupled despite differing individual responses; (2) backward capacitance control, whereby the tub level controls cascade backward through the system; (3) volumetric observer, whereby sand rate errors are decoupled and proportional ration control is allowed without steady-state error. The central control system can also be used to monitor equipment health and status. Simultaneously with the manufacture of a well treatment fluid, the control system can report the quantity and rate usage of each component comprising the fluid. For instance, the rate or total amount of proppant, chemicals, water, or electricity consumed for a given well in an operation over any time period can be immediately reported both during and after the operation. This information can be coordinated with cost schedules or billing schedules to immediately compute and report incremental or total costs of operation.
  • The present invention can be used both for onshore and offshore operations using existing or specialized equipment or a combination of both. Such equipment can be modularized to expedite installation or replacement. The present invention may be enclosed in a permanent, semipermanent, or mobile structure.
  • As those of ordinary skill in the art will appreciate, the present invention can be adapted for multiple uses. By way of example only, multiple well sites may be treated, produced, or treated and produced sequentially or simultaneously from a single central location. The invention is capable of considerable additional modification, alteration, and equivalents in form and function, as will occur to those ordinarily skilled in the art having the benefit of this disclosure. The depicted and described embodiments of the invention are exemplary only, and are not exhaustive of the scope of the invention. Consequently, the invention is intended to be limited only by the spirit and scope of the appended claims.

Claims (28)

1. An apparatus for providing pressure for a well fracturing operation comprising:
one or more docking areas for docking one or more pumping units to a pressure manifold wherein the one or more docking areas are operable to provide access between one or more pumping units; and
a structure operable to enclose the one or more docking areas and pumping units.
2. The apparatus of claim 1 further comprising a crane system surrounding the one or more docking areas.
3. The apparatus of claim 1 further comprising a central lubrication system connected to the one or more pumping units.
4. The apparatus of claim 1 further comprising a central power system connected to the one or more pumping units.
5. The apparatus of claim 4 wherein the central power system comprises a hydraulic power system.
6. The apparatus of claim 1 further comprising a central cooling system connected to the one or more pumping units.
7. The apparatus of claim 6 wherein the central cooling system comprises a cooling tower.
8. The apparatus of claim 1 wherein at least one of the one or more docking areas extend outside of the structure.
9. The apparatus of claim 1 further comprising a ventilation system.
10. The apparatus of claim 1 further comprising a central fueling system connected to the one or more pumping units for supplying fuel to the one or more pumping units.
11. The apparatus of claim 10 wherein the central fueling system supplies one or more fuels from the group consisting of: diesel, gasoline, and natural gas.
12. The apparatus of claim 1 wherein the structure comprises one or more structures from the group consisting of a supported fabric structure, a collapsible structure, a prefabricated structure, a retractable structure, a composite structure, a temporary structure, a prefabricated wall and roof structure, a deployable structure, a modular structure, a preformed structure, a mobile accommodation structure, and combinations thereof.
13. The apparatus of claim 1 wherein the one or more docking areas comprise walkways.
14. The apparatus of claim 1 wherein the one or more docking areas comprise one or more lubrication connections, coolant connections, fuel connections, power connections, and pressure connections.
15. The apparatus of claim 1 wherein the one or more pumping units comprise heaters.
16. An apparatus for providing pressure for a well fracturing operation comprising:
one or more pumping units connected to a manifold;
a central fueling system connected to the one or more pumping units;
a central power system connected to the one or more pumping units;
a central lubrication system connected to the one or more pumping units; and
a central cooling system connected to the one or more pumping units.
17. The apparatus of claim 16 wherein the central power system comprises a hydraulic power system.
18. The apparatus of claim 16 wherein the central cooling system comprises a cooling tower.
19. The apparatus of claim 16 further comprising a ventilation system.
20. The apparatus of claim 16 wherein the central fueling system supplies one or more fuels from the group consisting of: diesel, gasoline, natural gas, or electricity.
21. A method for operating one or more pumping units for a well fracturing operation from a land based location comprising:
providing fuel to the one or more pumping units from a central location;
providing lubrication to the one or more pumping units from a central location;
providing power to the one or more pumping units from a central location; and
providing coolant to the one or more pumping units from a central location.
22. The method of claim 21 wherein the power is provided from a hydraulic power system.
23. The method of claim 21 wherein the coolant is provided from a cooling tower.
24. The method of claim 21 further comprising providing ventilation to the one or more pumping units.
25. The method of claim 21 wherein the fuel comprises of one or more fuels from the group consisting of: diesel, gasoline, natural gas, or electricity.
26. The method of claim 21 further comprising enclosing the one or more pumping units in a structure.
27. An apparatus for providing well treatment fluid to a production site comprising:
a well treatment operations factory comprising an auxiliary pumping system; and
a pumping grid connected to the auxiliary pumping system; wherein
the pumping grid is located remotely from the well treatment operations factory.
28. A method for providing well treatment fluid to a production site comprising:
producing well treatment fluid at a central location;
pumping the well treatment fluid from the central location to a remote pumping grid; and
pumping the well treatment fluid from the remote pumping grid to the production site.
US11/396,918 2005-12-01 2006-04-03 Method and apparatus for providing pressure for well treatment operations Abandoned US20070125544A1 (en)

Priority Applications (5)

Application Number Priority Date Filing Date Title
US11/396,918 US20070125544A1 (en) 2005-12-01 2006-04-03 Method and apparatus for providing pressure for well treatment operations
CA002648265A CA2648265A1 (en) 2006-04-03 2007-04-02 Method and apparatus for providing pressure for well treatment operations
RU2008143351/03A RU2008143351A (en) 2006-04-03 2007-04-02 PRESSURE METHOD AND DEVICE FOR WELL TREATMENT OPERATIONS
PCT/GB2007/001189 WO2007113528A1 (en) 2006-04-03 2007-04-02 Method and apparatus for providing pressure for well treatment operation
US11/873,160 US7946340B2 (en) 2005-12-01 2007-10-16 Method and apparatus for orchestration of fracture placement from a centralized well fluid treatment center

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US11/291,496 US7841394B2 (en) 2005-12-01 2005-12-01 Method and apparatus for centralized well treatment
US11/396,918 US20070125544A1 (en) 2005-12-01 2006-04-03 Method and apparatus for providing pressure for well treatment operations

Related Parent Applications (2)

Application Number Title Priority Date Filing Date
US11/291,496 Continuation-In-Part US7841394B2 (en) 2005-12-01 2005-12-01 Method and apparatus for centralized well treatment
US11/545,749 Continuation-In-Part US7740072B2 (en) 2005-12-01 2006-10-10 Methods and systems for well stimulation using multiple angled fracturing

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US11/873,160 Continuation-In-Part US7946340B2 (en) 2005-12-01 2007-10-16 Method and apparatus for orchestration of fracture placement from a centralized well fluid treatment center

Publications (1)

Publication Number Publication Date
US20070125544A1 true US20070125544A1 (en) 2007-06-07

Family

ID=38110096

Family Applications (1)

Application Number Title Priority Date Filing Date
US11/396,918 Abandoned US20070125544A1 (en) 2005-12-01 2006-04-03 Method and apparatus for providing pressure for well treatment operations

Country Status (4)

Country Link
US (1) US20070125544A1 (en)
CA (1) CA2648265A1 (en)
RU (1) RU2008143351A (en)
WO (1) WO2007113528A1 (en)

Cited By (101)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070125543A1 (en) * 2005-12-01 2007-06-07 Halliburton Energy Services, Inc. Method and apparatus for centralized well treatment
US20070204991A1 (en) * 2006-03-03 2007-09-06 Loree Dwight N Liquified petroleum gas fracturing system
US20080083531A1 (en) * 2006-10-10 2008-04-10 Halliburton Energy Services, Inc. Methods and systems for well stimulation using multiple angled fracturing
US20080190618A1 (en) * 2007-02-09 2008-08-14 Ronald Dant Method of Blending Hazardous Chemicals to a Well Bore
US20080236818A1 (en) * 2005-12-01 2008-10-02 Dykstra Jason D Method and Apparatus for Controlling the Manufacture of Well Treatment Fluid
US20090183874A1 (en) * 2006-03-03 2009-07-23 Victor Fordyce Proppant addition system and method
US20100038077A1 (en) * 2006-02-27 2010-02-18 Heilman Paul W Method for Centralized Proppant Storage and Metering
US20100063901A1 (en) * 2008-09-10 2010-03-11 Sean Paul Brierley Oilfield Inventory control and Communication System
US20100071899A1 (en) * 2008-09-22 2010-03-25 Laurent Coquilleau Wellsite Surface Equipment Systems
US7711487B2 (en) 2006-10-10 2010-05-04 Halliburton Energy Services, Inc. Methods for maximizing second fracture length
US7931082B2 (en) 2007-10-16 2011-04-26 Halliburton Energy Services Inc., Method and system for centralized well treatment
US7946340B2 (en) 2005-12-01 2011-05-24 Halliburton Energy Services, Inc. Method and apparatus for orchestration of fracture placement from a centralized well fluid treatment center
US20110123303A1 (en) * 2009-11-20 2011-05-26 Stegemoeller Calvin L Methods and Systems for Material Transfer
US20110120702A1 (en) * 2009-11-25 2011-05-26 Halliburton Energy Services, Inc. Generating probabilistic information on subterranean fractures
US20110120705A1 (en) * 2009-11-25 2011-05-26 Halliburton Energy Services, Inc. Simulating Injection Treatments from Multiple Wells
US20110120706A1 (en) * 2009-11-25 2011-05-26 Halliburton Energy Services, Inc. Refining Information on Subterranean Fractures
US20110125471A1 (en) * 2009-11-25 2011-05-26 Halliburton Energy Services, Inc. Probabilistic Earth Model for Subterranean Fracture Simulation
US20110120718A1 (en) * 2009-11-25 2011-05-26 Halliburton Energy Services, Inc. Simulating Subterranean Fracture Propagation
US20110125476A1 (en) * 2009-11-25 2011-05-26 Halliburton Energy Services, Inc. Probabilistic Simulation of Subterranean Fracture Propagation
WO2012035293A1 (en) * 2010-09-15 2012-03-22 Halliburton Energy Services, Inc. Systems and methods for routing pressurized fluid
CN102602322A (en) * 2012-03-19 2012-07-25 西安邦普工业自动化有限公司 Electrically-driven fracturing pump truck
WO2014053056A1 (en) * 2012-10-05 2014-04-10 Evolution Well Services Mobile, modular, electrically powered system for use in fracturing underground formations using liquid petroleum gas
US20140103048A1 (en) * 2012-02-10 2014-04-17 Tfl Distribution, Llc Climatic protection of fracking hydro tanks
US20140216736A1 (en) * 2012-03-08 2014-08-07 Schlumberger Technology Corporation System and method for delivering treatment fluid
WO2013134622A3 (en) * 2012-03-08 2014-08-28 Schlumberger Canada Limited System and method for delivering treatment fluid
US9103193B2 (en) 2011-04-07 2015-08-11 Evolution Well Services, Llc Mobile, modular, electrically powered system for use in fracturing underground formations
WO2015153533A1 (en) * 2014-03-31 2015-10-08 Schlumberger Canada Limited Optimized drive of fracturing fluids blenders
WO2016024952A1 (en) * 2014-08-12 2016-02-18 Halliburton Energy Services, Inc. Methods and systems for routing pressurized fluid utilizing articulating arms
WO2018048974A1 (en) * 2016-09-07 2018-03-15 Schlumberger Technology Corporation Systems and methods for injecting fluids into high pressure injector line
US20180073338A1 (en) * 2016-09-08 2018-03-15 Wood Group Mustang (Canada) Inc. Method and apparatus for connecting well heads of steam stimulated hydrocarbon wells
US9932800B2 (en) * 2011-09-23 2018-04-03 Cameron International Corporation Fracturing manifold systems and methods
US10132146B2 (en) 2011-09-23 2018-11-20 Cameron International Corporation Adjustable fracturing head and manifold system
US10323475B2 (en) 2015-11-13 2019-06-18 Cameron International Corporation Fracturing fluid delivery system
US10385662B2 (en) 2012-01-11 2019-08-20 Cameron International Corporation Well fracturing manifold apparatus
US10487637B2 (en) 2011-09-23 2019-11-26 Cameron International Corporation Adjustable fracturing system
US10519758B2 (en) 2013-11-08 2019-12-31 Schlumberger Technology Corporation Oilfield surface equipment cooling system
US10914155B2 (en) 2018-10-09 2021-02-09 U.S. Well Services, LLC Electric powered hydraulic fracturing pump system with single electric powered multi-plunger pump fracturing trailers, filtration units, and slide out platform
US10927802B2 (en) 2012-11-16 2021-02-23 U.S. Well Services, LLC System for fueling electric powered hydraulic fracturing equipment with multiple fuel sources
US10934824B2 (en) 2012-11-16 2021-03-02 U.S. Well Services, LLC System for reducing vibrations in a pressure pumping fleet
US11015413B2 (en) 2018-10-31 2021-05-25 Cameron International Corporation Fracturing system with fluid conduit having communication line
US11066913B2 (en) 2016-05-01 2021-07-20 Cameron International Corporation Flexible fracturing line with removable liner
US11125066B1 (en) 2020-06-22 2021-09-21 Bj Energy Solutions, Llc Systems and methods to operate a dual-shaft gas turbine engine for hydraulic fracturing
US11129295B1 (en) 2020-06-05 2021-09-21 Bj Energy Solutions, Llc Enclosure assembly for enhanced cooling of direct drive unit and related methods
US11136870B2 (en) * 2012-11-16 2021-10-05 U.S. Well Services, LLC System for pumping hydraulic fracturing fluid using electric pumps
US11136872B2 (en) 2016-12-09 2021-10-05 Cameron International Corporation Apparatus and method of disbursing materials into a wellbore
US11149533B1 (en) 2020-06-24 2021-10-19 Bj Energy Solutions, Llc Systems to monitor, detect, and/or intervene relative to cavitation and pulsation events during a hydraulic fracturing operation
US11149726B1 (en) 2019-09-13 2021-10-19 Bj Energy Solutions, Llc Systems and method for use of single mass flywheel alongside torsional vibration damper assembly for single acting reciprocating pump
US11156159B1 (en) 2019-09-13 2021-10-26 Bj Energy Solutions, Llc Mobile gas turbine inlet air conditioning system and associated methods
US11174716B1 (en) 2020-06-09 2021-11-16 Bj Energy Solutions, Llc Drive equipment and methods for mobile fracturing transportation platforms
US11193360B1 (en) 2020-07-17 2021-12-07 Bj Energy Solutions, Llc Methods, systems, and devices to enhance fracturing fluid delivery to subsurface formations during high-pressure fracturing operations
US11208881B1 (en) 2020-06-09 2021-12-28 Bj Energy Solutions, Llc Methods and systems for detection and mitigation of well screen out
US11208879B1 (en) 2020-06-22 2021-12-28 Bj Energy Solutions, Llc Stage profiles for operations of hydraulic systems and associated methods
US11208953B1 (en) 2020-06-05 2021-12-28 Bj Energy Solutions, Llc Systems and methods to enhance intake air flow to a gas turbine engine of a hydraulic fracturing unit
US11208880B2 (en) 2020-05-28 2021-12-28 Bj Energy Solutions, Llc Bi-fuel reciprocating engine to power direct drive turbine fracturing pumps onboard auxiliary systems and related methods
US11220895B1 (en) 2020-06-24 2022-01-11 Bj Energy Solutions, Llc Automated diagnostics of electronic instrumentation in a system for fracturing a well and associated methods
US11236739B2 (en) 2019-09-13 2022-02-01 Bj Energy Solutions, Llc Power sources and transmission networks for auxiliary equipment onboard hydraulic fracturing units and associated methods
US11242802B2 (en) 2019-09-13 2022-02-08 Bj Energy Solutions, Llc Turbine engine exhaust duct system and methods for noise dampening and attenuation
US11255173B2 (en) 2011-04-07 2022-02-22 Typhon Technology Solutions, Llc Mobile, modular, electrically powered system for use in fracturing underground formations using liquid petroleum gas
US11261717B2 (en) 2020-06-09 2022-03-01 Bj Energy Solutions, Llc Systems and methods for exchanging fracturing components of a hydraulic fracturing unit
US11268346B2 (en) 2019-09-13 2022-03-08 Bj Energy Solutions, Llc Fuel, communications, and power connection systems
US11286154B2 (en) 2010-02-16 2022-03-29 Energera Inc. Fuel delivery system and method
US11319878B2 (en) 2019-09-13 2022-05-03 Bj Energy Solutions, Llc Direct drive unit removal system and associated methods
US11319757B2 (en) 2019-12-26 2022-05-03 Cameron International Corporation Flexible fracturing fluid delivery conduit quick connectors
USRE49083E1 (en) 2009-09-11 2022-05-24 Halliburton Energy Services, Inc. Methods of generating and using electricity at a well treatment
WO2022116483A1 (en) * 2020-12-04 2022-06-09 烟台杰瑞石油装备技术有限公司 Fracturing apparatus and fracturing system
US20220213772A1 (en) * 2012-11-16 2022-07-07 U.S. Well Services, LLC System for centralized monitoring and control of electric powered hydraulic fracturing fleet
US11408794B2 (en) 2019-09-13 2022-08-09 Bj Energy Solutions, Llc Fuel, communications, and power connection systems and related methods
US11415125B2 (en) 2020-06-23 2022-08-16 Bj Energy Solutions, Llc Systems for utilization of a hydraulic fracturing unit profile to operate hydraulic fracturing units
US11421673B2 (en) 2016-09-02 2022-08-23 Halliburton Energy Services, Inc. Hybrid drive systems for well stimulation operations
US11428165B2 (en) 2020-05-15 2022-08-30 Bj Energy Solutions, Llc Onboard heater of auxiliary systems using exhaust gases and associated methods
US11434737B2 (en) 2017-12-05 2022-09-06 U.S. Well Services, LLC High horsepower pumping configuration for an electric hydraulic fracturing system
US11451016B2 (en) 2012-11-16 2022-09-20 U.S. Well Services, LLC Switchgear load sharing for oil field equipment
US11449018B2 (en) 2012-11-16 2022-09-20 U.S. Well Services, LLC System and method for parallel power and blackout protection for electric powered hydraulic fracturing
US11454170B2 (en) 2012-11-16 2022-09-27 U.S. Well Services, LLC Turbine chilling for oil field power generation
US11454079B2 (en) 2018-09-14 2022-09-27 U.S. Well Services Llc Riser assist for wellsites
US11459863B2 (en) 2019-10-03 2022-10-04 U.S. Well Services, LLC Electric powered hydraulic fracturing pump system with single electric powered multi-plunger fracturing pump
US11476781B2 (en) 2012-11-16 2022-10-18 U.S. Well Services, LLC Wireline power supply during electric powered fracturing operations
US11473413B2 (en) 2020-06-23 2022-10-18 Bj Energy Solutions, Llc Systems and methods to autonomously operate hydraulic fracturing units
US11506126B2 (en) 2019-06-10 2022-11-22 U.S. Well Services, LLC Integrated fuel gas heater for mobile fuel conditioning equipment
US11519252B2 (en) 2021-05-07 2022-12-06 Halliburton Energy Services, Inc. Systems and methods for manufacturing and delivering fracturing fluid to multiple wells for conducting fracturing operations
US11542786B2 (en) 2019-08-01 2023-01-03 U.S. Well Services, LLC High capacity power storage system for electric hydraulic fracturing
US11560845B2 (en) 2019-05-15 2023-01-24 Bj Energy Solutions, Llc Mobile gas turbine inlet air conditioning system and associated methods
US11578577B2 (en) 2019-03-20 2023-02-14 U.S. Well Services, LLC Oversized switchgear trailer for electric hydraulic fracturing
US11608725B2 (en) 2019-09-13 2023-03-21 Bj Energy Solutions, Llc Methods and systems for operating a fleet of pumps
US11624326B2 (en) 2017-05-21 2023-04-11 Bj Energy Solutions, Llc Methods and systems for supplying fuel to gas turbine engines
US11635074B2 (en) 2020-05-12 2023-04-25 Bj Energy Solutions, Llc Cover for fluid systems and related methods
US11639654B2 (en) 2021-05-24 2023-05-02 Bj Energy Solutions, Llc Hydraulic fracturing pumps to enhance flow of fracturing fluid into wellheads and related methods
US11674352B2 (en) 2012-11-16 2023-06-13 U.S. Well Services, LLC Slide out pump stand for hydraulic fracturing equipment
US11708752B2 (en) 2011-04-07 2023-07-25 Typhon Technology Solutions (U.S.), Llc Multiple generator mobile electric powered fracturing system
US11713661B2 (en) 2012-11-16 2023-08-01 U.S. Well Services, LLC Electric powered pump down
US11728709B2 (en) 2019-05-13 2023-08-15 U.S. Well Services, LLC Encoderless vector control for VFD in hydraulic fracturing applications
US11851989B2 (en) * 2021-12-03 2023-12-26 Saudi Arabian Oil Company Cooling methodology to improve hydraulic fracturing efficiency and reduce breakdown pressure
US11850563B2 (en) 2012-11-16 2023-12-26 U.S. Well Services, LLC Independent control of auger and hopper assembly in electric blender system
US11859480B2 (en) * 2022-03-11 2024-01-02 Caterpillar Inc. Controlling fluid pressures at multiple well heads for continuous pumping
US11867118B2 (en) 2019-09-13 2024-01-09 Bj Energy Solutions, Llc Methods and systems for supplying fuel to gas turbine engines
US11898504B2 (en) 2020-05-14 2024-02-13 Bj Energy Solutions, Llc Systems and methods utilizing turbine compressor discharge for hydrostatic manifold purge
US11933153B2 (en) 2020-06-22 2024-03-19 Bj Energy Solutions, Llc Systems and methods to operate hydraulic fracturing units using automatic flow rate and/or pressure control
US11939828B2 (en) 2019-02-14 2024-03-26 Halliburton Energy Services, Inc. Variable frequency drive configuration for electric driven hydraulic fracking system
US11939853B2 (en) 2020-06-22 2024-03-26 Bj Energy Solutions, Llc Systems and methods providing a configurable staged rate increase function to operate hydraulic fracturing units
US11955782B1 (en) 2022-11-01 2024-04-09 Typhon Technology Solutions (U.S.), Llc System and method for fracturing of underground formations using electric grid power
US11959533B2 (en) 2023-07-24 2024-04-16 U.S. Well Services Holdings, Llc Multi-plunger pumps and associated drive systems

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100027371A1 (en) * 2008-07-30 2010-02-04 Bruce Lucas Closed Blending System
US8444312B2 (en) 2009-09-11 2013-05-21 Halliburton Energy Services, Inc. Methods and systems for integral blending and storage of materials
US8834012B2 (en) 2009-09-11 2014-09-16 Halliburton Energy Services, Inc. Electric or natural gas fired small footprint fracturing fluid blending and pumping equipment
US8511150B2 (en) 2009-12-10 2013-08-20 Halliburton Energy Services, Inc. Methods and systems for determining process variables using location of center of gravity
EP2593640A1 (en) * 2010-09-17 2013-05-22 Gasfrac Energy Services Inc. Pressure balancing proppant addition method and apparatus
CA3200448C (en) 2015-03-04 2024-02-27 Stewart & Stevenson Llc Well fracturing systems with electrical motors and methods of use

Citations (48)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2953460A (en) * 1950-08-03 1960-09-20 Baker Process Company Process and apparatus for preparing dough
US2980291A (en) * 1959-05-01 1961-04-18 United States Steel Corp Method and apparatus for compounding sinter feed
US4137970A (en) * 1977-04-20 1979-02-06 The Dow Chemical Company Packer with chemically activated sealing member and method of use thereof
US4209278A (en) * 1978-02-21 1980-06-24 Halliburton Company Chassis having articulated frame
US4265266A (en) * 1980-01-23 1981-05-05 Halliburton Company Controlled additive metering system
US4305463A (en) * 1979-10-31 1981-12-15 Oil Trieval Corporation Oil recovery method and apparatus
US4353482A (en) * 1980-01-23 1982-10-12 Halliburton Company Additive metering control system
US4409927A (en) * 1980-03-31 1983-10-18 Halliburton Company Flameless nitrogen skid unit with transmission retarder
US4410106A (en) * 1980-01-23 1983-10-18 Halliburton Company Additive material metering system with pneumatic discharge
US4427133A (en) * 1980-01-23 1984-01-24 Halliburton Company Additive material metering system with weighing means
US4701095A (en) * 1984-12-28 1987-10-20 Halliburton Company Transportable material conveying apparatus
US4715721A (en) * 1985-07-19 1987-12-29 Halliburton Company Transportable integrated blending system
US4724905A (en) * 1986-09-15 1988-02-16 Mobil Oil Corporation Sequential hydraulic fracturing
US4830106A (en) * 1987-12-29 1989-05-16 Mobil Oil Corporation Simultaneous hydraulic fracturing
US4845981A (en) * 1988-09-13 1989-07-11 Atlantic Richfield Company System for monitoring fluids during well stimulation processes
US4850750A (en) * 1985-07-19 1989-07-25 Halliburton Company Integrated blending control system
US5014218A (en) * 1986-12-24 1991-05-07 Halliburton Company Using a remote control computer connected to a vocal control computer and a monitor computer
US5245548A (en) * 1990-03-16 1993-09-14 Ching Fu Kuan Grain cargo automatic metering and dispensing system
US5281023A (en) * 1989-08-02 1994-01-25 Stewart & Stevenson Services, Inc. Method and apparatus for automatically controlling a well fracturing operation
US5365435A (en) * 1993-02-19 1994-11-15 Halliburton Company System and method for quantitative determination of mixing efficiency at oil or gas well
US5417283A (en) * 1994-04-28 1995-05-23 Amoco Corporation Mixed well steam drive drainage process
US5515920A (en) * 1994-08-05 1996-05-14 Canadian Fracmaster Ltd. High proppant concentration/high CO2 ratio fracturing system
US5574218A (en) * 1995-12-11 1996-11-12 Atlantic Richfield Company Determining the length and azimuth of fractures in earth formations
US5659480A (en) * 1995-06-27 1997-08-19 Industrial Service And Machine, Incorporated Method for coordinating motion control of a multiple axis machine
US6120175A (en) * 1999-07-14 2000-09-19 The Porter Company/Mechanical Contractors Apparatus and method for controlled chemical blending
US6193402B1 (en) * 1998-03-06 2001-02-27 Kristian E. Grimland Multiple tub mobile blender
US6394184B2 (en) * 2000-02-15 2002-05-28 Exxonmobil Upstream Research Company Method and apparatus for stimulation of multiple formation intervals
US6575247B2 (en) * 2001-07-13 2003-06-10 Exxonmobil Upstream Research Company Device and method for injecting fluids into a wellbore
US20030141064A1 (en) * 2002-01-31 2003-07-31 Roberson James David Method and apparatus for fracing earth formations surrounding a wellbore
US20040020662A1 (en) * 2000-09-08 2004-02-05 Jan Freyer Well packing
US6729394B1 (en) * 1997-05-01 2004-05-04 Bp Corporation North America Inc. Method of producing a communicating horizontal well network
US6991037B2 (en) * 2003-12-30 2006-01-31 Geosierra Llc Multiple azimuth control of vertical hydraulic fractures in unconsolidated and weakly cemented sediments
US7036587B2 (en) * 2003-06-27 2006-05-02 Halliburton Energy Services, Inc. Methods of diverting treating fluids in subterranean zones and degradable diverting materials
US20060161358A1 (en) * 2005-01-04 2006-07-20 Halliburton Energy Services, Inc. Methods and systems for estimating a nominal height or quantity of a fluid in a mixing tank while reducing noise
US7143842B2 (en) * 2004-08-17 2006-12-05 Makita Corporation Power tool
US20070116546A1 (en) * 2005-11-23 2007-05-24 Rolligon Corporation Distribution units and methods of use
US20070125543A1 (en) * 2005-12-01 2007-06-07 Halliburton Energy Services, Inc. Method and apparatus for centralized well treatment
US20070153622A1 (en) * 2005-12-30 2007-07-05 Dykstra Jason D Methods for volumetrically controlling a mixing apparatus
US20070153623A1 (en) * 2005-12-30 2007-07-05 Dykstra Jason D Methods for determining a volumetric ratio of a material to the total materials in a mixing vessel
US20070153624A1 (en) * 2005-12-30 2007-07-05 Dykstra Jason D Systems for determining a volumetric ratio of a material to the total materials in a mixing vessel
US7243726B2 (en) * 2004-11-09 2007-07-17 Schlumberger Technology Corporation Enhancing a flow through a well pump
US20070171765A1 (en) * 2005-12-30 2007-07-26 Dykstra Jason D Systems for volumetrically controlling a mixing apparatus
US20070201305A1 (en) * 2006-02-27 2007-08-30 Halliburton Energy Services, Inc. Method and apparatus for centralized proppant storage and metering
US20080083532A1 (en) * 2006-10-10 2008-04-10 Surjaatmadja Jim B Methods for Maximizing Second Fracture Length
US7391675B2 (en) * 2004-09-17 2008-06-24 Schlumberger Technology Corporation Microseismic event detection and location by continuous map migration
US20080236818A1 (en) * 2005-12-01 2008-10-02 Dykstra Jason D Method and Apparatus for Controlling the Manufacture of Well Treatment Fluid
US20090050311A1 (en) * 2006-03-20 2009-02-26 Crawford James B Well servicing combination unit
US20090194273A1 (en) * 2005-12-01 2009-08-06 Surjaatmadja Jim B Method and Apparatus for Orchestration of Fracture Placement From a Centralized Well Fluid Treatment Center

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2004007894A2 (en) * 2002-07-11 2004-01-22 Coody Richard L Apparatus and method for accelerating hydration of particulate polymer

Patent Citations (48)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2953460A (en) * 1950-08-03 1960-09-20 Baker Process Company Process and apparatus for preparing dough
US2980291A (en) * 1959-05-01 1961-04-18 United States Steel Corp Method and apparatus for compounding sinter feed
US4137970A (en) * 1977-04-20 1979-02-06 The Dow Chemical Company Packer with chemically activated sealing member and method of use thereof
US4209278A (en) * 1978-02-21 1980-06-24 Halliburton Company Chassis having articulated frame
US4305463A (en) * 1979-10-31 1981-12-15 Oil Trieval Corporation Oil recovery method and apparatus
US4353482A (en) * 1980-01-23 1982-10-12 Halliburton Company Additive metering control system
US4410106A (en) * 1980-01-23 1983-10-18 Halliburton Company Additive material metering system with pneumatic discharge
US4427133A (en) * 1980-01-23 1984-01-24 Halliburton Company Additive material metering system with weighing means
US4265266A (en) * 1980-01-23 1981-05-05 Halliburton Company Controlled additive metering system
US4409927A (en) * 1980-03-31 1983-10-18 Halliburton Company Flameless nitrogen skid unit with transmission retarder
US4701095A (en) * 1984-12-28 1987-10-20 Halliburton Company Transportable material conveying apparatus
US4850750A (en) * 1985-07-19 1989-07-25 Halliburton Company Integrated blending control system
US4715721A (en) * 1985-07-19 1987-12-29 Halliburton Company Transportable integrated blending system
US4724905A (en) * 1986-09-15 1988-02-16 Mobil Oil Corporation Sequential hydraulic fracturing
US5014218A (en) * 1986-12-24 1991-05-07 Halliburton Company Using a remote control computer connected to a vocal control computer and a monitor computer
US4830106A (en) * 1987-12-29 1989-05-16 Mobil Oil Corporation Simultaneous hydraulic fracturing
US4845981A (en) * 1988-09-13 1989-07-11 Atlantic Richfield Company System for monitoring fluids during well stimulation processes
US5281023A (en) * 1989-08-02 1994-01-25 Stewart & Stevenson Services, Inc. Method and apparatus for automatically controlling a well fracturing operation
US5245548A (en) * 1990-03-16 1993-09-14 Ching Fu Kuan Grain cargo automatic metering and dispensing system
US5365435A (en) * 1993-02-19 1994-11-15 Halliburton Company System and method for quantitative determination of mixing efficiency at oil or gas well
US5417283A (en) * 1994-04-28 1995-05-23 Amoco Corporation Mixed well steam drive drainage process
US5515920A (en) * 1994-08-05 1996-05-14 Canadian Fracmaster Ltd. High proppant concentration/high CO2 ratio fracturing system
US5659480A (en) * 1995-06-27 1997-08-19 Industrial Service And Machine, Incorporated Method for coordinating motion control of a multiple axis machine
US5574218A (en) * 1995-12-11 1996-11-12 Atlantic Richfield Company Determining the length and azimuth of fractures in earth formations
US6729394B1 (en) * 1997-05-01 2004-05-04 Bp Corporation North America Inc. Method of producing a communicating horizontal well network
US6193402B1 (en) * 1998-03-06 2001-02-27 Kristian E. Grimland Multiple tub mobile blender
US6120175A (en) * 1999-07-14 2000-09-19 The Porter Company/Mechanical Contractors Apparatus and method for controlled chemical blending
US6394184B2 (en) * 2000-02-15 2002-05-28 Exxonmobil Upstream Research Company Method and apparatus for stimulation of multiple formation intervals
US20040020662A1 (en) * 2000-09-08 2004-02-05 Jan Freyer Well packing
US6575247B2 (en) * 2001-07-13 2003-06-10 Exxonmobil Upstream Research Company Device and method for injecting fluids into a wellbore
US20030141064A1 (en) * 2002-01-31 2003-07-31 Roberson James David Method and apparatus for fracing earth formations surrounding a wellbore
US7036587B2 (en) * 2003-06-27 2006-05-02 Halliburton Energy Services, Inc. Methods of diverting treating fluids in subterranean zones and degradable diverting materials
US6991037B2 (en) * 2003-12-30 2006-01-31 Geosierra Llc Multiple azimuth control of vertical hydraulic fractures in unconsolidated and weakly cemented sediments
US7143842B2 (en) * 2004-08-17 2006-12-05 Makita Corporation Power tool
US7391675B2 (en) * 2004-09-17 2008-06-24 Schlumberger Technology Corporation Microseismic event detection and location by continuous map migration
US7243726B2 (en) * 2004-11-09 2007-07-17 Schlumberger Technology Corporation Enhancing a flow through a well pump
US20060161358A1 (en) * 2005-01-04 2006-07-20 Halliburton Energy Services, Inc. Methods and systems for estimating a nominal height or quantity of a fluid in a mixing tank while reducing noise
US20070116546A1 (en) * 2005-11-23 2007-05-24 Rolligon Corporation Distribution units and methods of use
US20070125543A1 (en) * 2005-12-01 2007-06-07 Halliburton Energy Services, Inc. Method and apparatus for centralized well treatment
US20090194273A1 (en) * 2005-12-01 2009-08-06 Surjaatmadja Jim B Method and Apparatus for Orchestration of Fracture Placement From a Centralized Well Fluid Treatment Center
US20080236818A1 (en) * 2005-12-01 2008-10-02 Dykstra Jason D Method and Apparatus for Controlling the Manufacture of Well Treatment Fluid
US20070153622A1 (en) * 2005-12-30 2007-07-05 Dykstra Jason D Methods for volumetrically controlling a mixing apparatus
US20070171765A1 (en) * 2005-12-30 2007-07-26 Dykstra Jason D Systems for volumetrically controlling a mixing apparatus
US20070153624A1 (en) * 2005-12-30 2007-07-05 Dykstra Jason D Systems for determining a volumetric ratio of a material to the total materials in a mixing vessel
US20070153623A1 (en) * 2005-12-30 2007-07-05 Dykstra Jason D Methods for determining a volumetric ratio of a material to the total materials in a mixing vessel
US20070201305A1 (en) * 2006-02-27 2007-08-30 Halliburton Energy Services, Inc. Method and apparatus for centralized proppant storage and metering
US20090050311A1 (en) * 2006-03-20 2009-02-26 Crawford James B Well servicing combination unit
US20080083532A1 (en) * 2006-10-10 2008-04-10 Surjaatmadja Jim B Methods for Maximizing Second Fracture Length

Cited By (281)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070125543A1 (en) * 2005-12-01 2007-06-07 Halliburton Energy Services, Inc. Method and apparatus for centralized well treatment
US7836949B2 (en) 2005-12-01 2010-11-23 Halliburton Energy Services, Inc. Method and apparatus for controlling the manufacture of well treatment fluid
US20080236818A1 (en) * 2005-12-01 2008-10-02 Dykstra Jason D Method and Apparatus for Controlling the Manufacture of Well Treatment Fluid
US7946340B2 (en) 2005-12-01 2011-05-24 Halliburton Energy Services, Inc. Method and apparatus for orchestration of fracture placement from a centralized well fluid treatment center
US7841394B2 (en) 2005-12-01 2010-11-30 Halliburton Energy Services Inc. Method and apparatus for centralized well treatment
US20100038077A1 (en) * 2006-02-27 2010-02-18 Heilman Paul W Method for Centralized Proppant Storage and Metering
US20070204991A1 (en) * 2006-03-03 2007-09-06 Loree Dwight N Liquified petroleum gas fracturing system
US8276659B2 (en) 2006-03-03 2012-10-02 Gasfrac Energy Services Inc. Proppant addition system and method
US20090183874A1 (en) * 2006-03-03 2009-07-23 Victor Fordyce Proppant addition system and method
US8408289B2 (en) 2006-03-03 2013-04-02 Gasfrac Energy Services Inc. Liquified petroleum gas fracturing system
US7711487B2 (en) 2006-10-10 2010-05-04 Halliburton Energy Services, Inc. Methods for maximizing second fracture length
US7740072B2 (en) 2006-10-10 2010-06-22 Halliburton Energy Services, Inc. Methods and systems for well stimulation using multiple angled fracturing
US20080083531A1 (en) * 2006-10-10 2008-04-10 Halliburton Energy Services, Inc. Methods and systems for well stimulation using multiple angled fracturing
US20080190618A1 (en) * 2007-02-09 2008-08-14 Ronald Dant Method of Blending Hazardous Chemicals to a Well Bore
US7931082B2 (en) 2007-10-16 2011-04-26 Halliburton Energy Services Inc., Method and system for centralized well treatment
US20100063901A1 (en) * 2008-09-10 2010-03-11 Sean Paul Brierley Oilfield Inventory control and Communication System
US20100071899A1 (en) * 2008-09-22 2010-03-25 Laurent Coquilleau Wellsite Surface Equipment Systems
US8794307B2 (en) * 2008-09-22 2014-08-05 Schlumberger Technology Corporation Wellsite surface equipment systems
US20140345865A1 (en) * 2008-09-22 2014-11-27 Schlumberger Technology Corporation Wellsite Surface Equipment Systems
USRE49156E1 (en) 2009-09-11 2022-08-02 Halliburton Energy Services, Inc. Methods of providing electricity used in a fracturing operation
USRE49140E1 (en) 2009-09-11 2022-07-19 Halliburton Energy Services, Inc. Methods of performing well treatment operations using field gas
USRE49083E1 (en) 2009-09-11 2022-05-24 Halliburton Energy Services, Inc. Methods of generating and using electricity at a well treatment
USRE49348E1 (en) 2009-09-11 2022-12-27 Halliburton Energy Services, Inc. Methods of powering blenders and pumps in fracturing operations using electricity
USRE49295E1 (en) 2009-09-11 2022-11-15 Halliburton Energy Services, Inc. Methods of providing or using a support for a storage unit containing a solid component for a fracturing operation
USRE49155E1 (en) 2009-09-11 2022-08-02 Halliburton Energy Services, Inc. Electric or natural gas fired small footprint fracturing fluid blending and pumping equipment
USRE49448E1 (en) 2009-09-11 2023-03-07 Halliburton Energy Services, Inc. Methods of performing oilfield operations using electricity
USRE49457E1 (en) 2009-09-11 2023-03-14 Halliburton Energy Services, Inc. Methods of providing or using a silo for a fracturing operation
USRE49456E1 (en) 2009-09-11 2023-03-14 Halliburton Energy Services, Inc. Methods of performing oilfield operations using electricity
US20110123303A1 (en) * 2009-11-20 2011-05-26 Stegemoeller Calvin L Methods and Systems for Material Transfer
US8734081B2 (en) 2009-11-20 2014-05-27 Halliburton Energy Services, Inc. Methods and systems for material transfer
US9260257B2 (en) 2009-11-20 2016-02-16 Halliburton Energy Services, Inc. Methods and systems for material transfer
US8392165B2 (en) 2009-11-25 2013-03-05 Halliburton Energy Services, Inc. Probabilistic earth model for subterranean fracture simulation
US20110120705A1 (en) * 2009-11-25 2011-05-26 Halliburton Energy Services, Inc. Simulating Injection Treatments from Multiple Wells
US8437962B2 (en) 2009-11-25 2013-05-07 Halliburton Energy Services, Inc. Generating probabilistic information on subterranean fractures
US8386226B2 (en) 2009-11-25 2013-02-26 Halliburton Energy Services, Inc. Probabilistic simulation of subterranean fracture propagation
US8886502B2 (en) 2009-11-25 2014-11-11 Halliburton Energy Services, Inc. Simulating injection treatments from multiple wells
US8898044B2 (en) 2009-11-25 2014-11-25 Halliburton Energy Services, Inc. Simulating subterranean fracture propagation
US20110120702A1 (en) * 2009-11-25 2011-05-26 Halliburton Energy Services, Inc. Generating probabilistic information on subterranean fractures
US20110120718A1 (en) * 2009-11-25 2011-05-26 Halliburton Energy Services, Inc. Simulating Subterranean Fracture Propagation
US20110120706A1 (en) * 2009-11-25 2011-05-26 Halliburton Energy Services, Inc. Refining Information on Subterranean Fractures
US20110125471A1 (en) * 2009-11-25 2011-05-26 Halliburton Energy Services, Inc. Probabilistic Earth Model for Subterranean Fracture Simulation
US9284829B2 (en) 2009-11-25 2016-03-15 Halliburton Energy Services, Inc. Simulating subterranean fracture propagation
US9176245B2 (en) 2009-11-25 2015-11-03 Halliburton Energy Services, Inc. Refining information on subterranean fractures
US20110125476A1 (en) * 2009-11-25 2011-05-26 Halliburton Energy Services, Inc. Probabilistic Simulation of Subterranean Fracture Propagation
US11286154B2 (en) 2010-02-16 2022-03-29 Energera Inc. Fuel delivery system and method
AU2011303725B2 (en) * 2010-09-15 2015-09-17 Halliburton Energy Services, Inc. Systems and methods for routing pressurized fluid
US8905056B2 (en) 2010-09-15 2014-12-09 Halliburton Energy Services, Inc. Systems and methods for routing pressurized fluid
WO2012035293A1 (en) * 2010-09-15 2012-03-22 Halliburton Energy Services, Inc. Systems and methods for routing pressurized fluid
EP3444432A1 (en) * 2011-04-07 2019-02-20 Evolution Well Services, LLC Electrically powered system for use in fracturing underground formations
US10718195B2 (en) 2011-04-07 2020-07-21 Typhon Technology Solutions, Llc Dual pump VFD controlled motor electric fracturing system
US9366114B2 (en) 2011-04-07 2016-06-14 Evolution Well Services, Llc Mobile, modular, electrically powered system for use in fracturing underground formations
EP3447239A1 (en) * 2011-04-07 2019-02-27 Evolution Well Services, LLC Electrically powered system for use in fracturing underground formations
US11187069B2 (en) 2011-04-07 2021-11-30 Typhon Technology Solutions, Llc Multiple generator mobile electric powered fracturing system
US9121257B2 (en) 2011-04-07 2015-09-01 Evolution Well Services, Llc Mobile, modular, electrically powered system for use in fracturing underground formations
US9103193B2 (en) 2011-04-07 2015-08-11 Evolution Well Services, Llc Mobile, modular, electrically powered system for use in fracturing underground formations
US11913315B2 (en) 2011-04-07 2024-02-27 Typhon Technology Solutions (U.S.), Llc Fracturing blender system and method using liquid petroleum gas
US10774630B2 (en) 2011-04-07 2020-09-15 Typhon Technology Solutions, Llc Control system for electric fracturing operations
US11708752B2 (en) 2011-04-07 2023-07-25 Typhon Technology Solutions (U.S.), Llc Multiple generator mobile electric powered fracturing system
US11613979B2 (en) 2011-04-07 2023-03-28 Typhon Technology Solutions, Llc Mobile, modular, electrically powered system for use in fracturing underground formations using liquid petroleum gas
US11939852B2 (en) 2011-04-07 2024-03-26 Typhon Technology Solutions (U.S.), Llc Dual pump VFD controlled motor electric fracturing system
US11851998B2 (en) 2011-04-07 2023-12-26 Typhon Technology Solutions (U.S.), Llc Dual pump VFD controlled motor electric fracturing system
EP3839200A1 (en) * 2011-04-07 2021-06-23 Typhon Technology Solutions, LLC Electrically powered system for use in fracturing underground formations
US11255173B2 (en) 2011-04-07 2022-02-22 Typhon Technology Solutions, Llc Mobile, modular, electrically powered system for use in fracturing underground formations using liquid petroleum gas
EP3444430A1 (en) * 2011-04-07 2019-02-20 Evolution Well Services, LLC Electrically powered system for use in fracturing underground formations
EP4276275A3 (en) * 2011-04-07 2023-12-27 Typhon Technology Solutions, LLC Electrically powered system for use in fracturing underground formations
US20190055827A1 (en) * 2011-04-07 2019-02-21 Evolution Well Services, Llc Electric blender system, apparatus and method for use in fracturing underground formations using liquid petroleum gas
EP4265883A3 (en) * 2011-04-07 2024-01-10 Typhon Technology Solutions, LLC Electrically powered system for use in fracturing underground formations
EP2726705A4 (en) * 2011-04-07 2016-04-13 Evolution Well Services Llc Mobile, modular, electrically powered system for use in fracturing underground formations
EP3456915A1 (en) * 2011-04-07 2019-03-20 Evolution Well Services, LLC Electrically powered system for use in fracturing underground formations
US10227855B2 (en) 2011-04-07 2019-03-12 Evolution Well Services, Llc Mobile, modular, electrically powered system for use in fracturing underground formations
US11002125B2 (en) 2011-04-07 2021-05-11 Typhon Technology Solutions, Llc Control system for electric fracturing operations
EP3453827A3 (en) * 2011-04-07 2019-06-12 Evolution Well Services, LLC Electrically powered system for use in fracturing underground formations
US11391136B2 (en) 2011-04-07 2022-07-19 Typhon Technology Solutions (U.S.), Llc Dual pump VFD controlled motor electric fracturing system
US10982521B2 (en) 2011-04-07 2021-04-20 Typhon Technology Solutions, Llc Dual pump VFD controlled motor electric fracturing system
US10895138B2 (en) 2011-04-07 2021-01-19 Typhon Technology Solutions, Llc Multiple generator mobile electric powered fracturing system
US10876386B2 (en) 2011-04-07 2020-12-29 Typhon Technology Solutions, Llc Dual pump trailer mounted electric fracturing system
US10851634B2 (en) 2011-04-07 2020-12-01 Typhon Technology Solutions, Llc Dual pump mobile electrically powered system for use in fracturing underground formations
US10502042B2 (en) * 2011-04-07 2019-12-10 Typhon Technology Solutions, Llc Electric blender system, apparatus and method for use in fracturing underground formations using liquid petroleum gas
US10837270B2 (en) 2011-04-07 2020-11-17 Typhon Technology Solutions, Llc VFD controlled motor mobile electrically powered system for use in fracturing underground formations for electric fracturing operations
US11391133B2 (en) 2011-04-07 2022-07-19 Typhon Technology Solutions (U.S.), Llc Dual pump VFD controlled motor electric fracturing system
US10648312B2 (en) 2011-04-07 2020-05-12 Typhon Technology Solutions, Llc Dual pump trailer mounted electric fracturing system
US10689961B2 (en) 2011-04-07 2020-06-23 Typhon Technology Solutions, Llc Multiple generator mobile electric powered fracturing system
US10718194B2 (en) 2011-04-07 2020-07-21 Typhon Technology Solutions, Llc Control system for electric fracturing operations
US10221668B2 (en) 2011-04-07 2019-03-05 Evolution Well Services, Llc Mobile, modular, electrically powered system for use in fracturing underground formations
US10724353B2 (en) 2011-04-07 2020-07-28 Typhon Technology Solutions, Llc Dual pump VFD controlled system for electric fracturing operations
US10132146B2 (en) 2011-09-23 2018-11-20 Cameron International Corporation Adjustable fracturing head and manifold system
US11391109B2 (en) 2011-09-23 2022-07-19 Cameron International Corporation Fracturing manifold systems and methods
US10487637B2 (en) 2011-09-23 2019-11-26 Cameron International Corporation Adjustable fracturing system
US10385643B2 (en) 2011-09-23 2019-08-20 Cameron International Corporation Fracturing manifold systems and methods
US10876371B2 (en) 2011-09-23 2020-12-29 Cameron International Corporation Fracturing manifold system
US10385645B2 (en) 2011-09-23 2019-08-20 Cameron International Corporation Fracturing manifold systems and methods
US9932800B2 (en) * 2011-09-23 2018-04-03 Cameron International Corporation Fracturing manifold systems and methods
US10094195B2 (en) 2011-09-23 2018-10-09 Cameron International Corporation Fracturing fluid distribution systems and methods
US10385662B2 (en) 2012-01-11 2019-08-20 Cameron International Corporation Well fracturing manifold apparatus
US11536119B2 (en) 2012-01-11 2022-12-27 Cameron International Corporation Well fracturing manifold apparatus
US10934816B2 (en) 2012-01-11 2021-03-02 Cameron International Corporation Well fracturing manifold apparatus
US9227749B2 (en) * 2012-02-10 2016-01-05 Tfl Distribution, Llc Climatic protection of fracking hydro tanks
US20140103048A1 (en) * 2012-02-10 2014-04-17 Tfl Distribution, Llc Climatic protection of fracking hydro tanks
US9803457B2 (en) 2012-03-08 2017-10-31 Schlumberger Technology Corporation System and method for delivering treatment fluid
US9863228B2 (en) * 2012-03-08 2018-01-09 Schlumberger Technology Corporation System and method for delivering treatment fluid
WO2013134622A3 (en) * 2012-03-08 2014-08-28 Schlumberger Canada Limited System and method for delivering treatment fluid
US20140216736A1 (en) * 2012-03-08 2014-08-07 Schlumberger Technology Corporation System and method for delivering treatment fluid
CN102602322A (en) * 2012-03-19 2012-07-25 西安邦普工业自动化有限公司 Electrically-driven fracturing pump truck
US10107084B2 (en) 2012-10-05 2018-10-23 Evolution Well Services System and method for dedicated electric source for use in fracturing underground formations using liquid petroleum gas
WO2014053056A1 (en) * 2012-10-05 2014-04-10 Evolution Well Services Mobile, modular, electrically powered system for use in fracturing underground formations using liquid petroleum gas
US11118438B2 (en) 2012-10-05 2021-09-14 Typhon Technology Solutions, Llc Turbine driven electric fracturing system and method
US9140110B2 (en) 2012-10-05 2015-09-22 Evolution Well Services, Llc Mobile, modular, electrically powered system for use in fracturing underground formations using liquid petroleum gas
US9475021B2 (en) 2012-10-05 2016-10-25 Evolution Well Services, Llc Mobile, modular, electrically powered system for use in fracturing underground formations using liquid petroleum gas
US10107085B2 (en) 2012-10-05 2018-10-23 Evolution Well Services Electric blender system, apparatus and method for use in fracturing underground formations using liquid petroleum gas
EP2904200A4 (en) * 2012-10-05 2016-12-28 Evolution Well Services Llc Mobile, modular, electrically powered system for use in fracturing underground formations using liquid petroleum gas
US9475020B2 (en) 2012-10-05 2016-10-25 Evolution Well Services, Llc Mobile, modular, electrically powered system for use in fracturing underground formations using liquid petroleum gas
US11476781B2 (en) 2012-11-16 2022-10-18 U.S. Well Services, LLC Wireline power supply during electric powered fracturing operations
US11449018B2 (en) 2012-11-16 2022-09-20 U.S. Well Services, LLC System and method for parallel power and blackout protection for electric powered hydraulic fracturing
US20220213772A1 (en) * 2012-11-16 2022-07-07 U.S. Well Services, LLC System for centralized monitoring and control of electric powered hydraulic fracturing fleet
US20220275716A1 (en) * 2012-11-16 2022-09-01 U.S. Well Services, LLC System for pumping hydraulic fracturing fluid using electric pumps
US11850563B2 (en) 2012-11-16 2023-12-26 U.S. Well Services, LLC Independent control of auger and hopper assembly in electric blender system
US11920449B2 (en) * 2012-11-16 2024-03-05 U.S. Well Services, LLC System for centralized monitoring and control of electric powered hydraulic fracturing fleet
US10927802B2 (en) 2012-11-16 2021-02-23 U.S. Well Services, LLC System for fueling electric powered hydraulic fracturing equipment with multiple fuel sources
US11136870B2 (en) * 2012-11-16 2021-10-05 U.S. Well Services, LLC System for pumping hydraulic fracturing fluid using electric pumps
US11451016B2 (en) 2012-11-16 2022-09-20 U.S. Well Services, LLC Switchgear load sharing for oil field equipment
US11713661B2 (en) 2012-11-16 2023-08-01 U.S. Well Services, LLC Electric powered pump down
US10934824B2 (en) 2012-11-16 2021-03-02 U.S. Well Services, LLC System for reducing vibrations in a pressure pumping fleet
US11674352B2 (en) 2012-11-16 2023-06-13 U.S. Well Services, LLC Slide out pump stand for hydraulic fracturing equipment
US11454170B2 (en) 2012-11-16 2022-09-27 U.S. Well Services, LLC Turbine chilling for oil field power generation
US10519758B2 (en) 2013-11-08 2019-12-31 Schlumberger Technology Corporation Oilfield surface equipment cooling system
WO2015153533A1 (en) * 2014-03-31 2015-10-08 Schlumberger Canada Limited Optimized drive of fracturing fluids blenders
US10610842B2 (en) 2014-03-31 2020-04-07 Schlumberger Technology Corporation Optimized drive of fracturing fluids blenders
US11452975B2 (en) 2014-03-31 2022-09-27 Liberty Oilfield Services Llc Optimized drive of fracturing fluids blenders
WO2016024952A1 (en) * 2014-08-12 2016-02-18 Halliburton Energy Services, Inc. Methods and systems for routing pressurized fluid utilizing articulating arms
US10302079B2 (en) 2014-08-12 2019-05-28 Halliburton Energy Services, Inc. Methods and systems for routing pressurized fluid utilizing articulating arms
US11162320B2 (en) 2015-11-13 2021-11-02 Cameron International Corporation Fracturing fluid delivery system
US11598174B2 (en) 2015-11-13 2023-03-07 Cameron International Corporation Fracturing fluid delivery system
US10323475B2 (en) 2015-11-13 2019-06-18 Cameron International Corporation Fracturing fluid delivery system
US10787879B2 (en) 2015-11-13 2020-09-29 Cameron International Corporation Fracturing fluid delivery system
US11066913B2 (en) 2016-05-01 2021-07-20 Cameron International Corporation Flexible fracturing line with removable liner
US11434739B2 (en) 2016-05-01 2022-09-06 Cameron International Corporation Fracturing system with flexible conduit
US11828148B2 (en) 2016-05-01 2023-11-28 Cameron International Corporation Fracturing system with flexible conduit
US11913316B2 (en) 2016-09-02 2024-02-27 Halliburton Energy Services, Inc. Hybrid drive systems for well stimulation operations
US11808127B2 (en) 2016-09-02 2023-11-07 Halliburton Energy Services, Inc. Hybrid drive systems for well stimulation operations
US11421673B2 (en) 2016-09-02 2022-08-23 Halliburton Energy Services, Inc. Hybrid drive systems for well stimulation operations
WO2018048974A1 (en) * 2016-09-07 2018-03-15 Schlumberger Technology Corporation Systems and methods for injecting fluids into high pressure injector line
US11286760B2 (en) 2016-09-07 2022-03-29 Schlumberger Technology Corporation Systems and methods for injecting fluids into high pressure injector line
US20180073338A1 (en) * 2016-09-08 2018-03-15 Wood Group Mustang (Canada) Inc. Method and apparatus for connecting well heads of steam stimulated hydrocarbon wells
US11136872B2 (en) 2016-12-09 2021-10-05 Cameron International Corporation Apparatus and method of disbursing materials into a wellbore
US11795801B2 (en) 2016-12-09 2023-10-24 Cameron International Corporation Apparatus and method of disbursing materials into a wellbore
US11624326B2 (en) 2017-05-21 2023-04-11 Bj Energy Solutions, Llc Methods and systems for supplying fuel to gas turbine engines
US11434737B2 (en) 2017-12-05 2022-09-06 U.S. Well Services, LLC High horsepower pumping configuration for an electric hydraulic fracturing system
US11454079B2 (en) 2018-09-14 2022-09-27 U.S. Well Services Llc Riser assist for wellsites
US10914155B2 (en) 2018-10-09 2021-02-09 U.S. Well Services, LLC Electric powered hydraulic fracturing pump system with single electric powered multi-plunger pump fracturing trailers, filtration units, and slide out platform
US11898411B2 (en) 2018-10-31 2024-02-13 Cameron International Corporation Fracturing system with fluid conduit having communication line
US11015413B2 (en) 2018-10-31 2021-05-25 Cameron International Corporation Fracturing system with fluid conduit having communication line
US11939828B2 (en) 2019-02-14 2024-03-26 Halliburton Energy Services, Inc. Variable frequency drive configuration for electric driven hydraulic fracking system
US11578577B2 (en) 2019-03-20 2023-02-14 U.S. Well Services, LLC Oversized switchgear trailer for electric hydraulic fracturing
US11728709B2 (en) 2019-05-13 2023-08-15 U.S. Well Services, LLC Encoderless vector control for VFD in hydraulic fracturing applications
US11560845B2 (en) 2019-05-15 2023-01-24 Bj Energy Solutions, Llc Mobile gas turbine inlet air conditioning system and associated methods
US11506126B2 (en) 2019-06-10 2022-11-22 U.S. Well Services, LLC Integrated fuel gas heater for mobile fuel conditioning equipment
US11542786B2 (en) 2019-08-01 2023-01-03 U.S. Well Services, LLC High capacity power storage system for electric hydraulic fracturing
US11346280B1 (en) 2019-09-13 2022-05-31 Bj Energy Solutions, Llc Direct drive unit removal system and associated methods
US11512642B1 (en) 2019-09-13 2022-11-29 Bj Energy Solutions, Llc Direct drive unit removal system and associated methods
US11415056B1 (en) 2019-09-13 2022-08-16 Bj Energy Solutions, Llc Turbine engine exhaust duct system and methods for noise dampening and attenuation
US11149726B1 (en) 2019-09-13 2021-10-19 Bj Energy Solutions, Llc Systems and method for use of single mass flywheel alongside torsional vibration damper assembly for single acting reciprocating pump
US11604113B2 (en) 2019-09-13 2023-03-14 Bj Energy Solutions, Llc Fuel, communications, and power connection systems and related methods
US11408794B2 (en) 2019-09-13 2022-08-09 Bj Energy Solutions, Llc Fuel, communications, and power connection systems and related methods
US11598263B2 (en) 2019-09-13 2023-03-07 Bj Energy Solutions, Llc Mobile gas turbine inlet air conditioning system and associated methods
US11156159B1 (en) 2019-09-13 2021-10-26 Bj Energy Solutions, Llc Mobile gas turbine inlet air conditioning system and associated methods
US11401865B1 (en) 2019-09-13 2022-08-02 Bj Energy Solutions, Llc Direct drive unit removal system and associated methods
US11608725B2 (en) 2019-09-13 2023-03-21 Bj Energy Solutions, Llc Methods and systems for operating a fleet of pumps
US11280331B2 (en) 2019-09-13 2022-03-22 Bj Energy Solutions, Llc Systems and method for use of single mass flywheel alongside torsional vibration damper assembly for single acting reciprocating pump
US11867118B2 (en) 2019-09-13 2024-01-09 Bj Energy Solutions, Llc Methods and systems for supplying fuel to gas turbine engines
US11859482B2 (en) 2019-09-13 2024-01-02 Bj Energy Solutions, Llc Power sources and transmission networks for auxiliary equipment onboard hydraulic fracturing units and associated methods
US11852001B2 (en) 2019-09-13 2023-12-26 Bj Energy Solutions, Llc Methods and systems for operating a fleet of pumps
US11460368B2 (en) 2019-09-13 2022-10-04 Bj Energy Solutions, Llc Fuel, communications, and power connection systems and related methods
US11613980B2 (en) 2019-09-13 2023-03-28 Bj Energy Solutions, Llc Methods and systems for operating a fleet of pumps
US11459954B2 (en) 2019-09-13 2022-10-04 Bj Energy Solutions, Llc Turbine engine exhaust duct system and methods for noise dampening and attenuation
US11767791B2 (en) 2019-09-13 2023-09-26 Bj Energy Solutions, Llc Mobile gas turbine inlet air conditioning system and associated methods
US11473997B2 (en) 2019-09-13 2022-10-18 Bj Energy Solutions, Llc Fuel, communications, and power connection systems and related methods
US11761846B2 (en) 2019-09-13 2023-09-19 Bj Energy Solutions, Llc Fuel, communications, and power connection systems and related methods
US11473503B1 (en) 2019-09-13 2022-10-18 Bj Energy Solutions, Llc Direct drive unit removal system and associated methods
US11725583B2 (en) 2019-09-13 2023-08-15 Bj Energy Solutions, Llc Mobile gas turbine inlet air conditioning system and associated methods
US11280266B2 (en) 2019-09-13 2022-03-22 Bj Energy Solutions, Llc Mobile gas turbine inlet air conditioning system and associated methods
US11578660B1 (en) 2019-09-13 2023-02-14 Bj Energy Solutions, Llc Direct drive unit removal system and associated methods
US11236739B2 (en) 2019-09-13 2022-02-01 Bj Energy Solutions, Llc Power sources and transmission networks for auxiliary equipment onboard hydraulic fracturing units and associated methods
US11268346B2 (en) 2019-09-13 2022-03-08 Bj Energy Solutions, Llc Fuel, communications, and power connection systems
US11719234B2 (en) 2019-09-13 2023-08-08 Bj Energy Solutions, Llc Systems and method for use of single mass flywheel alongside torsional vibration damper assembly for single acting reciprocating pump
US11242802B2 (en) 2019-09-13 2022-02-08 Bj Energy Solutions, Llc Turbine engine exhaust duct system and methods for noise dampening and attenuation
US11287350B2 (en) 2019-09-13 2022-03-29 Bj Energy Solutions, Llc Fuel, communications, and power connection methods
US11530602B2 (en) 2019-09-13 2022-12-20 Bj Energy Solutions, Llc Power sources and transmission networks for auxiliary equipment onboard hydraulic fracturing units and associated methods
US11319878B2 (en) 2019-09-13 2022-05-03 Bj Energy Solutions, Llc Direct drive unit removal system and associated methods
US11619122B2 (en) 2019-09-13 2023-04-04 Bj Energy Solutions, Llc Methods and systems for operating a fleet of pumps
US11655763B1 (en) 2019-09-13 2023-05-23 Bj Energy Solutions, Llc Direct drive unit removal system and associated methods
US11649766B1 (en) 2019-09-13 2023-05-16 Bj Energy Solutions, Llc Mobile gas turbine inlet air conditioning system and associated methods
US11629584B2 (en) 2019-09-13 2023-04-18 Bj Energy Solutions, Llc Power sources and transmission networks for auxiliary equipment onboard hydraulic fracturing units and associated methods
US11555756B2 (en) 2019-09-13 2023-01-17 Bj Energy Solutions, Llc Fuel, communications, and power connection systems and related methods
US11560848B2 (en) 2019-09-13 2023-01-24 Bj Energy Solutions, Llc Methods for noise dampening and attenuation of turbine engine
US11459863B2 (en) 2019-10-03 2022-10-04 U.S. Well Services, LLC Electric powered hydraulic fracturing pump system with single electric powered multi-plunger fracturing pump
US11905806B2 (en) 2019-10-03 2024-02-20 U.S. Well Services, LLC Electric powered hydraulic fracturing pump system with single electric powered multi-plunger fracturing pump
US11725460B2 (en) 2019-12-26 2023-08-15 Cameron International Corporation Flexible fracturing fluid delivery conduit quick connectors
US11319757B2 (en) 2019-12-26 2022-05-03 Cameron International Corporation Flexible fracturing fluid delivery conduit quick connectors
US11635074B2 (en) 2020-05-12 2023-04-25 Bj Energy Solutions, Llc Cover for fluid systems and related methods
US11708829B2 (en) 2020-05-12 2023-07-25 Bj Energy Solutions, Llc Cover for fluid systems and related methods
US11898504B2 (en) 2020-05-14 2024-02-13 Bj Energy Solutions, Llc Systems and methods utilizing turbine compressor discharge for hydrostatic manifold purge
US11542868B2 (en) 2020-05-15 2023-01-03 Bj Energy Solutions, Llc Onboard heater of auxiliary systems using exhaust gases and associated methods
US11624321B2 (en) 2020-05-15 2023-04-11 Bj Energy Solutions, Llc Onboard heater of auxiliary systems using exhaust gases and associated methods
US11698028B2 (en) 2020-05-15 2023-07-11 Bj Energy Solutions, Llc Onboard heater of auxiliary systems using exhaust gases and associated methods
US11434820B2 (en) 2020-05-15 2022-09-06 Bj Energy Solutions, Llc Onboard heater of auxiliary systems using exhaust gases and associated methods
US11428165B2 (en) 2020-05-15 2022-08-30 Bj Energy Solutions, Llc Onboard heater of auxiliary systems using exhaust gases and associated methods
US11814940B2 (en) 2020-05-28 2023-11-14 Bj Energy Solutions Llc Bi-fuel reciprocating engine to power direct drive turbine fracturing pumps onboard auxiliary systems and related methods
US11603745B2 (en) 2020-05-28 2023-03-14 Bj Energy Solutions, Llc Bi-fuel reciprocating engine to power direct drive turbine fracturing pumps onboard auxiliary systems and related methods
US11313213B2 (en) 2020-05-28 2022-04-26 Bj Energy Solutions, Llc Bi-fuel reciprocating engine to power direct drive turbine fracturing pumps onboard auxiliary systems and related methods
US11365616B1 (en) 2020-05-28 2022-06-21 Bj Energy Solutions, Llc Bi-fuel reciprocating engine to power direct drive turbine fracturing pumps onboard auxiliary systems and related methods
US11208880B2 (en) 2020-05-28 2021-12-28 Bj Energy Solutions, Llc Bi-fuel reciprocating engine to power direct drive turbine fracturing pumps onboard auxiliary systems and related methods
US11627683B2 (en) 2020-06-05 2023-04-11 Bj Energy Solutions, Llc Enclosure assembly for enhanced cooling of direct drive unit and related methods
US11378008B2 (en) 2020-06-05 2022-07-05 Bj Energy Solutions, Llc Systems and methods to enhance intake air flow to a gas turbine engine of a hydraulic fracturing unit
US11891952B2 (en) 2020-06-05 2024-02-06 Bj Energy Solutions, Llc Systems and methods to enhance intake air flow to a gas turbine engine of a hydraulic fracturing unit
US11746698B2 (en) 2020-06-05 2023-09-05 Bj Energy Solutions, Llc Systems and methods to enhance intake air flow to a gas turbine engine of a hydraulic fracturing unit
US11208953B1 (en) 2020-06-05 2021-12-28 Bj Energy Solutions, Llc Systems and methods to enhance intake air flow to a gas turbine engine of a hydraulic fracturing unit
US11723171B2 (en) 2020-06-05 2023-08-08 Bj Energy Solutions, Llc Enclosure assembly for enhanced cooling of direct drive unit and related methods
US11129295B1 (en) 2020-06-05 2021-09-21 Bj Energy Solutions, Llc Enclosure assembly for enhanced cooling of direct drive unit and related methods
US11598264B2 (en) 2020-06-05 2023-03-07 Bj Energy Solutions, Llc Systems and methods to enhance intake air flow to a gas turbine engine of a hydraulic fracturing unit
US11300050B2 (en) 2020-06-05 2022-04-12 Bj Energy Solutions, Llc Systems and methods to enhance intake air flow to a gas turbine engine of a hydraulic fracturing unit
US11339638B1 (en) 2020-06-09 2022-05-24 Bj Energy Solutions, Llc Systems and methods for exchanging fracturing components of a hydraulic fracturing unit
US11512570B2 (en) 2020-06-09 2022-11-29 Bj Energy Solutions, Llc Systems and methods for exchanging fracturing components of a hydraulic fracturing unit
US11174716B1 (en) 2020-06-09 2021-11-16 Bj Energy Solutions, Llc Drive equipment and methods for mobile fracturing transportation platforms
US11643915B2 (en) 2020-06-09 2023-05-09 Bj Energy Solutions, Llc Drive equipment and methods for mobile fracturing transportation platforms
US11319791B2 (en) 2020-06-09 2022-05-03 Bj Energy Solutions, Llc Methods and systems for detection and mitigation of well screen out
US11629583B2 (en) 2020-06-09 2023-04-18 Bj Energy Solutions, Llc Systems and methods for exchanging fracturing components of a hydraulic fracturing unit
US11867046B2 (en) 2020-06-09 2024-01-09 Bj Energy Solutions, Llc Systems and methods for exchanging fracturing components of a hydraulic fracturing unit
US11208881B1 (en) 2020-06-09 2021-12-28 Bj Energy Solutions, Llc Methods and systems for detection and mitigation of well screen out
US11939854B2 (en) 2020-06-09 2024-03-26 Bj Energy Solutions, Llc Methods for detection and mitigation of well screen out
US11566506B2 (en) 2020-06-09 2023-01-31 Bj Energy Solutions, Llc Methods for detection and mitigation of well screen out
US11261717B2 (en) 2020-06-09 2022-03-01 Bj Energy Solutions, Llc Systems and methods for exchanging fracturing components of a hydraulic fracturing unit
US11639655B2 (en) 2020-06-22 2023-05-02 Bj Energy Solutions, Llc Systems and methods to operate a dual-shaft gas turbine engine for hydraulic fracturing
US11208879B1 (en) 2020-06-22 2021-12-28 Bj Energy Solutions, Llc Stage profiles for operations of hydraulic systems and associated methods
US11598188B2 (en) 2020-06-22 2023-03-07 Bj Energy Solutions, Llc Stage profiles for operations of hydraulic systems and associated methods
US11236598B1 (en) 2020-06-22 2022-02-01 Bj Energy Solutions, Llc Stage profiles for operations of hydraulic systems and associated methods
US11898429B2 (en) 2020-06-22 2024-02-13 Bj Energy Solutions, Llc Systems and methods to operate a dual-shaft gas turbine engine for hydraulic fracturing
US11933153B2 (en) 2020-06-22 2024-03-19 Bj Energy Solutions, Llc Systems and methods to operate hydraulic fracturing units using automatic flow rate and/or pressure control
US11939853B2 (en) 2020-06-22 2024-03-26 Bj Energy Solutions, Llc Systems and methods providing a configurable staged rate increase function to operate hydraulic fracturing units
US11125066B1 (en) 2020-06-22 2021-09-21 Bj Energy Solutions, Llc Systems and methods to operate a dual-shaft gas turbine engine for hydraulic fracturing
US11408263B2 (en) 2020-06-22 2022-08-09 Bj Energy Solutions, Llc Systems and methods to operate a dual-shaft gas turbine engine for hydraulic fracturing
US11572774B2 (en) 2020-06-22 2023-02-07 Bj Energy Solutions, Llc Systems and methods to operate a dual-shaft gas turbine engine for hydraulic fracturing
US11732565B2 (en) 2020-06-22 2023-08-22 Bj Energy Solutions, Llc Systems and methods to operate a dual-shaft gas turbine engine for hydraulic fracturing
US11952878B2 (en) 2020-06-22 2024-04-09 Bj Energy Solutions, Llc Stage profiles for operations of hydraulic systems and associated methods
US11428218B2 (en) 2020-06-23 2022-08-30 Bj Energy Solutions, Llc Systems and methods of utilization of a hydraulic fracturing unit profile to operate hydraulic fracturing units
US11473413B2 (en) 2020-06-23 2022-10-18 Bj Energy Solutions, Llc Systems and methods to autonomously operate hydraulic fracturing units
US11719085B1 (en) 2020-06-23 2023-08-08 Bj Energy Solutions, Llc Systems and methods to autonomously operate hydraulic fracturing units
US11466680B2 (en) 2020-06-23 2022-10-11 Bj Energy Solutions, Llc Systems and methods of utilization of a hydraulic fracturing unit profile to operate hydraulic fracturing units
US11661832B2 (en) 2020-06-23 2023-05-30 Bj Energy Solutions, Llc Systems and methods to autonomously operate hydraulic fracturing units
US11649820B2 (en) 2020-06-23 2023-05-16 Bj Energy Solutions, Llc Systems and methods of utilization of a hydraulic fracturing unit profile to operate hydraulic fracturing units
US11415125B2 (en) 2020-06-23 2022-08-16 Bj Energy Solutions, Llc Systems for utilization of a hydraulic fracturing unit profile to operate hydraulic fracturing units
US11566505B2 (en) 2020-06-23 2023-01-31 Bj Energy Solutions, Llc Systems and methods to autonomously operate hydraulic fracturing units
US11939974B2 (en) 2020-06-23 2024-03-26 Bj Energy Solutions, Llc Systems and methods of utilization of a hydraulic fracturing unit profile to operate hydraulic fracturing units
US11299971B2 (en) 2020-06-24 2022-04-12 Bj Energy Solutions, Llc System of controlling a hydraulic fracturing pump or blender using cavitation or pulsation detection
US11692422B2 (en) 2020-06-24 2023-07-04 Bj Energy Solutions, Llc System to monitor cavitation or pulsation events during a hydraulic fracturing operation
US11274537B2 (en) 2020-06-24 2022-03-15 Bj Energy Solutions, Llc Method to detect and intervene relative to cavitation and pulsation events during a hydraulic fracturing operation
US11255174B2 (en) 2020-06-24 2022-02-22 Bj Energy Solutions, Llc Automated diagnostics of electronic instrumentation in a system for fracturing a well and associated methods
US11220895B1 (en) 2020-06-24 2022-01-11 Bj Energy Solutions, Llc Automated diagnostics of electronic instrumentation in a system for fracturing a well and associated methods
US11542802B2 (en) 2020-06-24 2023-01-03 Bj Energy Solutions, Llc Hydraulic fracturing control assembly to detect pump cavitation or pulsation
US11668175B2 (en) 2020-06-24 2023-06-06 Bj Energy Solutions, Llc Automated diagnostics of electronic instrumentation in a system for fracturing a well and associated methods
US11149533B1 (en) 2020-06-24 2021-10-19 Bj Energy Solutions, Llc Systems to monitor, detect, and/or intervene relative to cavitation and pulsation events during a hydraulic fracturing operation
US11746638B2 (en) 2020-06-24 2023-09-05 Bj Energy Solutions, Llc Automated diagnostics of electronic instrumentation in a system for fracturing a well and associated methods
US11391137B2 (en) 2020-06-24 2022-07-19 Bj Energy Solutions, Llc Systems and methods to monitor, detect, and/or intervene relative to cavitation and pulsation events during a hydraulic fracturing operation
US11512571B2 (en) 2020-06-24 2022-11-29 Bj Energy Solutions, Llc Automated diagnostics of electronic instrumentation in a system for fracturing a well and associated methods
US11506040B2 (en) 2020-06-24 2022-11-22 Bj Energy Solutions, Llc Automated diagnostics of electronic instrumentation in a system for fracturing a well and associated methods
US11193360B1 (en) 2020-07-17 2021-12-07 Bj Energy Solutions, Llc Methods, systems, and devices to enhance fracturing fluid delivery to subsurface formations during high-pressure fracturing operations
US11255175B1 (en) 2020-07-17 2022-02-22 Bj Energy Solutions, Llc Methods, systems, and devices to enhance fracturing fluid delivery to subsurface formations during high-pressure fracturing operations
US11920450B2 (en) 2020-07-17 2024-03-05 Bj Energy Solutions, Llc Methods, systems, and devices to enhance fracturing fluid delivery to subsurface formations during high-pressure fracturing operations
US11365615B2 (en) 2020-07-17 2022-06-21 Bj Energy Solutions, Llc Methods, systems, and devices to enhance fracturing fluid delivery to subsurface formations during high-pressure fracturing operations
US11603744B2 (en) 2020-07-17 2023-03-14 Bj Energy Solutions, Llc Methods, systems, and devices to enhance fracturing fluid delivery to subsurface formations during high-pressure fracturing operations
US11193361B1 (en) 2020-07-17 2021-12-07 Bj Energy Solutions, Llc Methods, systems, and devices to enhance fracturing fluid delivery to subsurface formations during high-pressure fracturing operations
US11608727B2 (en) 2020-07-17 2023-03-21 Bj Energy Solutions, Llc Methods, systems, and devices to enhance fracturing fluid delivery to subsurface formations during high-pressure fracturing operations
WO2022116483A1 (en) * 2020-12-04 2022-06-09 烟台杰瑞石油装备技术有限公司 Fracturing apparatus and fracturing system
US11519252B2 (en) 2021-05-07 2022-12-06 Halliburton Energy Services, Inc. Systems and methods for manufacturing and delivering fracturing fluid to multiple wells for conducting fracturing operations
US11732563B2 (en) 2021-05-24 2023-08-22 Bj Energy Solutions, Llc Hydraulic fracturing pumps to enhance flow of fracturing fluid into wellheads and related methods
US11867045B2 (en) 2021-05-24 2024-01-09 Bj Energy Solutions, Llc Hydraulic fracturing pumps to enhance flow of fracturing fluid into wellheads and related methods
US11639654B2 (en) 2021-05-24 2023-05-02 Bj Energy Solutions, Llc Hydraulic fracturing pumps to enhance flow of fracturing fluid into wellheads and related methods
US11851989B2 (en) * 2021-12-03 2023-12-26 Saudi Arabian Oil Company Cooling methodology to improve hydraulic fracturing efficiency and reduce breakdown pressure
US11859480B2 (en) * 2022-03-11 2024-01-02 Caterpillar Inc. Controlling fluid pressures at multiple well heads for continuous pumping
US11955782B1 (en) 2022-11-01 2024-04-09 Typhon Technology Solutions (U.S.), Llc System and method for fracturing of underground formations using electric grid power
US11959419B2 (en) 2023-05-10 2024-04-16 Bj Energy Solutions, Llc Onboard heater of auxiliary systems using exhaust gases and associated methods
US11959533B2 (en) 2023-07-24 2024-04-16 U.S. Well Services Holdings, Llc Multi-plunger pumps and associated drive systems

Also Published As

Publication number Publication date
CA2648265A1 (en) 2007-10-11
RU2008143351A (en) 2010-05-10
WO2007113528A1 (en) 2007-10-11

Similar Documents

Publication Publication Date Title
US20070125544A1 (en) Method and apparatus for providing pressure for well treatment operations
CA2643743C (en) Method and apparatus for centralized proppant storage and metering
US7841394B2 (en) Method and apparatus for centralized well treatment
US7836949B2 (en) Method and apparatus for controlling the manufacture of well treatment fluid
US7931082B2 (en) Method and system for centralized well treatment
USRE49448E1 (en) Methods of performing oilfield operations using electricity
US9863228B2 (en) System and method for delivering treatment fluid
EP2566614B1 (en) Electric or natural gas fired small footprint fracturing fluid blending and pumping equipment
CA2866257C (en) System and method for delivering treatment fluid
CN101270650A (en) Skid mounted polymer injection system for marine oil field
US20220136489A1 (en) Distributed in-field powered pumping configuration
US20190233275A1 (en) Method and apparatus for metering flow during centralized well treatment

Legal Events

Date Code Title Description
AS Assignment

Owner name: HALLIBURTON ENERGY SERVICES, INC., OKLAHOMA

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:ROBINSON, LONNIE R.;CURRY, JAMES;CASE, LEONARD;AND OTHERS;REEL/FRAME:017920/0594;SIGNING DATES FROM 20060508 TO 20060511

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION