US20070222295A1 - System and method for power load management - Google Patents

System and method for power load management Download PDF

Info

Publication number
US20070222295A1
US20070222295A1 US11/704,314 US70431407A US2007222295A1 US 20070222295 A1 US20070222295 A1 US 20070222295A1 US 70431407 A US70431407 A US 70431407A US 2007222295 A1 US2007222295 A1 US 2007222295A1
Authority
US
United States
Prior art keywords
load
power
management system
load management
user
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US11/704,314
Inventor
Paul Wareham
Stephen MacNeil
Michael MacLean
Shane Samson
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dynagen Technologies Inc
Original Assignee
Dynagen Technologies Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from US10/654,440 external-priority patent/US20040075343A1/en
Application filed by Dynagen Technologies Inc filed Critical Dynagen Technologies Inc
Priority to US11/704,314 priority Critical patent/US20070222295A1/en
Assigned to DYNAGEN TECHNOLOGIES, INC. reassignment DYNAGEN TECHNOLOGIES, INC. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: MACLEAN, MICHAEL A., MACNEIL, STEPHEN, SAMSON, SHANE D., WAREHAM, PAUL
Publication of US20070222295A1 publication Critical patent/US20070222295A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J9/00Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting
    • H02J9/04Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source
    • H02J9/06Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source with automatic change-over, e.g. UPS systems
    • H02J9/062Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source with automatic change-over, e.g. UPS systems for AC powered loads
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00004Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by the power network being locally controlled
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00006Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment
    • H02J13/00007Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment using the power network as support for the transmission
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00006Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment
    • H02J13/00016Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment using a wired telecommunication network or a data transmission bus
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/12Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
    • H02J3/14Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00006Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment
    • H02J13/00022Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment using wireless data transmission
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2310/00The network for supplying or distributing electric power characterised by its spatial reach or by the load
    • H02J2310/10The network having a local or delimited stationary reach
    • H02J2310/12The local stationary network supplying a household or a building
    • H02J2310/14The load or loads being home appliances
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • Y02B70/3225Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02B90/20Smart grids as enabling technology in buildings sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/12Energy storage units, uninterruptible power supply [UPS] systems or standby or emergency generators, e.g. in the last power distribution stages
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/222Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/242Home appliances
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/248UPS systems or standby or emergency generators
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S40/00Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
    • Y04S40/12Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
    • Y04S40/121Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment using the power network as support for the transmission
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S40/00Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
    • Y04S40/12Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
    • Y04S40/124Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment using wired telecommunication networks or data transmission busses
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S40/00Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
    • Y04S40/12Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
    • Y04S40/126Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment using wireless data transmission

Definitions

  • the present invention relates generally to power load management systems. More particularly, the present invention relates to managing loads for alternate power supplies and during conditions of limited supply imposed by energy provider.
  • a typical problem with automatic transfer switches installed prior to the use's service installation is the matching of the load power draw with the available power supplied by an alternate power supply, such as on-site generator (gas or diesel engine-generator).
  • an alternate power supply such as on-site generator (gas or diesel engine-generator).
  • FIG. 11 An example of an automatic transfer switch installed upon a service installation is shown in FIG. 11 .
  • an upgraded service installation 14 is mounted to the wall of the building 10 for receiving main power through main power cable 18 and emergency power from power generator 12 through cable 16 .
  • Upgraded service installation 14 includes a meter socket 20 , transfer switch 22 according to an embodiment of the present invention, and a watt-hour meter 24 .
  • the transfer switch 22 is small enough to fit within meter socket 20 , and includes a set of contact terminals on the load side, and a mirrored set of contact terminals on the side for connection to the watt-hour meter 24 , which permits quick push-in connection to the electrical system.
  • Meter socket 20 is connected to main power cable 18 and an internal power conduit 28 .
  • the internal power conduit 28 routes power received by the upgraded service installation 14 to a distribution panel inside the building 10 .
  • transfer switch 22 is mounted onto meter socket 20 for receiving the main power supply via meter socket 20 , and directly receives the emergency power from cable 16 through any standard plug and socket interface 26 .
  • standard twist lock or pin sleeve weatherproof connectors can be used for interface 26 .
  • Watt-hour meter 24 displays the power consumed for meter readings, and is mounted to the other end of transfer switch 22 .
  • a rigid conduit 30 serves to protect the cable 16 as it is routed along the wall of building 10 .
  • transfer switch 22 substitutes the main power from the electric utility with power from a power generator. Preferably, the switch over is automatically performed to minimize inconvenience to the user.
  • a load in this context, is any device that consumes electric energy, such as a water heater or an electric motor.
  • the present invention provides a power load management system for regulating power the demand for power from a power source via a distribution panel.
  • the system includes a switching means for selectively disconnecting and reconnecting specific loads from a distribution panel in response to demand limiting factors, a switching means providing load feedback data, and a control unit for monitoring the load feedback data and operational parameters for providing the switching signal in accordance with a power management algorithm.
  • the switching means includes a plurality of load control switches, where each load control switch is placed in series between a distribution circuit breaker in the distribution panel and a load.
  • the operation parameters include time, date, user weighting factor, utility weighting factor, power source limit, utility limit, total system load and rate limit factor.
  • the load control processor includes external inputs for allowing user and utility override capability and the load feedback data includes duty cycle data, frequency of operation data and power consumption data associated with the circuit breaker.
  • the control unit can include a main load control central processing unit for executing the power management algorithm.
  • FIG. 1 is a block diagram of the load management control system components and their location within a typical installation
  • FIG. 2 illustrates a switch mounting configuration according to an embodiment of the present invention
  • FIG. 3 is a detailed illustration of the switch mounting shown in FIG. 2 ;
  • FIG. 4 illustrates an alternate switch mounting configuration according to an embodiment of the present invention
  • FIG. 5 illustrates another alternate switch mounting configuration according to an embodiment of the present invention
  • FIG. 6 is a block diagram of the power load management sub-systems according to an embodiment of the present invention.
  • FIG. 7 is a schematic of a load control switch according to an embodiment of the present invention.
  • FIG. 8 is a flow diagram for the real time clock calendar algorithm
  • FIG. 9 is a flow diagram for the load data acquisition algorithm
  • FIG. 10 is a flow diagram for the basic load control algorithm.
  • FIG. 11 is a detailed diagram of a service installation.
  • the present invention provides a power load management system for regulating power demand on the distribution panel of a residence or building.
  • Load control switches placed in-line between circuit breakers of the distribution panel and loads associated with those circuit breakers and provide load feedback data to a load management controller.
  • the load management controller monitors the load feedback data and other operational parameters for selectively switching load control switches to the open or closed circuit states to regulate the total load demanded within the set limits of the power source.
  • the load management controller includes adaptive algorithms to automatically prioritize loads based on user and utility applied weighting factors, and patterns of loading based on accumulated data related to time and date.
  • Load management are achieved in part through the application of miniaturized, electrically operated and mechanically held, remote power switches which are connected in series with electrical circuits within a facility between the distribution panel and the loads to be controlled.
  • the power switches are controlled via a microprocessor based control system that is capable of prioritizing loads based on the usage profile of the facility occupants, the nature of the electrical loads, and the set or imposed capacity limits of the power source.
  • the system can ensure that an alternate power source, such as a standby generator set, is never overloaded, and ensures the user statistically attains the maximum possible convenience from the power source available.
  • the system has further application by providing a similar load management function while operating from the electric utility company's power system in order to reduce peak demand on the utility power system.
  • Load management in addition to matching the capacity of an on-site alternate power source, it can be extended to the concept of controlling the loads at the user facility to achieve a better use of energy, which would be a benefit to the utility, the customer or both.
  • Load management can be used for many different purposes, like avoiding overloads in bottlenecks in the grid, reduce losses caused by reactive power, reduce overtones and stabilize the network.
  • Direct load management implies that the utility determines what loads are to be connected or disconnected at specific occasions.
  • Indirect load management is the case where the utility sends some signal to the customer, such as demand limit or rate information, and relies on the user's load management system's ability to adjust the user's demand to meet the requirement imposed by this signal.
  • the system can be used to maximize the alternate power source efficiency during normal source failure, however the system can also include the aspect of allowing the utilities the ability to mange household loads (A/C, water heater, pool pump, electric heaters, etc.).
  • A/C mange household loads
  • the problem lies in how to best organize the order in which the system will allow loads to be disconnected.
  • FIG. 1 represents a block diagram of the overall system components and indicates how and where they will be located within a typical installation.
  • the main load management system components are the a) load control box, housing the main control CPU and communications and input/output interfaces to the remote smart load control switches, b) the smart load control switches, c) electric utility interface, and d) automatic transfer switch, if applicable.
  • the power control switches may also be located within the same enclosure as the load control CPU depending on the system application.
  • the user interface is a conveniently located operator interface unit that communicates with the main load control CPU via a communication link which may include the following transmission media: a) power line, b) RF wireless or c) dedicated twisted pair.
  • the operator interface provides the end user with an access point to the load management system from which they can input data about particular loads, generator size, etc. and obtain system operating information such as what loads are on or off, system demand limit, percentage of system capacity used, etc.
  • the smart load control switches may be located using three different methods depending on the installation application of the load management system, these are as follows: 1) load control switches mounted internally in UL67 panel board, 2) load control switches mounted externally to UL67 panel board, 3) load control switches mounted in main load control panel.
  • the load control switches can be mounted inside the existing distribution panel, or if space allows mounted externally on the distribution panel.
  • the load control switches may be incorporated in the same panel enclosure as the load control CPU.
  • the switch mounting locations are further illustrated by FIG. 2 through FIG. 5 .
  • the load control switches are very small power switches that may be installed inside of an existing UL67 Panel board (e.g. an typical residential panel listed by the Underwriters Laboratory).
  • the primary application is for residential load centers and the switches can be installed inside any standard residential load center containing fuses or circuit breakers.
  • the switches are electrically operated mechanically held devices that maintain switch position when no power is applied.
  • An overall system diagram is shown in FIG. 6 .
  • the power switches are typically installed in-line with the existing circuit breaker or fuse.
  • a connection scheme is shown in FIG. 3 .
  • the control wires are connections on a small industrial network which are wired to a data bus and connected to a Load Control Panel which is mounted outside of the Panel board.
  • the smart load control switches are addressable for recognition by the control network and contain circuits to provide load feedback data to the main load control CPU.
  • FIGS. 2 and 3 shows an architecture that performs load management on individual circuits within a facility.
  • One or more individual circuits can be controlled in an on/off fashion to allow the total peak load to be reduced to match the capacity of the alternate power source.
  • the control switches are centrally managed by load management controller that allows the user to set the priority of all loads via a User Interface as well as indicate the types of loads connected, percentage of system capacity used, status of all loads controlled and to indicate the total capacity of the alternate power source.
  • the load switching is accomplished by the use of miniature power switches that can be retrofitted to an existing electrical distribution panel describe previously.
  • An existing electrical distribution panel can consist of either individual circuit breakers or fuses for each circuit.
  • the existing load wire is removed from the circuit breaker or fuse, and is inserted into a clinch type push-in receptacle on the power switch.
  • a flexible pig-tail wire with spade terminal, which protrudes from the power switch, is then inserted into the existing circuit breaker or fuse, thus allowing remote on/off control of that circuit.
  • FIG. 4 show an alternative method of installing the load control switches, externally to the distribution panel.
  • This method would utilize the same latching switch unit incorporated into a housing which can be fastened to the electrical panel through a knockout hole and be held in place with an industry standard nut.
  • the circuit wiring would be completely pulled out of the panel, the load control switch would be installed in the opening left by the wire, then the existing wire ground and neutral conductors would be feed though the load control switch unit and re-terminated on the appropriate terminals.
  • the hot conductor would then be terminated on the terminal provided in the load control switch and the hot lead affixed to the load control switch would be terminated on the circuit breaker or fuse in the distribution panel.
  • control signals to interface with the main load management panel CPU will be via the same industrial network connection, which will allow the load control switches to be daisy chained together to minimize the amount of control wiring, connection for the control signals will be made via modular plugs and sockets provided on the load control switches.
  • FIG. 5 illustrates another option, where the load control switches are located within the main load management panel.
  • the circuits to be controlled via the load management system are fed though the load control. panel before the circuits are terminated in the distribution panel.
  • this connection scheme for the routing of the conductors.
  • the load management panel is provided with bond conductor and neutral conductor terminal bars for the connection of the circuit bonding and neutral conductors. These terminal bars are connected to the distribution panel neutral and bonding terminal with the appropriate sized conductors (based on the number of circuits installed in the load management panel).
  • circuit hot conductors are terminated on the load side of the load control switches mounted in the load management panel, the line side of the load control switches are then wired to the appropriate circuit breaker in the main distribution panel.
  • the overall system process includes several different concurrent processes as follows: a) Data acquisition and analysis (continuous system learning and adapting algorithm), b) Real time clock and calendar, c) Load control algorithm, and d) Remote input handling (override inputs from user/utility, generator).
  • the data acquisition and analysis process handles the adaptive features of the load control system which will allow the system to continuously update the profile of the one or more loads under control based on feed back from those loads.
  • the system monitors the following parameters: a) time of day of operation, b) frequency of operation and duty cycle time then use these values to compute time dependent priority adjustment factor (TDPAF).
  • TDPAF time dependent priority adjustment factor
  • the system also monitors the rate of energy used by a particular load and use this information to automatically set range limits under which the load would be disconnected and reconnected based on the power consumption limits imposed by operating from an on-site generator or limit peak hours from an electricity provider. These range limits are referred to as load weighting factors (LWF) for each load under control.
  • LWF load weighting factors
  • the load control algorithm controls the total energy demand applied to the system.
  • the algorithm uses the TDPAF and LWF from the data acquisition algorithm in combination with user programmed priority weight factors (UPWF) to shed load when required to by various control circumstances; this process is referred to as the utility function of the load control algorithm.
  • the control circumstances are: a) system power supplied by generator of limited capacity, b) the electricity provider has limited the capacity a customer can consume, the energy rates (where the cost of energy is a function of time of day) for peak time are in effect.
  • the utility function uses the values of TDPAF, LWF and UPWF in combination with the load constraints to maximize the convenience of the user under limited power conditions. Representing the weighting factors as numerical data and applying mathematical formulas to assign a priority level in relation to the other loads at any given time of day or year accomplish this. Different utility functions apply to each limited power situation and hence different load priorities may be assigned depending on the load constraint condition.
  • the system incorporates user control inputs. This will include the initial setup of the UPWF by the user that provides the initial conditions for the load control algorithm while allowing load priorities to be overridden by the user or the electricity provider. These actions may be received from a user interface or via a remote communications input. In the event that the system priorities are overridden by an external input, the system will attempt to compensate by dropping low priority loads if available. If the system is operating from a specific limited capacity supply such as an on-site generator, overrides will not be allowed if the available capacity is exceeded, i.e. no loads are available to shed in place of the called upon load.
  • the system incorporates a real time clock and calendar which all processes use as a time stamp and time basis for logging and updating the adaptive priority scheme and relating load priority to time of day operation.
  • FIG. 7 Illustrated in FIG. 7 is one possible solution for the smart load control switches.
  • the main elements of the illustrated load control switch are; the latching power switch unit; signal processing and filters; switch control drivers; remote signal processor and communications interface to data network; voltage regulator for digital circuits.
  • the load control switch would incorporate the circuitry to monitor the load current through the device, the load voltage and the line voltage.
  • the AC voltage and current signals are converted the DC signals that represent the average voltage and current values supplied to the load device. These DC signal are read by the A/D ports of the remote I/O signal processor and stored in internal memory where they are read by the main system controller via the data network connection.
  • the main control unit located remote to the load control switch
  • the main control unit would then use the data retrieved from the load control switch to make decisions about the status of the switch, ie. If the switch is on monitor the load current to ensure the capacity of the switch is not exceeded, compare the line and load voltage for excessive voltage drop across the switch contacts and evaluate the condition of the switch based on these signals, whether the switch has failed to open, or failed to close, or if the contacts are presenting excessive resistance to the circuit.
  • the current signal is derived from a current transformer (C.T.), which produces a secondary current directly proportional to the load current.
  • This proportional current id feed to a resistive network which produces an AC voltage signal, the AC signal is then processed through the active signal processing.
  • the active signal processing utilizes op-amps to perform several functions, the first is a precision half wave rectifier, the half wave rectified signal is then processed by a lossy integrator circuit.
  • the integrator circuit produces a voltage signal with a low frequency component that represents the average value of the rectified input signal.
  • a low pass filter removes the higher frequency component of the signal and produces a DC signal that is proportional to the average value of the RMS value of the AC input signal.
  • the active signal processing sections are identical for the line and load voltage sensing with the exception of the front end, where the input voltage to the signal processing will be via a simple resistive voltage diver network.
  • the Latching switch unit is controlled via the line driver unit, which provides the higher power required to change the switch position.
  • the signals to the line drive are provided via the remote I/O processor digital outputs, which reflect the state of internal memory bits.
  • the memory bits are controlled via the data network by the main control unit, thus giving the main controller the ability to switch the load control switch position via the data connection.
  • the priority function is the main loop of the load management software program. This function will determine the order in which loads are shed or picked up based on system demand by using the data acquired to determine the relative priority of each load under control based on the information gathered from the other algorithms.
  • the utility function acts as the core of the data acquisition algorithm; this is the main function, which will assemble the time of day, load frequency of operation, load duration, user factor, power supplier factors into a database for use by the priority function. Where this database of variable elements is continuously updated based on the overall power system usage, user and power system input.
  • the load based input sources are used by the utility function to generate a numeric representation of the importance of a particular load relative to the time of day (based on the real time clock). These utility values will be continually averaged over time to compensate for long duration (seasonal) changes.
  • the utility function will use the real time clock algorithm to establish which time periods to update in the database for each load utility value.
  • the priority function will also use the real time clock to synchronize with the correct values from the utility function database. Inputs to the utility function from the user or power supplier will be applied as direct weighting factors to utility function data and are not computed into the time averaged data but remain as constants that are applied to the utility database values sent to the Priority function.
  • the load control algorithm controls the actual switching loads on and off based on the following input information: overall system load, load limits imposed by power provider or generator size, overriding inputs from user or power provider and the load priority list establish by the priority function.
  • the load control algorithm will attempt to maximize the user convenience by maintaining the loads of high utility and priority by shedding the lowest priority load first in a limited system capacity situation. As load priorities change thought the day the system will change the loads shed should a load with a low priority become a higher priority load as time progresses (i.e. Kitchen appliances during meal preparation time). In a user override situation the system will shed higher priority loads to allow the user-selected load to operate. Power provider overrides (while under utility power only) may take precedence over all other inputs to shed a particular load, this will depend on the power provider policy for customer load shedding and will be a user setup function as to whether the user or utility preference take precedence.
  • the basic algorithm for the real time clock calendar flow, the load data acquisition flow, and the basic load control flow are shown in FIGS. 8, 9 and 10 respectively.

Abstract

A power load management system for regulating power demand from a distribution panel of a residence or building is disclosed. Load control switches placed in-line between circuit breakers of the distribution panel and the loads they control, such as a water heater, pump, AC unit etc., provide load feedback data to a load management CPU. The load management CPU monitors the load feedback data and other operational parameters for selectively switching load control switches to the open circuit state to ensure that the total load demanded does not exceed the demand limits imposed by the power source. The load management CPU includes adaptive algorithms to automatically prioritize loads based on user and utility applied weighting factors, and patterns of loading based on time and date.

Description

    CROSS-REFERENCE TO RELATED APPLICATIONS
  • This application is a Continuation in Part application of U.S. patent application Ser. No. 10/654,440 filed Sep. 4, 2003.
  • U.S. patent application Ser. No. 10/654,440 claims priority from U.S. Provisional Patent Application Ser. No. 60/407,949 filed Sep. 5, 2002.
  • FIELD OF THE INVENTION
  • The present invention relates generally to power load management systems. More particularly, the present invention relates to managing loads for alternate power supplies and during conditions of limited supply imposed by energy provider.
  • BACKGROUND OF THE INVENTION
  • A typical problem with automatic transfer switches installed prior to the use's service installation is the matching of the load power draw with the available power supplied by an alternate power supply, such as on-site generator (gas or diesel engine-generator). An example of an automatic transfer switch installed upon a service installation is shown in FIG. 11.
  • In FIG. 11, an upgraded service installation 14 is mounted to the wall of the building 10 for receiving main power through main power cable 18 and emergency power from power generator 12 through cable 16. Upgraded service installation 14 includes a meter socket 20, transfer switch 22 according to an embodiment of the present invention, and a watt-hour meter 24. The transfer switch 22 is small enough to fit within meter socket 20, and includes a set of contact terminals on the load side, and a mirrored set of contact terminals on the side for connection to the watt-hour meter 24, which permits quick push-in connection to the electrical system. Meter socket 20 is connected to main power cable 18 and an internal power conduit 28. The internal power conduit 28 routes power received by the upgraded service installation 14 to a distribution panel inside the building 10. One end of transfer switch 22 is mounted onto meter socket 20 for receiving the main power supply via meter socket 20, and directly receives the emergency power from cable 16 through any standard plug and socket interface 26. For example, standard twist lock or pin sleeve weatherproof connectors can be used for interface 26. Watt-hour meter 24 displays the power consumed for meter readings, and is mounted to the other end of transfer switch 22. A rigid conduit 30 serves to protect the cable 16 as it is routed along the wall of building 10. In the event that main power from an electric utility delivered through main power cable 18 becomes unavailable or is disturbed, transfer switch 22 substitutes the main power from the electric utility with power from a power generator. Preferably, the switch over is automatically performed to minimize inconvenience to the user.
  • If any load in the facility is capable of drawing power from the alternate power source, then concerns are raised over possible overloading of the alternate power source capacity leading to the tripping of over-current protection for the alternate power source. One solution is to increase the size of the alternate power source to accommodate all the possible loading. However, this is a very expensive and impractical solution. It is well known that the application of electrical loads exhibits a degree of statistical load diversity, such that not all loads will be engaged simultaneously, and the loads that are can be staggered in time to reduce the overall peak demand on the alternate power source. A load, in this context, is any device that consumes electric energy, such as a water heater or an electric motor.
  • In the case of an alternate power source, the problem can be boiled down to asking the question: what sequences should loads be applied and at what times, based on the constraints of the alternate power source while at the same time maximizing the convenience (or ‘utility function’) to the customer. In essence, one could view the problem as making an 8 KW power source be perceived as a 20 KW power source in terms of convenience levels. In cases of utility supply, in many areas there are requirements or special rates offered for limiting consumption to certain peak levels.
  • It is, therefore, desirable to provide a system that prevents overloading of the alternate power source.
  • SUMMARY OF THE INVENTION
  • It is an object of the present invention to obviate or mitigate at least one disadvantage of previous load management systems.
  • In a first aspect, the present invention provides a power load management system for regulating power the demand for power from a power source via a distribution panel. The system includes a switching means for selectively disconnecting and reconnecting specific loads from a distribution panel in response to demand limiting factors, a switching means providing load feedback data, and a control unit for monitoring the load feedback data and operational parameters for providing the switching signal in accordance with a power management algorithm.
  • In a further embodiment, the switching means includes a plurality of load control switches, where each load control switch is placed in series between a distribution circuit breaker in the distribution panel and a load.
  • As part of embodiment of the present aspect, the operation parameters include time, date, user weighting factor, utility weighting factor, power source limit, utility limit, total system load and rate limit factor.
  • In yet other embodiments of the present aspect, the load control processor includes external inputs for allowing user and utility override capability and the load feedback data includes duty cycle data, frequency of operation data and power consumption data associated with the circuit breaker. The control unit can include a main load control central processing unit for executing the power management algorithm.
  • Other aspects and features of the present invention will become apparent to those ordinarily skilled in the art upon review of the following description of specific embodiments of the invention in conjunction with the accompanying figures.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • Embodiments of the present invention will now be described, by way of example only, with reference to the attached Figures, wherein:
  • FIG. 1 is a block diagram of the load management control system components and their location within a typical installation;
  • FIG. 2 illustrates a switch mounting configuration according to an embodiment of the present invention;
  • FIG. 3 is a detailed illustration of the switch mounting shown in FIG. 2;
  • FIG. 4 illustrates an alternate switch mounting configuration according to an embodiment of the present invention;
  • FIG. 5 illustrates another alternate switch mounting configuration according to an embodiment of the present invention;
  • FIG. 6 is a block diagram of the power load management sub-systems according to an embodiment of the present invention;
  • FIG. 7 is a schematic of a load control switch according to an embodiment of the present invention;
  • FIG. 8 is a flow diagram for the real time clock calendar algorithm;
  • FIG. 9 is a flow diagram for the load data acquisition algorithm;
  • FIG. 10 is a flow diagram for the basic load control algorithm; and,
  • FIG. 11 is a detailed diagram of a service installation.
  • DETAILED DESCRIPTION
  • Generally, the present invention provides a power load management system for regulating power demand on the distribution panel of a residence or building. Load control switches placed in-line between circuit breakers of the distribution panel and loads associated with those circuit breakers and provide load feedback data to a load management controller. The load management controller monitors the load feedback data and other operational parameters for selectively switching load control switches to the open or closed circuit states to regulate the total load demanded within the set limits of the power source. The load management controller includes adaptive algorithms to automatically prioritize loads based on user and utility applied weighting factors, and patterns of loading based on accumulated data related to time and date.
  • Load management according to the embodiment of the present invention are achieved in part through the application of miniaturized, electrically operated and mechanically held, remote power switches which are connected in series with electrical circuits within a facility between the distribution panel and the loads to be controlled. The power switches are controlled via a microprocessor based control system that is capable of prioritizing loads based on the usage profile of the facility occupants, the nature of the electrical loads, and the set or imposed capacity limits of the power source. The system can ensure that an alternate power source, such as a standby generator set, is never overloaded, and ensures the user statistically attains the maximum possible convenience from the power source available. The system has further application by providing a similar load management function while operating from the electric utility company's power system in order to reduce peak demand on the utility power system.
  • With load management, in addition to matching the capacity of an on-site alternate power source, it can be extended to the concept of controlling the loads at the user facility to achieve a better use of energy, which would be a benefit to the utility, the customer or both. Load management can be used for many different purposes, like avoiding overloads in bottlenecks in the grid, reduce losses caused by reactive power, reduce overtones and stabilize the network. One normally distinguishes between two different categories of load management: direct and indirect. Direct load management implies that the utility determines what loads are to be connected or disconnected at specific occasions. Indirect load management is the case where the utility sends some signal to the customer, such as demand limit or rate information, and relies on the user's load management system's ability to adjust the user's demand to meet the requirement imposed by this signal.
  • The system can be used to maximize the alternate power source efficiency during normal source failure, however the system can also include the aspect of allowing the utilities the ability to mange household loads (A/C, water heater, pool pump, electric heaters, etc.). The problem lies in how to best organize the order in which the system will allow loads to be disconnected. There are several key elements as follows: allowing the user to arrange a preset importance based on their own individual preference; have the load management systems monitor the control circuits and based on duty cycle, load demand, time of day operation, an adaptive program to automatically prioritize loads based on a user applied weighing factor and cumulative adapting information which could account for time of day and seasonal importance, i.e. AC and pool pump are low priority in the winter month may gradually shift to high priority in summer months and vice versa for electric heat while water heater remain constant. This can be additionally weighted by a priority value applied by the electric utility.
  • FIG. 1 represents a block diagram of the overall system components and indicates how and where they will be located within a typical installation.
  • The main load management system components are the a) load control box, housing the main control CPU and communications and input/output interfaces to the remote smart load control switches, b) the smart load control switches, c) electric utility interface, and d) automatic transfer switch, if applicable. Note that the power control switches may also be located within the same enclosure as the load control CPU depending on the system application.
  • The user interface is a conveniently located operator interface unit that communicates with the main load control CPU via a communication link which may include the following transmission media: a) power line, b) RF wireless or c) dedicated twisted pair. The operator interface provides the end user with an access point to the load management system from which they can input data about particular loads, generator size, etc. and obtain system operating information such as what loads are on or off, system demand limit, percentage of system capacity used, etc.
  • The smart load control switches may be located using three different methods depending on the installation application of the load management system, these are as follows: 1) load control switches mounted internally in UL67 panel board, 2) load control switches mounted externally to UL67 panel board, 3) load control switches mounted in main load control panel. For a retrofit situation where the existing wiring for circuits to be controlled cannot be easily rerouted, the load control switches can be mounted inside the existing distribution panel, or if space allows mounted externally on the distribution panel. For new building installation (where wiring is being installed as to accommodate the load management system during construction) or where existing circuit wiring can easily be relocated (sufficient slack in wiring to easily locate to external panel) the load control switches may be incorporated in the same panel enclosure as the load control CPU. The switch mounting locations are further illustrated by FIG. 2 through FIG. 5.
  • The load control switches are very small power switches that may be installed inside of an existing UL67 Panel board (e.g. an typical residential panel listed by the Underwriters Laboratory). The primary application is for residential load centers and the switches can be installed inside any standard residential load center containing fuses or circuit breakers. The switches are electrically operated mechanically held devices that maintain switch position when no power is applied. An overall system diagram is shown in FIG. 6.
  • The power switches are typically installed in-line with the existing circuit breaker or fuse. A connection scheme is shown in FIG. 3. The control wires are connections on a small industrial network which are wired to a data bus and connected to a Load Control Panel which is mounted outside of the Panel board. The smart load control switches are addressable for recognition by the control network and contain circuits to provide load feedback data to the main load control CPU.
  • Typical ratings for the switches are shown below:
      • Single Pole and Double Pole (by stacking)
      • 240 VAC
      • 60 AMPS resistive; 1.5 HP
      • Size: approx 1″×0.5″×0.5″
      • Short Circuit Rating: 5 kA
  • FIGS. 2 and 3 shows an architecture that performs load management on individual circuits within a facility. One or more individual circuits can be controlled in an on/off fashion to allow the total peak load to be reduced to match the capacity of the alternate power source. The control switches are centrally managed by load management controller that allows the user to set the priority of all loads via a User Interface as well as indicate the types of loads connected, percentage of system capacity used, status of all loads controlled and to indicate the total capacity of the alternate power source. The load switching is accomplished by the use of miniature power switches that can be retrofitted to an existing electrical distribution panel describe previously. An existing electrical distribution panel can consist of either individual circuit breakers or fuses for each circuit. The existing load wire is removed from the circuit breaker or fuse, and is inserted into a clinch type push-in receptacle on the power switch. A flexible pig-tail wire with spade terminal, which protrudes from the power switch, is then inserted into the existing circuit breaker or fuse, thus allowing remote on/off control of that circuit.
  • FIG. 4 show an alternative method of installing the load control switches, externally to the distribution panel. This method would utilize the same latching switch unit incorporated into a housing which can be fastened to the electrical panel through a knockout hole and be held in place with an industry standard nut. The circuit wiring would be completely pulled out of the panel, the load control switch would be installed in the opening left by the wire, then the existing wire ground and neutral conductors would be feed though the load control switch unit and re-terminated on the appropriate terminals. The hot conductor would then be terminated on the terminal provided in the load control switch and the hot lead affixed to the load control switch would be terminated on the circuit breaker or fuse in the distribution panel.
  • The control signals to interface with the main load management panel CPU will be via the same industrial network connection, which will allow the load control switches to be daisy chained together to minimize the amount of control wiring, connection for the control signals will be made via modular plugs and sockets provided on the load control switches.
  • FIG. 5 illustrates another option, where the load control switches are located within the main load management panel. In this instance, the circuits to be controlled via the load management system are fed though the load control. panel before the circuits are terminated in the distribution panel. There are several variations of this connection scheme for the routing of the conductors. For the method illustrated, the load management panel is provided with bond conductor and neutral conductor terminal bars for the connection of the circuit bonding and neutral conductors. These terminal bars are connected to the distribution panel neutral and bonding terminal with the appropriate sized conductors (based on the number of circuits installed in the load management panel). The circuit hot conductors are terminated on the load side of the load control switches mounted in the load management panel, the line side of the load control switches are then wired to the appropriate circuit breaker in the main distribution panel. [00311 In this arrangement there is no need for a daisy chain network to control the load switches as the can be directly controlled from the main control board. This simplifies some of the control wiring and complexity of the overall system. Circuit load control switches become dedicated to the to specific controller outputs. In the networked arrangements the load control switches will have to be individually addressed so the CPU is aware of the circuits under control.
  • The overall system process includes several different concurrent processes as follows: a) Data acquisition and analysis (continuous system learning and adapting algorithm), b) Real time clock and calendar, c) Load control algorithm, and d) Remote input handling (override inputs from user/utility, generator).
  • The data acquisition and analysis process handles the adaptive features of the load control system which will allow the system to continuously update the profile of the one or more loads under control based on feed back from those loads. The system monitors the following parameters: a) time of day of operation, b) frequency of operation and duty cycle time then use these values to compute time dependent priority adjustment factor (TDPAF). The system also monitors the rate of energy used by a particular load and use this information to automatically set range limits under which the load would be disconnected and reconnected based on the power consumption limits imposed by operating from an on-site generator or limit peak hours from an electricity provider. These range limits are referred to as load weighting factors (LWF) for each load under control. The load control algorithm controls the total energy demand applied to the system. The algorithm uses the TDPAF and LWF from the data acquisition algorithm in combination with user programmed priority weight factors (UPWF) to shed load when required to by various control circumstances; this process is referred to as the utility function of the load control algorithm. The control circumstances are: a) system power supplied by generator of limited capacity, b) the electricity provider has limited the capacity a customer can consume, the energy rates (where the cost of energy is a function of time of day) for peak time are in effect. The utility function uses the values of TDPAF, LWF and UPWF in combination with the load constraints to maximize the convenience of the user under limited power conditions. Representing the weighting factors as numerical data and applying mathematical formulas to assign a priority level in relation to the other loads at any given time of day or year accomplish this. Different utility functions apply to each limited power situation and hence different load priorities may be assigned depending on the load constraint condition.
  • The system incorporates user control inputs. This will include the initial setup of the UPWF by the user that provides the initial conditions for the load control algorithm while allowing load priorities to be overridden by the user or the electricity provider. These actions may be received from a user interface or via a remote communications input. In the event that the system priorities are overridden by an external input, the system will attempt to compensate by dropping low priority loads if available. If the system is operating from a specific limited capacity supply such as an on-site generator, overrides will not be allowed if the available capacity is exceeded, i.e. no loads are available to shed in place of the called upon load.
  • The system incorporates a real time clock and calendar which all processes use as a time stamp and time basis for logging and updating the adaptive priority scheme and relating load priority to time of day operation.
  • Illustrated in FIG. 7 is one possible solution for the smart load control switches. The main elements of the illustrated load control switch are; the latching power switch unit; signal processing and filters; switch control drivers; remote signal processor and communications interface to data network; voltage regulator for digital circuits. In this particular solution, the load control switch would incorporate the circuitry to monitor the load current through the device, the load voltage and the line voltage.
  • The AC voltage and current signals are converted the DC signals that represent the average voltage and current values supplied to the load device. These DC signal are read by the A/D ports of the remote I/O signal processor and stored in internal memory where they are read by the main system controller via the data network connection. The main control unit (located remote to the load control switch) would then use the data retrieved from the load control switch to make decisions about the status of the switch, ie. If the switch is on monitor the load current to ensure the capacity of the switch is not exceeded, compare the line and load voltage for excessive voltage drop across the switch contacts and evaluate the condition of the switch based on these signals, whether the switch has failed to open, or failed to close, or if the contacts are presenting excessive resistance to the circuit.
  • The current signal is derived from a current transformer (C.T.), which produces a secondary current directly proportional to the load current. This proportional current id feed to a resistive network which produces an AC voltage signal, the AC signal is then processed through the active signal processing. The active signal processing utilizes op-amps to perform several functions, the first is a precision half wave rectifier, the half wave rectified signal is then processed by a lossy integrator circuit. The integrator circuit produces a voltage signal with a low frequency component that represents the average value of the rectified input signal. Finally a low pass filter removes the higher frequency component of the signal and produces a DC signal that is proportional to the average value of the RMS value of the AC input signal. The active signal processing sections are identical for the line and load voltage sensing with the exception of the front end, where the input voltage to the signal processing will be via a simple resistive voltage diver network.
  • The Latching switch unit is controlled via the line driver unit, which provides the higher power required to change the switch position. The signals to the line drive are provided via the remote I/O processor digital outputs, which reflect the state of internal memory bits. The memory bits are controlled via the data network by the main control unit, thus giving the main controller the ability to switch the load control switch position via the data connection.
  • This provides one possible solution for the smart switches, there are other methods, one might employ a low cost digital signal processor or micro controller in place of the remote I/O and communications controller. In this instance the input signal filtering could be simplified as the as digital signal filtering techniques could be applied. The load control switches would calculate and evaluate there own operating status as opposed to the main controller having to do these functions, the switch would simply be poled by the main controller for the status information of switch and controlled via the data network. Also the proposed solution does not include any zero crossing detection circuits, however, if local micro controllers are employed in each switch this ability to employ zero crossing detectors and switching becomes more easily implemented.
  • The overall system of FIG. 6 is now described in further detail.
  • The priority function is the main loop of the load management software program. This function will determine the order in which loads are shed or picked up based on system demand by using the data acquired to determine the relative priority of each load under control based on the information gathered from the other algorithms.
  • The utility function acts as the core of the data acquisition algorithm; this is the main function, which will assemble the time of day, load frequency of operation, load duration, user factor, power supplier factors into a database for use by the priority function. Where this database of variable elements is continuously updated based on the overall power system usage, user and power system input. The load based input sources are used by the utility function to generate a numeric representation of the importance of a particular load relative to the time of day (based on the real time clock). These utility values will be continually averaged over time to compensate for long duration (seasonal) changes. The utility function will use the real time clock algorithm to establish which time periods to update in the database for each load utility value. The priority function will also use the real time clock to synchronize with the correct values from the utility function database. Inputs to the utility function from the user or power supplier will be applied as direct weighting factors to utility function data and are not computed into the time averaged data but remain as constants that are applied to the utility database values sent to the Priority function.
  • The load control algorithm controls the actual switching loads on and off based on the following input information: overall system load, load limits imposed by power provider or generator size, overriding inputs from user or power provider and the load priority list establish by the priority function. The load control algorithm will attempt to maximize the user convenience by maintaining the loads of high utility and priority by shedding the lowest priority load first in a limited system capacity situation. As load priorities change thought the day the system will change the loads shed should a load with a low priority become a higher priority load as time progresses (i.e. Kitchen appliances during meal preparation time). In a user override situation the system will shed higher priority loads to allow the user-selected load to operate. Power provider overrides (while under utility power only) may take precedence over all other inputs to shed a particular load, this will depend on the power provider policy for customer load shedding and will be a user setup function as to whether the user or utility preference take precedence.
  • The basic algorithm for the real time clock calendar flow, the load data acquisition flow, and the basic load control flow are shown in FIGS. 8, 9 and 10 respectively.
  • The above-described embodiments of the present invention are intended to be examples only. Alterations, modifications and variations may be effected to the particular embodiments by those of skill in the art without departing from the scope of the invention, which is defined solely by the claims appended hereto.

Claims (9)

1. A power load management system for regulating the energy demand from a distribution panel comprising a load control switch for selectively decoupling specific loads from a distribution panel in response to a demand limiting signal, the load control switch also providing load feedback data; and a control unit for monitoring the load feedback data and operational parameters for providing the demand limiting signal in accordance with a power management algorithm; the operational parameters including at least one of: a user weighting factor, a utility weighting factor, a power source limit, a utility limit, a total system load and a rate limit factor.
2. The power load management system of claim 1, wherein there is a plurality of separately controllable load control switches.
3. The power load management system of claim 2, wherein each load control switch is coupled between a circuit breaker in the panel and associated load.
4. The power load management system of claim 2, wherein each load control switch is separate from the control unit.
5. The power load management system of claim 1, wherein the operation parameters include time, date, user weighting factor, utility weighting factor, power source limit, utility limit, total system load and rate limit factor and the load priority is established by a time varying optimizing algorithm that maximises user convenience.
6. The power load management system of claim 1, wherein the control unit includes external inputs for allowing user and electricity provider override capability.
7. The power load management system of claim 5, wherein a user or utility weighting factor is supplied from a source remote from the control unit.
8. The power load management system of claim 1, wherein the load feedback data includes data about the load under the control of that switch in the following aspects: duty cycle of the load supplied through an associated circuit breaker, frequency of operation of that load, and power consumption associated with that circuit breaker's controlled circuit.
9. The power load management system of claim 1, wherein the control unit includes a main load control central processing unit for executing the power management algorithm.
US11/704,314 2002-09-05 2007-02-09 System and method for power load management Abandoned US20070222295A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US11/704,314 US20070222295A1 (en) 2002-09-05 2007-02-09 System and method for power load management

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
US40794902P 2002-09-05 2002-09-05
US10/654,440 US20040075343A1 (en) 2002-09-05 2003-09-04 System and method for power load management
US11/704,314 US20070222295A1 (en) 2002-09-05 2007-02-09 System and method for power load management

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
US10/654,440 Continuation-In-Part US20040075343A1 (en) 2002-09-05 2003-09-04 System and method for power load management

Publications (1)

Publication Number Publication Date
US20070222295A1 true US20070222295A1 (en) 2007-09-27

Family

ID=32096074

Family Applications (1)

Application Number Title Priority Date Filing Date
US11/704,314 Abandoned US20070222295A1 (en) 2002-09-05 2007-02-09 System and method for power load management

Country Status (1)

Country Link
US (1) US20070222295A1 (en)

Cited By (72)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050271086A1 (en) * 2004-05-12 2005-12-08 Michael Macaluso System and method for an intelligent load center with integrated powerline communications network switching and network management capabilities
US20070064377A1 (en) * 2005-09-12 2007-03-22 Deboer John Panel layout for an integrated power distribution system
US20090244817A1 (en) * 2008-04-01 2009-10-01 Moyer Anthony R Electrical Distribution System
US20090299540A1 (en) * 2008-06-03 2009-12-03 Electric Power Research Institute, Inc. Emergency frequency load shedding scheme
US20100161146A1 (en) * 2008-12-23 2010-06-24 International Business Machines Corporation Variable energy pricing in shortage conditions
US20100225167A1 (en) * 2009-03-06 2010-09-09 Briggs And Stratton Corporation Power management system and method of operating the same
US20100312414A1 (en) * 2007-12-06 2010-12-09 Balesh Kumar System and method for power management and load shedding
CN101924392A (en) * 2010-08-04 2010-12-22 南京南瑞继保电气有限公司 Bipolar automatic power control method of high-voltage direct-current transmission
US20110057514A1 (en) * 2009-09-08 2011-03-10 Eaton Corporation Power meter with transfer switch
US20110068624A1 (en) * 2009-09-22 2011-03-24 Noribachi Llc Solar powered system with grid backup
US20110125542A1 (en) * 2009-07-17 2011-05-26 Honeywell International Inc. Demand response management system
US20110175450A1 (en) * 2010-01-18 2011-07-21 David Vicari Load Control Module For A Generator And Method Of Operation
US20110298286A1 (en) * 2010-06-03 2011-12-08 Briggs & Stratton Corporation Dynamic load shedding system for a standby generator
CN102354987A (en) * 2011-09-28 2012-02-15 南京南瑞继保电气有限公司 Control method of overload load-shedding for transformer or circuit
US20130169046A1 (en) * 2011-12-12 2013-07-04 Samsung Electronics Co., Ltd. Power consumption control apparatus and power consumption control method
US20130187462A1 (en) * 2010-06-03 2013-07-25 Briggs & Stratton Corporation Active load management system
US8565903B2 (en) 2007-10-05 2013-10-22 Honeywell International Inc. Critical resource notification system and interface device
US8626354B2 (en) 2011-01-28 2014-01-07 Honeywell International Inc. Approach for normalizing automated demand response events in energy management control systems
US8630744B2 (en) 2011-01-28 2014-01-14 Honeywell International Inc. Management and monitoring of automated demand response in a multi-site enterprise
US20140015323A1 (en) * 2012-07-10 2014-01-16 Arista Power, Inc. Power Management System
US8667132B2 (en) 2009-07-17 2014-03-04 Honeywell International Inc. Arrangement for communication about and management of a resource using a mobile device
US8670224B2 (en) 2011-11-04 2014-03-11 Kohler Co. Power management system that includes a membrane
US8671167B2 (en) 2009-07-17 2014-03-11 Honeywell International Inc. System for providing demand response services
US8671191B2 (en) 2009-07-17 2014-03-11 Honeywell International Inc. Installation system for demand response resources
US8676953B2 (en) 2009-07-17 2014-03-18 Honeywell International Inc. Use of aggregated groups for managing demand response resources
US20140088780A1 (en) * 2012-09-26 2014-03-27 Hongxia Chen Automatic local electric management system
US8942854B2 (en) 2011-11-28 2015-01-27 Kohler Co. System and method for identifying electrical devices in a power management system
CN104662763A (en) * 2012-07-13 2015-05-27 日东电工株式会社 On-demand multiple power source management system, on-demand multiple power source management system program and computer-readable recording medium on which said program is recorded
US9088180B2 (en) 2012-04-17 2015-07-21 Generac Power Systems, Inc. Load shed control module for use with electrical generator
US9124535B2 (en) 2009-07-17 2015-09-01 Honeywell International Inc. System for using attributes to deploy demand response resources
US9137050B2 (en) 2009-07-17 2015-09-15 Honeywell International Inc. Demand response system incorporating a graphical processing unit
US9153001B2 (en) 2011-01-28 2015-10-06 Honeywell International Inc. Approach for managing distribution of automated demand response events in a multi-site enterprise
US20150293549A1 (en) * 2014-04-14 2015-10-15 Eaton Corporation Load panel system
US20150311892A1 (en) * 2012-11-26 2015-10-29 Yazaki Corporation Electronic control device
US9281716B2 (en) 2011-12-20 2016-03-08 Kohler Co. Generator controller configured for preventing automatic transfer switch from supplying power to the selected load
US9293914B2 (en) 2011-11-04 2016-03-22 Kohler Co Power management system that includes a generator controller
US9331525B2 (en) 2011-02-11 2016-05-03 Sony Corporation Energy access control
US9389850B2 (en) 2012-11-29 2016-07-12 Honeywell International Inc. System and approach to manage versioning of field devices in a multi-site enterprise
US20160378128A1 (en) * 2014-06-20 2016-12-29 Kabushiki Kaisha Toshiba Device operation setting apparatus and device operation setting value determination program
US9665078B2 (en) 2014-03-25 2017-05-30 Honeywell International Inc. System for propagating messages for purposes of demand response
EP2671301A4 (en) * 2011-01-31 2017-05-31 Milbank Manufacturing Co. Energy interface system
US9678162B2 (en) 2011-11-04 2017-06-13 Kohler Co. Load control module that permits testing of power switching devices that are part of the load control module
US9684319B2 (en) 2011-01-04 2017-06-20 Getac Technology Corporation Heating circuit, electronic apparatus, and method for entering operation mode in low-temperature environment
US20170179854A1 (en) * 2015-12-21 2017-06-22 Schneider Eletric Usa, Inc. Motor on-delay timer
US9691076B2 (en) 2013-07-11 2017-06-27 Honeywell International Inc. Demand response system having a participation predictor
US20170212484A1 (en) * 2016-01-22 2017-07-27 Hayward Industries, Inc. Systems and Methods for Providing Network Connectivity and Remote Monitoring, Optimization, and Control of Pool/Spa Equipment
US9818073B2 (en) 2009-07-17 2017-11-14 Honeywell International Inc. Demand response management system
US9831664B1 (en) * 2014-05-06 2017-11-28 Google Inc. Integrated circuit breaker panels
US9841799B2 (en) 2011-12-20 2017-12-12 Kohler Co. System and method for using a network to control a power management system
US9979337B2 (en) 2014-04-24 2018-05-22 Generac Power Systems, Inc. Method of loadshedding for a variable speed, constant frequency generator
US20180151946A1 (en) * 2010-12-16 2018-05-31 Lennox Industries Inc. Priority-based energy management
US9991709B2 (en) 2011-11-04 2018-06-05 Kohler Co. Adding and shedding loads using load levels to determine timing
US9989937B2 (en) 2013-07-11 2018-06-05 Honeywell International Inc. Predicting responses of resources to demand response signals and having comfortable demand responses
WO2018130875A1 (en) * 2017-01-10 2018-07-19 Van Der Walt, Louis, Stephanus An electrical switching system for a building or installation
US10193381B2 (en) 2016-09-27 2019-01-29 Reliance Controls Corporation Load management and switching devices and methods
US10346931B2 (en) 2013-07-11 2019-07-09 Honeywell International Inc. Arrangement for communicating demand response resource incentives
US10467712B2 (en) 2017-01-18 2019-11-05 Coulomb, Inc. Energy management apparatus to upgrade and control an existing circuit breaker panel
US10521867B2 (en) 2012-09-15 2019-12-31 Honeywell International Inc. Decision support system based on energy markets
US10541556B2 (en) 2017-04-27 2020-01-21 Honeywell International Inc. System and approach to integrate and manage diverse demand response specifications for multi-site enterprises
US20200024832A1 (en) * 2016-07-29 2020-01-23 Veolia Environnement Ve Tool for managing multiple water resources
US20200319621A1 (en) 2016-01-22 2020-10-08 Hayward Industries, Inc. Systems and Methods for Providing Network Connectivity and Remote Monitoring, Optimization, and Control of Pool/Spa Equipment
US10840735B1 (en) 2011-05-26 2020-11-17 J. Carl Cooper Power source load control
US10879727B1 (en) 2011-05-26 2020-12-29 James Carl Cooper Power source load control
CN112637272A (en) * 2020-12-04 2021-04-09 广州电力通信网络有限公司 Electric power communication terminal and system based on thing networking intelligent distribution
US10976713B2 (en) 2013-03-15 2021-04-13 Hayward Industries, Inc. Modular pool/spa control system
US11183843B1 (en) 2011-05-26 2021-11-23 J. Carl Cooper Power source load control
US11522365B1 (en) 2011-05-26 2022-12-06 J. Carl Cooper Inverter power source load dependent frequency control and load shedding
WO2022260973A1 (en) * 2021-06-09 2022-12-15 Savant Systems, Inc. Flexible load management system
WO2023034378A1 (en) * 2021-08-31 2023-03-09 Savant Systems, Inc. Guidance set-up for companion module graphical display
US11621580B2 (en) 2021-08-31 2023-04-04 Savant Systems, Inc. Microgrid switchover using zero-cross detection
US11703895B2 (en) * 2018-06-26 2023-07-18 Mosaic Power, LLC System and method for monitoring hot water supply in a load control network
US11967857B1 (en) 2020-11-18 2024-04-23 J. Carl Cooper Power source load control

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4031372A (en) * 1973-11-06 1977-06-21 Westinghouse Electric Corporation System for manually or automatically transferring control between computers without power generation disturbance in an electric power plant or steam turbine operated by a multiple computer control system
US4216384A (en) * 1977-12-09 1980-08-05 Directed Energy Systems, Inc. System for monitoring and controlling electric power consumption
US4321526A (en) * 1980-09-11 1982-03-23 General Electric Company Ripple current stabilized control loop for switching regulator
US4583182A (en) * 1983-10-07 1986-04-15 At&T Information Systems Inc. Controllable risk parameter for device control system
US4819180A (en) * 1987-02-13 1989-04-04 Dencor Energy Cost Controls, Inc. Variable-limit demand controller for metering electrical energy
US5502339A (en) * 1989-09-07 1996-03-26 The Trustees Of Boston University Subscriber electric power load control system
US5673198A (en) * 1996-03-29 1997-09-30 Xilinx, Inc. Concurrent electronic circuit design and implementation
US20010030468A1 (en) * 1999-12-16 2001-10-18 Anderson George A. Method and apparatus utilized for priority sequencing
US20030178894A1 (en) * 2002-03-22 2003-09-25 Ghent Bobby A. Energy management system for an appliance
US20040024483A1 (en) * 1999-12-23 2004-02-05 Holcombe Bradford L. Controlling utility consumption
US6757590B2 (en) * 2001-03-15 2004-06-29 Utc Fuel Cells, Llc Control of multiple fuel cell power plants at a site to provide a distributed resource in a utility grid
US6996458B2 (en) * 2002-10-15 2006-02-07 Powerdsine, Ltd. Power over ethernet switch node for use in power pooling

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4031372A (en) * 1973-11-06 1977-06-21 Westinghouse Electric Corporation System for manually or automatically transferring control between computers without power generation disturbance in an electric power plant or steam turbine operated by a multiple computer control system
US4216384A (en) * 1977-12-09 1980-08-05 Directed Energy Systems, Inc. System for monitoring and controlling electric power consumption
US4321526A (en) * 1980-09-11 1982-03-23 General Electric Company Ripple current stabilized control loop for switching regulator
US4583182A (en) * 1983-10-07 1986-04-15 At&T Information Systems Inc. Controllable risk parameter for device control system
US4819180A (en) * 1987-02-13 1989-04-04 Dencor Energy Cost Controls, Inc. Variable-limit demand controller for metering electrical energy
US5502339A (en) * 1989-09-07 1996-03-26 The Trustees Of Boston University Subscriber electric power load control system
US5673198A (en) * 1996-03-29 1997-09-30 Xilinx, Inc. Concurrent electronic circuit design and implementation
US20010030468A1 (en) * 1999-12-16 2001-10-18 Anderson George A. Method and apparatus utilized for priority sequencing
US20040024483A1 (en) * 1999-12-23 2004-02-05 Holcombe Bradford L. Controlling utility consumption
US6757590B2 (en) * 2001-03-15 2004-06-29 Utc Fuel Cells, Llc Control of multiple fuel cell power plants at a site to provide a distributed resource in a utility grid
US20030178894A1 (en) * 2002-03-22 2003-09-25 Ghent Bobby A. Energy management system for an appliance
US6996458B2 (en) * 2002-10-15 2006-02-07 Powerdsine, Ltd. Power over ethernet switch node for use in power pooling

Cited By (108)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050271086A1 (en) * 2004-05-12 2005-12-08 Michael Macaluso System and method for an intelligent load center with integrated powerline communications network switching and network management capabilities
US8571026B2 (en) * 2004-05-12 2013-10-29 Stmicroelectronics, Inc. System and method for an intelligent load center with integrated powerline communications network switching and network management capabilities
US20070064377A1 (en) * 2005-09-12 2007-03-22 Deboer John Panel layout for an integrated power distribution system
US7907388B2 (en) * 2005-09-12 2011-03-15 Siemens Industry, Inc. Panel layout for an integrated power distribution system
US8565903B2 (en) 2007-10-05 2013-10-22 Honeywell International Inc. Critical resource notification system and interface device
US20100312414A1 (en) * 2007-12-06 2010-12-09 Balesh Kumar System and method for power management and load shedding
US20090244817A1 (en) * 2008-04-01 2009-10-01 Moyer Anthony R Electrical Distribution System
US20090299540A1 (en) * 2008-06-03 2009-12-03 Electric Power Research Institute, Inc. Emergency frequency load shedding scheme
US8204632B2 (en) * 2008-06-03 2012-06-19 Electric Power Research Institute, Inc. Emergency frequency load shedding scheme
US20120041612A1 (en) * 2008-06-03 2012-02-16 Electric Power Research Institute, Inc. Emergency frequency load shedding scheme
US20100161146A1 (en) * 2008-12-23 2010-06-24 International Business Machines Corporation Variable energy pricing in shortage conditions
US20100225167A1 (en) * 2009-03-06 2010-09-09 Briggs And Stratton Corporation Power management system and method of operating the same
US8324755B2 (en) * 2009-03-06 2012-12-04 Briggs And Stratton Corporation Power management system and method of operating the same
US9818073B2 (en) 2009-07-17 2017-11-14 Honeywell International Inc. Demand response management system
US8676953B2 (en) 2009-07-17 2014-03-18 Honeywell International Inc. Use of aggregated groups for managing demand response resources
US10762454B2 (en) 2009-07-17 2020-09-01 Honeywell International Inc. Demand response management system
US9183522B2 (en) 2009-07-17 2015-11-10 Honeywell International Inc. Demand response management system
US9137050B2 (en) 2009-07-17 2015-09-15 Honeywell International Inc. Demand response system incorporating a graphical processing unit
US9124535B2 (en) 2009-07-17 2015-09-01 Honeywell International Inc. System for using attributes to deploy demand response resources
US8782190B2 (en) * 2009-07-17 2014-07-15 Honeywell International, Inc. Demand response management system
US20110125542A1 (en) * 2009-07-17 2011-05-26 Honeywell International Inc. Demand response management system
US8667132B2 (en) 2009-07-17 2014-03-04 Honeywell International Inc. Arrangement for communication about and management of a resource using a mobile device
US8671191B2 (en) 2009-07-17 2014-03-11 Honeywell International Inc. Installation system for demand response resources
US8671167B2 (en) 2009-07-17 2014-03-11 Honeywell International Inc. System for providing demand response services
US20110057514A1 (en) * 2009-09-08 2011-03-10 Eaton Corporation Power meter with transfer switch
US20110068624A1 (en) * 2009-09-22 2011-03-24 Noribachi Llc Solar powered system with grid backup
US9728978B2 (en) 2009-09-22 2017-08-08 Noribachi Corporation Power management using reduced power to selected loads
US8138630B2 (en) 2009-09-22 2012-03-20 Ebay Inc. Solar powered system with grid backup
US8884463B2 (en) 2009-09-22 2014-11-11 Noribachi Corporation Solar powered system with grid backup
US20110175450A1 (en) * 2010-01-18 2011-07-21 David Vicari Load Control Module For A Generator And Method Of Operation
US8736103B2 (en) 2010-01-18 2014-05-27 Generac Power Systems, Inc. Load control module for a generator and method of operation
US8350405B2 (en) 2010-01-18 2013-01-08 Generac Power Systems, Inc. Load control module for a generator and method of operation
US8841797B2 (en) 2010-01-18 2014-09-23 Generac Power Systems, Inc. Wireless annunciator for an electrical generator
US8653692B2 (en) * 2010-06-03 2014-02-18 Briggs & Stratton Corporation Dynamic load shedding system for a standby generator
US20130187462A1 (en) * 2010-06-03 2013-07-25 Briggs & Stratton Corporation Active load management system
US8410633B2 (en) * 2010-06-03 2013-04-02 Briggs & Stratton Corporation Dynamic load shedding system for a standby generator
US20110298286A1 (en) * 2010-06-03 2011-12-08 Briggs & Stratton Corporation Dynamic load shedding system for a standby generator
CN101924392A (en) * 2010-08-04 2010-12-22 南京南瑞继保电气有限公司 Bipolar automatic power control method of high-voltage direct-current transmission
US20180151946A1 (en) * 2010-12-16 2018-05-31 Lennox Industries Inc. Priority-based energy management
US10950924B2 (en) * 2010-12-16 2021-03-16 Lennox Industries Inc. Priority-based energy management
US9684319B2 (en) 2011-01-04 2017-06-20 Getac Technology Corporation Heating circuit, electronic apparatus, and method for entering operation mode in low-temperature environment
US8630744B2 (en) 2011-01-28 2014-01-14 Honeywell International Inc. Management and monitoring of automated demand response in a multi-site enterprise
US9153001B2 (en) 2011-01-28 2015-10-06 Honeywell International Inc. Approach for managing distribution of automated demand response events in a multi-site enterprise
US8626354B2 (en) 2011-01-28 2014-01-07 Honeywell International Inc. Approach for normalizing automated demand response events in energy management control systems
EP2671301A4 (en) * 2011-01-31 2017-05-31 Milbank Manufacturing Co. Energy interface system
US9331525B2 (en) 2011-02-11 2016-05-03 Sony Corporation Energy access control
US10840735B1 (en) 2011-05-26 2020-11-17 J. Carl Cooper Power source load control
US10879727B1 (en) 2011-05-26 2020-12-29 James Carl Cooper Power source load control
US10892618B1 (en) 2011-05-26 2021-01-12 J. Carl Cooper Power source load control
US11183843B1 (en) 2011-05-26 2021-11-23 J. Carl Cooper Power source load control
US11522365B1 (en) 2011-05-26 2022-12-06 J. Carl Cooper Inverter power source load dependent frequency control and load shedding
US11764579B1 (en) 2011-05-26 2023-09-19 J. Carl Cooper Vehicle battery power source load control
CN102354987A (en) * 2011-09-28 2012-02-15 南京南瑞继保电气有限公司 Control method of overload load-shedding for transformer or circuit
US10790664B2 (en) 2011-11-04 2020-09-29 Kohler Co. Adding and shedding loads using load levels to determine timing
US8670224B2 (en) 2011-11-04 2014-03-11 Kohler Co. Power management system that includes a membrane
US9991709B2 (en) 2011-11-04 2018-06-05 Kohler Co. Adding and shedding loads using load levels to determine timing
US9293914B2 (en) 2011-11-04 2016-03-22 Kohler Co Power management system that includes a generator controller
US9678162B2 (en) 2011-11-04 2017-06-13 Kohler Co. Load control module that permits testing of power switching devices that are part of the load control module
US8942854B2 (en) 2011-11-28 2015-01-27 Kohler Co. System and method for identifying electrical devices in a power management system
US9306415B2 (en) * 2011-12-12 2016-04-05 Samsung Electronics Co., Ltd. Power consumption control apparatus and power consumption control method
US20130169046A1 (en) * 2011-12-12 2013-07-04 Samsung Electronics Co., Ltd. Power consumption control apparatus and power consumption control method
KR101851931B1 (en) * 2011-12-12 2018-04-26 삼성전자주식회사 Power consumption control apparatus and method
US9281716B2 (en) 2011-12-20 2016-03-08 Kohler Co. Generator controller configured for preventing automatic transfer switch from supplying power to the selected load
US9841799B2 (en) 2011-12-20 2017-12-12 Kohler Co. System and method for using a network to control a power management system
US9088180B2 (en) 2012-04-17 2015-07-21 Generac Power Systems, Inc. Load shed control module for use with electrical generator
US20140015323A1 (en) * 2012-07-10 2014-01-16 Arista Power, Inc. Power Management System
EP2874264A4 (en) * 2012-07-13 2016-03-30 Nitto Denko Corp On-demand multiple power source management system, on-demand multiple power source management system program and computer-readable recording medium on which said program is recorded
CN104662763A (en) * 2012-07-13 2015-05-27 日东电工株式会社 On-demand multiple power source management system, on-demand multiple power source management system program and computer-readable recording medium on which said program is recorded
US10521867B2 (en) 2012-09-15 2019-12-31 Honeywell International Inc. Decision support system based on energy markets
US20140088780A1 (en) * 2012-09-26 2014-03-27 Hongxia Chen Automatic local electric management system
US20150311892A1 (en) * 2012-11-26 2015-10-29 Yazaki Corporation Electronic control device
US9389850B2 (en) 2012-11-29 2016-07-12 Honeywell International Inc. System and approach to manage versioning of field devices in a multi-site enterprise
US10976713B2 (en) 2013-03-15 2021-04-13 Hayward Industries, Inc. Modular pool/spa control system
US11822300B2 (en) 2013-03-15 2023-11-21 Hayward Industries, Inc. Modular pool/spa control system
US9691076B2 (en) 2013-07-11 2017-06-27 Honeywell International Inc. Demand response system having a participation predictor
US10467639B2 (en) 2013-07-11 2019-11-05 Honeywell International Inc. Demand response system having a participation predictor
US10346931B2 (en) 2013-07-11 2019-07-09 Honeywell International Inc. Arrangement for communicating demand response resource incentives
US10948885B2 (en) 2013-07-11 2021-03-16 Honeywell International Inc. Predicting responses of resources to demand response signals and having comfortable demand responses
US9989937B2 (en) 2013-07-11 2018-06-05 Honeywell International Inc. Predicting responses of resources to demand response signals and having comfortable demand responses
US10324429B2 (en) 2014-03-25 2019-06-18 Honeywell International Inc. System for propagating messages for purposes of demand response
US9665078B2 (en) 2014-03-25 2017-05-30 Honeywell International Inc. System for propagating messages for purposes of demand response
US20150293549A1 (en) * 2014-04-14 2015-10-15 Eaton Corporation Load panel system
US9979337B2 (en) 2014-04-24 2018-05-22 Generac Power Systems, Inc. Method of loadshedding for a variable speed, constant frequency generator
US9831664B1 (en) * 2014-05-06 2017-11-28 Google Inc. Integrated circuit breaker panels
US10437273B2 (en) * 2014-06-20 2019-10-08 Kabushiki Kaisha Toshiba Device operation setting apparatus and device operation setting value determination program
US20160378128A1 (en) * 2014-06-20 2016-12-29 Kabushiki Kaisha Toshiba Device operation setting apparatus and device operation setting value determination program
US20170179854A1 (en) * 2015-12-21 2017-06-22 Schneider Eletric Usa, Inc. Motor on-delay timer
US11096862B2 (en) 2016-01-22 2021-08-24 Hayward Industries, Inc. Systems and methods for providing network connectivity and remote monitoring, optimization, and control of pool/spa equipment
US11720085B2 (en) 2016-01-22 2023-08-08 Hayward Industries, Inc. Systems and methods for providing network connectivity and remote monitoring, optimization, and control of pool/spa equipment
US20200319621A1 (en) 2016-01-22 2020-10-08 Hayward Industries, Inc. Systems and Methods for Providing Network Connectivity and Remote Monitoring, Optimization, and Control of Pool/Spa Equipment
US20170212484A1 (en) * 2016-01-22 2017-07-27 Hayward Industries, Inc. Systems and Methods for Providing Network Connectivity and Remote Monitoring, Optimization, and Control of Pool/Spa Equipment
US11000449B2 (en) 2016-01-22 2021-05-11 Hayward Industries, Inc. Systems and methods for providing network connectivity and remote monitoring, optimization, and control of pool/spa equipment
US11122669B2 (en) 2016-01-22 2021-09-14 Hayward Industries, Inc. Systems and methods for providing network connectivity and remote monitoring, optimization, and control of pool/spa equipment
US11129256B2 (en) 2016-01-22 2021-09-21 Hayward Industries, Inc. Systems and methods for providing network connectivity and remote monitoring, optimization, and control of pool/spa equipment
US20200024832A1 (en) * 2016-07-29 2020-01-23 Veolia Environnement Ve Tool for managing multiple water resources
US10871391B2 (en) * 2016-07-29 2020-12-22 Veolia Environnement Ve Tool for managing multiple water resources
US10193381B2 (en) 2016-09-27 2019-01-29 Reliance Controls Corporation Load management and switching devices and methods
WO2018130875A1 (en) * 2017-01-10 2018-07-19 Van Der Walt, Louis, Stephanus An electrical switching system for a building or installation
US10467712B2 (en) 2017-01-18 2019-11-05 Coulomb, Inc. Energy management apparatus to upgrade and control an existing circuit breaker panel
US10541556B2 (en) 2017-04-27 2020-01-21 Honeywell International Inc. System and approach to integrate and manage diverse demand response specifications for multi-site enterprises
US11703895B2 (en) * 2018-06-26 2023-07-18 Mosaic Power, LLC System and method for monitoring hot water supply in a load control network
US11967857B1 (en) 2020-11-18 2024-04-23 J. Carl Cooper Power source load control
CN112637272A (en) * 2020-12-04 2021-04-09 广州电力通信网络有限公司 Electric power communication terminal and system based on thing networking intelligent distribution
WO2022260973A1 (en) * 2021-06-09 2022-12-15 Savant Systems, Inc. Flexible load management system
US11817737B2 (en) 2021-06-09 2023-11-14 Savant Systems, Inc. Flexible load management system
US11621580B2 (en) 2021-08-31 2023-04-04 Savant Systems, Inc. Microgrid switchover using zero-cross detection
WO2023034378A1 (en) * 2021-08-31 2023-03-09 Savant Systems, Inc. Guidance set-up for companion module graphical display
US11941228B2 (en) 2021-08-31 2024-03-26 Savant Systems, Inc. Guidance set-up for companion module graphical display

Similar Documents

Publication Publication Date Title
US20070222295A1 (en) System and method for power load management
US20040075343A1 (en) System and method for power load management
US11552500B2 (en) Systems and methods for managing electrical loads
US11770006B2 (en) Integrated electrical panel
CA2690573C (en) Electrical power distribution system
US20090018706A1 (en) Flexible electric load management system and method therefore
US20220216728A1 (en) Multilayer control for managing power flow
EP0055314A1 (en) Improvements in or relating to energy management
US20050216131A1 (en) Residential load power management system
MX2014012410A (en) Load shed control module for use with electrical generator.
EP4087081A1 (en) Method for monitoring and managing electrical power consumption
US20230120740A1 (en) Integrated home energy management and electric vehicle charging
KR20220122736A (en) A storage system configured for use in an energy management system
US20220294222A1 (en) Energy management system and method
US20230291206A1 (en) Energy management system and method
CN108475993A (en) power recovery system and method
CA3234957A1 (en) Integrated home energy management and electric vehicle charging
IL191442A (en) Flexible electric load management system and method therefor

Legal Events

Date Code Title Description
AS Assignment

Owner name: DYNAGEN TECHNOLOGIES, INC., CANADA

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:WAREHAM, PAUL;MACNEIL, STEPHEN;MACLEAN, MICHAEL A.;AND OTHERS;REEL/FRAME:019878/0381;SIGNING DATES FROM 20070725 TO 20070726

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION