US20070223998A1 - Water-Permeable Paving and Method for Producing a Paving - Google Patents

Water-Permeable Paving and Method for Producing a Paving Download PDF

Info

Publication number
US20070223998A1
US20070223998A1 US10/597,778 US59777805A US2007223998A1 US 20070223998 A1 US20070223998 A1 US 20070223998A1 US 59777805 A US59777805 A US 59777805A US 2007223998 A1 US2007223998 A1 US 2007223998A1
Authority
US
United States
Prior art keywords
layer
ground covering
ballast
sand
superstructure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US10/597,778
Inventor
Roger Hartenburg
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TerraElast AG
Original Assignee
TerraElast AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TerraElast AG filed Critical TerraElast AG
Assigned to TERRAELAST AG reassignment TERRAELAST AG ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: HARTENBURG, ROGER
Publication of US20070223998A1 publication Critical patent/US20070223998A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/22Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
    • E01C11/224Surface drainage of streets
    • E01C11/225Paving specially adapted for through-the-surfacing drainage, e.g. perforated, porous; Preformed paving elements comprising, or adapted to form, passageways for carrying off drainage
    • E01C11/226Coherent pavings
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C5/00Pavings made of prefabricated single units
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C7/00Coherent pavings made in situ
    • E01C7/08Coherent pavings made in situ made of road-metal and binders
    • E01C7/30Coherent pavings made in situ made of road-metal and binders of road-metal and other binders, e.g. synthetic material, i.e. resin
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C7/00Coherent pavings made in situ
    • E01C7/08Coherent pavings made in situ made of road-metal and binders
    • E01C7/32Coherent pavings made in situ made of road-metal and binders of courses of different kind made in situ

Definitions

  • the invention relates to a water-permeable ground covering for application to a substratum, in which case the superstructure of the ground covering is a combination of compacted, mineral aggregates and organic binding materials.
  • the invention further relates to a method for producing a ground covering.
  • grid plates For special applications, such as, for example the construction of riding and sports grounds, plastics grid plates have proved good. Such grid plates are known from DE 197 20 006 C2. As a result of an ingenious structure of elevations and openings, on the one hand grid plates enable there to be surface-consolidation on which it is possible to walk or drive and on the other hand avoid sealing as a result of their water-controllability.
  • the areally laid grid plates are laid directly on the substratum, such as gravel, grass, loam or humus.
  • a layer of sand or ballast can, however, also be applied to the substratum in order then to lay grid plates on this layer. It is possible to compensate for instances of unevenness in the ground by means of the layer of sand or ballast.
  • a tread layer is applied to a thickness of several centimetres.
  • the tread layer which together with the grid plates forms the superstructure of the sports ground cover, in the case of riding grounds as a rule consists of a bedding of sand, of a bedding of sand provided with aggregates (wood or plastics chips) or exclusively of wood chips.
  • the latter has a thickness of between 8 to 15 centimetres, measured from the upper plate of the grid plates.
  • Coverings with a surface structure that is uniform and visually attractive are known from DE 197 33 588 A1.
  • the water-permeable covering is produced from mineral aggregates and organic bonding agents.
  • the mixture is built up in the not yet hardened and deformable state.
  • organic binding materials come into consideration as binding material that is mixed together with mineral aggregates to form a charge and is processed further before hardening.
  • an object of the invention is to specify a water-permeable ground covering of the type in the preamble which even in the case of complex shapings is inexpensive in comparison with known ground coverings and grid systems.
  • the ground covering should not result in any limitations in the use of the covered areas.
  • a method for producing a ground covering is to be specified that allows the covering to be laid in a simple and inexpensive manner.
  • the object that is set with regard to the ground covering is achieved by means of the features of claim 1 .
  • the ground covering has a multi-layered structure with a superstructure and a substructure, with the substructure having at least one layer of sand on the substratum side and a layer of ballast on the superstructure side.
  • the average size k ballast of the undersize particles in the ballast amounts to 5 mm or more.
  • the bulk material of the substructure enables there to be uniform load-distribution in the substratum that lies underneath so that even punctiform pressure loads that act on the superstructure are introduced into the substratum so that they are distributed over a large area over the layer of sand on the substratum side and thus the static and dynamic pressure-loading capacity of the superstructure is decisively improved in comparison with known solutions.
  • a further improvement is brought about by the substructure in its water-permeable passage to the superstructure as regards water-controllability. It is precisely in the case of a critical substratum that has a high proportion of loam that the substructure is able to supplement the water-storing capacity of the superstructure. Thus the surface water is taken up by the substructure through the superstructure and is distributed horizontally. Thus enormous quantities of water can be taken up within a short time and stored temporarily until the substratum or further drainage facilities drain off the water. This drainage capacity can be attributed to the high voidage so that problem-free installation is possible even in water-protection regions. This voidage as well as different rock sizes and sorts of materials result in excellent sound-absorption.
  • the grain size of the ballast in the substructure has a further favourable effect upon the water-absorption value and water-controllability of the ground. This promises excellent values given an average grain size for the undersize particles of 5 mm or more.
  • Tried and tested average grain sizes k ballast of the ballast lie in a range between 5 to 16 mm, 16 to 22 mm or 16 to 32 mm. That means that the layer of ballast is composed of ballast with different grain sizes, with the grain of a layer of ballast lying in one of the ranges mentioned.
  • the average layer thickness d s of the compacted layer of ballast preferably amounts to between 400 and 500 mm.
  • the grain size of the aggregates also has a substantial influence on the infiltration capacity of the ground covering. Aggregates whose average grain size lies between 1 and 7 mm are particularly preferred. As previously mentioned, the layer structure of the ground covering in accordance with the invention has a favourable influence on the mechanical resistance values so that even values of over 5 mm are possible for the average size of the grain without a substantially increased risk of rupture occurring. The infiltration capacity can be further increased with this grain diameter. In addition, with these values the drop in infiltration capacity as a result of the entry of mineral and organic fine parts over time remains low.
  • the open-pore structure of the superstructure results in high coefficients of friction on the surface so that the ground covering is suitable as a non-slip cover for carriageways, footpaths, steps and presentation spaces and thus reduces the risk of accidents.
  • Favourable layer thicknesses for the superstructure with regard to pressure-loading capacity and good water-permeability lie between 30 and 60 mm. Of course, lower values are also possible, in which case then concessions have to be made with regard to pressure-loading capacity. Greater layer thicknesses for the superstructure only bring about slight improvements for the pressure-loading capacity and increases the costs of a ground covering. The optimum for most cases of application therefore lies in the range mentioned above.
  • the grain-size distribution is defined according to DIN 66145.
  • the parameter n amounts to at least 9 and is determined whilst disregarding 1% oversize and undersize particles in each case.
  • the binding material is preferably a two-component polyurethane binding material.
  • a two-component epoxy resin binding material or a one-component polyurethane binding material can be used in exactly the same way.
  • Two-component epoxy resin binding materials are made available, for example, by the firm of Koch Marmorit under the trade name Kryorit.
  • ground covering in accordance with the invention does not, for example, have any toxic effect at all upon mould fungi and is considered difficult to break down microbially. Nevertheless, substances that can be eluted from the ground covering can easily be broken down, as material tests have shown. As washing tests prove, there is no chemical interaction between surface water and the covering materials so that surface water that seeps through the covering can be introduced into the sewerage system in an untreated state or can safely drain off into the groundwater. Finally, the ground covering in accordance with the invention can be disposed of after its phase of use in an earth—or ballast-washing system without any negative environmental effects. Alternatively, after comminution, reuse thereof as granular material is also possible.
  • the components of the superstructure or substructure that are present as chippings or sand are to be stabilized, these are advantageously mixed with the previously homogenized binding agent in situ and laid out.
  • epoxy resin or polyurethane and hardeners are also mixed in situ and sprayed in liquid form onto the ballast surface.
  • the binding agent flows into the depths and thereby bonds the individual ballast grains or the granular material one with the other.
  • the binding materials mentioned as a result of the high binding force enable any bulk materials to be combined as a result of very good adhesion in the range of adhesive and capillary action. This additionally contributes to the static and dynamic pressure-loading capacity of the ground covering that has been mentioned. Bonding of adjacent layers of the superstructure and substructure is particularly effective for high loading capacity so that it is also possible for vehicles to drive on the ground covering.
  • the ground covering in accordance with the invention as a result of the high voidage also absorbs the sound of vehicles in a clearly better way than, for example, asphalt.
  • Particularly favourable values result in the case of a voidage of at least 45% in the superstructure.
  • the object that is set with regard to the method for producing the ground covering is achieved by means of the features of claim 15 . Accordingly, the production is effected in accordance with the following method steps:
  • FIG. 1 shows a diagrammatic cross section through a ground covering that has been applied to a substratum with a double-layer substructure
  • FIG. 2 shows a diagrammatic cross section through a ground covering that has been applied to a substratum with a three-layer substructure.
  • FIG. 1 graphically shows in a cross section the multi-layered structure of the ground covering 1 in accordance with the invention.
  • the latter has three layers, the lowest course of which, the substructure 2 , is applied to a substratum 3 .
  • the substratum 3 must first be prepared. This is dug to a frost-resistant depth of 40 to 60 cm. This digging depth is recommended so that the connection between the substructure 2 and the substratum 3 remains unaffected by the erosive effects of freeze-thaw cycling.
  • the substructure 2 itself is composed of a course of sand on the substratum side, the so-called layer of sand 4 , and the layer of ballast 5 lying on top.
  • the binding material is a two-component polyurethane binding material.
  • a two-component epoxy resin or a one-component polyurethane binding material can be used in exactly the same way.
  • the mixture is then to be processed without interruption as long as it is still deformable and has not hardened. This takes place by applying the layer of sand 4 to the substratum 3 in an as uniform and planar manner as possible.
  • the layer thickness d sand of the compacted layer of sand 4 amounts to at least 20 mm.
  • the layer of ballast 5 is applied.
  • the average grain size k ballast of the ballast in the case of the present embodiment lies in a range between 5 to 16 mm, with the average size of the undersize particles amounting to 5 mm. Uniform properties are obtained with this narrow grain-size range.
  • the ballast is mixed with binding material in order to apply the mixture as uniformly as possible to the layer of sand 4 .
  • the layer of ballast 5 is compacted with a mechanical vibrator.
  • the layer of ballast 5 then has an average layer thickness d s , of approximately 500 mm.
  • binding material in a quantity of 150 g/cm 2 is sprayed into the layer of ballast 5 that supports the superstructure 6 in order to achieve a firmer connection between the superstructure and the substructure 6 and 2 respectively.
  • the depth of penetration of the binding material amounts to approximately 150 mm. Even before the binding material hardens, a layer of mineral aggregates is applied.
  • this is a mixture of mineral aggregates that is mixed with binding material and is applied in the still deformable state.
  • the aggregates that come into consideration are selected from quartzite, granite, basalt and quartz, with coloured granite being used in the exemplary embodiment that is being described.
  • the average size of the granite grain lies in the range between 2 and 5 mm.
  • the grain-size distribution is defined according to DIN 66145 with a parameter of at least 9 and whilst disregarding 1% oversize and undersize particles in each case.
  • FIG. 2 An alternative embodiment of the ground covering 1 in accordance with the invention that can be loaded to a greater extent as a result of an additional layer of sand 4 ′ is shown in FIG. 2 .
  • the additional layer of sand 4 ′ is applied to the layer of ballast 5 and like the layer of sand 4 on the substratum side is also stabilized with binding material.
  • binding material is sprayed into the layer of ballast 5 before the layer of sand 4 ′ is applied.
  • the build-up of the superstructure 6 is effected in the same way as described for the embodiment in accordance with FIG. 1 .

Abstract

The invention relates to a water-permeable paving (1), for application on a ground. The upper part (6) of the paving (1) comprises a combination of compacted mineral aggregate and organic adhesives. Said paving (1) has a multilayered structure with an upper part (6) and a lower part (2), whereby the lowerpart (2) comprises at least one layer of sand (4) on the side of the ground and one layer of gravel (5) on the side of the upper part, the average size kSchotter of the fine particles being 5 mm. The invention also relates to a method for producing said paving.

Description

  • The invention relates to a water-permeable ground covering for application to a substratum, in which case the superstructure of the ground covering is a combination of compacted, mineral aggregates and organic binding materials. The invention further relates to a method for producing a ground covering.
  • The consolidation of surfaces by ground coverings to produce roads, public places, building covers and other surfaces on which it is possible to walk or drive is a well-known technique. Concrete, asphalt, stone and wooden coverings are common. The disadvantage with regard to draining off surface water is the low level of or even absence of water-permeability; there is therefore often talk of a sealing of the surfaces, attempts being made to deal with this by means of drainage systems, which in most cases are expensive.
  • An ecologically undesirable phenomenon accompanying surface-sealing is the increased loading on river courses that change into raging torrents when there is heavy or persistent downpours of rain or as a result of melt water. The consequences are catastrophic: ever more frequently floods occur, communal sewage plants are overloaded and fail, groundwater levels drop.
  • Further demands are made with regard to constructional properties. These relate to performance in the event of moisture, resistance to pests, acoustic properties, reaction to chemical influences and to fire. The durability of a ground plays a big rôle as the most important demand, with properties such as pressure-resistance, bending tensile strength, wear-resistance to drag, rolling, impact and shock, resistance to pressing-in representing significant constructional parameters.
  • For special applications, such as, for example the construction of riding and sports grounds, plastics grid plates have proved good. Such grid plates are known from DE 197 20 006 C2. As a result of an ingenious structure of elevations and openings, on the one hand grid plates enable there to be surface-consolidation on which it is possible to walk or drive and on the other hand avoid sealing as a result of their water-controllability.
  • The areally laid grid plates are laid directly on the substratum, such as gravel, grass, loam or humus. A layer of sand or ballast can, however, also be applied to the substratum in order then to lay grid plates on this layer. It is possible to compensate for instances of unevenness in the ground by means of the layer of sand or ballast. Depending on the use of the sports ground, if applicable a tread layer is applied to a thickness of several centimetres. The tread layer, which together with the grid plates forms the superstructure of the sports ground cover, in the case of riding grounds as a rule consists of a bedding of sand, of a bedding of sand provided with aggregates (wood or plastics chips) or exclusively of wood chips. Depending on the stress and strain and composition of the tread layer, the latter has a thickness of between 8 to 15 centimetres, measured from the upper plate of the grid plates.
  • The comparatively high costs of grid plates when laid out on large areas and also their uneven structure are disadvantageous, however.
  • Coverings with a surface structure that is uniform and visually attractive are known from DE 197 33 588 A1. The water-permeable covering is produced from mineral aggregates and organic bonding agents. The mixture is built up in the not yet hardened and deformable state. Mostly organic binding materials come into consideration as binding material that is mixed together with mineral aggregates to form a charge and is processed further before hardening.
  • What is disadvantageous about these coverings consisting of bound mineral aggregates is the lack of bonding with the substratum, this impairing the mechanical stress and strain precisely in the case of freeze-thaw cycling in grounds that are outside. Chemical, physical and biological corrosion of building materials, weathering, destruction of the subsoil lying underneath can result from this.
  • It is precisely public building promoters therefore who want to have ground coverings that do not seal the surfaces and allow large areas which bear high mechanical loads, for example as a result of vehicles, in a problem-free manner, to be covered inexpensively.
  • Against this background an object of the invention is to specify a water-permeable ground covering of the type in the preamble which even in the case of complex shapings is inexpensive in comparison with known ground coverings and grid systems. As regards the mechanical loading capacity, the ground covering should not result in any limitations in the use of the covered areas. In addition, a method for producing a ground covering is to be specified that allows the covering to be laid in a simple and inexpensive manner.
  • In accordance with the invention, the object that is set with regard to the ground covering is achieved by means of the features of claim 1. Accordingly, the ground covering has a multi-layered structure with a superstructure and a substructure, with the substructure having at least one layer of sand on the substratum side and a layer of ballast on the superstructure side. The average size kballast of the undersize particles in the ballast amounts to 5 mm or more.
  • In practice, it has been identified that the service life and loading capacity of a covering consisting merely of grid systems or bound, mineral aggregates is limited. As a result of the structure of the covering in accordance with the invention consisting of a superstructure and a substructure it is possible to adapt the positive properties with regard to the water-permeability of a superstructure, consisting of bound, mineral aggregates, universally to the substratum. The bulk material of the substructure enables there to be uniform load-distribution in the substratum that lies underneath so that even punctiform pressure loads that act on the superstructure are introduced into the substratum so that they are distributed over a large area over the layer of sand on the substratum side and thus the static and dynamic pressure-loading capacity of the superstructure is decisively improved in comparison with known solutions.
  • A further improvement is brought about by the substructure in its water-permeable passage to the superstructure as regards water-controllability. It is precisely in the case of a critical substratum that has a high proportion of loam that the substructure is able to supplement the water-storing capacity of the superstructure. Thus the surface water is taken up by the substructure through the superstructure and is distributed horizontally. Thus enormous quantities of water can be taken up within a short time and stored temporarily until the substratum or further drainage facilities drain off the water. This drainage capacity can be attributed to the high voidage so that problem-free installation is possible even in water-protection regions. This voidage as well as different rock sizes and sorts of materials result in excellent sound-absorption.
  • Tests have shown that the ground covering in accordance with the invention is able to demonstrate excellent water-absorption values. In a field analysis, the water-absorption values of the ground covering were determined and compared with the values of a conventional water-permeable sports-ground construction in accordance with DIN 18 035-6, section 5.1.6.3 and 5.1.6.2. In this connection, the requirements of DIN 18 035-6 were met many times over. Thus a sample with a layer thickness d of the superstructure of 47 mm resulted in a water-absorption value k*=0.51 cm/s. The requirement according to DIN 18 035-6, Table 3, amounts to >0.01 cm/s.
  • The grain size of the ballast in the substructure has a further favourable effect upon the water-absorption value and water-controllability of the ground. This promises excellent values given an average grain size for the undersize particles of 5 mm or more. Tried and tested average grain sizes kballast of the ballast lie in a range between 5 to 16 mm, 16 to 22 mm or 16 to 32 mm. That means that the layer of ballast is composed of ballast with different grain sizes, with the grain of a layer of ballast lying in one of the ranges mentioned. The average layer thickness ds of the compacted layer of ballast preferably amounts to between 400 and 500 mm.
  • The grain size of the aggregates also has a substantial influence on the infiltration capacity of the ground covering. Aggregates whose average grain size lies between 1 and 7 mm are particularly preferred. As previously mentioned, the layer structure of the ground covering in accordance with the invention has a favourable influence on the mechanical resistance values so that even values of over 5 mm are possible for the average size of the grain without a substantially increased risk of rupture occurring. The infiltration capacity can be further increased with this grain diameter. In addition, with these values the drop in infiltration capacity as a result of the entry of mineral and organic fine parts over time remains low.
  • The open-pore structure of the superstructure results in high coefficients of friction on the surface so that the ground covering is suitable as a non-slip cover for carriageways, footpaths, steps and presentation spaces and thus reduces the risk of accidents.
  • Favourable layer thicknesses for the superstructure with regard to pressure-loading capacity and good water-permeability lie between 30 and 60 mm. Of course, lower values are also possible, in which case then concessions have to be made with regard to pressure-loading capacity. Greater layer thicknesses for the superstructure only bring about slight improvements for the pressure-loading capacity and increases the costs of a ground covering. The optimum for most cases of application therefore lies in the range mentioned above.
  • Generally, the grain-size distribution is defined according to DIN 66145. The parameter n amounts to at least 9 and is determined whilst disregarding 1% oversize and undersize particles in each case.
  • The binding material is preferably a two-component polyurethane binding material. A two-component epoxy resin binding material or a one-component polyurethane binding material can be used in exactly the same way. Two-component epoxy resin binding materials are made available, for example, by the firm of Koch Marmorit under the trade name Kryorit.
  • An important advantage of the use of two-component epoxy resin binding material can be seen in its environmental compatibility. The ground covering in accordance with the invention does not, for example, have any toxic effect at all upon mould fungi and is considered difficult to break down microbially. Nevertheless, substances that can be eluted from the ground covering can easily be broken down, as material tests have shown. As washing tests prove, there is no chemical interaction between surface water and the covering materials so that surface water that seeps through the covering can be introduced into the sewerage system in an untreated state or can safely drain off into the groundwater. Finally, the ground covering in accordance with the invention can be disposed of after its phase of use in an earth—or ballast-washing system without any negative environmental effects. Alternatively, after comminution, reuse thereof as granular material is also possible.
  • When processing the binding material, two methods are distinguished. If the components of the superstructure or substructure that are present as chippings or sand are to be stabilized, these are advantageously mixed with the previously homogenized binding agent in situ and laid out. When ballast or other comparatively coarse granular material is stabilized, epoxy resin or polyurethane and hardeners are also mixed in situ and sprayed in liquid form onto the ballast surface. The binding agent flows into the depths and thereby bonds the individual ballast grains or the granular material one with the other.
  • The binding materials mentioned as a result of the high binding force enable any bulk materials to be combined as a result of very good adhesion in the range of adhesive and capillary action. This additionally contributes to the static and dynamic pressure-loading capacity of the ground covering that has been mentioned. Bonding of adjacent layers of the superstructure and substructure is particularly effective for high loading capacity so that it is also possible for vehicles to drive on the ground covering.
  • Very often for a visually attractive configuration of spaces colouring of the ground is desired. By using coloured quartz sand or natural stones as an aggregate it is possible to choose from over 200 colour variations so that practically no limits are set on the coloured configuration of a ground covering. Architects in particular know how to use these coloured effects in an impressive way.
  • In addition to the static and dynamic resistance values that are important for suitability as a carriageway-covering, the ground covering in accordance with the invention as a result of the high voidage also absorbs the sound of vehicles in a clearly better way than, for example, asphalt. Particularly favourable values result in the case of a voidage of at least 45% in the superstructure.
  • Further advantageous embodiments of the invention with respect to the ground covering follow from the features of claims 11 to 14.
  • In accordance with the invention the object that is set with regard to the method for producing the ground covering is achieved by means of the features of claim 15. Accordingly, the production is effected in accordance with the following method steps:
      • application of a still deformable mixture of binding material and sand to the substratum,
      • compacting of the binding-material/sand mixture,
      • application of a still deformable mixture of binding material and ballast to the layer of sand,
      • application of the upper layer consisting of a still deformable mixture of aggregates and binding material to the layer applied last,
      • compacting of the still deformable mixture, and
      • hardening.
  • Intensive bonding of the layers one with the other results if directly after compacting the first layer the next layer is applied before the layer that lies underneath hardens. This calls for uninterrupted application and compacting layer by layer.
  • Further advantageous embodiments of the invention with respect to the ground covering follow from the features of claims 16 to 20.
  • Advantageous embodiments of the invention are explained in the following with reference to the attached drawing, in which:
  • FIG. 1 shows a diagrammatic cross section through a ground covering that has been applied to a substratum with a double-layer substructure, and
  • FIG. 2 shows a diagrammatic cross section through a ground covering that has been applied to a substratum with a three-layer substructure.
  • FIG. 1 graphically shows in a cross section the multi-layered structure of the ground covering 1 in accordance with the invention. In the present exemplary embodiment the latter has three layers, the lowest course of which, the substructure 2, is applied to a substratum 3. Before the substructure 2 can be applied, the substratum 3 must first be prepared. This is dug to a frost-resistant depth of 40 to 60 cm. This digging depth is recommended so that the connection between the substructure 2 and the substratum 3 remains unaffected by the erosive effects of freeze-thaw cycling.
  • The substructure 2 itself is composed of a course of sand on the substratum side, the so-called layer of sand 4, and the layer of ballast 5 lying on top. For this is first added a charge of binding material and sand that are mixed together. The binding material is a two-component polyurethane binding material. A two-component epoxy resin or a one-component polyurethane binding material can be used in exactly the same way. After the charge has been added, the mixture is then to be processed without interruption as long as it is still deformable and has not hardened. This takes place by applying the layer of sand 4 to the substratum 3 in an as uniform and planar manner as possible. The layer thickness dsand of the compacted layer of sand 4 amounts to at least 20 mm.
  • After the compacting and the hardening, which is already starting, of the layer of sand 4, the layer of ballast 5 is applied. The average grain size kballast of the ballast in the case of the present embodiment lies in a range between 5 to 16 mm, with the average size of the undersize particles amounting to 5 mm. Uniform properties are obtained with this narrow grain-size range. Here as well the ballast is mixed with binding material in order to apply the mixture as uniformly as possible to the layer of sand 4. Subsequently, the layer of ballast 5 is compacted with a mechanical vibrator. The layer of ballast 5 then has an average layer thickness ds, of approximately 500 mm.
  • Finally, there follows the build-up of the open-pore superstructure 6 that is visible in the finished state. In the first instance, binding material in a quantity of 150 g/cm2 is sprayed into the layer of ballast 5 that supports the superstructure 6 in order to achieve a firmer connection between the superstructure and the substructure 6 and 2 respectively. The depth of penetration of the binding material amounts to approximately 150 mm. Even before the binding material hardens, a layer of mineral aggregates is applied.
  • Here as well this is a mixture of mineral aggregates that is mixed with binding material and is applied in the still deformable state. The aggregates that come into consideration are selected from quartzite, granite, basalt and quartz, with coloured granite being used in the exemplary embodiment that is being described. The average size of the granite grain lies in the range between 2 and 5 mm. The grain-size distribution is defined according to DIN 66145 with a parameter of at least 9 and whilst disregarding 1% oversize and undersize particles in each case.
  • After the mixture has been applied, this is compacted with a roller and smoothed with a bladed smoothing screed. Compacting is preferably effected with a contact pressure of 10 to 50 N/cm2. The superstructure after compacting has a layer thickness do of 50 mm. After compacting, the superstructure is hardened. The ground covering can then be loaded.
  • Basically, before applying a layer to a layer that lies underneath it is not necessary for the layer that lies underneath to harden. On the contrary, application to a layer that has not yet hardened results in better connection of the layers one with the other.
  • An alternative embodiment of the ground covering 1 in accordance with the invention that can be loaded to a greater extent as a result of an additional layer of sand 4′ is shown in FIG. 2. The additional layer of sand 4′ is applied to the layer of ballast 5 and like the layer of sand 4 on the substratum side is also stabilized with binding material. For better adhesion, binding material is sprayed into the layer of ballast 5 before the layer of sand 4′ is applied. After compacting, the build-up of the superstructure 6 is effected in the same way as described for the embodiment in accordance with FIG. 1.
  • List of Reference Numerals
    • 1 Ground covering
    • 2 Substructure
    • 3 Substratum
    • 4, 4′ Layer of sand
    • 5 Layer of ballast
    • 6 Superstructure

Claims (20)

1. Water-permeable ground covering (1) for application to a substratum, wherein the superstructure (6) of the ground covering (1) is a combination of compacted, mineral aggregates and organic binding materials, characterised in that the ground covering (1) has a multi-layered structure with a superstructure and a substructure (6 and 2 respectively), with the substructure (2) having at least one layer of sand (4) on the substratum side and a layer of ballast (5) on the superstructure side, the average size kballast of the undersize particles of which amounts to 5 mm or more.
2. Ground covering according to claim 1, characterised in that layers of the superstructure and/or of the substructure (6 and 2 respectively) are connected together by bonding.
3. Ground covering according to one of the preceding claims, characterised in that the granulation of the aggregates kz amounts to 1 to 7 mm.
4. Ground covering according to one of the preceding claims, characterised in that the average layer thickness do of the superstructure (6) amounts to 30 to 60 mm.
5. Ground covering according to one of the preceding claims, characterised in that the voidage of the superstructure (6) amounts to up to 45%.
6. Ground covering according to one of the preceding claims, characterised in that the mineral aggregates comprise a selection of quartzite, granite, basalt and quartz.
7. Ground covering according to one of the preceding claims, characterised in that the mineral aggregates have a narrow grain-size distribution, with the average size dk of the grain amounting to a range between 1 to 3 mm, 2 to 3 mm, 2 to 4 mm, 2 to 5 mm or 3 to 7 mm.
8. Ground covering according to one of the preceding claims, characterised in that the mineral aggregates have a mixture of round grain and at least a proportion of 20% angular grain.
9. Ground covering according to one of the preceding claims, characterised in that the binding material is a two-component epoxy resin binding material or a one-component polyurethane binding material or a two-component polyurethane binding material.
10. Ground covering according to one of the preceding claims, characterised in that a proportion of the aggregates of the superstructure (6) are coloured and the proportion preferably consists of quartz sand.
11. Ground covering according to one of the preceding claims, characterised in that the average layer thickness dsand of the compacted layer of sand (4) amount to at least 20 mm.
12. Ground covering according to one of the preceding claims, characterised in that the layer of ballast (5) has undersize particles, whose average size kuballast amounts to 5 mm or more.
13. Ground covering according to one of the preceding claims, characterised in that the average grain size kballast of the ballast (5) lies in a range between 5 to 16 mm, 16 to 22 mm or 16 to 32 mm.
14. Ground covering according to one of the preceding claims, characterised in that the average layer thickness ds of the layer of ballast (5) amounts to 400 to 500 mm.
15. Method for producing a ground covering according to one of the preceding claims, characterised by the following method steps:
application of a still deformable mixture of binding material and sand to the substratum (3),
compacting of the binding-material/sand mixture,
application of a still deformable mixture of binding material and ballast (5) to the layer of sand (4),
application of the upper layer consisting of a still deformable mixture of aggregates and binding material to the layer applied last,
compacting of the still deformable mixture, and
hardening of the layers.
16. Method according to claim 15, characterised in that the superstructure (6) is applied to the substructure (2) even before the layer of the substructure (2) on the superstructure side has completely hardened.
17. Method according to claim 15 or 16, characterised in that a layer of sand (4) is applied after the layer of ballast (5) has been applied.
18. Method according to one of the claims 15 to 17, characterised in that before the layer of ballast (5) is applied to the layer of sand (4), a layer of binding material is applied to the layer of sand, for example by spraying.
19. Method according to one of the claims 15 to 18, characterised in that before the superstructure (6) is applied to the layer of ballast (5), a layer of binding material is applied to the layer of ballast (5), for example by spraying.
20. Method according to claim 18 or 19, characterised in that the depth of penetration t of the layer of binding material amounts to at least 150 mm.
US10/597,778 2004-02-07 2005-01-14 Water-Permeable Paving and Method for Producing a Paving Abandoned US20070223998A1 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
DE102004006165.3 2004-02-07
DE102004006165A DE102004006165B4 (en) 2004-02-07 2004-02-07 Water-permeable floor covering and method for producing a floor covering
PCT/DE2005/000046 WO2005075741A1 (en) 2004-02-07 2005-01-14 Water-permeable paving and method for producing a paving

Publications (1)

Publication Number Publication Date
US20070223998A1 true US20070223998A1 (en) 2007-09-27

Family

ID=34801750

Family Applications (1)

Application Number Title Priority Date Filing Date
US10/597,778 Abandoned US20070223998A1 (en) 2004-02-07 2005-01-14 Water-Permeable Paving and Method for Producing a Paving

Country Status (11)

Country Link
US (1) US20070223998A1 (en)
EP (1) EP1716291A1 (en)
KR (1) KR20070003914A (en)
CN (1) CN1981090A (en)
AU (1) AU2005211168A1 (en)
CA (1) CA2555307A1 (en)
DE (1) DE102004006165B4 (en)
MX (1) MXPA06009497A (en)
RU (1) RU2370588C2 (en)
WO (1) WO2005075741A1 (en)
ZA (1) ZA200607415B (en)

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080019770A1 (en) * 2006-07-19 2008-01-24 Shaw Lee A Aquifer replenishment system
US20080143623A1 (en) * 2006-12-16 2008-06-19 Thomson Licensing Radiating slot planar antennas
US20100112329A1 (en) * 2006-10-31 2010-05-06 Zhijian Yi Porous cement road surface made from polymer modified cement and a construction method thereof
US20100150654A1 (en) * 2006-07-19 2010-06-17 Lithocrete, Inc. Aquifer replenishment system with filter
US20100256295A1 (en) * 2007-09-14 2010-10-07 Basf Se Method for producing mineral-bearing cover layers for floor coverings
US20110229262A1 (en) * 2008-11-28 2011-09-22 Bridge Co., Ltd. Pavement body, method for constructing pavement body, and mold form for concrete
US20110230598A1 (en) * 2008-12-05 2011-09-22 Wacker Chemie Ag Pervious Concrete Composition
JP2012117236A (en) * 2010-11-30 2012-06-21 Takenaka Komuten Co Ltd Water retentive pavement and manufacturing method thereof
CN102776821A (en) * 2012-08-07 2012-11-14 张美玲 Layered water permeable brick
US8312690B1 (en) * 2012-02-29 2012-11-20 T.B. Penick & Sons, Inc. Pervious concrete system and method of forming pervious concrete
US20140272369A1 (en) * 2013-03-14 2014-09-18 Jonathan Todd King Pervious concrete permeable grout
CN104480825A (en) * 2014-12-03 2015-04-01 河南力新彩石建材有限公司 Construction method of water-permeable type pouring water-permeable stone
US9631088B2 (en) 2009-12-21 2017-04-25 Basf Se Composite pavement structures
WO2017121869A1 (en) * 2016-01-15 2017-07-20 Allnex Netherlands B.V. Road surfacing composition
JP2019027041A (en) * 2017-07-26 2019-02-21 矢作建設工業株式会社 Road surface treatment method
US20190177923A1 (en) * 2016-03-23 2019-06-13 Holcim Technology Ltd Concrete pavement structure comprising a concrete base layer and an elastomer improved concrete wearing layer
CN111996860A (en) * 2020-07-21 2020-11-27 湖南砼艺市政工程建设有限公司 Construction process of pavement structure of ecological cold-mixing permeable asphalt structure
CN112176818A (en) * 2020-07-18 2021-01-05 王春成 Drainage structure for highway engineering
US11346061B2 (en) 2019-08-29 2022-05-31 Andreas Stieglbauer Road surfacing system

Families Citing this family (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102007039650A1 (en) 2007-08-22 2009-02-26 Henkel Ag & Co. Kgaa Glued flooring
DE102008019439A1 (en) 2008-04-17 2009-10-22 Henkel Ag & Co. Kgaa Method for bonding granules
DE102008030954A1 (en) * 2008-07-02 2010-01-14 Kohlstadt, Hans-Peter Water permeable, drivable multilayered flooring for applying on buildings, comprises covering layer based on mineral-bound aggregates, reinforcement mesh fabric, and base layer
DE202008008740U1 (en) 2008-07-02 2008-09-04 Kohlstadt, Hans-Peter Water-permeable, drivable multi-layer flooring
DE202008010793U1 (en) 2008-08-05 2008-10-16 Kohlstadt, Hans-Peter Renovation of a water-permeable, passable multi-layered floor covering with cracks
DE102008039595A1 (en) 2008-08-25 2010-03-04 Kohlstadt, Hans-Peter Cracks remediation method for water-permeable, accessible multi-layered flooring in rainwater-permeable traffic area, involves removing cladding on top layer and filling groove in top layer with reactive sealant
CA2691669A1 (en) * 2010-02-01 2011-08-01 Chris Andersen Road mat
CN102465483B (en) * 2010-11-01 2013-12-25 华中农业大学 Pavement side vadose zone
BE1021351B1 (en) * 2014-10-20 2015-11-05 Green Road Nv METHOD AND COMPOSITION FOR THE APPLICATION OF AN ECOLOGICAL, WATERPROOFABLE SURFACE Curing
CN104452583B (en) * 2014-11-04 2016-04-06 江苏中路工程技术研究院有限公司 Compound antiskid wearing layer, Preparation method and use
RU2651733C1 (en) * 2016-12-02 2018-04-23 Акционерное общество "ОргСинтезРесурс" Astringent for strait of structural layers of a transport structure and method of its use for the construction of a transport structure
CN108265582A (en) * 2016-12-30 2018-07-10 上海美潘新材料科技有限公司 pervious concrete configuration method
CN106884364A (en) * 2017-04-20 2017-06-23 北京市政路桥建材集团有限公司 The cement concrete bridge deck water-proof tack coat and its construction method of a kind of rapid construction
DE202017002433U1 (en) * 2017-05-06 2018-08-07 Karl Kortmann Kit with concrete elements
CN109183558A (en) * 2018-09-14 2019-01-11 北京城建十六建筑工程有限责任公司 The preparation method and its construction method of a kind of pavement, its layered material
RU2728622C1 (en) * 2020-01-16 2020-07-30 Евгений Евгеньевич Усов Method for obtaining coating of tracks with drainage effect
DE102022120632A1 (en) 2022-08-16 2024-02-22 Lutz Weiler Road or sidewalk surface and process for its production

Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3687021A (en) * 1970-02-24 1972-08-29 Billy R Hensley Vertically draining flat structures
US3690227A (en) * 1970-07-14 1972-09-12 Lloyd G Welty Frictional self-draining structure
US3732791A (en) * 1967-07-27 1973-05-15 Basf Ag Pavement and railroad bed construction with light concrete sub-layer
US3870422A (en) * 1974-06-07 1975-03-11 Medico Christine Porous pavement
US4523755A (en) * 1981-05-28 1985-06-18 Egon Turba Surface for sports areas, particularly tennis courts, and its manufacture
US4708516A (en) * 1984-06-22 1987-11-24 Miller E James Asphalt pavement
US4797026A (en) * 1984-05-09 1989-01-10 The United States Of America As Represented By The Secretary Of The Army Expandable sand-grid for stabilizing an undersurface
US4826350A (en) * 1987-03-07 1989-05-02 Nisshoku Corporation Method for constructing water-permeable sports surface and the like
US5282691A (en) * 1990-10-24 1994-02-01 Fibrescreed Limited Structural material and drain
US5460649A (en) * 1994-06-06 1995-10-24 Strassman; David R. Fiber-reinforced rubber asphalt composition
US5511899A (en) * 1995-02-03 1996-04-30 Greater Lebanon Refuse Authority Light duty roadway surface from recycled waste asphalt roofing shingle materials
US5788407A (en) * 1995-05-01 1998-08-04 Hwang; Ik Hyun Paving method of water-permeable concrete
US6158920A (en) * 1996-03-28 2000-12-12 Total Raffinage Distribution S.A. Roadway structure made from rigid materials
US20040067103A1 (en) * 2001-04-06 2004-04-08 Peter Hart Reinforced permeable paving structure
US6766817B2 (en) * 2001-07-25 2004-07-27 Tubarc Technologies, Llc Fluid conduction utilizing a reversible unsaturated siphon with tubarc porosity action
US7351004B2 (en) * 2006-07-19 2008-04-01 Shaw & Sons, Inc. Aquifer replenishment system

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT318693B (en) * 1973-06-08 1974-11-11 Chemie Linz Ag Process to prevent water transport from deeper soil layers to the ice border in soils at risk of frost
ES2034541T3 (en) * 1988-09-07 1993-04-01 Hanne Hofmann-Jeckel COATING FOR TENNIS COURTS.
JP2864078B2 (en) * 1992-09-07 1999-03-03 信越化学工業株式会社 Road laying method
DE19605990C2 (en) * 1996-02-16 1999-11-04 Gisbert Trawny Process for producing a floor covering, in particular path covering, and floor covering
DE19622852A1 (en) * 1996-05-19 1997-11-20 Helmut Fischer Surface reinforcement of roads, paths, garage areas etc.
DE19651748A1 (en) * 1996-12-12 1998-06-18 Claus Dieter Ihle Production and/or pre-finishing of draining bulk material
DE19720006C2 (en) * 1997-05-13 2002-06-13 Willibald Hergeth Flooring and ceiling for sports fields
DE19733588A1 (en) * 1997-08-02 1999-02-18 Koch Marmorit Gmbh Method of manufacturing water permeable surface from mineral aggregate bonded with organic adhesive
DE19757746A1 (en) * 1997-12-23 1999-06-24 Quarz Color Steidle Baustoff G Strong, water-permeable surface or slab useful for outdoor surfaces and paths
DE29816625U1 (en) * 1998-09-16 1998-12-10 Amberger Kaolinwerke Eduard Ki Components for covering areas
DE20002066U1 (en) * 1999-04-06 2000-07-20 Theelen Joerg Infiltration system
AT4413U1 (en) * 2000-06-13 2001-07-25 Kleinhagauer Manfred Lures for fishing

Patent Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3732791A (en) * 1967-07-27 1973-05-15 Basf Ag Pavement and railroad bed construction with light concrete sub-layer
US3687021A (en) * 1970-02-24 1972-08-29 Billy R Hensley Vertically draining flat structures
US3690227A (en) * 1970-07-14 1972-09-12 Lloyd G Welty Frictional self-draining structure
US3870422A (en) * 1974-06-07 1975-03-11 Medico Christine Porous pavement
US4523755A (en) * 1981-05-28 1985-06-18 Egon Turba Surface for sports areas, particularly tennis courts, and its manufacture
US4797026A (en) * 1984-05-09 1989-01-10 The United States Of America As Represented By The Secretary Of The Army Expandable sand-grid for stabilizing an undersurface
US4708516A (en) * 1984-06-22 1987-11-24 Miller E James Asphalt pavement
US4826350A (en) * 1987-03-07 1989-05-02 Nisshoku Corporation Method for constructing water-permeable sports surface and the like
US5282691A (en) * 1990-10-24 1994-02-01 Fibrescreed Limited Structural material and drain
US5460649A (en) * 1994-06-06 1995-10-24 Strassman; David R. Fiber-reinforced rubber asphalt composition
US5511899A (en) * 1995-02-03 1996-04-30 Greater Lebanon Refuse Authority Light duty roadway surface from recycled waste asphalt roofing shingle materials
US5788407A (en) * 1995-05-01 1998-08-04 Hwang; Ik Hyun Paving method of water-permeable concrete
US6158920A (en) * 1996-03-28 2000-12-12 Total Raffinage Distribution S.A. Roadway structure made from rigid materials
US20040067103A1 (en) * 2001-04-06 2004-04-08 Peter Hart Reinforced permeable paving structure
US6766817B2 (en) * 2001-07-25 2004-07-27 Tubarc Technologies, Llc Fluid conduction utilizing a reversible unsaturated siphon with tubarc porosity action
US7351004B2 (en) * 2006-07-19 2008-04-01 Shaw & Sons, Inc. Aquifer replenishment system

Cited By (34)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8162563B2 (en) 2006-07-19 2012-04-24 Oceansafe Llc Aquifer replenishment system with filter
US20080159811A1 (en) * 2006-07-19 2008-07-03 Shaw & Sons, Inc. Aquifer replenishment system
US20080019770A1 (en) * 2006-07-19 2008-01-24 Shaw Lee A Aquifer replenishment system
US7351004B2 (en) * 2006-07-19 2008-04-01 Shaw & Sons, Inc. Aquifer replenishment system
US20100150654A1 (en) * 2006-07-19 2010-06-17 Lithocrete, Inc. Aquifer replenishment system with filter
US20090190998A1 (en) * 2006-07-19 2009-07-30 Shaw Lee A Aquifer Replenishment System
US7575394B2 (en) 2006-07-19 2009-08-18 Lithocrete, Inc. Aquifer replenishment system
US20090214296A1 (en) * 2006-07-19 2009-08-27 Shaw Lee A Aquifer Replenishment System
US7651293B2 (en) 2006-07-19 2010-01-26 Shaw Lee A Aquifer replenishment system
US7699557B2 (en) 2006-07-19 2010-04-20 Lithocrete, Inc. Aquifer replenishment system
US20080124176A1 (en) * 2006-07-19 2008-05-29 Shaw & Sons, Inc. Aquifer replenishment system
US20100112329A1 (en) * 2006-10-31 2010-05-06 Zhijian Yi Porous cement road surface made from polymer modified cement and a construction method thereof
US8470437B2 (en) 2006-10-31 2013-06-25 Zhijian Yi Porous cement road surface made from polymer modified cement and a construction method thereof
US20080143623A1 (en) * 2006-12-16 2008-06-19 Thomson Licensing Radiating slot planar antennas
US20100256295A1 (en) * 2007-09-14 2010-10-07 Basf Se Method for producing mineral-bearing cover layers for floor coverings
US20110229262A1 (en) * 2008-11-28 2011-09-22 Bridge Co., Ltd. Pavement body, method for constructing pavement body, and mold form for concrete
US20110230598A1 (en) * 2008-12-05 2011-09-22 Wacker Chemie Ag Pervious Concrete Composition
US9670094B2 (en) 2008-12-05 2017-06-06 Wacker Chemie Ag Pervious concrete composition
US9631088B2 (en) 2009-12-21 2017-04-25 Basf Se Composite pavement structures
US10480128B2 (en) 2009-12-21 2019-11-19 Basf Se Composite pavement structures
US9850625B2 (en) * 2009-12-21 2017-12-26 Basf Se Composite pavement structures
JP2012117236A (en) * 2010-11-30 2012-06-21 Takenaka Komuten Co Ltd Water retentive pavement and manufacturing method thereof
US8312690B1 (en) * 2012-02-29 2012-11-20 T.B. Penick & Sons, Inc. Pervious concrete system and method of forming pervious concrete
CN102776821A (en) * 2012-08-07 2012-11-14 张美玲 Layered water permeable brick
US20140272369A1 (en) * 2013-03-14 2014-09-18 Jonathan Todd King Pervious concrete permeable grout
CN104480825A (en) * 2014-12-03 2015-04-01 河南力新彩石建材有限公司 Construction method of water-permeable type pouring water-permeable stone
WO2017121869A1 (en) * 2016-01-15 2017-07-20 Allnex Netherlands B.V. Road surfacing composition
US20190177923A1 (en) * 2016-03-23 2019-06-13 Holcim Technology Ltd Concrete pavement structure comprising a concrete base layer and an elastomer improved concrete wearing layer
US10815624B2 (en) * 2016-03-23 2020-10-27 Holcim Technology Ltd Concrete pavement structure comprising a concrete base layer and an elastomer improved concrete wearing layer
JP2019027041A (en) * 2017-07-26 2019-02-21 矢作建設工業株式会社 Road surface treatment method
JP7095959B2 (en) 2017-07-26 2022-07-05 矢作建設工業株式会社 Road surface treatment method
US11346061B2 (en) 2019-08-29 2022-05-31 Andreas Stieglbauer Road surfacing system
CN112176818A (en) * 2020-07-18 2021-01-05 王春成 Drainage structure for highway engineering
CN111996860A (en) * 2020-07-21 2020-11-27 湖南砼艺市政工程建设有限公司 Construction process of pavement structure of ecological cold-mixing permeable asphalt structure

Also Published As

Publication number Publication date
EP1716291A1 (en) 2006-11-02
AU2005211168A1 (en) 2005-08-18
WO2005075741A1 (en) 2005-08-18
MXPA06009497A (en) 2007-08-02
DE102004006165A1 (en) 2005-08-25
RU2370588C2 (en) 2009-10-20
CA2555307A1 (en) 2005-08-18
ZA200607415B (en) 2007-12-27
CN1981090A (en) 2007-06-13
KR20070003914A (en) 2007-01-05
DE102004006165B4 (en) 2007-01-18
AU2005211168A2 (en) 2005-08-18
RU2006132178A (en) 2008-03-20

Similar Documents

Publication Publication Date Title
US20070223998A1 (en) Water-Permeable Paving and Method for Producing a Paving
AM et al. Development of high quality pervious concrete specifications for Maryland conditions.
US11479506B2 (en) Dry mix and concrete composition containing bed ash and related methods
CN106565175A (en) Permeable high elastic modulus mortar for sponge city and preparation method thereof and application mode thereof
US20090038511A1 (en) Carriageway and ground surfacing for carriageways
WO2007026977A1 (en) Soil rock layer's composition, constructing method thereof and road construction method thereby
KR102044882B1 (en) Road paving method
DE202004001884U1 (en) Water-permeable ground cover for a building site comprises a layer consisting of at least one sand sublayer next to the building ground and a sublayer of broken stone above it
GB2142329A (en) Road-surfacing material
KR100698587B1 (en) The improved pavement
KR100907751B1 (en) Packaging method using soybeans
JPH0648805A (en) Water-permeable concrete
JP2000178910A (en) Paving structure
EP0795059B1 (en) A method of providing a road surface with an overlay
JPH0336961B2 (en)
JP3210214B2 (en) Pavement correction material
JP5711781B2 (en) Permeable pavement and its construction method
KR101240533B1 (en) Structure for bicycle road
JP2000169720A (en) Asphalt mixture suitable for underwater application and application apparatus
KR950008588B1 (en) Process for producing collar asphalt
KR20090091989A (en) A drainage mortar and the manufacturing method using single size aggregate
Estakhri et al. Guidelines on the Use of Underseals as a Pavement Moisture Barrier
SK500512014A3 (en) Base layer of an engineering structures and method of its creation
SK288745B6 (en) Base layer of an engineering structure and method of its creation
KR20080012839A (en) Carriageway and ground surfacing for carriageways

Legal Events

Date Code Title Description
AS Assignment

Owner name: TERRAELAST AG, GERMANY

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:HARTENBURG, ROGER;REEL/FRAME:018814/0608

Effective date: 20070115

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION