US20070266601A1 - Device for measuring a load at the end of a rope wrapped over a rod - Google Patents

Device for measuring a load at the end of a rope wrapped over a rod Download PDF

Info

Publication number
US20070266601A1
US20070266601A1 US11/437,308 US43730806A US2007266601A1 US 20070266601 A1 US20070266601 A1 US 20070266601A1 US 43730806 A US43730806 A US 43730806A US 2007266601 A1 US2007266601 A1 US 2007266601A1
Authority
US
United States
Prior art keywords
rope
arm
dipper
boom
angle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US11/437,308
Inventor
Richard L. Claxton
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Harnischfeger Technologies Inc
Original Assignee
Harnischfeger Technologies Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Harnischfeger Technologies Inc filed Critical Harnischfeger Technologies Inc
Priority to US11/437,308 priority Critical patent/US20070266601A1/en
Assigned to HARNISCHFEGER TECHNOLOGIES, INC. reassignment HARNISCHFEGER TECHNOLOGIES, INC. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: CLAXTON, RICHARD L., MR.
Publication of US20070266601A1 publication Critical patent/US20070266601A1/en
Priority to US12/558,533 priority patent/US8209096B2/en
Priority to US12/558,532 priority patent/US8032313B2/en
Priority to US13/471,985 priority patent/US8370031B2/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/24Safety devices, e.g. for preventing overload
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/28Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets
    • E02F3/30Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets with a dipper-arm pivoted on a cantilever beam, i.e. boom
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/006Pivot joint assemblies
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01GWEIGHING
    • G01G19/00Weighing apparatus or methods adapted for special purposes not provided for in the preceding groups
    • G01G19/14Weighing apparatus or methods adapted for special purposes not provided for in the preceding groups for weighing suspended loads
    • G01G19/18Weighing apparatus or methods adapted for special purposes not provided for in the preceding groups for weighing suspended loads having electrical weight-sensitive devices
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01GWEIGHING
    • G01G23/00Auxiliary devices for weighing apparatus
    • G01G23/01Testing or calibrating of weighing apparatus
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01GWEIGHING
    • G01G3/00Weighing apparatus characterised by the use of elastically-deformable members, e.g. spring balances
    • G01G3/12Weighing apparatus characterised by the use of elastically-deformable members, e.g. spring balances wherein the weighing element is in the form of a solid body stressed by pressure or tension during weighing
    • G01G3/14Weighing apparatus characterised by the use of elastically-deformable members, e.g. spring balances wherein the weighing element is in the form of a solid body stressed by pressure or tension during weighing measuring variations of electrical resistance
    • G01G3/1402Special supports with preselected places to mount the resistance strain gauges; Mounting of supports
    • G01G3/141Special supports with preselected places to mount the resistance strain gauges; Mounting of supports the supports being disc or ring shaped
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01LMEASURING FORCE, STRESS, TORQUE, WORK, MECHANICAL POWER, MECHANICAL EFFICIENCY, OR FLUID PRESSURE
    • G01L5/00Apparatus for, or methods of, measuring force, work, mechanical power, or torque, specially adapted for specific purposes
    • G01L5/04Apparatus for, or methods of, measuring force, work, mechanical power, or torque, specially adapted for specific purposes for measuring tension in flexible members, e.g. ropes, cables, wires, threads, belts or bands
    • G01L5/10Apparatus for, or methods of, measuring force, work, mechanical power, or torque, specially adapted for specific purposes for measuring tension in flexible members, e.g. ropes, cables, wires, threads, belts or bands using electrical means
    • G01L5/101Apparatus for, or methods of, measuring force, work, mechanical power, or torque, specially adapted for specific purposes for measuring tension in flexible members, e.g. ropes, cables, wires, threads, belts or bands using electrical means using sensors inserted into the flexible member

Definitions

  • This invention is directed to devices for measuring the weight of a load at the end of a rope wrapped over a rod.
  • the calibration procedure used in this instance is as follows.
  • This invention eliminates these inaccuracies.
  • This invention provides a machine for raising and lowering a load, the machine including a platform, a boom attached at one end to the platform, and a rod mounted transverse to the longitudinal axis of the boom on the other end of a boom.
  • the rod has a central bore there through, with at least two strain gauges mounted therein and angled relative to each other, a hoist rope extending over the rod and having an end adapted to be attached to the load, and a mechanism connected to the at least two strain gauges for determining the angle of departure of the hoist rope from the rod and the amount of pull of the load on the hoist rope.
  • the object of this invention is to provide a relatively accurate device for measuring the weight of a load at the end of a rope wrapped over a rod, where the direction of rope pull caused by the load relative to the rod is variable.
  • FIG. 1 is a partial broken away side view of a pin with a rifle bore with strain gauges mounted in the bore.
  • FIG. 2 is a plan view of a surface mining shovel that employs the mechanism of the present invention.
  • FIGS. 3A , 3 B and 3 C are a perspective view of the sheave rod of this invention, with a cross section showing the placement of the two sets of strain gauges and the resulting strain gauge bridge and the mechanism of this invention.
  • FIG. 4 is a cross section of the sheave pin with arrows showing how to determine the pull of a rope given the strain gauge outputs.
  • FIG. 5 is a cross section of the sheave pin and sheave with arrows showing how to determine the tension and angle of the rope wrapped over the sheave on the sheave pin.
  • FIG. 6 is a graph of the sheave pin calibration data.
  • FIG. 7 is a graph of the calibration data showing how the data is not linear.
  • the invention is a machine for raising and lowering a load, such as a hoisting machine 8 including a device 22 supported from a structure. More particularly, the machine can be a piece of large mining machine or an industrial crane, or any device for lifting a load.
  • a power shovel is described, and the device 22 for holding the material to be lifted is a dipper.
  • the power shovel 8 of FIG. 2 is of a well-known construction commonly referred to as an electric rope shovel.
  • the shovel 8 comprises a mobile base 10 supported on drive tracks 11 , and having supported thereon through a turntable 12 , a platform in the form of a machinery deck 13 .
  • the turntable 12 permits full 360 degrees of rotation of the machinery deck relative to the base.
  • a boom 15 is pivotally connected at a lower end 16 to the machinery deck 13 .
  • the boom 15 is held in a upwardly and outwardly extending relation to the deck by a brace in the form of tension cables 18 which are anchored to a back stay 19 of a stay structure 20 rigidly mounted on the machinery deck 13 .
  • a sheave 17 is rotatably mounted on the upper end of the boom 15 .
  • the dipper 22 is suspended from the boom 15 by a hoist rope 23 wrapped over the sheave 17 and attached to the dipper 22 at a bail pin 30 .
  • the machine structure is movable to locate the dipper 22 in respective loaded and unloading positions.
  • the hoist rope is anchored to a winch drum 24 mounted on the machinery deck 13 . As the winch drum rotates, the hoist rope 23 is either paid out or pulled in, lowering or raising the dipper 22 .
  • the dipper has an arm (also known as a handle) 25 rigidly attached thereto, with the dipper arm 25 slidably supported in a saddle block 26 , which is pivotally mounted on the boom 15 at 27 .
  • the dipper arm has a rack tooth formation thereon (not shown) which engages a drive pinion (not shown) mounted in the saddle block 26 .
  • the drive pinion is driven by an electric motor and transmission unit 28 to effect extension or retraction of the dipper arm 25 relative to the saddle block 26 .
  • a source of electrical power (not shown) is mounted on the machinery deck 13 to provide power to one or more hoist electric motors (not shown) that drives the winch drum 24 , a crowd electric motor (not shown) that drives the saddle block transmission unit 28 , and a swing electric motor (not shown) that turns the machinery deck turntable 12 .
  • hoist electric motors (not shown) that drives the winch drum 24
  • crowd electric motor (not shown) that drives the saddle block transmission unit 28
  • a swing electric motor (not shown) that turns the machinery deck turntable 12 .
  • Each of the crowd, hoist, and swing motors is driven by its own motor controller (not shown) which responds to operator commands to generate the required voltages and currents in well known fashion.
  • the sheave 17 is mounted on a steel sheave rod 38 . More particularly (not shown), there are two hoist ropes and two spaced apart sheaves mounted on the sheave rod 38 . As shown in FIG. 1 , each of the spaced apart sheaves 17 is positioned inside of grooves 45 in the sheave rod 38 , with a portion of each sheave overlapping each groove.
  • the pull of the hoist rope 23 is generally equally divided between the sheaves, so, i.e., if there are two sheaves one half of the rope pull is experienced by each sheave. In other embodiments (not shown), only a single hoist rope and sheave can be used.
  • any reference to a hoist rope or a sheave is also intended to include 2 or more hoist ropes and sheaves.
  • the sheave rod 38 has a central rifle drilled bore 39 , and two sets of two strain gauges 40 each, as shown in FIG. 3 , are glued inside the bore 39 .
  • Each set of strain gauges is mounted adjacent one of the sheaves, and is responsive to the rope pull or tension seen by the sheaves, which in turn deflect the sheave rod.
  • the output of the two sets of strain gauges is combined through a bridge circuit 43 to get the output used for weight measurement.
  • An example of the bridge circuit for measuring forces in an X direction is shown in FIG. 3 . One half of the bridge circuit is located under each sheave.
  • a second bridge circuit for measuring forces in the Y direction is located in the same manner inside the bore 39 , only offset 90 degrees from the strain gauges of the first bridge circuit. The output from these bridge circuits of the instrumented sheave rod is used to determine the total applied force, as explained below.
  • the cross section of the bi-axial sheave pin 38 illustrates the gauge alignment.
  • the gauges marked Y sense load component Py while the gauges marked X sense load in the Px direction.
  • the line tension T and wrap angle ⁇ can be determined by T equaling the sum of Px 2 and Py 2 divided by 2Px, and ⁇ equal to 2 cos ⁇ 1 P divided by 2T.
  • the power shovel 8 also includes means in the form of a strain gauge reading mechanism 50 connected to the two sets of strain gauges 40 for determining the angle of departure of the hoist rope 23 from the sheave rod 38 and the amount of pull of the load on the hoist rope 23 , the mechanism 50 being, as shown schematically in FIG. 3 , in the form of a central processing unit 54 including software 56 and memory 58 , the memory including strain gauge calibration information.
  • the mechanism 50 uses a method of determining the tension or force and angle of the hoist rope 23 wrapped over the sheave rod 38 . The method comprises the following steps. First, of creating a calibration table of a plurality of outputs from each of the at least two strain gauge bridge sets, given various rope tensions and rope angles.
  • an amount of pull and direction of pull can be determined to within a + or ⁇ accuracy of 0.1%, as further described below.
  • the calibration information is a calibration table of a plurality of outputs from each of the at least two strain gauges, given the various rope tensions and rope angles. And the sets of data point angle and tension pairs is created from a curve fitted to the created strain gauge outputs. It is then determined where the two sets of data points intersect. This point is then put back into either of the date sets to determine the rope tension and rope angle.
  • the resultant tension or force P and angle of application of this force on the sheave rod will lie between 34 degrees (max extension and hoist), and 60 degrees (tuck) clockwise from the y-axis of the sheave rod, given the structure of the boom, arm, and dipper.
  • a total of 14 calibration curves were obtained for a sequence of calibration loads applied between 34 and 60 degrees in increments of 2 degrees. More particularly, a sequence of calibration loads was applied at an angle of 36 degrees. At each load increment, the corresponding voltage output from the x-axis and y-axis bridges was recorded. A fifth order curve fit was then determined for the Y and X axis data. The sheave rod was then rotated 2 degrees, and another calibration loading was applied, and so on.
  • the maximum design rope tension for a large electric shovel is 2 million pounds. At 1% accuracy, this results in an ideal resolution of +/ ⁇ 10 tons, and at 0.1% an ideal resolution of +/ ⁇ 1 Ton.
  • FIG. 6 is an actual calibration curve for an x-axis bridge calibration loading applied clockwise 42 degrees from the y-axis of the sheave rod. Note the maximum calibration load is 1.05 million pounds.
  • the difficulty with such calibration data is that as the resultant load moved on the sheave rod, the change in output of the sheave rod was not linear. Along any calibration curve, the accuracy is 0.1%, but off the curve the accuracy fell to 1%. If we know the angle that the load is applied and this falls along one of the calibration curves, the sheave rod was very accurate.
  • FIG. 7 shows a plot of the ratio of an inclined load to a vertical load, as a function of applied angle under ideal conditions.
  • the Load Ratio (E) varies from 1 (vertical load) to 0 (horizontal load).
  • the change in load is nonlinear from 0 to 45 degrees.
  • the mounted orientation of the sheave rod 38 on the power shovel 8 is chosen to insure that the resultant forces of the hoist rope on the sheave rod 38 were between 30 and 60 degrees for maximum sensitivity and linearity.
  • each strain gauge 40 in the sheave rod 38 in an operating shovel 8 is a millivolt (mV) signal from each of the X and Y bridges. The following procedure is then followed to obtain the resultant force and it angle of application.
  • mV millivolt
  • An accurate position of the dipper is needed to calculate the weight of soil in the dipper 22 .
  • a calibration procedure is performed at the beginning of operation of the shovel 8 , with the dipper 22 in a known position.
  • the crowd arm 25 is extended until the hoist rope 23 is vertical, and raised until it is horizontal. These orientations are checked with suitable equipment. From this calibrated position, the crowd arm length and the hoist rope length are initialized to their respective known dimensions as determined from the shovel mechanical drawings. Recalibration is needed when any of the wire ropes on the shovel are replaced, or when other shovel conditions change, such as when the arm rack and pinion drive system skips a tooth.
  • the resolvers are used to calculate the length of the hoist rope and the length of the crowd arm. From these lengths, the dipper position is found. Once the dipper position is known, as well as the hoist rope tension and the angle the hoist rope leaves the sheave rod, then the dipper weight can be calculated. Once such known approach to calculating the dipper weight is described in Chang U.S. Pat. No. 6,225,574.
  • Length offset+gain*resolver reading.
  • the gain is known and constant for both the hoist and crowd resolver and has units of inches per count.
  • step d) Use the estimated values calculated in step a) above as a starting value. Then vary the crowd calibration offsets and calculate the expected wrap angle of the rope for the data collected in step a) for each variation, thus obtaining an array of readings from the crowd resolver to calculate an array of calculated rope wrap angles. Then, to get a new calibrated crowd resolver offset, use the crowd offset that produces the minimum amount of error between the two calculated sets of data. For example, sum the square of the difference between the calculated rope wrap angles from the resolver data and the calculated rope wrap angles from the sheave rod data, to find the crowd offset that produces the least amount of error.
  • nonlinear programming such as nonlinear minimization to solve for n unknowns with m measurements, to determine the offset value that minimizes the difference between the calculated rope wrap angles from the resolver data and the calculated rope wrap angle from the other device for measuring the rope wrap angles.
  • Another method for calculating the crowd offset is to use the hoist rope length together with the rope angle calculated by the above strain gauge mechanism.
  • the length of the dipper arm can be calculated using basic geometry. Once the dipper arm length is known, the crowd offset can be determined.

Abstract

A machine for raising and lowering a load, the machine including a platform, a boom attached at one end to the platform, a rod mounted transverse to the longitudinal axis of the boom on the other end of a boom, the rod having a central bore there through, with at least two strain gauges mounted therein and angled relative to each other, a hoist rope extending over the rod and having an end adapted to be attached to the load, and a mechanism connected to the at least two strain gauges for determining the angle of departure of the hoist rope from the rod and the amount of pull of the load on the hoist rope.

Description

    BACKGROUND OF THE INVENTION
  • This invention is directed to devices for measuring the weight of a load at the end of a rope wrapped over a rod.
  • It is known to measure the weight of a load at the end of a rope wrapped or trained over a rod by using four strain gauges configured as a bridge circuit glued inside a central bore in a rod. This is an optimum configuration to measure a force applied in a vertical direction only. When the force to be measured has a constant angle relative to the strain gauge, one set of gauges has been used.
  • The calibration procedure used in this instance is as follows.
  • 1. Place the instrumented rod in a calibration fixture that applies a load in the vertical direction.
  • 2. Apply an increasing load in a series of load steps. The maximum load is the expected maximum load the sensor will see. Measure the strain gauge bridge output at each of these load steps.
  • 3. Repeat step 2 for decreasing load steps to zero load.
  • 4. A curve is then fitted to this data, for example, a simple linear curve y=mx+b. Then for any given x, the output y can be calculated. If the slope m has units of pounds/mV and assuming b=0 lbs., then we can directly relate the output of the bridge circuit to the applied load P. A linear fit is known to give an overall accuracy of 1% full scale.
  • It is also known to use two strain gauge bridge circuits disposed to intersect each other at right angles to measure tensile or compressive strains in biaxial directions. This is known as a bi-axial load-sensing element.
  • SUMMARY OF THE INVENTION
  • It has been difficult to accurately calibrate strain gauges for a resultant force P with a non-stationary point of application. If the angle of this force changes with a change in rope wrap angle, i.e., if the rope pull can be from different directions, two sets of gauges oriented perpendicular to each other are needed.
  • The invention eliminates these inaccuracies. This invention provides a machine for raising and lowering a load, the machine including a platform, a boom attached at one end to the platform, and a rod mounted transverse to the longitudinal axis of the boom on the other end of a boom. The rod has a central bore there through, with at least two strain gauges mounted therein and angled relative to each other, a hoist rope extending over the rod and having an end adapted to be attached to the load, and a mechanism connected to the at least two strain gauges for determining the angle of departure of the hoist rope from the rod and the amount of pull of the load on the hoist rope.
  • The object of this invention is to provide a relatively accurate device for measuring the weight of a load at the end of a rope wrapped over a rod, where the direction of rope pull caused by the load relative to the rod is variable.
  • It is still another advantage of this invention to provide a measuring system of the foregoing type which can determine such calculations in a dynamic state and with an accuracy of within + or −0.1%.
  • It is another object of this invention to provide an improved system for measuring the load weight of large mining and lifting machinery, which system eliminates the need to try to compute dynamic force effects on the machine in order to get an accurate weight measurement.
  • It is yet another advantage of the present invention to provide a measuring system of the foregoing type which is adaptable for use with a wide variety of mining and lifting machinery.
  • It is yet another advantage of the present invention to provide a device that can automatically calibrate equipment, so the device accurately determines the location of a load carried by a mining and lifting machinery.
  • BRIEF DESCRIPTIONS OF THE DRAWINGS
  • FIG. 1 is a partial broken away side view of a pin with a rifle bore with strain gauges mounted in the bore.
  • FIG. 2 is a plan view of a surface mining shovel that employs the mechanism of the present invention.
  • FIGS. 3A, 3B and 3C are a perspective view of the sheave rod of this invention, with a cross section showing the placement of the two sets of strain gauges and the resulting strain gauge bridge and the mechanism of this invention.
  • FIG. 4 is a cross section of the sheave pin with arrows showing how to determine the pull of a rope given the strain gauge outputs.
  • FIG. 5 is a cross section of the sheave pin and sheave with arrows showing how to determine the tension and angle of the rope wrapped over the sheave on the sheave pin.
  • FIG. 6 is a graph of the sheave pin calibration data.
  • FIG. 7 is a graph of the calibration data showing how the data is not linear.
  • Before one embodiment of the invention is explained in detail, it is to be understood that the invention is not limited in its application to the details of the construction and the arrangements of components set forth in the following description or illustrated in the drawings. The invention is capable of other embodiments and of being practiced or being carried out in various ways. Also, it is to be understood that the phraseology and terminology used herein is for the purpose of description and should not be regarded as limiting. Use of “including” and “comprising” and variations thereof as used herein is meant to encompass the items listed thereafter and equivalents thereof as well as additional items. Use of “consisting of” and variations thereof as used herein is meant to encompass only the items listed thereafter and equivalents thereof.
  • DESCRIPTION OF THE PREFERRED EMBODIMENTS
  • As described below and as illustrated in the drawings, the invention is a machine for raising and lowering a load, such as a hoisting machine 8 including a device 22 supported from a structure. More particularly, the machine can be a piece of large mining machine or an industrial crane, or any device for lifting a load. In this detailed description, a power shovel is described, and the device 22 for holding the material to be lifted is a dipper.
  • The power shovel 8 of FIG. 2 is of a well-known construction commonly referred to as an electric rope shovel. The shovel 8 comprises a mobile base 10 supported on drive tracks 11, and having supported thereon through a turntable 12, a platform in the form of a machinery deck 13. The turntable 12 permits full 360 degrees of rotation of the machinery deck relative to the base. A boom 15 is pivotally connected at a lower end 16 to the machinery deck 13. The boom 15 is held in a upwardly and outwardly extending relation to the deck by a brace in the form of tension cables 18 which are anchored to a back stay 19 of a stay structure 20 rigidly mounted on the machinery deck 13. A sheave 17 is rotatably mounted on the upper end of the boom 15.
  • The dipper 22 is suspended from the boom 15 by a hoist rope 23 wrapped over the sheave 17 and attached to the dipper 22 at a bail pin 30. The machine structure is movable to locate the dipper 22 in respective loaded and unloading positions. And the hoist rope is anchored to a winch drum 24 mounted on the machinery deck 13. As the winch drum rotates, the hoist rope 23 is either paid out or pulled in, lowering or raising the dipper 22. The dipper has an arm (also known as a handle) 25 rigidly attached thereto, with the dipper arm 25 slidably supported in a saddle block 26, which is pivotally mounted on the boom 15 at 27. The dipper arm has a rack tooth formation thereon (not shown) which engages a drive pinion (not shown) mounted in the saddle block 26. The drive pinion is driven by an electric motor and transmission unit 28 to effect extension or retraction of the dipper arm 25 relative to the saddle block 26.
  • A source of electrical power (not shown) is mounted on the machinery deck 13 to provide power to one or more hoist electric motors (not shown) that drives the winch drum 24, a crowd electric motor (not shown) that drives the saddle block transmission unit 28, and a swing electric motor (not shown) that turns the machinery deck turntable 12. The above-described basic construction of the shovel loader is widely known and used and further details of the construction are not provided, as they are well known in the art.
  • Each of the crowd, hoist, and swing motors is driven by its own motor controller (not shown) which responds to operator commands to generate the required voltages and currents in well known fashion.
  • More particularly, as shown in FIG. 1, the sheave 17 is mounted on a steel sheave rod 38. More particularly (not shown), there are two hoist ropes and two spaced apart sheaves mounted on the sheave rod 38. As shown in FIG. 1, each of the spaced apart sheaves 17 is positioned inside of grooves 45 in the sheave rod 38, with a portion of each sheave overlapping each groove. The pull of the hoist rope 23 is generally equally divided between the sheaves, so, i.e., if there are two sheaves one half of the rope pull is experienced by each sheave. In other embodiments (not shown), only a single hoist rope and sheave can be used. Hereinafter, any reference to a hoist rope or a sheave is also intended to include 2 or more hoist ropes and sheaves.
  • As shown in FIGS. 1 and 3, the sheave rod 38 has a central rifle drilled bore 39, and two sets of two strain gauges 40 each, as shown in FIG. 3, are glued inside the bore 39. Each set of strain gauges is mounted adjacent one of the sheaves, and is responsive to the rope pull or tension seen by the sheaves, which in turn deflect the sheave rod. The output of the two sets of strain gauges is combined through a bridge circuit 43 to get the output used for weight measurement. An example of the bridge circuit for measuring forces in an X direction is shown in FIG. 3. One half of the bridge circuit is located under each sheave.
  • In a similar fashion, a second bridge circuit (see FIG. 4) for measuring forces in the Y direction is located in the same manner inside the bore 39, only offset 90 degrees from the strain gauges of the first bridge circuit. The output from these bridge circuits of the instrumented sheave rod is used to determine the total applied force, as explained below.
  • As shown in FIG. 4, the cross section of the bi-axial sheave pin 38 illustrates the gauge alignment. The gauges marked Y sense load component Py, while the gauges marked X sense load in the Px direction. Given the voltage outputs form the two bridges as Ex and Ey, and constants Kx and Ky derived from calibration data, as hereinafter explained, the resultant force P is determined by Px=Kx*Ex and Py=Ky*Ey and the resultant Force P equals the square root of the same of the squares of Px and Py. As shown in FIG. 5, the line tension T and wrap angle Θ can be determined by T equaling the sum of Px2 and Py2 divided by 2Px, and Θ equal to 2 cos−1 P divided by 2T.
  • The power shovel 8 also includes means in the form of a strain gauge reading mechanism 50 connected to the two sets of strain gauges 40 for determining the angle of departure of the hoist rope 23 from the sheave rod 38 and the amount of pull of the load on the hoist rope 23, the mechanism 50 being, as shown schematically in FIG. 3, in the form of a central processing unit 54 including software 56 and memory 58, the memory including strain gauge calibration information. The mechanism 50 uses a method of determining the tension or force and angle of the hoist rope 23 wrapped over the sheave rod 38. The method comprises the following steps. First, of creating a calibration table of a plurality of outputs from each of the at least two strain gauge bridge sets, given various rope tensions and rope angles. Then second, when encountering an unknown rope tension and rope angle, taking the output from one strain gauge set and creating a set of data point angle and tension pairs from the plurality of calibration outputs that correspond to the one output from the one strain gauge set, and taking the output from the other strain gauge set and creating a set of data point angle and tension pairs from the plurality of calibration outputs that correspond to the one output from the other strain gauge set. Lastly, then determining, based on where the two sets of data points intersect, the rope tension and rope angle.
  • For a given output from the strain gauges, an amount of pull and direction of pull can be determined to within a + or − accuracy of 0.1%, as further described below.
  • In other words, the calibration information is a calibration table of a plurality of outputs from each of the at least two strain gauges, given the various rope tensions and rope angles. And the sets of data point angle and tension pairs is created from a curve fitted to the created strain gauge outputs. It is then determined where the two sets of data points intersect. This point is then put back into either of the date sets to determine the rope tension and rope angle.
  • For a large electric shovel, for example, the resultant tension or force P and angle of application of this force on the sheave rod will lie between 34 degrees (max extension and hoist), and 60 degrees (tuck) clockwise from the y-axis of the sheave rod, given the structure of the boom, arm, and dipper.
  • As an example, a total of 14 calibration curves were obtained for a sequence of calibration loads applied between 34 and 60 degrees in increments of 2 degrees. More particularly, a sequence of calibration loads was applied at an angle of 36 degrees. At each load increment, the corresponding voltage output from the x-axis and y-axis bridges was recorded. A fifth order curve fit was then determined for the Y and X axis data. The sheave rod was then rotated 2 degrees, and another calibration loading was applied, and so on.
  • The fifth order curve, i.e., y=a+b*x+c*x**2+d*x**3+e*x**4, results in an overall accuracy of 0.1%. The maximum design rope tension for a large electric shovel is 2 million pounds. At 1% accuracy, this results in an ideal resolution of +/−10 tons, and at 0.1% an ideal resolution of +/−1 Ton. FIG. 6 is an actual calibration curve for an x-axis bridge calibration loading applied clockwise 42 degrees from the y-axis of the sheave rod. Note the maximum calibration load is 1.05 million pounds.
  • The difficulty with such calibration data is that as the resultant load moved on the sheave rod, the change in output of the sheave rod was not linear. Along any calibration curve, the accuracy is 0.1%, but off the curve the accuracy fell to 1%. If we know the angle that the load is applied and this falls along one of the calibration curves, the sheave rod was very accurate.
  • FIG. 7 shows a plot of the ratio of an inclined load to a vertical load, as a function of applied angle under ideal conditions. The Load Ratio (E) varies from 1 (vertical load) to 0 (horizontal load). The change in load is nonlinear from 0 to 45 degrees.
  • The mounted orientation of the sheave rod 38 on the power shovel 8 is chosen to insure that the resultant forces of the hoist rope on the sheave rod 38 were between 30 and 60 degrees for maximum sensitivity and linearity.
  • More particularly, the output of each strain gauge 40 in the sheave rod 38 in an operating shovel 8 is a millivolt (mV) signal from each of the X and Y bridges. The following procedure is then followed to obtain the resultant force and it angle of application.
  • From the x-axis bridge output, for each of the calibration curves for the x-axis, calculate the resultant force given the mV output. For example, assume the x-axis bridge output is 0.095 mV. At 34 degrees, this might result in a calculated resultant force of 200,000 lbs. At 36 degrees, 280,000 lbs., and so on. We now have 34 calculated resultant forces from each of the x-axis calibration curves.
  • From the y-axis bridge output, for each of the calibration curves for the y-axis, calculate the resultant force. For example, say the y-axis bridge output is 0.195 mV. At 34 degrees, this might result in a calculated resultant force of 800,000 lbs. At 36 degrees, 720,000 lbs., and so on. We now have 34 calculated resultant forces from each of the Y-axis calibration curves.
  • Plotting the above data then produces two curves, the output of y-bridge and the output of x-bridge as a function of applied load angle. The point where these two curves cross is our unknown resultant force (from the y-axis) and the resultant angle (from the x-axis).
  • Analytically, by fitting a fifth-order curve to each of these two data sets, and setting these two fifth-order equations equal to each other and solving for the real roots we obtain the angle at the point where the two curves cross. Substituting this angle into either of the two fifth-order equations then produces the Resultant force. The accuracy of the resultant force is within 0.1%. In other less preferred embodiments (not shown), a second, third or fourth order curve could be used.
  • Dipper Position
  • An accurate position of the dipper is needed to calculate the weight of soil in the dipper 22. A calibration procedure is performed at the beginning of operation of the shovel 8, with the dipper 22 in a known position. For example, the crowd arm 25 is extended until the hoist rope 23 is vertical, and raised until it is horizontal. These orientations are checked with suitable equipment. From this calibrated position, the crowd arm length and the hoist rope length are initialized to their respective known dimensions as determined from the shovel mechanical drawings. Recalibration is needed when any of the wire ropes on the shovel are replaced, or when other shovel conditions change, such as when the arm rack and pinion drive system skips a tooth.
  • More particularly, the resolvers are used to calculate the length of the hoist rope and the length of the crowd arm. From these lengths, the dipper position is found. Once the dipper position is known, as well as the hoist rope tension and the angle the hoist rope leaves the sheave rod, then the dipper weight can be calculated. Once such known approach to calculating the dipper weight is described in Chang U.S. Pat. No. 6,225,574.
  • To calculate the hoist and crowd length, the following equation is used: Length=offset+gain*resolver reading. The gain is known and constant for both the hoist and crowd resolver and has units of inches per count. Using the resolver reading from the hoist and crowd at initial calibration, one can use the above equation to solve for the calibration offset for hoist and crowd.
  • Unfortunately, electric shovel operators may forgo recalibration of the offset when shovel conditions change. And if this happens, then the dipper position is not accurate, and as a result any weight measurements are also inaccurate. Experience has shown that the hoist offset does not change very much, but the crowd length offset can. It is therefore useful to create a method of automating recalculating the crowd length offset as shovel conditions change. The following method can also be used to recalculate the hoist rope offset, if desired.
  • Using a microprocessor connected to the crowd length resolver, such as the one used in the above strain gauge reading mechanism,
  • a) Keep track of the max crowd reading. From the length of crowd at max crowd extension, calculate the offset for the crowd.
  • b) From one dig cycle; obtain an array of readings from the crowd resolver.
  • c) At the same time, obtain an array of the calculated rope wrap angles from the analysis of the sheave rod strain gage data.
  • If a dig cycle has for example 400 data points, this would result in 400 calculated rope wrap angles from the resolver data and 400 wrap angles from the rod strain gauge outputs. If the calibration data was perfect, then each data point in the two curves would be equal. Data point 10 from the rod data would match the wrap angle calculated from data point 10 from the resolver calculation, for example.
  • d) Use the estimated values calculated in step a) above as a starting value. Then vary the crowd calibration offsets and calculate the expected wrap angle of the rope for the data collected in step a) for each variation, thus obtaining an array of readings from the crowd resolver to calculate an array of calculated rope wrap angles. Then, to get a new calibrated crowd resolver offset, use the crowd offset that produces the minimum amount of error between the two calculated sets of data. For example, sum the square of the difference between the calculated rope wrap angles from the resolver data and the calculated rope wrap angles from the sheave rod data, to find the crowd offset that produces the least amount of error. Still more particularly, use known nonlinear programming, such as nonlinear minimization to solve for n unknowns with m measurements, to determine the offset value that minimizes the difference between the calculated rope wrap angles from the resolver data and the calculated rope wrap angle from the other device for measuring the rope wrap angles.
  • Another method for calculating the crowd offset is to use the hoist rope length together with the rope angle calculated by the above strain gauge mechanism. With the known length of the boom between the dipper arm and the end of the boom (the hoist sheaves), the length of the hoist rope between the end of the boom and the dipper, and the hoist rope wrap angle, the length of the dipper arm can be calculated using basic geometry. Once the dipper arm length is known, the crowd offset can be determined.
  • Various other features and advantages of the invention will be apparent from the following claims.

Claims (14)

1. A machine for raising and lowering a load, said machine including a platform,
a boom attached at one end to said platform,
a rod mounted transverse to the longitudinal axis of said boom on the other end of said boom, the rod having a central bore there through, with at least two strain gauges mounted therein and angled relative to each other,
a hoist rope having one end connected to one of said base and said one end of said arm and extending over said rod and having another end adapted to be attached to the load, and
means connected to said at least two strain gauges for determining the angle of departure of said hoist rope from said rod and the amount of pull of said load on said hoist rope.
2. A machine in accordance with claim 1 wherein said means connected to said at least two strain gauges is a central processing unit including software and memory.
3. A machine in accordance with claim 1 wherein said memory includes strain gauge calibration information.
4. A method of determining the force and angle of a rope wrapped over a rod, the rod having a central bore there through, with at least two strain gauges mounted therein and angled relative to each other, the method comprising the steps of
creating a calibration table of a plurality of outputs from each of said at least two strain gauges, given various rope tensions and rope angles,
then, when encountering an unknown rope tension and rope angle,
taking the output from one strain gauge and creating a set of data point angle and tension pairs from said plurality of calibration outputs that correspond to said one output from said one strain gauge,
taking the output from the other strain gauge and creating a set of data point angle and tension pairs from said plurality of calibration outputs that correspond to said one output from said other strain gauge, and
determining, based on where said two sets of data points intersect, the rope tension and rope angle.
5. A method in accordance with claim 4 wherein said strain gauges are perpendicular to each other.
6. A method in accordance with claim 4 wherein a curve is fitted to said created strain gauge outputs for a given rope angle or rope tension.
7. A method in accordance with claim 6 wherein said curve is a fifth order curve.
8. A method in accordance with claim 6 wherein said sets of data point angle and tension pairs is created from said curve fitted to said created strain gauge outputs.
9. A method in accordance with claim 4 wherein a curve is fitted to each of said sets of data point angle and tension pairs.
10. A method in accordance with claim 4 wherein said curve is a fifth order curve.
11. A method, for a shovel including a base, a dipper, a boom pivotally mounted on the base, a hoist rope extending from the base to the dipper and wrapped over a sheave mounted on the end of the boom, and a dipper arm supported the dipper on the end thereof, the dipper arm being pivotally mounted on the boom, the method automatically recalibrating dipper position information, a arm resolver mounted on the boom and responsive to record arm extension and retraction, the arm length being equal to a arm offset plus a arm gain times said arm resolver reading, the method automatically recalibrating dipper position information, the method including the steps of:
storing the maximum values of the crowd resolver,
using the known length of the arm at the maximum extension positions, calculate the offset value for each resolver maximum value,
obtaining an array of readings from the crowd resolver to calculate an array of calculated rope wrap angles,
obtaining an array of rope wrap angles from another device for measuring the rope wrap angles, and
selecting a crowd length offset that minimizes the difference between the two sets of calculations.
12. A method in accordance with claim 11 wherein said crowd length offset is selected by minimizing the square of the differences between the two sets of values.
13. A method in accordance with claim 12 wherein said crowd length offset is selected by using nonlinear programming to determine the offset value that minimizes the difference between the calculated rope wrap angles from the resolver data and the calculated rope wrap angle from the other device for measuring the rope wrap angles.
14. A method, for a shovel including a base, a dipper, a boom pivotally mounted on the base, a hoist rope extending from the base to the dipper and wrapped over a sheave mounted on the end of the boom, and a dipper arm supported the dipper on the end thereof, the dipper arm being pivotally mounted on the boom, the method automatically recalibrating dipper position information, a arm resolver mounted on the boom and responsive to record arm extension and retraction, the arm length being equal to a arm offset plus a arm gain times said arm resolver reading, a hoist resolver mounted on the shovel and responsive to record hoist rope extension and retraction, the hoist rope length being equal to a hoist rope offset plus a hoist rope gain times said hoist rope resolver reading, the method automatically recalibrating dipper position information, the method including the steps of:
obtaining a hoist rope wrap angle from a device for measuring the rope wrap angle, and
then using the rope wrap angle, together with the known length of the boom between the dipper arm and the end of the boom, and the length of the hoist rope between the end of the boom and the dipper calculated using the hoist rope resolver, to then calculate the length of the dipper arm and the arm offset.
US11/437,308 2006-05-19 2006-05-19 Device for measuring a load at the end of a rope wrapped over a rod Abandoned US20070266601A1 (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
US11/437,308 US20070266601A1 (en) 2006-05-19 2006-05-19 Device for measuring a load at the end of a rope wrapped over a rod
US12/558,533 US8209096B2 (en) 2006-05-19 2009-09-13 Device for measuring a load at the end of a rope wrapped over a rod
US12/558,532 US8032313B2 (en) 2006-05-19 2009-09-13 Device for measuring a load at the end of a rope wrapped over a rod
US13/471,985 US8370031B2 (en) 2006-05-19 2012-05-15 Device for measuring a load at the end of a rope wrapped over a rod

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US11/437,308 US20070266601A1 (en) 2006-05-19 2006-05-19 Device for measuring a load at the end of a rope wrapped over a rod

Related Child Applications (2)

Application Number Title Priority Date Filing Date
US12/558,533 Division US8209096B2 (en) 2006-05-19 2009-09-13 Device for measuring a load at the end of a rope wrapped over a rod
US12/558,532 Division US8032313B2 (en) 2006-05-19 2009-09-13 Device for measuring a load at the end of a rope wrapped over a rod

Publications (1)

Publication Number Publication Date
US20070266601A1 true US20070266601A1 (en) 2007-11-22

Family

ID=38710656

Family Applications (4)

Application Number Title Priority Date Filing Date
US11/437,308 Abandoned US20070266601A1 (en) 2006-05-19 2006-05-19 Device for measuring a load at the end of a rope wrapped over a rod
US12/558,532 Active 2026-11-29 US8032313B2 (en) 2006-05-19 2009-09-13 Device for measuring a load at the end of a rope wrapped over a rod
US12/558,533 Active 2027-05-13 US8209096B2 (en) 2006-05-19 2009-09-13 Device for measuring a load at the end of a rope wrapped over a rod
US13/471,985 Active US8370031B2 (en) 2006-05-19 2012-05-15 Device for measuring a load at the end of a rope wrapped over a rod

Family Applications After (3)

Application Number Title Priority Date Filing Date
US12/558,532 Active 2026-11-29 US8032313B2 (en) 2006-05-19 2009-09-13 Device for measuring a load at the end of a rope wrapped over a rod
US12/558,533 Active 2027-05-13 US8209096B2 (en) 2006-05-19 2009-09-13 Device for measuring a load at the end of a rope wrapped over a rod
US13/471,985 Active US8370031B2 (en) 2006-05-19 2012-05-15 Device for measuring a load at the end of a rope wrapped over a rod

Country Status (1)

Country Link
US (4) US20070266601A1 (en)

Cited By (25)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2462719A (en) * 2008-08-18 2010-02-24 Peter Seaman Improvements in or relating to analysing structural members
CN101749997A (en) * 2008-12-19 2010-06-23 张家港市江南电子厂 Length and force measurement device for winch
EP2362201A1 (en) * 2010-02-25 2011-08-31 Bernd Futterer Unternehmensberatung GmbH Power measurement sleeve and power measurement device
US20120195730A1 (en) * 2011-02-01 2012-08-02 Hren William J Shovel having a wristing dipper
CN102628287A (en) * 2011-02-01 2012-08-08 哈尼施费格尔技术公司 Boom sheave with tubular reinforcing members
WO2012148436A1 (en) * 2011-04-29 2012-11-01 Harnischfeger Technologies, Inc. Controlling a digging operation of an industrial machine
CN102797461A (en) * 2011-05-27 2012-11-28 卡特彼勒特林布尔控制技术有限责任公司 Method and system for monitoring the operation of cable shovel machine
EP2538189A1 (en) * 2011-06-22 2012-12-26 Brosa AG Power measurement casing and power measurement method
CN102880065A (en) * 2011-07-15 2013-01-16 哈尼施费格尔技术公司 Systems and methods for actively biasing a loadpin
CN103122644A (en) * 2011-11-01 2013-05-29 哈尼施费格尔技术公司 Determining dipper geometry
CN103225327A (en) * 2012-01-31 2013-07-31 哈尼施费格尔技术公司 System and method for determining saddle block shimming gap of an industrial machine
US20130218423A1 (en) * 2011-04-29 2013-08-22 Harnischfeger Technologies, Inc. Controlling a digging operation of an industrial machine
US20130249336A1 (en) * 2012-03-26 2013-09-26 Harnischfeger Technologies, Inc. Modular direct drive system for an industrial machine
US20140019014A1 (en) * 2012-07-16 2014-01-16 Flanders Electric Motor Service, Inc. Optimized bank penetration system
US20140037414A1 (en) * 2011-02-01 2014-02-06 Harnischfeger Technologies, Inc. Rope shovel
US8887415B2 (en) 2012-01-31 2014-11-18 Harnischfeger Technologies, Inc. Hoist rope guide
AU2014201490B2 (en) * 2011-04-29 2015-08-20 Joy Global Surface Mining Inc Controlling a digging operation of an industrial machine
US20150300906A1 (en) * 2014-04-17 2015-10-22 Flanders Electric Motor Service, Inc. Boom calibration system
US9260834B2 (en) 2014-01-21 2016-02-16 Harnischfeger Technologies, Inc. Controlling a crowd parameter of an industrial machine
US9361270B2 (en) 2011-11-29 2016-06-07 Harnischfeger Technologies, Inc. Dynamic control of an industrial machine
US9611617B2 (en) 2012-01-31 2017-04-04 Harnischfeger Technologies, Inc. Shovel with pivoting bucket
CN107386349A (en) * 2016-04-08 2017-11-24 哈尼斯菲格技术公司 Rope shovel with non-linear excavation component
US20180282975A1 (en) * 2015-10-28 2018-10-04 Caterpillar Sarl Swivel joint for working machine
US10227754B2 (en) * 2011-04-14 2019-03-12 Joy Global Surface Mining Inc Swing automation for rope shovel
US20200299928A1 (en) * 2017-12-22 2020-09-24 Kubota Corporation Working machine

Families Citing this family (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8620533B2 (en) 2011-08-30 2013-12-31 Harnischfeger Technologies, Inc. Systems, methods, and devices for controlling a movement of a dipper
US9206587B2 (en) 2012-03-16 2015-12-08 Harnischfeger Technologies, Inc. Automated control of dipper swing for a shovel
US20130279298A1 (en) * 2012-04-19 2013-10-24 William Mark PRENTICE Monitoring of underwater mooring lines
US9009993B2 (en) * 2012-09-21 2015-04-21 Harnischfeger Technologies, Inc. Internal venting system for industrial machines
US9593460B2 (en) 2012-09-21 2017-03-14 Harnischfeger Technologies, Inc. Fluid conveyance system for industrial machine
AU2013245549B2 (en) 2012-10-19 2017-05-25 Joy Global Surface Mining Inc Conduit support system
CN103046928A (en) * 2012-12-17 2013-04-17 三一重型装备有限公司 Heading machine
US9169615B2 (en) 2013-01-14 2015-10-27 Caterpillar Global Mining Llc Control systems for a mining vehicle
CN103324094B (en) * 2013-05-14 2016-05-04 中联重科股份有限公司 Jib nonlinear deformation line solver device and method
AU2015200233B2 (en) * 2014-01-21 2019-01-31 Joy Global Surface Mining Inc Controlling the operation of an industrial machine based on wire rope dead wraps
US20160033344A1 (en) * 2014-07-30 2016-02-04 Dayton T. Brown, Inc. Structural shear load sensing pin
CA2978389A1 (en) 2016-09-08 2018-03-08 Harnischfeger Technologies, Inc. System and method for semi-autonomous control of an industrial machine
US10618788B2 (en) 2017-05-23 2020-04-14 Goodrich Corporation Hoist cable load sensor
US11002262B2 (en) * 2018-02-26 2021-05-11 Valco Instruments Company, L.P. Pump for liquid chromatography with pressure sensor
US11047731B2 (en) * 2018-03-21 2021-06-29 Johnson Health Tech Co., Ltd Auto-calibration of load cell in measuring discrete weights
US10696527B2 (en) * 2018-07-02 2020-06-30 Goodrich Corporation Hoist drive train torque sensor
IT201800010918A1 (en) * 2018-12-10 2020-06-10 Manitou Italia Srl Improved safety system for self-propelled machinery.
US11891772B2 (en) 2021-03-29 2024-02-06 Joy Global Surface Mining Inc System and method for estimating a payload of an industrial machine
US11781286B1 (en) * 2023-03-06 2023-10-10 Charles Constancon Method and system for calculating the mass of material in an excavating machine bucket

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3695096A (en) * 1970-04-20 1972-10-03 Ali Umit Kutsay Strain detecting load cell
US4532595A (en) * 1982-12-02 1985-07-30 Kruger Gmbh & Co. Kg Load-monitoring system for boom-type crane
US4677579A (en) * 1985-09-25 1987-06-30 Becor Western Inc. Suspended load measurement system
US6225574B1 (en) * 1998-11-06 2001-05-01 Harnischfeger Technology, Inc. Load weighing system for a heavy machinery
US6934616B2 (en) * 2002-12-17 2005-08-23 Caterpillar Inc System for determining an implement arm position

Family Cites Families (25)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4583907A (en) * 1984-05-18 1986-04-22 Wimberley Ronald J Extensible apparatus
JPH01251240A (en) 1988-03-31 1989-10-06 Seiko Epson Corp Runaway detecting system
JPH01251250A (en) * 1988-03-31 1989-10-06 Mitsubishi Electric Corp Shared cache memory
DE3823711C1 (en) * 1988-07-13 1990-04-12 Chemap Ag, Volketswil, Ch
JPH085623B2 (en) * 1989-09-27 1996-01-24 株式会社神戸製鋼所 Crane safety equipment
JPH04150125A (en) * 1990-10-09 1992-05-22 Nec Corp High frequency reception circuit
JPH04297511A (en) * 1991-03-26 1992-10-21 Nisshin Steel Co Ltd Method for protecting furnace bottom in blast furnace
JP3215502B2 (en) * 1992-05-19 2001-10-09 株式会社小松製作所 Work machine operation range limiting device
US5704141A (en) * 1992-11-09 1998-01-06 Kubota Corporation Contact prevention system for a backhoe
ZA952853B (en) * 1994-04-18 1995-12-21 Caterpillar Inc Method and apparatus for real time monitoring and co-ordination of multiple geography altering machines on a work site
US6768944B2 (en) * 2002-04-09 2004-07-27 Intelligent Technologies International, Inc. Method and system for controlling a vehicle
US6047475A (en) * 1998-02-26 2000-04-11 Nippon Pneumatic Mfg. Co. Ltd. Mounting for a construction shear
US6611738B2 (en) * 1999-07-12 2003-08-26 Bryan J. Ruffner Multifunctional mobile appliance
US6377210B1 (en) * 2000-02-25 2002-04-23 Grey Island Systems, Inc. Automatic mobile object locator apparatus and method
GB2360671B (en) * 2000-03-25 2003-09-03 Hewlett Packard Co Providing location data about a mobile entity
US6799116B2 (en) * 2000-12-15 2004-09-28 Trimble Navigation Limited GPS correction methods, apparatus and signals
US20030097885A1 (en) * 2001-09-24 2003-05-29 Kell Terrance A. Lateral displacement tensiometer and method for measuring tension
US6711838B2 (en) * 2002-07-29 2004-03-30 Caterpillar Inc Method and apparatus for determining machine location
NZ521094A (en) * 2002-08-30 2005-02-25 Holmes Solutions Ltd Apparatus for testing tension of elongated flexible member
US6882307B1 (en) * 2003-05-09 2005-04-19 Concentrax, Inc. Interactive system for monitoring and inventory of emergency vehicles and equipment and associated methods
US6958642B2 (en) * 2003-12-19 2005-10-25 Caterpillar Inc Ground difference compensating system
US7178606B2 (en) * 2004-08-27 2007-02-20 Caterpillar Inc Work implement side shift control and method
US7206681B2 (en) * 2004-12-20 2007-04-17 Caterpillar Inc. Adaptive vibration management system for a work machine
US7734397B2 (en) * 2005-12-28 2010-06-08 Wildcat Technologies, Llc Method and system for tracking the positioning and limiting the movement of mobile machinery and its appendages
US7441464B2 (en) * 2006-11-08 2008-10-28 Honeywell International Inc. Strain gauge sensor system and method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3695096A (en) * 1970-04-20 1972-10-03 Ali Umit Kutsay Strain detecting load cell
US4532595A (en) * 1982-12-02 1985-07-30 Kruger Gmbh & Co. Kg Load-monitoring system for boom-type crane
US4677579A (en) * 1985-09-25 1987-06-30 Becor Western Inc. Suspended load measurement system
US6225574B1 (en) * 1998-11-06 2001-05-01 Harnischfeger Technology, Inc. Load weighing system for a heavy machinery
US6934616B2 (en) * 2002-12-17 2005-08-23 Caterpillar Inc System for determining an implement arm position

Cited By (78)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2462719B (en) * 2008-08-18 2013-04-10 Peter Seaman Improvements in or relating to analysing structural members
GB2462719A (en) * 2008-08-18 2010-02-24 Peter Seaman Improvements in or relating to analysing structural members
CN101749997A (en) * 2008-12-19 2010-06-23 张家港市江南电子厂 Length and force measurement device for winch
EP2362201A1 (en) * 2010-02-25 2011-08-31 Bernd Futterer Unternehmensberatung GmbH Power measurement sleeve and power measurement device
WO2011104291A1 (en) * 2010-02-25 2011-09-01 Bernd Futterer Unternehmensberatung Gmbh Force-measurement sleeve and measurement and calculation method
WO2011104293A1 (en) * 2010-02-25 2011-09-01 Bernd Futterer Unternehmensberatung Gmbh Force-measurement body and measurement and calculation method
US8943714B2 (en) * 2011-02-01 2015-02-03 Harnischfeger Technologies, Inc. Shovel having a wristing dipper
US9297140B2 (en) * 2011-02-01 2016-03-29 Harnischfeger Technologies, Inc. Rope shovel
US20150147146A1 (en) * 2011-02-01 2015-05-28 Harnischfeger Technologies, Inc. Shovel having a wristing dipper
US9021725B2 (en) 2011-02-01 2015-05-05 Harnischfeger Technologies, Inc. Boom sheave with tubular reinforcing members
US20140037414A1 (en) * 2011-02-01 2014-02-06 Harnischfeger Technologies, Inc. Rope shovel
CN102628287A (en) * 2011-02-01 2012-08-08 哈尼施费格尔技术公司 Boom sheave with tubular reinforcing members
US20120195730A1 (en) * 2011-02-01 2012-08-02 Hren William J Shovel having a wristing dipper
AU2012200469B2 (en) * 2011-02-01 2014-02-13 Joy Global Surface Mining Inc Boom sheave with tubular reinforcing members
US11028560B2 (en) 2011-04-14 2021-06-08 Joy Global Surface Mining Inc Swing automation for rope shovel
US10227754B2 (en) * 2011-04-14 2019-03-12 Joy Global Surface Mining Inc Swing automation for rope shovel
US20140371996A1 (en) * 2011-04-29 2014-12-18 Harnischfeger Technologies, Inc. Controlling a digging operation of an industrial machine
CN103781969A (en) * 2011-04-29 2014-05-07 哈尼施费格尔技术公司 Controlling a digging operation of an industrial machine
WO2012148436A1 (en) * 2011-04-29 2012-11-01 Harnischfeger Technologies, Inc. Controlling a digging operation of an industrial machine
US8504255B2 (en) 2011-04-29 2013-08-06 Harnischfeger Technologies, Inc. Controlling a digging operation of an industrial machine
US20130218423A1 (en) * 2011-04-29 2013-08-22 Harnischfeger Technologies, Inc. Controlling a digging operation of an industrial machine
WO2012148438A1 (en) * 2011-04-29 2012-11-01 Harnischfeger Technologies, Inc. Controlling a digging operation of an industrial machine
US8571766B2 (en) * 2011-04-29 2013-10-29 Harnischfeger Technologies, Inc. Controlling a digging operation of an industrial machine
US8620536B2 (en) * 2011-04-29 2013-12-31 Harnischfeger Technologies, Inc. Controlling a digging operation of an industrial machine
AU2017216529B2 (en) * 2011-04-29 2019-01-17 Joy Global Surface Mining Inc Controlling a digging operation of an industrial machine
US9957690B2 (en) 2011-04-29 2018-05-01 Harnischfeger Technologies, Inc. Controlling a digging operation of an industrial machine
US9074354B2 (en) * 2011-04-29 2015-07-07 Harnischfeger Technologies, Inc. Controlling a digging operation of an industrial machine
AU2016202735B2 (en) * 2011-04-29 2017-06-08 Joy Global Surface Mining Inc Controlling a digging operation of an industrial machine
US8682542B2 (en) 2011-04-29 2014-03-25 Harnischfeger Technologies, Inc. Controlling a digging operation of an industrial machine
US8355847B2 (en) * 2011-04-29 2013-01-15 Harnischfeger Technologies, Inc. Controlling a digging operation of an industrial machine
US20140188351A1 (en) * 2011-04-29 2014-07-03 Harnischfeger Technologies, Inc. Controlling a digging operation of an industrial machine
AU2016202732B2 (en) * 2011-04-29 2017-04-20 Joy Global Surface Mining Inc Controlling a digging operation of an industrial machine
US9416517B2 (en) 2011-04-29 2016-08-16 Harnischfeger Technologies, Inc. Controlling a digging operation of an industrial machine
US20140207345A1 (en) * 2011-04-29 2014-07-24 Harnischfeger Technologies, Inc. Controlling a digging operation of an industrial machine
US8825317B2 (en) * 2011-04-29 2014-09-02 Harnischfeger Technologies, Inc. Controlling a digging operation of an industrial machine
CN104480990A (en) * 2011-04-29 2015-04-01 哈尼施费格尔技术公司 Controlling a digging operation of an industrial machine
AU2014201490B2 (en) * 2011-04-29 2015-08-20 Joy Global Surface Mining Inc Controlling a digging operation of an industrial machine
US20130131936A1 (en) * 2011-04-29 2013-05-23 Harnischfeger Technologies, Inc. Controlling a digging operation of an industrial machine
US8935061B2 (en) * 2011-04-29 2015-01-13 Harnischfeger Technologies, Inc. Controlling a digging operation of an industrial machine
US9080316B2 (en) * 2011-04-29 2015-07-14 Harnischfeger Technologies, Inc. Controlling a digging operation of an industrial machine
CN102797461A (en) * 2011-05-27 2012-11-28 卡特彼勒特林布尔控制技术有限责任公司 Method and system for monitoring the operation of cable shovel machine
US8498787B2 (en) 2011-05-27 2013-07-30 Caterpillar Trimble Control Technologies Llc Method and system for monitoring the operation of a cable shovel machine
EP2538189A1 (en) * 2011-06-22 2012-12-26 Brosa AG Power measurement casing and power measurement method
US8788245B2 (en) 2011-07-15 2014-07-22 Harnischfeger Technologies, Inc. Systems and methods for actively biasing a loadpin
CN102880065A (en) * 2011-07-15 2013-01-16 哈尼施费格尔技术公司 Systems and methods for actively biasing a loadpin
CN103122644A (en) * 2011-11-01 2013-05-29 哈尼施费格尔技术公司 Determining dipper geometry
AU2012244262B2 (en) * 2011-11-01 2015-05-07 Joy Global Surface Mining Inc Determining dipper geometry
US9361270B2 (en) 2011-11-29 2016-06-07 Harnischfeger Technologies, Inc. Dynamic control of an industrial machine
US20130197711A1 (en) * 2012-01-31 2013-08-01 Harnischfeger Technologies, Inc. System and method for determining saddle block shimming gap of an industrial machine
US8887415B2 (en) 2012-01-31 2014-11-18 Harnischfeger Technologies, Inc. Hoist rope guide
CN103225327A (en) * 2012-01-31 2013-07-31 哈尼施费格尔技术公司 System and method for determining saddle block shimming gap of an industrial machine
US9611617B2 (en) 2012-01-31 2017-04-04 Harnischfeger Technologies, Inc. Shovel with pivoting bucket
US9290909B2 (en) 2012-01-31 2016-03-22 Harnischfeger Technologies, Inc. Hoist rope guide
US9037359B2 (en) * 2012-01-31 2015-05-19 Harnischfeger Technologies, Inc. System and method for determining saddle block shimming gap of an industrial machine
US10094090B2 (en) 2012-01-31 2018-10-09 Joy Global Surface Mining Inc Shovel with pivoting bucket
AU2016219589B2 (en) * 2012-03-26 2019-05-30 Joy Global Surface Mining Inc Modular direct drive system for an industrial machine
AU2013202065B2 (en) * 2012-03-26 2016-05-26 Joy Global Surface Mining Inc Modular direct drive system for an industrial machine
US20130249336A1 (en) * 2012-03-26 2013-09-26 Harnischfeger Technologies, Inc. Modular direct drive system for an industrial machine
US10601281B2 (en) * 2012-03-26 2020-03-24 Joy Global Surface Mining Inc. Modular direct drive system for an industrial machine
US20140336870A1 (en) * 2012-07-16 2014-11-13 Flanders Electric Motor Services, Inc. Method for determining load on power shovel member
US9328482B2 (en) 2012-07-16 2016-05-03 Flanders Electric Motor Service, Inc. Optimized bank penetration method
US9334631B2 (en) 2012-07-16 2016-05-10 Flanders Electric Motor Service, Inc. Method for calibrating strain transducers
AU2013290552B2 (en) * 2012-07-16 2015-05-07 Flanders Electric Motor Service, Llc Optimized bank penetration system
US8788155B2 (en) * 2012-07-16 2014-07-22 Flanders Electric Motor Service, Inc. Optimized bank penetration system
WO2014014774A1 (en) * 2012-07-16 2014-01-23 Flanders Electric Motor Service, Inc. Optimized bank penetration system
US9328483B2 (en) * 2012-07-16 2016-05-03 Flanders Electric Motor Service, Inc. Method for determining load on power shovel member
US20140019014A1 (en) * 2012-07-16 2014-01-16 Flanders Electric Motor Service, Inc. Optimized bank penetration system
US10316490B2 (en) 2014-01-21 2019-06-11 Joy Global Surface Mining Inc Controlling a crowd parameter of an industrial machine
US9260834B2 (en) 2014-01-21 2016-02-16 Harnischfeger Technologies, Inc. Controlling a crowd parameter of an industrial machine
US9689141B2 (en) 2014-01-21 2017-06-27 Harnischfeger Technologies, Inc. Controlling a crowd parameter of an industrial machine
AU2015247635B2 (en) * 2014-04-17 2018-11-08 Flanders Electric Motor Service, Llc Boom calibration system
US10048154B2 (en) * 2014-04-17 2018-08-14 Flanders Electric Motor Service, Inc. Boom calibration system
US20150300906A1 (en) * 2014-04-17 2015-10-22 Flanders Electric Motor Service, Inc. Boom calibration system
US20180282975A1 (en) * 2015-10-28 2018-10-04 Caterpillar Sarl Swivel joint for working machine
US10968605B2 (en) * 2015-10-28 2021-04-06 Caterpillar Sarl Swivel joint for working machine
CN107386349A (en) * 2016-04-08 2017-11-24 哈尼斯菲格技术公司 Rope shovel with non-linear excavation component
US10920393B2 (en) 2016-04-08 2021-02-16 Joy Global Surface Mining Inc Rope shovel with non-linear digging assembly
US20200299928A1 (en) * 2017-12-22 2020-09-24 Kubota Corporation Working machine

Also Published As

Publication number Publication date
US8370031B2 (en) 2013-02-05
US20120290147A1 (en) 2012-11-15
US8032313B2 (en) 2011-10-04
US20100010714A1 (en) 2010-01-14
US8209096B2 (en) 2012-06-26
US20100000336A1 (en) 2010-01-07

Similar Documents

Publication Publication Date Title
US8032313B2 (en) Device for measuring a load at the end of a rope wrapped over a rod
US8271229B2 (en) Weight estimation for excavator payloads
AU648367B2 (en) A method for measuring the weight of a suspended load
US8126619B2 (en) Weight calculation compensation
US10048154B2 (en) Boom calibration system
CA2782920C (en) Systems and methods for actively biasing a loadpin
CN106836315A (en) A kind of vertical displacement detection means
CN100582734C (en) Method and apparatus of testing poles
US20220033203A1 (en) Conveyor system with weighing capability
EP0353099A2 (en) Monitoring system for load carriers
US3853001A (en) Crane load measuring means
US3971008A (en) Crane overload detector using a boom bending moment detector
US3948091A (en) Apparatus for determining the properties of metallic materials
US20230221200A1 (en) System and method for determining load on winch hook
JP2011163010A (en) Air cylinder type foundation strength investigation machine
JPH0435579B2 (en)
RU2326803C2 (en) Method of load-lifting crane safety electronic device adjustment and safety electronic device
SU1768752A1 (en) Method for establishing position of drilling ring working tool in hole-making
RU51607U1 (en) PIPELINE PROTECTION DEVICE
CN114046930A (en) Calibration method for underground weight-on-bit torque measurement nipple
SU411199A1 (en)
RU2268233C2 (en) Method of and device for measuring load-lifting crane azimuth angle (versions)
KR19990015886A (en) Deflection angle detection device of telescope type boom
Caliendo et al. CYCLIC LATERAL LOADING OF A MODEL PILE GROUP IN CLAY SOIL
JPH0783741A (en) Machine for loading and carrying heavy load

Legal Events

Date Code Title Description
AS Assignment

Owner name: HARNISCHFEGER TECHNOLOGIES, INC., DELAWARE

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:CLAXTON, RICHARD L., MR.;REEL/FRAME:018825/0302

Effective date: 20060519

STCB Information on status: application discontinuation

Free format text: EXPRESSLY ABANDONED -- DURING EXAMINATION