US20090090499A1 - Well system and method for controlling the production of fluids - Google Patents

Well system and method for controlling the production of fluids Download PDF

Info

Publication number
US20090090499A1
US20090090499A1 US11/867,807 US86780707A US2009090499A1 US 20090090499 A1 US20090090499 A1 US 20090090499A1 US 86780707 A US86780707 A US 86780707A US 2009090499 A1 US2009090499 A1 US 2009090499A1
Authority
US
United States
Prior art keywords
flow control
control device
reservoir
downhole
valve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US11/867,807
Inventor
Richard G. Lewis
Dinesh R. Patel
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Schlumberger Technology Corp
Original Assignee
Schlumberger Technology Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Schlumberger Technology Corp filed Critical Schlumberger Technology Corp
Priority to US11/867,807 priority Critical patent/US20090090499A1/en
Assigned to SCHLUMBERGER TECHNOLOGY CORPORATION reassignment SCHLUMBERGER TECHNOLOGY CORPORATION ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: LEWIS, RICHARD, PATEL, DINESH R.
Publication of US20090090499A1 publication Critical patent/US20090090499A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/12Means for transmitting measuring-signals or control signals from the well to the surface, or from the surface to the well, e.g. for logging while drilling
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B34/00Valve arrangements for boreholes or wells
    • E21B34/16Control means therefor being outside the borehole

Definitions

  • the present invention relates to methods and devices for recovering fluids from subterranean formations, and in particular, a system and a method for recovering hydrocarbons by means of individual or multi-lateral wells drilled to connect a distant reservoir to a subsurface zone.
  • U.S. Pat. No. 6,729,394 and U.S. Pat. No. 6,119,776 are examples of this.
  • U.S. Pat. No. 6,729,394 describes the use of a horizontal well network for producing low mobility oil, where at least one horizontal well is used as to allow fluids to move from one part of the producing formation to another and closer to the final production well.
  • U.S. Pat. No. 6,119,776 describes the use of an intersecting angled and vertical well, in which the vertical well being used to withdraw the fluid that was originally contained in the angled well, combined with the optional use of a third well from which fractures are generated to the second well.
  • practice of the methods and system disclosed by the foregoing art can be expensive and often requires the employment of relatively complicated procedures.
  • the prior art does not use multiple wells to produce from one hydrocarbon reservoir to another, but instead uses the reservoir length as a purposeful flow path.
  • existing flow control devices e.g., valves
  • controlling the flow between different reservoirs is still evolving and one aspect that can be improved is communication to a flow control device that has been along the wellbore.
  • the purpose of the flow control is to block unwanted fluids, such as water, gas, or oil, from coming to surface. Methods like 4-D seismic and others to detect the encroachment of such fluids already exist. Because of various drawbacks with designs that are well-known in the art, it is not desirable to send signals along the borehole to the flow control device.
  • Embodiments of the present invention address the known deficiencies for communicating with a valve along the borehole and, as such, do not require the wellbore as the signal path.
  • the primary reservoir is connected to the marginal reservoir either by drilling a bridging well adjutant to the primary well or extending the primary well.
  • a downhole production system comprises a wireless transmitter that transmits a wireless signal through the formation from a location external to the borehole.
  • a valve is located along a flow path between two reservoirs.
  • a sensor is adjacent to the valve and capable of detecting the wireless signal, wherein the valve is actuated in response to the detection of the wireless signal by the signal detector.
  • Certain embodiments of a method for actuating a flow control devise comprise several steps, which are as follows: (i) placing a flow control device between two reservoirs; (ii) transmitting a signal from a surface location to a borehole through a strata; (iii) detecting the signal; (iv) communicating to the flow control device in a preset coded sequence adapted to actuate the valve; and (v) actuating the flow control device when the sensor receives the signal.
  • embodiments of a method of producing subterranean hydrocarbons comprises of the following steps: (i) drilling and completing a primary well for producing a primary reservoir; (ii) drilling at least one auxiliary well adjacent to the primary well; (iii) connecting the primary reservoir to the marginal reservoir by extending the primary well; (iv) completing the primary well to control fluid communication between the primary reservoir and the marginal reservoir; and (v) placing a flow control device along a flow path between the primary reservoir and the marginal reservoir.
  • FIG. 1 illustrates a sectional view of a well with multiple producing intervals in sequence and a means to communicate to a valve located between the reservoirs without using the borehole.
  • FIG. 2 illustrates wellbores intersecting a plurality of production zones.
  • FIG. 3 is a sectional view similar to FIG. 2 , but illustrating an alternate flow control valve.
  • FIG. 4 is a sectional view similar to FIG. 3 , but illustrating a flow control valve in a well requiring sand control.
  • FIG. 5 shows a schematic diagram of a multi-zone sand face completion requiring more than one flow control valve and a communication line and cable.
  • FIG. 6 shows a schematic illustration of a sectional view of a multi-lateral wellbore with a plurality of production zones.
  • connection In the specification and appended claims: the terms “connect”, “connection”, “connected”, “in connection with”, and “connecting” are used to mean “in direct connection with” or “in connection with via another element”; and the term “set” is used to mean “one element” or “more than one element”.
  • set is used to mean “one element” or “more than one element”.
  • up and down the terms “up” and “down”, “upper” and “lower”, “upwardly” and downwardly”, “upstream” and “downstream”; “above” and “below”; and other like terms indicating relative positions above or below a given point or element are used in this description to more clearly describe some embodiments of the invention.
  • sealing mechanism includes: packers, bridge plugs, downhole valves, sliding sleeves, baffle-plug combinations, polished bore receptacle (PBR) seals, and all other methods and devices for temporarily blocking the flow of fluids through the wellbore.
  • An embodiment of the present invention provides a system and method for controlling the flow of fluids that migrate through the subsurface from a distant marginal reservoir to one or more production zones of the primary reservoir.
  • the method of producing subterranean hydrocarbons comprises of drilling and completing a primary well for producing a primary reservoir. At least one well adjacent to the primary well will also be drilled. The primary reservoir is then connected to the marginal reservoir by extending the primary well.
  • a well ( 3 ) with producing interval ( 4 ) connects separate hydrocarbon intervals ( 5 , 6 ) below the surface ( 1 ) to the surface facilities ( 2 ).
  • a flow control device e.g., a sleeve valve, ball valve, flapper valve, disk valve, choke valve and so forth
  • a flow control device e.g., a sleeve valve, ball valve, flapper valve, disk valve, choke valve and so forth
  • the migration of fluid from one interval to the next can effectively drain the produced fluid without having to drill a separate well from surface and still maintain control of the movement from the one interval to the next. While certain embodiments are described herein, for subsea operation, the present invention includes other embodiments employing the same systems and methods for land use.
  • the flow control device ( 14 ) can be placed along the flow path in the casing ( 13 ) between two or more reservoirs, In the open state, the flow control device allows the fluids from one reservoir ( 4 , 5 , 6 ) to flow into a different reservoir ( 4 , 5 , 6 ) until such time as the operator decides it is time to stop the flow or choke the flow between the reservoirs. In this application, it can also allow the purposeful drilling of a well to connect one side of a reservoir ( 5 ) to a second nearby reservoir ( 6 ) and subsequent plugging and abandoning of the upper section to surface of the subject well thus only contain the flow in the subsurface between the two reservoirs ( 5 and 6 ).
  • the flow control device ( 14 ) placed along the flow path can be actuated later in the life of the field to shut off or choke the flow between the reservoirs.
  • the flow control device ( 14 ) is a stand alone device with no physical connection to the surface and no reliance on the wellbore to detect a signal. This would eliminate the need for signal lines and/or fluid columns to actuate the valve. This in turn, yields a significant reduction of installation costs, thus reducing the cost of the development of the reservoir or field.
  • many signals ( 8 ) that are sent from surface are transmitted subsurface through the strata ( 29 ).
  • the signals ( 8 ) can be used to communicate to the flow control device ( 7 ) in a pre-set coded sequence that once understood by the flow control device ( 7 ) can actuate the flow control device ( 14 ) to open or close or choke position.
  • a wellbore is not needed to transmit the signals to actuate the flow control device ( 7 ).
  • an existing well ( 3 ) has a producing interval ( 10 ) with a casing ( 13 ) and a production conduit ( 15 ).
  • a sand screen ( 17 ) is provided within each of the intervals ( 10 , 11 , 12 ) allowing fluids to be produced while preventing sand to enter the production tubing.
  • the production intervals are separating fluidically by sealing elements ( 16 ).
  • a slotted pipe is provided in place of screen.
  • the hole is lined with casing or liner, cemented and perforated.
  • a second well ( 9 ) is drilled into another reservoir that is positioned further from the surface facilities.
  • a well may be drilled through the wellhead ( 28 ) and through a formation to extend a structural casing ( 13 ) through the formation.
  • a new well ( 9 ) is drilled to connect the bypassed marginal reservoir ( 11 ) to the existing reservoir ( 10 ).
  • a casing ( 13 ) is run to the top of the formation.
  • the second well ( 9 ) is plugged using a sealing element ( 18 ) above the formation interval ( 11 ) to provide a barrier.
  • the sealing element may either be permanent, or such that the well can be reentered at a latter time should it be necessary.
  • the reservoir ( 11 ) through the new well ( 9 ) is produced through the sand face completion and then injected into the existing reservoir ( 10 ).
  • a ball type flow control valve ( 14 ) is run with the well completion to regulate the flow from the reservoir ( 11 ) to the existing reservoir ( 10 ).
  • a sleeve type flow control valve ( 19 ) is run with the well completion.
  • the sleeve type flow control valve ( 19 ) is incorporated in the sand screen ( 17 ).
  • FIGS. 2 through 6 illustrate a sensor module ( 20 ) that is shown in the valve ( 14 and 19 ) to actuate the valve.
  • the power to the flow control valve ( 14 , 19 ) and downhole sensors ( 20 ) is supplied by a downhole power generator ( 21 ) which is run with the valve.
  • a remote coded signal or command is sent from the surface.
  • a long life battery, fuel cell or other type of power supply could be run in place of downhole power generator (such as an inline turbine).
  • electromagnetic communication acoustic communication
  • pressure pulse electronic signal communication in or along the casing or tubing
  • mud pulse communication or seismic communication
  • many different communication techniques may be used to communicate between the surface and the valve, in accordance with the possible embodiments of the invention.
  • an acoustic wave transmitter used in a wellbore typically will generate compressional waves, shear waves, and other types of waves when the acoustic transmitter is actuated.
  • the compression wave is refracted in the formation surrounding the borehole and propagates through a portion of the formation surrounding the borehole.
  • the acoustic wave is then reflected or partially reflected from the formation into the sensor, which detects and measures the acoustic wave by two or more receivers.
  • the sensor ( 20 ) in the valve ( 14 , 19 ) first detects this signal and then the signal is processed by microprocessor in the valve and sent to valve actuator for actuation of the valve.
  • Many signals that are sent from surface through the subsurface and rock strata can be used to communicate to the valve ( 14 , 19 ) in a preset coded sequence that once understood by the valve ( 14 , 19 ) can actuate the device to open or close or choked position.
  • An alternate embodiment of a method for sending signals from the surface to actuate the valve would require the downhole sensors to sense various reservoir parameters such as pressure, flow, temperature, fluid density, fluid viscosity, or PH, and feeds the data to the downhole processor which processes the data and makes a logical decision to send a proper command to the valve actuator for actuating the valve.
  • a well bore is not needed to transmit the signals to actuate the valve. It is in this way that the well design and related components as well as the operations related to installation can be reduced.
  • a communication line (e.g., an electric cable, a hydraulic control line, a pneumatic control line, a fiber optic cable, etc.) ( 22 ) from the flow control valve and sensor module ( 23 ) is run to the surface and then connected to the existing infrastructure ( 24 ).
  • the flow control valve is actuated by means of a communication line such as an electrical control line conveying electric signals, a hydraulic line conveying pressurized fluid, or a pneumatic control line containing an electrical conductor conveying pressure and electrical signals.
  • the communication line ( 22 ) supplies power and/or communication to the valve from surface.
  • a coiled tubing, small macaroni tubing, drill pipe, tubing, or umbilical hose bundle ( 25 ) could be used for conveying the cable and control line and/or actuating the valve.
  • a communication line ( 22 ) is run from the valve to the surface for supplying power and communication to the valve from the surface.
  • the communication line can supply communication to the valve from the surface location with a power supply (e.g. long life battery or fuel cell) in the well to provide power to the valve.
  • FIGS. 2 through to 6 show multi-zone sand face completions that require more than one flow control valve.
  • a multi-lateral well ( 26 ) has at least one branch to connect more than one reservoir ( 23 and 27 ) to the existing reservoir ( 10 ).

Abstract

Embodiments of the present invention allow the placement of a stand alone device (valve) along a flow path, without a physical connection to the surface or reliance on the borehole for signaling, to provide a means to control the flow between reservoirs. This is achieved using a valve located in the flow path that can be actuated without sending signals down the borehole or well path and thereby eliminating the need for complicated signal lines and or fluid columns to actuate the valve.

Description

    FIELD OF THE INVENTION
  • The present invention relates to methods and devices for recovering fluids from subterranean formations, and in particular, a system and a method for recovering hydrocarbons by means of individual or multi-lateral wells drilled to connect a distant reservoir to a subsurface zone.
  • BACKGROUND
  • It is generally known that methods for drilling wells close to another originate from the practice of drilling relief wells or the practice of field redevelopment where a second or third generation of drilling from existing well stock is required to enhance the recovery of the nearby oil or gas. Methods for drilling multiple wells which increase production from one well without injection from other wells have been proposed before.
  • U.S. Pat. No. 6,729,394 and U.S. Pat. No. 6,119,776 are examples of this. U.S. Pat. No. 6,729,394 describes the use of a horizontal well network for producing low mobility oil, where at least one horizontal well is used as to allow fluids to move from one part of the producing formation to another and closer to the final production well. U.S. Pat. No. 6,119,776 describes the use of an intersecting angled and vertical well, in which the vertical well being used to withdraw the fluid that was originally contained in the angled well, combined with the optional use of a third well from which fractures are generated to the second well. However, practice of the methods and system disclosed by the foregoing art can be expensive and often requires the employment of relatively complicated procedures.
  • The prior art does not use multiple wells to produce from one hydrocarbon reservoir to another, but instead uses the reservoir length as a purposeful flow path. Furthermore, existing flow control devices (e.g., valves) use the well to transmit a signal along the borehole. However, controlling the flow between different reservoirs is still evolving and one aspect that can be improved is communication to a flow control device that has been along the wellbore. The purpose of the flow control is to block unwanted fluids, such as water, gas, or oil, from coming to surface. Methods like 4-D seismic and others to detect the encroachment of such fluids already exist. Because of various drawbacks with designs that are well-known in the art, it is not desirable to send signals along the borehole to the flow control device. Embodiments of the present invention address the known deficiencies for communicating with a valve along the borehole and, as such, do not require the wellbore as the signal path.
  • SUMMARY OF THE INVENTION
  • In accordance with various embodiments of the present invention the primary reservoir is connected to the marginal reservoir either by drilling a bridging well adjutant to the primary well or extending the primary well. A downhole production system for producing and controlling hydrocarbon from primary and marginal reservoir,
  • In accordance with various embodiments of the present invention, a downhole production system comprises a wireless transmitter that transmits a wireless signal through the formation from a location external to the borehole. A valve is located along a flow path between two reservoirs. A sensor is adjacent to the valve and capable of detecting the wireless signal, wherein the valve is actuated in response to the detection of the wireless signal by the signal detector.
  • Certain embodiments of a method for actuating a flow control devise comprise several steps, which are as follows: (i) placing a flow control device between two reservoirs; (ii) transmitting a signal from a surface location to a borehole through a strata; (iii) detecting the signal; (iv) communicating to the flow control device in a preset coded sequence adapted to actuate the valve; and (v) actuating the flow control device when the sensor receives the signal.
  • Moreover, embodiments of a method of producing subterranean hydrocarbons comprises of the following steps: (i) drilling and completing a primary well for producing a primary reservoir; (ii) drilling at least one auxiliary well adjacent to the primary well; (iii) connecting the primary reservoir to the marginal reservoir by extending the primary well; (iv) completing the primary well to control fluid communication between the primary reservoir and the marginal reservoir; and (v) placing a flow control device along a flow path between the primary reservoir and the marginal reservoir.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • FIG. 1 illustrates a sectional view of a well with multiple producing intervals in sequence and a means to communicate to a valve located between the reservoirs without using the borehole.
  • FIG. 2 illustrates wellbores intersecting a plurality of production zones.
  • FIG. 3 is a sectional view similar to FIG. 2, but illustrating an alternate flow control valve.
  • FIG. 4 is a sectional view similar to FIG. 3, but illustrating a flow control valve in a well requiring sand control.
  • FIG. 5 shows a schematic diagram of a multi-zone sand face completion requiring more than one flow control valve and a communication line and cable.
  • FIG. 6 shows a schematic illustration of a sectional view of a multi-lateral wellbore with a plurality of production zones.
  • DETAILED DESCRIPTION
  • In the following description, numerous details are set forth to provide an understanding of the present invention. However, it is to be understood by those skilled in the art that the present invention may be practiced without these details and that numerous variations or modifications from the described embodiments may be possible.
  • In the specification and appended claims: the terms “connect”, “connection”, “connected”, “in connection with”, and “connecting” are used to mean “in direct connection with” or “in connection with via another element”; and the term “set” is used to mean “one element” or “more than one element”. As used herein, the terms “up” and “down”, “upper” and “lower”, “upwardly” and downwardly”, “upstream” and “downstream”; “above” and “below”; and other like terms indicating relative positions above or below a given point or element are used in this description to more clearly describe some embodiments of the invention. Moreover, the term “sealing mechanism” includes: packers, bridge plugs, downhole valves, sliding sleeves, baffle-plug combinations, polished bore receptacle (PBR) seals, and all other methods and devices for temporarily blocking the flow of fluids through the wellbore.
  • An embodiment of the present invention provides a system and method for controlling the flow of fluids that migrate through the subsurface from a distant marginal reservoir to one or more production zones of the primary reservoir. The method of producing subterranean hydrocarbons comprises of drilling and completing a primary well for producing a primary reservoir. At least one well adjacent to the primary well will also be drilled. The primary reservoir is then connected to the marginal reservoir by extending the primary well. With reference now to the figures, and in particular to FIG. 1, a well (3) with producing interval (4) connects separate hydrocarbon intervals (5, 6) below the surface (1) to the surface facilities (2). According to the invention, a flow control device (e.g., a sleeve valve, ball valve, flapper valve, disk valve, choke valve and so forth) (7) is placed between the intervals (4, 5 and 6) that can be used to close off flow between the intervals without any physical connections to the surface. The migration of fluid from one interval to the next can effectively drain the produced fluid without having to drill a separate well from surface and still maintain control of the movement from the one interval to the next. While certain embodiments are described herein, for subsea operation, the present invention includes other embodiments employing the same systems and methods for land use.
  • In this embodiment, with reference to FIGS. 1 and 2, the flow control device (14) can be placed along the flow path in the casing (13) between two or more reservoirs, In the open state, the flow control device allows the fluids from one reservoir (4, 5, 6) to flow into a different reservoir (4, 5, 6) until such time as the operator decides it is time to stop the flow or choke the flow between the reservoirs. In this application, it can also allow the purposeful drilling of a well to connect one side of a reservoir (5) to a second nearby reservoir (6) and subsequent plugging and abandoning of the upper section to surface of the subject well thus only contain the flow in the subsurface between the two reservoirs (5 and 6). This then provides an enhanced flow path between reservoirs. The flow control device (14) placed along the flow path can be actuated later in the life of the field to shut off or choke the flow between the reservoirs. In one embodiment the flow control device (14) is a stand alone device with no physical connection to the surface and no reliance on the wellbore to detect a signal. This would eliminate the need for signal lines and/or fluid columns to actuate the valve. This in turn, yields a significant reduction of installation costs, thus reducing the cost of the development of the reservoir or field.
  • With reference to FIG. 1, many signals (8) that are sent from surface are transmitted subsurface through the strata (29). The signals (8) can be used to communicate to the flow control device (7) in a pre-set coded sequence that once understood by the flow control device (7) can actuate the flow control device (14) to open or close or choke position. In some embodiments, a wellbore is not needed to transmit the signals to actuate the flow control device (7).
  • Referring to FIGS. 2 through 6, an existing well (3) has a producing interval (10) with a casing (13) and a production conduit (15). In one embodiment a sand screen (17) is provided within each of the intervals (10, 11, 12) allowing fluids to be produced while preventing sand to enter the production tubing. The production intervals are separating fluidically by sealing elements (16). Alternately a slotted pipe is provided in place of screen. Yet in another embodiment the hole is lined with casing or liner, cemented and perforated.
  • According to the invention, a second well (9) is drilled into another reservoir that is positioned further from the surface facilities. A well may be drilled through the wellhead (28) and through a formation to extend a structural casing (13) through the formation. A new well (9) is drilled to connect the bypassed marginal reservoir (11) to the existing reservoir (10). A casing (13) is run to the top of the formation. The second well (9) is plugged using a sealing element (18) above the formation interval (11) to provide a barrier. The sealing element may either be permanent, or such that the well can be reentered at a latter time should it be necessary.
  • The reservoir (11) through the new well (9) is produced through the sand face completion and then injected into the existing reservoir (10).
  • In the example in FIG. 2, a ball type flow control valve (14) is run with the well completion to regulate the flow from the reservoir (11) to the existing reservoir (10). Referring to FIG. 3, a sleeve type flow control valve (19) is run with the well completion. Referring to FIG. 4, the sleeve type flow control valve (19) is incorporated in the sand screen (17). FIGS. 2 through 6 illustrate a sensor module (20) that is shown in the valve (14 and 19) to actuate the valve.
  • In some embodiments of the present invention, the power to the flow control valve (14, 19) and downhole sensors (20) is supplied by a downhole power generator (21) which is run with the valve. A remote coded signal or command is sent from the surface. A long life battery, fuel cell or other type of power supply could be run in place of downhole power generator (such as an inline turbine).
  • Depending on the particular embodiment of the invention, electromagnetic communication, acoustic communication, pressure pulse, electronic signal communication in or along the casing or tubing, mud pulse communication, or seismic communication may be used. Thus, many different communication techniques may be used to communicate between the surface and the valve, in accordance with the possible embodiments of the invention. For example, an acoustic wave transmitter used in a wellbore typically will generate compressional waves, shear waves, and other types of waves when the acoustic transmitter is actuated. The compression wave is refracted in the formation surrounding the borehole and propagates through a portion of the formation surrounding the borehole. The acoustic wave is then reflected or partially reflected from the formation into the sensor, which detects and measures the acoustic wave by two or more receivers. The sensor (20) in the valve (14, 19) first detects this signal and then the signal is processed by microprocessor in the valve and sent to valve actuator for actuation of the valve. Many signals that are sent from surface through the subsurface and rock strata can be used to communicate to the valve (14,19) in a preset coded sequence that once understood by the valve (14,19) can actuate the device to open or close or choked position.
  • An alternate embodiment of a method for sending signals from the surface to actuate the valve would require the downhole sensors to sense various reservoir parameters such as pressure, flow, temperature, fluid density, fluid viscosity, or PH, and feeds the data to the downhole processor which processes the data and makes a logical decision to send a proper command to the valve actuator for actuating the valve. A well bore is not needed to transmit the signals to actuate the valve. It is in this way that the well design and related components as well as the operations related to installation can be reduced.
  • Some alternate embodiments comprise wired communication to the flow control valve and sensor module. Referring to FIGS. 5 and 6, a communication line (e.g., an electric cable, a hydraulic control line, a pneumatic control line, a fiber optic cable, etc.) (22) from the flow control valve and sensor module (23) is run to the surface and then connected to the existing infrastructure (24). For example, the flow control valve is actuated by means of a communication line such as an electrical control line conveying electric signals, a hydraulic line conveying pressurized fluid, or a pneumatic control line containing an electrical conductor conveying pressure and electrical signals. The communication line (22) supplies power and/or communication to the valve from surface. A coiled tubing, small macaroni tubing, drill pipe, tubing, or umbilical hose bundle (25) could be used for conveying the cable and control line and/or actuating the valve. A communication line (22) is run from the valve to the surface for supplying power and communication to the valve from the surface. As an alternate embodiment, the communication line can supply communication to the valve from the surface location with a power supply (e.g. long life battery or fuel cell) in the well to provide power to the valve.
  • Depending on the sand face completion (e.g. cased & perforated, stand alone screen, expandable screen, pre packed screen, slotted pipe, open hole) the flow control valve, sand face completion, and cable can be run in a single run on coiled tubing, pipe, or tubing (25). In a completion requiring two trips such as a frac pack completion or a gravel pack, a wet connect could be provided in the lower completion for connecting the communication line from the surface. FIGS. 2 through to 6 show multi-zone sand face completions that require more than one flow control valve.
  • As illustrated in FIG. 6, a multi-lateral well (26) has at least one branch to connect more than one reservoir (23 and 27) to the existing reservoir (10).
  • While the invention has been disclosed with respect to a limited number of embodiments, those skilled in the art will appreciate numerous modifications and variations there from. It is intended that the appended claims cover all such modifications and variations as fall within the true spirit and scope of the invention.

Claims (20)

1. A downhole completion system comprising:
a wireless transmitter that transmits a wireless signal from a surface location to a subsurface location;
a flow control device located along a flow path between two reservoirs proximate the subsurface location;
a sensor adjacent to the flow control device adapted to detect the wireless signal,
wherein the flow control device is actuated in response to the detection of the wireless signal by the sensor, and
wherein the wireless signal is transmitted through a strata between the surface location and the subsurface location.
2. The downhole system of claim 1, wherein the sensor and flow control valve are supplied with power from a downhole power supply.
3. The downhole system of claim 1, wherein the sensor and flow control valve are supplied with power from a downhole power generator.
4. The downhole system of claim 1, wherein the flow control device is connected with a communication line running from the surface location, and wherein the communication line is adapted to supply the flow control device with power.
5. The downhole system of claim 1, wherein the flow control device is a flow control valve, and wherein the wireless transmitter transmits a signal that is in a preset coded sequence that will actuate the valve.
6. The downhole system of claim 1, wherein the wireless transmitter transmits a signal that is in a preset coded sequence that will actuate the flow control device to open or close.
7. A method for actuating a flow control device, comprising:
placing a flow control device between two reservoirs;
transmitting a signal from a surface location to a borehole through a strata;
detecting the signal;
communicating to the flow control device in a preset coded sequence adapted to actuate the valve; and
actuating the flow control device when the sensor receives the signal.
8. The method of claim 7, wherein the signal from the surface location to actuate the flow control device is at least one selected from the group consisting of: seismic, acoustic, pressure pulse, mud pulse and electromagnetic.
9. The method of claim 7, further comprising actuating the flow control device requiring
the sensor to sense reservoir parameters and feed data to a downhole processor that sends a command to the flow control device to actuate the valve.
10. The method of claim 7, further comprising supplying power to the flow control device from a battery or a fuel cell that is run with the flow control device.
11. The method of claim 7, further comprising supplying power to the flow control device from a downhole power supply.
12. The method of claim 11, wherein the downhole power supply comprises a downhole power generator.
13. A method of producing subterranean hydrocarbons comprising of:
drilling and completing a primary well for producing a primary reservoir;
drilling at least one auxiliary well adjacent to the primary well;
connecting the primary reservoir to the marginal reservoir by extending the primary well;
completing the primary well to control fluid communication between the primary reservoir and the marginal reservoir; and
placing a flow control device along a flow path between the primary reservoir and the marginal reservoir.
14. A method of claim 13 further comprising placing a sensor adjacent to the flow control device.
15. The method of claim 13, further comprising actuating the flow control device via a cable or a control line from a surface location.
16. A method of claim 13 wherein the primary reservoir is connected to the marginal reservoir by drilling and completing a multilateral bridging well proximate the primary well.
17. The method of claim 13, further comprising regulating flow of the fluid between the marginal reservoir and the primary reservoir with the flow control device.
18. The method of claim 13, further comprising supplying power to the flow control device and downhole sensor using a downhole power supply.
19. The method of claim 14, further comprising detecting a wireless signal using the sensor, wherein the flow control device is actuated in response to the wireless.
20. The method of claim 15, wherein the step of actuating the flow control device via a cable or a control line from a surface location is at least one step selected from the group consisting of using an electrical control line to convey electric signals, using a hydraulic control line to convey pressurized fluid, using a pneumatic control line containing an electrical conductor to convey pressure and electrical signals.
US11/867,807 2007-10-05 2007-10-05 Well system and method for controlling the production of fluids Abandoned US20090090499A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US11/867,807 US20090090499A1 (en) 2007-10-05 2007-10-05 Well system and method for controlling the production of fluids

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US11/867,807 US20090090499A1 (en) 2007-10-05 2007-10-05 Well system and method for controlling the production of fluids

Publications (1)

Publication Number Publication Date
US20090090499A1 true US20090090499A1 (en) 2009-04-09

Family

ID=40522283

Family Applications (1)

Application Number Title Priority Date Filing Date
US11/867,807 Abandoned US20090090499A1 (en) 2007-10-05 2007-10-05 Well system and method for controlling the production of fluids

Country Status (1)

Country Link
US (1) US20090090499A1 (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110192591A1 (en) * 2010-02-08 2011-08-11 Bahorich Michael S Method for increasing fluid recovery from multiple lateral wellbores drilled through a subsurface formation
US20110192601A1 (en) * 2010-02-08 2011-08-11 Bahorich Michael S Method for drilling and fracture treating multiple wellbores
WO2011126669A1 (en) * 2010-03-31 2011-10-13 Halliburton Energy Services, Inc. Subterranean well valve activated with differential pressure
US8511388B2 (en) * 2010-12-16 2013-08-20 Hydril Usa Manufacturing Llc Devices and methods for transmitting EDS back-up signals to subsea pods
US10030513B2 (en) 2012-09-19 2018-07-24 Schlumberger Technology Corporation Single trip multi-zone drill stem test system
US10662762B2 (en) 2017-11-02 2020-05-26 Saudi Arabian Oil Company Casing system having sensors
US10954739B2 (en) 2018-11-19 2021-03-23 Saudi Arabian Oil Company Smart rotating control device apparatus and system
US10968735B2 (en) 2016-12-28 2021-04-06 Halliburton Energy Services, Inc. Deviated production well telemetry with assisting well/drillship
US11324896B2 (en) 2017-04-27 2022-05-10 Ucb Biopharma Sprl Cap for an injector

Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5133410A (en) * 1989-12-29 1992-07-28 Institut Francais Du Petrole Method and device for stimulating production of a subterranean zone of injection of a fluid from a neighboring zone via fracture made from a deflected drain drilled in an intermediate layer separating the zones
US6119776A (en) * 1998-02-12 2000-09-19 Halliburton Energy Services, Inc. Methods of stimulating and producing multiple stratified reservoirs
US6192988B1 (en) * 1995-02-09 2001-02-27 Baker Hughes Incorporated Production well telemetry system and method
US6318457B1 (en) * 1999-02-01 2001-11-20 Shell Oil Company Multilateral well and electrical transmission system
US6550541B2 (en) * 2000-05-12 2003-04-22 Schlumberger Technology Corporation Valve assembly
US6729394B1 (en) * 1997-05-01 2004-05-04 Bp Corporation North America Inc. Method of producing a communicating horizontal well network
US20050263286A1 (en) * 2004-05-28 2005-12-01 Schlumberger Technology Corporation Remotely Actuating a Casing Conveyed Tool
US7004252B2 (en) * 2003-10-14 2006-02-28 Schlumberger Technology Corporation Multiple zone testing system
US20060086497A1 (en) * 2004-10-27 2006-04-27 Schlumberger Technology Corporation Wireless Communications Associated With A Wellbore
US20060131030A1 (en) * 2004-12-21 2006-06-22 Schlumberger Technology Corporation Remotely Actuating a Valve
US20060157242A1 (en) * 2005-01-14 2006-07-20 Graham Stephen A System and method for producing fluids from a subterranean formation
US7100687B2 (en) * 2003-11-17 2006-09-05 Cdx Gas, Llc Multi-purpose well bores and method for accessing a subterranean zone from the surface
US7104324B2 (en) * 2001-10-09 2006-09-12 Schlumberger Technology Corporation Intelligent well system and method
US7222670B2 (en) * 2004-02-27 2007-05-29 Cdx Gas, Llc System and method for multiple wells from a common surface location
US7231971B2 (en) * 2004-10-11 2007-06-19 Schlumberger Technology Corporation Downhole safety valve assembly having sensing capabilities
US7360595B2 (en) * 2002-05-08 2008-04-22 Cdx Gas, Llc Method and system for underground treatment of materials
US20090283268A1 (en) * 2008-05-13 2009-11-19 Baker Hughes Incorporated Systems, methods and apparatuses for monitoring and recovery of petroleum from earth formations

Patent Citations (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5133410A (en) * 1989-12-29 1992-07-28 Institut Francais Du Petrole Method and device for stimulating production of a subterranean zone of injection of a fluid from a neighboring zone via fracture made from a deflected drain drilled in an intermediate layer separating the zones
US6192988B1 (en) * 1995-02-09 2001-02-27 Baker Hughes Incorporated Production well telemetry system and method
US6729394B1 (en) * 1997-05-01 2004-05-04 Bp Corporation North America Inc. Method of producing a communicating horizontal well network
US6119776A (en) * 1998-02-12 2000-09-19 Halliburton Energy Services, Inc. Methods of stimulating and producing multiple stratified reservoirs
US6318457B1 (en) * 1999-02-01 2001-11-20 Shell Oil Company Multilateral well and electrical transmission system
US6550541B2 (en) * 2000-05-12 2003-04-22 Schlumberger Technology Corporation Valve assembly
US7182134B2 (en) * 2000-08-03 2007-02-27 Schlumberger Technology Corporation Intelligent well system and method
US7104324B2 (en) * 2001-10-09 2006-09-12 Schlumberger Technology Corporation Intelligent well system and method
US7360595B2 (en) * 2002-05-08 2008-04-22 Cdx Gas, Llc Method and system for underground treatment of materials
US7004252B2 (en) * 2003-10-14 2006-02-28 Schlumberger Technology Corporation Multiple zone testing system
US7100687B2 (en) * 2003-11-17 2006-09-05 Cdx Gas, Llc Multi-purpose well bores and method for accessing a subterranean zone from the surface
US7222670B2 (en) * 2004-02-27 2007-05-29 Cdx Gas, Llc System and method for multiple wells from a common surface location
US20050263286A1 (en) * 2004-05-28 2005-12-01 Schlumberger Technology Corporation Remotely Actuating a Casing Conveyed Tool
US7231971B2 (en) * 2004-10-11 2007-06-19 Schlumberger Technology Corporation Downhole safety valve assembly having sensing capabilities
US20060086497A1 (en) * 2004-10-27 2006-04-27 Schlumberger Technology Corporation Wireless Communications Associated With A Wellbore
US20060131030A1 (en) * 2004-12-21 2006-06-22 Schlumberger Technology Corporation Remotely Actuating a Valve
US20060157242A1 (en) * 2005-01-14 2006-07-20 Graham Stephen A System and method for producing fluids from a subterranean formation
US7451814B2 (en) * 2005-01-14 2008-11-18 Halliburton Energy Services, Inc. System and method for producing fluids from a subterranean formation
US20090038792A1 (en) * 2005-01-14 2009-02-12 Graham Stephen A System and method for producing fluids from a subterranean formation
US20090283268A1 (en) * 2008-05-13 2009-11-19 Baker Hughes Incorporated Systems, methods and apparatuses for monitoring and recovery of petroleum from earth formations

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110192591A1 (en) * 2010-02-08 2011-08-11 Bahorich Michael S Method for increasing fluid recovery from multiple lateral wellbores drilled through a subsurface formation
US20110192601A1 (en) * 2010-02-08 2011-08-11 Bahorich Michael S Method for drilling and fracture treating multiple wellbores
US8490695B2 (en) * 2010-02-08 2013-07-23 Apache Corporation Method for drilling and fracture treating multiple wellbores
US8517091B2 (en) * 2010-02-08 2013-08-27 Apache Corporation Method for increasing fluid recovery from multiple lateral wellbores drilled through a subsurface formation
WO2011126669A1 (en) * 2010-03-31 2011-10-13 Halliburton Energy Services, Inc. Subterranean well valve activated with differential pressure
US8453748B2 (en) 2010-03-31 2013-06-04 Halliburton Energy Services, Inc. Subterranean well valve activated with differential pressure
US8511388B2 (en) * 2010-12-16 2013-08-20 Hydril Usa Manufacturing Llc Devices and methods for transmitting EDS back-up signals to subsea pods
US10030513B2 (en) 2012-09-19 2018-07-24 Schlumberger Technology Corporation Single trip multi-zone drill stem test system
US10968735B2 (en) 2016-12-28 2021-04-06 Halliburton Energy Services, Inc. Deviated production well telemetry with assisting well/drillship
US11324896B2 (en) 2017-04-27 2022-05-10 Ucb Biopharma Sprl Cap for an injector
US10662762B2 (en) 2017-11-02 2020-05-26 Saudi Arabian Oil Company Casing system having sensors
US10954739B2 (en) 2018-11-19 2021-03-23 Saudi Arabian Oil Company Smart rotating control device apparatus and system

Similar Documents

Publication Publication Date Title
US8925631B2 (en) Large bore completions systems and method
US20090090499A1 (en) Well system and method for controlling the production of fluids
CN104011326B (en) Hydraulic fracturing seismic events are monitored and sent in real time using the pilot hole of processing well as monitoring well to the system on surface
EP2758627B1 (en) Method for real-time monitoring and transmitting hydraulic fracture seismic events to surface using the pilot hole of the treatment well as the monitoring well
US5520247A (en) Method of producing a fluid from an earth formation
US7165892B2 (en) Downhole fiber optic wet connect and gravel pack completion
US6840321B2 (en) Multilateral injection/production/storage completion system
US6279658B1 (en) Method of forming and servicing wellbores from a main wellbore
US20080223585A1 (en) Providing a removable electrical pump in a completion system
US8985215B2 (en) Single trip multi-zone completion systems and methods
US8851189B2 (en) Single trip multi-zone completion systems and methods
US20050121190A1 (en) Segregated deployment of downhole valves for monitoring and control of multilateral wells
US20130037272A1 (en) Method and system for well access to subterranean formations
US20230287759A1 (en) Methods and systems for cemented open hole intelligent completions in multilateral wells requiring full isolation of gas cap, fractures and / or water bearing boundaries
RU2536523C1 (en) Development of multi-zone gas field
US11959363B2 (en) Multilateral intelligent well completion methodology and system
WO1999060248A1 (en) Method of producing fluids from an underground reservoir
Brooks et al. Development & Application of a Through Tubing Multi-Lateral Re-Entry System.
GB2480944A (en) Providing a removable electrical pump in a completion system

Legal Events

Date Code Title Description
AS Assignment

Owner name: SCHLUMBERGER TECHNOLOGY CORPORATION, TEXAS

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:LEWIS, RICHARD;PATEL, DINESH R.;REEL/FRAME:020372/0391;SIGNING DATES FROM 20070827 TO 20070926

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION