US20090216674A1 - Volatility Detection in a Non-Trading Security's Price Quotation - Google Patents

Volatility Detection in a Non-Trading Security's Price Quotation Download PDF

Info

Publication number
US20090216674A1
US20090216674A1 US12/035,748 US3574808A US2009216674A1 US 20090216674 A1 US20090216674 A1 US 20090216674A1 US 3574808 A US3574808 A US 3574808A US 2009216674 A1 US2009216674 A1 US 2009216674A1
Authority
US
United States
Prior art keywords
volatility
security
price
computer program
threshold
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US12/035,748
Inventor
Adam Seth Nunes
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nasdaq Inc
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to US12/035,748 priority Critical patent/US20090216674A1/en
Publication of US20090216674A1 publication Critical patent/US20090216674A1/en
Assigned to NASDAQ OMX GROUP, INC., THE reassignment NASDAQ OMX GROUP, INC., THE ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: NUNES, ADAM SETH
Assigned to NASDAQ, INC. reassignment NASDAQ, INC. CHANGE OF NAME (SEE DOCUMENT FOR DETAILS). Assignors: THE NASDAQ OMX GROUP, INC.
Priority to US15/882,243 priority patent/US10810669B2/en
Priority to US17/060,228 priority patent/US11508008B2/en
Priority to US17/975,733 priority patent/US20230064133A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q40/00Finance; Insurance; Tax strategies; Processing of corporate or income taxes
    • G06Q40/04Trading; Exchange, e.g. stocks, commodities, derivatives or currency exchange

Definitions

  • Electronic equity markets collect, aggregate and display trade information to market participants. Market participants initiate trades of securities by sending trade information to the electronic market on which the securities are traded.
  • the trade information includes continuous orders for execution during a market trading session.
  • a halted security is a previously traded security for which no trading occurs for a defined period of time. Halts are ordered by a market regulator or are otherwise operationally initiated. For example, Market Watch monitors securities and based on the new dissemination of information may order a halt.
  • An initial public offering (IPO) issue is an initial offering of shares of a security to the public. In some examples, an initial public offering is done on an exchange but this need not necessarily be the case.
  • trading commences at the time of the IPO.
  • a halt cross is a process for determining the price for which a security is executed at the opening of trading for a halted security or for an IPO issue.
  • the volatility in prices of quotations for the security is determined and the security is released for trading when the determined volatility is below a threshold.
  • the release of the security is delayed if the detected volatility in the security's price quotations exceeds the threshold.
  • volatility is detected in prices of quotations for an initial public offering issue before the issue is released for trading.
  • the time for volatility detection is extended if the detected volatility exceeds the threshold and volatility is detected over a period of time. At the end of this period of time, the security is released if volatility is less than the threshold.
  • the volatility is calculated as a variance in the prices of quotations for the security.
  • the variance is measured as a percentage value or in absolute terms.
  • the variance in the price quotations of the security prior to the release of the security is calculated at discrete intervals until the variance is less than the threshold.
  • FIG. 1 is a block diagram of a market system.
  • FIG. 2 is a logic view of functions in the in the Quote/Order Collector Facility.
  • FIG. 3 is a diagram of a Pre-Cross Period.
  • FIG. 4 is a block diagram of the volatility detection process.
  • FIG. 5 is a block diagram of periods within the volatility detection process.
  • FIG. 6 is a diagram of a computing system that implements a method of detecting volatility.
  • an electronic market 10 is shown as an example of a trading platform. Numerous other trading platforms are used, including platforms that facilitate trading in markets and exchanges.
  • the electronic market 10 includes client systems 12 that access a central quote/order collector facility 20 .
  • the client systems 12 are broker/dealer systems 12 a , electronic communication networks (ECN's) 12 b , market-maker(s) system(s) 12 c , and other exchanges 12 d .
  • ECN's electronic communication networks
  • the connections use Nasdaq® protocols such as SelectNet® and Small Order Execution System® (SOES®)
  • the client systems 12 include a processor, memory and a storage device, e.g., a client workstation or personal computer (all not shown) that can include a client process to enter quotes/orders into the electronic market systems (e.g., SOES® and SelectNet®) to deliver executions or orders to a market that is coupled to a clearing system 16 and a reporting system 18 . It also causes delivery of executions or routing of orders to the ECN's 12 b , depending on the status of the ECN, and routing of orders to other markets and exchanges 12 d .
  • the electronic market systems e.g., SOES® and SelectNet®
  • the quote/order collector facility 20 is comprised of one or preferably a plurality of server computers generally denoted as 22 including a processor 22 a , main memory 22 b and storage 22 c .
  • the storage system 22 c includes quote/order collector process 25 that is executed in memory 22 b.
  • the quote/order collector facility (OCF) 20 collects pre-trade information in the form of quotes or orders.
  • OCF quote/order collector facility
  • the distinction between a quote and an order depends on several factors. For example, each market maker typically sends a two-sided proprietary quote, i.e., a quote that represents its own trading interest for both buy and sell sides of a market, or an agency quote that represents trading interest of a sponsored entity. If one proprietary quote of a sponsored entity is sent it could be considered one order. If one agency quote is sent it also could be considered one order. If an agency quote reflects an aggregation of more than one agency order, however, the aggregate agency order is considered a quote. Entering quotes are limited to registered market makers 12 c and ECNs 12 b and possible UTP Exchanges 12 d.
  • a registered market maker or ECN directly enters a non-marketable order i.e., quote into the quote/order collector facility (OCF) 20 on behalf of its customer account, or it sponsors the direct entry of an order by its customer. All sponsored quotes are sent to the quote/order collector facility 20 under the name of the sponsoring market maker or ECN. In some embodiments, registered market makers or ECNs are permitted to submit an unlimited number of non-marketable quotes to the system 20 .
  • OCF quote/order collector facility
  • the quote/order collector facility 20 receives quotes, liability orders, (non-liability orders) and directed orders from market participants.
  • the quote/order collector facility 20 allows a quote/order to be displayed in the market, and also allows for marketable orders to be executed or routed to market participants.
  • the quote/order collector process (OCP) 25 provides transmission of multiple orders or quotes at multiple price levels by Quoting Market Participants to a quotation manager 26 a .
  • the quote/order manager 26 a provides a unified point of entry of quotes and orders from disparate delivery systems into the quote/order collector facility 20 to access quotes/orders displayed (as either attributable or non-attributable) in both the aggregate montage and current quote montage.
  • the quote/order manager 26 a manages multiple quotes/orders and quotes/orders at multiple price levels and uses a montage manager 26 b to display (either in the Aggregate montage or in the current quote montage) the orders/quotes consistent with an order's/quote's parameters.
  • the order collector process 25 also includes an internal execution process manager 26 c to match off executions for quoting market participants at the best bid/offer.
  • the order collector system 20 also includes an order routing/execution manager 26 d to provide a single point delivery of executions or routing of orders, which substantially eliminates potential for dual liability. That is, order collector process 25 maintains the order routing and executions functionality available in the SOES® and SelectNet® systems.
  • the order collector process 25 also includes a lock/cross manager 26 e , and an odd lot execution manager 26 f and a quote update manager 26 g.
  • the Quote/Order Collector Facility 20 collects quotes and orders during a period of nontrading, referred to as the Pre-Cross Period 30 , as illustrated in FIG. 3 .
  • securities such as halted securities and IPO issues
  • trading is halted when marketplace events cause volatility in the security's price, resulting in a trading halt.
  • price quotations and orders of the security are not generally monitored to calculate their volatility.
  • monitoring is resumed during the Quotation Only Period, occurring towards the end of the Pre-Cross Period 30 .
  • the level of volatility is acceptable, the security is released and trading resumes.
  • Trading halts prevent large fluctuations in the security's price, allowing the security's price to remain stable during trading.
  • Federal Drug Administration (FDA) approval of a company's product causes volatility in the company's securities due to increased demand for the securities initially after announcement of the approval. Then, as the market absorbs the announcement, demand for the security drops, causing the security's price to settle at a lower range. Therefore, trading will be halted during the period of volatility.
  • FDA Federal Drug Administration
  • a trading halt for that company's security could occur between 8 am and 10 am, if the market is able to fully absorb the announcement in two hours such volatility will have ceased upon trade resumption.
  • the price at which the security opens is determined by a halt cross process.
  • the halt cross process determines the security's equilibrium, re-opening price by calculating an intersection of the security's price quotation demand curve with its quotation supply curve.
  • IPO issue In the case of an IPO issue, the halted security process is replicated except that the IPO issue is not halted, because it has not yet begun trading. Therefore, instead of monitoring quotations for the security during the halt period, quotations for the IPO issue are monitored prior to the IPO release. This is done to ensure that once released, the IPO issue is stable and not subject to price volatility.
  • An IPO cross determines the price at which the IPO issue opens using the procedure described above.
  • Halt Cross to refers to a cross that takes place for both a halted security and an IPO issue.
  • the Pre-Cross Period 30 has at least three components: (1) the Pre-Quotation Period 32 ; (2) the Quotation Only Period 34 ; and (3) Trade Resumption 38 .
  • the Pre-Quotation Period 32 is sometimes referred to as the Halt Period, because trading is ceased (i.e. “halted”) during this time.
  • the entry of quotations and orders is prohibited.
  • quotes and orders are entered, entered quotes and orders are cancelable, and an indicative crossing price and imbalance information are disseminated, but no executions occur.
  • An event referred to as the Quote Resumption Event 36 , triggers the start of the Quotation Only Period 34 by communicating with a trading platform when the appropriate time for quote resumption arrives.
  • the Quote Resumption Event 36 specifies the time during the Pre-Cross Period 30 that the trading platform begins accepting quotations and orders.
  • the Quote Resumption Event 36 is measured with reference to the Pre-Cross Period 30 , such as 5 minutes after the beginning of the Pre-Cross Period 30 , or at a fractional point in time, such as after 2 ⁇ 3 of the Pre-Cross Period 30 has elapsed.
  • the time set for the Quote Resumption Event 36 depends on numerous factors and whether an IPO issue or halted security is being released. For a halted security, the time of news dissemination, the nature of the disseminated news such as its subject matter or whether it concerns a complex matter, and the amount of time necessary for analysts and other market participants to consume the information factor into the determination of the Quote Resumption time. For an IPO issue, factors such as market health, potential market hostility to the IPO issue, the amount of time an underwriting syndicate requires to determine an IPO price, and the time of the day during which an IPO can occur determine the Quote Resumption time.
  • the market participants receive a message, alerting them to the platform's acceptance of quotations and orders.
  • the Quotation Only Period 34 for IPO issues and halted securities differs.
  • the Quotation Only Period 34 for IPO issues is 15 minutes and for halted securities is 5 minutes.
  • quotations and orders placed during the Quotation Only Period 34 are collected and stored in the quote/order collector facility 20 .
  • Trade Resumption 38 The time at which a halted security or an IPO issue resumes or begins trading is referred to as Trade Resumption 38 .
  • Trade Resumption 38 marks the end of the Pre-Cross Period 30 , because once the security begins trading it is no longer in a halted or IPO state.
  • the time for Trade Resumption 38 is determined by numerous factors and is variable. In some examples, Trade Resumption 38 occurs at a pre-defined period of time after Quote Resumption and varies based on the type of security, such as a halted one or an IPO issue. However, such variation need not occur. In some examples, time for Trade Resumption 38 is generated automatically based on automatic monitoring of market conditions. In other examples, it is manually calculated and entered into the trading platform. Additionally, for either a halted security or an IPO issue, price volatility and an imbalance of shares in an IPO/Halt cross delays the time for Trade Resumption.
  • the time set for Trade Resumption is 5 minutes after Quote Resumption.
  • other Trade Resumption times exist if more or less time accurately reflects the length of time for volatility to subside.
  • the pharmaceutical company decides that 30 minutes is an appropriate length of time to allow the market to absorb the new information. Therefore, Trade Resumption 38 has a value of either 8.30 am or 30 minutes after the halt began.
  • the trading begins 15 minutes after Quote Resumption, because this is sufficient time to accurately assess an IPO's volatility.
  • other factors affect the Trade Resumption time such as whether an underwriter determines that a delay is necessary or price dislocation has occurred.
  • the issuer of the IPO such as an investment bank or the underlying company, determines the Trade Resumption time.
  • a Trade Resumption 38 event communicates with the trading platform that trading should begin and the platform sends a message to market participants signaling the resumption of trading.
  • the trading platform performs a volatility analysis based on all quotes and orders entered for the halted security or the IPO issue, calculating the equilibrium price for buy and sell quotations at varying points of time during the Quotation Only Period 34 .
  • This volatility analysis determines whether the halted security of IPO issue resumes or begins trading. Volatility is detected through calculations based on data contained in an electronic message referred to as the Net Order Imbalance Indicator (NOII).
  • NOII Net Order Imbalance Indicator
  • the NOII is generated and contains information about the halted security or IPO issue, such as paired volume, imbalance volume, the far indicative opening price and the near indicative opening price, as shown in Table 1 and Table 2 (below).
  • the NOII is disseminated to NADAQ members, service bureaus and data vendors, who redistribute the information to their customers and broker dealers.
  • the frequency of the NOII's dissemination is predefined. In one example, the NOII is disseminated every five seconds. However, its dissemination frequency varies based on the amount of time market participants require to react to the information. For example, if the market is largely electronic, then the reaction time to such information is small and market participants can consume frequent dissemination of information. Conversely, if the market is largely non-electronic, then participants require more time to consume information and therefore frequent dissemination of information is not properly consumed.
  • the NOII for the Halt Cross is disseminated every five seconds throughout the Quotation Only Period 34 by NASDAQTRADER.com, NASDAQ Total View and the NASDAQ application programming interface.
  • the NOII for the Halt Cross contains data elements reflecting the current state of the market leading into the Cross.
  • Table 1 below shows an exemplary IPO/Halt Net Order Imbalance Indicator Message Format.
  • the Halt Cross data elements reflect the current state of the market. These elements include (1) the Inside Match Price, which is the price at which the maximum number of shares of eligible quotes and orders are paired; (2) the number of shares represented by eligible quotes and orders that are paired at the Inside Match Price; (3) the number of shares in any imbalance at the Inside Match Price; and (4) the buy/sell direction of that imbalance at the Inside Match Price.
  • table 2 depicts details of the NOII that contains an indicative clearing price range at which the Halt Cross would occur if the Halt Cross were to occur at that time.
  • the two indicative prices in that range and the Inside Match Price have identical values because, in the absence of order types unique to the IPO and Halt Cross, the Inside Match Price and indicative price range are calculated based upon the same order set, resulting in the same price output.
  • Table 2 depicts an exemplary IPO/Halt Order Imbalance Indicator Message Dissemination Record.
  • Imbalance 1 byte This field indicates the market side B Buy Side Side Alphanumeric. of the imbalance.
  • the allowable Imbalance values are as follows: S Sell Side Imbalance N No Imbalance O No marketable Orders in SuperMontage, thus no imbalance.
  • S Sell Side Imbalance N No Imbalance O No marketable Orders in SuperMontage, thus no imbalance.
  • Match 10 bytes This field indicates the NASDAQ Price Numeric. Inside Price at which the Number of Paired Shares and the Number of Shares of Imbalance were calculated. this price will be identical to the Near and Far Indicative Clearing Prices.
  • the prices are present allowable values are as follows: Price 1 byte, Indicates the absolute value of the Code Value Variation Alphanumeric percentage of deviation of the Near Space Price Variation Indicator Indicative Price to the projected Indicator cannot be Inside Match Price. Since there is calculated no difference between Inside Match Price and the Near Indicative Price, this indicator cannot be accurately calculated.
  • the NOII disseminated prior to the Halt Cross differs in several ways from those disseminated prior to the Opening and Closing Crosses, as described in U.S. patent application Ser. No. 11/077,503 pertaining to opening crosses in an electronic market and U.S. patent application Ser. No. 10/835,510 pertaining closing crosses in an electronic market.
  • the Halt Cross NOII is based on different order types.
  • the NOII for the Opening and Closing Crosses include information about On Open and On Close order types, in addition to quotations and regular and extended hours orders for each time in force (Total Day, Day, Good-till-Canceled, and Immediate or Cancel).
  • the NOII for the Halt Cross includes quotations, regular hours orders, and extended hours orders.
  • the NOII for the Halt Cross disseminates the same value for the Inside Match Price, Near Indicative Clearing Price and Far Indicative Clearing Price.
  • the Inside Match Price is the price at which the Number of Paired Shares and the Number of Shares of Imbalance are calculated, and is discussed further below.
  • the Far Indicative Clearing Price and the Near Indicative Opening Price are the clearing prices for all orders in the book at a moment in time. That is, unlike during opening and closing of trading, during a trading halt, there is no firm inside quotation (firm bid and firm offer prices) and the inside can be locked (the bid being equal to the offer) or crossed (the bid being higher than the offer).
  • the Halt Cross does not include On Open and On Close orders.
  • On Open and On Close orders are available to absorb liquidity during the Opening and Closing Crosses and do affect the Near and Far Indicative Clearing Price data elements prior to the Opening and Closing Crosses. Due to these differences, calculating the Near and Far Indicative Clearing Prices provides ambiguous data.
  • Near and Far Indicative Clearing Price fields are disseminated with identical values to the Inside Match Price in order to avoid requiring market participants to re-program their systems to accept a different NOII.
  • the Inside Match Price (and thus the Near and Far Indicative Clearing Prices) are calculated as follows.
  • the system determines the price(s) that maximize the number of shares paired. If more than one such price exists, the system selects the price that minimizes the imbalance of shares unpaired, and that does not leave unexecuted shares at a superior price. If more than one price satisfies both conditions, the type of trading halt necessitating the Halt Cross, such as an IPO, is determinative. When the Halt Cross is for an IPO halt, if more than one such price satisfies the above conditions, the system selects the price that minimizes the price differential from the Issuer's Initial Public Offering price, which is found in the previous day's close field.
  • the system selects the price that minimizes the price differential from the last market center execution prior to the halt. If the security has not been opened for that day yet and more than one such price exists, the system selects the price that minimizes the price differential from the previous Official Closing Price.
  • the volatility in its price quotations are monitored and Trade Resumption 38 occurs when the volatility reaches an acceptable level.
  • Numerous computing environments support such volatility detection and monitoring, such as the computing environment illustrated in FIG. 6 . Therefore, the volatility of the security's price quotations are measured against a specified threshold 46 , and Trade Resumption 38 is delayed if volatility exceeds the threshold 54 .
  • the volatility detection and delay are based upon the data contained in the NOII, which is disseminated every five seconds throughout the Quotation Only Period 34 .
  • Volatility detection occurs during the Quotation Only Period 34 .
  • volatility detection takes place at a time closely preceding the time for Trade Resumption 38 .
  • An event referred to as the Volatility Detection Event 40 is programmed with the time that volatility detection begins. Volatility detection starts when real time equals the value of the Volatility Detection Event 40 . In some examples, the Volatility Detection Event 40 has a value of, e.g., five seconds prior to the time scheduled for Trade Resumption 38 . Because volatility is calculated by examining the value of data points 42 , 44 at varying times during the Quotation Only Period 34 , the Volatility Detection Event 40 also sets the times for sampling of data points 42 , 44 .
  • these times are defined with reference to the time for Trade Resumption 38 .
  • the data points are the Inside Match Prices disseminated every five seconds with the NOII and the Volatility Detection Event 40 specifies which Inside Match Prices are sampled. Therefore, in this example, the Volatility Detection Event 40 specifies the data points are the Inside Match Price from the third to last NOII before Trade Resumption 38 (T ⁇ 15 seconds to Trade Resumption) and the Inside Match Price from the NOII immediately prior to Trade Resumption 38 (T ⁇ 1 seconds to Trade Resumption).
  • Volatility of price quotations of the security is calculated by determining the price differential in the security's price quotations between the two data points 42 , 44 .
  • the price differential is calculated as a percentage value or as an absolute value.
  • the price differential is compared to a threshold value indicative of an acceptable level of volatility in the price quotations.
  • the threshold is a predetermined absolute price change or a percentage variance, such as 10% or 50 cents.
  • the threshold is adjustable based on numerous market conditions such as large point drops in indices and overall market volatility.
  • market participants are notified, allowing them to gauge the relative stability of stock after it has opened. In one example, market participants are notified using email alert systems.
  • the amount of the threshold adjustment need not be listed in the email. Instead, exchange associates could communicate the threshold adjustment directly to market participants. If the price differential exceeds the threshold value, the halted security's or IPO issue's price quotations are too volatile and trading does not resume. Instead, the halt is prolonged and the Trade Resumption 38 is delayed 54 to allow monitoring of the quotations of the security over an extended period of time until volatility has dropped to an acceptable level.
  • the period of time that the Quote Resumption Event 36 is extended for is referred to as “Volatility Delay” 52 . Monitoring time is increased by extending the time for the Quote Resumption Event 36 by the Volatility Delay, thus giving the market more time to absorb new market information.
  • Volatility Delay also extends the time for the Trade Resumption 38 .
  • a Volatility Delay occurs, a Delay Notification is issued to market participants.
  • the length of the Volatility Delay depends on many factors such as whether volatility is detected in a halt or IPO issue and relative market volatility in comparable indices or related sectors.
  • the Volatility Delay for an IPO is five minutes, because the underwriting syndicate group requires time to ensure that the IPO issue is accurately priced.
  • the Volatility Delay for a halted security is one minute, because the pricing of a halted security is a reaction to market participants' supply and demand and is not dependent on an underwriting component.
  • the Volatility Delay is automatically machine generated based on market factors or in other embodiments it is set by an analyst examining market indices such the NASDAQ Composite, the Dow Jones Industrial Average, the Commodity Research Bureau Index and the Goldman Sachs Commodity Index to determine if market volatility has increased.
  • volatility is calculated using data points generated within the volatility delay or a mixture of datapoints, some from the Volatility Delay period and some from the prior Quotation Only Period 34 .
  • the volatility detection process described above is repeated, comparing calculation volatility to the threshold. After detection, trading is further delayed 54 if the volatility level still exceeds the threshold. Analogously, trading resumes 38 if the volatility level is below the threshold.
  • no Volatility Delay occurs. For example, when the calculated volatility is below the threshold, trading resumes at the scheduled Trade Resumption 38 time and no extension in the Quote Resumption Event 36 or Trade Resumption 38 is triggered.
  • the number of Volatility Delays is limited, ensuring that the security is eventually released. This limitation is referred to as the Maximum Volatility Sampler.
  • a counter referred to as the Volatility Sampler, tracks each occurrence of Volatility Detection 46 . After every Volatility Detection 46 , the value of the Volatility Sampler is incremented by one 48 . After incrementing 48 , the value of the Volatility Sampler is compared to the value of the Maximum Volatility Sampler 50 . Once the Maximum Volatility Sampler 50 is reached, Trade Resumption 38 begins, even if volatility in the security's price quotations exceeds the threshold.
  • the value of the Volatility Sampler differs for an IPO issue and a halted security or based on the company underwriting the halted security or IPO issue. This is because different underwriters have varying sensitivities to volatility or perhaps volatility is less of a concern in certain industry sectors or is more problematic in an IPO issue situation than in a halted security situation.
  • the value of the Volatility Sampler for an IPO issue is three. Therefore, volatility is sampled at most three times ( 60 , 62 , 64 ) before the IPO issue is released. After the initial Quotation Only Period 34 (Quotation Only Period 1 ), the price quotations of the IPO issue are sampled. If volatility of quotations for the IPO issue exceeds the threshold, then the Volatility Delay extends the Quotation Only Period 34 , producing a new Quotation Only Period 2 and a new Trade Resumption 2 . Concurrently, the value of the Volatility Sampler is incremented by one 48 to a value of one.
  • Volatility detection is repeated at the end of the Quotation Only Period 2 62 and a second Volatility Delay occurs if volatility still exceeds the threshold.
  • the second Volatility Delay extends the time of Quotation Only Period 2 , producing a Quotation Only Period 3 64 , and the value of the Volatility Sampler is incremented by one to a value of two. If volatility exceeds the threshold value at the end of the Quotation Only Period 3 64 , the Volatility Sampler is incremented to a value of three, equaling the value of the Maximum Volatility Sampler. Therefore, after the third volatility detection cycle, volatility detection stops and trading resumes.
  • the value of the Maximum Volatility Sampler is two, allowing for two Volatility Detection Cycles.
  • the value of the Volatility Delay is one minute.
  • a Trade Resumption message is sent to market participants, notifying them of the opening of the IPO issue or halted security.
  • the trade is executed at a random time point during a 15 second period following Trade Resumption. This ensures that market participants do not manipulate the security's price, such as by inflating it, immediately prior to trade execution, because market participants do not know when during the 15 second period the trade will actually execute.
  • the system conducts the Halt Cross.
  • the Halt Cross is the process for determining the price at which a security is executed at the open of trading for a halted security or an IPO issue.
  • the Halt Cross finds the price that maximizes the number of shares executed. If more than one price satisfies this condition, the price that minimizes the imbalance of shares unexecuted and does not leave unexecuted shares at a superior price is determined. If more than one price satisfies this condition also, the type of cross, such as an IPO or another halt, is determinative. For an IPO, if more than one price satisfies the above conditions, the price that minimizes the price differential from the Issuer's Initial Public Offering price, found in the previous day's close field, is selected.
  • the price that minimizes the price differential from the last Nasdaq market center execution prior to the halt is selected. If the security has not opened for that day and more than one such price satisfies the above conditions, the price that minimizes the price differential from the previous Closing Price is selected.
  • All orders are executed in strict price/time priority starting with the displayed quotation size and then the reserve quotation size at the most aggressive price level, and then moving to successive price levels. All executable orders are executed at the Halt Cross price. Orders and quotations subject to automatic execution participate in the Halt Cross.
  • SIZE is a special MPID (market participant identifier) that represents the aggregate size of all non-attributable quotes/orders at the best bid/best offer displayed in a quote montage (not shown) for the market/exchange or other trading venue along with the other MPIDs for quoting market participants that are also displaying attributable size at the inside price in the market/exchange or other trading venue
  • UTDF UTP Trade Data Feed
  • NIDS Nasdaq Index Dissemination Service
  • NOOP Nasdaq Official Opening Price
  • the Halt Cross is reported as a single trade, but is not identified as a bulk print and is not disseminated as the NOOP.
  • the execution functionality opens for regular trading.
  • a computing system that implements volatility detection includes a processor 70 , memory 72 , disk controller 74 and an input/output (I/O) controller 76 all linked by a common bus.
  • the computing system also includes a disk drive 78 , a monitor or other communication output device or interface 80 and a keyboard or other communication input device or interface 80 .

Abstract

To ensure that a security does not experience large fluctuations in price after being released from a halt or an IPO, a volatility detection process is used to monitor a pre-release stability of the security based on pre-release orders to buy and orders to sell. These pre-release orders to buy and orders to sell establish an equilibrium price, a cross price. A security is released only when the cross price has been stable for a predetermined period of time prior to the release.

Description

    BACKGROUND
  • Electronic equity markets collect, aggregate and display trade information to market participants. Market participants initiate trades of securities by sending trade information to the electronic market on which the securities are traded. The trade information includes continuous orders for execution during a market trading session.
  • A halted security is a previously traded security for which no trading occurs for a defined period of time. Halts are ordered by a market regulator or are otherwise operationally initiated. For example, Market Watch monitors securities and based on the new dissemination of information may order a halt. An initial public offering (IPO) issue is an initial offering of shares of a security to the public. In some examples, an initial public offering is done on an exchange but this need not necessarily be the case. For an IPO issue, trading commences at the time of the IPO. A halt cross is a process for determining the price for which a security is executed at the opening of trading for a halted security or for an IPO issue.
  • SUMMARY
  • Before a security is released for trading, the volatility in prices of quotations for the security is determined and the security is released for trading when the determined volatility is below a threshold. The release of the security is delayed if the detected volatility in the security's price quotations exceeds the threshold. Additionally, volatility is detected in prices of quotations for an initial public offering issue before the issue is released for trading. The time for volatility detection is extended if the detected volatility exceeds the threshold and volatility is detected over a period of time. At the end of this period of time, the security is released if volatility is less than the threshold.
  • In some examples, the volatility is calculated as a variance in the prices of quotations for the security. The variance is measured as a percentage value or in absolute terms. The variance in the price quotations of the security prior to the release of the security is calculated at discrete intervals until the variance is less than the threshold.
  • The details of one or more embodiments of the invention are set forth in the accompanying drawings and the description below. Other features, objects, and advantages of the invention will be apparent from the description and drawings, and from the claims.
  • DESCRIPTION OF DRAWINGS
  • FIG. 1 is a block diagram of a market system.
  • FIG. 2 is a logic view of functions in the in the Quote/Order Collector Facility.
  • FIG. 3 is a diagram of a Pre-Cross Period.
  • FIG. 4 is a block diagram of the volatility detection process.
  • FIG. 5 is a block diagram of periods within the volatility detection process.
  • FIG. 6 is a diagram of a computing system that implements a method of detecting volatility.
  • DETAILED DESCRIPTION
  • Referring to FIG. 1, an electronic market 10 is shown as an example of a trading platform. Numerous other trading platforms are used, including platforms that facilitate trading in markets and exchanges. The electronic market 10 includes client systems 12 that access a central quote/order collector facility 20. In some examples, the client systems 12 are broker/dealer systems 12 a, electronic communication networks (ECN's) 12 b, market-maker(s) system(s) 12 c, and other exchanges 12 d. In one example, the connections use Nasdaq® protocols such as SelectNet® and Small Order Execution System® (SOES®) The client systems 12 include a processor, memory and a storage device, e.g., a client workstation or personal computer (all not shown) that can include a client process to enter quotes/orders into the electronic market systems (e.g., SOES® and SelectNet®) to deliver executions or orders to a market that is coupled to a clearing system 16 and a reporting system 18. It also causes delivery of executions or routing of orders to the ECN's 12 b, depending on the status of the ECN, and routing of orders to other markets and exchanges 12 d. The quote/order collector facility 20 is comprised of one or preferably a plurality of server computers generally denoted as 22 including a processor 22 a, main memory 22 b and storage 22 c. The storage system 22 c includes quote/order collector process 25 that is executed in memory 22 b.
  • The quote/order collector facility (OCF) 20 collects pre-trade information in the form of quotes or orders. The distinction between a quote and an order depends on several factors. For example, each market maker typically sends a two-sided proprietary quote, i.e., a quote that represents its own trading interest for both buy and sell sides of a market, or an agency quote that represents trading interest of a sponsored entity. If one proprietary quote of a sponsored entity is sent it could be considered one order. If one agency quote is sent it also could be considered one order. If an agency quote reflects an aggregation of more than one agency order, however, the aggregate agency order is considered a quote. Entering quotes are limited to registered market makers 12 c and ECNs 12 b and possible UTP Exchanges 12 d.
  • For any given stock, a registered market maker or ECN directly enters a non-marketable order i.e., quote into the quote/order collector facility (OCF) 20 on behalf of its customer account, or it sponsors the direct entry of an order by its customer. All sponsored quotes are sent to the quote/order collector facility 20 under the name of the sponsoring market maker or ECN. In some embodiments, registered market makers or ECNs are permitted to submit an unlimited number of non-marketable quotes to the system 20.
  • The quote/order collector facility 20 receives quotes, liability orders, (non-liability orders) and directed orders from market participants. The quote/order collector facility 20 allows a quote/order to be displayed in the market, and also allows for marketable orders to be executed or routed to market participants.
  • Referring to FIG. 2, the quote/order collector process (OCP) 25 is shown. The quote/order collector process 25 provides transmission of multiple orders or quotes at multiple price levels by Quoting Market Participants to a quotation manager 26 a. The quote/order manager 26 a provides a unified point of entry of quotes and orders from disparate delivery systems into the quote/order collector facility 20 to access quotes/orders displayed (as either attributable or non-attributable) in both the aggregate montage and current quote montage. The quote/order manager 26 a manages multiple quotes/orders and quotes/orders at multiple price levels and uses a montage manager 26 b to display (either in the Aggregate montage or in the current quote montage) the orders/quotes consistent with an order's/quote's parameters. The order collector process 25 also includes an internal execution process manager 26 c to match off executions for quoting market participants at the best bid/offer. The order collector system 20 also includes an order routing/execution manager 26 d to provide a single point delivery of executions or routing of orders, which substantially eliminates potential for dual liability. That is, order collector process 25 maintains the order routing and executions functionality available in the SOES® and SelectNet® systems. The order collector process 25 also includes a lock/cross manager 26 e, and an odd lot execution manager 26 f and a quote update manager 26 g.
  • The Quote/Order Collector Facility 20 collects quotes and orders during a period of nontrading, referred to as the Pre-Cross Period 30, as illustrated in FIG. 3. During the times that the markets are open, securities, such as halted securities and IPO issues, are not traded for numerous reasons. In the case of a halted security, trading is halted when marketplace events cause volatility in the security's price, resulting in a trading halt. During the trading halt, price quotations and orders of the security are not generally monitored to calculate their volatility. However, monitoring is resumed during the Quotation Only Period, occurring towards the end of the Pre-Cross Period 30. When the level of volatility is acceptable, the security is released and trading resumes. Trading halts prevent large fluctuations in the security's price, allowing the security's price to remain stable during trading. For example, Federal Drug Administration (FDA) approval of a company's product causes volatility in the company's securities due to increased demand for the securities initially after announcement of the approval. Then, as the market absorbs the announcement, demand for the security drops, causing the security's price to settle at a lower range. Therefore, trading will be halted during the period of volatility. In this example, if the FDA makes its announcement at 8:15 am, a trading halt for that company's security could occur between 8 am and 10 am, if the market is able to fully absorb the announcement in two hours such volatility will have ceased upon trade resumption.
  • After a trading halt, the price at which the security opens is determined by a halt cross process. The halt cross process determines the security's equilibrium, re-opening price by calculating an intersection of the security's price quotation demand curve with its quotation supply curve.
  • In the case of an IPO issue, the halted security process is replicated except that the IPO issue is not halted, because it has not yet begun trading. Therefore, instead of monitoring quotations for the security during the halt period, quotations for the IPO issue are monitored prior to the IPO release. This is done to ensure that once released, the IPO issue is stable and not subject to price volatility. An IPO cross determines the price at which the IPO issue opens using the procedure described above. Hereafter, the term Halt Cross to refers to a cross that takes place for both a halted security and an IPO issue.
  • Referring to FIG. 3, in some embodiments, for either a halted security or an IPO issue, the Pre-Cross Period 30 has at least three components: (1) the Pre-Quotation Period 32; (2) the Quotation Only Period 34; and (3) Trade Resumption 38. In the case of a halted security, the Pre-Quotation Period 32 is sometimes referred to as the Halt Period, because trading is ceased (i.e. “halted”) during this time.
  • During the Pre-Quotation Period 32, the entry of quotations and orders is prohibited. During the Quotation Only Period 34, quotes and orders are entered, entered quotes and orders are cancelable, and an indicative crossing price and imbalance information are disseminated, but no executions occur. An event, referred to as the Quote Resumption Event 36, triggers the start of the Quotation Only Period 34 by communicating with a trading platform when the appropriate time for quote resumption arrives. The Quote Resumption Event 36 specifies the time during the Pre-Cross Period 30 that the trading platform begins accepting quotations and orders. In some embodiments, the Quote Resumption Event 36 is measured with reference to the Pre-Cross Period 30, such as 5 minutes after the beginning of the Pre-Cross Period 30, or at a fractional point in time, such as after ⅔ of the Pre-Cross Period 30 has elapsed. In some examples, the time set for the Quote Resumption Event 36 depends on numerous factors and whether an IPO issue or halted security is being released. For a halted security, the time of news dissemination, the nature of the disseminated news such as its subject matter or whether it concerns a complex matter, and the amount of time necessary for analysts and other market participants to consume the information factor into the determination of the Quote Resumption time. For an IPO issue, factors such as market health, potential market hostility to the IPO issue, the amount of time an underwriting syndicate requires to determine an IPO price, and the time of the day during which an IPO can occur determine the Quote Resumption time.
  • With the start of the Quotation Only Period 34, the market participants receive a message, alerting them to the platform's acceptance of quotations and orders. In some examples, the Quotation Only Period 34 for IPO issues and halted securities differs. In some examples, the Quotation Only Period 34 for IPO issues is 15 minutes and for halted securities is 5 minutes. In some embodiments, quotations and orders placed during the Quotation Only Period 34 are collected and stored in the quote/order collector facility 20.
  • The time at which a halted security or an IPO issue resumes or begins trading is referred to as Trade Resumption 38. Trade Resumption 38 marks the end of the Pre-Cross Period 30, because once the security begins trading it is no longer in a halted or IPO state. The time for Trade Resumption 38 is determined by numerous factors and is variable. In some examples, Trade Resumption 38 occurs at a pre-defined period of time after Quote Resumption and varies based on the type of security, such as a halted one or an IPO issue. However, such variation need not occur. In some examples, time for Trade Resumption 38 is generated automatically based on automatic monitoring of market conditions. In other examples, it is manually calculated and entered into the trading platform. Additionally, for either a halted security or an IPO issue, price volatility and an imbalance of shares in an IPO/Halt cross delays the time for Trade Resumption.
  • For a halted security, in one example, the time set for Trade Resumption is 5 minutes after Quote Resumption. However, other Trade Resumption times exist if more or less time accurately reflects the length of time for volatility to subside. In the above FDA example, the pharmaceutical company decides that 30 minutes is an appropriate length of time to allow the market to absorb the new information. Therefore, Trade Resumption 38 has a value of either 8.30 am or 30 minutes after the halt began. For an IPO issue, in one example, the trading begins 15 minutes after Quote Resumption, because this is sufficient time to accurately assess an IPO's volatility. However, other factors affect the Trade Resumption time such as whether an underwriter determines that a delay is necessary or price dislocation has occurred. Additionally, in one IPO example, the issuer of the IPO, such as an investment bank or the underlying company, determines the Trade Resumption time.
  • Trading resumes when real time equals the time specified for Trade Resumption 38. In some examples, a Trade Resumption 38 event communicates with the trading platform that trading should begin and the platform sends a message to market participants signaling the resumption of trading.
  • At the end of the Quotation Only Period 34, the trading platform performs a volatility analysis based on all quotes and orders entered for the halted security or the IPO issue, calculating the equilibrium price for buy and sell quotations at varying points of time during the Quotation Only Period 34. This volatility analysis determines whether the halted security of IPO issue resumes or begins trading. Volatility is detected through calculations based on data contained in an electronic message referred to as the Net Order Imbalance Indicator (NOII). During the Quotation Only Period 34, the NOII is generated and contains information about the halted security or IPO issue, such as paired volume, imbalance volume, the far indicative opening price and the near indicative opening price, as shown in Table 1 and Table 2 (below). The NOII is disseminated to NADAQ members, service bureaus and data vendors, who redistribute the information to their customers and broker dealers. The frequency of the NOII's dissemination is predefined. In one example, the NOII is disseminated every five seconds. However, its dissemination frequency varies based on the amount of time market participants require to react to the information. For example, if the market is largely electronic, then the reaction time to such information is small and market participants can consume frequent dissemination of information. Conversely, if the market is largely non-electronic, then participants require more time to consume information and therefore frequent dissemination of information is not properly consumed.
  • In some examples, the NOII for the Halt Cross is disseminated every five seconds throughout the Quotation Only Period 34 by NASDAQTRADER.com, NASDAQ Total View and the NASDAQ application programming interface. The NOII for the Halt Cross contains data elements reflecting the current state of the market leading into the Cross.
  • Table 1 below shows an exemplary IPO/Halt Net Order Imbalance Indicator Message Format. The Halt Cross data elements reflect the current state of the market. These elements include (1) the Inside Match Price, which is the price at which the maximum number of shares of eligible quotes and orders are paired; (2) the number of shares represented by eligible quotes and orders that are paired at the Inside Match Price; (3) the number of shares in any imbalance at the Inside Match Price; and (4) the buy/sell direction of that imbalance at the Inside Match Price.
  • TABLE 1
    Number of Paired Number of Shares
    Cross Type Issue Symbol Shares of Imbalance Imbalance Side
    Inside Match Price Far Indicative Near Indicative No Indicative Price Variation
    Clearing Price Clearing Price Clearing Price Indicator
  • In one example, table 2 below depicts details of the NOII that contains an indicative clearing price range at which the Halt Cross would occur if the Halt Cross were to occur at that time. The two indicative prices in that range and the Inside Match Price have identical values because, in the absence of order types unique to the IPO and Halt Cross, the Inside Match Price and indicative price range are calculated based upon the same order set, resulting in the same price output. Table 2 depicts an exemplary IPO/Halt Order Imbalance Indicator Message Dissemination Record.
  • TABLE 2
    Field Format Description Code Value
    Cross Type
    1 byte This 1-byte alphanumeric field will O Regular Opening
    Alphanumeric denote the type of NASDAQ cross Cross
    event for which the NOII message is I Intra-day Opening
    being generated. for Single Security
    (IPO and Halt
    Situations)
    C Regular Closing
    Cross
    Issue Symbol 7 bytes, The Issue Symbol field identifies
    Alphanumeric. the symbol assigned by NASDAQ
    for a given security.
    Number of 12 bytes, This field indicates the total number
    Shares Paired Numeric. of shares that are currently eligible
    to be matched at the Inside Match
    Price.
    Number of 12 bytes, This field will only be populated
    Shares of Numeric. when there is a Market Buy or
    Imbalance Market Sell condition, indicating
    that there are unexecutable Market
    Priced shares on one side or the
    other. If all Market Priced shares
    will be executed, this field will be
    zero as defined by the Imbalance
    Shares Computation section below.
    Imbalance 1 byte, This field indicates the market side B Buy Side
    Side Alphanumeric. of the imbalance. The allowable Imbalance
    values are as follows: S Sell Side Imbalance
    N No Imbalance
    O No marketable
    Orders in
    SuperMontage,
    thus no imbalance.
    Inside Match 10 bytes, This field indicates the NASDAQ
    Price Numeric. Inside Price at which the Number of
    Paired Shares and the Number of
    Shares of Imbalance were
    calculated. this price will be
    identical to the Near and Far
    Indicative Clearing Prices.
    Far Indicative 10 bytes, This field indicates the price level at
    Clearing Numeric. which the order book would clear
    Price based on the current quotes and
    orders. The format of will be
    $$$$$.dddd.
    Near 10 bytes, This field indicates the price level at
    Indicative Numeric. which the order book would clear
    Clearing based on the current quotes and
    Price orders. The format of will be
    $$$$$.dddd.
    No Indicative 1 byte; This field indicates when Market B Market Buy
    Clearing Alphanumeric. orders cannot be fully paired against A Market Sell
    Price offsetting orders at either the Near Space Not applicable,
    Indicative Clearing Price or the Far Indicative Clearing
    Indicative Clearing Price. The Prices are present
    allowable values are as follows:
    Price 1 byte, Indicates the absolute value of the Code Value
    Variation Alphanumeric percentage of deviation of the Near Space Price Variation
    Indicator Indicative Price to the projected Indicator cannot be
    Inside Match Price. Since there is calculated
    no difference between Inside Match
    Price and the Near Indicative Price,
    this indicator cannot be accurately
    calculated.
  • The NOII disseminated prior to the Halt Cross differs in several ways from those disseminated prior to the Opening and Closing Crosses, as described in U.S. patent application Ser. No. 11/077,503 pertaining to opening crosses in an electronic market and U.S. patent application Ser. No. 10/835,510 pertaining closing crosses in an electronic market. The Halt Cross NOII is based on different order types. The NOII for the Opening and Closing Crosses include information about On Open and On Close order types, in addition to quotations and regular and extended hours orders for each time in force (Total Day, Day, Good-till-Canceled, and Immediate or Cancel). The NOII for the Halt Cross includes quotations, regular hours orders, and extended hours orders. The NOII for the Halt Cross disseminates the same value for the Inside Match Price, Near Indicative Clearing Price and Far Indicative Clearing Price. The Inside Match Price is the price at which the Number of Paired Shares and the Number of Shares of Imbalance are calculated, and is discussed further below. The Far Indicative Clearing Price and the Near Indicative Opening Price are the clearing prices for all orders in the book at a moment in time. That is, unlike during opening and closing of trading, during a trading halt, there is no firm inside quotation (firm bid and firm offer prices) and the inside can be locked (the bid being equal to the offer) or crossed (the bid being higher than the offer). In addition, the Halt Cross does not include On Open and On Close orders. On Open and On Close orders are available to absorb liquidity during the Opening and Closing Crosses and do affect the Near and Far Indicative Clearing Price data elements prior to the Opening and Closing Crosses. Due to these differences, calculating the Near and Far Indicative Clearing Prices provides ambiguous data. Thus, Near and Far Indicative Clearing Price fields are disseminated with identical values to the Inside Match Price in order to avoid requiring market participants to re-program their systems to accept a different NOII.
  • The Inside Match Price (and thus the Near and Far Indicative Clearing Prices) are calculated as follows. The system determines the price(s) that maximize the number of shares paired. If more than one such price exists, the system selects the price that minimizes the imbalance of shares unpaired, and that does not leave unexecuted shares at a superior price. If more than one price satisfies both conditions, the type of trading halt necessitating the Halt Cross, such as an IPO, is determinative. When the Halt Cross is for an IPO halt, if more than one such price satisfies the above conditions, the system selects the price that minimizes the price differential from the Issuer's Initial Public Offering price, which is found in the previous day's close field. For any other halt, if the stock has already been opened for that day and more than one price satisfies the above conditions, the system selects the price that minimizes the price differential from the last market center execution prior to the halt. If the security has not been opened for that day yet and more than one such price exists, the system selects the price that minimizes the price differential from the previous Official Closing Price.
  • Referring to FIG. 4, in order to facilitate the orderly opening of a halted security or IPO issue, the volatility in its price quotations are monitored and Trade Resumption 38 occurs when the volatility reaches an acceptable level. Numerous computing environments support such volatility detection and monitoring, such as the computing environment illustrated in FIG. 6. Therefore, the volatility of the security's price quotations are measured against a specified threshold 46, and Trade Resumption 38 is delayed if volatility exceeds the threshold 54. The volatility detection and delay are based upon the data contained in the NOII, which is disseminated every five seconds throughout the Quotation Only Period 34.
  • Volatility detection occurs during the Quotation Only Period 34. In some examples, volatility detection takes place at a time closely preceding the time for Trade Resumption 38. An event referred to as the Volatility Detection Event 40 is programmed with the time that volatility detection begins. Volatility detection starts when real time equals the value of the Volatility Detection Event 40. In some examples, the Volatility Detection Event 40 has a value of, e.g., five seconds prior to the time scheduled for Trade Resumption 38. Because volatility is calculated by examining the value of data points 42, 44 at varying times during the Quotation Only Period 34, the Volatility Detection Event 40 also sets the times for sampling of data points 42, 44. In some examples, these times are defined with reference to the time for Trade Resumption 38. In some embodiments, the data points are the Inside Match Prices disseminated every five seconds with the NOII and the Volatility Detection Event 40 specifies which Inside Match Prices are sampled. Therefore, in this example, the Volatility Detection Event 40 specifies the data points are the Inside Match Price from the third to last NOII before Trade Resumption 38 (T−15 seconds to Trade Resumption) and the Inside Match Price from the NOII immediately prior to Trade Resumption 38 (T−1 seconds to Trade Resumption).
  • Volatility of price quotations of the security is calculated by determining the price differential in the security's price quotations between the two data points 42, 44. In some examples, the price differential is calculated as a percentage value or as an absolute value. The price differential is compared to a threshold value indicative of an acceptable level of volatility in the price quotations. In some examples, the threshold is a predetermined absolute price change or a percentage variance, such as 10% or 50 cents. The threshold is adjustable based on numerous market conditions such as large point drops in indices and overall market volatility. In some examples, after a threshold adjustment, market participants are notified, allowing them to gauge the relative stability of stock after it has opened. In one example, market participants are notified using email alert systems. However, the amount of the threshold adjustment need not be listed in the email. Instead, exchange associates could communicate the threshold adjustment directly to market participants. If the price differential exceeds the threshold value, the halted security's or IPO issue's price quotations are too volatile and trading does not resume. Instead, the halt is prolonged and the Trade Resumption 38 is delayed 54 to allow monitoring of the quotations of the security over an extended period of time until volatility has dropped to an acceptable level. The period of time that the Quote Resumption Event 36 is extended for is referred to as “Volatility Delay” 52. Monitoring time is increased by extending the time for the Quote Resumption Event 36 by the Volatility Delay, thus giving the market more time to absorb new market information. In this case, additional volatility detection is performed during the length of the Volatility Delay. The Volatility Delay also extends the time for the Trade Resumption 38. In some examples, when a Volatility Delay occurs, a Delay Notification is issued to market participants.
  • The length of the Volatility Delay depends on many factors such as whether volatility is detected in a halt or IPO issue and relative market volatility in comparable indices or related sectors. In some embodiments, the Volatility Delay for an IPO is five minutes, because the underwriting syndicate group requires time to ensure that the IPO issue is accurately priced. In some embodiments, the Volatility Delay for a halted security is one minute, because the pricing of a halted security is a reaction to market participants' supply and demand and is not dependent on an underwriting component. In some embodiments, the Volatility Delay is automatically machine generated based on market factors or in other embodiments it is set by an analyst examining market indices such the NASDAQ Composite, the Dow Jones Industrial Average, the Commodity Research Bureau Index and the Goldman Sachs Commodity Index to determine if market volatility has increased.
  • During a Volatility Delay, volatility is calculated using data points generated within the volatility delay or a mixture of datapoints, some from the Volatility Delay period and some from the prior Quotation Only Period 34. The volatility detection process described above is repeated, comparing calculation volatility to the threshold. After detection, trading is further delayed 54 if the volatility level still exceeds the threshold. Analogously, trading resumes 38 if the volatility level is below the threshold.
  • In some examples, no Volatility Delay occurs. For example, when the calculated volatility is below the threshold, trading resumes at the scheduled Trade Resumption 38 time and no extension in the Quote Resumption Event 36 or Trade Resumption 38 is triggered.
  • In some examples, the number of Volatility Delays is limited, ensuring that the security is eventually released. This limitation is referred to as the Maximum Volatility Sampler. A counter, referred to as the Volatility Sampler, tracks each occurrence of Volatility Detection 46. After every Volatility Detection 46, the value of the Volatility Sampler is incremented by one 48. After incrementing 48, the value of the Volatility Sampler is compared to the value of the Maximum Volatility Sampler 50. Once the Maximum Volatility Sampler 50 is reached, Trade Resumption 38 begins, even if volatility in the security's price quotations exceeds the threshold. However, if the value of the Volatility Sampler is less than the value of the Maximum Volatility Sampler 50 then both the Quotation Only Period 34 and Trade Resumption 38 are extended by the Volatility Delay 52, 54. In some examples, the value of the Maximum Volatility Sampler differs for an IPO issue and a halted security or based on the company underwriting the halted security or IPO issue. This is because different underwriters have varying sensitivities to volatility or perhaps volatility is less of a concern in certain industry sectors or is more problematic in an IPO issue situation than in a halted security situation.
  • In one example, referring to FIG. 5, the value of the Volatility Sampler for an IPO issue is three. Therefore, volatility is sampled at most three times (60, 62, 64) before the IPO issue is released. After the initial Quotation Only Period 34 (Quotation Only Period 1), the price quotations of the IPO issue are sampled. If volatility of quotations for the IPO issue exceeds the threshold, then the Volatility Delay extends the Quotation Only Period 34, producing a new Quotation Only Period 2 and a new Trade Resumption 2. Concurrently, the value of the Volatility Sampler is incremented by one 48 to a value of one. Volatility detection is repeated at the end of the Quotation Only Period 2 62 and a second Volatility Delay occurs if volatility still exceeds the threshold. The second Volatility Delay extends the time of Quotation Only Period 2, producing a Quotation Only Period 3 64, and the value of the Volatility Sampler is incremented by one to a value of two. If volatility exceeds the threshold value at the end of the Quotation Only Period 3 64, the Volatility Sampler is incremented to a value of three, equaling the value of the Maximum Volatility Sampler. Therefore, after the third volatility detection cycle, volatility detection stops and trading resumes.
  • In some examples of a halted security, the value of the Maximum Volatility Sampler is two, allowing for two Volatility Detection Cycles. In some examples, the value of the Volatility Delay is one minute. Thus, if after the first cycle, detected volatility exceeds the threshold value, then the Volatility Sampler is incremented to a value of one and a Volatility Delay occurs. Therefore, at the end of the one minute Volatility Delay, volatility is again detected and the Volatility Sampler is incremented to a value of two. After this second cycle, if volatility still exceeds the threshold value, trading resumes, because volatility detection has occurred twice.
  • When the Quotation Only Period 34 ends, a Trade Resumption message is sent to market participants, notifying them of the opening of the IPO issue or halted security. To discourage gaming by market participants, the trade is executed at a random time point during a 15 second period following Trade Resumption. This ensures that market participants do not manipulate the security's price, such as by inflating it, immediately prior to trade execution, because market participants do not know when during the 15 second period the trade will actually execute. When the Trade Resumption notification has been sent, the system conducts the Halt Cross. The Halt Cross is the process for determining the price at which a security is executed at the open of trading for a halted security or an IPO issue.
  • The Halt Cross finds the price that maximizes the number of shares executed. If more than one price satisfies this condition, the price that minimizes the imbalance of shares unexecuted and does not leave unexecuted shares at a superior price is determined. If more than one price satisfies this condition also, the type of cross, such as an IPO or another halt, is determinative. For an IPO, if more than one price satisfies the above conditions, the price that minimizes the price differential from the Issuer's Initial Public Offering price, found in the previous day's close field, is selected. For any other halt, if the security has already been opened for that day and more than one price satisfies the above conditions, the price that minimizes the price differential from the last Nasdaq market center execution prior to the halt is selected. If the security has not opened for that day and more than one such price satisfies the above conditions, the price that minimizes the price differential from the previous Closing Price is selected.
  • All orders are executed in strict price/time priority starting with the displayed quotation size and then the reserve quotation size at the most aggressive price level, and then moving to successive price levels. All executable orders are executed at the Halt Cross price. Orders and quotations subject to automatic execution participate in the Halt Cross.
  • For IPOs and other halts where a security has not previously opened during the trading day, the Halt Cross execution is reported to Nasdaq's trade reporting system with SIZE as the contra party on both sides of the trade, and then transmitted to the consolidated tape. SIZE is a special MPID (market participant identifier) that represents the aggregate size of all non-attributable quotes/orders at the best bid/best offer displayed in a quote montage (not shown) for the market/exchange or other trading venue along with the other MPIDs for quoting market participants that are also displaying attributable size at the inside price in the market/exchange or other trading venue The Halt Cross price and the associated paired volume are disseminated via the UTP Trade Data Feed (“UTDF”) as a bulk print and on the Nasdaq Index Dissemination Service (“NIDS”) and the Nasdaq Application Program Interface as the Nasdaq Official Opening Price (“NOOP”). For halts where a security has already opened during the trading day, the Halt Cross is reported as a single trade, but is not identified as a bulk print and is not disseminated as the NOOP. When the Halt Cross is complete, the execution functionality opens for regular trading.
  • Referring to FIG. 6, a computing system that implements volatility detection includes a processor 70, memory 72, disk controller 74 and an input/output (I/O) controller 76 all linked by a common bus. In some examples, the computing system also includes a disk drive 78, a monitor or other communication output device or interface 80 and a keyboard or other communication input device or interface 80.
  • A number of embodiments of the invention have been described. Nevertheless, it will be understood that various modifications may be made without departing from the spirit and scope of the invention. Accordingly, other embodiments are within the scope of the following claims. It is to be understood that using volatility detection as described herein occurs across different types of markets, such as securities, bonds, derivatives, futures, commodities markets and other financial markets.

Claims (36)

1. A computer implemented method for releasing securities for trading, the method comprising:
determining volatility in prices of quotations for a security before the security is released for trading; and
releasing the security for trading when the determined volatility is below a threshold.
2. The method of claim 1 further comprising:
delaying the release of the security if the detected volatility in the security's price quotations exceeds the threshold.
3. The method of claim 1 further comprising:
detecting volatility in prices of quotations for an initial public offering issue before the issue is released for trading.
4. The method of claim 1 further comprising:
calculating the volatility as a variance in the prices of quotations for the security.
5. The method of claim 4 in which the variance is measured as a percentage value.
6. The method of claim 4 in which the variance is measured in absolute terms.
7. The method of claim 2 further comprising extending the time for volatility detection if the detected volatility exceeds the threshold.
8. The method of claim 2 comprising detecting volatility over a defined period.
9. The method of claim 8 comprising releasing the security at the end of the defined period.
10. The method of claim 8 comprising releasing the security during the defined period if volatility is less than the threshold.
11. The method of claim 4 wherein the variance in the price quotations of the security prior to the release of the security is calculated at discrete intervals until the variance is less than the threshold.
12. The method of claim 1 further comprising:
releasing the security if the detected volatility is below the threshold.
13. A computer program product embodied on a readable medium for releasing securities for trading the computer program product comprising instructions for
causing a computer system to:
determine volatility in prices of quotations for a security before the security is released for trading; and
release the security for trading when the determined volatility is below a threshold.
14. The computer program product of claim 13 wherein the computer program product comprises instructions to:
delay the release of the security if the detected volatility in the security's price quotations exceeds the threshold.
15. The computer program product of claim 13 wherein the computer program product comprise instructions to:
calculate the volatility as a variance in the prices of quotations for the security.
16. The computer program product of claim 15 wherein the variance is measured as a percentage value.
17. The computer program product of claim 15 wherein the variance is measured in absolute terms.
18. The computer program product of claim 14 wherein the computer program product comprises instructions to: extend the time for volatility detection if the detected volatility exceeds the threshold.
19. The computer program product of claim 14 wherein the computer program product comprises instructions to: detect volatility over a defined period.
20. The computer program product of claim 19 wherein the computer program product comprises instructions to:
release the security at the end of the defined period.
21. The computer program product of claim 19 wherein the computer program product comprises instructions to release the security during the defined period if volatility is less than the threshold.
22. The computer program product of claim 15 wherein the variance in the price quotations of the security prior to the release of the security is calculated at discrete intervals until the variance is less than the threshold.
23. The computer program product of claim 13 wherein the computer program product comprises instructions to release the security if the detected volatility is below the threshold.
23. The computer program product of claim 13 wherein the computer program product comprises instructions to detect volatility in prices of quotations for an initial public offering issue before the issue is released for trading.
25. An apparatus comprising:
a computing device that is configured to
determine volatility in prices of quotations for a security before the security is released for trading; and
release the security for trading when the determined volatility is below a threshold.
26. The apparatus of claim 25 further comprising the computing device facilitating a delay in the release of the security if the detected volatility in the security's price quotations exceeds the threshold.
27. The apparatus of claim 25 in which the computing device detects volatility in prices of quotations for an initial public offering issue before the issue is released for trading.
28. The apparatus of claim 25 in which the computing device calculates volatility as a variance in the prices of quotations for the security.
29. The apparatus of claim 28 in which the computing device calculates the variance as a percentage value.
30. The apparatus of claim 28 in which the computing device calculates the variance in absolute terms.
31. The apparatus of claim 26 in which the computing device extends the time for volatility detection if the detected volatility exceeds the threshold.
32. The apparatus of claim 26 in which the computing device detects volatility over a defined period.
33. The apparatus of claim 32 in which the computing device releases the security at the end of the defined period.
34. The apparatus of claim 32 in which the computing device releases the security during the defined period if volatility is less than the threshold.
35. The apparatus of claim 28 in which the computing device calculates the variance in the price quotations of the security prior to the release of the security at discrete intervals until the variance is less than the threshold.
36. The apparatus of claim 25 in which the computing device releases the security if the detected volatility is below the threshold.
US12/035,748 2008-02-22 2008-02-22 Volatility Detection in a Non-Trading Security's Price Quotation Abandoned US20090216674A1 (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
US12/035,748 US20090216674A1 (en) 2008-02-22 2008-02-22 Volatility Detection in a Non-Trading Security's Price Quotation
US15/882,243 US10810669B2 (en) 2008-02-22 2018-01-29 Apparatus and methods for detection, monitoring, and delay in a computer network
US17/060,228 US11508008B2 (en) 2008-02-22 2020-10-01 Apparatus and methods for detection, monitoring, and delay in a computer network
US17/975,733 US20230064133A1 (en) 2008-02-22 2022-10-28 Apparatus and methods for detection, monitoring, and delay in a computer network

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US12/035,748 US20090216674A1 (en) 2008-02-22 2008-02-22 Volatility Detection in a Non-Trading Security's Price Quotation

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US15/882,243 Continuation US10810669B2 (en) 2008-02-22 2018-01-29 Apparatus and methods for detection, monitoring, and delay in a computer network

Publications (1)

Publication Number Publication Date
US20090216674A1 true US20090216674A1 (en) 2009-08-27

Family

ID=40999254

Family Applications (4)

Application Number Title Priority Date Filing Date
US12/035,748 Abandoned US20090216674A1 (en) 2008-02-22 2008-02-22 Volatility Detection in a Non-Trading Security's Price Quotation
US15/882,243 Active 2028-08-18 US10810669B2 (en) 2008-02-22 2018-01-29 Apparatus and methods for detection, monitoring, and delay in a computer network
US17/060,228 Active 2028-03-16 US11508008B2 (en) 2008-02-22 2020-10-01 Apparatus and methods for detection, monitoring, and delay in a computer network
US17/975,733 Pending US20230064133A1 (en) 2008-02-22 2022-10-28 Apparatus and methods for detection, monitoring, and delay in a computer network

Family Applications After (3)

Application Number Title Priority Date Filing Date
US15/882,243 Active 2028-08-18 US10810669B2 (en) 2008-02-22 2018-01-29 Apparatus and methods for detection, monitoring, and delay in a computer network
US17/060,228 Active 2028-03-16 US11508008B2 (en) 2008-02-22 2020-10-01 Apparatus and methods for detection, monitoring, and delay in a computer network
US17/975,733 Pending US20230064133A1 (en) 2008-02-22 2022-10-28 Apparatus and methods for detection, monitoring, and delay in a computer network

Country Status (1)

Country Link
US (4) US20090216674A1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20140143122A1 (en) * 2012-11-01 2014-05-22 Trading Technologies International, Inc. Systems and Methods for Implementing a Confirmation Period
US20150228021A1 (en) * 2008-10-21 2015-08-13 The Nasdaq Omx Group, Inc. Calculating adjusted transaction matching parameter of a data item based on a determined variability of a transaction matching parameter for the data item
US20160314540A1 (en) * 2015-04-21 2016-10-27 Prima Regulated Markets Limited Price assessment platform
US10169816B2 (en) * 2015-01-06 2019-01-01 Morgan Stanley Services Group Inc. Trading anomaly kill switch

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11710181B1 (en) * 2020-01-10 2023-07-25 Cboe Exchange, Inc. Exchange risk controls

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20010042036A1 (en) * 2000-01-25 2001-11-15 Sanders Steven J. Method and system for investing in customizable investment products
US20020156716A1 (en) * 2001-04-24 2002-10-24 Asif Adatia Automated securities trade execution system and method
US6505174B1 (en) * 1996-03-25 2003-01-07 Hsx, Inc. Computer-implemented securities trading system with a virtual specialist function
US20030126066A1 (en) * 1999-09-23 2003-07-03 Adam Nunes Electronic communication network ranking for automated market system
US6618707B1 (en) * 1998-11-03 2003-09-09 International Securities Exchange, Inc. Automated exchange for trading derivative securities
US20050283421A1 (en) * 2004-04-28 2005-12-22 Frank Hatheway Closing in an electronic market
US20060206404A1 (en) * 2005-03-09 2006-09-14 The Nasdaq Stock Market, Inc. Opening cross in electronic market

Family Cites Families (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1191619A (en) * 1995-06-07 1998-08-26 花旗银行全国协会(N.A.) Method and system for providing integrated brokerage and other financial services through customer activated terminals
US6016483A (en) * 1996-09-20 2000-01-18 Optimark Technologies, Inc. Method and apparatus for automated opening of options exchange
US20030055768A1 (en) * 1999-07-02 2003-03-20 Anaya Ana Gabriela Alert delivery and delivery performance in a monitoring system
US7613647B1 (en) * 2000-01-19 2009-11-03 Itg Software Solutions, Inc. System and method for executing strategy security trading
FR2804526B1 (en) * 2000-01-31 2004-09-10 New York Stock Exchange METHOD AND SYSTEM FOR DISPLAYING DATA REPRESENTING THE OPERATION OF A VALUE STOCK
US7356499B1 (en) * 2000-02-09 2008-04-08 Dean Amburn Method and apparatus for automated trading of equity securities using a real time data analysis
US7103569B1 (en) * 2000-03-24 2006-09-05 Groveman Lloyd A Active account management using volatility arbitrage
US8924277B2 (en) * 2000-08-17 2014-12-30 Nyse Group, Inc. Method and system for automatic execution of a securities transaction
US20040039673A1 (en) * 2002-08-19 2004-02-26 Matt Amberson Method, system, and computer program product for summarizing an implied volatility surface
US8103576B2 (en) * 2003-07-25 2012-01-24 Chicago Mercantile Exchange Inc. Controlling markets during a stop loss trigger
US7685038B2 (en) * 2004-04-30 2010-03-23 Bank Of America Corporation Method and system for block trading of securities
US7529707B2 (en) * 2004-08-04 2009-05-05 Bgc Partners, Inc. System and method for managing trading using alert messages for outlying trading orders
US7577608B1 (en) * 2006-07-07 2009-08-18 Trading Technologies International Inc. System and method for providing a linear spread
US20080010186A1 (en) * 2006-07-07 2008-01-10 Rts Realtime Systems Software Gmbh System and method for internally matching electronic trade orders originated by a preselected group of traders
US7664692B2 (en) * 2006-08-31 2010-02-16 Chicago Board of Options Exchange Method and system for creating and trading derivative investment instruments based on an index of investment management companies
US8140425B2 (en) * 2006-11-13 2012-03-20 Chicago Board Options Exchange, Incorporated Method and system for generating and trading derivative investment instruments based on a volatility arbitrage benchmark index
JP2010534893A (en) * 2007-07-26 2010-11-11 パイプライン フィナンシャル グループ インコーポレイティッド Large transaction system and method for providing price improvements to aggressive orders
US8751352B2 (en) * 2009-10-08 2014-06-10 Ameriprise Financial, Inc. Rules-based risk management
US10062110B1 (en) * 2009-11-18 2018-08-28 Federal Home Loan Mortgage Corporation (Freddie Mac) Systems, methods, and computer-readable storage media for calculating a housing volatility index
US8660936B1 (en) * 2012-09-21 2014-02-25 Chicago Mercantile Exchange Inc. Detection and mitigation of effects of high velocity price changes
US10049404B2 (en) * 2012-12-18 2018-08-14 Trading Technologies International, Inc. Methods and systems to prevent adverse exchange limit effects
US10169816B2 (en) * 2015-01-06 2019-01-01 Morgan Stanley Services Group Inc. Trading anomaly kill switch

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6505174B1 (en) * 1996-03-25 2003-01-07 Hsx, Inc. Computer-implemented securities trading system with a virtual specialist function
US6618707B1 (en) * 1998-11-03 2003-09-09 International Securities Exchange, Inc. Automated exchange for trading derivative securities
US20030126066A1 (en) * 1999-09-23 2003-07-03 Adam Nunes Electronic communication network ranking for automated market system
US20010042036A1 (en) * 2000-01-25 2001-11-15 Sanders Steven J. Method and system for investing in customizable investment products
US20020156716A1 (en) * 2001-04-24 2002-10-24 Asif Adatia Automated securities trade execution system and method
US20050283421A1 (en) * 2004-04-28 2005-12-22 Frank Hatheway Closing in an electronic market
US20060206404A1 (en) * 2005-03-09 2006-09-14 The Nasdaq Stock Market, Inc. Opening cross in electronic market

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20150228021A1 (en) * 2008-10-21 2015-08-13 The Nasdaq Omx Group, Inc. Calculating adjusted transaction matching parameter of a data item based on a determined variability of a transaction matching parameter for the data item
US20140143122A1 (en) * 2012-11-01 2014-05-22 Trading Technologies International, Inc. Systems and Methods for Implementing a Confirmation Period
US10740839B2 (en) * 2012-11-01 2020-08-11 Trading Technologies International, Inc. Systems and methods for implementing a confirmation period
US11250511B2 (en) * 2012-11-01 2022-02-15 Trading Technologies International, Inc. Systems and methods for implementing a confirmation period
US20220129984A1 (en) * 2012-11-01 2022-04-28 Trading Technologies International Inc. Systems and Methods for Implementing a Confirmation Period
US11869081B2 (en) * 2012-11-01 2024-01-09 Trading Technologies International, Inc. Systems and methods for implementing a confirmation period
US10169816B2 (en) * 2015-01-06 2019-01-01 Morgan Stanley Services Group Inc. Trading anomaly kill switch
US20190130486A1 (en) * 2015-01-06 2019-05-02 Aditya Damodaran Trading anomaly kill switch
US10796366B2 (en) * 2015-01-06 2020-10-06 Morgan Stanley Services Group Inc. Trading anomaly kill switch
US20160314540A1 (en) * 2015-04-21 2016-10-27 Prima Regulated Markets Limited Price assessment platform

Also Published As

Publication number Publication date
US20210019828A1 (en) 2021-01-21
US20180150911A1 (en) 2018-05-31
US10810669B2 (en) 2020-10-20
US20230064133A1 (en) 2023-03-02
US11508008B2 (en) 2022-11-22

Similar Documents

Publication Publication Date Title
US11508008B2 (en) Apparatus and methods for detection, monitoring, and delay in a computer network
Min et al. A further investigation of the lead–lag relationship between the spot market and stock index futures: Early evidence from Korea
US8103575B1 (en) System and method for use in auditing financial transactions
US8458079B2 (en) Computer-implemented systems and methods for determining liquidity cycle for tradable financial products and for determining flow-weighted average pricing for same
US8078523B2 (en) System and method for monitoring trades outside of a no-bust range in an electronic trading system
US9026470B2 (en) Calculation of a price of a security based on volatility detection
US20160225083A1 (en) Method of Creating and Trading Derivative Investment Products Based on a Statistical Property Reflecting the Variance of an Underlying Asset
US20080120249A1 (en) Method of creating and trading derivative investment products based on a statistical property reflecting the volatility of an underlying asset
US11929967B2 (en) Streaming platform reader
US11695854B2 (en) Optimization of encoding cycles for object recovery feed
US20130185185A1 (en) Automated trading system for routing and matching orders
US8015098B2 (en) Sell-side benchmarking of security trading
US20160358261A1 (en) Automated trading system for routing and matching orders
US20080059353A1 (en) System and method for retrieving and analyzing information on securities and trading securities
US20190130485A1 (en) Methods and systems for creating an interest rate swap volatility index and trading derivative products based thereon
Chan et al. Asymmetric Price Distribution and Bid–Ask Quotes in the Stock Options Market
WO2009094342A1 (en) Non-traditional futures contracts and associated processing systems
JP2003323546A (en) L/s fund investment system
Chan et al. Asymmetric price distribution and bid-ask quotes in the stock options market
Murra Volatility Smile and Risk Neutral Density for FX Options: An Example for the USDMXN
Remolona taff Reports

Legal Events

Date Code Title Description
AS Assignment

Owner name: NASDAQ OMX GROUP, INC., THE, MARYLAND

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:NUNES, ADAM SETH;REEL/FRAME:023526/0047

Effective date: 20081014

AS Assignment

Owner name: NASDAQ, INC., NEW YORK

Free format text: CHANGE OF NAME;ASSIGNOR:THE NASDAQ OMX GROUP, INC.;REEL/FRAME:036822/0452

Effective date: 20150908

STCB Information on status: application discontinuation

Free format text: ABANDONED -- AFTER EXAMINER'S ANSWER OR BOARD OF APPEALS DECISION