US20090283279A1 - Zonal isolation system - Google Patents
Zonal isolation system Download PDFInfo
- Publication number
- US20090283279A1 US20090283279A1 US12/469,521 US46952109A US2009283279A1 US 20090283279 A1 US20090283279 A1 US 20090283279A1 US 46952109 A US46952109 A US 46952109A US 2009283279 A1 US2009283279 A1 US 2009283279A1
- Authority
- US
- United States
- Prior art keywords
- zonal isolation
- anchor
- anchors
- isolation tool
- tool
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
- E21B33/12—Packers; Plugs
- E21B33/127—Packers; Plugs with inflatable sleeve
- E21B33/1272—Packers; Plugs with inflatable sleeve inflated by down-hole pumping means operated by a pipe string
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B23/00—Apparatus for displacing, setting, locking, releasing, or removing tools, packers or the like in the boreholes or wells
- E21B23/06—Apparatus for displacing, setting, locking, releasing, or removing tools, packers or the like in the boreholes or wells for setting packers
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
- E21B33/12—Packers; Plugs
- E21B33/1208—Packers; Plugs characterised by the construction of the sealing or packing means
- E21B33/1216—Anti-extrusion means, e.g. means to prevent cold flow of rubber packing
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
- E21B33/12—Packers; Plugs
- E21B33/129—Packers; Plugs with mechanical slips for hooking into the casing
Definitions
- a zonal isolation tool should provide reliable, long-term isolation between two or more subsurface zones in a well.
- a typical application would be to segregate two zones in an open-hole region of a well, the zones being separated by a layer of low permeability shale in which the zonal isolation tool is placed.
- a nominal size configuration would be usable in wellbores drilled with an 81 ⁇ 2 inch (21.6 cm) outer diameter bit below 95 ⁇ 8 inch (24.5 cm) casing, but the use of zonal isolation tools is not limited to any particular size, or to use in open holes.
- downhole chokes may be used for production management.
- selective zonal injection may be performed. If distributed temperature sensing is placed in the well, monitoring predictive control is possible.
- FIGS. 1 and 2 A conventional completion assembly 10 with a zonal isolation tool 12 is illustrated in FIGS. 1 and 2 for allowing production of two separate flows 4 A and 4 B from an open hole 3 .
- Assembly 10 may include a production packer 14 , a gravel pack packer 16 , flow control valves 18 , and other components commonly used in downhole completions.
- Zonal isolation tool 12 may comprise a packer 20 , a pair of anchors 22 , a pair of polished bore receptacles (PBRs) 24 , and an expansion joint 26 .
- Service tools may include a setting string 28 and an isolation string 30 .
- a zonal isolation system for use in a well.
- the zonal isolation system includes a zonal isolation tool, at least one anchor, and at least one polished bore receptacle.
- the zonal isolation system includes a setting string for activation of the zonal isolation tool and/or the at least one anchor.
- the zonal isolation system may also include an isolation string for maintaining separation zones during production or injection of the well.
- FIG. 1 is a schematic side elevation view, partially in longitudinal cross section, of a completion assembly comprising an embodiment of a zonal isolation tool constructed in accordance with embodiments of the invention
- FIG. 2 is a schematic side elevation view, partially in longitudinal cross section, of the zonal isolation tool of FIG. 1 , along with a setting string and isolation string;
- FIG. 3 is a schematic longitudinal side elevation view of a portion of the base structure of the zonal isolation tool of FIG. 1 ;
- FIG. 4 is a schematic longitudinal side elevation view of a portion of the base structure of the zonal isolation tool of FIG. 1 after inflation pressure has been applied;
- FIG. 5 is a schematic longitudinal side elevation view of a portion of the base structure of the zonal isolation tool of FIG. 1 with a compressive load being applied;
- FIGS. 6A-D are schematic longitudinal cross sectional views of a portion of the base structure of the zonal isolation tool of FIG. 1 illustrating an operational sequence
- FIG. 7 is a schematic longitudinal cross section view of a portion of the zonal isolation tool of FIG. 1 illustrating the seal element
- FIG. 8 is a schematic longitudinal cross section view of a portion of the zonal isolation tool of FIG. 1 illustrating the seal element after inflation pressure
- FIG. 9 is a schematic longitudinal cross section view of a portion of the zonal isolation tool of FIG. 1 illustrating the seal element after compressive loading is applied;
- FIG. 10 is a more detailed schematic longitudinal cross section view of the seal element of the zonal isolation tool of FIG. 1 ;
- FIG. 11 is an enlarged detailed view of a portion of the seal element of the zonal isolation tool of FIG. 1 ;
- FIG. 12 is an enlarged schematic longitudinal cross section view illustrating anti-extrusion sheets used in the zonal isolation tool of FIG. 14 ;
- FIG. 13 is a perspective schematic view of the structural undercarriage of the zonal isolation tool of FIG. 1 ;
- FIGS. 14A and 14B are schematic axial cross section views illustrating alternate fluid pathways that may be incorporated in the zonal isolation tool of FIG. 1 ;
- FIGS. 15A , 15 B, and 15 C are schematic longitudinal cross section views of another embodiment of a zonal isolation tool.
- FIG. 16 is a schematic side elevation views, partially in longitudinal cross section, of the zonal isolation system along with a setting string and isolation string;
- FIG. 17 is a partial schematic side views of a slip anchor
- FIG. 18 is a partial schematic side views of a two-stage slip anchor
- FIG. 19 is a perspective view of a self locking anchor
- FIG. 20 is a partial schematic side views of a penetrator type anchor
- FIG. 21 is a schematic cross section side view of a portion of the zonal isolation system
- a “wellbore” may be any type of well, including, but not limited to, a producing well, a non-producing well, an experimental well, and exploratory well, and the like.
- Wellbores may be vertical, horizontal, any angle between vertical and horizontal, diverted or non-diverted, and combinations thereof, for example a vertical well with a non-vertical component.
- the terms “connect”, “connection”, “connected”, “in connection with”, and “connecting” are used to mean “in direct connection with” or “in connection with via another element”.
- the term “set” is used to mean “one element” or “more than one element”.
- the open hole zonal isolation system 80 may comprise a zonal isolation tool 29 , a first anchor 82 and a second anchor 84 , an upper polished bore receptacle 86 and a lower polished bore receptacle 88 , and an expansion joint 90 .
- the zonal isolation system may also include a setting string 92 and an isolation string 94 .
- FIGS. 3 , 4 and 5 an embodiment of the zonal isolation tool 29 is disclosed.
- This embodiment includes an elastomeric seal member 34 initially inflated by a fluid entering an inflation port 21 in base pipe 15 .
- Inflation port 21 aligns with a similar passage 31 in a member 19 , which may be described as an inflation valve, during initial expansion of seal member 34 .
- Member 19 along with a moveable piston 13 and a movable sleeve 7 also define an expandable chamber 2 .
- Moveable sleeve 7 includes a through hole 9 , whose function will become apparent.
- Base pipe 15 includes another through passage 11 opening into a chamber 23 formed in a stationary sleeve 5 .
- Moveable piston 13 is able to slide longitudinally downward within stationary sleeve 5 .
- Passage 31 opens into a large chamber 43 able to accept fluid to expand sealing member 34 .
- Chamber 43 is sealed by an o-ring or other seal at 39 .
- FIGS. 4 and 5 illustrate operation of the zonal isolation tool 29 .
- Sealing member 34 is initially expanded via fluid pressure entering through inflation port 21 and passage 31 and into chamber 43 to an initial expansion pressure, causing sealing member 34 to engage a wellbore or borehole wall 33 .
- moveable piston 13 and moveable sleeve 7 remain essentially stationary.
- member 19 moves to the left, blanking or closing inflation port 21 , and through hole 9 opens into the hydroforming chamber 43 , as illustrated in FIG. 5 .
- a fluid 45 is introduced into chamber 23 via through hole 11 , causing moveable piston 13 and moveable sleeve 7 to the right in FIG. 5 .
- sealing member 34 This in turn causes sealing member 34 to compress axially and also to form a seal at or near a leading edge 32 .
- Fluid pressure 35 A is also allowed to vent from the annulus 6 into chamber 43 through passage 9 and pressure 35 B is nearly equal to pressure 35 A, allowing pressure communication as indicated by the arrows from annulus 6 to chamber 43 .
- Pressures 35 A and 35 B are higher than pressure 37 .
- Sealing member 34 ( FIG. 5 ) may include an underlying carriage 36 ( FIG. 13 ). After actuation, differential pressure energizes the cup-type seal 34 , vis-à-vis pressure in 35 B which is greater than pressure in 37 . It should be noted that the fluid pressure used to activate the sealing member 34 may be transmitted to the sealing member 34 and/or setting pistons 13 by various means.
- An embodiment receives the tubing pressure via a setting tool 28 fitted with sealing elements (o-rings, packing, or the like).
- sealing elements o-rings, packing, or the like.
- a pressure chamber is formed that communicates with the packer element and setting pistons 13 .
- Pressure is applied thru the setting tool 28 via the surface control equipment at the rig.
- Another embodiment utilizes the differential pressure between the hydrostatic pressure downhole and a trapped atmospheric chamber (not shown) integral to the packer device. To activate the packer, a setting tool is used to break the seal of the atmospheric trap chamber. Once freed, the pressure differential may be used to hydroform the element, and further to apply the compressive load as claimed.
- a similar embodiment may compliment or even replace the trapped atmospheric chamber with a pre-charged volume of nitrogen or other gas stored within the packer. The result is to create a large differential pressure at setting depth.
- Further embodiments may include activation by non pressurizing means, such as mechanical ratcheting via an electric-powered or hydraulic-powered downhole device, such as a tractor run on slickline, e-line, or coiled tubing.
- the zonal isolation tool 29 of this embodiment uses hydroforming pressure as a first step to energize. Initial inflation will affect a long length of sealing contact, assuring good compliance to the open hole. After initial inflation, a compressive load is applied via linear piston 7 ( FIG. 5 ) to ensure sealing point 32 near the leading end of the sealing element structure.
- FIGS. 3-5 in certain embodiments a linear compressive load from a moveable piston opens a vent such as passage 9 in FIG. 5 .
- the operational sequence must happen in the proper order.
- FIGS. 6A-D illustrate this order. For example, if vent 9 is opened prior to port 21 being blanked, then it would become impossible to blank port 21 because open communication would be established. To blank the port 21 , an o-ring must un-seal, then re-seal under dynamic conditions. Despite that limitation, other combinations of this sequence may work in other embodiments, as disclosed herein.
- FIG. 7 illustrates schematically a simplified seal 34 with bands 40 .
- the right end 38 of seal 34 is fixed while the left end 44 is free to displace axially to the right.
- a ratchet ring 42 prevents axial movement to the left and thus helps seal 34 retain elastic (potential) energy.
- Setting pressure is applied inside seal 34 via the packer setting tool 28 ( FIG. 2 ).
- Bands 40 break when a defined pressure is reached, allowing seal 34 to expand and contact the formation wall 33 ( FIGS. 4 , 5 ).
- Another embodiment of this feature may replace or complement the circumferential bands with a poppet valve.
- the seal centerline in this embodiment lies to the right of the contact centerline. This behavior is conditioned by machining a notch 46 at the left end of carriage 36 ( FIG. 12 ).
- a setting pressure of approximately 1,500 psi (about 10.3 megaPascals) is used to lengthen the contact length of seal 34 with the formation ( FIG. 8 ). Finally, the setting pressure is increased to approximately 2,500 psi (about 17.2 megaPascals) to: (1) blank port 21 (i.e. isolate inside of sealing member 34 from tubing or base pipe 15 pressure); (2) vent sealing member 34 to annulus 6 through vent 9 ; and (3) axially compress the left end of sealing member 34 to bias sealing point 32 .
- the cup effect makes each seal unidirectional, as illustrated in FIG. 9 . When a bidirectional seal is desired, at least two seals are required facing opposite directions.
- a venting port 60 may be placed on the low-pressure side 37 of sealing member 34 to eliminate any atmospheric trap that would be created between the inner sealing element 50 outer sealing element 52 .
- Total seal length is indicated at 55
- slotted length is indicated at 56 if a slotted carriage is employed.
- Carriage 36 is illustrated in FIG. 13 as a cylinder having one or more machined slots 58 in the axial direction. These slots may be used to create individual beams 57 around the cylinder.
- the left end of beams 57 may be notched as illustrated in detail in FIG. 12 to simulate a “simply supported” beam.
- the right end may not be notched; if it is not, the right end simulates a “cantilevered” beam.
- Carriage 36 may also be un-slotted, that is, a thin solid tube.
- Inner sealing element 50 ( FIG. 11 ), sometimes referred to as a bladder, may be an elastomeric cylinder bonded near the ends of carriage 36 to provide inflation capability to sealing member 34 .
- Inner sealing element 50 allows sealing member 34 to deploy under internal pressure and to self-energize when differential pressure across packer 20 is present. Because inner sealing element 50 may be cold-bonded to metal at 51 , a mechanically energized wedge 53 may be used to improve reliability.
- Inner sealing element 50 may have a thickness ranging from about 0.10 to about 0.20 inch (from about 0.25 to about 0.5 cm), and may comprise 80 durometer HNBR, although the invention is not so limited, as other materials discussed herein may be employed.
- Outer sealing element 52 may be a rubber cylinder bonded to the ends of the carriage 36 to provide sealing against the formation. Outer sealing element 52 may have any thickness that provides appropriate tear and wear resistance during conveyance and good conformability to open-hole irregularities. Its thickness may range from about 0.30 to about 0.70 inch (from about 0.76 to about 1.78 cm) to. Outer seal element 52 may also comprise 80 durometer HNBR, and may comprise other materials as discussed herein.
- Dashed circle “A” in FIG. 11 refers to a detailed view illustrated in FIG. 12 .
- the use of notched beams in support carriage 36 helps control the axial location of the leading edge 32 of the contact point of sealing member 34 with the formation.
- the maximum deflection point shifts to the left of the structure, as illustrated schematically in FIGS. 8 and 9 . This improves the overall sealing performance of sealing elements 50 and 52 under differential pressure and contributes to the long-term reliability of the apparatus, particularly sealing member 34 .
- Carriage 36 may be made of, for example, 4130/4140 steel.
- Anti-extrusion sheets 54 are, in the embodiment illustrated, sheet metal cylinders located between carriage 36 and outer sealing element 52 and inner bladder 50 to prevent extrusion through the gaps formed as individual beams 57 in carriage 36 expand and separate.
- Anti-extrusion sheets 54 may be slotted or un-slotted, and may have any thickness suitable for the intended purpose, but will likely range in thickness from about 0.020 to about 0.050 inch (from about 0.051 to about 0.13 cm).
- Anti-extrusion sheets may comprise half-hardness low-carbon steel, and if used are welded at 59 to carriage 36 at each end. Un-slotted anti-extrusion sheets may allow removal of inner elastomeric element 50 and a buffer layer.
- a buffer layer of non-metallic material may be added between the innermost anti-extrusion sheet metal cylinder 54 and inner elastomeric element 50 .
- a buffer layer may be used to prevent the sharp edges of the sheet metal cylinder from puncturing the relatively thin layer of elastomer used for inner elastomeric member 50 .
- Suitable buffer layer materials include polyetheretherketone (PEEK), and may be have a thickness ranging from about 0.010 to about 0.030 inch (about 0.025 to about 0.076 cm).
- FIGS. 14A and 14B illustrate schematic cross section views at a screen pipe ( FIG. 14A ) and a packer ( FIG. 14B ).
- FIG. 14A illustrates shunt tubes 62 for pumping gravel slurry or injection fluids through a zonal isolation tool, and illustrates that the outer circumference of the screen may have a different center 70 than the inner circumference 72 .
- FIG. 14B illustrates alternate fluid pathways for pumping gravel slurry or injection fluids through a zonal isolation tool.
- the design illustrated preserves an equivalent area from for transport tubes. It is possible to move the packer and screen base pipes onto different centers, which would ease the disruption in the flow transition.
- FIGS. 15A , 15 B, and 15 C illustrate schematically an alternate embodiment of the invention 80 .
- This embodiment differs from embodiment 29 illustrated in FIGS. 3-5 in operation.
- a moveable block 76 is moved to the right by fluid pressure 45 , and an O-ring 77 is caused to unseat into a small chamber 78 .
- inflation port 21 is blanked close, and high pressure fluid in annulus 6 is allowed to pass through chamber 78 into chamber 43 , causing the pressures 35 A and 35 B to become nearly equivalent. Since there is no passage in block 76 to align with inflation port 21 in base pipe 15 , there is less chance in this embodiment that annulus pressure will pass through port 21 , and port 21 is more easily blanked.
- the outer elastomeric elements engage an adjacent surface of a well bore, casing, pipe, tubing, and the like.
- Other elastomeric layers between the inner and outer elastomeric members may be provided for additional flexibility and backup.
- a non-limiting example of an elastomeric element is rubber, but any elastomeric materials may be used.
- a separate membrane may be used with an elastomeric element if further wear and puncture resistance is desired.
- a separate membrane may be interleaved between elastomeric elements if the elastomeric material is insufficient for use alone.
- the elastomeric material of outer sealing elements should be of sufficient durometer for expandable contact with a well bore, casing, pipe or similar surface. In some embodiments the elastomeric material may be of sufficient elasticity to recover to a diameter smaller than that of the wellbore to facilitate removal therefrom.
- the elastomeric material should facilitate sealing of the well bore, casing, or pipe in the inflated state.
- “Elastomer” as used herein is a generic term for substances emulating natural rubber in that they stretch under tension, have a high tensile strength, retract rapidly, and substantially recover their original dimensions (or even smaller in some embodiments).
- the term includes natural and man-made elastomers, and the elastomer may be a thermoplastic elastomer or a non-thermoplastic elastomer.
- the term includes blends (physical mixtures) of elastomers, as well as copolymers, terpolymers, and multi-polymers.
- Examples include ethylene-propylene-diene polymer (EPDM), various nitrile rubbers which are copolymers of butadiene and acrylonitrile such as Buna-N (also known as standard nitrile and NBR). By varying the acrylonitrile content, elastomers with improved oil/fuel swell or with improved low-temperature performance can be achieved. Specialty versions of carboxylated high-acrylonitrile butadiene copolymers (XNBR) provide improved abrasion resistance, and hydrogenated versions of these copolymers (HNBR) provide improve chemical and ozone resistance elastomers. Carboxylated HNBR is also known.
- PVC-NBR polyvinylchloride-nitrile butadiene
- CM chlorinated polyethylene
- CSM chlorinated sulfonate polyethylene
- ECO epichlorohydrin copolymer
- GECO epichlorohydrin terpolymer
- polyacrylate rubbers such as ethylene-acrylate copolymer (ACM), ethylene-acrylate terpolymers (AEM), EPR, elastomers of ethylene and propylene, sometimes with a third monomer, such as ethylene-propylene copolymer (EPM), ethylene vinyl acetate copolymers (EVM), fluorocarbon polymers (FKM), copolymers of poly(vinylidene fluoride) and hexafluoropropylene (VF2/HFP), terpolymers of poly(vinylidene fluor
- the expandable portions of the packers may include continuous strands of polymeric fibers cured within the matrix of the integral composite body comprising elastomeric elements. Strands of polymeric fibers may be bundled along a longitudinal axis of the expandable packer body parallel to longitudinal cuts in a laminar interior portion of the expandable body. This can facilitate expansion of the expandable portion of the composite body yet provide sufficient strength to prevent catastrophic failure of the expandable packer upon complete expansion.
- the expandable portions of the tools may also contain a plurality of overlapping reinforcement members.
- These members may be constructed from any suitable material, for example high strength alloys, fiber-reinforced polymers and/or elastomers, nanofiber, nanoparticle, and nanotube reinforced polymers and/or elastomers, or the like, all in a manner known and disclosed in U.S. patent application Ser. No. 11/093390, filed on Mar. 30, 2005, entitled “Improved Inflatable Packers”, the entirety of which is incorporated by reference herein.
- the zonal isolation tools may be constructed of a composite or a plurality of composites so as to provide flexibility.
- the expandable portions of the tools may be constructed out of an appropriate composite matrix material, with other portions constructed of a composite sufficient for use in a wellbore, but not necessarily requiring flexibility.
- the composite may be formed and laid by conventional means known in the art of composite fabrication.
- the composite may be constructed of a matrix or binder that surrounds a cluster of polymeric fibers.
- the matrix can comprise a thermosetting plastic polymer which hardens after fabrication resulting from heat.
- Other matrices are ceramic, carbon, and metals, but the invention is not so limited.
- the matrix can be made from materials with a very low flexural modulus close to rubber or higher, as required for well conditions.
- the composite body may have a much lower stiffness than that of a metallic body, yet provide strength and wear impervious to corrosive or damaging well conditions.
- the composite tool body may be designed to be changeable with respect to the type of composite, dimensions, number of cable and fibrous layers, and shapes for differing downhole environments.
- the zonal isolation tool may be any type of isolation or separation device suitable for use in an openhole environment. These include, but are not limited to, hydroform-compress-energize packer, swellable elastomer packer, inflatable ECP, or rubber-compression packer. Furthermore, it is understood that multiple zonal isolation tools may be positioned or oriented in any manner to generate uni-directional or bi-directional sealing.
- the open hole zonal isolation system 80 may comprise the zonal isolation tool 29 , the first anchor 82 , the second anchor 84 , the upper polished bore receptacle 86 , the lower polished bore receptacle 88 , and the expansion joint 90 .
- the zonal isolation system may also include the setting string 92 and the isolation string 94 .
- the zonal isolation system 80 enables long term, openhole, hydraulic isolation while having the ability to allow for expansion and/or contraction due to thermal effects and maintain an effective sealing and anchoring system.
- the zonal isolation system 80 also retains the differential pressure rating for wider open hole internal diameters or changes in the open hole internal diameter within the specified operating envelope. After deployment, the system uses the differential pressure to maintain energized seals and once the well is put into production or injection, the differential of the pressure created may re-energize the seal.
- the upper polished bore receptacle 86 may be placed above the zonal isolation tool and a lower polished bore receptacle 88 may be placed below the zonal isolation tool, as shown in FIGS. 16 and 21 .
- the upper polished bore receptacle 86 may comprise a tubular structure 96 having a first end 98 and a second end 100 .
- the first end 98 and the second end 100 of the upper polished bore receptacle 86 may be threaded, preferably using premium threads.
- the upper polished bore receptacle 86 may have a continuous inner diameter 102 which is smooth and polished. The packing of the setting tool 28 will be positioned within the inner diameter 102 during setting.
- the lower polished bore receptacle 88 may comprise a tubular structure 104 having a first end 106 and a second end 108 .
- the lower polished bore receptacle 88 may also include a continuous inner diameter 110 which is smooth, however, a locating profile 112 machined as a feature in the inner diameter 110 of the lower polished bore receptacle 88 may be included to assist in locating the setting tool 28 within the inner diameter of the lower polished bore receptacle.
- the locating profile 112 is a pattern of grooves 114 for engaging and seating fingers 116 of a locating collet 118 .
- the engagement of the locating profile 112 and the fingers 116 provide an interference interaction between the components so that in order for the locating profile and the fingers to be disengaged, a specific amount of tensional force must be applied to the work string. This provides indication at the surface of the well that the zonal isolation tool has reached its intended position downhole.
- the locating profile is especially beneficial in long, horizontal, openhole completions. It is understood that the zonal isolation system may include more than two polished bore receptacles or one polished bore receptacle with a communication port that is attached to the zonal isolation tool.
- the zonal isolation system 80 may also include a pair of anchors for preventing movement of the zonal isolation tool 29 relative to the openhole by gripping the borehole wall, as shown in FIG. 16 .
- a piston effect resulting from a fully expanded zonal isolation tool may be isolated using the pair of anchors.
- the pair of anchors comprises a first anchor 82 and a second anchor 84 which are located generally adjacent to the zonal isolation tool 29 .
- the first anchor 82 may be placed above the zonal isolation tool and the second anchor 84 may be placed below the zonal isolation tool.
- the anchors 82 , 84 are located in between the zonal isolation tool 29 and the polished bore receptacles 86 , 88 and may be activated by using the setting tool 28 used for setting the zonal isolation tool either simultaneously or in the same trip.
- the anchors may be attached to the polished bore receptacles via threads. It is understood that the zonal isolation system may be deployed having only one anchor, multiple anchors, or in some cases no anchor will be used.
- the first anchor 82 and the second anchor 84 support tensile and compressive forces on the tubular string, and provide a torsional load path.
- the effectiveness of the anchors may be a function of the friction coefficient of the openhole and the radial load applied against the formation.
- the coefficient of friction is related to the type of formation and fluids present downhole in the region of setting the zonal isolation system. In order to protect the formation from fracture, it is important that the radial loads remain below the fracture pressure of the formation. Therefore, the load should be distributed over a large surface area.
- the anchors used with the zonal isolation system may be of several types.
- a classical slip type anchor 120 may be used.
- the classical slip anchor 120 comprises a cone that pushes slips outward toward the openhole wall until the slips make contact with the openhole wall. Friction against the formation maintains the anchor in position.
- a hydraulic piston may be used, and a ratchet maintains the anchor in position and prevents the anchor from relaxing or moving.
- a two-stage slip anchor 122 may also be used and contains a pair of support slips on the extremities, or ends of the anchor, and a pair of principal slips in a center of the anchor, as shown in FIG. 18 .
- the pair of support slips is based on a C-ring design, and the pair of principal slips are based on a barrel slip design. Contact is initiated in the same manner as in the classical slip anchor discussed above.
- a self-locking anchor 124 may be used, as illustrated in FIG. 19 .
- the self-locking anchor 124 realizes increased friction and contact pressure with the formation as the axial forces are increased.
- the self-locking anchor may comprise a collet-slip design having blades similar to collet fingers, and machined teeth similar to a barrel slip. The collet fingers may be compressed until the collet fingers expand outward and contact the formation wall. The internal part of the self-locking anchor maintains the outward force against the openhole, thus providing the anchor.
- a penetrator-type anchor system 126 shown in FIG. 20 may be used and consists of arms, or spikes, that extend outward and bury/anchor into the formation. It is also understood that other types of anchors may be used with the zonal isolation system.
- the zonal isolation system 80 may also include the expansion joint 90 (also called a compaction joint) to allow for movement due to external forces caused by temperature fluctuations downhole.
- the expansion joint 90 also allows for the movement of components of the zonal isolation system and tubulars that may be adjacent to the zonal isolation system.
- the expansion joint 90 may be attached to the polished bore receptacle using a threaded connection.
- the tubulars attached to the zonal isolation system may expand and contract due to thermal changes.
- the expansion joint 90 allows for contraction and expansion of that tubular basepipe.
- the expansion joint 90 is capable of supporting the weight of the tubular string by allowing for changes in length but still maintaining pressure integrity from its inner diameter to its outer diameter.
- the expansion joint may be inactive (locked) during installation and then activated (unlocked) during the setting and operation stages.
- the setting string 92 may be used in conjunction with the setting tool 28 discussed above to deploy the zonal isolation tool 29 .
- the setting string 92 may be installed within the zonal isolation system for activating one or more of the components above in the zonal isolation system.
- the setting string 92 includes sealing elements that are positioned at the time of setting in the pair of polished bore receptacles above and below the zonal isolation tool. By positioning the setting string in this manner, a pressure chamber is formed that communicates with the zonal isolation tool allowing for activation of the zonal isolation tool and/or the pair of anchors.
- the setting string 92 may set all of the components in a single trip simultaneously or one device at a time.
- the setting string 92 has several features to assist in the setting of the described components.
- the collet 118 may be attached to the setting string 92 which mates with the polished bore receptacle which includes the locating profile 112 discussed above.
- the setting string 92 may also comprise ports, checks, or valves to facilitate wash-down or debris removal capabilities while running in the borehole (not shown). These features assist operators specifically in long, horizontal, openhole completions. It is understood that the setting string may also comprise devices to set other completion equipment during the same single trip, such as production packers, sump packers, and formation isolation valves.
- the internal tubing string used to transport production or injection fluids is the isolation string 94 .
- the isolation string 94 may be installed after setting the zonal isolation system to maintain separation of zones during production or injection.
- the isolation string 94 utilizes the polished bore receptacles to complete the zonal isolation within the tubing string.
- the isolation string 94 may include a seal which may interact with the polished bore receptacles to effectively isolate the desired zone. It is understood that the type of seal used may be bonded seals, chevron seals or any seal which effectively seals the zones.
- the setting string may include seals which seal on the inside of the polished bore receptacle to separate the zones.
- the isolation string 94 maintains pressure integrity along its length, and provides the remaining separation for zonal isolation.
- the isolation string may be installed in place of the setting string after all of the components have been activated and are operational.
- the isolation string 94 may include a packing stack to seal in the lower polished bore receptacle which is located downhole, and may also include a locating collet to mate with the locating profile 112 on the lower polished bore receptacle.
- each end of the zonal isolation system may be adapted to be attached in a tubular string. This can be through threaded connections, friction fits, expandable sealing means, and the like, all in a manner well known in the oil tool arts.
- tubular string is used, this can include jointed or coiled tubing, casing or any other equivalent structure for positioning tools as disclosed herein.
- the materials used can be suitable for use with production fluid or with an inflation fluid.
- the embodiments described herein may be used in an open hole for sandface completions utilizing stand-alone screens. However, the embodiments described herein may also be adapted for use in open-hole gravel pack sand control applications. In the latter role, the embodiments described herein may incorporate the use of alternate path transport and shunt tubes to assist gravel slurry placement. Additionally, the embodiments described herein may be used in sand control applications utilizing expandable screens. Aside from the various sand control applications listed, the embodiments described herein may also be used as an annular barrier, or for compartmentalizing long open-hole sections.
Abstract
A zonal isolation system for use in a well is provided. The zonal isolation system includes a zonal isolation tool, at least one anchor, and at least one polished bore receptacle. The zonal isolation system may include a setting string for activation of the zonal isolation tool and/or the at least one anchor. The zonal isolation system may also include an isolation string for maintaining separation zones during production or injection of the well.
Description
- This application claims the benefit under 35 U.S.C. § 119(e) of and is a continuation-in-part of U.S. Provisional Application Ser. No. 60/594,628, entitled “Zonal Isolation Tool,” filed Apr. 25, 2005; and of U.S. application Ser. No. 11/308,617, entitled, “Zonal Isolation Tools and Methods of Use,” filed Apr. 12, 2006, both hereby incorporated by reference.
- A zonal isolation tool should provide reliable, long-term isolation between two or more subsurface zones in a well. A typical application would be to segregate two zones in an open-hole region of a well, the zones being separated by a layer of low permeability shale in which the zonal isolation tool is placed. A nominal size configuration would be usable in wellbores drilled with an 8½ inch (21.6 cm) outer diameter bit below 9⅝ inch (24.5 cm) casing, but the use of zonal isolation tools is not limited to any particular size, or to use in open holes. By segregating open-hole intervals, downhole chokes may be used for production management. Similarly, selective zonal injection may be performed. If distributed temperature sensing is placed in the well, monitoring predictive control is possible.
- A
conventional completion assembly 10 with azonal isolation tool 12 is illustrated inFIGS. 1 and 2 for allowing production of twoseparate flows 4A and 4B from an open hole 3.Assembly 10 may include aproduction packer 14, agravel pack packer 16,flow control valves 18, and other components commonly used in downhole completions.Zonal isolation tool 12 may comprise apacker 20, a pair ofanchors 22, a pair of polished bore receptacles (PBRs) 24, and anexpansion joint 26. Service tools may include asetting string 28 and anisolation string 30. - However, most of the current openhole zonal isolation systems are not designed to enable long term, openhole, hydraulic isolation. Specific challenges include sealing and anchoring the system, and the ability to allow for expansion and/or contraction due to thermal effects, all located within the openhole interval of a sandface completion. There are also issues of coping with retaining the differential pressure rating for wider open hole internal diameters or changes in the open hole internal diameter within the specified operating envelope.
- Therefore, while there have been some improvements in zonal isolation tool designs and systems, further improvement is desired.
- In general, a zonal isolation system for use in a well is provided. The zonal isolation system includes a zonal isolation tool, at least one anchor, and at least one polished bore receptacle. The zonal isolation system includes a setting string for activation of the zonal isolation tool and/or the at least one anchor. The zonal isolation system may also include an isolation string for maintaining separation zones during production or injection of the well.
-
FIG. 1 is a schematic side elevation view, partially in longitudinal cross section, of a completion assembly comprising an embodiment of a zonal isolation tool constructed in accordance with embodiments of the invention; -
FIG. 2 is a schematic side elevation view, partially in longitudinal cross section, of the zonal isolation tool ofFIG. 1 , along with a setting string and isolation string; -
FIG. 3 is a schematic longitudinal side elevation view of a portion of the base structure of the zonal isolation tool ofFIG. 1 ; -
FIG. 4 is a schematic longitudinal side elevation view of a portion of the base structure of the zonal isolation tool ofFIG. 1 after inflation pressure has been applied; -
FIG. 5 is a schematic longitudinal side elevation view of a portion of the base structure of the zonal isolation tool ofFIG. 1 with a compressive load being applied; -
FIGS. 6A-D are schematic longitudinal cross sectional views of a portion of the base structure of the zonal isolation tool ofFIG. 1 illustrating an operational sequence; -
FIG. 7 is a schematic longitudinal cross section view of a portion of the zonal isolation tool ofFIG. 1 illustrating the seal element; -
FIG. 8 is a schematic longitudinal cross section view of a portion of the zonal isolation tool ofFIG. 1 illustrating the seal element after inflation pressure; -
FIG. 9 is a schematic longitudinal cross section view of a portion of the zonal isolation tool ofFIG. 1 illustrating the seal element after compressive loading is applied; -
FIG. 10 is a more detailed schematic longitudinal cross section view of the seal element of the zonal isolation tool ofFIG. 1 ; -
FIG. 11 is an enlarged detailed view of a portion of the seal element of the zonal isolation tool ofFIG. 1 ; -
FIG. 12 is an enlarged schematic longitudinal cross section view illustrating anti-extrusion sheets used in the zonal isolation tool ofFIG. 14 ; -
FIG. 13 is a perspective schematic view of the structural undercarriage of the zonal isolation tool ofFIG. 1 ; -
FIGS. 14A and 14B are schematic axial cross section views illustrating alternate fluid pathways that may be incorporated in the zonal isolation tool ofFIG. 1 ; and -
FIGS. 15A , 15B, and 15C are schematic longitudinal cross section views of another embodiment of a zonal isolation tool. -
FIG. 16 is a schematic side elevation views, partially in longitudinal cross section, of the zonal isolation system along with a setting string and isolation string; -
FIG. 17 is a partial schematic side views of a slip anchor; -
FIG. 18 is a partial schematic side views of a two-stage slip anchor; -
FIG. 19 is a perspective view of a self locking anchor; -
FIG. 20 is a partial schematic side views of a penetrator type anchor; -
FIG. 21 is a schematic cross section side view of a portion of the zonal isolation system; - It is to be noted, however, that the appended drawings are not to scale and illustrate only some embodiments of this invention, and are therefore not to be considered limiting of its scope.
- In the following description, numerous details are set forth to provide an understanding of the present invention. However, it will be understood by those skilled in the art that the present invention may be practiced without these details and that numerous variations or modifications from the described embodiments may be possible.
- Described herein is a
zonal isolation system 80 for use in wellbores. A “wellbore” may be any type of well, including, but not limited to, a producing well, a non-producing well, an experimental well, and exploratory well, and the like. Wellbores may be vertical, horizontal, any angle between vertical and horizontal, diverted or non-diverted, and combinations thereof, for example a vertical well with a non-vertical component. Also, in the description, the terms “connect”, “connection”, “connected”, “in connection with”, and “connecting” are used to mean “in direct connection with” or “in connection with via another element”. The term “set” is used to mean “one element” or “more than one element”. The terms “up” and “down”, “upper” and “lower”, “upwardly” and “downwardly”, “upstream” and “downstream”, “above” and “below”, and other like terms indicating relative positions above or below a given point or element are used in this description to more clearly described some embodiments as disclosed herein. However, when applied to equipment and methods for use in wells that are deviated or horizontal, such terms may refer to a left to right, right to left, or other relationship as appropriate. - Referring now to
FIGS. 16 and 21 , the open holezonal isolation system 80 may comprise azonal isolation tool 29, afirst anchor 82 and asecond anchor 84, an upper polishedbore receptacle 86 and a lower polishedbore receptacle 88, and anexpansion joint 90. The zonal isolation system may also include asetting string 92 and anisolation string 94. - Referring now to
FIGS. 3 , 4 and 5, an embodiment of thezonal isolation tool 29 is disclosed. The drawings are schematic in fashion and not to scale. The same numerals are used to call out similar components. This embodiment includes anelastomeric seal member 34 initially inflated by a fluid entering aninflation port 21 inbase pipe 15.Inflation port 21 aligns with asimilar passage 31 in amember 19, which may be described as an inflation valve, during initial expansion ofseal member 34.Member 19, along with amoveable piston 13 and amovable sleeve 7 also define anexpandable chamber 2.Moveable sleeve 7 includes a throughhole 9, whose function will become apparent.Base pipe 15 includes another throughpassage 11 opening into achamber 23 formed in astationary sleeve 5.Moveable piston 13 is able to slide longitudinally downward withinstationary sleeve 5.Passage 31 opens into alarge chamber 43 able to accept fluid to expand sealingmember 34.Chamber 43 is sealed by an o-ring or other seal at 39. -
FIGS. 4 and 5 illustrate operation of thezonal isolation tool 29. Sealingmember 34 is initially expanded via fluid pressure entering throughinflation port 21 andpassage 31 and intochamber 43 to an initial expansion pressure, causing sealingmember 34 to engage a wellbore orborehole wall 33. During this initial expansion,moveable piston 13 andmoveable sleeve 7 remain essentially stationary. Once the defined initial pressure is reached inchamber 43,member 19 moves to the left, blanking or closinginflation port 21, and throughhole 9 opens into thehydroforming chamber 43, as illustrated inFIG. 5 . Afterinflation port 21 is blanked off or closed, a fluid 45 is introduced intochamber 23 via throughhole 11, causingmoveable piston 13 andmoveable sleeve 7 to the right inFIG. 5 . This in turncauses sealing member 34 to compress axially and also to form a seal at or near a leadingedge 32.Fluid pressure 35A is also allowed to vent from theannulus 6 intochamber 43 throughpassage 9 andpressure 35B is nearly equal topressure 35A, allowing pressure communication as indicated by the arrows fromannulus 6 tochamber 43.Pressures pressure 37. Sealing member 34 (FIG. 5 ) may include an underlying carriage 36 (FIG. 13 ). After actuation, differential pressure energizes the cup-type seal 34, vis-à-vis pressure in 35B which is greater than pressure in 37. It should be noted that the fluid pressure used to activate the sealingmember 34 may be transmitted to the sealingmember 34 and/or settingpistons 13 by various means. An embodiment receives the tubing pressure via asetting tool 28 fitted with sealing elements (o-rings, packing, or the like). When the sealingmembers 34 are situated in polished bores both above and below thezonal isolation tool 29 or packer system, a pressure chamber is formed that communicates with the packer element and settingpistons 13. Pressure is applied thru thesetting tool 28 via the surface control equipment at the rig. Another embodiment utilizes the differential pressure between the hydrostatic pressure downhole and a trapped atmospheric chamber (not shown) integral to the packer device. To activate the packer, a setting tool is used to break the seal of the atmospheric trap chamber. Once freed, the pressure differential may be used to hydroform the element, and further to apply the compressive load as claimed. A similar embodiment may compliment or even replace the trapped atmospheric chamber with a pre-charged volume of nitrogen or other gas stored within the packer. The result is to create a large differential pressure at setting depth. Further embodiments may include activation by non pressurizing means, such as mechanical ratcheting via an electric-powered or hydraulic-powered downhole device, such as a tractor run on slickline, e-line, or coiled tubing. - The
zonal isolation tool 29 of this embodiment uses hydroforming pressure as a first step to energize. Initial inflation will affect a long length of sealing contact, assuring good compliance to the open hole. After initial inflation, a compressive load is applied via linear piston 7 (FIG. 5 ) to ensuresealing point 32 near the leading end of the sealing element structure. - The following are operational considerations, occurring sequentially: (1) the tubing or
base pipe 15 must be open to the sealing member; (2) the initial inflation must stop when a defined pressure within sealingmember 34 is reached; (3)inflation port 21 must be assuredly blanked from tubing orbase pipe 15; and (4) a vent must open between sealingmember 34 andannulus 6. As illustrated inFIGS. 3-5 , in certain embodiments a linear compressive load from a moveable piston opens a vent such aspassage 9 inFIG. 5 . The operational sequence must happen in the proper order.FIGS. 6A-D illustrate this order. For example, ifvent 9 is opened prior toport 21 being blanked, then it would become impossible toblank port 21 because open communication would be established. To blank theport 21, an o-ring must un-seal, then re-seal under dynamic conditions. Despite that limitation, other combinations of this sequence may work in other embodiments, as disclosed herein. - Referring to
FIG. 7 , severalcircumferential bands 40 may be employed to preventseal 34 from expanding radially while running in hole.FIG. 7 illustrates schematically asimplified seal 34 withbands 40. Theright end 38 ofseal 34 is fixed while theleft end 44 is free to displace axially to the right. Aratchet ring 42 prevents axial movement to the left and thus helps seal 34 retain elastic (potential) energy. Setting pressure is applied insideseal 34 via the packer setting tool 28 (FIG. 2 ).Bands 40 break when a defined pressure is reached, allowingseal 34 to expand and contact the formation wall 33 (FIGS. 4 , 5). Another embodiment of this feature may replace or complement the circumferential bands with a poppet valve. - As illustrated in
FIG. 8 , the seal centerline in this embodiment lies to the right of the contact centerline. This behavior is conditioned by machining anotch 46 at the left end of carriage 36 (FIG. 12 ). - A setting pressure of approximately 1,500 psi (about 10.3 megaPascals) is used to lengthen the contact length of
seal 34 with the formation (FIG. 8 ). Finally, the setting pressure is increased to approximately 2,500 psi (about 17.2 megaPascals) to: (1) blank port 21 (i.e. isolate inside of sealingmember 34 from tubing orbase pipe 15 pressure); (2)vent sealing member 34 toannulus 6 throughvent 9; and (3) axially compress the left end of sealingmember 34 to bias sealingpoint 32. The cup effect makes each seal unidirectional, as illustrated inFIG. 9 . When a bidirectional seal is desired, at least two seals are required facing opposite directions. - A venting port 60 (
FIG. 10 ) may be placed on the low-pressure side 37 of sealingmember 34 to eliminate any atmospheric trap that would be created between theinner sealing element 50outer sealing element 52. Total seal length is indicated at 55, while slotted length is indicated at 56 if a slotted carriage is employed. -
Carriage 36 is illustrated inFIG. 13 as a cylinder having one or moremachined slots 58 in the axial direction. These slots may be used to createindividual beams 57 around the cylinder. The left end ofbeams 57 may be notched as illustrated in detail inFIG. 12 to simulate a “simply supported” beam. The right end may not be notched; if it is not, the right end simulates a “cantilevered” beam.Carriage 36 may also be un-slotted, that is, a thin solid tube. - Inner sealing element 50 (
FIG. 11 ), sometimes referred to as a bladder, may be an elastomeric cylinder bonded near the ends ofcarriage 36 to provide inflation capability to sealingmember 34. Inner sealingelement 50 allows sealingmember 34 to deploy under internal pressure and to self-energize when differential pressure acrosspacker 20 is present. Becauseinner sealing element 50 may be cold-bonded to metal at 51, a mechanically energizedwedge 53 may be used to improve reliability. Inner sealingelement 50 may have a thickness ranging from about 0.10 to about 0.20 inch (from about 0.25 to about 0.5 cm), and may comprise 80 durometer HNBR, although the invention is not so limited, as other materials discussed herein may be employed. - Outer sealing
element 52 may be a rubber cylinder bonded to the ends of thecarriage 36 to provide sealing against the formation. Outer sealingelement 52 may have any thickness that provides appropriate tear and wear resistance during conveyance and good conformability to open-hole irregularities. Its thickness may range from about 0.30 to about 0.70 inch (from about 0.76 to about 1.78 cm) to.Outer seal element 52 may also comprise 80 durometer HNBR, and may comprise other materials as discussed herein. - Dashed circle “A” in
FIG. 11 refers to a detailed view illustrated inFIG. 12 . The use of notched beams insupport carriage 36 helps control the axial location of the leadingedge 32 of the contact point of sealingmember 34 with the formation. By allowing some degree of enhanced freedom in radial movement in or near the notchedend 46, the maximum deflection point (contact point with maximum sealing pressure) shifts to the left of the structure, as illustrated schematically inFIGS. 8 and 9 . This improves the overall sealing performance of sealingelements member 34. Additionally,individual beams 57 able to expand radially may be more efficient than a continuous metallic cylinder in terms of pressure required to achieve a given expansion and in terms of conforming to irregular open hole geometries.Carriage 36 may be made of, for example, 4130/4140 steel. - Anti-extrusion sheets 54 (
FIG. 12 ) are, in the embodiment illustrated, sheet metal cylinders located betweencarriage 36 and outer sealingelement 52 andinner bladder 50 to prevent extrusion through the gaps formed asindividual beams 57 incarriage 36 expand and separate.Anti-extrusion sheets 54 may be slotted or un-slotted, and may have any thickness suitable for the intended purpose, but will likely range in thickness from about 0.020 to about 0.050 inch (from about 0.051 to about 0.13 cm). Anti-extrusion sheets may comprise half-hardness low-carbon steel, and if used are welded at 59 tocarriage 36 at each end. Un-slotted anti-extrusion sheets may allow removal of innerelastomeric element 50 and a buffer layer. A buffer layer of non-metallic material may be added between the innermost anti-extrusionsheet metal cylinder 54 and innerelastomeric element 50. A buffer layer may be used to prevent the sharp edges of the sheet metal cylinder from puncturing the relatively thin layer of elastomer used for innerelastomeric member 50. Suitable buffer layer materials include polyetheretherketone (PEEK), and may be have a thickness ranging from about 0.010 to about 0.030 inch (about 0.025 to about 0.076 cm). -
FIGS. 14A and 14B illustrate schematic cross section views at a screen pipe (FIG. 14A ) and a packer (FIG. 14B ).FIG. 14A illustratesshunt tubes 62 for pumping gravel slurry or injection fluids through a zonal isolation tool, and illustrates that the outer circumference of the screen may have adifferent center 70 than theinner circumference 72.FIG. 14B illustrates alternate fluid pathways for pumping gravel slurry or injection fluids through a zonal isolation tool. Threepathways 64 illustrated between ascreen base pipe 66 and apacker base pipe 15, along with threepacker setting ports 68. Maintaining a sufficiently large inner diameter is desirable to achieving full functionality for such alternate fluid pathways. The design illustrated preserves an equivalent area from for transport tubes. It is possible to move the packer and screen base pipes onto different centers, which would ease the disruption in the flow transition. -
FIGS. 15A , 15B, and 15C illustrate schematically an alternate embodiment of theinvention 80. This embodiment differs fromembodiment 29 illustrated inFIGS. 3-5 in operation. After initial seal pressure is reached inchamber 43 usingfluid 41, amoveable block 76 is moved to the right byfluid pressure 45, and an O-ring 77 is caused to unseat into asmall chamber 78. In the same movement,inflation port 21 is blanked close, and high pressure fluid inannulus 6 is allowed to pass throughchamber 78 intochamber 43, causing thepressures block 76 to align withinflation port 21 inbase pipe 15, there is less chance in this embodiment that annulus pressure will pass throughport 21, andport 21 is more easily blanked. - The outer elastomeric elements engage an adjacent surface of a well bore, casing, pipe, tubing, and the like. Other elastomeric layers between the inner and outer elastomeric members may be provided for additional flexibility and backup. A non-limiting example of an elastomeric element is rubber, but any elastomeric materials may be used. A separate membrane may be used with an elastomeric element if further wear and puncture resistance is desired. A separate membrane may be interleaved between elastomeric elements if the elastomeric material is insufficient for use alone. The elastomeric material of outer sealing elements should be of sufficient durometer for expandable contact with a well bore, casing, pipe or similar surface. In some embodiments the elastomeric material may be of sufficient elasticity to recover to a diameter smaller than that of the wellbore to facilitate removal therefrom. The elastomeric material should facilitate sealing of the well bore, casing, or pipe in the inflated state.
- “Elastomer” as used herein is a generic term for substances emulating natural rubber in that they stretch under tension, have a high tensile strength, retract rapidly, and substantially recover their original dimensions (or even smaller in some embodiments). The term includes natural and man-made elastomers, and the elastomer may be a thermoplastic elastomer or a non-thermoplastic elastomer. The term includes blends (physical mixtures) of elastomers, as well as copolymers, terpolymers, and multi-polymers. Examples include ethylene-propylene-diene polymer (EPDM), various nitrile rubbers which are copolymers of butadiene and acrylonitrile such as Buna-N (also known as standard nitrile and NBR). By varying the acrylonitrile content, elastomers with improved oil/fuel swell or with improved low-temperature performance can be achieved. Specialty versions of carboxylated high-acrylonitrile butadiene copolymers (XNBR) provide improved abrasion resistance, and hydrogenated versions of these copolymers (HNBR) provide improve chemical and ozone resistance elastomers. Carboxylated HNBR is also known. Other useful rubbers include polyvinylchloride-nitrile butadiene (PVC-NBR) blends, chlorinated polyethylene (CM), chlorinated sulfonate polyethylene (CSM), aliphatic polyesters with chlorinated side chains such as epichlorohydrin homopolymer (CO), epichlorohydrin copolymer (ECO), and epichlorohydrin terpolymer (GECO), polyacrylate rubbers such as ethylene-acrylate copolymer (ACM), ethylene-acrylate terpolymers (AEM), EPR, elastomers of ethylene and propylene, sometimes with a third monomer, such as ethylene-propylene copolymer (EPM), ethylene vinyl acetate copolymers (EVM), fluorocarbon polymers (FKM), copolymers of poly(vinylidene fluoride) and hexafluoropropylene (VF2/HFP), terpolymers of poly(vinylidene fluoride), hexafluoropropylene, and tetrafluoroethylene (VF2/HFP/TFE), terpolymers of poly(vinylidene fluoride), polyvinyl methyl ether and tetrafluoroethylene (VF2/PVME/TFE), terpolymers of poly(vinylidene fluoride), hexafluoropropylene, and tetrafluoroethylene (VF2/HPF/TFE), terpolymers of poly(vinylidene fluoride), tetrafluoroethylene, and propylene (VF2/TFE/P), perfluoroelastomers such as tetrafluoroethylene perfluoroelastomers (FFKM), highly fluorinated elastomers (FEPM), butadiene rubber (BR), polychloroprene rubber (CR), polyisoprene rubber (IR), IM, polynorbornenes, polysulfide rubbers (OT and EOT), polyurethanes (AU) and (EU), silicone rubbers (MQ), vinyl silicone rubbers (VMQ), fluoromethyl silicone rubber (FMQ), fluorovinyl silicone rubbers (FVMQ), phenylmethyl silicone rubbers (PMQ), styrene-butadiene rubbers (SBR), copolymers of isobutylene and isoprene known as butyl rubbers (IIR), brominated copolymers of isobutylene and isoprene (BIIR) and chlorinated copolymers of isobutylene and isoprene (CIIR).
- The expandable portions of the packers may include continuous strands of polymeric fibers cured within the matrix of the integral composite body comprising elastomeric elements. Strands of polymeric fibers may be bundled along a longitudinal axis of the expandable packer body parallel to longitudinal cuts in a laminar interior portion of the expandable body. This can facilitate expansion of the expandable portion of the composite body yet provide sufficient strength to prevent catastrophic failure of the expandable packer upon complete expansion.
- The expandable portions of the tools may also contain a plurality of overlapping reinforcement members. These members may be constructed from any suitable material, for example high strength alloys, fiber-reinforced polymers and/or elastomers, nanofiber, nanoparticle, and nanotube reinforced polymers and/or elastomers, or the like, all in a manner known and disclosed in U.S. patent application Ser. No. 11/093390, filed on Mar. 30, 2005, entitled “Improved Inflatable Packers”, the entirety of which is incorporated by reference herein.
- The zonal isolation tools may be constructed of a composite or a plurality of composites so as to provide flexibility. The expandable portions of the tools may be constructed out of an appropriate composite matrix material, with other portions constructed of a composite sufficient for use in a wellbore, but not necessarily requiring flexibility. The composite may be formed and laid by conventional means known in the art of composite fabrication. The composite may be constructed of a matrix or binder that surrounds a cluster of polymeric fibers. The matrix can comprise a thermosetting plastic polymer which hardens after fabrication resulting from heat. Other matrices are ceramic, carbon, and metals, but the invention is not so limited. The matrix can be made from materials with a very low flexural modulus close to rubber or higher, as required for well conditions. The composite body may have a much lower stiffness than that of a metallic body, yet provide strength and wear impervious to corrosive or damaging well conditions. The composite tool body may be designed to be changeable with respect to the type of composite, dimensions, number of cable and fibrous layers, and shapes for differing downhole environments.
- It is understood that the zonal isolation tool may be any type of isolation or separation device suitable for use in an openhole environment. These include, but are not limited to, hydroform-compress-energize packer, swellable elastomer packer, inflatable ECP, or rubber-compression packer. Furthermore, it is understood that multiple zonal isolation tools may be positioned or oriented in any manner to generate uni-directional or bi-directional sealing.
- Referring now to the zonal isolation system illustrated in
FIGS. 16 and 21 , as stated above, the open holezonal isolation system 80 may comprise thezonal isolation tool 29, thefirst anchor 82, thesecond anchor 84, the upperpolished bore receptacle 86, the lowerpolished bore receptacle 88, and theexpansion joint 90. The zonal isolation system may also include the settingstring 92 and theisolation string 94. Thezonal isolation system 80 enables long term, openhole, hydraulic isolation while having the ability to allow for expansion and/or contraction due to thermal effects and maintain an effective sealing and anchoring system. Thezonal isolation system 80 also retains the differential pressure rating for wider open hole internal diameters or changes in the open hole internal diameter within the specified operating envelope. After deployment, the system uses the differential pressure to maintain energized seals and once the well is put into production or injection, the differential of the pressure created may re-energize the seal. - To enable setting of the
zonal isolation tool 29 discussed above, the upperpolished bore receptacle 86 may be placed above the zonal isolation tool and a lowerpolished bore receptacle 88 may be placed below the zonal isolation tool, as shown inFIGS. 16 and 21 . The upperpolished bore receptacle 86 may comprise atubular structure 96 having a first end 98 and a second end 100. The first end 98 and the second end 100 of the upperpolished bore receptacle 86 may be threaded, preferably using premium threads. The upperpolished bore receptacle 86 may have a continuous inner diameter 102 which is smooth and polished. The packing of thesetting tool 28 will be positioned within the inner diameter 102 during setting. Similarly, the lowerpolished bore receptacle 88 may comprise a tubular structure 104 having a first end 106 and a second end 108. The lowerpolished bore receptacle 88 may also include a continuous inner diameter 110 which is smooth, however, a locating profile 112 machined as a feature in the inner diameter 110 of the lowerpolished bore receptacle 88 may be included to assist in locating thesetting tool 28 within the inner diameter of the lower polished bore receptacle. The locating profile 112 is a pattern of grooves 114 for engaging andseating fingers 116 of a locatingcollet 118. The engagement of the locating profile 112 and thefingers 116 provide an interference interaction between the components so that in order for the locating profile and the fingers to be disengaged, a specific amount of tensional force must be applied to the work string. This provides indication at the surface of the well that the zonal isolation tool has reached its intended position downhole. The locating profile is especially beneficial in long, horizontal, openhole completions. It is understood that the zonal isolation system may include more than two polished bore receptacles or one polished bore receptacle with a communication port that is attached to the zonal isolation tool. - The
zonal isolation system 80 may also include a pair of anchors for preventing movement of thezonal isolation tool 29 relative to the openhole by gripping the borehole wall, as shown inFIG. 16 . To prevent transmission of additional loads and movements into adjacent tubulars, a piston effect resulting from a fully expanded zonal isolation tool may be isolated using the pair of anchors. The pair of anchors comprises afirst anchor 82 and asecond anchor 84 which are located generally adjacent to thezonal isolation tool 29. Thefirst anchor 82 may be placed above the zonal isolation tool and thesecond anchor 84 may be placed below the zonal isolation tool. Theanchors zonal isolation tool 29 and thepolished bore receptacles setting tool 28 used for setting the zonal isolation tool either simultaneously or in the same trip. The anchors may be attached to the polished bore receptacles via threads. It is understood that the zonal isolation system may be deployed having only one anchor, multiple anchors, or in some cases no anchor will be used. - The
first anchor 82 and thesecond anchor 84 support tensile and compressive forces on the tubular string, and provide a torsional load path. The effectiveness of the anchors may be a function of the friction coefficient of the openhole and the radial load applied against the formation. The coefficient of friction is related to the type of formation and fluids present downhole in the region of setting the zonal isolation system. In order to protect the formation from fracture, it is important that the radial loads remain below the fracture pressure of the formation. Therefore, the load should be distributed over a large surface area. - The anchors used with the zonal isolation system may be of several types. For example, as illustrated in
FIG. 17 , a classicalslip type anchor 120 may be used. Theclassical slip anchor 120 comprises a cone that pushes slips outward toward the openhole wall until the slips make contact with the openhole wall. Friction against the formation maintains the anchor in position. To initiate contact with the formation, a hydraulic piston may be used, and a ratchet maintains the anchor in position and prevents the anchor from relaxing or moving. - A two-
stage slip anchor 122 may also be used and contains a pair of support slips on the extremities, or ends of the anchor, and a pair of principal slips in a center of the anchor, as shown inFIG. 18 . The pair of support slips is based on a C-ring design, and the pair of principal slips are based on a barrel slip design. Contact is initiated in the same manner as in the classical slip anchor discussed above. - In the alternative, a self-locking
anchor 124 may be used, as illustrated inFIG. 19 . The self-lockinganchor 124 realizes increased friction and contact pressure with the formation as the axial forces are increased. The self-locking anchor may comprise a collet-slip design having blades similar to collet fingers, and machined teeth similar to a barrel slip. The collet fingers may be compressed until the collet fingers expand outward and contact the formation wall. The internal part of the self-locking anchor maintains the outward force against the openhole, thus providing the anchor. - It is understood that a penetrator-
type anchor system 126 shown inFIG. 20 may be used and consists of arms, or spikes, that extend outward and bury/anchor into the formation. It is also understood that other types of anchors may be used with the zonal isolation system. - Referring to
FIGS. 16 and 21 , thezonal isolation system 80 may also include the expansion joint 90 (also called a compaction joint) to allow for movement due to external forces caused by temperature fluctuations downhole. Theexpansion joint 90 also allows for the movement of components of the zonal isolation system and tubulars that may be adjacent to the zonal isolation system. Theexpansion joint 90 may be attached to the polished bore receptacle using a threaded connection. - The tubulars attached to the zonal isolation system may expand and contract due to thermal changes. The
expansion joint 90 allows for contraction and expansion of that tubular basepipe. Theexpansion joint 90 is capable of supporting the weight of the tubular string by allowing for changes in length but still maintaining pressure integrity from its inner diameter to its outer diameter. The expansion joint may be inactive (locked) during installation and then activated (unlocked) during the setting and operation stages. - Referring to
FIG. 16 , the settingstring 92 may be used in conjunction with thesetting tool 28 discussed above to deploy thezonal isolation tool 29. The settingstring 92 may be installed within the zonal isolation system for activating one or more of the components above in the zonal isolation system. The settingstring 92 includes sealing elements that are positioned at the time of setting in the pair of polished bore receptacles above and below the zonal isolation tool. By positioning the setting string in this manner, a pressure chamber is formed that communicates with the zonal isolation tool allowing for activation of the zonal isolation tool and/or the pair of anchors. - The setting
string 92 may set all of the components in a single trip simultaneously or one device at a time. The settingstring 92 has several features to assist in the setting of the described components. Thecollet 118 may be attached to the settingstring 92 which mates with the polished bore receptacle which includes the locating profile 112 discussed above. The settingstring 92 may also comprise ports, checks, or valves to facilitate wash-down or debris removal capabilities while running in the borehole (not shown). These features assist operators specifically in long, horizontal, openhole completions. It is understood that the setting string may also comprise devices to set other completion equipment during the same single trip, such as production packers, sump packers, and formation isolation valves. - Referring to
FIG. 16 , the internal tubing string used to transport production or injection fluids is theisolation string 94. Theisolation string 94 may be installed after setting the zonal isolation system to maintain separation of zones during production or injection. Theisolation string 94 utilizes the polished bore receptacles to complete the zonal isolation within the tubing string. Theisolation string 94 may include a seal which may interact with the polished bore receptacles to effectively isolate the desired zone. It is understood that the type of seal used may be bonded seals, chevron seals or any seal which effectively seals the zones. Additionally, the setting string may include seals which seal on the inside of the polished bore receptacle to separate the zones. - The
isolation string 94 maintains pressure integrity along its length, and provides the remaining separation for zonal isolation. The isolation string may be installed in place of the setting string after all of the components have been activated and are operational. Theisolation string 94 may include a packing stack to seal in the lower polished bore receptacle which is located downhole, and may also include a locating collet to mate with the locating profile 112 on the lower polished bore receptacle. - It is understood that the zonal isolation tools as described and claimed herein may connect in any number of ways to their wellbore counterparts. Each end of the zonal isolation system may be adapted to be attached in a tubular string. This can be through threaded connections, friction fits, expandable sealing means, and the like, all in a manner well known in the oil tool arts. Although the term tubular string is used, this can include jointed or coiled tubing, casing or any other equivalent structure for positioning tools as disclosed herein. The materials used can be suitable for use with production fluid or with an inflation fluid.
- The embodiments described herein may be used in an open hole for sandface completions utilizing stand-alone screens. However, the embodiments described herein may also be adapted for use in open-hole gravel pack sand control applications. In the latter role, the embodiments described herein may incorporate the use of alternate path transport and shunt tubes to assist gravel slurry placement. Additionally, the embodiments described herein may be used in sand control applications utilizing expandable screens. Aside from the various sand control applications listed, the embodiments described herein may also be used as an annular barrier, or for compartmentalizing long open-hole sections.
- Although only a few exemplary embodiments of this invention have been described in detail above, those skilled in the art will readily appreciate that many modifications are possible in the exemplary embodiments without materially departing from the spirit of this invention. Accordingly, all such modifications are intended to be included within the scope of this invention as defined in the following claims.
Claims (18)
1. A zonal isolation system for use in a well, comprising:
a zonal isolation tool;
at least one anchor; and
at least one polished bore receptacle.
2. The system of claim 1 , further comprising a second polished bore receptacle wherein the at least one polished bore receptacle is placed above the zonal isolation tool and the second polished bore receptacle is place below the zonal isolation tool.
3. The system of claim 1 , further comprising a second anchor wherein the at least one anchor is placed above the zonal isolation tool and the second anchor is place below the zonal isolation tool.
4. The system of claim 1 , further comprising an expansion joint for allowing for movement of parts and tubulars due to external forces caused by temperature fluctuations downhole.
5. The system of claim 1 , further comprising a setting string for activating one or more parts of the zonal isolation system.
6. The system of claim 5 , further comprising a isolation string 94 for maintaining separation of zones during production or injection.
7. The system of claim 3 , wherein the at least one anchor and the second anchor are classical slip anchors.
8. The system of claim 3 , wherein the at least one anchor and the second anchor are two-stage slip anchors.
9. The system of claim 3 , wherein the at least one anchor and the second anchor are self locking anchors.
10. The system of claim 3 , wherein the at least one anchor and the second anchor are penetrator-type anchors.
11. A method of forming zonal isolation in a well, comprising
a) positioning a zonal isolation tool in a wellbore between two zones;
b) enabling setting the zonal isolation tool using polished bore receptacles;
c) preventing movement of the zonal isolation tool using anchors; and
c) setting the zonal isolation tool using a setting string positioned across the polished bore receptacles.
12. The method of claim 11 , further comprising an expansion joint for allowing for movement of parts and tubulars due to external forces caused by temperature fluctuations downhole.
13. The method of claim 11 , further comprising an isolation string 94 for maintaining separation of zones during production or injection.
14. The method of claim 11 , wherein the at least one anchor and the second anchor are classical slip anchors.
15. The method of claim 11 , wherein the anchors are two-stage slip anchors.
16. The method of claim 11 , wherein the anchors are self locking anchors.
17. The method of claim 11 , wherein the anchors are penetrator-type anchors.
18. The method of claim 11 , wherein one of the polished bore receptacles is placed above the zonal isolation tool and the other polished bore receptacle is places below the zonal isolation tool.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US12/469,521 US20090283279A1 (en) | 2005-04-25 | 2009-05-20 | Zonal isolation system |
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US59462805P | 2005-04-25 | 2005-04-25 | |
US11/308,617 US7591321B2 (en) | 2005-04-25 | 2006-04-12 | Zonal isolation tools and methods of use |
US12/469,521 US20090283279A1 (en) | 2005-04-25 | 2009-05-20 | Zonal isolation system |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US11/308,617 Continuation-In-Part US7591321B2 (en) | 2005-04-25 | 2006-04-12 | Zonal isolation tools and methods of use |
Publications (1)
Publication Number | Publication Date |
---|---|
US20090283279A1 true US20090283279A1 (en) | 2009-11-19 |
Family
ID=41315044
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US12/469,521 Abandoned US20090283279A1 (en) | 2005-04-25 | 2009-05-20 | Zonal isolation system |
Country Status (1)
Country | Link |
---|---|
US (1) | US20090283279A1 (en) |
Cited By (47)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20090008092A1 (en) * | 2006-04-03 | 2009-01-08 | Haeberle David C | Wellbore Method and Apparatus For Sand And Inflow Control During Well Operations |
US20100307772A1 (en) * | 2002-10-31 | 2010-12-09 | Bailey Thomas F | Solid rubber packer for a rotating control device |
US7938184B2 (en) | 2006-11-15 | 2011-05-10 | Exxonmobil Upstream Research Company | Wellbore method and apparatus for completion, production and injection |
US20120125640A1 (en) * | 2010-11-22 | 2012-05-24 | Halliburton Energy Services, Inc. | Swellable packer having thermal compensation |
WO2012041955A3 (en) * | 2010-09-30 | 2012-06-07 | Welltec A/S | Drill pipe |
US20120217010A1 (en) * | 2009-11-20 | 2012-08-30 | Exxonmobil Upstream Research Company | Open-Hole Packer For Alternate Path Gravel Packing, and Method For Completing An Open-Hole Wellbore |
EP2565368A1 (en) * | 2011-08-31 | 2013-03-06 | Welltec A/S | Annular barrier with pressure amplification |
US20130319677A1 (en) * | 2010-12-17 | 2013-12-05 | Welltech A/S | Well completion |
WO2013052830A3 (en) * | 2011-10-07 | 2014-01-16 | Weatherford/Lamb, Inc. | Seal assemblies in subsea rotating control devices |
WO2014016617A2 (en) * | 2012-07-26 | 2014-01-30 | Rubberatkins Limited | Sealing apparatus and method |
US20140182862A1 (en) * | 2010-02-01 | 2014-07-03 | Weatherford/Lamb, Inc. | Downhole Tool Having Setting Valve for Packing Element |
US8839861B2 (en) | 2009-04-14 | 2014-09-23 | Exxonmobil Upstream Research Company | Systems and methods for providing zonal isolation in wells |
US9010417B2 (en) | 2012-02-09 | 2015-04-21 | Baker Hughes Incorporated | Downhole screen with exterior bypass tubes and fluid interconnections at tubular joints therefore |
US9133705B2 (en) | 2010-12-16 | 2015-09-15 | Exxonmobil Upstream Research Company | Communications module for alternate path gravel packing, and method for completing a wellbore |
RU2575197C2 (en) * | 2011-01-11 | 2016-02-20 | Шлюмбергер Текнолоджи Б.В. | Gravel pack in branch hole |
US9284819B2 (en) | 2010-05-26 | 2016-03-15 | Exxonmobil Upstream Research Company | Assembly and method for multi-zone fracture stimulation of a reservoir using autonomous tubular units |
US9303485B2 (en) | 2010-12-17 | 2016-04-05 | Exxonmobil Upstream Research Company | Wellbore apparatus and methods for zonal isolations and flow control |
US9322239B2 (en) | 2012-11-13 | 2016-04-26 | Exxonmobil Upstream Research Company | Drag enhancing structures for downhole operations, and systems and methods including the same |
US9322248B2 (en) | 2010-12-17 | 2016-04-26 | Exxonmobil Upstream Research Company | Wellbore apparatus and methods for multi-zone well completion, production and injection |
US9328578B2 (en) | 2010-12-17 | 2016-05-03 | Exxonmobil Upstream Research Company | Method for automatic control and positioning of autonomous downhole tools |
US9404348B2 (en) | 2010-12-17 | 2016-08-02 | Exxonmobil Upstream Research Company | Packer for alternate flow channel gravel packing and method for completing a wellbore |
US20160273289A1 (en) * | 2013-11-11 | 2016-09-22 | Xtreme Well Technology Limited | Downhole tool |
WO2017014857A1 (en) * | 2015-07-23 | 2017-01-26 | Baker Hughes Incorporated | Retrievable inflatable bridge plug with separate seal and anchor components |
EP2516795A4 (en) * | 2009-12-23 | 2017-03-22 | Schlumberger Technology B.V. | Hydraulic deployment of a well isolation mechanism |
US9617829B2 (en) | 2010-12-17 | 2017-04-11 | Exxonmobil Upstream Research Company | Autonomous downhole conveyance system |
US9638012B2 (en) | 2012-10-26 | 2017-05-02 | Exxonmobil Upstream Research Company | Wellbore apparatus and method for sand control using gravel reserve |
US9638011B2 (en) | 2013-08-07 | 2017-05-02 | Schlumberger Technology Corporation | System and method for actuating downhole packers |
US9670756B2 (en) | 2014-04-08 | 2017-06-06 | Exxonmobil Upstream Research Company | Wellbore apparatus and method for sand control using gravel reserve |
US9797226B2 (en) | 2010-12-17 | 2017-10-24 | Exxonmobil Upstream Research Company | Crossover joint for connecting eccentric flow paths to concentric flow paths |
US9816361B2 (en) | 2013-09-16 | 2017-11-14 | Exxonmobil Upstream Research Company | Downhole sand control assembly with flow control, and method for completing a wellbore |
US9856720B2 (en) | 2014-08-21 | 2018-01-02 | Exxonmobil Upstream Research Company | Bidirectional flow control device for facilitating stimulation treatments in a subterranean formation |
US9903192B2 (en) | 2011-05-23 | 2018-02-27 | Exxonmobil Upstream Research Company | Safety system for autonomous downhole tool |
US9951596B2 (en) | 2014-10-16 | 2018-04-24 | Exxonmobil Uptream Research Company | Sliding sleeve for stimulating a horizontal wellbore, and method for completing a wellbore |
US10012032B2 (en) | 2012-10-26 | 2018-07-03 | Exxonmobil Upstream Research Company | Downhole flow control, joint assembly and method |
US10030473B2 (en) | 2012-11-13 | 2018-07-24 | Exxonmobil Upstream Research Company | Method for remediating a screen-out during well completion |
US10030513B2 (en) | 2012-09-19 | 2018-07-24 | Schlumberger Technology Corporation | Single trip multi-zone drill stem test system |
EP3356641A4 (en) * | 2015-09-30 | 2019-05-01 | Services Petroliers Schlumberger | Systems and Methods for Retraction Assembly |
US20190226299A1 (en) * | 2018-01-25 | 2019-07-25 | Welltec Oilfield Solutions Ag | Downhole wireline intervention tool |
US10612352B2 (en) | 2016-11-15 | 2020-04-07 | Exxonmobil Upstream Research Company | Autonomous downhole conveyance systems and methods using adaptable perforation sealing devices |
US10662745B2 (en) | 2017-11-22 | 2020-05-26 | Exxonmobil Upstream Research Company | Perforation devices including gas supply structures and methods of utilizing the same |
US10724350B2 (en) | 2017-11-22 | 2020-07-28 | Exxonmobil Upstream Research Company | Perforation devices including trajectory-altering structures and methods of utilizing the same |
US10920530B2 (en) | 2015-04-29 | 2021-02-16 | Schlumberger Technology Corporation | System and method for completing and stimulating a reservoir |
CN113445949A (en) * | 2021-07-21 | 2021-09-28 | 广州海洋地质调查局 | Hydraulic conduction type efficient sand blocking hydraulic anchor mechanism |
US11261671B2 (en) | 2020-06-11 | 2022-03-01 | Halliburton Energy Services, Inc. | Multi-flow compaction/expansion joint |
US11555364B2 (en) | 2020-10-30 | 2023-01-17 | Weatherford Technology Holdings, Llc | High expansion anchoring system |
US20230175346A1 (en) * | 2021-12-08 | 2023-06-08 | Halliburton Energy Services, Inc. | Pressure Isolation Ring To Isolate The Setting Chamber Once Hydraulic Packer Is Set |
US11713644B2 (en) | 2020-10-30 | 2023-08-01 | Weatherford Technology Holdings, Llc | Controlled deformation and shape recovery of packing elements |
Citations (36)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3437142A (en) * | 1965-10-28 | 1969-04-08 | George E Conover | Inflatable packer for external use on casing and liners and method of use |
US3524503A (en) * | 1968-09-05 | 1970-08-18 | Halliburton Co | Cementing tool with inflatable packer and method of cementing |
US3581816A (en) * | 1970-03-05 | 1971-06-01 | Lynes Inc | Permanent set inflatable element |
US3604732A (en) * | 1969-05-12 | 1971-09-14 | Lynes Inc | Inflatable element |
US3606924A (en) * | 1969-01-28 | 1971-09-21 | Lynes Inc | Well tool for use in a tubular string |
US4191383A (en) * | 1979-02-02 | 1980-03-04 | Halliburton Company | Inflatable packer and method of constructing same |
US4349204A (en) * | 1981-04-29 | 1982-09-14 | Lynes, Inc. | Non-extruding inflatable packer assembly |
US4403660A (en) * | 1980-08-08 | 1983-09-13 | Mgc Oil Tools, Inc. | Well packer and method of use thereof |
US4420159A (en) * | 1982-08-13 | 1983-12-13 | Completion Tool Company | Packer valve arrangement |
US4492383A (en) * | 1983-02-28 | 1985-01-08 | Completion Tool Company | Inflatable well bore packer with pressure equalized rib cavity |
US4648448A (en) * | 1984-12-20 | 1987-03-10 | Tam International, Inc. | Packer assembly |
US4711301A (en) * | 1985-09-05 | 1987-12-08 | Weatherford U.S., Inc. | Valve assembly for inflatable packer |
US4768590A (en) * | 1986-07-29 | 1988-09-06 | Tam International, Inc. | Inflatable well packer |
US4832120A (en) * | 1987-12-28 | 1989-05-23 | Baker Hughes Incorporated | Inflatable tool for a subterranean well |
US4951747A (en) * | 1989-10-17 | 1990-08-28 | Baker Hughes Incorporated | Inflatable tool |
US5143154A (en) * | 1990-03-13 | 1992-09-01 | Baker Hughes Incorporated | Inflatable packing element |
US5197542A (en) * | 1992-03-31 | 1993-03-30 | Davis-Lynch, Inc. | Well packer |
US5205567A (en) * | 1991-10-30 | 1993-04-27 | The Gates Rubber Company | Reinforced inflatable packer |
US5271469A (en) * | 1992-04-08 | 1993-12-21 | Ctc International | Borehole stressed packer inflation system |
US5295538A (en) * | 1992-07-29 | 1994-03-22 | Halliburton Company | Sintered screen completion |
US5439053A (en) * | 1993-07-13 | 1995-08-08 | Dowell Schlumberger Incorporated | Reinforcing slat for inflatable packer |
US5709269A (en) * | 1994-12-14 | 1998-01-20 | Head; Philip | Dissolvable grip or seal arrangement |
US6311772B1 (en) * | 1998-11-03 | 2001-11-06 | Baker Hughes Incorporated | Hydrocarbon preparation system for open hole zonal isolation and control |
US6494256B1 (en) * | 2001-08-03 | 2002-12-17 | Schlumberger Technology Corporation | Apparatus and method for zonal isolation |
US20030098153A1 (en) * | 2001-11-23 | 2003-05-29 | Serafin Witold P. | Composite packer cup |
US6575243B2 (en) * | 2001-04-16 | 2003-06-10 | Schlumberger Technology Corporation | Zonal isolation tool with same trip pressure test |
US6619397B2 (en) * | 1998-11-03 | 2003-09-16 | Baker Hughes Incorporated | Unconsolidated zonal isolation and control |
US6640893B1 (en) * | 1999-03-29 | 2003-11-04 | Groupement Europeen d'Interet Economique “Exploitation” Miniere de la Chaleur (G.E.I.E. EMC) | Wellbore packer |
US6648073B1 (en) * | 1998-08-28 | 2003-11-18 | Kerry D. Jernigan | Retrievable sliding sleeve flow control valve for zonal isolation control system |
US6752205B2 (en) * | 2002-04-17 | 2004-06-22 | Tam International, Inc. | Inflatable packer with prestressed bladder |
US20050072579A1 (en) * | 2003-10-03 | 2005-04-07 | Philippe Gambier | Well packer having an energized sealing element and associated method |
US20050161232A1 (en) * | 2004-01-27 | 2005-07-28 | Schlumberger Technology Corporation | Annular Barrier Tool |
US7096954B2 (en) * | 2001-12-31 | 2006-08-29 | Schlumberger Technology Corporation | Method and apparatus for placement of multiple fractures in open hole wells |
US7591321B2 (en) * | 2005-04-25 | 2009-09-22 | Schlumberger Technology Corporation | Zonal isolation tools and methods of use |
US7631695B2 (en) * | 2007-10-22 | 2009-12-15 | Schlumberger Technology Corporation | Wellbore zonal isolation system and method |
US7669653B2 (en) * | 2003-02-20 | 2010-03-02 | Schlumberger Technology Corporation | System and method for maintaining zonal isolation in a wellbore |
-
2009
- 2009-05-20 US US12/469,521 patent/US20090283279A1/en not_active Abandoned
Patent Citations (36)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3437142A (en) * | 1965-10-28 | 1969-04-08 | George E Conover | Inflatable packer for external use on casing and liners and method of use |
US3524503A (en) * | 1968-09-05 | 1970-08-18 | Halliburton Co | Cementing tool with inflatable packer and method of cementing |
US3606924A (en) * | 1969-01-28 | 1971-09-21 | Lynes Inc | Well tool for use in a tubular string |
US3604732A (en) * | 1969-05-12 | 1971-09-14 | Lynes Inc | Inflatable element |
US3581816A (en) * | 1970-03-05 | 1971-06-01 | Lynes Inc | Permanent set inflatable element |
US4191383A (en) * | 1979-02-02 | 1980-03-04 | Halliburton Company | Inflatable packer and method of constructing same |
US4403660A (en) * | 1980-08-08 | 1983-09-13 | Mgc Oil Tools, Inc. | Well packer and method of use thereof |
US4349204A (en) * | 1981-04-29 | 1982-09-14 | Lynes, Inc. | Non-extruding inflatable packer assembly |
US4420159A (en) * | 1982-08-13 | 1983-12-13 | Completion Tool Company | Packer valve arrangement |
US4492383A (en) * | 1983-02-28 | 1985-01-08 | Completion Tool Company | Inflatable well bore packer with pressure equalized rib cavity |
US4648448A (en) * | 1984-12-20 | 1987-03-10 | Tam International, Inc. | Packer assembly |
US4711301A (en) * | 1985-09-05 | 1987-12-08 | Weatherford U.S., Inc. | Valve assembly for inflatable packer |
US4768590A (en) * | 1986-07-29 | 1988-09-06 | Tam International, Inc. | Inflatable well packer |
US4832120A (en) * | 1987-12-28 | 1989-05-23 | Baker Hughes Incorporated | Inflatable tool for a subterranean well |
US4951747A (en) * | 1989-10-17 | 1990-08-28 | Baker Hughes Incorporated | Inflatable tool |
US5143154A (en) * | 1990-03-13 | 1992-09-01 | Baker Hughes Incorporated | Inflatable packing element |
US5205567A (en) * | 1991-10-30 | 1993-04-27 | The Gates Rubber Company | Reinforced inflatable packer |
US5197542A (en) * | 1992-03-31 | 1993-03-30 | Davis-Lynch, Inc. | Well packer |
US5271469A (en) * | 1992-04-08 | 1993-12-21 | Ctc International | Borehole stressed packer inflation system |
US5295538A (en) * | 1992-07-29 | 1994-03-22 | Halliburton Company | Sintered screen completion |
US5439053A (en) * | 1993-07-13 | 1995-08-08 | Dowell Schlumberger Incorporated | Reinforcing slat for inflatable packer |
US5709269A (en) * | 1994-12-14 | 1998-01-20 | Head; Philip | Dissolvable grip or seal arrangement |
US6648073B1 (en) * | 1998-08-28 | 2003-11-18 | Kerry D. Jernigan | Retrievable sliding sleeve flow control valve for zonal isolation control system |
US6311772B1 (en) * | 1998-11-03 | 2001-11-06 | Baker Hughes Incorporated | Hydrocarbon preparation system for open hole zonal isolation and control |
US6619397B2 (en) * | 1998-11-03 | 2003-09-16 | Baker Hughes Incorporated | Unconsolidated zonal isolation and control |
US6640893B1 (en) * | 1999-03-29 | 2003-11-04 | Groupement Europeen d'Interet Economique “Exploitation” Miniere de la Chaleur (G.E.I.E. EMC) | Wellbore packer |
US6575243B2 (en) * | 2001-04-16 | 2003-06-10 | Schlumberger Technology Corporation | Zonal isolation tool with same trip pressure test |
US6494256B1 (en) * | 2001-08-03 | 2002-12-17 | Schlumberger Technology Corporation | Apparatus and method for zonal isolation |
US20030098153A1 (en) * | 2001-11-23 | 2003-05-29 | Serafin Witold P. | Composite packer cup |
US7096954B2 (en) * | 2001-12-31 | 2006-08-29 | Schlumberger Technology Corporation | Method and apparatus for placement of multiple fractures in open hole wells |
US6752205B2 (en) * | 2002-04-17 | 2004-06-22 | Tam International, Inc. | Inflatable packer with prestressed bladder |
US7669653B2 (en) * | 2003-02-20 | 2010-03-02 | Schlumberger Technology Corporation | System and method for maintaining zonal isolation in a wellbore |
US20050072579A1 (en) * | 2003-10-03 | 2005-04-07 | Philippe Gambier | Well packer having an energized sealing element and associated method |
US20050161232A1 (en) * | 2004-01-27 | 2005-07-28 | Schlumberger Technology Corporation | Annular Barrier Tool |
US7591321B2 (en) * | 2005-04-25 | 2009-09-22 | Schlumberger Technology Corporation | Zonal isolation tools and methods of use |
US7631695B2 (en) * | 2007-10-22 | 2009-12-15 | Schlumberger Technology Corporation | Wellbore zonal isolation system and method |
Cited By (80)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20100307772A1 (en) * | 2002-10-31 | 2010-12-09 | Bailey Thomas F | Solid rubber packer for a rotating control device |
US7926560B2 (en) * | 2002-10-31 | 2011-04-19 | Weatherford/Lamb, Inc. | Solid rubber packer for a rotating control device |
US7984760B2 (en) | 2006-04-03 | 2011-07-26 | Exxonmobil Upstream Research Company | Wellbore method and apparatus for sand and inflow control during well operations |
US20090008092A1 (en) * | 2006-04-03 | 2009-01-08 | Haeberle David C | Wellbore Method and Apparatus For Sand And Inflow Control During Well Operations |
US8127831B2 (en) | 2006-04-03 | 2012-03-06 | Exxonmobil Upstream Research Company | Wellbore method and apparatus for sand and inflow control during well operations |
US8347956B2 (en) | 2006-11-15 | 2013-01-08 | Exxonmobil Upstream Research Company | Wellbore method and apparatus for completion, production and injection |
US8011437B2 (en) | 2006-11-15 | 2011-09-06 | Exxonmobil Upstream Research Company | Wellbore method and apparatus for completion, production and injection |
US20110132596A1 (en) * | 2006-11-15 | 2011-06-09 | Yeh Charles S | Wellbore Method and Apparatus For Completion, Production and Injection |
US8186429B2 (en) | 2006-11-15 | 2012-05-29 | Exxonmobil Upsteam Research Company | Wellbore method and apparatus for completion, production and injection |
US7938184B2 (en) | 2006-11-15 | 2011-05-10 | Exxonmobil Upstream Research Company | Wellbore method and apparatus for completion, production and injection |
US8430160B2 (en) | 2006-11-15 | 2013-04-30 | Exxonmobil Upstream Research Company | Wellbore method and apparatus for completion, production and injection |
US8356664B2 (en) | 2006-11-15 | 2013-01-22 | Exxonmobil Upstream Research Company | Wellbore method and apparatus for completion, production and injection |
US8839861B2 (en) | 2009-04-14 | 2014-09-23 | Exxonmobil Upstream Research Company | Systems and methods for providing zonal isolation in wells |
US20120217010A1 (en) * | 2009-11-20 | 2012-08-30 | Exxonmobil Upstream Research Company | Open-Hole Packer For Alternate Path Gravel Packing, and Method For Completing An Open-Hole Wellbore |
US8789612B2 (en) * | 2009-11-20 | 2014-07-29 | Exxonmobil Upstream Research Company | Open-hole packer for alternate path gravel packing, and method for completing an open-hole wellbore |
EP2516795A4 (en) * | 2009-12-23 | 2017-03-22 | Schlumberger Technology B.V. | Hydraulic deployment of a well isolation mechanism |
US9567822B2 (en) * | 2010-02-01 | 2017-02-14 | Weatherford Technology Holdings, Llc | Downhole tool having setting valve for packing element |
US20140182862A1 (en) * | 2010-02-01 | 2014-07-03 | Weatherford/Lamb, Inc. | Downhole Tool Having Setting Valve for Packing Element |
US9963955B2 (en) | 2010-05-26 | 2018-05-08 | Exxonmobil Upstream Research Company | Assembly and method for multi-zone fracture stimulation of a reservoir using autonomous tubular units |
US9284819B2 (en) | 2010-05-26 | 2016-03-15 | Exxonmobil Upstream Research Company | Assembly and method for multi-zone fracture stimulation of a reservoir using autonomous tubular units |
WO2012041955A3 (en) * | 2010-09-30 | 2012-06-07 | Welltec A/S | Drill pipe |
US8607883B2 (en) * | 2010-11-22 | 2013-12-17 | Halliburton Energy Services, Inc. | Swellable packer having thermal compensation |
US20120125640A1 (en) * | 2010-11-22 | 2012-05-24 | Halliburton Energy Services, Inc. | Swellable packer having thermal compensation |
US9133705B2 (en) | 2010-12-16 | 2015-09-15 | Exxonmobil Upstream Research Company | Communications module for alternate path gravel packing, and method for completing a wellbore |
US9797226B2 (en) | 2010-12-17 | 2017-10-24 | Exxonmobil Upstream Research Company | Crossover joint for connecting eccentric flow paths to concentric flow paths |
US9328578B2 (en) | 2010-12-17 | 2016-05-03 | Exxonmobil Upstream Research Company | Method for automatic control and positioning of autonomous downhole tools |
US9617829B2 (en) | 2010-12-17 | 2017-04-11 | Exxonmobil Upstream Research Company | Autonomous downhole conveyance system |
US9127533B2 (en) * | 2010-12-17 | 2015-09-08 | Welltec A/S | Well completion |
CN106968646B (en) * | 2010-12-17 | 2020-10-16 | 韦尔泰克油田解决方案股份公司 | Well completion device |
US20130319677A1 (en) * | 2010-12-17 | 2013-12-05 | Welltech A/S | Well completion |
CN106968646A (en) * | 2010-12-17 | 2017-07-21 | 韦尔泰克有限公司 | Completion system |
US9303485B2 (en) | 2010-12-17 | 2016-04-05 | Exxonmobil Upstream Research Company | Wellbore apparatus and methods for zonal isolations and flow control |
US9404348B2 (en) | 2010-12-17 | 2016-08-02 | Exxonmobil Upstream Research Company | Packer for alternate flow channel gravel packing and method for completing a wellbore |
US9322248B2 (en) | 2010-12-17 | 2016-04-26 | Exxonmobil Upstream Research Company | Wellbore apparatus and methods for multi-zone well completion, production and injection |
RU2575197C2 (en) * | 2011-01-11 | 2016-02-20 | Шлюмбергер Текнолоджи Б.В. | Gravel pack in branch hole |
US9903192B2 (en) | 2011-05-23 | 2018-02-27 | Exxonmobil Upstream Research Company | Safety system for autonomous downhole tool |
US10352144B2 (en) | 2011-05-23 | 2019-07-16 | Exxonmobil Upstream Research Company | Safety system for autonomous downhole tool |
CN103732850A (en) * | 2011-08-31 | 2014-04-16 | 韦尔泰克有限公司 | Annular barrier with pressure amplification |
US9725980B2 (en) | 2011-08-31 | 2017-08-08 | Welltec A/S | Annular barrier with pressure amplification |
EP2565368A1 (en) * | 2011-08-31 | 2013-03-06 | Welltec A/S | Annular barrier with pressure amplification |
WO2013030283A1 (en) * | 2011-08-31 | 2013-03-07 | Welltec A/S | Annular barrier with pressure amplification |
WO2013052830A3 (en) * | 2011-10-07 | 2014-01-16 | Weatherford/Lamb, Inc. | Seal assemblies in subsea rotating control devices |
US10000988B2 (en) | 2011-10-07 | 2018-06-19 | Weatherford Technology Holdings, Llc | Seal assemblies in subsea rotating control devices |
US9010417B2 (en) | 2012-02-09 | 2015-04-21 | Baker Hughes Incorporated | Downhole screen with exterior bypass tubes and fluid interconnections at tubular joints therefore |
WO2014016617A2 (en) * | 2012-07-26 | 2014-01-30 | Rubberatkins Limited | Sealing apparatus and method |
WO2014016617A3 (en) * | 2012-07-26 | 2014-06-26 | Rubberatkins Limited | Sealing apparatus and method |
US10030513B2 (en) | 2012-09-19 | 2018-07-24 | Schlumberger Technology Corporation | Single trip multi-zone drill stem test system |
US9638012B2 (en) | 2012-10-26 | 2017-05-02 | Exxonmobil Upstream Research Company | Wellbore apparatus and method for sand control using gravel reserve |
US10012032B2 (en) | 2012-10-26 | 2018-07-03 | Exxonmobil Upstream Research Company | Downhole flow control, joint assembly and method |
US10138707B2 (en) | 2012-11-13 | 2018-11-27 | Exxonmobil Upstream Research Company | Method for remediating a screen-out during well completion |
US10030473B2 (en) | 2012-11-13 | 2018-07-24 | Exxonmobil Upstream Research Company | Method for remediating a screen-out during well completion |
US9322239B2 (en) | 2012-11-13 | 2016-04-26 | Exxonmobil Upstream Research Company | Drag enhancing structures for downhole operations, and systems and methods including the same |
US9638011B2 (en) | 2013-08-07 | 2017-05-02 | Schlumberger Technology Corporation | System and method for actuating downhole packers |
US9816361B2 (en) | 2013-09-16 | 2017-11-14 | Exxonmobil Upstream Research Company | Downhole sand control assembly with flow control, and method for completing a wellbore |
US11066884B2 (en) * | 2013-11-11 | 2021-07-20 | Schlumberger Technology Corporation | Downhole tool |
US20160273289A1 (en) * | 2013-11-11 | 2016-09-22 | Xtreme Well Technology Limited | Downhole tool |
US9670756B2 (en) | 2014-04-08 | 2017-06-06 | Exxonmobil Upstream Research Company | Wellbore apparatus and method for sand control using gravel reserve |
US9856720B2 (en) | 2014-08-21 | 2018-01-02 | Exxonmobil Upstream Research Company | Bidirectional flow control device for facilitating stimulation treatments in a subterranean formation |
US9951596B2 (en) | 2014-10-16 | 2018-04-24 | Exxonmobil Uptream Research Company | Sliding sleeve for stimulating a horizontal wellbore, and method for completing a wellbore |
US10920530B2 (en) | 2015-04-29 | 2021-02-16 | Schlumberger Technology Corporation | System and method for completing and stimulating a reservoir |
WO2017014857A1 (en) * | 2015-07-23 | 2017-01-26 | Baker Hughes Incorporated | Retrievable inflatable bridge plug with separate seal and anchor components |
GB2557099A (en) * | 2015-07-23 | 2018-06-13 | Baker Hughes A Ge Co Llc | Retrievable inflatable bridge plug with separate seal and anchor components |
GB2557099B (en) * | 2015-07-23 | 2021-06-09 | Baker Hughes A Ge Co Llc | Retrievable inflatable bridge plug with separate seal and anchor components |
US10370932B2 (en) | 2015-09-30 | 2019-08-06 | Schlumberger Technology Corporation | Systems and methods for retraction assembly |
EP3356641A4 (en) * | 2015-09-30 | 2019-05-01 | Services Petroliers Schlumberger | Systems and Methods for Retraction Assembly |
US10612352B2 (en) | 2016-11-15 | 2020-04-07 | Exxonmobil Upstream Research Company | Autonomous downhole conveyance systems and methods using adaptable perforation sealing devices |
US10662745B2 (en) | 2017-11-22 | 2020-05-26 | Exxonmobil Upstream Research Company | Perforation devices including gas supply structures and methods of utilizing the same |
US10724350B2 (en) | 2017-11-22 | 2020-07-28 | Exxonmobil Upstream Research Company | Perforation devices including trajectory-altering structures and methods of utilizing the same |
US20190226299A1 (en) * | 2018-01-25 | 2019-07-25 | Welltec Oilfield Solutions Ag | Downhole wireline intervention tool |
AU2019212858B2 (en) * | 2018-01-25 | 2021-08-05 | Welltec Oilfield Solutions Ag | Downhole wireline intervention tool |
US11428066B2 (en) * | 2018-01-25 | 2022-08-30 | Welltec Oilfield Solutions Ag | Downhole wireline intervention tool |
RU2789709C2 (en) * | 2018-01-25 | 2023-02-07 | Веллтек Ойлфилд Солюшнс АГ | Downhole tool lowered on cable for downhole works, downhole system, and method for downhole works, implemented with such a tool, use of such a tool |
US11261671B2 (en) | 2020-06-11 | 2022-03-01 | Halliburton Energy Services, Inc. | Multi-flow compaction/expansion joint |
US11555364B2 (en) | 2020-10-30 | 2023-01-17 | Weatherford Technology Holdings, Llc | High expansion anchoring system |
US11713644B2 (en) | 2020-10-30 | 2023-08-01 | Weatherford Technology Holdings, Llc | Controlled deformation and shape recovery of packing elements |
US11713643B2 (en) | 2020-10-30 | 2023-08-01 | Weatherford Technology Holdings, Llc | Controlled deformation and shape recovery of packing elements |
CN113445949A (en) * | 2021-07-21 | 2021-09-28 | 广州海洋地质调查局 | Hydraulic conduction type efficient sand blocking hydraulic anchor mechanism |
US11959352B2 (en) | 2021-10-01 | 2024-04-16 | Weatherford Technology Holdings, Llc | Retrievable high expansion bridge plug and packer with retractable anti-extrusion backup system |
US20230175346A1 (en) * | 2021-12-08 | 2023-06-08 | Halliburton Energy Services, Inc. | Pressure Isolation Ring To Isolate The Setting Chamber Once Hydraulic Packer Is Set |
US11859463B2 (en) * | 2021-12-08 | 2024-01-02 | Halliburton Energy Services, Inc. | Pressure isolation ring to isolate the setting chamber once hydraulic packer is set |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20090283279A1 (en) | Zonal isolation system | |
US7591321B2 (en) | Zonal isolation tools and methods of use | |
US11028657B2 (en) | Method of creating a seal between a downhole tool and tubular | |
US9920588B2 (en) | Anchoring seal | |
US8997882B2 (en) | Stage tool | |
US7510015B2 (en) | Packers and methods of use | |
US8602116B2 (en) | Sequenced packing element system | |
US8573314B2 (en) | Packer system with reduced friction during actuation | |
US20120018143A1 (en) | Swellable Packer Anchors | |
NO334429B1 (en) | Inflatable gasket element | |
US8505638B2 (en) | Restricted axial movement locking mechanism | |
US6305477B1 (en) | Apparatus and method for maintaining relatively uniform fluid pressure within an expandable well tool subjected to thermal variants | |
US11215021B2 (en) | Anchoring and sealing tool |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
STCB | Information on status: application discontinuation |