US20110108323A1 - Methods and systems for drilling boreholes - Google Patents

Methods and systems for drilling boreholes Download PDF

Info

Publication number
US20110108323A1
US20110108323A1 US12/616,399 US61639909A US2011108323A1 US 20110108323 A1 US20110108323 A1 US 20110108323A1 US 61639909 A US61639909 A US 61639909A US 2011108323 A1 US2011108323 A1 US 2011108323A1
Authority
US
United States
Prior art keywords
drill
routine
monitored
control system
drill bit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US12/616,399
Inventor
II Edward Curtis Stacy
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Flanders Electric Motor Service LLC
Original Assignee
Flanders Electric Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Flanders Electric Ltd filed Critical Flanders Electric Ltd
Priority to US12/616,399 priority Critical patent/US20110108323A1/en
Assigned to Flanders Electric, Ltd. reassignment Flanders Electric, Ltd. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: STACY, EDWARD CURTIS, II
Priority to US12/940,577 priority patent/US8261855B2/en
Priority to AU2010319730A priority patent/AU2010319730C1/en
Priority to BR112012011271-6A priority patent/BR112012011271B1/en
Priority to BR122013028906-2A priority patent/BR122013028906B1/en
Priority to BR122013028913-5A priority patent/BR122013028913B1/en
Priority to BR122013028904-6A priority patent/BR122013028904B1/en
Priority to PCT/US2010/055808 priority patent/WO2011059912A1/en
Publication of US20110108323A1 publication Critical patent/US20110108323A1/en
Priority to CL2012001220A priority patent/CL2012001220A1/en
Priority to US13/524,623 priority patent/US9316053B2/en
Priority to US13/524,631 priority patent/US8261856B1/en
Priority to US13/524,608 priority patent/US8567523B2/en
Priority to US14/045,553 priority patent/US9194183B2/en
Assigned to FLANDERS ELECTRIC MOTOR SERVICE, INC. reassignment FLANDERS ELECTRIC MOTOR SERVICE, INC. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: Flanders Electric, Ltd.
Assigned to U.S. BANK NATIONAL ASSOCIATION reassignment U.S. BANK NATIONAL ASSOCIATION SECURITY INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: FLANDERS ELECTRIC MOTOR SERVICE, INC.
Priority to AU2015200749A priority patent/AU2015200749C1/en
Priority to US14/926,802 priority patent/US9995128B2/en
Priority to AU2017248445A priority patent/AU2017248445B2/en
Priority to US15/988,287 priority patent/US10494868B2/en
Priority to AU2019206072A priority patent/AU2019206072B2/en
Assigned to FLANDERS ELECTRIC MOTOR SERVICE, INC. reassignment FLANDERS ELECTRIC MOTOR SERVICE, INC. RELEASE BY SECURED PARTY (SEE DOCUMENT FOR DETAILS). Assignors: U.S. BANK NATIONAL ASSOCIATION
Abandoned legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B44/00Automatic control systems specially adapted for drilling operations, i.e. self-operating systems which function to carry out or modify a drilling operation without intervention of a human operator, e.g. computer-controlled drilling systems; Systems specially adapted for monitoring a plurality of drilling variables or conditions
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
    • E21B21/01Arrangements for handling drilling fluids or cuttings outside the borehole, e.g. mud boxes

Definitions

  • This invention relates to methods and systems for drilling boreholes in general and more specifically to methods and systems for drilling blastholes of the type commonly used in mining and quarrying operations.
  • boreholes are typically filled with an explosive that, when detonated, ruptures or fragments the surrounding rock. Thereafter, the fragmented material can be removed and processed in a manner consistent with the particular operation.
  • blastholes When used for this purpose, then, such boreholes are commonly referred to as “blastholes,” although the terms may be used interchangeably.
  • a number of factors influence the effectiveness of the blast including the nature of the geologic structure (i.e., rock), the size and spacing of the blastholes, the burden (i.e., distance to the free face of the geologic structure), the type, amount, and placement of the explosive, as well as the order in which the blastholes are detonated.
  • the size, spacing, and depth of the blastholes represent the primary means of controlling the degree of rupture or fragmentation of the geologic structure, and considerable effort goes into developing a blasthole specification that will produce the desired result. Because the actual results of the blasting operation are highly correlated with the degree to which the actual blastholes conform to the desired blasthole specification, it is important to ensure that the actual blastholes conform as closely as possible to the desired specification.
  • a typical blasting operation involves the formation several tens, if not hundreds, of blastholes, each of which must be drilled in proper location (i.e., to form the desired blasthole pattern) and to the proper depth.
  • a relatively high hole compliance rate i.e., the percentage of blastholes that comply with the desired specification
  • the large number of blastholes involved in a typical operation means that a significant number of blastholes nevertheless will fail to comply with the specification.
  • a system for drilling a borehole may include a drill rig and a control system.
  • the control system receives information from the drill rig that relates to at least one drill parameter.
  • the control system processes information relating to the drill parameter, determines whether the drill parameter is within a predetermined specification for the monitored drill parameter, chooses a hole defect mitigation routine based on the monitored drill parameter when the monitored drill parameter is outside the predetermined specification, and controls the drill rig to implement the chosen hole defect mitigation routine.
  • a method for drilling a borehole may include the steps of: Initiating a drilling phase; monitoring a drill parameter during the drilling phase; determining whether the monitored drill parameter is within a predetermined specification for the monitored drill parameter; choosing a drilling phase defect mitigation routine based on the monitored drill parameter when the monitored drill parameter is outside the predetermined specification; implementing the drilling phase defect mitigation routine; and resuming the drilling phase.
  • Also disclosed is a method for drilling a borehole that includes the steps of: Monitoring a drill parameter; using the monitored drill parameter to draw a conclusion about a borehole characteristic; choosing a defect mitigation routine base on the borehole characteristic; and implementing the defect mitigation routine.
  • FIG. 1 is a side view in elevation of a blasthole drill rig embodying the systems and methods of the present invention
  • FIG. 2 is a schematic representation of a blasthole drilling system according to one embodiment of the present invention.
  • FIG. 3 is a flow chart of one embodiment of a method for drilling blastholes
  • FIG. 4 is a schematic representation of drilling phase mitigation routines
  • FIG. 5 is a schematic representation of retraction phase mitigation routines
  • FIG. 6 is a flow chart of a collaring routine
  • FIG. 7 is a pictorial representation of a borehole during a first phase of the collaring routine
  • FIG. 8 is a pictorial representation of a borehole during a second phase of the collaring routine
  • FIG. 9 is a flow chart of an air pressure protection routine
  • FIG. 10 is a flow chart of a rotary stall protection routine
  • FIG. 11 is a pictorial representation of a borehole showing moderate and heavy fracture zones
  • FIG. 12 is a flow chart of an end of hole spin-out routine
  • FIG. 13 is a flow chart of an end of hole water control routine
  • FIG. 14 is a flow chart of a drill bit hang-up protection routine
  • FIG. 15 is a pictorial representation of a borehole showing a blockage area around the drill.
  • FIG. 16 is a flow chart of a torque monitoring routine.
  • blastholes 14 of the type commonly used in mining and quarrying operations.
  • the various blastholes 14 are then filled with an explosive material (not shown).
  • the subsequent detonation of the explosive material ruptures or fragments the geologic structure 15 , which may then be collected and processed in a manner consistent with the intended application (e.g., mining or quarrying, as the case may be).
  • the system 10 of the present invention increases the quality of boreholes 12 , i.e., the percentage of boreholes 12 that comply with the desired borehole specification.
  • the present invention not only increases initial hole quality, i.e., immediately after the boreholes 12 are drilled, but also long-term hole quality, i.e., the percentage of boreholes 12 that remain in compliance after they have been formed. That is, boreholes 12 that are formed in accordance with the teachings of the present invention are less subject to cave-ins and other post-drilling events that would otherwise make compliant boreholes 12 non-compliant.
  • the present invention increases both initial and long-term borehole quality by monitoring one or more drill parameters while the boreholes 12 are being formed or drilled.
  • the monitored drill parameter(s) is compared with a predetermined specification for the parameter(s). If the monitored drill parameter is outside the specification, the present invention selects and implements one or more defect mitigation routines to ensure that the borehole 12 is drilled to the desired specification. Significantly, the defect mitigation routine(s) also helps to ensure that the borehole 12 remains compliant even after it has been drilled. Stated another way, the system 10 uses the monitored drill parameter to draw a conclusion about one or more borehole characteristics. The system then chooses the mitigation routine that will most effectively mitigate or compensate for the particular borehole characteristic. Consequently, the present invention allows for a significant increase in the number of boreholes 12 that are compliant with the particular borehole specification, both on an initial and long-term basis.
  • the system 10 may comprise a drill rig 16 having a mast or derrick 18 configured to support a drill string 20 having a drill bit 32 provided on the end thereof.
  • Drill rig 16 may also be provided with various systems for operating the drill string 20 to form boreholes 12 (e.g., blastholes 14 ).
  • drill rig 16 may also comprise a drill motor system 22 , a drill hoist system 24 , an air injection system 26 , and a water injection system 28 , as best seen in FIG. 2 .
  • the system 10 of the present invention may also comprise a control system 30 that is operatively associated with the drill rig 16 , as well as the various systems thereof, e.g., motor system 22 , hoist system 24 , air injection system 26 , and water injection system 28 .
  • control system 30 monitors various drill parameters generated or produced by the various drill systems and controls them as necessary to form the blasthole 14 . In doing so, control system 30 may also implement the various hole defect mitigation routines 40 and 42 ( FIGS. 4 and 5 ) in order to improve blasthole quality.
  • drill motor system 22 is connected to the drill string 20 and may be operated by control system 30 to provide a rotational force or torque to rotate the drill bit 32 provided on the end of the drill string 20 .
  • Control system 30 may operate drill motor system 22 so that the drill bit 32 rotates in either the clockwise or counterclockwise directions.
  • Drill motor system 22 may also be provided with various sensors and transducers (not shown) to allow the control system 30 to monitor or sense the rotational force or torque applied to the drill bit 32 , as well as the rotational speed and direction of rotation of the drill bit 32 .
  • Drill hoist system 24 is also connected to the drill string 20 and may be operated by control system 30 to raise and lower drill bit 32 . As was the case for the drill motor system 22 , the drill hoist system 24 may also be provided with various sensors and transducers (not shown) to allow the control system 30 to monitor or sense the hoisting forces applied to the drill string 20 as well as the vertical position or depth of the drill bit 32 .
  • the air injection system 26 of drill rig 16 is operatively connected to drill string 20 and may be operated by control system 30 to provide high pressure air to the drill string 20 .
  • the high pressure air from air injection system 26 is directed through a suitable conduit (not shown) provided in drill string 20 and ultimately exits the drill string 20 , typically though one or more openings (not shown) provided in drill bit 32 .
  • the high pressure air from air injection system 26 is primarily used to assist in the bailing or removal from the borehole 12 of cuttings 34 dislodged by the rotating drill bit 32 .
  • the system and method of the present invention may use the high pressure air for other purposes as well.
  • the air injection system 26 may be provided with various sensors and transducers (not shown) to allow the control system 30 to monitor or sense various drill parameters relating to the function and operation of the air injection system 26 .
  • the water injection system 28 of drill rig 16 is also operatively connected to the drill string 20 .
  • Control system 30 may operate the water injection system 28 to provide a drilling fluid, such as water, to the drill bit 32 . More specifically, pressurized water from the water injection system 28 is directed through a suitable conduit or passageway (not shown) provided in drill string 20 , whereupon it ultimately exits the drill string 20 , typically through one or more openings (not shown) provided in drill bit 32 .
  • the water (or other drilling fluid) from water injection system 28 is primarily used to assist in the removal of cuttings 34 from borehole 12 . However, the system and method of the present invention may also use the water injection system 28 for other purposes as well, as will be described in greater detail herein.
  • the water injection system 28 may also be provided with various sensors and transducers (not shown) to allow the control system 30 to monitor or sense various drill parameters relating to the function and operation of the water injection system 28 .
  • control system 30 is operatively connected to various systems and devices of drill rig 16 and receives information (e.g., drill parameters) from the various systems and devices of drill rig 16 in the manner described herein.
  • control system 30 also stores program steps for program control, processes data, chooses or selects one or more hole defect mitigation routines (e.g., 40 and 42 ), and implements those routines by the appropriate control of the various systems and devices of drill rig 16 .
  • control system 30 may be programmed to implement a method 36 for drilling the boreholes 12 in accordance with the teachings provided herein.
  • the control system 30 monitors one or more drill parameters associated with the operation of drill rig 16 and the various systems thereof.
  • the particular drill parameters that are monitored by control system 30 may differ depending on whether the drill rig 16 is being operated in a drilling phase (i.e., in which the drill bit 32 is being advanced or driven into the geologic structure 15 to form borehole 12 ) or in a retraction phase (i.e., in which the drill bit 32 is being withdrawn from borehole 12 ).
  • the particular defect mitigation routine or routines that may be implemented by control system 30 may differ depending on whether the drill rig 14 is being operated in the drilling phase or the retraction phase.
  • control system 30 may select and implement one or more drilling phase defect mitigation routines 40 , as best seen in FIG. 4 .
  • control system 30 may select and implement one or more retraction phase defect mitigation routines 42 when the drill rig 16 is being operated in the retraction phase. See FIG. 5 .
  • control system 30 if the various drill parameters monitored by the control system 30 are within specifications for the various drill parameters, as determined during step 44 , then control system 30 takes no further action, other than to continue to operate the drill rig 16 to form blasthole 14 . That is, control system 30 will simply continue to monitor the various drill parameters at step 38 as the drilling operation proceeds. If, however, control system 30 determines that one or more of the drill parameters are not in accordance with the specified drill parameters, then control system 30 proceeds to step 46 , wherein control system 30 chooses or selects a defect mitigation routine, e.g., either a drilling phase defect mitigation routine 40 or a retraction phase defect mitigation routine 42 , as the case may be.
  • a defect mitigation routine e.g., either a drilling phase defect mitigation routine 40 or a retraction phase defect mitigation routine 42 , as the case may be.
  • control system 30 will then implement the particular defect mitigation routine at step 48 .
  • Control system 30 implements the particular defect mitigation routine by operating the various systems of drill rig 14 in accordance with the teachings provided herein. After the particular defect mitigation routine has been implemented, the control system 30 will continue to operate the drill rig 16 in accordance with the particular phase (e.g., the drilling phase or the retraction phase) at step 50 .
  • the particular phase e.g., the drilling phase or the retraction phase
  • the system 10 may be operated as follows to cause the drill rig 16 to drill a borehole 12 , such as a blasthole 14 , in a geologic structure 15 (i.e., the ground).
  • a geologic structure 15 i.e., the ground.
  • the control system 30 may initiate the drilling phase of operation.
  • the control system 30 operates the drill motor 22 , drill hoist 24 , air injection system 26 , and water injection system 28 to begin rotating and driving the drill bit 32 into the ground or geologic formation 15 .
  • the control system 30 monitors (i.e., at step 38 ) the various drill parameters that are generated or produced by the various systems comprising drill rig 16 .
  • certain drill parameters are indicative of certain issues during drilling that, if properly managed, can mitigate or lessen the possible adverse effects such issues may have on borehole quality.
  • the control system 30 may monitor drill parameters such as air pressure, drill rotational speed, drill torque, drill depth, and the number of times the drill has been retracted during the drilling phase. The control system 30 compares these various drill parameters with predetermined specifications for the respective parameters. If one or more of the drill parameters is outside the predetermined specification, the control system 30 chooses and implements one or more drilling phase defect mitigation routines 40 , as best seen in FIG. 4 .
  • the various drilling phase defect mitigation routines 40 comprise an air pressure protection routine 52 , a rotary stall protection routine 54 , an end of hole spin-out routine 56 , and an end of hole water control routine 58 .
  • the drilling phase defect mitigation routines 40 may also comprise a collaring routine 60 .
  • the collaring routine 60 is automatically performed at the start of each borehole 12 . That is, in one embodiment, the selection and implementation of the collaring routine 60 is not dependent on whether or not any drill parameter is within the predetermined specification.
  • the collaring routine 60 creates a high quality collar 62 (e.g., the first 1-3 meters of the borehole 12 ).
  • the air pressure protection routine 52 detects a failing borehole 12 by monitoring the air pressure at the drill bit 32 . If the air pressure exceeds the predetermined specification, then the drill bit 32 is retracted to clear the obstruction in the borehole 12 .
  • the rotary stall protection routine 54 is useful in detecting fractures or broken-up ground being engaged by the drill bit 32 . That is, when the drill bit 32 encounters broken or unstable ground, the bit 32 will typically stall out (i.e., cease to rotate). The rotary stall protection routine 54 detects these stalls and retracts the drill bit 32 to allow it to rotate again.
  • the end of hole spin-out routine 56 monitors the number of times the bit 32 needs to be retracted from the borehole 12 during the drilling phase and uses that number as a basis for determining how long to spend at the bottom of the borehole 12 clearing out any cuttings 34 before retracting the bit 32 from the borehole 12 .
  • the end of hole water control routine 58 deactivates the water injection system to allow the dry cuttings 34 being created without water injection to build-up a coating on the inside of the borehole 12 . The coating helps to reduce the amount of cuttings 34 that can fall back into the borehole 12 as the drill bit 32 is subsequently retracted.
  • the control system 30 may also utilize a variety of retraction phase mitigation routines 42 ( FIG. 5 ) during the retraction phase of drilling, i.e., when the drill bit 32 is being retracted from the borehole 12 .
  • the retraction phase mitigation routines 42 comprise a drill bit hang-up protection routine 64 , a torque monitoring routine 66 , and a hole clean-out routine 68 . See FIG. 5 .
  • the control system 30 selects or chooses from among the various retraction phase defect mitigation routines 42 based on one or more monitored drill parameters consisting of drill rotational speed, drill torque, hoist speed, and number of drill retractions.
  • the control system 30 monitors the hoist speed as well as the rotation speed and torque applied to drill bit 32 . If these drill parameters are out of specification, the control system 30 will implement the drill bit hang-up protection routine 64 to free the bit and implement the hole clean-out routine 68 .
  • the torque monitoring routine 66 detects bad spots in the borehole 12 by monitoring the torque applied to the rotating drill bit 32 as the bit 32 is withdrawn from the borehole 12 . If the torque exceeds or is outside the predetermined torque parameter, the control system 30 will implement the hole clean-out routine 68 .
  • the hole clean-out routine 68 involves re-lowering the drill bit 32 to the bottom of the borehole 12 , where the spin-out routine 56 is applied. The bit 32 will then be retracted once again.
  • a significant advantage of the present invention is that may be used to produce high quality boreholes 12 , i.e., boreholes 12 that are compliant with the desired borehole specification. Moreover, not only is initial hole quality increased, i.e., the percentage of boreholes that are compliant with the desired specification immediately after formation, but long-term hole quality is increased as well. That is, the various defect mitigation routines help to minimize the likelihood that post-drilling events, such as cave-ins, will cause otherwise compliant blastholes 14 to become non-compliant before they can be filled with explosives.
  • the present invention is able to implement the various defect mitigation routines 40 and 42 on an as-needed basis. That is, the various defect mitigation routines are not automatically implemented on every borehole 12 .
  • the selective implementation of the various defect mitigation routines 40 and 42 allows the boreholes 12 to be formed as rapidly as possible, while still allowing for the formation of high quality boreholes 12 .
  • the various hole defect mitigation routines 40 and 42 are only implemented when they are needed, e.g., due to defects in the geologic structure 15 . They are not implemented in areas where the geologic structure 15 will allow the formation of high quality boreholes without the need to implement any defect mitigation routines.
  • Yet another advantage of the present invention is that it selects and applies different hole defect mitigation routines depending on the type of defects that are encountered during drilling.
  • the present invention is thus able to apply the defect mitigation routine that is most appropriate for addressing the particular defects in the geologic structure 15 that are encountered when drilling each particular borehole 12 .
  • the present invention maximizes both initial and long-term borehole quality.
  • the quality of the hole collar 12 will always be uniformly high.
  • the present invention may also be used in other applications besides mining and quarrying operations. Indeed, the present invention could be used in any application wherein it would be desirable to form boreholes of consistent quality or otherwise compensate for variations in the geologic structure in which the boreholes are formed. Consequently, the present invention should not be regarded as limited to the particular devices, systems, and applications shown and described herein.
  • the system 10 for forming boreholes 12 is shown and described herein as may be used to drill or form a plurality of boreholes 12 of the type used in open-pit mining operations.
  • the various boreholes 12 are filled with an explosive material that, when detonated, ruptures or fractures the geologic structure 15 .
  • the fractured material may then be removed and processed to recover the valuable mineral content.
  • the drill rig 16 that is used to form the blastholes 14 comprises a mast or derrick 18 that is configured to support the drill string 20 that is used to drill or form the blastholes 14 .
  • Drill rig 16 may also comprise various other systems, such as a drill motor system 22 , a drill hoist system 24 , an air injection system 26 , and a water injection system 28 , required to operate the drill string 20 to form the blastholes 14 .
  • a control system 30 operatively connected to drill rig 16 and the various systems comprising drill rig 16 monitors drill parameters and controls the various systems in the manner described herein.
  • Drill rig 16 will also comprise a number of additional systems and devices, such as one or more power plants, electrical systems, hydraulic systems, pneumatic systems, etc. (not shown), that may be required or desired for the operation of the particular drill rig 16 .
  • additional systems and devices are well known in the art and are not required to understand or implement the present invention, such additional systems and devices that may be utilized in any particular drill rig 16 will not be described in further detail herein.
  • drill motor system 22 is operatively connected to drill string 20 and provides the rotational force or torque required to rotate drill bit 32 mounted on the end of drill string 20 .
  • drill motor system 22 will comprise an electrically- or hydraulically-powered system that is reversible so that the drill bit 32 can be rotated in either the clockwise or counterclockwise direction.
  • the drill motor system 22 is capable of automatic or semi-automatic operation, and will usually be provided with various sensors and transducers (not shown) suitable for sensing and producing output signals or data relating to various aspects and operational states of the drill motor system 22 .
  • drill motor system 22 is provided with sensors or transducers suitable for allowing the control system 30 to monitor the torque applied to drill bit 32 , as well as the rotational speed and rotational direction of drill bit 32 .
  • sensors or transducers suitable for providing the required drill parameter data to control system 30 . If not, suitable sensors or transducers would need to be provided.
  • drill motors for drill rigs are well-known in the art, and because a more detailed description of such drill motor systems 22 is not required to understand or practice the invention, the particular drill motor system 22 that may be utilized in conjunction with the present invention will not be described in further detail herein.
  • Drill rig 16 may also be provided with a drill hoist system 24 that is also operatively associated with the drill string 20 and control system 30 , as best seen in FIG. 2 .
  • the drill hoist system 24 applies axial or hoisting forces to the drill string 20 to raise and lower the drill bit 32 .
  • the drill hoist system 24 may be electrically or hydraulically powered and may be configured to apply axial forces to the drill string 20 in both directions, i.e., to provide both “pull-up” (i.e., retraction) and “pull-down” (i.e., extension) forces to the drill bit 32 .
  • the drill hoist system 24 is also capable of automatic or semi-automatic operation and may be provided with various sensors and transducers (not shown) suitable for sensing and producing signals relating to various aspects and operational states of the drill hoist system 24 .
  • the control system 30 monitors hoisting forces (e.g., both pull-up and pull-down forces) applied to drill string 20 , as well as the vertical position or depth of the drill bit 32 . Consequently, the drill hoist system 24 should be capable of providing such information to the control system 30 . If not, suitable sensors or transducers would need to be provided.
  • the air injection system 26 of drill rig 16 is operatively connected to the drill string 20 and provides high-pressure air to the drill string 20 .
  • the high-pressure air from air injection system 26 is directed through a suitable conduit (not shown) provided in the drill string 20 , and ultimately exits through one or more openings provided in the drill bit 32 .
  • the control system 30 of the present invention is operatively connected to the air injection system 26 so that it can control the operation thereof.
  • control system 30 also monitors the air pressure provided to the drill string 20 .
  • the air injection system provided on a typical drill rig will be capable of providing air pressure data to the control system 30 . If not, such systems could be readily provided by persons having ordinary skill in the art after having become familiar with the teachings provided herein.
  • Drill rig 16 may also be provided with a water injection system 28 suitable for providing water (or other suitable drilling fluid) to the drill bit 32 . Similar to the air injection system 26 , pressurized water from the water injection system may be directed through a suitable conduit (not shown) provided in the drill string 20 before ultimately exiting through one or more openings provided in the drill bit 32 .
  • Control system 30 is operatively connected to the water injection system 28 and controls the function and operation thereof.
  • control system 30 does not monitor any parameters of the water injection system 28 other than the operational state (e.g., whether the system is “on” or “off”), although provisions could be made to allow the control system 30 to monitor other parameters (e.g., water pressure and flow rate), if desired.
  • control system 30 In addition to being connected to the various systems of drill rig 16 so that control system 30 can monitor various drill parameters and control the function and operation of the various systems, control system 30 also stores program steps for program control, processes data, and selects and implements the various hole defect mitigation routines described herein. Accordingly, control system 30 may comprise any of a wide variety of systems and devices suitable for performing these functions, as would become apparent to persons having ordinary skill in the art after having become familiar with the teachings provided herein. Consequently, the present invention should not be regarded as limited to a control system 30 comprising any particular device or system.
  • control system 30 may comprise a general purpose programmable computer, such as a personal computer, that is programmed to implement the various processes and steps described herein and that can interface with the particular systems provided on drill rig 16 .
  • general purpose programmable computers are well known in the art and could be easily provided by persons having ordinary skill in the art after having become familiar with the teachings provided herein, the particular programmable computer system that may comprise control system 30 will not be described in further detail herein.
  • the control system 30 may be programmed to implement a method 36 for drilling the boreholes 12 .
  • the control system 30 monitors the drill parameters associated with the drill rig 16 .
  • Control system 30 may do this via a suitable data interface (not shown) provided between control system 30 and the various sensors or transducers associated with the various systems of drill rig 16 . If the various drill parameters monitored by the control system 30 are within the specifications for the various drill parameters, as determined during step 44 , the control system 30 will take no further action, other than to continue to operate the various systems of drill rig 16 as required to form the blast hole 14 . The control system 30 will continue to monitor the various drill parameters at step 38 .
  • control system 30 determines that one or more of the drill parameters being monitored is not in accordance with the specified parameter, then control system 30 will proceed to step 46 , wherein the control system 30 chooses or selects a defect mitigation routine.
  • control system 30 will depend on the particular drill parameter that is not within specification, as well as on whether the control system is operating the drill rig 16 in the drilling phase or the retraction phase. If the control system 30 is operating the drill rig 16 in the drilling phase, control system 30 will choose or select from among the various drilling phase defect mitigation routines 40 illustrated in FIG. 4 . On the other hand, if the control system 30 is operating the drill rig 16 in the retraction phase, control system 30 will choose or select from among the various retraction phase defect mitigation routines 42 illustrated in FIG. 5 .
  • control system 30 will then implement the particular defect mitigation routine at step 48 .
  • the control system 30 implements the selected defect mitigation routine by operating the various systems of drill rig 16 in the manner described below. After the defect mitigation routine has been implemented, the control system 30 will continue to operate the drill rig 16 at step 50 until the borehole 12 is completed.
  • the drilling phase defect mitigation routines 40 comprise an air pressure protection routine 52 , a rotary stall protection routine 54 , an end-of-hole spin-out routine 56 , an end-of-hole water control routine 58 , and a collaring routine 60 . See FIG. 4 .
  • the collaring routine 60 is performed automatically for every borehole 12 . That is, the selection of the collaring routine is not based on whether any particular drill parameter being monitored is outside specification. Accordingly, the collaring routine 60 will be described first, followed by the other drill phase defect mitigation routines 52 , 54 , 56 , and 58 .
  • the collaring routine 60 involves the formation of the collar 62 of the borehole 12 .
  • the collar 62 is regarded as the first 1-3 meters (about 2-10 feet) of the borehole 12 .
  • the collaring phase is perhaps the most important phase in blasthole formation. If the hole collar 62 is not properly prepared, both the hole quality and drill rig production will be adversely affected.
  • a number of factors or conditions can adversely affect the quality of the borehole 12 .
  • steep piles 70 of cuttings 34 deposited on the surface 72 adjacent the borehole 12 can result in back-filling of the borehole 12 after completion.
  • Excessive friction between the drill string 20 and the wall 74 of borehole 12 can result in wall failure, crooked boreholes, and poor borehole quality overall.
  • the borehole 12 may also be plugged if the collar 62 is too narrow, particularly near the top of the borehole 12 .
  • the productivity of the drill rig 16 also can be adversely affected if the hole collar 62 is not properly prepared.
  • back-filling or even complete plugging of the borehole 12 means that the drill rig 16 will need to clear the borehole 12 of obstructions, often more than once.
  • Crooked boreholes 12 will typically create excessive friction between the drill string 20 and the borehole wall 74 , resulting in the inefficient delivery of power to the drill bit 32 .
  • crooked boreholes 12 and excessive friction can damage the drill rig 16 over time, resulting in increased maintenance costs and poor drill rig performance.
  • the collaring routine 60 involves a two-phase process to form a high quality hole collar 62 .
  • the first phase 76 of the collaring routine 60 advances the drill bit 32 to a predetermined depth (i.e., a set depth which represents the maximum collaring depth) at step 78 .
  • a predetermined depth i.e., a set depth which represents the maximum collaring depth
  • maximum collaring depth may be selected to be in a range of about 1-3 meters (about 2-10 feet), although other depths may be used.
  • collaring routine 60 may advance the drill bit 32 to a depth that is determined to consist of competent rock, at step 80 .
  • Competent rock may be determined if the drill penetration rate falls below a predetermined level for a predetermined period of time.
  • This alternative step 80 may also be referred to herein as “dynamically determined collaring depth,” in that the depth of the collar 62 is not fixed, but rather is based on the particular characteristics of the geologic structure 15 in which the borehole 12 is being drilled.
  • operating the collaring routine 60 in conjunction with this second option i.e., step 80 ) may be advantageous in certain circumstances.
  • cuttings 34 will typically build-up in a steep pile 70 on the surface 72 , as best seen in FIG. 7 .
  • collar plugs 82 it is common for collar plugs 82 to form in borehole 12 at a distance of about half a meter (e.g., about 1 foot) below the surface 72 . Both of these conditions are detrimental to hole quality as broken material that would normally lay clear of the borehole 12 has a tendency to fall back into the borehole 12 .
  • the second phase 84 remedies these problems.
  • the second phase 84 of collaring routine 60 involves the retraction of drill bit 32 to location above the ground or surface 72 , at step 86 .
  • the control system 30 activates the water injection system 28 . This causes mud to build-up on the borehole wall 74 , stabilizing it.
  • the control system 30 continues to activate the water injection system 28 during the retraction process until the bit 32 is above the surface 72 . At this point, the control system 30 de-activates the water injection system 28 to terminate the flow of water.
  • control system 30 activates the air injection system 26 ( FIG. 2 ) to clear the ground of cuttings (i.e., at step 88 ).
  • High pressure air, represented by arrows 89 , exiting holes (not shown) provided in the drill bit 32 will be sufficient to blow the existing and normally steep pile 70 of cuttings 34 created in the first phase 76 away from the opening of borehole 12 .
  • step 88 creates a more spread out, shallow cuttings pile 90 that is sufficiently small or spread-out to allow future cuttings 34 to pile up in such a way so as to greatly reduce the amount of cuttings 34 apt to fall back into the borehole 12 .
  • implementation of the two-phase collaring routine 60 results in a far more reliable borehole 12 that is less prone to failure due to back-filling after the drill rig 16 has left the site.
  • any collar plug 82 FIG. 7 ) that may have formed is cleared from the wall 74 of the borehole 12 thereby allowing future cuttings 34 to clear the hole at a high rate of speed, further ensuring that the cuttings 34 will land far enough away from the opening of borehole 12 to prevent hole failure due to backfilling.
  • control system 30 may operate the drill hoist 24 to lift the drill bit 32 above the surface 72 by at least about 15 cm (about 6 inches) before rotating the drill bit 32 and starting the borehole 12 .
  • This lifting off of the ground and spinning of the drill bit 32 causes any large rocks that may be on or slightly below the surface 72 to be pushed out of the way.
  • the collaring routine 60 ensures that nothing will be in the way of the drill bit 32 that could cause it to be “kicked” sideways, thereby starting the borehole 12 in a crooked manner. If the borehole 12 is not straight when started, it will adversely affect the entire drilling process. Crooked holes may also result in excessive friction between the drill string 20 and the wall 74 of borehole 12 , resulting in possible wall failures, short boreholes, and poor hole quality.
  • the first phase 76 of the collaring routine 60 may involve alternative option (e.g., step 80 ) for determining the depth of the hole collar 62 .
  • Step 80 basically allows the depth of the collar 62 to be dynamically determined based on the particular conditions of the geologic structure 15 where the borehole 12 is being drilled, rather than merely drilling to a set depth.
  • step 80 may be used to ensure that an adequate depth of the borehole 12 is collared (i.e., the collar 62 is of adequate length) without the loss of productivity that would otherwise result from the “over-collaring” of borehole 12 .
  • the present invention determines competent ground by monitoring the drilling rate, or rate of penetration, over a selected time period. Competent rock or ground is determined if the drill penetration rate falls below a predetermined level for a predetermined period of time. By way of example, in one embodiment, once the rate of penetration drops below about 1 meter per minute (about 2 feet per minute) for a period of about 30 seconds, competent ground is determined to have been reached. The control system 30 will then proceed to the second phase 84 of collaring operation 60 already described.
  • the air pressure protection routine 52 is illustrated in FIG. 9 and serves two primary purposes: To provide plugged bit detection and prevention and to provide collapsed hole detection and protection. Both purposes are relevant to hole quality. Plugged bit protection ensures that proper air flow is being provided to the bottom of the borehole 12 to ensure adequate bailing of drill cuttings 34 . Without this protective functionality, a plugged drill bit 34 would result in inadequate bailing of drill cuttings 34 , causing them to remain in the borehole 12 rather than being bailed out of the borehole 12 . In addition, improper bailing velocities can cause erosion of the borehole walls 74 , which can lead to wall failure and shallow boreholes 12 .
  • the drill parameter that will cause the control system to select and implement the air pressure protection routine 52 is the air pressure supplied to the drill string 20 . If the air pressure is normal, the control system 30 simply continues the normal drilling operation and continues to monitor the air pressure. If the air pressure exceeds the maximum amount, as determined by comparing the monitored air pressure with the predetermined value for air pressure, the control system 30 will follow the various procedures and decision paths set forth in FIG. 9 . Basically, the procedures and decision paths involve control of the water injection system 28 as well as the retraction of the drill bit 32 and the resumption of the drilling operation. If the various procedures and decisions paths are unable to clear the plugged drill bit 32 , the system will provide a plugged bit indication to the system operator and will stop the drilling process.
  • the rotary stall protection routine 54 detects and mitigates problems likely to arise from various sub-surface fractures 92 that may be contained in the geologic structure 15 that are being penetrated by drill string 20 .
  • Sub-surface fracturing of the rock or geologic structure 15 tends to be very detrimental to borehole quality in that, as the drill bit 32 penetrates the fractured area 92 , the drilling process causes the fractured area 92 to further break apart or loosen at the wall 74 of the borehole 12 .
  • the loosened or broken material has the potential for falling into the borehole 12 after the drill rig 16 has left the borehole 12 upon completion of the drilling process. This situation must be mitigated in order to ensure quality boreholes 12 that will stand up over a period of time.
  • the rotary stall protection routine 54 detects these fractured areas 92 due to the probability of bit stalling when penetrating the fracture areas 92 . More specifically, as the broken or fractured area 92 is penetrated by drill bit 32 , the loose rock breaks apart in large pieces that often become wedged between the drill string 20 and borehole wall 74 . This wedging of broken material causes the drill string to stop rotating and thereby “stalls” the drill motor system 22 . The control system detects this stalled condition by monitoring the torque applied to drill bit 32 as well as its rotational speed. If the torque suddenly increases or spikes and the rotational speed suddenly drops, then control system 30 determines that the drill motor system 22 is stalling, as best seen in FIG. 10 .
  • control system 30 determines that the stalled condition has persisted for longer than some predetermined time, 1.5 seconds, for example, then the control system 30 will implement the rotary stall protection routine 54 . More specifically, control system 30 will operate drill hoist system 24 to retract the drill bit 32 to re-enable the rotation of drill bit 32 . If the rotational speed of the drill bit 32 does not recover within some period of time, for example within 3 seconds, the control system 30 will operate drill hoist system 24 to alternately apply pull-down and pull-up forces to the drill string 20 in an attempt to free drill bit 32 and allow it to rotate again.
  • some predetermined time 1.5 seconds
  • control system 30 will operate the hoist system 24 to slowly lower the bit 32 back to the bottom of the borehole 12 . Thereafter, control system 30 will reduce the pull-down force to avoid further stalling of the drill bit 32 . In addition, the control system 30 will increase the rotational speed of drill bit 32 to further assist in the grinding up of the broken particles from the fractured areas 92 .
  • the reduction of pull-down force and increase in rotational speed is maintained until the drill rig 16 meets the following conditions (i.e., indicating that the drill bit 32 has passed the fractured area 92 ): There are no torque spikes for at least 15 seconds; and the rate of penetration has stopped changing (e.g., the penetration rate change over a time period of about 1 second is less than about 6 cm per minute (about 0.2 feet per minute)). Alternatively, other values for these parameters could be used. Once these conditions are met, the control system 30 increases the pull-down force to normal values. Control system 30 continues to monitor the drill parameters to ensure that the bit 32 is not going to stall again. In summary, then, by slowly penetrating the fractured areas 92 , further damage to the wall 74 of borehole 12 is avoided and a quality borehole 12 is further insured.
  • the end of hole spin-out routine 56 is illustrated in FIG. 12 .
  • the control system 30 will spin the drill bit 32 just above the bottom of the hole and allow all the cuttings 34 that have been created to be bailed from or exit the borehole 12 .
  • the time required at the bottom of the borehole 12 is variable and is determined by how much trouble the system 10 has encountered during the drilling phase. Basically, the monitored drill parameters will allow the control system to determine whether the particular borehole 12 is a “good” or a “bad” borehole, more precisely, whether the geologic structure is stable or unstable.
  • a good borehole is defined as a borehole 12 that required the control system 30 to retract the drill bit 32 less than two (2) times during the drilling phase. If the control system 30 determines the borehole 12 to be good, then the end of the hole spin out time will be 30 seconds, which will be sufficient in most instances to allow all cuttings 34 to be bailed from the borehole 12 .
  • control system 30 determines the borehole 12 to be bad, then control system calculates the spin-out time by multiplying by 30 seconds the number of times the bit 32 had to retracted. For example, if the bit 32 had to be retracted two times, then the spin-out time is determined or calculated to be sixty (60) seconds. Similarly, if the bit 32 had to be retracted three times, then the spin-out time is calculated to be ninety (90) seconds. In the embodiment shown and described herein, the maximum spin-out time is limited to two (2) minutes. Alternatively, of course, other maximum time limits could be set, as would become apparent to persons having ordinary skill in the art after having become familiar with the teachings provided herein.
  • the end of hole spin-out routine 56 may be selected and implemented during the retraction phase of the drilling process. That is, if control system 30 detects a problem while retracting the bit, control system 30 will re-set the hole spin-ut time. Control system 30 will then re-lower drill bit 32 to the bottom of the borehole 12 and perform again the hole spin-out routine 56 . If multiple passes are required to penetrate the hole, the end of hole spin out time is accumulated accordingly.
  • the end of hole water control routine 58 is illustrated in FIG. 13 .
  • the control system 30 disables the water injection system 28 to allow dry cuttings 34 to attach to the wet walls 74 of the borehole 12 .
  • the control system 30 disables the water injection system 28 (i.e., turns off the flow of water) when the drill bit 32 is about 1 meter (about 3 feet) from the bottom of borehole 12 .
  • other distances could be used, as would become apparent to persons having ordinary skill in the art after having become familiar with the teachings provided herein.
  • Implementing the end of hole water control routine 58 causes a coating to be formed on the borehole wall 74 that helps to stabilize the borehole wall 74 .
  • This coating significantly reduces the likelihood that loose rock will fall from the borehole wall 74 , further reducing the possibility of hole failure.
  • the end of hole water control routine further mitigates any sub surface fractures that might transverse the borehole 12 .
  • the system and method of the present invention may also operate the drill rig 16 in a retraction phase.
  • the retraction phase is that phase of the drilling process during which the drill bit 32 is retracted from the bottom of the borehole 12 after reaching the desired depth.
  • the retraction phase is complete when the drill bit 32 is fully retracted from borehole 12 and the drill rig 16 ready to move to the next hole location.
  • the retraction phase defect mitigation routines 42 include a drill bit hang-up protection routine 64 , a torque monitoring routine 66 , and a hole clean-out routine 68 .
  • the control system 30 chooses and implements one or more of the various retraction phase defect mitigation routines 42 based on one or more monitored drill parameters of drill rotational speed, drill torque, hoist speed, and the number of drill retractions that were performed during the drilling phase.
  • control system 30 when retracting the rotation drill string 20 from the borehole 12 , control system 30 monitors the hoist speed (i.e., the speed at which the drill bit 32 is being retracted from borehole 12 ). Control system 30 also monitors the torque applied to the drill bit 32 as well as its rotation speed. Control system 30 compares these monitored drill parameters with predetermined specifications for these respective parameters during the retraction phase. If the bit retraction rate and rotational speed decline with a corresponding increase in torque, it is likely that material 98 has fallen from borehole wall 74 and is interfering with the rotating drill bit 32 , as illustrated in FIG. 15 . Once the drill bit 32 has been jammed or hung-up by material 98 , control system 32 implements or performs the various steps illustrated in FIG. 15 to mitigate the condition.
  • the hoist speed i.e., the speed at which the drill bit 32 is being retracted from borehole 12 .
  • Control system 30 also monitors the torque applied to the drill bit 32 as well as its rotation speed. Control system 30 compares
  • control system 30 Upon concluding that the drill bit 32 has been hung-up or jammed by material 98 , the control system 30 first tries to free the drill bit 32 from the obstruction (i.e., material 98 ) encountered during retraction. More specifically, the control system 30 operates the drill motor system 22 ( FIG. 2 ) to apply maximum torque to the drill bit 32 in an attempt to cause the drill bit 32 to free itself from material 98 . Control system 30 also operates the drill hoist system 24 to reverse the hoist force applied to the drill string 20 . That is, control system 30 will stop applying a pull-up force to the drill string 20 and will instead apply a pull-down force to the drill string 20 . In one embodiment, control system 30 applies the pull-down force for a period of 3-5 seconds in an attempt to cause the drill bit 32 to be freed from the blockage.
  • the obstruction i.e., material 98
  • control system 30 operates the drill hoist system 24 to alternately apply pull-up and pull-down forces to drill string 20 .
  • the pull-up and pull-down forces may each be applied for a time period or cycle ranging from about 3 seconds to about 5 seconds, although other cycle times may also be used.
  • control system 30 activates the water injection system 28 in an attempt to use water to free the obstruction.
  • the number of pull-up/pull-down cycles and the amount of water applied may vary depending on the particular application, as would become apparent to persons having ordinary skill in the art after having become familiar with the teachings provided herein. Consequently, the present invention should not be regarded as limited to any particular number of pull-up/pull-down cycles or any particular water flow.
  • control system 30 activates the water injection system 28 to provide 100% water flow if the drill bit 32 has not been freed after 5 pull-up/pull-down cycles.
  • control system 30 will terminate the retraction process. Control system 30 may then alert a system operator that it was not successful in freeing the drill bit 32 .
  • control system 30 operates drill hoist system 23 to hoist up the bit 32 at a greatly reduced rate of speed.
  • Control system 30 also operates drill motor system 22 to increase the bit rotation speed to maximum. This is done in an attempt to slowly bring the drill bit 32 above the blockage that exists. This slow retraction, combined with the high bit rotation speed allows the drill bit 32 to gradually break up the material 98 that has caused the blockage in borehole 12 .
  • the reduced rate of speed is about 0.3 m per minute (about 1 foot per minute).
  • the rotation rate is about 90 revolutions per minute (rpm), which is about 90% of maximum rpm in this example.
  • rpm revolutions per minute
  • other reduced hoisting speeds and bit rotation rates may be used as well.
  • control system 30 may return to a normal retraction speed until the bit 32 has cleared the borehole 12 . Thereafter, control system 30 may implement the hole clean-out routine 68 .
  • control system 30 implements torque monitoring routine 66 during the retraction phase.
  • control system 30 monitors the torque applied by the drill motor system 22 as the drill bit 32 is being retracted from borehole 12 . If the torque varies by more than a predetermined amount within a predetermined time, then control system 30 will implement clean-out routine 68 .
  • the variation in rotational torque indicates that the drill bit 32 has contacted something that is sticking out from the drill wall 34 sufficiently far to cause interference with the drill bit 32 . Once contact is made sufficient to cause a variation in torque, it is assumed that the drill bit 32 has dislodged the obstruction and caused it, and possibly additional material, to fall to the bottom of the blast hole resulting in a shortened hole and thereby poor hole quality.
  • torque variations as low as about 3 percent to about 7 percent that occur within about 500 milliseconds or less are indicative of problems that are likely to adversely affect hole quality.
  • the rotational torque monitoring routine 66 will continue to trigger hole clean out routines 68 until no torque variations occur during the retraction phase.
  • control system 30 may terminate the retraction phase if more than a predetermined number of attempts have been made that would indicate that the borehole 12 is not possible to drill.
  • the hole clean-out routine 68 performs a “re-drill” of the borehole 12 from start to finish.
  • the control system 30 implements the hole clean-out routine 68 under the following conditions:
  • the hole clean-out routine 68 incorporates all processes, including the monitoring and implementation of the various hole defect mitigation routines 40 , used during the normal drilling phase. If any of the above conditions are triggered again during the re-drilling of the hole, the entire clean out process will be re-started after the current clean out process is completed. This will continue for some predetermined number of clean out attempts. Thereafter, the control system 30 will stop trying to clean the hole and will mark the borehole 12 as a possibly bad hole that will need to be checked, if desired.
  • the predetermined number of clean-out attempts is selected to be seven (7) and is user-adjustable. That is, the number may be varied by a user depending on a number of factors, such as, for example, the importance of forming a substantially defect-free borehole compared to the number of holes desired to be drilled within a given time frame.
  • the system 10 may be operated as follows to cause the drill rig 16 to drill a borehole 12 , such as a blasthole 14 , in a geologic structure 15 (i.e., the ground).
  • the system 10 may be operated in a fully automatic mode wherein the system 10 automatically positions the drill rig 16 over the selected hole location and proceeds to automatically drill the borehole 12 in accordance with the teachings provided herein.
  • the control system 30 may initiate the drilling phase of operation.
  • the control system 30 operates the drill motor 22 , drill hoist 24 , air injection system 26 , and water injection system 28 to begin rotating and advancing the drill bit 32 into the ground or geologic formation 15 .
  • the control system 30 monitors (i.e., at step 38 ) the various drill parameters that are generated or produced by the various systems comprising drill rig 16 .
  • the drill parameters monitored by control system 30 include air pressure, drill rotational speed, drill torque, drill depth, and the number of times the drill has been retracted during the drilling phase.
  • the control system 30 compares these various drill parameters with predetermined specifications for the respective parameters. If one or more of the drill parameters is outside of the predetermined specification, the control system 30 chooses and implements one or more drilling phase defect mitigation routines 40 , as best seen in FIG. 4 .
  • the control system 30 will automatically implement the collaring routine 60 at the start of each borehole 12 . That is, in one embodiment, the selection and implementation of the collaring routine 60 is not dependent on whether any drill parameter is within the predetermined specification.
  • the collaring routine 60 creates a high quality collar 62 . Thus, automatically implementing the collaring routine 60 on every borehole 12 helps to ensure that each hole collar 62 will be of a high quality.
  • control system 30 will simply drill each borehole 12 in accordance with a developed drilling phase methods. That is, control system 30 may well drill a number of holes wherein none of the various drilling phase defect mitigation routines (with the exception of the collaring routine 60 ) will need to be implemented. On the other hand, and depending on which drill parameters are outside of specification, control system 30 may choose and implement one, several, or all of the drilling phase mitigation routines 40 on a single borehole 12 .
  • control system 30 will then operate the drill rig 16 in the retraction phase, i.e., withdraw the drill string 20 from the borehole 12 .
  • Control system 30 monitors various drill parameters during the retraction phase. Again, if none of the various parameters exceed or are outside the predetermined specifications for those parameters, then the drill string 20 is simply withdrawn from the borehole 12 . The drill rig 16 may then be moved or trammed to the location for the next borehole. On the other hand, if one or more of the drill parameters being monitored during the retraction phase exceed or are otherwise outside the corresponding predetermined specification, then control system 30 may implement one or more of the retraction phase defect mitigation routines 42 in the manner described herein.

Abstract

A system for drilling a borehole according includes a drill rig and a control system. The control system receives information from the drill rig that relates to at least one drill parameter. The control system processes information relating to the drill parameter, determines whether the drill parameter is within a predetermined specification for the monitored drill parameter, chooses a hole defect mitigation routine based on the monitored drill parameter when the monitored drill parameter is outside the predetermined specification, and controls the drill rig to implement the chosen hole defect mitigation routine.

Description

    TECHNICAL FIELD
  • This invention relates to methods and systems for drilling boreholes in general and more specifically to methods and systems for drilling blastholes of the type commonly used in mining and quarrying operations.
  • BACKGROUND
  • Various systems and methods for drilling boreholes are known in the art and have been used for decades in a wide variety of applications, from oil and gas, to mining, to quarrying operations, just to name a few. In mining and quarrying operations, such boreholes are typically filled with an explosive that, when detonated, ruptures or fragments the surrounding rock. Thereafter, the fragmented material can be removed and processed in a manner consistent with the particular operation. When used for this purpose, then, such boreholes are commonly referred to as “blastholes,” although the terms may be used interchangeably.
  • A number of factors influence the effectiveness of the blast, including the nature of the geologic structure (i.e., rock), the size and spacing of the blastholes, the burden (i.e., distance to the free face of the geologic structure), the type, amount, and placement of the explosive, as well as the order in which the blastholes are detonated. Generally speaking, the size, spacing, and depth of the blastholes represent the primary means of controlling the degree of rupture or fragmentation of the geologic structure, and considerable effort goes into developing a blasthole specification that will produce the desired result. Because the actual results of the blasting operation are highly correlated with the degree to which the actual blastholes conform to the desired blasthole specification, it is important to ensure that the actual blastholes conform as closely as possible to the desired specification.
  • Unfortunately, however, it has proven difficult to form or drill the blastholes so that they truly conform to the desired specification. First, a typical blasting operation involves the formation several tens, if not hundreds, of blastholes, each of which must be drilled in proper location (i.e., to form the desired blasthole pattern) and to the proper depth. Thus, even where it is possible to achieve a relatively high hole compliance rate (i.e., the percentage of blastholes that comply with the desired specification), the large number of blastholes involved in a typical operation means that a significant number of blastholes nevertheless will fail to comply with the specification. In addition, even where blastholes are drilled that do comply with the desired specification, a number of post-drilling events, primarily cave-ins, can make a blasthole non-compliant. Indeed, such post-drilling events can be major contributors to blasthole non-compliance.
  • Still further, because of the large number of blastholes that are typically required for a single blasting operation, methods are constantly being sought that will allow the blastholes to be formed or drilled as rapidly as possible. As with most endeavors, however, there is an inverse relationship between speed and quality, and systems that work to increase speed at which a series of blastholes can be drilled usually come at the expense of hole quality. Consequently, there is a need for methods and systems for forming blastholes that will ensure consistent blasthole quality while minimizing the adverse affects on the speed of blasthole formation.
  • SUMMARY OF THE INVENTION
  • A system for drilling a borehole according to one embodiment of the present invention may include a drill rig and a control system. The control system receives information from the drill rig that relates to at least one drill parameter. The control system processes information relating to the drill parameter, determines whether the drill parameter is within a predetermined specification for the monitored drill parameter, chooses a hole defect mitigation routine based on the monitored drill parameter when the monitored drill parameter is outside the predetermined specification, and controls the drill rig to implement the chosen hole defect mitigation routine.
  • In one embodiment, a method for drilling a borehole may include the steps of: Initiating a drilling phase; monitoring a drill parameter during the drilling phase; determining whether the monitored drill parameter is within a predetermined specification for the monitored drill parameter; choosing a drilling phase defect mitigation routine based on the monitored drill parameter when the monitored drill parameter is outside the predetermined specification; implementing the drilling phase defect mitigation routine; and resuming the drilling phase.
  • Also disclosed is a method for drilling a borehole that includes the steps of: Monitoring a drill parameter; using the monitored drill parameter to draw a conclusion about a borehole characteristic; choosing a defect mitigation routine base on the borehole characteristic; and implementing the defect mitigation routine.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • Illustrative and presently preferred exemplary embodiments of the invention are shown in the drawings in which:
  • FIG. 1 is a side view in elevation of a blasthole drill rig embodying the systems and methods of the present invention;
  • FIG. 2 is a schematic representation of a blasthole drilling system according to one embodiment of the present invention;
  • FIG. 3 is a flow chart of one embodiment of a method for drilling blastholes;
  • FIG. 4 is a schematic representation of drilling phase mitigation routines;
  • FIG. 5 is a schematic representation of retraction phase mitigation routines;
  • FIG. 6 is a flow chart of a collaring routine;
  • FIG. 7 is a pictorial representation of a borehole during a first phase of the collaring routine;
  • FIG. 8 is a pictorial representation of a borehole during a second phase of the collaring routine;
  • FIG. 9 is a flow chart of an air pressure protection routine;
  • FIG. 10 is a flow chart of a rotary stall protection routine;
  • FIG. 11 is a pictorial representation of a borehole showing moderate and heavy fracture zones;
  • FIG. 12 is a flow chart of an end of hole spin-out routine;
  • FIG. 13 is a flow chart of an end of hole water control routine;
  • FIG. 14 is a flow chart of a drill bit hang-up protection routine;
  • FIG. 15 is a pictorial representation of a borehole showing a blockage area around the drill; and
  • FIG. 16 is a flow chart of a torque monitoring routine.
  • DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
  • One embodiment of a system 10 for forming or drilling a borehole 12 is shown and described herein as it could be used to form blastholes 14 of the type commonly used in mining and quarrying operations. After the system 10 has been used to drill or form a plurality of blastholes 14 in the desired pattern, the various blastholes 14 are then filled with an explosive material (not shown). The subsequent detonation of the explosive material ruptures or fragments the geologic structure 15, which may then be collected and processed in a manner consistent with the intended application (e.g., mining or quarrying, as the case may be).
  • Briefly, the system 10 of the present invention increases the quality of boreholes 12, i.e., the percentage of boreholes 12 that comply with the desired borehole specification. Significantly, the present invention not only increases initial hole quality, i.e., immediately after the boreholes 12 are drilled, but also long-term hole quality, i.e., the percentage of boreholes 12 that remain in compliance after they have been formed. That is, boreholes 12 that are formed in accordance with the teachings of the present invention are less subject to cave-ins and other post-drilling events that would otherwise make compliant boreholes 12 non-compliant.
  • The present invention increases both initial and long-term borehole quality by monitoring one or more drill parameters while the boreholes 12 are being formed or drilled. The monitored drill parameter(s) is compared with a predetermined specification for the parameter(s). If the monitored drill parameter is outside the specification, the present invention selects and implements one or more defect mitigation routines to ensure that the borehole 12 is drilled to the desired specification. Significantly, the defect mitigation routine(s) also helps to ensure that the borehole 12 remains compliant even after it has been drilled. Stated another way, the system 10 uses the monitored drill parameter to draw a conclusion about one or more borehole characteristics. The system then chooses the mitigation routine that will most effectively mitigate or compensate for the particular borehole characteristic. Consequently, the present invention allows for a significant increase in the number of boreholes 12 that are compliant with the particular borehole specification, both on an initial and long-term basis.
  • Referring now to FIGS. 1 and 2 simultaneously, in one embodiment the system 10 may comprise a drill rig 16 having a mast or derrick 18 configured to support a drill string 20 having a drill bit 32 provided on the end thereof. Drill rig 16 may also be provided with various systems for operating the drill string 20 to form boreholes 12 (e.g., blastholes 14). For example, in the embodiments shown and described herein, drill rig 16 may also comprise a drill motor system 22, a drill hoist system 24, an air injection system 26, and a water injection system 28, as best seen in FIG. 2. The system 10 of the present invention may also comprise a control system 30 that is operatively associated with the drill rig 16, as well as the various systems thereof, e.g., motor system 22, hoist system 24, air injection system 26, and water injection system 28. As will be explained in much greater detail below, control system 30 monitors various drill parameters generated or produced by the various drill systems and controls them as necessary to form the blasthole 14. In doing so, control system 30 may also implement the various hole defect mitigation routines 40 and 42 (FIGS. 4 and 5) in order to improve blasthole quality.
  • As its name implies, drill motor system 22 is connected to the drill string 20 and may be operated by control system 30 to provide a rotational force or torque to rotate the drill bit 32 provided on the end of the drill string 20. Control system 30 may operate drill motor system 22 so that the drill bit 32 rotates in either the clockwise or counterclockwise directions. Drill motor system 22 may also be provided with various sensors and transducers (not shown) to allow the control system 30 to monitor or sense the rotational force or torque applied to the drill bit 32, as well as the rotational speed and direction of rotation of the drill bit 32.
  • Drill hoist system 24 is also connected to the drill string 20 and may be operated by control system 30 to raise and lower drill bit 32. As was the case for the drill motor system 22, the drill hoist system 24 may also be provided with various sensors and transducers (not shown) to allow the control system 30 to monitor or sense the hoisting forces applied to the drill string 20 as well as the vertical position or depth of the drill bit 32.
  • The air injection system 26 of drill rig 16 is operatively connected to drill string 20 and may be operated by control system 30 to provide high pressure air to the drill string 20. The high pressure air from air injection system 26 is directed through a suitable conduit (not shown) provided in drill string 20 and ultimately exits the drill string 20, typically though one or more openings (not shown) provided in drill bit 32. The high pressure air from air injection system 26 is primarily used to assist in the bailing or removal from the borehole 12 of cuttings 34 dislodged by the rotating drill bit 32. However, and as will be described in further detail herein, the system and method of the present invention may use the high pressure air for other purposes as well.
  • As was the case for the other systems of drill rig 16, the air injection system 26 may be provided with various sensors and transducers (not shown) to allow the control system 30 to monitor or sense various drill parameters relating to the function and operation of the air injection system 26.
  • The water injection system 28 of drill rig 16 is also operatively connected to the drill string 20. Control system 30 may operate the water injection system 28 to provide a drilling fluid, such as water, to the drill bit 32. More specifically, pressurized water from the water injection system 28 is directed through a suitable conduit or passageway (not shown) provided in drill string 20, whereupon it ultimately exits the drill string 20, typically through one or more openings (not shown) provided in drill bit 32. The water (or other drilling fluid) from water injection system 28 is primarily used to assist in the removal of cuttings 34 from borehole 12. However, the system and method of the present invention may also use the water injection system 28 for other purposes as well, as will be described in greater detail herein.
  • The water injection system 28 may also be provided with various sensors and transducers (not shown) to allow the control system 30 to monitor or sense various drill parameters relating to the function and operation of the water injection system 28.
  • As mentioned, the control system 30 is operatively connected to various systems and devices of drill rig 16 and receives information (e.g., drill parameters) from the various systems and devices of drill rig 16 in the manner described herein. In addition, control system 30 also stores program steps for program control, processes data, chooses or selects one or more hole defect mitigation routines (e.g., 40 and 42), and implements those routines by the appropriate control of the various systems and devices of drill rig 16.
  • Referring now to FIGS. 3-5 simultaneously, control system 30 may be programmed to implement a method 36 for drilling the boreholes 12 in accordance with the teachings provided herein. Briefly, in a first step 38 of method 36, the control system 30 monitors one or more drill parameters associated with the operation of drill rig 16 and the various systems thereof. As will be described in greater detail below, the particular drill parameters that are monitored by control system 30 may differ depending on whether the drill rig 16 is being operated in a drilling phase (i.e., in which the drill bit 32 is being advanced or driven into the geologic structure 15 to form borehole 12) or in a retraction phase (i.e., in which the drill bit 32 is being withdrawn from borehole 12). Similarly, the particular defect mitigation routine or routines that may be implemented by control system 30 may differ depending on whether the drill rig 14 is being operated in the drilling phase or the retraction phase.
  • For example, if drill rig 16 is being operated in the drilling phase, control system 30 may select and implement one or more drilling phase defect mitigation routines 40, as best seen in FIG. 4. Alternatively, control system 30 may select and implement one or more retraction phase defect mitigation routines 42 when the drill rig 16 is being operated in the retraction phase. See FIG. 5.
  • Referring back now to FIG. 3, if the various drill parameters monitored by the control system 30 are within specifications for the various drill parameters, as determined during step 44, then control system 30 takes no further action, other than to continue to operate the drill rig 16 to form blasthole 14. That is, control system 30 will simply continue to monitor the various drill parameters at step 38 as the drilling operation proceeds. If, however, control system 30 determines that one or more of the drill parameters are not in accordance with the specified drill parameters, then control system 30 proceeds to step 46, wherein control system 30 chooses or selects a defect mitigation routine, e.g., either a drilling phase defect mitigation routine 40 or a retraction phase defect mitigation routine 42, as the case may be.
  • Once the particular defect mitigation routine has been selected, i.e., at step 46, control system 30 will then implement the particular defect mitigation routine at step 48. Control system 30 implements the particular defect mitigation routine by operating the various systems of drill rig 14 in accordance with the teachings provided herein. After the particular defect mitigation routine has been implemented, the control system 30 will continue to operate the drill rig 16 in accordance with the particular phase (e.g., the drilling phase or the retraction phase) at step 50.
  • The system 10 may be operated as follows to cause the drill rig 16 to drill a borehole 12, such as a blasthole 14, in a geologic structure 15 (i.e., the ground). Once the drill rig 16 has been properly positioned, i.e., so that borehole 12 will be drilled at the desired location, the control system 30 may initiate the drilling phase of operation. During the drilling phase, the control system 30 operates the drill motor 22, drill hoist 24, air injection system 26, and water injection system 28 to begin rotating and driving the drill bit 32 into the ground or geologic formation 15. During the drilling phase, the control system 30 monitors (i.e., at step 38) the various drill parameters that are generated or produced by the various systems comprising drill rig 16.
  • As will be described in greater detail below, certain drill parameters are indicative of certain issues during drilling that, if properly managed, can mitigate or lessen the possible adverse effects such issues may have on borehole quality. For example, during the drilling phase, the control system 30 may monitor drill parameters such as air pressure, drill rotational speed, drill torque, drill depth, and the number of times the drill has been retracted during the drilling phase. The control system 30 compares these various drill parameters with predetermined specifications for the respective parameters. If one or more of the drill parameters is outside the predetermined specification, the control system 30 chooses and implements one or more drilling phase defect mitigation routines 40, as best seen in FIG. 4. The various drilling phase defect mitigation routines 40 comprise an air pressure protection routine 52, a rotary stall protection routine 54, an end of hole spin-out routine 56, and an end of hole water control routine 58.
  • In addition, the drilling phase defect mitigation routines 40 may also comprise a collaring routine 60. In the embodiments shown and described herein, the collaring routine 60 is automatically performed at the start of each borehole 12. That is, in one embodiment, the selection and implementation of the collaring routine 60 is not dependent on whether or not any drill parameter is within the predetermined specification. The collaring routine 60 creates a high quality collar 62 (e.g., the first 1-3 meters of the borehole 12).
  • Briefly described, the air pressure protection routine 52 detects a failing borehole 12 by monitoring the air pressure at the drill bit 32. If the air pressure exceeds the predetermined specification, then the drill bit 32 is retracted to clear the obstruction in the borehole 12. The rotary stall protection routine 54 is useful in detecting fractures or broken-up ground being engaged by the drill bit 32. That is, when the drill bit 32 encounters broken or unstable ground, the bit 32 will typically stall out (i.e., cease to rotate). The rotary stall protection routine 54 detects these stalls and retracts the drill bit 32 to allow it to rotate again. The end of hole spin-out routine 56 monitors the number of times the bit 32 needs to be retracted from the borehole 12 during the drilling phase and uses that number as a basis for determining how long to spend at the bottom of the borehole 12 clearing out any cuttings 34 before retracting the bit 32 from the borehole 12. The end of hole water control routine 58 deactivates the water injection system to allow the dry cuttings 34 being created without water injection to build-up a coating on the inside of the borehole 12. The coating helps to reduce the amount of cuttings 34 that can fall back into the borehole 12 as the drill bit 32 is subsequently retracted.
  • The control system 30 may also utilize a variety of retraction phase mitigation routines 42 (FIG. 5) during the retraction phase of drilling, i.e., when the drill bit 32 is being retracted from the borehole 12. In the embodiments shown and described herein, the retraction phase mitigation routines 42 comprise a drill bit hang-up protection routine 64, a torque monitoring routine 66, and a hole clean-out routine 68. See FIG. 5. The control system 30 selects or chooses from among the various retraction phase defect mitigation routines 42 based on one or more monitored drill parameters consisting of drill rotational speed, drill torque, hoist speed, and number of drill retractions.
  • For example, when retracting the rotating drill string 20 from the borehole 12, the control system 30 monitors the hoist speed as well as the rotation speed and torque applied to drill bit 32. If these drill parameters are out of specification, the control system 30 will implement the drill bit hang-up protection routine 64 to free the bit and implement the hole clean-out routine 68. The torque monitoring routine 66 detects bad spots in the borehole 12 by monitoring the torque applied to the rotating drill bit 32 as the bit 32 is withdrawn from the borehole 12. If the torque exceeds or is outside the predetermined torque parameter, the control system 30 will implement the hole clean-out routine 68. The hole clean-out routine 68 involves re-lowering the drill bit 32 to the bottom of the borehole 12, where the spin-out routine 56 is applied. The bit 32 will then be retracted once again.
  • A significant advantage of the present invention is that may be used to produce high quality boreholes 12, i.e., boreholes 12 that are compliant with the desired borehole specification. Moreover, not only is initial hole quality increased, i.e., the percentage of boreholes that are compliant with the desired specification immediately after formation, but long-term hole quality is increased as well. That is, the various defect mitigation routines help to minimize the likelihood that post-drilling events, such as cave-ins, will cause otherwise compliant blastholes 14 to become non-compliant before they can be filled with explosives.
  • Still other advantages are associated with the present invention. For example, by monitoring the drill parameters as the borehole 12 is being formed, the present invention is able to implement the various defect mitigation routines 40 and 42 on an as-needed basis. That is, the various defect mitigation routines are not automatically implemented on every borehole 12. The selective implementation of the various defect mitigation routines 40 and 42 allows the boreholes 12 to be formed as rapidly as possible, while still allowing for the formation of high quality boreholes 12. Stated another way, the various hole defect mitigation routines 40 and 42 are only implemented when they are needed, e.g., due to defects in the geologic structure 15. They are not implemented in areas where the geologic structure 15 will allow the formation of high quality boreholes without the need to implement any defect mitigation routines.
  • Yet another advantage of the present invention is that it selects and applies different hole defect mitigation routines depending on the type of defects that are encountered during drilling. The present invention is thus able to apply the defect mitigation routine that is most appropriate for addressing the particular defects in the geologic structure 15 that are encountered when drilling each particular borehole 12.
  • Still yet other advantages are associated with the collaring routine 60. For example, by implementing the collaring routine 60 on every borehole 12, i.e., regardless of whether the monitored drill parameters are within specification, the present invention maximizes both initial and long-term borehole quality. The quality of the hole collar 12 will always be uniformly high.
  • Having briefly described the system and method for forming boreholes according to the present invention, as well as some of its more significant features and advantages, various exemplary embodiments of the invention will now be described in detail. However, before proceeding with the description, it should be noted that the various embodiments of the present invention are shown and described herein as they could be implemented on a conventional semi-automated blasthole drill rig 16 of the type commonly used in mining and quarrying operations to drill boreholes suitable for blasting. However, it should be understood that the present invention could be implemented or practiced on other types of drill rigs that are now known in the art or that may be developed in the future that are, or would be, suitable for drilling such boreholes.
  • Of course, the present invention may also be used in other applications besides mining and quarrying operations. Indeed, the present invention could be used in any application wherein it would be desirable to form boreholes of consistent quality or otherwise compensate for variations in the geologic structure in which the boreholes are formed. Consequently, the present invention should not be regarded as limited to the particular devices, systems, and applications shown and described herein.
  • Referring back now to FIGS. 1-3 simultaneously, in one embodiment, the system 10 for forming boreholes 12 is shown and described herein as may be used to drill or form a plurality of boreholes 12 of the type used in open-pit mining operations. After being drilled or formed, the various boreholes 12 are filled with an explosive material that, when detonated, ruptures or fractures the geologic structure 15. The fractured material may then be removed and processed to recover the valuable mineral content.
  • In this particular application, the drill rig 16 that is used to form the blastholes 14 comprises a mast or derrick 18 that is configured to support the drill string 20 that is used to drill or form the blastholes 14. Drill rig 16 may also comprise various other systems, such as a drill motor system 22, a drill hoist system 24, an air injection system 26, and a water injection system 28, required to operate the drill string 20 to form the blastholes 14. A control system 30 operatively connected to drill rig 16 and the various systems comprising drill rig 16 monitors drill parameters and controls the various systems in the manner described herein.
  • Drill rig 16 will also comprise a number of additional systems and devices, such as one or more power plants, electrical systems, hydraulic systems, pneumatic systems, etc. (not shown), that may be required or desired for the operation of the particular drill rig 16. However, because such additional systems and devices are well known in the art and are not required to understand or implement the present invention, such additional systems and devices that may be utilized in any particular drill rig 16 will not be described in further detail herein.
  • Referring now primarily to FIGS. 1 and 2, drill motor system 22 is operatively connected to drill string 20 and provides the rotational force or torque required to rotate drill bit 32 mounted on the end of drill string 20. Typically, drill motor system 22 will comprise an electrically- or hydraulically-powered system that is reversible so that the drill bit 32 can be rotated in either the clockwise or counterclockwise direction.
  • In most drill rigs, the drill motor system 22 is capable of automatic or semi-automatic operation, and will usually be provided with various sensors and transducers (not shown) suitable for sensing and producing output signals or data relating to various aspects and operational states of the drill motor system 22. For example, in the embodiment shown and described herein, drill motor system 22 is provided with sensors or transducers suitable for allowing the control system 30 to monitor the torque applied to drill bit 32, as well as the rotational speed and rotational direction of drill bit 32. Generally speaking, most drill rigs will already be provided with sensors or transducers suitable for providing the required drill parameter data to control system 30. If not, suitable sensors or transducers would need to be provided. Finally, it should be noted that because drill motors for drill rigs are well-known in the art, and because a more detailed description of such drill motor systems 22 is not required to understand or practice the invention, the particular drill motor system 22 that may be utilized in conjunction with the present invention will not be described in further detail herein.
  • Drill rig 16 may also be provided with a drill hoist system 24 that is also operatively associated with the drill string 20 and control system 30, as best seen in FIG. 2. The drill hoist system 24 applies axial or hoisting forces to the drill string 20 to raise and lower the drill bit 32. The drill hoist system 24 may be electrically or hydraulically powered and may be configured to apply axial forces to the drill string 20 in both directions, i.e., to provide both “pull-up” (i.e., retraction) and “pull-down” (i.e., extension) forces to the drill bit 32.
  • In most cases, the drill hoist system 24 is also capable of automatic or semi-automatic operation and may be provided with various sensors and transducers (not shown) suitable for sensing and producing signals relating to various aspects and operational states of the drill hoist system 24. In the various embodiments shown and described herein, the control system 30 monitors hoisting forces (e.g., both pull-up and pull-down forces) applied to drill string 20, as well as the vertical position or depth of the drill bit 32. Consequently, the drill hoist system 24 should be capable of providing such information to the control system 30. If not, suitable sensors or transducers would need to be provided.
  • The air injection system 26 of drill rig 16 is operatively connected to the drill string 20 and provides high-pressure air to the drill string 20. The high-pressure air from air injection system 26 is directed through a suitable conduit (not shown) provided in the drill string 20, and ultimately exits through one or more openings provided in the drill bit 32. As described above, the control system 30 of the present invention is operatively connected to the air injection system 26 so that it can control the operation thereof. In addition, control system 30 also monitors the air pressure provided to the drill string 20. Generally speaking, the air injection system provided on a typical drill rig will be capable of providing air pressure data to the control system 30. If not, such systems could be readily provided by persons having ordinary skill in the art after having become familiar with the teachings provided herein.
  • Drill rig 16 may also be provided with a water injection system 28 suitable for providing water (or other suitable drilling fluid) to the drill bit 32. Similar to the air injection system 26, pressurized water from the water injection system may be directed through a suitable conduit (not shown) provided in the drill string 20 before ultimately exiting through one or more openings provided in the drill bit 32. Control system 30 is operatively connected to the water injection system 28 and controls the function and operation thereof.
  • In the embodiment shown and described herein, the control system 30 does not monitor any parameters of the water injection system 28 other than the operational state (e.g., whether the system is “on” or “off”), although provisions could be made to allow the control system 30 to monitor other parameters (e.g., water pressure and flow rate), if desired.
  • In addition to being connected to the various systems of drill rig 16 so that control system 30 can monitor various drill parameters and control the function and operation of the various systems, control system 30 also stores program steps for program control, processes data, and selects and implements the various hole defect mitigation routines described herein. Accordingly, control system 30 may comprise any of a wide variety of systems and devices suitable for performing these functions, as would become apparent to persons having ordinary skill in the art after having become familiar with the teachings provided herein. Consequently, the present invention should not be regarded as limited to a control system 30 comprising any particular device or system.
  • By way of example, in one embodiment, control system 30 may comprise a general purpose programmable computer, such as a personal computer, that is programmed to implement the various processes and steps described herein and that can interface with the particular systems provided on drill rig 16. However, because such general purpose programmable computers are well known in the art and could be easily provided by persons having ordinary skill in the art after having become familiar with the teachings provided herein, the particular programmable computer system that may comprise control system 30 will not be described in further detail herein.
  • Referring now to FIGS. 3-5, the control system 30 may be programmed to implement a method 36 for drilling the boreholes 12. In the first step 38 of method 36, the control system 30 monitors the drill parameters associated with the drill rig 16. Control system 30 may do this via a suitable data interface (not shown) provided between control system 30 and the various sensors or transducers associated with the various systems of drill rig 16. If the various drill parameters monitored by the control system 30 are within the specifications for the various drill parameters, as determined during step 44, the control system 30 will take no further action, other than to continue to operate the various systems of drill rig 16 as required to form the blast hole 14. The control system 30 will continue to monitor the various drill parameters at step 38.
  • If the control system 30 determines that one or more of the drill parameters being monitored is not in accordance with the specified parameter, then control system 30 will proceed to step 46, wherein the control system 30 chooses or selects a defect mitigation routine.
  • The particular defect mitigation routine or routines that may be selected by control system 30 will depend on the particular drill parameter that is not within specification, as well as on whether the control system is operating the drill rig 16 in the drilling phase or the retraction phase. If the control system 30 is operating the drill rig 16 in the drilling phase, control system 30 will choose or select from among the various drilling phase defect mitigation routines 40 illustrated in FIG. 4. On the other hand, if the control system 30 is operating the drill rig 16 in the retraction phase, control system 30 will choose or select from among the various retraction phase defect mitigation routines 42 illustrated in FIG. 5.
  • After the defect mitigation routine has been selected at step 46, control system 30 will then implement the particular defect mitigation routine at step 48. The control system 30 implements the selected defect mitigation routine by operating the various systems of drill rig 16 in the manner described below. After the defect mitigation routine has been implemented, the control system 30 will continue to operate the drill rig 16 at step 50 until the borehole 12 is completed.
  • The drilling phase defect mitigation routines 40 comprise an air pressure protection routine 52, a rotary stall protection routine 54, an end-of-hole spin-out routine 56, an end-of-hole water control routine 58, and a collaring routine 60. See FIG. 4. In the various embodiments shown and described herein, the collaring routine 60 is performed automatically for every borehole 12. That is, the selection of the collaring routine is not based on whether any particular drill parameter being monitored is outside specification. Accordingly, the collaring routine 60 will be described first, followed by the other drill phase defect mitigation routines 52, 54, 56, and 58.
  • Referring now to FIGS. 6-8, the collaring routine 60 involves the formation of the collar 62 of the borehole 12. Generally speaking, the collar 62 is regarded as the first 1-3 meters (about 2-10 feet) of the borehole 12. The collaring phase is perhaps the most important phase in blasthole formation. If the hole collar 62 is not properly prepared, both the hole quality and drill rig production will be adversely affected.
  • A number of factors or conditions can adversely affect the quality of the borehole 12. For example, steep piles 70 of cuttings 34 deposited on the surface 72 adjacent the borehole 12 can result in back-filling of the borehole 12 after completion. Excessive friction between the drill string 20 and the wall 74 of borehole 12 can result in wall failure, crooked boreholes, and poor borehole quality overall. The borehole 12 may also be plugged if the collar 62 is too narrow, particularly near the top of the borehole 12.
  • The productivity of the drill rig 16 also can be adversely affected if the hole collar 62 is not properly prepared. For example, back-filling or even complete plugging of the borehole 12 means that the drill rig 16 will need to clear the borehole 12 of obstructions, often more than once. Crooked boreholes 12 will typically create excessive friction between the drill string 20 and the borehole wall 74, resulting in the inefficient delivery of power to the drill bit 32. In addition, crooked boreholes 12 and excessive friction can damage the drill rig 16 over time, resulting in increased maintenance costs and poor drill rig performance.
  • The collaring routine 60 involves a two-phase process to form a high quality hole collar 62. Referring now primarily to FIGS. 6 and 7, the first phase 76 of the collaring routine 60 advances the drill bit 32 to a predetermined depth (i.e., a set depth which represents the maximum collaring depth) at step 78. By way of example, maximum collaring depth may be selected to be in a range of about 1-3 meters (about 2-10 feet), although other depths may be used.
  • Alternatively, collaring routine 60 may advance the drill bit 32 to a depth that is determined to consist of competent rock, at step 80. Competent rock may be determined if the drill penetration rate falls below a predetermined level for a predetermined period of time. This alternative step 80 may also be referred to herein as “dynamically determined collaring depth,” in that the depth of the collar 62 is not fixed, but rather is based on the particular characteristics of the geologic structure 15 in which the borehole 12 is being drilled. As will be described in greater detail below, operating the collaring routine 60 in conjunction with this second option (i.e., step 80) may be advantageous in certain circumstances.
  • During the first phase 76 of collaring routine 60, cuttings 34 will typically build-up in a steep pile 70 on the surface 72, as best seen in FIG. 7. In addition, it is common for collar plugs 82 to form in borehole 12 at a distance of about half a meter (e.g., about 1 foot) below the surface 72. Both of these conditions are detrimental to hole quality as broken material that would normally lay clear of the borehole 12 has a tendency to fall back into the borehole 12. The second phase 84 remedies these problems.
  • Referring now to FIGS. 6 and 8 simultaneously, the second phase 84 of collaring routine 60 involves the retraction of drill bit 32 to location above the ground or surface 72, at step 86. As the drill bit 32 is retracted, the control system 30 activates the water injection system 28. This causes mud to build-up on the borehole wall 74, stabilizing it. The control system 30 continues to activate the water injection system 28 during the retraction process until the bit 32 is above the surface 72. At this point, the control system 30 de-activates the water injection system 28 to terminate the flow of water.
  • Once the drill bit 32 is retracted to a point above the surface 72, control system 30 activates the air injection system 26 (FIG. 2) to clear the ground of cuttings (i.e., at step 88). High pressure air, represented by arrows 89, exiting holes (not shown) provided in the drill bit 32 will be sufficient to blow the existing and normally steep pile 70 of cuttings 34 created in the first phase 76 away from the opening of borehole 12. Performing step 88 creates a more spread out, shallow cuttings pile 90 that is sufficiently small or spread-out to allow future cuttings 34 to pile up in such a way so as to greatly reduce the amount of cuttings 34 apt to fall back into the borehole 12.
  • Thus, implementation of the two-phase collaring routine 60 results in a far more reliable borehole 12 that is less prone to failure due to back-filling after the drill rig 16 has left the site. In addition, any collar plug 82 (FIG. 7) that may have formed is cleared from the wall 74 of the borehole 12 thereby allowing future cuttings 34 to clear the hole at a high rate of speed, further ensuring that the cuttings 34 will land far enough away from the opening of borehole 12 to prevent hole failure due to backfilling.
  • In addition to the steps described above, and to ensure a straight hole start, control system 30 may operate the drill hoist 24 to lift the drill bit 32 above the surface 72 by at least about 15 cm (about 6 inches) before rotating the drill bit 32 and starting the borehole 12. This lifting off of the ground and spinning of the drill bit 32 causes any large rocks that may be on or slightly below the surface 72 to be pushed out of the way. By performing this process before starting to drill the borehole 12, the collaring routine 60 ensures that nothing will be in the way of the drill bit 32 that could cause it to be “kicked” sideways, thereby starting the borehole 12 in a crooked manner. If the borehole 12 is not straight when started, it will adversely affect the entire drilling process. Crooked holes may also result in excessive friction between the drill string 20 and the wall 74 of borehole 12, resulting in possible wall failures, short boreholes, and poor hole quality.
  • As briefly mentioned above with respect to FIG. 6, the first phase 76 of the collaring routine 60 may involve alternative option (e.g., step 80) for determining the depth of the hole collar 62. Step 80 basically allows the depth of the collar 62 to be dynamically determined based on the particular conditions of the geologic structure 15 where the borehole 12 is being drilled, rather than merely drilling to a set depth. Thus, step 80 may be used to ensure that an adequate depth of the borehole 12 is collared (i.e., the collar 62 is of adequate length) without the loss of productivity that would otherwise result from the “over-collaring” of borehole 12. Stated another way, by simply collaring to set depths (i.e., not implementing step 80), drill rig production can be reduced, as the collaring of the boreholes needs to be done more slowly to ensure the quality of the collar 62. However, if the drill bit 32 encounters competent ground early-on, the collaring phase can be shortened. That is, the need to continue the collaring operation is greatly diminished once competent ground is reached. Therefore, once the drill bit 32 contacts competent ground, the control system 30 can complete the collaring routine 60, e.g., by performing the second phase 84, and move on to the drilling phase which typically occurs at a high rate of penetration or drilling.
  • In one embodiment, the present invention determines competent ground by monitoring the drilling rate, or rate of penetration, over a selected time period. Competent rock or ground is determined if the drill penetration rate falls below a predetermined level for a predetermined period of time. By way of example, in one embodiment, once the rate of penetration drops below about 1 meter per minute (about 2 feet per minute) for a period of about 30 seconds, competent ground is determined to have been reached. The control system 30 will then proceed to the second phase 84 of collaring operation 60 already described.
  • Proceeding now to the remaining drilling phase defect mitigation routines 40 illustrated in FIG. 4, the air pressure protection routine 52 is illustrated in FIG. 9 and serves two primary purposes: To provide plugged bit detection and prevention and to provide collapsed hole detection and protection. Both purposes are relevant to hole quality. Plugged bit protection ensures that proper air flow is being provided to the bottom of the borehole 12 to ensure adequate bailing of drill cuttings 34. Without this protective functionality, a plugged drill bit 34 would result in inadequate bailing of drill cuttings 34, causing them to remain in the borehole 12 rather than being bailed out of the borehole 12. In addition, improper bailing velocities can cause erosion of the borehole walls 74, which can lead to wall failure and shallow boreholes 12.
  • As illustrated in FIG. 9, the drill parameter that will cause the control system to select and implement the air pressure protection routine 52 is the air pressure supplied to the drill string 20. If the air pressure is normal, the control system 30 simply continues the normal drilling operation and continues to monitor the air pressure. If the air pressure exceeds the maximum amount, as determined by comparing the monitored air pressure with the predetermined value for air pressure, the control system 30 will follow the various procedures and decision paths set forth in FIG. 9. Basically, the procedures and decision paths involve control of the water injection system 28 as well as the retraction of the drill bit 32 and the resumption of the drilling operation. If the various procedures and decisions paths are unable to clear the plugged drill bit 32, the system will provide a plugged bit indication to the system operator and will stop the drilling process.
  • Referring now to FIGS. 10 and 11, the rotary stall protection routine 54 detects and mitigates problems likely to arise from various sub-surface fractures 92 that may be contained in the geologic structure 15 that are being penetrated by drill string 20. Sub-surface fracturing of the rock or geologic structure 15 tends to be very detrimental to borehole quality in that, as the drill bit 32 penetrates the fractured area 92, the drilling process causes the fractured area 92 to further break apart or loosen at the wall 74 of the borehole 12. The loosened or broken material has the potential for falling into the borehole 12 after the drill rig 16 has left the borehole 12 upon completion of the drilling process. This situation must be mitigated in order to ensure quality boreholes 12 that will stand up over a period of time.
  • The rotary stall protection routine 54 detects these fractured areas 92 due to the probability of bit stalling when penetrating the fracture areas 92. More specifically, as the broken or fractured area 92 is penetrated by drill bit 32, the loose rock breaks apart in large pieces that often become wedged between the drill string 20 and borehole wall 74. This wedging of broken material causes the drill string to stop rotating and thereby “stalls” the drill motor system 22. The control system detects this stalled condition by monitoring the torque applied to drill bit 32 as well as its rotational speed. If the torque suddenly increases or spikes and the rotational speed suddenly drops, then control system 30 determines that the drill motor system 22 is stalling, as best seen in FIG. 10.
  • In addition, and with reference now primarily to FIG. 11, when fractured areas 92 are encountered, they can cause failure points in the wall 74 of the borehole 12. These failure points are manifested as voids in the normally intact borehole wall 74. Loose rocks and material may fall to the bottom of the borehole 12 resulting in boreholes 12 that are not as deep as when originally drilled. In catastrophic cases, i.e., where the geologic structure 15 is heavily fractured, these voids can lead to complete hole failure, i.e., where the entire borehole 12 is filled up by sloughing material from the fractured areas 92. For example, and as illustrated in FIG. 11, a heavily fractured area 94 near the bottom of the borehole 12 has resulted in a major void 96 forming at the bit 32. Failing to reduce the penetration rate and rotational speed will result in a hole failure in most instances.
  • Referring back now to FIG. 10, if control system 30 determines that the stalled condition has persisted for longer than some predetermined time, 1.5 seconds, for example, then the control system 30 will implement the rotary stall protection routine 54. More specifically, control system 30 will operate drill hoist system 24 to retract the drill bit 32 to re-enable the rotation of drill bit 32. If the rotational speed of the drill bit 32 does not recover within some period of time, for example within 3 seconds, the control system 30 will operate drill hoist system 24 to alternately apply pull-down and pull-up forces to the drill string 20 in an attempt to free drill bit 32 and allow it to rotate again. Once bit rotation has been re-established, the control system 30 will operate the hoist system 24 to slowly lower the bit 32 back to the bottom of the borehole 12. Thereafter, control system 30 will reduce the pull-down force to avoid further stalling of the drill bit 32. In addition, the control system 30 will increase the rotational speed of drill bit 32 to further assist in the grinding up of the broken particles from the fractured areas 92.
  • In one embodiment, the reduction of pull-down force and increase in rotational speed is maintained until the drill rig 16 meets the following conditions (i.e., indicating that the drill bit 32 has passed the fractured area 92): There are no torque spikes for at least 15 seconds; and the rate of penetration has stopped changing (e.g., the penetration rate change over a time period of about 1 second is less than about 6 cm per minute (about 0.2 feet per minute)). Alternatively, other values for these parameters could be used. Once these conditions are met, the control system 30 increases the pull-down force to normal values. Control system 30 continues to monitor the drill parameters to ensure that the bit 32 is not going to stall again. In summary, then, by slowly penetrating the fractured areas 92, further damage to the wall 74 of borehole 12 is avoided and a quality borehole 12 is further insured.
  • The end of hole spin-out routine 56 is illustrated in FIG. 12. Once the drill bit 32 reaches the determined depth, the control system 30 will spin the drill bit 32 just above the bottom of the hole and allow all the cuttings 34 that have been created to be bailed from or exit the borehole 12. Significantly, the time required at the bottom of the borehole 12 is variable and is determined by how much trouble the system 10 has encountered during the drilling phase. Basically, the monitored drill parameters will allow the control system to determine whether the particular borehole 12 is a “good” or a “bad” borehole, more precisely, whether the geologic structure is stable or unstable. A good borehole is defined as a borehole 12 that required the control system 30 to retract the drill bit 32 less than two (2) times during the drilling phase. If the control system 30 determines the borehole 12 to be good, then the end of the hole spin out time will be 30 seconds, which will be sufficient in most instances to allow all cuttings 34 to be bailed from the borehole 12.
  • On the other hand, if control system 30 determines the borehole 12 to be bad, then control system calculates the spin-out time by multiplying by 30 seconds the number of times the bit 32 had to retracted. For example, if the bit 32 had to be retracted two times, then the spin-out time is determined or calculated to be sixty (60) seconds. Similarly, if the bit 32 had to be retracted three times, then the spin-out time is calculated to be ninety (90) seconds. In the embodiment shown and described herein, the maximum spin-out time is limited to two (2) minutes. Alternatively, of course, other maximum time limits could be set, as would become apparent to persons having ordinary skill in the art after having become familiar with the teachings provided herein.
  • In the embodiment shown and described herein, the end of hole spin-out routine 56 may be selected and implemented during the retraction phase of the drilling process. That is, if control system 30 detects a problem while retracting the bit, control system 30 will re-set the hole spin-ut time. Control system 30 will then re-lower drill bit 32 to the bottom of the borehole 12 and perform again the hole spin-out routine 56. If multiple passes are required to penetrate the hole, the end of hole spin out time is accumulated accordingly.
  • The end of hole water control routine 58 is illustrated in FIG. 13. As the drill bit 32 approaches the pre-determined hole depth, the control system 30 disables the water injection system 28 to allow dry cuttings 34 to attach to the wet walls 74 of the borehole 12. In one embodiment, the control system 30 disables the water injection system 28 (i.e., turns off the flow of water) when the drill bit 32 is about 1 meter (about 3 feet) from the bottom of borehole 12. Alternatively, other distances could be used, as would become apparent to persons having ordinary skill in the art after having become familiar with the teachings provided herein.
  • Implementing the end of hole water control routine 58 causes a coating to be formed on the borehole wall 74 that helps to stabilize the borehole wall 74. This coating significantly reduces the likelihood that loose rock will fall from the borehole wall 74, further reducing the possibility of hole failure. Put another way, the end of hole water control routine further mitigates any sub surface fractures that might transverse the borehole 12.
  • As was already briefly mentioned above, the system and method of the present invention may also operate the drill rig 16 in a retraction phase. The retraction phase is that phase of the drilling process during which the drill bit 32 is retracted from the bottom of the borehole 12 after reaching the desired depth. The retraction phase is complete when the drill bit 32 is fully retracted from borehole 12 and the drill rig 16 ready to move to the next hole location. As illustrated in FIG. 5, the retraction phase defect mitigation routines 42 include a drill bit hang-up protection routine 64, a torque monitoring routine 66, and a hole clean-out routine 68. The control system 30 chooses and implements one or more of the various retraction phase defect mitigation routines 42 based on one or more monitored drill parameters of drill rotational speed, drill torque, hoist speed, and the number of drill retractions that were performed during the drilling phase.
  • Referring now to FIG. 14, when retracting the rotation drill string 20 from the borehole 12, control system 30 monitors the hoist speed (i.e., the speed at which the drill bit 32 is being retracted from borehole 12). Control system 30 also monitors the torque applied to the drill bit 32 as well as its rotation speed. Control system 30 compares these monitored drill parameters with predetermined specifications for these respective parameters during the retraction phase. If the bit retraction rate and rotational speed decline with a corresponding increase in torque, it is likely that material 98 has fallen from borehole wall 74 and is interfering with the rotating drill bit 32, as illustrated in FIG. 15. Once the drill bit 32 has been jammed or hung-up by material 98, control system 32 implements or performs the various steps illustrated in FIG. 15 to mitigate the condition.
  • Upon concluding that the drill bit 32 has been hung-up or jammed by material 98, the control system 30 first tries to free the drill bit 32 from the obstruction (i.e., material 98) encountered during retraction. More specifically, the control system 30 operates the drill motor system 22 (FIG. 2) to apply maximum torque to the drill bit 32 in an attempt to cause the drill bit 32 to free itself from material 98. Control system 30 also operates the drill hoist system 24 to reverse the hoist force applied to the drill string 20. That is, control system 30 will stop applying a pull-up force to the drill string 20 and will instead apply a pull-down force to the drill string 20. In one embodiment, control system 30 applies the pull-down force for a period of 3-5 seconds in an attempt to cause the drill bit 32 to be freed from the blockage.
  • If the drill bit 32 does not begin to move either up and down or to rotate freely, then control system 30 operates the drill hoist system 24 to alternately apply pull-up and pull-down forces to drill string 20. In one embodiment, the pull-up and pull-down forces may each be applied for a time period or cycle ranging from about 3 seconds to about 5 seconds, although other cycle times may also be used.
  • If the drill bit 32 is not free after some number of pull-up/pull-down cycles, then control system 30 activates the water injection system 28 in an attempt to use water to free the obstruction. The number of pull-up/pull-down cycles and the amount of water applied may vary depending on the particular application, as would become apparent to persons having ordinary skill in the art after having become familiar with the teachings provided herein. Consequently, the present invention should not be regarded as limited to any particular number of pull-up/pull-down cycles or any particular water flow. However, by way of example, in one embodiment, control system 30 activates the water injection system 28 to provide 100% water flow if the drill bit 32 has not been freed after 5 pull-up/pull-down cycles.
  • If drill bit 32 remains jammed even after water injection and if drill bit 32 remains jammed after exceeding some predetermined fault limit, control system 30 will terminate the retraction process. Control system 30 may then alert a system operator that it was not successful in freeing the drill bit 32.
  • If the drill bit 32 begins to rotate, indicating that it is freed from the blockage, then control system 30 operates drill hoist system 23 to hoist up the bit 32 at a greatly reduced rate of speed. Control system 30 also operates drill motor system 22 to increase the bit rotation speed to maximum. This is done in an attempt to slowly bring the drill bit 32 above the blockage that exists. This slow retraction, combined with the high bit rotation speed allows the drill bit 32 to gradually break up the material 98 that has caused the blockage in borehole 12. By way of example, in one embodiment, the reduced rate of speed is about 0.3 m per minute (about 1 foot per minute). The rotation rate is about 90 revolutions per minute (rpm), which is about 90% of maximum rpm in this example. Alternatively, other reduced hoisting speeds and bit rotation rates may be used as well.
  • After the drill bit 32 has cleared the obstruction, control system 30 may return to a normal retraction speed until the bit 32 has cleared the borehole 12. Thereafter, control system 30 may implement the hole clean-out routine 68.
  • Other issues or problems may occur during the retraction phase that are not so severe as to cause the drill bit 32 to become jammed (thus requiring implementation of the drill bit hang-up protection routine 64), but that may nevertheless adversely affect hole quality.
  • For example, and referring now primarily to FIGS. 16-18, control system 30 implements torque monitoring routine 66 during the retraction phase. During this routine 66, control system 30 monitors the torque applied by the drill motor system 22 as the drill bit 32 is being retracted from borehole 12. If the torque varies by more than a predetermined amount within a predetermined time, then control system 30 will implement clean-out routine 68. The variation in rotational torque indicates that the drill bit 32 has contacted something that is sticking out from the drill wall 34 sufficiently far to cause interference with the drill bit 32. Once contact is made sufficient to cause a variation in torque, it is assumed that the drill bit 32 has dislodged the obstruction and caused it, and possibly additional material, to fall to the bottom of the blast hole resulting in a shortened hole and thereby poor hole quality.
  • It should be noted that even small variations in torque may be indicative of problems that could adversely affect hole quality. For example, in one embodiment, torque variations as low as about 3 percent to about 7 percent that occur within about 500 milliseconds or less are indicative of problems that are likely to adversely affect hole quality.
  • The rotational torque monitoring routine 66 will continue to trigger hole clean out routines 68 until no torque variations occur during the retraction phase. Alternatively, control system 30 may terminate the retraction phase if more than a predetermined number of attempts have been made that would indicate that the borehole 12 is not possible to drill.
  • The hole clean-out routine 68 performs a “re-drill” of the borehole 12 from start to finish. In one embodiment, the control system 30 implements the hole clean-out routine 68 under the following conditions:
      • The drill bit 32 needed to be retracted more than twice during the drilling phase as a result of the implementation of the air pressure protection routine 52 or the rotary stall protection routine 54;
      • The implementation of the drill bit hang protection routine 64; or
      • A rotational spike occurred (e.g., during the implementation of the torque monitoring routine 66).
  • The hole clean-out routine 68 incorporates all processes, including the monitoring and implementation of the various hole defect mitigation routines 40, used during the normal drilling phase. If any of the above conditions are triggered again during the re-drilling of the hole, the entire clean out process will be re-started after the current clean out process is completed. This will continue for some predetermined number of clean out attempts. Thereafter, the control system 30 will stop trying to clean the hole and will mark the borehole 12 as a possibly bad hole that will need to be checked, if desired. In one embodiment, the predetermined number of clean-out attempts is selected to be seven (7) and is user-adjustable. That is, the number may be varied by a user depending on a number of factors, such as, for example, the importance of forming a substantially defect-free borehole compared to the number of holes desired to be drilled within a given time frame.
  • The system 10 may be operated as follows to cause the drill rig 16 to drill a borehole 12, such as a blasthole 14, in a geologic structure 15 (i.e., the ground). In the embodiment shown and described herein, the system 10 may be operated in a fully automatic mode wherein the system 10 automatically positions the drill rig 16 over the selected hole location and proceeds to automatically drill the borehole 12 in accordance with the teachings provided herein.
  • Once the drill rig 16 has been properly positioned, i.e., so that borehole 12 will be drilled at the desired location, the control system 30 may initiate the drilling phase of operation. During the drilling phase, the control system 30 operates the drill motor 22, drill hoist 24, air injection system 26, and water injection system 28 to begin rotating and advancing the drill bit 32 into the ground or geologic formation 15. During the drilling phase, the control system 30 monitors (i.e., at step 38) the various drill parameters that are generated or produced by the various systems comprising drill rig 16.
  • During the drilling phase, the drill parameters monitored by control system 30 include air pressure, drill rotational speed, drill torque, drill depth, and the number of times the drill has been retracted during the drilling phase. The control system 30 compares these various drill parameters with predetermined specifications for the respective parameters. If one or more of the drill parameters is outside of the predetermined specification, the control system 30 chooses and implements one or more drilling phase defect mitigation routines 40, as best seen in FIG. 4.
  • As mentioned, in one embodiment, the control system 30 will automatically implement the collaring routine 60 at the start of each borehole 12. That is, in one embodiment, the selection and implementation of the collaring routine 60 is not dependent on whether any drill parameter is within the predetermined specification. The collaring routine 60 creates a high quality collar 62. Thus, automatically implementing the collaring routine 60 on every borehole 12 helps to ensure that each hole collar 62 will be of a high quality.
  • Of course, if none of the monitored drill parameters are outside the predetermined specification for each parameter, then control system 30 will simply drill each borehole 12 in accordance with a developed drilling phase methods. That is, control system 30 may well drill a number of holes wherein none of the various drilling phase defect mitigation routines (with the exception of the collaring routine 60) will need to be implemented. On the other hand, and depending on which drill parameters are outside of specification, control system 30 may choose and implement one, several, or all of the drilling phase mitigation routines 40 on a single borehole 12.
  • After the borehole 12 has been drilled to the desired or target depth, the control system 30 will then operate the drill rig 16 in the retraction phase, i.e., withdraw the drill string 20 from the borehole 12. Control system 30 monitors various drill parameters during the retraction phase. Again, if none of the various parameters exceed or are outside the predetermined specifications for those parameters, then the drill string 20 is simply withdrawn from the borehole 12. The drill rig 16 may then be moved or trammed to the location for the next borehole. On the other hand, if one or more of the drill parameters being monitored during the retraction phase exceed or are otherwise outside the corresponding predetermined specification, then control system 30 may implement one or more of the retraction phase defect mitigation routines 42 in the manner described herein.
  • Having herein set forth preferred embodiments of the present invention, it is anticipated that suitable modifications can be made thereto which will nonetheless remain within the scope of the invention. The invention shall therefore only be construed in accordance with the following claims:

Claims (43)

1. A method for drilling a borehole, comprising:
initiating a drilling phase;
monitoring a drill parameter during the drilling phase;
determining whether the monitored drill parameter is within a predetermined specification for the monitored drill parameter;
choosing a drilling phase defect mitigation routine based on the monitored drill parameter when the monitored drill parameter is outside the predetermined specification;
implementing the drilling phase defect mitigation routine; and
resuming the drilling phase.
2. The method of claim 1, wherein monitoring a drill parameter comprises monitoring one or more drill parameters selected from the group consisting of air pressure, drill rotational speed, drill torque, drill depth, and number of drill retractions.
3. The method of claim 2, wherein choosing a drilling phase defect mitigation routine further comprises choosing one or more drilling phase defect mitigation routines selected from the group consisting of air pressure protection, rotary stall protection, end of hole spin-out, and end of hole water control.
4. The method of claim 3, further comprising choosing said air pressure protection routine when said monitored air pressure is outside a predetermined specification for air pressure.
5. The method of claim 4, wherein said air pressure protection routine comprises:
retracting a drill bit;
applying air pressure to the drill bit;
monitoring the air pressure;
resuming the drilling phase when the monitored air pressure is within the predetermined specification; and
activating a drill water injection system to unclog the drill bit when the monitored air pressure is outside the predetermined specification.
6. The method of claim 3, further comprising choosing said rotary stall protection routine when one or both of said monitored drill rotational speed is outside a predetermined specification for rotational speed and said drill torque is outside a predetermined specification for drill torque.
7. The method of claim 6, wherein said rotary stall protection routine comprises:
retracting a drill bit;
rotating the drill bit; and
resuming the drilling phase with one or both of a reduced down-force and an increased rotational drill bit speed.
8. The method of claim 3, further comprising choosing said end of hole spin-out routine when said monitored drill depth meets a predetermined specification for drill depth.
9. The method of claim 8, wherein said end of hole spin-out routine comprises:
retracting a drill bit to a position above a bottom of the borehole;
rotating the drill bit for a spin-out period if the drill bit was retracted two or fewer times during the drilling phase;
rotating the drill bit for a product of the spin-out period and the number of drill retractions if the drill bit was retracted 3 or more times during the drilling phase; and
retracting the drill bit from the borehole.
10. The method of claim 3, further comprising choosing said end of hole water control routine when said monitored drill depth meets a predetermined specification for drill depth.
11. The method of claim 10, wherein said end of hole water control routine comprises deactivating a water injection system when a drill bit is within a predetermined distance from a bottom of the borehole.
12. The method of claim 1, further comprising performing a collaring routine after said initiating a drilling phase.
13. The method of claim 12, wherein performing a collaring routine further comprises:
performing a first phase collaring operation from a surface start until one or both of a penetration rate drops below a predetermined penetration rate and a drill bit reaches a maximum collaring depth; and
performing a second phase collaring operation after the penetration rate drops below the predetermined penetration rate.
14. The method of claim 1, further comprising:
initiating a retraction phase;
monitoring at least one drill parameter during the retraction phase;
determining whether the monitored drill parameter is within a predetermined specification for the monitored drill parameter;
choosing a retraction phase defect mitigation routine based on the monitored drill parameter when the monitored drill parameter outside the predetermined specification; and
implementing the retraction phase defect mitigation routine.
15. The method of claim 14, wherein monitoring a drill parameter comprises monitoring one or more drill parameters selected from the group consisting of drill rotational speed, drill torque, hoist speed, and number of drill retractions.
16. The method of claim 15, wherein choosing a retraction phase defect mitigation routine further comprises choosing one or more retraction phase defect mitigation routines selected from the group consisting of drill bit hang-up protection, torque monitoring, and hole clean-out.
17. The method of claim 16, further comprising choosing said drill bit hang-up protection routine when one or both of said monitored drill rotational speed is outside a predetermined specification for drill rotational speed and said monitored hoist speed is outside a predetermined specification for hoist speed.
18. The method of claim 17, wherein said drill bit hang-up protection routine comprises:
increasing the rotational speed of a drill bit;
lowering the drill bit;
determining whether the drill bit is freed; and
raising the drill bit at a reduced hoist speed.
19. The method of claim 18, further comprising:
alternately applying to the drill bit a down hoist force and an up hoist force; and
activating a water injection system if the drill bit is not freed after said alternately applying down and up hoist forces.
20. The method of claim 17, further comprising choosing said torque monitoring routine when said monitored drill torque is outside a predetermined specification for drill torque.
21. The method of claim 20, wherein said torque monitoring routine comprises:
performing said hole clean-out routine;
retracting a drill bit from the borehole;
resuming the drilling phase; and
performing an end of hole spin-out routine.
22. The method of claim 16, further comprising choosing said hole clean-out routine when one or more of said monitored drill retractions is outside a predetermined specification for drill retractions, said monitored hoist speed is outside a predetermined specification for hoist speed, and said monitored drill torque is outside a predetermined specification for drill torque.
23. The method of claim 22, wherein said hole clean-out routine comprises:
lowering a drill bit to a position above a bottom of the borehole;
rotating the drill bit for a spin-out period if the drill bit was retracted two or fewer times during the drilling phase;
rotating the drill bit for a product of the spin-out period and the number of drill retractions if the drill bit was retracted at least 3 times during the drilling phase; and
retracting the drill bit from the borehole.
24. A system for drilling a borehole, comprising:
a drill rig comprising a drill, an air injection system, and a water injection system;
a control system operatively associated with said drill rig, said control system receiving information from said drill rig relating to at least one drill parameter, controlling said drill rig, storing program steps for program control, and processing data;
said control system processing information relating to the drill parameter, determining whether the drill parameter is within a predetermined specification for the monitored drill parameter, choosing a hole defect mitigation routine based on the monitored drill parameter when the monitored drill parameter is outside the predetermined specification, said control system controlling said drill rig to implement the chosen hole defect mitigation routine.
25. The system of claim 24, wherein said hole defect mitigation routine comprises at least one drilling phase defect mitigation routine and at least one retraction phase defect mitigation routine.
26. The system of claim 25, wherein said drilling phase defect mitigation routine comprises one or more selected from the group consisting of air pressure protection, rotary stall protection, end of hole spin-out, and end of hole water control.
27. The system of claim 26, wherein said control system monitors one or more drill parameters selected from the group consisting of air pressure, drill rotational speed, drill torque, drill depth, and number of drill retractions.
28. The system of claim 27, wherein said control system implements said air pressure protection routine when said monitored air pressure is outside a predetermined specification for air pressure.
29. The system of claim 27, wherein said control system implements said rotary stall protection routine when one or both of said monitored drill rotational speed is outside a predetermined specification for rotational speed and said drill torque is outside a predetermined specification for drill torque.
30. The system of claim 27, wherein said control system implements said end of hole spin-out routine when said monitored number of drill retractions during the drilling phase is outside a predetermined specification for number of drill retractions.
31. The system of claim 27, wherein said control system implements said end of hole water control routine when said monitored drill depth exceeds a predetermined specification for drill depth.
32. The system of claim 27, wherein said retraction phase defect mitigation routine comprises one or more selected from the group consisting of drill bit hang-up protection, torque monitoring, and hole clean-out.
33. The system of claim 32 wherein said control system monitors one or more drill parameters selected from the group consisting of drill rotational speed, drill torque, hoist speed, and number of drill retractions.
34. The system of claim 33, wherein said control system implements said drill bit hang-up protection routine when one or both of said monitored drill rotational speed is outside a predetermined specification for drill rotational speed and said monitored hoist speed is outside a predetermined specification for hoist speed.
35. The system of claim 33, wherein said control system implements said torque monitoring routine when said monitored drill torque is outside a predetermined specification for drill torque.
36. The system of claim 33, wherein said control system implements said hole clean-out routine when one or more of said monitored drill retractions is outside a predetermined specification for drill retractions, said monitored hoist speed is outside a predetermined specification for hoist speed, and said monitored drill torque is outside a predetermined specification for drill torque.
37. A method for drilling a borehole, comprising:
monitoring a drill parameter;
using the monitored drill parameter to draw a conclusion about a borehole characteristic;
choosing a defect mitigation routine based on the borehole characteristic; and
implementing the defect mitigation routine.
38. The method of claim 37, wherein monitoring a drill parameter is conducted during a drilling phase.
39. The method of claim 38, wherein monitoring a drill parameter comprises monitoring one or more drill parameters selected from the group consisting of air pressure, drill rotational speed, drill torque, drill depth, and number of drill retractions.
40. The method of claim 39, wherein choosing a defect mitigation routine further comprises choosing one or more defect mitigation routines selected from the group consisting of air pressure protection, rotary stall protection, end of hole spin-out, and end of hole water control.
41. The method of claim 37, wherein monitoring a drill parameter is conducted during a retraction'phase.
42. The method of claim 41, wherein monitoring a drill parameter comprises monitoring one or more drill parameters selected from the group consisting of drill rotational speed, drill torque, hoist speed, and number of drill retractions.
43. The method of claim 42, wherein choosing a defect mitigation routine further comprises choosing one or more retraction phase defect mitigation routines selected from the group consisting of drill bit hang-up protection, torque monitoring, and hole clean-out.
US12/616,399 2009-11-11 2009-11-11 Methods and systems for drilling boreholes Abandoned US20110108323A1 (en)

Priority Applications (18)

Application Number Priority Date Filing Date Title
US12/616,399 US20110108323A1 (en) 2009-11-11 2009-11-11 Methods and systems for drilling boreholes
US12/940,577 US8261855B2 (en) 2009-11-11 2010-11-05 Methods and systems for drilling boreholes
AU2010319730A AU2010319730C1 (en) 2009-11-11 2010-11-08 Methods and systems for drilling boreholes
BR112012011271-6A BR112012011271B1 (en) 2009-11-11 2010-11-08 Method for lining a well
BR122013028906-2A BR122013028906B1 (en) 2009-11-11 2010-11-08 Computer readable medium related to drilling a well
BR122013028913-5A BR122013028913B1 (en) 2009-11-11 2010-11-08 Non-transient computer readable medium related to casing a well
BR122013028904-6A BR122013028904B1 (en) 2009-11-11 2010-11-08 Method for drilling a well
PCT/US2010/055808 WO2011059912A1 (en) 2009-11-11 2010-11-08 Methods and systems for drilling boreholes
CL2012001220A CL2012001220A1 (en) 2009-11-11 2012-05-10 Method for drilling the ground in which a drilling parameter is monitored during the drilling phase to determine if it is within a predetermined specification, choosing and implementing a defect mitigation routine when such parameter is outside said specification; and associated system.
US13/524,608 US8567523B2 (en) 2009-11-11 2012-06-15 Methods and systems for drilling boreholes
US13/524,631 US8261856B1 (en) 2009-11-11 2012-06-15 Methods and systems for drilling boreholes
US13/524,623 US9316053B2 (en) 2009-11-11 2012-06-15 Methods and systems for drilling boreholes
US14/045,553 US9194183B2 (en) 2009-11-11 2013-10-03 Methods and systems for drilling boreholes
AU2015200749A AU2015200749C1 (en) 2009-11-11 2015-02-13 Methods and systems for drilling boreholes
US14/926,802 US9995128B2 (en) 2009-11-11 2015-10-29 Methods and systems for drilling boreholes
AU2017248445A AU2017248445B2 (en) 2009-11-11 2017-10-17 Methods and systems for drilling boreholes
US15/988,287 US10494868B2 (en) 2009-11-11 2018-05-24 Methods and systems for drilling boreholes
AU2019206072A AU2019206072B2 (en) 2009-11-11 2019-07-18 Methods and systems for drilling boreholes

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US12/616,399 US20110108323A1 (en) 2009-11-11 2009-11-11 Methods and systems for drilling boreholes

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US12/940,577 Continuation-In-Part US8261855B2 (en) 2009-11-11 2010-11-05 Methods and systems for drilling boreholes

Publications (1)

Publication Number Publication Date
US20110108323A1 true US20110108323A1 (en) 2011-05-12

Family

ID=43973309

Family Applications (1)

Application Number Title Priority Date Filing Date
US12/616,399 Abandoned US20110108323A1 (en) 2009-11-11 2009-11-11 Methods and systems for drilling boreholes

Country Status (1)

Country Link
US (1) US20110108323A1 (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120253518A1 (en) * 2009-11-11 2012-10-04 Flanders Electric, Ltd. Methods and systems for drilling boreholes
US9458683B2 (en) 2012-11-19 2016-10-04 Key Energy Services, Llc Mechanized and automated well service rig system
CN106438533A (en) * 2016-11-12 2017-02-22 湘潭大学 Automatic anti-clamping hydraulic control system of electric proportional control rock drill
CN106438532A (en) * 2016-11-12 2017-02-22 湘潭大学 Electric proportional control type rock drill rock drilling efficiency automatic control system
US10062044B2 (en) * 2014-04-12 2018-08-28 Schlumberger Technology Corporation Method and system for prioritizing and allocating well operating tasks
US11401795B2 (en) 2019-07-19 2022-08-02 Caterpillar Global Mining Equipment Llc Collar control system for mobile drilling machines
US11480014B2 (en) * 2019-12-13 2022-10-25 Caterpillar Global Mining Equipment Llc Automatic force adjustment control system for mobile drilling machines
CN116065950A (en) * 2022-12-08 2023-05-05 大庆石油管理局有限公司 Intelligent drilling construction process based on oil gas development engineering driller surface layer construction
WO2023205432A1 (en) * 2022-04-21 2023-10-26 Ojjo, Inc. Systems, methods, and machines for detecting and mitigating drill stalls

Citations (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3613805A (en) * 1969-09-03 1971-10-19 Bucyrus Erie Co Automatic control for rotary drill
US3670826A (en) * 1970-09-11 1972-06-20 Gardner Denver Co Control system for drills
US4809791A (en) * 1988-02-08 1989-03-07 The University Of Southwestern Louisiana Removal of rock cuttings while drilling utilizing an automatically adjustable shaker system
US5348106A (en) * 1991-01-03 1994-09-20 Tamrock Oy Method of drilling a hole in a rock
US5358058A (en) * 1993-09-27 1994-10-25 Reedrill, Inc. Drill automation control system
US5445229A (en) * 1994-09-12 1995-08-29 Delima; Robert L. Method and apparatus for drilling, cracking, and withdrawing earth cores
US5449047A (en) * 1994-09-07 1995-09-12 Ingersoll-Rand Company Automatic control of drilling system
US6209661B1 (en) * 1996-11-27 2001-04-03 Sandvik Tamrock Oy Method and arrangement for controlling feed in rock drilling
US20010050186A1 (en) * 1998-11-24 2001-12-13 Wilson Henry E. Enhanced computer control of in-situ drilling system
US20030056983A1 (en) * 1999-09-24 2003-03-27 Vermeer Manufacturing Company Underground drilling device and method employing down-hole radar
US6866106B2 (en) * 1995-12-08 2005-03-15 University Of Queensland Fluid drilling system with flexible drill string and retro jets
US7090037B2 (en) * 2001-01-10 2006-08-15 Shell Oil Company Device for anchoring a drill string in a borehole
US20060272861A1 (en) * 2002-04-19 2006-12-07 Hutchinson Mark W Method for improving drilling depth measurements
US7228899B2 (en) * 2003-02-14 2007-06-12 Key Energy Services, Inc. Warning device and method to prevent clutch burning
US7243735B2 (en) * 2005-01-26 2007-07-17 Varco I/P, Inc. Wellbore operations monitoring and control systems and methods
US20070242565A1 (en) * 2005-11-21 2007-10-18 Hall David R Downhole Pressure Pulse Activated by Jack Element
US20080000688A1 (en) * 2006-07-03 2008-01-03 Mcloughlin Stephen John Adaptive apparatus, system and method for communicating with a downhole device
US7350593B1 (en) * 2006-11-07 2008-04-01 Schramm, Inc. Electronically controlled earth drilling rig
US20090126994A1 (en) * 2007-11-15 2009-05-21 Tibbitts Gordon A Method And System For Controlling Force In A Down-Hole Drilling Operation
US20090266608A1 (en) * 2008-04-26 2009-10-29 Schlumberger Technology Corporation Torsional resonance prevention
US7762352B2 (en) * 2004-12-10 2010-07-27 Atlas Copco Rock Drills Ab Arrangement and method for controlling drilling parameters

Patent Citations (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3613805A (en) * 1969-09-03 1971-10-19 Bucyrus Erie Co Automatic control for rotary drill
US3670826A (en) * 1970-09-11 1972-06-20 Gardner Denver Co Control system for drills
US4809791A (en) * 1988-02-08 1989-03-07 The University Of Southwestern Louisiana Removal of rock cuttings while drilling utilizing an automatically adjustable shaker system
US5348106A (en) * 1991-01-03 1994-09-20 Tamrock Oy Method of drilling a hole in a rock
US5358058A (en) * 1993-09-27 1994-10-25 Reedrill, Inc. Drill automation control system
US5465798A (en) * 1993-09-27 1995-11-14 Reedrill, Inc. Drill automation control system
US5449047A (en) * 1994-09-07 1995-09-12 Ingersoll-Rand Company Automatic control of drilling system
US5445229A (en) * 1994-09-12 1995-08-29 Delima; Robert L. Method and apparatus for drilling, cracking, and withdrawing earth cores
US6866106B2 (en) * 1995-12-08 2005-03-15 University Of Queensland Fluid drilling system with flexible drill string and retro jets
US6209661B1 (en) * 1996-11-27 2001-04-03 Sandvik Tamrock Oy Method and arrangement for controlling feed in rock drilling
US20010050186A1 (en) * 1998-11-24 2001-12-13 Wilson Henry E. Enhanced computer control of in-situ drilling system
US20030056983A1 (en) * 1999-09-24 2003-03-27 Vermeer Manufacturing Company Underground drilling device and method employing down-hole radar
US7090037B2 (en) * 2001-01-10 2006-08-15 Shell Oil Company Device for anchoring a drill string in a borehole
US20060272861A1 (en) * 2002-04-19 2006-12-07 Hutchinson Mark W Method for improving drilling depth measurements
US7228899B2 (en) * 2003-02-14 2007-06-12 Key Energy Services, Inc. Warning device and method to prevent clutch burning
US7762352B2 (en) * 2004-12-10 2010-07-27 Atlas Copco Rock Drills Ab Arrangement and method for controlling drilling parameters
US7243735B2 (en) * 2005-01-26 2007-07-17 Varco I/P, Inc. Wellbore operations monitoring and control systems and methods
US20070242565A1 (en) * 2005-11-21 2007-10-18 Hall David R Downhole Pressure Pulse Activated by Jack Element
US7464772B2 (en) * 2005-11-21 2008-12-16 Hall David R Downhole pressure pulse activated by jack element
US20080000688A1 (en) * 2006-07-03 2008-01-03 Mcloughlin Stephen John Adaptive apparatus, system and method for communicating with a downhole device
US7350593B1 (en) * 2006-11-07 2008-04-01 Schramm, Inc. Electronically controlled earth drilling rig
US20090126994A1 (en) * 2007-11-15 2009-05-21 Tibbitts Gordon A Method And System For Controlling Force In A Down-Hole Drilling Operation
US20090266608A1 (en) * 2008-04-26 2009-10-29 Schlumberger Technology Corporation Torsional resonance prevention

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120253518A1 (en) * 2009-11-11 2012-10-04 Flanders Electric, Ltd. Methods and systems for drilling boreholes
US20120255775A1 (en) * 2009-11-11 2012-10-11 Flanders Electric, Ltd. Methods and systems for drilling boreholes
US8567523B2 (en) * 2009-11-11 2013-10-29 Flanders Electric Motor Service, Inc. Methods and systems for drilling boreholes
US9194183B2 (en) 2009-11-11 2015-11-24 Flanders Electric Motor Services, Inc. Methods and systems for drilling boreholes
US9316053B2 (en) * 2009-11-11 2016-04-19 Flanders Electric Motor Service, Inc. Methods and systems for drilling boreholes
US10494868B2 (en) 2009-11-11 2019-12-03 Flanders Electric Motor Service, Inc. Methods and systems for drilling boreholes
US9657538B2 (en) 2012-11-19 2017-05-23 Key Energy Services, Llc Methods of mechanized and automated tripping of rods and tubulars
US9562406B2 (en) 2012-11-19 2017-02-07 Key Energy Services, Llc Mechanized and automated well service rig
US9605498B2 (en) 2012-11-19 2017-03-28 Key Energy Services, Llc Rod and tubular racking system
US9611707B2 (en) 2012-11-19 2017-04-04 Key Energy Services, Llc Tong system for tripping rods and tubulars
US9470050B2 (en) 2012-11-19 2016-10-18 Key Energy Services, Llc Mechanized and automated catwalk system
US9458683B2 (en) 2012-11-19 2016-10-04 Key Energy Services, Llc Mechanized and automated well service rig system
US10062044B2 (en) * 2014-04-12 2018-08-28 Schlumberger Technology Corporation Method and system for prioritizing and allocating well operating tasks
CN106438533A (en) * 2016-11-12 2017-02-22 湘潭大学 Automatic anti-clamping hydraulic control system of electric proportional control rock drill
CN106438532A (en) * 2016-11-12 2017-02-22 湘潭大学 Electric proportional control type rock drill rock drilling efficiency automatic control system
US11401795B2 (en) 2019-07-19 2022-08-02 Caterpillar Global Mining Equipment Llc Collar control system for mobile drilling machines
US11480014B2 (en) * 2019-12-13 2022-10-25 Caterpillar Global Mining Equipment Llc Automatic force adjustment control system for mobile drilling machines
WO2023205432A1 (en) * 2022-04-21 2023-10-26 Ojjo, Inc. Systems, methods, and machines for detecting and mitigating drill stalls
CN116065950A (en) * 2022-12-08 2023-05-05 大庆石油管理局有限公司 Intelligent drilling construction process based on oil gas development engineering driller surface layer construction

Similar Documents

Publication Publication Date Title
US10494868B2 (en) Methods and systems for drilling boreholes
US20110108323A1 (en) Methods and systems for drilling boreholes
CA2889130C (en) Systems and methods for hydraulic balancing downhole cutting tools
NO20161076A1 (en) A method for energy efficient and fast rotary drilling in inhomogeneous and/or hard rock formations
AU2019206072B2 (en) Methods and systems for drilling boreholes
US9027643B2 (en) Method of removing cutters
US20210404324A1 (en) Tagging assembly including a sacrificial stop component
RU2703013C1 (en) Method for drilling of process equipment elements in well
CN108060902B (en) Stuck freeing salvaging method
Larisch Comparison of different hard rock drilling methods for bored piles
CN117627657A (en) Construction method for large-diameter shaft well reversing drill in soft rock area
US20110240378A1 (en) Tapered Blade Profile on an Outer Bit
NO20190949A1 (en) Tool and metod of reducing friction of casing or disintegrating cement

Legal Events

Date Code Title Description
AS Assignment

Owner name: FLANDERS ELECTRIC, LTD., TEXAS

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:STACY, EDWARD CURTIS, II;REEL/FRAME:023541/0546

Effective date: 20091106

STCB Information on status: application discontinuation

Free format text: EXPRESSLY ABANDONED -- DURING EXAMINATION

AS Assignment

Owner name: FLANDERS ELECTRIC MOTOR SERVICE, INC., INDIANA

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:FLANDERS ELECTRIC, LTD.;REEL/FRAME:032181/0487

Effective date: 20140130

AS Assignment

Owner name: U.S. BANK NATIONAL ASSOCIATION, GEORGIA

Free format text: SECURITY INTEREST;ASSIGNOR:FLANDERS ELECTRIC MOTOR SERVICE, INC.;REEL/FRAME:034572/0346

Effective date: 20141222

AS Assignment

Owner name: FLANDERS ELECTRIC MOTOR SERVICE, INC., INDIANA

Free format text: RELEASE BY SECURED PARTY;ASSIGNOR:U.S. BANK NATIONAL ASSOCIATION;REEL/FRAME:055301/0290

Effective date: 20170928