US20120208581A1 - Distributed antenna system base station and radio resource control method - Google Patents

Distributed antenna system base station and radio resource control method Download PDF

Info

Publication number
US20120208581A1
US20120208581A1 US13/359,994 US201213359994A US2012208581A1 US 20120208581 A1 US20120208581 A1 US 20120208581A1 US 201213359994 A US201213359994 A US 201213359994A US 2012208581 A1 US2012208581 A1 US 2012208581A1
Authority
US
United States
Prior art keywords
antenna
mobile terminal
antennas
cluster
identification information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US13/359,994
Inventor
Hitoshi Ishida
Kenzaburo Fujishima
Yunjian Jia
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Original Assignee
Hitachi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd filed Critical Hitachi Ltd
Assigned to HITACHI, LTD. reassignment HITACHI, LTD. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: FUJISHIMA, KENZABURO, ISHIDA, HITOSHI, JIA, YUNJIAN
Publication of US20120208581A1 publication Critical patent/US20120208581A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04BTRANSMISSION
    • H04B7/00Radio transmission systems, i.e. using radiation field
    • H04B7/02Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas
    • H04B7/04Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas
    • H04B7/06Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas at the transmitting station
    • H04B7/0686Hybrid systems, i.e. switching and simultaneous transmission
    • H04B7/0691Hybrid systems, i.e. switching and simultaneous transmission using subgroups of transmit antennas
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04BTRANSMISSION
    • H04B7/00Radio transmission systems, i.e. using radiation field
    • H04B7/02Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas
    • H04B7/04Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas
    • H04B7/08Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas at the receiving station
    • H04B7/0802Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas at the receiving station using antenna selection
    • H04B7/0834Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas at the receiving station using antenna selection based on external parameters, e.g. subscriber speed or location
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L5/00Arrangements affording multiple use of the transmission path
    • H04L5/0001Arrangements for dividing the transmission path
    • H04L5/0014Three-dimensional division
    • H04L5/0023Time-frequency-space
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/04Wireless resource allocation
    • H04W72/044Wireless resource allocation based on the type of the allocated resource
    • H04W72/046Wireless resource allocation based on the type of the allocated resource the resource being in the space domain, e.g. beams
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W88/00Devices specially adapted for wireless communication networks, e.g. terminals, base stations or access point devices
    • H04W88/08Access point devices
    • H04W88/085Access point devices with remote components

Landscapes

  • Engineering & Computer Science (AREA)
  • Signal Processing (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

Disclosed is a distributed antenna system that selects an antenna in accordance with the position of a mobile terminal and reduces the variation in the total number of mobile terminals using each antenna while maintaining adequate communication quality. In the distributed antenna system in which a large number of antennas are distributively disposed, an antenna group including antennas having good communication quality is selected in accordance with the position of a mobile terminal. Further, in accordance with the communication quality and load status of a current antenna group and with the communication quality and load status of a post-change antenna group, which is obtained by changing some antennas in the current antenna group, the post-change antenna group is formed by changing some antennas in the current antenna group with which a mobile terminal using a heavily loaded antenna communicates.

Description

    CLAIM OF PRIORITY
  • The present application claims priority from Japanese patent application JP 2011-027128 filed on Feb. 10, 2011, the content of which is hereby incorporated by reference into this application.
  • FIELD OF THE INVENTION
  • The present invention relates to a distributed antenna system, a base station, and a radio resource control method. More particularly, the present invention relates to a distributed antenna system in which antennas are distributively disposed, a base station in the distributed antenna system, and a radio resource control method.
  • BACKGROUND OF THE INVENTION
  • It is demanded that the data rate of a cellular system be further increased. Thus, a radio communication system compliant with LTE (Long Term Evolution) specifications, which provide a maximum data rate higher than 100 Mbps, has begun to be commercialized. LTE provides improved multipath resistance by using OFDMA (Orthogonal Frequency Division Multiple Access) for downlink access and SC-FDMA (Single Carrier-Frequency Division Multiple Access) for uplink access. In addition, a MIMO (Multiple-Input Multiple-Output) transmission method, which allows a transceiver and a receiver to use multiple antennas, is introduced to provide increased frequency usage efficiency.
  • In the cellular system, the communication quality of a cell-edge terminal, which is positioned at a distance from a base station transmitting a desired signal, deteriorates due to a signal power decrease caused by path loss and an interference power increase caused by a decreased distance to a neighboring base station.
  • To reduce the degree of communication quality deterioration of the cell-edge terminal, that is, the place dependency of communication quality, LTE-Advanced, which is an advanced standard of LTE, is being standardized to offer a CoMP (Coordinated Multi Point transmission and reception) technology and a Relay technology. The CoMP technology provides coordinated transmission and reception between base stations to reduce inter-cell interference. The Relay technology relays a signal transmitted from a base station to expand a coverage area. The LTE-Advanced standard is described in 3GPP, “Feasibility Study for Further Advancements for E-UTRA (LTE-Advanced) (Release 9)”, TR 36.912.V9.3.0, 2010/06, pp. 17-20, http://www 3gpp.org/ftp/Specs/html-info/36912.htm.
  • A DAS (Distributed Antenna System) is known as another technology for reducing the place dependency of communication quality.
  • FIG. 1 shows an example of a distributed antenna system. In the distributed antenna system, a large number of base station antennas 1-1 to 1-12 are distributively disposed within a service area. Individual mobile terminals (MTs) 2-1 to 2-6 establish communication by using an antenna group that includes multiple antennas. The antenna group is referred to as a cluster 3. The distributed antenna system is capable of preventing signal power from being decreased by path loss by reducing the distance between the base station antennas and the mobile terminals. This makes it possible to reduce communication quality variation with the position of a mobile terminal (MT). In the distributed antenna system in which the coverage area of a cluster 3 is fixed (a fixed cluster is used) as shown in FIG. 1, however, the communication quality of a mobile terminal positioned at a boundary between clusters, such as a mobile terminal 2-4 shown in FIG. 1, may deteriorate due to significant interference from a neighboring cluster, as is the case with a conventional cellular system.
  • SUMMARY OF THE INVENTION
  • To achieve communication quality independent of the position of a mobile terminal, it is necessary to not only use the distributed antenna system but also select an appropriate antenna group in accordance with the position of each mobile terminal. In other words, it is necessary to form a cluster that dynamically changes in accordance with individual mobile terminals. When such a cluster is formed, it is possible to not only reduce the propagation loss of a desired signal but also increase the propagation loss of an interference signal, thereby improving the SINR (Signal to Interference plus Noise power Ratio). It means that communication quality independent of the position of a mobile terminal can be provided.
  • A method of selecting an appropriate antenna for each mobile terminal is described in Japanese Unexamined Patent Application Publication No. 2007-53768. According to the method described in Japanese Unexamined Patent Application Publication No. 2007-53768, the capacity of a system can be increased by selecting an appropriate antenna for each mobile terminal.
  • Factors determining the throughput of each mobile terminal include the amount of available time-frequency resource per mobile terminal in addition to communication quality. An LTE or other cellular system that uses OFDMA or SC-FDMA divides a time or frequency resource to establish communication between mobile terminals belonging to the same cell. Therefore, the amount of available time-frequency resource per mobile terminal decreases in inverse proportion to the number of mobile terminals belonging to each cell. This also holds true for a distributed antenna system having fixed clusters as shown in FIG. 1. In other words, the amount of time-frequency resource per mobile terminal decreases in inverse proportion to the number of mobile terminals belonging to the same cluster.
  • Meanwhile, in the case of a distributed antenna system having dynamic clusters that permit free antenna selection in accordance with the position of a mobile terminal, a cluster formed for individual mobile terminals may involve a subset of antennas of another cluster. In other words, multiple clusters may share one antenna. If the same antenna transmits data for multiple mobile terminals by using the same time-frequency resource, significant interference may occur between the data transmissions for the mobile terminals. Therefore, it is necessary to divide the time-frequency resource between the clusters sharing the same antenna. As a result, the available time-frequency resource per mobile terminal depends on not only the number of mobile terminals belonging to the same cluster but also the number of mobile terminals that have selected different clusters sharing the same antenna.
  • When, in the above instance, multiple clusters share the same antenna, the total number of mobile terminals using a certain antenna is the total number of mobile terminals belonging to all clusters sharing the antenna. In general, the total number of mobile terminals using the antenna varies from one antenna to another within a cluster. In the distributed antenna system having dynamic clusters, therefore, the time-frequency resource per mobile terminal decreases in inverse proportion to the maximum total number of mobile terminals using the individual antennas within the clusters. Consequently, if an antenna is selected by a large number of mobile terminals, the amount of time-frequency resource available to each mobile terminal having selected the antenna decreases. In other words, although communication quality is improved by an appropriate antenna selection, the throughput may decrease in some cases due to a decrease in the amount of time-frequency resource.
  • A load balancing method to be employed when a large number of mobile terminals (loads) are placed in a particular base station area, cell, or sector within a conventional cellular system is described in Japanese Unexamined Patent Application Publication No. Hei 5 (1993)-344048. According to the method described in Japanese Unexamined Patent Application Publication No. Hei 5 (1993)-344048, load balancing is accomplished by changing the connection between an antenna and a base station. More specifically, if load concentration occurs in relation to a base station, the number of antennas connected to the base station is decreased to reduce its coverage area and decrease the number of mobile terminals connected to the base station. Further, the number of antennas connected to a lightly-loaded base station is increased to expand its coverage area and increase the number of mobile terminals connected to the base station.
  • However, when the square measure or shape of the coverage area of a cell or sector is changed by a conventional method of controlling load balancing between base stations, a mobile terminal previously positioned at the center of the area may be placed at a boundary of a new area. As a result, communication quality may deteriorate. In other words, even after load balancing, the throughput may decrease due to the deterioration of the communication quality. Further, a mobile terminal placed within the coverage area of a new cell or sector due to a change in the square measure or shape of an area need to perform handover to the new cell or sector to which it belongs. It means that multiple mobile terminals simultaneously perform handover procedure. This may result in an increase in the amount of control traffic.
  • Furthermore, when the conventional load balancing control method is employed, multiple cells or sectors are not supposed to simultaneously share some antennas. Therefore, the conventional load balancing control method cannot be applied to a distributed antenna system that makes an antenna selection in accordance with the position of a mobile terminal.
  • To address the above-described problem, it is necessary to provide a system that increases the amount of available time-frequency resource per mobile terminal and raises the throughput achievable by mobile terminals by reducing the variation in the total number of mobile terminals using each antenna while maintaining adequate communication quality.
  • The present invention has been made in view of the above circumstances and improves, for instance, the communication quality of a mobile terminal in a distributed antenna system by selecting an antenna group in accordance with the position of the mobile terminal. The present invention also increases the amount of time-frequency resource available to each mobile terminal and provides increased throughput by reducing the variation in the number of mobile terminals while preventing the deterioration of communication quality.
  • According to one aspect of the present invention, there is provided a distributed antenna system including a base station that uses a large number of distributively disposed antennas. When an antenna group including multiple antennas having good communication quality is to be selected in accordance with a mobile terminal, the configuration of antennas included in the antenna group and in at least one of the other antenna groups is changed in accordance with the load on the antennas included in the antenna group.
  • For example, the base station changes some antennas in an antenna group with which a mobile terminal using a heavily loaded antenna communicates, in accordance with the communication quality and load status of a current antenna group and with the communication quality and load status of the antenna group altered by changing some of its antennas.
  • According to another aspect of the present invention, there is provided a distributed antenna system including a base station that transmits and receives data by using multiple antennas disposed in the distributed antenna system. Multiple clusters including one or more of some of the antennas are formed in accordance with the position of a mobile terminal. At least two clusters share at least one antenna. The base station provisionally determines a first antenna and a second antenna for a first mobile terminal and a first cluster containing the first antenna and the second antenna when a new communication is initiated or a mobile terminal is moved, formulates an overload judgment to determine whether the provisionally determined first and second antennas are overloaded. When the first antenna is judged to be overloaded, the base station selects a third antenna and a fourth antenna as changed communication antennas for a second mobile terminal communicating with the first and third antennas and a second cluster containing the third and fourth antennas as a change destination cluster for load reduction purposes. The base station selects the provisionally determined first and second antennas and the first cluster as the antennas and cluster for the first mobile terminal. The base station conveys at least one of identification information about the selected first and second antennas and identification information about the first cluster to the first mobile terminal, and conducts subsequent communication by using the antennas whose identification information has been conveyed. The base station conveys at least one of identification information about the third and fourth antennas, which are selected as change destinations, and identification information about the second cluster to the second mobile terminal, and conducts subsequent communication by using the antennas whose identification information has been conveyed.
  • According to another aspect of the present invention, there is provided a base station for a distributed antenna system. The base station transmits and receives data by using multiple antennas disposed in the distributed antenna system in which multiple clusters including one or more of some of the antennas are formed in accordance with the position of a mobile terminal, and at least two clusters share at least one antenna. The base station includes a radio resource control unit that changes some of the antennas communicating with a mobile terminal in accordance with the load status, communication quality, throughput, or data rate of each antenna. The radio resource control unit provisionally determines a first antenna and a second antenna for a first mobile terminal and a first cluster containing the first antenna and the second antenna when a new communication is initiated or a mobile terminal is moved, formulates an overload judgment to determine whether the provisionally determined first and second antennas are overloaded. When the first antenna is judged to be overloaded, the radio resource control unit selects a third antenna and a fourth antenna as changed communication antennas for a second mobile terminal communicating with the first and third antennas and a second cluster containing the third and fourth antennas as a change destination cluster for load reduction purposes. The radio resource control unit selects the provisionally determined first and second antennas and the first cluster as the antennas and cluster for the first mobile terminal. The radio resource control unit conveys at least one of identification information about the selected first and second antennas and identification information about the first cluster to the first mobile terminal, and conducts subsequent communication by using the antennas whose identification information has been conveyed. The radio resource control unit conveys at least one of identification information about the third and fourth antennas, which are selected as change destinations, and identification information about the second cluster to the second mobile terminal, and conducts subsequent communication by using the antennas whose identification information has been conveyed.
  • According to still another aspect of the present invention, there is provided a radio resource control method for a distributed antenna system that includes a base station. The base station transmits and receives data by using multiple antennas disposed in the distributed antenna system in which multiple clusters including one or more of some of the antennas are formed in accordance with the position of a mobile terminal, and at least two clusters share at least one antenna. The radio resource control method including the steps of: causing the base station to provisionally determine a first antenna and a second antenna for a first mobile terminal and a first cluster containing the first antenna and the second antenna when a new communication is initiated or a mobile terminal is moved; causing the base station to formulate an overload judgment to determine whether the provisionally determined first and second antennas are overloaded; when the first antenna is judged to be overloaded, causing the base station to select a third antenna and a fourth antenna as changed communication antennas for a second mobile terminal communicating with the first and third antennas and a second cluster containing the third and fourth antennas as a change destination cluster for load reduction purposes; causing the base station to select the provisionally determined first and second antennas and the first cluster as the antennas and cluster for the first mobile terminal; causing the base station to convey at least one of identification information about the selected first and second antennas and identification information about the first cluster to the first mobile terminal, and conduct subsequent communication by using the antennas whose identification information has been conveyed; and causing the base station to convey at least one of identification information about the third and fourth antennas, which are selected as change destinations, and identification information about the second cluster to the second mobile terminal, and conduct subsequent communication by using the antennas whose identification information has been conveyed.
  • In the above-described distributed antenna system, before the provisional determination concerning an antenna change due to an initial access mobile terminal, the base station, upon receipt of an initial access signal from the first mobile terminal, estimates the antenna-specific received power of the initial access signal and sends a response signal to the first mobile terminal. Upon receipt of a mobile terminal-specific identification signal from the first mobile terminal, the base station can identify the first mobile terminal and provisionally determine the first and second antennas (a1, a2) for the first mobile terminal and the first cluster (n1) containing the first and second antennas (a1, a2) in accordance with the antenna-specific received power estimated from the initial access signal from the first mobile terminal.
  • In the above-described distributed antenna system, before the provisional determination concerning an antenna change (detected on the base station side) due to a moved mobile terminal, in a state where the first and second mobile terminals are communicating with the base station by respectively using the zeroth and second antennas (a0, a2) and the first and third antennas (a1, a3), the base station estimates the reception quality of a candidate antenna to change for each mobile terminal in accordance with a reference signal transmitted from the first and second mobile terminals on a periodic basis or at a predetermined timing. When the first mobile terminal is moved to change the reception quality of each antenna so that the base station detects that the first antenna (a1), which is a change destination candidate, has higher reception quality for the first mobile terminal than the zeroth antenna (a0), which is currently engaged in communication, in accordance with the result of estimation of the change destination candidate, the base station can provisionally select the first and second antennas (a1, a2) as changed antennas for the first mobile terminal and the first cluster (n1) containing the first and second antennas (a1, a2) as a change destination cluster.
  • In the above-described distributed antenna system, before the provisional determination concerning an antenna change (detected on the mobile terminal side) due to a moved mobile terminal, the base station transmits a downlink reference signal in such a manner that individual antennas can be distinguished from each other. Each mobile terminal measures the reception quality of a candidate antenna to change in addition to the reception quality of an antenna in a cluster currently engaged in communication by using the downlink reference signal transmitted from the base station. When the first mobile terminal detects that the first antenna (a1) has higher reception quality than the zeroth antenna (a0), which is currently engaged in communication, the first mobile terminal notifies the identification information and reception quality information about currently communicating antennas (a0, a2) and the identification information and reception quality information about a candidate antenna to change (a1). In accordance with the result of measurement of the reception quality of each antenna, which is notified from the first mobile terminal, the base station can provisionally select the first and second antennas (a1, a2) as changed antennas for the first mobile terminal and the first cluster (n1) containing the first and second antennas (a1, a2) as a change destination cluster.
  • According to an aspect of the present invention, the distributed antenna system can improve the communication quality of a mobile terminal by selecting an antenna group having low propagation loss in accordance with the position of the mobile terminal. Further, according to an aspect of the present invention, the variation in the number of mobile terminals can be reduced while preventing the deterioration of communication quality by replacing only some antennas in an antenna group having optimal communication quality with suboptimal antennas in accordance with the variation in the number of mobile terminals using each antenna. As a result, an aspect of the present invention makes it possible to increase the amount of available time-frequency resource per mobile terminal and provide increased throughput. In addition, according to an aspect of the present invention, when a communication antenna group change is notified to a mobile terminal by indicating an antenna identifier, the variation in the number of mobile terminals can be reduced without performing a hand-over process.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • An embodiment of the present invention will be described in detail based on the following figures, in which:
  • FIG. 1 shows a distributed antenna system having fixed clusters;
  • FIG. 2 shows a distributed antenna system that forms dynamic clusters in accordance with the position of a mobile terminal;
  • FIG. 3 shows an example of time-frequency resource allocation to clusters;
  • FIG. 4 is a conceptual diagram illustrating a radio resource control method according to an embodiment of the present invention that is used when an antenna change is made;
  • FIG. 5 shows an example of time-frequency resource allocation to clusters configured after an antenna change;
  • FIG. 6 is a first exemplary sequence diagram (1) illustrating the sequence of events occurring between the instant at which a initial access mobile terminal arises and the instant at, which an antenna change is made for load reduction;
  • FIG. 7 is a second exemplary sequence diagram (1) illustrating the sequence of events occurring between the instant at which an antenna change is made due to a moved mobile terminal and the instant at which an antenna change is made for load reduction;
  • FIG. 8 is a third exemplary sequence diagram (1) illustrating the sequence of events occurring between the instant at which an antenna change is made due to a moved mobile terminal and the instant at which an antenna change is made for load reduction;
  • FIG. 9 is a diagram illustrating the configuration of a centralized base station that implements a radio resource control method according to the embodiment of the present invention;
  • FIG. 10 is a first exemplary flowchart illustrating the radio resource control method according to the embodiment of the present invention;
  • FIG. 11 is a second exemplary flowchart illustrating the radio resource control method according to the embodiment of the present invention;
  • FIG. 12 shows an example of a management table concerning mobile terminal IDs and candidate antennas to change;
  • FIG. 13 shows an example of a radio resource management table for managing the relationship between clusters and antennas and the load information about the clusters and antennas;
  • FIG. 14 shows an example of a cluster management table for managing mobile terminals belonging to each cluster;
  • FIG. 15 is a first exemplary sequence diagram (2) illustrating the sequence of events occurring between the instant at which a initial access mobile terminal arises and the instant at which an antenna change is made for load reduction;
  • FIG. 16 is a second exemplary sequence diagram (2) illustrating the sequence of events occurring between the instant at which an antenna change is made due to a moved mobile terminal and the instant at which an antenna change is made for load reduction; and
  • FIG. 17 is a third exemplary sequence diagram (2) illustrating the sequence of events occurring between the instant at which an antenna change is made due to a moved mobile terminal and the instant at which an antenna change is made for load reduction.
  • DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENT 1. Distributed Antenna System
  • FIG. 2 shows an example of a distributed antenna system having dynamic clusters that select multiple antennas from antennas 1-1 to 1-12 from each mobile terminal in accordance with communication quality.
  • Mobile terminals 2-1 to 2-6 establish data communication by using antenna groups having multiple antennas, which are among a large number of antennas 1-1 to 1-12 distributively disposed within the system. Referring to FIG. 2, the mobile terminals 2-1 to 2-6 each use two antennas to establish communication. The antenna groups are referred to as clusters 3-1 to 3-5. Each antenna is connected to a centralized base station 5 through an optical fiber or other wired circuit 4. As regards a downlink, data generated by the centralized base station 5 and addressed to multiple mobile terminals is transmitted from multiple antennas at the same time and at the same frequency (hereinafter referred to as “at the same time and frequency”). As regards an uplink, a signal transmitted at the same time and frequency from multiple mobile terminals is received by multiple antennas and transferred to the centralized base station 5.
  • A cluster 3-1 to 3-5 including an antenna having low propagation loss is selected for individual mobile terminals in accordance with the position of a mobile terminal. This increases the received power of a desired signal and decreases the received power of a signal for another mobile terminal (interference signal). Therefore, the SINR (Signal to Interference plus Noise power Ratio) for the desired signal can be improved.
  • When an antenna selection is freely made for each of multiple mobile terminals, some or all of the selected antennas are shared between the mobile terminals as shown in FIG. 2. For example, the cluster 3-1 containing antennas 1-5 and 1-6 is selected for the mobile terminal 2-1. Further, cluster 3-2, which contains antennas 1-2 and 1-6, is selected for mobile terminals 2-2 and 2-3. Therefore, only antenna 1-6 is shared between clusters 3-1 and 3-2. If data addressed to multiple mobile terminals is transmitted from the same antenna at the same time and frequency, considerable interference occurs. Therefore, time-frequency resource needs to be divided between mobile terminals sharing all antennas within a cluster, that is, between mobile terminals belonging to the same cluster, as is the case with a conventional cellular system. In cluster 3-2, for instance, the time-frequency resource needs to be divided between mobile terminals 2-2 and 2-3. Further, the time-frequency resource needs to be divided between clusters sharing some antennas only. For example, the time-frequency resource needs to be divided between clusters 3-1 and 3-2. However, clusters sharing no antennas establish communication at the same time and frequency in order to provide increased spatial frequency efficiency. For example, the communication between clusters 3-1 and 3-5 is established at the same time and frequency.
  • FIG. 3 shows an example of time-frequency resource division between clusters configured as indicated in FIG. 2. In the following description, it is assumed that the time-frequency is normalized so that the time-frequency resource available to the overall system is 1.
  • Referring to FIG. 2, antenna 1-6 is shared by clusters 3-1, 3-2, 3-3, and 3-4, and the number of mobile terminals belonging to these clusters is 1, 2, 1, and 1, respectively. It means that a total of five mobile terminals use antenna 1-6. As described above, when multiple clusters share an antenna, the total number of mobile terminals using the antenna is equal to the total number of mobile terminals belonging to the clusters sharing the antenna. When, for instance, the time-frequency resource is divided between clusters (clusters 3-1 to 3-4) sharing antenna 1-6 in proportion to the number of mobile terminals belonging to each cluster, the time-frequency resource allocated to clusters 3-1, 3-2, 3-3, and 3-4 is ⅕, ⅖, ⅕, and ⅕, respectively, as shown in FIG. 3. The number of mobile terminals belonging to clusters 3-1, 3-3, and 3-4 is 1. Therefore, the time-frequency resource available to mobile terminals 2-1, 2-4, and 2-5, which belong to clusters 3-1, 3-3, and 3-4, is ⅕. Meanwhile, the number of mobile terminals belonging to cluster 3-2 is 2 (mobile terminals 2-2 and 2-3). If, in the above instance, the time-frequency resource allocated to cluster 3-2, which is ⅖, is equally divided between mobile terminals 2-2 and 2-3, the time-frequency resource available to each of mobile terminals 2-2 and 2-3 is ⅕. Meanwhile, the time-frequency resource available to cluster 3-5, which does not share antennas with any other cluster, is 1. Further, as only mobile terminal 2-6 belongs to cluster 3-5, the time-frequency resource for mobile terminal 2-6 is also 1.
  • As described above, when multiple clusters share at least one antenna, the available time-frequency resource per cluster is less than the time-frequency resource available to the overall system. Further, the time-frequency resource available to each cluster is divided between mobile terminals belonging to the same cluster. Therefore, if a large number of mobile terminals simultaneously use one antenna, the time-frequency resource per mobile terminal decreases to reduce the throughput of each mobile terminal. Although the time resource is divided between the clusters in the example shown in FIG. 3, an alternative is to divide the frequency resource or divide a combination of the time resource and frequency resource. In the following description, it is assumed for the sake of explanation that communication is established while the time resource is divided between clusters sharing some antennas.
  • FIG. 4 is a conceptual diagram illustrating a radio resource control method according to an embodiment of the present invention.
  • The centralized base station 5 monitors the load status such as the total number of mobile terminals using each antenna. When it is found that an antenna is overloaded, the centralized base station 5 performs a process of moving a mobile terminal away from the antenna. However, a currently communicating cluster has good communication quality for the mobile terminal. Therefore, a forced cluster change, that is, a forced antenna change, may significantly deteriorate the communication quality of the mobile terminal. Hence, the centralized base station 5 changes only some antennas in a cluster currently used by the mobile terminal for communication purposes. As a result, the load on the overloaded antenna is reduced while preventing the communication quality from deteriorating.
  • Referring, for instance, to FIG. 4, antenna 1-6 is heavily loaded because it is selected by a large number of mobile terminals. Therefore, the centralized base station 5 selects a mobile terminal from mobile terminals 2-1, 2-2, 2-3, 2-4, and 2-5, which use the heavily loaded antenna 1-6, as the mobile terminal to be subjected to an antenna change. Referring again to FIG. 4, the centralized base station 5 selects mobile terminal 2-1 as an antenna change target, and changes the cluster for mobile terminal 2-1 from cluster 3-1 (antennas 1-5 and 1-6) to cluster 3-6 (antennas 1-1 and 1-5). In other words, the centralized base station 5 keeps antenna 1-5, and replaces the heavily loaded antenna 1-6 with antenna 1-1, which is lightly loaded. Antenna 1-5 is positioned at a short distance from mobile terminal 2-1 and governing its received power. Therefore, even after the cluster is changed to cluster 3-6, the communication quality of mobile terminal 2-1 does not significantly deteriorate. Further, as the cluster for mobile terminals 2-2 to 2-5 remains unchanged, the communication quality of such mobile terminals does not practically deteriorate. Meanwhile, as mobile terminal 2-1 is moved, the total number of mobile terminals using antenna 1-6 is decreased to reduce the load. As described above, the radio resource control method according to the present embodiment prevents communication quality deterioration and achieves load reduction by changing only some antennas for mobile terminals and by making an antenna change on an individual mobile terminal basis.
  • FIG. 5 shows an example of how the resource is divided between clusters after an antenna change.
  • Referring to FIG. 4, in cluster 3-6 to which mobile terminal 2-1 is changed, no other mobile terminal uses antennas 1-1 and 1-5. Therefore, mobile terminal 2-1 can use the whole time-frequency resource available to the system. As a result, the time-frequency resource for mobile terminal 2-1 is increased to 1 from ⅕, which prevailed before an antenna change. In addition, as a result of the move of mobile terminal 2-1, the total number of mobile terminals using antenna 1-6 is decreased from 5 to 4. Consequently, the time resource allocated to clusters 3-2, 3-3, and 3-4 is increased to 2/4, ¼, and ¼, respectively. Hence, the time-frequency resource for mobile terminals 2-2, 2-3, 2-4, and 2-5 is increased from ⅕ to ¼.
  • 2. Sequence for Antenna Change
  • FIG. 6 is a first exemplary sequence diagram (1) illustrating the sequence of events occurring between the instant at which a initial access mobile terminal arises to change antenna load status and the instant at which the centralized base station 5 makes an antenna change for load reduction.
  • A basic initial access procedure for an initial access mobile terminal conforms, for instance, to that of an LTE system. However, when the initial access mobile terminal attempts to gain initial access, the cluster for data communication is not determined yet. Therefore, initial access steps followed until an antenna identifier (antenna ID) for data communication is notified are performed by using a predetermined antenna or an arbitrarily defined antenna. The simplest method would be to broadcast a signal concerning the initial access sequence with all antennas within the system or perform transmission diversity with a fixed cluster pattern.
  • The initial access mobile terminal u0 first receives a synchronization signal and system information broadcast into the system, achieves synchronization acquisition, and acquires the system information. Subsequently, the initial access mobile terminal u0 transmits an initial access signal (step S2). The system information may include, for instance, a transmission timing, frequency, and signal sequence of initial access signal and a bandwidth used by the system or the like. The initial access signal is transmitted by using the transmission timing, frequency, and signal sequence defined by the system information. The initial access signal corresponds to the random access preamble in the LTE system. The centralized base station 5 receives the initial access signal, and detects that a initial access mobile terminal u0 exists. Further, the centralized base station 5 estimates the received power of the initial access signal for each antenna (step S3). When the initial access mobile terminal is detected, the centralized base station 5 sends a response signal to the initial access mobile terminal u0 from all antennas (step S4) (the response signal corresponds to the random access response in the LTE system). Upon receipt of the response signal, the initial access mobile terminal u0 transmits a mobile terminal-specific identification signal in accordance with the frequency, modulation method, and coding method specified by the response signal (step S5) (the identification signal corresponds to a signal called “Msg3” in the LTE system). When the centralized base station 5 successfully receives the identification signal, it identifies the initial access mobile terminal u0. The centralized base station 5 then provisionally determines an initial cluster for the initial access mobile terminal u0 by using the received power of each antenna, which is estimated on the basis of the initial access signal (step S6). For the initial cluster, for example, P antennas are selected beginning with an antenna having the highest received power. Referring, for instance, to FIG. 6, P=2 and cluster n0 containing antennas a0 and a1 is selected as the initial cluster. A cluster ID n0 is used for cluster management in the centralized base station 5. The following description is given on the assumption that P=2. However, P is not limited to 2 and can be any number.
  • When the initial access mobile terminal u0 newly selects antennas a0 and a1, the load status of antennas a0 and a1 changes.
  • Therefore, the centralized base station 5 formulates an overload judgment about antennas a0 and a1 (a detailed description will be given later with reference, for instance, to FIGS. 10 and 11) (step S7). If, for instance, antenna a0 is judged to be overloaded, the centralized base station 5 performs, on a trial basis, a process of moving a mobile terminal (an connected mobile terminal or the initial access mobile terminal) away from antenna a0 for load reduction purposes. The centralized base station 5 then determines a mobile terminal ID, a changed antenna ID, and a cluster ID concerning an antenna change target (a detailed description will be given later with reference, for instance, to FIGS. 10 and 11) (step S8). Referring to FIG. 6, the centralized base station 5 selects a connected mobile terminal u1, which has been engaged in communication (step S1) by using antennas a0 and a2, as a mobile terminal targeted for antenna change. The centralized base station 5 then selects antenna a3 as a changed antenna for antenna a0 for the connected mobile terminal u1. In other words, the communication antennas for the connected mobile terminal u1 change from antennas a0 and a2 to antennas a2 and a3. Subsequently, the centralized base station 5 selects cluster n0, which has been provisionally selected as the initial cluster, as the cluster for the initial access mobile terminal u0 (step S9). Next, the centralized base station 5 notifies the initial access mobile terminal u0 of antenna IDs (a0 and a1) (step S10). The initial access mobile terminal u0 uses the notified antennas to establish subsequent communication (step S11). In addition, the centralized base station 5 notifies the connected mobile terminal u1, which is now an antenna change target for load reduction, of changed antenna IDs (a2 and a3) (step S12). The connected mobile terminal u1 uses the notified antennas to establish subsequent communication (step S13).
  • In the above description, it is assumed that the initial access mobile terminal is different from a mobile terminal to which an antenna change for load reduction is applied. In reality, however, the initial access mobile terminal may be identical with a mobile terminal to which an antenna change for load reduction is applied. In such an instance, the provisionally determined initial cluster is changed by an antenna change process. The initial access mobile terminal is then notified of a changed antenna ID as the antenna ID of the initial cluster. Further, mobile terminal u1 is will not be notified of an antenna change.
  • FIG. 15 is a first exemplary sequence diagram (2) illustrating the sequence of events occurring between the instant at which a initial access mobile terminal arises and the instant at which an antenna change is made for load reduction;
  • If antenna a0 is judged to be overloaded after the above-described processing steps up to step S6 are performed (step S7), step S8 is performed to achieve load reduction by changing the communication antennas for mobile terminal u0 to antennas a1 and a3 and selecting cluster n4 containing antennas a1 and a3. Next, step S9 is performed to select cluster n4 as the cluster for mobile terminal u0. Next, step S10 is performed to notify mobile terminal u0 of at least one of the identification information about the selected antennas a1 and a3 and the identification information about cluster n4. The notified antennas are then used to establish subsequent communication for mobile terminal u0.
  • FIG. 7 is a second exemplary sequence diagram (1) illustrating the sequence of events occurring between the instant at which the load status of each antenna changes due to a moved mobile terminal and the instant at which the centralized base station 5 makes an antenna change for load reduction.
  • Referring to FIG. 7, the initial state is a state where mobile terminals u0 and u1 are communicating with the centralized base station 5 by using antennas a0 and a1 and antennas a2 and a3, respectively (steps S21 and S22).
  • Each mobile terminal transmits the CQI (Channel Quality Indicator) of a currently communicating cluster and the reference signal, which represents a known sequence for estimating the quality of uplink reception, on a periodic basis or at a predetermined timing. In accordance with the CQI and the reference signal, the centralized base station 5 estimates the reception quality of a candidate antenna to change for each mobile terminal (that is, an antenna positioned around the currently communicating cluster) (step S23). When, for instance, the reception quality of each antenna is changed due to the move of mobile terminal u0, which has established communication by using antennas a0 and a1, the centralized base station 5 detects in accordance with the result of estimation (which will be described in detail later) that the reception quality of antenna a2 is higher for mobile terminal u0 than that of antenna a0, which is currently used for communication (step S24). The centralized base station 5 then performs an antenna change process for mobile terminal u0 in response to its move. First of all, the centralized base station 5 provisionally determines a change destination cluster (antennas a1 and a2) for mobile terminal u0 (step S25). As mentioned earlier, P antennas (e.g., P=2) are selected beginning with an antenna having the highest received power. As a result, the load status of antenna a2 changes. Next, the centralized base station 5 judges whether antenna a2 is overloaded (a detailed description will be given later with reference, for instance, to FIGS. 10 and 11) (step S26).
  • If antenna a2, which is a change destination for mobile terminal u0, is judged to be overloaded, the centralized base station 5 performs, on a trial basis, a process of moving the mobile terminal away from antenna a2 for load reduction purposes, as is the case where a initial access mobile terminal has arisen. The centralized base station 5 then determines a mobile terminal ID, a changed antenna ID, and a cluster ID, which represent an antenna change target (a detailed description will be given later with reference, for instance, to FIGS. 10 and 11) (mobile terminal ID u1, changed antenna IDs a3 and a4, and cluster ID n3 are selected in the case shown in FIG. 7) (step S27). Subsequently, the centralized base station 5 notifies mobile terminal u0, which is to be subjected to antenna change due to its move, and mobile terminal u1, which is to be subjected to antenna change for load reduction purposes, of a changed antenna ID, and then terminates the process (steps S28 to S32).
  • In the case shown in FIG. 7, it is assumed that the mobile terminal to be subjected to antenna change due to its move is different from the mobile terminal to be subjected to antenna change for load reduction purposes. In reality, however, these two mobile terminals may be identical with each other. In such an instance, an antenna change process is performed to change the provisionally determined change destination cluster. Mobile terminal u0 is then notified of a changed antenna ID as the antenna ID of the initial cluster. Further, mobile terminal u1 will not be notified of an antenna change.
  • FIG. 16 is a second exemplary sequence diagram (2) illustrating the sequence of events occurring between the instant at which an antenna change is made due to a moved mobile terminal and the instant at which an antenna change is made for load reduction.
  • If antenna a2 is judged to be overloaded after the above-described processing steps up to step S6 are performed (step S26), step S27 is performed to achieve load reduction by changing the communication antennas for mobile terminal u0 to antennas a1 and a4 and selecting cluster n5 containing antennas a1 and a4 as a change destination. Next, step S28 is performed to select cluster n5 as the cluster for mobile terminal u0. Next, step S29 is performed to notify mobile terminal u0 of at least one of the identification information about the selected antennas a1 and a4 and the identification information about cluster n5. The notified antennas are then used to establish subsequent communication.
  • FIG. 8 is a third exemplary sequence diagram (1) illustrating the sequence of events occurring between the instant at which the load status of each antenna changes due to a moved mobile terminal and the instant at which the centralized base station 5 makes an antenna change for load reduction. The example shown in FIG. 8 differs from the example shown in FIG. 7. More specifically, FIG. 7 indicates that the centralized base station 5 estimates the reception quality of each antenna for a mobile terminal by using an uplink reference signal, whereas FIG. 8 indicates that the mobile terminal side measures the reception quality of each antenna and reports the result of measurement to the centralized base station 5. An operation performed by a mobile terminal to measure the reception quality of each antenna and report the result of measurement to the centralized base station 5 is similar to an operation performed by the measurement function of the LTE system. The measurement function of the LTE system is described in TS (Technical Specification) 36.331. The above-described operation performed by the mobile terminal side differs from the operation performed by the measurement function of the LTE system in that the measurement function of the LTE system measures each cell having a cell ID and does not distinguish between antennas, whereas the operation performed by the mobile terminal side reports the reception quality of each antenna after measuring each antenna ID no matter whether it has the same cell ID.
  • Each mobile terminal measures the reception quality of not only an antenna in a currently communicating cluster but also a candidate antenna to change by using the downlink reference signal transmitted from the centralized base station 5. Referring to FIG. 8, the candidate antenna to change is called a neighbor antenna. The reception quality is averaged by means, for instance, of filtering. However, the centralized base station 5 transmits the downlink reference signal in such a manner as to distinguish between individual antenna IDs. When a periodic event or an event specified by the base station occurs, each mobile terminal reports the results of measurement of the reception quality and an antenna ID associated with each measurement result. The specified event corresponds to a case where the neighbor antenna, which serves as a change destination candidate, has higher reception quality than a currently communicating antenna. An alternative is to further specify a case where, for example, the reception quality of the currently communicating antenna is below a certain threshold value.
  • Referring to FIG. 8, mobile terminal u0 makes antenna measurements to detect that antenna a2 has higher reception quality than antenna a0, which is currently engaged in communication (step S43). As a result, when a periodic event or an event specified by the base station occurs, mobile terminal u0 reports the reception qualities of a currently communicating antenna and a neighbor antenna (step S44). The report may include, for instance, the IDs and reception qualities of antennas a0 and a1, which are currently engaged in communication, and the ID and reception quality of antenna a2, which is a change destination candidate. In accordance with the results of measurements of reception qualities of antennas a0, a1, and a2, which are reported from mobile terminal u0, the centralized base station 5 judges whether mobile terminal u0 needs an antenna change (a detailed description will be given later with reference, for instance, to FIGS. 10 and 11) (step S45). If the judgment result indicates that an antenna change is needed, the centralized base station 5 provisionally determines a changed antenna for mobile terminal u0 (a detailed description will be given later with reference, for instance, to FIGS. 10 and 11) (step S46). Next, the centralized base station 5 judges whether antenna a2, which is a change destination, is overloaded (a detailed description will be given later with reference, for instance, to FIGS. 10 and 11) (step S47). The subsequent operating steps are the same as indicated in FIG. 7.
  • In the case shown in FIG. 8, too, it is assumed that the mobile terminal to be subjected to antenna change due to its move is different from the mobile terminal to be subjected to antenna change for load reduction purposes. In reality, however, these two mobile terminals may be identical with each other. In such an instance, an antenna change process is performed to change the provisionally determined change destination cluster. Mobile terminal u0 is then notified of a changed antenna ID as the antenna ID of the initial cluster. Further, mobile terminal u1 will not be notified of an antenna change.
  • FIG. 17 is a third exemplary sequence diagram (2) illustrating the sequence of events occurring between the instant at which an antenna change is made due to a moved mobile terminal and the instant at which an antenna change is made for load reduction.
  • If antenna a2 is judged to be overloaded after the above-described processing steps up to step S46 are performed (step S47), step S48 is performed to achieve load reduction by changing the communication antennas for mobile terminal u0 to antennas a1 and a4 and selecting cluster n5 containing antennas a1 and a4 as a change destination. Next, step S49 is performed to select cluster n5 as the cluster for mobile terminal u0. Next, step S50 is performed to notify mobile terminal u0 of at least one of the identification information about the selected antennas a1 and a4 and the identification information about cluster n5. The notified antennas are then used to establish subsequent communication.
  • 3. Centralized Base Station
  • FIG. 9 is a diagram illustrating the configuration of the centralized base station 5 for the distributed antenna system that implements the present embodiment.
  • A large number of antennas 1 (each antenna 1 is also referred to as an RRH (Remote Radio Head)) are disposed on a plane within the system. Each antenna 1 is connected to an antenna switching unit 104 through the optical fiber or other wired circuit 4. Each antenna 1 transmits a downlink signal, which is output from a centralized signal processing unit 101, and receives an uplink signal, which is transmitted from a mobile terminal.
  • The antenna switching unit 104 has a router function that freely changes the connections between the antennas 1 and logical antenna ports 103-1, 103-2, which are interfaces for cluster signal processing units 102-1, 102-2 in the centralized signal processing unit 101. Connection control information about the connections between the antennas 1 and the logical antenna ports 103-1, 103-2 for the cluster signal processing units 102-1, 102-2 is input from a cluster scheduler 106. The centralized base station 5 changes the connections to change a communication cluster with time and form a cluster that dynamically changes in accordance with a communication mobile terminal.
  • The cluster scheduler 106 acquires the antenna ID-to-cluster ID correspondence of the antennas 1 and the load information about each cluster and about each antenna from a radio resource control unit 107. The cluster scheduler 106 then determines the proportion of time resource allocated to each cluster and a combination of clusters for establishing communication at the same time and frequency. When selecting clusters for establishing communication at the same time, the cluster scheduler 106 ensures that the selected clusters do not share the same antenna. A user scheduler 105 and the antenna switching unit 104 are notified of the correspondence between clusters and antennas that establish communication at a certain time (this information is referred to as a cluster scheduling result).
  • The user scheduler 105 receives the cluster scheduling result from the cluster scheduler 106, and acquires the information about a combination of clusters that establish communication at a certain time. Then, in accordance with the information about mobile terminals belonging to the clusters, the user scheduler 105 determines a communication mobile terminal in each cluster and the communication method for the mobile terminal (e.g., frequency, modulation method, and code rate). The information about a mobile terminal includes, for instance, the CQI and the buffer status. The round robin scheduling method, proportional fairness scheduling method, or other scheduling method used with the conventional cellular system may be used as a user scheduling method. The centralized signal processing unit 101 is notified of the IDs of clusters and mobile terminals that establish communication at a certain time and the method of communication (this information is referred to as a user scheduling result).
  • The centralized signal processing unit 101 buffers mobile terminal data received from a gateway 110, control information generated in the centralized signal processing unit 101, and antenna ID change notification information from the radio resource control unit 107. Then, in accordance with the user scheduling result, the centralized signal processing unit 101 combines the mobile terminal data and a control signal into a transport block and inputs the transport block into the cluster signal processing units 102-1, 102-2. However, transport blocks addressed to mobile terminals belonging to the same cluster are input into the same cluster signal processing unit.
  • The cluster signal processing units 102-1, 102-2 perform a MIMO process, including coding, modulating, layer mapping, and precoding, and a signal process, including frequency mapping, on a transport block addressed to each mobile terminal. The cluster signal processing units 102-1, 102-2 perform the above signal processing operations to generate P signal sequences, respectively. The P signal sequences correspond to signal sequences transmitted from P antennas in a cluster. The P signal sequences generated by the cluster signal processing units 102-1, 102-2 are output from the logical antenna ports 103-1, 103-2, respectively. The correspondence between the antenna IDs of antennas in a cluster and the logical antenna ports 103-1, 103-2 should be such that the antenna IDs correlate in ascending order of ID numbers to the logical antenna port numbers 0, 1, . . . , and P-1. However, it is necessary to understand that signal processing on the mobile terminal side is also performed in accordance with the above correspondence. It should also be noted that the signal processing for each mobile terminal is performed in accordance with the user scheduling result.
  • The radio resource control unit 107 is a key component that achieves load reduction by making an antenna change in the present embodiment. The radio resource control unit 107 includes a radio resource management unit 108 and an antenna change control unit 109. The radio resource management unit 108 is a memory that manages the correspondence between clusters and antennas, the load information about each antenna and about each cluster, and the connection information about each mobile terminal. The connection information about each mobile terminal corresponds, for instance, to the IDs of a communicating cluster and a candidate antenna to change and the information about communication quality. The memory will be described later with reference to an antenna management table shown in FIG. 12, a resource management table shown in FIG. 13, and a cluster ID-mobile terminal ID table shown in FIG. 14. The antenna change control unit 109 judges whether each antenna is overloaded. If an antenna is judged to be overloaded, the antenna change control unit 109 checks mobile terminals using the antenna to determine a mobile terminal ID, a changed antenna ID, and a cluster ID that are to subjected to an antenna change. The mobile terminal ID of the mobile terminal to be subjected to an antenna change and the changed antenna ID for the mobile terminal are notified to the centralized signal processing unit 101 as control information addressed to the mobile terminal. Further, the mobile terminal ID of the mobile terminal to be subjected to an antenna change, the changed antenna ID, and the cluster ID are conveyed to the radio resource management unit 108. The radio resource management unit 108 receives such information and updates the load information and mobile terminal connection information in accordance with the received information.
  • 4. Overload Judgment-to-Change Destination Determination Flowchart
  • FIG. 10 is a first exemplary flowchart illustrating operations performed by the antenna change control unit 109 of the radio resource control unit 107. More specifically, this flowchart illustrates the operations performed between the instant at which each antenna is checked to determine whether it is overloaded and the instant at which an antenna change is made for load reduction.
  • The antenna change control unit 109 judges whether each antenna is overloaded (step S101). More specifically, step S101 is performed to determine whether a threshold value is exceeded by the total number of mobile terminals using each antenna. If the threshold value is exceeded by the total number of mobile terminals using a certain antenna (ai), the antenna change control unit 109 examines mobile terminals using the antenna (ai), and applies an antenna change to a mobile terminal that uses the antenna (ai) as a second or subsequent antenna. The first antenna, the second antenna, and so on to the Pth antenna for a mobile terminal are determined in the descending order of reception quality that is, for example, estimated from the uplink reference signal by a base station or reported from the mobile terminal. A mobile terminal using the antenna (ai) as the first antenna is excluded from antenna change candidates because changing the first antenna is likely to considerably deteriorate the communication quality of the mobile terminal. The antenna change control unit 109 calculates the total number of mobile terminals using candidate antennas to change for the mobile terminal using the antenna (ai) judged to be overloaded. The antenna change control unit 109 performs this operation for all mobile terminals that use the antenna (ai) judged to be overloaded as the second or subsequent antenna. Then, the antenna change control unit 109 memorizes a mobile terminal ID, a changed antenna ID (aj) for a relevant mobile terminal, and a cluster ID that minimizes the total number of mobile terminals using a changed antenna (step S102). An ID of candidate antenna to change and the total number of mobile terminals using the antenna are acquired from the radio resource management unit 108. When the total number of mobile terminals using the changed antenna (aj) is smaller than the total number of mobile terminals using a change source antenna (ai), load reduction can be achieved. Thus, an antenna change is made (step S103). If there are two or more mobile terminals that minimize the total number of mobile terminals using the changed antenna (a), the antenna change control unit 109 selects one mobile terminal at random or by a predefined appropriate method (steps S104 and S105). The antenna change control unit 109 performs the above procedure to determine an antenna change target mobile terminal ID, a changed antenna ID (a), and a cluster ID (step S106). Further, the antenna change control unit 109 conveys antenna change information about the relevant mobile terminal to the radio resource management unit 108. In accordance with the antenna change information, the radio resource management unit 108 updates the connection information and load information about the mobile terminal. In addition, the antenna change control unit 109 operates so that control information for notifying the relevant mobile terminal of an antenna change is conveyed to the centralized signal processing unit.
  • To prevent the communication quality from being deteriorated by an antenna change, the method described in FIG. 10 limits antenna change targets to mobile terminals using an overloaded antenna as the second or subsequent antenna. However, whether or not an antenna change is to be made is determined depending solely on the total number of mobile terminals using each antenna. In general, there is a trade-off relationship between improving the time-frequency resource per mobile terminal by changing to an antenna used by a small number of mobile terminals and deteriorating the communication quality by changing to an antenna having lower communication quality than a previously used antenna. Therefore, the throughput may conversely decrease after an antenna change. To avoid such a problem, it is necessary to monitor the CQI reported from a mobile terminal after an antenna change or monitor the throughput achieved by the mobile terminal for a predetermined period of time after the antenna change. Further, if the CQI or the throughput is considerably decreased from a level attained before the antenna change, it is necessary to revert to the previous antenna and repeat a process of applying an antenna change to another mobile terminal on a trial basis.
  • However, it is preferred that the throughput prevailing after a change be predicted wherever possible as indicated in the following example to make an antenna change, thereby minimizing the probability of making antenna change again. Further, the time-frequency resource per cluster and per mobile terminal depends on the user scheduler 105 and the cluster scheduler 106. Therefore, the post-change throughput can be accurately predicted by considering the scheduling methods used by the schedulers.
  • FIG. 11 is a second exemplary flowchart illustrating operations performed by the antenna change control unit 109 of the radio resource control unit 107. More specifically, this flowchart illustrates the operations performed between the instant at which each antenna is checked to determine whether it is overloaded and the instant at which an antenna change is made for load reduction.
  • An evaluation function of each mobile terminal is compared against a threshold value to check for an overload.
  • The evaluation function is expressed, for instance, by Equation (1) below:

  • E u(n)=C u(n)R cluster(n)R u(n)  (1)
  • where Cu(n) is a term dependent on the reception quality of a cluster n for a mobile terminal u. For example, Shannon's channel capacity or spectrum efficiency tabulated in correspondence with the SINR can be used as this term. The channel capacity and SINR are calculated in accordance with the CQI reported from the mobile terminal and the received power of each antenna or with the received power estimated from the uplink reference signal. Rcluster (n) is a term dependent on the time-frequency resource allocated to the cluster n and is determined depending on the cluster scheduler. Ru(n) is a term dependent on the time-frequency resource allocated to the mobile terminal u in the cluster n and is determined depending on the user scheduler. Therefore, Rcluster(n)Ru(n) represents the time-frequency resource per mobile terminal.
  • When an evaluation function in Equation (1) is used, the evaluation function Eu(n) represents an expected throughput value of each mobile terminal. In other words, an increase in the total number of mobile terminals using a certain antenna decreases Rcluster(n) and Ru(n), thereby decreasing the expected throughput of a mobile terminal using the antenna or decreasing an expected data rate value. Meanwhile, a deterioration in the reception quality of each antenna decreases Cu(n) and similarly decreases the expected throughput value of the mobile terminal. The radio resource control method according to the present embodiment applies an antenna change to a certain mobile terminal to increase Rcluster(n)Ru(n) and raise the throughput achievable by the mobile terminal while inhibiting the decrease in (n). In addition, the antenna change applied to the mobile terminal increases Rcluster(n)Ru(n) of a mobile terminal using a change source antenna. Meanwhile, Cu(n) remains unchanged in this instance. This raises the throughput of the mobile terminal using the change source antenna.
  • For example, the following values can be used as Rcluster(n) and Ru(n).
  • When cluster scheduling is to be performed to allocate the time resource in proportion to the number of mobile terminals belonging to each cluster as shown in FIGS. 3 and 5, Rcluster(n) is given by Equation (2) below:
  • R cluster ( n ) = U cluster ( n ) / max p { 0 , , P - 1 } { U Ant ( n p ) } ( 2 )
  • where np is an antenna ID corresponding to a logical antenna port p of the cluster n, P is the number of logical antenna ports of the cluster n, Ucluster(n) is the number of mobile terminals belonging to the cluster n, and UAnt(np) is the total number of mobile terminals using antenna np.
  • Further, when the round robin or proportional fairness scheduling method is used for user scheduling, the time-frequency resource allocated to mobile terminals is approximately equal between mobile terminals belonging to the same cluster. Therefore, Ru(n) is determined by dividing the numerical value 1 by the number of mobile terminals belonging to the cluster n as indicated in Equation (3) below:

  • R u(n)=1/U cluster(n)  (3)
  • When cluster scheduling is to be performed to equally divide the time resource between clusters sharing an antenna in another example, Rcluster(n) can be expressed by Equation (4) below:
  • R cluster ( n ) = 1 / max p { 0 , , P - 1 } { N ( n p ) } ( 4 )
  • where N(np) is the number of clusters sharing antenna np and P is the number of base station side antennas used by one mobile terminal. P may be either fixed or variable. For example, P may be fixed by the system for each mobile terminal or variable and indicative of the number of antennas whose reception quality or reception strength is above a predetermined threshold value or within a predetermined threshold value range.
  • Further, when cluster scheduling is to be performed to allocate the time resource in proportion to the total buffer status for mobile terminals belonging to each cluster, Rcluster (n) can be expressed by Equation (5) below. Similarly, when user cluster scheduling is to be performed to allocate the time-frequency resource in proportion to the buffer status for each mobile terminal, Ru(n) can be expressed by Equation (6) below:
  • R cluster ( n ) = B cluster ( n ) / max p { 0 , , P - 1 } { B Ant ( n p ) } ( 5 ) R u ( n ) = B u / B cluster ( n ) ( 6 )
  • where Bcluster(n) is the total amount of buffer for mobile terminals belonging to the cluster n, BAnt(np) is the total amount of buffer for mobile terminals using antenna np, and Bu is the amount of buffer for mobile terminal u.
  • The antenna change control unit 109 checks each mobile terminal to judge whether the above-described evaluation function is below a threshold value (step S111). If the evaluation function of a certain mobile terminal is below the threshold value, the antenna change control unit 109 concludes that a certain antenna used by the mobile terminal is overloaded. The antenna change control unit 109 then selects an antenna (ai) having the maximum total number of mobile terminals UAnt(np) or the maximum total amount of buffer BAnt(np) from antennas in a cluster to which the mobile terminal belongs and designates the selected antenna (ai) as an overloaded antenna (step S112). In accordance with information stored in the radio resource management unit 108, the antenna change control unit 109 performs a calculation on a mobile terminal using the overloaded antenna (ai) to determine the evaluation function prevailing when the overloaded antenna (ai) is replaced by a candidate antenna to change (step S113). The evaluation function is calculated relative to all candidate antennas to change for the mobile terminal. Further, the same calculation is performed on all mobile terminals using the overloaded antenna. Next, the antenna change control unit 109 memorizes a mobile terminal ID, changed antenna ID, and cluster ID that maximize a post-antenna-change evaluation function divided by pre-antenna-change evaluation function (i.e., the rate of evaluation function increase upon an antenna change) (step S114). When the evaluation function is to be calculated, for instance, in step S113, an alternative is to store the evaluation function increase rate (post-change evaluation function/pre-change evaluation function) in a later-described table shown, for instance, in FIG. 12, reference the table in step S114, and determine the mobile terminal ID, ID of candidate antenna to change, and cluster ID that maximize the evaluation function increase rate or provide an evaluation function increase rate higher than a predetermined threshold value. If the evaluation function prevailing after an antenna change for the relevant mobile terminal is improved from the one prevailing before the antenna change, the antenna change control unit 109 effects the antenna change for load reduction purposes (step S115). The antenna change control unit 109 then decides on the memorized mobile terminal ID, changed antenna ID, and cluster ID of a change target (step S116). However, if the evaluation function does not improve, the antenna change control unit 109 does not effect the antenna change because it concludes that higher throughput can be achieved by using the previously employed cluster for communication.
  • When the evaluation function indicative of an expected throughput value or transmission speed value is used in addition to a list of antennas arranged in the order of quality (e.g., the first antenna, the second antenna, and so on) as described above to predict the throughput of the relevant mobile terminal that prevails after an antenna change, it is possible to decrease the probability of the throughput being conversely deteriorated by the antenna change.
  • Further, the evaluation function may be calculated by using a method other than indicated by Equation (1). For example, the evaluation function may be weighted in accordance with the number of clusters sharing the overloaded antenna, which is a change source, and with the reduction rate of the amount of total buffer.
  • 5. Radio Resource Management Unit Table
  • FIG. 12 shows a management table of candidate antenna to change that the radio resource management unit 108 uses to manage candidate antennas to change. The management table of candidate antenna to change includes mobile terminal IDs, IDs of current antenna and candidate antenna to change, and evaluation function increase rates prevailing after an antenna change. The candidate antennas to change indicated in the table represent a predetermined number of antennas having relatively high reception quality for each mobile terminal or antennas whose reception quality does not deviate from the reception quality of a currently communicating antenna by more than a predetermined threshold value. When the relevant reception quality information is received or estimated or when a communication antenna for each mobile terminal is changed, the antenna ID and evaluation function increase rate of a change destination candidate are updated.
  • FIG. 13 shows an example of a resource management table that the radio resource management unit 108 uses to manage the correspondence between cluster IDs and antenna IDs and the time-frequency resource of each cluster and of each antenna.
  • The resource management table includes cluster IDs, antenna IDs, the load information about each antenna and about each cluster, and the time-frequency resource of each cluster and of each mobile terminal. The cluster-to-antenna correspondence is managed by using a matrix where each row represents an antenna ID and each column represents a cluster ID. Each matrix component indicates load information about a relevant cluster. The information is stored in an antenna row corresponding to each cluster column (although FIG. 13 shows the number of mobile terminals, it may be substituted by the buffer status). In other words, each cluster includes antennas whose row component exists. For example, cluster ID 1 includes antenna IDs 5 and 6 and one mobile terminal. Further, the sum of individual row components represents the total number of mobile terminals using a relevant antenna (the number of mobile terminals/antenna). The time-frequency resource per cluster (resource/cluster) is given by Equation (2), (4), or (5) depending on the method employed by the cluster scheduler. Equation (2) is used in the example shown in FIG. 13. The time-frequency resource per mobile terminal (resource/mobile terminal) for each cluster is given by Equation (3) or (6) (Equation (3) is used in the example shown in FIG. 13). Each component in the table is updated when an initial access mobile terminal arises or antenna change is made due to a moved mobile terminal or for load reduction. If existing cluster IDs do not provide a selected combination of antenna IDs, a new cluster ID column is added. If the number of mobile terminals is currently zero (0) for a previously selected cluster ID, the row component of a relevant antenna ID is zero (0) in the column of the cluster ID. Further, when a new antenna is added to the system, an antenna ID row is added.
  • In the above example, a cluster ID is adaptively added in accordance with an antenna ID combination selected for each mobile terminal. An alternative is to predetermine a combination of cluster IDs and antenna IDs and limit antenna ID combinations selectable by mobile terminals by the predetermined cluster IDs.
  • In accordance with the matrix of cluster IDs and antenna IDs in the above-described resource management table, the cluster scheduler 106 selects multiple clusters communicating at the same time and frequency in such a manner that no antenna ID is shared. In other words, the cluster scheduler 106 selects multiple clusters from the matrix table in such a manner that no row is shared.
  • FIG. 14 shows a cluster ID-mobile terminal ID table for managing the IDs of mobile terminals belonging to each cluster. This table includes the IDs of clusters and the IDs of mobile terminals belonging to each cluster. The user scheduler 105 and the radio resource control unit 107 use this table to reference the mobile terminals belonging to each cluster.
  • It should be understood by those skilled in the art that various modifications, combinations, sub-combinations, and alterations may occur depending on design requirements and other factors insofar as they are within the scope of the appended claims or the equivalents thereof.

Claims (14)

1. A distributed antenna system comprising:
a base station that transmits and receives data by using a plurality of antennas disposed in the distributed antenna system, a plurality of clusters including one or more of some of the antennas being formed in accordance with the position of a mobile terminal, at least two clusters sharing at least one antenna,
wherein the base station performs an operation comprising:
when a new communication is initiated or a mobile terminal is moved, provisionally determining a first antenna and a second antenna for a first mobile terminal and a first cluster containing the first antenna and the second antenna;
formulating an overload judgment to determine whether the provisionally determined first and second antennas are overloaded;
when the first antenna is judged to be overloaded, selecting a third antenna and a fourth antenna as changed communication antennas for a second mobile terminal communicating with the first and third antennas and a second cluster containing the third and fourth antennas as a change destination cluster for load reduction purposes;
selecting the provisionally determined first and second antennas and the first cluster as the antennas and cluster for the first mobile terminal;
conveying at least one of identification information about the selected first and second antennas and identification information about the first cluster to the first mobile terminal and conducting subsequent communication by using the antennas whose identification information has been conveyed; and
conveying at least one of identification information about the third and fourth antennas, which are selected as change destinations, and identification information about the second cluster to the second mobile terminal and conducting subsequent communication by using the antennas whose identification information has been conveyed.
2. The distributed antenna system according to claim 1, wherein, when the first antenna is judged to be overloaded, the distributed antenna system performs an operation comprising:
selecting, for load reduction purposes, the second and fourth antennas as antennas for the first mobile terminal and a third cluster containing the second and fourth antennas as a cluster;
selecting the second and fourth antennas and the third cluster as antennas and cluster for the first mobile terminal; and
conveying at least one of identification information about the selected second and fourth antennas and identification information about the third cluster to the first mobile terminal and conducting subsequent communication by using the antennas whose identification information has been conveyed.
3. The distributed antenna system according to claim 1, wherein, before the provisional determination, the base station performs an operation comprising:
upon receipt of an initial access signal from the first mobile terminal, estimating the antenna-specific received power of the initial access signal and sending a response signal to the first mobile terminal; and
upon receipt of a mobile terminal-specific identification signal from the first mobile terminal, identifying the first mobile terminal and provisionally determining the first and second antennas (a1, a2) for the first mobile terminal and the first cluster (n1) containing the first and second antennas (a1, a2) in accordance with the antenna-specific received power estimated from the initial access signal from the first mobile terminal.
4. The distributed antenna system according to claim 1, wherein, before the provisional determination, in a state where the first and second mobile terminals are communicating with the base station by respectively using the zeroth and second antennas (a0, a2) and the first and third antennas (a1, a3), the base station performs an operation comprising:
estimating the reception quality of a candidate antenna to change for each mobile terminal in accordance with a reference signal transmitted from the first and second mobile terminals on a periodic basis or at a predetermined timing; and
when the first mobile terminal is moved to change the reception quality of each antenna to let the base station detect that the first antenna (a1), which is a change destination candidate, has higher reception quality for the first mobile terminal than the zeroth antenna (a0), which is currently engaged in communication, in accordance with the result of estimation of the change destination candidate, provisionally selecting the first and second antennas (a1, a2) as changed antennas for the first mobile terminal and the first cluster (n1) containing the first and second antennas (a1, a2) as a change destination cluster.
5. The distributed antenna system according to claim 4, wherein the reference signal includes a CQI (Channel Quality Indicator) and a reference signal that is a known sequence for estimating the quality of uplink reception.
6. The distributed antenna system according to claim 1, wherein, before the provisional determination, the base station transmits a downlink reference signal in such a manner that individual antennas can be distinguished from each other; wherein each mobile terminal measures the reception quality of a candidate antenna to change in addition to the reception quality of an antenna in a currently communicating cluster by using the downlink reference signal transmitted from the base station; wherein, when the first mobile terminal detects that the first antenna (a1) has higher reception quality than the zeroth antenna (a0), which is currently engaged in communication, the first mobile terminal reports the identification information and reception quality information about currently communicating antennas (a0, a2) and the identification information and reception quality information about a candidate antenna to change (a1); and wherein the base station provisionally selects the first and second antennas (a1, a2) as changed antennas for the first mobile terminal and the first cluster (n1) containing the first and second antennas (a1, a2) as a change destination cluster in accordance with the result of measurement of the reception quality of each antenna, which is reported from the first mobile terminal.
7. The distributed antenna system according to claim 6, wherein each mobile terminal reports the identification information and reception quality information about currently communicating antennas and the identification information and reception quality information about a candidate antenna to change on a periodic basis or when the candidate antenna to change has higher reception quality than a currently communicating antenna or the currently communicating antenna has lower reception quality than a threshold value.
8. The distributed antenna system according to claim 1, wherein, in the provisional determination, the base station forms a cluster by selecting a predetermined number of antennas having relatively high received power or selecting antennas having received power equal to or higher than a predetermined threshold value or within a predetermined range.
9. The distributed antenna system according to claim 1, wherein the base station performs an operation comprising:
formulating an overload judgment by checking whether a threshold value is exceeded by the total number of mobile terminals using each antenna;
when the threshold value is exceeded by the total number of mobile terminals using a certain antenna, performing calculations on all mobile terminals using an antenna judged to be overloaded and candidate antennas to change as second or subsequent antennas to determine the total number of mobile terminals using the relevant antenna;
memorizing the identification information about a mobile terminal, the identification information about a changed antenna for the mobile terminal, and the identification information about a cluster that minimize the total number of mobile terminals using the changed antenna; and
when the total number of mobile terminals using the changed antenna is smaller than the total number of mobile terminals using a previously used antenna, determining the identification information about a mobile terminal to be subjected to an antenna change, the identification information about the changed antenna, and the identification information about the cluster.
10. The distributed antenna system according to claim 1, wherein the base station performs an operation comprising:
judging whether an evaluation function indicative of an expected throughput value or transmission speed value of each mobile terminal is below a threshold value;
when the evaluation function of a certain mobile terminal is below the threshold value, checking antennas in a cluster to which the mobile terminal belongs in order to select an antenna having the maximum total number of mobile terminals or the maximum amount of buffer as an overloaded antenna;
performing calculations on mobile terminals using candidate antennas to change for the mobile terminals and an antenna judged to be overloaded to determine an evaluation function prevailing when the antenna is replaced by a candidate antenna to change;
memorizing the identification information about a mobile terminal, the identification information about a newly selected antenna, and the identification information about a cluster that maximize the rate of evaluation function increase upon an antenna change; and
when the evaluation function prevailing after an antenna change for the mobile terminal is improved from the one prevailing before the antenna change, selecting the memorized pieces of identification information as the identification information about a mobile terminal to be subjected to the antenna change, the identification information about a changed antenna, and the identification information about a cluster.
11. The distributed antenna system according to claim 10, wherein the evaluation function used for overload judgment is calculated using the following equation:

Evaluation function E u(n)=C u(n)R cluster(n)R u(n)
where Cu(n) is a term dependent on the reception quality of cluster n for mobile terminal u, Rcluster(n) is a term dependent on time-frequency resource allocated to cluster n, and Ru(n) is a term dependent on the time-frequency resource allocated to mobile terminal u in cluster n.
12. A base station comprising:
a plurality of antennas that form clusters in accordance with the position of a mobile terminal, are shared by at least two of the clusters, and communicate data with the mobile terminal;
wherein an operation performed by the base station includes
provisionally determining a first antenna and a second antenna for a first mobile terminal and a first cluster containing the first antenna and the second antenna when a new communication is initiated or a mobile terminal is moved,
formulating an overload judgment to determine whether the provisionally determined first and second antennas are overloaded,
when the first antenna is judged to be overloaded, selecting a third antenna and a fourth antenna as changed communication antennas for a second mobile terminal communicating with the first and third antennas and a second cluster containing the third and fourth antennas as a change destination cluster for load reduction purposes,
selecting the provisionally determined first and second antennas and the first cluster as the antennas and cluster for the first mobile terminal,
conveying at least one of identification information about the selected first and second antennas and identification information about the first cluster to the first mobile terminal and conducting subsequent communication by using the antennas whose identification information has been conveyed, and
conveying at least one of identification information about the third and fourth antennas, which are selected as change destinations, and identification information about the second cluster to the second mobile terminal and conducting subsequent communication by using the antennas whose identification information has been conveyed.
13. The base station according to claim 12, further comprising:
a centralized signal processing unit that includes a plurality of logical antenna ports and processes signals for a plurality of clusters;
a cluster scheduler that determines a plurality of clusters for communicating at the same time and at the same frequency;
a user scheduler that determines a method of communicating with a mobile terminal in each cluster; and
an antenna switching unit that changes the connections between a plurality of antennas and the logical antenna ports of the centralized signal processing unit in accordance with the result of scheduling provided by the cluster scheduler.
14. A radio resource control method for a distributed antenna system that includes a base station, the base station transmitting and receiving data by using a plurality of antennas disposed in the distributed antenna system in which a plurality of clusters including one or more of some of the antennas are formed in accordance with the position of a mobile terminal, at least two clusters sharing at least one antenna, the radio resource control method comprising the steps of:
when a new communication is initiated or a mobile terminal is moved, causing the base station to provisionally determine a first antenna and a second antenna for a first mobile terminal and a first cluster containing the first antenna and the second antenna;
causing the base station to formulate an overload judgment to determine whether the provisionally determined first and second antennas are overloaded;
when the first antenna is judged to be overloaded, causing the base station to select a third antenna and a fourth antenna as changed communication antennas for a second mobile terminal communicating with the first and third antennas and a second cluster containing the third and fourth antennas as a change destination cluster for load reduction purposes;
causing the base station to select the provisionally determined first and second antennas and the first cluster as the antennas and cluster for the first mobile terminal;
causing the base station to convey at least one of identification information about the selected first and second antennas and identification information about the first cluster to the first mobile terminal and conduct subsequent communication by using the antennas whose identification information has been conveyed; and
causing the base station to convey at least one of identification information about the third and fourth antennas, which are selected as change destinations, and identification information about the second cluster to the second mobile terminal and conduct subsequent communication by using the antennas whose identification information has been conveyed.
US13/359,994 2011-02-10 2012-01-27 Distributed antenna system base station and radio resource control method Abandoned US20120208581A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2011027128A JP5379177B2 (en) 2011-02-10 2011-02-10 Distributed antenna system, base station apparatus, and radio resource control method
JP2011-027128 2011-11-24

Publications (1)

Publication Number Publication Date
US20120208581A1 true US20120208581A1 (en) 2012-08-16

Family

ID=46637300

Family Applications (1)

Application Number Title Priority Date Filing Date
US13/359,994 Abandoned US20120208581A1 (en) 2011-02-10 2012-01-27 Distributed antenna system base station and radio resource control method

Country Status (2)

Country Link
US (1) US20120208581A1 (en)
JP (1) JP5379177B2 (en)

Cited By (50)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120214528A1 (en) * 2011-02-22 2012-08-23 Hitachi, Ltd. Distributed antenna system, communication control method and base station apparatus
US20140036678A1 (en) * 2012-08-01 2014-02-06 Wistron Neweb Corporation Load Balancing Method and Related Wireless Communication Device
US20140334318A1 (en) * 2013-05-10 2014-11-13 Qualcomm Incorporated Method and apparatus for estimating an achievable link throughput based on assistance information
EP2816854A1 (en) * 2013-06-21 2014-12-24 Alcatel Lucent Load balancing between antennas and scheduling to improve throughput of cell edge users
US20150109911A1 (en) * 2012-06-14 2015-04-23 Ideaware Inc. Method of managing policy for reducing network load in overloaded area, system and recording medium thereof
US20150120901A1 (en) * 2013-10-24 2015-04-30 Cellco Partnership D/B/A Verizon Wireless Detecting poor performing devices
WO2015067376A1 (en) * 2013-11-11 2015-05-14 Telefonaktiebolaget L M Ericsson (Publ) Port selection in combined cell of radio access network
US20150208251A1 (en) * 2014-01-20 2015-07-23 Electronics And Telecommunications Research Institute Method of beamforming and 3d antenna array
US20150256237A1 (en) * 2012-11-29 2015-09-10 Corning Optical Communications LLC HYBRID INTRA-CELL / INTER-CELL REMOTE UNIT ANTENNA BONDING IN MULTIPLE-INPUT, MULTIPLE-OUTPUT (MIMO) DISTRIBUTED ANTENNA SYSTEMS (DASs)
US9184819B2 (en) * 2012-04-04 2015-11-10 Telefonaktiebolaget L M Ericsson (Publ) Selecting antennas in downlink cooperative scheduling
US20160007364A1 (en) * 2013-03-29 2016-01-07 Hangzhou H3C Technologies Co., Ltd. Access point
WO2015191530A3 (en) * 2014-06-09 2016-01-28 Airvana Lp Scheduling the same resource in radio access networks
US20160095109A1 (en) * 2014-09-30 2016-03-31 The Boeing Company Self-optimizing mobile satellite systems
US9380466B2 (en) 2013-02-07 2016-06-28 Commscope Technologies Llc Radio access networks
US9414399B2 (en) 2013-02-07 2016-08-09 Commscope Technologies Llc Radio access networks
US9414224B1 (en) * 2012-11-12 2016-08-09 Sprint Communications Company L.P. Antenna port identification
US9432095B2 (en) 2006-12-19 2016-08-30 Corning Optical Communications Wireless Ltd Distributed antenna system for MIMO technologies
WO2016178506A1 (en) * 2015-05-07 2016-11-10 Samsung Electronics Co., Ltd. Method and apparatus for selecting antennas in wireless communication system
WO2016188579A1 (en) * 2015-05-28 2016-12-01 Telefonaktiebolaget Lm Ericsson (Publ) Establishing usefulness of remote antenna units in a wireless communications system
US9525472B2 (en) 2014-07-30 2016-12-20 Corning Incorporated Reducing location-dependent destructive interference in distributed antenna systems (DASS) operating in multiple-input, multiple-output (MIMO) configuration, and related components, systems, and methods
US9673904B2 (en) 2009-02-03 2017-06-06 Corning Optical Communications LLC Optical fiber-based distributed antenna systems, components, and related methods for calibration thereof
EP3176955A1 (en) * 2015-12-04 2017-06-07 Wipro Limited Method and system for coordination multi point set determination for a wireless network
US9681313B2 (en) * 2015-04-15 2017-06-13 Corning Optical Communications Wireless Ltd Optimizing remote antenna unit performance using an alternative data channel
US9729267B2 (en) 2014-12-11 2017-08-08 Corning Optical Communications Wireless Ltd Multiplexing two separate optical links with the same wavelength using asymmetric combining and splitting
US9729238B2 (en) 2009-11-13 2017-08-08 Corning Optical Communications LLC Radio-over-fiber (ROF) system for protocol-independent wired and/or wireless communication
CN107078785A (en) * 2015-10-30 2017-08-18 华为技术有限公司 A kind of data transmission method and device
US9807722B2 (en) 2011-04-29 2017-10-31 Corning Optical Communications LLC Determining propagation delay of communications in distributed antenna systems, and related components, systems, and methods
US9806797B2 (en) 2011-04-29 2017-10-31 Corning Optical Communications LLC Systems, methods, and devices for increasing radio frequency (RF) power in distributed antenna systems
US9813127B2 (en) 2012-03-30 2017-11-07 Corning Optical Communications LLC Reducing location-dependent interference in distributed antenna systems operating in multiple-input, multiple-output (MIMO) configuration, and related components, systems, and methods
US9936470B2 (en) 2013-02-07 2018-04-03 Commscope Technologies Llc Radio access networks
US9948349B2 (en) 2015-07-17 2018-04-17 Corning Optical Communications Wireless Ltd IOT automation and data collection system
US20180167407A1 (en) * 2015-06-26 2018-06-14 Nec Corporation Information processing device, information processing system, information processing method, and storage medium
US20180219604A1 (en) * 2015-08-11 2018-08-02 Telefonaktiebolaget Lm Ericsson (Publ) Recovery from Beam Failure
US10128951B2 (en) 2009-02-03 2018-11-13 Corning Optical Communications LLC Optical fiber-based distributed antenna systems, components, and related methods for monitoring and configuring thereof
US10136200B2 (en) 2012-04-25 2018-11-20 Corning Optical Communications LLC Distributed antenna system architectures
US20190140790A1 (en) * 2015-11-30 2019-05-09 Telefonaktiebolaget Lm Ericsson (Publ) Method and apparatus for configuring a cluster
JP2020031306A (en) * 2018-08-21 2020-02-27 日本電信電話株式会社 Radio base station using distributed antenna, and scheduling method
US20200178186A1 (en) * 2015-05-14 2020-06-04 Ntt Docomo, Inc. Access Method And Access Device
US10771989B2 (en) 2018-12-20 2020-09-08 The Boeing Company Adaptive self-optimizing network using closed-loop feedback
US10785791B1 (en) 2015-12-07 2020-09-22 Commscope Technologies Llc Controlling data transmission in radio access networks
US10798667B2 (en) 2018-06-08 2020-10-06 Commscope Technologies Llc Automatic transmit power control for radio points of a centralized radio access network that primarily provide wireless service to users located in an event area of a venue
EP3622767A4 (en) * 2017-05-09 2021-01-13 Commscope Technologies LLC Zone-based homing and scheduling for centralized radio access network (c-ran) system with a cluster of baseband units
US11050616B2 (en) 2018-12-20 2021-06-29 The Boeing Company Adaptive self-optimizing network using closed-loop feedback
US11304213B2 (en) 2018-05-16 2022-04-12 Commscope Technologies Llc Dynamic uplink reuse in a C-RAN
US11395259B2 (en) 2018-05-16 2022-07-19 Commscope Technologies Llc Downlink multicast for efficient front-haul utilization in a C-RAN
US11627497B2 (en) 2018-09-04 2023-04-11 Commscope Technologies Llc Front-haul rate reduction for use in a centralized radio access network
US11671914B2 (en) 2010-10-13 2023-06-06 Corning Optical Communications LLC Power management for remote antenna units in distributed antenna systems
US11678358B2 (en) 2017-10-03 2023-06-13 Commscope Technologies Llc Dynamic downlink reuse in a C-RAN
US11770757B2 (en) * 2016-07-15 2023-09-26 Datang Mobile Communications Equipment Co., Ltd. Method and device for accessing system information area or network area
US11974269B2 (en) 2021-06-11 2024-04-30 Commscope Technologies Llc Radio access networks

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5357216B2 (en) * 2011-06-30 2013-12-04 株式会社日立製作所 Wireless communication system and method, base station apparatus, terminal apparatus
US9276685B2 (en) * 2011-10-14 2016-03-01 Qualcomm Incorporated Distributed antenna systems and methods of wireless communications for facilitating simulcasting and de-simulcasting of downlink transmissions
GB2505965B (en) * 2012-09-18 2015-06-10 Toshiba Res Europ Ltd Controller for coordinating wireless transmissions between a plurality of radio units and one or more user devices
KR102069339B1 (en) * 2012-12-21 2020-01-23 주식회사 케이티 System and method for data traffic off-load
KR102051831B1 (en) * 2013-09-13 2019-12-04 삼성전자주식회사 Method and apparatus for traffic load balancing in mobile communication system
JP6762842B2 (en) * 2016-10-20 2020-09-30 株式会社東芝 Communication relay system and communication relay method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5101501A (en) * 1989-11-07 1992-03-31 Qualcomm Incorporated Method and system for providing a soft handoff in communications in a cdma cellular telephone system
US6308085B1 (en) * 1998-03-13 2001-10-23 Kabushiki Kaisha Toshiba Distributed antenna system and method of controlling the same
US20050085197A1 (en) * 2003-10-16 2005-04-21 Rajiv Laroia Methods and apparatus of providing transmit and/or receive diversity with multiple antennas in wireless communication systems
US7286854B2 (en) * 2003-06-27 2007-10-23 Telecom Italia S.P.A. Method for configuring a communication network, related network architecture and computer program product therefor
US20110003606A1 (en) * 2004-04-02 2011-01-06 Antonio Forenza System and method for managing inter-cluster handoff of clients which traverse multiple DIDO clusters
US8064939B2 (en) * 2006-06-01 2011-11-22 Juniper Networks, Inc. Wireless load balancing
US8583182B2 (en) * 2008-04-25 2013-11-12 Nokia Siemens Networks Oy Dynamic cell configuration employing distributed antenna system for advanced cellular networks

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2445246A1 (en) * 2010-10-22 2012-04-25 NTT DoCoMo, Inc. Apparatus and method for determining a core network configuration of a wireless communication system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5101501A (en) * 1989-11-07 1992-03-31 Qualcomm Incorporated Method and system for providing a soft handoff in communications in a cdma cellular telephone system
US6308085B1 (en) * 1998-03-13 2001-10-23 Kabushiki Kaisha Toshiba Distributed antenna system and method of controlling the same
US7286854B2 (en) * 2003-06-27 2007-10-23 Telecom Italia S.P.A. Method for configuring a communication network, related network architecture and computer program product therefor
US20050085197A1 (en) * 2003-10-16 2005-04-21 Rajiv Laroia Methods and apparatus of providing transmit and/or receive diversity with multiple antennas in wireless communication systems
US20110003606A1 (en) * 2004-04-02 2011-01-06 Antonio Forenza System and method for managing inter-cluster handoff of clients which traverse multiple DIDO clusters
US8064939B2 (en) * 2006-06-01 2011-11-22 Juniper Networks, Inc. Wireless load balancing
US8583182B2 (en) * 2008-04-25 2013-11-12 Nokia Siemens Networks Oy Dynamic cell configuration employing distributed antenna system for advanced cellular networks

Cited By (105)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9432095B2 (en) 2006-12-19 2016-08-30 Corning Optical Communications Wireless Ltd Distributed antenna system for MIMO technologies
US9461719B2 (en) 2006-12-19 2016-10-04 Corning Optical Communications Wirless Ltd Distributed antenna system for MIMO technologies
US9900097B2 (en) 2009-02-03 2018-02-20 Corning Optical Communications LLC Optical fiber-based distributed antenna systems, components, and related methods for calibration thereof
US10153841B2 (en) 2009-02-03 2018-12-11 Corning Optical Communications LLC Optical fiber-based distributed antenna systems, components, and related methods for calibration thereof
US9673904B2 (en) 2009-02-03 2017-06-06 Corning Optical Communications LLC Optical fiber-based distributed antenna systems, components, and related methods for calibration thereof
US10128951B2 (en) 2009-02-03 2018-11-13 Corning Optical Communications LLC Optical fiber-based distributed antenna systems, components, and related methods for monitoring and configuring thereof
US9729238B2 (en) 2009-11-13 2017-08-08 Corning Optical Communications LLC Radio-over-fiber (ROF) system for protocol-independent wired and/or wireless communication
US11671914B2 (en) 2010-10-13 2023-06-06 Corning Optical Communications LLC Power management for remote antenna units in distributed antenna systems
US8676241B2 (en) * 2011-02-22 2014-03-18 Hitachi, Ltd. Distributed antenna system, communication control method and base station apparatus
US20120214528A1 (en) * 2011-02-22 2012-08-23 Hitachi, Ltd. Distributed antenna system, communication control method and base station apparatus
US10148347B2 (en) 2011-04-29 2018-12-04 Corning Optical Communications LLC Systems, methods, and devices for increasing radio frequency (RF) power in distributed antenna systems
US9806797B2 (en) 2011-04-29 2017-10-31 Corning Optical Communications LLC Systems, methods, and devices for increasing radio frequency (RF) power in distributed antenna systems
US9807722B2 (en) 2011-04-29 2017-10-31 Corning Optical Communications LLC Determining propagation delay of communications in distributed antenna systems, and related components, systems, and methods
US9813127B2 (en) 2012-03-30 2017-11-07 Corning Optical Communications LLC Reducing location-dependent interference in distributed antenna systems operating in multiple-input, multiple-output (MIMO) configuration, and related components, systems, and methods
US9184819B2 (en) * 2012-04-04 2015-11-10 Telefonaktiebolaget L M Ericsson (Publ) Selecting antennas in downlink cooperative scheduling
US10136200B2 (en) 2012-04-25 2018-11-20 Corning Optical Communications LLC Distributed antenna system architectures
US10349156B2 (en) 2012-04-25 2019-07-09 Corning Optical Communications LLC Distributed antenna system architectures
US20150109911A1 (en) * 2012-06-14 2015-04-23 Ideaware Inc. Method of managing policy for reducing network load in overloaded area, system and recording medium thereof
US9426691B2 (en) * 2012-08-01 2016-08-23 Wistron Neweb Corporation Load balancing method and related wireless communication device
US20140036678A1 (en) * 2012-08-01 2014-02-06 Wistron Neweb Corporation Load Balancing Method and Related Wireless Communication Device
US9414224B1 (en) * 2012-11-12 2016-08-09 Sprint Communications Company L.P. Antenna port identification
US9531452B2 (en) * 2012-11-29 2016-12-27 Corning Optical Communications LLC Hybrid intra-cell / inter-cell remote unit antenna bonding in multiple-input, multiple-output (MIMO) distributed antenna systems (DASs)
US9979444B2 (en) 2012-11-29 2018-05-22 Corning Optical Communications LLC Hybrid intra-cell/inter-cell remote unit antenna bonding in multiple-input, multiple-output (MIMO) distributed antenna systems (DASs)
US20150256237A1 (en) * 2012-11-29 2015-09-10 Corning Optical Communications LLC HYBRID INTRA-CELL / INTER-CELL REMOTE UNIT ANTENNA BONDING IN MULTIPLE-INPUT, MULTIPLE-OUTPUT (MIMO) DISTRIBUTED ANTENNA SYSTEMS (DASs)
US9654189B2 (en) 2012-11-29 2017-05-16 Corning Optical Communications LLC Hybrid intra-cell / inter-cell remote unit antenna bonding in multiple-input, multiple-output (MIMO) distributed antenna systems (DASs)
US10904897B2 (en) * 2013-02-07 2021-01-26 Commscope Technologies Llc Radio access networks
US10142858B2 (en) 2013-02-07 2018-11-27 Commscope Technologies Llc Radio access networks
US11700602B2 (en) 2013-02-07 2023-07-11 Commscope Technologies Llc Radio access networks
US9936470B2 (en) 2013-02-07 2018-04-03 Commscope Technologies Llc Radio access networks
US20160345342A1 (en) * 2013-02-07 2016-11-24 Airvana Lp Radio access networks
US10455597B2 (en) * 2013-02-07 2019-10-22 Commscope Technologies Llc Radio access networks
US10064072B2 (en) 2013-02-07 2018-08-28 Commscope Technologies Llc Radio access networks
US9414399B2 (en) 2013-02-07 2016-08-09 Commscope Technologies Llc Radio access networks
US11445455B2 (en) 2013-02-07 2022-09-13 Commscope Technologies Llc Radio access networks
US11729758B2 (en) 2013-02-07 2023-08-15 Commscope Technologies Llc Radio access networks
US9380466B2 (en) 2013-02-07 2016-06-28 Commscope Technologies Llc Radio access networks
US11122447B2 (en) 2013-02-07 2021-09-14 Commscope Technologies Llc Radio access networks
US11102663B2 (en) 2013-02-07 2021-08-24 Commscope Technologies Llc Radio access networks
US10764846B2 (en) 2013-02-07 2020-09-01 Commscope Technologies Llc Radio access networks
US11706640B2 (en) 2013-02-07 2023-07-18 Commscope Technologies Llc Radio access networks
US10292175B2 (en) 2013-02-07 2019-05-14 Commscope Technologies Llc Radio access networks
US9974088B2 (en) * 2013-03-29 2018-05-15 Hewlett Packard Enterprise Development Lp Access point
US20160007364A1 (en) * 2013-03-29 2016-01-07 Hangzhou H3C Technologies Co., Ltd. Access point
US10244545B2 (en) * 2013-03-29 2019-03-26 Hewlett Packard Enterprise Development Lp Access point
US20140334318A1 (en) * 2013-05-10 2014-11-13 Qualcomm Incorporated Method and apparatus for estimating an achievable link throughput based on assistance information
US9538439B2 (en) * 2013-05-10 2017-01-03 Qualcomm Incorporated Method and apparatus for estimating an achievable link throughput based on assistance information
EP2816854A1 (en) * 2013-06-21 2014-12-24 Alcatel Lucent Load balancing between antennas and scheduling to improve throughput of cell edge users
US20150120901A1 (en) * 2013-10-24 2015-04-30 Cellco Partnership D/B/A Verizon Wireless Detecting poor performing devices
US10122597B2 (en) * 2013-10-24 2018-11-06 Cellco Partnership Detecting poor performing devices
US10080230B2 (en) * 2013-11-11 2018-09-18 Telefonaktiebolaget Lm Ericsson (Publ) Port selection in combined cell of radio access network
WO2015067376A1 (en) * 2013-11-11 2015-05-14 Telefonaktiebolaget L M Ericsson (Publ) Port selection in combined cell of radio access network
US20160330745A1 (en) * 2013-11-11 2016-11-10 Telefonaktiebolaget Lm Ericsson (Publ) Port selection in combined cell of radio access network
US20150208251A1 (en) * 2014-01-20 2015-07-23 Electronics And Telecommunications Research Institute Method of beamforming and 3d antenna array
US9479238B2 (en) * 2014-01-20 2016-10-25 Electronics And Telecommunications Research Institute Method of beamforming and 3D antenna array
EP3657882A1 (en) * 2014-06-09 2020-05-27 Commscope Technologies LLC Radio access networks using plural remote units
AU2021201369B2 (en) * 2014-06-09 2022-03-24 Commscope Technologies Llc Scheduling the same resource in radio access networks
US10536959B2 (en) 2014-06-09 2020-01-14 Commscope Technologies Llc Radio access networks in which remote units are configured to perform at least some baseband processing
AU2019205993B2 (en) * 2014-06-09 2020-12-17 Commscope Technologies Llc Scheduling the same resource in radio access networks
CN106797641A (en) * 2014-06-09 2017-05-31 艾尔瓦纳有限合伙公司 Identical resource is dispatched in radio access network
US11082997B2 (en) * 2014-06-09 2021-08-03 Commscope Technologies Llc Radio access networks in which mobile devices can be scheduled to use the same time-frequency resource
AU2022201683B2 (en) * 2014-06-09 2023-09-14 Commscope Technologies Llc Scheduling the same resource in radio access networks
WO2015191530A3 (en) * 2014-06-09 2016-01-28 Airvana Lp Scheduling the same resource in radio access networks
AU2015274867C1 (en) * 2014-06-09 2019-10-24 Commscope Technologies Llc Scheduling the same resource in radio access networks
US10057916B2 (en) 2014-06-09 2018-08-21 Commscope Technologies Llc Radio access networks in which mobile devices in the same communication cell can be scheduled to use the same airlink resource
AU2015274867B2 (en) * 2014-06-09 2019-05-02 Commscope Technologies Llc Scheduling the same resource in radio access networks
US9525472B2 (en) 2014-07-30 2016-12-20 Corning Incorporated Reducing location-dependent destructive interference in distributed antenna systems (DASS) operating in multiple-input, multiple-output (MIMO) configuration, and related components, systems, and methods
US10256879B2 (en) 2014-07-30 2019-04-09 Corning Incorporated Reducing location-dependent destructive interference in distributed antenna systems (DASS) operating in multiple-input, multiple-output (MIMO) configuration, and related components, systems, and methods
US9929786B2 (en) 2014-07-30 2018-03-27 Corning Incorporated Reducing location-dependent destructive interference in distributed antenna systems (DASS) operating in multiple-input, multiple-output (MIMO) configuration, and related components, systems, and methods
US9942892B2 (en) * 2014-09-30 2018-04-10 The Boeing Company Self-optimizing mobile satellite systems
US20160095109A1 (en) * 2014-09-30 2016-03-31 The Boeing Company Self-optimizing mobile satellite systems
US9729267B2 (en) 2014-12-11 2017-08-08 Corning Optical Communications Wireless Ltd Multiplexing two separate optical links with the same wavelength using asymmetric combining and splitting
US10135561B2 (en) 2014-12-11 2018-11-20 Corning Optical Communications Wireless Ltd Multiplexing two separate optical links with the same wavelength using asymmetric combining and splitting
US10009094B2 (en) * 2015-04-15 2018-06-26 Corning Optical Communications Wireless Ltd Optimizing remote antenna unit performance using an alternative data channel
US9681313B2 (en) * 2015-04-15 2017-06-13 Corning Optical Communications Wireless Ltd Optimizing remote antenna unit performance using an alternative data channel
US20170244475A1 (en) * 2015-04-15 2017-08-24 Corning Optical Communications Wireless Ltd Optimizing remote antenna unit performance using an alternative data channel
US10461899B2 (en) 2015-05-07 2019-10-29 Samsung Electronics Co., Ltd. Method and apparatus for selecting antennas in wireless communication system
KR20160131519A (en) * 2015-05-07 2016-11-16 삼성전자주식회사 Method and apparatus for selecting antenna in wireless communication system
WO2016178506A1 (en) * 2015-05-07 2016-11-10 Samsung Electronics Co., Ltd. Method and apparatus for selecting antennas in wireless communication system
KR102288804B1 (en) * 2015-05-07 2021-08-11 삼성전자 주식회사 Method and apparatus for selecting antenna in wireless communication system
CN107580756A (en) * 2015-05-07 2018-01-12 三星电子株式会社 Method and apparatus for selecting antenna in a wireless communication system
US20200178186A1 (en) * 2015-05-14 2020-06-04 Ntt Docomo, Inc. Access Method And Access Device
US10405203B2 (en) 2015-05-28 2019-09-03 Telefonaktiebolaget Lm Ericsson (Publ) Establishing usefulness of remote antenna units in a wireless communications system
WO2016188579A1 (en) * 2015-05-28 2016-12-01 Telefonaktiebolaget Lm Ericsson (Publ) Establishing usefulness of remote antenna units in a wireless communications system
US20180167407A1 (en) * 2015-06-26 2018-06-14 Nec Corporation Information processing device, information processing system, information processing method, and storage medium
US10819720B2 (en) * 2015-06-26 2020-10-27 Nec Corporation Information processing device, information processing system, information processing method, and storage medium
US9948349B2 (en) 2015-07-17 2018-04-17 Corning Optical Communications Wireless Ltd IOT automation and data collection system
US20180219604A1 (en) * 2015-08-11 2018-08-02 Telefonaktiebolaget Lm Ericsson (Publ) Recovery from Beam Failure
US10848230B2 (en) * 2015-08-11 2020-11-24 Telefonaktiebolaget Lm Ericsson (Publ) Recovery from beam failure
CN107078785A (en) * 2015-10-30 2017-08-18 华为技术有限公司 A kind of data transmission method and device
US10999028B2 (en) * 2015-11-30 2021-05-04 Telefonaktiebolaget Lm Ericsson (Publ) Method and apparatus for configuring a cluster
US20190140790A1 (en) * 2015-11-30 2019-05-09 Telefonaktiebolaget Lm Ericsson (Publ) Method and apparatus for configuring a cluster
EP3176955A1 (en) * 2015-12-04 2017-06-07 Wipro Limited Method and system for coordination multi point set determination for a wireless network
US10785791B1 (en) 2015-12-07 2020-09-22 Commscope Technologies Llc Controlling data transmission in radio access networks
US11770757B2 (en) * 2016-07-15 2023-09-26 Datang Mobile Communications Equipment Co., Ltd. Method and device for accessing system information area or network area
EP3622767A4 (en) * 2017-05-09 2021-01-13 Commscope Technologies LLC Zone-based homing and scheduling for centralized radio access network (c-ran) system with a cluster of baseband units
US11678358B2 (en) 2017-10-03 2023-06-13 Commscope Technologies Llc Dynamic downlink reuse in a C-RAN
US11304213B2 (en) 2018-05-16 2022-04-12 Commscope Technologies Llc Dynamic uplink reuse in a C-RAN
US11395259B2 (en) 2018-05-16 2022-07-19 Commscope Technologies Llc Downlink multicast for efficient front-haul utilization in a C-RAN
US10798667B2 (en) 2018-06-08 2020-10-06 Commscope Technologies Llc Automatic transmit power control for radio points of a centralized radio access network that primarily provide wireless service to users located in an event area of a venue
JP7044012B2 (en) 2018-08-21 2022-03-30 日本電信電話株式会社 Radio base station and scheduling method using distributed antenna
JP2020031306A (en) * 2018-08-21 2020-02-27 日本電信電話株式会社 Radio base station using distributed antenna, and scheduling method
US11627497B2 (en) 2018-09-04 2023-04-11 Commscope Technologies Llc Front-haul rate reduction for use in a centralized radio access network
US10771989B2 (en) 2018-12-20 2020-09-08 The Boeing Company Adaptive self-optimizing network using closed-loop feedback
US11050616B2 (en) 2018-12-20 2021-06-29 The Boeing Company Adaptive self-optimizing network using closed-loop feedback
US11974269B2 (en) 2021-06-11 2024-04-30 Commscope Technologies Llc Radio access networks

Also Published As

Publication number Publication date
JP2012169741A (en) 2012-09-06
JP5379177B2 (en) 2013-12-25

Similar Documents

Publication Publication Date Title
US20120208581A1 (en) Distributed antenna system base station and radio resource control method
US10135516B2 (en) Method and device for operating beam mode in wireless communication system
US8320926B2 (en) Methods and arrangements in a wireless communication system
US9026124B2 (en) System and method for interference mitigation in a wireless communications system
US10110294B2 (en) Adaptive use of receiver diversity
RU2648688C1 (en) Wireless communication system, base station, mobile station and wireless communication method
US9538400B2 (en) Radio communication system, base station, mobile station, and radio communication method
EP2529586B1 (en) Methods of determining uplink target signal-to-interfernce-and-noise ratios and systems thereof
WO2010053044A1 (en) Mobile terminal apparatus and radio base station apparatus
EP3048752B1 (en) Method and apparatus for management of frequency-division-duplex and time-division-duplex carrier aggregation
US9137702B2 (en) Methods and devices for multipoint transmission
WO2016055092A1 (en) Cell shaping in wireless communications networks
CN109565315B (en) Network node, terminal and method for transmitting and receiving reference signaling by using antenna array
WO2016155776A1 (en) Selection of a serving cell taking into consideration beamforming gains
US9445424B2 (en) Radio base station and method for scheduling radio resources for user equipment
US20160204919A1 (en) Method and Controlling Node for Controlling Radio Communication in a Cellular Network
EP3412058B1 (en) Control plane connectivity for wireless devices
US11283501B2 (en) Methods and apparatus relating to a wireless communication network that utilises beamforming
JP6168169B2 (en) Wireless communication system, base station, mobile station, and wireless communication method
KR102511752B1 (en) Interference avoidance control device and interference avoidance control method
US9246556B2 (en) Radio network control
Pan et al. Dual Adaptive Modulation and Coding for Mitigating UE-UE Interference in Heterogeneous TDD Slot Configurations

Legal Events

Date Code Title Description
AS Assignment

Owner name: HITACHI, LTD., JAPAN

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:ISHIDA, HITOSHI;FUJISHIMA, KENZABURO;JIA, YUNJIAN;REEL/FRAME:027744/0558

Effective date: 20120120

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION