US20130118188A1 - Method of defrosting an energy recovery ventilator unit - Google Patents

Method of defrosting an energy recovery ventilator unit Download PDF

Info

Publication number
US20130118188A1
US20130118188A1 US13/293,454 US201113293454A US2013118188A1 US 20130118188 A1 US20130118188 A1 US 20130118188A1 US 201113293454 A US201113293454 A US 201113293454A US 2013118188 A1 US2013118188 A1 US 2013118188A1
Authority
US
United States
Prior art keywords
air
defrost
zone
energy recovery
unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US13/293,454
Inventor
Justin McKie
Eric Perez
Herman Marcus Thomas
Steve Schneider
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Lennox Industries Inc
Original Assignee
Lennox Industries Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Lennox Industries Inc filed Critical Lennox Industries Inc
Priority to US13/293,454 priority Critical patent/US20130118188A1/en
Assigned to LENNOX INDUSTRIES INC. reassignment LENNOX INDUSTRIES INC. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: MCKIE, JUSTIN, PEREZ, ERIC, SCHNEIDER, STEVE, THOMAS, HERMAN MARCUS
Publication of US20130118188A1 publication Critical patent/US20130118188A1/en
Priority to US14/641,090 priority patent/US9791163B2/en
Priority to US15/708,530 priority patent/US10386087B2/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/30Control or safety arrangements for purposes related to the operation of the system, e.g. for safety or monitoring
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/30Control or safety arrangements for purposes related to the operation of the system, e.g. for safety or monitoring
    • F24F11/41Defrosting; Preventing freezing
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F12/00Use of energy recovery systems in air conditioning, ventilation or screening
    • F24F12/001Use of energy recovery systems in air conditioning, ventilation or screening with heat-exchange between supplied and exhausted air
    • F24F12/006Use of energy recovery systems in air conditioning, ventilation or screening with heat-exchange between supplied and exhausted air using an air-to-air heat exchanger
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F2140/00Control inputs relating to system states
    • F24F2140/30Condensation of water from cooled air

Definitions

  • This application is directed, in general, to space conditioning systems and methods for conditioning the temperature and humidity of an enclosed space using an energy recovery ventilator unit, and in particular, to methods and devices for defrosting energy recovery ventilator units.
  • Energy recovery ventilator units are often used in space conditioning systems to maintain air quality while minimizing energy losses. Sometimes the energy recovery ventilator unit can become frosted, thereby reducing the functionality of the unit.
  • One embodiment of the disclosure is a method defrosting an energy recovery ventilator unit.
  • the method comprises activating a defrost process of an enthalpy-exchange zone of the energy recovery ventilator unit when an air-flow blockage in the enthalpy-exchange zone coincides with a frost threshold in the ambient environment surrounding the energy recovery ventilator unit.
  • the method also comprises terminating the defrost process, including terminating the defrost process when an operating condition in the vicinity of the enthalpy-exchange zone substantially returns to a pre-frosting operating condition.
  • the energy recovery ventilator unit comprises a defrost control module configured to activate the defrost process and to terminate the defrost process, as described above.
  • FIG. 1 presents a flow diagram showing selected steps in an example method of defrosting an energy recovery ventilator unit according to the principles of the disclosure
  • FIG. 2 presents an cross-sectional view of an example energy recovery ventilator unit of the present disclosure
  • FIG. 3 presents a flow diagram of an example implementation of the method of the disclosure in the case where the energy recovery ventilator unit does not include a powered heat source or a secondary air-intake opening;
  • FIG. 4 presents a flow diagram of another example implementation of the method of the disclosure in the case where the energy recovery ventilator unit does include a powered heat source but does not include a secondary air intake opening;
  • FIG. 5 presents a flow diagram of another example implementation of the method of the disclosure in the case where the energy recovery ventilator unit does include a powered heat source 250 but not a secondary air-intake opening;
  • FIG. 6 presents a flow diagram of another example implementation of the method of the disclosure in the case where the energy recovery ventilator unit does include a powered heat source and a secondary air-intake opening.
  • FIG. 1 presents a flow diagram showing selected steps in an example method of defrosting an energy recovery ventilator unit according to the principles of the disclosure.
  • FIG. 2 presents a perspective view of an example energy recovery ventilator unit 200 of the disclosure, which can include but is not limited to, any of the design layouts and any of the components parts described in Appl-1.
  • the unit 200 can be part of a space conditioning system 202 .
  • the unit 200 can comprise a cabinet 205 housing an intake air zone 210 (e.g., sometimes a primary intake air zone), a supply air zone 212 , a return air zone 214 , an exhaust air zone 216 and an enthalpy-exchange zone 218 .
  • the intake zone 210 and the exhaust zone 216 are both on one side 220 of the enthalpy exchange zone 218
  • the supply zone 212 and the return zone 214 are both on an opposite side 225 of the enthalpy exchange zone 218 .
  • the energy recovery ventilator unit 100 also comprises a first blower 230 and a second blower 235 .
  • the first blower 230 is located in the intake zone 210 and is configured to push, or alternatively pull, outside air into the intake zone 210 and straight through the enthalpy exchange zone 218 into the supply zone 212 .
  • the second blower 235 is located in the return zone 214 and is configured to push, or alternatively pull, return air into the return zone 214 and straight through the enthalpy exchange zone 218 into the exhaust zone 216 .
  • the enthalpy exchange zone 218 can include one or more enthalpy-exchanger devices 240 configured as one or more enthalpy wheels or other enthalpy-exchange devices such as plated heat exchangers or heat pipes or other devices familiar to those skilled in the art.
  • the unit can further include a defrost control module 245 which as illustrated, can be located on the outside surface of the cabinet 205 although other located are within the scope of the disclosed unit 200 .
  • the method 100 of defrosting the energy recovery ventilator unit 200 comprises a step 105 of activating a defrost process of an enthalpy-exchange zone 218 of the energy recovery ventilator unit 200 when an air-flow blockage in the enthalpy-exchange zone 218 coincides with a frost threshold in the ambient environment surrounding the energy recovery ventilator unit 200 .
  • some embodiments of the method 100 can include a step 107 of determining if an air-flow blockage exists in the enthalpy-exchange zone 218 .
  • Step 107 can include any of the processes described in Appl-2 for determining the presence of an air-flow blockage through an enthalpy-exchange zone 218 .
  • step 107 can include determining a pressure difference across the enthalpy-exchange zone 218 while the energy recovery ventilator unit 200 is operating.
  • step 107 can include determining a heat transfer efficiency across the enthalpy-exchange zone 218 while the energy recovery ventilator unit 200 is operating.
  • the pressure or heat transfer efficiency can be compared to the analogous operational characteristic of pressure or heat transfer when the unit 200 determined during step 108 when the unit 200 was in a known normal operating condition.
  • the pressure difference increases or heat transfer decreases beyond a pre-defined limit the presence of an air-flow blockage is signaled, such as disclosed in Appl-2.
  • some embodiments of the method 100 can include a step 109 of determining if the air-flow blockage in the enthalpy-exchange zone coincides with a frost threshold existing in the ambient environment surrounding the unit 200 .
  • frost threshold refers to a pre-selected temperature value corresponding to the measured ambient air-temperature surrounding the energy recovery ventilator unit at which frost formation will occur.
  • the frost threshold can correspond to a pre-selected temperature value in a range of 20 to 32° F.
  • the frost threshold can be pre-selected temperature value that is adjusted depending on the relative humidity within energy recovery ventilator unit 200 .
  • the frost threshold may be a temperature value of 20° F. when the relative humidity is low (e.g., 30 percent or lower) but linearly adjusted to 32° F. as the relative humidity reaches 100 percent.
  • the defrost process (step 105 ) can be activated.
  • a non-frost failure mode step 110 can be activated. This can advantageously prevent the unit 200 from going into a defrost mode when it is determined a frosting condition unlikely to have occurred.
  • the procedures followed when the non-frost failure mode (step 110 ) is activated can include any of the processes described in Appl-2.
  • the method 100 also comprises a step 115 of terminating the defrost process, including a step 116 of terminating the defrost process when an operating condition in the vicinity of the enthalpy-exchange zone 218 substantially returns to a pre-frosting operating condition.
  • operating condition refers to an environmental conditions or properties at one or more locations in the unit 200 that is measurable while the unit 200 is operating either before or during the defrost process (step 110 ).
  • pre-frosting operating condition refers to the environmental condition when the unit 200 was in a normal operating state step 108 (e.g., prior to detecting a air-flow blockage in step 107 )
  • defrosting can reduce the energy and heat transfer efficiency of the unit 200 , and in some cases damage components (e.g., the enthalpy-exchanger devices 240 ) of the unit 200 .
  • damage components e.g., the enthalpy-exchanger devices 240
  • terminating the defrost process can include monitoring one or more different operating conditions of the unit 200 .
  • terminating the defrost process can further include a step 117 of determining the operating condition (as part of step 116 ), which includes measuring an air-pressure difference across the enthalpy-exchange zone 218 while the unit 200 is operating.
  • step 116 the operating condition
  • pressure transducers 242 situated on either side of the enthalpy zone 218 , can monitor the pressure during defrost process (step 110 ) as well as during pre-defrost conditions, such as determined, e.g., during a normal operating state (step 109 ).
  • terminating the defrost process includes terminating after the operating condition, corresponding to the measured air-pressure difference across the enthalpy-exchange zone 218 , has decreased to substantially equal to (e.g., within ⁇ 10% in some cases) the pre-frosting operating condition, corresponding to an air-pressure difference across the enthalpy-exchange zone 218 measured prior to activating the defrost process (e.g., measured during step 109 ).
  • terminating the defrost process (step 115 ) further includes a step 119 of determining the operating condition (as part of step 116 ), which includes measuring a heat transfer efficiency across the enthalpy-exchange zone 218 while the unit 200 is operating.
  • temperature sensor 244 situated on either side of the enthalpy zone 218 , can monitor the temperature during defrost process (step 110 ) as well as during pre-defrost conditions, such as determined, e.g., during a normal operating state (step 109 ).
  • the heat transfer efficiency is proportional to the ratio of: the temperature difference between the intake air zone 210 and the supply air zone 212 divided by the temperature difference between the return air zone 214 and the intake air zone 210 .
  • the temperature difference between the difference between return air zone 214 and intake air zone 210 is considered to represent the overall heat transfer occurring in the unit 200 , e.g., that drives energy transfer, while the temperature difference between the intake air zone 210 and the supply air zone is considered to represent the actual heat transfer occurring.
  • terminating the defrost process includes terminating after the operating condition, corresponding to the measured heat transfer efficiency across the enthalpy-exchange zone 218 , has decreased to be substantially equal to (e.g., within ⁇ 10% in some cases) the pre-frosting operating condition, corresponding to a heat transfer efficiency across the enthalpy-exchange zone 218 measured prior to activating the defrost process (e.g., measured during step 109 ).
  • the non-defrost failure mode (step 110 ) is entered.
  • step 115 it is also desirable to terminate the defrost process (step 115 ) after a measured pre-selected time limit is reached (step 120 ). This can advantageously prevent excessive energy and time being expended on defrosting when the enthalpy exchange zone 218 is blocked for reason other than frosting.
  • the time limit measured in step 120 has reached the pre-selected time limit (e.g., a defrosting time limit has expired)
  • the non-defrost failure mode is entered.
  • some embodiments of the method 100 provide multiple defrosting strategies that can be implemented, either alone or in combination, as part of the defrosting process 105 , and implements in a fashion that depends on the ambient environmental conditions surrounding the unit 200 or on the components that are included in the unit 200 .
  • the activated defrost process (step 105 ) further includes a step 130 of activating a powered heat source 250 configured to warm air in the intake air zone 210 or the exhaust air zone 216 located inside of the unit 200 .
  • the powered heat source 250 can pre-heat the ambient cold air outside of the unit to thereby facilitate rapid defrosting.
  • the powered heat source 250 can be an electric heater.
  • a gas-fired heat exchanger could be used.
  • the powered heat source 250 is, or includes, a modular electric heater coupled to the outside of the unit 200 and located upstream of an air intake opening 252 of the intake air zone 210 .
  • modular electric heater refers to a self-contained heater that includes one or more of temperature sensors, electrical power connections, device control connections, as integral parts of the heater 250 , thereby facilitating field-installation of the heater 250 , e.g., to a previously installed unit 200 .
  • activating the powered heat source 250 in step 130 further including a step 132 of adjusting the powered heat source 250 to one of a plurality of different levels of heat generation as a function of an ambient air temperature surrounding the unit 200 . For instance, if the ambient air temperature is at or below a pre-selected set-point (e.g., 20° F. in some cases) then the heater 250 can be adjusted to a high level of heating. If the ambient air temperature is above the set-point then the heater 250 can be adjusted to a low level of heating.
  • a pre-selected set-point e.g. 20° F. in some cases
  • Having the ability to adjust to plurality of different levels facilitates using the full heating the potential of the heater at certain times, but, avoiding excessive heating at other times, that could damage, e.g., due to melting or softening of plastic parts in the enthalpy exchange device 240 , or other components of the unit 200 .
  • the activated defrost process (step 105 ) further includes a step 135 of reducing airflow from an air intake zone 210 located inside of the unit 200 to the enthalpy exchange-zone 218 .
  • the speed of the air blower 230 located in the intake air zone 210 can be reduced.
  • the speed of the air blower 230 is reduced by about 20 to 30 percent as compared to the speed of the air blower when the unit 200 is in its normal operating state (e.g., step 108 ). Reducing the airflow can facilitate defrosting because the amount of cold air drawn into the unit 200 from the ambient outside air is reduced.
  • reducing the airflow from the air-intake zone 210 (step 135 ) at or during the same time as activating the heat source 250 (step 130 ) can speed defrosting because the temperature of the air reaching the enthalpy zone 218 is increased.
  • the activated defrost process (step 105 ) further includes a step 140 of activating an air controller assembly 260 so as to allow air-flow through a secondary air-intake opening 262 connected to the supply zone 212 located inside of the unit 200 .
  • the air controller assembly 260 can include baffles or dampers 264 which are configured to be continuously adjustable to allow substantially no air, to large volumes of air, to pass through the secondary intake opening 260 .
  • FIG. 2 only a partial cut-away view of the example air controller assembly 260 is depicted so that the supply air zone 212 and secondary input opening 262 can be more clearly depicted.
  • the air controller assembly 260 is activated in step 140 when the air flow through the primary air intake zone 210 is reduced in step 135 .
  • allowing air through the secondary air-intake opening 262 is important to meeting certain fresh air requirements that must be met, even when performing the defrost process (step 105 ).
  • the reduction in the air flow from the air intake zone 210 and an increase in the air-flow through the secondary air-intake opening 262 are coordinated such that the air-pressure inside of the unit 200 substantially equals an ambient air pressure surrounding unit 200 .
  • the air controller assembly 260 is activated such that there is a slightly negative pressure compared to the global demand pressure (e.g., within about 0.1 to ⁇ 0.2 inches, water column) to help prevent any ensure that any air conditioned by the enthalpy exchange zone 218 does not get blown out of the unit 200 (e.g., through the secondary air-intake opening 262 ) before being transferred into a air-handler unit 510 , (e.g., heating ventilation and cooling system, such as a roof top unit), coupled to the unit 200 .
  • a slightly negative pressure compared to the global demand pressure (e.g., within about 0.1 to ⁇ 0.2 inches, water column) to help prevent any ensure that any air conditioned by the enthalpy exchange zone 218 does not get blown out of the unit 200 (e.g., through the secondary air-intake opening 262 ) before being transferred into a air-handler unit 510 , (e.g., heating ventilation and cooling system, such as a roof top unit), coupled to
  • the defrost process (activated in step 105 ) further includes a step 145 of activating a heat source 270 of an air-handling unit 272 that is coupled to the unit 200 , such that the air exiting the air-handling unit 272 is heated to a substantially same temperature than before the defrosting process was activated (step 105 ).
  • the heater 270 of the air-handling unit 272 can be a gas-fired heater, electric heater or other heater familiar to those skilled in the art.
  • the air-handling unit is located down-stream, and configured to receive air, from the unit 200 .
  • the air-handling unit can be part of the space conditioning system 202 .
  • Activating the heat source 270 of an air-handling unit 272 in step 145 can advantageously heat cold outside air through the secondary air-intake opening 262 and thereby make the conditioned space more comfortable during the defrosting process 115 .
  • the heat source 270 in the air-handling unit 272 is activated in step 145 at the same time, or before, the air controller assembly is activated in step 140 .
  • the air controller assembly in step 140 cases dampers 264 covering the secondary air-intake opening 262 can take one to two minutes to fully open.
  • activating the heater 270 can pre-heat the air such that when the secondary air-intake opening 262 is fully opened, the air reaching the conditioned space is preheated to substantially same temperature as before the defrosting process started.
  • the energy recovery ventilator unit 200 can comprise any of embodiments of the unit 200 discussed in the context of FIG. 1 and presented in FIG. 2 .
  • the unit 200 comprises a defrost control module 245 is configured to activate the defrost process (step 105 ) and terminate the defrost process (step 115 ), such as disclosed in the context of FIG. 1 .
  • Embodiments of the unit 200 can include the components such as the intake air zone, 210 , supply air zone 212 , return air zone 214 , exhaust air zone 216 , enthalpy exchange zone 218 , as disclosed above and as further disclosed in Appl-1, Appl-2 and Appl-3.
  • the unit 200 can include pressure transducers 242 configured to measuring an air-pressure difference across the enthalpy-exchange zone 218 while the unit 200 is operating.
  • the pressure transducers 242 can be configured to transmit the measured air pressure difference to the defrost control module 245 , and the defrost control module 245 can be configured to determine the operating condition as including the air-pressure difference in accordance with step 117 .
  • the unit 200 can include temperature sensors configured to measuring air temperatures 244 of the intake zone 210 , a supply air zone 212 , and a return air zone 214 located inside of the unit 200 .
  • the temperature sensors 244 can be configured to transmit the measured air temperatures to the defrost control module 245 .
  • the defrost control module 245 can be configured to determine the operating condition as including a heat transfer efficiency determined from the measured air temperatures, in accordance with step 119 .
  • the defrost module 245 can be configured to terminate the defrost process (step 115 ) after a preselected time limit is reached.
  • the defrost module 245 includes an electronic timing circuit that monitors the time when the defrost process was activated in step 105 , and compare the accumulated defrosting time to the preselected time limit, e.g., as set by factory or installation personnel.
  • the unit 200 can further include a powered heat source 250 configured to warm air in the intake air zone 210 or the exhaust air zone 216 located inside of the unit 200 , and the defrost control module can be configured to activate or deactivate the heat source 250 .
  • the powered heat source 250 includes, or is, a modular electric heater configured to be coupled to the outside of the unit 200 and located upstream of the air intake opening 252 of the intake air zone 210 .
  • the defrost module 245 can be configured to control the airflow from the air intake zone 210 located inside unit 200 to the enthalpy exchange-zone 218 .
  • the defrost module 245 includes an electronic circuit configured to control the speed of the air intake blower 250 located in the intake air zone 210 , in accordance with step 135 .
  • the unit 200 can further include an air controller assembly 260 configured to adjust an amount of air-flow through a secondary air-intake opening 262 connected to a supply zone 212 located inside of the unit 200 , and the defrost control module 245 can be configured to control the air controller assembly 260 to increase or decrease the amount of air allowed through the secondary air-intake opening 262 .
  • an air controller assembly 260 configured to adjust an amount of air-flow through a secondary air-intake opening 262 connected to a supply zone 212 located inside of the unit 200
  • the defrost control module 245 can be configured to control the air controller assembly 260 to increase or decrease the amount of air allowed through the secondary air-intake opening 262 .
  • the defrost control module 245 can be configured the control a heat source 270 of an air-handling unit 272 that is coupled to the unit 200 .
  • the defrost module 245 includes an electronic circuit that is configured to activate the heat source 272 , e.g., when there is air flowing through the secondary intake air opening 262 , such that the air exiting the space conditioning system is heated to a substantially same temperature than before the defrosting process was activated.
  • the electronic circuit can be configured to deactivate the heat source 272 , when the defrosting process in terminated in step 115 , or when there is not longer air flowing through the secondary intake air opening 262 .
  • FIGS. 3-6 present of example implementations of the method 100 and the unit 200 .
  • FIG. 3 presents a flow diagram of an example implementation of the method 100 in the case where the unit 200 does not include a powered heat source 250 or a secondary air-intake opening 262 .
  • the method 100 can include a starting a defrost check mode (step 301 ) which can include: step 303 of turning on the enthalpy exchange device 240 (e.g., make sure an enthalpy wheel device 240 is rotating), step 305 of verifying that the blower 250 is at the proper set point for heat transfer to occur, and step 307 (an example of step 109 ) of deciding whether to enter defrost mode including, e.g. measuring the outside air temperature and determining if the temperature is above the frost threshold.
  • step 301 can include: step 303 of turning on the enthalpy exchange device 240 (e.g., make sure an enthalpy wheel device 240 is rotating), step 305 of verifying that the blower 250 is at the proper set point for heat transfer to occur, and step 30
  • the defrost check can include entering a non-frost failure mode step 310 (an example of step 110 ), if it is decided, in step 307 , that the blockage is not due to frost formation.
  • the defrost check can include a step 313 of deciding if there is a heater 250 installed. If there is a heater 250 installed, then other procedures such as set forth in FIGS. 4-8 may be followed. If there is not a heater 250 installed, then a blower defrost mode (step 315 ) is entered (an example of step 105 ).
  • the blower defrost mode can include a step 317 of reducing the air flow to the enthalpy exchange zone 218 e.g., by increasing the speed of the blower 230 (an example of step 135 ), a step 319 of commencing a timer, a step 321 of monitoring the accumulated time and determining in step 323 if a time-limit is reached (examples of step 120 ).
  • step 325 of further increasing the air flow is activated and in step 327 the operating condition (e.g., pressure difference and/or heat transfer efficiency) is measured (an example of steps 116 , 117 , 119 ).
  • step 329 it is decided if the operating condition (e.g., pressure or heat transfer efficiency) is not different than the pre-frosting operating condition. If there is no difference, then the blower defrost mode (step 315 ) is terminated (an example of step 115 ) and the unit 200 returns to a normal operating state in step 331 (an example of step 108 ). If there is still a difference in the operating condition compared to the pre-frosting condition, then a second blower defrost mode (step 333 ) is entered (an example continuation of step 105 ).
  • the operating condition e.g., pressure difference and/or heat transfer efficiency
  • the second blower defrost mode includes steps 335 , 337 , 339 , 341 , 343 , 345 , and 347 which are analogous to steps 317 , 319 , 321 , 323 , 325 , 327 , and 329 , respectively, with the exception that the air flow reduction in step 335 is greater than the air flow reduction in step 317 (e.g., blower 230 speed is further lowered).
  • a third blower defrost mode (step 353 ) is entered (an example of continuing step 105 ).
  • the third blower defrost mode includes steps 355 , 357 , 359 , 361 , 363 , 365 , and 367 which are analogous to steps 317 , 319 , 321 , 323 , 325 , 327 , and 329 , respectively, with the exception that the air flow reduction in step 355 is more (e.g., blower 230 speed is lower) than the air flow reduction in step 317 or step 335 .
  • the air flow is reduced to zero in step 355 (e.g., the blower 230 is turned off), while in other cases there is still air flow to enthalpy exchange zone 218 .
  • the time-limit set in step 339 can be different than the time-limit set in step 319 .
  • blower defrost modes could be increased or decreased compared to that depicted in FIG. before after a final decision step (e.g., step 367 ) that the is still a difference in the pressure difference or heat transfer efficiency compared to a pre-frosting operating condition and the a non-frost failure mode step 310 is activated.
  • FIG. 4 presents a flow diagram of another example implementation of the method 100 in the case where the unit 200 does include a powered heat source 250 but does not include the secondary air intake opening 262 .
  • the same numbers indicate steps that are analogous to the steps described in FIG. 3 , with the exception that instead of a blower defrost mode step 315 , there is a combined blower and heating defrost mode step 415 , which can include activating the powered heat source 250 (an example of step 130 , as part of step 105 ) and reducing the air flow such as described in the context of the defrost mode 315 disclosed in FIG. 3 .
  • an electric heater 250 can be staged to different heating levels based on an outside air temperature measured in the air-intake zone 210 the control module 245 can lower the intake air blower 230 speed, and electric heater 250 heater operated at a low heating level, until the pressure difference across the enthalpy zone 218 (e.g., an enthalpy wheel intake pressure minus a the wheel exhaust pressure) are at pre-frost conditions. If frosting not addressed the speed of the blower 230 can be reduced to an allowable minimum and electric heater will operate at a higher heating level.
  • FIG. 5 presents a flow diagram of another example implementation of the method 100 in the case where the unit 200 does include a powered heat source 250 but not the secondary air-intake opening 262 .
  • the same numbers indicate steps that are analogous to the steps described in FIG. 3 .
  • a blower defrost mode step 315 or combined blower defrost mode and heating mode step 415 ( FIG. 4 )
  • there is a staged heating defrost mode step 515 (an example of step 130 as part of step 105 ).
  • step 517 it determined if there outside air temperature is below a pre-selected temperature.
  • a low level of heating is selected (an example of step 132 ). If the outside air temperature is below the pre-selected temperature, then at step 521 , a high level of heating is selected (again an example of step 132 ). Alternatively, if after the time-limit set in step 319 has expired and there is still a difference in the pressure difference or heat transfer efficiency compared to a pre-frosting operating condition, the heating can transition at step 323 from the low level (step 519 ) to the high level (step 521 ).
  • the staged heating mode step 515 can transition at step 523 to the combined blower defrost mode and heating mode step 415 as described in FIG. 4 .
  • an electric heater 250 is staged in as quickly as possible to facilitate continued delivery the correct amount of fresh air.
  • the pressure across the enthalpy zone 218 can be monitoring to determine if defrost has been completed by observing that the pressure difference has reverted back to pre-frosted level.
  • FIG. 6 presents a flow diagram of another example implementation of the method 100 in the case where the unit 200 does include a powered heat source 250 and the secondary air-intake opening 262 .
  • the same numbers indicate steps that are analogous to the steps described in FIGS. 3 and 5 .
  • a blower defrost mode step 315 there is a combined blower and staged heating defrost mode step 615 which can include activating an air controller assembly 260 and a heat source 270 of an air-handler unit 272 (examples of steps 140 and 145 , respectively as part of step 105 ).
  • a heat source 270 of an air-handler unit 272 can be activated in step 617 , e.g., as a preheating step.
  • step 617 e.g., as a preheating step.
  • step 619 of reducing the air flow to the enthalpy exchange zone 218 (e.g., similar to step 317 ) plus activating an air controller assembly 260 (e.g., to open dampers covering the secondary air-intake opening 262 ).
  • step 621 it is determined if the secondary air-intake opening 262 is fully open and pressure in the unit 200 is at or slightly below a global pressure value (e.g., such as further described in Appl-3).
  • Step 623 If the pressure in the unit 200 is too low, then the intake air flow is increases (e.g., by increasing the blower 230 speed) in step 623 . Steps 619 , 621 and 623 are followed by either of steps 519 or 521 depending on the decision made in step 517 . Subsequent steps are similar to the steps presented in FIG. 3 or 5 .
  • control module 245 will slow down intake blower 230 to a minimum accepted air-flow and open up dampers 264 of the air controller assembly 260 until pressure at the air-handler 272 is the same as the ambient pressure.
  • An electric heater 250 will energize at maximum heating capacity until the pressure difference across the enthalpy exchange zone 218 is at a pre-frost condition. Then the damper will slowly close as the intake blower 230 speed increases back to it normal set point.

Abstract

A method of defrosting an energy recovery ventilator unit. The method comprises activating a defrost process of an enthalpy-exchange zone of the energy recovery ventilator unit when an air-flow blockage in the enthalpy-exchange zone coincides with a frost threshold in the ambient environment surrounding the energy recovery ventilator unit. The method also comprises terminating the defrost process, including terminating the defrost process when an operating condition in the vicinity of the enthalpy-exchange zone substantially returns to a pre-frosting operating condition.

Description

    CROSS REFERENCE TO RELATED APPLICATIONS
  • This application is related to U.S. patent application Ser. No. ______ (docket no. P100090), by McKie et al., entitled, “DESIGN LAYOUT FOR AN ENERGY RECOVERY VENTILATOR SYSTEM” (“Appl-1”), filed on Oct. ______, 2011, U.S. patent application Ser. No. 13/267,542 (Docket No. P100094), by McKie et al., entitled, “DETECTING AND CORRECTING ENTHALPY WHEEL FAILURE MODES” (“Appl-2”), filed on Oct. 6, 2011, and U.S. patent application Ser. No. 13/267,492 (Docket No. P100076), by McKie et al., entitled, “ERV GLOBAL PRESSURE DEMAND CONTROL VENTILATION MODE (ERV CASE)” (“Appl-3”), filed on Oct. 6, 2011, all of which are incorporated herein by reference in their entirety. One or more of the above applications may describe embodiments of Energy Recovery Ventilator Units components and processes thereof that may be suitable for making and/or use in some of the embodiments described herein.
  • TECHNICAL FIELD
  • This application is directed, in general, to space conditioning systems and methods for conditioning the temperature and humidity of an enclosed space using an energy recovery ventilator unit, and in particular, to methods and devices for defrosting energy recovery ventilator units.
  • BACKGROUND
  • Energy recovery ventilator units are often used in space conditioning systems to maintain air quality while minimizing energy losses. Sometimes the energy recovery ventilator unit can become frosted, thereby reducing the functionality of the unit.
  • SUMMARY
  • One embodiment of the disclosure is a method defrosting an energy recovery ventilator unit. The method comprises activating a defrost process of an enthalpy-exchange zone of the energy recovery ventilator unit when an air-flow blockage in the enthalpy-exchange zone coincides with a frost threshold in the ambient environment surrounding the energy recovery ventilator unit. The method also comprises terminating the defrost process, including terminating the defrost process when an operating condition in the vicinity of the enthalpy-exchange zone substantially returns to a pre-frosting operating condition.
  • Another embodiment is an energy recovery ventilator unit. The energy recovery ventilator unit comprises a defrost control module configured to activate the defrost process and to terminate the defrost process, as described above.
  • BRIEF DESCRIPTION
  • Reference is now made to the following descriptions taken in conjunction with the accompanying drawings, in which:
  • FIG. 1 presents a flow diagram showing selected steps in an example method of defrosting an energy recovery ventilator unit according to the principles of the disclosure;
  • FIG. 2 presents an cross-sectional view of an example energy recovery ventilator unit of the present disclosure;
  • FIG. 3 presents a flow diagram of an example implementation of the method of the disclosure in the case where the energy recovery ventilator unit does not include a powered heat source or a secondary air-intake opening;
  • FIG. 4 presents a flow diagram of another example implementation of the method of the disclosure in the case where the energy recovery ventilator unit does include a powered heat source but does not include a secondary air intake opening;
  • FIG. 5 presents a flow diagram of another example implementation of the method of the disclosure in the case where the energy recovery ventilator unit does include a powered heat source 250 but not a secondary air-intake opening; and
  • FIG. 6 presents a flow diagram of another example implementation of the method of the disclosure in the case where the energy recovery ventilator unit does include a powered heat source and a secondary air-intake opening.
  • DETAILED DESCRIPTION
  • The term, “or,” as used herein, refers to a non-exclusive or, unless otherwise indicated. Also, the various embodiments described herein are not necessarily mutually exclusive, as some embodiments can be combined with one or more other embodiments to form new embodiments.
  • It is desirable to have an efficient and flexible method for defrosting an energy recovery ventilator unit that both minimizes the energy expended for defrosting and minimizes the time spent when the energy recovery ventilator unit is not in its normal operating mode.
  • FIG. 1 presents a flow diagram showing selected steps in an example method of defrosting an energy recovery ventilator unit according to the principles of the disclosure. To facilitate understanding of the flow diagram presented in FIG. 1, FIG. 2 presents a perspective view of an example energy recovery ventilator unit 200 of the disclosure, which can include but is not limited to, any of the design layouts and any of the components parts described in Appl-1. The unit 200 can be part of a space conditioning system 202.
  • For instance, the unit 200 can comprise a cabinet 205 housing an intake air zone 210 (e.g., sometimes a primary intake air zone), a supply air zone 212, a return air zone 214, an exhaust air zone 216 and an enthalpy-exchange zone 218. The intake zone 210 and the exhaust zone 216 are both on one side 220 of the enthalpy exchange zone 218, and, the supply zone 212 and the return zone 214 are both on an opposite side 225 of the enthalpy exchange zone 218. The energy recovery ventilator unit 100 also comprises a first blower 230 and a second blower 235. The first blower 230 is located in the intake zone 210 and is configured to push, or alternatively pull, outside air into the intake zone 210 and straight through the enthalpy exchange zone 218 into the supply zone 212. The second blower 235 is located in the return zone 214 and is configured to push, or alternatively pull, return air into the return zone 214 and straight through the enthalpy exchange zone 218 into the exhaust zone 216. The enthalpy exchange zone 218 can include one or more enthalpy-exchanger devices 240 configured as one or more enthalpy wheels or other enthalpy-exchange devices such as plated heat exchangers or heat pipes or other devices familiar to those skilled in the art. As further illustrates the unit can further include a defrost control module 245 which as illustrated, can be located on the outside surface of the cabinet 205 although other located are within the scope of the disclosed unit 200.
  • Returning to FIG. 1, the method 100 of defrosting the energy recovery ventilator unit 200 comprises a step 105 of activating a defrost process of an enthalpy-exchange zone 218 of the energy recovery ventilator unit 200 when an air-flow blockage in the enthalpy-exchange zone 218 coincides with a frost threshold in the ambient environment surrounding the energy recovery ventilator unit 200.
  • As further illustrated in FIG. 1 some embodiments of the method 100 can include a step 107 of determining if an air-flow blockage exists in the enthalpy-exchange zone 218. Step 107 can include any of the processes described in Appl-2 for determining the presence of an air-flow blockage through an enthalpy-exchange zone 218. In some cases step 107 can include determining a pressure difference across the enthalpy-exchange zone 218 while the energy recovery ventilator unit 200 is operating. In other cases, step 107 can include determining a heat transfer efficiency across the enthalpy-exchange zone 218 while the energy recovery ventilator unit 200 is operating. The pressure or heat transfer efficiency can be compared to the analogous operational characteristic of pressure or heat transfer when the unit 200 determined during step 108 when the unit 200 was in a known normal operating condition. When the pressure difference increases or heat transfer decreases beyond a pre-defined limit the presence of an air-flow blockage is signaled, such as disclosed in Appl-2.
  • As also in FIG. 1, some embodiments of the method 100 can include a step 109 of determining if the air-flow blockage in the enthalpy-exchange zone coincides with a frost threshold existing in the ambient environment surrounding the unit 200.
  • The term, frost threshold, as used herein, refers to a pre-selected temperature value corresponding to the measured ambient air-temperature surrounding the energy recovery ventilator unit at which frost formation will occur. In some cases, for example, the frost threshold can correspond to a pre-selected temperature value in a range of 20 to 32° F. In some cases, the frost threshold can be pre-selected temperature value that is adjusted depending on the relative humidity within energy recovery ventilator unit 200. For example, in some cases, the frost threshold may be a temperature value of 20° F. when the relative humidity is low (e.g., 30 percent or lower) but linearly adjusted to 32° F. as the relative humidity reaches 100 percent.
  • As illustrated for the example method 100 shown in FIG. 1, when there is both an air-flow blockage (e.g., yes, in step 107) in the enthalpy-exchange zone 218 and there is a frost threshold (e.g., yes, in step 109) the defrost process (step 105) can be activated. Alternatively, when there is an air-flow blockage (yes, in step 107) in the enthalpy-exchange zone 218 but there is a frost threshold (no in step 109) then a non-frost failure mode step 110 can be activated. This can advantageously prevent the unit 200 from going into a defrost mode when it is determined a frosting condition unlikely to have occurred. The procedures followed when the non-frost failure mode (step 110) is activated can include any of the processes described in Appl-2.
  • As shown in FIG. 1, the method 100 also comprises a step 115 of terminating the defrost process, including a step 116 of terminating the defrost process when an operating condition in the vicinity of the enthalpy-exchange zone 218 substantially returns to a pre-frosting operating condition. The term operating condition, as used herein, refers to an environmental conditions or properties at one or more locations in the unit 200 that is measurable while the unit 200 is operating either before or during the defrost process (step 110). The term pre-frosting operating condition refers to the environmental condition when the unit 200 was in a normal operating state step 108 (e.g., prior to detecting a air-flow blockage in step 107)
  • It is often desirable for the defrost process to continue for as short a period as possible, because defrosting can reduce the energy and heat transfer efficiency of the unit 200, and in some cases damage components (e.g., the enthalpy-exchanger devices 240) of the unit 200. In some cases, minimizing the defrosting time can be facilitated by providing multiple different criteria for terminating the defrost process. Consequently, terminating the defrost process can include monitoring one or more different operating conditions of the unit 200.
  • For instance, in some cases, terminating the defrost process (step 115) can further include a step 117 of determining the operating condition (as part of step 116), which includes measuring an air-pressure difference across the enthalpy-exchange zone 218 while the unit 200 is operating. For example, pressure transducers 242, situated on either side of the enthalpy zone 218, can monitor the pressure during defrost process (step 110) as well as during pre-defrost conditions, such as determined, e.g., during a normal operating state (step 109). In such cases, terminating the defrost process (step 115) includes terminating after the operating condition, corresponding to the measured air-pressure difference across the enthalpy-exchange zone 218, has decreased to substantially equal to (e.g., within ±10% in some cases) the pre-frosting operating condition, corresponding to an air-pressure difference across the enthalpy-exchange zone 218 measured prior to activating the defrost process (e.g., measured during step 109).
  • For instance, in some cases, terminating the defrost process (step 115) further includes a step 119 of determining the operating condition (as part of step 116), which includes measuring a heat transfer efficiency across the enthalpy-exchange zone 218 while the unit 200 is operating.
  • For example, temperature sensor 244, situated on either side of the enthalpy zone 218, can monitor the temperature during defrost process (step 110) as well as during pre-defrost conditions, such as determined, e.g., during a normal operating state (step 109). The heat transfer efficiency is proportional to the ratio of: the temperature difference between the intake air zone 210 and the supply air zone 212 divided by the temperature difference between the return air zone 214 and the intake air zone 210. The temperature difference between the difference between return air zone 214 and intake air zone 210 is considered to represent the overall heat transfer occurring in the unit 200, e.g., that drives energy transfer, while the temperature difference between the intake air zone 210 and the supply air zone is considered to represent the actual heat transfer occurring.
  • In such cases, terminating the defrost process (step 115) includes terminating after the operating condition, corresponding to the measured heat transfer efficiency across the enthalpy-exchange zone 218, has decreased to be substantially equal to (e.g., within ±10% in some cases) the pre-frosting operating condition, corresponding to a heat transfer efficiency across the enthalpy-exchange zone 218 measured prior to activating the defrost process (e.g., measured during step 109).
  • In some embodiments, however, if the operating condition has not substantially returned to a pre-frosting operating condition, then the non-defrost failure mode (step 110) is entered.
  • In some cases, it is also desirable to terminate the defrost process (step 115) after a measured pre-selected time limit is reached (step 120). This can advantageously prevent excessive energy and time being expended on defrosting when the enthalpy exchange zone 218 is blocked for reason other than frosting. In some cases, if the time limit measured in step 120 has reached the pre-selected time limit (e.g., a defrosting time limit has expired), the non-defrost failure mode (step 110) is entered.
  • To facilitate minimizing the defrosting time and minimizing the energy expended on defrosting, some embodiments of the method 100 provide multiple defrosting strategies that can be implemented, either alone or in combination, as part of the defrosting process 105, and implements in a fashion that depends on the ambient environmental conditions surrounding the unit 200 or on the components that are included in the unit 200.
  • For instance, in some embodiments, the activated defrost process (step 105) further includes a step 130 of activating a powered heat source 250 configured to warm air in the intake air zone 210 or the exhaust air zone 216 located inside of the unit 200. The powered heat source 250 can pre-heat the ambient cold air outside of the unit to thereby facilitate rapid defrosting. In some cases, the powered heat source 250 can be an electric heater. However, in other cases, a gas-fired heat exchanger could be used. In some cases, the powered heat source 250 is, or includes, a modular electric heater coupled to the outside of the unit 200 and located upstream of an air intake opening 252 of the intake air zone 210. The term modular electric heater, as used herein, refers to a self-contained heater that includes one or more of temperature sensors, electrical power connections, device control connections, as integral parts of the heater 250, thereby facilitating field-installation of the heater 250, e.g., to a previously installed unit 200.
  • In some embodiments, activating the powered heat source 250 in step 130 further including a step 132 of adjusting the powered heat source 250 to one of a plurality of different levels of heat generation as a function of an ambient air temperature surrounding the unit 200. For instance, if the ambient air temperature is at or below a pre-selected set-point (e.g., 20° F. in some cases) then the heater 250 can be adjusted to a high level of heating. If the ambient air temperature is above the set-point then the heater 250 can be adjusted to a low level of heating. Having the ability to adjust to plurality of different levels facilitates using the full heating the potential of the heater at certain times, but, avoiding excessive heating at other times, that could damage, e.g., due to melting or softening of plastic parts in the enthalpy exchange device 240, or other components of the unit 200.
  • For instance, in some embodiments, the activated defrost process (step 105) further includes a step 135 of reducing airflow from an air intake zone 210 located inside of the unit 200 to the enthalpy exchange-zone 218. For instance, the speed of the air blower 230 located in the intake air zone 210 can be reduced. For instance, in some cases the speed of the air blower 230 is reduced by about 20 to 30 percent as compared to the speed of the air blower when the unit 200 is in its normal operating state (e.g., step 108). Reducing the airflow can facilitate defrosting because the amount of cold air drawn into the unit 200 from the ambient outside air is reduced. In some cases, when the unit 200 includes the powered heat source 250, reducing the airflow from the air-intake zone 210 (step 135) at or during the same time as activating the heat source 250 (step 130) can speed defrosting because the temperature of the air reaching the enthalpy zone 218 is increased.
  • In some embodiments, the activated defrost process (step 105) further includes a step 140 of activating an air controller assembly 260 so as to allow air-flow through a secondary air-intake opening 262 connected to the supply zone 212 located inside of the unit 200. As further disclosed in Appl-1, the air controller assembly 260 can include baffles or dampers 264 which are configured to be continuously adjustable to allow substantially no air, to large volumes of air, to pass through the secondary intake opening 260. In FIG. 2, only a partial cut-away view of the example air controller assembly 260 is depicted so that the supply air zone 212 and secondary input opening 262 can be more clearly depicted.
  • As illustrated in FIG. 1 in some cases, the air controller assembly 260 is activated in step 140 when the air flow through the primary air intake zone 210 is reduced in step 135. In some applications (e.g., schools, hospitals), allowing air through the secondary air-intake opening 262 is important to meeting certain fresh air requirements that must be met, even when performing the defrost process (step 105). In some cases, to facilitate meeting the fresh air requirements, the reduction in the air flow from the air intake zone 210 and an increase in the air-flow through the secondary air-intake opening 262 are coordinated such that the air-pressure inside of the unit 200 substantially equals an ambient air pressure surrounding unit 200. Examples of some such embodiments are further described in Appl-3 in the context of using measurements from a global demand pressure sensor of the unit 200 as part of controlling the air controller assembly 260 and thereby achieving the desired amount of air-flow through a secondary air-intake opening 262 to meet the fresh air requirements. In some cases, the air controller assembly 260 is activated such that there is a slightly negative pressure compared to the global demand pressure (e.g., within about 0.1 to −0.2 inches, water column) to help prevent any ensure that any air conditioned by the enthalpy exchange zone 218 does not get blown out of the unit 200 (e.g., through the secondary air-intake opening 262) before being transferred into a air-handler unit 510, (e.g., heating ventilation and cooling system, such as a roof top unit), coupled to the unit 200.
  • In some embodiments, the defrost process (activated in step 105) further includes a step 145 of activating a heat source 270 of an air-handling unit 272 that is coupled to the unit 200, such that the air exiting the air-handling unit 272 is heated to a substantially same temperature than before the defrosting process was activated (step 105). The heater 270 of the air-handling unit 272 can be a gas-fired heater, electric heater or other heater familiar to those skilled in the art. As illustrated in FIG. 2 the air-handling unit is located down-stream, and configured to receive air, from the unit 200. The air-handling unit can be part of the space conditioning system 202.
  • Activating the heat source 270 of an air-handling unit 272 in step 145 can advantageously heat cold outside air through the secondary air-intake opening 262 and thereby make the conditioned space more comfortable during the defrosting process 115. In some cases, the heat source 270 in the air-handling unit 272 is activated in step 145 at the same time, or before, the air controller assembly is activated in step 140. For instance, in some cases, activating the air controller assembly in step 140 cases dampers 264 covering the secondary air-intake opening 262 can take one to two minutes to fully open. During this time, activating the heater 270 can pre-heat the air such that when the secondary air-intake opening 262 is fully opened, the air reaching the conditioned space is preheated to substantially same temperature as before the defrosting process started.
  • Another embodiment of the disclosure is the energy recovery ventilator unit 200, which can comprise any of embodiments of the unit 200 discussed in the context of FIG. 1 and presented in FIG. 2. For instance, the unit 200 comprises a defrost control module 245 is configured to activate the defrost process (step 105) and terminate the defrost process (step 115), such as disclosed in the context of FIG. 1. Embodiments of the unit 200 can include the components such as the intake air zone, 210, supply air zone 212, return air zone 214, exhaust air zone 216, enthalpy exchange zone 218, as disclosed above and as further disclosed in Appl-1, Appl-2 and Appl-3.
  • For instance, the unit 200 can include pressure transducers 242 configured to measuring an air-pressure difference across the enthalpy-exchange zone 218 while the unit 200 is operating. The pressure transducers 242 can be configured to transmit the measured air pressure difference to the defrost control module 245, and the defrost control module 245 can be configured to determine the operating condition as including the air-pressure difference in accordance with step 117.
  • For instance, the unit 200 can include temperature sensors configured to measuring air temperatures 244 of the intake zone 210, a supply air zone 212, and a return air zone 214 located inside of the unit 200. The temperature sensors 244 can be configured to transmit the measured air temperatures to the defrost control module 245. The defrost control module 245 can be configured to determine the operating condition as including a heat transfer efficiency determined from the measured air temperatures, in accordance with step 119.
  • For instance, the defrost module 245 can be configured to terminate the defrost process (step 115) after a preselected time limit is reached. In some embodiments, e.g., the defrost module 245 includes an electronic timing circuit that monitors the time when the defrost process was activated in step 105, and compare the accumulated defrosting time to the preselected time limit, e.g., as set by factory or installation personnel.
  • For instance, the unit 200 can further include a powered heat source 250 configured to warm air in the intake air zone 210 or the exhaust air zone 216 located inside of the unit 200, and the defrost control module can be configured to activate or deactivate the heat source 250. In some embodiments the powered heat source 250 includes, or is, a modular electric heater configured to be coupled to the outside of the unit 200 and located upstream of the air intake opening 252 of the intake air zone 210.
  • For instance, the defrost module 245 can be configured to control the airflow from the air intake zone 210 located inside unit 200 to the enthalpy exchange-zone 218. In some embodiments, e.g., the defrost module 245 includes an electronic circuit configured to control the speed of the air intake blower 250 located in the intake air zone 210, in accordance with step 135.
  • For instance, the unit 200 can further include an air controller assembly 260 configured to adjust an amount of air-flow through a secondary air-intake opening 262 connected to a supply zone 212 located inside of the unit 200, and the defrost control module 245 can be configured to control the air controller assembly 260 to increase or decrease the amount of air allowed through the secondary air-intake opening 262.
  • For instance, the defrost control module 245 can be configured the control a heat source 270 of an air-handling unit 272 that is coupled to the unit 200. In some embodiments, e.g., the defrost module 245 includes an electronic circuit that is configured to activate the heat source 272, e.g., when there is air flowing through the secondary intake air opening 262, such that the air exiting the space conditioning system is heated to a substantially same temperature than before the defrosting process was activated. The electronic circuit can be configured to deactivate the heat source 272, when the defrosting process in terminated in step 115, or when there is not longer air flowing through the secondary intake air opening 262.
  • Aspects of the disclosed method of defrosting are further illustrated in FIGS. 3-6, which present of example implementations of the method 100 and the unit 200.
  • FIG. 3 presents a flow diagram of an example implementation of the method 100 in the case where the unit 200 does not include a powered heat source 250 or a secondary air-intake opening 262. The method 100 can include a starting a defrost check mode (step 301) which can include: step 303 of turning on the enthalpy exchange device 240 (e.g., make sure an enthalpy wheel device 240 is rotating), step 305 of verifying that the blower 250 is at the proper set point for heat transfer to occur, and step 307 (an example of step 109) of deciding whether to enter defrost mode including, e.g. measuring the outside air temperature and determining if the temperature is above the frost threshold. The defrost check (step 301) can include entering a non-frost failure mode step 310 (an example of step 110), if it is decided, in step 307, that the blockage is not due to frost formation. The defrost check (step 301) can include a step 313 of deciding if there is a heater 250 installed. If there is a heater 250 installed, then other procedures such as set forth in FIGS. 4-8 may be followed. If there is not a heater 250 installed, then a blower defrost mode (step 315) is entered (an example of step 105).
  • The blower defrost mode (step 315) can include a step 317 of reducing the air flow to the enthalpy exchange zone 218 e.g., by increasing the speed of the blower 230 (an example of step 135), a step 319 of commencing a timer, a step 321 of monitoring the accumulated time and determining in step 323 if a time-limit is reached (examples of step 120). If the time-limit is reached, a step 325 of further increasing the air flow (e.g., such as the air flow prior to step 317) is activated and in step 327 the operating condition (e.g., pressure difference and/or heat transfer efficiency) is measured (an example of steps 116, 117, 119). In step 329, it is decided if the operating condition (e.g., pressure or heat transfer efficiency) is not different than the pre-frosting operating condition. If there is no difference, then the blower defrost mode (step 315) is terminated (an example of step 115) and the unit 200 returns to a normal operating state in step 331 (an example of step 108). If there is still a difference in the operating condition compared to the pre-frosting condition, then a second blower defrost mode (step 333) is entered (an example continuation of step 105).
  • The second blower defrost mode (step 333) includes steps 335, 337, 339, 341, 343, 345, and 347 which are analogous to steps 317, 319, 321, 323, 325, 327, and 329, respectively, with the exception that the air flow reduction in step 335 is greater than the air flow reduction in step 317 (e.g., blower 230 speed is further lowered).
  • If there is still a difference in the operating condition (e.g., pressure difference or heat transfer efficiency) compared to a pre-frosting operating condition, then a third blower defrost mode (step 353) is entered (an example of continuing step 105). Again the third blower defrost mode (step 353) includes steps 355, 357, 359, 361, 363, 365, and 367 which are analogous to steps 317, 319, 321, 323, 325, 327, and 329, respectively, with the exception that the air flow reduction in step 355 is more (e.g., blower 230 speed is lower) than the air flow reduction in step 317 or step 335. In some cases, the air flow is reduced to zero in step 355 (e.g., the blower 230 is turned off), while in other cases there is still air flow to enthalpy exchange zone 218. In some cases the time-limit set in step 339 can be different than the time-limit set in step 319.
  • Based on the present disclosure, one of ordinary skill would appreciate that the number of blower defrost modes could be increased or decreased compared to that depicted in FIG. before after a final decision step (e.g., step 367) that the is still a difference in the pressure difference or heat transfer efficiency compared to a pre-frosting operating condition and the a non-frost failure mode step 310 is activated.
  • FIG. 4 presents a flow diagram of another example implementation of the method 100 in the case where the unit 200 does include a powered heat source 250 but does not include the secondary air intake opening 262. The same numbers indicate steps that are analogous to the steps described in FIG. 3, with the exception that instead of a blower defrost mode step 315, there is a combined blower and heating defrost mode step 415, which can include activating the powered heat source 250 (an example of step 130, as part of step 105) and reducing the air flow such as described in the context of the defrost mode 315 disclosed in FIG. 3.
  • In some cases, e.g., an electric heater 250 can be staged to different heating levels based on an outside air temperature measured in the air-intake zone 210 the control module 245 can lower the intake air blower 230 speed, and electric heater 250 heater operated at a low heating level, until the pressure difference across the enthalpy zone 218 (e.g., an enthalpy wheel intake pressure minus a the wheel exhaust pressure) are at pre-frost conditions. If frosting not addressed the speed of the blower 230 can be reduced to an allowable minimum and electric heater will operate at a higher heating level.
  • Aspects of a another embodiment staged heating are further illustrated in FIG. 5 which presents a flow diagram of another example implementation of the method 100 in the case where the unit 200 does include a powered heat source 250 but not the secondary air-intake opening 262. Again, the same numbers indicate steps that are analogous to the steps described in FIG. 3. Instead of a blower defrost mode step 315, or combined blower defrost mode and heating mode step 415 (FIG. 4), there is a staged heating defrost mode step 515 (an example of step 130 as part of step 105). In step 517, it determined if there outside air temperature is below a pre-selected temperature. If the outside air temperature is above the pre-selected temperature then at step 519, a low level of heating is selected (an example of step 132). If the outside air temperature is below the pre-selected temperature, then at step 521, a high level of heating is selected (again an example of step 132). Alternatively, if after the time-limit set in step 319 has expired and there is still a difference in the pressure difference or heat transfer efficiency compared to a pre-frosting operating condition, the heating can transition at step 323 from the low level (step 519) to the high level (step 521). If after the time-limit set in step 337 has expired and there is still a difference in the pressure difference or heat transfer efficiency compared to a pre-frosting operating condition, the staged heating mode step 515 can transition at step 523 to the combined blower defrost mode and heating mode step 415 as described in FIG. 4.
  • In some cases, e.g., an electric heater 250 is staged in as quickly as possible to facilitate continued delivery the correct amount of fresh air. The pressure across the enthalpy zone 218 can be monitoring to determine if defrost has been completed by observing that the pressure difference has reverted back to pre-frosted level.
  • FIG. 6 presents a flow diagram of another example implementation of the method 100 in the case where the unit 200 does include a powered heat source 250 and the secondary air-intake opening 262. Again, the same numbers indicate steps that are analogous to the steps described in FIGS. 3 and 5. Instead of a blower defrost mode step 315, there is a combined blower and staged heating defrost mode step 615 which can include activating an air controller assembly 260 and a heat source 270 of an air-handler unit 272 (examples of steps 140 and 145, respectively as part of step 105).
  • After starting the defrost mode, a heat source 270 of an air-handler unit 272 can be activated in step 617, e.g., as a preheating step. After step 517, but before either of steps 519 or 521, there is a step 619 of reducing the air flow to the enthalpy exchange zone 218 (e.g., similar to step 317) plus activating an air controller assembly 260 (e.g., to open dampers covering the secondary air-intake opening 262). In step 621 it is determined if the secondary air-intake opening 262 is fully open and pressure in the unit 200 is at or slightly below a global pressure value (e.g., such as further described in Appl-3). If the pressure in the unit 200 is too low, then the intake air flow is increases (e.g., by increasing the blower 230 speed) in step 623. Steps 619, 621 and 623 are followed by either of steps 519 or 521 depending on the decision made in step 517. Subsequent steps are similar to the steps presented in FIG. 3 or 5.
  • In some cases, e.g., the control module 245 will slow down intake blower 230 to a minimum accepted air-flow and open up dampers 264 of the air controller assembly 260 until pressure at the air-handler 272 is the same as the ambient pressure. An electric heater 250 will energize at maximum heating capacity until the pressure difference across the enthalpy exchange zone 218 is at a pre-frost condition. Then the damper will slowly close as the intake blower 230 speed increases back to it normal set point.
  • Those skilled in the art to which this application relates will appreciate that other and further additions, deletions, substitutions and modifications may be made to the described embodiments.

Claims (20)

What is claimed is:
1. A method of defrosting an energy recovery ventilator unit, comprising:
activating a defrost process of an enthalpy-exchange zone of the energy recovery ventilator unit when an air-flow blockage in the enthalpy-exchange zone coincides with a frost threshold in the ambient environment surrounding the energy recovery ventilator unit; and
terminating the defrost process, including terminating the defrost process when an operating condition in the vicinity of the enthalpy-exchange zone substantially returns to a pre-frosting operating condition.
2. The method of claim 1, wherein terminating the process to defrost further includes determining the operating condition, including measuring an air-pressure difference across the enthalpy-exchange zone while the energy recovery ventilator unit is operating.
3. The method of claim 2, wherein terminating the defrost process includes terminating after the operating condition, corresponding to the measured air-pressure difference across the enthalpy-exchange zone, has decreased to substantially equal the pre-frosting operating condition, corresponding to an air-pressure difference across the enthalpy-exchange zone measured prior to activating the defrost process.
4. The method of claim 1, wherein terminating the process to defrost further includes determining the operating condition, including measuring a heat transfer efficiency across the enthalpy-exchange zone while the energy recovery ventilator unit is operating.
5. The method of claim 4, wherein terminating the process to defrost includes terminating after the operating condition, corresponding to the measured heat transfer efficiency, has decreased to be substantially equal to the pre-frosting operating condition, corresponding to an heat transfer efficiency across the enthalpy-exchange zone prior to activating the defrost process.
6. The method of claim 1, wherein terminating the process to defrost includes terminating after a preselected time limit is reached.
7. The method of claim 1, wherein the defrost process further includes activating a powered heat source configured to warm air in an intake air zone or an exhaust air zone located inside of the energy recovery ventilator unit.
8. The method of claim 7, wherein the powered heat source includes a modular electric heater coupled to the outside of the energy recovery ventilator unit and located upstream of an air intake opening of the intake air zone.
9. The method of claim 7, wherein activating the powered heat source further including adjusting the powered heat source to one of a plurality of different levels of heat generation as a function of an ambient air temperature surrounding the energy recovery ventilator unit.
10. The method of claim 1, wherein the defrost process further includes reducing airflow from an air intake zone located inside of the energy recovery ventilator unit to the enthalpy exchange-zone.
11. The method of claim 10, wherein the defrost process further includes activating an air controller assembly so as to allow air-flow through a secondary air-intake opening connected to a supply zone located inside of the energy recovery ventilator unit.
12. The method of claim 11, wherein the reduction in the air flow from the air intake zone and an increase in the air-flow through the secondary air-intake opening are coordinated such that the air-pressure inside of the energy recovery ventilator unit substantially equals an ambient air pressure surrounding the energy recovery ventilator unit.
13. The method of claim 11, wherein the defrost process further includes activating a heat source of an air-handling unit coupled to the energy recovery ventilator unit, such that the air exiting the air-handling unit is heated to a substantially same temperature than before the defrosting process was activated.
14. The method of claim 13, wherein the heat source in the air-handling unit is activated at the same time, or before, the air controller assembly is activated.
15. An energy recovery ventilator unit, comprising:
a defrost control module configured to:
activate a defrost process of an enthalpy-exchange zone of the energy recovery ventilator unit when an air-flow blockage in the enthalpy-exchange zone coincides with a frost threshold in the ambient environment surrounding the energy recovery ventilator unit; and
terminate the defrost process, including terminating the defrost process when an operating condition in the vicinity of the enthalpy-exchange zone substantially returns to a pre-frosting operating condition.
16. The unit of claim 15, further including pressure transducers configured to measuring an air-pressure difference across the enthalpy-exchange zone while the energy recovery ventilator unit is operating and configured to transmit the measured air pressure difference to the defrost control module, and wherein the defrost control module is configured to determine the operating condition as including the air-pressure difference.
17. The unit of claim 15, further including temperature sensors configured to measuring air temperatures of an intake air zone, a supply air zone, and a return air zone located inside of the energy recovery ventilator unit and configured to transmit the measured air temperatures to the defrost control module, and wherein the defrost control module is configured to determine the operating condition as including a heat transfer efficiency determined from the measured air temperatures.
18. The unit of claim 15, wherein the defrost control module is further configured to terminate the defrost process after a preselected time limit is reached.
19. The unit of claim 15, further including a powered heat source configured to warm air in an intake air zone or an exhaust air zone located inside of the energy recovery ventilator unit, wherein the defrost control module is configured to activate or deactivate the heat source.
20. The unit of claim 19, wherein the powered heat source includes a modular electric heater configured to be coupled to the outside of the energy recovery ventilator unit and located upstream of an air intake opening of the intake air zone.
US13/293,454 2011-11-10 2011-11-10 Method of defrosting an energy recovery ventilator unit Abandoned US20130118188A1 (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
US13/293,454 US20130118188A1 (en) 2011-11-10 2011-11-10 Method of defrosting an energy recovery ventilator unit
US14/641,090 US9791163B2 (en) 2011-11-10 2015-03-06 Method of defrosting an energy recovery ventilator unit
US15/708,530 US10386087B2 (en) 2011-11-10 2017-09-19 Method of defrosting an energy recovery ventilator unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US13/293,454 US20130118188A1 (en) 2011-11-10 2011-11-10 Method of defrosting an energy recovery ventilator unit

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US14/641,090 Division US9791163B2 (en) 2011-11-10 2015-03-06 Method of defrosting an energy recovery ventilator unit

Publications (1)

Publication Number Publication Date
US20130118188A1 true US20130118188A1 (en) 2013-05-16

Family

ID=48279332

Family Applications (3)

Application Number Title Priority Date Filing Date
US13/293,454 Abandoned US20130118188A1 (en) 2011-11-10 2011-11-10 Method of defrosting an energy recovery ventilator unit
US14/641,090 Active 2032-07-29 US9791163B2 (en) 2011-11-10 2015-03-06 Method of defrosting an energy recovery ventilator unit
US15/708,530 Active US10386087B2 (en) 2011-11-10 2017-09-19 Method of defrosting an energy recovery ventilator unit

Family Applications After (2)

Application Number Title Priority Date Filing Date
US14/641,090 Active 2032-07-29 US9791163B2 (en) 2011-11-10 2015-03-06 Method of defrosting an energy recovery ventilator unit
US15/708,530 Active US10386087B2 (en) 2011-11-10 2017-09-19 Method of defrosting an energy recovery ventilator unit

Country Status (1)

Country Link
US (3) US20130118188A1 (en)

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104819543A (en) * 2014-01-30 2015-08-05 特灵国际有限公司 System and Method of Protecting an HVAC System
US20150253049A1 (en) * 2014-03-04 2015-09-10 General Electric Company Water heater appliance and a method for operating the same
US9175872B2 (en) 2011-10-06 2015-11-03 Lennox Industries Inc. ERV global pressure demand control ventilation mode
CN105042786A (en) * 2015-07-30 2015-11-11 广东美的制冷设备有限公司 Dehumidifier and method and device for controlling dehumidifier
US9395097B2 (en) 2011-10-17 2016-07-19 Lennox Industries Inc. Layout for an energy recovery ventilator system
US9404668B2 (en) 2011-10-06 2016-08-02 Lennox Industries Inc. Detecting and correcting enthalpy wheel failure modes
US9441843B2 (en) 2011-10-17 2016-09-13 Lennox Industries Inc. Transition module for an energy recovery ventilator unit
CN106765917A (en) * 2016-12-07 2017-05-31 珠海格力电器股份有限公司 A kind of air-conditioner control method and device
US9671122B2 (en) 2011-12-14 2017-06-06 Lennox Industries Inc. Controller employing feedback data for a multi-strike method of operating an HVAC system and monitoring components thereof and an HVAC system employing the controller
US20170219237A1 (en) * 2014-10-10 2017-08-03 Mitsubishi Electric Corporation Heat-exchange ventilation device
US9791163B2 (en) 2011-11-10 2017-10-17 Lennox Industries Inc. Method of defrosting an energy recovery ventilator unit
US9835353B2 (en) 2011-10-17 2017-12-05 Lennox Industries Inc. Energy recovery ventilator unit with offset and overlapping enthalpy wheels
CN107842970A (en) * 2017-10-18 2018-03-27 广东美的暖通设备有限公司 Air-conditioning system and its defrosting control method and device
CN108286775A (en) * 2017-12-29 2018-07-17 广东高而美制冷设备有限公司 It is a kind of that there is waste heat recovery and anti-freeze defrosting control method
EP3207315A4 (en) * 2014-10-16 2018-10-24 Swegon Operations AB Adaptive defrosting of an air treatment system
CN108895609A (en) * 2018-07-30 2018-11-27 珠海格力电器股份有限公司 A kind of control method and air-conditioning system of air-conditioning system defrost
US20190056134A1 (en) * 2016-01-08 2019-02-21 Mitsubishi Electric Corporation Ventilator, and defrosting method
EP2876378B1 (en) * 2013-11-12 2019-10-30 FläktGroup Deutschland GmbH System for the recovery of heat
US11371761B2 (en) * 2020-04-13 2022-06-28 Haier Us Appliance Solutions, Inc. Method of operating an air conditioner unit based on airflow
US20220390138A1 (en) * 2021-05-30 2022-12-08 Trane International Inc. Capacity control for hvac system

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN206191809U (en) * 2016-09-22 2017-05-24 广东松下环境系统有限公司 Ventilation device
CN106801976A (en) * 2017-01-06 2017-06-06 海信(广东)空调有限公司 A kind of air-conditioner defrosting method
CN107166664A (en) * 2017-06-09 2017-09-15 青岛海尔空调器有限总公司 A kind of air conditioner and control method
US11187429B2 (en) * 2017-08-31 2021-11-30 Steven Winter Associates, Inc. Integrated heat and energy recovery ventilator system
CN109373505A (en) * 2018-10-26 2019-02-22 奥克斯空调股份有限公司 A kind of air-conditioning cleaning prompting control method and air conditioner
CN109633780B (en) * 2018-12-19 2020-06-26 国家电投集团河南电力有限公司 Method, system and equipment for detecting blockage of stator bar of internal water cooling generator

Citations (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4281522A (en) * 1979-10-30 1981-08-04 Carrier Corporation Makeup air preconditioner for use with an air conditioning unit
US4843838A (en) * 1987-12-23 1989-07-04 Allen Trask Air-to-air heat pump
US5497823A (en) * 1993-12-30 1996-03-12 Honeywell Inc. Energy recovery ventilator: means for defrosting heat exchanger medium and damper motor actuation means
US6209622B1 (en) * 1994-10-24 2001-04-03 Venmar Ventilation Inc. Ventilation system
US6289974B1 (en) * 1997-07-11 2001-09-18 Elastek, Inc. Integrated heat recovery ventilator HEPA filter using a HEPA filter material regenerative heat exchanger
US6328095B1 (en) * 2000-03-06 2001-12-11 Honeywell International Inc. Heat recovery ventilator with make-up air capability
US6415616B1 (en) * 1999-09-03 2002-07-09 Lg Electronics, Inc. Method for controlling defrost heater of refrigerator
US20020153133A1 (en) * 1998-11-09 2002-10-24 Building Performance Equipment Inc. Ventilator system and method
US6575228B1 (en) * 2000-03-06 2003-06-10 Mississippi State Research And Technology Corporation Ventilating dehumidifying system
US20030140638A1 (en) * 2001-08-22 2003-07-31 Delaware Capital Formation, Inc. Refrigeration system
US6925999B2 (en) * 2003-11-03 2005-08-09 American Standard International Inc. Multistage warm air furnace with single stage thermostat and return air sensor and method of operating same
US20050236150A1 (en) * 2004-04-22 2005-10-27 Chagnot Catherine J Heat and energy recovery ventilators and methods of use
US7090000B2 (en) * 2003-10-30 2006-08-15 Trent Metals Limited Heat recovery ventilator
US7231967B2 (en) * 1994-01-31 2007-06-19 Building Performance Equipment, Inc. Ventilator system and method
US20070144187A1 (en) * 2005-12-22 2007-06-28 Ki Seok Lee Defrosting method of air conditioner
US20070234748A1 (en) * 2006-04-06 2007-10-11 Robertshaw Controls Company System and method for determining defrost power delivered by a defrost heater
US20080076346A1 (en) * 2006-09-26 2008-03-27 Osman Ahmed Ventilation Control Based on Occupancy
US7716936B2 (en) * 2006-06-26 2010-05-18 Heatcraft Refrigeration Products, L.L.C. Method and apparatus for affecting defrost operations for a refrigeration system
US8123518B2 (en) * 2008-07-10 2012-02-28 Honeywell International Inc. Burner firing rate determination for modulating furnace

Family Cites Families (38)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3252508A (en) 1962-02-12 1966-05-24 William H Goettl Combination air conditioner
US3889742A (en) 1973-11-13 1975-06-17 Gas Dev Corp Air conditioning apparatus and method
US4018266A (en) 1975-04-30 1977-04-19 Command-Aire Corporation Building fresh air ventilator system
US4060913A (en) 1976-08-02 1977-12-06 Takasago Thermal Engineering Co., Ltd Assembly for dehydrating air to be supplied to blast furnace
JPS6118445U (en) 1984-07-10 1986-02-03 ワイケイケイ株式会社 ventilation system
US4754651A (en) 1986-04-18 1988-07-05 Shortridge Instruments, Inc. Differential pressure apparatus for measuring flow and velocity
US4854726A (en) 1986-05-29 1989-08-08 Hughes Aircraft Company Thermal stress screening system
US5183098A (en) 1989-08-17 1993-02-02 Stirling Technology, Inc. Air to air heat recovery ventilator
JP2602589Y2 (en) 1990-10-29 2000-01-17 カルソニック株式会社 Housing for mounting temperature sensor
US5761908A (en) 1994-06-10 1998-06-09 Air Quality Engineering Apparatus suited for ventilating rooms contaminated with infectious disease organisms
US5826641A (en) 1994-10-27 1998-10-27 Aaon, Inc. Air conditioner with heat wheel
US5726424A (en) 1996-05-13 1998-03-10 Technology Licensing Corporation Modular control enclosure for a cooking appliance
US5728289A (en) 1996-10-11 1998-03-17 Kirchnavy; Steve Sensor cell holder for gas analyzer
US6039109A (en) 1996-11-05 2000-03-21 Stirling Technology, Inc. Air to air heat and moisture recovery ventilator
US6407469B1 (en) 1999-11-30 2002-06-18 Balboa Instruments, Inc. Controller system for pool and/or spa
DE10113627B4 (en) 2001-03-20 2005-12-29 Rittal Gmbh & Co. Kg Cabinet monitoring device
US6629422B2 (en) 2001-06-07 2003-10-07 Keith E. Wellman Sequential defrosting of refrigerated display cases
US20030178411A1 (en) 2002-03-25 2003-09-25 Mark Manganiello Food steamer with automatic electric steam trap, power modulation and automatic connected water supply
AU2002368429B2 (en) 2002-12-06 2007-09-06 Lg Electronics Inc. Heat exchanging system of ventilating device
WO2004073135A2 (en) 2003-02-10 2004-08-26 Briggs & Stratton Power Products Group, Llc Monitoring system for a generator
KR100497783B1 (en) 2003-05-01 2005-06-29 이준한 Winch for Underwater Fish-Gathering Light and Control Method Therefor
US7286907B2 (en) 2004-02-12 2007-10-23 Usa Technologies, Inc. Method and apparatus for conserving power consumed by a refrigerated appliance utilizing audio signal detection
US7258280B2 (en) 2004-04-13 2007-08-21 Tuckernuck Technologies Llc Damper control in space heating and cooling
US7922149B2 (en) 2004-07-29 2011-04-12 Siemens Industry Inc. Damper actuator assembly
US7383691B2 (en) 2005-01-26 2008-06-10 Hewlett-Packard Development Company, L.P. Modular networked sensor assembly
US8584305B2 (en) 2005-12-02 2013-11-19 Irobot Corporation Modular robot
US20070171647A1 (en) 2006-01-25 2007-07-26 Anthony, Inc. Control system for illuminated display case
US7891573B2 (en) 2006-03-03 2011-02-22 Micro Metl Corporation Methods and apparatuses for controlling air to a building
US20090095096A1 (en) 2007-10-10 2009-04-16 Charles Edwin Dean Hazardous materials sensing robot
EP2209554B1 (en) 2007-11-13 2017-10-11 F. Hoffmann-La Roche AG Modular sensor cassette
US8600559B2 (en) * 2008-10-27 2013-12-03 Lennox Industries Inc. Method of controlling equipment in a heating, ventilation and air conditioning network
KR20110044014A (en) * 2009-10-22 2011-04-28 엘지이노텍 주식회사 Defrosting system and method of refrigerator
US8943848B2 (en) * 2010-06-16 2015-02-03 Reznor Llc Integrated ventilation unit
US9175872B2 (en) 2011-10-06 2015-11-03 Lennox Industries Inc. ERV global pressure demand control ventilation mode
US9404668B2 (en) 2011-10-06 2016-08-02 Lennox Industries Inc. Detecting and correcting enthalpy wheel failure modes
US9395097B2 (en) 2011-10-17 2016-07-19 Lennox Industries Inc. Layout for an energy recovery ventilator system
US20130118188A1 (en) 2011-11-10 2013-05-16 Justin McKie Method of defrosting an energy recovery ventilator unit
US20150204578A1 (en) * 2013-01-30 2015-07-23 Ecoleap, Llc Heat and energy recovery and regeneration assembly, system and method

Patent Citations (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4281522A (en) * 1979-10-30 1981-08-04 Carrier Corporation Makeup air preconditioner for use with an air conditioning unit
US4843838A (en) * 1987-12-23 1989-07-04 Allen Trask Air-to-air heat pump
US5497823A (en) * 1993-12-30 1996-03-12 Honeywell Inc. Energy recovery ventilator: means for defrosting heat exchanger medium and damper motor actuation means
US7231967B2 (en) * 1994-01-31 2007-06-19 Building Performance Equipment, Inc. Ventilator system and method
US6209622B1 (en) * 1994-10-24 2001-04-03 Venmar Ventilation Inc. Ventilation system
US20060219381A1 (en) * 1994-10-24 2006-10-05 Frederic Lagace Ventilation system
US6289974B1 (en) * 1997-07-11 2001-09-18 Elastek, Inc. Integrated heat recovery ventilator HEPA filter using a HEPA filter material regenerative heat exchanger
US20020153133A1 (en) * 1998-11-09 2002-10-24 Building Performance Equipment Inc. Ventilator system and method
US6415616B1 (en) * 1999-09-03 2002-07-09 Lg Electronics, Inc. Method for controlling defrost heater of refrigerator
US6575228B1 (en) * 2000-03-06 2003-06-10 Mississippi State Research And Technology Corporation Ventilating dehumidifying system
US6328095B1 (en) * 2000-03-06 2001-12-11 Honeywell International Inc. Heat recovery ventilator with make-up air capability
US20030140638A1 (en) * 2001-08-22 2003-07-31 Delaware Capital Formation, Inc. Refrigeration system
US7090000B2 (en) * 2003-10-30 2006-08-15 Trent Metals Limited Heat recovery ventilator
US6925999B2 (en) * 2003-11-03 2005-08-09 American Standard International Inc. Multistage warm air furnace with single stage thermostat and return air sensor and method of operating same
US20050236150A1 (en) * 2004-04-22 2005-10-27 Chagnot Catherine J Heat and energy recovery ventilators and methods of use
US20070144187A1 (en) * 2005-12-22 2007-06-28 Ki Seok Lee Defrosting method of air conditioner
US20070234748A1 (en) * 2006-04-06 2007-10-11 Robertshaw Controls Company System and method for determining defrost power delivered by a defrost heater
US7716936B2 (en) * 2006-06-26 2010-05-18 Heatcraft Refrigeration Products, L.L.C. Method and apparatus for affecting defrost operations for a refrigeration system
US20080076346A1 (en) * 2006-09-26 2008-03-27 Osman Ahmed Ventilation Control Based on Occupancy
US8123518B2 (en) * 2008-07-10 2012-02-28 Honeywell International Inc. Burner firing rate determination for modulating furnace

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Ian Shaprio, Water & Energy Use in Steam-Heated Buildings, May 2010, ASHRAE *

Cited By (30)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10823447B2 (en) 2011-10-06 2020-11-03 Lennox Industries Inc. System and method for controlling a blower of an energy recovery ventilator in response to internal air pressure
US9175872B2 (en) 2011-10-06 2015-11-03 Lennox Industries Inc. ERV global pressure demand control ventilation mode
US9404668B2 (en) 2011-10-06 2016-08-02 Lennox Industries Inc. Detecting and correcting enthalpy wheel failure modes
US10197344B2 (en) 2011-10-06 2019-02-05 Lennox Industries Inc. Detecting and correcting enthalpy wheel failure modes
US10337759B2 (en) 2011-10-17 2019-07-02 Lennox Industries, Inc. Transition module for an energy recovery ventilator unit
US9835353B2 (en) 2011-10-17 2017-12-05 Lennox Industries Inc. Energy recovery ventilator unit with offset and overlapping enthalpy wheels
US9395097B2 (en) 2011-10-17 2016-07-19 Lennox Industries Inc. Layout for an energy recovery ventilator system
US9441843B2 (en) 2011-10-17 2016-09-13 Lennox Industries Inc. Transition module for an energy recovery ventilator unit
US9791163B2 (en) 2011-11-10 2017-10-17 Lennox Industries Inc. Method of defrosting an energy recovery ventilator unit
US10386087B2 (en) 2011-11-10 2019-08-20 Lennox Industries Inc. Method of defrosting an energy recovery ventilator unit
US9671122B2 (en) 2011-12-14 2017-06-06 Lennox Industries Inc. Controller employing feedback data for a multi-strike method of operating an HVAC system and monitoring components thereof and an HVAC system employing the controller
EP2876378B1 (en) * 2013-11-12 2019-10-30 FläktGroup Deutschland GmbH System for the recovery of heat
CN104819543A (en) * 2014-01-30 2015-08-05 特灵国际有限公司 System and Method of Protecting an HVAC System
US9664425B2 (en) * 2014-03-04 2017-05-30 Haier Us Appliance Solutions, Inc. Heat pump water heater appliance and a method for operating the same
US20150253049A1 (en) * 2014-03-04 2015-09-10 General Electric Company Water heater appliance and a method for operating the same
US10094587B2 (en) * 2014-10-10 2018-10-09 Mitsubishi Electric Corporation Heat-exchange ventilation device
US20170219237A1 (en) * 2014-10-10 2017-08-03 Mitsubishi Electric Corporation Heat-exchange ventilation device
EP3207315A4 (en) * 2014-10-16 2018-10-24 Swegon Operations AB Adaptive defrosting of an air treatment system
CN105042786A (en) * 2015-07-30 2015-11-11 广东美的制冷设备有限公司 Dehumidifier and method and device for controlling dehumidifier
US10935269B2 (en) * 2016-01-08 2021-03-02 Mitsubishi Electric Corporation Ventilator, and defrosting method
GB2559692B (en) * 2016-01-08 2021-02-10 Mitsubishi Electric Corp Ventilator, and defrosting method
US20190056134A1 (en) * 2016-01-08 2019-02-21 Mitsubishi Electric Corporation Ventilator, and defrosting method
CN106765917A (en) * 2016-12-07 2017-05-31 珠海格力电器股份有限公司 A kind of air-conditioner control method and device
CN107842970A (en) * 2017-10-18 2018-03-27 广东美的暖通设备有限公司 Air-conditioning system and its defrosting control method and device
US11561020B2 (en) 2017-10-18 2023-01-24 Gd Midea Heating & Ventilating Equipment Co., Ltd. Air conditioning system, and defrosting control method and device thereof
CN108286775A (en) * 2017-12-29 2018-07-17 广东高而美制冷设备有限公司 It is a kind of that there is waste heat recovery and anti-freeze defrosting control method
CN108895609A (en) * 2018-07-30 2018-11-27 珠海格力电器股份有限公司 A kind of control method and air-conditioning system of air-conditioning system defrost
US11371761B2 (en) * 2020-04-13 2022-06-28 Haier Us Appliance Solutions, Inc. Method of operating an air conditioner unit based on airflow
US20220390138A1 (en) * 2021-05-30 2022-12-08 Trane International Inc. Capacity control for hvac system
US11892188B2 (en) * 2021-05-30 2024-02-06 Trane International Inc. Capacity control for HVAC system

Also Published As

Publication number Publication date
US20150241081A1 (en) 2015-08-27
US9791163B2 (en) 2017-10-17
US20180003404A1 (en) 2018-01-04
US10386087B2 (en) 2019-08-20

Similar Documents

Publication Publication Date Title
US10386087B2 (en) Method of defrosting an energy recovery ventilator unit
AU2008218073B2 (en) Air-conditioning ventilator
US8944897B2 (en) Ventilation system and controlling method of the same
CN205536138U (en) New trend humidification system
KR102047754B1 (en) Multi-function smart air conditioning system
CN104896647A (en) Cold air prevention control method and system of indoor unit of air conditioner
EP3698088B1 (en) An air handling unit for a ventilation system in a building and a method for performing a defrosting operation of an air handling unit
CN207907434U (en) A kind of double low-temperature receiver depth dehumidifying fresh air treatment systems
US20180372361A1 (en) Heat exchange type ventilation device
KR101024699B1 (en) An air conditioning system
JP2010145012A (en) Heat exchange type ventilation device
CN111023414B (en) Air conditioning system and dehumidification control method
CN204787419U (en) Air conditioner
KR101520236B1 (en) air conditioner with freeze protection system and freeze protection method for the air conditioner
CN213020401U (en) Heating defrosting air source hot water pump
CN209801659U (en) Air conditioner
CN112797540A (en) Heat exchange fresh air system and control method
JP4236347B2 (en) Air conditioner
JPH11248232A (en) Floor-heating air-conditioning system
CN110081509A (en) A kind of antifreeze regulation unit of hot water heating air conditioner double temp and its control method
CN108592185B (en) Operation method of building cooling and heating system
CN216814447U (en) Constant temperature, humidity and oxygen installation system
CN213119398U (en) Passive form new trend system for building
CN206875666U (en) A kind of data center's Fresh air handling units control system
JP2008241190A (en) Air-conditioning system and its control method

Legal Events

Date Code Title Description
AS Assignment

Owner name: LENNOX INDUSTRIES INC., TEXAS

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:MCKIE, JUSTIN;PEREZ, ERIC;THOMAS, HERMAN MARCUS;AND OTHERS;REEL/FRAME:027207/0588

Effective date: 20111101

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION