US20130339078A1 - System and method linking building information modeling and enterprise resource planning - Google Patents

System and method linking building information modeling and enterprise resource planning Download PDF

Info

Publication number
US20130339078A1
US20130339078A1 US13/919,956 US201313919956A US2013339078A1 US 20130339078 A1 US20130339078 A1 US 20130339078A1 US 201313919956 A US201313919956 A US 201313919956A US 2013339078 A1 US2013339078 A1 US 2013339078A1
Authority
US
United States
Prior art keywords
data
bim
erp
metadata
sub
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US13/919,956
Inventor
Matthew Thomas Harris
Robert Wilson Humphreys
Lloyd Pickering
Richard Stokoe
Andrew Burden
Andrew Thomson
Andrew Ward
Laurence Skoropinski
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Viewpoint Inc
Original Assignee
Coaxis Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Coaxis Inc filed Critical Coaxis Inc
Priority to US13/919,956 priority Critical patent/US20130339078A1/en
Assigned to Coaxis, Inc. reassignment Coaxis, Inc. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: HARRIS, MATTHEW THOMAS, HUMPHREYS, ROBERT WILSON, BURDEN, ANDREW, PICKERING, LLOYD, SKOROPINSKI, LAURENCE, STOKOE, RICHARD, THOMSON, ANDREW, WARD, ANDREW
Publication of US20130339078A1 publication Critical patent/US20130339078A1/en
Assigned to VIEWPOINT, INC. reassignment VIEWPOINT, INC. CHANGE OF NAME (SEE DOCUMENT FOR DETAILS). Assignors: Coaxis, Inc.
Assigned to WELLS FARGO BANK, NATIONAL ASSOCIATION, AS AGENT reassignment WELLS FARGO BANK, NATIONAL ASSOCIATION, AS AGENT SECURITY AGREEMENT Assignors: VIEWPOINT, INC.
Priority to US15/443,844 priority patent/US11200522B2/en
Assigned to VIEWPOINT, INC. reassignment VIEWPOINT, INC. RELEASE BY SECURED PARTY (SEE DOCUMENT FOR DETAILS). Assignors: WELLS FARGO BANK, NATIONAL ASSOCIATION, AS AGENT
Priority to US17/523,338 priority patent/US11803791B2/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06313Resource planning in a project environment
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/21Design, administration or maintenance of databases
    • G06F16/211Schema design and management
    • G06F16/212Schema design and management with details for data modelling support
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Definitions

  • the present disclosure relates generally to the technical field of data processing, and more particularly, to linking Building Information Modeling (“BIM”) and Enterprise Resource Planning (“ERP”).
  • BIM Building Information Modeling
  • ERP Enterprise Resource Planning
  • a construction project may be bifurcated between architects and engineers on the one hand, and the contractors on the other. Architects and engineers may be more specialized than contractors, and may tend to focus primarily on their designs and engineering specifications. On the other hand, the construction of the project may be perceived as fungible. Assuming an equivalent basis of training and experience, multiple construction companies may be capable of executing a project design nearly identically. While a project design may vary based on an individual architect's interpretation of owner needs, the construction of the project design may be similar from one contractor to the next. What distinguishes one group of contractors from another is how the work will be done. This may be defined in project contract documents. Project contract documents may precisely describe how the contractor will deliver the constructed designs to the owner.
  • Project contract documents may describe, among other things, timelines, deliverables, budgets, and payment rates for the deliverables. Given the separate domains in which they function, architects and engineers on the one hand, and contractors on the other, have developed different systems and methods to manage their domains.
  • BIM programs may provide architects and engineers with a library of volumes and/or objects from which they may develop a particular design for the project.
  • ERP Enterprise Resource Planning
  • the electronic construction collaboration system includes an Enterprise Resource Planning (ERP) sub-system including a contract engine configured to generate at least one project contract including a contract data set and ERP metadata corresponding to Building Information Modeling (BIM) metadata included in a structural object of a construction project model in a BIM sub-system and an interconnection engine configured to associatively link the ERP metadata and the BIM metadata and send the contract data set to the BIM sub-system in response to associatively linking the ERP metadata and the BIM metadata.
  • ERP Enterprise Resource Planning
  • BIM Building Information Modeling
  • Associatively linking metadata in the BIM and ERP sub-systems and utilizing this correlation to share data between the systems increases workflow efficiency by decreasing the time needed to search for information separate sub-systems, such as contract data sets. As a result, a user's productivity is increased thereby increasing the amount of work that can be accomplished in a given amount of time and increasing their earning potential.
  • the system may be utilized by a wide range of professionals in the construction field such as contractors, engineers, architects, etc., thereby enabling contractors and engineers and/or architects to seamlessly share information, if desired.
  • FIG. 1 schematically illustrates an example construction project
  • FIG. 2 shows a schematic depiction of an electronic construction collaboration system
  • FIG. 3 schematically illustrates example computing devices that may be used as interfaces to Building Information Modeling (“BIM”) and Enterprise Resource Planning
  • BIM Building Information Modeling
  • Enterprise Resource Planning Enterprise Resource Planning
  • ERP ERP sub-systems in the system shown in FIG. 2 ;
  • FIG. 4 schematically illustrates example BIM and ERP objects, metadata associated with those objects, and links between the metadata of objects across the BIM and ERP sub-systems;
  • FIG. 5 schematically depicts an example of contractual and/or or other ERP related information a user might see when they select an object in a BIM sub-system
  • FIG. 6 schematically depicts an example method that may be implemented on a computing device associate with a BIM or ERP sub-system
  • FIGS. 7 and 8 depict a method for managing a construction project
  • FIG. 9 depicts another method for managing a construction project.
  • FIG. 10 schematically depicts an example computing device.
  • the system bridges a communication gap between a Building Information Modeling (BIM) sub-system and an Enterprise Resource Planning (ERP) sub-system.
  • BIM Building Information Modeling
  • ERP Enterprise Resource Planning
  • metadata included the BIM sub-system is mapped to metadata included in the ERP sub-system and data related to the linked metadata may be exchanged between the two sub-systems based on the metadata mapping.
  • the exchanged data may include structural object data, such as dimensional data defining the features and location of the object, and contract data, such as contract documents, cost data, labor hour data, equipment hour data.
  • users of the system such as architects, engineers, and/or contractors, may quickly be provided with pertinent project data without undue searching or interactive switching between the sub-systems. Consequently, the productivity of the users may be increased.
  • an example project 100 may include various entities working together. Architects and engineers, as noted in the background, may create project models and building plans, and adjust those plans to comply with various codes and regulations. In various embodiments, architects and engineers may include civic personnel (e.g., from the government and/or community organizations).
  • contractors may be engaged to execute the plans and models provided by the architects and engineers. As noted above, contractors may include subcontractors, vendors, suppliers and any other entities that are in contractual relationship with another contractor entity to execute a portion of a project or to supply a good or service related to the project.
  • the electronic construction collaboration system 200 may be used by a variety of professionals such as architects, engineers, contractors, etc.
  • the system may enable the aforementioned professionals to efficiently manage one or more constructions projects, such as projects for constructing buildings, roads, bridges, canals, dams, etc.
  • the electronic construction collaboration system 200 includes a BIM sub-system 202 .
  • the BIM sub-system 202 is configured to provide dimensional rendering (e.g., 2-D rendering, 3-D rendering) of a construction model for the professionals discussed above such as architects and engineers. Additionally, contractors may also utilize the BIM sub-system 202 due to the communications bridge established between the sub-systems in the electronic construction collaboration system 200 , discussed in greater detail herein.
  • the BIM sub-system 202 may include a plurality of engines for implementing various functionalities. Additionally, the BIM sub-system 202 may include one or more computing devices having code stored in memory executable by a processor to implement the aforementioned functionality. Therefore, the BIM sub-system may include and execute one or more application programs via one or more hardware components.
  • the engines may include a model engine 204 configured to generate a construction project model 206 .
  • the model engine 204 may be executed by programs such as Autodesk, CypeCAD, Vico Office Suite, etc.
  • the construction project model 206 may include at least one structural object 208 .
  • the construction project model 206 may include a plurality of structural objects.
  • the structural objects may be parametrically defined with regard to other structural objects in the construction project model. That is to say that the structural objects may be defined as parameters and relations to other objects, so that if a related object is amended, dependent ones may also change.
  • the construction project model 206 may be any suitable model such as a building, bridge, road, canal, dam, etc.
  • the structural object 208 may include form data 210 defining the contours, size, and other geometric features of the object.
  • the structural object 208 may further include location data 212 defining the location of the object.
  • the structural object 208 may also include BIM metadata 214 .
  • the BIM metadata 214 may include one or more of material data, vendor data, project number data, project phase data, a subcontract number, project schedule data, and cost data. The aforementioned types of data may each correspond to a different data field.
  • the model engine 204 may also be configured to enable the user to manipulate the structural objects, augment the structural objects, delete one or more of the structural objects, etc.
  • the BIM sub-system 202 further includes a BIM interconnection engine 216 configured communicatively link the BIM sub-system 202 to an ERP sub-system 218 .
  • a BIM interconnection engine 216 configured communicatively link the BIM sub-system 202 to an ERP sub-system 218 .
  • digital metadata independent of graphical rendering of the BIM sub-system may be linked with digital metadata in the ERP sub-system via the interconnection engine. In this way, electronic communication between the two sub-systems is established.
  • the BIM interconnection engine 216 is depicted as a separate component from the model engine 204 . However in some examples, the interconnection engine 216 may be integrated into the model engine 204 .
  • the ERP sub-system 218 is included in the electronic construction collaboration system 200 .
  • the ERP sub-system 218 also includes a plurality of engines configured to implement various computing functionalities.
  • the ERP sub-system 218 may include one or more computing devices having code stored in memory executable by a processor to implement the aforementioned functionality. Therefore, the ERP sub-system may include and execute one or more application programs via one or more hardware components.
  • the ERP sub-system 218 includes a contract engine 220 configured to generate and/or manage (e.g., augment, delete, and/or overwrite data in the contract) a project contract 222 .
  • the ERP sub-system 218 may include a plurality of project contracts related to different aspects of the construction project.
  • the project contract 222 may be delineated into contract elements associated with different aspects of the construction project.
  • the project contract 222 further includes a contract data set 224 .
  • the contract data set 224 includes contract documents, cost data, labor hour data, and/or equipment hour data.
  • the contract data set 224 therefore may include one or more files, data structures, etc.
  • the project contract 222 further includes ERP metadata 228 .
  • the ERP metadata 228 may be associated with the contract data set 224 .
  • the ERP metadata 228 may include one or more of material data, vendor data, project number data, project phase data, a subcontract number, project schedule data, and cost data. The aforementioned types of data may each correspond to a different data field.
  • the ERP sub-system 218 further includes an ERP interconnection engine 226 configured to communicatively link the ERP sub-system 218 to the BIM sub-system 202 . It will be appreciated that both the ERP interconnection engine 226 and the BIM interconnection engine 216 may work in combination to provide this functionality, in some examples.
  • the ERP interconnection engine 226 and the BIM interconnection engine 216 may both be configured to associatively link the BIM metadata 214 and the ERP metadata 228 .
  • corresponding metadata fields in the BIM metadata and the ERP metadata may be associatively linked (e.g., mapped) to one another indicated at arrow 230 .
  • the metadata may be mapped via a manual selection process, in one example. For instance, a user of the system may manually select linked metadata fields.
  • the metadata in the BIM sub-system and the ERP sub-system may be configured to comply with a similar standard and a one to one correlation, a one to two correlation, etc., may be drawn between metadata fields in the sub-systems. Still further in one example, a parser or an arranging process may be used to automatically link metadata fields in the sub-systems.
  • design software may be used to look up a project identification number in the BIM sub-system and map metadata associated with the project ID to metadata associated with an identical project ID in the ERP sub-system.
  • the ERP metadata 228 may include a first data field corresponding to a second data field in the BIM metadata 214 .
  • the first data field in the ERP metadata is associatively linked with a plurality of data fields in the BIM metadata.
  • the ERP metadata and the BIM metadata may not have a one to one correspondence.
  • the interconnection engines ( 216 and 226 ) may be configured to establish a plurality of links between ERP metadata and BIM metadata, each of the links may be associated with a particular building structural object. The links may be established based on a corresponding field, and once established, the links may include non-corresponding fields.
  • mapping may be automatically implemented by the electronic construction collaboration system 200 , in one example.
  • certain actions in the system may trigger the associative linking.
  • receiving a structural object selection input 232 from an input device 234 may trigger the associative linking.
  • the input device 234 may be any suitable input device such as a trackpad, a mouse, a keyboard, a touch screen, etc.
  • the input device 234 may be included in the BIM sub-system 202 , in some examples.
  • actions performed in the ERP sub-system 218 may also trigger the associative linking of the BIM metadata 214 and the ERP metadata 228 .
  • receiving a project contract selection input 236 from an input device 238 may trigger the associative linking.
  • the input device 238 may be any suitable input device such as a trackpad, a mouse, a keyboard, a touch screen, etc.
  • the input device 238 may be included in the ERP sub-system 218 , in some examples.
  • the associative linking of the BIM metadata 214 may trigger (e.g., automatically trigger) data transfer between the BIM sub-system 202 and the ERP sub-system 218 or vice-versa.
  • the BIM sub-system 202 may receive a duplicate of the contract data set 224 sent from the ERP sub-system 218 in response to the associative linking of the metadata indicated at arrow 240 .
  • the BIM sub-system 202 may receive a selected portion of the elements included in the contract data set 224 sent from the ERP sub-system 218 .
  • the portion of elements sent to the BIM sub-system 202 by the ERP sub-system 218 may be determined based on the type of metadata that is communicatively linked.
  • the ERP sub-system 218 may receive a duplicate of the location data 212 and/or the form data 210 sent from the BIM sub-system 202 in response to associatively linking the metadata, indicated at arrows 242 .
  • metadata associatively linked by the two sub-systems may trigger the sharing of relevant data between the two sub-systems.
  • a user's productivity may be increased via a decrease in wasted time spent searching for pertinent information stored within different sub-systems.
  • the BIM interconnection engine 216 and/or the ERP interconnection engine 226 may be configured to format the contract data into Construction Operations Building Information Exchange (COBie) format prior to sending the contract data.
  • COBie is a data format which may be useful for operations and maintenance information. Therefore, the COBie format may help provide a continuity of information and provide more effective metadata mapping.
  • the COBie format includes a type of extensible markup language (XML) format.
  • the BIM sub-system 202 may be in electronic communication with a display 250 enabling a user to view graphical data generated in the sub-system. Therefore, the structural object 208 as well as the contract data set 224 may be presented on a graphical user interface (GUI) in the display.
  • GUI graphical user interface
  • the BIM sub-system 202 may be in electronic communication with a display 250 , indicated via arrow 252 . It will be appreciated that in some examples, the display 250 may be integrated into the BIM sub-system 202 .
  • the ERP sub-system 218 may be in electronic communication with a display 260 enabling a user to view graphical data generated in the sub-system. Therefore, the contract data set 224 as well as the structural object 208 may be presented on the display 260 .
  • the display 260 may be integrated into the BIM sub-system 202 , in some examples. Further, in some examples, the BIM sub-system 202 may be remotely located from the ERP sub-system 218 . Furthermore, it will be appreciated that each separate sub-system may include one or more hardware components, devices, etc., which may be colocated or remotely located. Moreover, the ERP sub-system 218 and the BIM sub-system 202 may be in electronic communication via a network 270 (e.g., the Internet, a LAN network, etc.)
  • a network 270 e.g., the Internet, a LAN network, etc.
  • FIG. 3 shows an example use case scenario of the electronic construction collaboration system 200 shown in FIG. 2 . Therefore, the devices, components, elements, etc., shown in FIG. 3 may be included in the system shown in FIG. 2 .
  • An architect or engineer may utilize a BIM computing device 300 configured with or having access to BIM sub-system 302 to create and/or modify project plans and models.
  • the BIM sub-system may include software.
  • BIM sub-system 302 may be used to create a two-dimensional (“2D”) or three-dimensional (“3D”) drawing or model of a structure or building to be constructed as part of a project.
  • 2D and 3D BIM drawings and/or models may include a plurality of objects. Each object may correspond to a particular structure within the overall model.
  • BIM users may manipulate these objects in various ways. For instance, in some embodiments, a user may use a mouse, keyboard, light pin and/or other input devices to interact with a graphical user interface (“GUI”) depicted on one or more displays of BIM computing device 300 .
  • GUI graphical user interface
  • a contractor may use an ERP computing device 304 configured with or having access to ERP sub-system 306 to perform its role in a project.
  • the ERP sub-system may include software.
  • a general contractor may utilize ERP computing device 304 to view and/or edit contract data and/or other more general project data, such as costs, completion status, safety incidences, change orders, and so forth.
  • BIM computing device 300 is shown as a desktop computing device and ERP computing device 304 is shown as a laptop computing device, this is not meant to be limiting. Either of these computing devices, or any other computing device or system described herein, may be any type of computing device, including but not limited to a desktop computer, a laptop computer, a mobile phone, a tablet computing device, a personal digital assistance (“PDA”), a “dummy” terminal, a server, etc.
  • PDA personal digital assistance
  • BIM sub-system 302 and ERP sub-system 306 are shown as blocks in FIG. 3 to indicate that they may be implemented in various forms.
  • local computing devices such as BIM computing device 300 and ERP computing device 304 may execute client programs that may be configured to connect to corresponding server programs executing on BIM/ERP server computers.
  • BIM/ERP clients installed on computing devices such as BIM computing device 300 or ERP computing device 304 may store and retrieve data from a remote database (not shown), e.g., controlled by an BIM and/or ERP server.
  • objects that may correspond or relate to each other in real life may be classified and/or characterized differently in a BIM sub-system 402 versus an ERP sub-system 404 , shown in FIG. 4 .
  • the arrows indicate that a number of metadata fields associated with each object may correspond or otherwise relate to each other.
  • These relationships may be usable to link the BIM sub-system 402 and ERP sub-system 404 , so that a user may interact with one sub-system to view data from both sub-systems.
  • a user of BIM sub-system 402 may be able to select the structural steel column at grid location B5 and request, from ERP sub-system 404 , contractual documents or other data that is pertinent to the selected structural column or all structural columns in a project.
  • a number of metadata fields may be linked across BIM and ERP sub-systems.
  • both the “structural steel column at grid location B5” object of BIM sub-system 402 and the “structural steel records” of ERP sub-system 404 have “project number” fields. If the values of these objects' project number fields are the same, that may suggest that, at the very least, the BIM object and the ERP records relate to the same project. Additionally, both the BIM object and the ERP records in FIG. 3 have “vendor number” fields. If the vendor number for both objects and records is the same, that may further suggest that a single vendor was responsible for or at least involved with both the object and the associated records.
  • a user of BIM sub-system 402 could utilize a combination of the project number and vendor number fields to identify and view ERP records and data about pertinent BIM objects (e.g., contracts and other data related to the same project and vendor).
  • Associated fields may further include a project identification number field, a vendor field, a construction phase/trade field, a project readiness field, a phase field, a delivery date field, a customer field, and/or an asset owner field.
  • the project readiness field may include data that signifies if the project is complete or is pending.
  • contract information as well as change order information may be displayed to a user of the BIM sub-system and/or the ERP sub-system. Change order data may be integrated into the system via the mapped metadata.
  • time cards may be linked to a phase of construction in the ERP sub-system and therefore linked with associated metadata. In this way, time cards may be pulled (e.g., displayed to a user of the system) enabling payment and cost review by the user.
  • relationships between objects in BIM and records in ERP sub-systems need not be one-to-one.
  • a component in BIM sub-system 402 may correspond to more than one component in ERP sub-system 404 , and vice versa.
  • an object in BIM sub-system 402 such as a structural steel column may correspond to multiple records (e.g., vendor, contract, etc.) in ERP sub-system 404 by virtue of shared metadata fields.
  • a single contract in ERP sub-system 404 may relate to multiple individual objects in BIM sub-system 402 , e.g., where a particular subcontractor is hired to build multiple structures.
  • Benefits of linking BIM sub-system 402 and ERP sub-system 404 via metadata may become clearer through an example. Assume a project manager is viewing an engineering drawing of a particular structural steel column in BIM sub-system 402 , e.g., using BIM computing device 300 in FIG. 3 . Assume also that the project manager wishes to view ongoing costs and contractual documents associated with the structural steel column. Rather than switching to ERP sub-system 404 (e.g., by moving to ERP computing device 304 in FIG. 3 ) and manually searching for contracts and other pertinent data related to the structural steel column, the project manager may simply direct BIM sub-system 402 to cross reference the metadata associated with the structural steel column in BIM sub-system 402 with corresponding metadata in the ERP sub-system 404 . In this manner, the project manager may search for and retrieve project documents, contracts, and other data pertinent to the structural steel column from ERP sub-system 404 , without transitioning between the two sub-systems.
  • ERP sub-system 404 e.g., by moving to
  • associations between metadata in BIM and ERP sub-systems are not limited to associations between objects in the architectural or engineering models like structural steel columns (BIM) and project documents or contracts (ERP).
  • associations may additionally or alternatively include an association between objects in a BIM sub-system and other data related and unrelated to an ERP sub-system, including but not limited to cost data, labor hours, equipment hours, change orders, and so forth.
  • BIM sub-system 402 , ERP sub-system 404 , or both may be configured to cross reference with each other on user-selected metadata fields.
  • the project manager from the example above may refine the search results by specifying particular metadata to be linked from BIM sub-system 402 to ERP sub-system 404 .
  • the project manager could request only ERP components with the same project number and/or subcontractor number as the current BIM object, or even the same start and finish dates.
  • the more fields selected for cross reference the narrower the results may be.
  • BIM and ERP sub-systems described herein remain separate (though linked via metadata), this is not meant to be limiting.
  • a single sub-system or application program may incorporate both BIM and ERP capabilities.
  • FIG. 5 depicts schematically one example of what a user of BIM computing device 300 , shown in FIG. 3 , might see on a display when the user selects a particular drawing or model feature (e.g., a bathroom fixture).
  • a user may be viewing a building plan 502 and may have selected a particular feature, in this case, a dual sink 504 .
  • Selection of a feature in the drawing or model may cause another interface or window 506 to open.
  • the other interface or window 506 may depict various BIM-related information about the selected feature, such as the entity installing it, materials involved, etc.
  • the other interface or window 506 may also display non-BIM related information (including but not limited to ERP-related information) about the selected feature, such as contracts related to the feature, amounts received and paid for the particular feature, cash flow relating to the feature, the entity (e.g., subcontractor) responsible for constructing the feature, information relating to that entity, any change order requests or approvals pertinent to that particular feature, information about materials used for the feature, and so forth.
  • non-BIM related information including but not limited to ERP-related information
  • ERP-related information including but not limited to ERP-related information about the selected feature, such as contracts related to the feature, amounts received and paid for the particular feature, cash flow relating to the feature, the entity (e.g., subcontractor) responsible for constructing the feature, information relating to that entity, any change order requests or approvals pertinent to that particular feature, information about materials used for the feature, and so forth.
  • FIG. 6 depicts an example method 600 that may be implemented by a computing device such as BIM computing device 300 and/or ERP computing device 304 in FIG. 3 .
  • a computing device such as BIM computing device 300 and/or ERP computing device 304 in FIG. 3 .
  • the operations are depicted in a particular order, this is not meant to be limiting. One or more operations may be reordered, added and/or omitted without departing from the present disclosure.
  • input may be received, e.g., by BIM computing device 300 and/or ERP computing device 304 , that indicates that a user has selected (e.g., has interest in) a particular object. For example, if the user is using a BIM sub-system (e.g., via BIM computing device 300 ), the user may select (e.g., using a mouse, light pin, etc.) a graphical or textual object corresponding to a component of a building or other structure, such as the dual sink described above.
  • a BIM sub-system e.g., via BIM computing device 300
  • the user may select (e.g., using a mouse, light pin, etc.) a graphical or textual object corresponding to a component of a building or other structure, such as the dual sink described above.
  • the user may select a contract or other piece of data, e.g., using a mouse, keyboard, light pin, etc.
  • that object may become “active,” and the user may perform various actions on the object (e.g., depending on the user's access credentials), such as modification, deletion, and so forth.
  • Metadata related to the selected object may be retrieved. For instance, if a user selects a “structural column” at BIM computing device 300 , metadata relating to that object (e.g., shown in FIG. 3 ) may be retrieved, e.g., from a database associated with a BIM sub-system. In various embodiments, the retrieved metadata may be displayed or made available for display to the user.
  • input may be received from the user indicating a selection of particular metadata fields, e.g., for cross reference into a remote system.
  • a “remote system” may refer to the ERP sub-system from the perspective of the BIM sub-system, and to the BIM sub-system from the perspective of the ERP sub-system.
  • the user may select metadata fields for a variety of reasons. For example, the user may wish to know what other portions of a project are being handled by the same subcontractor as the currently-selected BIM object. Accordingly, the user may select the “subcontractor number” metadata field, for cross reference into the ERP sub-system.
  • metadata corresponding to the metadata retrieved at 604 and/or the metadata fields selected at 606 may be located in the remote system. If the user is using BIM computing device 300 , the corresponding metadata may be retrieved from ERP computing device 304 and/or an ERP sub-system 306 . If the user is using ERP computing device 304 , the corresponding metadata may be retrieved from BIM computing device 300 and/or BIM sub-system 302 .
  • BIM computing device 300 may retrieve contracts and other data associated with metadata received from ERP sub-system 306 and/or ERP computing device 304 .
  • ERP computing device 304 may retrieve BIM objects associated with metadata received from BIM sub-system 302 and/or BIM computing device 300 .
  • BIM computing device 300 may receive, e.g., from ERP sub-system 306 , contracts and other data with metadata that matches the metadata selected at 606 and/or that relates to metadata retrieved at 604 .
  • the contracts or other data returned from may include any contracts or other data having the same subcontractor number.
  • FIG. 7 shows a method 700 for managing a construction project in an in an electronic construction collaboration system.
  • the method shows an input device 702 , BIM sub-system 704 , and ERP sub-system 706 executing the method.
  • the input device 702 may be similar to the input device 234 shown in FIG. 2 .
  • the BIM sub-system 704 may be similar to the BIM sub-system 202 shown in FIG. 2
  • the ERP sub-system 706 may be similar to the ERP sub-system 218 shown in FIG. 2 .
  • the method may be implemented via the electronic construction collaboration system, sub-systems, components, elements, etc., shown in FIG. 2 or may be implemented via another suitable electronic construction collaboration system.
  • the method includes, at the input device 702 , generating a structural object selection input. For instance, an object may be selected via a mouse click over an object in a graphical user interface.
  • the method includes sending the structural object selection input from the input device 702 to the BIM sub-system 704 .
  • the method includes receiving the structural object selection input at the BIM sub-system 704 sent from the input device 702 .
  • the method includes selecting a structural object in response to receiving the structural object input, the structural object included in a construction project model in the BIM sub-system 704 .
  • BIM metadata included in the BIM sub-system included in the structural object may include material data, vendor data, project number data, project phase data, a subcontract number, project schedule data, and cost data.
  • the structural object may include form data and location data.
  • the metadata may be included in a metadata set having a plurality of data fields.
  • the method includes sending a contract data information request to the ERP sub-system from the BIM sub-system.
  • the contract data information request may include BIM metadata.
  • the method includes receiving the contract data information request from the BIM sub-system at the ERP sub-system. It will be appreciated that the contract data information request may be more generally referred to as an information request.
  • the method includes associatively linking the BIM metadata with ERP metadata included in a project contract included in the ERP sub-system at the ERP sub-system.
  • the associative linking may be implemented in the BIM sub-system.
  • metadata in both the BIM and ERP sub-systems may be mapped to provide a communication bridge between the systems to increase the system's efficiency.
  • associatively linking metadata in the two sub-systems may include selecting a set of ERP metadata from a plurality of sets of ERP metadata, the set of metadata including at least one metadata field included in the BIM metadata. Each set of ERP metadata may be associated with a different project contract.
  • relevant project contracts may be identified for subsequent transfer to the BIM sub-system and display by the BIM sub-system.
  • a contractor, architect, engineer, etc. may view contracts related to the structural object via the BIM sub-system without switching systems.
  • the ERP metadata and the BIM metdata may include one or more of material data, vendor data, project number data, project phase data, a subcontract number, project schedule data, and cost data. It will be appreciated that the metadata may be independent of the graphical data rendered via a rendering model in the BIM sub-system.
  • the method includes formatting a contract data set into a COBie format.
  • the COBie format may include a type of XML format.
  • the method includes sending the contract data set from the ERP sub-system to the BIM sub-system. In this way, contract data may be automatically sent to the BIM sub-system, enabling a user of the BIM sub-system to not only interact with a project model but also access pertinent contract information associated with the contract model stored in the ERP sub-system.
  • FIG. 9 shows a method 900 for managing a construction project in an in an electronic construction collaboration system.
  • the method 900 may be implemented via the electronic construction collaboration system, sub-systems, components, elements, etc., shown in FIG. 2 or may be implemented via another suitable electronic construction collaboration system.
  • the method includes receiving BIM data from a BIM subsystem, the data including a plurality of building structural objects, each with a plurality of associated meta-data fields.
  • the method includes receiving ERP data from an ERP subsystem, the data including contract and financial fields.
  • the method includes establishing a plurality of links between the ERP data and the BIM data, each of the links associated with a particular building structural object, the links established based on a corresponding field, and once established, the links includes even non-corresponding fields.
  • the establishment of the links is prioritized based on a number of corresponding fields between the ERP data and the BIM data for the particular building structural object. In this way, pertinent data may be correspondingly linked.
  • at least two corresponding fields are required to establish the links, the at least two fields including a project number and a vendor number. Therefore, it may be determined if a link is established based on the number of corresponding fields.
  • the plurality of links are further established based on COBie-formatted data.
  • the method includes displaying in a common view, linked data from each of the subsystems without transitioning between the two sub-systems.
  • the displaying includes, first displaying in the common view the linked data associated only with a selected structural object, and in response to an addition user selection from the common view, displaying, in the common view, data for a structural object other than the selected structural object, but with fields in common with the selected structural object.
  • the data for the structural object other than the selected structural object includes a common vendor or sub-contractor for the selected structural object and the structural object other than the selected structural object.
  • the linked data displayed in the common view includes one or more of an entity installing a selected structural object, materials for the selected structural object, a shape of the selected structural object, dimensions of the selected structural object, a contract for construction of the selected structural object, cash flow related to the selected structural object, change orders for the selected structural object, labor hours for the selected structural object, equipment hours for the selected structural object, approvals for the selected structural object, or combinations thereof.
  • the linked data displayed in the common view includes time cards for the selected structural object.
  • the method includes updating both the BIM data and ERP data, using the established links, for a structural object specified in a change order in response to receiving data from the change order.
  • FIG. 10 illustrates a computing system 1000 configured to practice all or selected aspects of the operations described above and shown in FIG. 6 .
  • the BIM and/or ERP subsystems shown in FIG. 2 may include one or more of the components shown in the computing system 1000 .
  • computing system 1000 may include processor 1004 , memory 1008 , and bus 1012 , coupled to each other as shown.
  • computing system 1000 may include storage 1016 and one or more communication interfaces 1020 , e.g., a network interface card (NIC), or an antenna, coupled to each other, and the earlier described elements as shown.
  • NIC network interface card
  • the memory 1008 may include random access memory (RAM), dynamic RAM (“DRAM”), static RAM (“SRAM”), synchronous DRAM (“SDRAM”), dual data rate RAM (“DDRRAM”), etc.
  • the processor 1004 may include one or more single-core processors, multiple-core processors, controllers, application-specific integrated circuits (“ASICs”), etc.
  • storage 1016 may be a storage resource physically part of the computing system 1000 or it may be accessible by, but not necessarily a part of, the computing system 1000 .
  • the storage 1016 may be accessed by the computing system 1000 over a network via the communication interface 1020 .
  • computing system 1000 may have more or less components, and/or different architectures.
  • phrase “A and/or B” means (A), (B), or (A and B).
  • phrase “A, B, and/or C” means (A), (B), (C), (A and B), (A and C), (B and C), or (A, B and C).

Abstract

An electronic construction collaboration system for managing a construction project is provided. The electronic construction collaboration system includes an Enterprise Resource Planning (ERP) sub-system including a contract engine configured to generate at least one project contract including a contract data set and ERP metadata corresponding to Building Information Modeling (BIM) metadata included in a structural object of a construction project model in a BIM sub-system and an interconnection engine configured to associatively link the ERP metadata and the BIM metadata and send the contract data set to the BIM sub-system in response to associatively linking the ERP metadata and the BIM metadata.

Description

    CROSS REFERENCE TO RELATED APPLICATION
  • This application claims priority to U.S. provisional patent application, Ser. No. 61/661,170, entitled “LINKING BUILDING INFORMATION MODELING AND ENTERPRISE RESOURCE PLANNING”, filed on Jun. 18, 2012, the entire disclosure of which is herein incorporated by reference.
  • FIELD
  • The present disclosure relates generally to the technical field of data processing, and more particularly, to linking Building Information Modeling (“BIM”) and Enterprise Resource Planning (“ERP”).
  • BACKGROUND
  • The background description provided herein is for the purpose of generally presenting the context of the disclosure. Work of the presently named inventors, to the extent it is described in this background section, as well as aspects of the description that may not otherwise qualify as prior art at the time of filing, are neither expressly nor impliedly admitted as prior art against the present disclosure.
  • A construction project may involve collaboration between architects, engineers and contractors, all of whom may be directly or indirectly in the employ of an owner or other managing party. The architects and engineers may design buildings or other structures (e.g., by creating plans and/or models) that will serve their intended function, be structurally and mechanically sound, be safe, comply with various rules and regulations (also referred to as “code”), and meet the needs of the project owner. Contractors may construct the building or other structure based on models and/or designs provided by the architects and/or engineers. Contractors may include one or more general contractors, subcontractors, suppliers or other vendors, service providers, and so forth. In some cases, a “construction company” may include a general contractor and one or more subcontractors or suppliers in privity with the general contractor.
  • A construction project may be bifurcated between architects and engineers on the one hand, and the contractors on the other. Architects and engineers may be more specialized than contractors, and may tend to focus primarily on their designs and engineering specifications. On the other hand, the construction of the project may be perceived as fungible. Assuming an equivalent basis of training and experience, multiple construction companies may be capable of executing a project design nearly identically. While a project design may vary based on an individual architect's interpretation of owner needs, the construction of the project design may be similar from one contractor to the next. What distinguishes one group of contractors from another is how the work will be done. This may be defined in project contract documents. Project contract documents may precisely describe how the contractor will deliver the constructed designs to the owner. They may be highly specific to an individual general contractor and his/her negotiations with an owner. Project contract documents may describe, among other things, timelines, deliverables, budgets, and payment rates for the deliverables. Given the separate domains in which they function, architects and engineers on the one hand, and contractors on the other, have developed different systems and methods to manage their domains.
  • Many architects and engineers utilize computers with sophisticated drafting programs. Drafting programs rapidly evolving from representing two-dimensional (“2D”) figures like squares, ovals, and trapezoids to representing of three-dimensional (“3D”) volumes like columns, slabs, and tubes. Such 2D or 3D drafting programs may be referred to as “Building Information Modeling,” or “BIM.” BIM programs may provide architects and engineers with a library of volumes and/or objects from which they may develop a particular design for the project.
  • Many contractors also employ sophisticated systems, referred to as Enterprise Resource Planning (“ERP”) systems, to manage project communications, contract documents, and job costs to increase the productivity and accountability of their businesses. ERP sub-systems may provide various parties such as business owners, managers, and partners access to job cost data, contract documents and financial data.
  • During the management of a mid-sized construction project, the average general contractor might interact with hundreds or even thousands of subcontractors and other venders, via tens of thousands of project and contract documents. The manual search to identify all of the pertinent documents, contracts, and data associated with a particular element of a project drawing or model may be time-consuming and/or inefficient.
  • In spite of the sophistication of the separate BIM and ERP sub-systems, a gap remains between the project model of the architect or engineer and the project contract of the contractor. In prior systems, there is not a link or association between project models and contract documents/financial performance data, or vice versa. Instead, an interested party may waste time manually looking up contracts pertinent to a particular portion of the project models, or by paging through the drawings for which a particular vendor has subcontracted. For example, a project manager (e.g., of a general contractor) may wish to learn more about the specifics of the contracts associated with a particular structure as described in the construction project models. To better understand the performance requirements associated with this particular structure, the project manager may first identify the structure using the BIM sub-system. The project manager must then switch from the BIM sub-system to the ERP sub-system (or to project contract notebooks in scenarios where there is no ERP sub-system) so that the project manager can look up the contracts associated with the particular structure. It is through this investigative process that the project manager can find relevant project documents (requests for information, submittals, etc.) and contracts (initial contract, pending and approved change orders, etc.) associated with the structure of interest.
  • SUMMARY
  • An electronic construction collaboration system for managing a construction project is provided. The electronic construction collaboration system includes an Enterprise Resource Planning (ERP) sub-system including a contract engine configured to generate at least one project contract including a contract data set and ERP metadata corresponding to Building Information Modeling (BIM) metadata included in a structural object of a construction project model in a BIM sub-system and an interconnection engine configured to associatively link the ERP metadata and the BIM metadata and send the contract data set to the BIM sub-system in response to associatively linking the ERP metadata and the BIM metadata.
  • Associatively linking metadata in the BIM and ERP sub-systems and utilizing this correlation to share data between the systems increases workflow efficiency by decreasing the time needed to search for information separate sub-systems, such as contract data sets. As a result, a user's productivity is increased thereby increasing the amount of work that can be accomplished in a given amount of time and increasing their earning potential. It will be appreciated that the system may be utilized by a wide range of professionals in the construction field such as contractors, engineers, architects, etc., thereby enabling contractors and engineers and/or architects to seamlessly share information, if desired.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • Embodiments will be readily understood by the following detailed description in conjunction with the accompanying drawings. To facilitate this description, like reference numerals designate like structural elements. Embodiments are illustrated by way of example and not by way of limitation in the figures of the accompanying drawings.
  • FIG. 1 schematically illustrates an example construction project;
  • FIG. 2 shows a schematic depiction of an electronic construction collaboration system;
  • FIG. 3 schematically illustrates example computing devices that may be used as interfaces to Building Information Modeling (“BIM”) and Enterprise Resource Planning
  • (“ERP”) sub-systems in the system shown in FIG. 2;
  • FIG. 4 schematically illustrates example BIM and ERP objects, metadata associated with those objects, and links between the metadata of objects across the BIM and ERP sub-systems;
  • FIG. 5 schematically depicts an example of contractual and/or or other ERP related information a user might see when they select an object in a BIM sub-system;
  • FIG. 6 schematically depicts an example method that may be implemented on a computing device associate with a BIM or ERP sub-system;
  • FIGS. 7 and 8 depict a method for managing a construction project;
  • FIG. 9 depicts another method for managing a construction project; and
  • FIG. 10 schematically depicts an example computing device.
  • DETAILED DESCRIPTION
  • An electronic construction collaboration system for managing digital data related to one or more constructions projects is described herein. The system bridges a communication gap between a Building Information Modeling (BIM) sub-system and an Enterprise Resource Planning (ERP) sub-system. Specifically, metadata included the BIM sub-system is mapped to metadata included in the ERP sub-system and data related to the linked metadata may be exchanged between the two sub-systems based on the metadata mapping. The exchanged data may include structural object data, such as dimensional data defining the features and location of the object, and contract data, such as contract documents, cost data, labor hour data, equipment hour data. As a result, users of the system, such as architects, engineers, and/or contractors, may quickly be provided with pertinent project data without undue searching or interactive switching between the sub-systems. Consequently, the productivity of the users may be increased.
  • Referring now to FIG. 1, an example project 100 may include various entities working together. Architects and engineers, as noted in the background, may create project models and building plans, and adjust those plans to comply with various codes and regulations. In various embodiments, architects and engineers may include civic personnel (e.g., from the government and/or community organizations).
  • Contractors may be engaged to execute the plans and models provided by the architects and engineers. As noted above, contractors may include subcontractors, vendors, suppliers and any other entities that are in contractual relationship with another contractor entity to execute a portion of a project or to supply a good or service related to the project.
  • Referring to FIG. 2, an electronic construction collaboration system 200 is depicted. The electronic construction collaboration system 200 may be used by a variety of professionals such as architects, engineers, contractors, etc. The system may enable the aforementioned professionals to efficiently manage one or more constructions projects, such as projects for constructing buildings, roads, bridges, canals, dams, etc.
  • The electronic construction collaboration system 200 includes a BIM sub-system 202. The BIM sub-system 202 is configured to provide dimensional rendering (e.g., 2-D rendering, 3-D rendering) of a construction model for the professionals discussed above such as architects and engineers. Additionally, contractors may also utilize the BIM sub-system 202 due to the communications bridge established between the sub-systems in the electronic construction collaboration system 200, discussed in greater detail herein.
  • The BIM sub-system 202 may include a plurality of engines for implementing various functionalities. Additionally, the BIM sub-system 202 may include one or more computing devices having code stored in memory executable by a processor to implement the aforementioned functionality. Therefore, the BIM sub-system may include and execute one or more application programs via one or more hardware components.
  • The engines may include a model engine 204 configured to generate a construction project model 206. The model engine 204 may be executed by programs such as Autodesk, CypeCAD, Vico Office Suite, etc. The construction project model 206 may include at least one structural object 208. However, it will be appreciated that in some examples, the construction project model 206 may include a plurality of structural objects. In such an example, the structural objects may be parametrically defined with regard to other structural objects in the construction project model. That is to say that the structural objects may be defined as parameters and relations to other objects, so that if a related object is amended, dependent ones may also change. The construction project model 206 may be any suitable model such as a building, bridge, road, canal, dam, etc.
  • The structural object 208 may include form data 210 defining the contours, size, and other geometric features of the object. The structural object 208 may further include location data 212 defining the location of the object. The structural object 208 may also include BIM metadata 214. The BIM metadata 214 may include one or more of material data, vendor data, project number data, project phase data, a subcontract number, project schedule data, and cost data. The aforementioned types of data may each correspond to a different data field. Additionally, the model engine 204 may also be configured to enable the user to manipulate the structural objects, augment the structural objects, delete one or more of the structural objects, etc.
  • The BIM sub-system 202 further includes a BIM interconnection engine 216 configured communicatively link the BIM sub-system 202 to an ERP sub-system 218. Specifically, digital metadata independent of graphical rendering of the BIM sub-system may be linked with digital metadata in the ERP sub-system via the interconnection engine. In this way, electronic communication between the two sub-systems is established. The BIM interconnection engine 216 is depicted as a separate component from the model engine 204. However in some examples, the interconnection engine 216 may be integrated into the model engine 204.
  • The ERP sub-system 218 is included in the electronic construction collaboration system 200. The ERP sub-system 218 also includes a plurality of engines configured to implement various computing functionalities. The ERP sub-system 218 may include one or more computing devices having code stored in memory executable by a processor to implement the aforementioned functionality. Therefore, the ERP sub-system may include and execute one or more application programs via one or more hardware components. Specifically, the ERP sub-system 218 includes a contract engine 220 configured to generate and/or manage (e.g., augment, delete, and/or overwrite data in the contract) a project contract 222. It will be appreciated that the ERP sub-system 218 may include a plurality of project contracts related to different aspects of the construction project. Furthermore, the project contract 222 may be delineated into contract elements associated with different aspects of the construction project.
  • The project contract 222 further includes a contract data set 224. The contract data set 224 includes contract documents, cost data, labor hour data, and/or equipment hour data. The contract data set 224 therefore may include one or more files, data structures, etc. The project contract 222 further includes ERP metadata 228. The ERP metadata 228 may be associated with the contract data set 224. The ERP metadata 228 may include one or more of material data, vendor data, project number data, project phase data, a subcontract number, project schedule data, and cost data. The aforementioned types of data may each correspond to a different data field.
  • The ERP sub-system 218 further includes an ERP interconnection engine 226 configured to communicatively link the ERP sub-system 218 to the BIM sub-system 202. It will be appreciated that both the ERP interconnection engine 226 and the BIM interconnection engine 216 may work in combination to provide this functionality, in some examples.
  • The ERP interconnection engine 226 and the BIM interconnection engine 216 may both be configured to associatively link the BIM metadata 214 and the ERP metadata 228.
  • Specifically, corresponding metadata fields in the BIM metadata and the ERP metadata may be associatively linked (e.g., mapped) to one another indicated at arrow 230. The metadata may be mapped via a manual selection process, in one example. For instance, a user of the system may manually select linked metadata fields. Additionally or alternatively, the metadata in the BIM sub-system and the ERP sub-system may be configured to comply with a similar standard and a one to one correlation, a one to two correlation, etc., may be drawn between metadata fields in the sub-systems. Still further in one example, a parser or an arranging process may be used to automatically link metadata fields in the sub-systems. For instance, design software may be used to look up a project identification number in the BIM sub-system and map metadata associated with the project ID to metadata associated with an identical project ID in the ERP sub-system. Thus, in one example the ERP metadata 228 may include a first data field corresponding to a second data field in the BIM metadata 214. In such an example, the first data field in the ERP metadata is associatively linked with a plurality of data fields in the BIM metadata. Thus, the ERP metadata and the BIM metadata may not have a one to one correspondence. Further in one example, the interconnection engines (216 and 226) may be configured to establish a plurality of links between ERP metadata and BIM metadata, each of the links may be associated with a particular building structural object. The links may be established based on a corresponding field, and once established, the links may include non-corresponding fields.
  • It will be appreciated that the mapping may be automatically implemented by the electronic construction collaboration system 200, in one example. However, in other examples, certain actions in the system may trigger the associative linking. For instance, receiving a structural object selection input 232 from an input device 234 may trigger the associative linking. The input device 234 may be any suitable input device such as a trackpad, a mouse, a keyboard, a touch screen, etc. The input device 234 may be included in the BIM sub-system 202, in some examples. Additionally or alternatively, actions performed in the ERP sub-system 218 may also trigger the associative linking of the BIM metadata 214 and the ERP metadata 228. Specifically, receiving a project contract selection input 236 from an input device 238 may trigger the associative linking. The input device 238 may be any suitable input device such as a trackpad, a mouse, a keyboard, a touch screen, etc. The input device 238 may be included in the ERP sub-system 218, in some examples.
  • The associative linking of the BIM metadata 214 may trigger (e.g., automatically trigger) data transfer between the BIM sub-system 202 and the ERP sub-system 218 or vice-versa. Specifically, in one example the BIM sub-system 202 may receive a duplicate of the contract data set 224 sent from the ERP sub-system 218 in response to the associative linking of the metadata indicated at arrow 240. In another example, the BIM sub-system 202 may receive a selected portion of the elements included in the contract data set 224 sent from the ERP sub-system 218. The portion of elements sent to the BIM sub-system 202 by the ERP sub-system 218 may be determined based on the type of metadata that is communicatively linked. In another example, the ERP sub-system 218 may receive a duplicate of the location data 212 and/or the form data 210 sent from the BIM sub-system 202 in response to associatively linking the metadata, indicated at arrows 242. In this way, metadata associatively linked by the two sub-systems may trigger the sharing of relevant data between the two sub-systems. As a result, a user's productivity may be increased via a decrease in wasted time spent searching for pertinent information stored within different sub-systems.
  • The BIM interconnection engine 216 and/or the ERP interconnection engine 226 may be configured to format the contract data into Construction Operations Building Information Exchange (COBie) format prior to sending the contract data. COBie is a data format which may be useful for operations and maintenance information. Therefore, the COBie format may help provide a continuity of information and provide more effective metadata mapping. In one example, the COBie format includes a type of extensible markup language (XML) format.
  • The BIM sub-system 202 may be in electronic communication with a display 250 enabling a user to view graphical data generated in the sub-system. Therefore, the structural object 208 as well as the contract data set 224 may be presented on a graphical user interface (GUI) in the display. Likewise, the BIM sub-system 202 may be in electronic communication with a display 250, indicated via arrow 252. It will be appreciated that in some examples, the display 250 may be integrated into the BIM sub-system 202. Likewise, the ERP sub-system 218 may be in electronic communication with a display 260 enabling a user to view graphical data generated in the sub-system. Therefore, the contract data set 224 as well as the structural object 208 may be presented on the display 260. Additionally, the display 260 may be integrated into the BIM sub-system 202, in some examples. Further, in some examples, the BIM sub-system 202 may be remotely located from the ERP sub-system 218. Furthermore, it will be appreciated that each separate sub-system may include one or more hardware components, devices, etc., which may be colocated or remotely located. Moreover, the ERP sub-system 218 and the BIM sub-system 202 may be in electronic communication via a network 270 (e.g., the Internet, a LAN network, etc.)
  • FIG. 3 shows an example use case scenario of the electronic construction collaboration system 200 shown in FIG. 2. Therefore, the devices, components, elements, etc., shown in FIG. 3 may be included in the system shown in FIG. 2. An architect or engineer may utilize a BIM computing device 300 configured with or having access to BIM sub-system 302 to create and/or modify project plans and models. As previously discussed the BIM sub-system may include software. In various embodiments, BIM sub-system 302 may be used to create a two-dimensional (“2D”) or three-dimensional (“3D”) drawing or model of a structure or building to be constructed as part of a project. 2D and 3D BIM drawings and/or models may include a plurality of objects. Each object may correspond to a particular structure within the overall model. BIM users may manipulate these objects in various ways. For instance, in some embodiments, a user may use a mouse, keyboard, light pin and/or other input devices to interact with a graphical user interface (“GUI”) depicted on one or more displays of BIM computing device 300.
  • A contractor (e.g., general contractors, subcontractors, suppliers, vendors, etc.) may use an ERP computing device 304 configured with or having access to ERP sub-system 306 to perform its role in a project. As previously discussed, the ERP sub-system may include software. For instance, a general contractor may utilize ERP computing device 304 to view and/or edit contract data and/or other more general project data, such as costs, completion status, safety incidences, change orders, and so forth.
  • While BIM computing device 300 is shown as a desktop computing device and ERP computing device 304 is shown as a laptop computing device, this is not meant to be limiting. Either of these computing devices, or any other computing device or system described herein, may be any type of computing device, including but not limited to a desktop computer, a laptop computer, a mobile phone, a tablet computing device, a personal digital assistance (“PDA”), a “dummy” terminal, a server, etc.
  • BIM sub-system 302 and ERP sub-system 306 are shown as blocks in FIG. 3 to indicate that they may be implemented in various forms. In some embodiments, local computing devices such as BIM computing device 300 and ERP computing device 304 may execute client programs that may be configured to connect to corresponding server programs executing on BIM/ERP server computers. In some such embodiments, BIM/ERP clients installed on computing devices such as BIM computing device 300 or ERP computing device 304 may store and retrieve data from a remote database (not shown), e.g., controlled by an BIM and/or ERP server.
  • BIM and ERP sub-systems may enable users to create, modify, and/or delete various objects. In various embodiments, these objects may be accompanied by metadata, which may describe various aspects of the objects. Examples of metadata are shown in FIG. 4. On the left, metadata for an example BIM sub-system 402 object, in this case a “structural steel column at grid location B5,” may include but is not limited to: date start, date complete, project number, phase code, subcontract number, and vendor number. Similarly, on the right, metadata for an example ERP sub-system 404 record, in this case “structural steel records,” may include but is not limited to: project number, project documents, vendor number, contract documents, estimated cost, actual cost, date start, and date complete. This metadata is provided as an example, and is not meant to be limiting in any way. Various other metadata (not shown) may additionally or alternatively be related to a component such as a structural steel column or structural steel records.
  • In various embodiments, objects that may correspond or relate to each other in real life may be classified and/or characterized differently in a BIM sub-system 402 versus an ERP sub-system 404, shown in FIG. 4. For instance, in FIG. 4, the arrows indicate that a number of metadata fields associated with each object may correspond or otherwise relate to each other. These relationships may be usable to link the BIM sub-system 402 and ERP sub-system 404, so that a user may interact with one sub-system to view data from both sub-systems. For example, a user of BIM sub-system 402 may be able to select the structural steel column at grid location B5 and request, from ERP sub-system 404, contractual documents or other data that is pertinent to the selected structural column or all structural columns in a project.
  • A number of metadata fields may be linked across BIM and ERP sub-systems. For example, both the “structural steel column at grid location B5” object of BIM sub-system 402 and the “structural steel records” of ERP sub-system 404 have “project number” fields. If the values of these objects' project number fields are the same, that may suggest that, at the very least, the BIM object and the ERP records relate to the same project. Additionally, both the BIM object and the ERP records in FIG. 3 have “vendor number” fields. If the vendor number for both objects and records is the same, that may further suggest that a single vendor was responsible for or at least involved with both the object and the associated records. In various embodiments, a user of BIM sub-system 402 could utilize a combination of the project number and vendor number fields to identify and view ERP records and data about pertinent BIM objects (e.g., contracts and other data related to the same project and vendor). Associated fields may further include a project identification number field, a vendor field, a construction phase/trade field, a project readiness field, a phase field, a delivery date field, a customer field, and/or an asset owner field. The project readiness field may include data that signifies if the project is complete or is pending. Furthermore, when a structural object is selected contract information as well as change order information may be displayed to a user of the BIM sub-system and/or the ERP sub-system. Change order data may be integrated into the system via the mapped metadata.
  • Additionally, time cards may be linked to a phase of construction in the ERP sub-system and therefore linked with associated metadata. In this way, time cards may be pulled (e.g., displayed to a user of the system) enabling payment and cost review by the user.
  • It should be understood that relationships between objects in BIM and records in ERP sub-systems, such as between the “structural steel column at grid location B5” of BIM sub-system 402 and the “structural steel records” of ERP sub-system 404, need not be one-to-one. A component in BIM sub-system 402 may correspond to more than one component in ERP sub-system 404, and vice versa. For example, an object in BIM sub-system 402 such as a structural steel column may correspond to multiple records (e.g., vendor, contract, etc.) in ERP sub-system 404 by virtue of shared metadata fields. As another example, a single contract in ERP sub-system 404 may relate to multiple individual objects in BIM sub-system 402, e.g., where a particular subcontractor is hired to build multiple structures.
  • Benefits of linking BIM sub-system 402 and ERP sub-system 404 via metadata may become clearer through an example. Assume a project manager is viewing an engineering drawing of a particular structural steel column in BIM sub-system 402, e.g., using BIM computing device 300 in FIG. 3. Assume also that the project manager wishes to view ongoing costs and contractual documents associated with the structural steel column. Rather than switching to ERP sub-system 404 (e.g., by moving to ERP computing device 304 in FIG. 3) and manually searching for contracts and other pertinent data related to the structural steel column, the project manager may simply direct BIM sub-system 402 to cross reference the metadata associated with the structural steel column in BIM sub-system 402 with corresponding metadata in the ERP sub-system 404. In this manner, the project manager may search for and retrieve project documents, contracts, and other data pertinent to the structural steel column from ERP sub-system 404, without transitioning between the two sub-systems.
  • Associations between metadata in BIM and ERP sub-systems are not limited to associations between objects in the architectural or engineering models like structural steel columns (BIM) and project documents or contracts (ERP). In various embodiments, associations may additionally or alternatively include an association between objects in a BIM sub-system and other data related and unrelated to an ERP sub-system, including but not limited to cost data, labor hours, equipment hours, change orders, and so forth.
  • In various embodiments, BIM sub-system 402, ERP sub-system 404, or both may be configured to cross reference with each other on user-selected metadata fields. For example, the project manager from the example above may refine the search results by specifying particular metadata to be linked from BIM sub-system 402 to ERP sub-system 404. For instance, the project manager could request only ERP components with the same project number and/or subcontractor number as the current BIM object, or even the same start and finish dates. In some cases, the more fields selected for cross reference, the narrower the results may be.
  • While the BIM and ERP sub-systems described herein remain separate (though linked via metadata), this is not meant to be limiting. In various embodiments, rather than separate BIM and ERP sub-systems simply being linked together using metadata, a single sub-system or application program may incorporate both BIM and ERP capabilities.
  • FIG. 5 depicts schematically one example of what a user of BIM computing device 300, shown in FIG. 3, might see on a display when the user selects a particular drawing or model feature (e.g., a bathroom fixture). In this example, a user may be viewing a building plan 502 and may have selected a particular feature, in this case, a dual sink 504. Selection of a feature in the drawing or model may cause another interface or window 506 to open. The other interface or window 506 may depict various BIM-related information about the selected feature, such as the entity installing it, materials involved, etc. Moreover, the other interface or window 506 may also display non-BIM related information (including but not limited to ERP-related information) about the selected feature, such as contracts related to the feature, amounts received and paid for the particular feature, cash flow relating to the feature, the entity (e.g., subcontractor) responsible for constructing the feature, information relating to that entity, any change order requests or approvals pertinent to that particular feature, information about materials used for the feature, and so forth.
  • FIG. 6 depicts an example method 600 that may be implemented by a computing device such as BIM computing device 300 and/or ERP computing device 304 in FIG. 3. Although the operations are depicted in a particular order, this is not meant to be limiting. One or more operations may be reordered, added and/or omitted without departing from the present disclosure.
  • At 602, input may be received, e.g., by BIM computing device 300 and/or ERP computing device 304, that indicates that a user has selected (e.g., has interest in) a particular object. For example, if the user is using a BIM sub-system (e.g., via BIM computing device 300), the user may select (e.g., using a mouse, light pin, etc.) a graphical or textual object corresponding to a component of a building or other structure, such as the dual sink described above. Likewise, if the user is using the ERP sub-system (e.g., via ERP computing device 304), the user may select a contract or other piece of data, e.g., using a mouse, keyboard, light pin, etc. In various embodiments, once selected, that object may become “active,” and the user may perform various actions on the object (e.g., depending on the user's access credentials), such as modification, deletion, and so forth.
  • At 604, either upon selection of the object at 602 or responsive to an additional command from the user, metadata related to the selected object may be retrieved. For instance, if a user selects a “structural column” at BIM computing device 300, metadata relating to that object (e.g., shown in FIG. 3) may be retrieved, e.g., from a database associated with a BIM sub-system. In various embodiments, the retrieved metadata may be displayed or made available for display to the user.
  • At 606, input may be received from the user indicating a selection of particular metadata fields, e.g., for cross reference into a remote system. (As used herein, a “remote system” may refer to the ERP sub-system from the perspective of the BIM sub-system, and to the BIM sub-system from the perspective of the ERP sub-system.) The user may select metadata fields for a variety of reasons. For example, the user may wish to know what other portions of a project are being handled by the same subcontractor as the currently-selected BIM object. Accordingly, the user may select the “subcontractor number” metadata field, for cross reference into the ERP sub-system.
  • At 608, metadata corresponding to the metadata retrieved at 604 and/or the metadata fields selected at 606 may be located in the remote system. If the user is using BIM computing device 300, the corresponding metadata may be retrieved from ERP computing device 304 and/or an ERP sub-system 306. If the user is using ERP computing device 304, the corresponding metadata may be retrieved from BIM computing device 300 and/or BIM sub-system 302.
  • At 610, data to which the metadata located at 608 is associated may be retrieved. For instance, BIM computing device 300 may retrieve contracts and other data associated with metadata received from ERP sub-system 306 and/or ERP computing device 304. Alternatively, ERP computing device 304 may retrieve BIM objects associated with metadata received from BIM sub-system 302 and/or BIM computing device 300. Continuing the example described above, BIM computing device 300 may receive, e.g., from ERP sub-system 306, contracts and other data with metadata that matches the metadata selected at 606 and/or that relates to metadata retrieved at 604. If at 606 the user of BIM computing device 300 selected particular metadata fields of interest, such as a subcontractor number, then the contracts or other data returned from (e.g., ERP sub-system 306), may include any contracts or other data having the same subcontractor number.
  • FIG. 7 shows a method 700 for managing a construction project in an in an electronic construction collaboration system. The method shows an input device 702, BIM sub-system 704, and ERP sub-system 706 executing the method. It will be appreciated that the input device 702 may be similar to the input device 234 shown in FIG. 2. Likewise, the BIM sub-system 704 may be similar to the BIM sub-system 202 shown in FIG. 2 and the ERP sub-system 706 may be similar to the ERP sub-system 218 shown in FIG. 2. Thus, the method may be implemented via the electronic construction collaboration system, sub-systems, components, elements, etc., shown in FIG. 2 or may be implemented via another suitable electronic construction collaboration system.
  • At 710 the method includes, at the input device 702, generating a structural object selection input. For instance, an object may be selected via a mouse click over an object in a graphical user interface. Next at 712 the method includes sending the structural object selection input from the input device 702 to the BIM sub-system 704. At 714 the method includes receiving the structural object selection input at the BIM sub-system 704 sent from the input device 702.
  • Next at 716 the method includes selecting a structural object in response to receiving the structural object input, the structural object included in a construction project model in the BIM sub-system 704. BIM metadata included in the BIM sub-system included in the structural object. The BIM metadata may include material data, vendor data, project number data, project phase data, a subcontract number, project schedule data, and cost data. Additionally, the structural object may include form data and location data. As previously discussed, the metadata may be included in a metadata set having a plurality of data fields.
  • At 718 the method includes sending a contract data information request to the ERP sub-system from the BIM sub-system. The contract data information request may include BIM metadata. Next at 720 the method includes receiving the contract data information request from the BIM sub-system at the ERP sub-system. It will be appreciated that the contract data information request may be more generally referred to as an information request.
  • Referring to FIG. 8, at 722 the method includes associatively linking the BIM metadata with ERP metadata included in a project contract included in the ERP sub-system at the ERP sub-system. However, in other examples the associative linking may be implemented in the BIM sub-system. In this way, metadata in both the BIM and ERP sub-systems may be mapped to provide a communication bridge between the systems to increase the system's efficiency. It will be appreciated that associatively linking metadata in the two sub-systems may include selecting a set of ERP metadata from a plurality of sets of ERP metadata, the set of metadata including at least one metadata field included in the BIM metadata. Each set of ERP metadata may be associated with a different project contract. In this way, relevant project contracts may be identified for subsequent transfer to the BIM sub-system and display by the BIM sub-system. Thus, a contractor, architect, engineer, etc., may view contracts related to the structural object via the BIM sub-system without switching systems. As previously discussed, the ERP metadata and the BIM metdata may include one or more of material data, vendor data, project number data, project phase data, a subcontract number, project schedule data, and cost data. It will be appreciated that the metadata may be independent of the graphical data rendered via a rendering model in the BIM sub-system.
  • Next at 724 the method includes formatting a contract data set into a COBie format. The COBie format may include a type of XML format. At 726 the method includes sending the contract data set from the ERP sub-system to the BIM sub-system. In this way, contract data may be automatically sent to the BIM sub-system, enabling a user of the BIM sub-system to not only interact with a project model but also access pertinent contract information associated with the contract model stored in the ERP sub-system.
  • FIG. 9 shows a method 900 for managing a construction project in an in an electronic construction collaboration system. The method 900 may be implemented via the electronic construction collaboration system, sub-systems, components, elements, etc., shown in FIG. 2 or may be implemented via another suitable electronic construction collaboration system.
  • At 902 the method includes receiving BIM data from a BIM subsystem, the data including a plurality of building structural objects, each with a plurality of associated meta-data fields.
  • Next at 904 the method includes receiving ERP data from an ERP subsystem, the data including contract and financial fields. At 906 the method includes establishing a plurality of links between the ERP data and the BIM data, each of the links associated with a particular building structural object, the links established based on a corresponding field, and once established, the links includes even non-corresponding fields. In one example, the establishment of the links is prioritized based on a number of corresponding fields between the ERP data and the BIM data for the particular building structural object. In this way, pertinent data may be correspondingly linked. Further in one example, at least two corresponding fields are required to establish the links, the at least two fields including a project number and a vendor number. Therefore, it may be determined if a link is established based on the number of corresponding fields. Further in one example, the plurality of links are further established based on COBie-formatted data.
  • Next at 908 the method includes displaying in a common view, linked data from each of the subsystems without transitioning between the two sub-systems. In one example, the displaying includes, first displaying in the common view the linked data associated only with a selected structural object, and in response to an addition user selection from the common view, displaying, in the common view, data for a structural object other than the selected structural object, but with fields in common with the selected structural object. Further in such an example, the data for the structural object other than the selected structural object includes a common vendor or sub-contractor for the selected structural object and the structural object other than the selected structural object. Further in one example, the linked data displayed in the common view includes one or more of an entity installing a selected structural object, materials for the selected structural object, a shape of the selected structural object, dimensions of the selected structural object, a contract for construction of the selected structural object, cash flow related to the selected structural object, change orders for the selected structural object, labor hours for the selected structural object, equipment hours for the selected structural object, approvals for the selected structural object, or combinations thereof. In this way, users can easily view common data without undue searching and/or switching between sub-systems. Further in one example, the linked data displayed in the common view includes time cards for the selected structural object.
  • At 910 the method includes updating both the BIM data and ERP data, using the established links, for a structural object specified in a change order in response to receiving data from the change order.
  • FIG. 10 illustrates a computing system 1000 configured to practice all or selected aspects of the operations described above and shown in FIG. 6. It will be appreciated that the BIM and/or ERP subsystems shown in FIG. 2 may include one or more of the components shown in the computing system 1000. As illustrated, computing system 1000 may include processor 1004, memory 1008, and bus 1012, coupled to each other as shown. Additionally, computing system 1000 may include storage 1016 and one or more communication interfaces 1020, e.g., a network interface card (NIC), or an antenna, coupled to each other, and the earlier described elements as shown.
  • Memory 1008 and storage 1016 may include, in particular, temporal and persistent copies of project logic 1024, respectively. The project logic 1024 may include instructions that when executed by the processor 1004 result in the various techniques described herein being performed.
  • In various embodiments, the memory 1008 may include random access memory (RAM), dynamic RAM (“DRAM”), static RAM (“SRAM”), synchronous DRAM (“SDRAM”), dual data rate RAM (“DDRRAM”), etc. In various embodiments, the processor 1004 may include one or more single-core processors, multiple-core processors, controllers, application-specific integrated circuits (“ASICs”), etc.
  • In various embodiments, storage 1016 may be a machine-accessible medium that includes integrated and/or peripheral storage devices, such as, but not limited to, disks and associated drives (e.g., magnetic, optical), universal serial bus (“USB”) storage devices and associated ports, a solid state drive (“SSD”), flash memory, read-only memory (“ROM’), nonvolatile semiconductor devices, etc.
  • In various embodiments, storage 1016 may be a storage resource physically part of the computing system 1000 or it may be accessible by, but not necessarily a part of, the computing system 1000. For example, the storage 1016 may be accessed by the computing system 1000 over a network via the communication interface 1020. In various embodiments, computing system 1000 may have more or less components, and/or different architectures.
  • Although certain embodiments have been illustrated and described herein for purposes of description, the application is intended to cover any adaptations or variations of the embodiments discussed herein. Therefore, it is manifestly intended that embodiments described herein be limited only by the claims.
  • Where the disclosure recites “a” or “a first” element or the equivalent thereof, such disclosure includes one or more such elements, neither requiring nor excluding two or more such elements. Further, ordinal indicators (e.g., first, second or third) for identified elements are used to distinguish between the elements, and do not indicate or imply a required or limited number of such elements, nor do they indicate a particular position or order of such elements unless otherwise specifically stated.
  • In the preceding detailed description, reference is made to the accompanying drawings which form a part hereof wherein like numerals designate like parts throughout, and in which is shown by way of illustration embodiments that may be practiced. It is to be understood that other embodiments may be utilized and structural or logical changes may be made without departing from the scope of the present disclosure. Therefore, the following detailed description is not to be taken in a limiting sense, and the scope of embodiments is defined by the appended claims and their equivalents.
  • In the description above various operations are described as multiple discrete actions or operations in turn, in a manner that is most helpful in understanding the claimed subject matter. However, the order of description should not be construed as to imply that these operations are necessarily order dependent. In particular, these operations may not be performed in the order of presentation. Operations described may be performed in a different order than the described embodiment. Various additional operations may be performed and/or described operations may be omitted in additional embodiments.
  • For the purposes of the present disclosure, the phrase “A and/or B” means (A), (B), or (A and B). For the purposes of the present disclosure, the phrase “A, B, and/or C” means (A), (B), (C), (A and B), (A and C), (B and C), or (A, B and C).
  • The description may use the phrases “in an embodiment,” or “in embodiments,” which may each refer to one or more of the same or different embodiments. Furthermore, the terms “comprising,” “including,” “having,” and the like, as used with respect to embodiments of the present disclosure, are synonymous.

Claims (20)

1. A method, comprising:
receiving BIM data from a BIM subsystem, the data including a plurality of building structural objects, each with a plurality of associated meta-data fields;
receiving ERP data from an ERP subsystem, the data including contract and financial fields;
establishing a plurality of links between the ERP data and the BIM data, each of the links associated with a particular building structural object, the links established based on a corresponding field, and once established, the links includes even non-corresponding fields; and
displaying in a common view, linked data from each of the subsystems without transitioning between the two sub-systems.
2. The method of claim 1, wherein the establishment of the links is prioritized based on a number of corresponding fields between the ERP data and the BIM data for the particular building structural object.
3. The method of claim 1, wherein the linked data displayed in the common view includes one or more of an entity installing a selected structural object, materials for the selected structural object, a shape of the selected structural object, dimensions of the selected structural object, a contract for construction of the selected structural object, cash flow related to the selected structural object, change orders for the selected structural object, labor hours for the selected structural object, equipment hours for the selected structural object, approvals for the selected structural object, or combinations thereof.
4. The method of claim 3, wherein the linked data displayed in the common view includes time cards for the selected structural object.
5. The method of claim 1, wherein at least two corresponding fields are required to establish the links, the at least two fields including a project number and a vendor number.
6. The method of claim 1, wherein the displaying includes, first displaying in the common view the linked data associated only with a selected structural object, and in response to an addition user selection from the common view, displaying, in the common view, data for a structural object other than the selected structural object, but with fields in common with the selected structural object.
7. The method of claim 6, wherein the data for the structural object other than the selected structural object includes a common vendor or sub-contractor for the selected structural object and the structural object other than the selected structural object.
8. The method of claim 1, further comprising updating both the BIM data and ERP data, using the established links, for a structural object specified in a change order in response to receiving data from the change order.
9. The method of claim 1, wherein the plurality of links are further established based on COBie-formatted data.
10. An electronic construction collaboration system for managing a construction project comprising:
an Enterprise Resource Planning (ERP) sub-system including;
a contract engine configured to generate at least one project contract including a contract data set and ERP metadata; and
an interconnection engine configured to associatively link the ERP metadata with BIM metadata included in a structural object of a construction project model in a BIM sub-system and send the contract data set to the BIM sub-system in response to associatively linking the ERP metadata and the BIM metadata.
11. The electronic construction collaboration system of claim 10, where the interconnection engine is further configured to format the contract data set into a Construction Operations Building Information Exchange (COBie) format prior to sending the contract data.
12. The electronic construction collaboration system of claim 11, where the COBie format includes a type of extensible markup language (XML) format.
13. The electronic construction collaboration system of claim 10, where the ERP metadata and the BIM metdata include one or more of material data, vendor data, project number data, project phase data, a subcontract number, project schedule data, and cost data.
14. The electronic construction collaboration system of claim 10, where the ERP metadata includes a first data field corresponding to a second data field in the BIM metadata.
15. The electronic construction collaboration system of claim 14, where the first data field in the ERP metadata is associatively linked with a plurality of data fields in the BIM metadata.
16. The electronic construction collaboration system of claim 14, where the first data field and the second data field are each included in separate data sets, the first data set including a different field than the second data set.
17. The electronic construction collaboration system of claim 10, where the contract data set includes contract documents, cost data, labor hour data, equipment hour data.
18. A method for managing a construction project in an electronic construction collaboration system, the method comprising:
receiving a structural object selection input from a BIM sub-system;
selecting a structural object in a construction project model executed via the BIM sub-system in response to receiving the structural object selection input, the structural object including BIM metadata;
sending a contract data information request to an ERP sub-system in the electronic construction collaboration system in response to selecting the structural object, the contract data information request including BIM metadata;
receiving the contract data information request from the ERP sub-system;
associatively linking the BIM metadata with ERP metadata the ERP metadata included in a project contract in the ERP sub-system based on the contract data information request; and
sending the contract data set in response to associatively linking the BIM metadata with the ERP metadata, the contract data set included in the project contract.
19. The method of claim 18, where the ERP metadata and the BIM metdata include one or more of material data, vendor data, project number data, project phase data, a subcontract number, project schedule data, and cost data.
20. The method of claim 19, where the structural object is defined parametrically with regard to other structural objects in the construction project model.
US13/919,956 2012-06-18 2013-06-17 System and method linking building information modeling and enterprise resource planning Abandoned US20130339078A1 (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
US13/919,956 US20130339078A1 (en) 2012-06-18 2013-06-17 System and method linking building information modeling and enterprise resource planning
US15/443,844 US11200522B2 (en) 2012-06-18 2017-02-27 System and method linking building information modeling and enterprise resource planning
US17/523,338 US11803791B2 (en) 2012-06-18 2021-11-10 System and method linking building information modeling and enterprise resource planning

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US201261661170P 2012-06-18 2012-06-18
US13/919,956 US20130339078A1 (en) 2012-06-18 2013-06-17 System and method linking building information modeling and enterprise resource planning

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US15/443,844 Continuation US11200522B2 (en) 2012-06-18 2017-02-27 System and method linking building information modeling and enterprise resource planning

Publications (1)

Publication Number Publication Date
US20130339078A1 true US20130339078A1 (en) 2013-12-19

Family

ID=49756723

Family Applications (3)

Application Number Title Priority Date Filing Date
US13/919,956 Abandoned US20130339078A1 (en) 2012-06-18 2013-06-17 System and method linking building information modeling and enterprise resource planning
US15/443,844 Active 2035-12-18 US11200522B2 (en) 2012-06-18 2017-02-27 System and method linking building information modeling and enterprise resource planning
US17/523,338 Active US11803791B2 (en) 2012-06-18 2021-11-10 System and method linking building information modeling and enterprise resource planning

Family Applications After (2)

Application Number Title Priority Date Filing Date
US15/443,844 Active 2035-12-18 US11200522B2 (en) 2012-06-18 2017-02-27 System and method linking building information modeling and enterprise resource planning
US17/523,338 Active US11803791B2 (en) 2012-06-18 2021-11-10 System and method linking building information modeling and enterprise resource planning

Country Status (3)

Country Link
US (3) US20130339078A1 (en)
EP (1) EP2862144A4 (en)
WO (1) WO2013192115A2 (en)

Cited By (25)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20140207774A1 (en) * 2013-01-24 2014-07-24 Mark Walter Virtual Building Browser Systems and Methods
US20150088916A1 (en) * 2013-09-20 2015-03-26 Viewpoint, Inc. Methods and systems for mapping and processing building information modeling (bim)- based data
CN104537459A (en) * 2014-12-03 2015-04-22 上海同筑信息科技有限公司 BIM-based micro field system and method
CN104715115A (en) * 2015-03-19 2015-06-17 中铁二局第五工程有限公司 Method and device for designing auxiliary construction facilities of steel truss arch bridge through BIM
CN105696467A (en) * 2016-02-04 2016-06-22 广厦建设集团有限责任公司 Formwork support construction method based on P-BIM technology
TWI549089B (en) * 2015-08-11 2016-09-11 國立屏東科技大學 Construction coordinated operation method
CN107194091A (en) * 2017-05-27 2017-09-22 成都希盟泰克科技发展有限公司 Rock fill dam construction dividing elements method based on BIM technology
CN109032075A (en) * 2018-06-28 2018-12-18 中铁山桥集团有限公司 A kind of intelligence steel construction stock method and system
US20180374052A1 (en) * 2016-12-20 2018-12-27 Chetan Mogal Method of improviding building information modeling
WO2019060106A1 (en) * 2017-09-22 2019-03-28 The Brandt Companies, LLC Fabrication, distribution, and integrated order processing system
TWI659385B (en) * 2017-08-01 2019-05-11 National Pingtung University Of Science & Technology Management and control method for construction process
CN109753753A (en) * 2019-01-21 2019-05-14 广东星层建筑科技股份有限公司 A kind of bridge mould base intelligent design method based on BIM
CN109885626A (en) * 2019-01-30 2019-06-14 北京筑业志远软件开发有限公司 Urban construction digital archives intelligent management system based on structural data and BIM model
CN110378588A (en) * 2019-07-10 2019-10-25 重庆大学 A kind of contract spatialization system
CN110796427A (en) * 2019-09-09 2020-02-14 国网浙江省电力有限公司经济技术研究院 BIM technology-based full-process control method for physical assets of power distribution network
CN111598379A (en) * 2020-03-31 2020-08-28 中铁建华南建设有限公司 Project management method, platform, device, computer equipment and storage medium
WO2020206378A1 (en) * 2019-04-03 2020-10-08 Inertia Systems Two-dimensional interactive construction drawings
CN111861428A (en) * 2020-08-10 2020-10-30 中建七局建筑装饰工程有限公司 Enterprise informatization real-time management system
US10878138B2 (en) 2017-02-23 2020-12-29 Mitek Holdings, Inc. Method of managing proxy objects
US10909502B2 (en) 2016-03-30 2021-02-02 Hexagon Technology Center Gmbh Configuration management system for large-scale capital projects
WO2021018369A1 (en) * 2019-07-26 2021-02-04 Friedrich Prem Systemic modelling device in the form of an automated assistance system for construction projects
CN112434366A (en) * 2020-12-31 2021-03-02 中国三峡建设管理有限公司 Cable crane arrangement and scheduling method based on BIM
CN113222407A (en) * 2021-05-11 2021-08-06 山西省交通科技研发有限公司 Highway project security evaluation system based on BIM
CN113421037A (en) * 2021-08-23 2021-09-21 武汉市政工程设计研究院有限责任公司 Multi-source collaborative construction planning compilation method and device
US11416958B1 (en) 2016-02-10 2022-08-16 Energysherlock LLC Mobile site watch

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107729609A (en) * 2017-09-14 2018-02-23 北京致臻智造科技有限公司 The display methods and system that a kind of building decoration technology is told somebody what one's real intentions are
CN108846644B (en) * 2018-06-22 2021-12-03 中船第九设计研究院工程有限公司 Integrated simulation technology, cooperative work, knowledge management and project management and control system
US10531883B1 (en) 2018-07-20 2020-01-14 Syntheon 2.0, LLC Aspiration thrombectomy system and methods for thrombus removal with aspiration catheter
CN109886563A (en) * 2019-01-29 2019-06-14 杭州凌望建筑科技有限公司 Wisdom based on BIM builds control platform
CN111310271A (en) * 2020-03-04 2020-06-19 青岛理工大学 BIM (building information modeling) standardized modeling method for high-speed railway swivel bridge
CN111488642A (en) * 2020-04-15 2020-08-04 中国十七冶集团有限公司 BIM technology-based method for preventing large-volume concrete cold joint
CN112288236A (en) * 2020-10-10 2021-01-29 河南方元建筑工程有限公司 Safety protection standardized construction system and method based on BIM technology
AU2021105794A4 (en) * 2020-10-16 2021-10-21 Tyrrells Administration Pty Ltd System and Method for Design and Construction
CN113989442B (en) * 2020-12-30 2022-12-30 万翼科技有限公司 Building information model construction method and related device

Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20010047251A1 (en) * 2000-03-03 2001-11-29 Kemp William H. CAD system which designs 3-D models
US6501501B1 (en) * 1999-04-28 2002-12-31 Aizudoken Co. Ltd. Construction and civil engineering database generator and display
US20030101098A1 (en) * 2001-11-27 2003-05-29 Erich Schaarschmidt Process and device for managing automatic data flow between data processing units for operational order processing
US20050188348A1 (en) * 2004-02-23 2005-08-25 Ironcad Llc Geometric modeling system with intelligent configuring of solid shapes
US20050246216A1 (en) * 2004-04-14 2005-11-03 Rosen Earl Iii Systems and methods for managing information at various levels
US20050288808A1 (en) * 2004-06-14 2005-12-29 Lopez George A Computer system for efficient design and manufacture of multiple-component devices
US20070061154A1 (en) * 2003-11-14 2007-03-15 Koninklijke Philips Electronics N.V. Product data exchange
US20070282873A1 (en) * 2004-03-23 2007-12-06 Ponessa Steven J Generating an information catalog for a business model
US20100106654A1 (en) * 2008-10-16 2010-04-29 Hntb Holdings Ltd Managing and memorializing design requirements of a building project
US20120066178A1 (en) * 2010-03-09 2012-03-15 Vela Systems, Inc. Systems and methods for construction field management and operations with building information modeling
US20120130521A1 (en) * 2010-11-24 2012-05-24 Stephan Kohlhoff Visual Assembly Tool
US8271336B2 (en) * 1999-11-22 2012-09-18 Accenture Global Services Gmbh Increased visibility during order management in a network-based supply chain environment
US20120278334A1 (en) * 2011-04-29 2012-11-01 John Abjanic Database System
US20130191078A1 (en) * 2012-01-19 2013-07-25 Oracle International Corporation Overlaying business intelligence data on a product design visualization
US20140143005A1 (en) * 2012-03-13 2014-05-22 Hemant B. Jatla PLM IN A BOX is a proprietary Process in the development and implementation a Product Lifecycle Management Solution for product manufacturers developing products based on a customer specification. This process establishes a process framework to linking customer project to a product design originated for a specific customer project, links to the design exchanges with suppliers on those designs and the linkage engineering change notices that originate for those product designs

Family Cites Families (126)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1255212A (en) 1915-03-18 1918-02-05 William H Miner Auxiliary shock-absorbing means for draft-riggings.
AU4398196A (en) 1994-12-16 1996-07-03 Graphisoft R&D Software Development Company Limited By Shares Software usage metering system
US5784068A (en) 1995-10-06 1998-07-21 Bentley Systems, Incorporated Method for drawing an element of an object during computer-aided drafting of the object
US5815415A (en) 1996-01-19 1998-09-29 Bentley Systems, Incorporated Computer system for portable persistent modeling
US6063128A (en) 1996-03-06 2000-05-16 Bentley Systems, Incorporated Object-oriented computerized modeling system
US6199125B1 (en) 1998-05-26 2001-03-06 Bentley Systems, Incorporated Input manager for a computer application with display icons mapped to a user selectable set of standard keyboard keys
US6341291B1 (en) 1998-09-28 2002-01-22 Bentley Systems, Inc. System for collaborative engineering using component and file-oriented tools
US7194489B2 (en) 1998-09-28 2007-03-20 Bentley Systems Incorporated System, method and computer program product for collaborative engineering using component and file oriented tools
US6385563B1 (en) 1998-11-10 2002-05-07 Autodesk, Inc. Reusable design model and apparatus
US7062532B1 (en) 1999-03-25 2006-06-13 Autodesk, Inc. Method and apparatus for drawing collaboration on a network
US8121874B1 (en) * 1999-05-27 2012-02-21 Accenture Global Services Limited Phase delivery of components of a system required for implementation technology
CN1402856A (en) 1999-06-04 2003-03-12 雷克斯·J·克鲁克香克斯 Building construction bid and contract management system, Internet-based method and computer program therefor
WO2001055831A1 (en) 2000-01-25 2001-08-02 Autodesk, Inc. Method and apparatus for providing access to and working with architectural drawings on the internet
WO2001055943A1 (en) 2000-01-28 2001-08-02 Buzzsaw.Com E-commerce bid and project management system and method for the construction industry
US6954895B1 (en) 2000-03-22 2005-10-11 Autodesk, Inc. Method and apparatus for using and storing objects
US6594466B1 (en) 2000-05-24 2003-07-15 Bentley Systems, Incorporated Method and system for computer based training
US6671701B1 (en) 2000-06-05 2003-12-30 Bentley Systems, Incorporated System and method to maintain real-time synchronization of data in different formats
US7958185B2 (en) 2000-09-18 2011-06-07 Bentley Systems, Inc. Spatial data enabled engineering, construction, and operations computer-aided design (CAD) project system, method and computer program product
US6791567B1 (en) 2000-09-29 2004-09-14 Bentley Systems, Incorporated Method and system for color clipping for extremely bright images
US6753859B1 (en) 2000-09-29 2004-06-22 Bentley Systems, Inc. Method and system for hybrid radiosity
US6853390B1 (en) 2000-10-26 2005-02-08 Bentley Systems, Inc. Displaying option information using a non-modal dialog box
EP1255391A1 (en) 2001-05-04 2002-11-06 conject AG Method and system for the safe assignment of a password in an Internet environment
EP1255212A1 (en) 2001-05-04 2002-11-06 conject AG Registration, invitation and subscription for a project in an Internet based system
US7428548B2 (en) 2001-08-15 2008-09-23 Bentley Systems, Inc. Computer readable medium for storing large data files
US6925473B2 (en) 2001-08-27 2005-08-02 Autodesk, Inc. Staged stylization in multiple tiers
US6791563B2 (en) 2001-09-18 2004-09-14 Bentley Systems, Incorporated System, method and computer program product for global rendering
US7065476B2 (en) 2002-04-22 2006-06-20 Autodesk, Inc. Adaptable multi-representation building systems part
EP1504555A4 (en) 2002-05-06 2008-09-03 Bentley Systems Inc Method and system for digital rights management and digital signatures
US7283135B1 (en) 2002-06-06 2007-10-16 Bentley Systems, Inc. Hierarchical tile-based data structure for efficient client-server publishing of data over network connections
FI20021097A (en) 2002-06-07 2003-12-08 Tekla Corp Method and arrangement for designing a structure
FI114063B (en) 2002-09-02 2004-07-30 Tekla Corp Arrangement and method for fitting a removable field device
US7949690B2 (en) 2002-09-06 2011-05-24 Autodesk, Inc. Project structure
US7366581B2 (en) 2002-09-23 2008-04-29 Autodesk, Inc. Replace face operator for solid body modeling
US7418666B2 (en) 2002-10-21 2008-08-26 Bentley Systems, Incorporated System, method and computer program product for managing CAD data
US7170528B1 (en) 2002-10-23 2007-01-30 Bentley Systems, Inc. Fast glyph rendering for vector based fonts
KR100484172B1 (en) 2002-11-01 2005-04-19 삼성전자주식회사 Apparatus for receiving television and radio using single tuner
US7589732B2 (en) 2002-11-05 2009-09-15 Autodesk, Inc. System and method of integrated spatial and temporal navigation
FI125202B (en) 2002-11-19 2015-06-30 Tekla Corp Method and arrangement for forming a building
US7265753B1 (en) 2002-12-09 2007-09-04 Bentley Systems, Inc. Particle tracing with on-demand meshing
US7844419B1 (en) 2003-01-10 2010-11-30 Bentley Systems, Incorporated Method of detecting potential topology problems in a network
US8266005B2 (en) * 2003-01-17 2012-09-11 Uniloc Luxembourg Automated pricing system
US7197181B1 (en) 2003-04-09 2007-03-27 Bentley Systems, Inc. Quick method for color-based selection of objects in a raster image
FI114831B (en) 2003-05-07 2004-12-31 Tekla Corp Computer-aided model design
US20040236754A1 (en) 2003-05-21 2004-11-25 Bentley Systems, Inc. Method and system for linking data across multiple files
US20040236711A1 (en) 2003-05-21 2004-11-25 Bentley Systems, Inc. System and method for automating the extraction of information contained within an engineering document
US7336851B1 (en) 2003-08-07 2008-02-26 Bentley Systems, Inc. Interactive tool for removal of isolated objects on raster images
US7617077B2 (en) 2003-09-29 2009-11-10 Autodesk, Inc. Method and apparatus for automatically discovering hierarchical relationships in planar topologies
US7280123B2 (en) 2004-01-13 2007-10-09 Bentley Systems, Inc. Display priority for 2D CAD documents
KR100593716B1 (en) * 2004-03-24 2006-06-28 고호은 4D construction management system and construction management information provision method using the same
US7742617B2 (en) 2004-05-19 2010-06-22 Bentley Systems, Inc. Document genealogy
US20080162221A1 (en) * 2004-06-14 2008-07-03 Symphonyrpm, Inc. Decision object for associating a plurality of business plans
US8041744B2 (en) 2004-06-24 2011-10-18 Tekla Corporation Computer-aided modeling
US9460441B2 (en) 2004-06-29 2016-10-04 Textura Corporation Construction payment management system and method with document exchange features
US7925584B2 (en) 2004-06-29 2011-04-12 Textura Corporation Construction payment management system and method with document tracking features
EP1769452A4 (en) 2004-06-29 2008-07-02 Textura Corp Construction payment management system and method
US7877321B2 (en) 2004-06-29 2011-01-25 Textura Corporation Method of and system for evaluating financial risk associated with a construction project
US20080288379A1 (en) 2004-06-29 2008-11-20 Allin Patrick J Construction payment management system and method with automated electronic document generation features
US8086950B2 (en) 2004-08-25 2011-12-27 Bentley Systems, Inc. Method and system for enhancing engineering information
US20060074609A1 (en) 2004-10-01 2006-04-06 Clay Freeman System and method for determining variance in building structures
US20060074608A1 (en) 2004-10-01 2006-04-06 Freeman Clay System and method for designing building structures with associated estimates and schedules
US8046210B2 (en) 2004-11-25 2011-10-25 Tekla Corporation Computer-aided modeling
US8108428B1 (en) * 2004-11-30 2012-01-31 Legal Systems Holding Company Vendor/client information system architecture
KR20060065838A (en) * 2004-12-10 2006-06-14 주식회사 디디알소프트 Management method for integrating construction cost and process and recording media for storing program source thereof
WO2006125090A2 (en) * 2005-05-17 2006-11-23 Creative Management Services, Llc Management and data handling system and method
US8473470B1 (en) 2005-05-23 2013-06-25 Bentley Systems, Incorporated System for providing collaborative communications environment for manufacturers and potential customers
US20070061428A1 (en) 2005-09-09 2007-03-15 Autodesk, Inc. Customization of applications through deployable templates
US7324102B2 (en) 2005-10-12 2008-01-29 Autodesk, Inc. Method for generating unified three-dimensional models of complex infrastructure configurations
US8306924B2 (en) 2005-11-16 2012-11-06 Submittal Exchange, Llc Method and system for online submittal exchange
US20070186094A1 (en) 2006-01-25 2007-08-09 Autodesk, Inc. Specification based routing of utility network systems
US7761266B2 (en) 2006-01-25 2010-07-20 Autodesk, Inc. Synchronized physical and analytical representations of a CAD model
US7800615B2 (en) 2006-01-25 2010-09-21 Autodesk, Inc. Universal timelines for coordinated productions
US8823751B2 (en) 2006-01-26 2014-09-02 Autodesk, Inc. Size based display of piping systems
US20070239410A1 (en) 2006-03-15 2007-10-11 Seppanen Olli P P Location-based construction planning and scheduling system
US8106903B2 (en) 2006-05-04 2012-01-31 Bentley Systems, Incorporated System and method for visually representing a project using graphic elements
US20070288207A1 (en) 2006-06-12 2007-12-13 Autodesk, Inc. Displaying characteristics of a system of interconnected components at different system locations
US20070285424A1 (en) 2006-06-12 2007-12-13 Autodesk, Inc. Generating annotation graphics in 2D form to model 3D elements
US7856342B1 (en) 2006-10-02 2010-12-21 Autodesk, Inc. Automatic reinforcement modeling
US8959005B2 (en) 2012-01-31 2015-02-17 Autodesk, Inc. Building envelope determination
FI20075084A0 (en) 2007-02-06 2007-02-06 Tekla Corp Computer-aided model design
US20080234987A1 (en) 2007-02-23 2008-09-25 Autodesk, Inc. Amalgamation of data models across multiple applications
US20080238918A1 (en) 2007-04-02 2008-10-02 Autodesk, Inc. View-specific representation of reinforcement
US8296199B2 (en) 2007-04-05 2012-10-23 Textura Corporation Construction payment management system and method with sub-tier document exchange and approval features
US7936354B2 (en) 2007-04-27 2011-05-03 Graphisoft R&D Zrt. Virtual trace-multiple view modeling system and method
US8306883B2 (en) 2007-04-30 2012-11-06 Textura Corporation Construction payment management systems and methods with specified billing features
US8412741B2 (en) * 2007-07-17 2013-04-02 Agile Software Corporation Product network management system and method
US8094976B2 (en) * 2007-10-03 2012-01-10 Esker, Inc. One-screen reconciliation of business document image data, optical character recognition extracted data, and enterprise resource planning data
US8131517B2 (en) 2007-11-01 2012-03-06 Autodesk, Inc. Interconnected objects slope modification tool
US8001552B1 (en) 2007-12-12 2011-08-16 Bentley Systems, Incorporated Model merger using an export map
US8022953B2 (en) 2008-01-30 2011-09-20 Tekla Corporation Dimensions and computer aided modeling
US20090204373A1 (en) 2008-02-13 2009-08-13 Bentley Systems, Inc. System, method and computer program product for computer modeling with generative components
US8150659B2 (en) 2008-03-12 2012-04-03 Bentley Systems, Inc. Dynamic selection of update methods
FI127113B (en) 2008-06-17 2017-11-15 Tekla Corp Information search
KR20100020060A (en) * 2008-08-12 2010-02-22 주식회사 두올테크 System for managing bim information based on the session
US8274510B2 (en) 2008-11-07 2012-09-25 Autodesk, Inc. Method and apparatus for visualizing a quantity of a material used in a physical object having a plurality of physical elements
DE102009053585A1 (en) 2008-11-17 2010-05-20 Conject Ag System for automatically creating task list from records in multiple documents of project discussion in construction industry, has CPU generating entry in database during determining code word or character string in code word format
EA201170796A1 (en) 2008-12-11 2012-01-30 Текстура Корпорейшн PRE-QUALIFICATION OF THE PROJECT CONSTRUCTION
US20100257485A1 (en) 2009-04-01 2010-10-07 Autodesk, Inc. Object network alignment line
DE102009016588A1 (en) 2009-04-06 2010-10-14 Conject Ag Method for determination of text information from portable document format documents, involves reading portable document format document, and analyzing structure of portable document format document
US8352218B2 (en) 2009-07-08 2013-01-08 Graphisoft Active building information modeling apparatus and method
US8438199B1 (en) 2009-09-10 2013-05-07 Bentley Systems, Incorporated System and method for identifying and highlighting a graphic element
US8405871B2 (en) 2009-09-10 2013-03-26 Bentley Systems, Incorporated Augmented reality dynamic plots techniques for producing and interacting in Augmented Reality with paper plots for which accompanying metadata is accessible
US8599220B2 (en) 2009-10-30 2013-12-03 Tekla Corporation Position fine tuning in a computer aided modeling
WO2011116418A1 (en) 2010-03-25 2011-09-29 Grazer Pty Ltd System and method for providing an enhanced facility plan
US9064219B2 (en) * 2010-05-05 2015-06-23 J. E. Dunn Construction Group, Inc. System and method for managing facility content and equipment information
US8381176B1 (en) 2010-06-08 2013-02-19 Bentley Systems, Incorporated Software build orchestration framework
US8605093B2 (en) 2010-06-10 2013-12-10 Autodesk, Inc. Pipe reconstruction from unorganized point cloud data
US9396545B2 (en) 2010-06-10 2016-07-19 Autodesk, Inc. Segmentation of ground-based laser scanning points from urban environment
US20120005151A1 (en) * 2010-07-01 2012-01-05 Vineetha Vasudevan Methods and systems of content development for a data warehouse
KR101105327B1 (en) * 2010-07-21 2012-01-17 이기상 Construction cost information processing system including element information and the method on it
US9424371B2 (en) 2010-11-05 2016-08-23 Autodesk, Inc. Click to accept as built modeling
US20130124269A1 (en) * 2011-11-14 2013-05-16 Deborah Dunning Performance reporting for products and services using web-based portals
CN107844911A (en) * 2010-11-15 2018-03-27 E半球股份有限公司 Performance report using network door to products & services
FI20115269A0 (en) 2011-03-18 2011-03-18 Tekla Corp Delayed update of shared information
US20120254710A1 (en) * 2011-04-01 2012-10-04 Caterpillar Inc. Risk charts for failure mode and effect analysis
US9182882B2 (en) 2011-04-12 2015-11-10 Autodesk, Inc. Dynamic creation and modeling of solid models
US8947429B2 (en) 2011-04-12 2015-02-03 Autodesk, Inc. Gestures and tools for creating and editing solid models
US8504292B1 (en) 2011-05-05 2013-08-06 Bentley Systems, Incorporated Indoor localization based on ultrasound sensors
US8773434B2 (en) 2011-05-26 2014-07-08 Autodesk, Inc. Directing indirect illumination to visibly influenced scene regions
CN103814374B (en) 2011-06-30 2018-11-27 阿科尼克斯有限公司 information management system and method
US8872831B2 (en) 2011-07-25 2014-10-28 Autodesk, Inc. Semantic-driven profile curve interpolation for swept-surface extrusion
WO2013090942A1 (en) 2011-12-16 2013-06-20 Gehry Technologies Method and apparatus for detecting interference in design environment
WO2013090944A1 (en) 2011-12-16 2013-06-20 Gehry Technologies Method and apparatus for representing 3d thumbnails
FI128995B (en) 2012-01-02 2021-04-30 Tekla Corp Object grouping in computer aided modeling
WO2013106802A1 (en) 2012-01-12 2013-07-18 Gehry Technologies, Inc. Method and apparatus for determining and presenting differences between 3d models
US9489756B2 (en) 2012-01-31 2016-11-08 Autodesk, Inc. Graph based degree of freedom counter for two dimensional drawings
WO2013116859A1 (en) 2012-02-02 2013-08-08 Gehry Technologies, Inc. Computer process for determining best-fitting materials for constructing architectural surfaces

Patent Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6501501B1 (en) * 1999-04-28 2002-12-31 Aizudoken Co. Ltd. Construction and civil engineering database generator and display
US8271336B2 (en) * 1999-11-22 2012-09-18 Accenture Global Services Gmbh Increased visibility during order management in a network-based supply chain environment
US20010047251A1 (en) * 2000-03-03 2001-11-29 Kemp William H. CAD system which designs 3-D models
US20030101098A1 (en) * 2001-11-27 2003-05-29 Erich Schaarschmidt Process and device for managing automatic data flow between data processing units for operational order processing
US20070061154A1 (en) * 2003-11-14 2007-03-15 Koninklijke Philips Electronics N.V. Product data exchange
US20050188348A1 (en) * 2004-02-23 2005-08-25 Ironcad Llc Geometric modeling system with intelligent configuring of solid shapes
US20070282873A1 (en) * 2004-03-23 2007-12-06 Ponessa Steven J Generating an information catalog for a business model
US20050246216A1 (en) * 2004-04-14 2005-11-03 Rosen Earl Iii Systems and methods for managing information at various levels
US20050288808A1 (en) * 2004-06-14 2005-12-29 Lopez George A Computer system for efficient design and manufacture of multiple-component devices
US20100106654A1 (en) * 2008-10-16 2010-04-29 Hntb Holdings Ltd Managing and memorializing design requirements of a building project
US20120066178A1 (en) * 2010-03-09 2012-03-15 Vela Systems, Inc. Systems and methods for construction field management and operations with building information modeling
US20120130521A1 (en) * 2010-11-24 2012-05-24 Stephan Kohlhoff Visual Assembly Tool
US20120278334A1 (en) * 2011-04-29 2012-11-01 John Abjanic Database System
US20130191078A1 (en) * 2012-01-19 2013-07-25 Oracle International Corporation Overlaying business intelligence data on a product design visualization
US20140143005A1 (en) * 2012-03-13 2014-05-22 Hemant B. Jatla PLM IN A BOX is a proprietary Process in the development and implementation a Product Lifecycle Management Solution for product manufacturers developing products based on a customer specification. This process establishes a process framework to linking customer project to a product design originated for a specific customer project, links to the design exchanges with suppliers on those designs and the linkage engineering change notices that originate for those product designs

Cited By (33)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20140207774A1 (en) * 2013-01-24 2014-07-24 Mark Walter Virtual Building Browser Systems and Methods
US10915671B2 (en) 2013-09-20 2021-02-09 Viewpoint, Inc. Methods and systems for processing building information modeling (BIM)-based data
US20150088467A1 (en) * 2013-09-20 2015-03-26 Viewpoint, Inc. Methods and systems for processing building information modeling (bim)- based data
US20150088916A1 (en) * 2013-09-20 2015-03-26 Viewpoint, Inc. Methods and systems for mapping and processing building information modeling (bim)- based data
US9679089B2 (en) * 2013-09-20 2017-06-13 Viewpoint, Inc. Methods and systems for mapping and processing building information modeling (BIM)-based data
US11263364B2 (en) 2013-09-20 2022-03-01 Viewpoint, Inc. Methods and systems for processing building information modeling (BIM)-based data
US10474765B2 (en) * 2013-09-20 2019-11-12 Viewpoint, Inc. Methods and systems for processing building information modeling (BIM)-based data
CN104537459A (en) * 2014-12-03 2015-04-22 上海同筑信息科技有限公司 BIM-based micro field system and method
CN104715115A (en) * 2015-03-19 2015-06-17 中铁二局第五工程有限公司 Method and device for designing auxiliary construction facilities of steel truss arch bridge through BIM
TWI549089B (en) * 2015-08-11 2016-09-11 國立屏東科技大學 Construction coordinated operation method
CN105696467A (en) * 2016-02-04 2016-06-22 广厦建设集团有限责任公司 Formwork support construction method based on P-BIM technology
US11416958B1 (en) 2016-02-10 2022-08-16 Energysherlock LLC Mobile site watch
US10909502B2 (en) 2016-03-30 2021-02-02 Hexagon Technology Center Gmbh Configuration management system for large-scale capital projects
US20180374052A1 (en) * 2016-12-20 2018-12-27 Chetan Mogal Method of improviding building information modeling
US11687684B2 (en) 2017-02-23 2023-06-27 Mitek Holdings, Inc. Method of managing proxy objects
US11314903B2 (en) 2017-02-23 2022-04-26 Mitek Holdings, Inc. Method of managing proxy objects
US10878138B2 (en) 2017-02-23 2020-12-29 Mitek Holdings, Inc. Method of managing proxy objects
CN107194091A (en) * 2017-05-27 2017-09-22 成都希盟泰克科技发展有限公司 Rock fill dam construction dividing elements method based on BIM technology
TWI659385B (en) * 2017-08-01 2019-05-11 National Pingtung University Of Science & Technology Management and control method for construction process
WO2019060106A1 (en) * 2017-09-22 2019-03-28 The Brandt Companies, LLC Fabrication, distribution, and integrated order processing system
US11200540B2 (en) * 2017-09-22 2021-12-14 The Brandt Companies, LLC Fabrication, distribution, and integrated order processing system
CN109032075A (en) * 2018-06-28 2018-12-18 中铁山桥集团有限公司 A kind of intelligence steel construction stock method and system
CN109753753A (en) * 2019-01-21 2019-05-14 广东星层建筑科技股份有限公司 A kind of bridge mould base intelligent design method based on BIM
CN109885626A (en) * 2019-01-30 2019-06-14 北京筑业志远软件开发有限公司 Urban construction digital archives intelligent management system based on structural data and BIM model
WO2020206378A1 (en) * 2019-04-03 2020-10-08 Inertia Systems Two-dimensional interactive construction drawings
CN110378588A (en) * 2019-07-10 2019-10-25 重庆大学 A kind of contract spatialization system
WO2021018369A1 (en) * 2019-07-26 2021-02-04 Friedrich Prem Systemic modelling device in the form of an automated assistance system for construction projects
CN110796427A (en) * 2019-09-09 2020-02-14 国网浙江省电力有限公司经济技术研究院 BIM technology-based full-process control method for physical assets of power distribution network
CN111598379A (en) * 2020-03-31 2020-08-28 中铁建华南建设有限公司 Project management method, platform, device, computer equipment and storage medium
CN111861428A (en) * 2020-08-10 2020-10-30 中建七局建筑装饰工程有限公司 Enterprise informatization real-time management system
CN112434366A (en) * 2020-12-31 2021-03-02 中国三峡建设管理有限公司 Cable crane arrangement and scheduling method based on BIM
CN113222407A (en) * 2021-05-11 2021-08-06 山西省交通科技研发有限公司 Highway project security evaluation system based on BIM
CN113421037A (en) * 2021-08-23 2021-09-21 武汉市政工程设计研究院有限责任公司 Multi-source collaborative construction planning compilation method and device

Also Published As

Publication number Publication date
EP2862144A4 (en) 2016-02-17
EP2862144A2 (en) 2015-04-22
US20220277239A1 (en) 2022-09-01
US11200522B2 (en) 2021-12-14
US20170169374A1 (en) 2017-06-15
WO2013192115A2 (en) 2013-12-27
US11803791B2 (en) 2023-10-31
WO2013192115A3 (en) 2014-03-06

Similar Documents

Publication Publication Date Title
US11803791B2 (en) System and method linking building information modeling and enterprise resource planning
Xu et al. A framework for BIM-enabled life-cycle information management of construction project
US11038948B2 (en) Real time updates and predictive functionality in block chain
US20140278663A1 (en) Electronic discovery systems and workflow management method
US20150006122A1 (en) Method and Apparatus for Real-time Inter-organizational Probabilistic Simulation
US11436387B2 (en) Computer system and method for managing coordination issues in construction projects
US20120095829A1 (en) Systems and Methods for Managing Contracts and Contract Bids
US20230015535A1 (en) Digital project based competitive bidding in government contracts
US11068505B2 (en) System and method for generating and merging activity-entry reports utilizing activity-entry hierarchy and hierarchical information of the activity-entries
US20220358259A1 (en) Construction Knowledge Graph
Mortazavi et al. Risk evaluation and prioritization in bridge construction projects using system dynamics approach
CN115427990A (en) System for mapping models, costs and schedules of large-scale infrastructure projects
Wang et al. Adopting BIM to facilitate dispute management in the construction industry: A conceptual framework development
Wang et al. Application of collaborative mobile system in ar-based visualization, data storage and manipulation
Mukherjee et al. Sector-level objectives and associated inhibiting and enabling factors for the Indian real estate sector from a process standardisation perspective
US11829951B2 (en) Computer system and methods for managing data, data access, and data retention
US20090024372A1 (en) Method of identifying reusable services through modelling a business process and commonalities in process flows
Holzer The BIM Manager's Handbook, Part 3: Focus on Technology
Isikdag et al. Data integration capability evaluation of ERP systems: A construction industry perspective
US20180053268A1 (en) Method and system for provisioning products and/or services for real estate properties
US20230058444A1 (en) Methods and systems for facilitating maintaining a record of a work order
US20230297910A1 (en) Systems and methods for controlling a project
Narayan et al. Paradigm Shift of Claims Management to Digital Space
KR20040025084A (en) System and method for administering operation cost of particulars of construction work
Vanossi et al. Paths between real and virtual environments within a bimbased scheme

Legal Events

Date Code Title Description
AS Assignment

Owner name: COAXIS, INC., OREGON

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:HARRIS, MATTHEW THOMAS;HUMPHREYS, ROBERT WILSON;PICKERING, LLOYD;AND OTHERS;SIGNING DATES FROM 20131011 TO 20131024;REEL/FRAME:031653/0988

AS Assignment

Owner name: VIEWPOINT, INC., OREGON

Free format text: CHANGE OF NAME;ASSIGNOR:COAXIS, INC.;REEL/FRAME:032166/0031

Effective date: 20140108

AS Assignment

Owner name: WELLS FARGO BANK, NATIONAL ASSOCIATION, AS AGENT,

Free format text: SECURITY AGREEMENT;ASSIGNOR:VIEWPOINT, INC.;REEL/FRAME:032231/0462

Effective date: 20140206

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION

AS Assignment

Owner name: VIEWPOINT, INC., OREGON

Free format text: RELEASE BY SECURED PARTY;ASSIGNOR:WELLS FARGO BANK, NATIONAL ASSOCIATION, AS AGENT;REEL/FRAME:043069/0478

Effective date: 20170721