US3690227A - Frictional self-draining structure - Google Patents

Frictional self-draining structure Download PDF

Info

Publication number
US3690227A
US3690227A US54780A US3690227DA US3690227A US 3690227 A US3690227 A US 3690227A US 54780 A US54780 A US 54780A US 3690227D A US3690227D A US 3690227DA US 3690227 A US3690227 A US 3690227A
Authority
US
United States
Prior art keywords
layer
volume
porous layer
composite structure
frictional
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US54780A
Inventor
Lloyd G Welty
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LLOYD G WELTY
Original Assignee
LLOYD G WELTY
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LLOYD G WELTY filed Critical LLOYD G WELTY
Application granted granted Critical
Publication of US3690227A publication Critical patent/US3690227A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D11/00Roof covering, as far as not restricted to features covered by only one of groups E04D1/00 - E04D9/00; Roof covering in ways not provided for by groups E04D1/00 - E04D9/00, e.g. built-up roofs, elevated load-supporting roof coverings
    • E04D11/02Build-up roofs, i.e. consisting of two or more layers bonded together in situ, at least one of the layers being of watertight composition
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/22Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
    • E01C11/224Surface drainage of streets
    • E01C11/225Paving specially adapted for through-the-surfacing drainage, e.g. perforated, porous; Preformed paving elements comprising, or adapted to form, passageways for carrying off drainage
    • E01C11/226Coherent pavings
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • E01C3/06Methods or arrangements for protecting foundations from destructive influences of moisture, frost or vibration
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C7/00Coherent pavings made in situ
    • E01C7/08Coherent pavings made in situ made of road-metal and binders
    • E01C7/30Coherent pavings made in situ made of road-metal and binders of road-metal and other binders, e.g. synthetic material, i.e. resin
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C7/00Coherent pavings made in situ
    • E01C7/08Coherent pavings made in situ made of road-metal and binders
    • E01C7/32Coherent pavings made in situ made of road-metal and binders of courses of different kind made in situ
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/08Damp-proof or other insulating layers; Drainage arrangements or devices ; Bridge deck surfacings
    • E01D19/083Waterproofing of bridge decks; Other insulations for bridges, e.g. thermal ; Bridge deck surfacings

Definitions

  • ABSTRACT A frictional, in situ self-draining composite structure for runway and roadway structural docking and pathway surface.
  • the composite structure has a solid base to which is bound a porous superstratum of aggregate and resinous binder.
  • the composite structure is fabricated by applying a first mixture containing about two to about four parts by volume of aggregate particles of crushed rock, river gravel, crushed coral, coarse sand, slag, or crushed refractory material and one part by volume of a settable resinous binder to the base section and allowing it'to set, and then by applying a second mixture containing about two to about four parts by volume of scoria and/or slag particles and one part by volume of a settable resinuous binder to the first porous layer.
  • the field of the present invention includes pavement surfaces, drainage surfaces, and insulating surfaces.
  • Pavement surfaces consisting of scoria or slag and a settable resinous binder are disclosed in US. Pat. No. 2,925,831 to Lloyd G. Welty and John N. I-Iinkson and No. 3,396,641 to Lloyd G. Welty and Simon J. Sluter.
  • the pavement surfaces disclosed in these patents are solid nonporous structures which have relatively high frictional surfaces.
  • the frictional properties of such pavement surfaces greatly exceed the frictional properties of the surfaces of conventional pavements, such as concrete pavements; however, since these patented pavement surfaces are solid, nonporous and not selfdraining,,they must be constructed with a sloped top surface to allow water to run off therefrom to prevent pooling'of the water on the surface.
  • the present invention is directed to a frictional, in situ self-draining composite structure comprising a solid substrate base to which is bonded a porous superstratum.
  • the porous superstratum has a first porous layer adjacent to the base which consists of aggregate particles of greater size than 1/ 16-inch mesh and a settable resinous binder which binds the aggregate particles into a cohesive porous mass.
  • the porous superstratum also has a second porous layer which is contiguous with the first porous layer; the second porous layer consists of scoria or slag particles having a size greater than 1/ l6-inch mesh and a settable resinous binder which binds the particles into a cohesive porous Phenomena of Pneumatic Tire frictional mass.
  • the composite structure of the present invention is suitable for road surfaces, pathway surfaces, runway surfaces, rooftop surfaces, and the like.
  • An object of this invention is to provide a lightweight, strong, frictional, in situ self-draining surface structure which is suitable for roadways, runways, and the like.
  • Another object of the present invention is to provide a frictional, in situ self-draining composite structure having a planar, horizontal top surface. More particularly, it is an object of the present invention to provide a frictional, self-draining composite structure surface which will eliminate hydroplaning conditions on high speed roads and on aircraft runways.
  • a related object is to provide an in situ self-draining composite structure which provides for the rapid drainage therethrough of fuel oil, inflammable liquids, I
  • Another and further object of the present invention is to provide an in situ self-draining composite structure which is resistant to the action of water, fuel, and oil. More particularly, it is an object of the present invention to provide a self-draining structure which can be back-flushed at periodic intervals with water to remove sand, dirt, rubber particles and the like from the channels of the structure.
  • FIG. 1 is a cross-sectional view of the self-draining composite structure of the present invention
  • FIG. 2 is an enlarged cross-sectional view of the selfdraining composite structure taken over the encircled area of FIG. 1;
  • FIG. 3 is an enlarged cross-sectional view of the selfdraining composite structure taken over the encircled area of FIG. 2.
  • the frictional, in situ self-draining composite structure 10 includes a solid substrate base 11 and porous superstratum 12 which is bonded to the base 11.
  • the porous superstratum 12 has a first porous layer 13 which is bonded to the base 11 and a second porous layer 14 which is contiguous with and bonded to the first layer 13.
  • Partially embedded in the base 11 is a drainage conduit 11a having its longitudinal axis at right angles to the plane of the drawing.
  • the upper portion of the conduit 11a is apertured (not shown) with a plurality of slots or holes to permit the How of water into the conduit 11a from the upper surface of the base 11 and from the porous superstratum 12.
  • the top surface of the base 11 is sloped to assist or promote the run-off of water from the surface into the conduit 11a.
  • the conduit 11a runs the length of the structure and empties into a master drainage system, storm sewer, stream or the like (not shown).
  • the base is impervious to water and is constructed from conventional construction materials such as concrete and asphalt.
  • the base 11 will generally be made of metal, such as steel or aluminum, structural members, plates or webbed or foraminous members. Foraminous members are particularly advantageous where weight is a critical engineering factor.
  • the base 11 is a metal web structure, the upper surface of the base 11 usually is not sloped and conduit 11a is omitted because liquids can drain from the porous super-structure through the holes of the foraminous structure.
  • the base 11 will generally be made of wood board, plywood board, or lightweight metal sheet.
  • the top surface of the second porous layer 14 is flat and substantially horizontal; however, the top surface can be sloped in the appropriate situation, such as in the construction of banked turns, or roofs.
  • the first porous layer 13 is shown constructed of a plurality of aggregate particles 16 which are bonded together with a settable resinous binder at points of contact 17 (FIG. 3). Between the aggregate particles 16, which are coated with a layer of the settable resinous binder, are lateral and vertical interconnecting drainage canals or channels 18 for the drainage of fluids from the top surface of the first layer 13 down to the base 11.
  • the first layer 13 can be bonded to the top surface of the base 11 with a resinous settable binder; however, other means of securing the first layer 13 to the base 11 can also be employed as described below.
  • the aggregate particles 16 are crushed rock, river gravel, crushed coral, coarse sand, slag, or crushed refractory material, and are at least l/l6-inch mesh, preferably at least l-lllCh mesh.
  • the first layer 13 contains from about 2 parts to about 4 parts by volume of aggregate particles to give the first layer a porosity of at least 10 percent, that is, at least 10 percent of the total volume of layer 13 are channels or air spaces; preferably the porosity will be at least 20 percent.
  • the porosity is the percentage of free volume in a porous layer that is accessible from the surface of the porous layer by channels and conduits. The porosity is conveniently measured by preparing a cube of known size or volume of the aggregate and binder mixture in a mold.
  • the first porous layer also contains one part by volume of a resinous settable binder to give the first layer an impact strength of at least 1,000 pounds per square inch, preferably at least 2,000 pounds per square inch. The impact strength increases with increasing proportions of binder.
  • the preferred settable resinous binders l5 employed in the first porous layer 13 include catalyzed epoxy, phenolic, polystyrene, acrylic esters with resorcinolformaldehyde, polyurethanes, polyester and silicon resins which set at ordinary room temperature and at accelerated rates with increased temperatures.
  • Epon, or resins (such as 828) supplied by Shell Chemical Company, Araldite resins (such as 502, 6010, 6020, and the like) supplied by Ciba Plastics, Plastics Division, C-8 Devron and other epoxy resins are generally prepared by the condensation of an epichlorohydrin and a bisphenol such as Bisphenol-A (4,4'-isopropylidenediphenol) to various molecular weight polymers.
  • Plasticizers such as Thiokol fluid and others can be employed therein.
  • Phenolformaldehyde liquids can be cured with organic bases, resorcinol-formaldehydes cure at room temperature with additional formaldehyde and urea-melamine-formaldehyde cures at room temperature or copolymerizes with others of the phenolics and epoxies.
  • True polymerizing adhesive bonding agents derived of styrene, allylic compounds, acrylic and methacrylic esters are cured with benzoyl peroxide or other organic peroxide and especially in the presence of a redox catalyst system.
  • Polyurethanes and hybrids with polyurea cure in the presence of water and acid.
  • the second porous layer 14 is shown having scoria or slag particles 19 which are bound together with a settable resinous binder, such as one of those binders described above, at points of contact 20 between the particles 19.
  • a settable resinous binder such as one of those binders described above
  • the second layer 14 is bound to the top surface of the first layer 13 with the resinous settable binder.
  • the channels 21 of the second layer 14 are contiguous with the channels 18 of the first layer 13.
  • the slag or scoria particles 19 are at least l/ l 6-inch mesh in size, preferably at least Iii-inch mesh.
  • the second porous layer 14 contains from about 2 to about 4 parts by volume of aggregate particles to give the second layer a porosity of at least 10 percent, that is, at least 10 percent of the total volume of the second layer 14 are canals, channels or air space; preferably the porosity of the second layer will be at least 20 percent.
  • the porosity of the second layer is preferably equal to, or greater than, the porosity of the first layer.
  • the second porous layer approaches the '10 percent limit; withlarger-size particles, such as 54-inch meshor larger, the porosity approaches 25 percent or more.
  • the second porous layer also contains one part by volume of a settable resinous binder, such as one of the binders described above, to give the second porous layer an impact furnace.
  • the slag as dross forms a fluid layer overlying matter smelted metal wherefrom it is poured off and cooled. The cool material is then fragmented by conventional grinding, rolling, and screening methods.
  • the scoria employed in the-composite structure is of volcanic origin and is generally cinder-like in character.
  • the scoria may occur in the form of vesicular lapilli, porous volcanic bombs, as scoria or as massive effusive formations of volcanic origin.
  • the material is usually rcdor black in color'and has a cellular structure in which there is a multitude of elongated or spheroidal cavities arranged in contiguity. A large proportion of the cavities is closed, i.e., the structure is largely unicellular, in the natural state.
  • scoria particles having highly irregular forms with large exposed surface areas presenting a myriad of outwardly projecting spicules as well as multitudinous depressions and cavities and the openingsthereto exposed but frequently having less area than the area within the cavities;
  • slag and/or scoria particles in a second porous layer provides thatithe top surface of the compositestructure will be highly frictional and will possess excellent light reflectedqualities.
  • the slag or scoria particles have many concave reflective surfaces facing in all directions. This gives a uniform reflective surface for light proportional to the particle size and the number of particles per square foot. in addition, the particle surface creates a backward reflection toward the light source.
  • the scoria or slag particles maintain their high and A uniform coefficient of frictional resistance with wear.
  • the 10 percent porositylimit of the first and second porous layers is critical.
  • the porosity of a layer is below 10 percent, the self-drainage characteristics are adversely affected, that is, drainage of water is effectively inhibited.
  • the reason for this is not understood at this time; however, it is believed that when the porosity is less than 10 percent the channels within a porous layer are quite narrow and have constricted areas with cross-sectional areas approaching the cross-sectional areas of capillary tubes. In such constricted areas, water droplets are effectively trapped by capillary action and block or dam the small channels of the porous layer which inhibits or prevents drainage and allows water to back up and form pools on the surface of the pavement structure.
  • One of the draining characteristics of the present pavement surface that has been observed is that in situ water drains through the pavement surface at an increased rate once the channels of the first and second porous layers have been wetted with water. At thepresent time there is no explanation for this phenomenon. I
  • thebinder and particles inv both porous layers are combined within a certain ratio range to provide that each layer has aporosity of at least 10 percent, preferably at least 20 percent, and an impact strength of at least 1,000 pounds vper square inch, preferably at least 2,000pounds per square inch.
  • the impact strength of a layer can be increased by increasing the proportion of binder within the range; however, the volume of binder used must bercontrolled to insure that the porous layer has a porosity of at least 10 percent.
  • small pavement samples will be prepared, prior to large-scale fabrications of a pavement structure, to determine the proper volumetric proportions of particles and resin to furnish a pavement structure having the desired porosity and impact strength.
  • the compositestructure 10 of FIG. 1 is fabricated by first preparing a mixture of the aggregate particles of at least l/ 16-inch mesh preferably free of fines, and a settableresinous binder in the liquid state; the two ingredients are mixed in a ratio, by volume, of about 2 to about 4 parts'aggregate particles to 1 part binder. The aggregate particles and binder are mixed until the particles are uniformly coated or wetted with the binder.
  • the top surface of the base element 11 is precleaned and roughened by sandblasting, wire brushing, acid washing, and the like to remove dirt, loose material, oil, grease and the like.
  • the surface is then coated with a layer of a settable resinous binder in the fluid state.
  • the selection of appropriate settable resin binder will depend upon the nature of the substrate surface and the ambient temperatures under which the surface is to be employed.
  • the mixture of the aggregate particles and binder is then applied to the'base 11 and compacted to insure maximum bonding to the top surface of the base and between the aggregate particles. The mixture can then be allowed to set to form the first porous layer 13 of the superstrata portion 12.
  • the second porous layer 14 is fabricated by preparing a mixture of scoria and/or slag particles of at least l/l6-inch mesh, preferably free of fines,and the settable resinous binder in the liquid state employing, by volume, about 2 to'about 4 parts scoria and/or slag to 1 part binder.
  • the particles of scoria and/or slag and the binder are mixed or tumbled to insure that each particle is uniformly coated or wetted with the binder.
  • the mixture is then applied to the top of the first porous layer 13 and compacted to insure maximum bonding to the top surface of the first layer 13 and between the scoria and/or slag particles 19.
  • This mixture is rolled or tamped before it sets to make the top surface planar and substantially horizontal.
  • the mixture is then allowed to set to form the second porous layer 14.
  • the mixture of scoria and/or slag particles and binder can be applied to the first porous layer before or after it has set; normally after the first layer has set.
  • the resulting first porous layer 13 and the resulting second porous layer 14 will each have a porosity of at least percent, preferably at least percent, and an impact strength of at least 1,000 pounds per square inch, preferably at least 2,000 pounds per square inch.
  • Another method of fabricating the composite structure of the present invention includes the step of applying a layer of a fluid adhesive bonding agent to the top surface of the base 11.
  • a layer of a fluid adhesive bonding agent to the top surface of the base 11.
  • the selection of an appropriate bonding agent will depend upon the nature of the substrate surface and the ambient conditions under which the surface is to be employed. In some instances the solution of adhesive material will solidify by evaporation of a solvent carrier. Likewise, it is possible to employ bonding agents which can be applied in molten condition and which solidify on cooling; however, it is generally preferred to employ a settable resinous binder with a catalyzed setting tie as described above. Solvent solutions such as asphaltic, coal tar, or other resinous materials exemplify the first-mentioned type of adhesive bonding agents.
  • Aqueous emulsions and dispersions of adhesive bonding agents of a similar character could be employed likewise.
  • Molten asphalts, coal tar, resins and synthetic resins exemplify the second type of bonding adhesive.
  • a layer of aggregate particles, free of fines and of uniform size are preferably applied to the treated surface of the base.
  • the aggregate is applied with rolling action of troweling to assure that lower surfaces of the aggregate particles are thoroughly wetted by the liquid adhesive bonding agent and are embedded partially therein.
  • Surfaces such as pathways and roofs to which only a thin covering is to be applied, mesh sizes of one-sixteenth and one-eighth inch or larger may be employed.
  • the composite structure in the event that the composite structure is to be used for vehicular or aircraft traffic, such as trucks and airplanes, aggregate of one-eighth, one-fourth, threeeighths, and one-half inch or larger mesh sizes are employed. Ordinarily, the bonding agent is then allowed to set. The mixture of aggregate particles and resin is then applied to the pretreated upper surface of the solid substrate base in the manner described above.
  • aggregate particles When the composite structures of this invention are being constructed on a new or fresh concrete base 11, aggregate particles, free of fines, and of uniform size, may be partially embedded in the top surface of the concrete base while the concrete is soft and fresh to provide an alternative bonding layer.
  • the top surface of the base 11 which is covered with embedded aggregate particles, is covered with a layer of settable resinous binder to which is applied prior to setting the aggregate particles and binder mixture employed in the fabrication of the first porous layer l3.
  • the first porous layer is laid in such a manner that its top surface is substantially horizontal and the second porous layer is laid in a relatively thin layer such that its top surface is planar and substantially horizontal.
  • the second porous layer has a thickness of at least one-fourth inch and preferably at least one-half inch, whereas the first porous layer has a thickness of at least 2 inches.
  • the composite structure is constructed with one or more drainage conduits between the phase of the solid substrate base and the first porous layer; the drainage conduits preferably run the length of the base section and perpendicular to the gradient of the base section.
  • the conduits are slotted by a plurality of holes in their upper surfaces, and can be made of metal, brick clay, stone, or plastic material.
  • the drainage conduit can be a slit trench constructed in the base section, the drainage conduit can be a conduit foraminous about its entire circumference which is merely laid on top of the base 11, and surrounded by the first porous layer.
  • the present composite structure can be constructed with heating elements near the upper surface of the superstratum portion.
  • the use of such heating elements will prevent ice formation in the channels 18 and 21 of the composite structure and will insure adequate drainage during freezing weather.
  • the heating elements can be conduits through which steam or hot water is circulated, or they can be waterproofed electrical heating elements.
  • the drainage conduit 11a (FIG. 1) not only can be utilized for drainage, but it can also be utilized for back-flushing; i.e., water can be pumped through the drainage conduit under pressure to force water up through the channels 18 and 21 of the porous superstratum and out through the top surface of the composite structure to remove dirt, rubber, and other particles from the channels.
  • a mixture of crushed white rock (50 percent /i-lnCh mesh, 30 percent -inch mesh, and 20 percent l/16-inch mesh) and the settable resinous binder of the above formula (221 parts by weight rock to 31 parts by weight binder; i.e., about 3.5 parts by volume rock to 1 part by volume binder) are applied to the base at a thickness no less than 6 inches.
  • the mixture of rock and binder are rolled to form a substantially horizontal upper surface; the mixture is then allowed to set to form the first porous layer having a porosity of 19 percent.
  • a mixture of slag 50 percent V4- inch mesh, 30 percent fit-inch mesh, and 20 percent l/ l 6-inch mesh
  • the settable resinous binder of the above formula 255 parts by weight slag to 34 parts by weight binder; i.e., about 3.75 parts by volume slag to 1 part by volume binder
  • the mixture of slag and binder is rolled to form a substantially horizontal surface; themixture is then allowed to set to form the upper porous layer having an approximate porosity of 23.7 percent.
  • the finished composite structure has excellent frictional anddrainage qualities which are ideal for runway surfaces.
  • the present frictional self-draining pavement structure is particularly valuable for 'the prevention of hydroplaning of wheeled vehicles, including airplanes.
  • Hydroplaning can take place when a pavement surface is covered with a thin layer, such as one-sixteenth inch or less, of water and the wheeled vehicle is traveling at speedsgreater. than 30 miles per hour, depending on vehicle weight.
  • the wheels of the vehicle lose contact with the pavement surface which inhibits or prevents effective steering, guidance and stopping of the vehicle.
  • Hydroplaning is a very serious problem on rainy days with respect to high-speed highway driving and airplane landings.
  • the crowning of roadsor runways does not circumvent'this problem
  • Component Parts Liquid resin 1010 (Shell Chem.
  • Plasticizer General Mills Corp., I25 [0% by volume of fluid resin and hardener Binder parts by weight gravel to 36 parts by weight binder; i.e., 24 parts by volume gravel to 1 part by volume binder) is applied to the asphalt treated freeway surface at depth no less than 4 inches to form the first porous layer; the first layer is rolled to form a substantially horizontal surface and allowed to set to form a layer with a porosity of about 20 percent.
  • a mixture of scoria 50 percent 56-inch mesh, 30 percent ia-inch mesh, and 20 percent one-sixteenth inch mesh
  • liquid binder of the above formula about 2 parts by weight scoria to 1 part by weight binder, i.e., about 2.6 parts by volume scoria to 1 part binder
  • the second layer is rolled toform ,a substantially horizontal layer and allowed to set to form a layer with a porosity of about 24 percent.
  • the resulting roadway is durable and has excellent frictional anddrainage characteristics.
  • a mixture of slag aggregate (k-inch to l-inch mesh) and the fluid epoxy resin of the above formula (3.5 parts by volume slag to 1 part by volume resin) is applied to the cement base to a depth of 12 inches.
  • the mixture is rolled to form a substantially horizontal surface and then allowed to set to formthe first porous layer.
  • a mixture of scoria (A-inch to l/l6-inch mesh) and the fluid epoxy resin of the above formula (3.75 parts by volume scoria to 1 part by volume resin) is spread over the first porous layer to a depth of about 1 inch.
  • The'material was tamped and rolled to form a substantially horizontal surface which has excellent frictional qualities and drainage qualities.
  • old concrete roadways or runways can be resurfaced; however, the old surface should be pretreated first by sandblasting or abrading mechanically an acid washing the surface to remove dirt, gums, rubbers and other oxidized materials therefrom.
  • EXAMPLE An upper surface of an aluminum foraminous structural panel is cleaned with detergent and water and allowed to dry. The surface is then cleaned with a petroleum spirit to remove grease, oil and gums. The surface is then sandblasted and wire-brushed to remove all loose material and prepare a clean metal uncovered surface. A catalyzed setting adhesive resin of a phenolic epoxy or silicon-type having a viscosity of about 400 to 5,000 centipoises is applied as a coating to the cleaned surface. Dry scoria aggregate (%-inch to inch mesh) is applied to the treated surface before the resin has been allowed to set.
  • a dough-like mixture of crushed light quartz (A-inch mesh) and a catalyzed setting adhesive resin of the phenolic epoxy or silicontype (about 3.5 parts by volume rock to 1 part resin) is applied to a depth of 2 inches over the metal substrate.
  • the material is rolled to form a substantially horizontal surface and allowed to set to form the first porous layer.
  • a dough-like mixture of scoria iii-inch mesh and a catalyzed setting adhesive resin of the phenolic epoxy or silicion-type (3 parts by volume scoria to l part by volume resin) is applied to a depth of one-half inch over the first porous layer.
  • the material is tamped, rolled and troweled to form a substantially horizontal layer and then allowed to set to approximately 24 hours to form a highly frictional lightweight surfacing material.
  • This surfacing is ideally suited for marine decking, traffic decking for bridges, and for a lightweight highly insulative roofing material.
  • EXAMPLE 6 A substrate of freshly poured and rough-finish concrete having a 5 percent sloped surface is covered with a thin layer of an :20 mixture of slag:score aggregate of %-inch to l-inch screen size; the surface is then rolled to imbed the particles about halfway into the concrete. After the concrete has set, a mixture of the fluid epoxy resin of the following formula:
  • Liquid resin Epi-rex 510 (Celanese) I00 Hardener: Epicure 872 (Celanese) 5 Plasticizer: dioctylphthalate 5 is brushed over the aggregate layer.
  • a mixture of 50:50 granitezslag aggregate sainch to l-inch mesh) and the fluid epoxy resin of the above formula (3.0 parts by volume of the aggregate mixture to 1 part by volume resin) is applied to the cement base to a depth of 12 inches. The mixture is rolled to form a substantially horizontal surface and then allowed to set to form the first porous layer.
  • a 60:40 mixture of slagzscoria (A-inch to l/ 16-inch mesh) and the fluid epoxy resin of the above formula (3.75 parts by volume of the slagzscoria mixture to 1 part by volume resin) is spread over the first porous layer to a depth of about 2 inches.
  • the material was tamped and rolled to form a substantially horizontal surface which has excellent frictional qualities and drainage qualities.
  • old concrete roadways or runways can be resurfaced; however, the old surface should be pretreated first by sandblasting or abrading mechanically an acid washing to remove dirt, gums, rubbers and other oxidized materials therefrom.
  • a high strength, frictional, in situ self-draining structure comprising:
  • a solid imperforate and substantially impervious substrate base having a top surface adapted for the collection and channeling of liquid to a drain;
  • drain is a drainage conduit which is partially embedded in the top surface of said base, the top portion of said drain conduit being perforated with a plurality of holes.
  • the high strength, frictional, in situ self-draining composite structure defined in claim 1 including heating means below the top surface of the porous superstratum layer.
  • a high strength, frictional, in situ self-draining composite structure comprising:
  • a solid imperforate and substantially impervious substrate base having a top surface for the collection and channeling of liquid to a drain and a superstratum porous throughout its depth and bonded to said base, said superstratum having a first porous layer bonded to said base and a second porous layer contiguous with and bonded to said first porous layer, said first porous layer consisting of aggregate particles of greater size than 1/16 inch mesh bonded together with a settable resinous binder which is present in an amount insufficient to fill the voids between aggregate particles, said first porous layer having about 2 to about 4 parts by volume of said aggregate particles and 1 part by volume of said settable resinous binder to give said layer a porosity of at least 10 percent and to give said layer an impact strength of at least 1,000 pounds per square inch, said second porous layer consisting of scoria and/or slag particles of greater size than l/l6-inch mesh bonded together with a settable resinous binder which binder serves to bond said first layer to said second layer and

Abstract

A frictional, in situ self-draining composite structure for runway and roadway structural docking and pathway surface. The composite structure has a solid base to which is bound a porous superstratum of aggregate and resinous binder. The composite structure is fabricated by applying a first mixture containing about two to about four parts by volume of aggregate particles of crushed rock, river gravel, crushed coral, coarse sand, slag, or crushed refractory material and one part by volume of a settable resinous binder to the base section and allowing it to set, and then by applying a second mixture containing about two to about four parts by volume of scoria and/or slag particles and one part by volume of a settable resinuous binder to the first porous layer.

Description

United States Welty atent Sept. 12, 1972 [54] FRICTIONAL SELF-DRAINING STRUCTURE [22] Filed: July 14, 1970 [21] Appl. No.: 54,780
[52] US. Cl. ..94/33, 94/7, 94/9, 94/22 [51] Int. Cl. ..E0lc 11/24 [58] Field of Search ..94/7, 9, 10, 22, 23
[56] References Cited UNITED STATES PATENTS 1,484,514 2/ 1924 Lloyd ..94/33 2,925,831 2/ 1960 Welty ..94/22 X 3,396,641 8/ 1968 Welty; ..'...94/22 3,112,681 12/ 1963 Gessler ..94/7
2,948,201 8/ 1960 Nagin ..94/5
3,334,555 8/1967 1 Nagin ..94/22 2,185,341 l/1940 Irvine ..94/23 X 2,039,450 5/1936 Rhodes ..94/23 Primary ExaminerJacob L. Nackenoff Attorney-Harris, Kiech, Russell & Kern [57] ABSTRACT A frictional, in situ self-draining composite structure for runway and roadway structural docking and pathway surface. The composite structure has a solid base to which is bound a porous superstratum of aggregate and resinous binder. The composite structure is fabricated by applying a first mixture containing about two to about four parts by volume of aggregate particles of crushed rock, river gravel, crushed coral, coarse sand, slag, or crushed refractory material and one part by volume of a settable resinous binder to the base section and allowing it'to set, and then by applying a second mixture containing about two to about four parts by volume of scoria and/or slag particles and one part by volume of a settable resinuous binder to the first porous layer.
7Claims,3DrawingFigures 1 Y FRICTIONAL SELF-DRAINING STRUCTURE BACKGROUND OF THE INVENTION The field of the present invention includes pavement surfaces, drainage surfaces, and insulating surfaces.
Pavement surfaces consisting of scoria or slag and a settable resinous binder are disclosed in US. Pat. No. 2,925,831 to Lloyd G. Welty and John N. I-Iinkson and No. 3,396,641 to Lloyd G. Welty and Simon J. Sluter. The pavement surfaces disclosed in these patents are solid nonporous structures which have relatively high frictional surfaces. The frictional properties of such pavement surfaces greatly exceed the frictional properties of the surfaces of conventional pavements, such as concrete pavements; however, since these patented pavement surfaces are solid, nonporous and not selfdraining,,they must be constructed with a sloped top surface to allow water to run off therefrom to prevent pooling'of the water on the surface. During rain falls, the surface of the pavement iscovered with alayer of water, even when the surface is sloped. A water layer or water pooling creates adangerous situation on roads and runways 'because the wheels of most vehicles, including airplanes, hydroplane on wet surfaces when the vehicle istraveling at high speeds, such as a car traveling fifty or sixty miles per hour. (See thetechnical paper entitled Hydroplaning by Walter B. Home and Robert C. Dreher in NASA Technical Note TN D-2056, November 1963.)
Due to their solid construction, these pavement surfaces are relatively heavy and cannot be used as replacement surfaces on most existing bridges and elevated structures because such bridges and structures were not designed or constructed to support the weight of such pavement-surfaces. Furthermore, due to their weight, it is not practical or feasible to employ them in roofing. v
Although the aforementioned patented pavement structures are a great improvement over conventional pavements, their use in many areas of the country has been thwarted by economic considerations. In most areas of the country, cement, gravel, and sand are 10- cally available and are the predominant materials used in conventional pavement construction. In contrast, scoria is found only in certain areas of the'western states and slag is produced only in steel-making areas. Since scoria and slag are not locally available in most areas of the country, the transportation costs of these materials sharply raises the construction cost of scoria and slag pavement structures.
SUMMARY OF THE INVENTION The present invention is directed to a frictional, in situ self-draining composite structure comprising a solid substrate base to which is bonded a porous superstratum. The porous superstratum has a first porous layer adjacent to the base which consists of aggregate particles of greater size than 1/ 16-inch mesh and a settable resinous binder which binds the aggregate particles into a cohesive porous mass. The porous superstratum also has a second porous layer which is contiguous with the first porous layer; the second porous layer consists of scoria or slag particles having a size greater than 1/ l6-inch mesh and a settable resinous binder which binds the particles into a cohesive porous Phenomena of Pneumatic Tire frictional mass. The composite structure of the present invention is suitable for road surfaces, pathway surfaces, runway surfaces, rooftop surfaces, and the like.
An object of this invention is to provide a lightweight, strong, frictional, in situ self-draining surface structure which is suitable for roadways, runways, and the like.
Another object of the present invention is to provide a frictional, in situ self-draining composite structure having a planar, horizontal top surface. More particularly, it is an object of the present invention to provide a frictional, self-draining composite structure surface which will eliminate hydroplaning conditions on high speed roads and on aircraft runways.
A related object is to provide an in situ self-draining composite structure which provides for the rapid drainage therethrough of fuel oil, inflammable liquids, I
poisonous liquids, caustic liquids and/or obnoxious liquids spilled, either by accident or from spillage during fueling of vehicles or aircraft, on the surface of such structure. More particularly, it is an object to provide a' vide a partially porous composite structure with insulavide a composite structure which has a slag or scoria W top surface and which is constructed principally of locally available materials.
Another and further object of the present invention is to provide an in situ self-draining composite structure which is resistant to the action of water, fuel, and oil. More particularly, it is an object of the present invention to provide a self-draining structure which can be back-flushed at periodic intervals with water to remove sand, dirt, rubber particles and the like from the channels of the structure.
BRIEF DESCRIPTION OF THE DRAWING FIG. 1 is a cross-sectional view of the self-draining composite structure of the present invention;
FIG. 2 is an enlarged cross-sectional view of the selfdraining composite structure taken over the encircled area of FIG. 1; and
FIG. 3 is an enlarged cross-sectional view of the selfdraining composite structure taken over the encircled area of FIG. 2.
DESCRIPTION OF THE PREFERRED EMBODIMENT Referring to FIG. 1,the frictional, in situ self-draining composite structure 10 includes a solid substrate base 11 and porous superstratum 12 which is bonded to the base 11. The porous superstratum 12 has a first porous layer 13 which is bonded to the base 11 and a second porous layer 14 which is contiguous with and bonded to the first layer 13. Partially embedded in the base 11 is a drainage conduit 11a having its longitudinal axis at right angles to the plane of the drawing. The upper portion of the conduit 11a is apertured (not shown) with a plurality of slots or holes to permit the How of water into the conduit 11a from the upper surface of the base 11 and from the porous superstratum 12. The top surface of the base 11 is sloped to assist or promote the run-off of water from the surface into the conduit 11a. The conduit 11a runs the length of the structure and empties into a master drainage system, storm sewer, stream or the like (not shown).
in most instances, the base is impervious to water and is constructed from conventional construction materials such as concrete and asphalt. in the case of bridge roadway construction, the base 11 will generally be made of metal, such as steel or aluminum, structural members, plates or webbed or foraminous members. Foraminous members are particularly advantageous where weight is a critical engineering factor. When the base 11 isa metal web structure, the upper surface of the base 11 usually is not sloped and conduit 11a is omitted because liquids can drain from the porous super-structure through the holes of the foraminous structure. In the case of roofing construction, the base 11 will generally be made of wood board, plywood board, or lightweight metal sheet.
The top surface of the second porous layer 14 is flat and substantially horizontal; however, the top surface can be sloped in the appropriate situation, such as in the construction of banked turns, or roofs.
In FIG. 2 the first porous layer 13 is shown constructed of a plurality of aggregate particles 16 which are bonded together with a settable resinous binder at points of contact 17 (FIG. 3). Between the aggregate particles 16, which are coated with a layer of the settable resinous binder, are lateral and vertical interconnecting drainage canals or channels 18 for the drainage of fluids from the top surface of the first layer 13 down to the base 11. The first layer 13 can be bonded to the top surface of the base 11 with a resinous settable binder; however, other means of securing the first layer 13 to the base 11 can also be employed as described below. The aggregate particles 16 are crushed rock, river gravel, crushed coral, coarse sand, slag, or crushed refractory material, and are at least l/l6-inch mesh, preferably at least l-lllCh mesh. The first layer 13 contains from about 2 parts to about 4 parts by volume of aggregate particles to give the first layer a porosity of at least 10 percent, that is, at least 10 percent of the total volume of layer 13 are channels or air spaces; preferably the porosity will be at least 20 percent. The porosity is the percentage of free volume in a porous layer that is accessible from the surface of the porous layer by channels and conduits. The porosity is conveniently measured by preparing a cube of known size or volume of the aggregate and binder mixture in a mold. After the binder has set, the cube of material and the mold are weighted. The cube of material in the mold is then filled and saturated with water and the combination is weighted. The difference between the first and second weightings is the weight of water in the free volume of the cube of material, and, assuming water weighs one gram per cubic centimeter, the free volume of the cube is directly found. The porosity is the percentage of the cubes volume that is free volume. With small-sized aggregate particles, i.e., l/ l6-inch mesh, the porosity of the first layer approaches the 10 percent limit; with larger-sized aggregate particles, i.e., Ki-inch mesh or larger, the porosity approaches 25 percent or more. The first porous layer also contains one part by volume of a resinous settable binder to give the first layer an impact strength of at least 1,000 pounds per square inch, preferably at least 2,000 pounds per square inch. The impact strength increases with increasing proportions of binder.
The preferred settable resinous binders l5 employed in the first porous layer 13 include catalyzed epoxy, phenolic, polystyrene, acrylic esters with resorcinolformaldehyde, polyurethanes, polyester and silicon resins which set at ordinary room temperature and at accelerated rates with increased temperatures. Epon, or resins (such as 828) supplied by Shell Chemical Company, Araldite resins (such as 502, 6010, 6020, and the like) supplied by Ciba Plastics, Plastics Division, C-8 Devron and other epoxy resins are generally prepared by the condensation of an epichlorohydrin and a bisphenol such as Bisphenol-A (4,4'-isopropylidenediphenol) to various molecular weight polymers. Catalysis by agents and mixtures thereof including organic bases, acid anhydrides, compounds containing active hydrogen, certain resins, and the like, is employed in the multitudinous commercially available formulations. Plasticizers such as Thiokol fluid and others can be employed therein. Phenolformaldehyde liquids can be cured with organic bases, resorcinol-formaldehydes cure at room temperature with additional formaldehyde and urea-melamine-formaldehyde cures at room temperature or copolymerizes with others of the phenolics and epoxies. True polymerizing adhesive bonding agents derived of styrene, allylic compounds, acrylic and methacrylic esters are cured with benzoyl peroxide or other organic peroxide and especially in the presence of a redox catalyst system. Polyurethanes and hybrids with polyurea cure in the presence of water and acid.
Referring to FIG. 2 again, the second porous layer 14 is shown having scoria or slag particles 19 which are bound together with a settable resinous binder, such as one of those binders described above, at points of contact 20 between the particles 19. Between the particles 19, which are coated with a layer of a settable resinous binder, are lateral and vertical interconnecting drainage channels 21 for the drainage of liquids from the top surface of layer 14 down to the top surface of the first layer 13. The second layer 14 is bound to the top surface of the first layer 13 with the resinous settable binder. In general, the channels 21 of the second layer 14 are contiguous with the channels 18 of the first layer 13. The slag or scoria particles 19 are at least l/ l 6-inch mesh in size, preferably at least Iii-inch mesh. The second porous layer 14 contains from about 2 to about 4 parts by volume of aggregate particles to give the second layer a porosity of at least 10 percent, that is, at least 10 percent of the total volume of the second layer 14 are canals, channels or air space; preferably the porosity of the second layer will be at least 20 percent. Moreover, the porosity of the second layer is preferably equal to, or greater than, the porosity of the first layer. With smaller-size particles of scoria or slag,
such as l/ 16-inch mesh, the porosity of the second,
layer approaches the '10 percent limit; withlarger-size particles, such as 54-inch meshor larger, the porosity approaches 25 percent or more. The second porous layer also contains one part by volume of a settable resinous binder, such as one of the binders described above, to give the second porous layer an impact furnace. The slag as dross forms a fluid layer overlying matter smelted metal wherefrom it is poured off and cooled. The cool material is then fragmented by conventional grinding, rolling, and screening methods.
" --The scoria employed in the-composite structure is of volcanic origin and is generally cinder-like in character. The scoria may occur in the form of vesicular lapilli, porous volcanic bombs, as scoria or as massive effusive formations of volcanic origin. The material is usually rcdor black in color'and has a cellular structure in which there is a multitude of elongated or spheroidal cavities arranged in contiguity. A large proportion of the cavities is closed, i.e., the structure is largely unicellular, in the natural state. After the scoria is mined, itis reduced to the appropriate size by a fracturing, fragmentationor crushing operationjto provide scoria particles having highly irregular forms with large exposed surface areas presenting a myriad of outwardly projecting spicules as well as multitudinous depressions and cavities and the openingsthereto exposed but frequently having less area than the area within the cavities; I I
The use of slag and/or scoria particles in a second porous layer provides thatithe top surface of the compositestructure will be highly frictional and will possess excellent light reflectedqualities. The slag or scoria particles have many concave reflective surfaces facing in all directions. This gives a uniform reflective surface for light proportional to the particle size and the number of particles per square foot. in addition, the particle surface creates a backward reflection toward the light source.
-' The scoria or slag particles maintain their high and A uniform coefficient of frictional resistance with wear.
When an exposed particle eventually breaks down and The 10 percent porositylimit of the first and second porous layers is critical. When the porosity ofa layer is below 10 percent, the self-drainage characteristics are adversely affected, that is, drainage of water is effectively inhibited. The reason for this is not understood at this time; however, it is believed that when the porosity is less than 10 percent the channels within a porous layer are quite narrow and have constricted areas with cross-sectional areas approaching the cross-sectional areas of capillary tubes. In such constricted areas, water droplets are effectively trapped by capillary action and block or dam the small channels of the porous layer which inhibits or prevents drainage and allows water to back up and form pools on the surface of the pavement structure. One of the draining characteristics of the present pavement surface that has been observed is that in situ water drains through the pavement surface at an increased rate once the channels of the first and second porous layers have been wetted with water. At thepresent time there is no explanation for this phenomenon. I
As described above, thebinder and particles inv both porous layers are combined within a certain ratio range to provide that each layer has aporosity of at least 10 percent, preferably at least 20 percent, and an impact strength of at least 1,000 pounds vper square inch, preferably at least 2,000pounds per square inch. The impact strength of a layer can be increased by increasing the proportion of binder within the range; however, the volume of binder used must bercontrolled to insure that the porous layer has a porosity of at least 10 percent. In normal practice, small pavement samples will be prepared, prior to large-scale fabrications of a pavement structure, to determine the proper volumetric proportions of particles and resin to furnish a pavement structure having the desired porosity and impact strength.
The compositestructure 10 of FIG. 1 is fabricated by first preparing a mixture of the aggregate particles of at least l/ 16-inch mesh preferably free of fines, and a settableresinous binder in the liquid state; the two ingredients are mixed in a ratio, by volume, of about 2 to about 4 parts'aggregate particles to 1 part binder. The aggregate particles and binder are mixed until the particles are uniformly coated or wetted with the binder.
The top surface of the base element 11 is precleaned and roughened by sandblasting, wire brushing, acid washing, and the like to remove dirt, loose material, oil, grease and the like. The surface is then coated with a layer of a settable resinous binder in the fluid state. The selection of appropriate settable resin binder will depend upon the nature of the substrate surface and the ambient temperatures under which the surface is to be employed. The mixture of the aggregate particles and binder, is then applied to the'base 11 and compacted to insure maximum bonding to the top surface of the base and between the aggregate particles. The mixture can then be allowed to set to form the first porous layer 13 of the superstrata portion 12.
The second porous layer 14 is fabricated by preparing a mixture of scoria and/or slag particles of at least l/l6-inch mesh, preferably free of fines,and the settable resinous binder in the liquid state employing, by volume, about 2 to'about 4 parts scoria and/or slag to 1 part binder. The particles of scoria and/or slag and the binder are mixed or tumbled to insure that each particle is uniformly coated or wetted with the binder. The mixture is then applied to the top of the first porous layer 13 and compacted to insure maximum bonding to the top surface of the first layer 13 and between the scoria and/or slag particles 19. This mixture is rolled or tamped before it sets to make the top surface planar and substantially horizontal. The mixture is then allowed to set to form the second porous layer 14. The mixture of scoria and/or slag particles and binder can be applied to the first porous layer before or after it has set; normally after the first layer has set.
The resulting first porous layer 13 and the resulting second porous layer 14 will each have a porosity of at least percent, preferably at least percent, and an impact strength of at least 1,000 pounds per square inch, preferably at least 2,000 pounds per square inch.
Another method of fabricating the composite structure of the present invention includes the step of applying a layer of a fluid adhesive bonding agent to the top surface of the base 11. The selection of an appropriate bonding agent will depend upon the nature of the substrate surface and the ambient conditions under which the surface is to be employed. In some instances the solution of adhesive material will solidify by evaporation of a solvent carrier. Likewise, it is possible to employ bonding agents which can be applied in molten condition and which solidify on cooling; however, it is generally preferred to employ a settable resinous binder with a catalyzed setting tie as described above. Solvent solutions such as asphaltic, coal tar, or other resinous materials exemplify the first-mentioned type of adhesive bonding agents. Aqueous emulsions and dispersions of adhesive bonding agents of a similar character could be employed likewise. Molten asphalts, coal tar, resins and synthetic resins exemplify the second type of bonding adhesive. While the fluid adhesive bonding agent is still in the fluid state, a layer of aggregate particles, free of fines and of uniform size, are preferably applied to the treated surface of the base. Generally the aggregate is applied with rolling action of troweling to assure that lower surfaces of the aggregate particles are thoroughly wetted by the liquid adhesive bonding agent and are embedded partially therein. Surfaces such as pathways and roofs to which only a thin covering is to be applied, mesh sizes of one-sixteenth and one-eighth inch or larger may be employed. in the event that the composite structure is to be used for vehicular or aircraft traffic, such as trucks and airplanes, aggregate of one-eighth, one-fourth, threeeighths, and one-half inch or larger mesh sizes are employed. Ordinarily, the bonding agent is then allowed to set. The mixture of aggregate particles and resin is then applied to the pretreated upper surface of the solid substrate base in the manner described above.
When the composite structures of this invention are being constructed on a new or fresh concrete base 11, aggregate particles, free of fines, and of uniform size, may be partially embedded in the top surface of the concrete base while the concrete is soft and fresh to provide an alternative bonding layer. After the concrete is set, the top surface of the base 11, which is covered with embedded aggregate particles, is covered with a layer of settable resinous binder to which is applied prior to setting the aggregate particles and binder mixture employed in the fabrication of the first porous layer l3.
in a preferred embodiment of the present invention where the top surface of the base 11 is sloped, the first porous layer is laid in such a manner that its top surface is substantially horizontal and the second porous layer is laid in a relatively thin layer such that its top surface is planar and substantially horizontal. In this preferred embodiment the second porous layer has a thickness of at least one-fourth inch and preferably at least one-half inch, whereas the first porous layer has a thickness of at least 2 inches.
In order to insure rapid draining and prevent backup, the composite structure is constructed with one or more drainage conduits between the phase of the solid substrate base and the first porous layer; the drainage conduits preferably run the length of the base section and perpendicular to the gradient of the base section. The conduits are slotted by a plurality of holes in their upper surfaces, and can be made of metal, brick clay, stone, or plastic material. In an alternative embodiment of the present invention (not shown) the drainage conduit can be a slit trench constructed in the base section, the drainage conduit can be a conduit foraminous about its entire circumference which is merely laid on top of the base 11, and surrounded by the first porous layer.
Although not shown in the drawing, the present composite structure can be constructed with heating elements near the upper surface of the superstratum portion. The use of such heating elements will prevent ice formation in the channels 18 and 21 of the composite structure and will insure adequate drainage during freezing weather. The heating elements can be conduits through which steam or hot water is circulated, or they can be waterproofed electrical heating elements.
The drainage conduit 11a (FIG. 1) not only can be utilized for drainage, but it can also be utilized for back-flushing; i.e., water can be pumped through the drainage conduit under pressure to force water up through the channels 18 and 21 of the porous superstratum and out through the top surface of the composite structure to remove dirt, rubber, and other particles from the channels.
EXAMPLE I A concrete runway substrate runway base having a lateral gradient of 2 is coated with a settable resinous binder of the following formula:
Phenyl glycidyl ether 5 Fluid thiokol (plasticizer) l0 Immediately after application of the binder, a mixture of crushed white rock (50 percent /i-lnCh mesh, 30 percent -inch mesh, and 20 percent l/16-inch mesh) and the settable resinous binder of the above formula (221 parts by weight rock to 31 parts by weight binder; i.e., about 3.5 parts by volume rock to 1 part by volume binder) are applied to the base at a thickness no less than 6 inches. The mixture of rock and binder are rolled to form a substantially horizontal upper surface; the mixture is then allowed to set to form the first porous layer having a porosity of 19 percent. After the 9 above mixture has set, a mixture of slag (50 percent V4- inch mesh, 30 percent fit-inch mesh, and 20 percent l/ l 6-inch mesh) and the settable resinous binder of the above formula (255 parts by weight slag to 34 parts by weight binder; i.e., about 3.75 parts by volume slag to 1 part by volume binder) is applied to the first porous layer to a depth of 1 inch. The mixture of slag and binder is rolled to form a substantially horizontal surface; themixture is then allowed to set to form the upper porous layer having an approximate porosity of 23.7 percent. 1
The finished composite structure has excellent frictional anddrainage qualities which are ideal for runway surfaces.
- The present frictional self-draining pavement structure is particularly valuable for 'the prevention of hydroplaning of wheeled vehicles, including airplanes. Hydroplaning can take place when a pavement surface is covered with a thin layer, such as one-sixteenth inch or less, of water and the wheeled vehicle is traveling at speedsgreater. than 30 miles per hour, depending on vehicle weight. When hydroplaning, the wheels of the vehicle lose contact with the pavement surface which inhibits or prevents effective steering, guidance and stopping of the vehicle. Hydroplaning is a very serious problem on rainy days with respect to high-speed highway driving and airplane landings. The crowning of roadsor runways does not circumvent'this problem Component Parts Liquid resin 1010 (Shell Chem. Co.) I00 Hardener Type U (Shell Chem. Co.) Plasticizer (dimethylcyclohexyl phthalate) 2 EXAMPLE 2 A used crowned concrete freeway surface having a lateral gradient of3 percent is sandblasted to remove loose material and acid treated to remove oil, gums and rubber. The surface is then sprayed with an asphalt emulsion. A single layer of iii-inch mesh river gravel is rolled on the asphalt treated surface; the surface is sprayed again with the asphalt emulsion. After the asphalt emulsion has solidified, a mixture of rivergravel (l/ 16-inch to A-inch mesh) and a liquid settable resin of the following formula:
Component Amounts Fluid resin (Applied Plastics Co., #2l0)" 6 parts by weight I part by weight Hardener (Applied Plastics Co..
' #180) Plasticizer (General Mills Corp., I25) [0% by volume of fluid resin and hardener Binder parts by weight gravel to 36 parts by weight binder; i.e., 24 parts by volume gravel to 1 part by volume binder) is applied to the asphalt treated freeway surface at depth no less than 4 inches to form the first porous layer; the first layer is rolled to form a substantially horizontal surface and allowed to set to form a layer with a porosity of about 20 percent. After the first porous layer has set, a mixture of scoria (50 percent 56-inch mesh, 30 percent ia-inch mesh, and 20 percent one-sixteenth inch mesh) and liquid binder of the above formula (about 2 parts by weight scoria to 1 part by weight binder, i.e., about 2.6 parts by volume scoria to 1 part binder) is applied over the layer to a depth of about 1 inch to form the second porous layer. The second layer is rolled toform ,a substantially horizontal layer and allowed to set to form a layer with a porosity of about 24 percent. I r
v The resulting roadway is durable and has excellent frictional anddrainage characteristics.
A pavement surface having properties and characteristics similar to the above-described pavement surface is prepared by employing the liquid settable resin of the following formula in place of the abovedescribed resin:
Component Parts Liquid resin: Epotuf 37.130
(Reichold Chem. Co.) I00 Hardener: Epotuf 37-623 (Reichold Chem. Co.) 7.5 Plasticizer: Kesscoflex BCP (Kessler Chem. Co.) 2.5
EXAMPLE 3 Component Amount Fluid resin (Applied Plastics Co.,
210) 4 parts by weight Hardener (Applied Plastics Co.,
1 part by weight Plasticizer (General Mills Corp.,
# I25) 3% by volume of fluid resin and hardener EXAMPLE 4 A substrate of freshly poured and rough-finish concrete having a 4 percent sloped surface is covered with a thin layer of slag aggregate of 56-inch to l-inch screen size; the surface is then rolled to imbed the particles about halfway into the concrete. After the concrete has set, a mixture of the fluid epoxy resin of the following formula:
is sprayed over the aggregate layer. Before the resin has set, a mixture of slag aggregate (k-inch to l-inch mesh) and the fluid epoxy resin of the above formula (3.5 parts by volume slag to 1 part by volume resin) is applied to the cement base to a depth of 12 inches. The mixture is rolled to form a substantially horizontal surface and then allowed to set to formthe first porous layer. A mixture of scoria (A-inch to l/l6-inch mesh) and the fluid epoxy resin of the above formula (3.75 parts by volume scoria to 1 part by volume resin) is spread over the first porous layer to a depth of about 1 inch. The'material was tamped and rolled to form a substantially horizontal surface which has excellent frictional qualities and drainage qualities.
In the same manner old concrete roadways or runways can be resurfaced; however, the old surface should be pretreated first by sandblasting or abrading mechanically an acid washing the surface to remove dirt, gums, rubbers and other oxidized materials therefrom.
EXAMPLE An upper surface of an aluminum foraminous structural panel is cleaned with detergent and water and allowed to dry. The surface is then cleaned with a petroleum spirit to remove grease, oil and gums. The surface is then sandblasted and wire-brushed to remove all loose material and prepare a clean metal uncovered surface. A catalyzed setting adhesive resin of a phenolic epoxy or silicon-type having a viscosity of about 400 to 5,000 centipoises is applied as a coating to the cleaned surface. Dry scoria aggregate (%-inch to inch mesh) is applied to the treated surface before the resin has been allowed to set. A dough-like mixture of crushed light quartz (A-inch mesh) and a catalyzed setting adhesive resin of the phenolic epoxy or silicontype (about 3.5 parts by volume rock to 1 part resin) is applied to a depth of 2 inches over the metal substrate. The material is rolled to form a substantially horizontal surface and allowed to set to form the first porous layer. A dough-like mixture of scoria iii-inch mesh and a catalyzed setting adhesive resin of the phenolic epoxy or silicion-type (3 parts by volume scoria to l part by volume resin) is applied to a depth of one-half inch over the first porous layer. The material is tamped, rolled and troweled to form a substantially horizontal layer and then allowed to set to approximately 24 hours to form a highly frictional lightweight surfacing material. This surfacing is ideally suited for marine decking, traffic decking for bridges, and for a lightweight highly insulative roofing material.
EXAMPLE 6 A substrate of freshly poured and rough-finish concrete having a 5 percent sloped surface is covered with a thin layer of an :20 mixture of slag:score aggregate of %-inch to l-inch screen size; the surface is then rolled to imbed the particles about halfway into the concrete. After the concrete has set, a mixture of the fluid epoxy resin of the following formula:
Component Parts Liquid resin: Epi-rex 510 (Celanese) I00 Hardener: Epicure 872 (Celanese) 5 Plasticizer: dioctylphthalate 5 is brushed over the aggregate layer. Before the resin has set, a mixture of 50:50 granitezslag aggregate sainch to l-inch mesh) and the fluid epoxy resin of the above formula (3.0 parts by volume of the aggregate mixture to 1 part by volume resin) is applied to the cement base to a depth of 12 inches. The mixture is rolled to form a substantially horizontal surface and then allowed to set to form the first porous layer. A 60:40 mixture of slagzscoria (A-inch to l/ 16-inch mesh) and the fluid epoxy resin of the above formula (3.75 parts by volume of the slagzscoria mixture to 1 part by volume resin) is spread over the first porous layer to a depth of about 2 inches. The material was tamped and rolled to form a substantially horizontal surface which has excellent frictional qualities and drainage qualities.
in the same manner old concrete roadways or runways can be resurfaced; however, the old surface should be pretreated first by sandblasting or abrading mechanically an acid washing to remove dirt, gums, rubbers and other oxidized materials therefrom.
Although the above examples have illustrated the composite structure of the present invention in runway, highway bridge decking, and roofing applications, it is not contemplated that the present invention be limited to such uses.
Iclaim:
l. A high strength, frictional, in situ self-draining structure, comprising:
a solid imperforate and substantially impervious substrate base having a top surface adapted for the collection and channeling of liquid to a drain; and
a superstratum layer porous throughout its depth and bonded to said base for the drainage of fluid from the top surface of said base, consisting of aggregate particles of greater size than l/l6-inch rnesh bonded together with a resinous binder which is present in an amount insufficient to fill the voids between aggregate particles and, having about 2 to about 4 parts by volume of said aggregate particles and 1 part by volume of said binder to give said layer a porosity of at least 10 percent and to give said layer an impact strength of at least l,000 pounds per square inch.
2. The high strength, frictional, in situ self-draining composite structure defined in claim 1 wherein the aggregate particles of the superstratum layer are selected from the group particles of crushed scoria, rock, river gravel, crushed coral, coarse sand, slag, and crushed refractory material.
3. The high strength, frictional, in situ self-draining composite structure defined in claim 1 wherein the drain is 'at the base of the sloped upper surface of said base.
4. The high strength, frictional, in situ self-draining composite structure defined in claim 3 wherein the drain is a drainage conduit which is partially embedded in the top surface of said base, the top portion of said drain conduit being perforated with a plurality of holes.
5. The high strength, frictional, in situ self-draining composite structure defined in claim 1 including heating means below the top surface of the porous superstratum layer.
6. A high strength, frictional, in situ self-draining composite structure comprising:
a solid imperforate and substantially impervious substrate base having a top surface for the collection and channeling of liquid to a drain and a superstratum porous throughout its depth and bonded to said base, said superstratum having a first porous layer bonded to said base and a second porous layer contiguous with and bonded to said first porous layer, said first porous layer consisting of aggregate particles of greater size than 1/16 inch mesh bonded together with a settable resinous binder which is present in an amount insufficient to fill the voids between aggregate particles, said first porous layer having about 2 to about 4 parts by volume of said aggregate particles and 1 part by volume of said settable resinous binder to give said layer a porosity of at least 10 percent and to give said layer an impact strength of at least 1,000 pounds per square inch, said second porous layer consisting of scoria and/or slag particles of greater size than l/l6-inch mesh bonded together with a settable resinous binder which binder serves to bond said first layer to said second layer and which is present in an amount insufficient to fill the voids between aggregate particles, said second porous layer having about 2 to about 4 parts by volume of said scoria and/or slag particles and 1 part by volume of said settable resinous binder to give said layer a porosity of at least 10 percent and to give said layer 'an impact strength of at least 1,000 pounds per square inch.
7. The high strength,'frictional, in situ self-draining composite structure defined in claim 6 wherein said second porous layer is at least one-half inch thick.

Claims (6)

  1. 2. The high strength, frictional, in situ self-draining composite structure defined in claim 1 wherein the aggregate particles of the superstratum layer are selected from the group particles of crushed scoria, rock, river gravel, crushed coral, coarse sand, slag, and crushed refractory material.
  2. 3. The high strength, frictional, in situ self-draining composite structure defined in claim 1 wherein the drain is at the base of the sloped upper surface of said base.
  3. 4. The high strength, frictional, in situ self-draining composite structure defined in claim 3 wherein the drain is a drainage conduit which is partially embedded in the top surface of said base, the top portion of said drain conduit being perforated with a plurality of holes.
  4. 5. The high strength, frictional, in situ self-draining composite structure defined in claim 1 including heating means below the top surface of the porous superstratum layer.
  5. 6. A high strength, frictional, in situ self-draining composite structure comprising: a solid imperforate and substantially impervious substrate base having a top surface for the collection and channeling of liquid to a drain and a superstratum porous throughout its depth and bonded to said base, said superstratum having a first porous layer bonded to said base and a second porous layer contiguous with and bonded to said first porous layer, said first porous layer consisting of aggregate particles of greater size than 1/16-inch mesh bonded together with a settable resinous binder which is present in an amount insufficient to fill the voids between aggregate particles, said first porous layer having about 2 to about 4 parts by volume of said aggregate particles and 1 part by volume of said settable resinous binder to give said layer a porosity of at least 10 percent and to give said layer an impact strength of at least 1,000 pounds per square inch, said second porous layer consisting of scoria and/or slag particles of greater size than 1/16-inch mesh bonded together with a settable resinous binder which binder serves to bond said first layer to said second layer and which is present in an amount insufficient to fill the voids between aggregate particles, said second porous layer having about 2 to about 4 parts by volume of said scoria and/or slag particles and 1 part by volume of said settable resinous binder to give said layer a porosity of at least 10 percent and to give said layer an impact strength of at least 1,000 pounds per square inch.
  6. 7. The high strength, frictional, in situ self-draining composite structure defined in claim 6 wherein said second porous layer is at least one-half inch thick.
US54780A 1970-07-14 1970-07-14 Frictional self-draining structure Expired - Lifetime US3690227A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US5478070A 1970-07-14 1970-07-14

Publications (1)

Publication Number Publication Date
US3690227A true US3690227A (en) 1972-09-12

Family

ID=21993495

Family Applications (1)

Application Number Title Priority Date Filing Date
US54780A Expired - Lifetime US3690227A (en) 1970-07-14 1970-07-14 Frictional self-draining structure

Country Status (1)

Country Link
US (1) US3690227A (en)

Cited By (44)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2434909A1 (en) * 1978-09-01 1980-03-28 Southern Chemicals Ltd Thermal insulating flat roof construction - has polystyrene insulation and drainage panels laid on the sealed roof surface
US4237152A (en) * 1972-11-29 1980-12-02 Domingos Loricchio Process for improving the resistance of asphalt pavement surfaces to corrosion, deterioration and disintegration
US4376595A (en) * 1980-08-08 1983-03-15 Arthur Shaw Monolithic water-permeable concrete roadway and related large area structures with integral drainage elements
US4396312A (en) * 1979-05-09 1983-08-02 Ifm Akustikbyran Ab Road surfacing and method for manufacturing such road surfacing
US4398842A (en) * 1980-12-29 1983-08-16 Harry Hodson Method of overlay and sandwich formation of pervious concrete
US4453844A (en) * 1980-08-08 1984-06-12 Arthur Shaw Monolithic water-permeable concrete roadway and related large area structures with integral drainage elements
US4515839A (en) * 1983-10-31 1985-05-07 Monsanto Company Permeable asphaltic concrete base for artificial turf
FR2643399A1 (en) * 1989-02-23 1990-08-24 Colas Sa METHOD FOR OBTAINING A COMPOSITE SEALING STRUCTURE FOR ART WORK APRONS AND CORRESPONDING STRUCTURE
EP0398023A1 (en) * 1989-05-18 1990-11-22 HMW FUGENTECHNIK-VERTRIEB Marianne Reher-Wedi Drainage element in panel form for installation under moisture loaded floors
US5114475A (en) * 1989-10-13 1992-05-19 Mannesmann Aktiengesellschaft Method for the preparation of a fine-grained mixture having hydrophobic properties
US5505987A (en) * 1989-10-10 1996-04-09 Jennings; Hamlin M. Processes for improving the bond between hydrating cement-based materials and existing cement-based substrates
US5695811A (en) * 1989-10-10 1997-12-09 E. Khashoggi Industries Methods and compositions for bonding a cement-based overlay on a cement-based substrate
WO1998001630A1 (en) * 1996-07-05 1998-01-15 Bilfinger + Berger Bauaktiengesellschaft Capillary barrier for sealing external surfaces
WO1999053142A1 (en) * 1998-04-10 1999-10-21 Autostrade - Concessioni E Costruzioni Autostrade S.P.A. Ecotechnical cooperating separation layer for a pavement and its manufacturing process
WO2000024984A1 (en) * 1998-10-27 2000-05-04 Ooms Avenhorn Holding B.V. Method for applying a protective layer on a hard underlayer, and protective layer used therefor
EP1067241A2 (en) * 1999-07-05 2001-01-10 Max Aicher Recycling GmbH Basin construction for catchment of a traffic road
US6187428B1 (en) 1997-12-30 2001-02-13 Colas S.A. Wheel rut-resistant carriageway and process for obtaining such a carriageway
US6468942B1 (en) 2000-11-16 2002-10-22 John J. Sansalone Absorptive-filtration media for the capture of waterborne or airborne constituents
US6505996B1 (en) * 2000-02-10 2003-01-14 Tenax Corporation Drainage system with unitary void-maintaining geosynthetic structure and method for constructing system
KR20030026642A (en) * 2001-09-26 2003-04-03 이관호 a
KR20030026643A (en) * 2001-09-26 2003-04-03 이관호 a
US20050000583A1 (en) * 2003-02-26 2005-01-06 Hiroyuki Masui Drainpipe for water-dischargeable pavement and water-dischargeable pavement body
US20050047866A1 (en) * 2003-09-02 2005-03-03 Chen Jui Wen Construction of environmental and water-permeable paving
US20060032807A1 (en) * 2000-11-16 2006-02-16 Sansalone John J Clarification and sorptive-filtration system for the capture of constituents and particulate matter in liquids and gases
US20060046511A1 (en) * 2002-06-28 2006-03-02 Masatomo Shibata Porous substrate and its manufacturing method, and gan semiconductor multilayer substrate and its manufacturing method
US20070223998A1 (en) * 2004-02-07 2007-09-27 Terraelast Ag Water-Permeable Paving and Method for Producing a Paving
US20080292865A1 (en) * 2005-12-20 2008-11-27 Frank Edward Ball Base For a Playing Field
US20090067924A1 (en) * 2007-09-07 2009-03-12 Kaul Corporation Hydrocarbon-adsorbing porous pavement structure
US20090067925A1 (en) * 2007-09-07 2009-03-12 Kaul Corporation Hydrocarbon-adsorbing porous pavement structure
WO2011113956A3 (en) * 2010-03-19 2011-11-24 Ignucell Ab Insulating and draining board
US20120237296A1 (en) * 2011-03-19 2012-09-20 Gerald Lynn Lemons System and method for golf course cart path construction
US20120269573A1 (en) * 2011-04-19 2012-10-25 Bass America Systems, LLC Systems and Methods for Diverting Sub-surface Water
US20120321390A1 (en) * 2009-06-25 2012-12-20 Chesney Orme Materials
NL1039592C2 (en) * 2012-05-10 2013-11-12 Amazone Holding B V ROAD CONSTRUCTION.
US8710135B2 (en) 2009-12-21 2014-04-29 Basf Se Composite materials comprising aggregate and an elastomeric composition
CN104562890A (en) * 2014-12-25 2015-04-29 北京仁创生态环保科技有限公司 Water-permeable silica sand road shoulder
CN105625133A (en) * 2016-03-14 2016-06-01 合肥工业大学 Dust-removal drainage macropore asphalt pavement comprising graded crushed stone composite layer
US9464003B2 (en) 2009-06-24 2016-10-11 Basf Se Method of producing a composite material using a mixing system
US9856363B2 (en) 2010-12-29 2018-01-02 Basf Se Colored composite pavement structure
WO2018068095A1 (en) * 2016-10-13 2018-04-19 Infrastructure Management Services Pty Ltd Drainage system
US10319358B2 (en) * 2015-09-11 2019-06-11 Nam Kyun IM Road noise reduction apparatus and installation method therefor
CN109881547A (en) * 2019-01-29 2019-06-14 同济大学 Airfield pavement settlement of subgrade control structure and construction technology are worn under high-speed rail tunnel
CN110004788A (en) * 2019-03-28 2019-07-12 河海大学 A kind of drainage asphalt paving structure slowing down pore plugging
WO2024039409A1 (en) * 2022-08-15 2024-02-22 Ut-Battelle, Llc Methods of plastic recycling using highly efficient organocatalysts

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1484514A (en) * 1921-10-21 1924-02-19 Lloyd Henry Gardiner Floor or paving for tennis courts and other purposes
US2039450A (en) * 1931-04-10 1936-05-05 American Tar Products Co Inc Method of treating road surfaces
US2185341A (en) * 1936-12-28 1940-01-02 Frederick R Paulsen Paving
US2925831A (en) * 1956-07-09 1960-02-23 Rock Fabricates And Mining Cor Fabrication of composite surfaces and structures
US2948201A (en) * 1960-03-09 1960-08-09 Reliance Steel Prod Co Pavement and method of producing the same
US3112681A (en) * 1959-08-03 1963-12-03 Exxon Research Engineering Co Paving with polymer-bonded aggregates
US3334555A (en) * 1964-04-29 1967-08-08 Reliance Steel Prod Co Paving utilizing epoxy resin
US3396641A (en) * 1964-12-16 1968-08-13 Welty Fabrication of slag surfaces and structures

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1484514A (en) * 1921-10-21 1924-02-19 Lloyd Henry Gardiner Floor or paving for tennis courts and other purposes
US2039450A (en) * 1931-04-10 1936-05-05 American Tar Products Co Inc Method of treating road surfaces
US2185341A (en) * 1936-12-28 1940-01-02 Frederick R Paulsen Paving
US2925831A (en) * 1956-07-09 1960-02-23 Rock Fabricates And Mining Cor Fabrication of composite surfaces and structures
US3112681A (en) * 1959-08-03 1963-12-03 Exxon Research Engineering Co Paving with polymer-bonded aggregates
US2948201A (en) * 1960-03-09 1960-08-09 Reliance Steel Prod Co Pavement and method of producing the same
US3334555A (en) * 1964-04-29 1967-08-08 Reliance Steel Prod Co Paving utilizing epoxy resin
US3396641A (en) * 1964-12-16 1968-08-13 Welty Fabrication of slag surfaces and structures

Cited By (72)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4237152A (en) * 1972-11-29 1980-12-02 Domingos Loricchio Process for improving the resistance of asphalt pavement surfaces to corrosion, deterioration and disintegration
FR2434909A1 (en) * 1978-09-01 1980-03-28 Southern Chemicals Ltd Thermal insulating flat roof construction - has polystyrene insulation and drainage panels laid on the sealed roof surface
US4396312A (en) * 1979-05-09 1983-08-02 Ifm Akustikbyran Ab Road surfacing and method for manufacturing such road surfacing
US4376595A (en) * 1980-08-08 1983-03-15 Arthur Shaw Monolithic water-permeable concrete roadway and related large area structures with integral drainage elements
US4453844A (en) * 1980-08-08 1984-06-12 Arthur Shaw Monolithic water-permeable concrete roadway and related large area structures with integral drainage elements
US4398842A (en) * 1980-12-29 1983-08-16 Harry Hodson Method of overlay and sandwich formation of pervious concrete
US4515839A (en) * 1983-10-31 1985-05-07 Monsanto Company Permeable asphaltic concrete base for artificial turf
EP0384840A1 (en) * 1989-02-23 1990-08-29 Colas S.A. Process for producing a composite seal structure for a bridge deck, and such a structure
US5024552A (en) * 1989-02-23 1991-06-18 Colas S.A. Method of obtaining a composite sealing structure for permanent roadways
FR2643399A1 (en) * 1989-02-23 1990-08-24 Colas Sa METHOD FOR OBTAINING A COMPOSITE SEALING STRUCTURE FOR ART WORK APRONS AND CORRESPONDING STRUCTURE
EP0398023A1 (en) * 1989-05-18 1990-11-22 HMW FUGENTECHNIK-VERTRIEB Marianne Reher-Wedi Drainage element in panel form for installation under moisture loaded floors
US5505987A (en) * 1989-10-10 1996-04-09 Jennings; Hamlin M. Processes for improving the bond between hydrating cement-based materials and existing cement-based substrates
US5695811A (en) * 1989-10-10 1997-12-09 E. Khashoggi Industries Methods and compositions for bonding a cement-based overlay on a cement-based substrate
US5114475A (en) * 1989-10-13 1992-05-19 Mannesmann Aktiengesellschaft Method for the preparation of a fine-grained mixture having hydrophobic properties
WO1998001630A1 (en) * 1996-07-05 1998-01-15 Bilfinger + Berger Bauaktiengesellschaft Capillary barrier for sealing external surfaces
US6187428B1 (en) 1997-12-30 2001-02-13 Colas S.A. Wheel rut-resistant carriageway and process for obtaining such a carriageway
US6379079B1 (en) 1998-04-10 2002-04-30 Autostrade Concessionie Costruzioni Autostrade S.P.A. Ecotechnical cooperating separation layer for a pavement and its manufacturing process
WO1999053142A1 (en) * 1998-04-10 1999-10-21 Autostrade - Concessioni E Costruzioni Autostrade S.P.A. Ecotechnical cooperating separation layer for a pavement and its manufacturing process
AU751459B2 (en) * 1998-04-10 2002-08-15 Atlantia S.P.A. Ecotechnical cooperating separation layer for a pavement and its manufacturing process
WO2000024984A1 (en) * 1998-10-27 2000-05-04 Ooms Avenhorn Holding B.V. Method for applying a protective layer on a hard underlayer, and protective layer used therefor
EP1067241A3 (en) * 1999-07-05 2001-03-14 Max Aicher Recycling GmbH Basin construction for catchment of a traffic road
EP1067241A2 (en) * 1999-07-05 2001-01-10 Max Aicher Recycling GmbH Basin construction for catchment of a traffic road
US6505996B1 (en) * 2000-02-10 2003-01-14 Tenax Corporation Drainage system with unitary void-maintaining geosynthetic structure and method for constructing system
US20040208697A1 (en) * 2000-11-16 2004-10-21 Sansalone John J. Adsorptive-filtration media for the capture of waterborne or airborne constituents
US7341661B2 (en) 2000-11-16 2008-03-11 Unit Process Technologies, L.L.C. Clarification and sorptive-filtration system for the capture of constituents and particulate matter in liquids and gases
US6767160B2 (en) * 2000-11-16 2004-07-27 John J. Sansalone Porous pavement for water quantity and quality management
US6468942B1 (en) 2000-11-16 2002-10-22 John J. Sansalone Absorptive-filtration media for the capture of waterborne or airborne constituents
US7524422B2 (en) 2000-11-16 2009-04-28 Unit Process Technologies, Llc Clarification and sorptive-filtration system for the capture of constituents and particulate matter in liquids and gases
US20090238646A1 (en) * 2000-11-16 2009-09-24 Sansalone John J Porous Pavement for Water Quality and Quantity Management
US8162562B2 (en) 2000-11-16 2012-04-24 Unit Process Technologies, Llc Method of constructing a filtering pavement surface
US20060032807A1 (en) * 2000-11-16 2006-02-16 Sansalone John J Clarification and sorptive-filtration system for the capture of constituents and particulate matter in liquids and gases
US7575393B2 (en) 2000-11-16 2009-08-18 Unit Process Technologies, Llc Cementitious porous pavement
US20080023383A1 (en) * 2000-11-16 2008-01-31 Sansalone John J Clarification and Sorptive-Filtration System for the Capture of Constituents and Particulate Matter in Liquids and Gases
KR20030026643A (en) * 2001-09-26 2003-04-03 이관호 a
KR20030026642A (en) * 2001-09-26 2003-04-03 이관호 a
US20060046511A1 (en) * 2002-06-28 2006-03-02 Masatomo Shibata Porous substrate and its manufacturing method, and gan semiconductor multilayer substrate and its manufacturing method
US20050000583A1 (en) * 2003-02-26 2005-01-06 Hiroyuki Masui Drainpipe for water-dischargeable pavement and water-dischargeable pavement body
US6962463B2 (en) * 2003-09-02 2005-11-08 Jui Wen Chen Construction of environmental and water-permeable paving
US20050047866A1 (en) * 2003-09-02 2005-03-03 Chen Jui Wen Construction of environmental and water-permeable paving
US20070223998A1 (en) * 2004-02-07 2007-09-27 Terraelast Ag Water-Permeable Paving and Method for Producing a Paving
US20080292865A1 (en) * 2005-12-20 2008-11-27 Frank Edward Ball Base For a Playing Field
US20100093454A1 (en) * 2005-12-20 2010-04-15 Greengauge Pty Ltd Base for a playing field
US20090067925A1 (en) * 2007-09-07 2009-03-12 Kaul Corporation Hydrocarbon-adsorbing porous pavement structure
US8025456B2 (en) * 2007-09-07 2011-09-27 Reynolds Consumer Products, Inc. Hydrocarbon-adsorbing porous pavement structure
US8137024B2 (en) 2007-09-07 2012-03-20 Reynolds Presto Products Inc. Hydrocarbon-adsorbing porous pavement structure
US8142101B2 (en) * 2007-09-07 2012-03-27 Reynolds Presto Products Inc. Hydrocarbon-adsorbing porous pavement structure
US20090067924A1 (en) * 2007-09-07 2009-03-12 Kaul Corporation Hydrocarbon-adsorbing porous pavement structure
US10040721B2 (en) 2009-06-24 2018-08-07 Basf Se Method of producing a composite material using a mixing system
US9896381B2 (en) 2009-06-24 2018-02-20 Basf Se Method of producing a composite material using a mixing system
US9464003B2 (en) 2009-06-24 2016-10-11 Basf Se Method of producing a composite material using a mixing system
US9163364B2 (en) * 2009-06-25 2015-10-20 Sudscape Technologies Limited Materials
US20120321390A1 (en) * 2009-06-25 2012-12-20 Chesney Orme Materials
US8710135B2 (en) 2009-12-21 2014-04-29 Basf Se Composite materials comprising aggregate and an elastomeric composition
US10480128B2 (en) 2009-12-21 2019-11-19 Basf Se Composite pavement structures
US10253460B2 (en) 2009-12-21 2019-04-09 Basf Se Composite pavement structure
US9505931B2 (en) 2009-12-21 2016-11-29 Basf Se Composite pavement structure
US9631088B2 (en) 2009-12-21 2017-04-25 Basf Se Composite pavement structures
US9850625B2 (en) 2009-12-21 2017-12-26 Basf Se Composite pavement structures
WO2011113956A3 (en) * 2010-03-19 2011-11-24 Ignucell Ab Insulating and draining board
US9856363B2 (en) 2010-12-29 2018-01-02 Basf Se Colored composite pavement structure
US20120237296A1 (en) * 2011-03-19 2012-09-20 Gerald Lynn Lemons System and method for golf course cart path construction
US8870491B2 (en) * 2011-03-19 2014-10-28 Gerald Lynn Lemons System and method for golf course cart path construction
US20120269573A1 (en) * 2011-04-19 2012-10-25 Bass America Systems, LLC Systems and Methods for Diverting Sub-surface Water
NL1039592C2 (en) * 2012-05-10 2013-11-12 Amazone Holding B V ROAD CONSTRUCTION.
CN104562890A (en) * 2014-12-25 2015-04-29 北京仁创生态环保科技有限公司 Water-permeable silica sand road shoulder
US10319358B2 (en) * 2015-09-11 2019-06-11 Nam Kyun IM Road noise reduction apparatus and installation method therefor
CN105625133A (en) * 2016-03-14 2016-06-01 合肥工业大学 Dust-removal drainage macropore asphalt pavement comprising graded crushed stone composite layer
WO2018068095A1 (en) * 2016-10-13 2018-04-19 Infrastructure Management Services Pty Ltd Drainage system
CN109881547A (en) * 2019-01-29 2019-06-14 同济大学 Airfield pavement settlement of subgrade control structure and construction technology are worn under high-speed rail tunnel
CN109881547B (en) * 2019-01-29 2021-04-27 同济大学 Uneven settlement control structure of roadbed of airport pavement passing under high-speed railway tunnel and construction process
CN110004788A (en) * 2019-03-28 2019-07-12 河海大学 A kind of drainage asphalt paving structure slowing down pore plugging
WO2024039409A1 (en) * 2022-08-15 2024-02-22 Ut-Battelle, Llc Methods of plastic recycling using highly efficient organocatalysts

Similar Documents

Publication Publication Date Title
US3690227A (en) Frictional self-draining structure
US3171335A (en) Pavements and method of making the same
US20070223998A1 (en) Water-Permeable Paving and Method for Producing a Paving
US2948201A (en) Pavement and method of producing the same
US3732791A (en) Pavement and railroad bed construction with light concrete sub-layer
CH569151A5 (en) High friction self-draining structure - having solid base layer and resin bonded particulate upper layer
US4118137A (en) Pavement and process of providing the same
JP3196038B2 (en) Road pavement method
US20060127572A1 (en) Method for producing a bituminous mix, in particular by cold process, and bituminous mix obtained by said method
US3396641A (en) Fabrication of slag surfaces and structures
US3797951A (en) Wearing courses of stone and mastic on pavements
US10654751B2 (en) Polymer modified cement adhesive for providing high friction surfacing
JP2916715B2 (en) Pavement with waterproof layer
CN211340403U (en) Bridge deck asphalt pavement structure capable of actively resisting ice and snow
KR101944925B1 (en) Asphalt paving method of pavement having drainage
JPH06146207A (en) Thawing and freezing prevention pavement of road
CN208136656U (en) A kind of whole-permeable asphalt pavement structure
JPH11247113A (en) Partially draining road pavement structure and construction thereof
JP2854342B2 (en) Paving method
KR100240140B1 (en) Road paving method of color water-permeation concrete
KR100897688B1 (en) Method of Constructing asphalt road by using surface layer paner
US6187428B1 (en) Wheel rut-resistant carriageway and process for obtaining such a carriageway
CN220246592U (en) Novel anti-rut semi-flexible pavement structure
Yao et al. Functional Layer Materials of and Preventive Maintenance Materials of Pavement
EP0795059B1 (en) A method of providing a road surface with an overlay