Method and apparatus for cementing drill strings in place for one pass drilling and completion of oil and gas wells US 7165634 B2 The steel drill string attached to a drilling bit during typical rotary drilling operations used to drill oil and gas wells is used for a second purpose as the casing that is cemented in place during typical oil and gas well completions. Methods of operation are described that provide for the efficient installation a cemented steel cased well wherein the drill string and the drill bit are cemented into place during one single drilling pass down into the earth. The normal mud passages or watercourses present in the rotary drill bit are used for the second independent purpose of passing cement into the annulus between the casing and the well while cementing the drill string into place during one single pass into the earth. A one-way cement valve is installed near the drill bit of the drill string that allows the cement to set up efficiently under ambiently hydrostatic conditions while the drill string and drill bit are cemented into place during one single drilling pass into the earth.
1. A method for forming a wellbore, comprising:
providing a drill string having a casing portion;
drilling the wellbore using the drill string;
locating the casing portion within the wellbore;
pumping a one-way valve down the drill string; and
placing a physically alterable bonding material in an annulus formed between the casing portion and the wellbore.
2. The method of claim 1, wherein placing the physically alterable bonding material in the annulus comprises flowing the bonding material through an earth removal member connected to the drill string.
3. The method of claim 2, further comprising circulating drilling fluid through the earth removal member while locating the casing portion within the wellbore.
4. The method of claim 1, further comprising establishing a hydrostatic pressure condition in the wellbore and allowing the bonding material to physically alter under the hydrostatic pressure condition.
5. The method of claim 4, wherein the bonding material is allowed to physically alter by reducing fluid pressure within the drill string.
6. The method of claim 1, further comprising connecting the one-way valve to the casing portion.
7. The method of claim 1, further comprising connecting an earth removal member to a lower end of the casing portion.
8. The method of claim 7, further comprising positioning the one-way valve above the earth removal member.
9. The method of claim 1, further comprising disposing a first wiper plug in front of the bonding material and a second wiper plug behind the bonding material.
10. The method of claim 9, further comprising landing the first wiper plug on the one-way valve.
11. The method of claim 1, further comprising stabilizing the drill string while drilling the wellbore.
12. The method of claim 1, further comprising maintaining the casing portion in a substantially centralized position in relation to a diameter of the wellbore after locating the casing portion within the wellbore.
13. The method of claim 1, wherein the physically alterable bonding material is cement.
14. The method of claim 1, wherein drilling the wellbore using the drill string comprises drilling with an earth removal member operatively connected to the drill string.
15. The method of claim 14, wherein the earth removal member is connected to the casing portion.
16. The method of claim 15, wherein the earth removal member is connected to a lower end of the casing portion.
17. The method of claim 1, further comprising measuring a geophysical parameter.
18. The method of claim 17, further comprising disposing a first wiper plug in front of the bonding material and a second wiper plug behind the bonding material.
19. The method of claim 18, further comprising landing the first wiper plug on the one-way valve.
20. The method of claim 19, further comprising establishing a hydrostatic pressure condition in the wellbore and allowing the bonding material to physically alter under the hydrostatic pressure condition.
21. The method of claim 20, wherein the bonding material is allowed to physically alter by reducing fluid pressure within the drill string.
22. A method for forming a wellbore, comprising:
providing a drill string having a casing portion;
drilling the wellbore using the drill string;
pumping a valve assembly down the drill string; and
locating the valve assembly in the casing portion.
23. The method of claim 22, wherein locating the valve assembly comprises latching the valve assembly to the casing portion.
24. The method of claim 22, further comprising attaching a drill bit at a lower end of the casing portion.
25. The method of claim 22, further comprising selectively blocking fluid flow through the casing portion.
26. The method of claim 25, wherein selectively blocking fluid flow through the casing portion comprises introducing a wiper plug into the casing portion.
27. The method of claim 22, wherein the valve assembly is pumped down the drill string using a drilling fluid.
28. The method of claim 27, further comprising introducing cement behind the drilling fluid.
29. The method of claim 28, further comprising positioning a wiper plug between the drilling fluid and cement.
30. The method of claim 22, wherein the valve assembly comprises a one-way valve.
31. The method of claim 22, further comprising selectively altering a trajectory of the wellbore.
CROSS-REFERENCE TO RELATED APPLICATIONS Portions of this application were disclosed in U.S. Disclosure Document No. 362582 filed on Sep. 30, 1994, which is incorporated herein by reference.
This application is a continuation of co-pending U.S. patent application Ser. No. 10/162,302, filed on Jun. 4, 2002, which is herein incorporated by reference in its entirety. U.S. patent application Ser. No. 10/162,302 is a continuation-in-part of U.S. patent application Ser. No. 09/487,197 filed on Jan. 19, 2000, now U.S. Pat. No. 6,397,946, which is herein incorporated by reference in its entirety. U.S. Pat. No. 6,397,946 is a continuation-in-part of U.S. patent application Ser. No. 09/295,808 filed on Apr. 20, 1999, now U.S. Pat. No. 6,263,987, which is herein incorporated by reference in its entirety. U.S. Pat. No. 6,263,987 is a continuation-in-part of U.S. patent application Ser. No. 08/708,396 filed on Sep. 3, 1996, now U.S. Pat. No. 5,894,897, which is incorporated herein by reference in its entirety. U.S. Pat. No. 5,894,897 is a continuation-in-part of U.S. patent application Ser. No. 08/323,152 filed on Oct. 14, 1994, now U.S. Pat. No. 5,551,521, which is herein incorporated by reference in its entirety.
This application further claims benefit of U.S. Provisional Patent Application Ser. No. 60/313,654 filed on Aug. 19, 2001, U.S. Provisional Patent Application Ser. No. 60/353,457 filed on Jan. 31, 2002, U.S. Provisional Patent Application Ser. No. 60/367,638 filed on Mar. 26, 2002, and U.S. Provisional Patent Application Ser. No. 60/384,964 filed on Jun. 3, 2002. All of the above United States Provisional Patent Applications are herein incorporated by reference in their entirety.
BACKGROUND OF THE INVENTION 1. Field of Invention
The field of invention relates to apparatus that uses the steel drill string attached to a drilling bit during drilling operations used to drill oil and gas wells for a second purpose as the casing that is cemented in place during typical oil and gas well completions. The field of invention further relates to methods of operation of said apparatus that provides for the efficient installation a cemented steel cased well during one single pass down into the earth of the steel drill string. The field of invention further relates to methods of operation of the apparatus that uses the typical mud passages already present in a typical drill bit, including any watercourses in a “regular bit”, or mud jets in a “jet bit”, that allow mud to circulate during typical drilling operations for the second independent, and the distinctly separate, purpose of passing cement into the annulus between the casing and the well while cementing the drill string into place during one single drilling pass into the earth. The field of invention further relates to apparatus and methods of operation that provides the pumping of cement down the drill string, through the mud passages in the drill bit, and into the annulus between the formation and the drill string for the purpose of cementing the drill string and the drill bit into place during one single drilling pass into the formation. The field of invention further relates to a one-way cement valve and related devices installed near the drill bit of the drill string that allows the cement to set up efficiently while the drill string and drill bit are cemented into place during one single drilling pass into the formation.
2. Description of the Prior Art
From an historical perspective, completing oil and gas wells using rotary drilling techniques has in recent times comprised the following typical steps. With a pile driver or rotary rig, install any necessary conductor pipe on the surface for attachment of the blowout preventer and for mechanical support at the wellhead. Install and cement into place any surface casing necessary to prevent washouts and cave-ins near the surface, and to prevent the contamination of freshwater sands as directed by state and federal regulations. Choose the dimensions of the drill bit to result in the desired sized production well. Begin rotary drilling of the production well with a first drill bit. Simultaneously circulate drilling mud into the well while drilling. Drilling mud is circulated downhole to carry rock chips to the surface, to prevent blowouts, to prevent excessive mud loss into formation, to cool the bit, and to clean the bit. After the first bit wears out, pull the drill string out, change bits, lower the drill string into the well and continue drilling. It should be noted here that each “trip” of the drill bit typically requires many hours of rig time to accomplish the disassembly and reassembly of the drill string, pipe segment by pipe segment.
Drill the production well using a succession of rotary drill bits attached to the drill string until the hole is drilled to its final depth. After the final depth is reached, pull out the drill string and its attached drill bit. Assemble and lower the production casing into the well while back filling each section of casing with mud as it enters the well to overcome the buoyancy effects of the air filled casing (caused by the presence of the float collar valve), to help avoid sticking problems with the casing, and to prevent the possible collapse of the casing due to accumulated build-up of hydrostatic pressure.
To “cure the cement under ambient hydrostatic conditions”, typically execute a two-plug cementing procedure involving a first Bottom Wiper Plug before and a second Top Wiper Plug behind the cement that also minimizes cement contamination problems comprised of the following individual steps. Introduce the Bottom Wiper Plug into the interior of the steel casing assembled in the well and pump down with cement that cleans the mud off the walls and separates the mud and cement. Introduce the Top Wiper Plug into the interior of the steel casing assembled into the well and pump down with water under pump pressure thereby forcing the cement through the float collar valve and any other one-way valves present. Allow the cement to cure.
SUMMARY OF THE INVENTION Apparatus and methods of operation of that apparatus are disclosed that allow for cementation of a drill string with attached drill bit into place during one single drilling pass into a geological formation. The process of drilling the well and installing the casing becomes one single process that saves installation time and reduces costs during oil and gas well completion procedures. Apparatus and methods of operation of the apparatus are disclosed that use the typical mud passages already present in a typical rotary drill bit, including any watercourses in a “regular bit”, or mud jets in a “jet bit”, for the second independent purpose of passing cement into the annulus between the casing and the well while cementing the drill string in place. This is a crucial step that allows a “Typical Drilling Process” involving some 14 steps to be compressed into the “New Drilling Process” that involves only 7 separate steps as described in the Description of the Preferred Embodiments below. The New Drilling Process is now possible because of “Several Recent Changes in the Industry” also described in the Description of the Preferred Embodiments below. In addition, the New Drilling Process also requires new apparatus to properly allow the cement to cure under ambient hydrostatic conditions. That new apparatus includes a Latching Subassembly, a Latching Float Collar Valve Assembly, the Bottom Wiper Plug, and the Top Wiper Plug. Suitable methods of operation are disclosed for the use of the new apparatus.
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 shows a section view of a drill string in the process of being cemented in place during one drilling pass into formation with a preferred embodiment of the invention.
DESCRIPTION OF THE PREFERRED EMBODIMENTS Apparatus and methods of operation of that apparatus are disclosed herein in the preferred embodiments of the invention that allow for cementation of a drill string with attached drill bit into place during one single drilling pass into a geological formation. The method of drilling the well and installing the casing becomes one single process that saves installation time and reduces costs during oil and gas well completion procedures as documented in the following description of the preferred embodiments of the invention. Apparatus and methods of operation of the apparatus are disclosed herein that use the typical mud passages already present in a typical rotary drill bit, including any watercourses in a “regular bit”, or mud jets in a “jet bit”, for the second independent purpose of passing cement into the annulus between the casing and the well while cementing the drill string in place.
FIG. 1 shows a section view of a drill string in the process of being cemented in place during one drilling pass into formation. A borehole 2 is drilled though the earth including geological formation 4. The borehole 2 is drilled with a milled tooth rotary drill bit 6 having milled steel roller cones 8, 10, and 12 (not shown for simplicity). A standard water passage 14 is shown through the rotary cone drill bit. This rotary bit could equally be a tungsten carbide insert roller cone bit having jets for waterpassages, the principle of operation and the related apparatus being the same for either case for the preferred embodiment herein.
The threads 16 on rotary drill bit 6 are screwed into the Latching Subassembly 18. The Latching Subassembly 18 is also called the Latching Sub for simplicity herein. The Latching Sub 18 is a relatively thick-walled steel pipe having some functions similar to a standard drill collar.
The Latching Float Collar Valve Assembly 20 is pumped downhole with drilling mud after the depth of the well is reached. The Latching Float Collar Valve Assembly 20 is pumped downhole with mud pressure pushing against the Upper Seal 22 of the Latching Float Collar Valve Assembly 20. The Latching Float Collar Valve Assembly 20 latches into place into Latch Recession 24. The Latch 26 of the Latching Float Collar Valve Assembly 20 is shown latched into place with Latching Spring 28 pushing against Latching Mandrel 30.
The Float 32 of the Latching Float Collar Valve Assembly 20 seats against the Float Seating Surface 34 under the force from Float Collar Spring 36 that makes a one-way cement valve. However, the pressure applied to the mud or cement from the surface may force open the Float to allow mud or cement to be forced into the annulus generally designated as 38 in FIG. 1. This one-way cement valve is a particular example of “a one-way cement valve means installed near the drill bit” which is a term defined herein. The one-way cement valve means may be installed at any distance from the drill bit but is preferentially installed “near” the drill bit.
FIG. 1 corresponds to the situation where cement is in the process of being forced from the surface through the Latching Float Collar Valve Assembly 20. In fact, the top level of cement in the well is designated as element 40. Below 40, cement fills the annulus of the borehole 2. Above 40, mud fills the annulus of the borehole 2. For example, cement is present at position 42 and drilling mud is present at position 44 in FIG. 1.
Relatively thin-wall casing, or drill pipe, designated as element 46 in FIG. 1, is attached to the Latching Sub 18. The bottom male threads of the drill pipe 48 are screwed into the female threads 50 of the Latching Sub 18.
The drilling mud was wiped off the walls of the drill pipe 48 in the well with Bottom Wiper Plug 52. The Bottom Wiper Plug 52 is fabricated from rubber in the shape shown. Portions 54 and 56 of the Upper Seal of the Bottom Wiper Plug 52 are shown in a ruptured condition in FIG. 1. Initially, they sealed the upper portion of the Bottom Wiper Plug 52. Under pressure from cement, the Bottom Wiper Plug 52 is pumped down into the well until the Lower Lobe 58 of the Bottom Wiper Plug 52 latches into place into Latching Sub Recession 60 in the Latching Sub 18. After the Bottom Wiper Plug 52 latches into place, the pressure of the cement ruptures the Upper Seal of the Bottom Wiper Plug 52. A Bottom Wiper Plug Lobe 62 is shown in FIG. 1. Such lobes provide an efficient means to wipe the mud off the walls of the drill pipe 48 while the Bottom Wiper Plug 52 is pumped downhole with cement.
Top Wiper Plug 64 is being pumped downhole by water 66 under pressure in the drill pipe. As the Top Wiper Plug 64 is pumped down under water pressure, the cement remaining in region 68 is forced downward through the Bottom Wiper Plug 52, through the Latching Float Collar Valve Assembly 20, through the waterpassages of the drill bit and into the annulus in the well. A Top Wiper Plug Lobe 70 is shown in FIG. 1. Such lobes provide an efficient means to wipe the cement off the walls of the drill pipe while the Top Wiper Plug 64 is pumped downhole with water.
After the Bottom Surface 72 of the Top Wiper Plug 64 is forced into the Top Surface 74 of the Bottom Wiper Plug 52, almost the entire “cement charge” has been forced into the annulus between the drill pipe and the hole. As pressure is reduced on the water, the Float of the Latching Float Latching Float Collar Valve Assembly 20 seals against the Float Seating Surface. As the water pressure is reduced on the inside of the drill pipe, then the cement in the annulus between the drill pipe and the hole can cure under ambient hydrostatic conditions. This procedure herein provides an example of the proper operation of a “one-way cement valve means”.
Therefore, the preferred embodiment in FIG. 1 provides apparatus that uses the steel drill string attached to a drilling bit during drilling operations used to drill oil and gas wells for a second purpose as the casing that is cemented in place during typical oil and gas well completions.
The preferred embodiment in FIG. 1 provides apparatus and methods of operation of said apparatus that results in the efficient installation of a cemented steel cased well during one single pass down into the earth of the steel drill string thereby making a steel cased borehole or cased well.
The steps described herein in relation to the preferred embodiment in FIG. 1 provides a method of operation that uses the typical mud passages already present in a typical rotary drill bit, including any watercourses in a “regular bit”, or mud jets in a “jet bit”, that allow mud to circulate during typical drilling operations for the second independent, and the distinctly separate, purpose of passing cement into the annulus between the casing and the well while cementing the drill string into place during one single pass into the earth.
The preferred embodiment of the invention further provides apparatus and methods of operation that result in the pumping of cement down the drill string, through the mud passages in the drill bit, and into the annulus between the formation and the drill string for the purpose of cementing the drill string and the drill bit into place during one single drilling pass into the formation.
The apparatus described in the preferred embodiment in FIG. 1 also provide a one-way cement valve and related devices installed near the drill bit of the drill string that allows the cement to set up efficiently while the drill string and drill bit are cemented into place during one single drilling pass into the formation.
Methods of operation of apparatus disclosed in FIG. 1 have been disclosed that use the typical mud passages already present in a typical rotary drill bit, including any watercourses in a “regular bit”, or mud jets in a “jet bit”, for the second independent purpose of passing cement into the annulus between the casing and the well while cementing the drill string in place. This is a crucial step that allows a “Typical Drilling Process” involving some 14 steps to be compressed into the “New Drilling Process” that involves only 7 separate steps as described in detail below. The New Drilling Process is now possible because of “Several Recent Changes in the Industry” also described in detail below.
Typical procedures used in the oil and gas industries to drill and complete wells are well documented. For example, such procedures are documented in the entire “Rotary Drilling Series” published by the Petroleum Extension Service of the University of Texas at Austin, Austin, Tex. that is included herein by reference in its entirety comprised of the following: Unit I—“The Rig and Its Maintenance” (12 Lessons); Unit II—“Normal Drilling Operations” (5 Lessons); Unit III—Nonroutine Rig Operations (4 Lessons); Unit IV—Man Management and Rig Management (1 Lesson); and Unit V—Offshore Technology (9 Lessons). All of the individual Glossaries of all of the above Lessons are explicitly included in the specification herein and any and all definitions in those Glossaries shall be considered explicitly referenced herein.
Additional procedures used in the oil and gas industries to drill and complete wells are well documented in the series entitled “Lessons in Well Servicing and Workover” published by the Petroleum Extension Service of the University of Texas at Austin, Austin, Tex. that is included herein by reference in its entirety comprised of all 12 Lessons. All of the individual Glossaries of all of the above Lessons are explicitly included in the specification herein and any and all definitions in those Glossaries shall be considered explicitly referenced herein.
With reference to typical practices in the oil and gas industries, a typical drilling process may therefore be described in the following.
Typical Drilling Process
From an historical perspective, completing oil and gas wells using rotary drilling techniques has in recent times comprised the following typical steps:
Step 1
With a pile driver or rotary rig, install any necessary conductor pipe on the surface for attachment of the blowout preventer and for mechanical support at the wellhead.
Step 2
Install and cement into place any surface casing necessary to prevent washouts and cave-ins near the surface, and to prevent the contamination of freshwater sands as directed by state and federal regulations.
Step 3
Choose the dimensions of the drill bit to result in the desired sized production well. Begin rotary drilling of the production well with a first drill bit. Simultaneously circulate drilling mud into the well while drilling. Drilling mud is circulated downhole to carry rock chips to the surface, to prevent blowouts, to prevent excessive mud loss into formation, to cool the bit, and to clean the bit. After the first bit wears out, pull the drill string out, change bits, lower the drill string into the well and continue drilling. It should be noted here that each “trip” of the drill bit typically requires many hours of rig time to accomplish the disassembly and reassembly of the drill string, pipe segment by pipe segment.
Step 4
Drill the production well using a succession of rotary drill bits attached to the drill string until the hole is drilled to its final depth.
Step 5
After the final depth is reached, pull out the drill string and its attached drill bit.
Step 6
Perform open-hole logging of the geological formations to determine the amount of oil and gas present. This typically involves measurements of the porosity of the rock, the electrical resistivity of the water present, the electrical resistivity of the rock, certain neutron measurements from within the open-hole, and the use of Archie's Equations. If no oil and gas is present from the analysis of such open-hole logs, an option can be chosen to cement the well shut. If commercial amounts of oil and gas are present, continue the following steps.
Step 7
Typically reassemble drill bit and drill string into the well to clean the well after open-hole logging.
Step 8
Pull out the drill string and its attached drill bit.
Step 9
Attach the casing shoe into the bottom male pipe threads of the first length of casing to be installed into the well. This casing shoe may or may not have a one-way valve (“casing shoe valve”) installed in its interior to prevent fluids from back-flowing from the well into the casing string.
Step 10
Typically install the float collar onto the top female threads of the first length of casing to be installed into the well which has a one-way valve (“float collar valve”) that allows the mud and cement to pass only one way down into the hole thereby preventing any fluids from back-flowing from the well into the casing string. Therefore, a typical installation has a casing shoe attached to the bottom and the float collar valve attached to the top portion of the first length of casing to be lowered into the well. Please refer to pages 28–31 of the book entitled “Casing and Cementing” Unit II Lesson 4, Second Edition, of the Rotary Drilling Series, Petroleum Extension Service, The University of Texas at Austin, Tex., 1982 (hereinafter defined as “Ref.1”). All of the individual definitions of words and phrases in the Glossary of Ref. 1 are explicitly included herein in their entirety.
Step 11
Assemble and lower the production casing into the well while back filling each section of casing with mud as it enters the well to overcome the buoyancy effects of the air filled casing (caused by the presence of the float collar valve), to help avoid sticking problems with the casing, and to prevent the possible collapse of the casing due to accumulated build-up of hydrostatic pressure.
Step 12
To “cure the cement under ambient hydrostatic conditions”, typically execute a two-plug cementing procedure involving a first Bottom Wiper Plug before and a second Top Wiper Plug behind the cement that also minimizes cement contamination problems comprised of the following individual steps:
-
- A. Introduce the Bottom Wiper Plug into the interior of the steel casing assembled in the well and pump down with cement that cleans the mud off the walls and separates the mud and cement (Ref. 1, pages 28–31).
- B. Introduce the Top Wiper Plug into the interior of the steel casing assembled into the well and pump down with water under pump pressure thereby forcing the cement through the float collar valve and any other one-way valves present (Ref. 1, pages 28–31).
- C. After the Bottom Wiper Plug and the Top Wiper Plug have seated in the float collar, release the pump pressure on the water column in the casing that results in the closing of the float collar valve which in turn prevents cement from backing up into the interior of the casing. The resulting interior pressure release on the inside of the casing upon closure of the float collar valve prevents distortions of the casing that might prevent a good cement seal (Ref. 1, page 30). In such circumstances, “the cement is cured under ambient hydrostatic conditions”.
Step 13
Allow the cement to cure.
Step 14
Follow normal “final completion operations” that include installing the tubing with packers and perforating the casing near the producing zones. For a description of such normal final completion operations, please refer to the book entitled “Well Completion Methods”, Well Servicing and Workover, Lesson 4, from the series entitled “Lessons in Well Servicing and Workover”, Petroleum Extension Service, The University of Texas at Austin, Tex., 1971 (hereinafter defined as “Ref. 2”). All of the individual definitions of words and phrases in the Glossary of Ref. 2 are explicitly included herein in their entirety. Other methods of completing the well are described therein that shall, for the purposes of this application herein, also be called “final completion operations”.
Several Recent Changes in the Industry
Several recent concurrent changes in the industry have made it possible to reduce the number of steps defined above. These changes include the following:
-
- a. Until recently, drill bits typically wore out during drilling operations before the desired depth was reached by the production well. However, certain drill bits have recently been able to drill a hole without having to be changed. For example, please refer to the book entitled “The Bit”, Unit I, Lesson 2, Third Edition, of the Rotary Drilling Series, The University of Texas at Austin, Tex., 1981 (hereinafter defined as “Ref. 3”). All of the individual definitions of words and phrases in the Glossary of Ref. 3 are explicitly included herein in their entirety. On page 1 of Ref. 3 it states: “For example, often only one bit is needed to make a hole in which the casing will be set.” On page 12 of Ref. 3 it states in relation to tungsten carbide insert roller cone bits: “Bit runs as long as 300 hours have been achieved; in some instances, only one or two bits have been needed to drill a well to total depth.” This is particularly so since the advent of the sealed bearing tri-cone bit designs appeared in 1959 (Ref. 3, page 7) having tungsten carbide inserts (Ref. 3, page 12). Therefore, it is now practical to talk about drill bits lasting long enough for drilling a well during one pass into the formation, or “one pass drilling”.
- b. Until recently, it has been impossible or impractical to obtain sufficient geophysical information to determine the presence or absence of oil and gas from inside steel pipes in wells. Heretofore, either standard open-hole logging tools or Measurement-While-Drilling (“MWD”) tools were used in the open-hole to obtain such information. Therefore, the industry has historically used various open-hole tools to measure formation characteristics. However, it has recently become possible to measure the various geophysical quantities listed in Step 6 above from inside steel pipes such as drill strings and casing strings. For example, please refer to the book entitled “Cased Hole Log Interpretation Principles/Applications”, Schlumberger Educational Services, Houston, Tex., 1989. Please also refer to the article entitled “Electrical Logging: State-of-the-Art”, by Robert E. Maute, The Log Analyst, May-June 1992, pages 206–227.
Because drill bits typically wore out during drilling operations until recently, different types of metal pipes have historically evolved which are attached to drilling bits, which, when assembled, are called “drill strings”. Those drill strings are different than typical “casing strings” run into the well. Because it was historically absolutely necessary to do open-hole logging to determine the presence or absence of oil and gas, the fact that different types of pipes were used in “drill strings” and “casing strings” was of little consequence to the economics of completing wells. However, it is possible to choose the “drill string” to be acceptable for a second use, namely as the “casing string” that is to be installed after drilling has been completed.
New Drilling Process
Therefore, the preferred embodiments of the invention herein reduce and simplify the above 14 steps as follows:
Repeat Steps 1–2 above.
Steps 3–5 (Revised)
Choose the drill bit so that the entire production well can be drilled to its final depth using only one single drill bit. Choose the dimensions of the drill bit for desired size of the production well. If the cement is to be cured under ambient hydrostatic conditions, attach the drill bit to the bottom female threads of the Latching Subassembly (“Latching Sub”). Choose the material of the drill string from pipe material that can also be used as the casing string. Attach the first section of drill pipe to the top female threads of the Latching Sub. Rotary drill the production well to its final depth during “one pass drilling” into the well. While drilling, simultaneously circulate drilling mud to carry the rock chips to the surface, to prevent blowouts, to prevent excessive mud loss into formation, to cool the bit, and to clean the bit.
Step 6 (Revised)
After the final depth of the production well is reached, perform logging of the geological formations to determine the amount of oil and gas present from inside the drill pipe of the drill string. This typically involves measurements from inside the drill string of the necessary geophysical quantities as summarized in Item “b.” of “Several Recent Changes in the Industry”. If such logs obtained from inside the drill string show that no oil or gas is present, then the drill string can be pulled out of the well and the well filled in with cement. If commercial amounts of oil and gas are present, continue the following steps.
Steps 7–11 (Revised)
If the cement is to be cured under ambient hydrostatic conditions, pump down a Latching Float Collar Valve Assembly with mud until it latches into place in the notches provided in the Latching Sub located above the drill bit.
Steps 12–13 (Revised)
To “cure the cement under ambient hydrostatic conditions”, typically execute a two-plug cementing procedure involving a first Bottom Wiper Plug before and a second Top Wiper Plug behind the cement that also minimizes cement contamination comprised of the following individual steps:
-
- A. Introduce the Bottom Wiper Plug into the interior of the drill string assembled in the well and pump down with cement that cleans the mud off the walls and separates the mud and cement.
- B. Introduce the Top Wiper Plug into the interior of the drill string assembled into the well and pump down with water thereby forcing the cement through any Float Collar Valve Assembly present and through the watercourses in “a regular bit” or through the mud nozzles of a “jet bit” or through any other mud passages in, the drill bit into the annulus between the drill string and the formation.
- C. After the Bottom Wiper Plug and Top Wiper Plug have seated in the Latching Float Collar Valve Assembly, release the pressure on the interior of the drill string that results in the closing of the float collar which in turn prevents cement from backing up in the drill string. The resulting pressure release upon closure of the float collar prevents distortions of the drill string that might prevent a good cement seal as described earlier. I.e., “the cement is cured under ambient hydrostatic conditions”.
Repeat Step 14 above.
Therefore, the “New Drilling Process” has only 7 distinct steps instead of the 14 steps in the “Typical Drilling Process”. The “New Drilling Process”, consequently has fewer steps, is easier to implement, and will be less expensive.
The preferred embodiment of the invention disclosed in FIG. 1 requires a Latching Subassembly and a Latching Float Collar Valve Assembly. The advantage of this approach is that the Float 32 of the Latching Float Collar Valve Assembly and the Float Seating Surface 34 in FIG. 1 are installed at the end of the drilling process and will not be worn due to mud passage during normal drilling operations.
Another preferred embodiment of the invention provides a float and float collar valve assembly permanently installed within the Latching Subassembly at the beginning of the drilling operations. However, such a preferred embodiment has the disadvantage that drilling mud passing by the float and the float collar valve assembly during normal drilling operations will tend to wear on the mutually sealing surfaces.
The drill bit described in FIG. 1 is a milled steel toothed roller cone bit. However, any rotary bit can be used with the invention. A tungsten carbide insert roller cone bit can be used. Any type of diamond bit or drag bit can be used. The invention may be used with any drill bit described in Ref. 3 above that possesses mud passages, waterpassages, or passages for gas. Any type of rotary drill bit can be used possessing such passageways. Similarly, any type of bit whatsoever that utilizes any fluid or gas that passes through passageways in the bit can be used whether or not the bit rotates.
While the above description contains many specificities, these should not be construed as limitations on the scope of the invention, but rather as exemplification of preferred embodiments thereto. As have been briefly described, there are many possible variations. Accordingly, the scope of the invention should be determined not only by the embodiments illustrated, but by the appended claims and their legal equivalents.
| Brevet cité | Date de dépôt | Date de publication | Déposant | Titre |
|---|
| US122514 | | 9 janv. 1872 | | Titre non disponible | | US1077772 | 25 janv. 1913 | 4 nov. 1913 | Fred Richard Weathersby | Drill. | | US1185582 | 13 juil. 1914 | 30 mai 1916 | Edward Bignell | Pile. | | US1301285 | 1 sept. 1916 | 22 avr. 1919 | Frank W. A. Finley | Expansible well-casing. | | US1342424 | 6 sept. 1918 | 8 juin 1920 | Cotten Shepard M | Method and apparatus for constructing concrete piles | | US1418766 | 2 août 1920 | 6 juin 1922 | The Guiberson Corporation | Well-casing spear | | US1471526 | 19 juil. 1920 | 23 oct. 1923 | Pickin Rowland O | Rotary orill bit | | US1585069 | 18 déc. 1924 | 18 mai 1926 | Youle William E | Casing spear | | US1728136 | 21 oct. 1926 | 10 sept. 1929 | Elmore D. Jones | Casing spear | | US1777592 | 8 juil. 1929 | 7 oct. 1930 | Idris Thomas | Casing spear | | US1825026 | 7 juil. 1930 | 29 sept. 1931 | Idris Thomas | Casing spear | | US1830625 | 16 févr. 1927 | 3 nov. 1931 | Schrock George W | Drill for oil and gas wells | | US1842638 | 29 sept. 1930 | 26 janv. 1932 | Wigle Wilson B | Elevating apparatus | | US1880218 | 1 oct. 1930 | 4 oct. 1932 | Simmons Richard P | Method of lining oil wells and means therefor | | US1917135 | 17 févr. 1932 | 4 juil. 1933 | James Littell | Well apparatus | | US1981525 | 5 déc. 1933 | 20 nov. 1934 | Price Bailey E | Method of and apparatus for drilling oil wells | | US1998833 | 17 mars 1930 | 23 avr. 1935 | Baker Oil Tools, Inc. | Cementing guide | | US2017451 | 21 nov. 1933 | 15 oct. 1935 | Baash-Ross Tool Company | Packing casing bowl | | US2049450 | 23 août 1933 | 4 août 1936 | Macclatchie Manufacturing Company | Expansible cutter tool | | US2060352 | 20 juin 1936 | 10 nov. 1936 | Reed Roller Bit Company | Expansible bit | | US2105885 | 7 janv. 1935 | 18 janv. 1938 | Hinderliter Frank J | Hollow trip casing spear | | US2167338 | 26 juil. 1937 | 25 juil. 1939 | U. C. Murcell, Inc. | Welding and setting well casing | | US2214429 | 24 oct. 1939 | 10 sept. 1940 | Miller William J | Mud box | | US2216895 | 6 avr. 1939 | 8 oct. 1940 | Reed Roller Bit Company | Rotary underreamer | | US2228503 | 25 avr. 1939 | 14 janv. 1941 | Boyd | Liner hanger | | US2295803 | 29 juil. 1940 | 15 sept. 1942 | O'Leary Charles M | Cement shoe | | US2305062 | 9 mai 1940 | 15 déc. 1942 | C-M-P Fishing Tool Corporation | Cementing plug | | US2324679 | 9 avr. 1941 | 20 juil. 1943 | Louise Cox Nellie | Rock boring and like tool | | US2370832 | 19 août 1941 | 6 mars 1945 | Baker Oil Tools, Inc. | Removable well packer | | US2379800 | 11 sept. 1941 | 3 juil. 1945 | The Texas Company | Signal transmission system | | US2414719 | 25 avr. 1942 | 21 janv. 1947 | Stanolind Oil And Gas Company | Transmission system | | US2499630 | 5 déc. 1946 | 7 mars 1950 | Clark Paul B | Casing expander | | US2522444 | 20 juil. 1946 | 12 sept. 1950 | Grable Donovan B | Well fluid control | | US2536458 | 29 nov. 1948 | 2 janv. 1951 | Munsinger Theodor R | Pipe rotating device for oil wells | | US2610690 | 10 août 1950 | 16 sept. 1952 | Beatty Guy M | Mud box | | US2621742 | 26 août 1948 | 16 déc. 1952 | Brown Cicero C | Apparatus for cementing well liners | | US2627891 | 28 nov. 1950 | 10 févr. 1953 | Clark Paul B | Well pipe expander | | US2641444 | 3 sept. 1946 | 9 juin 1953 | Signal Oil And Gas Company | Method and apparatus for drilling boreholes | | US2650314 | 12 févr. 1952 | 25 août 1953 | Hennigh George W | Special purpose electric motor | | US2663073 | 19 mars 1952 | 22 déc. 1953 | Acrometal Products, Inc. | Method of forming spools | | US2668689 | 7 nov. 1947 | 9 févr. 1954 | C & C Tool Corporation | Automatic power tongs | | US2692059 | 15 juil. 1953 | 19 oct. 1954 | Standard Oil Development Company | Device for positioning pipe in a drilling derrick | | US2720267 | 12 déc. 1949 | 11 oct. 1955 | Brown Cicero C | Sealing assemblies for well packers | | US2738011 | 17 févr. 1953 | 13 mars 1956 | Mabry Thomas S | Means for cementing well liners | | US2741907 | 27 avr. 1953 | 17 avr. 1956 | Joseph Nagy | Locksmithing tool | | US2743087 | 13 oct. 1952 | 24 avr. 1956 | Layne | Under-reaming tool | | US2743495 | 7 mai 1951 | 1 mai 1956 | The National Supply Company | Method of making a composite cutter | | US2764329 | 10 mars 1952 | 25 sept. 1956 | Hampton Lucian W | Load carrying attachment for bicycles, motorcycles, and the like | | US2765146 | 9 févr. 1952 | 2 oct. 1956 | Williams Jr Edward B | Jetting device for rotary drilling apparatus | | US2805043 | 12 juil. 1956 | 3 sept. 1957 | Williams Jr Edward B | Jetting device for rotary drilling apparatus | | US2953406 | 24 nov. 1958 | 20 sept. 1960 | A. D. Timmons | Casing spear | | US2978047 | 3 déc. 1957 | 4 avr. 1961 | De Vaan Walter H | Collapsible drill bit assembly and method of drilling | | US3006415 | | 31 oct. 1961 | | Titre non disponible | | US3036530 | 5 mai 1960 | 29 mai 1962 | Harvest Queen Mill & Elevator Company | Governor for pipeline apparatus | | US3041901 | 16 mai 1960 | 3 juil. 1962 | Dowty Rotol Limited | Make-up and break-out mechanism for drill pipe joints | | US3054100 | 4 juin 1958 | 11 sept. 1962 | General Precision, Inc. | Signalling system | | US3087546 | 11 août 1958 | 30 avr. 1963 | Woolley Brown J | Methods and apparatus for removing defective casing or pipe from well bores | | US3090031 | 29 sept. 1959 | 14 mai 1963 | Texaco Inc. | Signal transmission system | | US3102599 | 18 sept. 1961 | 3 sept. 1963 | Continental Oil Company | Subterranean drilling process | | US3111179 | 26 juil. 1960 | 19 nov. 1963 | A And B Metal Manufacturing Company, Inc. | Jet nozzle | | US3117636 | 8 juin 1960 | 14 janv. 1964 | Jensen John J | Casing bit with a removable center | | US3122811 | 29 juin 1962 | 3 mars 1964 | Gilreath Lafayette E | Hydraulic slip setting apparatus | | US3123160 | | 3 mars 1964 | | Titre non disponible | | US3124023 | | 10 mars 1964 | | Titre non disponible | | US3131769 | 9 avr. 1962 | 5 mai 1964 | Baker Oil Tools, Inc. | Hydraulic anchors for tubular strings | | US3159219 | 13 mai 1958 | 1 déc. 1964 | Byron Jackson Inc. | Cementing plugs and float equipment | | US3169592 | 22 oct. 1962 | 16 févr. 1965 | Archer W. Kammerer, Jr. | Retrievable drill bit | | US3191677 | 29 avr. 1963 | 29 juin 1965 | Kinley Corp. | Method and apparatus for setting liners in tubing | | US3191680 | 14 mars 1962 | 29 juin 1965 | Pan American Petroleum Corporation | Method of setting metallic liners in wells | | US3193116 | 23 nov. 1962 | 6 juil. 1965 | Esso Production Research Company | System for removing from or placing pipe in a well bore | | US3353599 | 4 août 1964 | 21 nov. 1967 | Gulf Oil Corporation | Method and apparatus for stabilizing formations | | US3380528 | 24 sept. 1965 | 30 avr. 1968 | Tri-State Oil Tool Industries, Inc. | Method and apparatus of removing well pipe from a well bore | | US3387893 | 24 mars 1966 | 11 juin 1968 | Beteiligungs- Und Patentverwaltungsgesellschaft Mit Beschrankter Haftung | Gallery driving machine with radially movable roller drills | | US3392609 | 24 juin 1966 | 16 juil. 1968 | Abegg And Reinhold Co. | Well pipe spinning unit | | US3419079 | 27 sept. 1967 | 31 déc. 1968 | Schlumberger Technology Corporation | Well tool with expansible anchor | | US3477527 | 5 juin 1967 | 11 nov. 1969 | Global Marine Inc. | Kelly and drill pipe spinner-stabber | | US3489220 | 2 août 1968 | 13 janv. 1970 | Kinley Corp. | Method and apparatus for repairing pipe in wells | | US3548936 | 15 nov. 1968 | 22 déc. 1970 | Dresser Ind. Inc. | Well tools and gripping members therefor | | US3550684 | 3 juin 1969 | 29 déc. 1970 | Schlumberger Technology Corp. | Methods and apparatus for facilitating the descent of well tools through deviated well bores | | US3552507 | 25 nov. 1968 | 5 janv. 1971 | Hughes Tool Company A Corp. Of De | System for rotary drilling of wells using casing as the drill string | | US3552508 | 3 mars 1969 | 5 janv. 1971 | Hughes Tool Company A Corp. Of De | Apparatus for rotary drilling of wells using casing as the drill pipe | | US3552509 | 11 sept. 1969 | 5 janv. 1971 | Hughes Tool Company A Corp. Of De | Apparatus for rotary drilling of wells using casing as drill pipe | | US3552510 | 8 oct. 1969 | 5 janv. 1971 | Hughes Tool Company A Corp. Of De | Apparatus for rotary drilling of wells using casing as the drill pipe | | US3552848 | 20 nov. 1967 | 5 janv. 1971 | Xerox Corp. | Xerographic plate | | US3559739 | 20 juin 1969 | 2 févr. 1971 | Chevron Research Co. | Method and apparatus for providing continuous foam circulation in wells | | US3566505 | 9 juin 1969 | 2 mars 1971 | Hydrotech Services Inc. | Apparatus for aligning two sections of pipe | | US3570598 | 5 mai 1969 | 16 mars 1971 | Glenn D. Johnson | Constant strain jar | | US3575245 | 5 févr. 1969 | 20 avr. 1971 | Smith International, Inc., A Corp Of California | Apparatus for expanding holes | | US3602302 | 10 nov. 1969 | 31 août 1971 | Westinghouse Electric Corp. | Oil production system | | US3603411 | 19 janv. 1970 | 7 sept. 1971 | Eastman Christensen Company | Retractable drill bits | | US3603412 | 2 févr. 1970 | 7 sept. 1971 | Baker Oil Tools Inc. | Method and apparatus for drilling in casing from the top of a borehole | | US3603413 | 3 oct. 1969 | 7 sept. 1971 | Eastman Christensen Company | Retractable drill bits | | US3606664 | 4 avr. 1969 | 21 sept. 1971 | Esso Production Research Co. | Leak-proof threaded connections | | US3624760 | 3 nov. 1969 | 30 nov. 1971 | Albert G. Bodine | Sonic apparatus for installing a pile jacket, casing member or the like in an earthen formation | | US3635105 | 22 juil. 1969 | 18 janv. 1972 | Varco International, Inc., A Ca. Corp. | Power tong head and assembly | | US3656564 | 3 déc. 1970 | 18 avr. 1972 | Hughes Tool Company A Corp. Of De | Apparatus for rotary drilling of wells using casing as the drill pipe | | US3662842 | 14 avr. 1970 | 16 mai 1972 | National Oilwell, A General Partnership Of De | Automatic coupling system | | US3669190 | 21 déc. 1970 | 13 juin 1972 | Halliburton Company | Methods of completing a well | | US3680412 | 3 déc. 1969 | 1 août 1972 | Gardner-Denver Co. | Joint breakout mechanism | | US3691624 | 16 janv. 1970 | 19 sept. 1972 | John C. Kinley | Method of expanding a liner | | US3945444 | 1 avr. 1975 | 23 mars 1976 | The Anaconda Company | Split bit casing drill |
| Référence |
|---|
| 1 | "First Success with Casing-Drilling" Word Oil, Feb. (1999), pp. 25. | | 2 | 500 or 650 ECIS Top Drive, Advanced Permanent Magnet Motor Technology, TESCO Drilling Technology, Apr. 1998, 2 Pages. | | 3 | 500 or 650 HCIS Top Drive, Powerful Hydraulic Compact Top Drive Drilling System, TESCO Drilling Technology, Apr. 1998, 2 Pages. | | 4 | Anon, "Slim Holes Fat Savings," Journal of Petroleum Technology, Sep. 1992, pp. 816-819. | | 5 | Anon, "Slim Holes, Slimmer Prospect," Journal of Petroleum Technology, Nov. 1995, pp. 949-952. | | 6 | Boykin, "The Role Of A Worldwide Drilling Organization And The Road To The Future," SPE/IADC Paper 37630, SPE/IADC Drilling Conference, Mar. 4-6, 1997, pp. 489-498. | | 7 | Canrig Top Drive Drilling Systems, Harts Petroleum Engineer International, Feb. 1997, 2 Pages. | | 8 | Daigle, et al., "Expandable Tubulars: Field Examples Of Application In Well Construction And Remediation," SPE Paper 62958, SPE Annual Technical Conference And Exhibition, Oct. 1-4, 2000, pp. 1-14. | | 9 | De Leon Mojarro, "Breaking A Paradigm: Drilling With Tubing Gas Wells," SPE Paper 40051, SPE Annual Technical Conference And Exhibition, Mar. 3-5, 1998, pp. 465-472. | | 10 | De Leon Mojarro, "Drilling/Completing With Tubing Cuts Well Costs By 30%," World Oil, Jul. 1998, pp. 145-150. | | 11 | Dean E. Gaddy, Editor, "Russia Shares Technical Know-How with U.S." Oil & Gas Journal, Mar. (1999), pp. 51-52 and 54-56. | | 12 | Detlef Hahn, Friedhelm Makohl, and Larry Watkins, Casing-While Drilling System Reduces Hole Collapse Risks, Offshore, pp. 54, 56, and 59, Feb. 1998. | | 13 | Directional Drilling, M. Mims, World Oil, May 1999, pp. 40-43. | | 14 | Editor, "Innovation Starts At The Top At Tesco," The American Oil & Gas Reporter, Apr., 1998, p. 65. | | 15 | Editor, "Tesco Finishes Field Trial Program," Drilling Contractor, Mar./Apr. 2001, p. 53. | | 16 | Filippov, et al., "Expandable Tubular Solutions," SPE paper 56500, SPE Annual Technical Conference And Exhibition, Oct. 3-6, 1999, pp. 1-16. | | 17 | Forest, et al., "Subsea Equipment For Deep Water Drilling Using Dual Gradient Mud System," SPE/IADC Drilling Conference, Amsterdam, The Netherlands, Feb. 27, 2001-Mar. 1, 2001, 8 pages. | | 18 | Hahn, et al., "Simultaneous Drill and Case Technology-Case Histories, Status and Options for Further Development," Society of Petroleum Engineers, IADC/SPE Drilling Conference, New Orlean, LA Feb. 23-25, 2000 pp. 1-9. | | 19 | Jafer, et al., "Discussion And Comparison Of Performance Of Horizontal Wells In Bouri Field," SPE Paper 36927, SPE Annual Technical Conference And Exhibition, Oct. 22-24, 1996, pp. 465-473. | | 20 | LaFleur Petroleum Services, Inc., "Autoseal Circulating Head," Engineering Manufacturing, 1992, 11 Pages. | | 21 | Laurent, et al., "A New Generation Drilling Rig: Hydraulically Powered And Computer Controlled," CADE/CAODC Paper 99-120, CADE/CAODC Spring Drilling Conference, Apr. 7 & 8, 1999, 14 pages. | | 22 | Laurent, et al., "Hydraulic Rig Supports Casing Drilling," World Oil, Sep. 1999, pp. 61-68. | | 23 | Littleton, "Refined Slimhole Drilling Technology Renews Operator Interest," Petroleum Engineer International, Jun. 1992, pp. 19-26. | | 24 | Lohefer, et al., "Expandable Liner Hanger Provides Cost-Effective Alternative Solution," IADC/SPE Paper 59151, IADC/SPE Drilling Conference, Feb. 23-25, 2000, pp. 1-12. | | 25 | M. Gelfgat, "Retractable Bits Development and Application" Transactions of the ASME, vol. 120, Jun. (1998), pp. 124-130. | | 26 | M.B. Stone and J. Smith, "Expandable Tubulars and Casing Drilling are Options" Drilling Contractor, Jan./Feb. 2002, pp. 52. | | 27 | Madell, et al., "Casing Drilling An Innovative Approach To Reducing Drilling Costs," CADE/CAODC Paper 99-121, CADE/CAODC Spring Drilling Conference, Apr. 7 & 8, 1999, pp. 1-12. | | 28 | Mike Killalea, Portable Top Drives: What's Driving The Marked?, IADC, Drilling Contractor, Sep. 1994, 4 Pages. | | 29 | Mojarro, et al., "Drilling/Completing With Tubing Cuts Well Costs By 30%," World Oil, Jul. 1998, pp. 145-150. | | 30 | Multilateral Classification System w/Example Applications, Alan MacKenzie & Cliff Hogg, World Oil, Jan. 1999, pp. 55-61. | | 31 | Perdue, et al., "Casing Technology Improves," Hart's E & P, Nov. 1999, pp. 135-136. | | 32 | Product Information (Sections 1-10) CANRIG Drilling Technology, Ltd., Sep. 18, 1996. | | 33 | Rotary Drilling Series, The Rotary Rig and Its Components, Unit I, Lesson 1, Third Edition, The University of Texas at Austin, Austin, Texas. | | 34 | Rotary Drilling, Blowout Prevention, Unit III, Lesson 3, Third Edition. | | 35 | Rotary Drilling, Casing and Cementing, Unit II, Lesson 4, Second Edition. | | 36 | Rotary Drilling, Circulating Systems, Unit I, Lesson 8, Third Edition. | | 37 | Rotary Drilling, Controlled Directional Drilling, Unit III, Lesson 1, Third Edition. | | 38 | Rotary Drilling, Drilling a Straight Hole, Unit II, Lesson 3, Second Edition. | | 39 | Rotary Drilling, Drilling Mud, Unit II, Lesson 2, Third Edition. | | 40 | Rotary Drilling, Making Hole, Unit II, Lesson 1, Second Edition. | | 41 | Rotary Drilling, Open-Hole Fishing, Unit III, Lesson 2, Third Edition. | | 42 | Rotary Drilling, Subsea Blowout Preventers and Marine Riser Systems, Unit III, Lesson 4. | | 43 | Rotary Drilling, Testing and Completing, Unit II, Lesson 5, Second Edition. | | 44 | Rotary Drilling, The Bit, Unit I, Lesson 2, Third Edition. | | 45 | Rotary Drilling, The Drill Stem, Unit I, Lesson 3, Second Edition, The University of Texas at Austin, Austin, Texas. | | 46 | Rotary Steerable Technology-Technology Gains Momentum, Oil & Gas Journal, Dec. 28, 1998. | | 47 | Santos, et al., "Consequences And Relevance Of Drillstring Vibration On Wellbore Stability," SPE/IADC Paper 52820, SPE/IADC Drilling Conference, Mar. 9-11, 1999, pp. 25-31. | | 48 | Shepard, et al., "Casing Drilling: An Emerging Technology," IADC/SPE Paper 67731, SPE/IADC Drilling Conference, Feb. 27-Mar. 1, 2001, pp. 1-13. | | 49 | Shephard, et al., "Casing Drilling Successfully Applied In Southern Wyoming," World Oil, Jun. 2002, pp. 33-41. | | 50 | Shephard, et al., "Casing Drilling: An Emerging Technology," SPE Drilling & Completion, Mar. 2002, pp. 4-14. | | 51 | Silverman, "Drilling Technology-Retractable Bit Eliminates Drill String Trips," Petroleum Engineer International, Apr. 1999, p. 15. | | 52 | Silverman, "Novel Drilling Method-Casing Drilling Process Eliminates Tripping String," Petroleum Engineer International, Mar. 1999, p. 15. | | 53 | Sinor, et al., Rotary Liner Drilling For Depleted Reservoirs, IADC/SPE Paper 39399, IADC/SPE Drilling Conference, Mar. 3-6, 1998, pp. 1-13. | | 54 | Tarr, et al., "Casing-while-Drilling: The Next Step Change In Well Construction," World Oil, Oct. 1999, pp. 34-40. | | 55 | Tessari, et al., "Casing Drilling-A Revolutionary Approach To Reducing Well Costs," SPE/IADC Paper 52789, SPE/IADC Drilling Conference, Mar. 9-11, 1999, pp. 221-229. | | 56 | Tessari, et al., "Focus: Drilling With Casing Promises Major Benefits," Oil & Gas Journal, May 17, 1999, pp. 58-62. | | 57 | The Original Portable Top Drive Drilling System, TESCO Drilling Technology, 1997. | | 58 | Tommy Warren, SPE, Bruce Houtchens, SPE, Garret Madell, SPE, Directional Drilling With Casing, SPE/IADC 79914, Tesco Corporation, SPE/IADC Drilling Conference 2003. | | 59 | U.S. Appl. No. 10/162,302, filed Jun. 4, 2004. | | 60 | U.S. Appl. No. 10/189,570. | | 61 | U.S. Appl. No. 10/269,661. | | 62 | U.S. Appl. No. 10/319,792. | | 63 | U.S. Appl. No. 10/325,636. | | 64 | U.S. Appl. No. 10/331,964. | | 65 | U.S. Appl. No. 10/335,957. | | 66 | U.S. Appl. No. 10/382,080. | | 67 | U.S. Appl. No. 10/382,353. | | 68 | U.S. Appl. No. 10/618,093. | | 69 | U.S. Appl. No. 10/767,322, filed Jan. 29, 2004. | | 70 | U.S. Appl. No. 10/772,217, filed Feb. 2, 2004. | | 71 | U.S. Appl. No. 10/775,048, filed Feb. 9, 2004. | | 72 | U.S. Appl. No. 10/788,976, filed Feb. 27, 2004. | | 73 | U.S. Appl. No. 10/794,790, filed Mar. 5, 2004. | | 74 | U.S. Appl. No. 10/794,795, filed Mar. 5, 2004. | | 75 | U.S. Appl. No. 10/794,797, filed Mar. 5, 2004. | | 76 | U.S. Appl. No. 10/794,800, filed Mar. 5, 2004. | | 77 | U.S. Appl. No. 10/795,129, filed Mar. 5, 2004. | | 78 | U.S. Appl. No. 10/795,214, filed Mar. 5, 2004. | | 79 | U.S. Appl. No. 10/832,804, filed Apr. 27, 2004. | | 80 | Valves Wellhead Equipment Safety Systems, W-K-M Division, ACF Industries, Catalog 80, 1980, 5 Pages. | | 81 | Vogt, et al., "Drilling Liner Technology For Depleted Reservoir," SPE Paper 36827, SPE Annual Technical Conference And Exhibition, Oct. 22-24, pp. 127-132. | | 82 | Warren, et al., "Casing Drilling Application Design Considerations," IADC/SPE Paper 59179, IADC/SPE Drilling Conference, Feb. 23-25, 2000 pp. 1-11. | | 83 | Warren, et al., "Casing Drilling Technology Moves To More Challenging Application," AADE Paper 01-NC-HO-32, AADE National Drilling Conference, Mar. 27-29, 2001, pp. 1-10. | | 84 | Warren, et al., "Drilling Technology: Part I-Casing Drilling With Directional Steering In The U.S. Gulf Of Mexico," Offshore, Jan. 2001, pp. 50-52. | | 85 | Warren, et al., "Drilling Technology: Part II-Casing Drilling With Directional Steering In The Gulf Of Mexico," Offshore, Feb. 2001, pp. 40-42. | | 86 | Well Servicing and Workover, Artificial Lift Methods, Lesson 5, Petroleum Extension Service, The University of Texas at Austin. | | 87 | Well Servicing and Workover, Control of Formation Pressure, Lesson 9, Petroleum Extension Service, The University of Texas at Austin. | | 88 | Well Servicing and Workover, Fishing Tools and Techniques, Lesson 10, Petroleum Extension Service, The University of Texas at Austin. | | 89 | Well Servicing and Workover, Introduction to Oil Well Service and Workover, Lesson 1, Petroleum Extension Service, The University of Texas at Austin. | | 90 | Well Servicing and Workover, Petroleum Geology and Reservoirs, Lesson 2, Petroleum Extension Service, The University of Texas at Austin. | | 91 | Well Servicing and Workover, Production Rig Equipment, Lesson 6, Petroleum Extension Service, The University of Texas at Austin. | | 92 | Well Servicing and Workover, Well Cleanout and Repair Methods, Lesson 8, Petroleum Extension Service, The University of Texas at Austin. | | 93 | Well Servicing and Workover, Well Completion Methods, Lesson 4, Petroleum Extension Service, The University of Texas at Austin. | | 94 | Well Servicing and Workover, Well Logging Methods, Lesson 3, Petroleum Extension Service, The University of Texas at Austin. | | 95 | Well Servicing and Workover, Well Service and Workover Profitability, Lesson 12, Petroleum Extension Service, The University of Texas at Austin. | | 96 | Well Servicing and Workover, Well Servicing and Repair, Lesson 7, Petroleum Extension Service, The University of Texas at Austin. | | 97 | Well Servicing and Workover, Well Stimulation Treatments, Lesson 11, Petroleum Extension Service, The University of Texas at Austin. | | 98 | World's First Drilling With Casing Operation From A Floating Drilling Unit, Sep. 2003, 1 page. | | 99 | Yakov A. Gelfgat, Mikhail Y. Gelfgat and Yuri S. Lopatin, Retractable Drill Bit Technology-Drilling Without Pulling Out Drillpipe, Advanced Drilling Solutions Lessons From the FSU; Jun. 2003; vol. 2, pp. 351-464. |
| Brevet citant | Date de dépôt | Date de publication | Déposant | Titre |
|---|
| US7287584 | 8 déc. 2003 | 30 oct. 2007 | Tesco Corporation | Anchoring device for a wellbore tool | | US7409758 | 29 oct. 2004 | 12 août 2008 | Weatherford/Lamb, Inc. | Vibration damper systems for drilling with casing | | US7428927 | 25 mai 2001 | 30 sept. 2008 | Tesco Corporation | Cement float and method for drilling and casing a wellbore with a pump down cement float | | US7484559 | 29 mars 2007 | 3 févr. 2009 | Tesco Corporation | Method for drilling and casing a wellbore with a pump down cement float | | US7757764 | 2 mai 2007 | 20 juil. 2010 | Tesco Corporation | Method for drilling and casing a wellbore with a pump down cement float | | US7784552 | 25 sept. 2008 | 31 août 2010 | Tesco Corporation | Liner drilling method | | US7810567 | 27 juin 2007 | 12 oct. 2010 | Schlumberger Technology Corporation | Methods of producing flow-through passages in casing, and methods of using such casing | | US7909109 | 22 oct. 2007 | 22 mars 2011 | Tesco Corporation | Anchoring device for a wellbore tool | | US7926578 | 31 déc. 2008 | 19 avr. 2011 | Tesco Corporation | Liner drilling system and method of liner drilling with retrievable bottom hole assembly | | US7926590 | 31 déc. 2008 | 19 avr. 2011 | Tesco Corporation | Method of liner drilling and cementing utilizing a concentric inner string | | US8186457 | 17 sept. 2009 | 29 mai 2012 | Tesco Corporation | Offshore casing drilling method | | US8365637 | 23 oct. 2007 | 5 févr. 2013 | Caterpillar Inc. | Drop box for powertrain |
|