US7631541B2 - Method of measuring a set cement density and settling properties - Google Patents

Method of measuring a set cement density and settling properties Download PDF

Info

Publication number
US7631541B2
US7631541B2 US11/868,708 US86870807A US7631541B2 US 7631541 B2 US7631541 B2 US 7631541B2 US 86870807 A US86870807 A US 86870807A US 7631541 B2 US7631541 B2 US 7631541B2
Authority
US
United States
Prior art keywords
cement slurry
sample
temperature
cement
paddle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related, expires
Application number
US11/868,708
Other versions
US20090090180A1 (en
Inventor
Bryan Waugh
Christopher Gordon
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Halliburton Energy Services Inc
Original Assignee
Halliburton Energy Services Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Halliburton Energy Services Inc filed Critical Halliburton Energy Services Inc
Priority to US11/868,708 priority Critical patent/US7631541B2/en
Publication of US20090090180A1 publication Critical patent/US20090090180A1/en
Assigned to HALLIBURTON ENERGY SERVICES, INC. reassignment HALLIBURTON ENERGY SERVICES, INC. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: GORDON, CHRISTOPHER, WAUGH, BRYAN
Application granted granted Critical
Publication of US7631541B2 publication Critical patent/US7631541B2/en
Expired - Fee Related legal-status Critical Current
Adjusted expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N9/00Investigating density or specific gravity of materials; Analysing materials by determining density or specific gravity
    • G01N9/10Investigating density or specific gravity of materials; Analysing materials by determining density or specific gravity by observing bodies wholly or partially immersed in fluid materials
    • G01N9/12Investigating density or specific gravity of materials; Analysing materials by determining density or specific gravity by observing bodies wholly or partially immersed in fluid materials by observing the depth of immersion of the bodies, e.g. hydrometers
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N33/00Investigating or analysing materials by specific methods not covered by groups G01N1/00 - G01N31/00
    • G01N33/38Concrete; ceramics; glass; bricks
    • G01N33/383Concrete, cement
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N1/00Sampling; Preparing specimens for investigation
    • G01N1/02Devices for withdrawing samples
    • G01N1/04Devices for withdrawing samples in the solid state, e.g. by cutting
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N2203/00Investigating strength properties of solid materials by application of mechanical stress
    • G01N2203/0058Kind of property studied
    • G01N2203/0092Visco-elasticity, solidification, curing, cross-linking degree, vulcanisation or strength properties of semi-solid materials

Definitions

  • the present invention primarily relates to subterranean cementing operations. More particularly, the present invention relates to an improved method for measuring the density and settling properties of cement slurries.
  • Hydraulic cement compositions are frequently utilized in subterranean well completion and remedial operations.
  • a hydraulic cement and various additives are mixed with sufficient water to form a pumpable slurry, and the slurry is pumped into a subterranean zone to be cemented.
  • hydraulic cement compositions are used to cement strings of pipes such as casings and liners in well bores.
  • a hydraulic cement composition is pumped into the annular space between the walls of a well bore and the exterior surfaces of a pipe string disposed therein.
  • the cement composition is then permitted to set in the annular space.
  • the cement composition forms an annular sheath of substantially impermeable cement which supports and positions the pipe string in the well bore and bonds the exterior surfaces of the pipe string to the walls of the well bore.
  • Hydraulic cement compositions are also used in remedial cementing operations such as plugging highly permeable zones or fractures in well bores, plugging cracks or holes in pipe strings and the like.
  • the amount of water that will separate from a cement slurry during the settling process is referred to as the free water.
  • the free water amount for a particular slurry has been determined utilizing a standard American Petroleum Institute (API) test well known in the art. During this API test, a 9.4 inch sample of the cement slurry is placed into a 1.375 inch diameter column. As the cement slurry sets, a small amount of water separates from the cement slurry and accumulates on the top of the column. The amount of water accumulated is measured after two hours and is the free water for the particular slurry sample being tested. An excessive amount of free water is a symptom of a poor cement and a poor cement slurry.
  • API American Petroleum Institute
  • API free water test A major drawback of the API free water test is that the test is usually carried out at room temperature and atmospheric pressure, rather than at the actual temperature and pressures encountered in the well bore environment. Moreover, the free water test cannot be used at temperatures exceeding 190 degrees Fahrenheit. The suspension properties of a cement slurry tend to reduce at higher temperatures. Because the rate at which a cement slurry cures is dependent upon the surrounding temperature and pressure and the free water test is not conducted under conditions existing during actual use, the free water test does not provide an accurate result.
  • the BP Settling Test was developed by BP International Ltd as an alternative means to perform relative measurements of cement formulation stability at elevated temperatures and pressures.
  • the cement slurry is allowed to set hard, permitting free water, unconsolidated solids, and the density profile of the set solids to be distinguished and measured.
  • a cement slurry is prepared and heated to the Bottom Hole Circulating Temperature (BHCT) in a pressurized consistometer.
  • the BHCT represents the temperature of a circulating fluid at the bottom of the wellbore after several hours of circulation.
  • the slurry is then cooled and transferred into a settling tube where it is allowed to cure at BHCT.
  • the stability of the slurry is determined once the cement has set.
  • the height of the set column of cement is measured and compared with the original height to determine the amount of free water and unconsolidated solids that result from slurry segregation.
  • the settling tube is broken and the cement column is cut into different sections.
  • the density along the cement column is then measured by measuring the bulk volume of each section using the Archimedes Principle.
  • the BP Settling Test has several disadvantages.
  • BP Settling Test Another shortcoming of the BP Settling Test is that with today's increasing temperatures and pressures of cementing, the BP Settling Test has inherent risks and problems that could lead to false readings of a cement density. Specifically, in the BP Settling Test the sample is heated to the BHCT, removed from the consistometer and cooled down before being transferred to the settling tubes and reheated to the BHCT. These steps are time consuming and hazardous. Moreover, the temperature reduction of the slurry is often accompanied by a viscosification of the slurry as it cools. This viscosification alters the slurry properties and reduces the test's accuracy as there is no such cooling in real downhole conditions.
  • the present invention primarily relates to subterranean cementing operations. More particularly, the present invention relates to an improved method for measuring the density and settling properties of cement slurries.
  • the present invention is directed to a method for analyzing a cement slurry comprising the steps of: placing a cement slurry in a consistometer having a paddle, heating the cement slurry; allowing the cement slurry to set; cooling the cement slurry; removing the paddle; cutting off a set cement slurry sample from the paddle; and analyzing the sample.
  • the present invention is directed to a method of analyzing a cement slurry comprising the steps of: stirring a cement slurry in a consistometer; heating the cement slurry to a predetermined temperature; halting the stirring of the cement slurry; cooling the cement slurry; and removing the cement slurry from the consistometer.
  • the present invention is directed to a method of analyzing a cement slurry comprising the steps of: stirring a cement slurry with a generally planar paddle in a consistometer; heating the cement slurry to a first temperature; halting the stirring of the cement slurry; changing temperature of the cement slurry to a second temperature; cooling the cement slurry; and removing the cement slurry from the consistometer.
  • the cement slurry sets on the planar paddle.
  • FIG. 1 illustrates a consistometer paddle in accordance with the prior art.
  • FIG. 2 illustrates a consistometer paddle in accordance with an embodiment of the present invention.
  • FIG. 3 is a flow diagram of the steps for a settling test in accordance with an embodiment of the present invention.
  • FIG. 4 depicts the paddle of FIG. 2 removed from the consistometer can with the cement slurry set on the paddle.
  • the present invention primarily relates to subterranean cementing operations. More particularly, the present invention relates to an improved method for measuring the density and settling properties of cement slurries.
  • FIG. 1 a consistometer paddle 100 in accordance with the prior art is depicted.
  • the paddle 100 consists of a partitioned frame 102 with protruding portions 104 .
  • the cement slurry is mixed in the consistometer can through rotations of the paddle 100 .
  • the partitioned frame 102 and the protruding portions 104 mix the slurry.
  • FIG. 2 depicts a paddle 200 used in a consistometer for carrying out a settling test in accordance with an embodiment of the present invention.
  • the paddle 200 includes a planar partitioned frame 202 and does not have any portions protruding from the plain of the frame.
  • FIG. 3 illustrates a flow diagram of the steps for conducting a settling test in accordance with an embodiment of the present invention.
  • the cement slurry is placed in a consistometer.
  • the sample is placed in the consistometer's can.
  • the consistometer also includes an improved paddle 200 .
  • the consistometer motor is turned on and the paddle rotates, mixing the cement slurry in the consistometer can.
  • the cement slurry is brought up to the Bottom Hole Circulating Temperature (“BHCT”) and Bottom Hole Pressure (“BHP”) while being stirred by the improved paddle 200 .
  • BHCT Bottom Hole Circulating Temperature
  • BHP Bottom Hole Pressure
  • a High Pressure High Temperature (“HPHT”) program is used to increase the pressure and temperature of the cement slurry to the BHCT and BHP.
  • the cement slurry's temperature and pressure reaches the BHCT and BHP in a pre-specified time representing the time it would take to get all the cement slurry placed in position for a particular job, or
  • the consistometer motor is then turned off at step 306 .
  • the movement of the paddle 200 stops and the cement slurry is no longer being stirred.
  • the HPHT program heats the cement slurry up to the Bottom Hole Static Temperature (“BHST”).
  • the BHST represents the downhole temperature under static conditions and after sufficient time has elapsed to negate any effect of the circulating fluid.
  • the BHST is typically higher than the BHCT.
  • the BHST for a particular job may be estimated in a variety of ways. For example, tables, charts and computer routines may be used to predict the BHST as a function of a number different factors such as the job depth or the geographic area where the job is to be performed.
  • the BHST closely simulates the actual conditions under ground after the cement has been put in place. Specifically, this step simulates the stage where the cement is put in place on the field and undergoes an increase in temperature as it becomes static.
  • the BHST is achieved in a minimum of 4 hours.
  • the slurry is maintained at the BHST for a predetermined period of time. In one exemplary embodiment, the slurry is maintained at the BHST for a period of at least 12 hours from the time the motor is turned off.
  • the HPHT program cools down and depressurized the consistometer can over a set amount of time.
  • the consistometer can is disassembled and the set slurry which is now hardened around the consistometer paddle 200 is removed from the consistometer can.
  • FIG. 4 shows the paddle 200 removed from the consistometer can 404 with the cement slurry 402 set on the paddle 200 .
  • the set cement slurry 402 forms a cylindrical body around the paddle 200 .
  • the set cement may take on other shapes depending on the shape of the consistometer can.
  • a cement slurry sample is cut off from the paddle 200 at step 314 .
  • the improved paddle design provides for an easy removal of the hardened cement sample. Removal of the cement slurry sample from the paddle was not possible in the prior art, mainly because of the protruding portions 104 of the paddle 100 . Specifically, an attempt to cut off the cement sample from a paddle in accordance with the prior art would damage the paddle itself.
  • a rock saw may be used to cut off the set cement from the improved paddle 200 .
  • the hardened cement sample can be easily cut off from the paddle itself.
  • the cement sample may be cut off from the paddle 200 by cutting parallel to the paddle's planar frame on each side of the frame. The cement sample is then turned perpendicular and cut along its horizontal axis into three parts having substantially equal lengths. These parts represent the top, the middle and the bottom of the cement sample. The characteristics of the cement samples obtained may then be studied. In one embodiment, the density of the samples may be measured using the Archimedes principle which is well known in the art.
  • the setting time for cement is temperature dependent.
  • the accuracy of any analysis of the cement slurry is largely dependent upon how closely the test temperature resembles the actual temperature conditions on the field where the slurry is to be used.
  • the testing method of the present invention maintains the cement slurry under the predetermined temperature and pressure throughout the test, therefore simulating what the slurry is actually subjected to in downhole conditions.
  • the sample need not be cooled down and removed from the HPHT machine in order to be transferred to the settling tubes and reheated. Therefore, the new method does not involve viscosification of the slurry in the middle of the test due to cooling and transfer of the slurry at room temperature. The elimination of this step improves the test's accuracy, saves time and reduces the hazards associated with removing the glass shards from the sample once the settling tube is broken.
  • testing method of the present invention reduces the risk of oil contamination of the cement slurry by eliminating the open-ended glass tubes used in the BP Settling test.
  • Tables 1.1 and 1.2 depict the result of analyzing two different samples.
  • Table 1.1 depicts the results of analyzing a “stable” sample.
  • table 1.2 depicts the results from analyzing an unstable sample.
  • Each sample was analyzed with both the BP Settling Test and the method in accordance with an embodiment of the present invention. As demonstrated in the tables, the new method yields more accurate results.

Abstract

An improved method for measuring the density and settling properties of cement slurries. The cement slurry is stirred in a consistometer and heated to a predetermined temperature. The stirring of the cement slurry is then halted and the cement slurry is cooled. The cement slurry is then removed from the consistometer.

Description

BACKGROUND OF THE INVENTION
The present invention primarily relates to subterranean cementing operations. More particularly, the present invention relates to an improved method for measuring the density and settling properties of cement slurries.
Hydraulic cement compositions are frequently utilized in subterranean well completion and remedial operations. In cementing operations carried out in oil, gas and other wells, a hydraulic cement and various additives are mixed with sufficient water to form a pumpable slurry, and the slurry is pumped into a subterranean zone to be cemented.
For instance, in primary cementing operations hydraulic cement compositions are used to cement strings of pipes such as casings and liners in well bores. In performing primary cementing, a hydraulic cement composition is pumped into the annular space between the walls of a well bore and the exterior surfaces of a pipe string disposed therein. The cement composition is then permitted to set in the annular space. Once hardened, the cement composition forms an annular sheath of substantially impermeable cement which supports and positions the pipe string in the well bore and bonds the exterior surfaces of the pipe string to the walls of the well bore. Hydraulic cement compositions are also used in remedial cementing operations such as plugging highly permeable zones or fractures in well bores, plugging cracks or holes in pipe strings and the like.
It is desirable to create a set cement where the density of the slurry remains consistent from the top to the bottom of the cemented formation. However, solid segregation in the cement slurry causes the fluid portion to migrate upward through the slurry after it is placed in the well bore creating an uncemented area in the annulus. The movement of the fluid portion reduces the density consistency of the cemented portion and the existence of the uncemented area makes the cemented portion unstable. The formation of the free fluid is particularly harmful in deviated or horizontal wells because it can collect along the high side of the annulus forming a channel which can contribute to zonal communication or gas migration. This concern is magnified because the driving force for segregation and separation of the slurry is much more prevalent under deviated conditions. Even in vertical wells, pockets of free fluid located near a corrosive water zone can eventually result in casing leaks. Consequently, the capability of a cement slurry to maintain good suspension properties under downhole conditions is critical.
The amount of water that will separate from a cement slurry during the settling process is referred to as the free water. Historically, the free water amount for a particular slurry has been determined utilizing a standard American Petroleum Institute (API) test well known in the art. During this API test, a 9.4 inch sample of the cement slurry is placed into a 1.375 inch diameter column. As the cement slurry sets, a small amount of water separates from the cement slurry and accumulates on the top of the column. The amount of water accumulated is measured after two hours and is the free water for the particular slurry sample being tested. An excessive amount of free water is a symptom of a poor cement and a poor cement slurry.
A major drawback of the API free water test is that the test is usually carried out at room temperature and atmospheric pressure, rather than at the actual temperature and pressures encountered in the well bore environment. Moreover, the free water test cannot be used at temperatures exceeding 190 degrees Fahrenheit. The suspension properties of a cement slurry tend to reduce at higher temperatures. Because the rate at which a cement slurry cures is dependent upon the surrounding temperature and pressure and the free water test is not conducted under conditions existing during actual use, the free water test does not provide an accurate result.
The BP Settling Test was developed by BP International Ltd as an alternative means to perform relative measurements of cement formulation stability at elevated temperatures and pressures. Generally, in the BP Settling Test the cement slurry is allowed to set hard, permitting free water, unconsolidated solids, and the density profile of the set solids to be distinguished and measured. Specifically, a cement slurry is prepared and heated to the Bottom Hole Circulating Temperature (BHCT) in a pressurized consistometer. The BHCT represents the temperature of a circulating fluid at the bottom of the wellbore after several hours of circulation. The slurry is then cooled and transferred into a settling tube where it is allowed to cure at BHCT. The stability of the slurry is determined once the cement has set. First, the height of the set column of cement is measured and compared with the original height to determine the amount of free water and unconsolidated solids that result from slurry segregation. Next, the settling tube is broken and the cement column is cut into different sections. The density along the cement column is then measured by measuring the bulk volume of each section using the Archimedes Principle.
The BP Settling Test has several disadvantages. First, the cement slurry is subject to aeration when being transferred to the settling tube. This aeration of the cement slurry should be minimized during mixing as any entrained air in the cement slurry will be compressed when the cement is pressurized in the curing chamber causing the cement column to shrink. The shrinkage of the cement column due to compression of air will cause errors in the measurement of the slurry stability. To prevent this false indication of settling the slurry should be placed under a partial vacuum before it is placed in the settling tube. This process is expensive and time consuming.
Another shortcoming of the BP Settling Test is that with today's increasing temperatures and pressures of cementing, the BP Settling Test has inherent risks and problems that could lead to false readings of a cement density. Specifically, in the BP Settling Test the sample is heated to the BHCT, removed from the consistometer and cooled down before being transferred to the settling tubes and reheated to the BHCT. These steps are time consuming and hazardous. Moreover, the temperature reduction of the slurry is often accompanied by a viscosification of the slurry as it cools. This viscosification alters the slurry properties and reduces the test's accuracy as there is no such cooling in real downhole conditions.
Yet another disadvantage of the BP Settling test is that once the settling tube is broken, shards of glass have to be carefully removed from the slurry surface before further measurements can be obtained. This process is time consuming and gives rise to safety concerns.
SUMMARY
The present invention primarily relates to subterranean cementing operations. More particularly, the present invention relates to an improved method for measuring the density and settling properties of cement slurries.
In one embodiment the present invention is directed to a method for analyzing a cement slurry comprising the steps of: placing a cement slurry in a consistometer having a paddle, heating the cement slurry; allowing the cement slurry to set; cooling the cement slurry; removing the paddle; cutting off a set cement slurry sample from the paddle; and analyzing the sample.
In another embodiment, the present invention is directed to a method of analyzing a cement slurry comprising the steps of: stirring a cement slurry in a consistometer; heating the cement slurry to a predetermined temperature; halting the stirring of the cement slurry; cooling the cement slurry; and removing the cement slurry from the consistometer.
In yet another embodiment, the present invention is directed to a method of analyzing a cement slurry comprising the steps of: stirring a cement slurry with a generally planar paddle in a consistometer; heating the cement slurry to a first temperature; halting the stirring of the cement slurry; changing temperature of the cement slurry to a second temperature; cooling the cement slurry; and removing the cement slurry from the consistometer. The cement slurry sets on the planar paddle.
The features and advantages of the present invention will be apparent to those skilled in the art from the description of the preferred embodiments which follows when taken in conjunction with the accompanying drawings. While numerous changes may be made by those skilled in the art, such changes are within the spirit of the invention.
BRIEF DESCRIPTION OF THE DRAWINGS
These drawings illustrate certain aspects of some of the embodiments of the present invention, and should not be used to limit or define the invention.
FIG. 1 illustrates a consistometer paddle in accordance with the prior art.
FIG. 2 illustrates a consistometer paddle in accordance with an embodiment of the present invention.
FIG. 3 is a flow diagram of the steps for a settling test in accordance with an embodiment of the present invention.
FIG. 4 depicts the paddle of FIG. 2 removed from the consistometer can with the cement slurry set on the paddle.
DESCRIPTION OF PREFERRED EMBODIMENTS
The present invention primarily relates to subterranean cementing operations. More particularly, the present invention relates to an improved method for measuring the density and settling properties of cement slurries.
Turning now to FIG. 1, a consistometer paddle 100 in accordance with the prior art is depicted. The paddle 100 consists of a partitioned frame 102 with protruding portions 104. The cement slurry is mixed in the consistometer can through rotations of the paddle 100. As the paddle 100 rotates, the partitioned frame 102 and the protruding portions 104 mix the slurry. FIG. 2 depicts a paddle 200 used in a consistometer for carrying out a settling test in accordance with an embodiment of the present invention. The paddle 200 includes a planar partitioned frame 202 and does not have any portions protruding from the plain of the frame.
FIG. 3 illustrates a flow diagram of the steps for conducting a settling test in accordance with an embodiment of the present invention. At step 302, the cement slurry is placed in a consistometer. The sample is placed in the consistometer's can. The consistometer also includes an improved paddle 200. The consistometer motor is turned on and the paddle rotates, mixing the cement slurry in the consistometer can. Then, at step 304, the cement slurry is brought up to the Bottom Hole Circulating Temperature (“BHCT”) and Bottom Hole Pressure (“BHP”) while being stirred by the improved paddle 200. In an exemplary embodiment a High Pressure High Temperature (“HPHT”) program is used to increase the pressure and temperature of the cement slurry to the BHCT and BHP. In one embodiment the cement slurry's temperature and pressure reaches the BHCT and BHP in a pre-specified time representing the time it would take to get all the cement slurry placed in position for a particular job, or the “job time”
The consistometer motor is then turned off at step 306. The movement of the paddle 200 stops and the cement slurry is no longer being stirred. Next, at step 308 the HPHT program heats the cement slurry up to the Bottom Hole Static Temperature (“BHST”). The BHST represents the downhole temperature under static conditions and after sufficient time has elapsed to negate any effect of the circulating fluid. The BHST is typically higher than the BHCT. The BHST for a particular job may be estimated in a variety of ways. For example, tables, charts and computer routines may be used to predict the BHST as a function of a number different factors such as the job depth or the geographic area where the job is to be performed.
Turning off the motor and heating up the cement slurry to the BHST closely simulates the actual conditions under ground after the cement has been put in place. Specifically, this step simulates the stage where the cement is put in place on the field and undergoes an increase in temperature as it becomes static. In one embodiment, the BHST is achieved in a minimum of 4 hours. The slurry is maintained at the BHST for a predetermined period of time. In one exemplary embodiment, the slurry is maintained at the BHST for a period of at least 12 hours from the time the motor is turned off. Once the cement slurry is retained at the BHST for the pre-specified time and begins to set, at step 310, the HPHT program cools down and depressurized the consistometer can over a set amount of time.
At step 312, the consistometer can is disassembled and the set slurry which is now hardened around the consistometer paddle 200 is removed from the consistometer can. FIG. 4 shows the paddle 200 removed from the consistometer can 404 with the cement slurry 402 set on the paddle 200. As depicted in FIG. 4, the set cement slurry 402 forms a cylindrical body around the paddle 200. As would be appreciated by those of ordinary skill in the art, with the benefit of this disclosure, the set cement may take on other shapes depending on the shape of the consistometer can.
Returning now to FIG. 3, a cement slurry sample is cut off from the paddle 200 at step 314. The improved paddle design provides for an easy removal of the hardened cement sample. Removal of the cement slurry sample from the paddle was not possible in the prior art, mainly because of the protruding portions 104 of the paddle 100. Specifically, an attempt to cut off the cement sample from a paddle in accordance with the prior art would damage the paddle itself.
In contrast, in an embodiment of the present invention a rock saw may be used to cut off the set cement from the improved paddle 200. Because the improved paddle does not have any portions protruding from its planar frame, the hardened cement sample can be easily cut off from the paddle itself. Specifically, the cement sample may be cut off from the paddle 200 by cutting parallel to the paddle's planar frame on each side of the frame. The cement sample is then turned perpendicular and cut along its horizontal axis into three parts having substantially equal lengths. These parts represent the top, the middle and the bottom of the cement sample. The characteristics of the cement samples obtained may then be studied. In one embodiment, the density of the samples may be measured using the Archimedes principle which is well known in the art.
The setting time for cement is temperature dependent. As a result, the accuracy of any analysis of the cement slurry is largely dependent upon how closely the test temperature resembles the actual temperature conditions on the field where the slurry is to be used. As discussed above, the testing method of the present invention maintains the cement slurry under the predetermined temperature and pressure throughout the test, therefore simulating what the slurry is actually subjected to in downhole conditions. Specifically, the sample need not be cooled down and removed from the HPHT machine in order to be transferred to the settling tubes and reheated. Therefore, the new method does not involve viscosification of the slurry in the middle of the test due to cooling and transfer of the slurry at room temperature. The elimination of this step improves the test's accuracy, saves time and reduces the hazards associated with removing the glass shards from the sample once the settling tube is broken.
Additionally, the testing method of the present invention reduces the risk of oil contamination of the cement slurry by eliminating the open-ended glass tubes used in the BP Settling test.
To facilitate a better understanding of the present invention, the following examples of certain aspects of some embodiments are given. In no way should the following examples be read to limit, or define, the scope of the invention.
EXAMPLES
Tables 1.1 and 1.2 depict the result of analyzing two different samples. Table 1.1 depicts the results of analyzing a “stable” sample. In contrast, table 1.2 depicts the results from analyzing an unstable sample. Each sample was analyzed with both the BP Settling Test and the method in accordance with an embodiment of the present invention. As demonstrated in the tables, the new method yields more accurate results.
TABLE 1.1
Slurry with good suspension - Actual pressurized balance
weight - 18.00 ppg
18 ppg Slurry - Known to be stable New Method BP Settling Test
Top Sample 18.00 ppg 18.03 ppg
Middle Sample 18.06 ppg 18.02 ppg
Bottom Sample 18.19 ppg 18.21 ppg
TABLE 1.2
Slurry with bad suspension - Actual pressurized balance
weight - 17.95 ppg
New
17.95 ppg Slurry - Known to be unstable Method BP Settling Test
Top Sample 17.77 ppg 17.75 ppg
Middle Sample 18.48 ppg 17.94 ppg
Bottom Sample 19.28 ppg 18.77 ppg

Claims (20)

1. A method for analyzing a cement slurry comprising the steps of:
placing a cement slurry in a consistometer having a paddle,
heating the cement slurry;
allowing the cement slurry to set;
cooling the cement slurry;
removing the paddle;
cutting off a set cement slurry sample from the paddle; and
analyzing the sample.
2. The method of claim 1, further comprising the step of cutting the set cement slurry sample into a plurality of smaller sections corresponding to a top portion sample, a middle portion sample and a bottom portion sample.
3. The method of claim 1, wherein the step of heating the cement slurry comprises heating the cement slurry to a Bottom Hole Circulating Temperature.
4. The method of claim 1, wherein the paddle comprises a generally planar frame.
5. The method of claim 4, wherein the step of cutting off the set cement slurry sample from the paddle comprises cuffing the set cement slurry parallel to the generally planar frame.
6. The method of claim 1, wherein the step of heating the cement slurry comprises:
heating the cement slurry at a Bottom Hole Circulating Temperature during a first time period; and
heating the cement slurry at a Bottom Hole Static Temperature during a second time period;
wherein the cement slurry is stirred during the first time period and not stirred during the second time period.
7. The method of claim 6, wherein the first time period represents a job time.
8. The method of claim 6, wherein the second time period is at least about 12 hours.
9. The method of claim 6, wherein temperature of the cement slurry changes from the Bottom Hole Circulating Temperature to the Bottom Hole Static Temperature in a time period of at least 4 hours.
10. A method of analyzing a cement slurry comprising the steps of:
stirring a cement slurry in a consistometer;
heating the cement slurry to a predetermined temperature;
halting the stirring of the cement slurry;
cooling the cement slurry;
removing the cement slurry from the consistometer; and
analyzing the cement slurry.
11. The method of claim 10, wherein the predetermined temperature is a Bottom Hole Circulating Temperature.
12. The method of claim 10, wherein stirring the cement sample is carried out by a planar paddle.
13. A method of analyzing a cement slurry comprising the steps of:
stirring a cement slurry with a generally planar paddle in a consistometer;
heating the cement slurry to a first temperature;
halting the stirring of the cement slurry;
changing temperature of the cement slurry to a second temperature;
cooling the cement slurry;
removing the cement slurry from the consistometer; and
analyzing the cement slurry,
wherein the cement slurry sets on the planar paddle.
14. The method of claim 13, wherein the first temperature is a Bottom Hole Circulating Temperature.
15. The method of claim 13, wherein the second temperature is a Bottom Hole Static Temperature.
16. The method of claim 13, wherein the cement slurry is stirred for a period of time representing a job time.
17. The method of claim 13, wherein the cement slurry is maintained at the second temperature for at least 12 hours.
18. The method of claim 13, further comprising cutting off a cement slurry sample from the cement slurry set on the paddle.
19. The method of claim 18, further comprising cutting the cement slurry sample into three parts representing a top sample, a middle sample and a bottom sample.
20. The method of claim 19, further comprising analyzing a settling property of the top sample, the middle sample and the bottom sample.
US11/868,708 2007-10-08 2007-10-08 Method of measuring a set cement density and settling properties Expired - Fee Related US7631541B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US11/868,708 US7631541B2 (en) 2007-10-08 2007-10-08 Method of measuring a set cement density and settling properties

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US11/868,708 US7631541B2 (en) 2007-10-08 2007-10-08 Method of measuring a set cement density and settling properties

Publications (2)

Publication Number Publication Date
US20090090180A1 US20090090180A1 (en) 2009-04-09
US7631541B2 true US7631541B2 (en) 2009-12-15

Family

ID=40522133

Family Applications (1)

Application Number Title Priority Date Filing Date
US11/868,708 Expired - Fee Related US7631541B2 (en) 2007-10-08 2007-10-08 Method of measuring a set cement density and settling properties

Country Status (1)

Country Link
US (1) US7631541B2 (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110172130A1 (en) * 2004-10-20 2011-07-14 Girish Dinkar Sarap Treatment Fluids Comprising Vitrified Shale and Methods of Using Such Fluids in Subterranean Formations
US8689870B2 (en) 2011-04-19 2014-04-08 Baker Hughes Incorporated Use of methylhydroxyethyl cellulose as cement additive
US9512345B2 (en) 2004-10-20 2016-12-06 Halliburton Energy Services, Inc. Settable spacer fluids comprising pumicite and methods of using such fluids in subterranean formations
US10767098B2 (en) 2013-09-17 2020-09-08 Baker Hughes, A Ge Company, Llc Method of using sized particulates as spacer fluid
US10822917B2 (en) 2013-09-17 2020-11-03 Baker Hughes, A Ge Company, Llc Method of cementing a well using delayed hydratable polymeric viscosifying agents
US10844270B2 (en) 2013-09-17 2020-11-24 Baker Hughes, A Ge Company, Llc Method of enhancing stability of cement slurries in well cementing operations
US11028309B2 (en) 2019-02-08 2021-06-08 Baker Hughes Oilfield Operations Llc Method of using resin coated sized particulates as spacer fluid

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102539280B (en) * 2010-12-10 2013-11-13 中国石油化工股份有限公司 Temperature increasing and pressurizing foam cement slurry density testing device
CN104237070B (en) * 2014-10-13 2016-06-01 中国石油集团渤海钻探工程有限公司 A kind of device and method determining high-density cement mortar sedimentation stability index
CN111596042A (en) * 2020-05-13 2020-08-28 中国石油集团渤海钻探工程有限公司 Real-time evaluation device and evaluation method for sedimentation stability of well cementation cement slurry
CN113008732A (en) * 2021-02-24 2021-06-22 中铁六局集团有限公司 Test method for measuring stability of slurry

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4941536A (en) * 1989-06-27 1990-07-17 Halliburton Company Set retarded cement compositions and methods for well cementing
US6729405B2 (en) * 2001-02-15 2004-05-04 Bj Services Company High temperature flexible cementing compositions and methods for using same
US20070194476A1 (en) * 2006-02-17 2007-08-23 Ramsey W G Foamed glass ceramic composite materials and a method for producing the same
US7530396B1 (en) * 2008-01-24 2009-05-12 Halliburton Energy Services, Inc. Self repairing cement compositions and methods of using same

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4941536A (en) * 1989-06-27 1990-07-17 Halliburton Company Set retarded cement compositions and methods for well cementing
US6729405B2 (en) * 2001-02-15 2004-05-04 Bj Services Company High temperature flexible cementing compositions and methods for using same
US20070194476A1 (en) * 2006-02-17 2007-08-23 Ramsey W G Foamed glass ceramic composite materials and a method for producing the same
US7530396B1 (en) * 2008-01-24 2009-05-12 Halliburton Energy Services, Inc. Self repairing cement compositions and methods of using same

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110172130A1 (en) * 2004-10-20 2011-07-14 Girish Dinkar Sarap Treatment Fluids Comprising Vitrified Shale and Methods of Using Such Fluids in Subterranean Formations
US9512345B2 (en) 2004-10-20 2016-12-06 Halliburton Energy Services, Inc. Settable spacer fluids comprising pumicite and methods of using such fluids in subterranean formations
US8689870B2 (en) 2011-04-19 2014-04-08 Baker Hughes Incorporated Use of methylhydroxyethyl cellulose as cement additive
US10767098B2 (en) 2013-09-17 2020-09-08 Baker Hughes, A Ge Company, Llc Method of using sized particulates as spacer fluid
US10822917B2 (en) 2013-09-17 2020-11-03 Baker Hughes, A Ge Company, Llc Method of cementing a well using delayed hydratable polymeric viscosifying agents
US10844270B2 (en) 2013-09-17 2020-11-24 Baker Hughes, A Ge Company, Llc Method of enhancing stability of cement slurries in well cementing operations
US11028309B2 (en) 2019-02-08 2021-06-08 Baker Hughes Oilfield Operations Llc Method of using resin coated sized particulates as spacer fluid

Also Published As

Publication number Publication date
US20090090180A1 (en) 2009-04-09

Similar Documents

Publication Publication Date Title
US7631541B2 (en) Method of measuring a set cement density and settling properties
Lavrov et al. Physics and mechanics of primary well cementing
Zhou et al. Mechanical characteristics of well cement under cyclic loading and its influence on the integrity of shale gas wellbores
US11130899B2 (en) Compositions and methods for well cementing
US20140174192A1 (en) Apparatus for measuring shear bond strength of set cement and method of using same
NO324297B1 (en) Procedure for sealing a drill well
Reddy et al. Cement mechanical property measurements under wellbore conditions
US20150260009A1 (en) Portland cement type-g with nanosilica additive for high pressure-high temperature applications
Pang et al. An innovative test apparatus for oil well cement: In-situ measurement of chemical shrinkage and tensile strength
Al-Yami et al. Evaluation and optimization of low-density cement: laboratory studies and field application
Corina et al. Cement plug sealing studies of silica cement systems
US20140332217A1 (en) Portland saudi cement type-g with nanosilica additive for high pressure-high temperature applications
Opedal et al. Cement Bond Strength Measurements
Li et al. A newly developed wellbore-simulation apparatus to study performance of oilwell cements
Pedersen et al. Cementing of an offshore disposal well using a novel sealant that withstands pressure and temperature cycles
Fahrman et al. Visualizing Well System Breakdown: Experimental and Numerical Analyses
Boniface et al. Analysis of nigerian local cement for slurry design in oil and gas well cementation
Beirute et al. A method for selection of cement recipes to control fluid invasion after cementing
Sharifi et al. Application of a Laboratory-Scale Apparatus to Simulate Gas Migration during Cement Slurry Hydration
Broni-Bediako et al. Comparative study of local cements with imported class ‘G’cement at different temperatures for oil well cementing operations in Ghana
Al-Yami et al. Engineered fit-for-purpose cement system to withstand life-of-the-well pressure and temperature cycling
Kok et al. Fluid migration and rheological properties of different origin G-class cements in oil well drilling applications
Kumar et al. Flexible cement extends wellbore life with an integrated approach to zonal isolation
Al-Yami et al. Durable and Self-Healing Cement Systems: Lab Testing and Field Deployment
Haberman et al. Downhole fluid-loss measurements from drilling fluid and cement slurries

Legal Events

Date Code Title Description
STCF Information on status: patent grant

Free format text: PATENTED CASE

AS Assignment

Owner name: HALLIBURTON ENERGY SERVICES, INC., TEXAS

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:WAUGH, BRYAN;GORDON, CHRISTOPHER;REEL/FRAME:023610/0637;SIGNING DATES FROM 20071107 TO 20071108

FPAY Fee payment

Year of fee payment: 4

FPAY Fee payment

Year of fee payment: 8

FEPP Fee payment procedure

Free format text: MAINTENANCE FEE REMINDER MAILED (ORIGINAL EVENT CODE: REM.); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY

LAPS Lapse for failure to pay maintenance fees

Free format text: PATENT EXPIRED FOR FAILURE TO PAY MAINTENANCE FEES (ORIGINAL EVENT CODE: EXP.); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY

STCH Information on status: patent discontinuation

Free format text: PATENT EXPIRED DUE TO NONPAYMENT OF MAINTENANCE FEES UNDER 37 CFR 1.362

FP Lapsed due to failure to pay maintenance fee

Effective date: 20211215