USRE24617E - Method for forming- conduits - Google Patents

Method for forming- conduits Download PDF

Info

Publication number
USRE24617E
USRE24617E US24617DE USRE24617E US RE24617 E USRE24617 E US RE24617E US 24617D E US24617D E US 24617DE US RE24617 E USRE24617 E US RE24617E
Authority
US
United States
Prior art keywords
concrete
granular
soluble
conduits
tubular
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
Publication date
Application granted granted Critical
Publication of USRE24617E publication Critical patent/USRE24617E/en
Expired legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G15/00Forms or shutterings for making openings, cavities, slits, or channels
    • E04G15/06Forms or shutterings for making openings, cavities, slits, or channels for cavities or channels in walls of floors, e.g. for making chimneys
    • E04G15/061Non-reusable forms

Definitions

  • An object of my invention is to provide a method for [of] forming [radiant heat] conduits [in concrete buildings] which is a continuation-in-part of my application filed October 8, 1951, Serial No. 250,288, now abandoned, on the same invention [method].
  • the invention relates to the official class of heat exchange and more particularly to a new and novel method of forming radiant heat conduits in the concrete floors of buildings.
  • a further object of my invention is to provide a method of forming radiant heat conduits in concrete floors 2 vice will be particularly pointed out in the appended claims.
  • Figure 1 is a plan view of a soluble pipe laid on a prepoured concrete base, prior to pouring a covering layer of concrete over the pipe;
  • the material forming the pipes is made strong enough ,to resist any crushing by the concrete poured thereon.
  • the pipes can be bent into any desired shapes through application of any well known softening means.
  • One of the chief features of my invention is to provide a material for the dissolvable pipes which will float in a flush-
  • the granular particles of the material are insoluble and lighter than water so that they will be water-borne during the flushing process.
  • a pervious material will take on weight when soaked in a liquid and so may become too heavy to be completely carried away when the forms are dissolved and flushed out;
  • a pervious material usually will swell when soaked in a liquid and may cause the grains to clog the passages, particularly at the bends or joints in the pipes, while an impervious material will not swell.
  • the dissolvable pipe is made of insoluble granular ma- .a soluble cement or a glutinous material that would dissolve in the flushing fluid and free the sawdust particles so that they could be floated away with the fluid.
  • tubular dissolvable forms are protected on their outer surfaces by a fine non-corrosive wire [wesh] mesh strip that is wrapped spirally around the dissolvable form.
  • Another suitable material for protecting the pipe could be a strip of spun glass mesh such as Fiberglas.
  • Figure 3 is an enlarged view of a portion of the soluble pipe and illustrates how the outer surface of the pipe is wrapped in a protective strip of non-corrosive wire mesh or spun glass;
  • Figure-4 is a view similar to Figure 2, and illustrates how the soluble pipe may be flushed away after the concrete has set, leaving only a conduit in the concrete, lined with the non-corrosive wire mesh or spun glass;
  • Figure 5 is a section along the line V-V of Figure 1.
  • 1 provide a lower layer of concrete A, see Figure 1, and this pre-poured layer constitutes the. concrete base.
  • the concrete base is preferably poured on the ground B, see Figure 2, and between form boards C.
  • the soluble core indicated generally at D is laid upon the concrete base A and is bent and curved in any desired manner.
  • Conduits 1 and 2 may be applied to the ends 3 and 4 for the purpose of forcing air through the soluble core to test the core D before ,pouring the upper concrete layer Fto make sure that there is no obstruction and to clean out any foreign matter that migh be lying therein.
  • the soluble core D Before the soluble core D is laid on the concrete base, it is preferably externally wrapped with a tape E that can be made of a non-conductive wire mesh or spun glass.
  • the soluble core D as shown in Figure 1 has the tape E wrapped therearound.
  • the soluble core is formed from an impervious granular material such as expanded perlite or waterproofed sawdust and the granular particles are held together by a glutinous material whichwill dissolve in water.
  • glutinous material to be broad enough to include any type of adhesive which will hold the granular material together, but which will dissolve when water is flushed through the soluble core or other liquid is forced therethrough so as to permit the granular impervious particles to break up and be floated away with the liquid.
  • the granular particles are preferably light enough to float in the liquid although they do not necessarily have to belighter than the liquid that is used to flush them out. If, for example, he granular particles are of the same specific gravity, or a very little heavier than the liquid, they will still be borne away by the liquid when there is a strong current flowing through the passage. However, grains that are a little lighter than the liquid are preferable.
  • the fioatable character of the granular material forming the soluble core is indispensable in clearing long passages since all of the unsoluble matter must be waterborne. If this were not true the joints in the soluble core or the curved portions would become clogged with the granular material.
  • the mesh of the helically wrapped strip E should be dampened and impregnated with cement. This will insure its adhering strongly to the upper layer F of the concrete so that it will not become dis -engaged from the concrete F when the soluble core is washed'away. Also, the strip E will remain adhered to 3 the concrete F when the passages it encloses are used for the carrying of a heated liquid such as hot water.
  • the cement that closes the openings in the tape E- it may be possible to mix a dry waterproofing material and this material would not disintegrate when the dissolvable pipe is flushed out.
  • the Waterproofing material in the strip or tape B would prevent the moisture from the upper layer of concrete during the pouring of the latter, from gaining access to the soluble pipe and cause it to disintegrate or dissolve prematurely.
  • Such material may vary from the size of the small grains of sand to lager grains of sand.
  • the binder In the actual mixing of the granular material with the adhesive or glutinous material so as to form the soluble binder, the binder is likely to be much more costly than the grains volume for volume.
  • the size of the grains could be graded from fine to coarse in a way to reduce to a minimum the voids between the grains that have to be filled with the binder.
  • the dissolvable core D is made up of granular particles of impervious material mixed with a soluble binder and then the mixture is formed into tubes of the desired diameter and wall thickness.
  • the soluble binder fills all of the interstices between adjacent granular particles.
  • the outer surface of the tube is then protected by a covering of a non-rusting mesh material which is preferably in tape form and helically wrapped around the tube.
  • conduits 1 and 2 will become permanent parts of the piping system.
  • the conduits are bent at right angles so as to project vertically out of the concrete upper layer F, see Figure 5.
  • the first purpose of the conduits is to flush out the dissolvable core D with fluid after the concrete has set. After this is completed, the conduits 1 and 2 are then used as connections for the permanent hot water or hot air heating system.
  • the floating characteristics of the insoluble aggregate making up the pipe D becomes indispensable where the concrete slab comprising the layers A and F, might be at a point lower than the outlet of the piping system that carries the hot water or hot air to the final passage D in the slab.
  • a concrete floor could be poured below ground level and this would necessitate the floating of.
  • FIG. 5 is a section taken along the line VV of Figure l, and in addition shows the upper layer of concrete F which is not shown in Figure l.
  • the herein described method of forming a system of conduits in concrete floors comprising: laying a system of tubular forms on a concrete supporting base, the tubular forms being made of a granular floatable impervious material held together by a soluble binder and enclosed in a mesh of tubular form; pouring concrete on the base and enclosing the tubular forms and permitting the poured concrete to set; and flowing a dissolving fluid through the tubular forms for dissolving the soluble binder and freeing the granular floatable impervious material so that it will be flushed away with the fluid and carried out of the conduit so as to leave a conduit in the concrete, lined with a tubular mesh.
  • the herein described method of forming a system of conduits in concrete floors comprising: laying a systern of tubular forms on a concrete supporting base; the tubular forms being made of a granular floatable impervious material held together by a soluble binder and enclosed in a mesh of tubular form; sealing the interstices of the mesh with a self-setting and moisture resistant coating; pouring concrete on the base and enclosing the tubular forms and permitting the poured concrete to set; and flowing a dissolving fluid through the tubular forms for dissolving the soluble binder and freeing the granular floatable impervious material so that it will be flushed away with the fluid and carried out of the conduit 50 as to leave a conduit in the concrete that is lined with a tubular mesh whose self-setting coating becomes attached to the previously poured concrete.
  • the herein described method of forming a system of conduits in concrete floors comprising: laying a systern of tubular forms on a concrete supporting base, the tubular forms being made of a granular floatable material held together by a soluble binder and enclosed in mesh of tubular form; pouring concrete on the base and enclosing the tubular forms and permitting the poured concrete to set; and flowing a dissolving fluid through the tubular forms for dissolving the soluble binder and freeing the granular floatable material so that it will be flushed away with the fluid and carried out of the conduit so as to leave a conduit in the concrete, lined with a tubular mesh.
  • the herein described method of forming a conduit in a concrete floor comprising: laying a tubular form on a concrete supporting base, the tubular form being made of a granular floatable materialheld together by a soluble binder; pouring concrete on the base and enclosing the tubular form and permitting the concrete to set; and flowing a dissolving fluid through the tubular form for dissolving the soluble binder and freeing the granular floatable material so that it will be flushed away with the fluid and carried out of the conduit thus formed and thereby leaving, a conduit in the concrete.
  • the herein described method of forming a conduit in a concrete floor comprising: laying a tubular form on a supporting base, the tubular form being made of a granular floatable material held together by a soluble binder; pouring concrete on the base and enclosing the tubular form and permitting 'the concrete to set; and flowing a ten'al so that it will be flushed away with the fluid and carried out of the conduit thus formed and thereby leaving a conduit in the concrete.

Description

March 10, 1959 c, GREENE Re. 24,617
METHOD FOR FORMING CONDUITS Original Filed March 20, 1953 Irvmvrozc CURTIS GREENE A-r-ronu EYS .ing fluid such as water.
United States Patent METHOD FOR FORMING CONDUITS Curtis Greene, Sacramento, Calif.
Original No. 2,765,511, dated October 9, 1956, Serial No. 343,717, March 20, 1953. Application for reissue October 28, 1957, Serial No. 694,476
5 Claims. (Cl. 25-454) Matter enclosed in heavy brackets appears in the original patent but forms no part of this reissue specification; matter printed in italics indicates the additions made by reissue.
An object of my invention is to provide a method for [of] forming [radiant heat] conduits [in concrete buildings] which is a continuation-in-part of my application filed October 8, 1951, Serial No. 250,288, now abandoned, on the same invention [method]. In the application, I set forth that the invention relates to the official class of heat exchange and more particularly to a new and novel method of forming radiant heat conduits in the concrete floors of buildings.
A further object of my invention is to provide a method of forming radiant heat conduits in concrete floors 2 vice will be particularly pointed out in the appended claims. I
My invention is illustrated in the accompanying draw= ing forming a part of this application, in which:
Figure 1 is a plan view of a soluble pipe laid on a prepoured concrete base, prior to pouring a covering layer of concrete over the pipe;
that will save time and cost in the installation of the conduits in. the floors. It is proposed to pour concrete around a system of soluble pipes and after the concrete has set,
to remove the pipes by dissolving and flushing them from the conduits thus formed.
The material forming the pipes is made strong enough ,to resist any crushing by the concrete poured thereon. The pipes can be bent into any desired shapes through application of any well known softening means. One of the chief features of my invention is to provide a material for the dissolvable pipes which will float in a flush- The granular particles of the material are insoluble and lighter than water so that they will be water-borne during the flushing process.
The advantages of an impervious material for the granular filling particles, held together by a soluble binder in the tubular forms, are two:
(1) A pervious material will take on weight when soaked in a liquid and so may become too heavy to be completely carried away when the forms are dissolved and flushed out; and
(2) A pervious material usually will swell when soaked in a liquid and may cause the grains to clog the passages, particularly at the bends or joints in the pipes, while an impervious material will not swell.
The dissolvable pipe is made of insoluble granular ma- .a soluble cement or a glutinous material that would dissolve in the flushing fluid and free the sawdust particles so that they could be floated away with the fluid.
The tubular dissolvable forms are protected on their outer surfaces by a fine non-corrosive wire [wesh] mesh strip that is wrapped spirally around the dissolvable form.
Another suitable material for protecting the pipe could be a strip of spun glass mesh such as Fiberglas.
Other objects and advantages will appear in the following specification, and the novel features of the de- Figure 2 is a cross sectional view of the embedded pipe shown lying on the concrete base and embedded in the upper layer of concrete;
Figure 3 is an enlarged view of a portion of the soluble pipe and illustrates how the outer surface of the pipe is wrapped in a protective strip of non-corrosive wire mesh or spun glass;
Figure-4 is a view similar to Figure 2, and illustrates how the soluble pipe may be flushed away after the concrete has set, leaving only a conduit in the concrete, lined with the non-corrosive wire mesh or spun glass; and
Figure 5 is a section along the line V-V of Figure 1.
While I have shown only the preferred form ofmy invention, it should be understood that various changes or modifications may be made within the scope of the appended claims without departing from the spirit and scope of the invention.
In carrying out my invention, 1 provide a lower layer of concrete A, see Figure 1, and this pre-poured layer constitutes the. concrete base. The concrete base is preferably poured on the ground B, see Figure 2, and between form boards C. The soluble core indicated generally at D is laid upon the concrete base A and is bent and curved in any desired manner. Conduits 1 and 2 may be applied to the ends 3 and 4 for the purpose of forcing air through the soluble core to test the core D before ,pouring the upper concrete layer Fto make sure that there is no obstruction and to clean out any foreign matter that migh be lying therein.
Before the soluble core D is laid on the concrete base, it is preferably externally wrapped with a tape E that can be made of a non-conductive wire mesh or spun glass. The soluble core D as shown in Figure 1 has the tape E wrapped therearound. The soluble core is formed from an impervious granular material such as expanded perlite or waterproofed sawdust and the granular particles are held together by a glutinous material whichwill dissolve in water. I wish the term glutinous material to be broad enough to include any type of adhesive which will hold the granular material together, but which will dissolve when water is flushed through the soluble core or other liquid is forced therethrough so as to permit the granular impervious particles to break up and be floated away with the liquid.
The granular particles are preferably light enough to float in the liquid although they do not necessarily have to belighter than the liquid that is used to flush them out. If, for example, he granular particles are of the same specific gravity, or a very little heavier than the liquid, they will still be borne away by the liquid when there is a strong current flowing through the passage. However, grains that are a little lighter than the liquid are preferable.
The fioatable character of the granular material forming the soluble core is indispensable in clearing long passages since all of the unsoluble matter must be waterborne. If this were not true the joints in the soluble core or the curved portions would become clogged with the granular material. Before the upper layer F of the concrete flour is poured, the mesh of the helically wrapped strip E should be dampened and impregnated with cement. This will insure its adhering strongly to the upper layer F of the concrete so that it will not become dis -engaged from the concrete F when the soluble core is washed'away. Also, the strip E will remain adhered to 3 the concrete F when the passages it encloses are used for the carrying of a heated liquid such as hot water. With the cement that closes the openings in the tape E- it may be possible to mix a dry waterproofing material and this material would not disintegrate when the dissolvable pipe is flushed out. Moreover, the Waterproofing material in the strip or tape B would prevent the moisture from the upper layer of concrete during the pouring of the latter, from gaining access to the soluble pipe and cause it to disintegrate or dissolve prematurely.
I do not wish to be confined to any particular size of granular material used. Such material may vary from the size of the small grains of sand to lager grains of sand. The larger the diameter of the soluble core, the larger the grains can be used.
In the actual mixing of the granular material with the adhesive or glutinous material so as to form the soluble binder, the binder is likely to be much more costly than the grains volume for volume. The size of the grains could be graded from fine to coarse in a way to reduce to a minimum the voids between the grains that have to be filled with the binder.
At the time the top layer F is to be poured, all of the mesh covered outer surfaces of the soluble forms D are thoroughly moistened either with a spray or a brush so that the insoluble cement in the voids in the tape E will set and be bonded with the concrete to be poured and which will form the upper layer F. As an alternative to using dry waterproofing compound mixed with the insoluble cement in the tape mesh, this compound may be omitted, and a liquid waterproofing compound may be used instead of water for moistening the outer surface of the helically wrapped tapes just before the top course of the floor slab is poured. This will protect the soluble core from disintegrating at the time the top course of concrete F is poured;
The top course of concrete F is allowed to set and then the conduits 1 and 2 are used for forcing a fluid indicated at G, in Figure 4, through the soluble core D. This fluid will dissolve the soluble core D and leave only the helically wound tape E as a lining for the passage D in the concrete. Figure 4 illustrates how the granular particles 5, forming the soluble core, will be floated away with the fluid flowing through the central or inner, portion G of the core, which is more permeable than the surr unding outer portion of the core. When the entire soluble core is thus washed away, the remaining passage D will be formed in the top layer of concrete F and will be ready to convey heated liquid for the purpose of heating the floors of the building in which the passage is formed. 7
The dissolvable core D is made up of granular particles of impervious material mixed with a soluble binder and then the mixture is formed into tubes of the desired diameter and wall thickness. The soluble binder fills all of the interstices between adjacent granular particles. The outer surface of the tube is then protected by a covering of a non-rusting mesh material which is preferably in tape form and helically wrapped around the tube.
In practice, the conduits 1 and 2 will become permanent parts of the piping system. The conduits are bent at right angles so as to project vertically out of the concrete upper layer F, see Figure 5. The first purpose of the conduits is to flush out the dissolvable core D with fluid after the concrete has set. After this is completed, the conduits 1 and 2 are then used as connections for the permanent hot water or hot air heating system.
The floating characteristics of the insoluble aggregate making up the pipe D becomes indispensable where the concrete slab comprising the layers A and F, might be at a point lower than the outlet of the piping system that carries the hot water or hot air to the final passage D in the slab. A concrete floor could be poured below ground level and this would necessitate the floating of. the
granular particles of the disintegrated pipe D, during the flushing process, up to at least ground level so that they could be carried away from the concrete slab.
The drawing shows an elbow 6 for the pipe D in Figure 5. In actual practice, joints and Ts would be used and preferably made of light metal that would remain in the concrete slab after the pipe D has been flushed out. The joints or Ts would have tapered ends for receiving the ends of the pipes D that fit thereinto. Figure 5 is a section taken along the line VV of Figure l, and in addition shows the upper layer of concrete F which is not shown in Figure l.
I claim:
1. The herein described method of forming a system of conduits in concrete floors comprising: laying a system of tubular forms on a concrete supporting base, the tubular forms being made of a granular floatable impervious material held together by a soluble binder and enclosed in a mesh of tubular form; pouring concrete on the base and enclosing the tubular forms and permitting the poured concrete to set; and flowing a dissolving fluid through the tubular forms for dissolving the soluble binder and freeing the granular floatable impervious material so that it will be flushed away with the fluid and carried out of the conduit so as to leave a conduit in the concrete, lined with a tubular mesh.
2. The herein described method of forming a system of conduits in concrete floors comprising: laying a systern of tubular forms on a concrete supporting base; the tubular forms being made of a granular floatable impervious material held together by a soluble binder and enclosed in a mesh of tubular form; sealing the interstices of the mesh with a self-setting and moisture resistant coating; pouring concrete on the base and enclosing the tubular forms and permitting the poured concrete to set; and flowing a dissolving fluid through the tubular forms for dissolving the soluble binder and freeing the granular floatable impervious material so that it will be flushed away with the fluid and carried out of the conduit 50 as to leave a conduit in the concrete that is lined with a tubular mesh whose self-setting coating becomes attached to the previously poured concrete. I
3. The herein described method of forming a system of conduits in concrete floors comprising: laying a systern of tubular forms on a concrete supporting base, the tubular forms being made of a granular floatable material held together by a soluble binder and enclosed in mesh of tubular form; pouring concrete on the base and enclosing the tubular forms and permitting the poured concrete to set; and flowing a dissolving fluid through the tubular forms for dissolving the soluble binder and freeing the granular floatable material so that it will be flushed away with the fluid and carried out of the conduit so as to leave a conduit in the concrete, lined with a tubular mesh.
4. The herein described method of forming a conduit in a concrete floor comprising: laying a tubular form on a concrete supporting base, the tubular form being made of a granular floatable materialheld together by a soluble binder; pouring concrete on the base and enclosing the tubular form and permitting the concrete to set; and flowing a dissolving fluid through the tubular form for dissolving the soluble binder and freeing the granular floatable material so that it will be flushed away with the fluid and carried out of the conduit thus formed and thereby leaving, a conduit in the concrete.
5. The herein described method of forming a conduit in a concrete floor comprising: laying a tubular form on a supporting base, the tubular form being made of a granular floatable material held together by a soluble binder; pouring concrete on the base and enclosing the tubular form and permitting 'the concrete to set; and flowing a ten'al so that it will be flushed away with the fluid and carried out of the conduit thus formed and thereby leaving a conduit in the concrete.
References Cited in the file of this patent 5 or the original patent UNITED STATES PATENTS Cranmer et al Mar. 26, 1889 Granjon et a]. Aug. 28, 1894
US24617D Method for forming- conduits Expired USRE24617E (en)

Publications (1)

Publication Number Publication Date
USRE24617E true USRE24617E (en) 1959-03-10

Family

ID=2092868

Family Applications (1)

Application Number Title Priority Date Filing Date
US24617D Expired USRE24617E (en) Method for forming- conduits

Country Status (1)

Country Link
US (1) USRE24617E (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5853651A (en) * 1995-09-07 1998-12-29 Simula, Inc. High pressure hollow process for manufacturing composite structures
US20080164027A1 (en) * 2007-01-07 2008-07-10 Schlumberger Technology Corporation Rigless sand control in multiple zones
US20100163235A1 (en) * 2008-12-30 2010-07-01 Schlumberger Technology Corporation Efficient single trip gravel pack service tool
US8220542B2 (en) 2006-12-04 2012-07-17 Schlumberger Technology Corporation System and method for facilitating downhole operations

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5853651A (en) * 1995-09-07 1998-12-29 Simula, Inc. High pressure hollow process for manufacturing composite structures
US8220542B2 (en) 2006-12-04 2012-07-17 Schlumberger Technology Corporation System and method for facilitating downhole operations
US20080164027A1 (en) * 2007-01-07 2008-07-10 Schlumberger Technology Corporation Rigless sand control in multiple zones
US8245782B2 (en) 2007-01-07 2012-08-21 Schlumberger Technology Corporation Tool and method of performing rigless sand control in multiple zones
US20100163235A1 (en) * 2008-12-30 2010-07-01 Schlumberger Technology Corporation Efficient single trip gravel pack service tool
WO2010077729A1 (en) * 2008-12-30 2010-07-08 Schlumberger Canada Limited Efficient single trip gravel pack service tool
US8496055B2 (en) 2008-12-30 2013-07-30 Schlumberger Technology Corporation Efficient single trip gravel pack service tool

Similar Documents

Publication Publication Date Title
US2765511A (en) Method of forming radiant heat conduits in concrete buildings
US5002438A (en) Method of rehabilitating manholes by custom lining/relining
CN106014454B (en) Tunnel-liner vault band is molded into sizing device and grouting process
US4698887A (en) Method for fabricating thermally insulated pipeline section
US2707984A (en) Method of insulating underground pipe
USRE24617E (en) Method for forming- conduits
US20090080976A1 (en) Lightweight aggregate unit and method of manufacture
CN109930780A (en) A kind of construction technology of subsided rest room
CN110130667A (en) A kind of method of the pre-buried pipeline finished product protection of flooring
JP3732427B2 (en) Improvement method of ground reinforcement in underground cavity
US3206867A (en) Method of drying pipe embedded in concrete
JP2520967B2 (en) Cement-based filler composition and existing pipe lining method
CN206279562U (en) A kind of post-cast strip Novel drainage discharge structure
CN209169853U (en) A kind of novel cable cement special pipe
PL156462B1 (en) Method for repairing building structures of objects,especially in reference to statics and water tightness of damaged channels,piping,without disassembly
US3112183A (en) Underground insulating conduit
US1403585A (en) Form for making pipe
CN217815422U (en) Waterproof pipe wall penetrating structure
PL167861B1 (en) Method of sealing and externally repairing existing pipelines of small internal diameter and sealing member therefor
JP2002348849A (en) Filling method for cavity in ground
CN106759519A (en) A kind of post-cast strip Novel drainage discharge structure and its construction method
JP2825189B2 (en) Pipe burial method
Gibson Lining cast-iron mains in position with cement mortar
CN205296129U (en) Sewer line slip casting structure
Bowen et al. CENTRIFUGALLY CAST CONCRETE HIGH PRESSURE PIPE FOR RIVERSIDE [with DISCUSSION]