USRE38633E1 - Automated, electronic network based, project management server system - Google Patents

Automated, electronic network based, project management server system Download PDF

Info

Publication number
USRE38633E1
USRE38633E1 US09/137,186 US13718698A USRE38633E US RE38633 E1 USRE38633 E1 US RE38633E1 US 13718698 A US13718698 A US 13718698A US RE38633 E USRE38633 E US RE38633E
Authority
US
United States
Prior art keywords
project
resource
database
management
electronic messaging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US09/137,186
Inventor
Seshan R. Srinivasan
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ENPAT Inc
Original Assignee
ENPAT Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=22781855&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=USRE38633(E1) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by ENPAT Inc filed Critical ENPAT Inc
Priority to US09/137,186 priority Critical patent/USRE38633E1/en
Application granted granted Critical
Publication of USRE38633E1 publication Critical patent/USRE38633E1/en
Assigned to ENPAT, INC. reassignment ENPAT, INC. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: RAJ, SESHAN S, MR.
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • G06Q10/063114Status monitoring or status determination for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • G06Q10/063118Staff planning in a project environment
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06312Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06313Resource planning in a project environment
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10TECHNICAL SUBJECTS COVERED BY FORMER USPC
    • Y10STECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10S706/00Data processing: artificial intelligence
    • Y10S706/902Application using ai with detail of the ai system
    • Y10S706/919Designing, planning, programming, CAD, CASE

Definitions

  • a patent search revealed no patent under the categories, Automatic Project Management, or under Electronic Mail based Project Management or Groupware Project Management.
  • the invention described here is the design and application of an electronic network based project management server system.
  • the use of the product will result in an improved organizational process for compiling, tracking and managing multiple projects within an organization.
  • the goal of the ‘Auto Multi-Project Server’ is to act as an automated computer based project coordinator to manage the goals of multiple organizational work-teams. Activities of the automated computer based server comprise of collating/compiling project data, flagging inconsistencies, follow-up with work-team members, obtain updated project tracking data, communicate project progress to work-team, resolve inter-project conflicts by re-allocation of critical resources based on project priorities and generate management reports for flagging time and cost overruns and critical path information.
  • Project planning tools with software for generating charts such as Gantt, Pert/CPM etc. Many of the techniques were invented during the Second World War Majority of project management is perceived as belonging to this area. These are static standalone tools and do not impose any particular process in the organization. Organizations have to figure out methods for input, tracking and report distribution. Typically a project coordinator is hired by organizations to manually compile input data, run the tools and distribute progress reports.
  • Example (1) U.S. Pat. No. 5,168,444 for a Work-flow shipment system, including processing of document images. This is not related to automatic project management for multiple work-groups.
  • Example (2) Lotus NOTES is a leading groupware product offering the necessary technology to build organizational processes including Project Tracking examples.
  • the system is not designed to handle large multi-project/multi-priority environments. There is no automatic system proposed by the manufacturer and it is left for each organization to design its own process or system of project management.
  • Example (3) The nearest commercial product design is a product called SYZYGY from Information Research Corp., which builds on inherent capability of local area networks (LAN) to tie workers together.
  • LAN local area networks
  • the system has a central database on organizational projects and can be automatically be programmed by managers to broadcast reminder messages. (Reference: Personal Computing, Volume 14, Issue 4, Date: Apr. 27, 1990, Page: 152), The differences I see between this product and the invention under this patent:
  • Syzygy is not ideal for managing large or complex projects since it lacks critical path analysis.
  • the invention under this patent includes a complete computation engine for computing critical path activities,
  • Syzygy is not targeted for multiple work-teams with inter-conflicting priorities.
  • Syzygy does not attempt any resources leveling or resource re-allocation.
  • Auto Multi-Project Server consists of a centralized automatic project management server software, based in a computer and accessible via electronic mail or fax messages.
  • the ‘Auto Multi-Project Server’ automatically computes task completion/start dates and triggers messages based on data mailed to it. Thus the data itself is used to program the ‘Auto Multi-Project Server’.
  • the ‘Auto Multi-Project Server’ reads electronic mail or fax messages, such as project plans and flags project data inconsistencies. It then compiles project management data into a usable project database with information to include details on goals, milestones, budgets etc.
  • the ‘Auto Multi-Project Server’ includes extensive dependency calculations, such as taking into account complex inter-task dependencies and start/finish lags between dependent activities.
  • the ‘Auto Multi-Project Server’ goes beyond just reminding people about their start and finish dates, it also serves as a project information system by informing the group team members on their inter-dependencies.
  • the ‘Auto Multi-Project Server’ includes resolution of multi-project priorities, which is an essential component for managing multi-groups with divergent priorities. It allows for example a program or general manager to examine multiple-projects under his program and assign priorities for completion. Individual task deadlines and resource usage would be controlled by the priorities assigned to the completion of the project.
  • the ‘Auto Multi-Project Server’ will re-allocate critical resources based on project priorities and re-compute completion dates.
  • the project database would automatically be updated with the new dates. Thus there is automatic resolution of priority conflicts.
  • the project leader does not have to have to constantly escalate issues up the management hierarchy for resolution.
  • Security issues are handled by the authorization of ell input mail or faxes, prior to processing.
  • the incoming mail is checked against a valid list of passwords prior to processing.
  • each project is assigned a unique identifier to prevent mix-up of information between projects.
  • FIG. 1 Architecture drawing to show the different components of an ‘Auto Multi-Project Management Process’, which is required for implementing the ‘Auto Multi-Project Server’.
  • FIG. 2 Internal architecture of the ‘Auto Multi-Project Server’.
  • FIG. 3 Provides a Subject database example, format to serve as the primary communication and storage format for information on the different project(s).
  • FIG. 4 Build Program Flowchart, to compile together data on inter-dependent tasks for each project and build a reference database (with all necessary project information). To compute completion dates based on resource limits and inter-project dependencies.
  • FIG. 5 Dependency computation flowchart, to compute task start and finish dates based on relationship to dependent predecessors.
  • FIG. 6 Reminder program flowchart, to track pending tasks and remind task owners on a pre-determined frequency on when to start/finish tasks. To update task owners on status of dependencies.
  • FIG. 7 Inform flowchart, to track task completion and inform dependent tasks on start or finish status of their predecessors, thus acting as a formal channel of communication eliminating the chance of misinformation. Also to inform project and task leaders on re-computed completion dates based on resource re-allocation between projects (based on project priorities).
  • FIG. 8 Update flowchart, to update the ‘build’ file with status changes in task details or task inter-dependencies or inter-project priorities.
  • FIG. 9 Inter-project priorities and resource allocation flowchart. To allocate common resources based on inter-project priorities and re-compute task duration.
  • FIG. 10 Reports flowchart, to generate project management reports for reporting progress of projects(s).
  • FIG. 1 A first figure.
  • Network Operating System is a general term used to refer to the communication protocol used to allow users communicate with the ‘Auto Project Server’.
  • Fax is the media for communication.
  • LAN local area network
  • WAN wide area network
  • telephone network is the media for communication.
  • FIG. 1 shows the overall process of using the invention in an organization to manage multiple projects vi an automatic computer server.
  • FIG. 2 shows the internal architecture of the invention which is an ‘Auto Multi-Project Server’.
  • FIG. 1, Part 10 refers to the set of project database files stored, one for each project. These files are also referred to as the ‘build’ file. Refer FIG. 3 for a sample format. This file contains information about the project, such as the start date and other global information such as the project leader's name, mail identity, holidays, weekends etc. It also contains detailed information about each task such as the description, task leader's name/mail identity, task duration or planned completion date. In addition it contains information about the dependencies for each task, in terms of the predecessor task id, the type of dependency whether FS(predeceseor finishes and task starts), FF(predecessor and task finish together) or SS (predecessor and task start together), and the lag between the predecessor and task activities. Finally the database contains information about which resources, amount of resources and budget for resources required for doing the task.
  • FIG. 1, Part 20 is the ‘Auto Multiple Project Server’.
  • This is a software system which is the head of the new process. Details of its internal architecture are contained in FIG. 2 . Its workings are explained in the flowcharts contained in FIG. 4 through FIG. 10 .
  • the server is a software process that runs at fixed intervals (example: at the end of the day) and performs the task of project management coordination by performing date compilation, data validation, database update, follow-up reminders to task leaders, inter-project resource conflict resolution and allocation and management reports generation on critical tasks and overruns.
  • the main modules of the server software are described below:
  • Project creation module to read and check for consistency, project data on new projects. (Component 50 , FIG. 2)
  • Data computation module to compute completion dates for all activities in the project based on dependency information and project start date.
  • this module creates a new database project file. (Component 30 , FIG. 2 ).
  • Project database holds centralized complete information on the project. (Component 60 , FIG. 2 ).
  • ‘Resource’ module to check for resource usage and to re-allocate resources on the basis of inter-project priorities, if resource are limits exceeded. Project database has to be re-created if resources are re-allocated.(Component 70 , FIG. 2 ).
  • Updating functions consisting of:
  • Project Update module, to receive and parse updates from project/task leaders (Component 10 , FIG. 2)
  • Database updating module to update the project database with new project status information.(Component 20 , FIG. 2 ).
  • Database access to retrieve task information from project database. (Component 80 , FIG. 2 ).
  • ‘Remind’ module to send auto reminders to task leaders of pending tasks. (Component 90 , FIG. 2 ).
  • Project reporting to generate and send out project progress reports.
  • the server software system has been implemented in C language, making it easier to port to different machines and also providing the necessary performance for handling the largest projects.
  • the server system has to work closely with the Messaging system and the Network Operating System, the components of which are described below.
  • FIG. 1, Part 30 Messaging system is used to refer to the communication protocol used to allow users communicate with the ‘Auto Multi-Project Server’. This has to work under and is closely related to FIG. 1, Part 40 which is the Network Operating System. The network operating system controls the network operation.
  • the ‘Auto Multi-Project Server’ has to be configured separately for each type of messaging system/network operating system.
  • the following are some of the example environments, they are provided for clarity and do not exclude other environments:
  • UNIX mail system running under a UNIX server machine such as a 486 PC, PENTIUM PC, SUN Workstation, DEC workstation, IBM RS6000 workstation etc. and communicating to other machines via an electronic network (Part 40 ). Users send electronic mail to the server machine on new project information and status updates, which is processed by the ‘Auto Multi-Project Server’. The ‘Auto Multi-Project Server’ in turn sends back electronic mail reminders and management reports.
  • the mail system running on a network of PCs'.
  • the mail system may be LOTUS CCMAIL or LOTUS NOTES or MICROSOFT MAIL etc.
  • the Network Operating System may be NOVELL NETWARE or VINES or PC-NFS etc.
  • Fax based communication system based on fax board inside PC coupled with OCR software to read fax messages.
  • the fax board and software functions as the messaging system, as well as the network operating system.
  • the fax system must have automatic transmission, automatic receipt and optical character recognition capability.
  • Part 50 is the communication network, which may be Fax, LAN (local area network), WAN (wide area network) or telephone network is the physical media for communication. This is generally transparent for the ‘Auto Multi-Project Server’, as it is handled by the Network Operating System (Part 40 ).
  • FIG. 1, Part 60 are the different Project Work-team members communicating to the ‘Auto Multi-Project Server’, these may be program managers, project leaders, task leaders etc.
  • the program manager assigns inter-project priorities, the project leader creates the first plan for the project and the task leaders update the project database with progress of project.
  • the ‘Auto Multi-Project Server’ is designed to change the organization process of planning, tracking and management of work-team projects. The entire process is planned to be automated with managers focusing only on the exceptions and crisis situations. I describe below the process of using the ‘Auto Multi-Project Server’, as well as the logic used by the Invention to manage projects.
  • Step 1 Set up the environment, this involves creating an environment configuration file with an entry in it to show the command string to be used in submitting an input file for electronic mail or for faxing it out. Also the command string to be used in reading an electronic mail or fax, and the input file name.
  • the environment file is also used to indicate week-ends, holidays and default reminder frequency and default reminder window.
  • authorization will consist of a list of ‘user names’ and valid passwords’.
  • the above environment configuration files are the only manual operation and is a one time operation. These can be performed by a Systems Manager, who does not require to have any knowledge of ‘Project management processes’. Based on the configuration values the appropriate communication procedures are invoked.
  • Step 2 The project leader creates a project plan in the format as per FIG. 3 . This has information on the project, tasks, dependencies and resources to be used.
  • Step 3 The ‘Auto Multi-Project Server’ reads the project plan and invokes the ‘Build’ Procedure as per flowchart in FIG. 4 .
  • the first step is to validate the user/password and then parse the input for errors such as if names, descriptions, mail ids etc. are missing.
  • the server computes the completion dates for each task. Completion dates are based on work-days only, so the software accounts for week-ends and holidays.
  • FIG. 5 Dependency Computation Flowchart for details on how dependencies are handled.
  • Step 4 Resolving Inter-project resource conflicts.
  • the ‘build’ procedure is not complete unless critical common resource usage has been compared against the resource limits.
  • FIG. 9 for the flowchart for the re-allocation of critical resources and the re-computing of completion dates.
  • Program Manager Prior to this the Program Manager is mailed a list of projects and is requested to assign a rank priority. In addition the program manager is requested to supply a list of critical resources and their usage limits. The actual usage is compared against this limit.
  • Step 5 Task Reminders are accompanied by information about the task, to allow task leaders to provide change updates such as changes in the task duration or the estimated completion date or to inform on amount of resources actually consumed.
  • change updates such as changes in the task duration or the estimated completion date or to inform on amount of resources actually consumed.
  • Step 6 The ‘Inform’ procedure is invoked each time there is a change in a dependent task status such as starting or completion.
  • a dependent task status such as starting or completion.
  • FIG. 7 for the flowchart.
  • the ‘Auto Multi-Project Server’ serves also as a formal mode of communication of task status, and does not leave it to be communicated via other informal means.
  • Step 7 The ‘Reports’ procedure shown in FIG. 10, is invoked to generate the necessary management reports on time/cost overruns and critical path analysis. In addition managers are informed on re-allocation of any resources, to explain re-computation of completion dates.

Abstract

Design and implementation of an ‘Auto Multi-Project Server System’, which automates the tasks of Project Management Coordination, for organizational work-group team members. The ‘Auto Multi-Project Server’, referred to as AMPS, consists of a core piece of software running on a host server computer system and interacting with a messaging system such as electronic mail, fax etc. Once the AMPS system is configured for the work environment, all interactions with it by work-group team members is via messages. First the AMPS system compiles multi-project plans into a multi-project database, and tracks the ownership of projects, tasks and resources within the plans. Second the AMPS system performs automatic checking of resource requests, if resource availability limits are exceeded then resources are re-allocated to projects based on priorities, and project plans are accordingly changed Third the database is processed periodically to send out reminder follow-ups and project status reports. Fourth the databases are continuously updated based on status changes reported by work-group members. These four steps are continuously repeated enabling an automated method of multi-project management for organizational work-group team members.

Description

BACKGROUND
1. Cross-references to Related Applications
A patent search revealed no patent under the categories, Automatic Project Management, or under Electronic Mail based Project Management or Groupware Project Management.
The category Project Management revealed two patents:
(1) U.S. Pat. No. 4,451,067, A Comprehensive Central Scheduling Folder for Project Management offers a non-computerized method for planning and tracking projects. This has no similarity with the proposed electronic network based project management system, as it does not involve computers.
(2) U.S. Pat. No. 4,875,162, An Automated Interface of Design Software with Project Management Software. The scope of this is narrow, focuses on design organizations only and involves automatic status update of files between design software and project Management software. This is not for general purpose management of multiple work-groups. Also it does not address the design of a general purpose auto-server for project management, which will perform automatic project database creation, project follow-up, multi-project resource planning and project reporting.
2. Field of Invention
The invention described here is the design and application of an electronic network based project management server system. The product termed in this application as an ‘AUTO MULTI-PROJECT SERVER’. The use of the product will result in an improved organizational process for compiling, tracking and managing multiple projects within an organization.
The goal of the ‘Auto Multi-Project Server’ is to act as an automated computer based project coordinator to manage the goals of multiple organizational work-teams. Activities of the automated computer based server comprise of collating/compiling project data, flagging inconsistencies, follow-up with work-team members, obtain updated project tracking data, communicate project progress to work-team, resolve inter-project conflicts by re-allocation of critical resources based on project priorities and generate management reports for flagging time and cost overruns and critical path information.
Future re-engineered corporations will demand heavy computing needs for managing large number of work-teams with different project goals, schedules, dependencies and priorities running simultaneously. The present techniques for static project-management tools and for limited project-management groupware technologies will no longer be adequate.
3. Discussion of Prior Art
Presently the following types of project management systems are available:
1. Project planning tools, with software for generating charts such as Gantt, Pert/CPM etc. Many of the techniques were invented during the Second World War Majority of project management is perceived as belonging to this area. These are static standalone tools and do not impose any particular process in the organization. Organizations have to figure out methods for input, tracking and report distribution. Typically a project coordinator is hired by organizations to manually compile input data, run the tools and distribute progress reports.
Examples: Commercial tools such as PRIMAVERA and MICROSOFT-PROJECT offer computerized static software approach to planning projects, i.e. a person has to supervise the input data collection and output report generation, and there is no automatic process specified by the manufacturer.
A survey of existing project management tools showed no use of electronic mail or faxing methods to do any automatic creation, updating, planning or reporting. (Reference: DATAMATION—Oct. 1, 1993, Article: Project Management Software that's IS friendly, has a survey of the capabilities of Project Management tools and there is no mention of any automatic server based tools, driven by electronic messaging.)
2. Group collaboration and Work flow management tools, provide technologies to automate the flow of documents. These are directed at a wide variety of needs such as facilitating group conferences, meetings' management, project database management, information flow control and other custom mail enabled applications. The tools by themselves do not impose any organizational process, but offer an underlying technology to build applications, including the design proposed by this patent.
Example (1): U.S. Pat. No. 5,168,444 for a Work-flow shipment system, including processing of document images. This is not related to automatic project management for multiple work-groups.
Example (2) Lotus NOTES is a leading groupware product offering the necessary technology to build organizational processes including Project Tracking examples. The system is not designed to handle large multi-project/multi-priority environments. There is no automatic system proposed by the manufacturer and it is left for each organization to design its own process or system of project management.
Example (3) The nearest commercial product design is a product called SYZYGY from Information Research Corp., which builds on inherent capability of local area networks (LAN) to tie workers together. The system has a central database on organizational projects and can be automatically be programmed by managers to broadcast reminder messages. (Reference: Personal Computing, Volume 14, Issue 4, Date: Apr. 27, 1990, Page: 152), The differences I see between this product and the invention under this patent:
Syzygy is not ideal for managing large or complex projects since it lacks critical path analysis. The invention under this patent includes a complete computation engine for computing critical path activities,
Syzygy does not do complex inter-task dependency computations.
Syzygy is not targeted for multiple work-teams with inter-conflicting priorities.
Syzygy does not attempt any resources leveling or resource re-allocation.
Objects and Advantages
The product in this patent application the ‘Auto Multi-Project Server’ consists of a centralized automatic project management server software, based in a computer and accessible via electronic mail or fax messages.
No Programming is involved by people using the system, the ‘Auto Multi-Project Server’ automatically computes task completion/start dates and triggers messages based on data mailed to it. Thus the data itself is used to program the ‘Auto Multi-Project Server’.
The ‘Auto Multi-Project Server’ reads electronic mail or fax messages, such as project plans and flags project data inconsistencies. It then compiles project management data into a usable project database with information to include details on goals, milestones, budgets etc.
The ‘Auto Multi-Project Server’ follows-up with task leaders on pending tasks by reminding them on task start and finish dates
The ‘Auto Multi-Project Server’ includes extensive dependency calculations, such as taking into account complex inter-task dependencies and start/finish lags between dependent activities.
The ‘Auto Multi-Project Server’ goes beyond just reminding people about their start and finish dates, it also serves as a project information system by informing the group team members on their inter-dependencies.
The ‘Auto Multi-Project Server’ includes resolution of multi-project priorities, which is an essential component for managing multi-groups with divergent priorities. It allows for example a program or general manager to examine multiple-projects under his program and assign priorities for completion. Individual task deadlines and resource usage would be controlled by the priorities assigned to the completion of the project.
The ‘Auto Multi-Project Server’ will re-allocate critical resources based on project priorities and re-compute completion dates. The project database would automatically be updated with the new dates. Thus there is automatic resolution of priority conflicts. The project leader does not have to have to constantly escalate issues up the management hierarchy for resolution.
Security issues are handled by the authorization of ell input mail or faxes, prior to processing. For electronic mail and faxes the incoming mail is checked against a valid list of passwords prior to processing. Also each project is assigned a unique identifier to prevent mix-up of information between projects.
In summary the ‘Auto Multi-Project Server’ is a necessary requirement for the needs of future HORIZONTAL CORPORATIONS where the information to manage multiple projects will be too complex to be done via manual present-day tools.
Further objects and advantages of my invention will become apparent from a consideration of the drawings and ensuing description.
DESCRIPTION OF DRAWINGS
FIG. 1—Architecture drawing to show the different components of an ‘Auto Multi-Project Management Process’, which is required for implementing the ‘Auto Multi-Project Server’.
FIG. 2—Internal architecture of the ‘Auto Multi-Project Server’.
FIG. 3—Project database example, format to serve as the primary communication and storage format for information on the different project(s).
FIG. 4—Build Program Flowchart, to compile together data on inter-dependent tasks for each project and build a reference database (with all necessary project information). To compute completion dates based on resource limits and inter-project dependencies.
FIG. 5—Dependency computation flowchart, to compute task start and finish dates based on relationship to dependent predecessors.
FIG. 6—Reminder program flowchart, to track pending tasks and remind task owners on a pre-determined frequency on when to start/finish tasks. To update task owners on status of dependencies.
FIG. 7—Inform flowchart, to track task completion and inform dependent tasks on start or finish status of their predecessors, thus acting as a formal channel of communication eliminating the chance of misinformation. Also to inform project and task leaders on re-computed completion dates based on resource re-allocation between projects (based on project priorities).
FIG. 8—Update flowchart, to update the ‘build’ file with status changes in task details or task inter-dependencies or inter-project priorities.
FIG. 9—Inter-project priorities and resource allocation flowchart. To allocate common resources based on inter-project priorities and re-compute task duration.
FIG. 10—Reports flowchart, to generate project management reports for reporting progress of projects(s).
LIST OF REFERENCE NUMERALS FIG. 1
10 Project(s) databases, contains information on the project, also referred to as the ‘BUILD’ file. Format for this file is shown in FIG. 3.
20 Auto project management server. This software system is the heart of the process and its workings are explained in the flowcharts contained in FIG. 4 through FIG. 10.
30 Messaging system such as Fax or Email (Electronic Mail)
40 Network Operating System, is a general term used to refer to the communication protocol used to allow users communicate with the ‘Auto Project Server’.
50 Fax, LAN (local area network), WAN (wide area network) or telephone network is the media for communication.
60 Work-team members communicating to the ‘Auto Multi-Project Server’, these may be program managers, project leaders, task leaders etc.
FIG. 2
10 Project updates, module to parse and read project updates,
20 Database updating, module to update the project database with new information.
30 Database creation, module to open a new database project file.
40 Project data computation, module to compute all project data, (Dates etc.)
50 Project creation, module to parse and read in project data on new projects.
60 Project database, centralized complete information on the project.
70 Resource re-allocation, re-assigns critical resources if limit exceeded.
80 Database access, to retrieve task information from project database.
90 Reminder processing, to send out reminders to pending task owners.
100 Inform status, to communicate status of dependencies.
110 Project reporting, to generate and send out project progress reports.
SUMMARY
The design and implementation of an ‘Auto Multi-Project Server’ for Automatic Multiple Project Management is described in this patent. This involves a self-running software system running on a central server computer system with capabilities for automatic data compilation, tracking and management, handle multiple projects, resolve inter-project resource conflicts and communicate with users via electronic mail or fax mail.
DESCRIPTION OF INVENTION
FIG. 1 shows the overall process of using the invention in an organization to manage multiple projects vi an automatic computer server. FIG. 2 shows the internal architecture of the invention which is an ‘Auto Multi-Project Server’.
FIG. 1, Part 10—refers to the set of project database files stored, one for each project. These files are also referred to as the ‘build’ file. Refer FIG. 3 for a sample format. This file contains information about the project, such as the start date and other global information such as the project leader's name, mail identity, holidays, weekends etc. It also contains detailed information about each task such as the description, task leader's name/mail identity, task duration or planned completion date. In addition it contains information about the dependencies for each task, in terms of the predecessor task id, the type of dependency whether FS(predeceseor finishes and task starts), FF(predecessor and task finish together) or SS (predecessor and task start together), and the lag between the predecessor and task activities. Finally the database contains information about which resources, amount of resources and budget for resources required for doing the task.
FIG. 1, Part 20 is the ‘Auto Multiple Project Server’. This is a software system which is the head of the new process. Details of its internal architecture are contained in FIG. 2. Its workings are explained in the flowcharts contained in FIG. 4 through FIG. 10. The server is a software process that runs at fixed intervals (example: at the end of the day) and performs the task of project management coordination by performing date compilation, data validation, database update, follow-up reminders to task leaders, inter-project resource conflict resolution and allocation and management reports generation on critical tasks and overruns. The main modules of the server software are described below:
Creation functions consisting of:
Project creation module to read and check for consistency, project data on new projects. (Component 50, FIG. 2)
Data computation module, to compute completion dates for all activities in the project based on dependency information and project start date. (Component 40, FIG. 2)
Database creation, this module creates a new database project file. (Component 30, FIG. 2).
Project database, holds centralized complete information on the project. (Component 60, FIG. 2).
Conflict-resolution functions consisting of:
‘Resource’ module, to check for resource usage and to re-allocate resources on the basis of inter-project priorities, if resource are limits exceeded. Project database has to be re-created if resources are re-allocated.(Component 70, FIG. 2).
Updating functions consisting of:
‘Project Update’ module, to receive and parse updates from project/task leaders (Component 10, FIG. 2)
Database updating, module to update the project database with new project status information.(Component 20, FIG. 2).
Information functions consisting of:
Database access, to retrieve task information from project database. (Component 80, FIG. 2).
‘Remind’ module, to send auto reminders to task leaders of pending tasks. (Component 90, FIG. 2).
‘Inform’ module, to inform task leaders on completion of dependent activities. (Component 100, FIG. 2)
Project reporting, to generate and send out project progress reports. (Component 110, FIG. 2)
The server software system has been implemented in C language, making it easier to port to different machines and also providing the necessary performance for handling the largest projects. The server system has to work closely with the Messaging system and the Network Operating System, the components of which are described below.
FIG. 1, Part 30—Messaging system is used to refer to the communication protocol used to allow users communicate with the ‘Auto Multi-Project Server’. This has to work under and is closely related to FIG. 1, Part 40 which is the Network Operating System. The network operating system controls the network operation.
The ‘Auto Multi-Project Server’ has to be configured separately for each type of messaging system/network operating system. The following are some of the example environments, they are provided for clarity and do not exclude other environments:
UNIX mail system running under a UNIX server machine such as a 486 PC, PENTIUM PC, SUN Workstation, DEC workstation, IBM RS6000 workstation etc. and communicating to other machines via an electronic network (Part 40). Users send electronic mail to the server machine on new project information and status updates, which is processed by the ‘Auto Multi-Project Server’. The ‘Auto Multi-Project Server’ in turn sends back electronic mail reminders and management reports.
Mail system running on a network of PCs'. The mail system may be LOTUS CCMAIL or LOTUS NOTES or MICROSOFT MAIL etc. The Network Operating System may be NOVELL NETWARE or VINES or PC-NFS etc.
Fax based communication system, based on fax board inside PC coupled with OCR software to read fax messages. Here the fax board and software functions as the messaging system, as well as the network operating system. The fax system must have automatic transmission, automatic receipt and optical character recognition capability.
FIG. 1, Part 50 is the communication network, which may be Fax, LAN (local area network), WAN (wide area network) or telephone network is the physical media for communication. This is generally transparent for the ‘Auto Multi-Project Server’, as it is handled by the Network Operating System (Part 40).
FIG. 1, Part 60 are the different Project Work-team members communicating to the ‘Auto Multi-Project Server’, these may be program managers, project leaders, task leaders etc. The program manager assigns inter-project priorities, the project leader creates the first plan for the project and the task leaders update the project database with progress of project.
Operation of Invention
The ‘Auto Multi-Project Server’ is designed to change the organization process of planning, tracking and management of work-team projects. The entire process is planned to be automated with managers focusing only on the exceptions and crisis situations. I describe below the process of using the ‘Auto Multi-Project Server’, as well as the logic used by the Invention to manage projects.
Step 1—Set up the environment, this involves creating an environment configuration file with an entry in it to show the command string to be used in submitting an input file for electronic mail or for faxing it out. Also the command string to be used in reading an electronic mail or fax, and the input file name. The environment file is also used to indicate week-ends, holidays and default reminder frequency and default reminder window.
In addition a separate file containing authorization information is required for ‘project leaders to allow them to create new projects. The authorization will consist of a list of ‘user names’ and valid passwords’.
The above environment configuration files are the only manual operation and is a one time operation. These can be performed by a Systems Manager, who does not require to have any knowledge of ‘Project management processes’. Based on the configuration values the appropriate communication procedures are invoked.
Step 2—The project leader creates a project plan in the format as per FIG. 3. This has information on the project, tasks, dependencies and resources to be used.
Step 3—The ‘Auto Multi-Project Server’ reads the project plan and invokes the ‘Build’ Procedure as per flowchart in FIG. 4. The first step is to validate the user/password and then parse the input for errors such as if names, descriptions, mail ids etc. are missing. Based on dependencies, the server computes the completion dates for each task. Completion dates are based on work-days only, so the software accounts for week-ends and holidays. Refer FIG. 5—Dependency Computation Flowchart for details on how dependencies are handled.
Step 4—Resolving Inter-project resource conflicts. The ‘build’ procedure is not complete unless critical common resource usage has been compared against the resource limits. Refer FIG. 9 for the flowchart for the re-allocation of critical resources and the re-computing of completion dates.
Prior to this the Program Manager is mailed a list of projects and is requested to assign a rank priority. In addition the program manager is requested to supply a list of critical resources and their usage limits. The actual usage is compared against this limit.
Step 5—Task Reminders are accompanied by information about the task, to allow task leaders to provide change updates such as changes in the task duration or the estimated completion date or to inform on amount of resources actually consumed. Refer FIG. 8 for the procedure flowchart on updating the project database.
Step 6—The ‘Inform’ procedure is invoked each time there is a change in a dependent task status such as starting or completion. Refer FIG. 7 for the flowchart. Thus the ‘Auto Multi-Project Server’ serves also as a formal mode of communication of task status, and does not leave it to be communicated via other informal means.
Step 7—The ‘Reports’ procedure shown in FIG. 10, is invoked to generate the necessary management reports on time/cost overruns and critical path analysis. In addition managers are informed on re-allocation of any resources, to explain re-computation of completion dates.
Automatic Operation—It should be noted that the operations of the ‘Auto Multi-Project Server’ are automatic (or self-running) and there is no manual intervention. Only at the staff-up stage is there any manual customization of the environment, by changing some of the program variables and setting up the environment file. In general the operation is driven by mail messages received from users. The ‘Auto Multi-Project Server’ responds to the messages and is thus ‘event driven’, though the response does not occur immediately but rather batched together for the end of day processing, as explained in the next paragraph.
Night processing—It is suggested that given the heavy amount of processing for each project, all ‘build’, ‘reminder’, ‘inform’, ‘reports’, ‘resource re-allocation’ procedures be run at night. This will allow for lowered load on the server and also allow accumulation of all status updates to be handled together eliminating database file access problems. Real time response to user messages is not necessary.
Summary, Ramifications and Scope
I have described so far the architecture and working of an ‘Auto Multi-Project Server’ which is necessary to implement the proposed ‘Automatic Multiple Project Management Process’. As can be seen from the product description and operation so far, the ‘Auto Multi-Project Server’ is a first of its kind product with some very unique features to handle large and multiple number of projects, including where there are resource conflicts. The future organizations will be greatly demanding in terms of number end size of projects and only an automated software system can prove to be useful. Existing static tools will be overwhelmed by the amount of project data.

Claims (51)

What is claimed as the invention is:
1. A method executed by a computer system as part of a computer program, said system for coordinating the management of a project, said computer system to comprise of a central database server connected to a electronic network, said method using a two way electronic messaging system that allows different types of organizational work-group team members to send messages to the computer program and receive messages from the computer program via the said electronic network, said method storing and accessing data from a multi-project database, said method to be automatic in nature and with built in triggers which are based on the nature and status of said data without need for manual project management coordination, said project management coordination to involve all the steps of the project management cycle including planning, resource leveling, status reporting and reminding, tracking and updating plans, said method to be configurable for the said organizational work-group environment, said method comprising the steps of:
(a) identifying the owner of received message;
(b) identifying the nature of said received message;
(c) setting up said multi-project database and saving said received messages to said database according to the nature of said received message;
(d) receiving project plans and compiling project plans and saving project plans into said multi-project database;
(e) checking said project plans for resource requests against resource availability and reallocating resources if necessary based on inter-project priorities;
(f) recalculating and sending back said project plans based on resource reallocation;
(g) sending project status reports and reminders to organizational work-group team members based on the status of said triggers;
(h) receiving project updates and status changes and updating said project database;
(i) repeating steps (a) through (h) on a periodic basis, as desired by said organizational work-group team members.
2. A method as claimed in claim 1 wherein said identifying the owner of the message step additionally comprises the step of identifying the incoming user messages and authorizing them against a valid list of users.
3. A method as claimed in claim 1 wherein said identifying the nature of the message step additionally comprises the step of checking the consistency of data sent to it via user messages, prior to processing the messages; has means to reject and return user messages which are inconsistent.
4. A method as claimed in claim 1 wherein said compiling project plans step additionally comprises the step of computing task completion dates based on project start date and inter-dependencies among tasks.
5. A method as claimed in claim 1 wherein said saving project plans step additionally comprises the step of creating a project database of information on the project, with all necessary information for follow-up of progress and all necessary information for reporting progress.
6. A method as claimed in claim 1 wherein said recalculating project plans based on resource reallocation step additionally comprises the step of recomputing task duration's and completion dates of tasks.
7. A method as claimed in claim 1 wherein said sending project status reports and reminders step additionally comprises the step of processing each project database and generating outgoing reminder messages for task leaders whose tasks are pending.
8. A method as claimed in claim 1 wherein said sending project status reports step additionally comprises the step for soliciting for updates to project and database status information.
9. A method as claimed in claim 1 wherein said sending project status reports step additionally comprises the step of sending messages to task leaders, on status of inter-dependent tasks.
10. A method executed by a computer system as part of a computer program,
said system for coordinating the management of a project comprising at least one task,
said computer system comprising a central database server connected to an electronic network,
said method using a two-way electronic messaging system that allows organizational work-group team members to send messages to the computer program and receive messages from the computer program via said electronic network,
said method storing and accessing data from a project database,
said method further comprising built-in triggers which are based on the nature and status of said data without need for manual project management coordination,
said project management coordination to include planning, resource leveling, status reporting and reminding, tracking and updating plans, said method to be configurable for said organizational work-group environment, and
said method comprising:
(a) identifying the owner of a received message;
(b) identifying the nature of said received message;
(c) setting up said project database and saving said received messages to said project database according to the nature of said received message;
(d) receiving project plans and compiling project plans and saving project plans into said project database;
(e) checking said project plans for resource requests against resource availability and reallocating resources if necessary based on inter-task priorities;
(f) recalculating and sending back said project plans based on resource reallocation;
(g) sending project status reports and reminders to organizational work-group team members based on the status of said triggers;
(h) receiving project updates and status changes and updating said project database;
repeating steps (a) through (h) as desired by said organizational work-group team members.
11. An apparatus for coordinating the management of a project comprising at least one task,
said apparatus comprising a computer system including a computer program,
said computer system to comprise a central database server connected to an electronic network,
said apparatus using a two-way electronic messaging system that allows organization work-group team members to send messages to the computer program and receive messages from the computer program via said electronic network,
said apparatus storing and accessing data from a project database,
said apparatus including built-in triggers which are based on the nature and status of said data without need for manual project management coordination,
said project management coordination to include planning, resource leveling, status reporting and reminding, tracking and updating plans,
said apparatus to be configurable for said organizational work-group environment,
said apparatus comprising:
means for identifying an owner of a received message;
means for identifying the nature of said received message;
means for setting up said project database;
means for saving said received messages to said project database according to said nature of said received message;
means for receiving project plans;
means for compiling said received project plans;
means for saving said received project plans into said project database;
means for checking said project plans for resource requests against resource availability;
means for reallocating resources as necessary based on inter-task priorities;
means for recalculating said project plans based on resource reallocation;
means for sending project status reports to organizational work-group team members based on a status of said triggers;
means for receiving project status changes; and
means for updating said project database.
12. Apparatus that is automatic in nature and for coordinating management of a project, comprising:
an electronic messaging receiver module;
a project database including allocation of at least one resource between a plurality of project tasks; and
a resource leveling module with built-in triggers adapted to level allocation of said at least one resource between said plurality of project tasks in response to an electronic message received by said electronic messaging receiver.
13. The apparatus according to claim 12, wherein:
said electronic messaging receiver module is an E-mail receiver.
14. The apparatus according to claim 12 wherein:
said resource leveling module allocates said at least one resource in accordance with priorities assigned to each of said plurality of project tasks.
15. The apparatus according to claim 12, wherein:
said project database includes allocation of a plurality of resources; and
said project database is centrally accessible by electronic messaging from each of said plurality of resources.
16. The apparatus according to claim 12, wherein:
said resource leveling module is further adapted to identify inconsistencies in said allocation of said at least one resource between said plurality of project asks.
17. The apparatus according to claim 16, further comprising:
an electronic messaging transmitter module;
at least one work group member being notifiable by electronic messaging of said identified inconsistencies.
18. The apparatus according to claim 12, further comprising:
an electronic messaging transmitter module; and
a module adapted to notify at least one work group member of milestones for at least one of said plurality of project tasks by electronic messaging.
19. The apparatus according to claim 12, further comprising:
an electronic messaging transmitter module;
said resource leveling module being further adapted to report via electronic messaging interdependencies between said plurality of project tasks.
20. The apparatus according to claim 12, wherein:
said electronic message acted on by said apparatus is password protected.
21. The apparatus according to claim 12, wherein:
said resource leveling module is further adapted to resolve resource conflicts between said plurality of project tasks.
22. Apparatus that is automatic in nature and for coordinating multi-project management, comprising:
an electronic messaging receiver module;
a multi-project database including allocation of at least one resource between a plurality of projects; and
a resource-leveling module with built-in triggers adapted to level allocation of said at least one resource between said plurality of projects in response to an electronic messaging received by said electronic messaging receiver.
23. The apparatus according to claim 22, wherein:
said electronic messaging receiver module is an E-mail receiver.
24. The apparatus according to claim 22, wherein:
said resource leveling module allocates said at least one resource in accordance with priorities assigned to each of said plurality of projects.
25. The apparatus according to claim 22, wherein:
said multi-project database includes allocation of a plurality of resources; and
said multi-project database is centrally accessible by electronic messaging from each of said plurality of resources.
26. The apparatus according to claim 22, wherein:
said resource leveling module is further adapted to identify inconsistencies in said allocation of said at least one resource between said plurality of projects.
27. The apparatus according to claim 26, further comprising:
an electronic messaging transmitter module;
at least one work group member being notifiable by electronic messaging of said identified inconsistencies.
28. The apparatus according to claim 22, further comprising:
an electronic messaging transmitter module; and
a module adapted to notify at least one work group member of milestones for at least one of said plurality of projects by electronic messaging.
29. The apparatus according to claim 22, further comprising:
an electronic messaging transmitter module;
said resource leveling module being further adapted to report via electronic messaging interdependencies between said plurality of projects.
30. The apparatus according to claim 22, wherein:
said electronic message acted on by said apparatus is password protected.
31. The apparatus according to claim 22, wherein:
said resource leveling module is further adapted to resolve resource conflicts between said plurality of projects.
32. A method that is automatic in nature and for coordinating the management of a project, said method comprising:
receiving an electronic message;
allocating at least one resource between each of a plurality of project tasks represented in a common database, based on said received electronic message; and
leveling allocation of said at least one resource between said plurality of project tasks with built-in triggers in response to said received electronic message.
33. The method for coordinating management of a project according to claim 32, wherein:
said received electronic message is an E-mail message, and
said at least one resource comprises one of labor, equipment, and material.
34. The method for coordinating management of a project according to claim 32, wherein:
said at least one resource is leveled in accordance with priorities assigned to each of said plurality of project tasks.
35. The method for coordinating management of a project according to claim 32, wherein:
a plurality of resources are allocated between each of said plurality of project tasks; and
said common database is centrally accessible by electronic messaging from each of said plurality of resources.
36. The method for coordinating management of a project according to claim 32, further comprising:
identifying inconsistencies in said allocation of said at least one recourse between said plurality of project tasks included in said common database.
37. The method for coordinating management of a project according to claim 36, further comprising:
notifying at least one work group member of said identified inconsistencies by electronic messaging.
38. The method for coordinating management of a project according to claim 32, further comprising:
notifying by electronic messaging at least one work group member of milestones for said plurality of project tasks.
39. The method for coordinating management of a project according to claim 32, further comprising:
reporting via electronic messaging interdependencies between said plurality of project tasks.
40. The method for coordinating management of a project according to claim 32, wherein:
said received electronic message is password protected.
41. The method for coordinating management of a project according to claim 32, further comprising:
resolving resource conflicts between said plurality of project tasks.
42. A method that is automatic in nature and for coordinating multi-project management, said method comprising:
receiving an electronic message;
allocating at least one resource between each of a plurality of projects represented in a common database based on said received electronic message; and
leveling allocation of said at least one resource between said plurality of projects with built-in triggers in response to said received electronic message.
43. The method for coordinating multi-project management according to claim 42 , wherein:
said received electronic message is an E-mail message.
44. The method for coordinating multi-project management according to claim 42 , wherein:
said at least one resource is leveled in accordance with priorities assigned to individual tasks within each of said plurality of projects.
45. The method for coordinating multi-project management according to claim 42 , wherein:
a plurality of resources are allocated between each of said plurality of projects; and
said common database is centrally accessible by electronic messaging from each of said plurality of resources.
46. The method for coordinating multi-project management according to claim 42 , further comprising:
identifying inconsistencies in said allocation of said at least one resource between said plurality of projects included in said common database.
47. The method for coordinating multi-project management according to claim 46 , further comprising:
notifying by electronic messaging at least one work group member of said identified inconsistencies.
48. The method for coordinating multi-project management according to claim 42 , further comprising:
notifying by electronic messaging at least one work group member of milestones for said plurality of projects.
49. The method for coordinating multi-project management according to claim 42 , further comprising:
reporting via electronic messaging interdependencies between said plurality projects.
50. The method for coordinating multi-project management according to claim 42 , wherein:
said received electronic message is password protected.
51. The method for coordinating multi-project management according to claim 42 , further comprising:
resolving resource conflicts between said plurality of projects.
US09/137,186 1994-03-17 1998-08-20 Automated, electronic network based, project management server system Expired - Lifetime USRE38633E1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US09/137,186 USRE38633E1 (en) 1994-03-17 1998-08-20 Automated, electronic network based, project management server system

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US08/210,172 US5548506A (en) 1994-03-17 1994-03-17 Automated, electronic network based, project management server system, for managing multiple work-groups
US09/137,186 USRE38633E1 (en) 1994-03-17 1998-08-20 Automated, electronic network based, project management server system

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
US08/210,172 Reissue US5548506A (en) 1994-03-17 1994-03-17 Automated, electronic network based, project management server system, for managing multiple work-groups

Publications (1)

Publication Number Publication Date
USRE38633E1 true USRE38633E1 (en) 2004-10-19

Family

ID=22781855

Family Applications (2)

Application Number Title Priority Date Filing Date
US08/210,172 Ceased US5548506A (en) 1994-03-17 1994-03-17 Automated, electronic network based, project management server system, for managing multiple work-groups
US09/137,186 Expired - Lifetime USRE38633E1 (en) 1994-03-17 1998-08-20 Automated, electronic network based, project management server system

Family Applications Before (1)

Application Number Title Priority Date Filing Date
US08/210,172 Ceased US5548506A (en) 1994-03-17 1994-03-17 Automated, electronic network based, project management server system, for managing multiple work-groups

Country Status (1)

Country Link
US (2) US5548506A (en)

Cited By (60)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20010007977A1 (en) * 2000-01-06 2001-07-12 Geary Stuart Lloyd Reminder and actioning system
US20020035608A1 (en) * 2000-08-09 2002-03-21 Rajko Milovanovic Automated follow-up to a request
US20020049657A1 (en) * 2000-10-11 2002-04-25 Main Peter T. Web site for retail marketing program
US20020064460A1 (en) * 2000-11-29 2002-05-30 Industrial Technology Research Institute Integrated 3-D blade structure
US20020120744A1 (en) * 2001-02-28 2002-08-29 Chellis Eugene C. System and method for describing and automatically managing resources
US20020156671A1 (en) * 2000-11-08 2002-10-24 The Boeing Company System and method for collaborative action
US20020178044A1 (en) * 1999-01-15 2002-11-28 Bicknell Barbara A. Adaptable integrated-content product development system
US20020184071A1 (en) * 1999-01-15 2002-12-05 Bicknell Barbara A. Adaptable integrated-content product development system
US20030061330A1 (en) * 2000-09-29 2003-03-27 Frisco Lynn A. Web-based collaborative project and process management solution
US20030078874A1 (en) * 2001-09-20 2003-04-24 Cope Warren Scott Process and system for tracking versions of field documentation data collection configurations in a complex project workflow system
US20030105657A1 (en) * 2001-11-16 2003-06-05 Nandigama Murali K. Personal resource management tool
US20040010772A1 (en) * 2001-11-13 2004-01-15 General Electric Company Interactive method and system for faciliting the development of computer software applications
US20040054565A1 (en) * 2002-09-17 2004-03-18 Nemecek Carole M. Enterprise management using an enterprise program office (EPO)
US20040083480A1 (en) * 2002-10-21 2004-04-29 The Boeing Company System and method for creating a pert chart
US20040111328A1 (en) * 2002-12-10 2004-06-10 International Business Machines Corporation Method, system, and storage medium for facilitating procurement functions over a computer network
US20040143477A1 (en) * 2002-07-08 2004-07-22 Wolff Maryann Walsh Apparatus and methods for assisting with development management and/or deployment of products and services
US20040205531A1 (en) * 2001-08-17 2004-10-14 Innes Bruce Donald Method and application for developing a statement of work
US20050192866A1 (en) * 2000-10-11 2005-09-01 Nintendo Of America Inc. System and method for managing a retail marketing program utilizing dynamic forms
US20050262471A1 (en) * 2004-05-21 2005-11-24 Bea Sytems, Inc. System and method for managing cross project dependencies at development time
US7031963B1 (en) * 1998-11-09 2006-04-18 Unisys Corporation Green ice printout sorting and delivery program
US20060111953A1 (en) * 2002-10-17 2006-05-25 The Knowledge It Corporation Virtual knowledge management system
US20060136510A1 (en) * 2004-12-17 2006-06-22 Microsoft Corporation Method and system for tracking changes in a document
US20060173724A1 (en) * 2005-01-28 2006-08-03 Pegasystems, Inc. Methods and apparatus for work management and routing
WO2006091978A2 (en) * 2005-02-25 2006-08-31 Douglas Baker Mission console
US20060241994A1 (en) * 2005-04-20 2006-10-26 Kumar Anand Automated support for monitoring and managing knowledge work
US7159206B1 (en) * 2002-11-26 2007-01-02 Unisys Corporation Automated process execution for project management
US20070027934A1 (en) * 2005-07-29 2007-02-01 Burkhard Roehrle Software release validation
US20070038893A1 (en) * 2005-08-10 2007-02-15 Christine Junghans Creating, Designing, Managing, Scheduling, Developing and Producing Products
US20070073572A1 (en) * 2005-09-27 2007-03-29 The Q Llc Data collection and distribution system
US20070251988A1 (en) * 2006-04-28 2007-11-01 Century Solutions Limited Field servicing
US7302401B1 (en) * 1999-04-06 2007-11-27 Single Source Oy Data management mechanism for project planning
US7302674B1 (en) * 2002-11-26 2007-11-27 Unisys Corporation Automating document reviews in a project management system
US20070288842A1 (en) * 2002-03-01 2007-12-13 Averitt John W Cad-Interfaced, Automated System for Assisting the Architectural Process
US20070294155A1 (en) * 2006-05-31 2007-12-20 Renegade Swish, Llc Apparatus, system, method, and computer program for managing transactions involving aviation assets
US20080059946A1 (en) * 2006-08-31 2008-03-06 Jeremy Harding Method and system for determining dependencies in a mainframe development environment
US20080065460A1 (en) * 2006-08-23 2008-03-13 Renegade Swish, Llc Apparatus, system, method, and computer program for task and process management
US20080114668A1 (en) * 2006-11-15 2008-05-15 International Business Machines Corporation Method, system, and computer program product for collaborative and integrated intellectual property management
US7386797B1 (en) * 2002-05-22 2008-06-10 Oracle Corporation Framework to model and execute business processes within a collaborative environment
US20080270267A1 (en) * 2007-04-26 2008-10-30 Caterpillar Inc. System and method for logistics management
US20080288322A1 (en) * 2007-05-10 2008-11-20 Kevin Kennedy & Associates, Inc. Methods and systems for project management
US20090198531A1 (en) * 2008-01-31 2009-08-06 International Business Machines Corporation Method and system for discovering dependencies in project plans of distributed system
US20090204463A1 (en) * 2008-02-13 2009-08-13 Lockheed Martin Corporation Method, tool, and system for analyzing a project
US20090307035A1 (en) * 2008-06-04 2009-12-10 Microsoft Corporation Resolution of resource over-allocations in project plans
US20090327403A1 (en) * 2008-06-26 2009-12-31 Microsoft Corporation Asynchronously editing a synchronous data store, such as a project management data store
US20100211957A1 (en) * 2009-02-19 2010-08-19 International Business Machines Corporation Scheduling and assigning standardized work requests to performing centers
US8250525B2 (en) 2007-03-02 2012-08-21 Pegasystems Inc. Proactive performance management for multi-user enterprise software systems
US8479157B2 (en) 2004-05-26 2013-07-02 Pegasystems Inc. Methods and apparatus for integration of declarative rule-based processing with procedural programming in a digital data-processing evironment
US8521663B1 (en) 1999-09-08 2013-08-27 C4Cast.Com, Inc. Community-selected content
US8812339B1 (en) 2002-07-24 2014-08-19 Jack D. Stone, Jr. System and method for scheduling tasks
US8880487B1 (en) 2011-02-18 2014-11-04 Pegasystems Inc. Systems and methods for distributed rules processing
US8924335B1 (en) 2006-03-30 2014-12-30 Pegasystems Inc. Rule-based user interface conformance methods
US9195936B1 (en) 2011-12-30 2015-11-24 Pegasystems Inc. System and method for updating or modifying an application without manual coding
WO2016003728A1 (en) * 2014-07-01 2016-01-07 Tuul, Inc. System and method for implementing workflow management using messaging
US9678719B1 (en) 2009-03-30 2017-06-13 Pegasystems Inc. System and software for creation and modification of software
US10469396B2 (en) 2014-10-10 2019-11-05 Pegasystems, Inc. Event processing with enhanced throughput
US10467200B1 (en) 2009-03-12 2019-11-05 Pegasystems, Inc. Techniques for dynamic data processing
US10698647B2 (en) 2016-07-11 2020-06-30 Pegasystems Inc. Selective sharing for collaborative application usage
US10698599B2 (en) 2016-06-03 2020-06-30 Pegasystems, Inc. Connecting graphical shapes using gestures
US11048488B2 (en) 2018-08-14 2021-06-29 Pegasystems, Inc. Software code optimizer and method
US11567945B1 (en) 2020-08-27 2023-01-31 Pegasystems Inc. Customized digital content generation systems and methods

Families Citing this family (309)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6614451B1 (en) * 1991-10-24 2003-09-02 Grouputer Corporation Pty Ltd Group based computer use system
US5974391A (en) * 1994-07-12 1999-10-26 Fujitsu Limited Device and method for project management
JP2865573B2 (en) * 1994-09-21 1999-03-08 株式会社日立製作所 Workflow management system
JP3658422B2 (en) 1994-09-21 2005-06-08 株式会社日立製作所 Electronic circulation system and electronic circulation method
JP2947713B2 (en) * 1994-09-21 1999-09-13 株式会社日立製作所 Electronic document circulation system
US6526425B2 (en) 1994-09-21 2003-02-25 Hitachi, Ltd. Digitized document circulating system with circulation history
US5634127A (en) * 1994-11-30 1997-05-27 International Business Machines Corporation Methods and apparatus for implementing a message driven processor in a client-server environment
US5682550A (en) * 1995-06-07 1997-10-28 International Business Machines Corporation System for restricting user access to default work area settings upon restoration from nonvolatile memory where the settings are independent of the restored state information
JPH09149076A (en) * 1995-09-22 1997-06-06 Canon Inc Data communication equipment and method
AUPN773496A0 (en) * 1996-01-25 1996-02-15 Task Solutions Pty Ltd Task management system
AU707550B2 (en) * 1996-01-25 1999-07-15 Taskey Pty Ltd Task management system
US5893074A (en) * 1996-01-29 1999-04-06 California Institute Of Technology Network based task management
US5956491A (en) 1996-04-01 1999-09-21 Marks; Daniel L. Group communications multiplexing system
US5995951A (en) * 1996-06-04 1999-11-30 Recipio Network collaboration method and apparatus
US5826252A (en) * 1996-06-28 1998-10-20 General Electric Company System for managing multiple projects of similar type using dynamically updated global database
US6049801A (en) * 1996-10-07 2000-04-11 Whitmyer, Jr.; Wesley W. Web site providing professional services
US5895468A (en) * 1996-10-07 1999-04-20 Whitmyer, Jr.; Wesley W. System automating delivery of professional services
US6016307A (en) 1996-10-31 2000-01-18 Connect One, Inc. Multi-protocol telecommunications routing optimization
US6473404B1 (en) 1998-11-24 2002-10-29 Connect One, Inc. Multi-protocol telecommunications routing optimization
GB9623954D0 (en) * 1996-11-15 1997-01-08 Xerox Corp Systems and methods providing flexible representations of work
US6044354A (en) * 1996-12-19 2000-03-28 Sprint Communications Company, L.P. Computer-based product planning system
US6272523B1 (en) 1996-12-20 2001-08-07 International Business Machines Corporation Distributed networking using logical processes
US6058423A (en) 1996-12-23 2000-05-02 International Business Machines Corporation System and method for locating resources in a distributed network
US5923552A (en) * 1996-12-31 1999-07-13 Buildnet, Inc. Systems and methods for facilitating the exchange of information between separate business entities
US6820071B1 (en) * 1997-01-16 2004-11-16 Electronic Data Systems Corporation Knowledge management system and method
US6278996B1 (en) * 1997-03-31 2001-08-21 Brightware, Inc. System and method for message process and response
US6308164B1 (en) * 1997-04-28 2001-10-23 Jeff Nummelin Distributed project management system and method
US6968379B2 (en) * 1997-05-30 2005-11-22 Sun Microsystems, Inc. Latency-reducing bandwidth-prioritization for network servers and clients
CA2228574A1 (en) * 1997-06-05 1999-08-02 Attention Control Systems, Inc. An automatic planning and cueing system and method
US5907490A (en) * 1997-06-10 1999-05-25 Electronic Data Systems Corporation System and method for project management and assessment
US6311191B1 (en) * 1997-06-17 2001-10-30 Appintec Corporation Method and apparatus for improved contact and activity management and planning
US6256651B1 (en) * 1997-06-20 2001-07-03 Raja Tuli Time management workflow software
US6601035B1 (en) * 1997-07-10 2003-07-29 At&T Corp. Methods for dynamically predicting workflow completion times and workflow escalations
DE19730112A1 (en) * 1997-07-14 1999-01-21 Ericsson Telefon Ab L M Receiving and storage device for transmission units
US5978836A (en) 1997-07-28 1999-11-02 Solectron Corporation Workflow systems and methods
US7546346B2 (en) * 1997-07-28 2009-06-09 Juniper Networks, Inc. Workflow systems and methods for project management and information management
US6038538A (en) * 1997-09-15 2000-03-14 International Business Machines Corporation Generating process models from workflow logs
AU8913098A (en) * 1997-09-18 1999-04-05 Prevue International, Inc. Electronic-mail reminder for an internet television program guide
US6021410A (en) * 1997-09-25 2000-02-01 International Business Machines Corporation Extensible digital library
AU9783098A (en) * 1997-10-06 1999-04-27 Nexprise, Inc. Trackpoint-based computer-implemented systems and methods for facilitating collaborative project development and communication
US6917962B1 (en) 1997-10-22 2005-07-12 Brokercom Inc. Web-based groupware system
US6223177B1 (en) * 1997-10-22 2001-04-24 Involv International Corporation Network based groupware system
US6321374B1 (en) 1997-11-07 2001-11-20 International Business Machines Corporation Application-independent generator to generate a database transaction manager in heterogeneous information systems
US6256636B1 (en) 1997-11-26 2001-07-03 International Business Machines Corporation Object server for a digital library system
US6012683A (en) * 1997-12-08 2000-01-11 Micron Technology, Inc. Apparatus for managing cables
US6996904B1 (en) 1997-12-08 2006-02-14 Micron Technology, Inc. Method for managing cables
US6259449B1 (en) * 1997-12-10 2001-07-10 Sony Corporation Integrated communication center
EP0954121B1 (en) * 1997-12-10 2013-04-10 Research In Motion Limited Mobile communication system
JPH11184679A (en) * 1997-12-19 1999-07-09 Fujitsu Ltd Method and system for constructing system, and storage medium storing system constructing program
US5987615A (en) * 1997-12-22 1999-11-16 Stmicroelectronics, Inc. Programmable load transient compensator for reducing the transient response time to a load capable of operating at multiple power consumption levels
US6038542A (en) * 1998-04-28 2000-03-14 Micron Electronics, Inc. System for notifying an individual of a previously scheduled event
US20030120775A1 (en) * 1998-06-15 2003-06-26 Compaq Computer Corporation Method and apparatus for sending address in the message for an e-mail notification action to facilitate remote management of network devices
EP1093622A4 (en) * 1998-07-06 2005-03-23 Stephen E Beller Flexible, modular electronic element patterning method and apparatus for compiling, processing, transmitting, and reporting data and information
US6401119B1 (en) * 1998-09-18 2002-06-04 Ics Intellegent Communication Software Gmbh Method and system for monitoring and managing network condition
AU1912500A (en) * 1998-11-12 2000-05-29 Cyberoffice Technologies, Llc Automatic project management system with machine-initiated bidirectional communication
US6442592B1 (en) 1998-12-11 2002-08-27 Micro Computer Systems, Inc. Message center system
CA2356182A1 (en) 1998-12-21 2000-06-29 Roland R. Thompson System and method for performing substitute fulfillment information compilation and notification
US6334133B1 (en) * 1998-12-21 2001-12-25 Frontline Data, Inc. System and method for performing substitute fulfillment
US6724724B1 (en) 1999-01-21 2004-04-20 Cisco Technology, Inc. System and method for resolving an electronic address
US6434594B1 (en) 1999-03-09 2002-08-13 Talk2 Technology, Inc. Virtual processing network enabler
JP4098435B2 (en) * 1999-03-12 2008-06-11 富士通株式会社 Information management apparatus, data generation method, and computer-readable recording medium storing information management program
US8095413B1 (en) 1999-05-07 2012-01-10 VirtualAgility, Inc. Processing management information
US6442567B1 (en) * 1999-05-14 2002-08-27 Appintec Corporation Method and apparatus for improved contact and activity management and planning
GB2352307A (en) * 1999-07-20 2001-01-24 Int Computers Ltd Computer system for automatically tracking transactions
US7945468B1 (en) 1999-08-20 2011-05-17 Frontline Technologies, Inc. Notification of employees via pass code accessed web pages
WO2001015050A1 (en) * 1999-08-24 2001-03-01 Elance, Inc. Method and apparatus for an electronic marketplace for services having a collaborative workspace
US6405364B1 (en) * 1999-08-31 2002-06-11 Accenture Llp Building techniques in a development architecture framework
US7302430B1 (en) 1999-08-31 2007-11-27 International Business Machines Corporation Workflow management system for generating output material based on customer input
US7028303B2 (en) * 1999-09-17 2006-04-11 International Business Machines Corporation Method, system, and program for processing a job in an event driven workflow environment
US7171373B2 (en) * 1999-10-21 2007-01-30 International Business Machines Corporation Database driven workflow management system for generating output material based on customer input
CA2400341A1 (en) * 1999-10-27 2001-05-03 Fjord-Tech Industrie Inc. System and method for remotely following up or assessing a project
US7321864B1 (en) * 1999-11-04 2008-01-22 Jpmorgan Chase Bank, N.A. System and method for providing funding approval associated with a project based on a document collection
US6876991B1 (en) 1999-11-08 2005-04-05 Collaborative Decision Platforms, Llc. System, method and computer program product for a collaborative decision platform
US8606588B1 (en) 1999-11-23 2013-12-10 Accenture Global Services Limited Merger and acquisition knowledgebase
US6671693B1 (en) 1999-11-23 2003-12-30 Accenture Llp System for effectively collecting and disseminating data
US6671692B1 (en) 1999-11-23 2003-12-30 Accenture Llp System for facilitating the navigation of data
US20050049903A1 (en) * 1999-12-01 2005-03-03 Raja Ramkumar N. Method and system for computer aided management of time & financial data
US6968360B1 (en) * 1999-12-21 2005-11-22 Bellsouth Intellectual Property Corporation Automatic status notification
US7275078B2 (en) * 1999-12-30 2007-09-25 Texas Instruments Incorporated Distributed web CGI architecture
US7089583B2 (en) * 2000-01-14 2006-08-08 Saba Software, Inc. Method and apparatus for a business applications server
AU2001229371A1 (en) 2000-01-14 2001-07-24 Saba Software, Inc. Information server
US6643652B2 (en) 2000-01-14 2003-11-04 Saba Software, Inc. Method and apparatus for managing data exchange among systems in a network
AU2001227857A1 (en) 2000-01-14 2001-07-24 Saba Software, Inc. Method and apparatus for a business applications management system platform
WO2001052090A2 (en) * 2000-01-14 2001-07-19 Saba Software, Inc. Method and apparatus for a web content platform
AU2001234662A1 (en) * 2000-02-01 2001-08-14 Rivio, Inc. Logic-enhanced email with checklist
US6581040B1 (en) * 2000-02-18 2003-06-17 Daniel B. Wright Project specific communications system and method
US20010034738A1 (en) * 2000-02-22 2001-10-25 Xerox Corporation Method and system for managing electronic documents in an agenda process
CA2400442A1 (en) * 2000-02-25 2001-08-30 Yet Mui Method for enterprise workforce planning
WO2001073583A2 (en) * 2000-03-26 2001-10-04 Alliedsignal Inc. Method and apparatus for a closed loop real time working assignment tracking system
US20010029494A1 (en) * 2000-04-05 2001-10-11 Kazuhiko Tomita Computer readable recording medium recorded with electronic authorization program, electronically authorizing device and electronically authorizing method
US6578004B1 (en) * 2000-04-27 2003-06-10 Prosight, Ltd. Method and apparatus for facilitating management of information technology investment
US7774219B1 (en) * 2000-04-28 2010-08-10 Microsoft Corporation Long running transaction integration with selective dehydration and selective compensation
US7503033B2 (en) 2000-04-28 2009-03-10 Microsoft Corporation Model for business workflow processes
US7325201B2 (en) * 2000-05-18 2008-01-29 Endeca Technologies, Inc. System and method for manipulating content in a hierarchical data-driven search and navigation system
US7617184B2 (en) 2000-05-18 2009-11-10 Endeca Technologies, Inc. Scalable hierarchical data-driven navigation system and method for information retrieval
US7062483B2 (en) * 2000-05-18 2006-06-13 Endeca Technologies, Inc. Hierarchical data-driven search and navigation system and method for information retrieval
US7035864B1 (en) 2000-05-18 2006-04-25 Endeca Technologies, Inc. Hierarchical data-driven navigation system and method for information retrieval
US20010037234A1 (en) * 2000-05-22 2001-11-01 Parmasad Ravi A. Method and apparatus for determining a voting result using a communications network
AU6719901A (en) 2000-06-09 2001-12-17 Brokercom Inc Web-based groupware system
EP1168259A3 (en) * 2000-06-28 2003-12-17 Hitachi, Ltd. Data management method and system for IC card
JP2002024495A (en) * 2000-07-11 2002-01-25 Honda Motor Co Ltd Schedule management system
EP1172745A1 (en) * 2000-07-12 2002-01-16 Sonera Oyj Advertising/information campaign management
US7127486B1 (en) 2000-07-24 2006-10-24 Vignette Corporation Method and system for facilitating marketing dialogues
US7155435B1 (en) * 2000-08-14 2006-12-26 Ford Motor Company Method for resolving issues within a team environment
US7072940B1 (en) 2000-08-14 2006-07-04 Ford Motor Company System and method for managing communications and collaboration among team members
US20020035504A1 (en) * 2000-08-16 2002-03-21 Alyssa Dver Lead suspect management
AU2001290671A1 (en) * 2000-09-05 2002-03-22 Ramesh Subramanyam System and method for facilitating the activities of remote workers
US6879996B1 (en) 2000-09-13 2005-04-12 Edward W. Laves Method and apparatus for displaying personal digital assistant synchronization data using primary and subordinate data fields
US7958185B2 (en) * 2000-09-18 2011-06-07 Bentley Systems, Inc. Spatial data enabled engineering, construction, and operations computer-aided design (CAD) project system, method and computer program product
JP2002109169A (en) * 2000-09-29 2002-04-12 Hitachi Ltd Method and system for supporting work and recording medium having work supporting method recorded thereon
US6907607B1 (en) * 2000-10-17 2005-06-14 International Business Machines Corporation System and method for analyzing capacity in a plurality of processing systems
US20070192155A1 (en) * 2000-10-24 2007-08-16 Gauger Derek K Network based, interactive project management apparatus and method
US20020052770A1 (en) * 2000-10-31 2002-05-02 Podrazhansky Mikhail Yury System architecture for scheduling and product management
US7249042B1 (en) * 2000-11-01 2007-07-24 Microsoft Corporation Method and system for visually indicating project task durations are estimated using a character
US7139720B1 (en) * 2000-11-14 2006-11-21 Xerox Corporation Project planning system and method for accommodating AD HOC requests within a fixed core development cycle
US7653566B2 (en) * 2000-11-30 2010-01-26 Handysoft Global Corporation Systems and methods for automating a process of business decision making and workflow
US7991633B2 (en) * 2000-12-12 2011-08-02 On Time Systems, Inc. System and process for job scheduling to minimize construction costs
FR2818410B1 (en) * 2000-12-14 2003-03-28 France Telecom SYSTEM AND METHOD FOR MANAGING IMAGE AND TEXT DATA
US20020077877A1 (en) * 2000-12-20 2002-06-20 Electronic Data Systems Corporation System and method for project management and assessment
US20020082889A1 (en) * 2000-12-20 2002-06-27 Electronic Data Systems Corporation System and method for project management and assessment
US20030074247A1 (en) * 2000-12-26 2003-04-17 Appareon System, method, and article of manufacture for manipulating the actors in a supply chain system
AU2002248295A1 (en) * 2001-01-04 2002-08-19 Worldcom, Inc. Method and apparatus for project management in a communication system
US7076439B1 (en) * 2001-01-10 2006-07-11 Lsi Logic Corporation Method and apparatus for managing multiple projects
JP2002207854A (en) * 2001-01-12 2002-07-26 Yazaki Corp Work plan supporting device and work plan supporting system
US20020099775A1 (en) * 2001-01-25 2002-07-25 Anoop Gupta Server system supporting collaborative messaging based on electronic mail
US7222156B2 (en) * 2001-01-25 2007-05-22 Microsoft Corporation Integrating collaborative messaging into an electronic mail program
US20020111850A1 (en) * 2001-02-12 2002-08-15 Chevron Oronite Company Llc System and method for new product clearance and development
US8214501B1 (en) 2001-03-02 2012-07-03 At&T Intellectual Property I, L.P. Methods and systems for electronic data exchange utilizing centralized management technology
US20020147626A1 (en) * 2001-04-05 2002-10-10 Zagotta Robert J. System for and method of implementing a shared strategic plan of an organization
US7073177B2 (en) * 2001-05-10 2006-07-04 Sun Microsystems, Inc. Resource managing system for changing resource consumption state of the lower priority resource entity to more restrictive state when resource reached critical level
US7006978B2 (en) * 2001-05-14 2006-02-28 General Electric Capital Corporation Method and systems for developing an acquisition integration project plan
US6925457B2 (en) * 2001-07-27 2005-08-02 Metatomix, Inc. Methods and apparatus for querying a relational data store using schema-less queries
US6856992B2 (en) * 2001-05-15 2005-02-15 Metatomix, Inc. Methods and apparatus for real-time business visibility using persistent schema-less data storage
US8572059B2 (en) * 2001-05-15 2013-10-29 Colin P. Britton Surveillance, monitoring and real-time events platform
US7058637B2 (en) * 2001-05-15 2006-06-06 Metatomix, Inc. Methods and apparatus for enterprise application integration
US20030208499A1 (en) * 2002-05-03 2003-11-06 David Bigwood Methods and apparatus for visualizing relationships among triples of resource description framework (RDF) data sets
US7890517B2 (en) * 2001-05-15 2011-02-15 Metatomix, Inc. Appliance for enterprise information integration and enterprise resource interoperability platform and methods
US6954749B2 (en) * 2002-10-07 2005-10-11 Metatomix, Inc. Methods and apparatus for identifying related nodes in a directed graph having named arcs
US7406432B1 (en) 2001-06-13 2008-07-29 Ricoh Company, Ltd. Project management over a network with automated task schedule update
US7191141B2 (en) * 2001-06-13 2007-03-13 Ricoh Company, Ltd. Automated management of development project files over a network
US7716332B1 (en) 2001-06-20 2010-05-11 At&T Intellectual Property I, L.P. System and method for server-based predictive caching of back-end system data
US8204972B2 (en) * 2001-06-29 2012-06-19 International Business Machines Corporation Management of logical networks for multiple customers within a network management framework
US7353183B1 (en) 2001-07-17 2008-04-01 Move, Inc. Method and system for managing and closing a real estate transaction
US7110988B1 (en) * 2001-08-01 2006-09-19 Trilogy Development Group, Inc. Automated system and method for creating aligned goals
US20030050812A1 (en) * 2001-09-10 2003-03-13 Xerox Corporation Electronic project management system using project phases
US7120699B2 (en) * 2001-09-20 2006-10-10 Ricoh Company, Ltd. Document controlled workflow systems and methods
US6966061B1 (en) * 2001-09-20 2005-11-15 Bellsouth Intellectual Property Corp. System and method for managing initiative delivery process
US20030061266A1 (en) * 2001-09-27 2003-03-27 Norman Ken Ouchi Project workflow system
US6988105B2 (en) * 2001-09-27 2006-01-17 International Business Machines Corporation Use of agents and control documents to update a database structure
US20030074090A1 (en) * 2001-09-28 2003-04-17 Zdenek Becka System and method for improving operational efficiency through process automation
US20030078975A1 (en) * 2001-10-09 2003-04-24 Norman Ken Ouchi File based workflow system and methods
US20030078830A1 (en) * 2001-10-22 2003-04-24 Wagner Todd R. Real-time collaboration and workflow management for a marketing campaign
US7212987B2 (en) * 2001-10-23 2007-05-01 International Business Machines Corporation System and method for planning a design project, coordinating project resources and tools and monitoring project progress
US7305392B1 (en) 2001-11-02 2007-12-04 Apex Innovations, Inc. Multi-organizational project management system
EP1461674A4 (en) * 2001-12-03 2007-10-24 Dyax Corp Library screening
US7051036B2 (en) 2001-12-03 2006-05-23 Kraft Foods Holdings, Inc. Computer-implemented system and method for project development
US7937281B2 (en) * 2001-12-07 2011-05-03 Accenture Global Services Limited Accelerated process improvement framework
US20030120630A1 (en) * 2001-12-20 2003-06-26 Daniel Tunkelang Method and system for similarity search and clustering
US20030135565A1 (en) * 2002-01-14 2003-07-17 Julio Estrada Electronic mail application with integrated collaborative space management
US20040205576A1 (en) * 2002-02-25 2004-10-14 Chikirivao Bill S. System and method for managing Knowledge information
WO2003073234A2 (en) * 2002-02-27 2003-09-04 Levy Scott System and method for managing organization's resources
US20030187766A1 (en) * 2002-03-29 2003-10-02 Nissho Iwai American Corporation Automated risk management system and method
US20080091492A1 (en) * 2002-04-19 2008-04-17 Bowler Steven B Web-enabled deliverable-gate program management with scoring method for product development processes
US20080065515A1 (en) * 2002-04-26 2008-03-13 Bowler Steve B Program management of supplier deliverables using web-enabled software
US20040015556A1 (en) * 2002-05-10 2004-01-22 Renu Chopra Software-based process/issue management system
US20030212587A1 (en) * 2002-05-13 2003-11-13 International Business Machines Corporation Apparatus and methods for coordinating Web services using role based interpretation of coordination plans
US20030220824A1 (en) * 2002-05-21 2003-11-27 Shou-Min Tseng Enterprise organization operational flow management system
US7801976B2 (en) * 2002-05-28 2010-09-21 At&T Intellectual Property I, L.P. Service-oriented architecture systems and methods
US20040006399A1 (en) * 2002-06-26 2004-01-08 Klein Alan L. Method and system for managing and monitoring an organization
US20070244981A1 (en) * 2002-06-27 2007-10-18 Malden Matthew S Disseminating information about security threats
US8423374B2 (en) 2002-06-27 2013-04-16 Siebel Systems, Inc. Method and system for processing intelligence information
US20050193000A1 (en) * 2002-08-01 2005-09-01 Siemens Ag Method for the processing and visualization of distributed stored data
US20040024629A1 (en) * 2002-08-02 2004-02-05 Kirby Jack Reese Methods and apparatus for project management
US7424702B1 (en) 2002-08-19 2008-09-09 Sprint Communications Company L.P. Data integration techniques for use in enterprise architecture modeling
US20040044550A1 (en) * 2002-09-04 2004-03-04 Ford Motor Company Online method and system for facilitating improvements in the consistency, deliverability and/or measurability of launch practices
US20040054562A1 (en) * 2002-09-16 2004-03-18 Motoo Tanaka Multi-perspective enterprise management tool
AU2003301602A1 (en) * 2002-10-23 2004-05-13 David Theiler Method and apparatus for managing workflow
US20080195446A1 (en) * 2002-10-24 2008-08-14 Bowler Steven B Cross-program dependency scheduling
US8443036B2 (en) * 2002-11-18 2013-05-14 Siebel Systems, Inc. Exchanging project-related data in a client-server architecture
US7836103B2 (en) * 2002-11-18 2010-11-16 Siebel Systems, Inc. Exchanging project-related data between software applications
US7698163B2 (en) * 2002-11-22 2010-04-13 Accenture Global Services Gmbh Multi-dimensional segmentation for use in a customer interaction
US7707059B2 (en) * 2002-11-22 2010-04-27 Accenture Global Services Gmbh Adaptive marketing using insight driven customer interaction
US7171652B2 (en) * 2002-12-06 2007-01-30 Ricoh Company, Ltd. Software development environment with design specification verification tool
US7360201B2 (en) * 2002-12-09 2008-04-15 International Business Machines Corporation Automated analysis and identification of options in project management
JP2004240486A (en) * 2003-02-03 2004-08-26 Hitachi Ltd Change management method and apparatus for project
US20040230793A1 (en) * 2003-02-14 2004-11-18 Julio Estrada System and method for encrypting and authenticating messages in a collaborative work environment
US20040172320A1 (en) * 2003-02-28 2004-09-02 Performaworks, Incorporated Method and system for goal management
US20040193639A1 (en) * 2003-03-28 2004-09-30 Ramot University Authority For Applied Research And Industrial Development Ltd. Method and system for projectwise management of computer data objects
US20040215618A1 (en) * 2003-04-25 2004-10-28 Wacke Robert S. Automated quality compliance system
US7904323B2 (en) * 2003-06-23 2011-03-08 Intel Corporation Multi-team immersive integrated collaboration workspace
US20050014122A1 (en) * 2003-06-25 2005-01-20 Ruvinsky Ilene G. Project management system for education
US20040267589A1 (en) * 2003-06-25 2004-12-30 International Business Machines Corporation System and method for applying human resources to a project plan
WO2005008397A2 (en) * 2003-07-10 2005-01-27 Computer Associates Think, Inc. Systems and methods for categorizing charts
US7237224B1 (en) * 2003-08-28 2007-06-26 Ricoh Company Ltd. Data structure used for skeleton function of a class in a skeleton code creation tool
US7308675B2 (en) * 2003-08-28 2007-12-11 Ricoh Company, Ltd. Data structure used for directory structure navigation in a skeleton code creation tool
US20050182641A1 (en) * 2003-09-16 2005-08-18 David Ing Collaborative information system for real estate, building design, construction and facility management and similar industries
US20050125275A1 (en) * 2003-12-03 2005-06-09 Wright Robert H. Method and system for measuring work productivity
US7559049B1 (en) 2003-12-08 2009-07-07 Sprint Communications Company L.P. Integrated advance scheduling of indeterminate projects in an integrated development process
US20050137924A1 (en) * 2003-12-23 2005-06-23 Vish Aiyah Method and System for a resource allocation and analysis decision support tool
US20050198146A1 (en) * 2004-01-14 2005-09-08 International Business Machines Corporation System and method for targeted notifications tracking
US7197502B2 (en) * 2004-02-18 2007-03-27 Friendly Polynomials, Inc. Machine-implemented activity management system using asynchronously shared activity data objects and journal data items
US7428528B1 (en) 2004-03-31 2008-09-23 Endeca Technologies, Inc. Integrated application for manipulating content in a hierarchical data-driven search and navigation system
US20050240795A1 (en) * 2004-04-27 2005-10-27 Nokia Corporation Resource management system and method
US7849438B1 (en) 2004-05-27 2010-12-07 Sprint Communications Company L.P. Enterprise software development process for outsourced developers
US7734491B2 (en) * 2004-06-15 2010-06-08 Microsoft Corporation Hierarchical projects in a computer-enabled project management method and system
US20050278208A1 (en) * 2004-06-15 2005-12-15 Microsoft Corporation Method and system for restarting a project management system scheduling engine based on user input of contractual start/finish data
US20060010005A1 (en) * 2004-07-08 2006-01-12 William Rowland Building construction management system
US20060036451A1 (en) 2004-08-10 2006-02-16 Lundberg Steven W Patent mapping
US7617232B2 (en) * 2004-09-02 2009-11-10 Microsoft Corporation Centralized terminology and glossary development
US7363305B2 (en) * 2004-09-02 2008-04-22 Microsoft Corporation Centralized terminology and glossary management
US7702730B2 (en) 2004-09-03 2010-04-20 Open Text Corporation Systems and methods for collaboration
US8290805B2 (en) * 2004-09-13 2012-10-16 Hirokazu Usui Project management system
US8732696B2 (en) * 2004-09-30 2014-05-20 Sap Aktiengesellschaft Analytic application model and marketplace
US8566400B2 (en) * 2004-09-30 2013-10-22 International Business Machines Corporation On demand email response
US20060130057A1 (en) * 2004-11-18 2006-06-15 Siranjan Kulatilake Multiple-party project management system and method
EP1836660A1 (en) * 2004-12-03 2007-09-26 THE STATE OF OREGON acting by and through THE STATE BOARD OF HIGHER EDUCATION on behalf of THE UNIVERSITY OF OREGON System and process for job scheduling to minimize construction cost
US8868440B1 (en) * 2005-01-07 2014-10-21 Sprint Communications Company L.P. Forecasting and analysis tool
US7844480B2 (en) * 2005-01-27 2010-11-30 International Business Machines Corporation Method and system for planning and managing multiple projects on demand with critical chain and replenishment
US7774743B1 (en) 2005-03-04 2010-08-10 Sprint Communications Company L.P. Quality index for quality assurance in software development
US7742939B1 (en) * 2005-03-04 2010-06-22 Sprint Communications Company L.P. Visibility index for quality assurance in software development
US8108232B1 (en) 2005-05-26 2012-01-31 Sprint Communications Company L.P. System and method for project contract management
US20110153509A1 (en) 2005-05-27 2011-06-23 Ip Development Venture Method and apparatus for cross-referencing important ip relationships
US20070016461A1 (en) * 2005-06-17 2007-01-18 Jacques Draperi Method for the scheduling and control of projects and production-phase business operation
US8484065B1 (en) 2005-07-14 2013-07-09 Sprint Communications Company L.P. Small enhancement process workflow manager
US8161025B2 (en) 2005-07-27 2012-04-17 Schwegman, Lundberg & Woessner, P.A. Patent mapping
US8571913B2 (en) * 2005-08-04 2013-10-29 Jeffrey K. Johnson System and method for managing data within a calendaring framework
US8019752B2 (en) 2005-11-10 2011-09-13 Endeca Technologies, Inc. System and method for information retrieval from object collections with complex interrelationships
US8306924B2 (en) * 2005-11-16 2012-11-06 Submittal Exchange, Llc Method and system for online submittal exchange
US8131718B2 (en) * 2005-12-13 2012-03-06 Muse Green Investments LLC Intelligent data retrieval system
US20070156731A1 (en) * 2005-12-23 2007-07-05 Sap Ag Automatic project management application
US20070186214A1 (en) * 2005-12-23 2007-08-09 Promptt Technologies Ltd. Method of managing a task
EP1977377A1 (en) * 2005-12-23 2008-10-08 Promptt Technologies LTD A method of managing a task
US7814475B2 (en) * 2005-12-28 2010-10-12 Sap Portals Israel Ltd. Generating and deploying client-side rendered components
US20070174100A1 (en) * 2006-01-26 2007-07-26 Roy Daniel G Method and apparatus for synchronizing a scheduler with a financial reporting system
US20070240223A1 (en) * 2006-03-28 2007-10-11 Zpevak Christopher M Systems, methods, and apparatus to manage offshore software development
US20070233538A1 (en) * 2006-03-28 2007-10-04 Zpevak Christopher M Systems, methods, and apparatus to manage offshore software development
US7810107B2 (en) * 2006-04-11 2010-10-05 Sap Portals Israel Ltd. Dynamic portal registration of generic data source
US20070288288A1 (en) * 2006-06-07 2007-12-13 Tetsuro Motoyama Use of schedule editors in a network-based project schedule management system
US8799043B2 (en) * 2006-06-07 2014-08-05 Ricoh Company, Ltd. Consolidation of member schedules with a project schedule in a network-based management system
US8050953B2 (en) * 2006-06-07 2011-11-01 Ricoh Company, Ltd. Use of a database in a network-based project schedule management system
US20080004925A1 (en) * 2006-06-29 2008-01-03 Bangel Matthew J Multi-site project management
WO2008005334A2 (en) * 2006-06-30 2008-01-10 American Express Travel Related Services Company, Inc. Availability tracker
US20080154711A1 (en) * 2006-12-22 2008-06-26 American Express Travel Related Services Company, Inc. Availability Tracker
AU2007276695A1 (en) * 2006-07-19 2008-01-24 Harmony Gold (Australia) Pty Ltd A method and system for managing an action
US8082301B2 (en) 2006-11-10 2011-12-20 Virtual Agility, Inc. System for supporting collaborative activity
US8676802B2 (en) 2006-11-30 2014-03-18 Oracle Otc Subsidiary Llc Method and system for information retrieval with clustering
US8666794B1 (en) * 2007-03-26 2014-03-04 Sprint Communications Company L.P. Project management tool
US8108238B1 (en) * 2007-05-01 2012-01-31 Sprint Communications Company L.P. Flexible project governance based on predictive analysis
US8060568B2 (en) * 2007-05-29 2011-11-15 SAP Portal Israel Ltd. Real time messaging framework hub to intercept and retransmit messages for a messaging facility
US20090048894A1 (en) * 2007-08-14 2009-02-19 Michel Shane Simpson Techniques for propagating changes in projects
US20090177535A1 (en) * 2007-09-18 2009-07-09 Pmp Corporation System and method for monitoring and executing substitute fulfillment
US20120046985A1 (en) * 2007-10-02 2012-02-23 Emergency Response And Training Solutions, Inc. Method for the secure logging of correspondence and notification thereof
US10121153B1 (en) 2007-10-15 2018-11-06 Elance, Inc. Online escrow service
US7856434B2 (en) * 2007-11-12 2010-12-21 Endeca Technologies, Inc. System and method for filtering rules for manipulating search results in a hierarchical search and navigation system
US8140366B2 (en) 2008-01-04 2012-03-20 Frontline Technologies, Inc. Method, system and program product for filling job orders
US20090265210A1 (en) * 2008-04-22 2009-10-22 The Kroger Co. Systems for Store Associate Management in a Store
US8595044B2 (en) * 2008-05-29 2013-11-26 International Business Machines Corporation Determining competence levels of teams working within a software
US8667469B2 (en) * 2008-05-29 2014-03-04 International Business Machines Corporation Staged automated validation of work packets inputs and deliverables in a software factory
US8943271B2 (en) 2008-06-12 2015-01-27 Microsoft Corporation Distributed cache arrangement
US10204074B1 (en) 2008-06-12 2019-02-12 Elance, Inc. Online professional services storefront
US20090313079A1 (en) * 2008-06-12 2009-12-17 Microsoft Corporation Managing access rights using projects
US8176256B2 (en) * 2008-06-12 2012-05-08 Microsoft Corporation Cache regions
US7886015B2 (en) * 2008-07-08 2011-02-08 International Business Machines Corporation Method and system for future defined email recipient
US8452629B2 (en) * 2008-07-15 2013-05-28 International Business Machines Corporation Work packet enabled active project schedule maintenance
US8527329B2 (en) * 2008-07-15 2013-09-03 International Business Machines Corporation Configuring design centers, assembly lines and job shops of a global delivery network into “on demand” factories
US20100023920A1 (en) * 2008-07-22 2010-01-28 International Business Machines Corporation Intelligent job artifact set analyzer, optimizer and re-constructor
US8140367B2 (en) 2008-07-22 2012-03-20 International Business Machines Corporation Open marketplace for distributed service arbitrage with integrated risk management
US8375370B2 (en) * 2008-07-23 2013-02-12 International Business Machines Corporation Application/service event root cause traceability causal and impact analyzer
US8418126B2 (en) * 2008-07-23 2013-04-09 International Business Machines Corporation Software factory semantic reconciliation of data models for work packets
US8336026B2 (en) * 2008-07-31 2012-12-18 International Business Machines Corporation Supporting a work packet request with a specifically tailored IDE
US8271949B2 (en) 2008-07-31 2012-09-18 International Business Machines Corporation Self-healing factory processes in a software factory
US8448129B2 (en) * 2008-07-31 2013-05-21 International Business Machines Corporation Work packet delegation in a software factory
US8856018B2 (en) * 2008-09-15 2014-10-07 The Boeing Company Methods and systems for optimizing production forecasts using statistically prioritized discrete modeling methodology
US10481878B2 (en) 2008-10-09 2019-11-19 Objectstore, Inc. User interface apparatus and methods
US8700614B1 (en) 2008-10-14 2014-04-15 Elance, Inc. Method of and a system for ranking members within a services exchange medium
US8380709B1 (en) 2008-10-14 2013-02-19 Elance, Inc. Method and system for ranking users
US20100131513A1 (en) 2008-10-23 2010-05-27 Lundberg Steven W Patent mapping
US20100306265A1 (en) * 2009-05-18 2010-12-02 Dynology Corporation Data and event management system and method
US10635412B1 (en) 2009-05-28 2020-04-28 ELANCE, Inc . Online professional badge
US10650332B1 (en) 2009-06-01 2020-05-12 Elance, Inc. Buyer-provider matching algorithm
US20110167018A1 (en) * 2010-01-04 2011-07-07 Vicki Hamilton Prioritizing and Tracking Investments
US20110184771A1 (en) * 2010-01-28 2011-07-28 Wells Robert Frances Implementation resource project management
US9940594B1 (en) 2010-02-19 2018-04-10 Elance, Inc. Digital workroom
US8407073B2 (en) 2010-08-25 2013-03-26 International Business Machines Corporation Scheduling resources from a multi-skill multi-level human resource pool
US9904726B2 (en) 2011-05-04 2018-02-27 Black Hills IP Holdings, LLC. Apparatus and method for automated and assisted patent claim mapping and expense planning
BR112013028967A2 (en) 2011-05-10 2019-09-24 Dante Consulting Inc enterprise product management system and method
US8660878B2 (en) 2011-06-15 2014-02-25 International Business Machines Corporation Model-driven assignment of work to a software factory
US9940363B2 (en) 2011-10-03 2018-04-10 Black Hills Ip Holdings, Llc Systems, methods and user interfaces in a patent management system
US8972385B2 (en) 2011-10-03 2015-03-03 Black Hills Ip Holdings, Llc System and method for tracking patent ownership change
US8818935B2 (en) 2011-11-21 2014-08-26 Fluor Technologies Corporation Collaborative data management system for engineering design and construction projects
US11461862B2 (en) 2012-08-20 2022-10-04 Black Hills Ip Holdings, Llc Analytics generation for patent portfolio management
US9117180B1 (en) 2013-03-15 2015-08-25 Elance, Inc. Matching method based on a machine learning algorithm and a system thereof
US9767190B2 (en) 2013-04-23 2017-09-19 Black Hills Ip Holdings, Llc Patent claim scope evaluator
US20150127402A1 (en) * 2013-11-06 2015-05-07 Giga-Byte Technology Co.,Ltd. Method and system for structuring information background of the invention
US20160055437A1 (en) * 2014-08-22 2016-02-25 Bank Of America Corporation Resource capacity management framework
US9720737B2 (en) 2014-10-31 2017-08-01 Microsoft Technology Licensing, Llc Controlling resource allocation with automated consumption against a work breakdown structure
US10986144B1 (en) * 2015-09-28 2021-04-20 HealthLinx Technologies, Inc. System and method for collaboration over a network
US10423441B2 (en) 2016-09-06 2019-09-24 James CATTERMOLE Computer-implemented methods and systems of automatically generating and storing tasks for messaging applications
US11227258B2 (en) 2017-05-17 2022-01-18 International Business Machines Corporation Managing project resources
US10331437B2 (en) * 2017-07-05 2019-06-25 International Business Machines Corporation Providing customized and targeted performance improvement recommendations for software development teams
US11150635B2 (en) * 2017-10-02 2021-10-19 Fisher-Rosemount Systems, Inc. Projects within a process control asset management system
US10437711B1 (en) 2018-03-20 2019-10-08 Bank Of America Corporation Framework for fault tolerant case creation
US11113667B1 (en) 2018-12-18 2021-09-07 Asana, Inc. Systems and methods for providing a dashboard for a collaboration work management platform
USD1019696S1 (en) 2020-02-14 2024-03-26 Atlassian Pty Ltd. Display screen or portion thereof with graphical user interface
US11205146B2 (en) * 2020-02-14 2021-12-21 Atlassian Pty Ltd. Computer implemented methods and systems for project management
US11449836B1 (en) 2020-07-21 2022-09-20 Asana, Inc. Systems and methods to facilitate user engagement with units of work assigned within a collaboration environment
CN111724912A (en) * 2020-07-28 2020-09-29 嘉兴易迪希计算机技术有限公司 Personal security report messaging system and method thereof
CN112036825A (en) * 2020-08-28 2020-12-04 航天科工网络信息发展有限公司 Automatic operation and maintenance management system based on work order
US11694162B1 (en) 2021-04-01 2023-07-04 Asana, Inc. Systems and methods to recommend templates for project-level graphical user interfaces within a collaboration environment

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4451067A (en) * 1982-06-01 1984-05-29 Williams M E Comprehensive, central scheduling folder for project management
US4809170A (en) 1987-04-22 1989-02-28 Apollo Computer, Inc. Computer device for aiding in the development of software system
US4875162A (en) * 1987-10-28 1989-10-17 International Business Machines Corporation Automated interfacing of design/engineering software with project management software
US5168444A (en) * 1989-11-15 1992-12-01 Teknekron Transportation Systems Shipment system including processing of document images
US5255181A (en) * 1990-06-01 1993-10-19 Motorola, Inc. Method of planning organizational activities
US5301270A (en) 1989-12-18 1994-04-05 Anderson Consulting Computer-assisted software engineering system for cooperative processing environments
US5381332A (en) * 1991-12-09 1995-01-10 Motorola, Inc. Project management system with automated schedule and cost integration
US5530861A (en) 1991-08-26 1996-06-25 Hewlett-Packard Company Process enaction and tool integration via a task oriented paradigm

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4451067A (en) * 1982-06-01 1984-05-29 Williams M E Comprehensive, central scheduling folder for project management
US4809170A (en) 1987-04-22 1989-02-28 Apollo Computer, Inc. Computer device for aiding in the development of software system
US4875162A (en) * 1987-10-28 1989-10-17 International Business Machines Corporation Automated interfacing of design/engineering software with project management software
US5168444A (en) * 1989-11-15 1992-12-01 Teknekron Transportation Systems Shipment system including processing of document images
US5301270A (en) 1989-12-18 1994-04-05 Anderson Consulting Computer-assisted software engineering system for cooperative processing environments
US5255181A (en) * 1990-06-01 1993-10-19 Motorola, Inc. Method of planning organizational activities
US5530861A (en) 1991-08-26 1996-06-25 Hewlett-Packard Company Process enaction and tool integration via a task oriented paradigm
US5381332A (en) * 1991-12-09 1995-01-10 Motorola, Inc. Project management system with automated schedule and cost integration

Non-Patent Citations (16)

* Cited by examiner, † Cited by third party
Title
"Groupware Rocks the Enterprize", by Mtch Irsfeld, Open Systems Today, p. 32(1), Aug. 1993.* *
"High-End Project Manager Coordinate Enterprisewide Project with Desktop Flexibility," Heck, Mike, InfoWorld, v15, n5, p. 59(9), Feb. 1993.* *
"Is Lotus Notes Groupware in your company's future: Lotus Notes 3.0," Michael miley MacWeek, vol. 7 issue 22, pp. 22-24, May 31, 1993.* *
"Primavear Project Planner: Project Management Sortware", PC Magazine, p. 170(1), Aug. 1992.* *
"Project Management Software That's IS Friendly", Lee, Datamation p. 55(4), Oct., 1993.* *
"Software Review-Primavera Project Planner 5.0," by Jay Medlock, Cost Engineering, v34, n8, p. 25 (2), Aug. 1992.* *
"Software Review—Primavera Project Planner 5.0," by Jay Medlock, Cost Engineering, v34, n8, p. 25 (2), Aug. 1992.*
"Syzygy: Aiding a Stellar of Resources" by Joseph Devlin, Personal Computing, v 14, n4, p. 152(1), Apr. 1990.* *
1992David King, Project Management Made Simple (1992).
Anthony Welsh, "Project Management In Action-The Future of project Management," May 1992.
Anthony Welsh, "Project Management In Action—The Future of project Management," May 1992.
InConcert version 2.5, Mar., 1993.
Microsoft7 Project 4.0, including Microsoft7 Project Workgroup Extensions and Project Scheduler Template, Feb., 1994.
Richard E. Westney, Computerized Management of Multiple Small Projects (1992).
Steve Gilliland, Project Managers: Upping the Organization, PC Sources, v. 3, n. 12, Dec. 1992.
TeamEffort by Saratoga Software, Inc. Aug., 1990.

Cited By (91)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7031963B1 (en) * 1998-11-09 2006-04-18 Unisys Corporation Green ice printout sorting and delivery program
US20020178044A1 (en) * 1999-01-15 2002-11-28 Bicknell Barbara A. Adaptable integrated-content product development system
US20020184071A1 (en) * 1999-01-15 2002-12-05 Bicknell Barbara A. Adaptable integrated-content product development system
US7222330B2 (en) * 1999-01-15 2007-05-22 Bicknell Barbara A Project planning system with content loaded project planning template generator and a plurality of content loaded project planning templates
US7302401B1 (en) * 1999-04-06 2007-11-27 Single Source Oy Data management mechanism for project planning
US8521663B1 (en) 1999-09-08 2013-08-27 C4Cast.Com, Inc. Community-selected content
US8954361B1 (en) 1999-09-08 2015-02-10 C4Cast.Com, Inc. Community-selected content
US20010007977A1 (en) * 2000-01-06 2001-07-12 Geary Stuart Lloyd Reminder and actioning system
US20020035608A1 (en) * 2000-08-09 2002-03-21 Rajko Milovanovic Automated follow-up to a request
US20030061330A1 (en) * 2000-09-29 2003-03-27 Frisco Lynn A. Web-based collaborative project and process management solution
US20020049657A1 (en) * 2000-10-11 2002-04-25 Main Peter T. Web site for retail marketing program
US20050192866A1 (en) * 2000-10-11 2005-09-01 Nintendo Of America Inc. System and method for managing a retail marketing program utilizing dynamic forms
US20020156671A1 (en) * 2000-11-08 2002-10-24 The Boeing Company System and method for collaborative action
US20020064460A1 (en) * 2000-11-29 2002-05-30 Industrial Technology Research Institute Integrated 3-D blade structure
US7257635B2 (en) 2001-02-28 2007-08-14 Microsoft Corporation System and method for describing and automatically managing resources
US6901446B2 (en) * 2001-02-28 2005-05-31 Microsoft Corp. System and method for describing and automatically managing resources
US20020120744A1 (en) * 2001-02-28 2002-08-29 Chellis Eugene C. System and method for describing and automatically managing resources
US9110870B1 (en) 2001-03-01 2015-08-18 Visions Computer Imaging Systems Ltd. Automated system for assisting the architectural process
US20040205531A1 (en) * 2001-08-17 2004-10-14 Innes Bruce Donald Method and application for developing a statement of work
US20030078874A1 (en) * 2001-09-20 2003-04-24 Cope Warren Scott Process and system for tracking versions of field documentation data collection configurations in a complex project workflow system
US7043486B2 (en) * 2001-09-20 2006-05-09 Wellogix, Inc. Process and system for tracking versions of field documentation data collection configurations in a complex project workflow system
US20040010772A1 (en) * 2001-11-13 2004-01-15 General Electric Company Interactive method and system for faciliting the development of computer software applications
US20030105657A1 (en) * 2001-11-16 2003-06-05 Nandigama Murali K. Personal resource management tool
US8578262B2 (en) 2002-03-01 2013-11-05 Charles W. Williams Cad-interfaced, automated system for assisting the architectural process
US20070288842A1 (en) * 2002-03-01 2007-12-13 Averitt John W Cad-Interfaced, Automated System for Assisting the Architectural Process
US7386797B1 (en) * 2002-05-22 2008-06-10 Oracle Corporation Framework to model and execute business processes within a collaborative environment
US20040143477A1 (en) * 2002-07-08 2004-07-22 Wolff Maryann Walsh Apparatus and methods for assisting with development management and/or deployment of products and services
US8812339B1 (en) 2002-07-24 2014-08-19 Jack D. Stone, Jr. System and method for scheduling tasks
US7613623B2 (en) * 2002-09-17 2009-11-03 Hewlett-Packard Development Company, L.P. Enterprise management using an enterprise program office (EPO)
US20040054565A1 (en) * 2002-09-17 2004-03-18 Nemecek Carole M. Enterprise management using an enterprise program office (EPO)
US7729924B2 (en) * 2002-10-17 2010-06-01 Knowledge It Corporation Virtual knowledge management system
US20060111953A1 (en) * 2002-10-17 2006-05-25 The Knowledge It Corporation Virtual knowledge management system
US20040083480A1 (en) * 2002-10-21 2004-04-29 The Boeing Company System and method for creating a pert chart
US7260772B2 (en) * 2002-10-21 2007-08-21 The Boeing Company System and method for creating a pert chart
US7302674B1 (en) * 2002-11-26 2007-11-27 Unisys Corporation Automating document reviews in a project management system
US7159206B1 (en) * 2002-11-26 2007-01-02 Unisys Corporation Automated process execution for project management
US20040111328A1 (en) * 2002-12-10 2004-06-10 International Business Machines Corporation Method, system, and storage medium for facilitating procurement functions over a computer network
US20090307115A1 (en) * 2002-12-10 2009-12-10 International Business Machines Corporation Facilitating procurement functions over a computer network
US7765520B2 (en) * 2004-05-21 2010-07-27 Bea Systems, Inc. System and method for managing cross project dependencies at development time
US20050262471A1 (en) * 2004-05-21 2005-11-24 Bea Sytems, Inc. System and method for managing cross project dependencies at development time
US8959480B2 (en) 2004-05-26 2015-02-17 Pegasystems Inc. Methods and apparatus for integration of declarative rule-based processing with procedural programming in a digital data-processing environment
US8479157B2 (en) 2004-05-26 2013-07-02 Pegasystems Inc. Methods and apparatus for integration of declarative rule-based processing with procedural programming in a digital data-processing evironment
US7788237B2 (en) * 2004-12-17 2010-08-31 Microsoft Corporation Method and system for tracking changes in a document
US20060136510A1 (en) * 2004-12-17 2006-06-22 Microsoft Corporation Method and system for tracking changes in a document
US8335704B2 (en) * 2005-01-28 2012-12-18 Pegasystems Inc. Methods and apparatus for work management and routing
US20060173724A1 (en) * 2005-01-28 2006-08-03 Pegasystems, Inc. Methods and apparatus for work management and routing
WO2006091978A3 (en) * 2005-02-25 2007-11-01 Douglas Baker Mission console
WO2006091978A2 (en) * 2005-02-25 2006-08-31 Douglas Baker Mission console
US20060241994A1 (en) * 2005-04-20 2006-10-26 Kumar Anand Automated support for monitoring and managing knowledge work
US20070027934A1 (en) * 2005-07-29 2007-02-01 Burkhard Roehrle Software release validation
US8024303B2 (en) 2005-07-29 2011-09-20 Hewlett-Packard Development Company, L.P. Software release validation
US7584078B2 (en) 2005-08-10 2009-09-01 Iav Gmbh Ingenieurgesellschaft Auto Und Verker Creating, designing, managing, scheduling, developing and producing products
US20070038893A1 (en) * 2005-08-10 2007-02-15 Christine Junghans Creating, Designing, Managing, Scheduling, Developing and Producing Products
US20070073572A1 (en) * 2005-09-27 2007-03-29 The Q Llc Data collection and distribution system
US9658735B2 (en) 2006-03-30 2017-05-23 Pegasystems Inc. Methods and apparatus for user interface optimization
US10838569B2 (en) 2006-03-30 2020-11-17 Pegasystems Inc. Method and apparatus for user interface non-conformance detection and correction
US8924335B1 (en) 2006-03-30 2014-12-30 Pegasystems Inc. Rule-based user interface conformance methods
US20070251988A1 (en) * 2006-04-28 2007-11-01 Century Solutions Limited Field servicing
US8463636B2 (en) 2006-04-28 2013-06-11 Field Nation, Llc Field servicing
US20070294155A1 (en) * 2006-05-31 2007-12-20 Renegade Swish, Llc Apparatus, system, method, and computer program for managing transactions involving aviation assets
US20080065460A1 (en) * 2006-08-23 2008-03-13 Renegade Swish, Llc Apparatus, system, method, and computer program for task and process management
US8924931B2 (en) * 2006-08-31 2014-12-30 Serena Software, Inc. Method and system for determining dependencies in a mainframe development environment
US20080059946A1 (en) * 2006-08-31 2008-03-06 Jeremy Harding Method and system for determining dependencies in a mainframe development environment
US8719174B2 (en) 2006-11-15 2014-05-06 International Business Machines Corporation Method, system, and computer program product for collaborative and integrated intellectual property management
US20080114668A1 (en) * 2006-11-15 2008-05-15 International Business Machines Corporation Method, system, and computer program product for collaborative and integrated intellectual property management
US9189361B2 (en) 2007-03-02 2015-11-17 Pegasystems Inc. Proactive performance management for multi-user enterprise software systems
US8250525B2 (en) 2007-03-02 2012-08-21 Pegasystems Inc. Proactive performance management for multi-user enterprise software systems
US20080270267A1 (en) * 2007-04-26 2008-10-30 Caterpillar Inc. System and method for logistics management
US20080288322A1 (en) * 2007-05-10 2008-11-20 Kevin Kennedy & Associates, Inc. Methods and systems for project management
US7949610B2 (en) 2008-01-31 2011-05-24 International Business Machines Corporation Method and system for discovering dependencies in project plans of distributed system
US20090198531A1 (en) * 2008-01-31 2009-08-06 International Business Machines Corporation Method and system for discovering dependencies in project plans of distributed system
US20090204463A1 (en) * 2008-02-13 2009-08-13 Lockheed Martin Corporation Method, tool, and system for analyzing a project
US20090307035A1 (en) * 2008-06-04 2009-12-10 Microsoft Corporation Resolution of resource over-allocations in project plans
US8676919B2 (en) 2008-06-26 2014-03-18 Microsoft Corporation Asynchronously editing a synchronous data store, such as a project management data store
US20090327403A1 (en) * 2008-06-26 2009-12-31 Microsoft Corporation Asynchronously editing a synchronous data store, such as a project management data store
US20100211957A1 (en) * 2009-02-19 2010-08-19 International Business Machines Corporation Scheduling and assigning standardized work requests to performing centers
US8464263B2 (en) 2009-02-19 2013-06-11 International Business Machines Corporation Scheduling work requests to performing centers based on overall cost and duration of multiple assignment options
US10467200B1 (en) 2009-03-12 2019-11-05 Pegasystems, Inc. Techniques for dynamic data processing
US9678719B1 (en) 2009-03-30 2017-06-13 Pegasystems Inc. System and software for creation and modification of software
US8880487B1 (en) 2011-02-18 2014-11-04 Pegasystems Inc. Systems and methods for distributed rules processing
US9270743B2 (en) 2011-02-18 2016-02-23 Pegasystems Inc. Systems and methods for distributed rules processing
US9195936B1 (en) 2011-12-30 2015-11-24 Pegasystems Inc. System and method for updating or modifying an application without manual coding
US10572236B2 (en) 2011-12-30 2020-02-25 Pegasystems, Inc. System and method for updating or modifying an application without manual coding
US9477522B2 (en) 2014-07-01 2016-10-25 Tuul, Inc. System and method for implementing workflow management using messaging
WO2016003728A1 (en) * 2014-07-01 2016-01-07 Tuul, Inc. System and method for implementing workflow management using messaging
US10469396B2 (en) 2014-10-10 2019-11-05 Pegasystems, Inc. Event processing with enhanced throughput
US11057313B2 (en) 2014-10-10 2021-07-06 Pegasystems Inc. Event processing with enhanced throughput
US10698599B2 (en) 2016-06-03 2020-06-30 Pegasystems, Inc. Connecting graphical shapes using gestures
US10698647B2 (en) 2016-07-11 2020-06-30 Pegasystems Inc. Selective sharing for collaborative application usage
US11048488B2 (en) 2018-08-14 2021-06-29 Pegasystems, Inc. Software code optimizer and method
US11567945B1 (en) 2020-08-27 2023-01-31 Pegasystems Inc. Customized digital content generation systems and methods

Also Published As

Publication number Publication date
US5548506A (en) 1996-08-20

Similar Documents

Publication Publication Date Title
USRE38633E1 (en) Automated, electronic network based, project management server system
US5594639A (en) Order processing control module
US8306841B2 (en) Enterprise project management system and method therefor
US6370562B2 (en) Trackpoint-based computer-implemented systems and methods for facilitating collaborative project development and communication
Leymann et al. Workflow-based applications
RU2400814C2 (en) Hierarchical projects in system and method of project control supported by computer
US7640225B2 (en) System and method for process automation and enforcement
US8464263B2 (en) Scheduling work requests to performing centers based on overall cost and duration of multiple assignment options
WO2012102782A1 (en) Method and system for allocation of resources in a project portfolio
US20070073572A1 (en) Data collection and distribution system
EP1367520A1 (en) Project workforce management
US20070100881A1 (en) Method, system and storage medium for identifying and allocating surplus inventory
US20070300229A1 (en) Configurable application integrating service request and fulfillment process
AU2011202260A1 (en) A project management method and system
WO2001071621A9 (en) Method and system for top-down business process definition and execution
MXPA01002771A (en) Computer-implemented product development planning method.
US20090063413A1 (en) Method and system for tracking allocations of assets and tasks
US8805919B1 (en) Multi-hierarchical reporting methodology
Afifi et al. RBPSim: A Resource-aware Extension of BPSim Using Workflow Resource Patterns.
Ott Conceptual design and implementation of a graphical workflow-modelling editor in the context of distributed groupware-databases
AU2021107402A4 (en) Computer implemented system and method for monitoring and reporting productivity in enterprise environment for construction companies
Olford Why is multiple-project management hard and how can we make it easier?
Thomas et al. Building a knowledge base for the knowledge worker system
Buco et al. Pem: A framework enabling continual optimization of workflow process executions based upon business value metrics
Lang et al. Workflow-supported organizational memory systems: An industrial application

Legal Events

Date Code Title Description
FEPP Fee payment procedure

Free format text: PAT HOLDER NO LONGER CLAIMS SMALL ENTITY STATUS, ENTITY STATUS SET TO UNDISCOUNTED (ORIGINAL EVENT CODE: STOL); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY

AS Assignment

Owner name: ENPAT, INC., FLORIDA

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:RAJ, SESHAN S, MR.;REEL/FRAME:020403/0684

Effective date: 20040401

FPAY Fee payment

Year of fee payment: 12