WO1997008054A1 - Process for the manufacture of prefilled syringes - Google Patents

Process for the manufacture of prefilled syringes Download PDF

Info

Publication number
WO1997008054A1
WO1997008054A1 PCT/US1996/013559 US9613559W WO9708054A1 WO 1997008054 A1 WO1997008054 A1 WO 1997008054A1 US 9613559 W US9613559 W US 9613559W WO 9708054 A1 WO9708054 A1 WO 9708054A1
Authority
WO
WIPO (PCT)
Prior art keywords
packaged
plunger
barrel
environment
tip seal
Prior art date
Application number
PCT/US1996/013559
Other languages
French (fr)
Inventor
David M. Reilly
Edward J. Rhinehart
Eugene A. Gelblum
Mark Hitchins
Michelle Robinson
Original Assignee
Medrad, Inc.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Medrad, Inc. filed Critical Medrad, Inc.
Priority to DE69612859T priority Critical patent/DE69612859T2/en
Priority to EP96929717A priority patent/EP0846072B1/en
Priority to AT96929717T priority patent/ATE201177T1/en
Priority to AU69002/96A priority patent/AU6900296A/en
Publication of WO1997008054A1 publication Critical patent/WO1997008054A1/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65BMACHINES, APPARATUS OR DEVICES FOR, OR METHODS OF, PACKAGING ARTICLES OR MATERIALS; UNPACKING
    • B65B3/00Packaging plastic material, semiliquids, liquids or mixed solids and liquids, in individual containers or receptacles, e.g. bags, sacks, boxes, cartons, cans, or jars
    • B65B3/003Filling medical containers such as ampoules, vials, syringes or the like
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10TECHNICAL SUBJECTS COVERED BY FORMER USPC
    • Y10TTECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
    • Y10T29/00Metal working
    • Y10T29/49Method of mechanical manufacture
    • Y10T29/49808Shaping container end to encapsulate material
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10TECHNICAL SUBJECTS COVERED BY FORMER USPC
    • Y10TTECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
    • Y10T29/00Metal working
    • Y10T29/49Method of mechanical manufacture
    • Y10T29/49826Assembling or joining
    • Y10T29/4984Retaining clearance for motion between assembled parts

Definitions

  • This application relates in general to manufacturing processes for syringes, and more particularly to manufacturing processes for syringes prefilled with a fluid, such as a diagnostic contrast media or drug, where at least one ofthe syringe components is manufactured in at least a class 100 environment.
  • a fluid such as a diagnostic contrast media or drug
  • Prefilled syringes provide convenience of use by eliminating the need to load the syringe with fluid, contrast media, and by minimizing the need to purge air.
  • Manufacturing processes for prefilled syringes are known in the art. For example, processes are known for producing prefilled, sterile glass syringes whereby the manufactured syringe components are washed and sterilized prior to partial assembly. The partially assembled glass syringe is filled with a fluid, sealed with a plunger, and sterilized once again by heating.
  • This invention relates to a process for manufacturing prefilled syringes which reduces the number of component washing steps and permits the molding, assembly and filling of components substantially free of contaminants.
  • a typical syringe which can be manufactured by the process ofthe invention includes a barrel, plunger substrate, plunger cover and tip seal.
  • a class 100 environment is defined as an environment having no more than 100 viable or nonviable particles per cubic foot of air, 0.5 microns and larger. Further, this manufacturing environment should be at least a MCB-3 environment.
  • a MCB-3 environment is defined as an environment wherein the microbial level of gram positive microorganisms is less than 3 cfu (colony forming unit) per cubic foot of air, and the microbial level of gram negative microorganisms is less than 1 cfu per cubic foot of air.
  • the molding temperature for the barrel and plunger substrate may be selected such that it renders these components substantially sterile and substantially free from contaminants. Any contaminants, such as particulate matter, that may exist in the air within the class 100 environment proximate to the components after molding may be removed from the class 100 environment by air flow. Thus, the barrel and plunger substrate manufactured under these conditions need not be washed.
  • the plunger cover and tip seal are molded from an elastomeric material, such as rubber, by any suitable molding method such as compression molding. As it is typically more difficult to compression mold these components within a class 100 environment due to the procedures and materials used, these components are manufactured in an environment less clean than a class 100 environment. Specifically, compression molded components are typically formed from a large sheet of rubber material. After the rubber has vulcanized in the mold, the entire sheet of molded components is removed from the mold and trimmed. The trimming process generates particulate matter from the cutoffs and lubrication that is used.
  • any contaminants that may exist on the plunger cover or tip seal after molding are removed by any suitable method, such as the use of ultrasound or washing with freon or ultra-purified water, otherwise referred to as water-for- injection.
  • the plunger cover and tip seal are then transferred to a class 100 environment. After molding and contaminant removal, the plunger cover and tip seal are lubricated with silicone oil, hereinafter referred to as "silicone", to facilitate the assembly of the plunger cover onto the plunger substrate to form the plunger, and the assembly of the tip seal to the distal end of the barrel to form the barrel/tip seal combination.
  • silicone oil hereinafter referred to as "silicone”
  • the plunger cover and tip seal may also require sterilization by any suitable method, such as use of ethylene oxide or autoclaving.
  • the barrel/tip seal combination is filled with a fluid, such as a contrast medium or drug, and the plunger is inserted therein to complete the assembly ofthe prefilled syringe.
  • a fluid such as a contrast medium or drug
  • the plunger is inserted therein to complete the assembly ofthe prefilled syringe.
  • the components or partially assembled components are "triple-bagged" to prevent contamination. Specifically, the components or partially assembled components are inserted into separate first and second containers, such as plastic bags, which are sealed to prevent entry of contamination.
  • the packaged components or partially assembled components are then transferred to an environment less clean than a class 100 environment, such as a class 10,000 environment, where they are placed in a third container, such as a plastic bag, which is sealed to prevent entry of contaminants.
  • a class 10,000 environment as used herein, is defined as an environment having no more than 10,000 viable or nonviable particles per cubic foot of air, 0.5 microns and larger.
  • the third bag is then placed in a shipping box for delivery to the next manufacturing location. Upon arrival at the next manufacturing location, the shipping box is placed in an environment less clean than a class 100 environment, such as a class 10,000 environment.
  • the packaged components or partially assembled components are then removed from the box and third bag, and placed in a feedthrough box connected to at least a class 100 environment, where they are removed from the second bag.
  • the second bag remains in the feedthrough box, and the first bag containing the packaged components or partially assembled components is transported to into the class 100 environment.
  • the packaged components or partially assembled components are removed from the first bag and set up for further manufacturing steps. It is understood that the components and partially assembled components can be transferred to any number of manufacturing locations by using the packaging and unpackaging procedures of the present invention.
  • a salient technical advantage is that the number of washing steps required by the prior art is substantially reduced and the syringe components are molded, assembled and filled substantially free from contaminants.
  • Fig. 1 is an axial sectional view of a representative syringe which may be manufactured according a syringe manufacturing process ofthe invention
  • Figs. 2a and 2b together comprise a flow diagram of a syringe manufacturing process according to a first embodiment ofthe invention
  • FIGS. 3-5 are schematic block diagrams showing successive steps in a filling and final syringe assembly procedure according to a syringe manufacturing process ofthe invention
  • Figs. 6a and 6b together comprise a flow diagram of a syringe manufacturing process according to a second embodiment ofthe invention
  • Fig. 7 is a schematic diagram showing successive steps in a packaging process according to the invention.
  • Fig. 8 is a process flow diagram showing steps in an unpackaging process according to the invention.
  • Syringe 10 comprises several components including a barrel 12 having a cylindrically-shaped body 14 and a tapered nozzle section 16 joined together by a tapered conical section 18. Tip 20 of nozzle section 16 forms the distal end of syringe 10.
  • Flange 22 is located on the body 14 at the proximal end of barrel 12 to secure syringe 10 within an injector pressure jacket (not shown), such as the pressure jacket described in U.S. Patent No. 4,677,980.
  • syringe 10 may include mounting flanges (not shown) at its proximal and to facilitate attachment to a front-loading injector, as described in U.S. Patent No. 5,383,858.
  • Syringe 10 further comprises a plunger 24 which is sealingly engaged within the body 14.
  • Plunger 24 typically includes a plunger substrate 26 and legs 28 extending therefrom to engage the drive piston (not shown) of the injector (not shown). Plunger 24 may further include a plunger cover 30 attached to the plunger substrate 26. Alternatively, plunger 24 may be made of a single piece including legs 28. Tip seal 32 having an interior surface 34 is attached to syringe tip 20 by any suitable means, such a friction or screw threads (not shown).
  • the barrel 12 and plunger substrate 26 are manufactured from a non-elastomeric material, such as polypropylene and polycarbonate, respectively, and the plunger cover 30 and tip seal are manufactured from an elastomeric material, such as rubber.
  • the first embodiment of the process invention is demonstrated in the flow diagram of Figs. 2a and 2b.
  • all of the manufacturing activities for syringe 10 are performed within the same manufacturing location.
  • plastic pellets for barrel 12 are received at step 210, inspected at step 212 and staged at step 214.
  • Barrel 12 is molded at step 216 within at least a class 100 environment, at a temperature sufficient to render barrel 12 substantially free from contaminants.
  • the manufacturing environment should also be at least a MCB- 3 environment. Any particulate matter that may exist in the air proximate to the barrel 12 after the molding process is diverted away from barrel 12 by any suitable means, such as air flow. Thus, barrel 12 need not be decontaminated or otherwise washed.
  • Barrel 12 is inspected at step 218 and its inside surface is lubricated with any suitable lubrication means, such as silicone, at step 220. Lubrication is required because barrel 12 receives plunger 24 having a rubber cover 30.
  • the raw material for tip seal 32 is received at step 222.
  • the molding compound for tip seal 32 is formulated at step 224, tested and inspected at step 226, and staged at step 228.
  • Tip seal 32 is molded out ofthe compound at step 230 in an environment less clean than a class 100 environment and is inspected at step 232. Contaminants on the tip seal 32 surface are then removed at step 234 by any suitable method, such as the use of ultrasound or jet washing with freon or ultra-purified water. After contaminant removal, tip seal 32 is maintained in at least a class 100 environment at step 236 and lubricated at step 238 with any suitable lubrication means, such as silicone. It is understood that tip seal 32 may also be lubricated while being decontaminated at step 234.
  • Tip seal 32 may also be sterilized at step 239, by any suitable sterilization method, such as use of ethylene oxide or autoclaving. Barrel 12 and tip seal 32 are then assembled at step 240 to form a barrel/tip seal combination. Non-elastomeric material, such as polypropylene pellets, is received for the plunger substrate
  • plunger substrate 26 is molded at step 248 in at least a class 100 environment at a temperature sufficient to render the plunger substrate 26 substantially free from contaminants.
  • the manufacturing environment should also be at least a MCB-3 environment. Any particulate matter that may exist in the air proximate to the plunger substrate 26 after the molding process is diverted away from plunger substrate 26 by any suitable means, such as air flow. Thus, the plunger substrate 26 need not be decontaminated or otherwise washed.
  • Plunger substrate 26 is then inspected at step 250.
  • Elastomeric material, such as rubber, for the plunger cover 30 is received at step 252.
  • the molding compound for the plunger cover 30 is formulated at step 254, tested and inspected at step
  • Plunger cover 30 is molded from the molding compound at step 260 in an environment less clean than a class 100 environment and inspected at step 262. Any contaminants that may exist on the surface ofthe plunger cover 30 are then removed by any suitable method at step 264, such as using ultrasound or jet washing with freon or ultra-purified water. Plunger cover 30 is then maintained in at least a class 100 environment at step 265 and lubricated at step 266 by any suitable lubrication means, such as silicone. It is understood that plunger cover 30 may also be lubricated while being decontaminated at step 264. As with tip seal 32, plunger cover 30 may also be sterilized at step 267 by any suitable method. Plunger cover 30 and plunger substrate 26 are assembled at step 268.
  • the fluid 36 such as contrast medium, for filling the prefillable syringe 10
  • the fluid 36 is staged at step 268, made up at step 270, placed in a holding tank at step 272 and tested at step 274.
  • the barrel/tip seal combination is then filled with the fluid 36 by any suitable filling method at step 276 and plunger 24 is then inserted into the filled barrel/tip seal combination at step 278.
  • Figs. 3-5 show the progressive stages of a preferred method for filling the barrel/tip seal combination, identified by reference numeral 38.
  • the barrel/tip seal combination 38 and plunger 24 are placed inside of a hermetic enclosure 300 located within a clean environment, preferably at least a class 100 and MCB-3 environment.
  • Filling tube 310 for introducing fluid 36 into the barrel/tip seal combination 38 also extends into the enclosure 300.
  • Barrel/tip seal combination 38 and plunger 24 are held in place by appropriate retaining means, such as clamps or the like (not shown). Class 100 air within the enclosure 300 is then evacuated.
  • filling tube 310 is used to inject fluid 36, such as a contrast medium, into the proximal end ofthe barrel/tip seal combination 38.
  • fluid 36 such as a contrast medium
  • fluid 36 Prior to filling, fluid 36 is staged according to the manufacturing process described in accordance with Figs. 2a and 2b. After a predetermined level of fluid 36 is injected into the barrel/tip seal combination 38, fluid flow through tube 310 is terminated.
  • plunger 24 is moved by an articulable arm (not shown) or the like and inserted into the barrel/tip seal combination 38.
  • the outside surface of the plunger 24 forms a hermetic seal with the interior sidewalls of the barrel/tip seal combination 38.
  • Class 100 air is then reintroduced into enclosure 300 and the completely assembled, prefilled syringe 10 is removed therefrom. The process is then repeated for each subsequent barrel/tip seal combination 38 and plunger 24. It is understood that suitable machinery can be designed to perform this filling and final assembly step on a plurality of barrel/tip seal combinations 38 and plungers 24 at the same time.
  • Tip seal 32 located at the distal end of syringe 10 and plunger 24 located near the proximal end of syringe 10 provide, in combination with the sidewalls of the syringe 10, a hermetic seal to contain the injectable fluid 36.
  • the filling and final assembly process results in a prefilled, sterile syringe 10 which subsequently can be speedily mounted onto an injector head (not shown) by the user.
  • a technical advantage is provided in that the user need not fill the syringe 10 through the tip 20, but can proceed directly to a fluid injection procedure. Referring back to Fig.
  • the completed prefilled syringe 10 which may be placed in a protective pouch, is then sterilized at step 280 by any suitable method, such as autoclaving, labeled at step 282, and inspected at step 284.
  • a prefilled syringe 10 that does not meet predetermined requirements is rejected at step 286.
  • a prefilled syringe that meets predetermined requirements is packaged at step 288, by any suitable packaging means, inspected again at step 290, stored at step 292 and shipped at step 294.
  • the second embodiment ofthe process invention is depicted in the flow diagrams of Figs. 6a and 6b.
  • the manufacturing process takes place at separate manufacturing ' locations designated A, B, C and D, as shown by the dashed enclosures of Figs. 6a and 6b.
  • the barrel 12 and plunger substrate 26 are molded in at least a class 100 and MCB-3 environment designated as site A in Fig. 6a, by any suitable molding method such as injection molding.
  • Plunger cover 30 and tip seal 32 are typically molded by compression molding which normally takes place in an environment less clean than a class 100 environment, designated as site B.
  • polypropylene pellets are received at step 610, inspected at step 612 and staged at step 614.
  • barrel 12 is molded at step 616 in at least a class 100 environment at a temperature sufficient to render barrel 12 substantially free from contaminants. Any particulate matter that may exist in the air proximate to the barrel 12 after the molding process is diverted away from barrel 12 by any suitable means, such as air flow. Thus, barrel 12 need not be decontaminated or otherwise washed. Barrel 12 is then inspected and packaged at step 618. It is understood that barrel 12 may also be lubricated by any suitable means after being molded at step 616.
  • barrel 12 is packaged according to the procedure depicted in Fig. 7. While within a class 100 and MCB-3 environment, a plurality of barrels 12, such as four, are placed in a holder 730a. Another plurality of barrels 12, such as four, are placed in a holder 730b mateable with holder 730a to form a single clip 731. Clip 731 along with its barrels 12 are then inserted into a first container, such as plastic bag 732a which is then sealed by any suitable means, such as heat sealing. A second barrel 12 and clip 731 assembly can be inserted into another first container, such as plastic bag 732b which is then sealed.
  • a first container such as plastic bag 732a which is then sealed by any suitable means, such as heat sealing.
  • Bags 732a and 732b are then inserted into a second container, such as plastic bag 734, which is sealed by any suitable means, such as heat sealing.
  • Plastic bag 734 may then be transported to an environment less clean than a class 100 environment, such as a class 10,000 environment, and inserted into a third container, such as plastic bag or carton liner 736 which is sealed by any suitable means, such as a tie or other clasp (not shown).
  • Carton liner 736 is then inserted into a shipping container, such as container 738 which is closed for shipping.
  • a label (not shown) may be applied to the outer surface of bags 732a, 732b, 734 and 736 to identify the contents.
  • label 740 may be applied to the outer surface of container 738 to identify the contents or provide shipping instructions.
  • Fig. 6a after barrel 12 has been packaged at step 618, it is shipped to site C at step 620. It is understood that the packaging materials used to package the syringe components must themselves be substantially free from contaminants to maintain the cleanliness
  • Plunger substrate 26 may also be molded at site A. Polycarbonate pellets are received at step 622, inspected at step 624 and staged at 626. Similar to barrel 12, plunger substrate 26 is molded at step 628 in at least a class 100 and MCB-3 environment at a temperature sufficient to render plunger substrate 26 substantially free from contaminants. Any particulate matter that may exist proximate to the plunger substrate 26 after the molding process is diverted away from plunger substrate 26 by any suitable means, such as air flow. Thus, plunger substrate 26 need not be decontaminated or otherwise washed. The molded plunger substrate 26 is then inspected and packaged at step 630. In a preferred embodiment, plunger substrate 26 is packaged according to the packaging procedure previously described in accordance with Fig. 7. After packaging, the plunger substrate 26 is shipped to site C at step 632.
  • the plunger cover 30 is molded at site B, typically an environment less clean than a class 100 environment. As shown in Fig. 6a, raw materials for the plunger cover 30 are received at step 634. The molding compound for the cover 30 is formulated at step 636, tested and inspected at step 638, and staged at step 640. Plunger cover 30 is molded at step 642 in an environment less clean than a class 100 environment, and again inspected at step 644. To remove any contaminants that may exist on the plunger cover 30 after molding, any suitable method may be used, such as use of ultrasound or jet washing with freon or ultra-purified water. After removing contaminants, the plunger cover 30 is maintained in a clean environment at step 649, such as at least a class 100 environment.
  • plunger cover 30 is then lubricated at step 650 using any suitable lubrication means, such as silicone, to facilitate its attachment to plunger substrate 26.
  • plunger cover 30 is packaged at step 651 in accordance with the procedure previously described in connection with Fig. 7, and shipped to a site C at step 652.
  • tip seal 32 is manufactured at site B. Plunger cover 30 and tip seal 32 need not be manufactured from the same materials.
  • raw materials for the tip seal 32 are received at step 654 and the tip seal molding compound is formulated at step 656.
  • the tip seal compound is tested and inspected at step 658 and staged for molding at step 660.
  • Tip seal 32 is molded at step 662 in an environment less clean than a class 100 environment, inspected at step 664, packaged at step 665 according to the procedure of Fig. 7, and shipped to site D at step 666. It is understood that contaminants may be removed from the tip seal 32 surface and tip seal 32 may be lubricated at site B. If so, after contaminant removal and lubrication, tip seal 32 is packaged according to the procedure previously described in accordance with Fig. 7, prior to shipping to site D.
  • plunger substrate 26 and plunger cover 30 are removed from their respective packaging at step 667.
  • these components are unpackaged according to the procedure depicted in Fig. 8.
  • packaged plunger substrates 26 are received at site C in an environment less clean than a class 100 environment, such as a class 10,000 environment, and are removed from shipping container 738 and third container or liner 736, at steps 810 and 812.
  • removal from the third container takes place proximate to the feedthrough box just prior to inserting the packaged plunger substrates 26 into the feedthrough box.
  • packaged plunger substrates 26 in the second container 734 are inserted into a feedthrough box connected to at least a class 100 environment, where the second container 734 is removed.
  • the packaged plunger substrates 26 within the first containers 732a and 732b are transported into the class 100 environment where the plunger substrates 26 are removed from the first containers 732a and 732b and placed into a holder (not shown), at steps 816 and 818.
  • the packaged plunger covers 30 are similarly unpackaged in accordance with the procedure shown in Fig. 8.
  • plunger substrate 26 and plunger cover 30 After a plunger substrate 26 and plunger cover 30 have been unpackaged, they are assembled at step 668 to form a plunger 24 which is subsequently sterilized at step 670, by any suitable means, such as the use of ethylene oxide. After sterilization, plunger 24 is packaged in accordance with Fig. 7 at step 671 and then shipped to site D at step 672.
  • barrel 12 is unpackaged at site C at step 673 according to the procedure depicted in Fig. 8, and sterilized by any suitable means, such as the use of ethylene oxide at step 674. Sterilized barrel 12 is then repackaged according to the procedure of Fig. 7 at step 675 and shipped to cite D at step 676.
  • the plunger 24, barrel 12, tip seal 32, all packaged according to the steps of Fig. 7 and unpackaged according to the steps of Fig. 8, and fluid 36 used to fill syringe 10, are received at a receiving step 678 and undergo quality control inspection and testing at step 680.
  • barrel 12 is staged at step 682 and the inside surface of barrel 12 is lubricated by any suitable lubrication means, such as silicone, at step 684 to facilitate insertion of plunger 24. If contaminants on tip seal 32 were not previously removed at site B, tip seal
  • tip seal 32 is placed in an environment less clean than a class 100 environment, staged at step 686, and decontaminated at step 688 by any suitable means to remove any contaminants that may have accumulated. After decontamination, tip seal 32 is maintained in at least a class 100 and MCB-3 environment at step 690, and then lubricated at step 692 by any suitable means, such as silicone. Tip seal 32 may also be sterilized at step 693 by any suitable method, such as use of ethylene oxide or autoclaving. The barrel 12 and tip seal 32 are then assembled to form a barrel/tip seal combination 38 at step 694.
  • the fluid 36 used in syringe 10, such as contrast medium, is staged at step 696, made up at step 698, put into a holding tank at step 700, and tested at step 702.
  • the barrel/tip seal combination 38 is filled with fluid 36, preferably by the process previously described in reference to Figs. 3-5.
  • plunger 24 is inserted into the barrel/tip seal combination 38 at step 708 to complete the prefilled syringe 10, and may be placed in a protective container.
  • the prefilled syringe 10 is sterilized by any suitable method, such as autoclaving.
  • syringe 10 After sterilizing, an identifying label is affixed to syringe 10, or its protective container, at step 712. Syringe 10 is then inspected in accordance with predetermined requirements at step 714, and if found to be non- conforming, it is rejected at step 716. If syringe 10 meets the predetermined requirements, it is then packaged at step 718, inspected at step 720, stored at step 722 and ultimately shipped at step 724.
  • the barrel/tip seal combination 38 could be packaged according to the process of Fig. 7, transported to at least a class 100 and MCB-3 filling and final assembly site (not shown), unpackaged according to the procedure of Fig. 8, and filled and finally assembled according to the procedure of Figs. 3-5.

Abstract

This invention relates to a process for manufacturing prefilled syringes where at least one of the syringe components is manufactured in at least a class 100 environment. The process includes the steps of manufacturing syringe components, such as the barrel and plunger substrate, within at least a class 100 and MCB-3 environment (210-218, 242-250); manufacturing syringe components, such as the plunger cover and tip seal in an environment less clean than a class 100 environment (252-262, 222-232); decontaminating the plunger cover and tip seal (264-265, 234-236); lubricating at least one of the barrel, plunger substrate, plunger cover and tip seal (220, 266, 238); assembling the barrel and tip seal to form a barrel/tip seal combination (240); assembling the plunger cover and plunger substrate to form a plunger (268); filling the barrel/tip seal combination with a predetermined amount of fluid (276); and final assembling of the prefilled syringe by inserting the plunger into the barrel/tip seal combination (278). When the syringe components are manufactured at different locations, each component is tripled-bagged to maintain the component substantially free from contaminants, and transported to an assembly site where the components are unpackaged and assembled into the barrel/tip seal combination and plunger. When filling and final assembly of the barrel/tip seal combination takes place at a location separate from its assembly site, the barrel/tip seal combination is tripled-bagged to maintain it substantially free from contaminants, and transported to a filling and final assembling site for filling and final assembling into a prefilled syringe.

Description

Description PROCESS FOR THE MANUFACTURE OF PREFILLED SYRINGES
TECHNICAL FIELD OF THE INVENTION This application relates in general to manufacturing processes for syringes, and more particularly to manufacturing processes for syringes prefilled with a fluid, such as a diagnostic contrast media or drug, where at least one ofthe syringe components is manufactured in at least a class 100 environment.
BACKGROUND OF THE INVENTION
Prefilled syringes provide convenience of use by eliminating the need to load the syringe with fluid, contrast media, and by minimizing the need to purge air. Manufacturing processes for prefilled syringes are known in the art. For example, processes are known for producing prefilled, sterile glass syringes whereby the manufactured syringe components are washed and sterilized prior to partial assembly. The partially assembled glass syringe is filled with a fluid, sealed with a plunger, and sterilized once again by heating. U.S. Patent Nos. 4,718,463 and 4,628,969, both issued to Jurgens, Jr. et al., teach a process for manufacturing plastic, prefilled syringes using repeated water jet washing of the syringe components prior to assembly and filling. Water washing is expensive because it requires ultra-purified water. Water washing is also troublesome because it is difficult to inspect and insure satisfactory cleaning. Therefore, it is desirable to reduce the number of washing steps required in the manufacture of prefilled syringes. Further, prior art syringe manufacturing processes do not provide precautionary steps to maintain syringe components substantially free from contaminants, such as viable and nonviable particles, during molding, assembly and filling. Therefore, it is desirable to develop a method for manufacturing prefilled syringes which substantially reduces viable and nonviable particles that may contaminate the syringe components during molding, assembly and filling.
SUMMARY OF THE INVENTION
This invention relates to a process for manufacturing prefilled syringes which reduces the number of component washing steps and permits the molding, assembly and filling of components substantially free of contaminants. A typical syringe which can be manufactured by the process ofthe invention includes a barrel, plunger substrate, plunger cover and tip seal.
In general the process begins by molding the barrel and plunger substrate from non¬ elastomeric material, such as polypropylene, polycarbonate or other medical grade plastic, within at least a class 100 environment. A class 100 environment, as used herein, is defined as an environment having no more than 100 viable or nonviable particles per cubic foot of air, 0.5 microns and larger. Further, this manufacturing environment should be at least a MCB-3 environment. A MCB-3 environment, as used herein, is defined as an environment wherein the microbial level of gram positive microorganisms is less than 3 cfu (colony forming unit) per cubic foot of air, and the microbial level of gram negative microorganisms is less than 1 cfu per cubic foot of air.
The molding temperature for the barrel and plunger substrate may be selected such that it renders these components substantially sterile and substantially free from contaminants. Any contaminants, such as particulate matter, that may exist in the air within the class 100 environment proximate to the components after molding may be removed from the class 100 environment by air flow. Thus, the barrel and plunger substrate manufactured under these conditions need not be washed.
The plunger cover and tip seal are molded from an elastomeric material, such as rubber, by any suitable molding method such as compression molding. As it is typically more difficult to compression mold these components within a class 100 environment due to the procedures and materials used, these components are manufactured in an environment less clean than a class 100 environment. Specifically, compression molded components are typically formed from a large sheet of rubber material. After the rubber has vulcanized in the mold, the entire sheet of molded components is removed from the mold and trimmed. The trimming process generates particulate matter from the cutoffs and lubrication that is used. Any contaminants that may exist on the plunger cover or tip seal after molding are removed by any suitable method, such as the use of ultrasound or washing with freon or ultra-purified water, otherwise referred to as water-for- injection. The plunger cover and tip seal are then transferred to a class 100 environment. After molding and contaminant removal, the plunger cover and tip seal are lubricated with silicone oil, hereinafter referred to as "silicone", to facilitate the assembly of the plunger cover onto the plunger substrate to form the plunger, and the assembly of the tip seal to the distal end of the barrel to form the barrel/tip seal combination. The plunger cover and tip seal may also require sterilization by any suitable method, such as use of ethylene oxide or autoclaving. After assembly of the plunger and barrel/tip seal combination within at least a class 100 and MCB-3 environment, the barrel/tip seal combination is filled with a fluid, such as a contrast medium or drug, and the plunger is inserted therein to complete the assembly ofthe prefilled syringe. Oftentimes different manufacturing steps take place at different locations. In this instance, it is desirable to package the components or partially assembled components in packaging that will maintain the components or partially assembled components substantially free from contaminants while being transported from one manufacturing location to another. In a preferred embodiment ofthe invention, the components or partially assembled components within at least a class 100 environment are "triple-bagged" to prevent contamination. Specifically, the components or partially assembled components are inserted into separate first and second containers, such as plastic bags, which are sealed to prevent entry of contamination. The packaged components or partially assembled components are then transferred to an environment less clean than a class 100 environment, such as a class 10,000 environment, where they are placed in a third container, such as a plastic bag, which is sealed to prevent entry of contaminants. A class 10,000 environment, as used herein, is defined as an environment having no more than 10,000 viable or nonviable particles per cubic foot of air, 0.5 microns and larger. The third bag is then placed in a shipping box for delivery to the next manufacturing location. Upon arrival at the next manufacturing location, the shipping box is placed in an environment less clean than a class 100 environment, such as a class 10,000 environment. The packaged components or partially assembled components are then removed from the box and third bag, and placed in a feedthrough box connected to at least a class 100 environment, where they are removed from the second bag. The second bag remains in the feedthrough box, and the first bag containing the packaged components or partially assembled components is transported to into the class 100 environment. The packaged components or partially assembled components are removed from the first bag and set up for further manufacturing steps. It is understood that the components and partially assembled components can be transferred to any number of manufacturing locations by using the packaging and unpackaging procedures of the present invention.
In the manufacturing process ofthe invention, a salient technical advantage is that the number of washing steps required by the prior art is substantially reduced and the syringe components are molded, assembled and filled substantially free from contaminants.
BRIEF DESCRIPTION OF THE DRAWINGS
Fig. 1 is an axial sectional view of a representative syringe which may be manufactured according a syringe manufacturing process ofthe invention; Figs. 2a and 2b together comprise a flow diagram of a syringe manufacturing process according to a first embodiment ofthe invention;
Figs. 3-5 are schematic block diagrams showing successive steps in a filling and final syringe assembly procedure according to a syringe manufacturing process ofthe invention; Figs. 6a and 6b together comprise a flow diagram of a syringe manufacturing process according to a second embodiment ofthe invention;
Fig. 7 is a schematic diagram showing successive steps in a packaging process according to the invention; and
Fig. 8 is a process flow diagram showing steps in an unpackaging process according to the invention.
DETAILED DESCRIPTION OF THE INVENTION
The manufacturing process of the invention may be used to manufacture a syringe, such as syringe 10 shown in Fig. 1. Syringe 10 comprises several components including a barrel 12 having a cylindrically-shaped body 14 and a tapered nozzle section 16 joined together by a tapered conical section 18. Tip 20 of nozzle section 16 forms the distal end of syringe 10. Flange 22 is located on the body 14 at the proximal end of barrel 12 to secure syringe 10 within an injector pressure jacket (not shown), such as the pressure jacket described in U.S. Patent No. 4,677,980. Alternatively, syringe 10 may include mounting flanges (not shown) at its proximal and to facilitate attachment to a front-loading injector, as described in U.S. Patent No. 5,383,858.
Syringe 10 further comprises a plunger 24 which is sealingly engaged within the body 14.
Plunger 24 typically includes a plunger substrate 26 and legs 28 extending therefrom to engage the drive piston (not shown) of the injector (not shown). Plunger 24 may further include a plunger cover 30 attached to the plunger substrate 26. Alternatively, plunger 24 may be made of a single piece including legs 28. Tip seal 32 having an interior surface 34 is attached to syringe tip 20 by any suitable means, such a friction or screw threads (not shown). Typically, the barrel 12 and plunger substrate 26 are manufactured from a non-elastomeric material, such as polypropylene and polycarbonate, respectively, and the plunger cover 30 and tip seal are manufactured from an elastomeric material, such as rubber. For details considering the structure and operation of syringe 10, reference is made to U.S. Patent Nos. 4,677,980 and 5,383,858 assigned to the common assignee of this application. These patents are fully incorporated herein by reference for their description of syringes and injectors. When syringe 10 is manufactured with a predetermined amount of fluid 36 contained within barrel 12, the syringe is referred to as a "prefilled syringe."
The first embodiment of the process invention is demonstrated in the flow diagram of Figs. 2a and 2b. In this embodiment, all of the manufacturing activities for syringe 10 are performed within the same manufacturing location. With respect to barrel 12, plastic pellets for barrel 12 are received at step 210, inspected at step 212 and staged at step 214. Barrel 12 is molded at step 216 within at least a class 100 environment, at a temperature sufficient to render barrel 12 substantially free from contaminants. The manufacturing environment should also be at least a MCB- 3 environment. Any particulate matter that may exist in the air proximate to the barrel 12 after the molding process is diverted away from barrel 12 by any suitable means, such as air flow. Thus, barrel 12 need not be decontaminated or otherwise washed. Barrel 12 is inspected at step 218 and its inside surface is lubricated with any suitable lubrication means, such as silicone, at step 220. Lubrication is required because barrel 12 receives plunger 24 having a rubber cover 30.
The raw material for tip seal 32 is received at step 222. The molding compound for tip seal 32 is formulated at step 224, tested and inspected at step 226, and staged at step 228. Tip seal 32 is molded out ofthe compound at step 230 in an environment less clean than a class 100 environment and is inspected at step 232. Contaminants on the tip seal 32 surface are then removed at step 234 by any suitable method, such as the use of ultrasound or jet washing with freon or ultra-purified water. After contaminant removal, tip seal 32 is maintained in at least a class 100 environment at step 236 and lubricated at step 238 with any suitable lubrication means, such as silicone. It is understood that tip seal 32 may also be lubricated while being decontaminated at step 234. Tip seal 32 may also be sterilized at step 239, by any suitable sterilization method, such as use of ethylene oxide or autoclaving. Barrel 12 and tip seal 32 are then assembled at step 240 to form a barrel/tip seal combination. Non-elastomeric material, such as polypropylene pellets, is received for the plunger substrate
26 at step 242, inspected at step 244 and staged at step 246. Similar to barrel 12, plunger substrate 26 is molded at step 248 in at least a class 100 environment at a temperature sufficient to render the plunger substrate 26 substantially free from contaminants. The manufacturing environment should also be at least a MCB-3 environment. Any particulate matter that may exist in the air proximate to the plunger substrate 26 after the molding process is diverted away from plunger substrate 26 by any suitable means, such as air flow. Thus, the plunger substrate 26 need not be decontaminated or otherwise washed. Plunger substrate 26 is then inspected at step 250. Elastomeric material, such as rubber, for the plunger cover 30 is received at step 252. The molding compound for the plunger cover 30 is formulated at step 254, tested and inspected at step
256 and staged at step 258. Plunger cover 30 is molded from the molding compound at step 260 in an environment less clean than a class 100 environment and inspected at step 262. Any contaminants that may exist on the surface ofthe plunger cover 30 are then removed by any suitable method at step 264, such as using ultrasound or jet washing with freon or ultra-purified water. Plunger cover 30 is then maintained in at least a class 100 environment at step 265 and lubricated at step 266 by any suitable lubrication means, such as silicone. It is understood that plunger cover 30 may also be lubricated while being decontaminated at step 264. As with tip seal 32, plunger cover 30 may also be sterilized at step 267 by any suitable method. Plunger cover 30 and plunger substrate 26 are assembled at step 268.
As shown in Fig. 2b, the fluid 36, such as contrast medium, for filling the prefillable syringe 10, is staged at step 268, made up at step 270, placed in a holding tank at step 272 and tested at step 274. The barrel/tip seal combination is then filled with the fluid 36 by any suitable filling method at step 276 and plunger 24 is then inserted into the filled barrel/tip seal combination at step 278.
Figs. 3-5 show the progressive stages of a preferred method for filling the barrel/tip seal combination, identified by reference numeral 38. As demonstrated in Fig. 3, the barrel/tip seal combination 38 and plunger 24 are placed inside of a hermetic enclosure 300 located within a clean environment, preferably at least a class 100 and MCB-3 environment. Filling tube 310 for introducing fluid 36 into the barrel/tip seal combination 38 also extends into the enclosure 300. Barrel/tip seal combination 38 and plunger 24 are held in place by appropriate retaining means, such as clamps or the like (not shown). Class 100 air within the enclosure 300 is then evacuated.
As shown in Fig. 4, filling tube 310 is used to inject fluid 36, such as a contrast medium, into the proximal end ofthe barrel/tip seal combination 38. Prior to filling, fluid 36 is staged according to the manufacturing process described in accordance with Figs. 2a and 2b. After a predetermined level of fluid 36 is injected into the barrel/tip seal combination 38, fluid flow through tube 310 is terminated.
After the barrel/tip seal combination 38 is filled with fluid 38, plunger 24 is moved by an articulable arm (not shown) or the like and inserted into the barrel/tip seal combination 38. The outside surface of the plunger 24 forms a hermetic seal with the interior sidewalls of the barrel/tip seal combination 38. Class 100 air is then reintroduced into enclosure 300 and the completely assembled, prefilled syringe 10 is removed therefrom. The process is then repeated for each subsequent barrel/tip seal combination 38 and plunger 24. It is understood that suitable machinery can be designed to perform this filling and final assembly step on a plurality of barrel/tip seal combinations 38 and plungers 24 at the same time.
The filling process described herein prohibits air from entering into barrel/tip seal combination 38, which would be medically undesirable. Tip seal 32 located at the distal end of syringe 10 and plunger 24 located near the proximal end of syringe 10 provide, in combination with the sidewalls of the syringe 10, a hermetic seal to contain the injectable fluid 36. The filling and final assembly process results in a prefilled, sterile syringe 10 which subsequently can be speedily mounted onto an injector head (not shown) by the user. A technical advantage is provided in that the user need not fill the syringe 10 through the tip 20, but can proceed directly to a fluid injection procedure. Referring back to Fig. 2b, the completed prefilled syringe 10, which may be placed in a protective pouch, is then sterilized at step 280 by any suitable method, such as autoclaving, labeled at step 282, and inspected at step 284. A prefilled syringe 10 that does not meet predetermined requirements is rejected at step 286. A prefilled syringe that meets predetermined requirements is packaged at step 288, by any suitable packaging means, inspected again at step 290, stored at step 292 and shipped at step 294.
The second embodiment ofthe process invention is depicted in the flow diagrams of Figs. 6a and 6b. In this embodiment, the manufacturing process takes place at separate manufacturing' locations designated A, B, C and D, as shown by the dashed enclosures of Figs. 6a and 6b. The barrel 12 and plunger substrate 26 are molded in at least a class 100 and MCB-3 environment designated as site A in Fig. 6a, by any suitable molding method such as injection molding. Plunger cover 30 and tip seal 32 are typically molded by compression molding which normally takes place in an environment less clean than a class 100 environment, designated as site B.
Referring to Fig. 6a, polypropylene pellets are received at step 610, inspected at step 612 and staged at step 614. Similar to the molding process of Fig. 2a, barrel 12 is molded at step 616 in at least a class 100 environment at a temperature sufficient to render barrel 12 substantially free from contaminants. Any particulate matter that may exist in the air proximate to the barrel 12 after the molding process is diverted away from barrel 12 by any suitable means, such as air flow. Thus, barrel 12 need not be decontaminated or otherwise washed. Barrel 12 is then inspected and packaged at step 618. It is understood that barrel 12 may also be lubricated by any suitable means after being molded at step 616.
In a preferred embodiment ofthe invention, barrel 12 is packaged according to the procedure depicted in Fig. 7. While within a class 100 and MCB-3 environment, a plurality of barrels 12, such as four, are placed in a holder 730a. Another plurality of barrels 12, such as four, are placed in a holder 730b mateable with holder 730a to form a single clip 731. Clip 731 along with its barrels 12 are then inserted into a first container, such as plastic bag 732a which is then sealed by any suitable means, such as heat sealing. A second barrel 12 and clip 731 assembly can be inserted into another first container, such as plastic bag 732b which is then sealed. Bags 732a and 732b are then inserted into a second container, such as plastic bag 734, which is sealed by any suitable means, such as heat sealing. Plastic bag 734 may then be transported to an environment less clean than a class 100 environment, such as a class 10,000 environment, and inserted into a third container, such as plastic bag or carton liner 736 which is sealed by any suitable means, such as a tie or other clasp (not shown). Carton liner 736 is then inserted into a shipping container, such as container 738 which is closed for shipping. A label (not shown) may be applied to the outer surface of bags 732a, 732b, 734 and 736 to identify the contents. Further, label 740 may be applied to the outer surface of container 738 to identify the contents or provide shipping instructions. As shown in Fig. 6a, after barrel 12 has been packaged at step 618, it is shipped to site C at step 620. It is understood that the packaging materials used to package the syringe components must themselves be substantially free from contaminants to maintain the cleanliness ofthe components.
Plunger substrate 26 may also be molded at site A. Polycarbonate pellets are received at step 622, inspected at step 624 and staged at 626. Similar to barrel 12, plunger substrate 26 is molded at step 628 in at least a class 100 and MCB-3 environment at a temperature sufficient to render plunger substrate 26 substantially free from contaminants. Any particulate matter that may exist proximate to the plunger substrate 26 after the molding process is diverted away from plunger substrate 26 by any suitable means, such as air flow. Thus, plunger substrate 26 need not be decontaminated or otherwise washed. The molded plunger substrate 26 is then inspected and packaged at step 630. In a preferred embodiment, plunger substrate 26 is packaged according to the packaging procedure previously described in accordance with Fig. 7. After packaging, the plunger substrate 26 is shipped to site C at step 632.
The plunger cover 30 is molded at site B, typically an environment less clean than a class 100 environment. As shown in Fig. 6a, raw materials for the plunger cover 30 are received at step 634. The molding compound for the cover 30 is formulated at step 636, tested and inspected at step 638, and staged at step 640. Plunger cover 30 is molded at step 642 in an environment less clean than a class 100 environment, and again inspected at step 644. To remove any contaminants that may exist on the plunger cover 30 after molding, any suitable method may be used, such as use of ultrasound or jet washing with freon or ultra-purified water. After removing contaminants, the plunger cover 30 is maintained in a clean environment at step 649, such as at least a class 100 environment. The inside surface of plunger cover 30 is then lubricated at step 650 using any suitable lubrication means, such as silicone, to facilitate its attachment to plunger substrate 26. After lubrication, plunger cover 30 is packaged at step 651 in accordance with the procedure previously described in connection with Fig. 7, and shipped to a site C at step 652. Similar to plunger cover 30, tip seal 32 is manufactured at site B. Plunger cover 30 and tip seal 32 need not be manufactured from the same materials. As shown in Fig. 6a, raw materials for the tip seal 32, are received at step 654 and the tip seal molding compound is formulated at step 656. The tip seal compound is tested and inspected at step 658 and staged for molding at step 660. Tip seal 32 is molded at step 662 in an environment less clean than a class 100 environment, inspected at step 664, packaged at step 665 according to the procedure of Fig. 7, and shipped to site D at step 666. It is understood that contaminants may be removed from the tip seal 32 surface and tip seal 32 may be lubricated at site B. If so, after contaminant removal and lubrication, tip seal 32 is packaged according to the procedure previously described in accordance with Fig. 7, prior to shipping to site D.
At site C, plunger substrate 26 and plunger cover 30 are removed from their respective packaging at step 667. In a preferred embodiment, these components are unpackaged according to the procedure depicted in Fig. 8. For example, packaged plunger substrates 26 are received at site C in an environment less clean than a class 100 environment, such as a class 10,000 environment, and are removed from shipping container 738 and third container or liner 736, at steps 810 and 812. To minimize contamination, removal from the third container takes place proximate to the feedthrough box just prior to inserting the packaged plunger substrates 26 into the feedthrough box. At step 814, packaged plunger substrates 26 in the second container 734 are inserted into a feedthrough box connected to at least a class 100 environment, where the second container 734 is removed. After removal of the second container 734, the packaged plunger substrates 26 within the first containers 732a and 732b are transported into the class 100 environment where the plunger substrates 26 are removed from the first containers 732a and 732b and placed into a holder (not shown), at steps 816 and 818. The packaged plunger covers 30 are similarly unpackaged in accordance with the procedure shown in Fig. 8.
After a plunger substrate 26 and plunger cover 30 have been unpackaged, they are assembled at step 668 to form a plunger 24 which is subsequently sterilized at step 670, by any suitable means, such as the use of ethylene oxide. After sterilization, plunger 24 is packaged in accordance with Fig. 7 at step 671 and then shipped to site D at step 672.
Similarly, barrel 12 is unpackaged at site C at step 673 according to the procedure depicted in Fig. 8, and sterilized by any suitable means, such as the use of ethylene oxide at step 674. Sterilized barrel 12 is then repackaged according to the procedure of Fig. 7 at step 675 and shipped to cite D at step 676.
Referring to Fig. 6b, the plunger 24, barrel 12, tip seal 32, all packaged according to the steps of Fig. 7 and unpackaged according to the steps of Fig. 8, and fluid 36 used to fill syringe 10, are received at a receiving step 678 and undergo quality control inspection and testing at step 680. Within at least a class 100 and MCB-3 environment, barrel 12 is staged at step 682 and the inside surface of barrel 12 is lubricated by any suitable lubrication means, such as silicone, at step 684 to facilitate insertion of plunger 24. If contaminants on tip seal 32 were not previously removed at site B, tip seal
32 is placed in an environment less clean than a class 100 environment, staged at step 686, and decontaminated at step 688 by any suitable means to remove any contaminants that may have accumulated. After decontamination, tip seal 32 is maintained in at least a class 100 and MCB-3 environment at step 690, and then lubricated at step 692 by any suitable means, such as silicone. Tip seal 32 may also be sterilized at step 693 by any suitable method, such as use of ethylene oxide or autoclaving. The barrel 12 and tip seal 32 are then assembled to form a barrel/tip seal combination 38 at step 694.
The fluid 36 used in syringe 10, such as contrast medium, is staged at step 696, made up at step 698, put into a holding tank at step 700, and tested at step 702. As shown in Fig. 6b, at step 704, the barrel/tip seal combination 38 is filled with fluid 36, preferably by the process previously described in reference to Figs. 3-5. After filling, plunger 24 is inserted into the barrel/tip seal combination 38 at step 708 to complete the prefilled syringe 10, and may be placed in a protective container. At step 710, the prefilled syringe 10 is sterilized by any suitable method, such as autoclaving. It is understood that during autoclaving of a prefilled syringe, varying pressures are exerted on the syringe. Providing a gas overpressure during the autoclaving procedure to minimize stress on the barrel 12 to prevent plunger movement due to pressure fluctuations is known to those skilled in the art. After sterilizing, an identifying label is affixed to syringe 10, or its protective container, at step 712. Syringe 10 is then inspected in accordance with predetermined requirements at step 714, and if found to be non- conforming, it is rejected at step 716. If syringe 10 meets the predetermined requirements, it is then packaged at step 718, inspected at step 720, stored at step 722 and ultimately shipped at step 724.
Alternatively, after the assembly of the barrel/tip seal combination 38 at step 694, it is understood that the barrel/tip seal combination 38 could be packaged according to the process of Fig. 7, transported to at least a class 100 and MCB-3 filling and final assembly site (not shown), unpackaged according to the procedure of Fig. 8, and filled and finally assembled according to the procedure of Figs. 3-5. Although the manufacturing processes of the invention have been described in detail for the purpose of illustration, it is to be understood that such detail is solely for that purpose and that variations can be made thereto by those skilled in the art without departing from the spirit and scope of the invention except as it may be limited by the claims.

Claims

WE CLAIM:
1. A process for manufacturing a syringe having several components including at least a first component and at least a second component, the process comprising the steps of: manufacturing the first component within at least a class 100 environment; manufacturing the second component within an environment less clean than a class 100 environment; decontaminating the second component; lubricating at least one ofthe first and second components; and partially assembling the first and second components within at least a class 100 environment to form a partially assembled syringe.
2. The process of Claim 1 wherein the environment in which the first component is manufactured is at least a MCB-3 environment.
3. The process of Claim 1 wherein the environment in which the first and second components are partially assembled is at least a MCB-3 environment.
4. The process of Claim 1 wherein the decontaminating step comprises washing the second component.
5. The process of Claim 1 further comprising the steps of: filling the partially assembled syringe with a predetermined amount of a fluid; and final assembling any remaining syringe components to form a prefilled syringe.
6. The process of Claim 5 further comprising the step of: after final assembling ofthe prefilled syringe, sterilizing the prefilled syringe.
7. The process of Claim 5 wherein the steps of manufacturing, decontaminating, lubricating, partial assembling, filling and final assembling are all performed at one manufacturing location.
8. The process of Claim 1 further comprising the steps of: after manufacturing the first component, packaging the first component to maintain it substantially free from contaminants; after manufacturing, decontaminating and lubricating the second component, packaging the second component to maintain it substantially free from contaminants; and transporting the packaged first component and packaged second component to a first assembly site for partial assembling to form the partially assembled syringe, the first assembly site being at least a class 100 environment.
9. The process of Claim 8 wherein the first assembly site is at least a MCB-3 environment.
10. The process of Claim 8 wherein the steps of packaging the first and second components comprise the steps of: after manufacturing the first component, and after manufacturing, decontaminating, and lubricating the second component, inserting each ofthe first and second components into respective first containers; sealing the respective first containers; inserting the respective sealed first containers into respective second containers; and sealing the respective second containers; transporting the respective sealed second containers to an environment less clean than a class 100 environment; inserting the respective sealed second containers into respective third containers; and sealing the respective third containers.
11. The process of Claim 10 further comprising the steps of: prior to partial assembly of the packaged first and second components at the first assembly site, transporting each ofthe packaged first and second components to a receiving site being less clean than a class 100 environment; removing the respective sealed third containers from each of the packaged first and second components; transporting each ofthe packaged first and second components to a feedthrough area; removing the respective sealed second containers from each of the packaged first and second components; transporting each of the packaged first and second components to the first assembly site; and removing the respective sealed first containers from each ofthe packaged first and second components.
12. The process of Claim 1 further comprising the steps of: after forming the partially assembled syringe, packaging the partially assembled syringe to maintain it substantially free from contaminants; transporting the partially assembled syringe to a filling and final assembling site which is at least a class 100 environment; filling the partially assembled syringe with a predetermined amount of a fluid; and final assembling any remaining components to form a prefilled syringe.
13. The process of Claim 12 wherein the filling and final assembling site is at least a MCB-3 environment.
14. The process of Claim 12 wherein the step of packaging the partially assembled syringe comprises the steps of: after forming the partially assembled syringe, inserting the partially assembled into a first container; sealing the first container; inserting the sealed first container into a second container; and sealing the second container; transporting the second sealed container to an environment less clean than a class 100 environment; inserting the second sealed container into a third container; and sealing the third container.
15. The process of Claim 14 further comprising the steps of: prior to final assembling of the packaged, partially assembled syringe at the filling and final assembling site, transporting the packaged, partially assembled syringe to a receiving site being less clean than a class 100 environment; removing the sealed third container from the packaged, partially assembled syringe; transporting the packaged, partially assembled syringe to a feedthrough area; removing the sealed second container from the packaged, partially assembled syringe; transporting the packaged, partially assembled syringe to the filling and final assembling site; and removing the sealed first container from the packaged, partially assembled syringe.
16. The process of Claim 12 further comprising the step of: after final assembling ofthe prefilled syringe, sterilizing the prefilled syringe.
17. A process for manufacturing a syringe including syringe components of a barrel having a distal end and a proximal end, plunger substrate, plunger cover and tip seal, the process comprising the steps of: manufacturing the barrel and plunger substrate within at least a class 100 environment; manufacturing the plunger cover and tip seal within an environment less clean than a class 100 environment; decontaminating at least one ofthe plunger cover and tip seal; lubricating at least one ofthe barrel, plunger substrate, plunger cover and tip seal; assembling the tip seal to the distal end of the barrel within at least a class 100 environment to form a barrel/tip seal combination; and assembling the plunger cover to the plunger substrate within at least a class 100 environment to form a plunger.
18. The process of Claim 17 wherein the environment in which the barrel and plunger substrate are manufactured is at least a MCB-3 environment.
19. The process of Claim 17 wherein the environment in which the barrel/tip seal combination and plunger are assembled is at least a MCB-3 environment.
20. The process of Claim 17 wherein the decontamination step comprises washing at least one ofthe plunger cover and tip seal.
21. The process of Claim 17 further comprising the steps of: filling the barrel/tip seal combination with a predetermined amount of a fluid; and final assembling ofthe syringe by inserting the plunger into the barrel/tip seal combination to form a prefilled syringe.
22. The process of Claim 21 further comprising the step of: after final assembly ofthe prefilled syringe, sterilizing the prefilled syringe.
23. The process of Claim 21 wherein the steps of manufacturing, decontaminating, lubricating, barrel/tip seal combination assembly, plunger assembly, filling and final assembling are all performed at one manufacturing location.
24. The process of Claim 17 further comprising the steps of: after manufacturing the barrel, packaging the barrel to maintain it substantially free from contaminants; after manufacturing, decontaminating and lubricating the tip seal, packaging the tip seal to maintain it substantially free from contaminants; transporting the packaged barrel and packaged tip seal to a first assembly site for assembly into the barrel/tip seal combination, the first assembly site being at least a class 100 environment; after manufacturing the plunger substrate, packaging the plunger substrate to maintain it substantially free from contaminants; after manufacturing, washing and lubricating the plunger cover, packaging the plunger cover to maintain it substantially free from contaminants; and transporting the packaged plunger substrate and plunger cover to a second assembly site for assembly into the plunger, the second assembly site being at least a class 100 environment.
25. The process of Claim 24 wherein the first and second assembly sites are at least a MCB-3 environment.
26. The process of Claim 24 wherein each packaging step comprises the steps of: after manufacturing the barrel and plunger substrate, and after manufacturing, decontaminating and lubricating the plunger cover and tip seal, inserting each of the barrel, plunger substrate, plunger cover and tip seal into respective first containers; sealing the respective first containers; inserting the respective sealed first containers into respective second containers; and sealing the respective second containers; transporting the respective sealed second containers to an environment less clean than a class 100 environment; inserting the respective sealed second containers into respective third containers; and sealing the respective third containers.
27. The process of claim 26 further comprising the steps of: prior to assembling the barrel/tip seal combination, transporting the packaged barrel and packaged tip seal to a receiving site being less clean than a class 100 environment; removing the respective sealed third containers from each of the packaged barrel and packaged tip seal; transporting the packaged barrel and packaged tip seal to a feedthrough area; removing the respective sealed second containers from each of the packaged barrel and packaged tip seal; transporting each ofthe packaged barrel and packaged tip seal to the first assembly site; and removing the respective sealed first containers from each of the packaged barrel and packaged tip seal.
28. The process of claim 26 further comprising the steps of: prior to assembling the plunger, transporting the packaged plunger substrate and packaged plunger cover to a receiving site being less clean than a class 100 environment; removing the respective sealed third containers from each of the packaged plunger substrate and packaged plunger cover; transporting the packaged plunger substrate and packaged plunger cover to a feedthrough area; removing the respective sealed second containers from each of the packaged plunger substrate and packaged plunger cover; transporting each of the packaged plunger substrate and packaged plunger cover to the second assembly site; and removing the respective sealed first containers from each of the packaged plunger substrate and packaged plunger cover.
29. The process of Claim 17 further comprising the steps of: after forming the barrel/tip seal combination, packaging the barrel/tip seal combination to maintain it substantially free from contaminants; after forming the plunger, packaging the plunger to maintain it substantially free from contaminants; transporting the packaged barrel/tip seal combination and packaged plunger to a filling and final assembling site which is at least a class 100 environment; and final assembling of the syringe by filling the barrel/tip seal combination with a predetermined amount of a fluid and inserting the plunger into the barrel/tip seal combination to form a prefilled syringe.
30. The process of Claim 29 wherein the filling and final assembling site is at least a MCB-3 environment.
31. The process of Claim 29 wherein the packaging step comprises the steps of: after forming the barrel/tip seal combination and the plunger; inserting each ofthe barrel/tip seal combination and plunger into a respective first container; sealing the respective first containers; inserting the respective sealed first containers into respective second containers; and sealing the respective second containers; transporting the respective sealed second containers to an environment less clean than a class 100 environment; inserting the respective sealed second containers into respective third containers; and sealing the respective third containers.
32. The process of Claim 31 further comprising the steps of: prior to final assembling of packaged barrel/tip seal combination and packaged plunger, transporting the packaged barrel/tip seal combination and packaged plunger to a receiving site being less clean than a class 100 environment; removing the respective sealed third containers from each of the packaged barrel/tip seal combination and packaged plunger; transporting each ofthe packaged barrel/tip seal combination and packaged plunger to a feedthrough area; removing the respective sealed second containers from each of packaged barrel/tip seal combination and packaged plunger; transporting each ofthe packaged barrel/tip seal combination and packaged plunger to the filling and final assembling site; and removing the respective sealed first containers from packaged barrel/tip seal combination and packaged plunger.
33. The process of Claim 29 further comprising the step of: after final assembly ofthe prefilled syringe, sterilizing the prefilled syringe.
PCT/US1996/013559 1995-08-22 1996-08-20 Process for the manufacture of prefilled syringes WO1997008054A1 (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
DE69612859T DE69612859T2 (en) 1995-08-22 1996-08-20 METHOD FOR PRODUCING PARTLY ASSEMBLED SYRINGES
EP96929717A EP0846072B1 (en) 1995-08-22 1996-08-20 Process for manufacturing partially assembled syringes
AT96929717T ATE201177T1 (en) 1995-08-22 1996-08-20 METHOD FOR PRODUCING PARTIALLY ASSEMBLED SYRINGES
AU69002/96A AU6900296A (en) 1995-08-22 1996-08-20 Process for the manufacture of prefilled syringes

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US08/517,645 US6189195B1 (en) 1995-08-22 1995-08-22 Manufacture of prefilled syringes
US08/517,645 1995-08-22

Publications (1)

Publication Number Publication Date
WO1997008054A1 true WO1997008054A1 (en) 1997-03-06

Family

ID=24060639

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/US1996/013559 WO1997008054A1 (en) 1995-08-22 1996-08-20 Process for the manufacture of prefilled syringes

Country Status (6)

Country Link
US (1) US6189195B1 (en)
EP (1) EP0846072B1 (en)
AT (1) ATE201177T1 (en)
AU (1) AU6900296A (en)
DE (1) DE69612859T2 (en)
WO (1) WO1997008054A1 (en)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2000010629A1 (en) 1998-08-21 2000-03-02 Medrad, Inc. Connector and tubing assembly for use with a syringe
US6189292B1 (en) 1998-03-13 2001-02-20 Becton Dickinson And Company Method and apparatus for manufacturing, filling and packaging medical devices and medical containers
US6255396B1 (en) 1999-09-09 2001-07-03 Baxter International Inc. Cycloolefin blends and method for solvent bonding polyolefins
US6297322B1 (en) 1999-09-09 2001-10-02 Baxter International Inc. Cycloolefin blends and method for solvent bonding polyolefins
US6590033B2 (en) 1999-09-09 2003-07-08 Baxter International Inc. Cycloolefin blends and method for solvent bonding polyolefins
US6613187B1 (en) 1999-09-09 2003-09-02 Baxter International Inc Solvent bonding method for polyolefin materials
US6632318B1 (en) 1999-09-09 2003-10-14 Baxter International Inc. Method for solvent bonding polyolefins
JP2004535254A (en) * 2001-07-16 2004-11-25 イーライ・リリー・アンド・カンパニー Cartridge-free multiple dose injection device
US7867189B2 (en) 2002-07-19 2011-01-11 Baxter International Inc. System including machine interface for pumping cassette-based therapies
US8870812B2 (en) 2007-02-15 2014-10-28 Baxter International Inc. Dialysis system having video display with ambient light adjustment
US9474842B2 (en) 2000-02-10 2016-10-25 Baxter International Inc. Method and apparatus for monitoring and controlling peritoneal dialysis therapy
US10905786B2 (en) 2017-03-27 2021-02-02 Regeneron Pharmaceuticals, Inc. Sterilisation method
US11179516B2 (en) 2017-06-22 2021-11-23 Baxter International Inc. Systems and methods for incorporating patient pressure into medical fluid delivery
US11433186B2 (en) 2017-12-13 2022-09-06 Regeneron Pharmaceuticals, Inc. Devices and methods for precision dose delivery
US11439758B2 (en) 2019-06-05 2022-09-13 Regeneron Pharmaceuticals, Inc. Devices and methods for precision dose delivery

Families Citing this family (34)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7392638B2 (en) * 2000-08-10 2008-07-01 Baxa Corporation Method, system, and apparatus for handling, labeling, filling, and capping syringes with improved cap
WO2002011787A2 (en) * 2000-08-10 2002-02-14 Baxa Corporation Method, system, and apparatus for handling, labeling, filling, and capping syringes
US8489176B1 (en) 2000-08-21 2013-07-16 Spectrum Dynamics Llc Radioactive emission detector equipped with a position tracking system and utilization thereof with medical systems and in medical procedures
US8565860B2 (en) * 2000-08-21 2013-10-22 Biosensors International Group, Ltd. Radioactive emission detector equipped with a position tracking system
US8909325B2 (en) * 2000-08-21 2014-12-09 Biosensors International Group, Ltd. Radioactive emission detector equipped with a position tracking system and utilization thereof with medical systems and in medical procedures
GB2367038A (en) * 2000-09-20 2002-03-27 New Holland Uk Ltd Cab for an agricultural vehicle
DE10254762A1 (en) * 2002-11-22 2004-06-09 Transcoject Gesellschaft für medizinische Geräte mbH & Co. KG Process for producing and / or handling a high-purity object
DE10306400A1 (en) * 2003-02-15 2004-09-02 Arzneimittel Gmbh Apotheker Vetter & Co. Ravensburg Method for identifying and / or monitoring medical syringes, in particular prefilled pre-filled syringes
WO2007010534A2 (en) * 2005-07-19 2007-01-25 Spectrum Dynamics Llc Imaging protocols
US9470801B2 (en) * 2004-01-13 2016-10-18 Spectrum Dynamics Llc Gating with anatomically varying durations
US7968851B2 (en) 2004-01-13 2011-06-28 Spectrum Dynamics Llc Dynamic spect camera
US8571881B2 (en) * 2004-11-09 2013-10-29 Spectrum Dynamics, Llc Radiopharmaceutical dispensing, administration, and imaging
US8586932B2 (en) 2004-11-09 2013-11-19 Spectrum Dynamics Llc System and method for radioactive emission measurement
US7176466B2 (en) * 2004-01-13 2007-02-13 Spectrum Dynamics Llc Multi-dimensional image reconstruction
US9040016B2 (en) * 2004-01-13 2015-05-26 Biosensors International Group, Ltd. Diagnostic kit and methods for radioimaging myocardial perfusion
EP1778957A4 (en) 2004-06-01 2015-12-23 Biosensors Int Group Ltd Radioactive-emission-measurement optimization to specific body structures
US8615405B2 (en) 2004-11-09 2013-12-24 Biosensors International Group, Ltd. Imaging system customization using data from radiopharmaceutical-associated data carrier
EP1827505A4 (en) 2004-11-09 2017-07-12 Biosensors International Group, Ltd. Radioimaging
US9943274B2 (en) 2004-11-09 2018-04-17 Spectrum Dynamics Medical Limited Radioimaging using low dose isotope
US8000773B2 (en) 2004-11-09 2011-08-16 Spectrum Dynamics Llc Radioimaging
US9316743B2 (en) 2004-11-09 2016-04-19 Biosensors International Group, Ltd. System and method for radioactive emission measurement
WO2008059489A2 (en) 2006-11-13 2008-05-22 Spectrum Dynamics Llc Radioimaging applications of and novel formulations of teboroxime
US8837793B2 (en) 2005-07-19 2014-09-16 Biosensors International Group, Ltd. Reconstruction stabilizer and active vision
US8894974B2 (en) 2006-05-11 2014-11-25 Spectrum Dynamics Llc Radiopharmaceuticals for diagnosis and therapy
DE102006049528A1 (en) * 2006-09-28 2008-04-03 Robert Bosch Gmbh Device and method for mounting a needle guard on a syringe body
US9275451B2 (en) 2006-12-20 2016-03-01 Biosensors International Group, Ltd. Method, a system, and an apparatus for using and processing multidimensional data
EP2020245B1 (en) * 2007-07-31 2011-11-30 AL.CHI.MI.A. S.r.l. Method for making a device for ophthalmic treatments
US8521253B2 (en) * 2007-10-29 2013-08-27 Spectrum Dynamics Llc Prostate imaging
US8250062B2 (en) * 2007-11-09 2012-08-21 Oracle International Corporation Optimized streaming evaluation of XML queries
US8435217B2 (en) * 2008-04-11 2013-05-07 Applied Silicone Corporation Gas sterilizable two-part polymer delivery system
US8338788B2 (en) 2009-07-29 2012-12-25 Spectrum Dynamics Llc Method and system of optimized volumetric imaging
US8286671B1 (en) 2011-03-23 2012-10-16 Saverio Roberto Strangis Automated syringe filler and loading apparatus
US10780228B2 (en) 2012-05-07 2020-09-22 Medline Industries, Inc. Prefilled container systems
US20170349313A1 (en) * 2016-06-01 2017-12-07 Centurion Medical Products Corporation Methods for manufacturing non-glass prefilled syringes

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1995012482A1 (en) * 1993-11-03 1995-05-11 Bracco International B.V. Method for the preparation of pre-filled plastic syringes

Family Cites Families (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB877372A (en) 1959-01-29 1961-09-13 Pharmaplast Ab A method of producing aseptically packaged sterile articles made of plastic, and an arrangement for carrying out the method
US3105335A (en) 1960-12-30 1963-10-01 Fmc Corp Apparatus for aseptic canning of food products
US3202084A (en) 1962-06-19 1965-08-24 Ralston Purina Co Apparatus for producing a food product
GB1206475A (en) 1967-10-27 1970-09-23 Sterilin Ltd A method and apparatus for producing aseptically packaged sterile articles
US4267769A (en) 1979-02-22 1981-05-19 Environmental Air Control, Inc. Prefabricated knockdown clean room
US4391080A (en) 1979-09-20 1983-07-05 The Mead Corporation Method for providing an inert sterile atmosphere in an aseptic packaging machine
DE3587540T3 (en) 1984-06-06 1998-01-22 Medrad Inc Angiography syringe for use with an angiography injector.
JPS6162740A (en) 1984-09-03 1986-03-31 Sanki Eng Co Ltd Blower cleaning device for clean tunnel
JPH067542B2 (en) 1984-11-22 1994-01-26 株式会社日立製作所 Manufacturing equipment
US4628969A (en) 1985-12-20 1986-12-16 Mallinckrodt, Inc. Method of producing prefilled sterile plastic syringes
US4718463A (en) 1985-12-20 1988-01-12 Mallinckrodt, Inc. Method of producing prefilled sterile plastic syringes
JPS62193703A (en) 1986-02-18 1987-08-25 Masayoshi Kakizaki Cam shaft mechanism in high speed precision automatic lathe
US4880581A (en) 1986-12-24 1989-11-14 Alcon Laboratories, Inc. Means and method for aseptic particle-free production of articles
US4987673A (en) 1987-06-18 1991-01-29 Mitsubishi Denki Kabushiki Kaisha Apparatus for packaging semiconductor devices
AU595096B2 (en) 1988-02-10 1990-03-22 Astra Pharmaceuticals Pty Ltd Plastic cartridge and syringe
US5141430A (en) 1989-05-22 1992-08-25 Galic Maus Ventures Injection molding apparatus operating without opening the mold to airborne contaminants
IT1240348B (en) 1990-03-28 1993-12-07 Ruggero Angeletti PROCEDURE AND EQUIPMENT FOR THE PRODUCTION OF STERILE CONTAINERS AND OBJECTS IN GENERAL, PARTICULARLY FOR PHARMACEUTICAL USE
US5511594A (en) 1992-06-23 1996-04-30 Brennan; Eric L. Modular pharmacy system and pharmacy process
US5259812A (en) 1992-09-23 1993-11-09 Kleinsek Don A Clean room and clean room containment center
US5316560A (en) 1993-03-19 1994-05-31 Hughes Aircraft Company Environment control apparatus
US5373757A (en) 1993-06-22 1994-12-20 Profile For Speed, Inc. Adjustable handlebar mounting
US5535746A (en) 1994-03-29 1996-07-16 Sterling Winthrop Inc. Prefilled syringe for use with power injector

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1995012482A1 (en) * 1993-11-03 1995-05-11 Bracco International B.V. Method for the preparation of pre-filled plastic syringes

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
"Disposable syringes: Klöckner standards for mass production", PLASTICS SOUTHERN AFRICA, vol. 21, no. 4, September 1991 (1991-09-01), pages 10, XP002021619 *

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6792743B2 (en) 1998-03-13 2004-09-21 Becton, Dickinson And Company Method and apparatus for manufacturing, filling and packaging medical devices and medical containers
US6189292B1 (en) 1998-03-13 2001-02-20 Becton Dickinson And Company Method and apparatus for manufacturing, filling and packaging medical devices and medical containers
US6250052B1 (en) 1998-03-13 2001-06-26 Becton, Dickinson And Company Method and apparatus for assembling and packaging medical devices
USRE46510E1 (en) 1998-03-13 2017-08-15 Becton, Dickinson And Company Method and apparatus for manufacturing, filling and packaging medical devices and medical containers
US6263641B1 (en) 1998-03-13 2001-07-24 Becton, Dickinson And Company Method and apparatus for manufacturing, filling and packaging medical devices and medical containers
WO2000010629A1 (en) 1998-08-21 2000-03-02 Medrad, Inc. Connector and tubing assembly for use with a syringe
US6255396B1 (en) 1999-09-09 2001-07-03 Baxter International Inc. Cycloolefin blends and method for solvent bonding polyolefins
US6613187B1 (en) 1999-09-09 2003-09-02 Baxter International Inc Solvent bonding method for polyolefin materials
US6632318B1 (en) 1999-09-09 2003-10-14 Baxter International Inc. Method for solvent bonding polyolefins
US6590033B2 (en) 1999-09-09 2003-07-08 Baxter International Inc. Cycloolefin blends and method for solvent bonding polyolefins
US6297322B1 (en) 1999-09-09 2001-10-02 Baxter International Inc. Cycloolefin blends and method for solvent bonding polyolefins
US10322224B2 (en) 2000-02-10 2019-06-18 Baxter International Inc. Apparatus and method for monitoring and controlling a peritoneal dialysis therapy
US9474842B2 (en) 2000-02-10 2016-10-25 Baxter International Inc. Method and apparatus for monitoring and controlling peritoneal dialysis therapy
JP2004535254A (en) * 2001-07-16 2004-11-25 イーライ・リリー・アンド・カンパニー Cartridge-free multiple dose injection device
US7867189B2 (en) 2002-07-19 2011-01-11 Baxter International Inc. System including machine interface for pumping cassette-based therapies
US8870812B2 (en) 2007-02-15 2014-10-28 Baxter International Inc. Dialysis system having video display with ambient light adjustment
US9799274B2 (en) 2007-02-15 2017-10-24 Baxter International Inc. Method of controlling medical fluid therapy machine brightness
US10905786B2 (en) 2017-03-27 2021-02-02 Regeneron Pharmaceuticals, Inc. Sterilisation method
US10918754B2 (en) 2017-03-27 2021-02-16 Regeneron Pharmaceuticals, Inc. Sterilisation method
US11179516B2 (en) 2017-06-22 2021-11-23 Baxter International Inc. Systems and methods for incorporating patient pressure into medical fluid delivery
US11433186B2 (en) 2017-12-13 2022-09-06 Regeneron Pharmaceuticals, Inc. Devices and methods for precision dose delivery
US11439758B2 (en) 2019-06-05 2022-09-13 Regeneron Pharmaceuticals, Inc. Devices and methods for precision dose delivery

Also Published As

Publication number Publication date
DE69612859D1 (en) 2001-06-21
EP0846072B1 (en) 2001-05-16
EP0846072A1 (en) 1998-06-10
US6189195B1 (en) 2001-02-20
DE69612859T2 (en) 2001-11-08
ATE201177T1 (en) 2001-06-15
AU6900296A (en) 1997-03-19

Similar Documents

Publication Publication Date Title
EP0846072B1 (en) Process for manufacturing partially assembled syringes
EP2253549B1 (en) Method for manufacturing, filling and packaging medical containers
US4628969A (en) Method of producing prefilled sterile plastic syringes
US4718463A (en) Method of producing prefilled sterile plastic syringes
US5597530A (en) Process for prefilling and terminally sterilizing syringes
US7509784B2 (en) Method for the preparation of pre-filled plastic syringes
JPH08504353A (en) Manufacturing method and manufacturing device for pre-filled sterilizing and discharging device
WO1994013345A1 (en) Pre-filled, sterilized syringe and method of making
EP0739638A1 (en) Method of sterilizing prefilled syringe medicines
MXPA00008780A (en) Method for manufacturing, filling and packaging medical containers

Legal Events

Date Code Title Description
AK Designated states

Kind code of ref document: A1

Designated state(s): AL AM AT AU AZ BB BG BR BY CA CH CN CZ DE DK EE ES FI GB GE HU IS JP KE KG KP KR KZ LK LR LS LT LU LV MD MG MK MN MW MX NO NZ PL PT RO RU SD SE SG SI SK TJ TM TR TT UA UG UZ VN AM AZ BY KG KZ MD RU TJ TM

AL Designated countries for regional patents

Kind code of ref document: A1

Designated state(s): KE LS MW SD SZ UG AT BE CH DE DK ES FI FR GB GR IE IT LU MC NL PT SE BF BJ CF CG CI CM GA GN ML

DFPE Request for preliminary examination filed prior to expiration of 19th month from priority date (pct application filed before 20040101)
121 Ep: the epo has been informed by wipo that ep was designated in this application
WWE Wipo information: entry into national phase

Ref document number: 1996929717

Country of ref document: EP

WWP Wipo information: published in national office

Ref document number: 1996929717

Country of ref document: EP

REG Reference to national code

Ref country code: DE

Ref legal event code: 8642

NENP Non-entry into the national phase

Ref country code: CA

WWG Wipo information: grant in national office

Ref document number: 1996929717

Country of ref document: EP