WO2000041050A1 - Testing device for industrial control systems - Google Patents

Testing device for industrial control systems Download PDF

Info

Publication number
WO2000041050A1
WO2000041050A1 PCT/EP1999/007793 EP9907793W WO0041050A1 WO 2000041050 A1 WO2000041050 A1 WO 2000041050A1 EP 9907793 W EP9907793 W EP 9907793W WO 0041050 A1 WO0041050 A1 WO 0041050A1
Authority
WO
WIPO (PCT)
Prior art keywords
control system
testing
testing device
plant
modeling
Prior art date
Application number
PCT/EP1999/007793
Other languages
French (fr)
Inventor
Guido Ceiner
Massimo Danieli
Luca Ferrarini
Claudio Maffezzoni
Andrea Cataldo
Original Assignee
Abb Research Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Abb Research Ltd filed Critical Abb Research Ltd
Publication of WO2000041050A1 publication Critical patent/WO2000041050A1/en

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B23/00Testing or monitoring of control systems or parts thereof
    • G05B23/02Electric testing or monitoring
    • G05B23/0205Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults
    • G05B23/0208Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults characterized by the configuration of the monitoring system
    • G05B23/0216Human interface functionality, e.g. monitoring system providing help to the user in the selection of tests or in its configuration
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B17/00Systems involving the use of models or simulators of said systems
    • G05B17/02Systems involving the use of models or simulators of said systems electric

Definitions

  • the present invention relates to a bench-testing device for industrial control systems. More particularly, the present invention relates to a testing device to 5 be used during the factory-testing of industrial control systems.
  • the configuration software of industrial control systems usually uses a testing panel of the hardware type. This panel, after being set up, is physically it) connected to the input and output boards of the control system to be tested and allows closing the control and regulation loops to be tested.
  • the hardware panel is generally constituted by:
  • potentiometers for replicating the analog signals (e.g. 4-20 mA signals) from the plant (for example level, pressure, position, flow-rate, temperature
  • switches for replicating the digital signals e.g. 0-24 V.
  • switches for replicating the digital signals e.g. 0-24 V.
  • amperemeters for replicating the actions of the analog actuators provided in the plant (for example valve regulations, motor rpm-rate adjustments and the l ike );
  • each one of the devices provided on the hardware panel is assigned with a specific function among those provided in the plant portion to be tested ( valve, switch, transducer, actuator, etcetera).
  • Each one of these 5 devices is then connected, by means of dedicated cables, to the specific channel of a given acquisition (input) or control (output) board of the control system, so as to close the control loops provided by the designer of the control system. In this way the control system is tested before physically implementing it in the field.
  • the operators involved in the control system testing work check on the hardware panel that the commands issued by the controller are correct (lighting of lamps and indication of amperemeters) and provide the controller with the appropriate signals which, during normal operation, would arrive from the plant (potentiometers and switches).
  • connection between the control system to be tested and the conventional testing panel is provided by means of electrical cables.
  • This entails the need for considerable time in order to provide and check the connection of any input and/or output channel of the control system to the various elements of said panel, in addition to requiring bulky wiring.
  • Another drawback is due the fact that the testing of control systems is always performed by individual plant portions for complexity reasons. Any time the testing of a new plant portion begins it is necessary to reassemble and reconnect the hardware panel, which is accordingly scarcely flexible in relation to the continuous modifications that are required when testing a plurality of plant sections in succession. Errors are unavoidably made during the preparation of the testing panel and during its subsequent connection to the control system and are added to the errors already present in the configuration software of the controller.
  • the conventional testing bench does not facilitate the execution of all the necessary operations. For example, the action of stopping a pump, with the consequent closure of the intake and delivery valves and with an interlocking action with respect to other plant portions, results quite complicated. In fact, it entails that one or more operators must operate various devices of the panel and constantly monitor both the indications of the panel and the information from the control system.
  • the aim of the present invention is to provide a testing device, for industrial control systems, which allows eliminating conventional hardware test benches and control system-specific software programs. It must allow, at the same, editing a model of the components of the plant to be tested and 5 therefore perform its factory testing.
  • an object of the present invention is to provide a testing device, for industrial control systems, which allows preparing, in an assisted and reusable manner, a software bench.
  • the software bench is aimed to test industrial control systems and allows defining the structure of the plant o portion being controlled independently of the hardware/software platform used.
  • Another object of the present invention is to provide a testing device, for industrial control systems, which allows reducing the time and cost entailed by factory testing, which is compulsory before the field installation of an industrial control system. 5
  • Another object of the present invention is to provide a testing device, for industrial control systems, which allows eliminating the operations for wiring and assembly a conventional hardware panel to the control system to be tested, and therefore the costs arising from the construction of said hardware panel.
  • Another object of the present invention is to provide a testing device for o industrial control systems which allows reusing the software bench prepared with the device according to the invention, accordingly offering high flexibility in use.
  • Another object of the present invention is to provide a testing device for industrial control systems, which allows to evaluating much more complex ⁇ control logic systems than allowed by a conventional testing panel.
  • the present invention provides a testing device for industrial control systems, comprising:
  • Figure I is a block diagram of the testing device according to the present invention.
  • Figure 2 is a block diagram of the use of the testing device according to the invention, connected to a plant control system.
  • the testing device consists of a device which is suitable to create a model of the components of an industrial plant, which exchanges information with a control system (prepared for the industrial plant).
  • the testing device according to the present invention is also suitable to execute the resulting model in order to directly factory-test said control system.
  • the testing device designated by the reference numeral 1 , comprises, as shown in Figure 1 , editing means 2, which allow composing a software test bench by assembling various models taken from storage means 4.
  • editing means 2 By way of said editing means 2, it is also possible to connect all the input and output signals exchanged between the control system and the plant, rerouting them onto the bus of the control system, with the inputs and the outputs of the models used.
  • the editing interface means allow performing the following functions: - preparing a new plant model (20);
  • the testing device is further provided with modeling means 3, which provide functions suitable to guide and facilitate the testing engineer in synthesizing a simplified model to be used for testing particular control loops. If the loops to be tested are standard (for example pump control, simple adjustment loops, etcetera), modeling means allow advantageously the testing engineer to simply input few parameters that characterize the individual loop and to compose semi-automatically the software test bench part related to the testing of said loops.
  • the modeling means 3 therefore comprise functions 27 for individual loops, functions 28 for cascaded loops and functions 29 for modeling driving devices such as valves or motors or the like.
  • the testing device further comprises, as mentioned, storage means 4 which are meant to provide the testing engineer with a plurality of pre-wire models for closing the loops to be tested.
  • the storage means 4 can be represented, for example, by libraries of plant models. These models allow, for example, emulating plant responses. For example, when testing the drive of a pump, time delays might be used to obtain plant response emulation.
  • the models contained in the storage means 4 are therefore constituted by input-output functions with 1 -2 poles, or in algebraic relationships, or by pure delays, so as to give the feedback signal from the plant a minimum of dynamic range.
  • the models available can be, for example, regulation and/or on/off valves 30, > pumps and/or motors 3 1 , analog indications (for example levels, flow-rates, positions) and/or digital indications (for example pressure switches, level switches, limit switches) 32.
  • the device according to the invention further includes a simulation engine 5, which is meant to process the simplified models. It constitutes the feedback to the control system 10 and is connected to lo the inputs and outputs of the control system, appropriately re-routed on the bus 12 of the controller 13.
  • the simulation engine 5 accordingly receives in input the structure of the plant components, produced by the testing engineer by using the models of the storage means 4. made available within the testing device 1 .
  • the hardware means 6, suitable to interface the testing device to a specific industrial control system 10 are meant to exchange the input and output signals of the control system 10 rerouted on the control bus 12 of the control system 10.
  • Said means 6 must be designed specifically for the control bus 1 2 to which the test bench provided by the device according to the in invention connects and specifically for the data exchange protocol used by the specific control system 10 that is used.
  • the reference numeral 10 designates the control system of a plant, which is generally designated by the reference numeral 1 1 .
  • the reference numeral 1 2 designates the control bus, which carries signals to controllers 13 5 and to I/O cards 14 of the control system 10.
  • the control bus is connected to interface means 6 which allow to connect the testing device 1 to the control system 10.
  • the testing device 1 shown in Figure 2 is understood to include the editing interface means 2 and the means 3-5 described hereafter in detail and shown in Figure 1 .
  • the testing device according to the invention therefore can be, in practice, implemented by means of a computerized system, which can be connected to ⁇ the control bus 12 of the industrial control system 10 through the interface means 6.
  • the monitor, the keyboard and the mouse of the computerized constitute the tools that can help the basic editing and modeling functions available.
  • the testing engineer receives via monitor all the indications related to the signals sent by the testing device according to the invention (commands o to pumps, regulator control actions, etcetera). Monitoring of the feedback signals, that the software test bench supplies to the control system 10 through the interface means 6, can be performed.
  • simulation engine 5 which runs on the electronic computer and is capable of executing the model defined by the 5 testing engineer.
  • the testing device according to the invention fully achieves the intended aim and objects, since it allows to el iminate the hardware test bench and software test benches designed specifically for a particular control system to be tested. o
  • the test bench created by the testing device according to the invention allows high sensitivity in use and a high level of simplicity for the testing engineer.
  • the test benches thus created can also be easily used for different control systems, since they are not dependent on a specific programming language.
  • the testing device thus conceived is susceptible of numerous modifications 5 and variations, all of which are within the scope of the inventive concept; all the details may also be replaced with other technically equivalent elements.

Abstract

A testing device for industrial control systems, comprising: editing means (2) which allow to compose a software test bench for a control system of an industrial plant; storage means (4), suitable to provide the editing interface means with predefined models which describe a physical process being controlled; modeling means (3), suitable to guide and facilitate the testing engineer in testing standard control loops; simulation means (5) which comprise a simulation engine suitable to process the models generated by the editing interface means; and hardware means which are suitable to interface the testing system with a control system to be tested.

Description

TESTING DEVICE FOR INDUSTRIAL CONTROL SYSTEMS
DESCRIPTION
The present invention relates to a bench-testing device for industrial control systems. More particularly, the present invention relates to a testing device to 5 be used during the factory-testing of industrial control systems.
It is known that the configuration software of industrial control systems (control and interlock logic systems, graphic pages, structures for analog regulation, startup and placing the plant in safe mode) usually uses a testing panel of the hardware type. This panel, after being set up, is physically it) connected to the input and output boards of the control system to be tested and allows closing the control and regulation loops to be tested. The hardware panel is generally constituted by:
— potentiometers, for replicating the analog signals (e.g. 4-20 mA signals) from the plant (for example level, pressure, position, flow-rate, temperature
I? transducers);
— a simulator for simulating the heat probes and thermocouples connected to the control system;
— switches for replicating the digital signals (e.g. 0-24 V). for example limit switches on valve positioners, status indicators from users such as pumps and 0 motors, pressure switches, level switches and the like;
— amperemeters for replicating the actions of the analog actuators provided in the plant (for example valve regulations, motor rpm-rate adjustments and the l ike );
— indicators in order to replicate the actions of the digital actuators provided in 5 the plant (for example stop and start actuators for pumps, for closing two-state valves and the like);
— terminal devices for interfacing with the control system
— power supplies to be used for all the components that require a power supply.
Accordingly, each one of the devices provided on the hardware panel is assigned with a specific function among those provided in the plant portion to be tested ( valve, switch, transducer, actuator, etcetera). Each one of these 5 devices is then connected, by means of dedicated cables, to the specific channel of a given acquisition (input) or control (output) board of the control system, so as to close the control loops provided by the designer of the control system. In this way the control system is tested before physically implementing it in the field. id The operators involved in the control system testing work check on the hardware panel that the commands issued by the controller are correct (lighting of lamps and indication of amperemeters) and provide the controller with the appropriate signals which, during normal operation, would arrive from the plant (potentiometers and switches). i s In some cases, and for particular boundary conditions, preference is given to the use of software programs instead of the hardware panel. Such programs must be written in the specific language of the particular control system platform and must be executed by the controller during testing. The purpose of these programs is the same as for the hardware panel. They are 0 aimed to having, during testing, an instrument, which can provide the controller with the signals normally provided by the plant (when the controller is implemented in the plant) and receive from the controller the commands that are normally sent to the plant (plant control commands). The hardware panels commonly used are characterized by the following ^ drawbacks.
First of all. in order to have a panel, which exactly reproduces the plant portion to be tested, it is necessary for the devices included therein to fully correspond, in terms of number and type, to the instruments connected to the control system and contained in the same plant section. This entails an onerous preparation of the hardware panel.
Moreover, the connection between the control system to be tested and the conventional testing panel is provided by means of electrical cables. This entails the need for considerable time in order to provide and check the connection of any input and/or output channel of the control system to the various elements of said panel, in addition to requiring bulky wiring. Another drawback is due the fact that the testing of control systems is always performed by individual plant portions for complexity reasons. Any time the testing of a new plant portion begins it is necessary to reassemble and reconnect the hardware panel, which is accordingly scarcely flexible in relation to the continuous modifications that are required when testing a plurality of plant sections in succession. Errors are unavoidably made during the preparation of the testing panel and during its subsequent connection to the control system and are added to the errors already present in the configuration software of the controller. The presence of these errors increases the complexity of system testing and reduces its effectiveness and efficiency. One of the main problems encountered during the testing of control systems is the fact that, once the presence of an error has been detected, it is necessary to determine whether the error is due to a physical (hardware) problem or to a configuration (software) problem. Using an hardware testing panel considerably increases the amount of electronic components (potentiometers, switches, lamps) and cables (cable discontinuity problems, poorly executed soldering between cables and their terminals) that can be affected by defects and in any case constitute a weak link in control system testing. Moreover, providing inputs to the control system by means of hardware (for example a potentiometer set to a given value) is neither easy nor stable, since the measure can oscillate in the neighborhood of the intended value. This fact considerably complicates testing operations and reduces the consequent level of precision and reliability.
It often occurs that the testing engineers must reproduce certain very complex operating sequences. The conventional testing bench does not facilitate the execution of all the necessary operations. For example, the action of stopping a pump, with the consequent closure of the intake and delivery valves and with an interlocking action with respect to other plant portions, results quite complicated. In fact, it entails that one or more operators must operate various devices of the panel and constantly monitor both the indications of the panel and the information from the control system.
Also the use of software programs, written specifically in the proprietary language of the control platform used in each instance, is not free from drawbacks. First of all, as mentioned, these testing programs must be written in the particular language of the specific control system used for a certain plant. This of course entails the need for the programmer to acquire specific skills regarding the control being used.
Moreover, this drawback is worsened by the fact that when the programmer changes plant he often finds himself using a different control system having a new programming language and therefore the previously written testing software can no longer be used for the new situation.
The need to write ad-hoc software programs in the specific language of the control system, and especially software programs which very likely will have to be written in the presence of a different type of plant, entails considerable efforts and costs.
Additionally, the functional correctness of software programs for testing plant control systems is difficult to be checked promptly. Therefore, the aim of the present invention is to provide a testing device, for industrial control systems, which allows eliminating conventional hardware test benches and control system-specific software programs. It must allow, at the same, editing a model of the components of the plant to be tested and 5 therefore perform its factory testing.
Within the scope of this aim, an object of the present invention is to provide a testing device, for industrial control systems, which allows preparing, in an assisted and reusable manner, a software bench. The software bench is aimed to test industrial control systems and allows defining the structure of the plant o portion being controlled independently of the hardware/software platform used. Another object of the present invention is to provide a testing device, for industrial control systems, which allows reducing the time and cost entailed by factory testing, which is compulsory before the field installation of an industrial control system. 5 Another object of the present invention is to provide a testing device, for industrial control systems, which allows eliminating the operations for wiring and assembly a conventional hardware panel to the control system to be tested, and therefore the costs arising from the construction of said hardware panel. Another object of the present invention is to provide a testing device for o industrial control systems which allows reusing the software bench prepared with the device according to the invention, accordingly offering high flexibility in use.
Another object of the present invention is to provide a testing device for industrial control systems, which allows to evaluating much more complex ^ control logic systems than allowed by a conventional testing panel.
Thus the present invention provides a testing device for industrial control systems, comprising:
- editing means which allow to compose a software test bench for a control system of an industrial plant; and
- storage means, suitable to provide said editing interface means with predefined models which describe a physical process being controlled; and
- modeling means, suitable to facilitate the composition a portion of said test bench related to the testing of said adjustment loops; and
- simulation means which comprise a simulation engine suitable to process the models generated by said editing interface means; and
- hardware means suitable to interface said testing system with a control system to be tested.
Further characteristics and advantages of the present invention will become apparent from the following detailed description of preferred but not exclusive embodiments of the device according to the invention, illustrated only by way of non-limitative example in the accompanying drawings, wherein:
Figure I is a block diagram of the testing device according to the present invention; and
Figure 2 is a block diagram of the use of the testing device according to the invention, connected to a plant control system.
With reference to the above figures, the testing device according to the present invention consists of a device which is suitable to create a model of the components of an industrial plant, which exchanges information with a control system (prepared for the industrial plant). The testing device according to the present invention is also suitable to execute the resulting model in order to directly factory-test said control system.
The testing device according to the invention, designated by the reference numeral 1 , comprises, as shown in Figure 1 , editing means 2, which allow composing a software test bench by assembling various models taken from storage means 4. By way of said editing means 2, it is also possible to connect all the input and output signals exchanged between the control system and the plant, rerouting them onto the bus of the control system, with the inputs and the outputs of the models used.
Preferably, the editing interface means allow performing the following functions: - preparing a new plant model (20);
- setting the parameters of the plant model (21 );
-- connecting a plant model and the control system 10 of said plant (22);
- managing the conditioning and forcing of the signals (23);
— deleting signals and connections (24); — saving the plant model thus defined (25);
— printing the model (26).
The testing device according to the invention is further provided with modeling means 3, which provide functions suitable to guide and facilitate the testing engineer in synthesizing a simplified model to be used for testing particular control loops. If the loops to be tested are standard (for example pump control, simple adjustment loops, etcetera), modeling means allow advantageously the testing engineer to simply input few parameters that characterize the individual loop and to compose semi-automatically the software test bench part related to the testing of said loops. The modeling means 3 therefore comprise functions 27 for individual loops, functions 28 for cascaded loops and functions 29 for modeling driving devices such as valves or motors or the like. The testing device according to the invention further comprises, as mentioned, storage means 4 which are meant to provide the testing engineer with a plurality of pre-wire models for closing the loops to be tested. The storage means 4 can be represented, for example, by libraries of plant models. These models allow, for example, emulating plant responses. For example, when testing the drive of a pump, time delays might be used to obtain plant response emulation. The models contained in the storage means 4 are therefore constituted by input-output functions with 1 -2 poles, or in algebraic relationships, or by pure delays, so as to give the feedback signal from the plant a minimum of dynamic range.
The models available can be, for example, regulation and/or on/off valves 30, > pumps and/or motors 3 1 , analog indications (for example levels, flow-rates, positions) and/or digital indications (for example pressure switches, level switches, limit switches) 32. The device according to the invention further includes a simulation engine 5, which is meant to process the simplified models. It constitutes the feedback to the control system 10 and is connected to lo the inputs and outputs of the control system, appropriately re-routed on the bus 12 of the controller 13.
The simulation engine 5 accordingly receives in input the structure of the plant components, produced by the testing engineer by using the models of the storage means 4. made available within the testing device 1 . 15 Finally, the hardware means 6, suitable to interface the testing device to a specific industrial control system 10, are meant to exchange the input and output signals of the control system 10 rerouted on the control bus 12 of the control system 10. Said means 6 must be designed specifically for the control bus 1 2 to which the test bench provided by the device according to the in invention connects and specifically for the data exchange protocol used by the specific control system 10 that is used.
In Figure 2. the reference numeral 10 designates the control system of a plant, which is generally designated by the reference numeral 1 1 . The reference numeral 1 2 designates the control bus, which carries signals to controllers 13 5 and to I/O cards 14 of the control system 10. The control bus is connected to interface means 6 which allow to connect the testing device 1 to the control system 10. In this case, the testing device 1 shown in Figure 2 is understood to include the editing interface means 2 and the means 3-5 described hereafter in detail and shown in Figure 1 .
The testing device according to the invention therefore can be, in practice, implemented by means of a computerized system, which can be connected to ^ the control bus 12 of the industrial control system 10 through the interface means 6. The monitor, the keyboard and the mouse of the computerized constitute the tools that can help the basic editing and modeling functions available. The testing engineer receives via monitor all the indications related to the signals sent by the testing device according to the invention (commands o to pumps, regulator control actions, etcetera). Monitoring of the feedback signals, that the software test bench supplies to the control system 10 through the interface means 6, can be performed.
This is achieved by means of the simulation engine 5, which runs on the electronic computer and is capable of executing the model defined by the 5 testing engineer.
In practice it has been observed that the testing device according to the invention fully achieves the intended aim and objects, since it allows to el iminate the hardware test bench and software test benches designed specifically for a particular control system to be tested. o The test bench created by the testing device according to the invention allows high sensitivity in use and a high level of simplicity for the testing engineer. The test benches thus created can also be easily used for different control systems, since they are not dependent on a specific programming language. The testing device thus conceived is susceptible of numerous modifications 5 and variations, all of which are within the scope of the inventive concept; all the details may also be replaced with other technically equivalent elements.

Claims

1 A testing device for industrial control systems, comprising:
- editing means which allow to compose a software test bench for a control system of an industrial plant; and
- storage means, suitable to provide said editing interface means with predefined models which describe a physical process being controlled; and
- modeling means, suitable to facilitate the composition of a portion of said test bench related to the testing of said control loops; and
- simulation means which comprise a simulation engine suitable to process the models generated by said editing interface means; and
- hardware means suitable to interface said testing system with a control system to be tested.
2. The testing device according to claim 1 , characterized in that said editing means provide the following functions:
- preparing a new plant model;
- setting the parameters of the plant model;
- connecting a plant model and said control system;
- managing the conditioning and forcing of signals of said control system;
- deleting signals and connections;
- ing said plant model thus created:
- printing said model. The testing device according to claim 1. characterized in that said modeling means provide the following functions:
- single loop modeling;
— cascade loop modeling;
— modeling of driving device commands. The testing device according to claim 1. characterized in that said hardware means exchange input and output signals of said control system re-routed on a control bus of said control system.
5. The testing device according to claim 1 , characterized in that said storage means comprise one or more libraries of models constituted by input-output functions, algebraic relations, pure delays and the like.
6. The testing device according to claim 1 , characterized in that it provides by said editing means, through said model library means and said modeling means, feedback signals to said control system, by means of said hardware means, in response to commands given by said control system.
PCT/EP1999/007793 1998-12-31 1999-10-05 Testing device for industrial control systems WO2000041050A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
ITMI98A002873 1998-12-31
IT1998MI002873A IT1304079B1 (en) 1998-12-31 1998-12-31 TESTING DEVICE FOR INDUSTRIAL CONTROL SYSTEMS

Publications (1)

Publication Number Publication Date
WO2000041050A1 true WO2000041050A1 (en) 2000-07-13

Family

ID=11381393

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/EP1999/007793 WO2000041050A1 (en) 1998-12-31 1999-10-05 Testing device for industrial control systems

Country Status (2)

Country Link
IT (1) IT1304079B1 (en)
WO (1) WO2000041050A1 (en)

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1259831A1 (en) * 2000-01-24 2002-11-27 Fluor Corporation Control system simulation, testing, and operator training
WO2003032100A1 (en) * 2001-10-05 2003-04-17 Rosemount Inc. Root cause diagnostics of aberrations in a controlled process
WO2003038618A1 (en) * 2001-10-29 2003-05-08 Goalart Ab A method, an apparatus and a computer program product for managing hierarchical structures
US6889166B2 (en) 2001-12-06 2005-05-03 Fisher-Rosemount Systems, Inc. Intrinsically safe field maintenance tool
US7027952B2 (en) 2002-03-12 2006-04-11 Fisher-Rosemount Systems, Inc. Data transmission method for a multi-protocol handheld field maintenance tool
US7039744B2 (en) 2002-03-12 2006-05-02 Fisher-Rosemount Systems, Inc. Movable lead access member for handheld field maintenance tool
US7054695B2 (en) 2003-05-15 2006-05-30 Fisher-Rosemount Systems, Inc. Field maintenance tool with enhanced scripts
WO2007053023A1 (en) * 2005-10-31 2007-05-10 Marine Cybernetics As Method and system for testing a control system for a marine petroleum process plant
WO2008152010A1 (en) * 2007-06-14 2008-12-18 Avl List Gmbh Device and method for simulating a developmental arrangement for a test stand
EP2076784A2 (en) * 2006-08-03 2009-07-08 Lam Research Corporation Automated test and characterization data analysis methods and arrangement
US8874402B2 (en) 2003-05-16 2014-10-28 Fisher-Rosemount Systems, Inc. Physical memory handling for handheld field maintenance tools
US8898036B2 (en) 2007-08-06 2014-11-25 Rosemount Inc. Process variable transmitter with acceleration sensor
US9009013B2 (en) 2009-04-23 2015-04-14 Avl List Gmbh Method and device for verification of an automation system
US9052240B2 (en) 2012-06-29 2015-06-09 Rosemount Inc. Industrial process temperature transmitter with sensor stress diagnostics
US9207670B2 (en) 2011-03-21 2015-12-08 Rosemount Inc. Degrading sensor detection implemented within a transmitter
US9602122B2 (en) 2012-09-28 2017-03-21 Rosemount Inc. Process variable measurement noise diagnostic
US10261506B2 (en) 2002-12-05 2019-04-16 Fisher-Rosemount Systems, Inc. Method of adding software to a field maintenance tool

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0283382A1 (en) * 1987-03-11 1988-09-21 SPIE-TRINDEL Société Anonyme Means for checking the functioning of an automatic controller and device for its implementation
US5371851A (en) * 1989-04-26 1994-12-06 Credence Systems Corporation Graphical data base editor
GB2293886A (en) * 1994-09-30 1996-04-10 S3 Research & Dev Limited Design and testing of electronic systems
DE19523483A1 (en) * 1995-06-28 1997-01-02 Daimler Benz Ag Computer-aided fault diagnosis device for a complex technical system
US5663900A (en) * 1993-09-10 1997-09-02 Vasona Systems, Inc. Electronic simulation and emulation system
US5758123A (en) * 1994-04-12 1998-05-26 Yokogawa Electric Corporation Verification support system
US5812394A (en) * 1995-07-21 1998-09-22 Control Systems International Object-oriented computer program, system, and method for developing control schemes for facilities

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0283382A1 (en) * 1987-03-11 1988-09-21 SPIE-TRINDEL Société Anonyme Means for checking the functioning of an automatic controller and device for its implementation
US5371851A (en) * 1989-04-26 1994-12-06 Credence Systems Corporation Graphical data base editor
US5663900A (en) * 1993-09-10 1997-09-02 Vasona Systems, Inc. Electronic simulation and emulation system
US5758123A (en) * 1994-04-12 1998-05-26 Yokogawa Electric Corporation Verification support system
GB2293886A (en) * 1994-09-30 1996-04-10 S3 Research & Dev Limited Design and testing of electronic systems
DE19523483A1 (en) * 1995-06-28 1997-01-02 Daimler Benz Ag Computer-aided fault diagnosis device for a complex technical system
US5812394A (en) * 1995-07-21 1998-09-22 Control Systems International Object-oriented computer program, system, and method for developing control schemes for facilities

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
R.ISERMANN ET AL: "HARDWARE-IN-THE-LOOP SIMULATION FOR THE DESIGN AND TESTING OF ENGINE-CONTROL SYSTEMSW", PROCEEDINGS OF THE 5TH IFAC WORKSHOP ALGORITHMS AND ARCHITECTURES FORREAL TIME CONTROL, 15 April 1998 (1998-04-15), MEXICO, pages 1 - 10, XP000870020 *

Cited By (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1259831A4 (en) * 2000-01-24 2004-11-03 Fluor Corp Control system simulation, testing, and operator training
EP1259831A1 (en) * 2000-01-24 2002-11-27 Fluor Corporation Control system simulation, testing, and operator training
WO2003032100A1 (en) * 2001-10-05 2003-04-17 Rosemount Inc. Root cause diagnostics of aberrations in a controlled process
WO2003038618A1 (en) * 2001-10-29 2003-05-08 Goalart Ab A method, an apparatus and a computer program product for managing hierarchical structures
US7117122B2 (en) 2001-12-06 2006-10-03 Fisher-Rosemount Systems, Inc. Field maintenance tool
US6889166B2 (en) 2001-12-06 2005-05-03 Fisher-Rosemount Systems, Inc. Intrinsically safe field maintenance tool
US7039744B2 (en) 2002-03-12 2006-05-02 Fisher-Rosemount Systems, Inc. Movable lead access member for handheld field maintenance tool
US7027952B2 (en) 2002-03-12 2006-04-11 Fisher-Rosemount Systems, Inc. Data transmission method for a multi-protocol handheld field maintenance tool
US10261506B2 (en) 2002-12-05 2019-04-16 Fisher-Rosemount Systems, Inc. Method of adding software to a field maintenance tool
US7054695B2 (en) 2003-05-15 2006-05-30 Fisher-Rosemount Systems, Inc. Field maintenance tool with enhanced scripts
US8874402B2 (en) 2003-05-16 2014-10-28 Fisher-Rosemount Systems, Inc. Physical memory handling for handheld field maintenance tools
WO2007053023A1 (en) * 2005-10-31 2007-05-10 Marine Cybernetics As Method and system for testing a control system for a marine petroleum process plant
EP2076784A2 (en) * 2006-08-03 2009-07-08 Lam Research Corporation Automated test and characterization data analysis methods and arrangement
EP2076784A4 (en) * 2006-08-03 2011-09-28 Lam Res Corp Automated test and characterization data analysis methods and arrangement
WO2008152010A1 (en) * 2007-06-14 2008-12-18 Avl List Gmbh Device and method for simulating a developmental arrangement for a test stand
US8825460B2 (en) 2007-06-14 2014-09-02 Avl List Gmbh Device and method for the simulation of a development system
US8898036B2 (en) 2007-08-06 2014-11-25 Rosemount Inc. Process variable transmitter with acceleration sensor
US9009013B2 (en) 2009-04-23 2015-04-14 Avl List Gmbh Method and device for verification of an automation system
US9207670B2 (en) 2011-03-21 2015-12-08 Rosemount Inc. Degrading sensor detection implemented within a transmitter
US9052240B2 (en) 2012-06-29 2015-06-09 Rosemount Inc. Industrial process temperature transmitter with sensor stress diagnostics
US9602122B2 (en) 2012-09-28 2017-03-21 Rosemount Inc. Process variable measurement noise diagnostic

Also Published As

Publication number Publication date
IT1304079B1 (en) 2001-03-07
ITMI982873A0 (en) 1998-12-31
ITMI982873A1 (en) 2000-07-01

Similar Documents

Publication Publication Date Title
WO2000041050A1 (en) Testing device for industrial control systems
JP4597603B2 (en) A distributed processing control system functionally integrated on a single computer.
US9864355B2 (en) Test device for testing a virtual electronic control unit
CA2397372C (en) Control system simulation, testing, and operator training
US9201764B2 (en) Method and device for creating and testing a control unit program
JP2008170998A (en) System and method for turbine control simulation
KR20050083751A (en) Device and method for checking railway logical software engines for commanding plants, particularly station plants
US8954920B2 (en) Apparatus for developing embedded software and a process for making the same
KR101168486B1 (en) Training system for an automated system for controlling a technical process
EP3703075A1 (en) Method for verifying measurement control system of nuclear power plant, and verification device therefor
US20050071802A1 (en) Numerical control with machine-tool simulator
CN113260935A (en) Method and device for computer-aided simulation of a modular technical system
US7054694B2 (en) Process control system
KR20180106098A (en) Real time gas turbine simulation system, and execution method thereof
KR100221473B1 (en) Simulation system
US20090132067A1 (en) Design Device for Designing a Control System and Method for Examining the Technological Aims When Designing a Control System
RU2282248C1 (en) Device for training operating personnel of energy equipment
KR102614431B1 (en) Integrated simulation apparatus
JP7360348B2 (en) Supervisory control systems and input/output devices
Sigari et al. Portable and affordable operator training simulators
JPH1185251A (en) Digital control device and input/output substrate testing device for the digital
JP3325397B2 (en) Simulation system for programs executed by programmable controllers
CN113646708A (en) Virtual test method and simulation device for facility control
RU58241U1 (en) MANAGEMENT SYSTEM SIMULATOR
JP2615222B2 (en) Operators console for distributed digital control systems.

Legal Events

Date Code Title Description
AK Designated states

Kind code of ref document: A1

Designated state(s): BR CA CN IN JP KR PL US

AL Designated countries for regional patents

Kind code of ref document: A1

Designated state(s): AM AZ BY KG KZ MD RU TJ TM AT BE CH CY DE DK ES FI FR GB GR IE IT LU MC NL PT SE

121 Ep: the epo has been informed by wipo that ep was designated in this application
122 Ep: pct application non-entry in european phase
NENP Non-entry into the national phase

Ref country code: CA