WO2001043039A1 - System and method for monitoring lighting systems - Google Patents

System and method for monitoring lighting systems Download PDF

Info

Publication number
WO2001043039A1
WO2001043039A1 PCT/US2000/042078 US0042078W WO0143039A1 WO 2001043039 A1 WO2001043039 A1 WO 2001043039A1 US 0042078 W US0042078 W US 0042078W WO 0143039 A1 WO0143039 A1 WO 0143039A1
Authority
WO
WIPO (PCT)
Prior art keywords
lighting
power consumption
fee
control center
lighting system
Prior art date
Application number
PCT/US2000/042078
Other languages
French (fr)
Other versions
WO2001043039A9 (en
Inventor
Timothy M. Yablonowski
Joseph C. Notarianni
Clarence W. Russell
Orlando M. Riera
Original Assignee
Ultrawatt.Com
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ultrawatt.Com filed Critical Ultrawatt.Com
Priority to AU45049/01A priority Critical patent/AU4504901A/en
Priority to CA002392592A priority patent/CA2392592A1/en
Priority to EP00992492A priority patent/EP1234269A1/en
Priority to MXPA02005507A priority patent/MXPA02005507A/en
Publication of WO2001043039A1 publication Critical patent/WO2001043039A1/en
Publication of WO2001043039A9 publication Critical patent/WO2001043039A9/en

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/04Billing or invoicing
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/02Marketing; Price estimation or determination; Fundraising
    • G06Q30/0207Discounts or incentives, e.g. coupons or rebates
    • G06Q30/0234Rebates after completed purchase
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply

Definitions

  • the present invention generally relates to electrical lighting systems More particularly, the present invention relates to systems and methods for maintaining the lighting systems and for monitoring energy consumption of the lighting systems
  • the method and systems should provide an incentive for facility owners to use the improved lighting systems.
  • the method and system of the preferred embodiments may provide for energy monitoring and maintenance of lighting systems at reduced costs to the facility owner.
  • a first aspect is described for charging a fee to an end user where a service company upgrades and services a lighting system of the end user's facility.
  • a service company upgrades and services a lighting system of the end user's facility.
  • an original power consumption of the facility is determined before the lighting system is retrofitted ⁇ ith at least one power savings device Thereafter, the lighting system is retro-fitted with the at least one power saving device Then, a new power consumption ⁇ alue is measured Finally, the fee is charged to the end user, such that the fee is a function of a difference between the original power consumption and the new powei consumption.
  • a second aspect is described for monitoring energy consumption of a lighting system
  • Power consumption of the lighting system is controlled with a lighting control unit connected with the lighting system.
  • the lighting control unit collects power consumption data and transfers the power consumption data via a data transfer line to a control center
  • the power consumption data is received at a server located at the control center
  • the received power consumption data may then be used to calculate the fee charged to the customer
  • a third aspect is descnbed foi maintaining a lighting system which includes lighting cii cuiti y At least one monitor monitors the lighting cn cuitry of at least one customer and produces at least one alarm signal as a function of the occurrence of a system fault.
  • a data transfer line transfers the alarm signal to a control center.
  • a server receives the alarm signal at the control center, and at least one operator coordinates service to the lighting circuitry when the alarm signal indicates that a fault exists with the lighting system.
  • FIG. 1 is a block diagram showing one embodiment of exemplary costs to a facility before utilization of the service program
  • FIG. 2 is a block diagram showing one preferred embodiment of exemplary costs to a facility after utilization of the service program
  • FIG. 3 is a block diagram showing one preferred embodiment of a lighting monitoring system
  • FIGS. 4A-4D are detailed wiring schematics showing one preferred embodiment for wiring the lighting monitoring system shown in FIG. 3;
  • FIG. 5 is a flow chart representing one preferred embodiment on the lighting system service program
  • FIGS. 6A-6F show one preferred embodiment of exemplary lighting system audit sheets for use before the lighting system is operated in a power savings mode
  • FIGS. 6G-6I show one preferred embodiment of exemplary lighting system audit sheets for use after the lighting system is operated in a power savings mode
  • FIG. 7 is a block diagram showing one preferred embodiment of lighting system maintenance. TABLE OF ACRONYMS
  • C/T current transformer.
  • HID high intensity discharge.
  • I/O input/output
  • ISDN integrated services digital network.
  • ISP internet service provider
  • Kwh kilowatt hours.
  • LCU lighting control unit.
  • PC personal computer
  • THD total harmonic distortion
  • the below described embodiments utilize 1 ) a lighting monitoring system and method. 2) a service program system and method, and 3) a lighting maintenance system and method for energy consuming facilities
  • facilities include office buildings, warehouse buildings, banks, schools, federal and state buildings, private residences, and others. The three aspects of the pieferred embodiments may be used separately or together.
  • a typical lighting system includes at least one ballast 4 and lighting fixture 5.
  • the lighting fixture 5 includes a lamp 6, powered from an end user panel 7 which connects with an electric utility 8.
  • the electric utility 8 uses, for example, an electric utility meter 9 to monitor the end user's power consumption to determine an amount the end user should be charged
  • the lighting system is modified according to the preferred embodiments to include a lighting control unit (LCU) 10
  • LCU lighting control unit
  • a preferred LCU is an ULTRAWATT power savings unit as described in commonly owned patents to Walker, U.S. Patent No. 5,754,036 and Bangerter 5,583,423, the disclosures of which are incorporated herein by reference.
  • Those skilled in the art will appreciate that other equipment light produces energy reduction may be used, such as other electronically controlled power reduction devices, transformers, switch based power reducers or dimmer switches.
  • dimmer switches unlike with the ULTRAWATT power savings unit, high lighting quality may not be maintained.
  • the preferred LCU is utilized to regulate alternating current (AC) power to a wide range of complex capacitive and inductive loads to provide reduction in power consumption and may also provide a leading or lagging power factor.
  • the LCU adjustable for a wide range of loads and may reduce power consumption by 25 percent or more in lighting loads while producing minimal reduction in light output.
  • the LCU implements a predetermined energy reduction.
  • the LCU uses a mam switch which is initially turned off slightly in advance of the load current zero crossing.
  • the turn-off time is advanced gradually to reduce power to a target level, and optionally a load phase angle is measured and maintained to control the power savings iatio
  • a capacitor bank or parallel capacitor allows power reduction in a low noise fashion
  • the LCU 10 sends signals to a control center 12, for example, relating to power consumption, via a communication poit These signals allow the control center 12 to diagnose the operation of the lighting system and to monitor power consumption.
  • the modified system may include current transformers (C/T's) 14 with power monitoring capabilities.
  • An exemplary C/T unit is Model Number Hawkeye 8036 manufactured by Ve ⁇ s Industries (Square D), but other C/Ts may be used.
  • the unit includes three C/T's, and at least one of the C/T's contains power monitor circuitry for logging energy data, such as, Amperage, Voltage, power and Kwh
  • the LCU 10 performs the consumption and/or fault monitoring
  • FIG 3 another preferred embodiment of the modified lighting system is shown according to the prefe ⁇ ed embodiments
  • the C/T's 14 preferably connect in daisy chain fashion with an input/output (I/O) card 16.
  • I/O input/output
  • An exemplary I/O card is manufactured by Ve ⁇ s Industries, but other I/O cards may be used.
  • the I O card 16 connects with the LCU's communication port.
  • the communications port is a standard 15-pin connector which is rated for nominal 5 Volt, 10 milliamp dry contact operation.
  • Other communication ports may be used.
  • the I/O card 16 includes a protocol platform so that a device, such as the E-server 18, may read the signals sent via the communications port of the LCU 10.
  • the protocol platform identifies each LCU 10 with a unique address so that an operator can determine from which LCU 10 a signal originated
  • the I/O card 16 integrated at least one LCU 10 with an E-server unit 18
  • An exemplary E-Server unit 18 is Model Number Series H8800 manufactured by Ve ⁇ s Industries Other communication devices may be used, such as personal computers, processors, or general servers.
  • the E-Server 18 is an energy information server which contains an onboard converter, a microprocessor and a modem
  • the E-Server 18 preferably includes software that is configurable so that the E-Server may adapt to different lighting system configurations, but may be hard wired
  • the E-Server 18 logs energy information, like Kwh usage of the lighting system, and signals, like alarm signals, from the LCU 10, and automatically transfers this information, for example, via e-mail.
  • the E-Server can send messages to the control center 12 using other methods such as via a telephone line with a modem, via a Tl line, or by cable.
  • the E-Server 18 connects with a first uninterrupted power source (UPS) 20 for continuous operation in the case of a power failure.
  • UPS uninterrupted power source
  • the UPS 20 allows operators at the control center 12 to communicate with the E-Server 18 to diagnose alarms during power failure
  • An internet service provider (ISP) 22 connects with the E-Server 18
  • the ISP 22 allow s operators at the control center 12 to connect w ith any LCU 10
  • the ISP 22 also allows messages to be sent from the E-Seiver 18 to the control centei 12 from anywheie in a iegion oi globally
  • a domain name 24 is preferably set-up, for example, ULTRAWATT-LINK.com, to allow the control center 12 to receive the messages from the E-Server 18 and other E-servers.
  • a concentrator 26 connects the ISP 22 with the control center 12 via an integrated services digital network (ISDN) high speed dataJine or other data transfer mechanism.
  • ISDN integrated services digital network
  • the concentrator 26 allows multiple computers to connect with and simultaneously run from a single ISDN line. Other communication configurations may be used such as using multiple dedicated lines and modems, Tl or cable.
  • the ISDN transmits data digitally and preferably provides two simultaneous connections over a single line. In addition, multiple devices may attach to the line in a network fashion.
  • the ISP 22 provides the concentrator 26 which houses a high speed ISDN Modem expansion card.
  • the concentrator 26 connects with a second UPS 28.
  • the concentrator 26, ISP 22, LCU 10, C/T 14 or I/O 16 connects with a network server 30 at the control center 12.
  • the network server 30 facilitates message delivery to a server processor 32, for example, a personal computer (PC), and transfers logging data between the PCs and an accounting department, described below.
  • the network server 28 preferably connects with an internal backup 34 and a third UPS 36 with a generator 38, to safeguard against the loss and corruption of received consumption and alarm data.
  • the server processor 32 is located at the control center 12 and is preferably a dedicated stand alone PC with a live connection to the network server 30.
  • the server processor 32 automatically sends alarm messages, for example, via e-mail, to at least one customer processor 40a-40c, for example, a PC.
  • each end user account, per facility has a dedicated customer processor 40a-40c which performs the logging of energy information for service program fee charging purposes, as discussed above, and receiving alarm messages for the lighting system maintenance program, as discussed below.
  • Each customer processor 40a- 40c is networked via the network server 30 and connects with dedicated accounting processors 42a-42c, for example, PCs, one for each monitored facility. for ease of transferring logged alarm signals and energy consumption information.
  • the accounting processors 42a-42c are used to determine charged fees under the service program, as discussed below.
  • Dedicated processors or PCs are used per facility for convenience purposes, but one PC could be used for all facilities.
  • all processors are interconnected by the network aaad have constant connection to the Internet through ISP 22 for receiving information.
  • the server processor 32 connects with a redundant server processor 44 and the customer dedicated processors 40a-40c connect with data backups 46a-46c and UPSs 48a-48c. Non-redundant or different redundant systems may be used.
  • FIGS. 4A-4D exemplary detailed wiring schematics are shown for differing lighting monitoring systems. Other electrical systems may use the method and systems of the preferred embodiments. Referring to FIG.
  • a lighting load 50 such as HID fluorescent and incandescent, of the lighting system and electrical panel 52 are shown connected with the LCU 10, the I/O 16, the C/T's 14 and the E-Server 18.
  • the LCU 10 connects in series with the load 50.
  • One C/T 14 is used per phase for each load 50
  • the C/Ts 14 preferably snap fit around a line 54 from the lighting load 50
  • the C/T 14 connects with the I/O 16 which connects with C/Ts from other panels and the E-server 18 is a daisy wheel configuration
  • the I/O 16 connects to the E-server 18 through a socket connector, for example, a RS-45 connector.
  • a transformer 56 is used to obtain the 120 Volts or other voltages necessary to power the E- server 18 or other component.
  • Other power sources may be provided.
  • FIG. 4B an exemplary wiring diagram is shown for a 120/277 Volt system.
  • FIG. 4C a wiring diagram is shown for a 208 Volt system.
  • FIG. 4D a wiring diagram is shown for a 240 Volt system.
  • Other wiring arrangements are possible for each system or other voltage systems
  • the LCU 10 is preferably ided by at least one membci of an alliance of service pioviders
  • the service providers also preferably include an Engineering Firm/Project Manager, Construction Manager/Contractor, a wholesale fixture company, and/or a lighting service company.
  • the alliance may be any combination of these providers and may include other types of providers as well.
  • the LCU 10 is preferably used with the service program to attract potential customers, for example, owners or managers of facilities with lighting systems, i.e., end users.
  • the service providers use at least three basic avenues to introduce the service program to potential customers.
  • the potential customers are selected as a result of leads generated by support groups that the alliance has developed or other leads.
  • the support groups preferably have strong contacts at the highest levels of major corporations to reduce the time normally required to determine and reach the correct upper management personal at the highest levels of the potential customer's corporate structure.
  • potential customers are preferably reviewed to determine whether the customer's financial position is solid and to determine whether the customer's facilities fall within the guidelines of the service program Alliance personnel prc-quahfy the potential customer by gathci ing general information about the potential customer's facilities. For example, hours of operation, kilowatt hours (Kwh) rates, and existing lighting system component information is obtained.
  • a questionnaire provides general information about the existing lighting systems in all or a subset of the customer's facilities. Gathered information also includes whether operating hours vary in different areas of the facility. The audit reflects the operating hours by area and whether or not the area has air conditioning. If lights are switched on/off, the switching method is verified. Switching methods include energy management system, time clock, photocell, and occupancy sensors. If some fixtures are switched by wall switches, the average hours of operation for these fixtures is noted. These fixtures may be excluded from the base program and may be included under separate negotiations with the customer. Alternatively, such fixtures are included in the program
  • the alliance introduces the service program to the customer and the customer receives a copy of an agreement.
  • the ice piogiam directly geneiates at least one stream of revenue for the service providers, i.e., the alliance.
  • the revenue is based on cost avoidance funds as determined by costs to the facility both before and after the facility is upgraded.
  • the facility is typically upgraded with, for example, the LCU, energy efficient lamps and lighting fixtures, new ballasts, energy meters, and/or communications hardware and software.
  • the service providess typically install the LCU and upgrade the facilities lighting system at no cost. Additional changes may be provided. Thereafter, the service providers gain a stream of revenue in at least one or two ways described below.
  • the upgrades provide for more energy efficient facilities which m turn reduces facility energy costs and is better for the environment.
  • a first source of revenue comprises a fee based on savings in energy costs.
  • the electric utility cost for the original lighting system is determined to create a baseline figure (block 70).
  • the original power consumption may be determined using the book value of the existing fixtures, as determined within the industry.
  • the lighting system is retrofitted with at least one power savings device (block 72) and optionally other electrical equipment
  • new power consumption data is measured (block 74).
  • a fee is charged as a function of the difference between the power consumption of the original lighting system and the power consumption for the new lighting system (block 76)
  • the service provider maintains the lighting system at no, or a reduced, cost to the end user
  • the cost for the original lighting system is preferably determined from the Kwh usage of the original system as measured by the service provider and physically verified by the end user.
  • exemplary lighting system costs are shown for an original lighting system, i.e.. prior to operation in the power savings mode
  • electric utility costs are one dollar and end user maintenance costs total twenty cents, ten cents for ballast maintenance, two cents for light fixture maintenance, and eight cents for spot re-lamp.
  • exemplary sheets are shown for collecting information relating to total cost figures that are determined before and after the lighting system is operating in the power savings mode. The described sheets are for example purposes only and other sheet formats may be used. Referring to FIG.
  • an exemplary first sheet contains general information about the end user including the address of the end user's facility.
  • the audit is performed by an alliance member such as the Engineering Firm/Project Manager and/or Construction Manager/Contractor personnel.
  • FIGS. 6B-6D measurements are taken before the LCU or other power reduction equipment are installed. Using a meter, measurements are made for mam panel feeders and all neutrals. All total harmonic distortion (THD) readings are taken from the Amp scale of the meter.
  • new fluorescent lamps are operated for a minimum of one hour and high intensity discharge (HID) lamps are operated for a minimum of seventy two hours prior to recording any power measurements.
  • HID high intensity discharge
  • measurements are taken after the LCU is installed and the LCU is operating in the power savings mode off. Operation m this bypass mode allows the fixtures to stabilize, preferably for fifteen to thirty minutes, and the neutral lines are verified to meet code.
  • the LCU is switched to the savings mode and the fixtures are allowed to stabilize for about fifteen to thirty minutes. Thereafter, lighting circuit measurements are recorded at the panel for the circuits connected to the LCU units.
  • Light level recordings are also performed before the retrofit and LCU units are installed and after the retrofit is completed and the LCU units are installed to allow for a light level comparison.
  • Light level readings are preferably performed using the same light meter and at the same points in the facility Also, the leadings preferably occur without interference from outside light. Pictures may be taken of the aieas where the light level readings are taken.
  • the light level before and after the lighting system is operating in the power savings mode is preferably w ithin a ccitain percentage as negotiated by the end user and the seivice pi ouder Referrmg again to FIG 2, exemplary costs to the facility after utilization of the service program are shown according to a preferred embodiment.
  • the fee is charged to the end user, such that the fee is a function of a difference between the original power consumption and the new power consumption
  • the fee from the end user to the service company is forty cents where the original electric utility cost was one dollar (see FIG 1) and the new electric utility cost is sixty cents.
  • the end user has received an upgraded system with no out of pocket expenses and saves twenty cents on maintenance costs (see FIG 1) where maintenance is provided without cost
  • the fee is the difference between the original power consumption and the new power consumption multiplied by actual hours of operation, multiplied by a power rate, and multiplied by an air conditioning reduction factor
  • the hours of operation, the powei rate and the air conditioning reduction factor may be determined through negotiation Other calculations may be used to suit the specific requirements of the end user and the service provider, such as a fee comprising only a portion of the reduction
  • the direct fee is charged w ith a periodic billing cycle, for example, every 28 days, to allow for the same number of Saturday and Sundays in each cycle
  • the fee is preferably determined at the end of each billing cycle according to actual power consumption, the data of which is logged according to the method and system described above, for that billing period
  • the end user pays a fee as a function of the power savings for that particular billing period
  • the fee is determined automatically at the control center based on information communicated from the end user's facility Alternatively, those skilled in the art will appreciate that a fixed fee may be used
  • the service providei may dispatch maintenance personnel, and co ⁇ ective measures are automatically taken, as descnbed with icgaid to the lighting system maintenance descnbed below
  • the service program of the preferred embodiments may also generate an indirect stream of revenue in the form of additional products and services from the service provider. Funds normally spent on lighting costs may be redirected into equipment and services from the service providers business. In turn, the service provider's gross sales are increased.
  • the E-Server 18 sends alarm signals 56 from the LCU 10 or C/T 14 located at one or more facilities 58 to the control center 12.
  • the information may also be communicated to other control centers of other locations.
  • Each control center 12 may be operated by one or more of engineering, maintenance and billing companies.
  • the alarm signals 56 are preferable sent with power consumption data 60, discussed above, via a communications device such as the Internet 22.
  • the power consumption data 60 is logged in an energy data archive 62 and the alarm signals 56 are logged in a fault data archive 64, preferably located at the control center 12.
  • the alarm signals may be in the form of different color lights located on the LCU 10 that preferably correspond to the operating status of the LCU 10 and include, for example, 1) the LCU is in bypass mode, I e., not energy savings mode, 2) the LCU is not functioning, l e , a hard fault exists in the unit, and 3) the LCU is operating in power savings mode.
  • alarm signals may be used, such as signals indicating an uncharacteristic change in consumption (e.g., reduction or increase indicating fixture, lamp or ballast malfunction).
  • an operator diagnoses the alarm signals to determine if there is a fault
  • a computer program is run to analyze the alarm signals and display a message corresponding to the fault. If there is a fault, service personnel 66 are automatically dispatched to facility with information regarding, for example, the date and time the fault occurred, the facility's location, the LCU 10 that sent the fault data, the location and type of the lamp and ballast, the panel location and circuit number, and/or the fixture height. Additionally, in the case of the alarm, the operator may immediately call the end user to diagnose the k ⁇ V, Ampciagc, and any othei signals to determine whethei oi not service personnel should be dispatched.

Abstract

A method and system for charging a fee to an end user where a service company services a lighting system of the end user's facility. To determine the fee, an original power consumption of the facility is determined (70) before the lighting system is retrofitted with at least one power savings device. Thereafter, the lighting system is retro-fitted (72) with the at least one power saving device. Then, a new power consumption (74) is measured of the facility. Finally, the fee is charged to the end user (76), such that the fee is a function of a difference between the original power consumption and the new power consumption.

Description

SYSTEM AND METHOD FOR MONITORING LIGHTING SYSTEMS.
FIELD OF THE INVENTION
The present invention generally relates to electrical lighting systems More particularly, the present invention relates to systems and methods for maintaining the lighting systems and for monitoring energy consumption of the lighting systems
BACKGROUND
Energy consumption in the United States has grown m alarming proportions One concern is that indiscriminate use of energy and other resources will leave the environment and those that live in it wanting That concern has existed at least since the oil crisis of the 1970's, and since then American consumers and businesses have focused their attention to the current usage and future supply of energy The government increased its demand for energy efficient systems when, in the late 1980's and early 1990's, the Department of Eneigy and the Public Utility Commission pi ovtded a financial incentive foi utilities to offer Demand Side Measuies (DSM) to their customers End customers took advantage of DSM in the foπn of utility funded rebates used to purchase more energy efficient motois, variable frequency drives, lighting systems, and occupancy sensors Despite the prevalence of DSM programs offeied by local utilities, however, not all building managers were aware of the programs, and a small percentage of all buildings participated
To encourage the nation's top corporations to upgrade their facility floor space to more energy efficient lighting, the United States Environmental Protection Agency launched the Green Lights initiative in 1991 Even with the Green Lights initiative, by the end of 1996 only a small percentage of pledged space for lighting l etrofit had been upgraded with new lighting technologies Fuither initiatives include the Enei gy Policy Act (EPACT 1992), the President's Climate Change Initiative ( 1993) and an Executive Older on Energy Efficiency in Federal Facilities by the year 2005. Increased market demand for energy efficient lighting products has also been stimulated by performance based contracting programs offered by energy service companies.
Accordingly, there is a need for improved facility lighting systems. The method and systems should provide an incentive for facility owners to use the improved lighting systems. Thus, the method and system of the preferred embodiments may provide for energy monitoring and maintenance of lighting systems at reduced costs to the facility owner.
BRIEF SUMMARY The present invention is defined by the following claims, and nothing in this section should be taken as a limitation on those claims. By way of introduction, the preferred embodiment described below includes a method and system for servicing, monitoring and maintaining lighting systems.
A first aspect is described for charging a fee to an end user where a service company upgrades and services a lighting system of the end user's facility. To determine the fee, an original power consumption of the facility is determined before the lighting system is retrofitted \\ ith at least one power savings device Thereafter, the lighting system is retro-fitted with the at least one power saving device Then, a new power consumption \ alue is measured Finally, the fee is charged to the end user, such that the fee is a function of a difference between the original power consumption and the new powei consumption.
A second aspect is described for monitoring energy consumption of a lighting system Power consumption of the lighting system is controlled with a lighting control unit connected with the lighting system. The lighting control unit collects power consumption data and transfers the power consumption data via a data transfer line to a control center The power consumption data is received at a server located at the control center The received power consumption data may then be used to calculate the fee charged to the customer
A third aspect is descnbed foi maintaining a lighting system which includes lighting cii cuiti y At least one monitor monitors the lighting cn cuitry of at least one customer and produces at least one alarm signal as a function of the occurrence of a system fault. A data transfer line transfers the alarm signal to a control center. A server receives the alarm signal at the control center, and at least one operator coordinates service to the lighting circuitry when the alarm signal indicates that a fault exists with the lighting system.
BRIEF DESCRIPTION OF THE DRAWINGS
Other features and advantages of the invention will be apparent to those skilled in the art with reference to the detailed description and the drawings, of which: FIG. 1 is a block diagram showing one embodiment of exemplary costs to a facility before utilization of the service program;
FIG. 2 is a block diagram showing one preferred embodiment of exemplary costs to a facility after utilization of the service program;
FIG. 3 is a block diagram showing one preferred embodiment of a lighting monitoring system;
FIGS. 4A-4D are detailed wiring schematics showing one preferred embodiment for wiring the lighting monitoring system shown in FIG. 3;
FIG. 5 is a flow chart representing one preferred embodiment on the lighting system service program; FIGS. 6A-6F show one preferred embodiment of exemplary lighting system audit sheets for use before the lighting system is operated in a power savings mode;
FIGS. 6G-6I show one preferred embodiment of exemplary lighting system audit sheets for use after the lighting system is operated in a power savings mode; and
FIG. 7 is a block diagram showing one preferred embodiment of lighting system maintenance. TABLE OF ACRONYMS
The following table aids the reader in determining the meaning of the several acronyms used to describe the embodiments:
C/T = current transformer. HID = high intensity discharge.
I/O = input/output.
ISDN = integrated services digital network.
ISP = internet service provider.
Kwh = kilowatt hours. LCU = lighting control unit.
PC = personal computer.
THD = total harmonic distortion.
UPS = uninterrupted power source.
DETAILED DESCRIPTION OF THE PRESENTLY PREFERRED EMBODIMENTS
To preserve the environment by reducing energy consumption, the below described embodiments utilize 1 ) a lighting monitoring system and method. 2) a service program system and method, and 3) a lighting maintenance system and method for energy consuming facilities As used herein, facilities include office buildings, warehouse buildings, banks, schools, federal and state buildings, private residences, and others. The three aspects of the pieferred embodiments may be used separately or together.
Referring to the drawings, and particularly FIG. 1, a typical lighting system includes at least one ballast 4 and lighting fixture 5. The lighting fixture 5 includes a lamp 6, powered from an end user panel 7 which connects with an electric utility 8. The electric utility 8 uses, for example, an electric utility meter 9 to monitor the end user's power consumption to determine an amount the end user should be charged
Referring now to FIG 2, the lighting system is modified according to the preferred embodiments to include a lighting control unit (LCU) 10 A preferred LCU is an ULTRAWATT power savings unit as described in commonly owned patents to Walker, U.S. Patent No. 5,754,036 and Bangerter 5,583,423, the disclosures of which are incorporated herein by reference. Those skilled in the art will appreciate that other equipment light produces energy reduction may be used, such as other electronically controlled power reduction devices, transformers, switch based power reducers or dimmer switches. Of course, with dimmer switches, unlike with the ULTRAWATT power savings unit, high lighting quality may not be maintained.
The preferred LCU is utilized to regulate alternating current (AC) power to a wide range of complex capacitive and inductive loads to provide reduction in power consumption and may also provide a leading or lagging power factor. The LCU adjustable for a wide range of loads and may reduce power consumption by 25 percent or more in lighting loads while producing minimal reduction in light output. Alternatively, the LCU implements a predetermined energy reduction. The LCU uses a mam switch which is initially turned off slightly in advance of the load current zero crossing. The turn-off time is advanced gradually to reduce power to a target level, and optionally a load phase angle is measured and maintained to control the power savings iatio This in combination with a capacitor bank or parallel capacitor allows power reduction in a low noise fashion The LCU 10 sends signals to a control center 12, for example, relating to power consumption, via a communication poit These signals allow the control center 12 to diagnose the operation of the lighting system and to monitor power consumption. The modified system may include current transformers (C/T's) 14 with power monitoring capabilities. An exemplary C/T unit is Model Number Hawkeye 8036 manufactured by Veπs Industries (Square D), but other C/Ts may be used. The unit includes three C/T's, and at least one of the C/T's contains power monitor circuitry for logging energy data, such as, Amperage, Voltage, power and Kwh In alternative embodiments, the LCU 10 performs the consumption and/or fault monitoring Referring to FIG 3, another preferred embodiment of the modified lighting system is shown according to the prefeπ ed embodiments The C/T's 14 preferably connect in daisy chain fashion with an input/output (I/O) card 16. Preferably, one C/T 14 is utilized for each phase of the electrical system. An exemplary I/O card is manufactured by Veπs Industries, but other I/O cards may be used. The I O card 16 connects with the LCU's communication port. For example, the communications port is a standard 15-pin connector which is rated for nominal 5 Volt, 10 milliamp dry contact operation. Other communication ports may be used. The I/O card 16 includes a protocol platform so that a device, such as the E-server 18, may read the signals sent via the communications port of the LCU 10. Preferably, the protocol platform identifies each LCU 10 with a unique address so that an operator can determine from which LCU 10 a signal originated
The I/O card 16 integrated at least one LCU 10 with an E-server unit 18 An exemplary E-Server unit 18 is Model Number Series H8800 manufactured by Veπs Industries Other communication devices may be used, such as personal computers, processors, or general servers. The E-Server 18 is an energy information server which contains an onboard converter, a microprocessor and a modem The E-Server 18 preferably includes software that is configurable so that the E-Server may adapt to different lighting system configurations, but may be hard wired The E-Server 18 logs energy information, like Kwh usage of the lighting system, and signals, like alarm signals, from the LCU 10, and automatically transfers this information, for example, via e-mail. Those skilled in the art will appreciate that the E-Server can send messages to the control center 12 using other methods such as via a telephone line with a modem, via a Tl line, or by cable. Optionally, the E-Server 18 connects with a first uninterrupted power source (UPS) 20 for continuous operation in the case of a power failure. The UPS 20 allows operators at the control center 12 to communicate with the E-Server 18 to diagnose alarms during power failure An internet service provider (ISP) 22 connects with the E-Server 18 The ISP 22 allow s operators at the control center 12 to connect w ith any LCU 10 The ISP 22 also allows messages to be sent from the E-Seiver 18 to the control centei 12 from anywheie in a iegion oi globally A domain name 24 is preferably set-up, for example, ULTRAWATT-LINK.com, to allow the control center 12 to receive the messages from the E-Server 18 and other E-servers.
Optionally, a concentrator 26 connects the ISP 22 with the control center 12 via an integrated services digital network (ISDN) high speed dataJine or other data transfer mechanism. The concentrator 26 allows multiple computers to connect with and simultaneously run from a single ISDN line. Other communication configurations may be used such as using multiple dedicated lines and modems, Tl or cable. The ISDN transmits data digitally and preferably provides two simultaneous connections over a single line. In addition, multiple devices may attach to the line in a network fashion. Typically, the ISP 22 provides the concentrator 26 which houses a high speed ISDN Modem expansion card. Preferably, the concentrator 26 connects with a second UPS 28.
The concentrator 26, ISP 22, LCU 10, C/T 14 or I/O 16 connects with a network server 30 at the control center 12. Those skilled in the art will appreciate that the concentrator 26 may also be located away from the control center 12. The network server 30 facilitates message delivery to a server processor 32, for example, a personal computer (PC), and transfers logging data between the PCs and an accounting department, described below. The network server 28 preferably connects with an internal backup 34 and a third UPS 36 with a generator 38, to safeguard against the loss and corruption of received consumption and alarm data. The server processor 32 is located at the control center 12 and is preferably a dedicated stand alone PC with a live connection to the network server 30. The server processor 32 automatically sends alarm messages, for example, via e-mail, to at least one customer processor 40a-40c, for example, a PC. Preferably, each end user account, per facility, has a dedicated customer processor 40a-40c which performs the logging of energy information for service program fee charging purposes, as discussed above, and receiving alarm messages for the lighting system maintenance program, as discussed below. Each customer processor 40a- 40c is networked via the network server 30 and connects with dedicated accounting processors 42a-42c, for example, PCs, one for each monitored facility. for ease of transferring logged alarm signals and energy consumption information. The accounting processors 42a-42c are used to determine charged fees under the service program, as discussed below. Dedicated processors or PCs are used per facility for convenience purposes, but one PC could be used for all facilities. Preferably, all processors are interconnected by the network aaad have constant connection to the Internet through ISP 22 for receiving information. In addition, the server processor 32 connects with a redundant server processor 44 and the customer dedicated processors 40a-40c connect with data backups 46a-46c and UPSs 48a-48c. Non-redundant or different redundant systems may be used. Referring now to FIGS. 4A-4D, exemplary detailed wiring schematics are shown for differing lighting monitoring systems. Other electrical systems may use the method and systems of the preferred embodiments. Referring to FIG. 4A, a 277/480 Volt system is shown A lighting load 50, such as HID fluorescent and incandescent, of the lighting system and electrical panel 52 are shown connected with the LCU 10, the I/O 16, the C/T's 14 and the E-Server 18. The LCU 10 connects in series with the load 50. One C/T 14 is used per phase for each load 50 The C/Ts 14 preferably snap fit around a line 54 from the lighting load 50 As discussed above, the C/T 14 connects with the I/O 16 which connects with C/Ts from other panels and the E-server 18 is a daisy wheel configuration The I/O 16 connects to the E-server 18 through a socket connector, for example, a RS-45 connector. To obtain the 120 Volts or other voltages necessary to power the E- server 18 or other component, a transformer 56 is used. Other power sources may be provided. Referring to FIG. 4B, an exemplary wiring diagram is shown for a 120/277 Volt system. Referring to FIG. 4C, a wiring diagram is shown for a 208 Volt system. Referring to FIG. 4D, a wiring diagram is shown for a 240 Volt system. Other wiring arrangements are possible for each system or other voltage systems
Turning now to the service program of the preferred embodiments, one or more of the above-described monitoring systems or another system are used to ide power reduction and/or energy charge savings. The LCU 10 is preferably
Figure imgf000010_0001
ided by at least one membci of an alliance of service pioviders The service providers also preferably include an Engineering Firm/Project Manager, Construction Manager/Contractor, a wholesale fixture company, and/or a lighting service company. Those skilled in the art should appreciate that that the alliance may be any combination of these providers and may include other types of providers as well. Since the LCU 10 provides for power reduction and thus costs savings to facilities, the LCU 10 is preferably used with the service program to attract potential customers, for example, owners or managers of facilities with lighting systems, i.e., end users.
The service providers use at least three basic avenues to introduce the service program to potential customers. First, the service providers market the alliance to potential customers. Through the years, alliance members have developed a customer base to sell products and services. Alliance members have numerous accounts that are dealt with on a regular basis and existing contracts with these customers. To introduce the service program to potential customers, marketing personnel of the alliance members are preferably trained to identify potential customers and present the service program to such customers. Second, the alliance preferably has an internal marketing force to introduce the service program to potential customers. The potential customers are selected as a result of leads generated by support groups that the alliance has developed or other leads. The support groups preferably have strong contacts at the highest levels of major corporations to reduce the time normally required to determine and reach the correct upper management personal at the highest levels of the potential customer's corporate structure. Third, as projects are completed, the alliance preferably requests testimonials from satisfied customers to explain their satisfaction with the results of the service program for their particular facilities.
These testimonials may be in the form of videos, letters of recommendation and verbal recommendations.
Thereafter, potential customers are preferably reviewed to determine whether the customer's financial position is solid and to determine whether the customer's facilities fall within the guidelines of the service program Alliance personnel prc-quahfy the potential customer by gathci ing general information about the potential customer's facilities. For example, hours of operation, kilowatt hours (Kwh) rates, and existing lighting system component information is obtained. Preferably, a questionnaire provides general information about the existing lighting systems in all or a subset of the customer's facilities. Gathered information also includes whether operating hours vary in different areas of the facility. The audit reflects the operating hours by area and whether or not the area has air conditioning. If lights are switched on/off, the switching method is verified. Switching methods include energy management system, time clock, photocell, and occupancy sensors. If some fixtures are switched by wall switches, the average hours of operation for these fixtures is noted. These fixtures may be excluded from the base program and may be included under separate negotiations with the customer. Alternatively, such fixtures are included in the program
The type and number of fixtures and lamps, their wattage and voltage, and the type of reflectors, if any are identified. Broken and discolored lenses are noted, as is the type of bell of the fixture. The approximate age of ballasts is also recorded for use during the design phase of the project Any obvious code violations are noted, and new lighting control equipment is considered for any lighting circuits to achieve additional energy savings. Gathered information is then used to run a computer model, for example, to determine the financial feasibility of the project for the alliance, i.e., the margin of profit. The higher the Kwh costs, for example, greater than seven cents, and the longer the operating hours, the greater the potential for profit. In addition, particular applications, for example warehouses, distribution centers, retail, and industrial buildings have a greater potential for using high wattage lamps than residential buildings, and thus have the potential for higher energy consumption. After reviewing the feasibility of the project, including possible fixture retrofitting or replacement, the alliance either accepts or rejects the project.
Once the project is accepted, the alliance introduces the service program to the customer and the customer receives a copy of an agreement. According to the preferred embodiments, the
Figure imgf000012_0001
ice piogiam directly geneiates at least one stream of revenue for the service providers, i.e., the alliance. The revenue is based on cost avoidance funds as determined by costs to the facility both before and after the facility is upgraded. The facility is typically upgraded with, for example, the LCU, energy efficient lamps and lighting fixtures, new ballasts, energy meters, and/or communications hardware and software. The service providess typically install the LCU and upgrade the facilities lighting system at no cost. Additional changes may be provided. Thereafter, the service providers gain a stream of revenue in at least one or two ways described below. The upgrades provide for more energy efficient facilities which m turn reduces facility energy costs and is better for the environment.
A first source of revenue comprises a fee based on savings in energy costs. Referring FIG. 5, to determine a fee charged by the service provider, the electric utility cost for the original lighting system is determined to create a baseline figure (block 70). For example, the original power consumption may be determined using the book value of the existing fixtures, as determined within the industry.
Thereafter, the lighting system is retrofitted with at least one power savings device (block 72) and optionally other electrical equipment After the power savings device is installed, new power consumption data is measured (block 74). Finally, a fee is charged as a function of the difference between the power consumption of the original lighting system and the power consumption for the new lighting system (block 76) Preferably, the service provider maintains the lighting system at no, or a reduced, cost to the end user
More particularly, the cost for the original lighting system is preferably determined from the Kwh usage of the original system as measured by the service provider and physically verified by the end user. Referring again to FIG. 1 , exemplary lighting system costs are shown for an original lighting system, i.e.. prior to operation in the power savings mode As an example, electric utility costs are one dollar and end user maintenance costs total twenty cents, ten cents for ballast maintenance, two cents for light fixture maintenance, and eight cents for spot re-lamp. Also referring to FIGS. 6A-6I, exemplary sheets are shown for collecting information relating to total cost figures that are determined before and after the lighting system is operating in the power savings mode. The described sheets are for example purposes only and other sheet formats may be used. Referring to FIG. 6A, an exemplary first sheet contains general information about the end user including the address of the end user's facility. Preferably, the audit is performed by an alliance member such as the Engineering Firm/Project Manager and/or Construction Manager/Contractor personnel. Referring to FIGS. 6B-6D, measurements are taken before the LCU or other power reduction equipment are installed. Using a meter, measurements are made for mam panel feeders and all neutrals. All total harmonic distortion (THD) readings are taken from the Amp scale of the meter. Preferably, to allow for burn in time, new fluorescent lamps are operated for a minimum of one hour and high intensity discharge (HID) lamps are operated for a minimum of seventy two hours prior to recording any power measurements. Referring to FIGS. 6C and 6D, measurements are taken of the circuits before and after the circuits are retrofitted.
Referring to FIGS. 6E and 6F, measurements are taken after the LCU is installed and the LCU is operating in the power savings mode off. Operation m this bypass mode allows the fixtures to stabilize, preferably for fifteen to thirty minutes, and the neutral lines are verified to meet code. Referring to FIGS 6G-6I, the LCU is switched to the savings mode and the fixtures are allowed to stabilize for about fifteen to thirty minutes. Thereafter, lighting circuit measurements are recorded at the panel for the circuits connected to the LCU units.
Light level recordings are also performed before the retrofit and LCU units are installed and after the retrofit is completed and the LCU units are installed to allow for a light level comparison. Light level readings are preferably performed using the same light meter and at the same points in the facility Also, the leadings preferably occur without interference from outside light. Pictures may be taken of the aieas where the light level readings are taken. The light level before and after the lighting system is operating in the power savings mode is preferably w ithin a ccitain percentage as negotiated by the end user and the seivice pi ouder Referrmg again to FIG 2, exemplary costs to the facility after utilization of the service program are shown according to a preferred embodiment. The fee is charged to the end user, such that the fee is a function of a difference between the original power consumption and the new power consumption For example, the fee from the end user to the service company is forty cents where the original electric utility cost was one dollar (see FIG 1) and the new electric utility cost is sixty cents. Notice that the end user has received an upgraded system with no out of pocket expenses and saves twenty cents on maintenance costs (see FIG 1) where maintenance is provided without cost Alternatively, the fee is the difference between the original power consumption and the new power consumption multiplied by actual hours of operation, multiplied by a power rate, and multiplied by an air conditioning reduction factor The hours of operation, the powei rate and the air conditioning reduction factor may be determined through negotiation Other calculations may be used to suit the specific requirements of the end user and the service provider, such as a fee comprising only a portion of the reduction
Preferably, the direct fee is charged w ith a periodic billing cycle, for example, every 28 days, to allow for the same number of Saturday and Sundays in each cycle Instead of charging a fixed fee, the fee is preferably determined at the end of each billing cycle according to actual power consumption, the data of which is logged according to the method and system described above, for that billing period Thus, the end user pays a fee as a function of the power savings for that particular billing period The fee is determined automatically at the control center based on information communicated from the end user's facility Alternatively, those skilled in the art will appreciate that a fixed fee may be used
Accordingly, careful monitoring and maintenance of the power consumption is accomplished to insure that the power saving devices continue to function properly If power consumption increases, the service providei may dispatch maintenance personnel, and coπective measures are automatically taken, as descnbed with icgaid to the lighting system maintenance descnbed below The service program of the preferred embodiments may also generate an indirect stream of revenue in the form of additional products and services from the service provider. Funds normally spent on lighting costs may be redirected into equipment and services from the service providers business. In turn, the service provider's gross sales are increased.
Referring now to lighting system maintenance as shown in FIG. 7, as stated above, the E-Server 18 sends alarm signals 56 from the LCU 10 or C/T 14 located at one or more facilities 58 to the control center 12. The information may also be communicated to other control centers of other locations. Each control center 12 may be operated by one or more of engineering, maintenance and billing companies. The alarm signals 56 are preferable sent with power consumption data 60, discussed above, via a communications device such as the Internet 22. The power consumption data 60 is logged in an energy data archive 62 and the alarm signals 56 are logged in a fault data archive 64, preferably located at the control center 12. The alarm signals may be in the form of different color lights located on the LCU 10 that preferably correspond to the operating status of the LCU 10 and include, for example, 1) the LCU is in bypass mode, I e., not energy savings mode, 2) the LCU is not functioning, l e , a hard fault exists in the unit, and 3) the LCU is operating in power savings mode. Those skilled in the art will appreciate that other alarm signals may be used, such as signals indicating an uncharacteristic change in consumption (e.g., reduction or increase indicating fixture, lamp or ballast malfunction).
At the control center 12, an operator diagnoses the alarm signals to determine if there is a fault Alternatively, a computer program is run to analyze the alarm signals and display a message corresponding to the fault. If there is a fault, service personnel 66 are automatically dispatched to facility with information regarding, for example, the date and time the fault occurred, the facility's location, the LCU 10 that sent the fault data, the location and type of the lamp and ballast, the panel location and circuit number, and/or the fixture height. Additionally, in the case of the alarm, the operator may immediately call the end user to diagnose the k\V, Ampciagc, and any othei signals to determine whethei oi not service personnel should be dispatched. Alternative to waiting, preferably the operator informs the end user that the service provider is aware of the alarm. Other coordinating activities or a sub-set of the above-described coordinating activities may be performed. It is to be understood that changes and modifications to the embodiments described above will be apparent to those skilled in the art, and are contemplated. It is therefore intended that the foregoing detailed description be regarded as illustrative rather than limiting, and that it be understood that it is the following claims, including all equivalents, that are intended to define the spirit and scope of this invention.

Claims

WHAT IS CLAIMED IS:
1. A method for charging a fee to an end user where a service company services a lighting system of the end user's facility, the method comprising: a) determining an original power consumption of the facility before the lighting system is retrofitted with at least one power savings device; b) retrofitting the lighting system with said at least one power saving device; c) measuring a new power consumption of the facility after retrofitting the lighting system with said at least one power saving device; and d) charging the fee to the end user, such that the fee is a function of a difference between said original power consumption and said new power consumption.
2. The method of claim 1, wherein said fee comprises the difference between said original power consumption and said new power consumption multiplied by actual hours of operation, multiplied by a power rate, and multiplied by an air conditioning reduction factor.
3. The method of claim 2, wherein said power rate is determined through negotiation.
4. The method of claim 2, wherein said air conditioning reduction factor is determined through negotiation.
5. The method of claim 1, wherein said charging of the fee occurs according to a periodic billing cycle.
6. The method of claim 5, wherein said billing cycle occurs every 28 days.
7. The method of claim 5, wherein said fee is determined at the end of each billing cycle according to actual power consumption.
8. The method of claim 1, wherein a) includes preparing a pre-retrofit consumption report.
9. The method of claim 1, wherein c) includes preparing a post-retrofit consumption report.
10. The method of claim 1, wherein d) includes maintaining the hghting system at no fee.
1 1. The method of claim 1 , further comprising: monitoring the lighting circuitry of at least one customer; producing at least one alarm signal as a function of the occurrence of a system fault; transferring said alarm signal via a data transfer line to a control center; receiving said alarm signal at a server located at said control center; and coordinating service to the lighting circuitry when said alarm signal indicates that a fault exists with the lighting system
12. The method of claim 1 1 , said control center is located remote from the lighting system.
13. A system for charging a fee to an end user where a service company services a lighting system of the end user's facility, comprising: at least one power savings device; at least one power meter such that said at least one meter measures a new power consumption of the facility after the lighting system is retrofitted with said at least one power savings device; and a processor that receives original power consumption and said new power consumption as inputs and calculates the fee to be charged to the end user as a function of a difference between said original power consumption and said new power consumption.
14. The system of claim 13, wherein said fee comprises the difference between said original power consumption and said new power consumption multiplied by actual hours of operation, multiplied by a power rate, and multiplied by an air conditioning reduction factor.
15. The system of claim 13, wherein said charging of the fee occurs according to a periodic billing cycle.
16. The system of claim 15, wherein said billing cycle occurs every 28 days.
17. The system of claim 15, wherein said fee is determined at the end of each billing cycle according to actual power consumption.
18. A method for monitoring energy consumption of a lighting system, the method comprising: a) controlling power consumption of the lighting system with a lighting control unit connected with the lighting system; b) producing power consumption data; c) transferring said power consumption data via a data transfer line to a control center; and d) receiving said power consumption data at a server located at said control center.
19. The method of claim 18, wherein c) comprises transferring via electronic-mail.
20. The method of claim 18, wherein c) comprises transferring via an internet service provider.
21. The method of claim 18, further comprising: e) determining a total energy usage; and f) calculating a fee as a function of said total energy usage.
22. The method of claim 21 , further comprising retrofitting the lighting system with a power savings device, such that said fee is calculated as a function of the difference between said total energy usage as measured before and after said power savings device is retrofitted to the lighting system.
23. The method of claim 18, wherein b) comprises producing at least one alarm signal as a function of the occurrence of a system fault, c) comprises transferring said alarm signal via a data transfer line to said control center, and d) comprises receiving said alarm signal at a server located at said control center.
24. The method of claim 23, wherein c) further comprises transferring data from said server to separate accounting processors for each of said first facility location and said second facility location.
25. The method of claim 18, further comprising. performing a) through c) at a first facility location; and performing a) through c) at a second facility location, wherein d) comprises receiving said power consumption data at said server located at said control center for both said first facility location and said second facility location.
26. A system for monitoring energy consumption of a lighting system, the system comprising: a) a lighting control unit connected with the lighting system to control power consumption of the lighting system; b) a power meter to produce power consumption data; c) a data transfer line to transfer said power consumption data to said control center; and d) at least one server located at said control center to receive said power consumption data
27. The system of claim 26, wherein c) is performed via electronic- mail.
28. The system of claim 26, further comprising a processor, such that a total energy usage is determined and said processor calculates a fee charged by a service provider to an end user as a function of said total energy usage.
29. The system of claim 28, wherein said processor calculates said fee as a function of the difference between said total energy usage as measured before and after a power savings device is added to the lighting system.
30. The system of claim 26, wherein said lighting control unit produces at least one alarm signal as a function of the occurrence of a system fault, c) transfers said alarm signal to said control center, and d) receives said power consumption data.
31. The system of claim 26, further comprising: a) through c) located at a first facility location; and a) through c) located at a second facility location, wherein d) receives said power consumption data at said control center for both said first facility location and said second facility location.
32. The system of claim 31 , furthering comprising separate accounting processors for each of said first facility location and said second facility location.
33. A method for maintaining a lighting system which includes lighting circuitry, the method comprising: monitoring the lighting circuitry of at least one customer; producing at least one alarm signal as a function of the occurrence of a system fault; transferring said alarm signal via a data transfer line to a control center; receivmg said alarm signal at a server located at said control center; and coordinating service to the lighting circuitry when said alarm signal indicates that a fault exists with the lighting system.
34. The method of claim 33 wherein said control center is located remote from said lighting circuits.
35. The method of claim 33, further including transferring said alarm signal to said control center via electronic-mail.
36. The method of claim 33, further comprising: determining a total energy usage of the lighting system; and calculating a fee a function of said total energy usage.
37. The method of claim 36, further comprising retrofitting the lighting system with a power savings device, such that said fee is calculated as a function of the difference between said total energy usage as measured before and after said power savings device is retrofitted to the lighting system.
38. A system for maintaining a lighting system which includes lighting circuitry, the method comprising: at least one monitor to monitor the lighting circuitry of at least one customer and to produce at least one alarm signal as a function of the occurrence of a system fault; a data transfer line to transfer said alarm signal line to a control center; a server to receive said alarm signal at said control center; and at least one operator to coordinate service to the lighting circuitry when said alarm signal indicates that a fault exists with the lighting system.
39 The system of claim 38 wherein said control center is located remote from said lighting circuits
40. The system of claim 39, wherein said alarm signal is transferred to said control center via electronic-mail.
41. The system of claim 39, wherein said alarm signal is transferred between said facility and said control center via an internet service provider.
42. The system of claim 38, further comprising a processor to determine a total energy usage of the lighting system and calculate a fee a function of said total energy usage.
43. The system of claim 42, wherein said processor calculates the fee as a function of the difference between said total energy usage as measured before and after said power savings device is retrofitted to the lighting system.
PCT/US2000/042078 1999-12-03 2000-11-10 System and method for monitoring lighting systems WO2001043039A1 (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
AU45049/01A AU4504901A (en) 1999-12-03 2000-11-10 System and method for monitoring lighting systems
CA002392592A CA2392592A1 (en) 1999-12-03 2000-11-10 System and method for monitoring lighting systems
EP00992492A EP1234269A1 (en) 1999-12-03 2000-11-10 System and method for monitoring lighting systems
MXPA02005507A MXPA02005507A (en) 1999-12-03 2000-11-10 System and method for monitoring lighting systems.

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US09/454,775 1999-12-03
US09/454,775 US6535859B1 (en) 1999-12-03 1999-12-03 System and method for monitoring lighting systems

Publications (2)

Publication Number Publication Date
WO2001043039A1 true WO2001043039A1 (en) 2001-06-14
WO2001043039A9 WO2001043039A9 (en) 2002-08-15

Family

ID=23806032

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/US2000/042078 WO2001043039A1 (en) 1999-12-03 2000-11-10 System and method for monitoring lighting systems

Country Status (6)

Country Link
US (2) US6535859B1 (en)
EP (1) EP1234269A1 (en)
AU (1) AU4504901A (en)
CA (1) CA2392592A1 (en)
MX (1) MXPA02005507A (en)
WO (1) WO2001043039A1 (en)

Families Citing this family (61)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1085636A3 (en) * 1999-09-13 2002-12-18 Hitachi, Ltd. Energy saving service offering method and apparatus therefor
US7181517B1 (en) * 2000-06-02 2007-02-20 Astec International Limited Browser-enabled remote user interface for telecommunications power system
JP4523124B2 (en) * 2000-07-14 2010-08-11 日立アプライアンス株式会社 Energy service business system
US7159054B2 (en) * 2000-11-29 2007-01-02 Abb T&D Technology Ltd. System and method for digital protection and control device for a power distribution network
JP4238483B2 (en) * 2001-03-12 2009-03-18 株式会社日立製作所 Electronics rental system
US6836083B2 (en) * 2001-03-23 2004-12-28 Matsushita Electric Industrial Co., Ltd. Illumination light supply system
US6892546B2 (en) * 2001-05-03 2005-05-17 Emerson Retail Services, Inc. System for remote refrigeration monitoring and diagnostics
US6668240B2 (en) 2001-05-03 2003-12-23 Emerson Retail Services Inc. Food quality and safety model for refrigerated food
US7430512B2 (en) * 2001-06-25 2008-09-30 Koninklijke Philips Electronics N.V. Method and system for selling lighting solutions
US6995685B2 (en) * 2001-09-25 2006-02-07 Landis+Gyr, Inc. Utility meter power arrangements and methods
EP1367685A1 (en) * 2002-05-31 2003-12-03 Whirlpool Corporation Electronic system for power consumption management of appliances
US6889173B2 (en) * 2002-10-31 2005-05-03 Emerson Retail Services Inc. System for monitoring optimal equipment operating parameters
ES2538484T3 (en) * 2003-01-21 2015-06-22 Whirlpool Corporation A process to manage and reduce the power demand of household appliances and their components, and the system that uses said process
US20040158541A1 (en) * 2003-02-06 2004-08-12 Ultrawatt Energy Systems, Inc. Power savings financial compensation control method and system
DE10334397A1 (en) * 2003-07-28 2005-03-10 Siemens Ag Reducing energy costs in an industrially operated facility e.g. paper and pulp production involves providing for energy flows of the facility, from its purchase, its conversion in secondary process and its consumption in core process
WO2005012464A2 (en) * 2003-07-28 2005-02-10 Siemens Aktiengesellschaft Method and system for reducing energy costs in an industrially operated facility
US7412842B2 (en) 2004-04-27 2008-08-19 Emerson Climate Technologies, Inc. Compressor diagnostic and protection system
US20110237664A1 (en) * 2004-06-07 2011-09-29 Dalton James T Selective androgen receptor modulators for treating diabetes
US7275377B2 (en) 2004-08-11 2007-10-02 Lawrence Kates Method and apparatus for monitoring refrigerant-cycle systems
US7623042B2 (en) * 2005-03-14 2009-11-24 Regents Of The University Of California Wireless network control for building lighting system
US7779099B2 (en) 2006-03-16 2010-08-17 Us Beverage Net Inc. Distributed intelligent systems and methods therefor
US8590325B2 (en) 2006-07-19 2013-11-26 Emerson Climate Technologies, Inc. Protection and diagnostic module for a refrigeration system
US20080027883A1 (en) * 2006-07-25 2008-01-31 Earth Utility Pty Ltd Utilities provision system and method
US20080216494A1 (en) 2006-09-07 2008-09-11 Pham Hung M Compressor data module
US7865252B2 (en) * 2007-01-26 2011-01-04 Autani Corporation Upgradeable automation devices, systems, architectures, and methods
US8450670B2 (en) 2007-06-29 2013-05-28 Orion Energy Systems, Inc. Lighting fixture control systems and methods
US8376600B2 (en) 2007-06-29 2013-02-19 Orion Energy Systems, Inc. Lighting device
US8344665B2 (en) * 2008-03-27 2013-01-01 Orion Energy Systems, Inc. System and method for controlling lighting
US8406937B2 (en) 2008-03-27 2013-03-26 Orion Energy Systems, Inc. System and method for reducing peak and off-peak electricity demand by monitoring, controlling and metering high intensity fluorescent lighting in a facility
US8626643B2 (en) * 2007-05-03 2014-01-07 Orion Energy Systems, Inc. System and method for a utility financial model
US8884203B2 (en) 2007-05-03 2014-11-11 Orion Energy Systems, Inc. Lighting systems and methods for displacing energy consumption using natural lighting fixtures
US8866582B2 (en) * 2009-09-04 2014-10-21 Orion Energy Systems, Inc. Outdoor fluorescent lighting fixtures and related systems and methods
US8476565B2 (en) 2007-06-29 2013-07-02 Orion Energy Systems, Inc. Outdoor lighting fixtures control systems and methods
US8586902B2 (en) 2007-06-29 2013-11-19 Orion Energy Systems, Inc. Outdoor lighting fixture and camera systems
US8445826B2 (en) 2007-06-29 2013-05-21 Orion Energy Systems, Inc. Outdoor lighting systems and methods for wireless network communications
US8729446B2 (en) 2007-06-29 2014-05-20 Orion Energy Systems, Inc. Outdoor lighting fixtures for controlling traffic lights
US20090037142A1 (en) 2007-07-30 2009-02-05 Lawrence Kates Portable method and apparatus for monitoring refrigerant-cycle systems
US9140728B2 (en) 2007-11-02 2015-09-22 Emerson Climate Technologies, Inc. Compressor sensor module
US8447993B2 (en) * 2008-01-23 2013-05-21 Palo Alto Research Center Incorporated Integrated energy savings and business operations in data centers
US8364325B2 (en) * 2008-06-02 2013-01-29 Adura Technologies, Inc. Intelligence in distributed lighting control devices
US20100114340A1 (en) * 2008-06-02 2010-05-06 Charles Huizenga Automatic provisioning of wireless control systems
US8275471B2 (en) 2009-11-06 2012-09-25 Adura Technologies, Inc. Sensor interface for wireless control
US7839017B2 (en) * 2009-03-02 2010-11-23 Adura Technologies, Inc. Systems and methods for remotely controlling an electrical load
US20100200191A1 (en) * 2009-02-11 2010-08-12 American Ecothermal, Inc. Geothermal heating and cooling system and method
US20100305998A1 (en) * 2009-04-27 2010-12-02 Empowered Solutions, Inc Evaluating Energy Saving Improvements
AU2010253739B2 (en) 2009-05-29 2015-07-16 Emerson Climate Technologies Retail Solutions, Inc. System and method for monitoring and evaluating equipment operating parameter modifications
US20110119113A1 (en) * 2010-08-20 2011-05-19 Hara Software, Inc. Best Practices for Emission and Energy Management
CN105910247B (en) 2011-02-28 2018-12-14 艾默生电气公司 The monitoring and diagnosis of the HVAC of house solution
US20130125499A1 (en) * 2011-05-19 2013-05-23 Hermmannus Gerhardus Maria SILDERHUIS Method of exploiting lighting assemblies in professional architectural structures
WO2012174141A2 (en) * 2011-06-13 2012-12-20 Gridpoint, Inc. Valuating energy management systems
US9192019B2 (en) 2011-12-07 2015-11-17 Abl Ip Holding Llc System for and method of commissioning lighting devices
US8964338B2 (en) 2012-01-11 2015-02-24 Emerson Climate Technologies, Inc. System and method for compressor motor protection
WO2013155530A1 (en) * 2012-04-13 2013-10-17 Aeon Labs Electrical device with low voltage output and low voltage touch panel
GB2504971A (en) * 2012-08-15 2014-02-19 Univ Warwick Calculating the reduction in power consumption or energy usage provided by a voltage optimizer
US9310439B2 (en) 2012-09-25 2016-04-12 Emerson Climate Technologies, Inc. Compressor having a control and diagnostic module
US9551504B2 (en) 2013-03-15 2017-01-24 Emerson Electric Co. HVAC system remote monitoring and diagnosis
US9803902B2 (en) 2013-03-15 2017-10-31 Emerson Climate Technologies, Inc. System for refrigerant charge verification using two condenser coil temperatures
WO2014144446A1 (en) 2013-03-15 2014-09-18 Emerson Electric Co. Hvac system remote monitoring and diagnosis
CN106030221B (en) 2013-04-05 2018-12-07 艾默生环境优化技术有限公司 Heat pump system with refrigerant charging diagnostic function
US10304145B2 (en) * 2015-05-15 2019-05-28 Linkbee, Llc System and method to dynamically allocate energy savings amounts for remote energy efficient light fixture networks
US20190012750A1 (en) * 2016-01-12 2019-01-10 Philips Lighting Holding B.V. Energy performance evaluation method and device

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4333119A (en) * 1980-04-28 1982-06-01 Purex Corporation Power monitor system
US4710751A (en) * 1986-04-24 1987-12-01 Environmental Protection Systems Ground fault monitor circuit
US5301122A (en) * 1992-02-12 1994-04-05 Measuring And Monitoring, Inc. Measuring and monitoring system
US5621654A (en) * 1994-04-15 1997-04-15 Long Island Lighting Company System and method for economic dispatching of electrical power

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2107093B (en) * 1981-09-16 1985-01-30 Walker Crosweller And Company Automatic reading of public utility meters or the like
US5583423A (en) 1993-11-22 1996-12-10 Bangerter; Fred F. Energy saving power control method
US5758331A (en) * 1994-08-15 1998-05-26 Clear With Computers, Inc. Computer-assisted sales system for utilities
US5699276A (en) * 1995-12-15 1997-12-16 Roos; Charles E. Utility meter providing an interface between a digital network and home electronics
US5754036A (en) 1996-07-25 1998-05-19 Lti International, Inc. Energy saving power control system and method
US6262672B1 (en) * 1998-08-14 2001-07-17 General Electric Company Reduced cost automatic meter reading system and method using locally communicating utility meters
US5930773A (en) * 1997-12-17 1999-07-27 Avista Advantage, Inc. Computerized resource accounting methods and systems, computerized utility management methods and systems, multi-user utility management methods and systems, and energy-consumption-based tracking methods and systems
US6327541B1 (en) * 1998-06-30 2001-12-04 Ameren Corporation Electronic energy management system
US6785592B1 (en) * 1999-07-16 2004-08-31 Perot Systems Corporation System and method for energy management

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4333119A (en) * 1980-04-28 1982-06-01 Purex Corporation Power monitor system
US4710751A (en) * 1986-04-24 1987-12-01 Environmental Protection Systems Ground fault monitor circuit
US5301122A (en) * 1992-02-12 1994-04-05 Measuring And Monitoring, Inc. Measuring and monitoring system
US5621654A (en) * 1994-04-15 1997-04-15 Long Island Lighting Company System and method for economic dispatching of electrical power

Also Published As

Publication number Publication date
CA2392592A1 (en) 2001-06-14
EP1234269A1 (en) 2002-08-28
MXPA02005507A (en) 2004-09-10
US6535859B1 (en) 2003-03-18
US20030225640A1 (en) 2003-12-04
WO2001043039A9 (en) 2002-08-15
AU4504901A (en) 2001-06-18

Similar Documents

Publication Publication Date Title
US6535859B1 (en) System and method for monitoring lighting systems
Shirmohammadi et al. Transmission dispatch and congestion management in the emerging energy market structures
Ton et al. DC power for improved data center efficiency
US7627401B2 (en) System and method for remotely regulating the power consumption of an electric appliance
US8396608B2 (en) Computer based energy management
JP4060095B2 (en) Photovoltaic power generation management server, solar power generation management system, solar power generation management method, and machine-readable recording medium recording a program for realizing the method
US20090198384A1 (en) Electronic smart meter enabling demand response and method for demand response
JP2004501599A (en) Method and system for monitoring and controlling energy distribution
US20090234685A1 (en) Renewable energy system maintenance business model
JP2002291162A (en) Distributed generator system, and system and method for power supply therewith
JP2007020260A (en) Power supplying system and power supplying service method
JP2004096906A (en) System and method for power management, cubicle arrangement, measuring apparatus, communication apparatus, distribution board, server for power management
Harper Review of strategies and technologies for demand-side management on isolated mini-grids
US11145010B2 (en) System and method for monitoring use of a lamp
US20030127998A1 (en) Lighting depreciation compensation system and method
JP2012200138A (en) Systems and methods for managing energy distribution network
US20100161146A1 (en) Variable energy pricing in shortage conditions
JP2004282898A (en) Power supply and demand control system
JP2002049723A (en) System and method for diagnosing energy saving
JP5405223B2 (en) Self-generated power operation device for collective housing and self-generated power operation system for collective housing using the device
EP1269385A1 (en) System and method for network implementation and monitoring of systems
Rosenstock Issues in demand-side management programs operated by electric utilities in the United States
Stillesjö Innovative procurement mechanisms for the commercialization of energy-efficient lighting and ventilation products
Louie et al. Solar Lanterns and Solar Home Systems
Moore Energizing customer demand response in California

Legal Events

Date Code Title Description
AK Designated states

Kind code of ref document: A1

Designated state(s): AE AG AL AM AT AU AZ BA BB BG BR BY BZ CA CH CN CR CU CZ DE DK DM DZ EE ES FI GB GD GE GH GM HR HU ID IL IN IS JP KE KG KP KR KZ LC LK LR LS LT LU LV MA MD MG MK MN MW MX MZ NO NZ PL PT RO RU SD SE SG SI SK SL TJ TM TR TT TZ UA UG UZ VN YU ZA ZW

AL Designated countries for regional patents

Kind code of ref document: A1

Designated state(s): GH GM KE LS MW MZ SD SL SZ TZ UG ZW AM AZ BY KG KZ MD RU TJ TM AT BE CH CY DE DK ES FI FR GB GR IE IT LU MC NL PT SE TR BF BJ CF CG CI CM GA GN GW ML MR NE SN TD TG

121 Ep: the epo has been informed by wipo that ep was designated in this application
DFPE Request for preliminary examination filed prior to expiration of 19th month from priority date (pct application filed before 20040101)
WWE Wipo information: entry into national phase

Ref document number: 2000992492

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 2392592

Country of ref document: CA

WWE Wipo information: entry into national phase

Ref document number: PA/a/2002/005507

Country of ref document: MX

COP Corrected version of pamphlet

Free format text: PAGES 1/18-18/18, DRAWINGS, REPLACED BY NEW PAGES 1/18-18/18; DUE TO LATE TRANSMITTAL BY THE RECEIVING OFFICE

WWP Wipo information: published in national office

Ref document number: 2000992492

Country of ref document: EP

REG Reference to national code

Ref country code: DE

Ref legal event code: 8642

WWW Wipo information: withdrawn in national office

Ref document number: 2000992492

Country of ref document: EP