WO2003014849A1 - Prozessleitsystem mit taxierfunktion - Google Patents
Prozessleitsystem mit taxierfunktion Download PDFInfo
- Publication number
- WO2003014849A1 WO2003014849A1 PCT/EP2002/008352 EP0208352W WO03014849A1 WO 2003014849 A1 WO2003014849 A1 WO 2003014849A1 EP 0208352 W EP0208352 W EP 0208352W WO 03014849 A1 WO03014849 A1 WO 03014849A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- process control
- control system
- operations
- computer
- internet
- Prior art date
Links
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM]
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/30—Nc systems
- G05B2219/31—From computer integrated manufacturing till monitoring
- G05B2219/31408—Cost calculation of use of certain machine types
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
Definitions
- the invention relates to a process control system.
- Process control systems are usually developed by a manufacturer, delivered to a customer, installed in a technical system to be controlled and put into operation.
- the process control system consists of hardware and software components, each of which implements at least one process control function of the process control system. The sum of these functions provides the customer with a large number of operating, monitoring and control options for the technical system.
- the customer pays a price for the delivery and possibly for the installation of the process control system, for example an agreed purchase price as a one-time payment, which includes the use of the process control system over its lifespan with all its functions, whereby this price does not take into account the extent to which he actually uses the functions provided and / or how often and / or for what periods of time certain functions are used.
- the customer usually receives a project planning system as part of the process control system, with which he can implement new I&C functions or change the included I&C functions, so that the process control system can be adapted to the changing requirements of the technical system at any time during its operating years.
- This aspect is also not taken into account in the pricing of the process control system, the customer pays a - usually very high - purchase price and can use the components of the process control system supplied to him practically at will without the additional and / or reduced use of the Features of the Process control system in an additional and / or repayment of at least part of the purchase price.
- the customer In a known process control system, the customer usually pays a purchase price for this at the time of delivery
- Process control system which includes a price share for each of the hardware and software components supplied. For the customer at the latest at the time of delivery, a high level of financial commitment is required to acquire a functional process control system with all of its hardware and software components.
- the task therefore arises of specifying a process control system which can be flexibly adapted to the needs of a customer and which, in particular, reduces the aforementioned high initial investment costs, in particular the investment costs for the software components of the process control system and the license payments to be made for this. It is also an object of the invention to provide a process control system which has an architecture which is particularly suitable for overcoming the disadvantages of the prior art mentioned.
- the object is achieved by a process control system which has a computing unit which is capable of determining a remuneration value from operations which take place in the process control system.
- the invention is based on the consideration of determining a remuneration value, for example license fees to be paid by a customer, depending on the actual use of the process control system. This ensures that the customer - apart from an agreed base price, for example, for the hardware components of the process control system supplied - only has to pay (extra) for those functions of the process control system that he actually uses.
- a remuneration value for example license fees to be paid by a customer
- the type of operation for example the call of a graphic process picture with current process measurement data or the execution of a control function for an aggregate of the technical system, have an influence on the determination of the remuneration value.
- the frequency with which the functions mentioned are used can also influence the determination of the remuneration value. It is e.g. it is conceivable that each access to a certain function delivers a fixed portion of the compensation value at the compensation value.
- the operations advantageously include the creation and / or removal of a control function, an operating action and a sequence of an automation function.
- the creation and / or removal of a process control function can be carried out by the customer, for example, when he is planning the process control system and, for example, by means of a project planning program, is creating a new process control function which is to run on the process control system. Furthermore, the customer can also generate a new control function by selecting one or more from a supply of ready-made control functions and connecting them to the new control function using the configuration program.
- the supply of ready-made control functions can be kept available, for example, on a computer of the manufacturer of the process control system, which is connected to the Internet by means of a web server, so that the customer can download such ready-made control functions from the Internet and use them for a process control system can.
- Such operations in the pro- Customer control systems can also have an impact on the determination of the remuneration value.
- An operating action can e.g. Calling up a specific process picture in the process control system or operating an aggregate of the technical system using the process control system or requesting error logs, status reports, message lists etc. using the process control system.
- Operating actions can also be the customer's access to the process control system via the Internet, insofar as the process control system is capable of being operated via the Internet.
- operating actions can also be executions of control algorithms, which are carried out, for example, in a programmable logic controller (PLC) of the process control system, in order to e.g. to keep the speed of a motor of the technical system constant during operation, even if the operating conditions, e.g. change the load to be handled by the motor.
- PLC programmable logic controller
- the process control system advantageously comprises a process control computer, a client computer and the Internet, and at least some of the operations taking place in the process control system run on the process control computer.
- the process control system can further comprise one or more field devices, which are advantageously installed in the technical system and used for the automation of system components.
- the process control system is empowered to be operated by means of the Internet, the process control computer having at least some of the functions of the process control system which run as corresponding operations on the process control computer.
- process control system includes one or more field devices, they can also perform some of the functions of the Have process control systems that run as corresponding operations on the field device or devices.
- the client computer can be installed, for example, in an almost arbitrary location with Internet access, for example in a central control room, which may be very far from the technical system to be controlled.
- the client computer is connected to the Internet and can operate the process control computer via the Internet and thus operate functions of the process control system, in particular those which relate to the operation of the technical system, via the Internet.
- those operating actions of the process control system can now also be used to determine the remuneration value that are carried out by a user via the Internet. It is e.g. it is conceivable that the process control computer is installed in a server farm of a service provider (application service provider) that belongs to it.
- the service provider makes the functions of the process control system installed on the process control computer available to the user via the Internet.
- the compensation value can now be calculated depending on the operations running on the process control computer, since the operations are triggered by an operator action on the Internet.
- the process control computer which does not become the property of the customer, but remains with the service provider, the customer's investments in his process control system are particularly low, since he only corresponds to the remuneration value for the use of the functions installed on the process control computer are, must pay.
- the process control computer comprises a web server and the client computer an internet browser, so that the operations taking place in the process control computer can be influenced by means of the client computer, the operations also including those through what other operations in other components of the process control system.
- the process control computer has a web server which can transmit data processed and / or stored in the process control computer to the Internet.
- the client computer can use the Internet browser to select the web server of the process control computer via the Internet and use the known Internet technologies (for example URL addressing or the TCP / IP transmission protocol) to specifically retrieve data from the process control computer and / or commands transmit to this.
- the process control system comprises further components in which further operations take place.
- These other components can e.g. PLC, which are installed near a unit of the technical system to be controlled and which receive a command from the process control computer to process a program stored in the PLC.
- operations that take place in the process control computer trigger further operations in one or more further components of the process control computer, that is to say, for example, the execution of a program in a PLC, which is carried out, for example, by an operator action by a user who enters a command into the client computer which is transmitted to the process control computer via the Internet and which causes the process control computer to trigger the execution of a program in the PLC.
- the further components comprise field devices for monitoring and controlling components of a technical system which are operated by radio communication and / or by means of a fixed Wiring are connected to the process control computer and the further operations also include those operations which are carried out in the field devices.
- Field devices in this embodiment comprise at least actuators and measuring elements, which are installed in a technical system and by means of which control interventions on units of the technical system or measured values of components and / or units of the technical system are recorded.
- the commands for triggering are at least one
- Actuating intervention is transmitted by radio from the process control computer to at least one actuator and the measured values recorded by the measuring elements are transmitted to the process control computer by radio.
- the actuators and / or measuring elements are devices which are not assigned to a control, by means of which a radio connection can be established, for example by means of a radio interface card arranged in the control, then at least one radio To provide a device to which the actuators and / or measuring elements are to be connected so that the data obtained can be transmitted by radio.
- the field devices also include so-called “intelligent” field devices which have at least one microprocessor, so that the further operations, for example the execution of a control program, can be carried out in the field devices.
- the field devices are more or less powerful computers which can usually be easily upgraded, for example by means of a radio interface card, in order to carry out radio communication with the process control computer.
- practically only such intelligent field devices must be installed at or near the location of the technical system, which transmit control commands to the actuators and read measured values from the measuring elements.
- the field devices that carry out the further operations are controlled by means of the radio connection to the process control computer.
- the Process control computers can therefore be installed at almost any location with a radio connection and the client computer can be installed at almost any location with Internet access.
- the process control system is particularly flexible with regard to its flexibility with regard to the installation locations of the components of the process control system; Practically all of the functionality of the process control system can be implemented in the process control computer, although some of the functionality can also be implemented in the field devices and the client computer only has to enable access to the Internet by means of a (widespread) Internet browser.
- the client computer does not have to have any special process control system software and is therefore particularly inexpensive.
- the configuration of the process control system according to this embodiment offers the advantage that diagnosis and / or maintenance and / or repair of the process control system is at least partially possible via the Internet.
- the communication between the components of the process control system is particularly advantageously based on the TCP / IP transmission protocol.
- the most important components of the process control system are the process control computer, the client computer and the field devices.
- the use of the transmission protocol mentioned which is widespread in the Internet, makes the development and / or the use of a special transmission protocol and / or the use of a special medium for communication, such as a bus system consisting of optical waveguides, superfluous. Furthermore, by using the transmission protocol mentioned, the use of the known Internet technologies for data transmission and program execution.
- the remuneration value is advantageously a service fee to be paid by a user of the process control system to an application service provider.
- a service provider provides the functionality of the process control system, preferably in the process control computer, and a user, for example a customer who wants to use the process control system, uses the process control system, the determined remuneration value as a service -
- the user usually has to pay the fee in the form of money to the service provider.
- the user essentially only pays for those functions that he actually uses. He only pays for the time and / or period, on or by using the functions.
- a license server application is preferably to be provided in the process control computer, which has access to project planning data and to current operating data and / or stored archive data of the technical system.
- the customer can advantageously be equipped with a special software program which on the one hand allows him to carry out certain functions, but on the other hand also obliges him to pay the correspondingly "dynamic" usage-dependent remuneration values.
- FIG. 2 shows a process control system according to the invention which can be operated via the Internet.
- FIG. 1 shows a process control system 5 which has a computer unit 10.
- the computer unit 10 determines a compensation value W from the operations 7 taking place in the process control system.
- the operations 7 can be, for example, operations which are triggered by an operator action by a user of the process control system 5.
- An example of this is the selection of, for example, a graphic process picture of the technical system, in which current measured values of the technical system and control boxes for operating units of the technical system are displayed.
- Operations 7 also encompass the actuation of the control boxes, for example by means of a mouse click by a user or a key press on the keyboard for executing a function.
- the operations 7 include control programs running in the process control system, for example one or more automation functions, which are implemented, for example, as a control algorithm.
- a further example of operations 7 are actions carried out by a user to configure the process control system 5, for example control functions being newly created and / or new control functions being composed of ready-made basic functions which are advantageously kept in a basic function supply by connecting interfaces of such basic functions, for example, and the basic functions connected in this way thereby forming a new function.
- FIG. 2 shows a process control system 5 which comprises a process control computer 15, a client computer 25 and the Internet 20, so that the process control system 5 can be operated by means of the Internet 20.
- the process control computer comprises a web server 30, by means of which, in particular, the data arising in it, which relate to the operation of a technical system 50, can be transmitted via the internet 20. Operations 7 run in the process control computer 15, such as have already been described in connection with FIG. 1.
- the process control computer 15 further comprises a computing unit 10, which determines a compensation value W from the operations 7 and / or configuration data 55 and / or operating data 60.
- the project planning data 55 include all data which are related to the structure of the process control system 5, in particular in terms of software technology. These are e.g. the type and number of control, regulation, operating and monitoring and automation functions implemented in the process control system 5.
- the configuration data 50 consequently show how the software system of the process control system 5 is structured.
- the operating data 60 comprise at least current values of operating parameters, measured values and state parameters which currently prevail in the technical system 50 and which are transmitted to the process control computer 15.
- the operating data 60 can also include stored archive data of the aforementioned signals, from which a past operating state of the technical system 50 can be determined.
- the client computer 25 comprises an Internet browser 35, by means of which the web server 30 of the process control computer 15 can be selected via the Internet 20, so that the process control computer 15 of the process control system 5 can be accessed via the Internet 20. is serviceable.
- the communication between the client computer and the Internet 20 and between the Internet and the process control computer 15 is preferably based on the TCP / IP transmission protocol, which is known from Internet technology and is widely used there.
- the process control computer 15 is also connected to other components 40 of the process control system 5 by means of a radio link F.
- These further components 40 are designed, for example, as field devices with their own microprocessor, so that further operations 8, e.g. the execution of a control program or another automation function on which further component 40 is made possible.
- the further components 40 in turn control and / or regulate components 45 of the technical system 50.
- the architecture of this embodiment of the invention allows the process control computer 15 to be operated via the internet 20 by means of the client computer 25 and thereby to execute operations 7 in the process control computer 15.
- a sequence of operations 7 can trigger a sequence of further operations 8 in the further components 40 of the process control system if, for example, a user uses the client computer 25 to send a control command relating to a component 45 of the technical system to the process control computer 15 via the Internet 20 transmitted, where operations 7 are then carried out which carry out further operations 8 in the further components 40 by means of the radio link F.
- the operations 7 can be, for example, the sequence of an identification routine which identifies the control command entered by the user and, after identification has taken place, a control algorithm as a further operation 8 in a further component, for example in a field device, by means of which a component 45, for example an aggregate of the technical system, a motor or a pump, is regulated.
- the remuneration value W determined by the computing unit 10 can be, for example, a service and / or license fee that is to be paid by the user of the process control system 5 to a service provider (application service provider).
- a service provider application service provider
Abstract
Description
Claims
Priority Applications (6)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP02754946A EP1415209B1 (de) | 2001-08-07 | 2002-07-26 | Prozessleitsystem mit taxierfunktion |
MXPA03010651A MXPA03010651A (es) | 2001-08-07 | 2002-07-26 | Sistema de procesamiento con funcion de cobro. |
JP2003519718A JP2004538565A (ja) | 2001-08-07 | 2002-07-26 | 料金評価機能を有するプロセス制御システム |
AT02754946T ATE305149T1 (de) | 2001-08-07 | 2002-07-26 | Prozessleitsystem mit taxierfunktion |
AU2002321267A AU2002321267B2 (en) | 2001-08-07 | 2002-07-26 | Process control system with a charging function |
DE50204338T DE50204338D1 (de) | 2001-08-07 | 2002-07-26 | Prozessleitsystem mit taxierfunktion |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP01119041.0 | 2001-08-07 | ||
EP01119041A EP1286238A1 (de) | 2001-08-07 | 2001-08-07 | Prozessleitsystem mit Taxierfunktion |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2003014849A1 true WO2003014849A1 (de) | 2003-02-20 |
Family
ID=8178264
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/EP2002/008352 WO2003014849A1 (de) | 2001-08-07 | 2002-07-26 | Prozessleitsystem mit taxierfunktion |
Country Status (12)
Country | Link |
---|---|
US (1) | US8086325B2 (de) |
EP (2) | EP1286238A1 (de) |
JP (1) | JP2004538565A (de) |
CN (1) | CN1297859C (de) |
AT (1) | ATE305149T1 (de) |
AU (1) | AU2002321267B2 (de) |
DE (1) | DE50204338D1 (de) |
ES (1) | ES2249610T3 (de) |
MX (1) | MXPA03010651A (de) |
RU (1) | RU2324966C2 (de) |
WO (1) | WO2003014849A1 (de) |
ZA (1) | ZA200309707B (de) |
Families Citing this family (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102004010203B4 (de) * | 2004-03-02 | 2007-05-10 | Siemens Ag | Verfahren, Vorrichtung und Computerprogramm zur Erstellung einer Projektierung für ein Bediengerät einer Automatisierungskomponente |
US7698242B2 (en) * | 2006-08-16 | 2010-04-13 | Fisher-Rosemount Systems, Inc. | Systems and methods to maintain process control systems using information retrieved from a database storing general-type information and specific-type information |
US8914783B2 (en) | 2008-11-25 | 2014-12-16 | Fisher-Rosemount Systems, Inc. | Software deployment manager integration within a process control system |
US8898660B2 (en) * | 2008-11-25 | 2014-11-25 | Fisher-Rosemount Systems, Inc. | Systems and methods to provide customized release notes during a software system upgrade of a process control system |
US9164501B2 (en) * | 2009-10-05 | 2015-10-20 | Fisher-Rosemount Systems, Inc. | Methods and apparatus to manage data uploading in a process control environment |
DE102013216420A1 (de) * | 2013-08-20 | 2015-02-26 | Robert Bosch Gmbh | Steueranlage zum Steuern von zumindest einem Schweißprozess |
CN103885426B (zh) * | 2014-03-28 | 2018-07-10 | 百度在线网络技术(北京)有限公司 | 设备的控制方法、客户端、服务器、中间设备和被控设备 |
US10481595B2 (en) | 2015-10-05 | 2019-11-19 | Fisher-Rosemount Systems, Inc. | Method and apparatus for assessing the collective health of multiple process control systems |
US10438144B2 (en) | 2015-10-05 | 2019-10-08 | Fisher-Rosemount Systems, Inc. | Method and apparatus for negating effects of continuous introduction of risk factors in determining the health of a process control system |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0116327A1 (de) * | 1983-02-01 | 1984-08-22 | Minibit AG | Programmtaxiervorrichtung für Rechenanlagen |
EP1093038A2 (de) * | 1999-10-15 | 2001-04-18 | Siemens Aktiengesellschaft | Verfahren und Vorrichtung zur Verarbeitung von für die Prozessführung in einer technischen Anlage relevanten Daten |
Family Cites Families (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5103392A (en) * | 1983-10-05 | 1992-04-07 | Fujitsu Limited | System for storing history of use of programs including user credit data and having access by the proprietor |
JPH08305560A (ja) | 1995-05-10 | 1996-11-22 | Fuji Xerox Co Ltd | ライセンス管理システム |
US7035898B1 (en) * | 1997-09-10 | 2006-04-25 | Schneider Automation Inc. | System for programming a factory automation device using a web browser |
US6282454B1 (en) * | 1997-09-10 | 2001-08-28 | Schneider Automation Inc. | Web interface to a programmable controller |
JPH11338696A (ja) | 1998-03-04 | 1999-12-10 | Ricoh Co Ltd | ソフトウェアモジュ―ルの課金システム |
CN1213915A (zh) * | 1998-08-31 | 1999-04-14 | 海南三富计算机网络工程有限公司 | 一种商品动态交易网络及其生成方法 |
US6233626B1 (en) * | 1998-10-06 | 2001-05-15 | Schneider Automation Inc. | System for a modular terminal input/output interface for communicating messaging application layer over encoded ethernet to transport layer |
JP4637988B2 (ja) | 1999-02-22 | 2011-02-23 | フィッシャー−ローズマウント システムズ, インコーポレイテッド | プロセス制御システムで用いられる診断ツール |
CN1274905A (zh) * | 1999-05-19 | 2000-11-29 | 广西三合科技有限责任公司 | 一种分布式数字采集与远程传输集中管理自动化网络系统 |
US6522934B1 (en) | 1999-07-02 | 2003-02-18 | Fisher-Rosemount Systems, Inc. | Dynamic unit selection in a process control system |
US6968384B1 (en) * | 1999-09-03 | 2005-11-22 | Safenet, Inc. | License management system and method for commuter licensing |
DE60113073T2 (de) * | 2000-03-10 | 2006-08-31 | Smiths Detection Inc., Pasadena | Steuerung für einen industriellen prozes mit einer oder mehreren multidimensionalen variablen |
US7647407B2 (en) * | 2000-09-15 | 2010-01-12 | Invensys Systems, Inc. | Method and system for administering a concurrent user licensing agreement on a manufacturing/process control information portal server |
CN1156157C (zh) * | 2000-10-11 | 2004-06-30 | 武汉诚源科技有限责任公司 | 有线电视网络用户接入状态检测与管理系统 |
CN1287312A (zh) * | 2000-10-19 | 2001-03-14 | 徐国新 | Ic卡计费上网器 |
US7720727B2 (en) * | 2001-03-01 | 2010-05-18 | Fisher-Rosemount Systems, Inc. | Economic calculations in process control system |
-
2001
- 2001-08-07 EP EP01119041A patent/EP1286238A1/de not_active Withdrawn
-
2002
- 2002-07-26 WO PCT/EP2002/008352 patent/WO2003014849A1/de active IP Right Grant
- 2002-07-26 RU RU2004106600/63A patent/RU2324966C2/ru not_active IP Right Cessation
- 2002-07-26 DE DE50204338T patent/DE50204338D1/de not_active Expired - Lifetime
- 2002-07-26 AU AU2002321267A patent/AU2002321267B2/en not_active Ceased
- 2002-07-26 MX MXPA03010651A patent/MXPA03010651A/es active IP Right Grant
- 2002-07-26 AT AT02754946T patent/ATE305149T1/de active
- 2002-07-26 ES ES02754946T patent/ES2249610T3/es not_active Expired - Lifetime
- 2002-07-26 CN CNB028107330A patent/CN1297859C/zh not_active Expired - Lifetime
- 2002-07-26 JP JP2003519718A patent/JP2004538565A/ja active Pending
- 2002-07-26 EP EP02754946A patent/EP1415209B1/de not_active Expired - Lifetime
-
2003
- 2003-12-15 ZA ZA200309707A patent/ZA200309707B/xx unknown
-
2004
- 2004-01-23 US US10/763,786 patent/US8086325B2/en not_active Expired - Fee Related
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0116327A1 (de) * | 1983-02-01 | 1984-08-22 | Minibit AG | Programmtaxiervorrichtung für Rechenanlagen |
EP1093038A2 (de) * | 1999-10-15 | 2001-04-18 | Siemens Aktiengesellschaft | Verfahren und Vorrichtung zur Verarbeitung von für die Prozessführung in einer technischen Anlage relevanten Daten |
Also Published As
Publication number | Publication date |
---|---|
EP1415209B1 (de) | 2005-09-21 |
DE50204338D1 (de) | 2005-10-27 |
EP1415209A1 (de) | 2004-05-06 |
CN1297859C (zh) | 2007-01-31 |
MXPA03010651A (es) | 2004-07-01 |
AU2002321267B2 (en) | 2005-09-08 |
US20040153412A1 (en) | 2004-08-05 |
EP1286238A1 (de) | 2003-02-26 |
RU2004106600A (ru) | 2005-08-10 |
JP2004538565A (ja) | 2004-12-24 |
ES2249610T3 (es) | 2006-04-01 |
ZA200309707B (en) | 2004-05-12 |
ATE305149T1 (de) | 2005-10-15 |
RU2324966C2 (ru) | 2008-05-20 |
CN1526087A (zh) | 2004-09-01 |
US8086325B2 (en) | 2011-12-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP1088259B1 (de) | Elektronische steuerung für anlagen der druckluft- oder vakuumerzeugung | |
EP1415208B1 (de) | Verfahren und prozessleitsystem zum betrieb einer technischen anlage | |
DE10021698A1 (de) | Auf einem einzelnen Computer realisierte integrierende Funktionalität für ein verteiltes Prozessregelsystem | |
DE10250165A1 (de) | System und Verfahren zur Überwachung des Zustandes einer Maschine von Ferne | |
DE112004001775T5 (de) | Verfahren und Vorrichtung zur Bereitstellung von automatischen Software-Updates | |
WO1997039393A1 (de) | Vorrichtung zur steuerung und datenaufbereitung einer industriellen anlage | |
DE10247221A1 (de) | System und Verfahren zur ferngesteuerten Modifikation von Programmen einer Maschine | |
DE69926966T2 (de) | Verteiltes Automatisierungssystem | |
EP0916466B1 (de) | Spritzgiessmaschine mit LAN Schnittstelle | |
EP1415209B1 (de) | Prozessleitsystem mit taxierfunktion | |
EP0997347B1 (de) | Verfahren und System zur Umschaltung eines Steuergerätes, insbesondere eines Kraftfahrzeuges | |
DE10243856B4 (de) | Regler und Verfahren zum Betreiben eines Reglers | |
DE19860069B4 (de) | Programmierbare Steuereinrichtung | |
DE19752997A1 (de) | Periphergeräte-Steuersystem | |
EP2002316B1 (de) | Steuereinrichtung mit integriertem maschinenmodell | |
EP1957760B1 (de) | Verfahren und vorrichtung zur steuerung eines computergestützten rechenverfahrens in einer technischen anlage | |
EP1119801A1 (de) | Verfahren zum betrieb eines automatisierungssystems | |
EP1454199B1 (de) | Verfahren zur aktualisierung von elektronisch modifizierbaren komponenten eines automatisierungsgerätes | |
EP1227379B1 (de) | Verfahren und Vorrichtung zur Steuerung einer Maschine in einem Fertigungssystem | |
EP1478990B1 (de) | Verfahren zum übertragen von feldgerätedaten an eine externe datenbank | |
EP3717314B1 (de) | Waschkonfigurator | |
DE102007025004A1 (de) | Steuerungsprogramm mit austauschbaren Parametern | |
DE102021126175A1 (de) | Verfahren zum Transfer von Kunden und/oder Benutzerdaten einschließlich Betriebsinformationen | |
EP1165263B1 (de) | Leitsystem für ein walzwerk, insbesondere für eine walzstrasse | |
DE10322080A1 (de) | Verfahren zum automatischen Erstellen einer Ersatzteilliste |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AK | Designated states |
Kind code of ref document: A1 Designated state(s): AU CN IN JP MX RU US Kind code of ref document: A1 Designated state(s): AU CN IN JP MX RU US ZA |
|
AL | Designated countries for regional patents |
Kind code of ref document: A1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FR GB GR IE IT LU MC NL PT SE SK TR Kind code of ref document: A1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR IE IT LU MC NL PT SE SK TR |
|
DFPE | Request for preliminary examination filed prior to expiration of 19th month from priority date (pct application filed before 20040101) | ||
121 | Ep: the epo has been informed by wipo that ep was designated in this application | ||
WWE | Wipo information: entry into national phase |
Ref document number: 2002754946 Country of ref document: EP |
|
WWE | Wipo information: entry into national phase |
Ref document number: PA/A/2003/010651 Country of ref document: MX |
|
WWE | Wipo information: entry into national phase |
Ref document number: 028107330 Country of ref document: CN |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2003/09707 Country of ref document: ZA Ref document number: 200309707 Country of ref document: ZA |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2003519718 Country of ref document: JP |
|
WWE | Wipo information: entry into national phase |
Ref document number: 243/KOLNP/2004 Country of ref document: IN Ref document number: 00243/KOLNP/2004 Country of ref document: IN |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2002321267 Country of ref document: AU |
|
WWP | Wipo information: published in national office |
Ref document number: 2002754946 Country of ref document: EP |
|
WWG | Wipo information: grant in national office |
Ref document number: 2002754946 Country of ref document: EP |
|
WWG | Wipo information: grant in national office |
Ref document number: 2002321267 Country of ref document: AU |