WO2007007210A3 - Solution method and apparatus for large-scale simulation of layered formations - Google Patents
Solution method and apparatus for large-scale simulation of layered formations Download PDFInfo
- Publication number
- WO2007007210A3 WO2007007210A3 PCT/IB2006/002765 IB2006002765W WO2007007210A3 WO 2007007210 A3 WO2007007210 A3 WO 2007007210A3 IB 2006002765 W IB2006002765 W IB 2006002765W WO 2007007210 A3 WO2007007210 A3 WO 2007007210A3
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- grid
- layered
- unstructured
- scale simulation
- semi
- Prior art date
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
- G06F30/23—Design optimisation, verification or simulation using finite element methods [FEM] or finite difference methods [FDM]
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F2111/00—Details relating to CAD techniques
- G06F2111/10—Numerical modelling
Abstract
Priority Applications (6)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CA2604713A CA2604713C (en) | 2005-04-14 | 2006-04-13 | Solution method and apparatus for large-scale simulation of layered formations |
EP06808948A EP1869579B1 (en) | 2005-04-14 | 2006-04-13 | Solution method and apparatus for large-scale simulation of layered formations |
BRPI0609073-7A BRPI0609073B1 (en) | 2005-04-14 | 2006-04-13 | SOLUTION METHOD AND APPARATUS FOR LARGE-SCALE TRAINING SIMULATION |
AT06808948T ATE529810T1 (en) | 2005-04-14 | 2006-04-13 | SOLUTION METHOD AND APPARATUS FOR LARGE SCALE SIMULATION OF LAYER FORMATIONS |
AU2006267927A AU2006267927B2 (en) | 2005-04-14 | 2006-04-13 | Solution method and apparatus for large-scale simulation of layered formations |
NO20074589A NO339000B1 (en) | 2005-04-14 | 2007-09-11 | Procedure and computer system for simulation of layered foundation formations |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US11/106,300 | 2005-04-14 | ||
US11/106,300 US7596480B2 (en) | 2005-04-14 | 2005-04-14 | Solution method and apparatus for large-scale simulation of layered formations |
Publications (2)
Publication Number | Publication Date |
---|---|
WO2007007210A2 WO2007007210A2 (en) | 2007-01-18 |
WO2007007210A3 true WO2007007210A3 (en) | 2007-07-05 |
Family
ID=37109635
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/IB2006/002765 WO2007007210A2 (en) | 2005-04-14 | 2006-04-13 | Solution method and apparatus for large-scale simulation of layered formations |
Country Status (8)
Country | Link |
---|---|
US (1) | US7596480B2 (en) |
EP (1) | EP1869579B1 (en) |
AT (1) | ATE529810T1 (en) |
AU (1) | AU2006267927B2 (en) |
BR (1) | BRPI0609073B1 (en) |
CA (1) | CA2604713C (en) |
NO (1) | NO339000B1 (en) |
WO (1) | WO2007007210A2 (en) |
Families Citing this family (97)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7516056B2 (en) * | 2005-04-26 | 2009-04-07 | Schlumberger Technology Corporation | Apparatus, method and system for improved reservoir simulation using a multiplicative overlapping Schwarz preconditioning for adaptive implicit linear systems |
CA2612093C (en) * | 2005-06-14 | 2014-03-11 | Schlumberger Canada Limited | Apparatus, method and system for improved reservoir simulation using an algebraic cascading class linear solver |
US20070279429A1 (en) * | 2006-06-02 | 2007-12-06 | Leonhard Ganzer | System and method for rendering graphics |
US8711146B1 (en) * | 2006-11-29 | 2014-04-29 | Carnegie Mellon University | Method and apparatuses for solving weighted planar graphs |
US7565278B2 (en) * | 2006-12-04 | 2009-07-21 | Chevron U.S.A. Inc. | Method, system and apparatus for simulating fluid flow in a fractured reservoir utilizing a combination of discrete fracture networks and homogenization of small fractures |
US7932904B2 (en) * | 2007-06-01 | 2011-04-26 | Branets Larisa V | Generation of constrained voronoi grid in a plane |
GB2455077A (en) * | 2007-11-27 | 2009-06-03 | Polyhedron Software Ltd | Estimating the state of a physical system using generalized nested factorisation |
EP2247820A4 (en) | 2007-12-13 | 2016-02-24 | Exxonmobil Upstream Res Co | Parallel adaptive data partitioning on a reservoir simulation using an unstructured grid |
EP2235500B1 (en) * | 2007-12-18 | 2018-10-31 | Exxonmobil Upstream Research Company | Determining connectivity architecture in 2-d and 3-d heterogeneous data |
US8370122B2 (en) | 2007-12-21 | 2013-02-05 | Exxonmobil Upstream Research Company | Method of predicting connectivity between parts of a potential hydrocarbon reservoir and analyzing 3D data in a subsurface region |
WO2009085395A1 (en) * | 2007-12-31 | 2009-07-09 | Exxonmobil Upstream Research Company | Methods and systems for determining near-wellbore characteristics and reservoir properties |
US8437997B2 (en) | 2008-01-22 | 2013-05-07 | Exxonmobil Upstream Research Company | Dynamic connectivity analysis |
EP2252903A4 (en) | 2008-03-10 | 2018-01-03 | Exxonmobil Upstream Research Company | Method for determing distinct alternative paths between two object sets in 2-d and 3-d heterogeneous data |
US8190414B2 (en) * | 2008-03-26 | 2012-05-29 | Exxonmobil Upstream Research Company | Modeling of hydrocarbon reservoirs containing subsurface features |
US8175853B2 (en) * | 2008-03-28 | 2012-05-08 | International Business Machines Corporation | Systems and methods for a combined matrix-vector and matrix transpose vector multiply for a block-sparse matrix |
EP2283386B1 (en) | 2008-05-05 | 2019-10-16 | Exxonmobil Upstream Research Company | Systems and methods for connectivity analysis using functional objects |
FR2933220B1 (en) * | 2008-06-27 | 2010-06-18 | Inst Francais Du Petrole | METHOD FOR CONSTRUCTING A HYBRID MESH FROM A CPG TYPE MESH |
BRPI0914102A2 (en) * | 2008-07-03 | 2015-10-20 | Chevron Usa Inc | multiscale finite volume method and systems for use to simulate a fine scale geological model of a subsurface reservoir |
US8302076B2 (en) * | 2008-11-12 | 2012-10-30 | Landmark Graphics Corporation | Systems and methods for improved parallel ILU factorization in distributed sparse linear systems |
US9552462B2 (en) * | 2008-12-23 | 2017-01-24 | Exxonmobil Upstream Research Company | Method for predicting composition of petroleum |
US8352228B2 (en) * | 2008-12-23 | 2013-01-08 | Exxonmobil Upstream Research Company | Method for predicting petroleum expulsion |
EP2406663A1 (en) | 2009-03-13 | 2012-01-18 | Exxonmobil Upstream Research Company | Method for predicting fluid flow |
CA2774181A1 (en) | 2009-10-20 | 2011-04-28 | Exxonmobil Upstream Research Company | Method for quantitatively assessing connectivity for well pairs at varying frequencies |
US8429671B2 (en) * | 2009-10-21 | 2013-04-23 | Exxonmobil Upstream Research Company | Integrated workflow builder for disparate computer programs |
CN102648425B (en) * | 2009-10-28 | 2014-12-10 | 雪佛龙美国公司 | Multiscale finite volume method for reservoir simulation |
CA2776487C (en) | 2009-11-12 | 2017-02-14 | Exxonmobil Upstream Research Company | Method and apparatus for generating a three-dimentional simulation grid for a reservoir model |
US9260947B2 (en) | 2009-11-30 | 2016-02-16 | Exxonmobil Upstream Research Company | Adaptive Newton's method for reservoir simulation |
WO2011100002A1 (en) * | 2010-02-12 | 2011-08-18 | Exxonmobil Upstream Research Company | Method and system for partitioning parallel simulation models |
WO2011100009A1 (en) | 2010-02-12 | 2011-08-18 | Exxonmobil Upstream Research Company | Method and system for creating history-matched simulation models |
US9134454B2 (en) | 2010-04-30 | 2015-09-15 | Exxonmobil Upstream Research Company | Method and system for finite volume simulation of flow |
US8463586B2 (en) * | 2010-06-22 | 2013-06-11 | Saudi Arabian Oil Company | Machine, program product, and computer-implemented method to simulate reservoirs as 2.5D unstructured grids |
EP2585858A2 (en) * | 2010-06-22 | 2013-05-01 | Saudi Arabian Oil Company | Machine, program product, and computer-implemented method to simulate reservoirs as 2.5d unstructured grids |
CA2801382C (en) | 2010-06-29 | 2018-12-18 | Exxonmobil Upstream Research Company | Method and system for parallel simulation models |
US8359185B2 (en) | 2010-06-30 | 2013-01-22 | Saudi Arabian Oil Company | Reservoir simulation of giant subsurface reservoirs with accelerated phase equilibrium determination |
EP2599028B1 (en) | 2010-07-26 | 2019-10-02 | Exxonmobil Upstream Research Company | Method and system for parallel multilevel simulation |
EP2599032A4 (en) | 2010-07-29 | 2018-01-17 | Exxonmobil Upstream Research Company | Method and system for reservoir modeling |
EP2599023B1 (en) | 2010-07-29 | 2019-10-23 | Exxonmobil Upstream Research Company | Methods and systems for machine-learning based simulation of flow |
AU2011283192B2 (en) * | 2010-07-29 | 2014-07-17 | Exxonmobil Upstream Research Company | Methods and systems for machine-learning based simulation of flow |
AU2011283190A1 (en) | 2010-07-29 | 2013-02-07 | Exxonmobil Upstream Research Company | Methods and systems for machine-learning based simulation of flow |
US8386227B2 (en) | 2010-09-07 | 2013-02-26 | Saudi Arabian Oil Company | Machine, computer program product and method to generate unstructured grids and carry out parallel reservoir simulation |
WO2012033650A2 (en) * | 2010-09-07 | 2012-03-15 | Saudi Arabian Oil Company | Machine, computer program product and method to generate unstructured grids and carry out parallel reservoir simulation |
US8433551B2 (en) | 2010-11-29 | 2013-04-30 | Saudi Arabian Oil Company | Machine, computer program product and method to carry out parallel reservoir simulation |
US9063882B1 (en) * | 2010-09-09 | 2015-06-23 | Sas Ip, Inc. | Matrix preconditioners for simulations of physical fields |
US9058446B2 (en) | 2010-09-20 | 2015-06-16 | Exxonmobil Upstream Research Company | Flexible and adaptive formulations for complex reservoir simulations |
US9626466B2 (en) | 2010-11-23 | 2017-04-18 | Exxonmobil Upstream Research Company | Variable discretization method for flow simulation on complex geological models |
GB2499768A (en) * | 2010-12-13 | 2013-08-28 | Chevron Usa Inc | Improved constrained pressure residual preconditioner for efficient solution of the adjoint equation |
CA2821482C (en) * | 2010-12-16 | 2017-02-28 | Landmark Graphics Corporation | Systems and methods for two-dimensional domain decomposition during parallel reservoir simulation |
US9922142B2 (en) | 2010-12-30 | 2018-03-20 | Exxonmobil Upstream Research Company | Systems and methods for subsurface reservoir simulation |
US8583411B2 (en) | 2011-01-10 | 2013-11-12 | Saudi Arabian Oil Company | Scalable simulation of multiphase flow in a fractured subterranean reservoir as multiple interacting continua |
US8437999B2 (en) | 2011-02-08 | 2013-05-07 | Saudi Arabian Oil Company | Seismic-scale reservoir simulation of giant subsurface reservoirs using GPU-accelerated linear equation systems |
US9164191B2 (en) * | 2011-02-09 | 2015-10-20 | Saudi Arabian Oil Company | Sequential fully implicit well model for reservoir simulation |
US10175386B2 (en) | 2011-02-09 | 2019-01-08 | Saudi Arabian Oil Company | Sequential fully implicit well model with tridiagonal matrix structure for reservoir simulation |
US10113400B2 (en) | 2011-02-09 | 2018-10-30 | Saudi Arabian Oil Company | Sequential fully implicit well model with tridiagonal matrix structure for reservoir simulation |
GB2501829B (en) * | 2011-02-24 | 2019-07-17 | Chevron Usa Inc | System and method for performing reservoir simulation using preconditioning |
AU2011365452A1 (en) | 2011-04-14 | 2013-11-07 | Exxonmobil Upstream Research Company | Method for preparing petroleum based sample for analysis of elemental and isotopic species |
CA2832882A1 (en) * | 2011-05-17 | 2012-11-22 | Exxonmobil Upstream Research Company | Method for partitioning parallel reservoir simulations in the presence of wells |
WO2013039606A1 (en) | 2011-09-15 | 2013-03-21 | Exxonmobil Upstream Research Company | Optimized matrix and vector operations in instruction limited algorithms that perform eos calculations |
US9429677B2 (en) | 2011-10-11 | 2016-08-30 | Saudi Arabian Oil Company | High performance and grid computing with fault tolerant data distributors quality of service |
US9482769B2 (en) | 2011-10-11 | 2016-11-01 | Saudi Arabian Oil Company | High performance and grid computing with partitioning quality of service control |
US9674033B2 (en) | 2011-10-11 | 2017-06-06 | Saudi Arabian Oil Company | High performance and grid computing with liveliness and deadlines fault tolerant data distributor quality of service |
US8874804B2 (en) | 2011-10-11 | 2014-10-28 | Saudi Arabian Oil Company | High performance and grid computing with quality of service control |
RU2608344C2 (en) | 2011-11-11 | 2017-01-17 | Эксонмобил Апстрим Рисерч Компани | Method of surveying and system for detection of hydrocarbons using underwater vehicle |
EP2776667B1 (en) | 2011-11-11 | 2022-03-02 | ExxonMobil Upstream Research Company | Method and system for reservoir surveillance utilizing clumped isotope and noble gas data |
US9378311B2 (en) | 2012-02-09 | 2016-06-28 | Saudi Arabian Oil Company | Multi-level solution of large-scale linear systems in simulation of porous media in giant reservoirs |
US9208268B2 (en) | 2012-02-14 | 2015-12-08 | Saudi Arabian Oil Company | Giga-cell linear solver method and apparatus for massive parallel reservoir simulation |
US9753180B2 (en) | 2012-03-28 | 2017-09-05 | Exxonmobil Upstream Research Company | Method for multiphase flow upscaling |
WO2013180709A1 (en) * | 2012-05-30 | 2013-12-05 | Landmark Graphics Corporation | Oil or gas production using computer simulation of oil or gas fields and production facilities |
US10036829B2 (en) | 2012-09-28 | 2018-07-31 | Exxonmobil Upstream Research Company | Fault removal in geological models |
US10591638B2 (en) | 2013-03-06 | 2020-03-17 | Exxonmobil Upstream Research Company | Inversion of geophysical data on computer system having parallel processors |
GB2512372B (en) * | 2013-03-28 | 2020-07-29 | Total Sa | Method of modelling a subsurface volume |
EP3069500B1 (en) | 2013-11-17 | 2021-01-06 | Ping Liang | Massive mimo multi-user beamforming and single channel full duplex for wireless networks |
WO2015095843A1 (en) | 2013-12-20 | 2015-06-25 | Ping Liang | Method for acquiring channel state information in fdd mimo wireless networks |
KR102287454B1 (en) | 2013-12-20 | 2021-08-09 | 핑 리앙 | Adaptive precoding in a mimo wireless communication system |
EP3114505B1 (en) | 2014-03-07 | 2022-07-20 | ExxonMobil Upstream Research Company | Exploration method and system for detection of hydrocarbons from the water column |
US9810052B2 (en) | 2014-07-14 | 2017-11-07 | Saudi Arabian Oil Company | Multilateral wells placement via transshipment approach |
US10341043B2 (en) * | 2014-09-27 | 2019-07-02 | RF DSP Inc. | Methods for multi-user MIMO wireless communication using approximation of zero-forcing beamforming matrix |
AU2015339883B2 (en) | 2014-10-31 | 2018-03-29 | Exxonmobil Upstream Research Company | Methods to handle discontinuity in constructing design space for faulted subsurface model using moving least squares |
WO2016069171A1 (en) | 2014-10-31 | 2016-05-06 | Exxonmobil Upstream Research Company | Handling domain discontinuity in a subsurface grid model with the help of grid optimization techniques |
AU2015382382B2 (en) * | 2015-02-13 | 2019-05-30 | Exxonmobil Upstream Research Company | Method and system to enhance computations for a physical system |
US10242136B2 (en) | 2015-05-20 | 2019-03-26 | Saudi Arabian Oil Company | Parallel solution for fully-coupled fully-implicit wellbore modeling in reservoir simulation |
CN105260175B (en) * | 2015-09-16 | 2019-01-25 | 浪潮(北京)电子信息产业有限公司 | The processing method of astronomy software Gridding based on OpenMP |
US10571605B2 (en) | 2016-03-28 | 2020-02-25 | Exxonmobil Upstream Research Company | Method and system for modeling and simulating a fractured reservoir |
US10329905B2 (en) | 2016-04-07 | 2019-06-25 | Baker Hughes, A Ge Company, Llc | Method to estimate the influence of pore-size distribution on phase equilibrium of multi-component hydrocarbon systems in unconventional shale gas and oil reservoirs |
US10572611B2 (en) | 2016-04-29 | 2020-02-25 | Exxonmobil Upstream Research Company | Method and system for characterizing fractures in a subsurface region |
US10846447B2 (en) | 2016-04-29 | 2020-11-24 | Exxonmobil Upstream Research Company | Method and system for stacking fracture prediction |
US10712472B2 (en) | 2016-04-29 | 2020-07-14 | Exxonmobil Upstresm Research Company | Method and system for forming and using a subsurface model in hydrocarbon operations |
WO2018009396A1 (en) | 2016-07-05 | 2018-01-11 | Saudi Arabian Oil Company | High performance and grid computing with liveliness and deadlines fault tolerant data distributor quality of service |
US10997271B2 (en) | 2016-11-29 | 2021-05-04 | Halliburton Energy Services, Inc. | Variable elimination to improve solver efficiency |
CA3043231C (en) | 2016-12-23 | 2022-06-14 | Exxonmobil Upstream Research Company | Method and system for stable and efficient reservoir simulation using stability proxies |
US10570706B2 (en) | 2017-06-23 | 2020-02-25 | Saudi Arabian Oil Company | Parallel-processing of invasion percolation for large-scale, high-resolution simulation of secondary hydrocarbon migration |
US10913901B2 (en) | 2017-09-12 | 2021-02-09 | Saudi Arabian Oil Company | Integrated process for mesophase pitch and petrochemical production |
US11126762B2 (en) | 2018-02-28 | 2021-09-21 | Saudi Arabian Oil Company | Locating new hydrocarbon fields and predicting reservoir performance from hydrocarbon migration |
CN109902412B (en) * | 2019-03-07 | 2023-02-17 | 南方科技大学 | Prediction method and device of underground water flow value, server and storage medium |
US11353622B2 (en) | 2020-01-06 | 2022-06-07 | Saudi Arabian Oil Company | Systems and methods for hydrocarbon reservoir three dimensional unstructured grid generation and development |
CN110984979B (en) * | 2020-01-06 | 2023-03-14 | 中国石油化工股份有限公司 | Grid design method for angle-unconformity reservoir modeling digital-analog |
CN111914448B (en) * | 2020-07-16 | 2023-06-09 | 青岛海洋地质研究所 | Fluid-solid coupling numerical simulation method based on control body finite element method |
CN114385972B (en) * | 2021-12-20 | 2023-09-01 | 北京科技大学 | Parallel computing method for directly solving structured triangular sparse linear equation set |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5321612A (en) * | 1991-02-26 | 1994-06-14 | Swift Energy Company | Method for exploring for hydrocarbons utilizing three dimensional modeling of thermal anomalies |
Family Cites Families (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5710726A (en) | 1995-10-10 | 1998-01-20 | Atlantic Richfield Company | Semi-compositional simulation of hydrocarbon reservoirs |
US5809458A (en) * | 1996-09-05 | 1998-09-15 | Western Atlas International, Inc. | Method of simulating the response of a through-casing electrical resistivity well logging instrument and its application to determining resistivity of earth formations |
US6002985A (en) | 1997-05-06 | 1999-12-14 | Halliburton Energy Services, Inc. | Method of controlling development of an oil or gas reservoir |
US6282452B1 (en) | 1998-11-19 | 2001-08-28 | Intelligent Inspection Corporation | Apparatus and method for well management |
US6662146B1 (en) * | 1998-11-25 | 2003-12-09 | Landmark Graphics Corporation | Methods for performing reservoir simulation |
US6826520B1 (en) | 1999-06-24 | 2004-11-30 | Exxonmobil Upstream Research Company | Method of upscaling permeability for unstructured grids |
US7006959B1 (en) | 1999-10-12 | 2006-02-28 | Exxonmobil Upstream Research Company | Method and system for simulating a hydrocarbon-bearing formation |
US6928399B1 (en) | 1999-12-03 | 2005-08-09 | Exxonmobil Upstream Research Company | Method and program for simulating a physical system using object-oriented programming |
FR2802324B1 (en) | 1999-12-10 | 2004-07-23 | Inst Francais Du Petrole | METHOD FOR GENERATING A MESH ON A HETEROGENEOUS FORMATION CROSSED BY ONE OR MORE GEOMETRIC DISCONTINUITIES FOR THE PURPOSE OF MAKING SIMULATIONS |
US6980940B1 (en) | 2000-02-22 | 2005-12-27 | Schlumberger Technology Corp. | Intergrated reservoir optimization |
US20020049575A1 (en) | 2000-09-28 | 2002-04-25 | Younes Jalali | Well planning and design |
US20020177986A1 (en) | 2001-01-17 | 2002-11-28 | Moeckel George P. | Simulation method and system using component-phase transformations |
US7379853B2 (en) | 2001-04-24 | 2008-05-27 | Exxonmobil Upstream Research Company | Method for enhancing production allocation in an integrated reservoir and surface flow system |
JP2003031650A (en) * | 2001-07-13 | 2003-01-31 | Toshiba Corp | Method for manufacturing semiconductor device |
CA2486857C (en) | 2002-05-31 | 2011-11-22 | Schlumberger Canada Limited | Method and apparatus for effective well and reservoir evaluation without the need for well pressure history |
US7627461B2 (en) | 2004-05-25 | 2009-12-01 | Chevron U.S.A. Inc. | Method for field scale production optimization by enhancing the allocation of well flow rates |
US7526418B2 (en) | 2004-08-12 | 2009-04-28 | Saudi Arabian Oil Company | Highly-parallel, implicit compositional reservoir simulator for multi-million-cell models |
-
2005
- 2005-04-14 US US11/106,300 patent/US7596480B2/en active Active
-
2006
- 2006-04-13 CA CA2604713A patent/CA2604713C/en active Active
- 2006-04-13 AT AT06808948T patent/ATE529810T1/en not_active IP Right Cessation
- 2006-04-13 EP EP06808948A patent/EP1869579B1/en active Active
- 2006-04-13 WO PCT/IB2006/002765 patent/WO2007007210A2/en not_active Application Discontinuation
- 2006-04-13 AU AU2006267927A patent/AU2006267927B2/en not_active Ceased
- 2006-04-13 BR BRPI0609073-7A patent/BRPI0609073B1/en not_active IP Right Cessation
-
2007
- 2007-09-11 NO NO20074589A patent/NO339000B1/en not_active IP Right Cessation
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5321612A (en) * | 1991-02-26 | 1994-06-14 | Swift Energy Company | Method for exploring for hydrocarbons utilizing three dimensional modeling of thermal anomalies |
Also Published As
Publication number | Publication date |
---|---|
EP1869579A4 (en) | 2010-08-18 |
BRPI0609073A2 (en) | 2010-02-17 |
AU2006267927B2 (en) | 2011-04-21 |
US7596480B2 (en) | 2009-09-29 |
EP1869579A2 (en) | 2007-12-26 |
CA2604713C (en) | 2012-06-19 |
CA2604713A1 (en) | 2007-01-18 |
EP1869579B1 (en) | 2011-10-19 |
WO2007007210A2 (en) | 2007-01-18 |
NO20074589L (en) | 2007-11-13 |
BRPI0609073B1 (en) | 2018-04-10 |
NO339000B1 (en) | 2016-11-07 |
ATE529810T1 (en) | 2011-11-15 |
US20060235667A1 (en) | 2006-10-19 |
AU2006267927A1 (en) | 2007-01-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2007007210A3 (en) | Solution method and apparatus for large-scale simulation of layered formations | |
WO2005050404A3 (en) | Transparent checkpointing and process migration in a distributed system | |
WO2009131809A3 (en) | Multi-touch detection panel with disambiguation of touch coordinates | |
IL193182A0 (en) | Data mining by determining patterns in input data | |
GB201013074D0 (en) | Executing a utility in a distributed computing system based on an integrated model | |
Hoefler | Software and hardware techniques for power-efficient hpc networking | |
Jia et al. | Groundwater dynamic drift and response to different exploitation in the North China Plain: A case study of Luancheng County, Hebei Province | |
TW200507280A (en) | Capacitance-type dynamic-quantity sensor and manufacturing method therefor | |
ATE312411T1 (en) | DOUBLE DAMASCEN INTERMEDIATE JOINTS WITHOUT ETCH STOP LAYER USING ALTERNATE ILDS | |
Chen et al. | Effects of coastline changes on tide system of Yellow Sea off Jiangsu coast, China | |
CN206388126U (en) | A kind of radiating structure of computer | |
Xie et al. | Effects of different irrigations on the water physiological characteristics of Haloxylon ammodendron in Taklimakan Desert hinterland | |
Wang et al. | Influence of central buckle on dynamic behavior of long-span suspension bridge. | |
CN204503147U (en) | Conical flask water-bath frame | |
Li et al. | Numerical model on the flow dynamics around the sediment-water interface in the tidal coastal area | |
CN201829492U (en) | Through silicon via connecting structure | |
Cunhong et al. | New development in the numerical simulation of the tidal bore | |
Zuo | Relationship between carrying capacity and optimal deployment of water resources. | |
Xian | New exact solutions to a class of nonlinear wave equations. | |
CN203388339U (en) | Antiskid sole | |
Christiansen et al. | Theoretical models for coupled compaction and free convection in a seamount environment | |
Fan et al. | The groundwater recharge rule study in the condition of aeration zone incrassation. | |
TW200618639A (en) | Flat hexagon-based search (HEXBS) of fast block moving detection | |
Hu et al. | Design and implementation of multi-displayer system and its simulation. | |
CN201883631U (en) | Stone face brick |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
WWE | Wipo information: entry into national phase |
Ref document number: 2604713 Country of ref document: CA |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2006267927 Country of ref document: AU |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
WWW | Wipo information: withdrawn in national office |
Country of ref document: DE |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2006808948 Country of ref document: EP |
|
ENP | Entry into the national phase |
Ref document number: 2006267927 Country of ref document: AU Date of ref document: 20060413 Kind code of ref document: A |
|
WWP | Wipo information: published in national office |
Ref document number: 2006267927 Country of ref document: AU |
|
NENP | Non-entry into the national phase |
Ref country code: RU |
|
WWW | Wipo information: withdrawn in national office |
Country of ref document: RU |
|
WWP | Wipo information: published in national office |
Ref document number: 2006808948 Country of ref document: EP |
|
ENP | Entry into the national phase |
Ref document number: PI0609073 Country of ref document: BR Kind code of ref document: A2 |