WO2012068006A2 - System for controlling cement flow in a well - Google Patents

System for controlling cement flow in a well Download PDF

Info

Publication number
WO2012068006A2
WO2012068006A2 PCT/US2011/060576 US2011060576W WO2012068006A2 WO 2012068006 A2 WO2012068006 A2 WO 2012068006A2 US 2011060576 W US2011060576 W US 2011060576W WO 2012068006 A2 WO2012068006 A2 WO 2012068006A2
Authority
WO
WIPO (PCT)
Prior art keywords
choke
cement
pressure drop
well
port
Prior art date
Application number
PCT/US2011/060576
Other languages
French (fr)
Other versions
WO2012068006A3 (en
Inventor
Betsy Lorene Boswell
James Frank Heathman
Eirik Sorgard
Original Assignee
Shell Oil Company
Shell Internationale Research Maatschappij B.V.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shell Oil Company, Shell Internationale Research Maatschappij B.V. filed Critical Shell Oil Company
Priority to US13/885,132 priority Critical patent/US20130233549A1/en
Publication of WO2012068006A2 publication Critical patent/WO2012068006A2/en
Publication of WO2012068006A3 publication Critical patent/WO2012068006A3/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/13Methods or devices for cementing, for plugging holes, crevices, or the like
    • E21B33/14Methods or devices for cementing, for plugging holes, crevices, or the like for cementing casings into boreholes
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B34/00Valve arrangements for boreholes or wells
    • E21B34/06Valve arrangements for boreholes or wells in wells
    • E21B34/10Valve arrangements for boreholes or wells in wells operated by control fluid supplied from outside the borehole

Definitions

  • the invention relates to a system and method for preventing undesired cement flow in a well containing a tubing string, including installing in the tubing string a choke having at least one port with a desired flow area.
  • a typical arrangement will include a borehole 10 into which a casing or liner string 12 extends, forming an annulus 11 between the borehole wall and the outside of casing 12.
  • string 12 will hang from a second tubing string 16 that is placed higher in the well.
  • a hanger 18 supports string 12.
  • String 12 is typically provided with a float collar 14 near its lower end.
  • a landing string 17 is positioned such that its lower end is within the upper end of string 12.
  • a packer 15 seals the annulus 19 between string 17 and string 12.
  • At least four pressure zones are created in such a system, namely a first zone 30 within string 17, second zone 32 within string 12 and above collar 14, a third zone 34 within string 12 and below collar 14, and a fourth zone 36 between string 12 and the wellbore.
  • zone 34 A positive pressure difference between zone 34 and zone 36 is required in order to place the cement in the annulus.
  • the pressure in zone 34 is the hydrostatic pressure of the cement column above zone 34.
  • the pressure in zone 34 is the hydrostatic pressure of the cement column above zone 34 less the pressure drop attributable to friction and any pressure drop across collar 14.
  • the pressure in zone 34 is so much greater than the pressure in zone 36 that the cement flows from zone 34 to zone 36 more rapidly than desired. This may occur, for instance, when the cement is significantly denser than the fluid in annulus 11. This pressure differential then causes fluid to move uncontrollably faster, resulting in excessive annular frictional pressure drop and uncertainty in fluid location within the wellbore.
  • a differential pressure typically exists between the fluid column in the annulus (zone 36) and the pore pressure of the exposed formation.
  • the hydrostatic pressure in zone 36 immediately after the cement is placed is typically designed to be higher than the pore pressure of exposed formations in order to prevent flow of formation fluids into the annulus. It is also desirable, however, to ensure that the pressure in zone 36 is less than the fracturing pressure of the exposed formation, since otherwise the formation would fracture and the cement slurry would flow into the formation rather than filling up the annulus around the casing.
  • Low-density cement slurries can be provided by including in the slurry a low- density aggregate such as graphite or hollow spheres, by diluting the cement with additional water, or by creating a foam from the slurry.
  • typical oil- or gas- well slurries can have densities of 1380 kg/m 3 J to 2280 kg/ m 3 J (11.5 lbm/gal to 19.0 lbm/gal) while fluids used in specialized techniques, such as foamed cementing and particle-size distribution cementing, can extend this range to 840 kg/m 3 to 2760 kg/m 3 (7 lbm/gal to 23 lbm/gal).
  • the rate of flow from zone 34 to zone 36 may be such that an undesirable pressure drop occurs in zone 32 or zone 30. Such a pressure drop can cause gas bubbles in the cement to coalesence into larger and less stable bubbles.
  • this rate of flow resulting the aforementioned excessive pressure in zone 36 may be uncontrollable, not only resulting in excessive pressure in zone 36 but also very low pressure in zone 30.
  • a U-tubing effect the outcome can be uncontrolled placement of the cement slurry and subsequent formation failure in zone 36 or unacceptably low pressure in zone 30.
  • the purpose of this invention is to provide a means to induce a back-pressure inside the casing, thus limiting or eliminating the U-tube effect.
  • the present invention also provides means for controlling the flow of cement into the annulus, resulting in turn in better control over the placement and quality of the cement.
  • the present invention provides a method for preventing undesired cement flow in a well containing a tubing string, comprising the steps of: a) determining a desired pressure drop for a desired flow rate at a desired location in the tubing string; b) determining a flow area that will cause the desired pressure drop; and c) installing in the tubing string a choke having at least one port, wherein the total cross-sectional area of the port or ports equals the desired flow area.
  • the choke may includes at least two ports and may further include at least one rupture disk disposed in a port and at least one port that is unobstructed.
  • the rupture disk is selected to rupture when the pressure drop across the choke exceeds a predetermined value.
  • the choke may be positioned in the well below a float collar or the like.
  • the method may further include the step of cementing the well using foamed cement and, if desired, the foamed cement may have a density that is less than the lowest density that could have been used if the choke were not in place.
  • the desired pressure drop across the choke may be in the range of between 100 (0.69 MPa) and 1000 psi (6.9 MPa) and in some embodiments at least one port can be actuated from a closed mode to an open mode.
  • Figure 1 is a schematic illustration of a conventional cementing arrangement
  • Figure 2 is a schematic illustration of a cementing arrangement configured in accordance with one embodiment of the present invention.
  • the strings 12, 16 and 17, packer 15, and float collar 14 are configured essentially as set out above with respect to Figure 1.
  • a choke 20 is included in string 12.
  • Choke 20 creates an additional pressure zone, 33, which is below float collar 14 and above choke 20.
  • Choke 20 comprises a body 20 that is affixed to the inner surface of string 12 and includes at least one and preferably a plurality of longitudinal bores or ports 24 extending therethrough. As discussed below, the total area of bore(s) 24 is preferably selectively determined based on the desired pressure drop across choke 20 and the anticipated viscosity, density, pressure and flow rate of the cement.
  • V V ' (3 ⁇ 4)
  • choke 20 comprises a drillable plate that is inserted in the casing/liner string to be cemented in place below any float collar or landing collar, so as to avoid interference with any existing casing/liner hardware.
  • the diameter(s) and total area of bore(s) 24 is selected so that induce a specific, desired back-pressure will be induced inside the casing at the intended flow rate(s).
  • the ID of the liner will be 8.535 inches (21.7 cm) and choke 20 may include 4 bores each having a diameter of 1/4 inches (6.4 mm).
  • this configuration would result in a pressure drop of 320 psi (2.2 MPa) to 570 psi (3.9 MPa) across choke 20.
  • one or more of bores 24 may include a rupture disk 26 therein.
  • Rupture disks may be conventional rupture disks such as are known in the art. The purpose of the rupture disks is to allow continued fluid flow in the event bores 24 become plugged or the induced back-pressure in zone 33 is higher than intended.
  • Each rupture disk can be optionally designed to fail at various pressures. By way of example only, one rupture disk may be designed to fail when the pressure in zone 33 is 250 psi (1.7 MPa) above desired backpressure, a second rupture disk may be designed to fail when the pressure in zone 33 is 500 psi above desired backpressure. In some embodiments, it may be desirable to provide rupture disks having a total area equal to or greater than the total flow area of bores 24.
  • chock 20 comprises a concrete or composite body with brass/aluminum sleeves in bores 24 for wear/erosion protection. It will be recognized by those skilled in the art that choke 20 may be constructed in any manner and of any materials that are suitable for use in a downhole environment.
  • choke 20 By inducing controlled back-pressure inside the casing, i.e. in zone 30, 32, and 33, choke 20 reduces the U-tube effect and allows more control and placement of the cementing fluids. It also reduces the risk of bubble coalescence during foamed cementing operations.
  • positive pressure indication during the cementing operation helps ensure proper placement and displacement of fluids and ensures better control over the entire pumping process, thus a better-quality cementation of the pipe in the wellbore.
  • the present invention allows the use of foamed cements having a higher gas/liquid ratio than would otherwise be possible, enabling lower effective density cement slurries to be pumped with control.
  • the present invention avoids interference with subsea plug launch systems, as well as ensuring that the backpressure is present during the entire mixing and displacement. Further, the present invention allows for normal cementing operations with minimum modifications to the current casing design.
  • bore(s) 24 do not need to be longitudinal or cylindrical, so long as they extend from zone 33 to zone 34; rupture disks 26 need not be disposed in the radially outer bore(s); and the distance between choke 20 and float collar 14 can be set to any desired value or order in the pipe string.
  • controllable embodiments of choke 20 can be constructed, in which one or more bore(s) 24 can be actuated to an open mode as desired, using a control mechanism or signal from the surface or elsewhere.

Abstract

A method for preventing undesired cement flow in a well containing a tubing string, comprises: determining a desired pressure drop for a desired flow rate at a desired location in the tubing string, determining a flow area that will cause the desired pressure drop, and installing in the tubing string a choke having at least one port, wherein the total area of the port or ports equals the desired flow area. The choke may include at least two ports, one of which may include a least one rupture disk disposed selected to rupture when the pressure drop across the choke exceeds a predetermined value. The choke may be below a float collar in the well. The invention allows the use of foamed cement and in particular foamed cement having a density that is less than the lowest density that could have been used if the choke were not in place.

Description

SYSTEM FOR CONTROLLING CEMENT FLOW IN A WELL
RELATED CASES
This application claims priority from U.S. application Serial No. 61/413,676, filed 15 November 2010, which is hereby incorporated by reference in its entirety.
FIELD OF THE INVENTION
[0001] The invention relates to a system and method for preventing undesired cement flow in a well containing a tubing string, including installing in the tubing string a choke having at least one port with a desired flow area.
BACKGROUND OF THE INVENTION
[0002] Subsequent to drilling a borehole of an oil or gas well, casing or liner is run into the well and a cement slurry is placed in the annulus between the outside of the casing and the borehole wall.
[0003] Referring initially to Figure 1, a typical arrangement will include a borehole 10 into which a casing or liner string 12 extends, forming an annulus 11 between the borehole wall and the outside of casing 12. In some instances string 12 will hang from a second tubing string 16 that is placed higher in the well. In such instances, a hanger 18 supports string 12. String 12 is typically provided with a float collar 14 near its lower end. When it is desired to cement string 12 in the well, a landing string 17 is positioned such that its lower end is within the upper end of string 12. A packer 15 seals the annulus 19 between string 17 and string 12. As illustrated in Figure 1 , at least four pressure zones are created in such a system, namely a first zone 30 within string 17, second zone 32 within string 12 and above collar 14, a third zone 34 within string 12 and below collar 14, and a fourth zone 36 between string 12 and the wellbore.
[0004] When it is desired to perform a cementing operation, a calculation is made to determine the volume of cement that will be required in order to fully occupy the desired space. Once the pre-determined amount of cement has been pumped into the well, a second fluid, often drilling fluid or water, is pumped behind the cement to displace the cement out the bottom of the casing and up into the annulus between the casing and borehole wall. The cement slurry is usually raised to a point above the uppermost section of the formations to be isolated and may be raised into the annulus between the casing string being cemented and a previously cemented casing.
[0005] A positive pressure difference between zone 34 and zone 36 is required in order to place the cement in the annulus. When the cement is not flowing, the pressure in zone 34 is the hydrostatic pressure of the cement column above zone 34. When the cement is flowing, i.e. being pumped into the well, the pressure in zone 34 is the hydrostatic pressure of the cement column above zone 34 less the pressure drop attributable to friction and any pressure drop across collar 14.
[0006] It has been found that in some instances, the pressure in zone 34 is so much greater than the pressure in zone 36 that the cement flows from zone 34 to zone 36 more rapidly than desired. This may occur, for instance, when the cement is significantly denser than the fluid in annulus 11. This pressure differential then causes fluid to move uncontrollably faster, resulting in excessive annular frictional pressure drop and uncertainty in fluid location within the wellbore.
[0007] In addition, a differential pressure typically exists between the fluid column in the annulus (zone 36) and the pore pressure of the exposed formation. The hydrostatic pressure in zone 36 immediately after the cement is placed is typically designed to be higher than the pore pressure of exposed formations in order to prevent flow of formation fluids into the annulus. It is also desirable, however, to ensure that the pressure in zone 36 is less than the fracturing pressure of the exposed formation, since otherwise the formation would fracture and the cement slurry would flow into the formation rather than filling up the annulus around the casing.
[0008] To reduce the likelihood of losses into the formation, lightweight cements have been developed. Low-density cement slurries can be provided by including in the slurry a low- density aggregate such as graphite or hollow spheres, by diluting the cement with additional water, or by creating a foam from the slurry. By way of example only, typical oil- or gas- well slurries can have densities of 1380 kg/m 3J to 2280 kg/ m 3J (11.5 lbm/gal to 19.0 lbm/gal) while fluids used in specialized techniques, such as foamed cementing and particle-size distribution cementing, can extend this range to 840 kg/m 3 to 2760 kg/m 3 (7 lbm/gal to 23 lbm/gal).
[0009] When foamed cement is being used, the rate of flow from zone 34 to zone 36 may be such that an undesirable pressure drop occurs in zone 32 or zone 30. Such a pressure drop can cause gas bubbles in the cement to coalesence into larger and less stable bubbles.
Extremely large bubbles, or pockets of gas in the cement are undesirable for many reasons, including their effect on cement integrity. Gas pockets can also increase the certainty of cement placement within a well.
[0010] Additionally, this rate of flow resulting the aforementioned excessive pressure in zone 36 may be uncontrollable, not only resulting in excessive pressure in zone 36 but also very low pressure in zone 30. Commonly referred to as a U-tubing effect, the outcome can be uncontrolled placement of the cement slurry and subsequent formation failure in zone 36 or unacceptably low pressure in zone 30. The purpose of this invention is to provide a means to induce a back-pressure inside the casing, thus limiting or eliminating the U-tube effect.
[0011] By controlling the cement flow rate and thus the pressure in zones 30 and 32, the flow of cement into the annulus can be controlled, resulting in turn in better control over the placement and quality of the cement, especially that of foamed cements. There remains a need for a system or apparatus that would provide such control.
SUMMARY OF THE INVENTION
[0012] In accordance with preferred embodiments of the invention there is provided for controlling the cement pressure. Thus the present invention also provides means for controlling the flow of cement into the annulus, resulting in turn in better control over the placement and quality of the cement.
[0013] As used in this specification and claims the following terms shall have the following meanings:
"Above," "upper," and "uphole," shall all refer to objects or locations that are relatively closer to the surface than a second object or location.
[0014] In certain embodiments, the present invention provides a method for preventing undesired cement flow in a well containing a tubing string, comprising the steps of: a) determining a desired pressure drop for a desired flow rate at a desired location in the tubing string; b) determining a flow area that will cause the desired pressure drop; and c) installing in the tubing string a choke having at least one port, wherein the total cross-sectional area of the port or ports equals the desired flow area.
[0015] The choke may includes at least two ports and may further include at least one rupture disk disposed in a port and at least one port that is unobstructed. The rupture disk is selected to rupture when the pressure drop across the choke exceeds a predetermined value.
[0016] The choke may be positioned in the well below a float collar or the like. The method may further include the step of cementing the well using foamed cement and, if desired, the foamed cement may have a density that is less than the lowest density that could have been used if the choke were not in place.
[0017] The desired pressure drop across the choke may be in the range of between 100 (0.69 MPa) and 1000 psi (6.9 MPa) and in some embodiments at least one port can be actuated from a closed mode to an open mode. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] For a more detailed understanding of the invention, reference is made to the accompanying wherein:
[0019] Figure 1 is a schematic illustration of a conventional cementing arrangement; and
[0020] Figure 2 is a schematic illustration of a cementing arrangement configured in accordance with one embodiment of the present invention.
DETAILED DESCRIPTION OF A PREFERRED EMBODIMENT
[0021] Referring now to Figure 2, the strings 12, 16 and 17, packer 15, and float collar 14 are configured essentially as set out above with respect to Figure 1. In addition to float collar 14 near the bottom of string 12, a choke 20 is included in string 12. Choke 20 creates an additional pressure zone, 33, which is below float collar 14 and above choke 20. Choke 20 comprises a body 20 that is affixed to the inner surface of string 12 and includes at least one and preferably a plurality of longitudinal bores or ports 24 extending therethrough. As discussed below, the total area of bore(s) 24 is preferably selectively determined based on the desired pressure drop across choke 20 and the anticipated viscosity, density, pressure and flow rate of the cement.
[0022] As is known in the art, a constriction in the flow of an inviscid, incompressible fluid will cause a pressure drop ΔΡ that is a function of the fluid density and the velocities of the fluid upstream of the constriction and at the constriction, per Eq. (1):
Figure imgf000006_0001
[0023] Since the velocity is dependent on flow area for an incompressible fluid,
V = V' (¾)
and ΔΡ can be expressed as function of the ratio of flow areas:
Figure imgf000006_0002
where p= density, vj and V2 are the velocity upstream and at the choke, respectively, and A/ is the cross-sectional area of zone 33 and A2 is the sum of the cross-sectional areas of bore(s) 24, respectively. To compensate for frictional losses and the effect of viscosity, a discharge coefficient may be included in the equation. [0024] In preferred embodiments, choke 20 comprises a drillable plate that is inserted in the casing/liner string to be cemented in place below any float collar or landing collar, so as to avoid interference with any existing casing/liner hardware. The diameter(s) and total area of bore(s) 24 is selected so that induce a specific, desired back-pressure will be induced inside the casing at the intended flow rate(s).
[0025] By way of example only, in a 9 5/8 inch (24.5 cm) liner, the ID of the liner will be 8.535 inches (21.7 cm) and choke 20 may include 4 bores each having a diameter of 1/4 inches (6.4 mm). At total flow rates in the range of 3 bbl/min to 4 bbl/min this configuration would result in a pressure drop of 320 psi (2.2 MPa) to 570 psi (3.9 MPa) across choke 20.
[0026] In preferred embodiments, one or more of bores 24 may include a rupture disk 26 therein. Rupture disks may be conventional rupture disks such as are known in the art. The purpose of the rupture disks is to allow continued fluid flow in the event bores 24 become plugged or the induced back-pressure in zone 33 is higher than intended. Each rupture disk can be optionally designed to fail at various pressures. By way of example only, one rupture disk may be designed to fail when the pressure in zone 33 is 250 psi (1.7 MPa) above desired backpressure, a second rupture disk may be designed to fail when the pressure in zone 33 is 500 psi above desired backpressure. In some embodiments, it may be desirable to provide rupture disks having a total area equal to or greater than the total flow area of bores 24.
[0027] By way of further example, Table 1 is provided below.
Figure imgf000007_0001
[0028] In preferred embodiments, chock 20 comprises a concrete or composite body with brass/aluminum sleeves in bores 24 for wear/erosion protection. It will be recognized by those skilled in the art that choke 20 may be constructed in any manner and of any materials that are suitable for use in a downhole environment.
[0029] By inducing controlled back-pressure inside the casing, i.e. in zone 30, 32, and 33, choke 20 reduces the U-tube effect and allows more control and placement of the cementing fluids. It also reduces the risk of bubble coalescence during foamed cementing operations.
[0030] In addition, positive pressure indication during the cementing operation helps ensure proper placement and displacement of fluids and ensures better control over the entire pumping process, thus a better-quality cementation of the pipe in the wellbore. In turn, the present invention allows the use of foamed cements having a higher gas/liquid ratio than would otherwise be possible, enabling lower effective density cement slurries to be pumped with control.
[0031] The present invention avoids interference with subsea plug launch systems, as well as ensuring that the backpressure is present during the entire mixing and displacement. Further, the present invention allows for normal cementing operations with minimum modifications to the current casing design.
[0032] While the present invention has been described herein in terms of preferred
embodiments, it will be understood that various modifications can be made thereto without departing from the scope of the invention, which is established by the claims that follows. For example, the dimensions, configuration, orientation, materials, and number of the present choke that are used in a given well can vary and are limited only by their suitability for that well. By way of specific examples: bore(s) 24 do not need to be longitudinal or cylindrical, so long as they extend from zone 33 to zone 34; rupture disks 26 need not be disposed in the radially outer bore(s); and the distance between choke 20 and float collar 14 can be set to any desired value or order in the pipe string. It is also envisioned that controllable embodiments of choke 20 can be constructed, in which one or more bore(s) 24 can be actuated to an open mode as desired, using a control mechanism or signal from the surface or elsewhere.

Claims

C L A I M S What is claimed is:
1. A method for preventing undesired cement flow in a well containing a tubing string, comprising the steps of:
a) determining a desired pressure drop for a desired flow rate at a desired location in the tubing string;
b) determining a flow area that will cause the desired pressure drop; and c) installing in the tubing string a choke having at least one port, wherein the total cross-sectional area of the port or ports equals the desired flow area.
2. The method according to claim 1 wherein the choke includes at least two ports.
3. The method according to claim 1 wherein the choke includes at least one rupture disk disposed in a port and at least one port that is unobstructed.
4. The method according to claim 3 wherein the rupture disk is selected to rupture when the pressure drop across the choke exceeds a predetermined value.
5. The method according to claim 1 wherein step c) comprises installing the choke below a float collar in the well.
6. The method according to claim 1, further including the step of:
d) cementing the well using foamed cement.
7. The method according to claim 6 wherein the foamed cement has a density that is less than the lowest density that could have been used if the choke were not in place.
8. The method according to claim 1 wherein the desired pressure drop is in the range of between 100 (0.69 MPa) and 1000 psi (6.9 MPa).
9. The method according to claim 1 wherein at least one port can be actuated from a closed mode to an open mode.
PCT/US2011/060576 2010-11-15 2011-11-14 System for controlling cement flow in a well WO2012068006A2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US13/885,132 US20130233549A1 (en) 2010-11-15 2011-11-14 System for controlling cement flow in a well

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US41367610P 2010-11-15 2010-11-15
US61/413,676 2010-11-15

Publications (2)

Publication Number Publication Date
WO2012068006A2 true WO2012068006A2 (en) 2012-05-24
WO2012068006A3 WO2012068006A3 (en) 2012-08-16

Family

ID=46084588

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/US2011/060576 WO2012068006A2 (en) 2010-11-15 2011-11-14 System for controlling cement flow in a well

Country Status (2)

Country Link
US (1) US20130233549A1 (en)
WO (1) WO2012068006A2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111058794A (en) * 2019-11-26 2020-04-24 中国石油天然气股份有限公司 Control method and device for applying back pressure to annulus

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10113394B2 (en) * 2014-02-11 2018-10-30 Smith International, Inc. Multi-stage flow device
US9644450B2 (en) 2015-01-26 2017-05-09 Halliburton Energy Services, Inc. Well flow control assemblies and associated methods
CN105114031B (en) * 2015-08-27 2018-02-27 长江大学 A kind of well cementation compress control method and system for U-tube effect
CN107247816B (en) * 2016-07-20 2020-09-04 西南石油大学 Method for judging farthest construction radius of cold recovery chemical viscosity reduction for heavy oil reservoir
CN110487668B (en) * 2018-05-15 2022-03-08 中国石油化工股份有限公司 Detection device and detection method for foam cement density along with pressure change
US10914135B2 (en) * 2018-09-27 2021-02-09 Halliburton Energy Services, Inc. Attachments for mitigating set cement downhole
US20210239549A1 (en) * 2020-01-31 2021-08-05 Halliburton Energy Services, Inc. Fiber optic distributed sensing using a cement deployment system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4730676A (en) * 1982-12-06 1988-03-15 Halliburton Company Downhole foam generator
US20020153138A1 (en) * 2001-04-20 2002-10-24 Phillips Petroleum Company Downhole cementing system
US20080257605A1 (en) * 2002-08-30 2008-10-23 Hewson James A Method of forming a bore
US7533729B2 (en) * 2005-11-01 2009-05-19 Halliburton Energy Services, Inc. Reverse cementing float equipment

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3123517A (en) * 1964-03-03 Conduit string
US2884074A (en) * 1953-06-17 1959-04-28 Phillips Petroleum Co Deep well casing orifice and check valve
US3013612A (en) * 1957-09-13 1961-12-19 Phillips Petroleum Co Casing bottom fill device
US4522264A (en) * 1983-09-02 1985-06-11 Otis Engineering Corporation Apparatus and method for treating wells
GB8922302D0 (en) * 1989-10-03 1989-11-15 Gullett Paul D M The control of'u'tubing in the flow of cement in oil well casings

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4730676A (en) * 1982-12-06 1988-03-15 Halliburton Company Downhole foam generator
US20020153138A1 (en) * 2001-04-20 2002-10-24 Phillips Petroleum Company Downhole cementing system
US20080257605A1 (en) * 2002-08-30 2008-10-23 Hewson James A Method of forming a bore
US7533729B2 (en) * 2005-11-01 2009-05-19 Halliburton Energy Services, Inc. Reverse cementing float equipment

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111058794A (en) * 2019-11-26 2020-04-24 中国石油天然气股份有限公司 Control method and device for applying back pressure to annulus

Also Published As

Publication number Publication date
WO2012068006A3 (en) 2012-08-16
US20130233549A1 (en) 2013-09-12

Similar Documents

Publication Publication Date Title
US20130233549A1 (en) System for controlling cement flow in a well
US8789582B2 (en) Apparatus and methods for well cementing
US7231975B2 (en) Borehole stabilisation
US6634430B2 (en) Method for installation of evacuated tubular conduits
AU2014413665B2 (en) Method for using managed pressure drilling with epoxy resin
US7475726B2 (en) Continuous monobore liquid lining system
WO2003042494A1 (en) Method and apparatus for borehole stabilisation
EP2161405A1 (en) An assembly and method for placing a cement plug
WO2022132183A1 (en) Single sleeve, multi-stage cementer
US20110315381A1 (en) Compositions and method for use in plugging a well
EP1026365A2 (en) Liner assembly and method of running the same
US9494000B2 (en) Methods of maintaining sufficient hydrostatic pressure in multiple intervals of a wellbore in a soft formation
US11519258B2 (en) Pressure testing casing string during reverse cementing operations
CA2977231C (en) Methods for cementing a subterranean wellbore
US20120145382A1 (en) System and Method for Operating Multiple Valves
CA2761477C (en) System and method for operating multiple valves
AU2018410835A1 (en) Downhole check valve assembly with a frustoconical mandrel
GB2522882A (en) Method, downhole system and fluid laden with particles to form a barrier or restriction in a wellbore flow channel

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 11842113

Country of ref document: EP

Kind code of ref document: A2

WWE Wipo information: entry into national phase

Ref document number: 13885132

Country of ref document: US

NENP Non-entry into the national phase in:

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 11842113

Country of ref document: EP

Kind code of ref document: A2