WO2013060086A1 - Wall-mounted pipeline heating bag type water dispenser - Google Patents

Wall-mounted pipeline heating bag type water dispenser Download PDF

Info

Publication number
WO2013060086A1
WO2013060086A1 PCT/CN2012/000205 CN2012000205W WO2013060086A1 WO 2013060086 A1 WO2013060086 A1 WO 2013060086A1 CN 2012000205 W CN2012000205 W CN 2012000205W WO 2013060086 A1 WO2013060086 A1 WO 2013060086A1
Authority
WO
WIPO (PCT)
Prior art keywords
water
valve
heating
water supply
supply pipe
Prior art date
Application number
PCT/CN2012/000205
Other languages
French (fr)
Chinese (zh)
Inventor
李万红
Original Assignee
Li Wanhong
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Li Wanhong filed Critical Li Wanhong
Publication of WO2013060086A1 publication Critical patent/WO2013060086A1/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B67OPENING, CLOSING OR CLEANING BOTTLES, JARS OR SIMILAR CONTAINERS; LIQUID HANDLING
    • B67DDISPENSING, DELIVERING OR TRANSFERRING LIQUIDS, NOT OTHERWISE PROVIDED FOR
    • B67D3/00Apparatus or devices for controlling flow of liquids under gravity from storage containers for dispensing purposes
    • B67D3/0022Apparatus or devices for controlling flow of liquids under gravity from storage containers for dispensing purposes provided with heating arrangements

Definitions

  • the present invention relates to the field of water bag machines, and more particularly to a wall-mounted pipe heating bag water machine.
  • the conventional water dispenser has the disadvantages of large occupied space, inconvenient use in a flowing environment, limited space environment, and energy consumption.
  • the wall-mounted pipeline heating bag water machine has a small size, does not occupy a position, and is energy-saving and environmentally friendly.
  • the advantages are to be used in the form of hanging in the wall to adapt to the needs of special environments, such as the environment of mobile cars, boats and housing.
  • the object of the present invention is to solve the above-mentioned deficiencies of conventional water dispensers, and the book provides a wall-mounted pipeline heating bag water machine to the society, and the advantages of the present invention are -
  • the rapid heating system (001) adopts an advanced non-open flame, non-oxidizing electrothermal film quartz tube as a heat source, electrothermal film quartz tube water and electricity separation, direct heating, "fire water” mode, to achieve heating of drinking water,
  • the thermal efficiency is up to 97%.
  • the power is turned on, the drinking water reaches a boiling state in 5-8 seconds.
  • the rapid heating system (001) uses a switch delay circuit and a de-flow decompression device to enhance the safety factor of the machine operation. It not only greatly reduces the control elements of the pipeline heating, but also the degree of freedom of operation in practical applications. Greatly widened, so you can achieve the desired opening and closing of the water valve (5), to obtain the required amount of boiling water.
  • the power-on time of the water-heating is 60 seconds, which can save more than 80% of electricity by the conventional drinking machine, and the hat of the water-consuming "powered tiger" is removed in one fell swoop.
  • the electrothermal film quartz heating tube is a process of printing inorganic ceramics, glass and various non-metal conductive materials through printing, high-temperature sintering, etc., and is laminated on the outer surface of the glass tube to form an inorganic conductive resistive film layer, and the resistive film layer passes through The current is generated by conduction and convection.
  • High-strength special temperature-resistant glass is used as the carrier of the heating tube to realize complete separation of hydropower.
  • the heating film is prepared on the outer surface of the glass tube, and the heated water circulates through the tube, which is safe and reliable, and never leaks; the heating film and the glass tube are permanently made. Integral, using direct heating, thermal efficiency of up to 97%.
  • Rapid heating system consisting of three electric heating film quartz heating tubes (21)
  • the series consists of a series of end-to-end and step-by-step heating, using the "fire-in-water” mode to heat the drinking water, so that the drinking water reaches an instant boiling state within 5_8 seconds; the dredging pressure reducing valve (12) and the delay
  • the complementary function of the switch (29) realizes the intelligent control of the machine, and protects the machine in a safe state under any circumstances; the switch delay circuit sets the delay heating time to 60 seconds, so that the water output per time Not less than 350ml.
  • a wall-mounted pipeline heating bag water machine is composed of a water supply system, a rapid heating system (001) and an installation and protection system:
  • the water supply system includes: a cover (1) on the body (2) ), water bag (4), water outlet valve (5), water head (6), switch tube (7), fixed nut (8), water supply pipe (9) and tank interface (10);
  • Thermal heating system (001) including: boiling water tee (11), dredging decompression wide (12), boiling water pipe (13), thermostat (14), cold water tee (16), wires and junctions ( 17), connecting pipe (18), check valve (19), electric heating film quartz heating pipe (21), water supply pipe (23), circuit board (26), water inlet (25), drain (27) and extension Time switch (29);
  • the components of the installation and protection system include: hook (3), lower body and wall (24) on it, protection box (15), mounting bracket (20), integrated screw hole (28) and a fixed pupil (30); characterized in that: the three electrothermal pancreatic quartz heating tubes (21) are connected in series and
  • the water inlet (25) at the lower end of the heater is connected to the water supply pipe (23), and the upper port of the water supply pipe (23) is connected to the check valve (19), the check valve
  • the upper port of (19) is connected to the water intake head (6) through the water supply pipe (9);
  • the switch delay circuit board (26) is set to delay heating for 60 seconds, each heating The water output of the duration is not less than 350 ml;
  • the heater consisting of three electric heating film quartz heating tubes (21) connected in series is installed in the protection box (15): the cover (1) and the upper body (2) Using a hinge connection, the upper body (2) acts as a loading box for the water bag (4), and the water bag (4) is loaded into the upper body (2) from above, and the bottom of the upper body (2) Center, the water head (6) is fixed by a fixed cap (8), below the water head (6), connected to the water supply pipe (9), the other end of the water supply pipe (9), and the rapid heating system
  • the heater in (001) is connected; the water bag (4) is vertically
  • the tube (7) is discharged from the outlet valve (5); the outlet valve (5) is compatible with the function of the cold and hot water switch; the upper body (2) is connected to the lower body through the tank interface (10) The back of the upper body (2) is provided with a hook (3); the wall-mounted bag water machine is used in a form suspended from a wall; the bottom of the machine is also provided below Wall (24).
  • the three electrothermal film quartz heating tubes (21) are sequentially installed at corresponding positions of the mounting frame (20), and adjacent two ports of the electrothermal film quartz heating tube (21) on the mounting frame (20) Connected in series by the connecting pipe (18) to form a lineup of "S"-shaped temperature rise.
  • the lower port (25) of the electrothermal film quartz heating tube (21) of the step-up heating line is connected with the water supply pipe (22), and the upper end thereof passes through the boiling water pipe (13) and the desuperheating pressure reducing valve.
  • boiling water tee (11) splicing, boiling water tee (11) The other port is connected to the outlet valve (5).
  • the intelligent control refers to that when the user uses the wall-mounted pipeline to heat the water bag machine, there is no complicated control program to operate, and the machine can be used arbitrarily according to the daily use of the user.
  • the random and convenient mode of operation is due to the fact that the rapid heating system (001) uses the dehydration relief valve (12) and the delay switch (29) to complement each other.
  • the dredging pressure reducing valve (12) is composed of a three-way upper valve body (1201), a ball seat (1202), a valve ball (1203), a valve spring (1204), and a lower valve body (1205).
  • the upper valve body (1201) and the lower valve body (1205) are screwed to form a valve body cavity, and the upper valve body (i20i) serves as a valve ball seat (1202) of the valve ball (1203); 204) Press the valve ball (1203) onto the valve seat (202).
  • the dredging pressure reducing valve (12) is connected in parallel between the hot and cold water pipes, and a port boiling water pipe in the three-way upper valve body (1201) of the dredging pressure reducing valve (12) 13) Connected, the other port of the tee is connected to the outlet valve (5); the lower end of the diverting pressure reducing valve (12) and the upper valve body of the three-way type in the check valve (19) (1201).
  • the phase is connected, when the drinking water is boiling, and the delay circuit is still in working condition, the water and gas pressure generated by the rapid heating system (001) can be released through the desuperheating valve (12). Achieve safe heating.
  • the upper valve body of the dredging pressure reducing valve (12) and the check valve (19) are three-way, and the geometrical shape and structure thereof are also uniform and universal, and only need to replace the internal
  • the device can achieve different application purposes, in order to save the whole machine manufacturing.
  • the delay switch circuit board (23) is characterized in that: when the machine is in the standby state, the drink machine is connected to the power source, the 220V mains is rectified by D1-D4, R2 is limited to current limit, and C3 is filtered. , get the DC working voltage. Then, by R4 current limiting, VT1 is turned on by a base bias current, and the trigger current of the unidirectional thyristor SCR is short-circuited to ground by VT1. Since the SCR has no trigger current, the main circuit is in the off state, and the machine does not work. . When the machine is heated, press the delay switch (29) while the electrolytic capacitor C 2 is charging, and VT2 is turned on by a base bias current.
  • the base bias current of VT1 is VT2 to ground.
  • Short circuit VT1 is cut off due to loss of base bias current, SCR trigger terminal gets trigger current, and is turned on, the brewer starts to work; when the delay switch (29) is released, the base bias current of VT2 is broken again.
  • the base bias current of VT2 can still be maintained through R5, VT2 is turned on, VT1 is turned off, SCR continues to conduct, and the drinking machine is always working, when C 2
  • the upper charging voltage is released and VT2 has no base bias current and is turned off, VT21 is turned on, and the SCR turns off the main circuit and stops.
  • the delay operation time of the delay switch circuit is set to 60 seconds, and the amount of water that can be output by the drink machine is not less than 35 (1 ⁇ 21).
  • the amount of water used by the user may not be exactly 350 ml. Since the machine adopts the dredging pressure reducing valve (12), when the dosage is less than 350ml, the user can close the outlet valve (5) casually, because the dewatering pressure reducing valve (12) installed in the machine is closed. After the valve (5), it will start by itself, and the boiling water will be returned to the water dispenser. Thus, although the machine is working for a few seconds, it is replaced by the safe operation and convenient use of the machine.
  • the check valve (19) of the rapid heating system (001) is characterized in that: the check valve (19) is composed of a three-way upper valve body (1901), a closed port (1902), a ceramic valve
  • the root (1903), the round valve ⁇ (1904) and the lower valve body (1905), the upper valve body (1901) and the lower valve body (1905) are screwed together to form a valve cavity of the check valve (19)
  • the soft cavity is provided in the valve cavity (1904), the circular valve flap (1904) and the valve flap root (1903) have an L-shaped structure, and the circular valve flap (1904) and the valve flap root (1903) are a system.
  • the valve root is embedded in a predetermined groove of the upper jaw body (i9 (U) and the lower valve body (i905); the check valve (19) is connected in series with the water supply pipe (9) ) in the pipeline between the water supply pipe (23),
  • the upper valve body (1901) of the check valve (19) is a three-way connecting body and functions as a cold water tee (16) according to the present invention.
  • the thermostat (14) of the rapid heating system (001) is characterized in that: a thermostat (14), an electrothermal film quartz heating tube (21) arranged in an "S" shape Near the boiling water outlet end, the thermostat (14), set the shutdown temperature to 105'C, when the surface temperature of the dry-burning or electrothermal film quartz heating tube (21) exceeds 105'C, the thermostat (14) ) The circuit is automatically cut off to protect the safe operation of the machine.
  • the delay switch (29) of the rapid heating system (001) is characterized in that: the delay switch (29) controls the action of the delay switch circuit, and the circuit principle has the above text, no longer repeat.
  • the circuit board (26) of the time delay switch circuit is installed under the protection box (15), and the electrical nodes in the machine are connected by wires and the array shown by the node (17).
  • the protection box (15) of the rapid heating system (001) is characterized in that: an upper part of the protection box (15) is provided with a check valve (19) and a three-way pressure reducing valve (12) Part of the through hole for the input and output of cold and hot water; the outside of the bottom of the protective case (15), the mounting post of the indented circuit board (26), the circuit board of the delay switch circuit ( 26) can be accommodated therein; the upper and lower sides of the protection box (15) are further provided with an integrated screw hole (28) and a drain port (27) of the protection box (15), and are connected through the power line.
  • the preset hole; the inside of the protection box (15) is provided with a mounting bracket (20) of the rapid heating system (001).
  • the mounting bracket (20) is two vertical brackets, and the bracket is provided with a semi-circular electric heating film quartz heating tube (21) mounting column, and two semi-circular mounting posts are provided.
  • the combination of the mounting brackets (20) encloses the electrothermal film quartz heating tube (21) on the mounting bracket (20).
  • the mounting bracket (20) and the protective box (15) are integrally molded; the protective box (15) is composed of two symmetrical half-box synthetic protective boxes (15).
  • connection sequence of the rapid heating system (001) is: the cold water tee (16) receives the water supply pipe (9) water supply, and the drinking water is connected to the water inlet (25) via the check valve (19)
  • the connecting tube (18) is connected in series with the "S"-shaped electric heating film quartz heating tube (21) at the lower port, and the drinking water flows into the electric heating film quartz heating tube (21) and receives the "fire-in-water” heating mode.
  • the drain port (27) of the rapid heating system (001) is characterized in that: the drain port (27) is symmetrically arranged with the water inlet port (25), and when the machine needs to be cleaned, the drain port is opened (27) ) The water in the machine can be drained and cleaned up.
  • the rapid heating system (001) is compact, compact, and self-contained, and can not only independently serve as a heating task for any drinking machine, but also design a broad-spectrum heating component for water appliances according to compatibility requirements. In particular, it is an optimization solution to replace the traditional hot water tank.
  • FIG. 1 is a schematic structural view of a water-filled bag water machine according to the present invention.
  • FIG. 2 is a schematic structural view of a rapid heating system (001) according to the present invention.
  • FIG 3 is a schematic structural view of a recirculation pressure reducing valve and a check valve according to the present invention.
  • FIG. 4 is an electrical circuit diagram of a time delay switch of the present invention.
  • FIG. 1 The uniform label names in Figures 1 and 2 are: rapid heating system (001), cover (1), upper body (2), hook (3), water bag (4), outlet valve (5), Water head (6), switch tube (7), fixed nut (8), water supply pipe (9), tank interface (10), boiling water tee (11), dredging pressure reducing valve (12), boiling water pipe (13), thermostat (14), protection box (15), cold water tee (16), wire and junction (17), connecting pipe (18), check valve (19), mounting bracket (20) , electric heating film quartz heating tube (21), mounting column (22), water supply pipe (23), lower body wall (24), water inlet (25), circuit board (26), drain port (27), integrated screw Hole (28), switch (29) and fixing screw hole (30).
  • FIG. 3 The labeling names of FIG. 3 are: a diverting pressure reducing valve (12), a three-way upper valve body (1201), a ball seat (1202), a valve ball (1203), a valve spring (1204), a lower valve. Body (1205).
  • FIG. 4 The labeling names of FIG. 4 are: check valve (19), three-way upper valve body (1901), closed port (1902), valve flap root (1903), round valve flap (1904), lower valve body ( 1905)
  • FIG. 5 is a circuit diagram of a time delay switch of the present invention.
  • a wall-mounted pipeline heating bag water machine can be divided into two parts, namely a water supply part and a heating part.
  • the water supply part includes: a cover (1) on the cover (1), a hook (3), a water bag (4), a water outlet valve (5), and a water intake head ( 6), a switch tube (7), a fixed nut (8), a water supply pipe (9), a tank interface (10), characterized in that: the water bag (4) is vertically placed as a water tank In the upper body (2), when the water bag (4) is placed, the water head (6) will pierce the water bag (4), and the drinking water passes through the water head (6), the water supply pipe (9), and the check valve ( 19), rapid heating system
  • the system (001) water supply; the outlet valve (5), compatible with the cold and hot water switch function, serves as a two-valve task. This is because the instant boiling heating system (001) is not in the normal state. What needs to be heated by electricity is water at normal temperature. At this time, the so-called cold drinking water can be obtained by opening the water outlet valve (5).
  • the heating part is composed of a water outlet valve (5), a water supply pipe (9), a cold water tee (16), a boiling water pipe (13), and a desuperheating pressure reducing valve (12). ), thermostat (14), boiling water tee (11), connecting pipe (18), check valve (19), electric heating film quartz heating pipe (21), water supply pipe (23) and water inlet (25) .
  • the cold water tee (16) turns on the water supply pipe (9), receives the water supply pipe (9) water supply, and the drinking water enters the water supply pipe (23) via the check valve (i9).
  • the water supply pipe (23) is connected to the water inlet (25) of the electrothermal film quartz heat pipe (21), and enters the electric heating film quartz heat pipe (21) which is connected in series by the communication pipe (18) into an "S" shape.
  • the device of the control system is composed of a desuperheating pressure reducing valve (12), a thermostat (14), a check valve (19), a circuit board (26), and a delay.
  • the time switch (29) is combined.
  • the function of the dredging pressure reducing valve (12) is that when the drinking water is boiled, the delay circuit is still in the working state and the outlet valve (5) is closed, the rapid heating is performed.
  • the pressure generated by the system (001) can be released through the sluice relief valve (12) for safe heating.
  • the dredging pressure reducing valve (12) is composed of a three-way upper body (1201), a ball seat (1202), a valve ball (1203), and a spring (1204). And a lower valve body (1205), the upper valve body (1201) and the lower valve body (1205) are screwed to form a valve body cavity, and the upper valve body (1201) acts as a valve ball seat (1202) of the valve ball (1203), The valve spring (1204) presses the valve ball (1203) onto the ball seat (1202).
  • the dredging pressure reducing valve (12) is installed in parallel on the pipeline between the boiling water pipe (13) and the water supply pipe (9) so as to close the water outlet valve (5).
  • the high-pressure water and gas are discharged back into the water supply pipe (9);
  • the upper valve body (201) of the dewatering and decompression reading (12) is a three-way port and the boiling water pipe (13) Connected, the other port of the boiling water tee (11) is connected to the outlet valve (5);
  • Body (301) When the phase is connected, when the drinking water is boiling and the delay circuit is still working, but the outlet valve (5) is closed, the high-pressure water generated by the rapid heating system (001) will open the diverting pressure reducing valve ( The ball (1203) in the 12) discharges the high-pressure water and gas back into the water supply pipe (9) for safe heating.
  • the check valve (19) is composed of a three-way upper valve body (1901), a closed U (1902), a valve flap root (103), a circular valve flap (1904), and
  • the lower valve body (1905) is composed of the upper valve body (1901) and the lower valve body (1905), forming a valve cavity of the check valve (19), wherein the valve chamber is provided with a soft
  • the circular valve flap (1904), the round valve (1904) and the valve stem root (1903) have an L-shaped structure, and the circular valve flap (1904) and the valve flap root (1903) are integrally formed, and the valve stem root (1903) is buried.
  • the check valve (19) Planted in a preset groove of the upper valve body (i90i) and the lower valve body (1905) screwing portion; the check valve (19) is connected in series with the water supply pipe (23), and has the function of controlling drinking water only. Out of the function; to enable drinking water to achieve heating in a closed environment.
  • the thermostat (14) as shown in FIG. 2 is connected in series to the zero line of the main circuit, and is disposed at the boiling water outlet of the electrothermal film quartz heating tube (21) of the "S" type series.
  • the temperature of the open circuit set by the thermostat (14) is 105*C.
  • the bimetal in the thermostat (14) The separation principle is generated due to the difference in thermal expansion coefficient, which automatically cuts off the circuit and protects the safe operation of the machine.
  • the functions and principles of the delay switch (29) and the circuit board (26) are:
  • the drinking machine is connected to the power supply in the standby state, and the 220V main power is rectified by the Dl-D4.
  • R2 voltage limiting current limit, C 3 filtering to obtain DC working voltage.
  • VT1 is turned on by the base bias current
  • the trigger current of the unidirectional thyristor SCR is shorted to ground by VT1. Since the SCR has no trigger current, the main circuit is in the off state, and the machine does not work.
  • the delay switch (29) is pressed, the electrolytic capacitor C 2 is charged, and VT2 is turned on by the base bias current.
  • the base bias current of VT1 is short-circuited by VT2 to the ground.
  • VT1 is turned off due to loss of the base bias current, the SCR trigger terminal is turned on and the drinker starts to work; when the delay switch (29) is released, the base bias current of VT2 is turned off again, but
  • the base bias current of VT2 can still be maintained through R5, VT2 is turned on, VT1 is turned off, SCR continues to be turned on, and the drinking machine is constantly operated, when the charging voltage is on C 2
  • VT21 is turned on, SCR turns off the main circuit, and the machine stops.
  • the circuit board (26) of the delay switch circuit is installed in a special mounting groove below the protection box (15) to avoid the influence of high temperature on the circuit.
  • the delay time of the delay switch circuit is 60 seconds. During this period, the boiling water output by the drinking machine is not less than 350 ml. However, the user's water consumption may not be exactly 350ml, and the amount greater than or less than 350ml is objectively present. The following two conditions are described as follows -
  • the protective and installed components include: protective case (1), mounting bracket (20), drain port (27), integrated boring hole (28) and integrated screw hole (2S).
  • the upper part of the protection box (15) is provided with a check valve (19) and a through hole of the three-way portion of the flow reducing pressure reducing valve (12) for the input and output of cold and hot water. .
  • the outer surface of the bottom of the protection box (15) is provided with a special mounting post of the inwardly recessed circuit board (26), and the circuit board (26) of the delay switch circuit is accommodated therein.
  • the upper and lower sides of the protection box (15) are further provided with an integrated boring hole (28) of the protection box (15) and a drain port (27> pre-existing and power line access pre- Hole
  • an integrated screw hole (28) of the protection box (15) is disposed for fixing and mounting.
  • a mounting frame (20) of a rapid heating system (001) electrothermal film quartz tube is provided inside the protective case (15).
  • the mounting bracket (20) is two vertical brackets, and the bracket is provided with a semi-circular electric heating film quartz heating tube (21) mounting position, and two semi-circular mounting positions are provided.
  • the combination of the mounting bracket (20) is used to knead the electric heating film quartz heating tube (21) to the mounting position of the mounting bracket (20).
  • the mounting bracket (20) and the protective case (15) are integrally injection molded, and are formed by two symmetrical half boxes to form an integral protective case (15).

Abstract

A wall-mounted pipeline heating bag type water dispenser comprises a water supply system, a rapid-boiling heating system (001) and an installation and protecting system. The rapid-boiling heating system (001) includes a boiling water tee joint (11), a flow draining and pressure reducing valve (12), a boiling water pipe (13), a temperature controller (14), a cold water tee joint (16), a check valve (19), electric heating film quartz heating pipes (21), a water supply pipe (23), an electric circuit board (26) and a delay switch (29). A heater, which is heated step by step, is comprised of three electric heating film quartz heating pipes (21) connected in series end to end, and allows the drinking water to reach a boiling state in 5 to 8 seconds; By the combined action of the flow draining and pressure reducing valve (12), the delay switch (29) and the temperature controller (14), the heater can realize the dynamic intelligent control to the dispenser, which ensures safety operation of the dispenser under any conditions; By a switch delay electric circuit board(26), the time interval for delay heating is set at 60 seconds, so that the water outlet capacity is not less than 350ml each time. The instant boiling technology used in the invention can save electric energy consumption and cut back the manufacturing cost of the water dispenser because there is no parts such as an exhaust device, a cold water switch and the like in the conventional water dispenser.

Description

一种壁挂式管路加热袋水机 技术领域  Wall-mounted pipeline heating bag water machine
[0001] 本发明涉及袋水机的领域, 特别是一种壁挂式管路加热袋水机。  [0001] The present invention relates to the field of water bag machines, and more particularly to a wall-mounted pipe heating bag water machine.
背景技术 说 Background art
[0002] 常规的饮水机存在占用空间大, 不便在流动的场合、 空间有限的环境中使用及耗能的弊 端, 壁挂式管路加热袋水机具有体积小巧, 不占用安放的位置, 节能环保等优势, 以悬挂于壁体 的形式实现使用, 以适应特殊环境的需要, 如流动的车、 船及住房紧张等的环境。  [0002] The conventional water dispenser has the disadvantages of large occupied space, inconvenient use in a flowing environment, limited space environment, and energy consumption. The wall-mounted pipeline heating bag water machine has a small size, does not occupy a position, and is energy-saving and environmentally friendly. The advantages are to be used in the form of hanging in the wall to adapt to the needs of special environments, such as the environment of mobile cars, boats and housing.
[0003] 本发明之目的, 是解决常规饮水机上述之不足,书向社会提供一种壁挂式管路加热袋水机, 本发明的优点在于-[0003] The object of the present invention is to solve the above-mentioned deficiencies of conventional water dispensers, and the book provides a wall-mounted pipeline heating bag water machine to the society, and the advantages of the present invention are -
[0004] 1、壁挂式袋水机, 体积小巧, 不占用安放的位置, 以悬挂于壁体的形式以适应特殊环境, 如流动的车、 船、 住房紧张等。 [0004] 1, wall-mounted bag water machine, small size, does not occupy the location of the position, to hang in the form of the wall to adapt to special circumstances, such as mobile cars, boats, housing tension and so on.
[0005] 2、 瞬间沸腾。 速热加热系统 (001)采用先进的无明火、 不会氧化的电热膜石英管为发热 源, 电热膜石英管水电分离、 直接加热, "以火包水"的模式, 实现对饮水的加热, 使热效率髙 达 97%。 接通电源, 饮水在 5-8秒钟就达到沸腾的状态。  [0005] 2, instant boiling. The rapid heating system (001) adopts an advanced non-open flame, non-oxidizing electrothermal film quartz tube as a heat source, electrothermal film quartz tube water and electricity separation, direct heating, "fire water" mode, to achieve heating of drinking water, The thermal efficiency is up to 97%. When the power is turned on, the drinking water reaches a boiling state in 5-8 seconds.
[0006] 3、 智能控制。 速热加热系统 (001) , 采用开关延时电路及疏流减压装置, 增强了机器运 行的安全系数, 不但大幅精简了管路加热的控制元件, 且在实际应用中, 由于操作的自由度大为 拓宽, 故能实现随心所欲的启、 闭出水阀 (5) , 获取所需的开水用量。  [0006] 3, intelligent control. The rapid heating system (001) uses a switch delay circuit and a de-flow decompression device to enhance the safety factor of the machine operation. It not only greatly reduces the control elements of the pipeline heating, but also the degree of freedom of operation in practical applications. Greatly widened, so you can achieve the desired opening and closing of the water valve (5), to obtain the required amount of boiling water.
[0007] 4、 环保节能。 本发明设定, 取水加热的每次通电时长为 60秒, 比传统饮机可节电 80% 以上, 一举摘掉饮水机 "耗电老虎"的帽子。  [0007] 4, environmental protection and energy conservation. According to the invention, the power-on time of the water-heating is 60 seconds, which can save more than 80% of electricity by the conventional drinking machine, and the hat of the water-consuming "powered tiger" is removed in one fell swoop.
发明内容 Summary of the invention
[0008] 本发明的技术方案是这样实现的:  [0008] The technical solution of the present invention is implemented as follows:
[0009] 电热膜石英发热管是将无机陶瓷、 玻璃和多种非金属导电材料经过印刷、 高温烧结等工 艺, 复合在玻璃管的外表面, 形成一层无机导电电阻膜层, 电阻膜层通过电流后经传导、 对流方 式而产生热量。 采用高强度特种耐温玻璃作为发热管的载体, 实现水电完全分离, 发热膜制备在 玻璃管的外表面, 加热的水从管内循环通行, 安全可靠, 永不漏电; 发热膜与玻璃管永久制成一 体, 采用直接加热方式, 热效率高达 97%。 速热加热系统 (001), 由三条电热膜石英发热管 (21 ) 串联组成首尾相接、逐级升温的阵容,采用"以火包水"的模式,对饮水实施加热,使饮水在 5_8 秒内达到瞬间沸腾的状态; 疏流减压阀(12)与延时开关(29)的互补, 实现对机器的智能控制, 保护机器在任何情况下都处于安全运行的状态; 开关延时电路, 设定延时加热的时长为 60秒钟, 使每次的出水量不少于 350ml。 [0009] The electrothermal film quartz heating tube is a process of printing inorganic ceramics, glass and various non-metal conductive materials through printing, high-temperature sintering, etc., and is laminated on the outer surface of the glass tube to form an inorganic conductive resistive film layer, and the resistive film layer passes through The current is generated by conduction and convection. High-strength special temperature-resistant glass is used as the carrier of the heating tube to realize complete separation of hydropower. The heating film is prepared on the outer surface of the glass tube, and the heated water circulates through the tube, which is safe and reliable, and never leaks; the heating film and the glass tube are permanently made. Integral, using direct heating, thermal efficiency of up to 97%. Rapid heating system (001), consisting of three electric heating film quartz heating tubes (21) The series consists of a series of end-to-end and step-by-step heating, using the "fire-in-water" mode to heat the drinking water, so that the drinking water reaches an instant boiling state within 5_8 seconds; the dredging pressure reducing valve (12) and the delay The complementary function of the switch (29) realizes the intelligent control of the machine, and protects the machine in a safe state under any circumstances; the switch delay circuit sets the delay heating time to 60 seconds, so that the water output per time Not less than 350ml.
[0010] 本发明所述的瞬间沸腾的技术方案是-[0010] The technical solution of the instant boiling according to the present invention is -
[0011] 一种壁挂式管路加热袋水机,由供水系统、速热加热系统 (001)及安装及保护系统所组成: 所述的供水系统, 包括: 机盖(1 )上机体 (2)、 水包(4)、 出水阀(5) 、 取水头(6) 、 开关 管 (7) 、 固定螺帽 (8) 、 供水管 (9)及箱体接口 (10) ; 所述的速热加热系统 (001), 包括: 沸水三通(11 ) 、 疏流减压阔 ( 12) 、 沸水管(13) 、 温控器(14) 、 冷水三通 ( 16) 、 导线及 结点 (17) 、 连通管(18) 、 止回阀(19)、 电热膜石英发热管(21 )、 补水管(23)、 电路板 (26) 、进水口 (25) 、排水口 (27)及延时开关(29); 所述的安装及保护系统的部件, 包括: 挂钩(3) 、 下机体及其上的墙靠(24) 、 保护盒(15) 、 安装架(20) 、整合螺孔(28)及固定 嫘孔(30);其特征在于:所述的由三条电热胰石英发热管(21 ) , 串联组成首尾相接的,呈 "S" 形走向的, 逐级升温的加热器, 所述的加热器下端的进水口 (25) , 与补水管(23)相连接, 补 水管(23)的上端口与止回阀(19)相连接, 止回阀(19)的上端口, 通过供水管(9), 与取水 头 (6)相接通; 所述的开关延时电路板(26) , 设定延时加热的时长为 60秒钟, 每加热时长的 出水量, 不少于 350ml; 所述的由三条电热膜石英发热管 (21 ) 串联组成的加热器, 安装于保护 盒(15)之中: 所述的机盖(1 )与上机体(2)采用铰链连接, 所述的上机体(2),充当水包(4) 的装入箱, 水包(4) , 从上方装入上机体 (2) 中, 上机体(2)底部的中心, 由固定嫘帽 (8) 将取水头(6) 固定其上, 取水头(6) 的下方, 与供水管(9)相连, 供水管 (9) 的另一端, 与 速热加热系统 (001)中的加热器相连接; 所述的水包(4) , 是垂直放入充当水包箱的上机体(2) 中的; 所述的取水头(6)刺入水包(4)中, 饮水经取水头(6) 、供水管(9)及止回阀(19) , 向速热加热系统 (001)供水,加热后饮水,经开关管(7)从出水阀(5)泻出;所述的出水阀(5) , 兼容冷、热水开关功能; 所述的上机体 (2)通过箱体接口 (10), 与下机体相连接; 所述的上机 体(2) 的背面, 设有挂钩(3) ; 所述的壁挂式袋水机是以悬挂于壁体上的形式使用的; 所述的 机器背面的下方还设有墙靠(24) 。 [0011] A wall-mounted pipeline heating bag water machine is composed of a water supply system, a rapid heating system (001) and an installation and protection system: the water supply system includes: a cover (1) on the body (2) ), water bag (4), water outlet valve (5), water head (6), switch tube (7), fixed nut (8), water supply pipe (9) and tank interface (10); Thermal heating system (001), including: boiling water tee (11), dredging decompression wide (12), boiling water pipe (13), thermostat (14), cold water tee (16), wires and junctions ( 17), connecting pipe (18), check valve (19), electric heating film quartz heating pipe (21), water supply pipe (23), circuit board (26), water inlet (25), drain (27) and extension Time switch (29); the components of the installation and protection system include: hook (3), lower body and wall (24) on it, protection box (15), mounting bracket (20), integrated screw hole (28) and a fixed pupil (30); characterized in that: the three electrothermal pancreatic quartz heating tubes (21) are connected in series and end to each other, and are oriented in an "S" shape. a stepwise heating heater, the water inlet (25) at the lower end of the heater is connected to the water supply pipe (23), and the upper port of the water supply pipe (23) is connected to the check valve (19), the check valve The upper port of (19) is connected to the water intake head (6) through the water supply pipe (9); the switch delay circuit board (26) is set to delay heating for 60 seconds, each heating The water output of the duration is not less than 350 ml; the heater consisting of three electric heating film quartz heating tubes (21) connected in series is installed in the protection box (15): the cover (1) and the upper body (2) Using a hinge connection, the upper body (2) acts as a loading box for the water bag (4), and the water bag (4) is loaded into the upper body (2) from above, and the bottom of the upper body (2) Center, the water head (6) is fixed by a fixed cap (8), below the water head (6), connected to the water supply pipe (9), the other end of the water supply pipe (9), and the rapid heating system The heater in (001) is connected; the water bag (4) is vertically placed in the upper body (2) serving as a water tank; The water head (6) penetrates into the water bag (4), and the drinking water passes through the water head (6), the water supply pipe (9) and the check valve (19), supplies water to the rapid heating system (001), and drinks water after heating. The tube (7) is discharged from the outlet valve (5); the outlet valve (5) is compatible with the function of the cold and hot water switch; the upper body (2) is connected to the lower body through the tank interface (10) The back of the upper body (2) is provided with a hook (3); the wall-mounted bag water machine is used in a form suspended from a wall; the bottom of the machine is also provided below Wall (24).
[0012] 进一步, 所述的三条电热膜石英发热管(21 )顺序安装在安装架(20)相应的位置上, 安装架 (20)上的电热膜石英发热管 (21 )的相邻两端口, 由连通管 (18)采取串联连接, 形成 "S"形逐级升温的阵容。  [0012] Further, the three electrothermal film quartz heating tubes (21) are sequentially installed at corresponding positions of the mounting frame (20), and adjacent two ports of the electrothermal film quartz heating tube (21) on the mounting frame (20) Connected in series by the connecting pipe (18) to form a lineup of "S"-shaped temperature rise.
[0013] 进一步,所述的逐级升温阵容的电热膜石英发热管(21)的下端口(25)与补水管 (22) 相 连通, 其上端通过沸水管 (13)与疏流减压阀(12) 的沸水三通(11 )枏接, 沸水三通(11 ) 的 另一端口与出水阀 (5)相连接。 [0013] Further, the lower port (25) of the electrothermal film quartz heating tube (21) of the step-up heating line is connected with the water supply pipe (22), and the upper end thereof passes through the boiling water pipe (13) and the desuperheating pressure reducing valve. (12) boiling water tee (11) splicing, boiling water tee (11) The other port is connected to the outlet valve (5).
[0014] 本发明所述的智能控制是这样实现的- [0014] The intelligent control of the present invention is implemented in this way -
[0015] 所述的智能控制, 是指用户在使用壁挂式管路加热袋水机时, 没有繁琐的控制程序需要 操作, 完全可按照用户日常的使用实惯, 随意地使用机器, 这种能随意且方便的操作模式, 是得 益于速热加热系统 (001)采用了疏流减压阀(12)与延时开关(29) 巧妙互补的结果。 [0015] The intelligent control refers to that when the user uses the wall-mounted pipeline to heat the water bag machine, there is no complicated control program to operate, and the machine can be used arbitrarily according to the daily use of the user. The random and convenient mode of operation is due to the fact that the rapid heating system (001) uses the dehydration relief valve (12) and the delay switch (29) to complement each other.
[0016] 所述的疏流减压阀 (12) , 由三通式上阀体(1201 ) 、 阀球座(1202) 、 阀球(1203) 、 阀弹簧(1204)及下阀体(1205)组成, 上阀体(1201 )与下阀体(1205)采用螺合, 形成阀体 腔, 上阀体(i20i )充当阀球(1203)的阀球座 ( 1202); 所述的阀弹簧 (204)紧压阀球(1203) 于阀球座 (202)上。 [0016] The dredging pressure reducing valve (12) is composed of a three-way upper valve body (1201), a ball seat (1202), a valve ball (1203), a valve spring (1204), and a lower valve body (1205). The upper valve body (1201) and the lower valve body (1205) are screwed to form a valve body cavity, and the upper valve body (i20i) serves as a valve ball seat (1202) of the valve ball (1203); 204) Press the valve ball (1203) onto the valve seat (202).
C0017] 进一步, 所述的疏流减压阀(12) , 并联于冷热水管道之间, 疏流减压阀 (12) 的三通 式上阀体(1201 )中的一个端口 沸水管(13)相接,三通中的另一端口则 出水阀(5)相接通; 疏流减压阀 (12)的下端与止回阀 (19) 中的三通式的上阀体(1201 )相接通, 当饮水沸腾, 而 延时电路仍处工作状态的情况下, 由速热加热系统 (001)所产生的水、气压力,可通过疏流减压阀 (12)得以释放, 实现安全加热的目的。  C0017] Further, the dredging pressure reducing valve (12) is connected in parallel between the hot and cold water pipes, and a port boiling water pipe in the three-way upper valve body (1201) of the dredging pressure reducing valve (12) 13) Connected, the other port of the tee is connected to the outlet valve (5); the lower end of the diverting pressure reducing valve (12) and the upper valve body of the three-way type in the check valve (19) (1201 The phase is connected, when the drinking water is boiling, and the delay circuit is still in working condition, the water and gas pressure generated by the rapid heating system (001) can be released through the desuperheating valve (12). Achieve safe heating.
[0018] 进一步, 所述的疏流减压阀 (12)与止回阀 (19) 的上阀体均呈三通状, 其几何尺和结 构也是一致的、 通用的, 只需更换内部的器件, 就可达到不同的应用目的, 以节省整机的制造成 木。  [0018] Further, the upper valve body of the dredging pressure reducing valve (12) and the check valve (19) are three-way, and the geometrical shape and structure thereof are also uniform and universal, and only need to replace the internal The device can achieve different application purposes, in order to save the whole machine manufacturing.
[0019] 所述的延时开关电路板 (23),其特征在于:机器在待机状态时饮机是连接着电源的, 220V 市电经 D1-D4整流, R2限压限流, C 3滤波, 得到直流工作电压。然后经 R4限流, 使 VT1得到一 基极偏置电流而导通, 单向可控硅 SCR的触发电流被 VT1对地短路, SCR因无触发电流, 主回路 处于断开状态, 机器不工作。 当饮机加热时, 按一下延时开关(29)的同时, 电解电容 C 2充电, 同时 VT2得到一基极偏置电流而导通, 此时 VT1的基极偏置电流, 被 VT2对地短路, VT1因失去 基极偏置电流而截止, SCR触发端得到触发电流, 而导通, 饮机开始工作; 当松开延时开关(29) 后, VT2的基极偏置电流又被断开,但此时因有 C 2上充电电压的存在,因此仍能通过 R5维持 VT2 的基极偏置电流, VT2导通, VT1截止, SCR继续导通, 维持饮机经常工作, 当 C 2上充电电压释 放完毕, VT2无基极偏置电流而截止时, VT21导通, SCR截止主回路断开, 停机。  [0019] The delay switch circuit board (23) is characterized in that: when the machine is in the standby state, the drink machine is connected to the power source, the 220V mains is rectified by D1-D4, R2 is limited to current limit, and C3 is filtered. , get the DC working voltage. Then, by R4 current limiting, VT1 is turned on by a base bias current, and the trigger current of the unidirectional thyristor SCR is short-circuited to ground by VT1. Since the SCR has no trigger current, the main circuit is in the off state, and the machine does not work. . When the machine is heated, press the delay switch (29) while the electrolytic capacitor C 2 is charging, and VT2 is turned on by a base bias current. At this time, the base bias current of VT1 is VT2 to ground. Short circuit, VT1 is cut off due to loss of base bias current, SCR trigger terminal gets trigger current, and is turned on, the brewer starts to work; when the delay switch (29) is released, the base bias current of VT2 is broken again. On, but at this time, due to the presence of the charging voltage on C 2 , the base bias current of VT2 can still be maintained through R5, VT2 is turned on, VT1 is turned off, SCR continues to conduct, and the drinking machine is always working, when C 2 When the upper charging voltage is released and VT2 has no base bias current and is turned off, VT21 is turned on, and the SCR turns off the main circuit and stops.
[0020] 进一步, 所述的延时开关电路的延时工作时长, 设定为 60秒, 饮机能输出的开水量不少 于 35(½1。 但是, 用户用开水时的用量不可能刚好是 350ml的, 由于本机采了疏流减压阀 (12) 后, 当用量小于 350ml时, 用户即可随便关闭出水阀(5), 因机内设置的疏流减压阀(12)在关 闭出水阀 (5)后会自行启动, 把开水导回饮水机中, 这样, 机器虽然是多工作了几秒钟的时间, 但却换来饮机的安全运行和方便使用好处。 另一种情况, 在如来了一批客人或开水需用量大于 350ml之时, 饮机经 60秒时间的工作, 就会自动停止工作, 在这一情况下, 用户只需再做一次启 动延时开关(29)的轻松作动就 0K了。智能控制为机器实现了安全和可靠的运行, 为用户带去了 简单且方便的操作效用。 [0020] Further, the delay operation time of the delay switch circuit is set to 60 seconds, and the amount of water that can be output by the drink machine is not less than 35 (1⁄21). However, the amount of water used by the user may not be exactly 350 ml. Since the machine adopts the dredging pressure reducing valve (12), when the dosage is less than 350ml, the user can close the outlet valve (5) casually, because the dewatering pressure reducing valve (12) installed in the machine is closed. After the valve (5), it will start by itself, and the boiling water will be returned to the water dispenser. Thus, although the machine is working for a few seconds, it is replaced by the safe operation and convenient use of the machine. In the case of a group of guests or boiling water needs more than At 350ml, the machine will automatically stop working after 60 seconds of operation. In this case, the user only needs to do another start of the delay switch (29). Intelligent control provides safe and reliable operation for the machine, bringing simple and convenient operation to the user.
[0021] 所述的速热加热系统 (001)的止回阀(19) , 其特征在于: 止回阀(19) 由三通状上阀体 ( 1901 ) 、 闭合口 (1902) 、 陶瓣根(1903) 、 圆阀辧(1904)及下阀体(1905)组成, 所述的 上阀体(1901 )与下阀体(1905)螺合, 形成止回阀 (19)的阀腔体, 阀腔内设置有软性的圆阖 瓣(1904) , 圆阀瓣(1904)和阀瓣根(1903)呈 L状结构, 圆阀瓣(1904)和阀瓣根(1903) 系一体制成, 阀瓣根 , 埋植于上阖体(i9(U )与下阀体(i905)蟝合部的预设槽中; 所 述的止回阀(19) , 串接于供水管 (9)与补水管(23)之间的管路中,  [0021] The check valve (19) of the rapid heating system (001) is characterized in that: the check valve (19) is composed of a three-way upper valve body (1901), a closed port (1902), a ceramic valve The root (1903), the round valve 辧 (1904) and the lower valve body (1905), the upper valve body (1901) and the lower valve body (1905) are screwed together to form a valve cavity of the check valve (19) The soft cavity is provided in the valve cavity (1904), the circular valve flap (1904) and the valve flap root (1903) have an L-shaped structure, and the circular valve flap (1904) and the valve flap root (1903) are a system. The valve root is embedded in a predetermined groove of the upper jaw body (i9 (U) and the lower valve body (i905); the check valve (19) is connected in series with the water supply pipe (9) ) in the pipeline between the water supply pipe (23),
[0022] 进一步, 所述的止回阀 (19)的上阀体(1901 ) , 是一个呈三通状的连接体, 担当本发 明所述的冷水三通(16)的角色。  Further, the upper valve body (1901) of the check valve (19) is a three-way connecting body and functions as a cold water tee (16) according to the present invention.
[0023] 所述的速热加热系统 (001)的温控器(14) , 其特征在于: 温控器(14), 设置于呈 "S" 形串接的电热膜石英发热管(21 )的沸水出口端附近, 温控器 ( 14), 设定的断路温度为 105'C, 当发生干烧或电热膜石英发热管(21 )的表面温度超过 105'C时, 温控器 (14) 即会自动切断电 路, 保护机器的安全工作。  [0023] The thermostat (14) of the rapid heating system (001) is characterized in that: a thermostat (14), an electrothermal film quartz heating tube (21) arranged in an "S" shape Near the boiling water outlet end, the thermostat (14), set the shutdown temperature to 105'C, when the surface temperature of the dry-burning or electrothermal film quartz heating tube (21) exceeds 105'C, the thermostat (14) ) The circuit is automatically cut off to protect the safe operation of the machine.
[0024] 所述的速热加热系统 (001)的延时开关(29) , 其特征在于: 延时开关(29)控制延时开 关电路的动作, 电路原理已有上面的文字表述, 不再复述。 延时开关电路的电路扳(26) , 安装 于保护盒 (15)的下方, 机内各电气结点由导线及结点 (17)所示的阵式相连接。  [0024] The delay switch (29) of the rapid heating system (001) is characterized in that: the delay switch (29) controls the action of the delay switch circuit, and the circuit principle has the above text, no longer repeat. The circuit board (26) of the time delay switch circuit is installed under the protection box (15), and the electrical nodes in the machine are connected by wires and the array shown by the node (17).
[00253 所述的速热加热系统 (001)的保护盒(15) , 其特征在于: 保护盒(15)的上部, 设有止 回阀 (19)和疏流减压阀(12)三通部分的穿出孔, 以便冷、 热水的输入和输出; 所述的保护盒 (15)底部外面, 设有向内凹陷的电路板 (26)的安装柱, 延时开关电路的电路板 (26)可容置 其中;所述的保护盒(15)两侧的上、下方,还设有保护盒(15)的整合螺孔(28)及排水口(27) 穿过和电源线接入的预置孔; 保护盒(15) 的内部设有速热加热系统 (001)的安装架(20) 。 [00253] The protection box (15) of the rapid heating system (001) is characterized in that: an upper part of the protection box (15) is provided with a check valve (19) and a three-way pressure reducing valve (12) Part of the through hole for the input and output of cold and hot water; the outside of the bottom of the protective case (15), the mounting post of the indented circuit board (26), the circuit board of the delay switch circuit ( 26) can be accommodated therein; the upper and lower sides of the protection box (15) are further provided with an integrated screw hole (28) and a drain port (27) of the protection box (15), and are connected through the power line. The preset hole; the inside of the protection box (15) is provided with a mounting bracket (20) of the rapid heating system (001).
[0026] 进一步, 所述的安装架 (20)是二条竖向的支架, 支架上设有半圆形的电热膜石英发热 管(21 )的安装柱, 二个设有半圆形的安装柱的安装架(20)的组合, 把电热膜石英发热管(21 ) 箍合于安装架(20)上。 [0026] Further, the mounting bracket (20) is two vertical brackets, and the bracket is provided with a semi-circular electric heating film quartz heating tube (21) mounting column, and two semi-circular mounting posts are provided. The combination of the mounting brackets (20) encloses the electrothermal film quartz heating tube (21) on the mounting bracket (20).
[0027] 进一步, 所述的安装架(20)与保护盒(15)系一体的注塑成型件; 所述的保护盒(15) 由二个对称的半盒合成保护盒(15)的整体。  [0027] Further, the mounting bracket (20) and the protective box (15) are integrally molded; the protective box (15) is composed of two symmetrical half-box synthetic protective boxes (15).
[0028] 所述的速热加热系统 (001)的连接顺序为: 冷水三通(16)接受供水管(9)供水, 饮水 经由止回阀(19)相接的进水口 (25)与由连通管 ( 18)串接成 "S"形布局的电热膜石英发热管 (21 )的下端口相接, 饮水流入电热膜石英发热管(21 )后接受 "以火包水"的加热模式, 当饮 水流入由连通管(18)串接成 "S"形布局的电热膜石英发热管(21)的上端口时, 已经沸腾的饮 水经沸水管 (13) 、 沸水三通(11 )从热水龙头泻出。 [0028] The connection sequence of the rapid heating system (001) is: the cold water tee (16) receives the water supply pipe (9) water supply, and the drinking water is connected to the water inlet (25) via the check valve (19) The connecting tube (18) is connected in series with the "S"-shaped electric heating film quartz heating tube (21) at the lower port, and the drinking water flows into the electric heating film quartz heating tube (21) and receives the "fire-in-water" heating mode. When drinking When water flows into the upper port of the electrothermal film quartz heating pipe (21) which is connected in series by the connecting pipe (18) into an "S" shape, the boiling water has been boiled through the boiling water pipe (13) and the boiling water tee (11) from the hot water tap. Lax out.
[0029] 所述的速热加热系统 (001)的排水口 (27) , 其特征在于: 排水口 (27)与进水口 (25) 呈对称布局, 当需清洗机器时, 打开排水口 (27) 即可排放机内的积水, 实施清理工作。  [0029] The drain port (27) of the rapid heating system (001) is characterized in that: the drain port (27) is symmetrically arranged with the water inlet port (25), and when the machine needs to be cleaned, the drain port is opened (27) ) The water in the machine can be drained and cleaned up.
[0030] 本发明所述的应用广谱的述说如下: [0030] The broad spectrum of applications described in the present invention is as follows:
[0031] 所述的速热加热系统 (001)结构紧凑、 体积小巧、 自成体系, 不但可独立担当任何饮机的 加热任务, 还可根据配伍要求设计出广谱应用于水家电的加热部件, 特别是一种替代传统袋水机 热胆的优化方案。  [0031] The rapid heating system (001) is compact, compact, and self-contained, and can not only independently serve as a heating task for any drinking machine, but also design a broad-spectrum heating component for water appliances according to compatibility requirements. In particular, it is an optimization solution to replace the traditional hot water tank.
附圉说明 Appendix
[0032] 图 1为本发明管路加热的式袋水机结构示意图。  1 is a schematic structural view of a water-filled bag water machine according to the present invention.
[0033] 图 2为本发明速热加热系统 (001)的结构示意图。 2 is a schematic structural view of a rapid heating system (001) according to the present invention.
[0034] 图 3为本发明疏流减压阀和止回阀的结构示意图。 3 is a schematic structural view of a recirculation pressure reducing valve and a check valve according to the present invention.
[0035] 图 4为本发明延时开关的电气电路图。 4 is an electrical circuit diagram of a time delay switch of the present invention.
具体实施方式 detailed description
[0036] 图 1、 2统一的标记名称是: 速热加热系统 (001)、机盖 ( 1 )、上机体(2)、 挂钩 (3) 、 水包 (4) 、 出水阀 (5) 、 取水头 (6) 、 开关管(7) 、 固定螺帽 (8) 、 供水管(9) 、 箱体接 口 (10)、 沸水三通(11 )、 疏流减压阀(12)、 沸水管(13)、温控器 ( 14)、 保护盒(15) 、 冷水三通(16) 、 导线及结点 (17) 、 连通管(18) 、 止回阀(19) 、 安装架(20) 、 电热膜石 英发热管(21 )、安装柱(22)、补水管(23)、下机体墙靠(24)、进水口(25)、电路扳(26)、 排水口 (27) 、 整合螺孔(28) 、 开关(29)及固定螺孔(30) 。  [0036] The uniform label names in Figures 1 and 2 are: rapid heating system (001), cover (1), upper body (2), hook (3), water bag (4), outlet valve (5), Water head (6), switch tube (7), fixed nut (8), water supply pipe (9), tank interface (10), boiling water tee (11), dredging pressure reducing valve (12), boiling water pipe (13), thermostat (14), protection box (15), cold water tee (16), wire and junction (17), connecting pipe (18), check valve (19), mounting bracket (20) , electric heating film quartz heating tube (21), mounting column (22), water supply pipe (23), lower body wall (24), water inlet (25), circuit board (26), drain port (27), integrated screw Hole (28), switch (29) and fixing screw hole (30).
[0037] 图 3的标记名称是: 疏流减压阀(12) 、 三通式上阀体(1201) 、 阀球座 ( 1202) 、 阀 球(1203) 、 阀弹簧(1204) 、 下阀体(1205) 。  [0037] The labeling names of FIG. 3 are: a diverting pressure reducing valve (12), a three-way upper valve body (1201), a ball seat (1202), a valve ball (1203), a valve spring (1204), a lower valve. Body (1205).
[0038] 图 4 的标记名称是: 止回阀 (19) 、 三通式上阀体(1901 ) 、 闭合口 (1902) 、 阀瓣根 (1903) 、 圆阀瓣 ( 1904) 、 下阀体 ( 1905)  [0038] The labeling names of FIG. 4 are: check valve (19), three-way upper valve body (1901), closed port (1902), valve flap root (1903), round valve flap (1904), lower valve body ( 1905)
[0039] 图 5为本发明的延时开关电路图。 5 is a circuit diagram of a time delay switch of the present invention.
[0040] 下面结合附图详细描述本发明-[0040] The present invention will be described in detail below with reference to the accompanying drawings -
[0041] 如图 1、 2所示, 一种壁挂式管路加热袋水机可分成二大部分, 即供水部分和加热部分。 [0041] As shown in FIGS. 1 and 2, a wall-mounted pipeline heating bag water machine can be divided into two parts, namely a water supply part and a heating part.
[0042] 如图 1、 2所示, 所述的供水部分, 包括:机盖(1 )上机体(2)、挂钩(3)、水包(4)、 出水阀(5)、 取水头(6) 、 开关管(7)、 固定螺帽(8) 、供水管(9) 、 箱体接口 (10) , 其 特征在于: 所述的水包(4)是垂直置于充当水包箱的上机体(2)中的, 水包(4)放入时, 取水 头 (6)便会刺入水包 (4) , 饮水经取水头 (6) 、 供水管(9) 、 止回阀 (19) 、 向速热加热系 统 (001)供水; 所述的出水阀(5) , 兼容冷、 热水开关功能, 担当一阀二用的任务, 这是因为瞬 间沸腾的速热加热系统 (001), 在常态下是不需通电加热的,是常温的饮水,这时开启出水阀(5) 就可得到所谓的冷饮水。 [0042] As shown in FIG. 1 and 2, the water supply part includes: a cover (1) on the cover (1), a hook (3), a water bag (4), a water outlet valve (5), and a water intake head ( 6), a switch tube (7), a fixed nut (8), a water supply pipe (9), a tank interface (10), characterized in that: the water bag (4) is vertically placed as a water tank In the upper body (2), when the water bag (4) is placed, the water head (6) will pierce the water bag (4), and the drinking water passes through the water head (6), the water supply pipe (9), and the check valve ( 19), rapid heating system The system (001) water supply; the outlet valve (5), compatible with the cold and hot water switch function, serves as a two-valve task. This is because the instant boiling heating system (001) is not in the normal state. What needs to be heated by electricity is water at normal temperature. At this time, the so-called cold drinking water can be obtained by opening the water outlet valve (5).
[0043] 如图 1、 2所示, 所述的加热部分, 由出水阀 (5) 、 供水管(9) 、 冷水三通 ( 16) 、 沸 水管(13)、疏流减压阀(12)、温控器 ( 14)、沸水三通 ( 11 )、连通管(18)、止回阀(19) 、 电热膜石英发热管(21 ) 、 补水管(23)及进水口 (25)组成。  [0043] As shown in FIG. 1 and 2, the heating part is composed of a water outlet valve (5), a water supply pipe (9), a cold water tee (16), a boiling water pipe (13), and a desuperheating pressure reducing valve (12). ), thermostat (14), boiling water tee (11), connecting pipe (18), check valve (19), electric heating film quartz heating pipe (21), water supply pipe (23) and water inlet (25) .
[0044] 如图 1、 2所示, 所述的冷水三通 (16)接通供水管 (9) , 接受供水管(9)供水, 饮 水经由止回阀(i9)进入补水管(23), 补水管(23)与电热膜石英发热管(21 )的进水口 (25) 接通, 进入由连通管(18)串接成 "S"形布局的电热膜石英发热管(21 )的下端口, 接受速热加 热系统 (001) "以火包水"的加热, 经三级加热后的饮水, 流经呈 "S"形布局的电热膜石英发热 管(21 )的上端口时,饮水已处于沸腾的状态,瞬间沸腾的饮水,经沸水管(13)、沸水三通(11 ) 从出水阀 (5)泻出。  [0044] As shown in FIG. 1 and 2, the cold water tee (16) turns on the water supply pipe (9), receives the water supply pipe (9) water supply, and the drinking water enters the water supply pipe (23) via the check valve (i9). The water supply pipe (23) is connected to the water inlet (25) of the electrothermal film quartz heat pipe (21), and enters the electric heating film quartz heat pipe (21) which is connected in series by the communication pipe (18) into an "S" shape. Port, accepting the heating system of the rapid heating (001) "fire-filled water", drinking water after three-stage heating, flowing through the upper port of the electrothermal film quartz heating tube (21) in the "S" shape, drinking water It is already in a boiling state, and the boiled drinking water is ejected from the water outlet valve (5) through the boiling water pipe (13) and the boiling water tee (11).
[0045] 如图 1、 2所示, 所述的控制系统的器件, 由疏流减压阀(12) 、 温控器 (14) 、 止回阀 ( 19) 、 电路板 (26)及延时开关(29)联合组成。  [0045] As shown in FIG. 1 and 2, the device of the control system is composed of a desuperheating pressure reducing valve (12), a thermostat (14), a check valve (19), a circuit board (26), and a delay. The time switch (29) is combined.
[0046] 如图 1、 2所示, 所述的疏流减压阀 (12)的功能在于, 当饮水沸腾、 延时电路仍处工作 状态并关闭出水阀(5)情况下, 速热加热系统 (001)所产生的压力, 可通过疏流减压阀(12)得 以释放, 实现安全加热的目的。  [0046] As shown in FIG. 1 and 2, the function of the dredging pressure reducing valve (12) is that when the drinking water is boiled, the delay circuit is still in the working state and the outlet valve (5) is closed, the rapid heating is performed. The pressure generated by the system (001) can be released through the sluice relief valve (12) for safe heating.
[0047] 换言之, 如机器仍处于加热的工况, 而用户取水量又是少于 350ID1 这样的情况下, 允许 用户关闭出水阀 (5)停止出水, 这是因为出水阀(5)关闭的同时疏流减压阀 (12) 即会开始动 作, 速热加热系统 (001)所产生的压力会顶开疏流减压阀(12)中的阀球(1203)把高压气、水排 回供水管(9)中。 所以说: 疏流减压阀(12)的应用, 使用户能随心所欲地获取所需的开水量, 大为提高了机器操作的自由度, 用户取水量 350ml可即时关闭出水阀(5), 需大量获取开水之 时, 只需再次启动延时开关(29) 的轻松劳动就 0K了。  [0047] In other words, if the machine is still in the heating condition and the user draws water less than 350ID1, the user is allowed to close the outlet valve (5) to stop the water outlet, because the outlet valve (5) is closed at the same time. The dredging pressure reducing valve (12) will start to operate, and the pressure generated by the rapid heating system (001) will open the valve ball (1203) in the dredging pressure reducing valve (12) to discharge the high pressure gas and water back to the water supply. In tube (9). Therefore, the application of the dewatering pressure reducing valve (12) allows the user to freely obtain the required amount of water, which greatly improves the freedom of operation of the machine. The user can directly close the outlet valve (5) with a water intake of 350 ml. When a large amount of boiling water is obtained, it is only necessary to start the delay switch (29) again.
[0048] 如图 3所示, 所述的疏流减压阀 (12) , 由三通式上阖体(1201 ) 、 阀球座 (1202) 、 阀球(1203) 、 润弹簧(1204)及下阀体(1205)组成, 上阀体(1201 )与下阀体(1205)采用 螺合, 形成阀体腔, 上阀体(1201 )充当阀球(1203) 的阀球座 (1202) , 阀弹簧 (1204) 紧压 阀球(1203)于阀球座(1202)上。  [0048] As shown in FIG. 3, the dredging pressure reducing valve (12) is composed of a three-way upper body (1201), a ball seat (1202), a valve ball (1203), and a spring (1204). And a lower valve body (1205), the upper valve body (1201) and the lower valve body (1205) are screwed to form a valve body cavity, and the upper valve body (1201) acts as a valve ball seat (1202) of the valve ball (1203), The valve spring (1204) presses the valve ball (1203) onto the ball seat (1202).
[0049] 如图 3所示, 所述的疏流减压阀 (12) , 并联安装于沸水管 (13)与供水管(9)之间的 管路上, 以便在关闭出水阀 (5)的情况下, 把高压的水、 气排回供水管(9) 中; 所述的疏流减 压阅 ( 12)的上阀体(201)呈三通状的一个端口与沸水管(13)相接, 沸水三通 ( 11)中的另一 端口则与出水阀(5)相接通;疏流减压阀(12〉的下端口与止回阀(19)中的三通式的上阀体(301 ) 相接通,当饮水沸腾、延时电路仍处工作状态却要关闭出水阀(5)的情况下,经速热加热系统 (001) 所产生的高压水气会顶开疏流减压阀(12) 中的阀球(1203) , 把高压的水、 气排回供水管(9) 中, 实现安全加热的目的。 [0049] As shown in FIG. 3, the dredging pressure reducing valve (12) is installed in parallel on the pipeline between the boiling water pipe (13) and the water supply pipe (9) so as to close the water outlet valve (5). In the case, the high-pressure water and gas are discharged back into the water supply pipe (9); the upper valve body (201) of the dewatering and decompression reading (12) is a three-way port and the boiling water pipe (13) Connected, the other port of the boiling water tee (11) is connected to the outlet valve (5); the lower port of the decanting pressure reducing valve (12> and the upper valve of the three-way type in the check valve (19) Body (301) When the phase is connected, when the drinking water is boiling and the delay circuit is still working, but the outlet valve (5) is closed, the high-pressure water generated by the rapid heating system (001) will open the diverting pressure reducing valve ( The ball (1203) in the 12) discharges the high-pressure water and gas back into the water supply pipe (9) for safe heating.
[0050] 如图 3所示, 所述的止回阀 (19) , 由三通状上阀体(1901 ) 、 闭合 U ( 1902) 、 阀瓣 根(103) 、 圆阀瓣(1904)及下阀体(1905)组成, 所述的上阀体(1901 )与下阀体(1905)嫘 合, 形成止回阀 (19)的阀腔体, 所述的阀腔内设置有软性的圆阀瓣(1904) , 圆阀辦(1904) 和阀瓣根(1903)呈 L状结构, 圆阀瓣(1904)和阀瓣根(1903)系一体制成, 阀瓣根(1903) 埋植于上阀体(i90i )与下阀体(1905)螺合部的预设槽中; 所述的止回阀(19) , 串接于补水 管(23) 中, 具有控制饮水只进不出的功能; 使饮水在闭路环境下实现加热。  [0050] As shown in FIG. 3, the check valve (19) is composed of a three-way upper valve body (1901), a closed U (1902), a valve flap root (103), a circular valve flap (1904), and The lower valve body (1905) is composed of the upper valve body (1901) and the lower valve body (1905), forming a valve cavity of the check valve (19), wherein the valve chamber is provided with a soft The circular valve flap (1904), the round valve (1904) and the valve stem root (1903) have an L-shaped structure, and the circular valve flap (1904) and the valve flap root (1903) are integrally formed, and the valve stem root (1903) is buried. Planted in a preset groove of the upper valve body (i90i) and the lower valve body (1905) screwing portion; the check valve (19) is connected in series with the water supply pipe (23), and has the function of controlling drinking water only. Out of the function; to enable drinking water to achieve heating in a closed environment.
[0051] 如图 2所示所述的温控器(14) , 串联于主电路的零线上, 设置于呈 "S"型串接的电热 膜石英发热管 (21 ) 的沸水出口处。 温控器 ( 14)设定的断路温度为 105*C , 当电热膜石英发热 管(21 ) 的表面温度超过 105T:, 或发生机器干烧时, 温控器 (14) 中的双金属片因热膨胀系数 不同而产生分离原理, 会自动切断电路, 保护机器的安全工作。 [0051] The thermostat (14) as shown in FIG. 2 is connected in series to the zero line of the main circuit, and is disposed at the boiling water outlet of the electrothermal film quartz heating tube (21) of the "S" type series. The temperature of the open circuit set by the thermostat (14) is 105*C. When the surface temperature of the electrothermal film quartz heating tube (21) exceeds 105T:, or the machine is dry, the bimetal in the thermostat (14) The separation principle is generated due to the difference in thermal expansion coefficient, which automatically cuts off the circuit and protects the safe operation of the machine.
[0052] 如图 2所示, 所述的延时开关(29)和电路板(26)的功能及原理是: 饮机在待机状态 时是连接电源的, 220V市电经 Dl- D4整流, R2限压限流, C 3滤波, 得到直流工作电压。 然后经 R4限流, 使 VT1得到基极偏置电流而导通, 单向可控硅 SCR的触发电流被 VT1对地短路, SCR因 无触发电流, 主回路处于断开状态, 机器不工作。 当饮机加热时, 按下延时开关(29) 的同时, 电解电容 C 2充电, VT2得到基极偏置电流而导通, 此时 VT1的基极偏置电流, 被 VT2对地短路, VT1因失去基极偏置电流而截止, SCR触发端得到触发电流而导通,饮机开始工作; 当松开延时开 关(29)后, VT2的基极偏置电流又被断开, 但此时因有 C 2上充电电压的存在, 因此仍能通过 R5维持 VT2的基极偏置电流, VT2导通, VT1截止, SCR继续导通, 维持饮机经常工作, 当 C 2 上充电电压释放完毕, VT2无基极偏置电流而截止时, VT21导通, SCR截止主回路断开, 饮机停 机。  [0052] As shown in FIG. 2, the functions and principles of the delay switch (29) and the circuit board (26) are: The drinking machine is connected to the power supply in the standby state, and the 220V main power is rectified by the Dl-D4. R2 voltage limiting current limit, C 3 filtering, to obtain DC working voltage. Then, after R4 current limit, VT1 is turned on by the base bias current, and the trigger current of the unidirectional thyristor SCR is shorted to ground by VT1. Since the SCR has no trigger current, the main circuit is in the off state, and the machine does not work. When the drinking machine is heated, while the delay switch (29) is pressed, the electrolytic capacitor C 2 is charged, and VT2 is turned on by the base bias current. At this time, the base bias current of VT1 is short-circuited by VT2 to the ground. VT1 is turned off due to loss of the base bias current, the SCR trigger terminal is turned on and the drinker starts to work; when the delay switch (29) is released, the base bias current of VT2 is turned off again, but At this time, due to the presence of the charging voltage on C 2 , the base bias current of VT2 can still be maintained through R5, VT2 is turned on, VT1 is turned off, SCR continues to be turned on, and the drinking machine is constantly operated, when the charging voltage is on C 2 After the release is completed, when VT2 has no base bias current and is turned off, VT21 is turned on, SCR turns off the main circuit, and the machine stops.
[0053〗 如图 2所示, 所述的延时开关电路的电路板(26) , 安装于保护盒(15)下方的专设的 安装凹槽中, 以尽量避免高温对电路的影响。  [0053] As shown in FIG. 2, the circuit board (26) of the delay switch circuit is installed in a special mounting groove below the protection box (15) to avoid the influence of high temperature on the circuit.
[0054] 进一^ , 所述的延时开关电路的延时时长, 为 60秒, 在这一时段, 饮机能输出的开水, 不少于 350ml。 但是, 用户的用水量不可能刚好是 350ml的, 大于或小于 350ml的用量是客观存 在的, 现分二种使用状况作如下的描述- [0054] Further, the delay time of the delay switch circuit is 60 seconds. During this period, the boiling water output by the drinking machine is not less than 350 ml. However, the user's water consumption may not be exactly 350ml, and the amount greater than or less than 350ml is objectively present. The following two conditions are described as follows -
[0055} 第一种状况, 当用户的用量小于 350ml时, 是允许即时关闭出水阀(5) 的。 由于机内设 置的疏流减压阀(12)在关闭出水阀(5)的同时会 β行启动, 把开水排回饮机的供水管(9)中。 这样, 机器虽是多工作了几秒钟的时间, 但却换来饮机的安全运行和用户的方便使用。 [0056] 另一种情况是, 如来了一批客人或开水需用量大于 350ml之时, 饮机, 经 60秒时间的工 作后, 就会自动停止, 在这一情况下, 用户只需再次启动延时开关(29)的轻松劳动就可以了。 [0055] In the first case, when the amount of the user is less than 350 ml, it is allowed to immediately close the outlet valve (5). Since the dredging pressure reducing valve (12) provided in the machine starts the β water line while closing the water outlet valve (5), the boiling water is discharged back into the water supply pipe (9) of the drinking machine. In this way, although the machine works for a few seconds, it is in exchange for the safe operation of the drinker and the user's convenient use. [0056] In another case, if a group of guests or boiling water needs more than 350ml, the drinking machine will automatically stop after 60 seconds of work, in this case, the user only needs to start again. Easy work on the delay switch (29) is fine.
[0057] 速热加热系统 (001)的保护及安装。 [0057] Protection and installation of the rapid heating system (001).
[0058] 保护及安装的部件包括: 保护盒(1 ) 、 安装架 (20) 、 排水口 (27) 、 整合嫘孔(28) 及整合螺孔 (2S) 。  [0058] The protective and installed components include: protective case (1), mounting bracket (20), drain port (27), integrated boring hole (28) and integrated screw hole (2S).
[0059] 所述的保护盒(15) 的上部, 设有止回阀(19) 和疏流减压阀 (12) 的三通部分的穿出 孔, 以便冷、 热水的 ί入和输出。  [0059] The upper part of the protection box (15) is provided with a check valve (19) and a through hole of the three-way portion of the flow reducing pressure reducing valve (12) for the input and output of cold and hot water. .
[0060] 进一步, 所述的保护盒 ( 15)底部的外面, 设有向内凹陷的电路板(26) 的专用安装柱, 延时开关电路的电路板 (26)容置其中。  [0060] Further, the outer surface of the bottom of the protection box (15) is provided with a special mounting post of the inwardly recessed circuit board (26), and the circuit board (26) of the delay switch circuit is accommodated therein.
[0061] 进一步, 所述的保护盒(15)两侧的上、 下方, 还设有保护盒(15)的整合螵孔(28) 及排水口 (27>穿出和电源线接入的预置孔  [0061] Further, the upper and lower sides of the protection box (15) are further provided with an integrated boring hole (28) of the protection box (15) and a drain port (27> pre-existing and power line access pre- Hole
[0062] 进一步, 所述的保护盒(15) 的下方, 设置有保护盒(15) 的整合螺孔(28) , 以便实 现固定和安装。  [0062] Further, under the protection box (15), an integrated screw hole (28) of the protection box (15) is disposed for fixing and mounting.
[0063] 进一步,所述的保护盒 ( 15)的内部,设有速热加热系统 (001)电热膜石英管的安装架 (20)。  Further, inside the protective case (15), a mounting frame (20) of a rapid heating system (001) electrothermal film quartz tube is provided.
[0064〗 所述的安装架(20) , 是二条竖向的支架, 支架上设有半圆形的电热膜石英发热管(21 ) 的安装位, 二个设有半圆形的安装位的安装架(20)的组合, 把电热膜石英发热管 (21 )籀合于 安装架(20)的安装位上。 [0064] The mounting bracket (20) is two vertical brackets, and the bracket is provided with a semi-circular electric heating film quartz heating tube (21) mounting position, and two semi-circular mounting positions are provided. The combination of the mounting bracket (20) is used to knead the electric heating film quartz heating tube (21) to the mounting position of the mounting bracket (20).
[0065]进一步, 所述的安装架 (20)与保护盒(15)是一体注塑成型的, 是由二个对称的半盒, 合成一个整体的保护盒(15) 的。  [0065] Further, the mounting bracket (20) and the protective case (15) are integrally injection molded, and are formed by two symmetrical half boxes to form an integral protective case (15).

Claims

权 利 要 求 书 Claim
1. 一种壁挂式管路加热袋水机, 由供水系统、 速热加热系统 (001)及安装及保护系统所组成; 所 述的供水系统, 包括: 机盖 ( 1 )上机体 (2)、 水包(4)、 出水阀(5) 、 取水头(6)、 开关管1. A wall-mounted pipeline heating bag water machine, comprising a water supply system, a rapid heating system (001) and an installation and protection system; the water supply system comprising: a cover (1) on the body (2) , water bag (4), water outlet valve (5), water head (6), switch tube
(7) 、 凼定蟝帽 (8) 、 供水管(9)及箱体接口 (10) ; 所述的速热加热系统 (001), 包括: 沸 水三通(11 ) 、 疏流减压阀(12) 、 沸水管 (13) 、 温控器(14) 、 冷水三通(16) 、 导线及结 点(17)、连通管(18)、止回阀(19)、电热膜石英发热管(21 )、补水管(23)、 电路板(26)、 进水口(25)、排水口(27)及延时开关(29);所述的安装及保护系统的部件,包括:挂钩 (3)、 下机体及其上的墙靠(24)、 保护盒(15)、 安装架(20)、 整合螺孔(28)及固定蟓孔(30); 其特征在于:所述的由三条电热胰石英发热管(21), 串联组成首尾相接的,呈 "S" 形走向的, 逐级升温的加热器, 所述的加热器卜端的进水口 (25) , 与补水管(23)相连接, 补水管(23) 的上端口与止回阀 (19)相连接, 止回阀 (19) 的上端口, 通过供水管(9) , 与取水头(6)相 接通; 所述的开关延时电路板(26) , 设定延时加热的时长为 60秒钟,每加热时长的出水量, 不 少于 350ml; 所述的由三条电热膜石英发热管 (21 ) 串联组成的加热器, 安装于保护盒(15)之 中; 所述的机盖(1 )与上机体(2)采用铰链连接, 所述的上机体(2) , 充当水包(4)的装入 箱, 水包(4) , 从上方装入上机体 (2) 中, 上机体 (2)底部的中心, 由固定嫘帽 (8)将取水 头(6) 固定其上, 取水头(6)的下方, 与供水管 (9)相连, 供水管(9) 的另一端, 与速热加 热系统 (001)中的加热器相连接; 所述的水包(4) , 是垂直放入充当水包箱的上机体(2) 中的; 所述的取水头(6)刺入水包(4)中, 饮水经取水头(6) 、 供水管(9)及止回阀(19) , 向速 热加热系统 (001)供水, 加热后饮水, 经开关管(7)从出水阀 (5)泻出; 所述的出水阀 (5) , 兼容冷、热水开关功能; 所述的上机体(2)通过箱体接口(10) , 与下机体相连接; 所述的上机 体(2) 的背面, 设有挂钩(3) ; 所述的壁挂式袋水机是以悬挂于壁体上的形式使用的; 所述的 机器背面的下方还设有墙靠 (24) 。 (7), 蟝 蟝 (8), water supply pipe (9) and tank interface (10); The rapid heating system (001), including: boiling water tee (11), dredging pressure reducing valve (12), boiling water pipe (13), thermostat (14), cold water tee (16), wire and junction (17), connecting pipe (18), check valve (19), electric heating film quartz heating pipe (21), water supply pipe (23), circuit board (26), water inlet (25), water outlet (27) and time delay switch (29); components of the installation and protection system, including: hooks (3) ), the lower body and the wall (24), the protective box (15), the mounting bracket (20), the integrated screw hole (28) and the fixed bore (30); characterized in that: the three electric heaters are Pancreatic quartz heating tube (21), which is connected in series to form an "S"-shaped, step-by-step heating heater, the water inlet (25) of the heater end, and the water supply pipe (23) Connected, the upper port of the water supply pipe (23) is connected to the check valve (19), and the upper port of the check valve (19) is connected to the water intake head (6) through the water supply pipe (9); open The delay circuit board (26) sets the duration of the delay heating to 60 seconds, and the water output per heating time is not less than 350 ml; the heater consisting of three electric heating film quartz heating tubes (21) connected in series Installed in the protective box (15); the cover (1) and the upper body (2) are hingedly connected, and the upper body (2) serves as a loading box for the water bag (4), water Pack (4), from above into the upper body (2), the center of the bottom of the upper body (2), the water head (6) is fixed by the fixed cap (8), below the water head (6), Connected to the water supply pipe (9), the other end of the water supply pipe (9) is connected to the heater in the rapid heating system (001); the water bag (4) is vertically placed into the water tank. In the upper body (2); the water intake head (6) is pierced into the water bag (4), and the drinking water is heated by the water intake head (6), the water supply pipe (9) and the check valve (19). The system (001) supplies water, and the drinking water after heating is discharged from the outlet valve (5) through the switch tube (7); the outlet valve (5) is compatible with the function of cold and hot water switch; The upper body (2) is connected to the lower body through the box interface (10); the back of the upper body (2) is provided with a hook (3); the wall-mounted bag water machine is suspended from the wall Used in the form of a body; the wall back (24) is also provided under the back of the machine.
2. 根据权利要求 1 所述的壁挂式管路加热袋水机, 其特征在于, 所述的三条电热膜石英发热管 (21 )是通过连通管 (18) , 连接成 "S"型的走向; 所述的速热加热系统 (001)屮的电热膜石英 发热管(21 )的两端, 设有一正一负的二个电极, 两电极间采用并联连接。  2. The wall-mounted pipeline heating bag water machine according to claim 1, wherein the three electrothermal film quartz heating tubes (21) are connected by an "S" type through a communication tube (18). The two ends of the electric heating film quartz heating tube (21) of the rapid heating system (001) are provided with two positive and negative electrodes, and the two electrodes are connected in parallel.
3. 根据权利要求 1 所述的壁挂式管路加热袋水机, 其特征在于, 所述的疏流减压阀 (12) 由三 通式上阀体(1201 ) 、 阀球座(1202) 、 阀球(1203) 、 阀弹簧 (1204)及下阀体(1205)组成, 上阀体(1201 )与下阀体(1205)采用螺合, 形成阀体腔; 上阀体(1201 )充当阀球(1203) 的 阀球座 ( 1202),阀弹簧 ( 1204)紧压阀球(1203)于阀球座 ( 1202)上;所述的疏流减压阀(12), 并联于冷、 热水管道之间, 疏流减压阀 (12) 的上阀体(1201 )呈三通状, 上阀体(1201 )上的 二个端口一个与沸水管(13)相接, 另一个则通过开关管(7)与出水阅 (5)相接通; 疏流减压 阀 (12) 的下端口, 与止回阀 (19) 中的呈三通状的上阀体(1301 )相接通, 当饮水沸腾, 而延 时电路仍处工作状态的情况下, 关闭出水阀 (5) , 速热加热系统 (001)所产生的压力水流, 可通 过疏流减压阀 (12)得以释放。 3. The wall-mounted pipeline heating water bag machine according to claim 1, wherein the dredging pressure reducing valve (12) is composed of a three-way upper valve body (1201) and a valve ball seat (1202). , the valve ball (1203), the valve spring (1204) and the lower valve body (1205), the upper valve body (1201) and the lower valve body (1205) are screwed to form a valve body cavity; the upper valve body (1201) acts as a valve The ball seat (1202) of the ball (1203), the valve spring (1204) presses the valve ball (1203) on the ball seat (1202); the decanter pressure reducing valve (12), Parallel between the cold and hot water pipes, the upper valve body (1201) of the dredging pressure reducing valve (12) is three-way, and the two ports on the upper valve body (1201) are connected to the boiling water pipe (13). The other is connected to the water outlet (5) through the switch tube (7); the lower port of the flow relief valve (12), and the three-way upper valve body in the check valve (19) ( 1301) The phase is connected, when the drinking water is boiling, and the delay circuit is still in working condition, the outlet water valve (5) is closed, and the pressure water generated by the rapid heating system (001) can pass through the dehydration pressure reducing valve ( 12) Released.
4. 根据权利要求 1 所述的壁挂式管路加热袋水机, 其特征在于, 所述的止回阀(19) 由三通状 上阀体(1901) 、 闭合口 (1902) 、 阀瓣根(1903) 、 圆阀瓣(1904)及下阀体(1905)组成, 所述的上阀体(1901 )与下阀体(1905)螺合, 形成止回阀(19)的阀腔体, 阀腔内设有软性的 圆阀瓣(1904) ; 所述的圆阀瓣(1904)与阀瓣根(1903)呈 L状结构, 圆阀瓣(1904)和阀瓣 根(9103) , 系一体制成; 所述的阀瓣根 ( 1903)埋植于上阀体(1901) 与下阀体(1905)螺合 部的预设槽中; 所述的止回阀(19), 串接于供水管(9) ¾补水管(23)之间的管路中, 所述的 止回阀 (19) 中的上阀体(1901) , 是一个呈三通状的连接体; 所述的上阙体 (1901 )的三个端 口中, 其中一个端口与下阓体(1905)嫘合, 形成止回阀 (19)的阀腔体, 另外二个端口, 分别 与疏流减压阀 (12)及供水管 (9)相连接。  4. The wall-mounted pipeline heating bag water machine according to claim 1, wherein the check valve (19) is formed by a three-way upper valve body (1901), a closed port (1902), and a valve flap. The root (1903), the circular valve flap (1904) and the lower valve body (1905), the upper valve body (1901) and the lower valve body (1905) are screwed together to form a valve cavity of the check valve (19) , a soft circular valve flap (1904) is arranged in the valve cavity; the circular valve flap (1904) and the valve flap root (1903) have an L-shaped structure, a circular valve flap (1904) and a valve flap root (9103) The valve stem root (1903) is embedded in a predetermined groove of the upper valve body (1901) and the lower valve body (1905) screwing portion; the check valve (19), Connected in series between the water supply pipe (9) 3⁄4 water supply pipe (23), the upper valve body (1901) in the check valve (19) is a three-way connecting body; Among the three ports of the upper jaw (1901), one of the ports is coupled with the lower jaw (1905) to form a valve chamber of the check valve (19), and the other two ports are respectively decompressed and decompressed. Valve (12) and water supply pipe (9) Connection.
5. 根据权利要求 1 所述的壁挂式管路加热袋水机, 其特征在于, 所述的温控器(14) , 串接于 加热电路中, 设置于 "S"形电热膜石英发热管(21 )的沸水出口端, 设定断路温度为 105 。 The wall-mounted pipeline heating bag water machine according to claim 1, wherein the temperature controller (14) is connected in series with a heating circuit, and is disposed on an "S"-shaped electric heating film quartz heating tube. At the boiling water outlet end of (21), set the breaking temperature to 105.
6. 根据权利要求 1 所述的壁挂式管路加热袋水机, 其特征在于, 所述的电路板 (26) , 是延时 开关电路板, 电路板(26) , 设置于保护盒下方的安装室内; 设定延时开关电路板通电的延时时 长为 60秒; 所述的延时开关(29) , 位于饮机下方的侧面。 The wall-mounted pipeline heating bag water machine according to claim 1, wherein the circuit board (26) is a time delay switch circuit board, and the circuit board (26) is disposed under the protection box. Install the room; set the delay switch circuit board power-on delay time is 60 seconds; the delay switch (29), located on the side below the machine.
7. 根据权利要求 1 所述的壁挂式管路加热袋水机, 其特征在于, 所述的保护盒(15) , 是由二 个半盒通过整合螺孔(28),由螺丝整合而成的,在保护盒(15)中,设有电热膜石英发热管(21) 的安装架(20) , 在安装架(20)上, 设有与电热膜石英发热管(21)相对应的下凹的半圆槽; 所述的电热膜石英发热管(21 )箍合、安装于保护盒(15)的安装架(20)上;所述的保护盒(15) 的底部外面, 设有向内凹陷的电路板(26)的安装柱, 延时开关电路的电路板(26)可嵌入其中; 所述的保护盒(15)两側的上、 下方还设有保护盒(15)的整合嫘孔(28); 所述的保护盒(15) 的下面, 设有保护盒(15) 的固定螺孔(30) , 以便于加热器 (001)的安装, 所述的保护盒(15) 的上部设有止回阀 (19)和减压阀(12) 的穿出孔, 以便冷、 热水的输入和输出, 所述的保护盒 7. The wall-mounted pipe heating bag water machine according to claim 1, wherein the protection box (15) is formed by two half boxes passing through an integrated screw hole (28) and integrated by screws. In the protection box (15), a mounting frame (20) of an electric heating film quartz heating tube (21) is provided, and on the mounting frame (20), a lower portion corresponding to the electrothermal film quartz heating tube (21) is provided. a concave semicircular groove; the electrothermal film quartz heating tube (21) is hooped and mounted on a mounting frame (20) of the protective case (15); the bottom of the protective case (15) is provided with an inward The mounting post of the recessed circuit board (26), the circuit board (26) of the delay switch circuit can be embedded therein; and the protection box (15) is further integrated on the upper and lower sides of the protection box (15). a hole (28); under the protection box (15), a fixing screw hole (30) of the protection box (15) is provided to facilitate the installation of the heater (001), and the protection box (15) The upper part is provided with a check valve (19) and a through hole for the pressure reducing valve (12) for input and output of cold and hot water, the protective case
(15)的下方设有排水口 (27) 穿过和电源线接入的预置孔。 Below the (15), there is a drain hole (27) through the preset hole that is connected to the power cord.
PCT/CN2012/000205 2011-10-26 2012-02-20 Wall-mounted pipeline heating bag type water dispenser WO2013060086A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN 201120413547 CN202312858U (en) 2011-10-26 2011-10-26 Wall-mounted pipeline heating bag water dispenser
CN201120413547.6 2011-10-26

Publications (1)

Publication Number Publication Date
WO2013060086A1 true WO2013060086A1 (en) 2013-05-02

Family

ID=46424870

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2012/000205 WO2013060086A1 (en) 2011-10-26 2012-02-20 Wall-mounted pipeline heating bag type water dispenser

Country Status (2)

Country Link
CN (1) CN202312858U (en)
WO (1) WO2013060086A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103637689A (en) * 2013-12-25 2014-03-19 赵立 Soft water containing device
CN104172929A (en) * 2014-02-25 2014-12-03 周林斌 Brewing machine with electric pressure cooker and magnetic water valve for feeding and discharging water and method of brewing machine

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105011775A (en) * 2015-08-18 2015-11-04 王金春 Low-power energy-saving hot water device
US11060764B2 (en) 2018-11-13 2021-07-13 White Knight Fluid Handling Inc. On-demand heater and temperature control system and related process

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0213725A (en) * 1988-07-01 1990-01-18 Sharp Corp High-frequency heating apparatus
US6834160B1 (en) * 2003-11-14 2004-12-21 Huang Chen-Lung Electric heater with a sensor preventing no-water heating
CN201481092U (en) * 2009-04-18 2010-05-26 陆建钢 Quick electric-heating drinking water machine
CN102113823A (en) * 2010-12-15 2011-07-06 李万红 Wall-mounted pipeline heating and rapid-boiling bag water fountain
CN102133041A (en) * 2010-12-15 2011-07-27 李万红 Quick-boiling type water dispenser through pipeline heating

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0213725A (en) * 1988-07-01 1990-01-18 Sharp Corp High-frequency heating apparatus
US6834160B1 (en) * 2003-11-14 2004-12-21 Huang Chen-Lung Electric heater with a sensor preventing no-water heating
CN201481092U (en) * 2009-04-18 2010-05-26 陆建钢 Quick electric-heating drinking water machine
CN102113823A (en) * 2010-12-15 2011-07-06 李万红 Wall-mounted pipeline heating and rapid-boiling bag water fountain
CN102133041A (en) * 2010-12-15 2011-07-27 李万红 Quick-boiling type water dispenser through pipeline heating

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103637689A (en) * 2013-12-25 2014-03-19 赵立 Soft water containing device
CN104172929A (en) * 2014-02-25 2014-12-03 周林斌 Brewing machine with electric pressure cooker and magnetic water valve for feeding and discharging water and method of brewing machine

Also Published As

Publication number Publication date
CN202312858U (en) 2012-07-11

Similar Documents

Publication Publication Date Title
WO2013060086A1 (en) Wall-mounted pipeline heating bag type water dispenser
CN202069459U (en) Embedded-type drinking water machine
WO2010118565A1 (en) Electric heater and quick water heating machine
CN102113823B (en) Wall-mounted pipeline heating and rapid-boiling bag water fountain
CN201050864Y (en) Secondary heating electric water heater
CN204445413U (en) A kind of new and effective Green energy-saving drinking water machine
CN100501263C (en) Instant electric water heater with syncretic volume and the heating method
CN202051554U (en) Electrothermal-film quartz-tube progressive type rapid boiling heater
CN202489782U (en) Pipeline heating quick boiling type water dispenser
CN209246380U (en) Semiconductor-type hot and cold water device for making based on solar energy and piezoelectricity energy
CN2524172Y (en) Electric energy saving safety water heater with oil media
CN2460022Y (en) Automatic circulation heating thermal insulation device for bathtub
CN2909093Y (en) Water storage energy-saving quick electric water heater
WO2013123610A1 (en) Electrothermal film progressive quartz pipe rapid boiling heater
CN105587138A (en) Energy-saving integral water heater shower room
CN2516875Y (en) Multifunction electric water-storage heater with double-bladder
CN201199090Y (en) Electrical heating bathtub
CN201306839Y (en) Multi-functional energy-saving high-efficiency instant water heater
CN205107361U (en) Set up water dispenser of heat preservation room
CN203163207U (en) Instant-heating water heater under cabinet
CN103185393A (en) Instant heating type water heater under cabinet
CN216409110U (en) Multifunctional heater of intelligent temperature control system
CN202419890U (en) Water heater capable of automatically heating and preserving heat
CN201104004Y (en) Instantaneously heated capacity integrated electric water heater
TW200825343A (en) Composite electric heater

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 12843375

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 12843375

Country of ref document: EP

Kind code of ref document: A1

122 Ep: pct application non-entry in european phase

Ref document number: 12843375

Country of ref document: EP

Kind code of ref document: A1