WO2014127059A2 - Apparatus and methods of running casing in a dual gradient system - Google Patents

Apparatus and methods of running casing in a dual gradient system Download PDF

Info

Publication number
WO2014127059A2
WO2014127059A2 PCT/US2014/016129 US2014016129W WO2014127059A2 WO 2014127059 A2 WO2014127059 A2 WO 2014127059A2 US 2014016129 W US2014016129 W US 2014016129W WO 2014127059 A2 WO2014127059 A2 WO 2014127059A2
Authority
WO
WIPO (PCT)
Prior art keywords
casing
density fluid
plug
high density
lowering
Prior art date
Application number
PCT/US2014/016129
Other languages
French (fr)
Other versions
WO2014127059A3 (en
Inventor
Marcel Budde
Brent J. Lirette
Michael Logiudice
Original Assignee
Weatherford/Lamb, Inc.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Weatherford/Lamb, Inc. filed Critical Weatherford/Lamb, Inc.
Priority to AU2014216312A priority Critical patent/AU2014216312B2/en
Priority to EP14707059.3A priority patent/EP2956615A2/en
Priority to BR112015019325A priority patent/BR112015019325A2/en
Priority to CA2900502A priority patent/CA2900502A1/en
Publication of WO2014127059A2 publication Critical patent/WO2014127059A2/en
Publication of WO2014127059A3 publication Critical patent/WO2014127059A3/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/13Methods or devices for cementing, for plugging holes, crevices, or the like
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
    • E21B21/08Controlling or monitoring pressure or flow of drilling fluid, e.g. automatic filling of boreholes, automatic control of bottom pressure
    • E21B21/082Dual gradient systems, i.e. using two hydrostatic gradients or drilling fluid densities
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/02Subsoil filtering
    • E21B43/10Setting of casings, screens, liners or the like in wells
    • E21B43/101Setting of casings, screens, liners or the like in wells for underwater installations
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/13Methods or devices for cementing, for plugging holes, crevices, or the like
    • E21B33/14Methods or devices for cementing, for plugging holes, crevices, or the like for cementing casings into boreholes
    • E21B33/16Methods or devices for cementing, for plugging holes, crevices, or the like for cementing casings into boreholes using plugs for isolating cement charge; Plugs therefor

Definitions

  • Embodiments of the present invention generally relate to running casing into a dual gradient well.
  • Drilling operations that use two different fluid densities or mud weights have been used to construct subsea wells. See for example, U.S. Patent Numbers 6,536,540; 6,843,331 ; and 6,926,101 .
  • Benefits of a dual gradient drilling system include reduction of the hydrostatic pressure in the well annulus above the bottom or at a previous casing point while simultaneously maintaining an equivalent hydrostatic pressure at the bottom of the hole as a single gradient fluid system.
  • One challenge of using a dual gradient system is the process of running in casing. For example, the process of running in casing may cause a pressure surge that may induce fluid losses that would jeopardize the well. Also, the mud weight needed to control pressures in the well must be carefully monitored against the pressure that may induce formation breakdown in the annulus. Formation breakdown may also cause undesired fluid losses to the formation between a casing shoe and total depth.
  • a method of running casing in a dual gradient system includes lowering a casing into a low density fluid region and allowing the low density fluid to enter the casing; releasing a plug into the casing; supplying a high density fluid behind the plug, thereby urging the low density fluid out of the casing; and lowering the casing into a high density fluid region until target depth is reached.
  • the method includes operating a pump to maintain the dual gradient effect.
  • the method includes pumping the high density fluid out of the casing until the hydrostatic head of the high density fluid is substantially the same as a hydrostatic head of the low density fluid.
  • a plug in another embodiment, includes a housing; a plurality of fins disposed on an exterior of the housing; a bore extending through the housing; a catcher attached to the bore; and a piston releasably attached to the catcher, wherein the piston forms a seal with the catcher to selectively block fluid flow through the bore.
  • a method of running casing in a dual gradient system includes lowering a casing into a low density fluid region and allowing a low density fluid to enter the casing; supplying a high density fluid behind the low density fluid; displacing the low density fluid out of a bottom end of the casing; and lowering the casing into a high density fluid region until target depth is reached.
  • Figure 1 illustrates an exemplary dual gradient system.
  • Figure 2 illustrates an exemplary plug suitable for use with the dual gradient system of Figure 1 .
  • Figure 3 illustrates a step of running casing in the dual gradient system of Figure 1 .
  • Figure 4 illustrates another step of running casing in the dual gradient system of Figure 1 .
  • Figure 5 illustrates another exemplary dual gradient system.
  • FIG 1 illustrates an exemplary well operating under a dual gradient fluid system (also referred to herein as "DGS").
  • the DGS may be used to drill the wellbore 10.
  • a subsea riser 15 extends from a surface or semi-submerged vessel (not illustrated) through seawater 2 and connects to a wellhead 17 on the sea floor 3. In one embodiment, the riser 15 may connect to a blow out preventor (not shown) in the wellhead 17.
  • a casing 20 extends below the wellhead 17 and is supported by cement. An uncased or open-hole portion of the wellbore 10 is shown below the casing 20.
  • a low density fluid 31 is disposed in the riser 15, and a high density fluid 33 is disposed in the casing 20 and the uncased portion of the wellbore 10.
  • An interface 32 exists between the low density fluid 31 and the high density fluid 33.
  • the interface 32 may or may not be as clearly defined as depicted in the Figures, and in some embodiments, may contain a mixture of low and high density fluids 31 , 33.
  • the terms "low density fluid” and "high density fluid” simply mean that the "low density fluid” has a lower density than the "high density fluid” in the well.
  • the high density fluid may have a density that is at least 5 percent more than the low density fluid.
  • the high density fluid may be 10, or 15, or 20, or 25, or 30, or more percent higher, i.e., heavier, than the low density fluid.
  • the high and low density fluids may be a mud.
  • the high or low density muds may be a water-based mud, an oil-based mud, a synthetic oil-based mud, and combinations thereof.
  • the low density fluid may be seawater or a viscous water.
  • the density of the high density mud may be between 1 1 to 21 pounds per gallon (ppg).
  • the density of the low density mud may be between 5 to 10 ppg; more preferably, the density of the fluid in the riser 15 is approximately the same as the seawater outside of the riser 15.
  • a return line 26 is connected to the wellhead 17 or riser 15 for removing fluid in the region of the interface 32.
  • a lift pump 27 is coupled to the return line 26 to facilitate removal of the fluid proximate the interface 32.
  • the pump 27 may be operated to maintain the pressure conditions in the wellbore 10. For example, if the wellbore is in an underbalanced pressure condition, then the pump 27 may be operated to maintain that condition. Alternatively, if the wellbore is in an overbalanced pressure condition, then the pump 27 may be operated to maintain that condition. In another embodiment, the pump 27 may be configured to automatically turn on or off in response to a change in the pressure condition of the wellbore. In another embodiment, the return line 26 may be used to supply a fluid such as low or high density fluids into the wellbore.
  • the casing 40 to be run-in may include an autofill float device 45 such as a collar or a shoe coupled to a lower portion of the casing 40.
  • the float shoe 45 is adapted to allow fluid to flow into the casing 40 during run-in.
  • the float shoe 45 may be converted to a one way valve that only allows fluid to flow out of the casing 40.
  • the float shoe 45 may be converted in response to a predetermined pressure.
  • the float shoe 45 may be configured to convert at a pressure between 500 psi to 700 psi and a flow rate between 5 to 8 bpm.
  • Any suitable autofill float shoe known to one of ordinary skill in the art may be used.
  • An exemplary autofill float shoe is the Large Bore Auto-Fill sold by Weatherford International Ltd located in Houston, Texas.
  • a landing collar 48 for receiving a pump down plug 50 may be disposed above the float shoe 45.
  • the landing collar 48 may be any suitable landing collar known to a person of ordinary skill in the art.
  • the pump down plug 50 may be used to separate the two different types of fluids, such as separating low and high density fluids.
  • the pump down plug 50 may be adapted to receive another plug such as a bottom plug during a cementing operation.
  • the pump down plug includes a rupturable membrane blocking fluid flow through a bore of the plug. During operation, the pump down plug separates a fluid in front of the plug from a fluid behind the plug. After the pump down plug lands in the landing collar, pressure above the plug is increased to break the rupturable membrane, thereby allow fluid flow through the bore of the plug.
  • FIG. 2 illustrates another exemplary pump down plug 50.
  • the plug 50 includes a housing 51 having one or more fins 52 on the exterior and a bore 53 extending through an interior.
  • a catcher 56 is positioned in the bore 53 either directly or by using a connector 54.
  • the catcher 56 may be a cage like structure having a plurality of openings formed between a plurality of legs 64 for allowing fluid flow.
  • a piston 55 is selectively coupled to the catcher 56.
  • the piston 55 includes a piston head 57 disposed in an upper portion of the catcher 56.
  • a sealing member 59 such as an o-ring may be used to form a seal between the piston head 57 and the catcher 56.
  • the lower portion of the piston 55 may be selectively attached to the catcher 56 using a shearable member 58 such as a shearable pin.
  • the shearable member 58 is adapted to shear at a predetermined pressure differential.
  • the shearable member 58 is adapted to shear between a maximum pressure of 200 psi and a minimum pressure that exceeds the maximum pressure required to move the plug 50 downward.
  • the minimum pressure to shear the shearable member 58 allows for the uppermost shear range of the shearable member to exceed the maximum pressure required to move the plug 50 downward plus a safety margin.
  • the shear pressure should be at least 100 psi for a safety factor of two and less than 200 psi. In other examples, safety factor may be between 1 .2 to 4 times to the maximum pump down pressure.
  • the piston head 57 prevents fluid flow through the bore 53 of the plug 50. After the shearable member 58 is sheared, the piston head 57 is allowed to fall relative to the catcher 56, thereby opening the bore 53 for fluid communication.
  • the lower portion of the piston 55 may optionally include a shoulder 62 to prevent shearing of the pin 58 by a pressure below the plug 50.
  • the pump down plug may be adapted to receive a ball or another dropped object.
  • the ball may land in the plug and allow fluid pressure to build behind the plug. The increased pressure will urge the plug to move downward. After stopping at the desired position, pressure may be increased to remove the ball, thereby reestablishing fluid communication through the plug again.
  • a shearable sleeve may be used in place of the piston to block flow through the plug until sufficient pressure is built up behind the plug to shear the sleeve and allow flow through the plug.
  • a casing 40 is run-in to support the uncased portion of the wellbore 10.
  • the casing 40 may be hung off of the wellhead 17 or hung off from the existing casing 20 at a location below the wellhead 17.
  • the low density fluid 31 such as seawater or a low density mud at 8.6 ppg in the riser 15 is allowed to enter the casing 40 through the autofill float shoe 45.
  • the casing 40 is lowered until the bottom of the casing 40 is located in the region of the interface 32, as shown in Figure 1 .
  • the casing 40 is shown located in the high density fluid 31 below the interface 32, it is contemplated that the casing 40 may be located just above the interface 32 in the low density fluid 33.
  • the high density fluid may be a high density mud having a density between 12-15 ppg.
  • Exemplary high density fluids include any fluid or mud suitable for use in drilling operations.
  • the density selected is sufficient to maintain control of the well without fracturing the formations in the wellbore.
  • the pump down plug 50 is inserted into the casing 40 and pumped down the bore of the casing 40 to displace the light density fluid below the plug 50 out of the casing 40.
  • This embodiment is particularly useful when the length of casing 40 is longer than the water depth to the sea floor.
  • the plug 50 may be positioned in a pup joint or casing joint that is connected to the casing 40.
  • This pup joint or casing joint may have an inside diameter that is larger than the inside diameter of the casing 40 above and/or below the position of the plug 50. The larger diameter keeps the plug 50 from falling from the joint as it is lifted for insertion in the casing string.
  • a push fluid such as a high density fluid is supplied behind the plug 50 to urge the plug 50 down the casing 40.
  • Figure 1 shows the plug 50 traveling downward in the casing 40.
  • the high density fluid is the same high density mud 33 disposed in the uncased portion of the wellbore 10, although it is contemplated that they could be different fluids.
  • the push fluid may have a density between 12-21 ppg. As the plug 50 is pumped down, the low density mud in the casing 40 is forced out of the casing 40 through the float shoe 45. The displaced light density fluid may be removed from the riser 15 at or near the interface 32 by the lift pump 27, or may cause an overflow of light density fluid into a discharge line near the top of the riser 15.
  • pressure is increased behind the plug 50 in order to shear the pin 58.
  • the pressure may be increased to 150 psi to shear the pin 58, thereby opening the plug 50 for fluid flow therethrough.
  • the high density mud 33 in the casing 40 then flows out and mixes with the light density mud 31 in the riser 15. Mixing of the high and low density muds 33, 31 may cause a change in the pressure condition of wellbore.
  • the lift pump 27 may be operated to maintain the pressure condition of the wellbore 10 by removing the mixed muds from the interface 32 via the return line 26.
  • the lift pump 27 may continue to pump the muds 31 , 33 until the hydrostatic head caused by the level 63 of the high density mud 33 in the casing 40 is equal to the hydrostatic head caused by the level 61 of the low density mud 31 in the riser 15, as illustrated in Figure 3.
  • the area 67 above the high density fluid 33 in the casing 40 may contain air.
  • the casing 40 is lowered into the wellbore 10 toward the uncased portion.
  • the introduction of the casing 40 into the wellbore 10 may cause the high density mud 33 in the wellbore 10 to be displaced upward. Constant pressure at the interface 32 is maintained by removing the displaced high density mud 33 using the pump 27, thereby maintaining the dual gradient effect.
  • Some of the high density mud 33 enters the casing 40 through the autofill float shoe 45 and enters the empty area 67 in the casing 40.
  • the casing 40 may be lowered before the hydrostatic equilibrium is reached.
  • a conveyance string such as a pipe landing string 70 is connected to the casing 40, as illustrated in Figure 4.
  • a subsurface plug release system having a top plug 71 and a bottom plug 72 may be attached to the distal end of the landing string 70.
  • the casing 40 continues to be lowered until the casing 40 lands in the wellhead 17. For clarity, a casing hanger is not shown. Then the pressure inside the casing 40 is increased in order to convert the autofill float shoe 45 to a one way valve that prevents the inflow of fluid. In this manner, a casing 40 may be run in the dual gradient system with minimal pressure surge and with minimal contamination of the low and high density muds in the casing 40.
  • the casing 40 is ready for the cementing operation.
  • the top and bottom plugs 71 , 72 may be released in the appropriate order as is known to a person of ordinary skill.
  • the bottom plug 72 may be released in front of the cement to separate the cement from the high density mud.
  • the bottom plug 72 may be released using a first dart dropped from the rig.
  • the top plug 71 is released to separate the cement from a push fluid, such as the high density mud.
  • the top plug 71 may be released using a second dart dropped from the rig. After the bottom plug 72 lands on the pump down plug 50, pressure is increased to break a rupturable membrane in the bottom plug 72.
  • top and bottom cement plugs may be released from the surface, such as using a cementing head.
  • the cement is then urged out of the casing 40 to fill the annulus.
  • the cement is squeezed out until the top plug 71 lands on the bottom plug 72 or calculated displacement is reached. Thereafter, the cement is allowed to cure.
  • the plug 50 may be positioned in the casing 40 as the casing 40 is made up.
  • one or more subsurface release plugs 71 , 72 may be positioned behind the pump down plug 50.
  • the pump down plug 50 may be inserted into a pup joint 53 as described previously.
  • the casing 40 with plugs 50, 71 , 72 at the top end are lowered using a conveyance string such as a landing string 70.
  • a high density mud may be supplied behind the plugs 50, 71 , 72 as the casing string 40 is run-in to prevent the plugs 50, 71 , 72 from being forced upward as the casing 40 is run in and to reduce the amount of light density fluid that must be removed from the casing 20 when the casing 40 reaches the interface.
  • the plugs 50, 71 , 72 are already disposed in the casing 40 when the casing 40 reaches the interface 32 or the well head 17.
  • the casing 40 may be lowered into the high density fluid in accordance with the methods described above.
  • a method of running casing in a dual gradient system includes lowering a casing into a low density fluid region and allowing the low density fluid to enter the casing; releasing a plug into the casing; supplying a high density fluid behind the plug, thereby urging the low density fluid out of the casing; and lowering the casing into a high density fluid region until target depth is reached.
  • a method of running casing in a dual gradient system includes lowering a casing into a low density fluid region and allowing a low density fluid to enter the casing; supplying a high density fluid into the casing, wherein the high density fluid is behind the low density fluid; displacing the low density fluid out of a bottom end of the casing; and lowering the casing into a high density fluid region until target depth is reached.
  • the method includes operating a pump to maintain the dual gradient effect. [0030] In one or more embodiments described herein, the method includes urging the high density fluid out of the casing until a hydrostatic head of the high density fluid is substantially the same as a hydrostatic head of the low density fluid.
  • the method includes lowering the casing to a location proximate an interface between the low and high density fluid regions before releasing the plug.
  • lowering the casing into the high density fluid region is performed after the hydrostatic head equilibrium is substantially reached.
  • the method includes operating a pump to maintain the dual gradient effect while the high density fluid is being urged out of the casing.
  • the method includes operating a pump to maintain the dual gradient effect while lowering the casing into the high density fluid region.
  • a plug in one or more embodiments described herein, includes a housing; a plurality of fins disposed on an exterior of the housing; a bore extending through the housing; a catcher attached to the bore; and a piston releasably attached to the catcher, wherein the piston forms a seal with the catcher to selectively block fluid flow through the bore.
  • the catcher includes one or more windows for fluid flow.

Abstract

A method of running casing in a dual gradient system includes lowering a casing into a low density fluid region and allowing the low density fluid to enter the casing; releasing a plug into the casing; supplying a high density fluid behind the plug; and lowering the casing into a high density fluid region until target depth is reached.

Description

APPARATUS AND METHODS OF RUNNING CASING IN A DUAL GRADIENT
SYSTEM
BACKGROUND OF THE INVENTION
Field of the Invention
[0001] Embodiments of the present invention generally relate to running casing into a dual gradient well.
Description of the Related Art
[0002] Drilling operations that use two different fluid densities or mud weights (Dual Gradient Drilling Systems) have been used to construct subsea wells. See for example, U.S. Patent Numbers 6,536,540; 6,843,331 ; and 6,926,101 . Benefits of a dual gradient drilling system include reduction of the hydrostatic pressure in the well annulus above the bottom or at a previous casing point while simultaneously maintaining an equivalent hydrostatic pressure at the bottom of the hole as a single gradient fluid system. [0003] One challenge of using a dual gradient system is the process of running in casing. For example, the process of running in casing may cause a pressure surge that may induce fluid losses that would jeopardize the well. Also, the mud weight needed to control pressures in the well must be carefully monitored against the pressure that may induce formation breakdown in the annulus. Formation breakdown may also cause undesired fluid losses to the formation between a casing shoe and total depth.
[0004] There is a need, therefore, for systems and methods for running casing in a well with a dual gradient system, which minimize the pressure effects upon the formation. SUMMARY OF THE INVENTION
[0005] A method of running casing in a dual gradient system includes lowering a casing into a low density fluid region and allowing the low density fluid to enter the casing; releasing a plug into the casing; supplying a high density fluid behind the plug, thereby urging the low density fluid out of the casing; and lowering the casing into a high density fluid region until target depth is reached. In one embodiment, the method includes operating a pump to maintain the dual gradient effect. In another embodiment, the method includes pumping the high density fluid out of the casing until the hydrostatic head of the high density fluid is substantially the same as a hydrostatic head of the low density fluid. [0006] In another embodiment, a plug includes a housing; a plurality of fins disposed on an exterior of the housing; a bore extending through the housing; a catcher attached to the bore; and a piston releasably attached to the catcher, wherein the piston forms a seal with the catcher to selectively block fluid flow through the bore.
[0007] In another embodiment, a method of running casing in a dual gradient system includes lowering a casing into a low density fluid region and allowing a low density fluid to enter the casing; supplying a high density fluid behind the low density fluid; displacing the low density fluid out of a bottom end of the casing; and lowering the casing into a high density fluid region until target depth is reached.
BRIEF DESCRIPTION OF THE DRAWINGS
[0008] So that the manner in which the above recited features of the present invention can be understood in detail, a more particular description of the invention, briefly summarized above, may be had by reference to embodiments, some of which are illustrated in the appended drawings. It is to be noted, however, that the appended drawings illustrate only typical embodiments of this invention and are therefore not to be considered limiting of its scope, for the invention may admit to other equally effective embodiments.
[0009] Figure 1 illustrates an exemplary dual gradient system.
[0010] Figure 2 illustrates an exemplary plug suitable for use with the dual gradient system of Figure 1 . [0011] Figure 3 illustrates a step of running casing in the dual gradient system of Figure 1 .
[0012] Figure 4 illustrates another step of running casing in the dual gradient system of Figure 1 .
[0013] Figure 5 illustrates another exemplary dual gradient system. DETAILED DESCRIPTION
[0014] Figure 1 illustrates an exemplary well operating under a dual gradient fluid system (also referred to herein as "DGS"). The DGS may be used to drill the wellbore 10. A subsea riser 15 extends from a surface or semi-submerged vessel (not illustrated) through seawater 2 and connects to a wellhead 17 on the sea floor 3. In one embodiment, the riser 15 may connect to a blow out preventor (not shown) in the wellhead 17. A casing 20 extends below the wellhead 17 and is supported by cement. An uncased or open-hole portion of the wellbore 10 is shown below the casing 20. [0015] In one embodiment of the dual gradient system, a low density fluid 31 is disposed in the riser 15, and a high density fluid 33 is disposed in the casing 20 and the uncased portion of the wellbore 10. An interface 32 exists between the low density fluid 31 and the high density fluid 33. The interface 32 may or may not be as clearly defined as depicted in the Figures, and in some embodiments, may contain a mixture of low and high density fluids 31 , 33. As used herein, the terms "low density fluid" and "high density fluid" simply mean that the "low density fluid" has a lower density than the "high density fluid" in the well. In one embodiment, the high density fluid may have a density that is at least 5 percent more than the low density fluid. In certain embodiments, the high density fluid may be 10, or 15, or 20, or 25, or 30, or more percent higher, i.e., heavier, than the low density fluid. The high and low density fluids may be a mud. The high or low density muds may be a water-based mud, an oil-based mud, a synthetic oil-based mud, and combinations thereof. In another embodiment, the low density fluid may be seawater or a viscous water. In one example, the density of the high density mud may be between 1 1 to 21 pounds per gallon (ppg). The density of the low density mud may be between 5 to 10 ppg; more preferably, the density of the fluid in the riser 15 is approximately the same as the seawater outside of the riser 15.
[0016] A return line 26 is connected to the wellhead 17 or riser 15 for removing fluid in the region of the interface 32. A lift pump 27 is coupled to the return line 26 to facilitate removal of the fluid proximate the interface 32. In one embodiment, the pump 27 may be operated to maintain the pressure conditions in the wellbore 10. For example, if the wellbore is in an underbalanced pressure condition, then the pump 27 may be operated to maintain that condition. Alternatively, if the wellbore is in an overbalanced pressure condition, then the pump 27 may be operated to maintain that condition. In another embodiment, the pump 27 may be configured to automatically turn on or off in response to a change in the pressure condition of the wellbore. In another embodiment, the return line 26 may be used to supply a fluid such as low or high density fluids into the wellbore.
[0017] In one embodiment, the casing 40 to be run-in may include an autofill float device 45 such as a collar or a shoe coupled to a lower portion of the casing 40. The float shoe 45 is adapted to allow fluid to flow into the casing 40 during run-in. The float shoe 45 may be converted to a one way valve that only allows fluid to flow out of the casing 40. In one embodiment, the float shoe 45 may be converted in response to a predetermined pressure. For example, the float shoe 45 may be configured to convert at a pressure between 500 psi to 700 psi and a flow rate between 5 to 8 bpm. Any suitable autofill float shoe known to one of ordinary skill in the art may be used. An exemplary autofill float shoe is the Large Bore Auto-Fill sold by Weatherford International Ltd located in Houston, Texas.
[0018] In another embodiment, a landing collar 48 for receiving a pump down plug 50 may be disposed above the float shoe 45. The landing collar 48 may be any suitable landing collar known to a person of ordinary skill in the art. The pump down plug 50 may be used to separate the two different types of fluids, such as separating low and high density fluids. The pump down plug 50 may be adapted to receive another plug such as a bottom plug during a cementing operation. In one example, the pump down plug includes a rupturable membrane blocking fluid flow through a bore of the plug. During operation, the pump down plug separates a fluid in front of the plug from a fluid behind the plug. After the pump down plug lands in the landing collar, pressure above the plug is increased to break the rupturable membrane, thereby allow fluid flow through the bore of the plug.
[0019] Figure 2 illustrates another exemplary pump down plug 50. The plug 50 includes a housing 51 having one or more fins 52 on the exterior and a bore 53 extending through an interior. A catcher 56 is positioned in the bore 53 either directly or by using a connector 54. The catcher 56 may be a cage like structure having a plurality of openings formed between a plurality of legs 64 for allowing fluid flow. A piston 55 is selectively coupled to the catcher 56. In one embodiment, the piston 55 includes a piston head 57 disposed in an upper portion of the catcher 56. A sealing member 59 such as an o-ring may be used to form a seal between the piston head 57 and the catcher 56. The lower portion of the piston 55 may be selectively attached to the catcher 56 using a shearable member 58 such as a shearable pin. The shearable member 58 is adapted to shear at a predetermined pressure differential. In one embodiment, the shearable member 58 is adapted to shear between a maximum pressure of 200 psi and a minimum pressure that exceeds the maximum pressure required to move the plug 50 downward. In one embodiment, the minimum pressure to shear the shearable member 58 allows for the uppermost shear range of the shearable member to exceed the maximum pressure required to move the plug 50 downward plus a safety margin. For example, if the plug 50 is pumped down with a maximum pressure of 50 psi, then the shear pressure should be at least 100 psi for a safety factor of two and less than 200 psi. In other examples, safety factor may be between 1 .2 to 4 times to the maximum pump down pressure. In the initial position, the piston head 57 prevents fluid flow through the bore 53 of the plug 50. After the shearable member 58 is sheared, the piston head 57 is allowed to fall relative to the catcher 56, thereby opening the bore 53 for fluid communication. In another embodiment, the lower portion of the piston 55 may optionally include a shoulder 62 to prevent shearing of the pin 58 by a pressure below the plug 50. In another embodiment, the pump down plug may be adapted to receive a ball or another dropped object. The ball may land in the plug and allow fluid pressure to build behind the plug. The increased pressure will urge the plug to move downward. After stopping at the desired position, pressure may be increased to remove the ball, thereby reestablishing fluid communication through the plug again. In yet another embodiment, a shearable sleeve may be used in place of the piston to block flow through the plug until sufficient pressure is built up behind the plug to shear the sleeve and allow flow through the plug.
[0020] In operation, a casing 40 is run-in to support the uncased portion of the wellbore 10. The casing 40 may be hung off of the wellhead 17 or hung off from the existing casing 20 at a location below the wellhead 17. During run-in, the low density fluid 31 such as seawater or a low density mud at 8.6 ppg in the riser 15 is allowed to enter the casing 40 through the autofill float shoe 45. The casing 40 is lowered until the bottom of the casing 40 is located in the region of the interface 32, as shown in Figure 1 . It must be noted that although the casing 40 is shown located in the high density fluid 31 below the interface 32, it is contemplated that the casing 40 may be located just above the interface 32 in the low density fluid 33. In this example, the high density fluid may be a high density mud having a density between 12-15 ppg. Exemplary high density fluids include any fluid or mud suitable for use in drilling operations. In one embodiment, the density selected is sufficient to maintain control of the well without fracturing the formations in the wellbore.
[0021] In one embodiment, after reaching the region of the interface 32, the pump down plug 50 is inserted into the casing 40 and pumped down the bore of the casing 40 to displace the light density fluid below the plug 50 out of the casing 40. This embodiment is particularly useful when the length of casing 40 is longer than the water depth to the sea floor. Before release, the plug 50 may be positioned in a pup joint or casing joint that is connected to the casing 40. This pup joint or casing joint may have an inside diameter that is larger than the inside diameter of the casing 40 above and/or below the position of the plug 50. The larger diameter keeps the plug 50 from falling from the joint as it is lifted for insertion in the casing string. Other mechanisms of retaining the plug may be used, such as a series of grooves that engage the plug fins or alternatively a drillable retainer that is smaller than the drift I.D. of the casing. A push fluid such as a high density fluid is supplied behind the plug 50 to urge the plug 50 down the casing 40. Figure 1 shows the plug 50 traveling downward in the casing 40. In one embodiment described herein, the high density fluid is the same high density mud 33 disposed in the uncased portion of the wellbore 10, although it is contemplated that they could be different fluids. In another embodiment, the push fluid may have a density between 12-21 ppg. As the plug 50 is pumped down, the low density mud in the casing 40 is forced out of the casing 40 through the float shoe 45. The displaced light density fluid may be removed from the riser 15 at or near the interface 32 by the lift pump 27, or may cause an overflow of light density fluid into a discharge line near the top of the riser 15.
[0022] After the plug 50 lands in the landing collar 48, pressure is increased behind the plug 50 in order to shear the pin 58. For example, the pressure may be increased to 150 psi to shear the pin 58, thereby opening the plug 50 for fluid flow therethrough. The high density mud 33 in the casing 40 then flows out and mixes with the light density mud 31 in the riser 15. Mixing of the high and low density muds 33, 31 may cause a change in the pressure condition of wellbore. In response, the lift pump 27 may be operated to maintain the pressure condition of the wellbore 10 by removing the mixed muds from the interface 32 via the return line 26.
[0023] In one embodiment, the lift pump 27 may continue to pump the muds 31 , 33 until the hydrostatic head caused by the level 63 of the high density mud 33 in the casing 40 is equal to the hydrostatic head caused by the level 61 of the low density mud 31 in the riser 15, as illustrated in Figure 3. The area 67 above the high density fluid 33 in the casing 40 may contain air. Thereafter, the casing 40 is lowered into the wellbore 10 toward the uncased portion. The introduction of the casing 40 into the wellbore 10 may cause the high density mud 33 in the wellbore 10 to be displaced upward. Constant pressure at the interface 32 is maintained by removing the displaced high density mud 33 using the pump 27, thereby maintaining the dual gradient effect. Some of the high density mud 33 enters the casing 40 through the autofill float shoe 45 and enters the empty area 67 in the casing 40. In another embodiment, the casing 40 may be lowered before the hydrostatic equilibrium is reached.
[0024] After the proper length of casing 40 has been run, a conveyance string such as a pipe landing string 70 is connected to the casing 40, as illustrated in Figure 4. A subsurface plug release system having a top plug 71 and a bottom plug 72 may be attached to the distal end of the landing string 70. The casing 40 continues to be lowered until the casing 40 lands in the wellhead 17. For clarity, a casing hanger is not shown. Then the pressure inside the casing 40 is increased in order to convert the autofill float shoe 45 to a one way valve that prevents the inflow of fluid. In this manner, a casing 40 may be run in the dual gradient system with minimal pressure surge and with minimal contamination of the low and high density muds in the casing 40.
[0025] After conversion, the casing 40 is ready for the cementing operation. The top and bottom plugs 71 , 72 may be released in the appropriate order as is known to a person of ordinary skill. For example, the bottom plug 72 may be released in front of the cement to separate the cement from the high density mud. The bottom plug 72 may be released using a first dart dropped from the rig. Then the top plug 71 is released to separate the cement from a push fluid, such as the high density mud. The top plug 71 may be released using a second dart dropped from the rig. After the bottom plug 72 lands on the pump down plug 50, pressure is increased to break a rupturable membrane in the bottom plug 72. In another embodiment, top and bottom cement plugs may be released from the surface, such as using a cementing head. The cement is then urged out of the casing 40 to fill the annulus. The cement is squeezed out until the top plug 71 lands on the bottom plug 72 or calculated displacement is reached. Thereafter, the cement is allowed to cure.
[0026] In another embodiment, where the length of casing 40 is shorter than the water depth, the plug 50 may be positioned in the casing 40 as the casing 40 is made up. In one example, as shown in Figure 5, one or more subsurface release plugs 71 , 72 may be positioned behind the pump down plug 50. The pump down plug 50 may be inserted into a pup joint 53 as described previously. The casing 40 with plugs 50, 71 , 72 at the top end are lowered using a conveyance string such as a landing string 70. In this embodiment, a high density mud may be supplied behind the plugs 50, 71 , 72 as the casing string 40 is run-in to prevent the plugs 50, 71 , 72 from being forced upward as the casing 40 is run in and to reduce the amount of light density fluid that must be removed from the casing 20 when the casing 40 reaches the interface. Thus, in this embodiment, the plugs 50, 71 , 72 are already disposed in the casing 40 when the casing 40 reaches the interface 32 or the well head 17. The casing 40 may be lowered into the high density fluid in accordance with the methods described above. [0027] In one embodiment, a method of running casing in a dual gradient system includes lowering a casing into a low density fluid region and allowing the low density fluid to enter the casing; releasing a plug into the casing; supplying a high density fluid behind the plug, thereby urging the low density fluid out of the casing; and lowering the casing into a high density fluid region until target depth is reached. [0028] In another embodiment, a method of running casing in a dual gradient system includes lowering a casing into a low density fluid region and allowing a low density fluid to enter the casing; supplying a high density fluid into the casing, wherein the high density fluid is behind the low density fluid; displacing the low density fluid out of a bottom end of the casing; and lowering the casing into a high density fluid region until target depth is reached.
[0029] In one or more embodiments described herein, the method includes operating a pump to maintain the dual gradient effect. [0030] In one or more embodiments described herein, the method includes urging the high density fluid out of the casing until a hydrostatic head of the high density fluid is substantially the same as a hydrostatic head of the low density fluid.
[0031] In one or more embodiments described herein, the method includes lowering the casing to a location proximate an interface between the low and high density fluid regions before releasing the plug.
[0032] In one or more embodiments described herein, lowering the casing into the high density fluid region is performed after the hydrostatic head equilibrium is substantially reached. [0033] In one or more embodiments described herein, the method includes operating a pump to maintain the dual gradient effect while the high density fluid is being urged out of the casing.
[0034] In one or more embodiments described herein, the method includes operating a pump to maintain the dual gradient effect while lowering the casing into the high density fluid region.
[0035] In one or more embodiments described herein, a plug includes a housing; a plurality of fins disposed on an exterior of the housing; a bore extending through the housing; a catcher attached to the bore; and a piston releasably attached to the catcher, wherein the piston forms a seal with the catcher to selectively block fluid flow through the bore.
[0036] In one or more embodiments described herein, the catcher includes one or more windows for fluid flow.
[0037] While the foregoing is directed to embodiments of the present invention, other and further embodiments of the invention may be devised without departing from the basic scope thereof, and the scope thereof is determined by the claims that follow.

Claims

Claims:
1 . A method of running casing in a dual gradient system, comprising:
lowering a casing into a low density fluid region and allowing the low density fluid to enter the casing;
releasing a plug into the casing;
supplying a high density fluid behind the plug; and
lowering the casing into a high density fluid region until target depth is reached. 2. The method of claim 1 , further comprising operating a pump to maintain the dual gradient effect.
3. The method of claim 1 , further comprising lowering the casing to a location proximate an interface between the low and high density fluid regions before releasing the plug.
4. The method of claim 3, further comprising pumping the high density fluid out of the casing until a hydrostatic head of the high density fluid is substantially the same as a hydrostatic head of the low density fluid.
5. The method of claim 4, wherein lowering the casing into the high density fluid region is performed after the hydrostatic head equilibrium is substantially reached.
6. The method of claim 1 , further comprising urging the high density fluid out of the casing until a hydrostatic head of the high density fluid is substantially the same as a hydrostatic head of the low density fluid.
7. The method of claim 1 , further comprising operating a pump to maintain the dual gradient effect while lowering the casing into the high density fluid region.
8. The method of claim 1 , further comprising urging the low density fluid out of the casing.
9. The method of claim 1 , further comprising: retaining the plug in the casing using at least one of one or more grooves in the pup joint, a removable retainer, a drillable retainer, and combinations thereof; and releasing the plug using an applied pressure or force. 10. The method of claim 1 , wherein the plug comprises:
a housing;
a plurality of fins disposed on an exterior of the housing;
a bore extending through the housing;
a catcher attached to the bore; and
a piston releasably attached to the catcher, wherein the piston forms a seal with the catcher to selectively block fluid flow through the bore.
The method of claim 1 , further comprising:
attaching a conveyance string to the casing; and
lowering the conveyance string before releasing the plug
12. The method of claim 1 1 , further comprising positioning one or more subsurface release plugs above the plug. 13. The method of claim 1 , further comprising positioning the plug in a pup joint connected to the casing.
14. The method of claim 13, further comprising:
retaining the plug in the pup joint using at least one of one or more grooves in the pup joint, a removable retainer, a drillable retainer, and combinations thereof; and releasing the plug using an applied pressure or force.
15. The method of claim 1 , wherein the plug comprises:
a housing;
a plurality of fins disposed on an exterior of the housing;
a bore extending through the housing; and
a rupture disc for blocking fluid flow through the bore.
16. A plug, comprising:
a housing;
a plurality of fins disposed on an exterior of the housing;
a bore extending through the housing;
a catcher attached to the bore; and
a piston releasably attached to the catcher, wherein the piston forms a seal with the catcher to selectively block fluid flow through the bore.
17. The plug of claim 16, wherein the catcher includes one or more windows for fluid flow.
18. A method of running casing in a dual gradient system, comprising:
lowering a casing into a low density fluid region and allowing a low density fluid to enter the casing;
supplying a high density fluid into the casing, wherein the high density fluid is behind the low density fluid;
displacing the low density fluid out of a bottom portion of the casing; and lowering the casing into a high density fluid region until target depth is reached. 19. The method of claim 18, further comprising lowering the casing to a location proximate an interface between the low and high density fluid regions before displacing the low density fluid out of the casing.
20. The method of claim 19, further comprising pumping the high density fluid out of the casing until a hydrostatic head of the high density fluid is substantially the same as a hydrostatic head of the low density fluid.
21 . The method of claim 20, wherein lowering the casing into the high density fluid region is performed after the hydrostatic head equilibrium is substantially reached.
22. The method of claim 18, further comprising urging the high density fluid out of the casing until a hydrostatic head of the high density fluid is substantially the same as a hydrostatic head of the low density fluid.
23. The method of claim 18, further comprising operating a pump to maintain the dual gradient effect while lowering the casing into the high density fluid region.
PCT/US2014/016129 2013-02-12 2014-02-12 Apparatus and methods of running casing in a dual gradient system WO2014127059A2 (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
AU2014216312A AU2014216312B2 (en) 2013-02-12 2014-02-12 Apparatus and methods of running casing in a dual gradient system
EP14707059.3A EP2956615A2 (en) 2013-02-12 2014-02-12 Apparatus and methods of running casing in a dual gradient system
BR112015019325A BR112015019325A2 (en) 2013-02-12 2014-02-12 METHOD FOR INSTALLING A CASING PIPE IN A DOUBLE GRADIENT AND PLUG SYSTEM
CA2900502A CA2900502A1 (en) 2013-02-12 2014-02-12 Apparatus and methods of running casing in a dual gradient system

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US201361763827P 2013-02-12 2013-02-12
US61/763,827 2013-02-12

Publications (2)

Publication Number Publication Date
WO2014127059A2 true WO2014127059A2 (en) 2014-08-21
WO2014127059A3 WO2014127059A3 (en) 2015-04-16

Family

ID=50185069

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/US2014/016129 WO2014127059A2 (en) 2013-02-12 2014-02-12 Apparatus and methods of running casing in a dual gradient system

Country Status (6)

Country Link
US (1) US9657548B2 (en)
EP (1) EP2956615A2 (en)
AU (1) AU2014216312B2 (en)
BR (1) BR112015019325A2 (en)
CA (1) CA2900502A1 (en)
WO (1) WO2014127059A2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10990717B2 (en) 2015-09-02 2021-04-27 Halliburton Energy Services, Inc. Software simulation method for estimating fluid positions and pressures in the wellbore for a dual gradient cementing system

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2906771A2 (en) * 2012-10-15 2015-08-19 National Oilwell Varco, L.P. Dual gradient drilling system

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6536540B2 (en) 2001-02-15 2003-03-25 De Boer Luc Method and apparatus for varying the density of drilling fluids in deep water oil drilling applications
US6843331B2 (en) 2001-02-15 2005-01-18 De Boer Luc Method and apparatus for varying the density of drilling fluids in deep water oil drilling applications
US6926101B2 (en) 2001-02-15 2005-08-09 Deboer Luc System and method for treating drilling mud in oil and gas well drilling applications

Family Cites Families (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4310058A (en) * 1980-04-28 1982-01-12 Otis Engineering Corporation Well drilling method
US4577689A (en) * 1984-08-24 1986-03-25 Completion Tool Company Method for determining true fracture pressure
US5553667A (en) 1995-04-26 1996-09-10 Weatherford U.S., Inc. Cementing system
GB9525044D0 (en) 1995-12-07 1996-02-07 Nodeco Ltd Plugs for downhole tools
NO303742B1 (en) 1996-12-06 1998-08-24 Nodeco As Device for insertion of one or more scratch plugs in an extension year
GB9721537D0 (en) 1997-10-11 1997-12-10 Weatherford Lamb An apparatus and a method for launching plugs
GB9723581D0 (en) 1997-11-07 1998-01-07 Weatherford Lamb Plug for use in wellbore operations and apparatus for launching said plug
US6318472B1 (en) * 1999-05-28 2001-11-20 Halliburton Energy Services, Inc. Hydraulic set liner hanger setting mechanism and method
AU6429699A (en) * 1999-08-03 2001-02-19 Frank's International, Inc. Anti-rotation device for use with well tools
US6283213B1 (en) * 1999-08-12 2001-09-04 Atlantic Richfield Company Tandem spacer fluid system and method for positioning a cement slurry in a wellbore annulus
US6328107B1 (en) * 1999-09-17 2001-12-11 Exxonmobil Upstream Research Company Method for installing a well casing into a subsea well being drilled with a dual density drilling system
US6554068B1 (en) * 2002-01-29 2003-04-29 Halliburton Energy Service,S Inc. Method of downhole fluid separation and displacement and a plug utilized therein
US6799638B2 (en) 2002-03-01 2004-10-05 Halliburton Energy Services, Inc. Method, apparatus and system for selective release of cementing plugs
US6802372B2 (en) 2002-07-30 2004-10-12 Weatherford/Lamb, Inc. Apparatus for releasing a ball into a wellbore
US7182135B2 (en) 2003-11-14 2007-02-27 Halliburton Energy Services, Inc. Plug systems and methods for using plugs in subterranean formations
US7789162B2 (en) * 2005-03-22 2010-09-07 Exxonmobil Upstream Research Company Method for running tubulars in wellbores
US8496055B2 (en) * 2008-12-30 2013-07-30 Schlumberger Technology Corporation Efficient single trip gravel pack service tool
US8201634B2 (en) * 2009-05-20 2012-06-19 Baker Hughes Incorporated Subsea cementing plug system with plug launching tool
WO2011019469A2 (en) * 2009-08-12 2011-02-17 Bp Corporation North America Inc. Systems and methods for running casing into wells drilled with dual-gradient mud systems
EP2475840B1 (en) * 2009-09-10 2014-11-12 BP Corporation North America Inc. Systems and methods for circulating out a well bore influx in a dual gradient environment
US8327937B2 (en) 2009-12-17 2012-12-11 Schlumberger Technology Corporation Equipment for remote launching of cementing plugs
US8789582B2 (en) 2010-08-04 2014-07-29 Schlumberger Technology Corporation Apparatus and methods for well cementing
US8967255B2 (en) 2011-11-04 2015-03-03 Halliburton Energy Services, Inc. Subsurface release cementing plug
US20130292135A1 (en) 2012-05-01 2013-11-07 Blackhawk Specialty Tools, Llc Method and Apparatus for Launching Objects in Dual Gradient Systems

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6536540B2 (en) 2001-02-15 2003-03-25 De Boer Luc Method and apparatus for varying the density of drilling fluids in deep water oil drilling applications
US6843331B2 (en) 2001-02-15 2005-01-18 De Boer Luc Method and apparatus for varying the density of drilling fluids in deep water oil drilling applications
US6926101B2 (en) 2001-02-15 2005-08-09 Deboer Luc System and method for treating drilling mud in oil and gas well drilling applications

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10990717B2 (en) 2015-09-02 2021-04-27 Halliburton Energy Services, Inc. Software simulation method for estimating fluid positions and pressures in the wellbore for a dual gradient cementing system

Also Published As

Publication number Publication date
AU2014216312B2 (en) 2016-09-29
CA2900502A1 (en) 2014-08-21
US9657548B2 (en) 2017-05-23
AU2014216312A8 (en) 2015-08-27
BR112015019325A2 (en) 2017-08-22
AU2014216312A1 (en) 2015-08-20
EP2956615A2 (en) 2015-12-23
US20140224487A1 (en) 2014-08-14
WO2014127059A3 (en) 2015-04-16

Similar Documents

Publication Publication Date Title
US6802372B2 (en) Apparatus for releasing a ball into a wellbore
US5181571A (en) Well casing flotation device and method
US7926590B2 (en) Method of liner drilling and cementing utilizing a concentric inner string
US5117915A (en) Well casing flotation device and method
CA2403174C (en) Multi-purpose float equipment and method
US8789582B2 (en) Apparatus and methods for well cementing
EP1055798B1 (en) Apparatus and method for setting a liner by hydraulic pressure
US6802374B2 (en) Reverse cementing float shoe
AU2009232499B2 (en) Systems and methods for subsea drilling
US6491103B2 (en) System for running tubular members
US20100294503A1 (en) Subsea Cementing Plug System With Plug Launching Tool
US9279295B2 (en) Liner flotation system
DK2935771T3 (en) METHOD AND DEVICE FOR TREATING AN UNDERGROUND AREA
US20040007354A1 (en) System for running tubular members
US9657548B2 (en) Apparatus and methods of running casing in a dual gradient system
US20030230405A1 (en) System for running tubular members
JPH05500695A (en) Well casing flotation device and method
US8770275B2 (en) Fill up and circulating tool with well control feature
US3077227A (en) Method and apparatus for cementing well casing
RU2626108C2 (en) Method of well casing by tail pipe with bottomhole screen
US10329873B2 (en) Methods for cementing a subterranean wellbore

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 14707059

Country of ref document: EP

Kind code of ref document: A2

WWE Wipo information: entry into national phase

Ref document number: 2014707059

Country of ref document: EP

ENP Entry into the national phase

Ref document number: 2900502

Country of ref document: CA

ENP Entry into the national phase

Ref document number: 2014216312

Country of ref document: AU

Date of ref document: 20140212

Kind code of ref document: A

REG Reference to national code

Ref country code: BR

Ref legal event code: B01A

Ref document number: 112015019325

Country of ref document: BR

ENP Entry into the national phase

Ref document number: 112015019325

Country of ref document: BR

Kind code of ref document: A2

Effective date: 20150812