The wind power installation ship MPI Resolution will be moored at Maasvlakte on September 18, 2020.

The wind power installation ship MPI Resolution will be moored at Maasvlakte on September 18, 2020. Stock Photo
Preview

Image details

Contributor:

Martin Lüke / Alamy Stock Photo

Image ID:

2E1NB70

File size:

64.1 MB (1.6 MB Compressed download)

Releases:

Model - no | Property - noDo I need a release?

Dimensions:

5798 x 3866 px | 49.1 x 32.7 cm | 19.3 x 12.9 inches | 300dpi

Date taken:

18 September 2020

Location:

Rotterdam